1 CITY OF NEW ORLEANS Repaving the Gateway to the French Quarter: Implementing the Downtown Infrastructure Improvement Project

2 Agenda Background Project Scope 2

3 Superdome Central Business District French Quarter Convention Center Cruise Ship Terminal 3

4 Project concept initiated by New Orleans bid to host Super Bowl DPW thoroughly assessed conditions of Central Business District/French Quarter streets Partnership with the Convention Center identified scope of work Background Until recently, many New Orleans French Quarter streets were in poor condition. 4

5 Background Hospitality Zone legislation failed Cooperative Endeavor Agreement between the City and Convention Center authorizes $6.5 million to implement the Downtown Infrastructure Improvement Project Project budget presented to City Council Budget Committee - May Full City Council vote and approval - June 20, 2013 Hospitality Zone legislation called for establishment of a 10-yr tax that would fund repairs to 100-miles of roadway within the zone 5

6 Downtown Infrastructure Improvements Project and Scope of Work Intersection of Julia St. / Convention Center Blvd. Intersection enhancement; decorative plaza Julia St. Iberville St. Regional Planning Commission/City Match $2.5 million investment Convention Center to Loyola - White topping North Rampart to North Peters- White topping and drainage point repairs S. Peters (Calliope to Canal) Baronne (Canal to Calliope) Project Cost Estimate $3,851,000 French Quarter Lighting Dauphine/Canal/Decatur/Dumaine $1,000,000 Drainage Limited point repairs to improve drainage French Quarter and Central Business District $500,000 Signage / Striping Street signs and striping cross walks $100,000 Sanitation Improvements to sanitation services to be used over a 2-year period including new bins and enhanced operations $1,000,000 TOTAL INVESTMENT $6,451,000

7 Existing potholes and sink holes allow standing water on the roadway. Poor gutter lines prevent water from reaching the drainage system. Composite Pavement. Last Paved: Iberville St. Resurfacing N. Rampart St. to N. Peters St. Pre-Existing Conditions 7

8 Julia St. Convention Center Blvd. to Loyola Ave. Pre-Existing Conditions A combination of repeated patching and curb settlement left portions of Julia St. unappealing and without a clear curb/roadway boundary. Composite Pavement. Last paved:

9 Pavement Condition Pavement Deterioration Curve Excellent Good Every $1 in Maint cost here Fair Poor will cost $4 to $5 if delayed to here. Very Poor 9 Failure Time (Years) A normal pavement maintenance program will continuously restore the pavement condition to excellent.

10 Project Team CONTRACTOR: Hard Rock Construction CONCRETE: Lafarge N.A. TESTING: Beta Testing & Inspection Inc. DESIGN: New Orleans Dept of Public Works INSPECTION: New Orleans Dept of Public Works 10

11 Communications Strategic Communication Frequent, transparent communication with stakeholders Stakeholder Concerns Resident and employee access to on-street and parking structures Possible lost revenue Access to loading docks/dumpsters Limited parking/temporary conversion of roadways Continual access to sidewalks during construction Specific construction timelines and duration DPW hosted three formal community meetings and several informal smallgroup sessions with affected stakeholders to discuss DIIP. 11

12 Neighborhood Engagement Phoned and ed Iberville and Julia St. businesses and HOAs in May/June 2013 Iberville St. pre-construction community meeting - mid-july Julia St. pre-construction community meetings - mid-july Regular weekly updates Communications Regular updates to project fact sheet 12

13 Project Scope Replaced asphalt composite roadways with ultra thin concrete (white topping) Used high-early strength concrete (4, 12 and 24 hour mixes) at driveways to address stakeholder concerns Factors considered when replacing roadway: Cost Increased durability Increased design life Increased reflectively to improve street light illumination Concrete cure time is 72-hours vs. asphalt immediate cure, however tradeoff is increased life expectancy. Concrete is anticipated to last 30+ years. 13

14 Project Scope White Topping Polypropeline fiber reinforcement Maturity meters used in lieu of concrete cylinders. Meters checked at 4, 12, 24 and 72- hours to measure PSI No forms, joints, or steel needed Three times the normal dosage of polypropeline fibers were used to reinforce the DIIP concrete mix. 14 Maturity meters measure time and temperature of placed concrete on site vs. concrete cylinders which must be tested at lab.

15 Concrete Mix Design inch, high early strength concrete mix 72-hour mix at 3,000 PSI 28-days mix at 4,000 PSI Expected life is 30+ years Project Scope On average, PSI was reached at 48-hours allowing the busy Iberville and Julia Street roadways to be opened a day earlier than standard concrete roadways. 15

16 16 Project Scope

17 Project Scope Scoring 3 ft x 3 ft pattern will reduce cracking Simplifies future repairs Added flexibility increases longevity Aesthetically pleasing Scoring adds dimension and character to the project, infusing with the surrounding community. 17

18 18 Project Results

19 19 Iberville 2014

20 20 Iberville 2011

21 21 The End?

Transportation Report to SPC on Transportation and Transit 2017 April 19. ISC: UNRESTRICTED TT Page 1 of 7

Transportation Report to SPC on Transportation and Transit 2017 April 19. ISC: UNRESTRICTED TT Page 1 of 7 Page 1 of 7 EXECUTIVE SUMMARY The City of Calgary owns and maintains over 12,200 km of sidewalks, curbs and gutters with a current replacement value of $5.1 billion. The quality of new concrete and condition

More information

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017 2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017 2017 CBD Improvements Agenda Meeting Agenda Introduction Scope of Improvements Time frames for improvements May vary

More information

BERKELEY STREETS: A PAVEMENT MANAGEMENT PROGRAM

BERKELEY STREETS: A PAVEMENT MANAGEMENT PROGRAM Public Works Department BERKELEY STREETS: A PAVEMENT MANAGEMENT PROGRAM City Council Work Session November 15, 2011 Berkeley Streets: An Introduction Our streets today PRESENTATION OUTLINE 1. Berkeley

More information

BATAVIA S STATE OF STREETS STREET MAINTENANCE PROGRAM REPORT

BATAVIA S STATE OF STREETS STREET MAINTENANCE PROGRAM REPORT BATAVIA S STATE OF STREETS STREET MAINTENANCE PROGRAM REPORT September 2015 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Street Area (SY) Street

More information

CITY HALL: March 15, AN ORDINANCE to amend and reordain Section of the Code of the City of

CITY HALL: March 15, AN ORDINANCE to amend and reordain Section of the Code of the City of ORDINANCE CITY OF NEW ORLEANS CITY HALL: March 15, 2012 CALENDER NO. 28,965 NO. MAYOR COUNCIL SERIES BY: COUNCILMEMBER HEAD AN ORDINANCE to amend and reordain Section 146-193 of the Code of the City of

More information

2018 Utility & Street Reconstruction

2018 Utility & Street Reconstruction 2018 Utility & Street Reconstruction Public Hearing On Proposed Special Assessments/Hookup Fees for Installation and Construction of Public Improvements Introduction of the Village technical staff Laura

More information

Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax

Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax Engineering Sales Tax Projects Bridges $ 43.4 m (27) Roads (Resurfacing) $ 77.6 m (121) Roads (Restriping) $

More information

Pavement Rehabilitation Options in Indiana. Dave Holtz Tommy E. Nantung Lisa Egler-Kellems Indiana Department of Transportation

Pavement Rehabilitation Options in Indiana. Dave Holtz Tommy E. Nantung Lisa Egler-Kellems Indiana Department of Transportation Pavement Rehabilitation Options in Indiana Dave Holtz Tommy E. Nantung Lisa Egler-Kellems Indiana Department of Transportation Decision to select treatment options Rehabilitation Treatment Overview Objectives

More information

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ)

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ) FREQUENTLY ASKED S (FAQ) The purpose of this document is to provide detailed information about the Harvard Road Reconstruction & Water Main Replacement Project. This project will directly affect residents

More information

Implementing a Pavement Management System PASER Based City of Omaha, NE

Implementing a Pavement Management System PASER Based City of Omaha, NE Implementing a Pavement Management System PASER Based City of Omaha, NE Introductions JESS HASTINGS, PE Project Manager 10 Years of Experience TIM O BRYAN, PE Senior Project Manager 30 Years of Experience

More information

T HE V ILLAGE OF N EWBURGH H EIGHTS R OADWAY P AVEMENT M AINTENANCE R EPORT

T HE V ILLAGE OF N EWBURGH H EIGHTS R OADWAY P AVEMENT M AINTENANCE R EPORT T ABLE OF C ONTENTS 1. Executive Summary... 2 2. Background... 3 3. PART I: 2016 Pavement Condition... 8 4. PART II: 2018 Current Backlog... 12 5. PART III: Maintenance & Rehabilitation (M&R) Program...

More information

Public Works Department Five Year Capital Improvement Plan FY PROPOSED

Public Works Department Five Year Capital Improvement Plan FY PROPOSED Public Works Department Five Year Capital Improvement Plan FY 2019-2023 PROPOSED Capital Improvement Plan Summary STREET DIVISION PROJECTS 141 Asphalt Sidewalk Replacement Program Funding Source Adopted

More information

CHAPTER 11 - RESTORATION OF SURFACE IMPROVEMENTS

CHAPTER 11 - RESTORATION OF SURFACE IMPROVEMENTS CHAPTER 11 - RESTORATION OF SURFACE IMPROVEMENTS 11.1 GENERAL The Developer/Contractor shall be responsible for the protection and the restoration or replacement of any improvements existing on public

More information

2018 Street Reconstruction Project Woodside/Huron Neighborhood Street Improvements. December 11, 2017 Public Improvement Hearing

2018 Street Reconstruction Project Woodside/Huron Neighborhood Street Improvements. December 11, 2017 Public Improvement Hearing 2018 Street Reconstruction Project Woodside/Huron Neighborhood Street Improvements December 11, 2017 Public Improvement Hearing Project Objectives Reconstruct Deteriorated Streets Upgrade City Underground

More information

ISSUED: 1/16/15 REVISION: 1.0 REVISION: STANDARD DETAIL COMBINATION 6'' CURB & GUTTER CITY OF FALLS CHURCH VA PUBLIC WORKS

ISSUED: 1/16/15 REVISION: 1.0 REVISION: STANDARD DETAIL COMBINATION 6'' CURB & GUTTER CITY OF FALLS CHURCH VA PUBLIC WORKS ISSUED: 1/16/15 1.0 COMBINATION 6'' CURB & GUTTER ISSUED: 1/16/15 1.0 SIDEWALK DETAIL ISSUED: 7/7/15 1.0 VALLEY GUTTER ISSUED: 2/11/16 1.0 BRICK PAVER SIDEWALK DETAIL 1''=1' WIDTH VARIES SEE SHEET 2 MIN.

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

Effective Pavement Management: Understanding the Health and Needs of your Roads

Effective Pavement Management: Understanding the Health and Needs of your Roads Effective Pavement Management: Understanding the Health and Needs of your Roads October, 2017 Agenda What s in your Road Portfolio? Investing Wisely in your Roads Create $avings from your Road Data What

More information

Existing Conditions Summary and Capital Improvement Plan

Existing Conditions Summary and Capital Improvement Plan Town of Ledyard, CT Pavement Management Program Existing Conditions Summary and Capital Improvement Plan February 2011 Why Pavement Management? Maximize Available Funding Reduce long-term maintenance costs

More information

CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES

CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES SUMMARY AND INTENT OF PROJECT The City of Des Plaines Curb and Sidewalk Program is intended to repair hazardous sidewalk and

More information

STRUCTURAL EVALUATION & TREATMENT SELECTION FOR LOCAL ROADS. Nick Jones Local Technical Assistance Program Utah State University

STRUCTURAL EVALUATION & TREATMENT SELECTION FOR LOCAL ROADS. Nick Jones Local Technical Assistance Program Utah State University STRUCTURAL EVALUATION & TREATMENT SELECTION FOR LOCAL ROADS Nick Jones Local Technical Assistance Program Utah State University SO YOU THINK YOU HAVE A DIFFICULT INTERSECTION? The condition of your

More information

Maps are enclosed of the larger areas to be included in the projects. The area in yellow are the proposed areas.

Maps are enclosed of the larger areas to be included in the projects. The area in yellow are the proposed areas. January 20, 2015 Contractor: The Park Hill School District is soliciting bids for asphalt and concrete repairs and additions for parking lots, curbs and sidewalks at various schools. A Mandatory Pre-Bid

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

C I T Y O F A V O N L A K E

C I T Y O F A V O N L A K E C I T Y O F A V O N L A K E T ABLE OF C ONTENTS 1. Executive Summary... 2 2. Background... 3 3. PART I: 2016 Pavement Condition... 8 4. PART II: 2018 Current Backlog... 12 5. PART III: Maintenance &

More information

Sidewalk Assessment Restoration Process

Sidewalk Assessment Restoration Process Sidewalk Assessment Restoration Process 1. Purpose 2. Scope 1.1. To assess potentially hazardous conditions for exterior sidewalk and/or pavement surfaces which require replacement and/or repair. 2.1.

More information

ENGINEERING MEMORANDUM

ENGINEERING MEMORANDUM ENGINEERING MEMORANDUM April 10, 2017 TO: FROM: City Council Mike Payne, City Engineer SUBJECT: Consideration and action to award contract for Bid Schedule C - 2017: C2017-12 Landfill Paving Improvements

More information

CITY OF LAWRENCE RESIDENTIAL DRIVEWAY PERMIT CHAPTER 16, ARTICLE 3, ADOPTED BY THE CITY COMMISSION ON JULY 10, 1996.

CITY OF LAWRENCE RESIDENTIAL DRIVEWAY PERMIT CHAPTER 16, ARTICLE 3, ADOPTED BY THE CITY COMMISSION ON JULY 10, 1996. CITY OF LAWRENCE RESIDENTIAL DRIVEWAY PERMIT CHAPTER 16, ARTICLE 3, ADOPTED BY THE CITY COMMISSION ON JULY 10, 1996. DATE ADDRESS OF INSTALLATION OWNER ADDRESS CITY STATE ZIP CODE NATURE OF WORK: (check

More information

Project Need and Evaluation

Project Need and Evaluation City of Brooklyn Center 2011 Palmer Lake East Street and Utility Reconstruction Project Public Hearings February 14, 2011 Public Improvement Hearing: Special Assessments Local public improvements to the

More information

Implementing an Asset and Pavement Management System in Alexandria, VA. Craig Schorling, GISP Business Development Manager, Transmap Corporation

Implementing an Asset and Pavement Management System in Alexandria, VA. Craig Schorling, GISP Business Development Manager, Transmap Corporation Implementing an Asset and Pavement Management System in Alexandria, VA Craig Schorling, GISP Business Development Manager, Transmap Corporation Alexandria Statistics Located on the Western bank of the

More information

Department of Street Services

Department of Street Services Department of Street Services FY 07-08 Proposed Budget Briefing to the City Council September 5, 2007 Purpose An overview of the Department of Street Services Scope of operation and maintenance activities

More information

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES CITY OF SANTA MONICA Department of Public Works Civil Engineering Division 1685 Main, Room 116 Santa Monica, CA 90401 Tel: (310) 458-2240 or (310) 458-8737 EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL

More information

study for 2018 include:

study for 2018 include: MEMORANDUM TO: Mayor and City Council gk FROM: Shawn Sanders irector of Public Works DATE: March 15, 2018 RE: Feasibility Study for the 2018 Street Improvement Project Project No. 2018-02 INTRODUCTION

More information

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07 TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07 SUBJECT: APPROVAL OF A CONTRACT WITH BOND BLACKTOP, INC., IN THE AMOUNT OF $556,812 FOR PHASE 1 AND

More information

Magna Township Community Preservation Town Hall

Magna Township Community Preservation Town Hall Magna Township Community Preservation Town Hall Your Ballot Questions COUNTY PROPOSITION #6 Question 1: Shall Magna Planning Township be incorporated as a metro township Magna Metro Township or as the

More information

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees CR 9 (Bradt Hollow Road) Over Fox Creek Bridge Replacement Project Replacement of a 156 ft. long x 32ft. wide, 3 span pre stressed concrete box beam bridge over Fox Creek in the Town of Berne. The bridge

More information

Sandstone Curb Replacement Standards

Sandstone Curb Replacement Standards Sandstone Curb Replacement Standards Division of Infrastructure Management SCOPE OF CURB REPLACEMENT (Funding Dependent) Sandstone Curb Section I - Purpose: Sandstone curb may be replaced only if existing

More information

CHAPTER B TABLE OF CONTENTS

CHAPTER B TABLE OF CONTENTS July 2006 Page B-1 CHAPTER B TABLE OF CONTENTS B.00 Introduction B.01 Definitions B.02 Maintenance Levels B.03 Definition of Traveled Way B.04 Policy for Performing Roadbed Maintenance Work B.05 Surface

More information

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL This section covers the restoration of roadways and sidewalks, in whole or in part, with bituminous concrete paving. WITHIN 4 DAYS OF BACKFILLING IN AREAS

More information

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1 PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road STAFFING MATRIX Construction Engineering and Inspection-Wiles Road JAMES JEFFERS, P.E. Senior Project Engineer Years of Experience:

More information

Private Roads Maintenance Workshop

Private Roads Maintenance Workshop Private Roads Maintenance Workshop Been There/Done That Joe Hausknecht streets@fenwickgardenvillage.net Pavement Surface Evaluation and Rating (PASER) System The PASER system is a management tool used

More information

Public Works Department

Public Works Department Your Logo Here Public Works Department FY FY 2010 2010 Budget Budget Workshop Presentation Overview Public Works Department responds to the concerns of New Smyrna Beach residents by providing the following:

More information

ISO-9001:Quality Management System Progress Report

ISO-9001:Quality Management System Progress Report ISO-9001:Quality Management System Progress Report Department of Street Services May 2, 2007 Purpose Provide an overview of the Department of Street Services Provide background of ISO 9001 certification

More information

Concrete Pavement: Concrete Pavement Basics. Basic Components of a Concrete Pavement. Concrete Pavement Types. Jointed Plain

Concrete Pavement: Concrete Pavement Basics. Basic Components of a Concrete Pavement. Concrete Pavement Types. Jointed Plain Concrete Pavement: PCCP Repair & Rehabilitation Applications, Options & Performance Concrete Pavement Basics Purdue Road School March 25, 2003 Basic Components of a Concrete Pavement Surface smoothness

More information

OCT 2012 DPW. Peak Metrics Report Out D E N V E R PERFORMANCE

OCT 2012 DPW. Peak Metrics Report Out D E N V E R PERFORMANCE OCT 2012 DW D E N V E R Mission Level Overview Strategies and Tactics D E N V E R resent Future The Department of ublic Works aims to deliver high quality, cost effective, efficient, safe services involving

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

Maintaining a Walkable Sacramento: SIDEWALK MAINTENANCE PROGRAM HANDBOOK

Maintaining a Walkable Sacramento: SIDEWALK MAINTENANCE PROGRAM HANDBOOK Maintaining a Walkable Sacramento: SIDEWALK MAINTENANCE PROGRAM HANDBOOK Well-maintained sidewalks and curb ramps provide safe and desirable paths for pedestrians and others to enjoy neighborhoods, commercial

More information

V I L L A G E O F S O U T H R U S S E L L

V I L L A G E O F S O U T H R U S S E L L V I L L A G E O F S O U T H R U S S E L L T ABLE OF C ONTENTS 1. Executive Summary... 2 2. Background... 3 3. PART I: 2016 Pavement Condition... 8 4. PART II: 2018 Current Backlog... 12 5. PART III:

More information

RUEKERT & MIELKE, INC. Serving Local People. Solving Local Problems.

RUEKERT & MIELKE, INC. Serving Local People. Solving Local Problems. RUEKERT & MIELKE, INC. Serving Local People. Solving Local Problems. March 15, 2017 Effective Road Ratings & Forecasting Agenda Introductions & Welcome 10:05-10:15 How to Rate Your Roads 10:15-10:50 What

More information

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

SECTION IV. PIPELINE EXCAVATION AND BACKFILL SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include

More information

VILLAGE OF MORTON GROVE DEPARTMENT OF PUBLIC WORKS RIGHT-OF-WAY (ROW) PERMIT APPLICATION REQUIREMENTS

VILLAGE OF MORTON GROVE DEPARTMENT OF PUBLIC WORKS RIGHT-OF-WAY (ROW) PERMIT APPLICATION REQUIREMENTS VILLAGE OF MORTON GROVE DEPARTMENT OF PUBLIC WORKS RIGHT-OF-WAY (ROW) PERMIT APPLICATION REQUIREMENTS For general information concerning submittal requirements, please refer to Village Code 7-9-4 (c.).

More information

LAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050

LAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050 LAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050 Resolution 2004-5 Resolution of the Board of Trustees of LaGrange Township, Lorain County, Ohio, adopting general rules and regulations

More information

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TABLE OF DRAWINGS. Pierce County Public Works & Utilities Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 05/10/2018 PC.A1.2 Arterial with Cement

More information

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH CHAPTER 2 201 ROADS 201.1 General This section is to assist the designer in determining what is needed for the design of roads in public rights-of-way. For these standards, the terms used are: Restricted

More information

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: --

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: -- ROADWAY CONSTRUCTION NOTES 1. ALL RIGHT-OF-WAY OTHER THAN ROADWAY AREAS SHALL BE SODDED. ALL SLOPE STEEPER THAN 6:1 SHALL REQUIRE SODDING. THE CITY RESERVES THE RIGHT TO REQUIRE SODDING IN SPECIAL AREAS

More information

CITY OF GEORGETOWN, TEXAS

CITY OF GEORGETOWN, TEXAS CITY OF GEORGETOWN, TEXAS STREET MAINTENANCE TREATMENTS SUMMARY REPORT Prepared By CITY OF GEORGETOWN & KPA ENGINEERS FEBRUARY 2016 1.0 Executive Summary In 2005, the City of Georgetown implemented the

More information

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TABLE OF DRAWINGS. Pierce County Public Works & Utilities Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 04/01/2019 PC.A1.2 Arterial with Cement

More information

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report Function : Transportation Activity : Road & Street Facilities Category : Arterial Roads Pinellas County Capital Improvement Program, FY2011 - FY2016 Project No: 1618 Title: 118th Avenue Expressway Cost

More information

Naperville Public Library. Parking Lot Work Naper Blvd. Library & 95 th St. Library

Naperville Public Library. Parking Lot Work Naper Blvd. Library & 95 th St. Library Naperville Public Library Request for Pricing Parking Lot Work Naper Blvd. Library & 95 th St. Library Submission Date/Time: May 31, 2018, at 10:00 a.m. CST Place: Nichols Library-Board Room 200 West Jefferson

More information

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis. PART 1 GENERAL 1.01 SUMMARY A. This Section includes the following: Section 02775 1. Reinforced concrete sidewalks. 2. Wheelchair Ramps. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete

More information

NYSDOT TRANSPORTATION MAINTENANCE DIVISION PAVING PROJECT QUALITY ASSURANCE ASSESSMENT Rating Guidelines (Revision #1)

NYSDOT TRANSPORTATION MAINTENANCE DIVISION PAVING PROJECT QUALITY ASSURANCE ASSESSMENT Rating Guidelines (Revision #1) NYSDOT TRANSPORTATION MAINTENANCE DIVISION PAVING PROJECT QUALITY ASSURANCE ASSESSMENT Rating Guidelines (Revision #1) INTRODUCTION The condition assessment is intended to be performed from a customer

More information

Asphalt Parking Lots Restoration and Maintenance Retail Shopping Centers (See: 2009 Parking Lot Maintenance and Repair)

Asphalt Parking Lots Restoration and Maintenance Retail Shopping Centers (See: 2009 Parking Lot Maintenance and Repair) Inland Commercial Property Management, Inc. 2901 Butterfield Road Oak Brook, IL 60523 Phone: 877.206.5656 Fax: 630.218.5270 Request for Proposal Date: March 12, 2009 Submit to: Dale Rammien E-mail: drammien@inlandrealestate.com

More information

Capital Improvement Plan (CIP) Adopted Oct. 17, 2016

Capital Improvement Plan (CIP) Adopted Oct. 17, 2016 2017-2021 Capital Improvement Plan (CIP) Adopted Oct. 17, 2016 Fiscal Year 2017 Adopted Capital Improvement Plan Table of Contents Page Description CIP Project Category Start Timeline N/A 1 Introduction

More information

Pavement Surface Evaluation and Rating. Manual RATING RATING RATING PASER RATING. Concrete Roads

Pavement Surface Evaluation and Rating. Manual RATING RATING RATING PASER RATING. Concrete Roads PASER MANUAL FOR CONCRETE ROADS PAVEMENT ENGINEERING SERVICES PASER RATING SUNFLOWER VILLAGE HOMES ASSOCIATION 45800 HANFORD ROAD CANTON, MICHIGAN SME Project Number: 074170.00 July 1, 2016 Pavement Surface

More information

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report BRIDGE DISTRICT Phase 1 Infrastructure Improvement Project (for work completed thru November 2011) Cover Photo: Joint Utility Trench installation along Fifth Street just north of Bridge Street. Page 1

More information

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS GENERAL PLAN NOTES PERMANENT SIGNS PROJECT SCOPE THIS PROJECT INCLUDES REMOVAL OF PORTIONS OF CONCRETE CURB & GUTTER AND HMA SURFACE; INSTALLATION OF SANITARY AND STORM SEWER AND UNDERDRAIN; EXCAVATION

More information

TRANSPORTATION. Governmental Projects

TRANSPORTATION. Governmental Projects TRANSPORTATION Governmental Projects Function: Activity: Category: Transportation Road & Street Facilities Arterial Roads Project No: 1618 Title: 118th Avenue Expressway Cost Center: 841418 Department:

More information

Arlington County, VA Materials Testing Specification Reference Guide (8/18/2016) MATERIAL AND TEST (REF. - VDOT TEST METHODS MANUAL )

Arlington County, VA Materials Testing Specification Reference Guide (8/18/2016) MATERIAL AND TEST (REF. - VDOT TEST METHODS MANUAL ) MINIMUM RATE 1. Embankments SOILS AND AGGREGATES (a) Density, 303.04(h) One (1) test per 2500 yd3 or less plus: (a) for fills less than 500 ft. length one (1) test on every other 6-in. layer bottom to

More information

Arlington County, VA Materials Testing Specification Reference Guide (8/18/2016) MATERIAL AND TEST (REF. VDOT TEST METHODS MANUAL )

Arlington County, VA Materials Testing Specification Reference Guide (8/18/2016) MATERIAL AND TEST (REF. VDOT TEST METHODS MANUAL ) 1. Embankments SOILS AND AGGREGATES (a) Density, 303.04(h) One (1) test per 2500 yd3 or less plus: (a) for fills less than 500 ft. length one (1) test on every other 6-in. layer bottom to top of fill starting

More information

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017 VT 14 East Montpelier Bridge Project Informational Meeting February 22, 2017 Welcome & Introductions VTrans Mark Sargent, Project Manager Wayne Symonds, Structures Program Manager Chris Barker, Resident

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Comment Form Date: To: From:

More information

REQUEST FOR PROPOSAL Asphalt & Concrete Repair

REQUEST FOR PROPOSAL Asphalt & Concrete Repair REQUEST FOR PROPOSAL 2017 Asphalt & Concrete Repair English Landing Elementary School Union Chapel Elementary School Lakeview Middle School Park Hill High School Prairie Point Elementary School Congress

More information

404-LVT (Low Volume Traffic) A new 404 specification for your lightly traveled roads

404-LVT (Low Volume Traffic) A new 404 specification for your lightly traveled roads 404-LVT (Low Volume Traffic) A new 404 specification for your lightly traveled roads 404-LVT Asphalt Concrete The 404-LVT specification has been designed to provide a mix rich in asphalt binder, fine textured,

More information

ROAD CUT PERMIT APPLICATION & INSTRUCTIONS

ROAD CUT PERMIT APPLICATION & INSTRUCTIONS Jeremy Robinson Commissioner Ann Fordock Martin E. Davis, L.S. DEPARTMENT OF PUBLIC WORKS Ben Walsh, Mayor ROAD CUT PERMIT APPLICATION & INSTRUCTIONS REQUIRED FOR: Construction in (cutting into) a city

More information

C I T Y O F C H A R D O N

C I T Y O F C H A R D O N C I T Y O F C H A R D O N T ABLE OF C ONTENTS 1. Executive Summary... 2 2. Background... 3 3. PART I: 2016 Pavement Condition... 8 4. PART II: 2018 Current Backlog... 13 5. PART III: Maintenance & Rehabilitation

More information

Thinlay Asphalt for Pavement Preservation

Thinlay Asphalt for Pavement Preservation Thinlay Asphalt for Pavement Preservation Jim Huddleston, P.E. Executive Director APAO The Need Pavement Management Professionals are tasked with implementing strategies and treatments that will provide

More information

2008 Street and Utility Improvement Project West Golden Lake Road. Public Informational Meeting January 3, 2008

2008 Street and Utility Improvement Project West Golden Lake Road. Public Informational Meeting January 3, 2008 2008 Street and Utility Improvement Project West Golden Lake Road C P Public Informational Meeting January 3, 2008 Presentation Summary Project Location Existing Conditions Proposed Improvements Project

More information

TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP &

TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP & TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP 4910-29 & 0504-14 Contract No. 1002252 Project Overview is in need of professional and technical assistance to provide detail design for State

More information

Pavement Management 1

Pavement Management 1 Pavement Management 1 Pavement Management Program Review September 2017 - City Council requested: 1. Further analysis of pavement applications 2. Application effectiveness and community impact/influence;

More information

FY 2019 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2019 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Baltic Avenue, Maine to Mississippi Avenues Project ID Numbers: S1702 / 173620 This project will mill and repave the roadway, upgrade ADA ramps, and improve drainage, thermoplastic stripping, manholes,

More information

Clinton Street Bridge over the Maumee River. ODOT Project DEF December 2, 2014 Stakeholder s Meeting

Clinton Street Bridge over the Maumee River. ODOT Project DEF December 2, 2014 Stakeholder s Meeting Clinton Street Bridge over the Maumee River ODOT Project DEF-15-14.77 December 2, 2014 Stakeholder s Meeting Purpose of Stakeholder Meeting Discuss the project and why it s happening Describe the process

More information

EXHIBIT A-2 SCOPE OF SERVICES HAS PROJECT NUMBER 646A PROFESSIONAL ENGINEERING DESIGN SERVICES FOR TAXIWAYS RA, RB, SA, AND SB AT IAH

EXHIBIT A-2 SCOPE OF SERVICES HAS PROJECT NUMBER 646A PROFESSIONAL ENGINEERING DESIGN SERVICES FOR TAXIWAYS RA, RB, SA, AND SB AT IAH 1. INTRODUCTION EXHIBIT A-2 SCOPE OF SERVICES HAS PROJECT NUMBER 646A PROFESSIONAL ENGINEERING DESIGN SERVICES FOR TAXIWAYS RA, RB, SA, AND SB AT IAH 1.1. The objective of this Project includes: 1.1.1.

More information

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices. SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section

More information

To: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project

To: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project 5180 SOQUEL DR. SOQUEL, CA 95073 PO Box 1550 CAPITOLA, CA 95010 TEL 831-475-8500 FAX 831-475-4291 BOARD OF DIRECTORS To: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project Dr. THOMAS LAHUE

More information

B HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313

B HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313 B 313-1 OPSS 313 313-1.1 GENERAL HL,, Mixture, and/or Mix, is hot mixed, hot laid asphaltic concrete, used for pavement construction and other uses. 1. HL 1 This dense graded surface course mix is used

More information

WSDOT Pavement Preservation Performance

WSDOT Pavement Preservation Performance WSDOT Pavement Preservation Performance Jianhua Li, PhD PE 2014 NWPMA Conference 1 FHWA Pavement Preservation Definition Pavement Preservation is a program employing a network level, long-term strategy

More information

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines. SECTION 15.0 PIPE TRENCHES 15.01 Clearing and Grubbing The developer/contractor shall be responsible for the clearing and grubbing of the entire right-of-way. See Sections 13.01 and 14.01. Clearing and

More information

CITY OF STEVENS POINT AGENDA

CITY OF STEVENS POINT AGENDA CITY OF STEVENS POINT BOARD OF PUBLIC WORKS MEETING Monday, October 9, 2017 6:15 p.m. (or immediately following previously scheduled meeting) Lincoln Center 1519 Water Street Stevens Point, WI 54481 AGENDA

More information

C ITY OF I NDEPENDENCE

C ITY OF I NDEPENDENCE C ITY OF I NDEPENDENCE T ABLE OF C ONTENTS 1. Executive Summary... 2 2. Background... 3 3. PART I: 2016 Pavement Condition... 8 4. PART II: 2018 Current Backlog... 12 5. PART III: Maintenance & Rehabilitation

More information

In Service Replacement of Box Girder Bottom Slab

In Service Replacement of Box Girder Bottom Slab In Service Replacement of Box Girder Bottom Slab WSDOT Bridge No. 5/537S - Span 11 Craig R. Boone, P.E., S.E. Lynn Peterson Secretary of Transportation 2015 Western Bridge Engineers Seminar Reno, Nevada

More information

11 th National Asset Management Conference July 12, 2016 Minneapolis Marriot City Center

11 th National Asset Management Conference July 12, 2016 Minneapolis Marriot City Center 11 th National Asset Management Conference July 12, 2016 Minneapolis Marriot City Center 1 Life-Cycle Costs Iceberg Initial Capital Expenditures Maintenance Costs Future Capital Costs Operational costs

More information

Benefits of Pavement Preservation

Benefits of Pavement Preservation Benefits of Pavement Preservation Simone Ardoin Systems Preservation Engineer Administrator LA DOTD 2011 LA Transportation Conference Baton Rouge, Louisiana January 2011 What is PAVEMENT PRESERVATION?

More information

Current Construction Projects in Progress. Thru January 31, 2016

Current Construction Projects in Progress. Thru January 31, 2016 Current Construction Projects in Progress Thru January 31, 2016 Orange Ave Pump Station Improvements Before After Project consist of the removal of the existing pumps, housing and piping. Remove and replace

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Foreword This manual contains

More information

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016 Rehabilitation of West Main Street Culvert and Shirley Street Bridge Town of Ayer November 22, 2016 Agenda Outline Introductions Project Goals and Objectives Existing Conditions Review Design Considerations

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL

Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL TECHNICAL SUPPORTIVE SERVICES IN IDOT DISTRICTS 2 & 3 FOR CERTIFIED

More information

Maintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013

Maintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013 Maintenance, Construction & Secondary Roads Terry Gibson, PE Chief Engineer February 20, 2013 State versus local responsibility Division structure Allocations Flexibility in funding Implications of not

More information

Improvement Plan Cost Estimate

Improvement Plan Cost Estimate Building and Engineering Division Development Services Department 214 S. C Street, Oxnard CA 93030 ph: 805.385.7925 fax 805.385.7854 Improvement Plan Cost Estimate Land Development Permit No. (Tract or

More information

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction

More information

C 3. Chaney Compacted Concrete. Roller Compacted Concrete

C 3. Chaney Compacted Concrete. Roller Compacted Concrete C 3 Chaney Compacted Concrete Roller Compacted Concrete The Future of Paving C 3 (Chaney Compacted Concrete) is Chaney Enterprises Roller Compacted Concrete (RCC) paving mix which has been specially formulated

More information