LOWER CACHE CREEK, YOLO COUNTY WOODLAND AREA FEASIBILITY STUDY

Size: px
Start display at page:

Download "LOWER CACHE CREEK, YOLO COUNTY WOODLAND AREA FEASIBILITY STUDY"

Transcription

1 Background LOWER CACHE CREEK, YOLO COUNTY WOODLAND AREA FEASIBILITY STUDY Energy and Water Development Appropriations Act of 1993 Reconnaissance Study completed June 1994 Feasibility Cost Share Agreement signed January 2000 $2.5M Study Sponsors The Reclamation Board City of Woodland

2 Study Area

3 LOWER CACHE CREEK, YOLO COUNTY WOODLAND AREA FEASIBILITY STUDY Study Purpose: Define flood related problems and opportunities, evaluate a full range of alternatives, and recommend a plan to reduce potential flood risk within the City of Woodland and the unincorporated areas of Yolo County. Study Scope Establish specific objectives of a plan to reduce flood damages and protect related environmental resources. Inventory and forecast conditions in the study area. Define criteria and constraints for formulating and evaluating alternatives. Formulate alternatives to reduce flood damages and protect related environmental resources. Compare alternative plans and identify recommended plan.

4 LOWER CACHE CREEK, YOLO COUNTY WOODLAND AREA FEASIBILITY STUDY Topographical Surveying Tasks Completed To Date Baseline Geotechnical Analysis Hydrologic Model and Frequency Curves Environmental Site Assessment (Hazardous Waste) Hydrology &Hydraulic Without Project Modeling (10/00) Floodplain Mapping

5 LOWER CACHE CREEK, YOLO COUNTY WOODLAND AREA FEASIBILITY STUDY Discussion Points Sacramento District is Committed to Meeting Project Schedule WRDA 2002 Authorization City of Woodland s Economic Viability Timeliness of Appropriation for New Construction Continuing Federal Support and Appropriation of Funds

6 Survey & Mapping Completed August 2000 by Corps Photogrammetric & Ground Control 2 Contours Datum: NAVD 88 More Detailed than Reconnaissance Report

7 Hydrology Developed by Corps with HEC-1 Return Period (years) Peak Flow (cfs) 50 yr 53, yr 63, yr 70, yr 78,595 No significant changes compared to Reconnaissance Study

8 Hydraulics UNET - Unsteady, One-Dimensional Flow FLO2D - Unsteady, Two-Dimensional Flow HEC-RAS - Steady, One-Dimensional Flow

9 Existing Cache Creek Levee Design Original Design: 30,000 cfs 3 freeboard 10-year protection

10 Peak Rainflood Frequency Curve Cache Creek at Rd. 94B

11 Non-Damaging Flow Geotechnical Risk-Based Analysis Probable Non-Failure Point 2 Below Top of Levee Probable Failure Point Top of Levee Calculated Flow Below PNP, and Does Not Overtop Existing Bank (30,000 Yolo; 34,000 Rd. 94B)

12 N 65 DRAFT LIMIT OF 8,100 cfs " STUDY Road 17 Yolo ÑÑÑÑ Ñ Ñ Ñ ÑÑÑ Ñ " 85 16,000 cfs Ñ Ñ Ñ Ñ Ñ Ñ ÑÑ ÑÑ ÑÑ ÑÑ 80 " 7,000 cfs (LF) Interstate 5 70 LIMIT OF STUDY 60 9,100 cfs (LF) " " 10,700 cfs (LF) Union Pacif ic Ra ilr oad H ighw ay 113 R oad Cache Creek ± Road 101 Bes t Ranch Rd. Road 18C R oa d 1 02 " Water Surface Elevation Contours Approximate Extent of Overbank Flooding, Existing Conditions Peak Flow R oad 94B Kentuck y Av e. Road 98 Road 99 W. M ain Street Woodland E. M ain Street Cache Creek Settling Basin Yolo Bypass H ighw ay 113 Legend (LF) Levee Failure Highw ay 16 I nterstate 5 35 Road 24 W. G ibs on Rd. E. Gibs on Rd. Vert ical Dat um: NAVD 88 Cache Creek Hydraulic Study Existing Conditions 200-Year Flood Event Feet LIMIT OF STUDY

13 Economic Damages Analysis Table year Floodplain Structure Values ($1,000s) (October 2000 Price Levels) Lower Cache Creek Study Main Reach Total SFR Struct $289,205 $289,205 MFR Struct $21,283 $21,283 Office Struct $10,852 $10,852 Retail Struct $33,403 $33,403 Restaurant $5,377 $5,377 Service Struct $1,150 $1,150 Public Struct $18,377 $18,377 Industrial $354,803 $354,803 Total $734,450 $734,450

14 Economic Damages Analysis Table 9 Without Project Conditions Expected Annual Damages (Base Year Conditions) (In $1,000s) Lower Cache Creek Main Reach Total Aggregated Structures & Contents $12,313 $12,313 Total $12,313 $12,313

15 Environmental Analysis Status of work. Land-use constraints. Endangered species and conservation programs.

16 Plan Formulation and Evaluation Process Define specific objectives to reduce flood damages. Define criteria and constraints for formulating and evaluating alternatives. Identify and assess potential measures to reduce flood damages. Evaluate and screen preliminary alternatives. Evaluate and screen selected alternatives to identify the NED and the LPP plans.

17 Planning Objectives Provide a minimum of 100-year flood protection to the City of Woodland from flooding from Cache Creek. Maximize the use of existing flood reduction facilities prior to constructing new facilities.

18 Planning Constraints Plans will be formulated according to Congressional direction, current applicable laws, regulations, and policies. Plans will be formulated according to the Federal objective of water and related land resource planning. Minimize the operation and maintenance requirements and associated costs of the flood reduction system. Minimize impacts to agricultural lands and to lands adjacent to Cache Creek.

19 Planning Criteria Completeness is the extent to which a given alternative plan provides and accounts for all necessary investments or other actions to ensure the realization of the planning objectives. Effectiveness is the extent to which an alternative plan alleviates the identified problems and achieves the planning objectives. Efficiency is primarily a measure of the planning objectives. It is a measure of the extent to which an alternative plan is the most costeffective means of alleviating identified flood problems. Acceptability is the workability and viability of the alternative plans with other Federal agencies, affected State and local agencies, and public entities given existing laws, regulations, and public policies.

20 Initial Screening Nonstructural Raise/flood proof structures Relocate structures Flood Warning System Structural Storage Channelization Levees/set-back levees Flood bypass

21 Preliminary Alternatives Clearing and grubbing Raise levees Channelization and raise levees Set-back levees Lower Cache Creek Overflow Barrier

22 N RD [PRELIMINARY ALTERNATIVE 1 plan view map] RD 94B I-5 CALIFORNIA NORTHERN RR YOLO RD 18B RD 97A HWY 16 RD 19A RD 98 RD 18 RD 99 RD 99E RD 18A RD 100B RD 18B RD 18C RD 99 HWY 113 RD 101 RD 102 KENTUCKY AVE KENTUCKY AVE Miles LEGEND Cache Creek Existing Project Levee Limits of Clearing and Grubbing HWY 16 MAIN ST WOODLAND HWY 113 MAIN ST CACHE CREEK SETTLING BASIN I-5 RD 24 GIBSON RD GIBSON RD LOWER CACHE CREEK, WO ODLAND, CALIFORNIA AREA FEASIBILITY Preliminary Alternative 1 CHANNEL CLEARING AND GRUBBING SACRAMENTO DISTRICT, CORPS OF ENGINEERS FEBRUARY 2001

23 Preliminary Alternative 1: Channel Clearing and Grubbing Primary Features Clear and grub channel approximately 9.3 miles No bridge replacements Riprap protection Accomplishments Increase level of protection from 10 to 40 years Environmental Impacts Significant removal of valuable riparian habitat Mitigation very difficult

24 N I-5 RD 94B [PRELIMINARY ALTERNATIVE 2 plan view map] 700 RD RD 18B RD 97A YOLO HWY 16 RD 19A RD 98 CALIFORNIA NORTHERN RR RD 18 RD RD 99E 400 RD 99 HWY 113 RD 101 RD RD 18A RD 100B 300 RD 18B RD 18C KENTUCKY AVE KENTUCKY AVE Miles LEGEND Cache Creek Existing Project Levee Raise Project Levee Construct New Levee HWY 16 MAIN ST WOODLAND HWY 113 MAIN ST CACHE CREEK SETTLING BASIN I-5 RD 24 GIBSON RD GIBSON RD LOWER CACHE CREEK, WOODLAND, CALIFORNIA AREA FEASIBILITY Preliminary Alternative 2 RAISE EXISTING LEVEE & CONSTRUCT NEW LEVEE SACRAMENTO DISTRICT, CORPS OF ENGINEERS FEBRUARY 2001

25 Preliminary Alternative 2: Raise Levees Primary Features Raise existing levees 1 to 14 feet for 9.3 miles Replace bridges: I-5, Road 99W, Railroad, 113, Road 102 Riprap protection Accomplishments 200-year level of protection Environmental Impacts Removal of valuable riparian habitat Mitigation very difficult

26 N I-5 RD 94B [PRELIMINARY ALTERNATIVE 3 plan view map] 700 RD RD 18B RD 97A YOLO HWY 16 RD 19A RD 98 CALIFORNIA NORTHERN RR RD 18 RD RD 99E 400 RD 99 HWY 113 RD 101 RD RD 18A RD 100B 300 RD 18B RD 18C KENTUCKY AVE KENTUCKY AVE Miles LEGEND Cache Creek Existing Project Levee Construct New Levee HWY 16 MAIN ST WOODLAND HWY 113 MAIN ST CACHE CREEK SETTLING BASIN I-5 RD 24 GIBSON RD GIBSON RD LOWER CACHE CREEK, WOODLAND, CALIFORNIA AREA FEASIBILITY Preliminary Alternative 3 IMPROVE CHANNEL AND CONSTRUCT NEW LEVEES SACRAMENTO DISTRICT, CORPS OF ENGINEERS FEBRUARY 2001

27 Preliminary Alternative 3: Channelization and Levee Raising Primary Features Approximately 9.3 miles of bench channel to 2-year flow channel 500 to 700-foot terraces at the 2-year water surface elevation Construct new levees on one side to existing heights Replace bridges: Railroad bridge Riprap protection Accomplishments 200-year level of protection Environmental Impacts Removal of agricultural lands Significant removal of valuable riparian habitat (temporary) Potential for on-site mitigation

28 N I-5 RD 94B [PRELIMINARY ALTERNATIVE 4 plan view map] 700 RD RD 18B RD 97A YOLO HWY 16 RD 19A RD 98 CALIFORNIA NORTHERN RR RD 18 RD RD 99E 400 RD 99 HWY 113 RD 101 RD RD 18A RD 100B 300 RD 18B RD 18C KENTUCKY AVE KENTUCKY AVE Miles LEGEND Cache Creek Existi ng Project Levee Raise Exi sting Project Levee Construct New Levee Proposed 1000' Setback HWY 16 MAIN ST WOODLAND HWY 113 MAIN ST CACHE CREEK SETTLING BASIN I-5 RD 24 GIBSON RD GIBSON RD LOWER CACHE CREEK, WOODLAND, CALIFORNIA AREA FEASIBILITY Preliminary Alternative 4 CONSTRUCT SETBACK LEVEES SACRAMENTO DISTRICT, CORPS OF ENGINEERS FEBRUARY 2001

29 Preliminary Alternative 4: Setback Levees Primary Features Approximately 9.3 miles of set-back levees on one side or other 1 to 14 feet high Raise levees on other side, if necessary, from 1 to 7 feet high Replace bridges: Railroad bridge Riprap protection Accomplishments 200-year level of protection Environmental Impacts Removal of agricultural lands Removal of valuable riparian habitat near bridges Potential for on-site mitigation

30 N I-5 RD 94B [PRELIMINARY ALTERNATIVE 5 plan view map] 700 RD RD 18B RD 97A YOLO HWY 16 RD 19A RD 98 CALIFORNIA NORTHERN RR RD 18 RD RD 99E 400 RD 99 HWY 113 RD 101 RD RD 18A RD 100B 300 RD 18B RD 18C KENTUCKY AVE KENTUCKY AVE Miles LEGEND Cache Creek Existing Project Levee Const ruct New Levee HWY 16 MAIN ST WOODLAND HWY 113 MAIN ST CACHE CREEK SETTLING BASIN I-5 RD 24 GIBSON RD GIBSON RD LOWER CACHE CREEK, WOODLAND, CALIFORNIA AREA FEASIBILITY Preliminary Alternative 5 LOWER CACHE CREEK OVERFLOW BARRIER SACRAMENTO DISTRICT, CORPS OF ENGINEERS FEBRUARY 2001

31 N I-5 RD 17 YOLO Miles RD 94B RD 18B RD 97A 600 HWY 16 RD 19A RD 98 CALIFORNIA NORTHERN RR RD 18 RD 99 RD 99E 400 RD 18A RD 100B RD 18B RD 18C RD 99 HWY 113 RD 101 RD 102 KENTUCKY AVE KENTUCKY AVE 250 LEGEND Cache Creek Lower Cache Creek Overflow Barrier 200-Yr Floodplain, Pre-project 200-Yr Floodplain, Post-project HWY 16 MAIN ST WOODLAND HWY 113 MAIN ST CACHE CREEK SETTLING BASIN I-5 RD 24 GIBSON RD GIBSON RD LOWER CACHE CREEK, WOODLAND, CALIFORNIA AREA FEASIBILITY Preliminary Alternative YEAR PRE- AND POST-PROJECT FLOODPLAIN SACRAMENTO DISTRICT, CORPS OF ENGINEERS FEBRUARY 2001

32 N YOLO 9,100 9,100! LF LF Miles 8,100 8,100!! 16,000 16,000 LF! 7,000 7,000! 15,300 15,900! 10,700 10,700 2,600 2,900!! 2,300 3, ,700!! 17,900 32,400 N/A 40,100! LEGEND Existi ng Pro ject! LF Cache Creek Lower Cache Creek Overflow Barrier 200-Yr Floodplain, Pre-Project 200-Yr Floodplain, Post-Project Peak Flow (CFS) Levee Failure! 11,200 N/A CACHE CREEK SETTLING BASIN WOODLAND! 20,300 N/A LOWER CACHE CREEK, W OODLAND, CAL IFORNIA AREA FEASIBILITY Preliminary Alternative (200-YEAR) Existing Conditions Vs. North Woodland Overflow Barrier SACRAMENTO DISTRICT, CO RPS OF ENGINEERS FEBRUARY 2001

33 N 6 HWY ROAD 102 Depth (ft) [PRELIMINARY ALTERNATIVE 3 5 plan view map with 6 pre- 2 and post- hydrographs] 4 ROAD 98 Depth (ft) Time (hrs) Depth (ft) # # # # Time (hrs) Miles LEGEND Cache Creek Existing Conditions With North Woodland Overflow Barrier 200-Yr Floodplain, Pre-proj ect 200-Yr Floodplain, Post-project Time (hrs) I I-5 Depth (ft) Depth (ft) # Time (hrs) Time (hrs) LOWER CACHE CREEK, WOODLAND, CALIFORNIA AREA FEASIBILITY Preliminary Alternatives YEAR PRE- AND POST-PROJECT FLOODPLAIN HYDROGRAPHS SACRAMENTO DISTRICT, CORPS OF ENGINEERS FEBRUARY 2001

34 N I-5 RD 17 YOLO Miles RD 94B RD 18B RD 97A 600 HWY 16 RD 19A RD 98 CALIFORNIA NORTHERN RR RD 18 RD RD 99E 400 RD 99 HWY 113 RD 101 RD RD 18A RD 100B 300 RD 18B RD 18C KENTUCKY AVE KENTUCKY AVE 250 LEGEND Cache Creek Lower Cache Creek OverFlow Barrier Water Depth Contours 10-Yr Floodplain HWY 16 MAIN ST WOODLAND HWY 113 MAIN ST CACHE CREEK SETTLING BASIN I-5 RD 24 GIBSON RD GIBSON RD LOWER CACHE CREEK, WOODLAND, CALIFORNIA AREA FEASIBILITY Preliminary Alternative 5 10-Year Post-Project Floodplain SACRAMENTO DISTRICT, CORPS OF ENGINEERS FEBRUARY 2001

35 Preliminary Alternative 5: Lower Cache Creek Overflow Barrier Primary Features Approximately 6.7 miles of new levee from County Road 96 to the Settling Basin west levee from 4 to 17 feet high. Internal drainage canal on water side Flood warning system Removal of a portion of Settling Basin west levee Accomplishments 200-year level of protection for Woodland Alleviate flooding of Northern California Railroad and Interstate 5 south of flood barrier Environmental Impacts Minimal impacts to agricultural lands and the environment

36 Ranking of Preliminary Alternatives Ranking 1 Preliminary Alternative Lower Cache Creek Overflow Barrier 2 Setback Levees Comparative Cost Investment Cost Annual Cost Environmental Impact Effectiveness Acceptability $27,707,000 $2,028,000 Minimal Excellent High $36,457,000 to $45,615,000 $2,668,000 to $3,339,000 Moderate Good Moderate 3 Channelization $69,201,000 $5,063,000 Extensive Moderate Poor 4 Raise Levees $81,139,000 $5,937,000 Extensive Moderate Poor 5 Clearing & Grubbing $37,383,000 $2,945,000 Extensive Unacceptable Unacceptable

37 Key Issues Existing project Erosion sites--future operation and maintenance Raising existing weir--future operation Removing west levee of settling basin Real estate takings in floodway only for lands significantly impacted Bridge and road impacts--state highways, county roads, and railroads Mercury load

38 LOWER CACHE CREEK, YOLO COUNTY WOODLAND AREA FEASIBILITY STUDY Feasibility Study Milestones January 20,2000 May 23, 2000 March 26,2001 July 2001 December 2001 February 2002 March 2002 April 2002 June 2002 Project Milestones Feasibility Cost share Agreement Signed Public Workshop F3 Conference (without project condition) Determination of Selected Plan Draft Feasibility Report w/eis/eir for Public Review Final Feasibility Report w/eis/eir Final Public Meeting Division Engineer s Notice Chief of Engineer s Report to OMB to Achieve Conditional Authorization in WRDA 2002

39 LOWER CACHE CREEK, YOLO COUNTY WOODLAND AREA FEASIBILITY STUDY Project Milestones Design and Construction Milestones October 2002 March 2005 November 2007 Execute Design Agreement and Initiate Preconstruction, Engineering and Design (PED) Award Construction Contract Complete Construction

40 Conclusions/Concurrences Detailed analysis of overflow barrier and set-back levee alternatives

Technical Memorandum No. 8 June 3, 2013 Page 2. FEMA Floodplain Mapping Flood Elevations at WWTP

Technical Memorandum No. 8 June 3, 2013 Page 2. FEMA Floodplain Mapping Flood Elevations at WWTP Page 2 FEMA Floodplain Mapping Flood Elevations at WWTP Existing Flood Control Facilities The City of Davis WWTP is located immediately north of the Willow Slough Bypass and west of the Yolo Bypass (see

More information

June 22, Francis E. Borcalli, P.E.

June 22, Francis E. Borcalli, P.E. CACHE CREEK SETTLING BASIN SYMPOSIUM Managing the Settling Basin Who s Doing What! June 22, 2009 Francis E. Borcalli, P.E. CACHE CREEK SETTLING BASIN SYMPOSIUM Managing the Settling Basin Who s Doing What!

More information

Summary ECONOMIC STUDIES

Summary ECONOMIC STUDIES ECONOMIC STUDIES The Comprehensive Study performed basin-wide economic evaluations that incorporated a risk-based analysis. The primary tool for the economic studies was the Corps Flood Damage Analysis

More information

Prepared for: City of Jeffersonville. November Prepared by

Prepared for: City of Jeffersonville. November Prepared by JEFFERSONVILLE STORMWATER MASTER PLAN HYDRAULICS APPENDIX JEFFERSONVILLE, INDIANA Prepared for: City of Jeffersonville November 2011 Prepared by Christopher B. Burke Engineering, Ltd. 115 W. Washington

More information

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine Bridge Replacement Project Preliminary Hydraulic Study Lincoln, California BRLS-5089 (021) BRIDGE 19C 0059 Mcbean Park Drive at Auburn Ravine Prepared By: Prepared By: Date 11/25/2014 Thomas S. Plummer

More information

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 Phasing of Meetings April Meeting May Meeting October Review of Tax Day Storm Event and Immediate Actions Taken By City Review of Coordination

More information

PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS

PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS 1 NEW JERSEY ASSOCIATION FOR FLOODPLAIN MANAGEMENT PRESENTATION FOR THE 10 TH ANNUAL CONFERENCE PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN

More information

Manhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas

Manhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas Manhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas Tuttle Creek Dam and Lake Kansas City District Project Development Team Manhattan, KS US Army Corps of Engineers 1

More information

John Remus Assessment of Conceptual Nonstructural Alternative

John Remus Assessment of Conceptual Nonstructural Alternative John Remus Assessment of Conceptual Nonstructural Alternative Assessment of Conceptual Nonstructural Alternative Levee Setbacks along the Missouri River (Lower L-575 / Upper L-550 and Lower L-550) Missouri

More information

Hey and Associates, Inc.

Hey and Associates, Inc. Hey and Associates, Inc. Table 1: 100-Year Study Existing Conditions Discharges and Elevations vs. FIS Results Location Existing FIS Q (cfs) Existing FIS Elevation Existing XP- SWMM Q (cfs) Existing XP-SWMM

More information

PUBLIC INFORMATION MEETING Rahway River Basin Flood Risk Management Feasibility Study

PUBLIC INFORMATION MEETING Rahway River Basin Flood Risk Management Feasibility Study PUBLIC INFORMATION MEETING Rahway River Basin Flood Risk Management Feasibility Study COL Paul E. Owen District Engineer U.S. Army Corps of Engineers New York District New Jersey Department of Environmental

More information

DRAFT FOREST VIEW, ILLINOIS SECTION 205 FLOOD RISK MANAGEMENT APPENDIX E HYDROLOGY AND HYDRAULIC ANALYSIS

DRAFT FOREST VIEW, ILLINOIS SECTION 205 FLOOD RISK MANAGEMENT APPENDIX E HYDROLOGY AND HYDRAULIC ANALYSIS FOREST VIEW, ILLINOIS SECTION 205 FLOOD RISK MANAGEMENT APPENDIX E HYDROLOGY AND HYDRAULIC ANALYSIS U.S. Army Corps of Engineers, Chicago District Hydraulics and Environmental Engineering Section 17 March

More information

LOWER BOISE RIVER INTERIM FEASIBILITY STUDY

LOWER BOISE RIVER INTERIM FEASIBILITY STUDY LOWER BOISE RIVER INTERIM FEASIBILITY STUDY Public Information Meetings June 29, 2010 June 30, 2010 July 1, 2010 US Army Corps of Engineers BUILDING STRONG Agenda Introductions / Meeting Objectives Greg

More information

Dam Safety & Planning: Examples of Collaboration and Lessons Learned

Dam Safety & Planning: Examples of Collaboration and Lessons Learned US Army Corps of Engineers PLANNING SMART BUILDING STRONG Dam Safety & Planning: Examples of Collaboration and Lessons Learned Eric Halpin, P.E. Special Assistant for Dam & Levee Safety, HQUSACE Maria

More information

Chicago Waterways Tail Water Conditions Modeling

Chicago Waterways Tail Water Conditions Modeling MEMORANDUM Chicago Waterways Tail Water Conditions Modeling TO: FROM: Tim Coleman, Phil Bonn, CH2MHILL Marion Kessy, FLUIDCLARITY DATE: June 1, 2008 PROJECT NUMBER: FCL 7000 Purpose This memorandum is

More information

RE: Recommendations for Staged Implementation of Alternative 3a

RE: Recommendations for Staged Implementation of Alternative 3a March 10, 2006 Ms. Julie Thomas Coastal San Luis Resource Conservation District 545 Main Street, Suite B-1 Morry Bay, Ca 93442 RE: Recommendations for Staged Implementation of Alternative 3a Dear Ms. Thomas,

More information

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION US Army Corps of Engineers Philadelphia District PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION CECIL COUNTY MARYLAND STORMWATER MANAGEMENT PLAN NARRATIVE INITIAL SUBMISSION JUNE 2014 1 PEARCE CREEK

More information

Appendix C, Attachment 4 June 11, Diversion Channel Outlet Hydraulic Modeling RAS and ADH

Appendix C, Attachment 4 June 11, Diversion Channel Outlet Hydraulic Modeling RAS and ADH Diversion Channel Outlet Hydraulic Modeling RAS and ADH 11 June 2012 1 Contents Introduction... 3 HEC-RAS modeling of Outlet... 3 Transition Structure Geometry... 3 ADH Modeling of Outlet and Floodplain...

More information

CITY OF ANGLETON MASTER DRAINAGE PLAN PHASE I EVALUATION & PRELIMINARY REPORT

CITY OF ANGLETON MASTER DRAINAGE PLAN PHASE I EVALUATION & PRELIMINARY REPORT CITY OF ANGLETON MASTER DRAINAGE PLAN PHASE I EVALUATION & PRELIMINARY REPORT February 2008 Prepared by STOKES & ASSOCIATES, INC. 605 South Main Street, Suite 200 Henderson, Texas 75654 903-657-7558 TABLE

More information

Presentation Overview

Presentation Overview Little Dry Creek Restoration Deep River Flood Risk Management Final Presentation to LCRBDC June 10, 2015 Presentation Overview Project Overview & Background Information Data Collection Model Development

More information

Appendix K Civil Engineering

Appendix K Civil Engineering Appendix K Civil Engineering Fargo-Moorhead Metropolitan Area Flood Risk Management Final Feasibility Report and Environmental Impact Statement Prepared by: U.S. Army Corps of Engineers St. Paul District

More information

Skagit River Flood Damage Reduction Study

Skagit River Flood Damage Reduction Study Skagit River Flood Damage Reduction Study Preliminary Measures Presentation Aug. 18, 2008 Introduction Preliminary measures are required by the Corps planning guidance - ER-1105-2-100. Six-Step Planning

More information

FEMA/USACE Coordination Plan

FEMA/USACE Coordination Plan FEMA/USACE Coordination Plan Project: Fargo-Moorhead Metropolitan Feasibility Study ND Diversion Channel with upstream staging Federal Plan (Authorized WRRDA 2014) Project Design: Project Reach: U.S. Army

More information

Scope of Work Lower Arroyo Grande Creek Flooding Analysis

Scope of Work Lower Arroyo Grande Creek Flooding Analysis Scope of Work Lower Arroyo Grande Creek Flooding Analysis Overview Please note that the limits of work for the hydrologic and hydraulic analysis include the following: Detailed topographic surveys: flood

More information

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA PUBLIC NOTICE

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA PUBLIC NOTICE DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA 95814-2922 408 Permission Section PUBLIC NOTICE REQUEST FOR PERMISSION TO ALTER A U.S. ARMY CORPS OF

More information

Westminster East Garden Grove, California Flood Risk Management Feasibility Study

Westminster East Garden Grove, California Flood Risk Management Feasibility Study 1 Public Scoping Meeting Westminster East Garden Grove, California 255 255 255 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 239 65 53 80 119 27 252 174.59 110 135 120 112 92 56 62

More information

Fargo-Moorhead Metropolitan Feasibility Study. Presentation for. City Engineers Association of Minnesota

Fargo-Moorhead Metropolitan Feasibility Study. Presentation for. City Engineers Association of Minnesota Fargo-Moorhead Metropolitan Feasibility Study Presentation for City Engineers Association of Minnesota January 28, 2010 Partners Corps of Engineers City of Fargo City of Moorhead Metropolitan Flood Management

More information

NEPA Scoping Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

NEPA Scoping Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study NEPA Scoping Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study U.S. Army Corps of Engineers New York District New Jersey Department of Environmental Protection Non-Federal

More information

Technical Memorandum No River Geometry

Technical Memorandum No River Geometry Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.5 River Geometry Task: Collection and Analysis of River Geometry Data To: PRWFPA Staff Working Group Prepared by: J. Schaaf

More information

The Beckett s Run Experience. Fort Wayne, Indiana

The Beckett s Run Experience. Fort Wayne, Indiana The Beckett s Run Experience Fort Wayne, Indiana Introductions Charlie Cochran City of Fort Wayne, Wet Weather Storm & Sewer Engineering Jason Durr, PE Christopher B. Burke Engineering, LLC 2 A Little

More information

BLACK HAWK COUNTY, IOWA AND INCORPORATED AREAS

BLACK HAWK COUNTY, IOWA AND INCORPORATED AREAS VOLUME 2 OF 3 BLACK HAWK COUNTY, IOWA AND INCORPORATED AREAS COMMUNITY NAME BLACK HAWK COUNTY, UNINCORPORATED AREAS COMMUNITY NUMBER 190535 CEDAR FALLS, CITY OF 190017 DUNKERTON, CITY OF 190018 ELK RUN

More information

Lower San Joaquin Feasibility Study Environmental Impact Report/ Supplemental Environmental Impacts Statement

Lower San Joaquin Feasibility Study Environmental Impact Report/ Supplemental Environmental Impacts Statement Sacramento District Engineering Division Lower San Joaquin Feasibility Study Environmental Impact Report/ Supplemental Environmental Impacts Statement San Joaquin County, California Appendix B: Engineering

More information

CLAY STREET BRIDGE REPLACEMENT

CLAY STREET BRIDGE REPLACEMENT HYDROLOGY /HYDRAULICS REPORT. EL DORADO COUNTY CLAY STREET BRIDGE REPLACEMENT Prepared by: Joseph Domenichelli Domenichelli & Associates 1107 Investment Blvd., Suite 145 El Dorado Hills, California 95762

More information

US Army Corps of Engineers

US Army Corps of Engineers I I I ' A I US Army Corps of Engineers LA River Ecosystem Restoration, CA Preconstruction Engineering and Design Phase 104791 LOS ANGELES DISTRICT SOUTH PACIFIC DIVISION August 15, 2017 1 Table of Contents

More information

Hydrology and Flooding

Hydrology and Flooding Hydrology and Flooding Background The 1996 flood Between February 4, 1996 and February 9, 1996 the Nehalem reporting station received 28.9 inches of rain. Approximately 14 inches fell in one 48 hour period.

More information

DESIGN DOCUMENTATION REPORT APPENDIX C HYDROLOGY AND HYDRAULICS

DESIGN DOCUMENTATION REPORT APPENDIX C HYDROLOGY AND HYDRAULICS January 8, 2016 WP-42I FINAL SUBMITTAL DESIGN DOCUMENTATION REPORT APPENDIX C HYDROLOGY AND HYDRAULICS Fargo-Moorhead Flood Risk Management Project In-Town Levees Mickelson Levee Extension WP-42I Engineering

More information

RECORD OF DECISION MAY RIO GRANDE FLOODWAY, SAN ACACIA TO BOSQUE DEL APACHE UNIT FLOOD RISK MANAGEMENT PROJECT SOCORRO COUNTY, NEW MEXICO

RECORD OF DECISION MAY RIO GRANDE FLOODWAY, SAN ACACIA TO BOSQUE DEL APACHE UNIT FLOOD RISK MANAGEMENT PROJECT SOCORRO COUNTY, NEW MEXICO RECORD OF DECISION MAY 2 0 2014 RIO GRANDE FLOODWAY, SAN ACACIA TO BOSQUE DEL APACHE UNIT FLOOD RISK MANAGEMENT PROJECT SOCORRO COUNTY, NEW MEXICO The Final General Reevaluation Report and Supplemental

More information

Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014

Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014 ASFPM 2014 Annual Conference Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014 Agenda Overview and Background Hydrology

More information

LOWER CACHE CREEK, YOLO COUNTY, CITY OF WOODLAND AND VICINITY, CA

LOWER CACHE CREEK, YOLO COUNTY, CITY OF WOODLAND AND VICINITY, CA REVIEW PLAN LOWER CACHE CREEK, YOLO COUNTY, CITY OF WOODLAND AND VICINITY, CA FEASIBILITY STUDY SACRAMENTO DISTRICT August 2010 REVIEW PLAN LOWER CACHE CREEK, YOLO COUNTY, CITY OF WOODLAND AND VICINITY,

More information

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows:

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows: UNION PACIFIC RAILROAD SCOPE OF HYDROLOGIC/HYDRAULIC DESIGN ENGINEERING AND PERMITTING SERVICES FOR SIZING WATERWAY OPENINGS AT NEW AND REPLACEMENT STRICTURES These flood passage criteria were developed

More information

APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS

APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS GENERAL The Hydrologic and Hydraulic information presented in this appendix is provided as a supplement to the Dallas Floodway Extension General Re-evaluation

More information

Sacramento River General Reevaluation Report

Sacramento River General Reevaluation Report Sacramento River General Reevaluation Report Yolo Bypass Working Group 24 May 2016 US Army Corps of Engineers Guidance Engineer Circular (EC) 1105-2-404 Planning Civil Works Projects under the Environmental

More information

Pilot Study for Storage Requirements for Low Flow Augmentation

Pilot Study for Storage Requirements for Low Flow Augmentation US Army Corps of Engineers Hydrologic Engineering Center Pilot Study for Storage Requirements for Low Flow Augmentation April 1968 Approved for Public Release. Distribution Unlimited. TP-7 REPORT DOCUMENTATION

More information

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project IAFSM 2010 Annual Conference City of Rockford Keith Creek Greenway Flood Mitigation Project March 10, 2010 Introduction Problem Overview 1890 s Building of homes along Keith Creek 1920 s Home construction

More information

Computer Determination of Flow Through Bridges

Computer Determination of Flow Through Bridges US Army Corps of Engineers Hydrologic Engineering Center Computer Determination of Flow Through Bridges July 1970 Approved for Public Release. Distribution Unlimited. TP-20 REPORT DOCUMENTATION PAGE Form

More information

CHAPTER 3 FLOOD RELATED STUDIES

CHAPTER 3 FLOOD RELATED STUDIES CHAPTER 3 FLOOD RELATED STUDIES Although the area has experienced regular flooding there have been few formal flood studies until more recently. There are a number of water quality studies in the basins.

More information

Suspended Sediment Discharges in Streams

Suspended Sediment Discharges in Streams US Army Corps of Engineers Hydrologic Engineering Center Suspended Sediment Discharges in Streams April 1969 Approved for Public Release. Distribution Unlimited. TP-19 REPORT DOCUMENTATION PAGE Form Approved

More information

LEVEE DISTRICT NO. 1 OF SUTTER COUNTY

LEVEE DISTRICT NO. 1 OF SUTTER COUNTY LEVEE DISTRICT NO. 1 OF SUTTER COUNTY STAR BEND SETBACK LEVEE AND HABITAT ENHANCEMENT PROJECT BASIS OF DESIGN FEBRUARY 2009 Prepared By: TABLE OF CONTENTS QUALITY CONTROL CERTIFICATION... iv 1.0 INTRODUCTION...

More information

Preliminary Feasibility Study for South San Francisco Bay Shoreline Economic Impact Areas 1-10 Executive Summary

Preliminary Feasibility Study for South San Francisco Bay Shoreline Economic Impact Areas 1-10 Executive Summary Economic Impact Areas 1-10 Executive Summary Prepared For: Department of Water Resource Division of Flood Management State Of California Prepared By: Santa Clara Valley Water District February 2017 A preliminary

More information

Characterizing the Soap Lake Floodplain CHAPTER 2

Characterizing the Soap Lake Floodplain CHAPTER 2 Characterizing the Soap Lake Floodplain CHAPTER 2 CHAPTER 2 CHARACTERIZING THE SOAP LAKE FLOODPLAIN This chapter provides some background on Soap Lake including a general description of the Lake location,

More information

DRAFT. Technical Memorandum. Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update. Prepared For:

DRAFT. Technical Memorandum. Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update. Prepared For: DRAFT Technical Memorandum Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update Prepared For: Pinellas County Department of Environment and Infrastructure Division of Engineering and

More information

Prairie Creek and Tributaries, Russellville, Arkansas

Prairie Creek and Tributaries, Russellville, Arkansas Draft Copy Prairie Creek and Tributaries, Russellville, Arkansas, Draft Feasibility Report with a Draft Finding of No Significant Impact and a Draft Environmental Assessment US Army Corps of Engineers

More information

FINDINGS: Olsson used a three-step analysis strategy to develop a benefit cost ratio that would indicate the relative feasibility of this project.

FINDINGS: Olsson used a three-step analysis strategy to develop a benefit cost ratio that would indicate the relative feasibility of this project. EXECUTIVE SUMMARY FINDINGS: Based on the results of this feasibility study, the Platte Republican Diversion Project would be cost-effective. With minimal improvements to the channel, and the existing bridge

More information

Analyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure

Analyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure Analyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure Tiffany Coleman, PE Senior Project Engineer Stantec/STARR September 10, 2015 How

More information

PROJECT REVIEW PLAN TOPEKA, KANSAS FLOOD RISK MANAGEMENT PROJECT PRE-CONSTRUCTION ENGINEERING AND DESIGN PHASE

PROJECT REVIEW PLAN TOPEKA, KANSAS FLOOD RISK MANAGEMENT PROJECT PRE-CONSTRUCTION ENGINEERING AND DESIGN PHASE PROJECT REVIEW PLAN TOPEKA, KANSAS FLOOD RISK MANAGEMENT PROJECT PRE-CONSTRUCTION ENGINEERING AND DESIGN PHASE NOVEMBER 2010 THIS PAGE INTENTIONALLY LEFT BLANK PROJECT REVIEW PLAN TOPEKA, KANSAS, FLOOD

More information

III. INVENTORY OF EXISTING FACILITIES

III. INVENTORY OF EXISTING FACILITIES III. INVENTORY OF EXISTING FACILITIES Within the Growth Management Boundary, the existing storm drainage facilities are largely associated with development that has historically occurred in the ten drainage

More information

West Sacramento General Reevaluation Report

West Sacramento General Reevaluation Report July 214 West Sacramento General Reevaluation Report Draft Report Documentation Cost Engineering Report Cover Photo Sacramento River, West Sacramento, and Yolo Bypass, March 211 Photo courtesy of Chris

More information

Section 6: Stormwater Improvements

Section 6: Stormwater Improvements Section 6: Stormwater Improvements A major objective of this study was to identify opportunities for improvements to address the widespread water quality impairments caused by stormwater runoff in the

More information

Alternative Approaches to Water Resource System Simulation

Alternative Approaches to Water Resource System Simulation US Army Corps of Engineers Hydrologic Engineering Center Alternative Approaches to Water Resource System Simulation May 1972 Approved for Public Release. Distribution Unlimited. TP-32 REPORT DOCUMENTATION

More information

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction Technical Memorandum Hydraulic Analysis Smith House Flood Stages 1.0 Introduction Pacific International Engineering (PIE) performed a hydraulic analysis to estimate the water surface elevations of the

More information

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models...

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models... TABLE OF CONTENTS 1.0 Background... 1 2.0 Watershed Description... 1 3.0 Hydrology - HEC-HMS Models... 2 3.1 Hydrologic Approach... 2 3.2 Drainage Areas... 2 3.3 Curve Numbers... 2 3.4 Lag Times... 3 3.5

More information

Hydraulic and Sediment Transport Modeling Strategy

Hydraulic and Sediment Transport Modeling Strategy Appendix B Hydraulic and Sediment Transport May 2014 Technical Memorandum Channel Capacity Report September 2014 San Joaquin River Restoration Program Hydraulic and Sediment Transport The San Joaquin River

More information

Southeast Policy Area Drainage Study

Southeast Policy Area Drainage Study Southeast Policy Area Drainage Study Prepared for City of Elk Grove January 2014 448-00-12-03 Table of Contents 1.0 Introduction... 1 2.0 Watershed Description... 1 3.0 Drainage Plan Concept... 1 4.0

More information

Environmental Protection (NJDEP) The Louis Berger Group, Inc.

Environmental Protection (NJDEP) The Louis Berger Group, Inc. Hydraulic Modeling for Preliminary Evaluation of Potential Flooding Impacts for Various Dredging, Capping and Armoring Scenarios of The Lower Passaic River Restoration Abdulai Fofanah, PE, D.WRE, CFM Murat

More information

Engineering Report Preliminary Floodplain Study. Executive Summary

Engineering Report Preliminary Floodplain Study. Executive Summary Executive Summary Engineering Report Preliminary Floodplain Study The Federal Emergency Management Agency (FEMA) has updated the Flood Insurance Rate Maps (FIRM) for Finney County, including the City of

More information

TRUCKEE MEADOWS FLOOD CONTROL PROJECT, NEVADA

TRUCKEE MEADOWS FLOOD CONTROL PROJECT, NEVADA TRUCKEE MEADOWS FLOOD CONTROL PROJECT, NEVADA DRAFT GENERAL REEVALUATION REPORT May 2013 Truckee Meadows Flood Control Project, Nevada May 2013 Prepared by U.S. Army Corps of Engineers Sacramento District

More information

DRAINAGE SUBMITTAL CHECKLIST

DRAINAGE SUBMITTAL CHECKLIST Project Name: Firm Name: Map ID: Engineer: Address: City: State: Zip: Phone Number: Fax Number: Property Owner: Address: City: State: Zip: Reviewed By: Date Received: Date Accepted for Review: The following

More information

Prepared by Battelle Memorial Institute

Prepared by Battelle Memorial Institute Final Independent External Peer Review Report Phase II Post-Authorization Decision Documents (PADD) for the Sacramento River Bank Protection Project (SRBPP), California Prepared by Battelle Memorial Institute

More information

Simulation of Daily Streamflow

Simulation of Daily Streamflow US Army Corps of Engineers Hydrologic Engineering Center Simulation of Daily Streamflow April 1968 Approved for Public Release. Distribution Unlimited. TP-6 REPORT DOCUMENTATION PAGE Form Approved OMB

More information

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM PLAN FORMULATION ADDENDUM Non-Structural Measure Descriptions Elevate Critical Infrastructure This measure would raise at-risk critical structures above the design inundation level. Elevation would be

More information

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Final Report September 2005 Prepared by Center for Ecosystem Management and Restoration, Oakland,

More information

3.3 Acceptable Downstream Conditions

3.3 Acceptable Downstream Conditions iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and

More information

Hydrostatistics Principles of Application

Hydrostatistics Principles of Application US Army Corps of Engineers Hydrologic Engineering Center Hydrostatistics Principles of Application July 1969 Approved for Public Release. Distribution Unlimited. TP-15 REPORT DOCUMENTATION PAGE Form Approved

More information

Pajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study

Pajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study Pajaro River Watershed Flood Prevention Authority Phase 3 and 4a FEBRUARY 2005 Funding for this project has been provided in full or in part through a contract with the SWRCB pursuant to the Costa-Machado

More information

Hypothetical Flood Computation for a Stream System

Hypothetical Flood Computation for a Stream System US Army Corps of Engineers Hydrologic Engineering Center Hypothetical Flood Computation for a Stream System December 1968 Approved for Public Release. Distribution Unlimited. TP-12 REPORT DOCUMENTATION

More information

Hackensack River Flood Reduction Study Update

Hackensack River Flood Reduction Study Update Township of River Vale Hackensack River Flood Reduction Study Update November 11, 2013 Purpose of Study To Analyze Where Frequent Flooding Is Impacting Property and How It Might Be Reduced Hackensack River

More information

PAGE LEFT INTENTIONALLY BLANK

PAGE LEFT INTENTIONALLY BLANK PAGE LEFT INTENTIONALLY BLANK EXECUTIVE SUMMARY This Post Authorization Change Report (PACR) for the Sacramento River Bank Protection Project (SRBPP) identifies the Federal interest in the SRBPP as modified

More information

SECONDARY WETLAND IMPACTS ANALYSIS

SECONDARY WETLAND IMPACTS ANALYSIS SECONDARY WETLAND IMPACTS ANALYSIS USACE File. SWG-2012-00153 During the development of the Grand Parkway (State Highway 99) Segments H and I-1 from United States Highway 59/Interstate Highway 69 N to

More information

DRAINAGE REPORT. Project Name: PG&E Gas Operations Technical Training Center Winters, CA. Date: February 4, Prepared by: BKF Engineers

DRAINAGE REPORT. Project Name: PG&E Gas Operations Technical Training Center Winters, CA. Date: February 4, Prepared by: BKF Engineers DRAINAGE REPORT Project Name: PG&E Gas Operations Technical Training Center Winters, CA Date: February 4, 2015 Prepared by: BKF Engineers Client: Pacific Gas & Electric Company This report has been prepared

More information

Flood Mitigation Plan

Flood Mitigation Plan City of Huntsville, Alabama Flood Mitigation Plan 2001 Prepared by Flood Mitigation Planning Committee June 1, 2001 City of Huntsville, Alabama Flood Mitigation Plan Executive Summary 1973 1999 Prepared

More information

DRAINAGE STUDY CROWS LANDING INDUSTRIAL BUSINESS PARK. Stanislaus County. Prepared by:

DRAINAGE STUDY CROWS LANDING INDUSTRIAL BUSINESS PARK. Stanislaus County. Prepared by: DRAINAGE STUDY FOR CROWS LANDING INDUSTRIAL BUSINESS PARK Stanislaus County Prepared by: March, 2017 Revised November, 2017 Table of Contents EXECUTIVE SUMMARY... 1 1. INTRODUCTION... 2 2. HYDROLOGY...

More information

Appendix G Preliminary Hydrology Study

Appendix G Preliminary Hydrology Study Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014

More information

APPENDIX E PLAN FORMULATION APPENDIX

APPENDIX E PLAN FORMULATION APPENDIX APPENDIX E PLAN FORMULATION APPENDIX Augusta Rocky Creek, Georgia Flood Risk Management Section 205 Feasibility Study Augusta-Richmond County, Georgia APPENDIX E PLAN FORMULATION Augusta Rocky Creek, Georgia

More information

Marysville Levee Commission

Marysville Levee Commission Marysville Levee Commission Outline CVFPP Goals & Objectives Highlights of Draft Feather River RFMP Integration between Flood Protection, Agriculture and Wildlife and Floodplain Uses Proposed Projects

More information

Dallas Floodway Improvements

Dallas Floodway Improvements TRINITY RIVER CORRIDOR PROJECT Dallas Floodway Improvements Refinement of the Balanced Vision Plan - Update to the Trinity River Committee 01-March March-2004 Status of the Urban Design Study As result

More information

U.S. Army Corps of Engineers Los Angeles District. US Army Corps of Engineers BUILDING STRONG

U.S. Army Corps of Engineers Los Angeles District. US Army Corps of Engineers BUILDING STRONG U.S. Army Corps of Engineers Los Angeles District US Army Corps of Engineers BUILDING STRONG 1. Opening Comments; 2. Los Angeles County Drainage Area Project As-Built Condition, Current Condition, and

More information

Dam Failure Analysis. Olivotti Lake Dam. Houle Enterprises, LLC. (Final) Oshkosh, Wisconsin. Lincoln County, Wisconsin. Report prepared for

Dam Failure Analysis. Olivotti Lake Dam. Houle Enterprises, LLC. (Final) Oshkosh, Wisconsin. Lincoln County, Wisconsin. Report prepared for Dam Failure Analysis (Final) Olivotti Lake Dam Lincoln County, Wisconsin Report prepared for Houle Enterprises, LLC Oshkosh, Wisconsin Report prepared by www.meadhunt.com July 2012 Table of Contents Table

More information

Location Hydraulic Study Alisal Creek Bridge at Hartnell Road State Bridge Number 44C0110 County Bridge Number 209

Location Hydraulic Study Alisal Creek Bridge at Hartnell Road State Bridge Number 44C0110 County Bridge Number 209 Alisal Creek Bridge at Hartnell Road State Bridge Number 44C0110 County Bridge Number 209 Prepared for Monterey County RMA February 2017 10680 White Rock Road, Suite 100 Rancho Cordova, CA 95670-6165 Table

More information

Project Drainage Report

Project Drainage Report Design Manual Chapter 2 - Stormwater 2A - General Information 2A-4 Project Drainage Report A. Purpose The purpose of the project drainage report is to identify and propose specific solutions to stormwater

More information

Forecast Informed Reservoir Operations for Groundwater Recharge Prado Dam

Forecast Informed Reservoir Operations for Groundwater Recharge Prado Dam Forecast Informed Reservoir Operations for Groundwater Recharge Prado Dam Greg Woodside Orange County Water District Bridging the Gap Conference January 29, 2019 Anaheim Army Corps of Engineers & OCWD

More information

Upper Mississippi River Comprehensive Plan (UMRCP) October 05

Upper Mississippi River Comprehensive Plan (UMRCP) October 05 Upper Mississippi River Comprehensive Plan (UMRCP) October 05 UMRCP Background Authorized by WRDA 1999 The Secretary shall develop a plan to address water resource and related land resource problems and

More information

Community Technical Group Meeting 7. Wednesday, Feb. 24, 2016

Community Technical Group Meeting 7. Wednesday, Feb. 24, 2016 Community Technical Group Meeting 7 Wednesday, Feb. 24, 2016 Meeting Overview Finalize edits to the proposed vegetation management strategy Learn about and discuss relevant River Capital Improvements and

More information

By Roger Churchwell San Joaquin Area Flood Control Agency.

By Roger Churchwell San Joaquin Area Flood Control Agency. By Roger Churchwell San Joaquin Area Flood Control Agency www.sjafca.com Urban flood control facilities have preformed over the last 59 years Locally we are at the bottom of the bathtub Nearly 500,000

More information

Fargo-Moorhead Metropolitan Area Flood Risk Management Project

Fargo-Moorhead Metropolitan Area Flood Risk Management Project Fargo-Moorhead Metropolitan Area Flood Risk Management Project 52ND ANNUAL IOWA ASCE ENVIRONMENTAL & WATER RESOURCES CONFERENCE 03 April 2014 Aaron W. Buesing Senior Hydraulic Engineer Corps of Engineers,

More information

Lower American River Task Force Briefing. 10 March 2009

Lower American River Task Force Briefing. 10 March 2009 US Army Corps of Engineers Lower American River Task Force Briefing American River Waterways Folsom Dam Modifications / Dam Raise Joint Federal Project 10 March 2009 The Partnership Partner Agencies USACE

More information

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Gregory J Daviero, PhD, PE, Principal Kevin Ruswick, PE, CFM, Associate May 2, 2014 Schnabel Engineering

More information

Alternatives for Willow Creek Flood Mitigation Study

Alternatives for Willow Creek Flood Mitigation Study Alternatives for Willow Creek Flood Mitigation Study Presented by: Anil Tangirala, PE, CFM, ENV SP ms consultants, inc. June 22, 2016 Presentation Overview Introduction Project Background Willow Creek

More information

Tribal Partnership Program Jamestown S Klallam Tribe and USACE Dungeness River in Washington State

Tribal Partnership Program Jamestown S Klallam Tribe and USACE Dungeness River in Washington State Tribal Partnership Program Jamestown S Klallam Tribe and USACE Dungeness River in Washington State Zac Corum, PE, Sr. Hydraulic Engineer, Seattle District USACE Randy Johnson, Habitat Program Manager (JSKT)

More information

Appendix E. Civil Design and Cost Engineering

Appendix E. Civil Design and Cost Engineering Appendix E Civil Design and Cost Engineering Appendix E1 Civil Design Civil Design Appendix South San Francisco Bay Shoreline Study U.S. Army Corps of Engineers, San Francisco District September 2015 USACE

More information

APPENDIX M MITIGATION STRATEGY For WESTMINSTER, EAST GARDEN GROVE FLOOD RISK MANAGEMENT STUDY

APPENDIX M MITIGATION STRATEGY For WESTMINSTER, EAST GARDEN GROVE FLOOD RISK MANAGEMENT STUDY APPENDIX M MITIGATION STRATEGY For WESTMINSTER, EAST GARDEN GROVE FLOOD RISK MANAGEMENT STUDY October 2018 Page intentionally left blank Table of Contents: 1.0 Introduction... 5 1.1 Study Area... 5 1.2

More information