1 IMPULSA CONSULTORES, S.L.U. Company Profile Luis E. Félez Managing Partner Barcelona, June 2013 Agustina Saragossa, 15, 5º C Barcelona Tel. (+34) lefelez@impulsaconsul.net

2 Presentation This document intends to show our capabilities and expertise in relation to the possibility of assisting you in connection with any engineering project related to hydroelectric and hydraulic works. At Impulsa Consultores, S.L.U., we employ our resources to provide our clients efficient services, with a team of professionals with broad experience and knowledge in the engineering sector. We will be very glad to further discuss our potential involvement in this exciting project. Luis E. Félez Managing Partner Civil Engineer Tel. (+34) lefelez@impulsaconsul.net

3 Activity Business consultancy, providing our clients business and technical support, and engineering knowledge for the promotion, design, construction and operation any hydroelectric and other hydraulic works. Specialised in hydropower, pumping facilities, irrigation, supply, canals and pipelines, dams and ponds. Civil works, hydraulic equipment, mechanical equipment, electrical equipment, remote, telecommunications, control systems, energy efficiency. Services Consulting and advisory services during the previous phases of the project: Advice on decision making for defining the optimal functional solution Installation Functional Analysis Solutions Optimization Technical assistance for the development of basic project Technical Support for the drafting of: Monitoring and supervision of the project Defining criteria or calculation and design work and equipment items Calculation of hydraulic and mechanical elements and equipment work Technical Support for the procurement of works and facilities: Drafting of technical specifications for the manufacture, supply, installation, testing and quality control of pumps, turbines, valves, gates, pressure pipes, etc. Drafting of technical specifications for civil works Writing technical specifications for the manufacture, supply, installation of electrical, telecommunications and control systems. Supervision of contractor selection process and fixing supplies and contractual technical conditions. Technical Support during construction: Study of alternative proposals or technical changes of work Supervision of manufacturing processes, assembly, quality control and commissioning of equipment Technical Support for the operation of the facility: Design or control systems Functional safety and energy efficiency Design and implementation of surveillance and preventive and predictive maintenance Surveillance system monitoring and maintenance Analysis of incidents and corrective actions proposed Technical assistance for the development of the construction project

4 Recent projects (2005 a 2012): Team biography Partner Luis E. Félez Managing Partner Civil Engineer Tel. (+34) lefelez@impulsaconsul.net Girabolhos Pumped Storage Power Plant (430 MW) ( ) Iznajar Pumped Storage Power Plant (425 MW) ( ) Ribafeita Pumped Storage Power Plant (350 MW) (2010) Suarna Pumped Storage Power Plant (335 MW) (2009) Matalavilla Pumped Storage Power Plant (450 MW) (2008) Alto Tamega Hydroelectric Plant (600 MW) (2008) FOZ TUA Hydroelectric Plant (400 MW) (2008) Rialb Hydroelectric Plant (34 MW) ( ) La Peña Hydroelectric Plant (40 MW) (2006) San Esteve Hydroelectric Plant (10 MW) ( ) FECSA (10 years) Supervisor of project and construction of new hydroelectric projects COPISA (5 years) Technical Manager in the project of construction of the Estangento-Sallente pumped storage power plant (450 MW), La Torre de Capdella, Lleida, Spain ( ) Civil engineer consultant with extensive experience in planning, promotion, project, construction and exploitation of hydroelectric plants and hydraulic installations. Specialised in electric power and hydroelectric plants, reversible pumped storage. Civil and hydraulic engineering. Project, construction, repair and maintenance. Dams safety. Hydraulic management. Energy audit. Contracting. Experience Impulsa Consultores, S.L.U Present (11 years) Barcelona, Spain Managing Partner Endesa Generación S.A.U (17 years) Barcelona, Spain Project Manager in the Hydroelectric department Reversible pumped storage, identification of sites, study of feasibility, basic engineering, conceptual and detail engineering, contracting, supervision of project management, installation and commissioning, administrative procedure, concession requests, authorizations. Universitat Politècnica de Catalunya (UPC) 1990 Present (23 years) Lecturer in the Department of the Hydraulic, Maritime and Environmental Engineering Investigation Team Flumen (UPC) 2000 Present (13 years) Member Formation IESE Business School Management (2007) Instituto Catalán de Tecnología Master, Management (1998) Universitat Politècnica de Catalunya (UPC) Civil Engineering, Hydraulic (1976) Publications and presentations Several publications and presentations on different topics in various siminars, masters, courses and symposium, including but not limited to dams security, turbines, hydroelectric optimization and pumped storage.

5 Pumped Storage power plant Estangento-Sallente (Lleida, Spain) ( ) Technical and construction Manager in COPISA ( ) Functional parameters Power: 450 MW / Gross Jump up: 401 m. Flow: 125 m3/seg turbine mode and pump mode 96 m3/seg. Elements of the work - Dam Sallente asphalt screen breakwater, 89 m in height. - Strengthening Estangento Dam. Central or cavern: Excavation by New Austrian system. 89 meters long, 20 meters wide and 37 meters high. - Hydroelectric reversible: 4 groups Francis Transformer station (1.5 KV/400 KV) Hidraulic circuit: Two pipes in tunnel 600 m long each. Pending 106%. Drilling Diameter 4.20 meters, 3.50 meters diameter. Pierced by Robbins TBM. Armor steel pipe and concrete filling. Cable tunnels: Four units of 125 meters long and 3 meters in diameter, excavated by Raise Borer system. Tunnel access to central auxiliary tunnels, road access, etc.. Investment: 84 million (year 1985). Plan of identification and development of new pumped storage power plant in Spain and Portugal Project Manager in charge of the feasibility study in ENDESA ( ) Prospective study of the evolution of generation technologies. Objectives of wind energy penetration and increased regulatory requirements. Projected changes in energy prices over the medium and long term. Identification of sites for new pumps reversible. Study of functional alternatives. Definition of conceptual engineering facility at each site selected. Performance Analysis. Planning the development of the new pumps identified.

6 Pumped storage power plant in Girabolhos (Viseu, Portugal) Project Manager in charge of the feasibility study, basic engineering, conceptual and detail engineering in ENDESA ( ) Functional parameters: Power 430 MW Maximum gross Jump: 75 m. Flow: 505 m3/sec. - Girabolhos Dam: Dome Type 107 m above ground. - Bogueira Dam: Gravity, ground line 90 feet above foundation - Hydroelectric reversible. Two groups Francis (vertical axis), 400 MW Foreign Central / well Conventional hydraulic power Two groups Francis (vertical axis), 30 MW Foreign Central - Hydraulic Circuit: Driving through two pipes 150 m each, 6.70 m in diameter. Access road and viaducts, etc.. Transformative Station (1.5 KV/400 KV). Investment: 450 million

7 Power plant in Rialp (Lleida, Spain) Project Manager in charge of the feasibility study, basic engineering, conceptual and detail engineering in ENDESA ( ) Functional parameters: Power: 34 MW / Maximum gross Jump: 70 m. Flow: 55 m3/sec - Conventional Central base of the dam. two groups Francis (vertical axis) + 1 group Francis (horizontal) foreign Central - Hydraulic Circuit: Two steel pipes 3 m in diameter and 250 meters long. access road, etc.. transformative Station (1.5 KV/110 KV). Investment: 13 million Pumped storage power plant in Matalavilla (León, Spain) Project Manager in charge of the feasibility study, basic engineering, conceptual and detail engineering in ENDESA ( ) Functional parameters: Power 450 MW / Gross Jump up: 695 m. Flow: 75 m3/seg turbine mode and pump mode 60 m3/seg. - Superior tank capacity of 3.7 hm3. - Hydroelectric reversible. Two groups Francis (vertical axis) Central or cavern - Hydraulic Circuit: High Pressure: Driving tunnel 1600 meters and 4.50 meters in diameter. Low Pressure: Driving tunnel 1100 meters and 4.50 meters in diameter. Cable tunnels: Four units of 125 meters long and 3 meters in diameter, excavated by Raise-Borer system. Tunnel access to central auxiliary tunnels, road access, etc.. Transformative Station (1.5 KV/400 KV). Investment: 373 million

8 Pumped storage power plant in Ribafeita (Ribafeita, Portugal) Project Manager in charge of the feasibility study, basic engineering, conceptual and detail engineering in ENDESA ( ) Functional parameters: Power 350 MW Gross Jump up: 328 m. Flow: 120 m3/seg turbine mode and pump mode 97 m3/seg. - Superior tank capacity of 4.41 hm3. - Lower gravity dam of 53 m high and 300 m long coronation - Hydroelectric reversible. Two groups Francis (vertical axis) Foreign Central - Conventional hydraulic power 2 of 6 MW Francis foreign Central - Hydraulic Circuit: High Pressure Tunnel 1500 m and 5 m in diameter. Low Pressure: Two pipe 100 m long and 4.5 m in diameter. Access road, etc.. Transformative Station (1.5 KV/400 KV). Investment: 283 million.

9 Pumped storage power plant in Suarna (Lugo, Spain) Pumped storage power plant in Salime (Asturias, Spain) Project Manager in charge of the feasibility study, basic engineering, conceptual and detail engineering in ENDESA ( ) Functional parameters: Power: 400 MW / Maximum gross Jump: 75 m. Flow: 505 m3/sec. - Suarna Dam: Dome Type 102 m above ground. - Hydroelectric reversible. Two groups Francis (vertical axis), 400 MW Foreign Central / well - Hydraulic Circuit: Driving through two pipes of 135 m each, 7.5 m in diameter. Access road and viaducts, etc.. Transformative Station (1.5 KV/400 KV). Investment: 380 million Project Manager in charge of the feasibility study, basic engineering, conceptual and detail engineering in ENDESA (2011) Functional parameters: (alternatives) Power: MW / Maximum gross Jump: m Flow: m3/sec. - Tank top (alternatives between 3 and 9 Hm3 capacity) - Hydroelectric reversible. 4 groups Francis (vertical axis) Central cavern / outdoor / well - Hydraulic Circuit: Driving through tunnel lengths between 900 and 1700 Access road and viaducts, etc.. Transformative Station (1.5 KV/400 KV). Investment: Between 350 million and 750 million

10 Pumped storage power plant in Iznajar (Malaga, Spain) Project Manager in charge of the feasibility study, basic engineering, conceptual and detail engineering in ENDESA (2011) Functional parameters: Power 425 MW/467MW Gross Jump up: 440 m. Flow: 112 m3/seg turbine mode and pump mode m3/seg Superior tank capacity of 4.1 hm3. - Hydroelectric reversible. Two groups Francis (vertical axis) Central or pit, circular diameter of 25 meters - Hydraulic Circuit: High Pressure Tunnel 1056 m and 5 m in diameter and outer section of 1175 m and 4.7 m in diameter. Low Pressure: Two tunnels 250 m long and 4.5 m in diameter. access road, etc.. transformative Station (1.5 KV/400 KV). Investment: 313 million

11 Other Relevant Projects Project Manager of Plan Of Identification And Development Of Plants Hydropower News River Basin Ebro (Aragon and CataloniaStudy. Feasibility and conceptual engineering ( ) Systematic maintenance of Civil Works of hydroelectric exploitation ( ). Development and commissioning of equipment for testing performance in hydraulic plants and periodic performance testing of different plants in ENDESA Group. Technical assistance in the Conceptual Design, Project Construction and Construction Management DRIVE PROJECT AND CONNECTING RIALB DAM Segarra-Garrigues CANAL, PRELIMINARY PHASE, 1ST AND 2ND, TT.MM. OF ponts And tiurana. LLEIDA "(CASEGA-SERCAL). ( ). Technical Assistance in the conceptual design and SECTOR PROJECT 2 Primeria RED WATERING SYSTEM Segarra-Garrigues canal. (FOREST-ASG). ( ). Proposed classification disne and rafts Conceptual design and pump selection Design hydraulic circuit. Aspiration and drive. Overpressure calculation water hammer and pipe mecánco. Technical Assistance in the conceptual design and DRAFT WATER LIFT A ANDORRA Ebro (Teruel). (IAVE). From 2005 to Design and proposal classification rafts. Functional design and geometric take on the Ebro Functional design of pumping station and pump type selection. Hydraulic circuit design. Aspiration and drive. Water hammer and boilers. Technical Assistance in the conceptual design and modification PROJECT CANAL SECTION 1 SEGARRA-Garrigues. (UTE Ponts- Oliola/CASEGA). (2007). Hydraulic design general. Functional design and geometric beacons Hydraulic and mechanical design of Llobregos Sifon Technical Assistance in the conceptual design and SECTOR PROJECT IRRIGATION SYSTEM 18 CHANNEL URGEL. (IAVE-REGSA) Design and proposal classification rafts. Functional design and geometric outlets, drains and special works. Functional design of pumping station and pump type selection. Hydraulic circuit design. Aspiration and drive. Water hammer and boilers. Proposal for Classification and Emergency Plan dams Valduno Valduno I and II (Hidromedia). ( ).

12 Agustina Saragossa, 15, 5º C Barcelona Tel. (+34) lefelez@impulsaconsul.net

11/10/2009. Lake Uist - BAKER PT. Distributor from bore to penstocks Lowest level in draft tube FSL Top of surge tank.

11/10/2009. Lake Uist - BAKER PT. Distributor from bore to penstocks Lowest level in draft tube FSL Top of surge tank. Parametric Analysis of Pump- Turbine Sites J. L. Gordon, P. Eng. Fellow CSCE 190.0 FSL 203.6 Top of surge tank. Lake Uist - BAKER PT 193.0 Deck El. 2120.6 Surge tank required? Yes 169.5 Bottom of surge

More information

PROJECT INFORMATION AND SHORTLISTING CRITERIA FOR SCREENING OF CONSULTING FIRM. Tamakoshi V Hydroelectric Project

PROJECT INFORMATION AND SHORTLISTING CRITERIA FOR SCREENING OF CONSULTING FIRM. Tamakoshi V Hydroelectric Project PROJECT INFORMATION AND SHORTLISTING CRITERIA FOR SCREENING OF CONSULTING FIRM 1. PROJECT INFORMATION Intoduction: Tamakoshi V Hydroelectric Project The Tamakoshi-V Hydropower Project is a cascade development

More information

RÍO AMOYÁ - LA ESPERANZA Hydroelectric Power Plant

RÍO AMOYÁ - LA ESPERANZA Hydroelectric Power Plant RÍO AMOYÁ - LA ESPERANZA Hydroelectric Power Plant The power plant is located in southern Tolima, in the municipality of Chaparral, approximately 150 km from Ibague. It has an installed capacity of 80

More information

Hydropower. Identifying needs. Our service offering

Hydropower. Identifying needs. Our service offering Hydropower Identifying needs Hydropower forms the world s largest source of renewable energy. With an increasing emphasis on developing renewable energy sources, the need for new hydro-electric power stations,

More information

MIEL I Hydroelectric Power Plant

MIEL I Hydroelectric Power Plant MIEL I Hydroelectric Power Plant The Miel I Power Plant, which is located in the municipality of Norcasia, forms part of the hydro potential in western Caldas. This region comprises the basins of the rivers

More information

Tender Call No.: Likhu/GVN/Pkg-03/2012 OLUME III A 1 TABLE OF CONTENTS SALIENT FEATURES 1.0 SCOPE SALIENT FEATURES... 1

Tender Call No.: Likhu/GVN/Pkg-03/2012 OLUME III A 1 TABLE OF CONTENTS SALIENT FEATURES 1.0 SCOPE SALIENT FEATURES... 1 Table of contents OLUME III A 1 TABLE OF CONTENTS SALIENT FEATURES 1.0 SCOPE... 1 1.1 SALIENT FEATURES... 1 1.2 TRANSPORT LIMITATIONS... 8 1.3 DEVIATIONS FROM SPECIFICATIONS... 9 1.4 APPROVAL OF DRAWINGS...

More information

Mini Voith New Solutions for a Market in Focus

Mini Voith New Solutions for a Market in Focus voith.com Mini Hydro @ Voith New Solutions for a Market in Focus Philipp Daus BHA Conference Glasgow 2018-11-08 Agenda Mini Hydro @ Voith 1. Introduction to Mini Hydro @ Voith 2. Project Lifecycle & Our

More information

IMPACT AND PUNCTURING OF JARI TUNNEL AND ENLARGEMENT OF EXISTING TAPPINGS FOR ADDITIONAL WATER SUPPLY AND POWER GENERATION

IMPACT AND PUNCTURING OF JARI TUNNEL AND ENLARGEMENT OF EXISTING TAPPINGS FOR ADDITIONAL WATER SUPPLY AND POWER GENERATION 117 Paper No. 738 IMPACT AND PUNCTURING OF JARI TUNNEL AND ENLARGEMENT OF EXISTING TAPPINGS FOR ADDITIONAL WATER SUPPLY AND POWER GENERATION JAVED MUNIR, SYED ABBAS ALI, IRFAN MAHMOOD 118 Javed Munir,

More information

Headquarters. Registered office. Via F.lli Ceirano, Cuneo (Cn) - Italia. Corso Dante, Cuneo (Cn) - Italia.

Headquarters. Registered office. Via F.lli Ceirano, Cuneo (Cn) - Italia. Corso Dante, Cuneo (Cn) - Italia. Foto - archivio E++ Headquarters Via F.lli Ceirano, 9 12100 Cuneo (Cn) - Italia Registered office Corso Dante, 10 12100 Cuneo (Cn) - Italia info@eplusplus.net Ph. +39 0171 413963 Fax +39 0171 414981 1

More information

HydroHelp 5 AN EXCEL PROGRAM DEVELOPED FOR PRE-FEASIBILITY ASSESSMENT PUMP-STORAGE HYDROELECTRIC SITES. J. L. GORDON P.Eng.

HydroHelp 5 AN EXCEL PROGRAM DEVELOPED FOR PRE-FEASIBILITY ASSESSMENT PUMP-STORAGE HYDROELECTRIC SITES. J. L. GORDON P.Eng. HydroHelp 5 AN EXCEL PROGRAM DEVELOPED FOR PRE-FEASIBILITY ASSESSMENT OF PUMP-STORAGE HYDROELECTRIC SITES BY J. L. GORDON P.Eng. January, 2009 HydroHelp 5 for pump-turbine sites. A continuation of the

More information

Condition of Improvements 30 December 2014 Snettisham, Alaska (CWIS No )

Condition of Improvements 30 December 2014 Snettisham, Alaska (CWIS No ) Snettisham Condition of Improvements 30 December 2014 Snettisham, Alaska (CWIS No. 017020) Authorization Flood Control Act, 23 October 1962 (House Doc. 40, 87th Congress, 1st Session) as adopted, provides

More information

Then the revolving speed of turbine is obtained as 300 r/min based on the specific speed of Ns 208 m-kw.

Then the revolving speed of turbine is obtained as 300 r/min based on the specific speed of Ns 208 m-kw. 11.4 Electromechanical Equipment Generally, a turbine-generator is said larger unit capacity has more economical merit of scale. However, the optimum unit size of turbine-generator is determined in consideration

More information

Hydropower and Water Resources

Hydropower and Water Resources Hydropower and Water Resources Hydropower and Water Resources The development, planning, design, and construction of hydropower as well as large-scale irrigation schemes and special hydraulic structures

More information

HPP CEBREN. Prepared by: Development and Investments Department

HPP CEBREN. Prepared by: Development and Investments Department HPP CEBREN Prepared by: Development and Investments Department Skopje, 2017 The partition place Cebren is located at the River Crna Reka, 81 km upstream from its inflow in the River Vardar, near the village

More information

CURRICULUM VITAE. Born in Campina Grande, Paraiba- Brazil, on February 19, Public Profile:

CURRICULUM VITAE. Born in Campina Grande, Paraiba- Brazil, on February 19, Public Profile: CURRICULUM VITAE 1. PERSONAL DATA Name: OSCAR MACHADO BANDEIRA Born in Campina Grande, Paraiba- Brazil, on February 19, 1947. E-mail: oscarbandeira@norteenergiasa.com.br Public Profile: www.linkedin.com/in/oscarbandeiracivilengineer

More information

INVITATION OF BID (INTERNATIONAL COMPETITIVE BIDDING)

INVITATION OF BID (INTERNATIONAL COMPETITIVE BIDDING) INVITATION OF BID (INTERNATIONAL COMPETITIVE BIDDING) Bid Title : EPC Bid for Planning, detailed design& engineering, construction/manufacturing of civil, electro-mechanical, hydro- mechanical and switch

More information

RENEWABLE HYDRAULIC TURBO GENERATORS

RENEWABLE HYDRAULIC TURBO GENERATORS RENEWABLE HYDRAULIC TURBO GENERATORS EMSC Global Water Solutions offers a solution for power generation using turbo generators installed in distribution pipes and wells. EMSC Global Water Solutions S.L.,

More information

Chakachamna Hydro. AEA Geothermal Conference

Chakachamna Hydro. AEA Geothermal Conference Chakachamna Hydro AEA Geothermal Conference August 2007 Chakachamna Hydro 300+ MW hydro opportunity identified Preliminary FERC License application filed in May 2006 Initial scoping/informational meetings

More information

Hydraulic infrastructures

Hydraulic infrastructures Hydraulic infrastructures Innovative technology solutions for sustainability Hydraulic infrastructures Water on principle Negratin-Almanzora water transfer system in Spain Water is an essential element

More information

HYDROPOWER AND WATER RESOURCES

HYDROPOWER AND WATER RESOURCES HYDROPOWER AND WATER RESOURCES Shaping our world A company of D-ZM-14137-01-00 Head of Certification body OUR EXPERTISE Hydropower and Water Resources The development, planning, design, and construction

More information

Hydroelectric power plants

Hydroelectric power plants Hydroelectric power plants Hydroelectric power plants can drive from a water stream or accumulation reservoir. Run-of-river hydroelectric plants (those without accumulation reservoirs) built along a river

More information

DEPARTMENT OF CIVIL ENGINEERING CE6403/ APPLIED HYDRAULIC ENGINEERING QUESTION BANK TWO MARKS UNIT I UNIFORM FLOW 1. Differentiate open channel flow from pipe flow. 2. What is specific energy and is the

More information

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION 1.1 General The Lower Erkhuwa hydropower Project is located in Kulung and Chauki Danda VDCs of Bhojpur District, in East Nepal. It is located

More information

JOURNAL OF ADVANCEMENT IN ENGINEERING AND TECHNOLOGY

JOURNAL OF ADVANCEMENT IN ENGINEERING AND TECHNOLOGY Research Article JOURNAL OF ADVANCEMENT IN ENGINEERING AND TECHNOLOGY Journal homepage: http://scienceq.org/journals/jaet.php Open Access Performance of Francis Turbine and Hydro Electric Governing B.Sandhya

More information

Construction OS&H Project planning and control for safe OS&H

Construction OS&H Project planning and control for safe OS&H Construction OS&H Project planning and control for safe OS&H Summary General principles of project planning and control OS&H by design as a key element of project planning and control OS&H performance

More information

Bringing Untapped Hydropower to Reality

Bringing Untapped Hydropower to Reality voith.com Bringing Untapped Hydropower to Reality Whitepaper 2018 Voith Mini Hydro Solutions 1 Reducing Interfaces by Turnkey Solutions 2 Customized Solutions for Standard Applications 3 Water-to-Wire

More information

consulting engineers hydraulic steel structures

consulting engineers hydraulic steel structures consulting engineers hydraulic steel structures Floating Sector Gate at Yeonsang Front cover Five of the seven rising sector gates at the Gangchon bridge and weir at Yeoju on the Han River in central Korea.

More information

Consulting Services for the Programme for the Promotion of Renewable Energies: Phase III, BMZ ID Small Hydropower Projects (SHPP)

Consulting Services for the Programme for the Promotion of Renewable Energies: Phase III, BMZ ID Small Hydropower Projects (SHPP) Consulting Services for the Programme for the Promotion of Renewable Energies: German-Armenian Renewable Energy Fund (GAF-RE) Phase III, BMZ ID 2012.7029.7 Small Hydropower Projects (SHPP) Introduction

More information

Regulation 18 August 2009 NO Operations and Maintenance LEVEE ENCROACHMENT STANDARDS AND PROCEDURES

Regulation 18 August 2009 NO Operations and Maintenance LEVEE ENCROACHMENT STANDARDS AND PROCEDURES CENWP-EC DEPARTMENT OF THE ARMY PDR 30-2-5 Portland District, Corps of Engineers (Draft) P.O. Box 2946 Portland, Oregon 97208 Regulation 8 August 2009 NO. 30-2-5 Operations and Maintenance LEVEE ENCROACHMENT

More information

Renewable energy assisted agriculture in Campania Region - Italy

Renewable energy assisted agriculture in Campania Region - Italy Campania Region Renewable energy assisted agriculture in Campania Region - Italy Contribution to Conference and Meeting of the InterMediterranean Commission (IMC) of the Conference of Peripheral Maritime

More information

MINING: FROM CONCEPT TO START-UP, OUR COMPREHENSIVE CONSTRUCTION OFFER

MINING: FROM CONCEPT TO START-UP, OUR COMPREHENSIVE CONSTRUCTION OFFER MINING: FROM CONCEPT TO START-UP, OUR COMPREHENSIVE CONSTRUCTION OFFER At the heart of VINCI s integrated model, VINCI s subsidiaries form an unrivalled network of expertise across the world. For mining

More information

Pipelines and Penstocks Avoiding operational issues throughout the life of your project

Pipelines and Penstocks Avoiding operational issues throughout the life of your project Pipelines and Penstocks Avoiding operational issues throughout the life of your project Presenter Dan Murrer, P.E. 322 East Front Street Suite 200 Boise, ID 83702 Tel. 208.383.6108 Daniel.Murrer@CH2M.com

More information

UNIT I: UNIFORM FLOW PART B

UNIT I: UNIFORM FLOW PART B UNIT I: UNIFORM FLOW PART-A 1 Define open channel flow with example BT-1-1 2 Distinguish between open channel flow and pipe flow. BT-4-1 3 Compute the hydraulic mean depth of a small channel 1m wide, 0.5m

More information

Tabulated overview of the obligation to submit the use and occupancy notice or building design documentation and to apply for use and occupancy permit

Tabulated overview of the obligation to submit the use and occupancy notice or building design documentation and to apply for use and occupancy permit Tabulated overview of the obligation to submit the use and occupancy or building and to apply for use and occupancy Building Code Annex 2 Building Activity Erection Construction Remodelling Expansion by

More information

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Monthly Progress Report Prepared by : Sano Milti Khola Hydropower Limited www.smi.com.np smi.investment.limited@gmail.com Date : August,

More information

WATER SUPPLY SERVICES

WATER SUPPLY SERVICES PRACTICE MANUAL FOR WATER SUPPLY SERVICES IN KENYA PART A WATER SUPPLY A 1 LIST OF CONTENTS PART A - WATER SUPPLY Page: A1 1. INTRODUCTION A16 1.1 Background A16 1.2 Purpose A17 1.3 Water Supply Administration

More information

Client: Budhi Gandaki Hydroelectric Project Development Committee. General Presentation

Client: Budhi Gandaki Hydroelectric Project Development Committee. General Presentation Client: Budhi Gandaki Hydroelectric Project Development Committee General Presentation 1. Background and objectives 2. Project location 3. Project information/features 4. Project performances 5. Environmental

More information

Power Recovery Turbines

Power Recovery Turbines Power Recovery Turbines Fixed and Variable Geometry Vertical Horizontal Bulletin PS-90-1 (E/A4) Pump Supplier To The World Flowserve is the driving force in the global industrial pump marketplace. No other

More information

John Hart Generating Station Replacement Project. March 2017 Community Construction Update Report #45

John Hart Generating Station Replacement Project. March 2017 Community Construction Update Report #45 John Hart Generating Station Replacement Project March 2017 Community Construction Update Report #45 Prepared by: Stephen Watson, BC Hydro (O) 250-755-4795 or (C) 250-616-9888 Twitter: @Puntledge Email:

More information

consulting engineers hydropower

consulting engineers hydropower consulting engineers hydropower Glendoe, Scottish Highlands Front cover The turbine hall in the Dolgarrog Power Station, North Wales consulting engineers Sloy, Loch Lommond, Scotland KGAL acted as Principal

More information

Hybrid Hydroelectric Power Plant : The Ultimate Technology For Electricity Generation

Hybrid Hydroelectric Power Plant : The Ultimate Technology For Electricity Generation Hybrid Hydroelectric Power Plant : The Ultimate Technology For Electricity Generation Prof. Nilesh P. Patil. 1*, Prof. Dr. V. S. Patil. 2 1 - Asst. Professor (Chemical Engineering), University Institute

More information

South-to-North Water Diversion( middle route ) China Institute of Water Resources and Hydropower Research(IWHR)

South-to-North Water Diversion( middle route ) China Institute of Water Resources and Hydropower Research(IWHR) South-to-North Water Diversion( middle route ) China Institute of Water Resources and Hydropower Research(IWHR) Contents 1 Canal 2 PCCP pipe 3 Tunnel 1 Canal The middle route runs from Danjiangkou Reservoir

More information

Hydropower retrofitted onto existing water infrastructure assets

Hydropower retrofitted onto existing water infrastructure assets Hydropower retrofitted onto existing water infrastructure assets Marco van Dijk Lecturer and Principal Researcher University of Pretoria / Water Research Commission South Africa Presentation Layout How

More information

Client Assessment of Requirements to make Particular Safety & Health Appointments

Client Assessment of Requirements to make Particular Safety & Health Appointments Client Assessment of Requirements to make Particular Safety & Health Appointments > Contents Form 1...... Client Checklist - Does the project involve Construction Work? Form 2...... Client Checklist -

More information

2.29 XE KONG 5 HYDROPOWER PROJECT

2.29 XE KONG 5 HYDROPOWER PROJECT 2.29 XE KONG 5 HYDROPOWER PROJECT The Xe Kong 5 Hydropower Project is located in Kaleum District, Xe Kong Province on the upper reaches of the Xe Kong, immediately upstream of the proposed Xe Kong 4 Hydropower

More information

Renewable and Alternative Energies

Renewable and Alternative Energies Department of Electrical and Energy Engineering This work is published under a license: Creative Commons BY-NC-SA 4.0 Contents Topic 1. Wind energy. Topic 2. Solar energy. Topic 3. Ocean energy.. Topic

More information

2 FINDING OF THE POTENTIAL SITES

2 FINDING OF THE POTENTIAL SITES EXECUTIVE SUMMARY 1 Background S-1 2 User of Manual S-1 3 Applicable Range of Micro-hydro power in the Indonesia S-2 4 How to use this Manual S-2 Chapter 1 INTRODUCTION 1-1 1.1 Purpose of the Manual

More information

2.32 XESET 2 HYDROPOWER PROJECT

2.32 XESET 2 HYDROPOWER PROJECT 2.32 XESET 2 HYDROPOWER PROJECT The Xeset 2 Hydropower Project is part of the development of the hydropower potential of the Xe Set basin in Saravan Province. It is upstream of the existing 45 MW Xeset

More information

Yale Hydroelectric Project FERC Project No Exhibit C - Construction History

Yale Hydroelectric Project FERC Project No Exhibit C - Construction History Exhibit C - Construction History PacifiCorp Portland, Oregon April 1999 EXHIBIT C CONTENTS 1.0 INTRODUCTION... 1 2.0 CONSTRUCTION HISTORY... 1 3.0 PROPOSED CHANGES TO PROJECT FACILITIES... 1 TABLES Table

More information

ITEM 404 DRIVING STEEL PILING

ITEM 404 DRIVING STEEL PILING AFTER MARCH 1, 2012 ITEM 404 DRIVING STEEL PILING 404.1 Description. This Item shall govern the driving of steel piling. The piling shall be of the size and weight shown on the plans and shall be in accordance

More information

ENGINEERING AND CONSTRUCTION ENERGY

ENGINEERING AND CONSTRUCTION ENERGY ENGINEERING AND CONSTRUCTION ENERGY THE SAFETY OF OUR PEOPLE AND THE PROTECTION OF THE COMMUNITIES AND THE ENVIRONMENT ARE OUR TOP PRIORITY Techint Engineering & Construction is committed to the safety

More information

Y EA E R A S R O F F EXCE C LL L EN E C N E

Y EA E R A S R O F F EXCE C LL L EN E C N E Infrastructure Dams & Hydropower WATER Levees Kleinfelder understands the importance of water to our clients, communities, and families. We deliver solutions to sustainably manage this vital resource.

More information

10 Project Cost Estimation

10 Project Cost Estimation 10 Project Cost Estimation Contents 10 Project Cost Estimation... 1 10.1 Project Overview... 1 10.2 Principles of Project Cost Estimation... 2 10.3 Data Basis and Assumptions for Project Cost Estimation...

More information

Technical meeting : Catalan programme to improve water efficiency in irrigation projects.

Technical meeting : Catalan programme to improve water efficiency in irrigation projects. Department of Agriculture, Food and Rural Affairs V WORLD WATER FORUM Technical meeting : Catalan programme to improve water efficiency in irrigation projects. March 2009 SITUATION 2 INDEX Description

More information

BACKFLOW PREVENTION ASSEMBLY INSTALLATION STANDARDS

BACKFLOW PREVENTION ASSEMBLY INSTALLATION STANDARDS Revised May 2014 BACKFLOW PREVENTION ASSEMBLY INSTALLATION STANDARDS All backflow prevention assembly installation shall be in accordance with the following Standards unless otherwise directed or approved

More information

Study on Economic Partnership Projects in Developing Countries in FY2013. Final Report SUMMARY. February 2014

Study on Economic Partnership Projects in Developing Countries in FY2013. Final Report SUMMARY. February 2014 Study on Economic Partnership Projects in Developing Countries in FY2013 Study on the small hydro power project in the province of Lam Dong in Socialist Republic of Vietnam Final Report SUMMARY February

More information

Vinnie Naidoo Technical Executive GIBB (Pty) Limited South Africa

Vinnie Naidoo Technical Executive GIBB (Pty) Limited South Africa Vinnie Naidoo Technical Executive GIBB (Pty) Limited South Africa Structure of Presentation Outline of the Project Development Phases Key Attributes of the Project Environmental Considerations Scheme Layout

More information

UPSC ESE/IES Civil Engineering Syllabus

UPSC ESE/IES Civil Engineering Syllabus 1 UPSC ESE/IES Civil Engineering Syllabus PAPER I 1. Building Materials: Stone, Lime, Glass, Plastics, Steel, FRP, Ceramics, Aluminum, Fly Ash, Basic Admixtures, Timber, Bricks and Aggregates: Classification,

More information

Annex V Concrete Structures Removal Plan

Annex V Concrete Structures Removal Plan Appendix D Annex V Concrete Structures Removal Plan Figure V1 Lower Granite Sequences of Concrete Removal and Cofferdam Figure V2 Little Goose Sequence of Concrete Removal and Cofferdam Figure V3 Lower

More information

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer APPENDIX I Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer THE CITY OF BARRIE PROJECT NO. 15M-00594-01 CONCEPTUAL DESIGN SALEM ROAD AND MCKAY ROAD TRUNK WATERMAIN AND SANITARY

More information

ANNEXURE-III SALIENT FEATURES OF DUGAR HYDRO ELECTRIC PROJECT. Himachal Pradesh. Latitude. Longitude Nearest Railhead; Udhampur (J&K)

ANNEXURE-III SALIENT FEATURES OF DUGAR HYDRO ELECTRIC PROJECT. Himachal Pradesh. Latitude. Longitude Nearest Railhead; Udhampur (J&K) ANNEXURE-III SALIENT FEATURES OF DUGAR HYDRO ELECTRIC PROJECT Project Location State District River Vicinity Latitude Longitude Nearest Railhead; Udhapur (J&K) Hiachal Pradesh Chaba Chenab River Luj village

More information

Client Requirements to make Particular Safety & Health Appointments

Client Requirements to make Particular Safety & Health Appointments Client Requirements to make Particular Safety & Health Appointments REVISED IN ACCORDANCE WITH THE SAFETY HEALTH AND WELFARE AT WORK (CONSTRUCTION) REGULATIONS 2013. > Contents Form 1...... Client Checklist

More information

SEES 503 SUSTAINABLE WATER RESOURCES HYDROELECTRIC POWER. Assist. Prof. Dr. Bertuğ Akıntuğ

SEES 503 SUSTAINABLE WATER RESOURCES HYDROELECTRIC POWER. Assist. Prof. Dr. Bertuğ Akıntuğ SEES 503 SUSTAINABLE WATER RESOURCES HYDROELECTRIC POWER Assist. Prof. Dr. Bertuğ Akıntuğ Civil Engineering Program Middle East Technical University Northern Cyprus Campus SEES 503 Sustainable Water Resources

More information

INCREASING LATERAL CAPACITY OF OLD BARRAGES INTRODUCING CABLES

INCREASING LATERAL CAPACITY OF OLD BARRAGES INTRODUCING CABLES INCREASING LATERAL CAPACITY OF OLD BARRAGES INTRODUCING CABLES Ahmed Hashad 1, Yasser El-Hakem 1 and Eehab Khalil 2 1 Assistant Professor, Construction Research Institute, National Water Research Center,

More information

CDM Kirstie Phillips

CDM Kirstie Phillips CDM 2015 Kirstie Phillips INTRODUCTIONS A bit about me and what I do! WORKING IN CONJUNCTION Fire fighting! WITH Auditing Assisting current safety officers HS & E management systems 90001, 18001(45001),

More information

ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal.

ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal. ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal. Kutch (Gujarat) Date: 19/10/2016, Wednesday Duration: 1 Day A FEEDBACK REPORT ON VISIT

More information

Introduction to hydropower for European students under the Athens program

Introduction to hydropower for European students under the Athens program Introduction to hydropower for European students under the Athens program Ånund Killingtveit Norwegian University of Science and Technology (NTNU) Department of Hydraulic and Environmental Engineering

More information

TOLEDO BEND PROJECT FERC NO DRAFT LICENSE APPLICATION EXHIBIT E - ENVIRONMENTAL EXHIBIT 2.0 PROPOSED ACTION AND ALTERNATIVES

TOLEDO BEND PROJECT FERC NO DRAFT LICENSE APPLICATION EXHIBIT E - ENVIRONMENTAL EXHIBIT 2.0 PROPOSED ACTION AND ALTERNATIVES TOLEDO BEND PROJECT FERC NO. 2305 DRAFT LICENSE APPLICATION EXHIBIT E - ENVIRONMENTAL EXHIBIT 2.0 PROPOSED ACTION AND ALTERNATIVES May 2011 Copyright 2011.Sabine River Authority of Texas and Sabine River

More information

Training Certification Categories

Training Certification Categories Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and

More information

Planning & Research. Technical Innovation, Function And, Practicality, Specialized Services

Planning & Research. Technical Innovation, Function And, Practicality, Specialized Services Water Solutions Planning & Research Technical Innovation, Function And, Practicality, To ensure the success of each project, Gwin, Dobson & Foreman applies time-tested research methods to optimize project

More information

The fresh approach to engineering and project management.» Rich in experience» Responsive & flexible» Delivery certainty

The fresh approach to engineering and project management.» Rich in experience» Responsive & flexible» Delivery certainty The fresh approach to engineering and project management» Rich in experience» Responsive & flexible» Delivery certainty 01 AE Projects has a strong... in-house engineering capability that covers all disciplines

More information

Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013

Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013 Report Engineering Services Group Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013 Summary This report provides a summary of fiscal year accomplishments, capital expenditures

More information

Section 12 Hydraulics.

Section 12 Hydraulics. Design Guidelines Section 12 Hydraulics. www.canterbury.ac.nz/learningresources Standards in the Design Guidelines Suite Design Standard Guidelines Index: 01 General 02 Architecture 03 Audio Visual 04

More information

Hydropower & Dams Services

Hydropower & Dams Services Hydropower & Dams Services We represent a world-class concentration of hydropower and dam expertise. Since 1920, we have designed hundreds of new hydropower and dams globally, producing clean reliable

More information

2.16 NAM POT HYDROPOWER PROJECT

2.16 NAM POT HYDROPOWER PROJECT 2.16 NAM POT HYDROPOWER PROJECT Nam Pot is a hydropower project of around 20 to 25 MW located in Xiangkhouang Province. Due to its size, location and economics, Nam Pot project is best suited to a domestic

More information

Bloemwater head-office is becoming energy independent with its own conduit hydropower generation plant M van Dijk Lecturer & Principle Researcher

Bloemwater head-office is becoming energy independent with its own conduit hydropower generation plant M van Dijk Lecturer & Principle Researcher Bloemwater head-office is becoming energy independent with its own conduit hydropower generation plant M van Dijk Lecturer & Principle Researcher University of Pretoria South Africa Layout of the presentation

More information

JOBS AROUND THE WORLD

JOBS AROUND THE WORLD PILE DRIVERS AND THE U.S. SUPREME COURT: A STORIED FOUNDATION OF CONSTRUCTION LAW EST. 1984 THE INTERNATIONAL PILE DRIVERS, DEEP FOUNDATIONS & MARINE CONTRACTOR S MAGAZINE PILE BUCK PRESENTS 2013 VOLUME

More information

Asst.Prof.Dr. Jaafar S. Maatooq. 1 st Semester HYDRAULIC STRUCTUER, KINDS & FUNCTIONS 1 of 26

Asst.Prof.Dr. Jaafar S. Maatooq. 1 st Semester HYDRAULIC STRUCTUER, KINDS & FUNCTIONS 1 of 26 1 st Semester HYDRAULIC STRUCTUER, KINDS & FUNCTIONS 1 of 26 1 st Semester HYDRAULIC STRUCTUER, KINDS & FUNCTIONS 2 of 26 Water is often more useful to people when it is properly controlled, conveyed,

More information

Water Resources. Associate Prof. Ahmed Moustafa Moussa Lecture -1 Lecture 4

Water Resources. Associate Prof. Ahmed Moustafa Moussa Lecture -1 Lecture 4 Water Resources By Associate Prof. Ahmed Moustafa Moussa Lecture -1 Lecture 4 High Aswan Dam Project 1. Location The High Aswan Dam (HAD) location was determined to fit the topographical features of the

More information

Power plant Asset. Thermal power Hydro power Geothermal power. QuestIntegrity.com CHALLENGE CONVENTION

Power plant Asset. Thermal power Hydro power Geothermal power. QuestIntegrity.com CHALLENGE CONVENTION Power plant Asset Integrity Management Thermal power Hydro power Geothermal power QuestIntegrity.com CHALLENGE CONVENTION Effective Asset Integrity Management in Power Plants Effective asset integrity

More information

SECTION WASTEWATER FORCE MAINS

SECTION WASTEWATER FORCE MAINS SECTION 02732 WASTEWATER FORCE MAINS PART 1 GENERAL 1.01 GENERAL: A. This section includes the general requirements for design and installation of force main systems serving wastewater lift stations. B.

More information

Use of Coal Mines Facilities in Northern Spain for the Production of Sustainable Energy

Use of Coal Mines Facilities in Northern Spain for the Production of Sustainable Energy Use of Coal Mines Facilities in Northern Spain for the Production of Sustainable Energy Javier Menéndez SADIM, S.A. C/ Jaime Alberti, Nº2 33900 CIAÑO (ASTURIAS) javier.menendez@sadim.es Jorge Loredo Mining

More information

Status Quo and Future Prospects of Hydro Power in Germany

Status Quo and Future Prospects of Hydro Power in Germany Energy Status Quo and Future Prospects of Hydro Power in Germany Renewable Energy Symposium Lima, November 10 th, 2009 Dirk Volkmann www.german-renewable-energy.com content historical development technology

More information

PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER

PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER Margarida Isabel Godinho Sobral Department of Civil Engineering and Architecture, Instituto Superior Técnico - Lisbon, Portugal SUMMARY

More information

2.24 VIENGPHOUKA THERMAL PROJECT

2.24 VIENGPHOUKA THERMAL PROJECT 2.24 VIENGPHOUKA THERMAL PROJECT The Viengphouka Thermal Project is a mine-mouth coal-fired base load power generation project located in Luangnamtha Province. The Consultant has evaluated the Project

More information

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Monthly Progress Report Prepared by : Sano Milti Khola Hydropower Limited www.smi.com.np smi.investment.limited@gmail.com Date : August,

More information

Bulb/pit/S-turbines and generators

Bulb/pit/S-turbines and generators Bulb/pit/S-turbines and generators Expertise in hydro with engineered reliability The future belongs to hydropower. It conserves our fossil fuel reserves, is in abundant, self-renewing supply, is non-polluting

More information

Circular No. 10/2013/TT-BXD of July 25, 2013, on construction quality management THE MINISTRY OF CONSTRUCTION

Circular No. 10/2013/TT-BXD of July 25, 2013, on construction quality management THE MINISTRY OF CONSTRUCTION THE MINISTRY OF CONSTRUCTION Circular No. 10/2013/TT-BXD of July 25, 2013, on construction quality management Pursuant to the Government s Decree No. 63/2012/ND-CP of August 31, 2012, defining the functions,

More information

The Rio Grande project - Argentina

The Rio Grande project - Argentina The Rio Grande project - Argentina Introduction The Rio Grande pumped storage project is located on the Rio Grande river near the town of Santa Rosa de Calamucita in the Province of Cordoba in Argentina.

More information

6 Preliminary Assessment of Construction Method and Constructability Issues

6 Preliminary Assessment of Construction Method and Constructability Issues 6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual

More information

INCREASING THE ACCURACY OF PARAMETERS FOR HYDROTECHNICAL NODES DETERMINATION USING GEOGRAPHIC INFORMATION SYSTEM

INCREASING THE ACCURACY OF PARAMETERS FOR HYDROTECHNICAL NODES DETERMINATION USING GEOGRAPHIC INFORMATION SYSTEM P. Pleşca, V. Mocreac, G. Sandulache, O. Mocreac Increasing the Accuracy Of Parameters For Hydrotechnical Nodes Determination Using GIS INCREASING THE ACCURACY OF PARAMETERS FOR HYDROTECHNICAL NODES DETERMINATION

More information

Code No: R Set No. 1

Code No: R Set No. 1 Code No: R050210201 Set No. 1 II B.Tech I Semester Regular Examinations, November 2006 FLUID MECHANICS & HYDRAULIC MACHINERY (Electrical & Electronic Engineering) Time: 3 hours Max Marks: 80 Answer any

More information

NEELUM JHELUM HYDRO POWER PROJECT TECHNICAL VISIT BY A DELEGATION OF PAKISTAN ENGINEERING CONGRESS ON NOVEMBER, 2011

NEELUM JHELUM HYDRO POWER PROJECT TECHNICAL VISIT BY A DELEGATION OF PAKISTAN ENGINEERING CONGRESS ON NOVEMBER, 2011 NEELUM JHELUM HYDRO POWER PROJECT TECHNICAL VISIT BY A DELEGATION OF PAKISTAN ENGINEERING CONGRESS ON 25-27 NOVEMBER, 2011 A 15 - Members delegation of Pakistan Engineering Congress paid an extensive visit

More information

John Hart Generating Station Replacement Project. January 2016 Community Construction Update Report #31

John Hart Generating Station Replacement Project. January 2016 Community Construction Update Report #31 John Hart Generating Station Replacement Project January 2016 Community Construction Update Report #31 Prepared by: Stephen Watson, BC Hydro (O) 250-755-4795 or (C) 250-616-9888 Twitter: @Puntledge Email:

More information

SHRI RAMSWAROOP MEMORIAL COLLEGE OF ENGG. & MANAGEMENT

SHRI RAMSWAROOP MEMORIAL COLLEGE OF ENGG. & MANAGEMENT B.Tech. [SEM VI(ME-61,62,63 & 64)] QUIZ TEST-1 Q-1). A jet strikes a smooth curved vane moving in the same direction as the jet and the jet get reversed in the direction. Show that the maximum efficiency

More information

İSPİR DAM AND HEPP (HYDROELECTRİC POWER PLANT) PROJECT

İSPİR DAM AND HEPP (HYDROELECTRİC POWER PLANT) PROJECT İSPİR DAM AND HEPP (HYDROELECTRİC POWER PLANT) PROJECT Brief Profile of the Project İspir Dam, the second dam of Upper Çoruh Watershed is planned to build on the downstream of Laleli Dam. The Project is

More information

Experts in tunneling with Tunnel Boring Machines

Experts in tunneling with Tunnel Boring Machines www.eurohinca.com www.terratest.es Experts in tunneling with Tunnel Boring Machines info@eurohinca.com EUROHINCA Europea de Hincas Teledirigidas, S.A., EUROHINCA, was incorporated in 1996 for the execution

More information

A proposal to realize sustainable development of large hydropower project

A proposal to realize sustainable development of large hydropower project A proposal to realize sustainable development of large hydropower project Yoshifumi NISHIWAKI President, Tokyo Electric Power Services Co., Ltd. (3-3, Higashi-Ueno 3, Taito-ku, Tokyo 110-0015, Japan) E-mail:

More information

L4W Guide to Designing and Sizing Hydraulic Ram Pump System

L4W Guide to Designing and Sizing Hydraulic Ram Pump System L4W Guide to Designing and Sizing Hydraulic Ram Pump System Published by the Engineering and Construction Services Department of Life 4 Water, Inc. Iligan City 9200, Philippines With Reference from: Technical

More information

MEMORANDUM. The general findings of the assessment are as follows:

MEMORANDUM. The general findings of the assessment are as follows: November 28, 2006 MEMORANDUM Project No.: 030009-002-01 To: From: Re: WRIA 31 Planning Unit Steve Germiat, LHG, CGWP, and Timothy J. Flynn, LHG, CWGP Evaluation of Winterizing Existing River Pump/Conveyance