QUARTERLY STORMWATER UPDATE FLOOD CONTROL PROJECTS TONI ALGER, P.E. CITY ENGINEER S OFFICE/STORMWATER ENGINEERING CENTER DECEMBER 12, 2017

Size: px
Start display at page:

Download "QUARTERLY STORMWATER UPDATE FLOOD CONTROL PROJECTS TONI ALGER, P.E. CITY ENGINEER S OFFICE/STORMWATER ENGINEERING CENTER DECEMBER 12, 2017"

Transcription

1 QUARTERLY STORMWATER UPDATE FLOOD CONTROL PROJECTS TONI ALGER, P.E. CITY ENGINEER S OFFICE/STORMWATER ENGINEERING CENTER DECEMBER 12, 2017

2 D A S H B O A R D Aragona Drainage Improvements Ashville Park Drainage Improvements Central Resort District Drainage Improvements Chubb Lake/ Lake Bradford Eastern Shore Drive Drainage Sherwood Lakes Drainage Improvements Stormwater Master Planning, Analysis and Inventory Windsor Woods, Princess Anne Plaza, and The Lakes 2

3 ARAGONA DRAINAGE IMPROVEMENTS, Neighborhood developed in the mid 1950s Storm drain improvements to address severe roadway flooding Project limits include the area south of Haygood Road and west of Aragona Blvd. Under Design Approximately 50% complete Estimated Project Cost $3.7M 3

4 ARAGONA DRAINAGE IMPROVEMENTS SECOND QUARTER ACTIVITIES Modeling the area south of Haygood Road and west of Aragona Boulevard o Modeling will show necessary long-term improvements Design ongoing, approximately 50% complete Scheduled to advertise for construction in July

5 ASHVILLE PARK DRAINAGE IMPROVEMENTS, Storm drain improvements to address severe roadway and property flooding Stormwater Pump Station Gated Control Structure at Existing Outfall (Flanagans Lane) Additional Stormwater Ponds Temporary pumping in advance of significant rainfall events Phase I Estimated Project Cost $8.2M

6 ASHVILLE PARK DRAINAGE IMPROVEMENTS SECOND QUARTER ACTIVITIES Pump down lakes in advance of forecasted significant rainfall Gated control structure design is complete o Awaiting final DEQ permitting approval o Dominion Energy coordination Phase I preliminary design underway due December 2017 Met with Developer October 20, 2017 to discuss cost participation agreement 6

7 CENTRAL RESORT DISTRICT DRAINAGE IMPROVEMENTS, ATD: $300K, BTC: $112.7M Multi-phase project to address severe roadway flooding Improvements include storm drains, tide gate, pump station & ocean outfall Interim Projects: o Redirect approx. 15 ac. from 21st St and Baltic Ave. to 16th St. Pump Station; estimated cost ~ $15M o Replace existing 42 pipe located under 24 th Street with box culvert or bridge; estimated cost ~ $5M

8 CENTRAL RESORT DISTRICT DRAINAGE IMPROVEMENTS SECOND QUARTER ACTIVITIES Draft is under review for the analysis to evaluate a potential stormwater management pond at the Visitor Center Presentation to City Council November 21, 2017 No further project activities at this time 8

9 LAKE CHUBB CHESAPEAKE BAY CHUBB LAKE/ LAKE BRADFORD, BRADFORD LAKE Multi-phase project Storm drain improvements to alleviate roadway flooding Additional stormwater culverts under roadways Tide control devices such as mechanized sluice gates Stormwater management pond improvements Channel and ditch clearing 9

10 CHUBB LAKE/ LAKE BRADFORD SECOND QUARTER ACTIVITIES Public Works continues coordinating with the Navy to open the weir gate when major rain events are forecasted Public Works/Operations cleared the ditch from Lake Bradford to Nider Blvd. o Waiting on permit to complete the project from Nider Blvd to Boone Clinic culvert Preliminary stormwater model is complete and under review First Phase: o Public Involvement o Preliminary Engineering Report Identify Early Implementation Projects Develop Project Schedule 10

11 EASTERN SHORE DRIVE DRAINAGE PHASE I, Multi-phase project Flood control drainage improvements Improvements include stormwater collection systems, tide gates & pump stations Detailed Engineering Analyses to develop the specific program of flood control measures 11

12 EASTERN SHORE DRIVE DRAINAGE PHASE I SECOND QUARTER ACTIVITIES Cape Henry Canal Drainage Improvements design underway o Box culvert from Ebb Tide Road to West Great Neck Road o Begin construction in July 2018 o Estimated Project Cost $8M o Provides an improved drainage outfall for the Shore Drive Corridor Improvements Phase III project (CIP 2-117) Parcel at Page Avenue for future pump station is being acquired as part of the Shore Drive Corridor Improvements Phase III Roadway project o Appraisals are underway 12

13 SHERWOOD LAKES DRAINAGE IMPROVEMENTS, Project to address severe roadway and property flooding Improvements include a pump station with a pipe connection between 2 lakes Temporary Pumping in advance of rain event Estimated Project Cost $3.75M 13

14 SHERWOOD LAKES DRAINAGE IMPROVEMENTS SECOND QUARTER ACTIVITIES Lakes pumped down to elevation 3.0 in advance of forecasted significant rainfall Design for the Permanent Pump Station including interconnect pipe is approximately 90% complete Design for pump station vault, lake intake pipe, and outfall pipe design is complete Real Estate is working with HOA on right of entry and easement plat for the outfall pipe Finalizing the Environmental permit for the outfall 14

15 WINDSOR WOODS, PRINCESS ANNE PLAZA & THE LAKES, 7-028, 7-050, & Detailed Engineering Analyses to develop the specific program of flood control measures Projects combined for initial analysis Analyses will Identify o Needed Improvements o Cost of the Improvements o Implementation and Phasing Plan o Environmental Permitting Required

16 WINDSOR WOODS, PRINCESS ANNE PLAZA & THE LAKES SECOND QUARTER ACTIVITIES Detailed Engineering Analyses to Develop the Specific Program of Flood Control Measures underway Flood Mitigation Assistance Grant 3 projects (upsizing pipes) o South Plaza Trail $4.2M ($3.2M Federal, $1.0M Local) Rosemont Road to Presidential Boulevard 4,813 lf of pipe o Old Forge Road $948K ($711K Federal, $237K Local) Old Forge Court to Red Lion Road 1,415 lf of pipe o Kings Point Court $201K ($158K Federal, $43K Local) 445 lf of pipe 16

17 WINDSOR WOODS, PRINCESS ANNE PLAZA & THE LAKES SECOND QUARTER ACTIVITIES Use of temporary commercial flood barriers being evaluated 15 early implementation construction projects identified Initial screening of 15 early implementation construction projects in Windsor Woods performed o Can the early implementation construction project be started in 12 months and be completed within 3 years? o Does the project provide independent beneficial flood relief in the area? o Are the project costs within CIP budget? 17

18 15 EARLY CONSTRUCTION PROJECTS IDENTIFIED 1. Clubhouse Road Pipe Replacement and Outfall Channel Improvements 18

19 WINDSOR WOODS, PRINCESS ANNE PLAZA & THE LAKES SECOND QUARTER ACTIVITIES Feasibility analysis for Club House Road Storm Drain and Outfall Improvement project is being performed and will be completed by end of the year October 16, 2017 Coordination meeting with PW/Operations and Parks and Recreation o Bow Creek Golf Course ditch from hole #2 to Bow Creek is scheduled to be snagged and dragged in January 2018 o Storm Drains on Elmont Road were cleaned November 2017 November 7, 2017 Public Utilities kick-off coordination meeting 19

20 WINDSOR WOODS, PRINCESS ANNE PLAZA & THE LAKES SECOND QUARTER ACTIVITIES December 15, 2017 Final stormwater model for Windsor Woods, Princess Anne Plaza and The Lakes to be submitted for review Made the following presentations: o October 10, 2017 Princess Anne Plaza Civic League Project Update o November 14, 2017 Princess Anne Plaza Civic League Project Update o December 12, 2017 Princess Anne Plaza Civic League Project Update 20

21 ACTIVE PROJECTS Avg. Pre-depth: 3.1 Avg. Post-depth: 5.2 WINDSOR WOODS CANAL, CIP Dredge 4,100-ft canal to restore original drainage capacity Approximately 10,900 cubic yards of dredge material Notice to Proceed June 2017 Construction Complete June 2018 Total Project Cost $2M 21

22 ACTIVE PROJECTS Avg. Pre-depth: 1.5 Avg. Post-depth: 4.4 NORTHGATE DITCH, CIP Dredge 6,000-ft canal to restore original drainage capacity Approximately 3,000 cubic yards of dredge material Notice to Proceed May 2017 Construction Complete January 2018 Total Project Cost $2M 22

23 ACTIVE PROJECTS Avg. Pre-depth: 0.8 Avg. Post-depth: 4.05 WINDSOR OAKS WEST I, CIP Dredge 1,510-ft canal to restore original drainage capacity 4,218 cubic yards of dredge material removed Notice to Proceed June 2017 Construction Complete Total Project Cost $700K 23

24 ACTIVE PROJECTS Avg. Pre-depth: 0.65 Avg. Post-depth: 4.55 WINDSOR OAKS WEST II, CIP Dredge 2,760-ft canal to restore original drainage capacity Approximately 7,000 cubic yards of dredge material Notice to Proceed July 2017 Construction Complete January 2018 Estimated Total Project Cost $850K 24

25 ACTIVE PROJECTS Avg. Pre-depth: 1.8 Avg. Post-depth: 4.95 WINDSOR OAKS WEST III, CIP Dredge 2,150-ft canal to restore original drainage capacity Approximately 5,000 cubic yards of dredge material Begin Construction January 2018 Construction Complete August 2018 Estimated Total Project Cost $650K 25

26 26 SWM MASTER PLANNING, ANALYSIS, AND MODELING, Updating the City s 31 Stormwater Watershed Models Includes Preliminary Drainage Analysis to identify future Capital Drainage Projects Models will allow Stormwater Engineering Center to provide drainage design parameters such as downstream water surface levels to developers for projects Models will be kept up to date and reside in the Stormwater Engineering Center

27 SWM MASTER PLANNING, ANALYSIS, AND MODELING SECOND QUARTER ACTIVITIES Lynnhaven River Watershed o Watersheds 4 & 7 to be complete by January 2018 o Watershed 6 to be complete by February 2018 o Watershed 30 to be complete by March 2018 Little Creek Watersheds o Watershed 31 to be complete by August 2018 o Watershed 1 to be complete by September 2018 Atlantic Ocean Watershed o Watershed 29 to be complete by January

28 SWM MASTER PLANNING, ANALYSIS, AND MODELING SECOND QUARTER ACTIVITIES Elizabeth River Watersheds o Watershed 2 to be complete by April 2018 o Watersheds to be complete by February 2019 Southern Rivers Watershed o Watersheds 9 to be complete by May 2018 o Watersheds 10 to be complete by April 2018 o Watershed 12 to be complete by June 2018 o Watershed 14 & 15 to be complete by January 2019 o Watersheds 11, 13, 16, to be complete by February

29 DISCUSSION

PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN. o Execution of New and Expanded Flood Control Projects o Program Options

PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN. o Execution of New and Expanded Flood Control Projects o Program Options PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN o Execution of New and Expanded Flood Control Projects o Program Options PHILLIP A. DAVENPORT DIRECTOR OF PUBLIC WORKS APRIL 25, 2017 FLOOD CONTROL PROJECTS

More information

FY Virginia Beach Budget Response to Council Questions

FY Virginia Beach Budget Response to Council Questions FY 2018-2019 Virginia Beach Budget Response to Council Questions Question Number: FY19 70 Question: Building on my question number FY19 69 above, under the column heading Budgeted for FY 2019 please provide

More information

PRINCESS ANNE DISTRICT STORMWATER PROJECTS

PRINCESS ANNE DISTRICT STORMWATER PROJECTS PRINCESS ANNE DISTRICT STORMWATER PROJECTS Topics o o o o o Sea Level Rise and the Southern Watersheds Ashville Park Sherwood Lakes Kingston Estates Drainage Operations & Maintenance in the Southern Watersheds

More information

FY STORMWATER UPDATE TO CITY COUNCIL

FY STORMWATER UPDATE TO CITY COUNCIL FY 2017-2022 STORMWATER UPDATE TO CITY COUNCIL MARCH 8, 2016 1 OVERVIEW Fund Summary Functional Components Closing Discussion 2 FUND SUMMARY 3 FY17 PROPOSED REVENUE ERU Daily Fee = $0.433 ERU Annual Fee

More information

ASHVILLE PARK STORMWATER UPDATE

ASHVILLE PARK STORMWATER UPDATE ASHVILLE PARK STORMWATER UPDATE JULY 18, 2017 1 ASHVILLE PARK CHRONOLOGY 2005: Ashville Park conditionally rezoned. Consisted of Five Villages 2006-2007: Village A Wilshire Village was approved and construction

More information

ASHVILLE PARK STORMWATER UPDATE JULY 18, 2017 1 ASHVILLE PARK CHRONOLOGY 2005: Ashville Park conditionally rezoned. Consisted of Five Villages 2006-2007: Village A Wilshire Village was approved and construction

More information

City of Virginia Beach Department of Public Works/Engineering

City of Virginia Beach Department of Public Works/Engineering City of Virginia Beach Department of Public Works/Engineering Civil & Environmental Engineering Visiting Council Spring 2010 Seminar Phil Pullen, P.E. Transportation Division May 6, 2010 1 Public Works

More information

Consultants, Builders and Developers Informational Meeting Stormwater Design Requirements

Consultants, Builders and Developers Informational Meeting Stormwater Design Requirements Consultants, Builders and Developers Informational Meeting Stormwater Design Requirements Monday, December 4, 2017 9:00 AM 11:00 AM Public Utilities Operations Multipurpose Rooms 3500 Dam Neck Road Virginia

More information

PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS

PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS Public Information Meeting ~ May 2, 2018 Public Works Stormwater Management Division OVERVIEW Surface Water Quality Protection Municipal

More information

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds News Release Contact: Al Sanders 206-477-1016 August 31, 2015 Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds The Flood Control District

More information

SFPUC Flooding Workshop Tuesday, February 9, 2016

SFPUC Flooding Workshop Tuesday, February 9, 2016 Presenters: SFPUC Flooding Workshop Tuesday, February 9, 2016 Tommy Moala, Assistant General Manager, Wastewater Enterprise Stefani Harrison, Project Manager Photo: Dec 3, 2014 End of Cayuga Street 25-year

More information

Princess Anne Plaza and The Lakes Neighborhoods Stormwater Management System Flood Mitigation Plan

Princess Anne Plaza and The Lakes Neighborhoods Stormwater Management System Flood Mitigation Plan CITY OF VIRGINIA BEACH Princess Anne Plaza and The Lakes Neighborhoods Stormwater Management System Flood Mitigation Plan FINAL APRIL 5, 2018 osemont Road Extent London Bridge Creek Windsor Woods Canal

More information

Sewer System Flood Reduction Measures in the Rockcliffe Area

Sewer System Flood Reduction Measures in the Rockcliffe Area PW28.6 REPORT FOR ACTION Sewer System Flood Reduction Measures in the Rockcliffe Area Date: March 26, 2018 To: Public Works and Infrastructure Committee From: General Manager, Toronto Water Wards: Ward

More information

THUNDER BAY AREA DRAINAGE MASTER PLAN

THUNDER BAY AREA DRAINAGE MASTER PLAN THUNDER BAY AREA DRAINAGE MASTER PLAN Overall problem Vs. local solutions There are several areas with local flooding problems A review of the situation showed that the problem is not local, but that the

More information

CITY OF MOUNTAIN VIEW

CITY OF MOUNTAIN VIEW CITY OF MOUNTAIN VIEW Incorporate Climate Change Adaptation in Municipal Scale, Urban Watershed Planning at the City of Mountain View Raymond Wong, PhD, PE, LEED AP Lisa Au, PE Floodplain Management Association

More information

NOVATO WATERSHED PROGRAM

NOVATO WATERSHED PROGRAM NOVATO WATERSHED PROGRAM NOVATO CITY COUNCIL Photo Credit: Sue Lattanzio AGENDA OVERVIEW OF TONIGHT S TALK Slide 2 Context what is a watershed? Process how did we implement the watershed approach? Content

More information

BCWMC Capital Improvement Program (approved April 19, 2018; pending minor Plan amendment)

BCWMC Capital Improvement Program (approved April 19, 2018; pending minor Plan amendment) BCWMC Capital Improvement Program 2020 2024 (approved April 19, 2018; pending minor Plan amendment) Project Name City Number 2019 2020 2021 2022 2023 2024 2025 Totals Medicine Lake Rd and Winnetka Ave

More information

Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement

Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement Case Study: Myrtle-Morehead SDIP City of Charlotte, North Carolina Presented By: Chip Smith, PE Woolpert Kate Labadorf,

More information

PUBLIC WORKS. Public Works

PUBLIC WORKS. Public Works PUBLIC WORKS Department includes CIP and Production, Operations, Transportation, and Finance divisions Overall, 66 positions eliminated in FY2010 Details on the two largest divisions follow; representative

More information

V. DRAINAGE IMPROVEMENTS

V. DRAINAGE IMPROVEMENTS V. DRAINAGE IMPROVEMENTS 5.1 Formulation of Drainage Improvements As indicated in Chapter 4, following the completion of the hydrologic analysis associated with future land use conditions, drainage improvements

More information

Stormwater Control and Treatment

Stormwater Control and Treatment Stormwater Control and Treatment EXISTING CONDITIONS The topography of Pinellas County is mostly flat to gently sloping, characterized by sandy soils and high groundwater levels. Elevations range from

More information

City of San Jose Storm Sewer Master Plan

City of San Jose Storm Sewer Master Plan City of San Jose Storm Sewer Master Plan Anne Symonds, PE and Mira Chokshi, PE 2016 Pacific Water Conference AWWA Hawaii Section HWEA February 4, 2016 Agenda Introduction and Goals of the Project Background

More information

AS A COURTESY, PLEASE TURN OFF CELL PHONES AND PAGERS WHILE MEETING IS IN PROGRESS.

AS A COURTESY, PLEASE TURN OFF CELL PHONES AND PAGERS WHILE MEETING IS IN PROGRESS. Table of Contents Agenda 2 Wastewater Treatment Plant (WWTP) Hydraulic Capacity Update Staff Report 3 WWTP Capacity Outline 5 WWTP Capacity Charts 6 Drainage Concerns on Oak Hill Drive and Quail Drive

More information

The newly updated and comprehensive SWMP shall:

The newly updated and comprehensive SWMP shall: RFQ SCOPE OF SERVICES 2.1 Project Purpose The City of Miami, ( City ) is seeking professional engineering services from a qualified firm for the purpose of planning and developing a newly updated and comprehensive

More information

NOVATO FLOOD CONTROL ZONE No. 1 Marin County Flood Control and Water Conservation District

NOVATO FLOOD CONTROL ZONE No. 1 Marin County Flood Control and Water Conservation District NOVATO FLOOD CONTROL ZONE No. 1 Marin County Flood Control and Water Conservation District Photo by R. Tong. Marin IJ INFORMATION ON MEASURE E: NOVEMBER 7, 2017 PARCEL TAX MEASURE PRESENTATION TO NOVATO

More information

Verbal Interim Progress Report Jim Beever October 25, 2017

Verbal Interim Progress Report Jim Beever October 25, 2017 Verbal Interim Progress Report Jim Beever October 25, 2017 The Southwest Florida Regional Planning Council (SWFRPC) is assisting the City of Bonita Springs in developing a City of Bonita Springs Flooding

More information

Audit of Stormwater Management Utility

Audit of Stormwater Management Utility Audit of Stormwater Management Utility City Council Presentation Tuesday, October 3, 2017 Lyndon S. Remias, City Auditor Gretchen Hudome, Deputy City Auditor Tim Bell, Senior Auditor Tony Gonzalez, Senior

More information

People s Republic of China: Nanjing Qinhuai River Environmental Improvement Project

People s Republic of China: Nanjing Qinhuai River Environmental Improvement Project Draft Design and Monitoring Framework Project Number: 37603 December 2006 People s Republic of China: Nanjing Qinhuai River Environmental Improvement Project A design and monitoring framework is an active

More information

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1

More information

Presentation Overview

Presentation Overview Little Dry Creek Restoration Deep River Flood Risk Management Final Presentation to LCRBDC June 10, 2015 Presentation Overview Project Overview & Background Information Data Collection Model Development

More information

Appendix D - Evaluation of Interim Solutions

Appendix D - Evaluation of Interim Solutions Appendix D - Evaluation of Interim Solutions D.1 Introduction The implementation of long-term improvements is projected to take 5 to 8 years. To reduce the number of years of flooding impacts, the partner

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 3E

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 3E TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 3E From: Date: Subject: Staff May 19, 2017 Council Meeting Local Government Comprehensive Plan Review Draft

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

Gwinnett County Stormwater System Assessment Program

Gwinnett County Stormwater System Assessment Program Gwinnett County Stormwater System Assessment Program Jonathan Semerjian, PE Dept. of Water Resources Stormwater Management Sam Fleming, PE Dewberry Presentation Overview Project Background Drivers Enhanced

More information

Woodhills Bay Colony Stormwater Master Plan

Woodhills Bay Colony Stormwater Master Plan Woodhills Bay Colony Stormwater Master Plan FREP Noon Network Fox Lake February 18, 2015 Michael E. Novotney, PE Water Resources Professional Stormwater Master Plan Presents an overall stormwater management

More information

Draft Pond Sizing Technical Memorandum

Draft Pond Sizing Technical Memorandum Project Development & Environment Study I-75 (SR 93A) From Moccasin Wallow Road (CR 6) to South of US Highway 301 (SR 43) Draft Pond Sizing Technical Memorandum WPI Segment No.: 419235-2 Manatee & Hillsborough

More information

Julia Bahen, Urban Strategies Inc.

Julia Bahen, Urban Strategies Inc. THE MUNICIPAL INFRASTRUCTURE GROUP LTD. 8800 Dufferin Street, Suite 200 Vaughan, Ontario L4K 0C5 T 905.738.5700 F 905.738.0065 www.tmig.ca TECHNICAL MEMORANDUM DATE June 13, 2017 TO CC SUBJECT FROM PROJECT

More information

Concept, Feasibility & Mobility Studies. Southport Connector Expressway

Concept, Feasibility & Mobility Studies. Southport Connector Expressway Concept, Feasibility & Mobility Studies Southport Connector Expressway Project Background FDOT Alternative Corridor Evaluation (ACE) Study Advanced Notification Package distributed September 2012 ETDM

More information

CHAPTER 7. San Dieguito River Flooding Adaptation

CHAPTER 7. San Dieguito River Flooding Adaptation CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,

More information

III. INVENTORY OF EXISTING FACILITIES

III. INVENTORY OF EXISTING FACILITIES III. INVENTORY OF EXISTING FACILITIES Within the Growth Management Boundary, the existing storm drainage facilities are largely associated with development that has historically occurred in the ten drainage

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

PRESENTERS. Contact Information: RW Armstrong Union Station, 300 S. Meridian St. Indianapolis, IN

PRESENTERS. Contact Information: RW Armstrong Union Station, 300 S. Meridian St. Indianapolis, IN 1 PRESENTERS David Bourff, Director of Environmental Planning Simon Davies, LEED AP, Environmental Scientist Summer O Brien, PWS, Senior Environmental Scientist Contact Information: RW Armstrong Union

More information

Pasco County Watershed Meeting for Flood Impacted Areas Pinellas Anclote Watershed

Pasco County Watershed Meeting for Flood Impacted Areas Pinellas Anclote Watershed Pasco County Watershed Meeting for Flood Impacted Areas Pinellas Anclote Watershed August 26, 2015 County Board Room, Pasco County The following is a summary of the Pinellas Anclote Watershed meeting held

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Virginia Stormwater Management Program SPECIFIC SUBJECT: Application of the

More information

Stantec LAKEW OD RANCH STEWARDSHIP DISTRICT MASTER ENGINEER'S REPORT FOR NORTHEAST SECTOR AT LAKEWOOD RANCH INFRASTRUCTURE IMPROVEMENTS

Stantec LAKEW OD RANCH STEWARDSHIP DISTRICT MASTER ENGINEER'S REPORT FOR NORTHEAST SECTOR AT LAKEWOOD RANCH INFRASTRUCTURE IMPROVEMENTS LAKEW OD RANCH STEWARDSHIP DISTRICT MASTER ENGINEER'S REPORT FOR NORTHEAST SECTOR AT LAKEWOOD RANCH INFRASTRUCTURE IMPROVEMENTS Stantec Prepared for: Lakewood Ranch Stewardship District 14400 Covenant

More information

New Castle County, DE. Floodplain Regulations

New Castle County, DE. Floodplain Regulations New Castle County, DE Floodplain Regulations John J. Gysling, PE CFM Department of Land Use New Castle County, DE February 26, 2009 Today s Presentation Floodplain Protection and Uses Terms and Definitions

More information

Sea Level Rise Adaptation Strategy for San Diego Bay. Brian Holland, AICP, Climate Program Manager City of San Diego EESTF June 29, 2011

Sea Level Rise Adaptation Strategy for San Diego Bay. Brian Holland, AICP, Climate Program Manager City of San Diego EESTF June 29, 2011 Sea Level Rise Adaptation Strategy for San Diego Bay Brian Holland, AICP, Climate Program Manager City of San Diego EESTF June 29, 2011 Five Milestones for Climate Adaptation Adapted from Preparing for

More information

Stormwater Maintenance. Committee of the Whole Middleton Common Council Updated March 12, 2013

Stormwater Maintenance. Committee of the Whole Middleton Common Council Updated March 12, 2013 Stormwater Maintenance Committee of the Whole Middleton Common Council Updated March 12, 2013 What is Stormwater Runoff? The waters derived from rains falling or snowmelt or ice melt occurring within the

More information

Storm Sewer System Maintenance: Post-Construction and Pollution Prevention/Good Housekeeping

Storm Sewer System Maintenance: Post-Construction and Pollution Prevention/Good Housekeeping DEPARTMENT OF TRANSPORTATION AND ENVIRONMENTAL SERVICES Storm Sewer System Maintenance: Post-Construction and Pollution Prevention/Good Housekeeping August 20, 2015 APWA Mid-Atlantic Lunch-n-Learn Agenda

More information

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project IAFSM 2010 Annual Conference City of Rockford Keith Creek Greenway Flood Mitigation Project March 10, 2010 Introduction Problem Overview 1890 s Building of homes along Keith Creek 1920 s Home construction

More information

Winter Haven, FL & the Peace Creek Watershed. Howard T. Odum Center for Wetlands University of Florida

Winter Haven, FL & the Peace Creek Watershed. Howard T. Odum Center for Wetlands University of Florida Winter Haven, FL & the Peace Creek Watershed Howard T. Odum Center for Wetlands University of Florida Sustainable Water Resource Management: the use of water resources in a way that meets the needs of

More information

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report Prepared for: Cameron McCarthy Landscape Architects LLP

More information

Ashville Park Stormwater Management System Flood Mitigation Plan

Ashville Park Stormwater Management System Flood Mitigation Plan CITY OF VIRGINIA BEACH Ashville Park Stormwater Management System Flood Mitigation Plan FINAL DRAFT FEBRUARY 21, 2017 Table of Contents Executive Summary... ES-1 Section 1 Introduction... 1-1 Section

More information

6 Preliminary Assessment of Construction Method and Constructability Issues

6 Preliminary Assessment of Construction Method and Constructability Issues 6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT Goal 7.0. To optimize integrated stormwater management in order to reduce damage and impacts from sea level rise and flooding, promotes recharge to the Surficial Aquifer System (SAS), improve and protect

More information

Review Zone Application for D&R Canal Commission Decision

Review Zone Application for D&R Canal Commission Decision Review Zone Application for D&R Canal Commission Decision MEETING DATE: June 15, 2016 DRCC #: 15-4748 Phase I and II Latest Submission Received: May 4, 2016 Applicant: Kevin Hayes Country Club Meadows,

More information

Suffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation

Suffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation Suffolk Downs Redevelopment Expanded PNF Appendix G: Stormwater Management Supporting Documentation Suffolk Downs Redevelopment Phase 1 Stormwater Management Report Boston, Massachusetts 285402RP004 TABLE

More information

Table D-1. Montour County Hazard Mitigation Projects - Municipalities Affected. Structural Projects

Table D-1. Montour County Hazard Mitigation Projects - Municipalities Affected. Structural Projects Table D-1 Montour County Hazard Mitigation Projects - Municipalities Affected Structural Projects Project Description Mitigation Objective Hazard Municipality(s) Affected Pursue re-mapping of the 100-year

More information

Public Utilities - Sewer

Public Utilities - Sewer County of Henrico, Virginia Capital Improvement Program FY 2017-18 through FY 2021-22 Fund 51 Enterprise Fund - W&S Request Request Request Request Request Project/Work Phase Priority FY 17-18 FY18-19

More information

SURFACE WATER MANAGEMENT ELEMENT

SURFACE WATER MANAGEMENT ELEMENT SURFACE WATER MANAGEMENT ELEMENT of the PINELLAS COUNTY COMPREHENSIVE PLAN Prepared By: The Pinellas County Planning Department as staff to the LOCAL PLANNING AGENCY for THE BOARD OF COUNTY COMMISSIONERS

More information

5.2-2 Progress Report and Future Outlook

5.2-2 Progress Report and Future Outlook 5.2-2 Progress Report and Future Outlook Presentation to Peel Regional Council By Deborah Martin-Downs June 22, 2017 5.2-3 Outline 2016 Highlights and 2017 Accomplishments to Date Climate Risk Methodology

More information

Appendix G Preliminary Hydrology Study

Appendix G Preliminary Hydrology Study Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014

More information

HYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California

HYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California HYDROLOGY STUDY 12000 LA MIRADA BOULEVARD La Mirada, California TTM 73119 Prepared for: The Olson Company 3010 Old Ranch Parkway, Suite 100 Seal Beach, CA 90740 Contact: Mr. Aaron Orenstein (562) 370-9531

More information

UPPER HOOD CANAL WATERSHED

UPPER HOOD CANAL WATERSHED UPPER HOOD CANAL WATERSHED 2014 Water Quality Monitoring Report Kitsap Public Health District 1 2 UPPER HOOD CANAL WATERSHED The Upper Hood Canal (UHC) watershed, most of which is designated as Extraordinary

More information

East St. Tammany Storm Surge Protection Project Request

East St. Tammany Storm Surge Protection Project Request East St. Tammany Storm Surge Protection Project Request Submitted to Coastal Protection & Restoration Authority of Louisiana (CPRA) August 2015 Contact Information: Thomas Nolan Thompson The East St. Tammany

More information

Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory

Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining

More information

CONSOLIDATED CITY - COUNTY Duval County City of Jacksonville, Florida. Adopted Capital Improvement Program FY

CONSOLIDATED CITY - COUNTY Duval County City of Jacksonville, Florida. Adopted Capital Improvement Program FY CONSOLIDATED CITY - COUNTY Duval County City of Jacksonville, Florida Adopted Capital Improvement Program FY 2012-2016 FY 13-17 ADOPTED CAPITAL IMPROVEMENT PROJECTS FUNDING SOURCE FY 12/13 FY 13/14 FY

More information

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX H H.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

Vulnerability Assessment

Vulnerability Assessment Brief coastal vulnerability assessment for the City of Cocoa Beach, conducted utilizing available NOAA and UF GeoPlan tools. Vulnerability Assessment City of Cocoa Beach East Central Florida Regional Planning

More information

NY Rising Reconstruction Program Project Update

NY Rising Reconstruction Program Project Update NY Rising Reconstruction Program Project Update Rye City Council Monthly Meeting PRESENTERS: Bradley Cantor Kate Seely-Kirk Peter Johantgen Brian Platt Governor s Office of Storm Recovery (GOSR) Regional

More information

City of Virginia Beach Urban Tree Canopy Implementation Plan. Susan French, City Arborist Barbara Duke, Senior Planner

City of Virginia Beach Urban Tree Canopy Implementation Plan. Susan French, City Arborist Barbara Duke, Senior Planner City of Virginia Beach Urban Tree Canopy Implementation Plan Susan French, City Arborist Barbara Duke, Senior Planner Urban Tree Canopy Implementation Plan Motivation In 2012: PAR began active development

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

TMDL Report for Chesapeake Bay Shellfish Waters: Ware Creek, Taskinas Creek, and Skimino Creek Bacterial Impairments (VADEQ, 2010)

TMDL Report for Chesapeake Bay Shellfish Waters: Ware Creek, Taskinas Creek, and Skimino Creek Bacterial Impairments (VADEQ, 2010) As part of a long term commitment to environmental stewardship, James City County volunteers and staff have been gathering information about stream health throughout the County since 2008. The goal of

More information

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO.

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO. APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO. 11-91360-001 ADVERTISED: November 5, 2010 MANDATORY PRE-BID MEETING:

More information

Chapter 13. Implementation Plan

Chapter 13. Implementation Plan Chapter 13 Implementation Plan Table of Contents 13-3 13.1 Agencies Responsible for Implementation... 13-3 13.2 Updating and Amending the List of Projects and Programs... 13-5 13.3 Timelines for Active

More information

Ditches in North Carolina

Ditches in North Carolina Ditches in North Carolina Raleigh Bland Regulatory Project Manager Washington Regulatory Field Office February 11, 2016 US Army Corps of Engineers Army Corps of Engineers Standard Operating Procedures

More information

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1 City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June 2010... Chapter 1 i CITY OF AZLE iswm CRITERIA MANUAL FOR SITE DEVELOPMENT AND CONSTRUCTION Incorporating the Regional NCTCOG Integrated

More information

ATTACHMENT N ASSESSMENT OF PROGRAM EFFECTIVENESS

ATTACHMENT N ASSESSMENT OF PROGRAM EFFECTIVENESS ATTACHMENT N ASSESSMENT OF PROGRAM EFFECTIVENESS [This page has been left blank intentionally] Assessment of Program Effectiveness 1. Assessment of your agency's compliance with permit requirements, based

More information

CITY OF SAFETY HARBOR ENGINEERING

CITY OF SAFETY HARBOR ENGINEERING CITY OF SAFETY HARBOR ENGINEERING The Engineering Department provides the city with technical services including design of construction and maintenance projects, review of development plans, field surveys,

More information

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 Phasing of Meetings April Meeting May Meeting October Review of Tax Day Storm Event and Immediate Actions Taken By City Review of Coordination

More information

Office of the City Auditor. Audit of Stormwater Management Utility

Office of the City Auditor. Audit of Stormwater Management Utility eport ate: September 29, 2017 Office of the City Auditor 2401 Courthouse rive, oom 344 Virginia Beach, Virginia 23456 757.385.5870 Promoting Accountability and Integrity in City Operations Contact Information

More information

ORDINANCE. AMENDMENT TO THE CECIL COUNTY ROAD CODE and STANDARD SPECIFICATIONS

ORDINANCE. AMENDMENT TO THE CECIL COUNTY ROAD CODE and STANDARD SPECIFICATIONS ORDINANCE AMENDMENT TO THE CECIL COUNTY ROAD CODE and STANDARD SPECIFICATIONS WHEREAS, by virtue of Chapter 242-1.A. of the Cecil County Code of Public Laws, the Board of County Commissioners of Cecil

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

Building a Stormwater BMP Maintenance Program from the ground up.

Building a Stormwater BMP Maintenance Program from the ground up. DEPARTMENT OF TRANSPORTATION AND ENVIRONMENTAL SERVICES Building a Stormwater BMP Maintenance Program from the ground up. May 4-6, 2016 APWA Mid-Atlantic Presentation Agenda Post-Construction Stormwater

More information

Coastal Restoration and Protection Projects - SLFPA-East and Vicinity

Coastal Restoration and Protection Projects - SLFPA-East and Vicinity Coastal Restoration and Protection Projects - SLFPA-East and Vicinity committed to our coast committed to our coast 2012 Master Plan Project Details 2012 Master Plan Projects in SLFPA-East Projects in

More information

Hiawatha Golf Course. Minneapolis Park & Recreation Board City of Minneapolis. Update on investigations and Phase Two work plan 29 November 2016

Hiawatha Golf Course. Minneapolis Park & Recreation Board City of Minneapolis. Update on investigations and Phase Two work plan 29 November 2016 Hiawatha Golf Course Minneapolis Park & Recreation Board City of Minneapolis Update on investigations and Phase Two work plan 29 November 2016 Meeting purpose There are three primary goals for this meeting:

More information

Stormwater Improvement for St. Armands Key

Stormwater Improvement for St. Armands Key Stormwater Improvement for St. Armands Key Michael A. Hanson, P.E. Senior Engineer Boyle Engineering Corporation 5971 Cattleridge Boulevard, Suite 200 Sarasota, Florida 34232 Rajaraman Jayakrishnan, Ph.D.

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

U.S. Army Corps of Engineers Permit Application Tips

U.S. Army Corps of Engineers Permit Application Tips U.S. Army Corps of Engineers Permit Application Tips MnDOT Environmental Conference Ben Orne and Sarah Wingert, USACE 4-29-2015 US Army Corps of Engineers BUILDING STRONG Outline Introduction to Corps

More information

The Gateway Expressway FTBA Conference. February 2-3, 2017

The Gateway Expressway FTBA Conference. February 2-3, 2017 The Gateway Expressway FTBA Conference February 2-3, 2017 256996-1 SR 686 (Roosevelt Blvd.) at CR 611 (49th St. N) PD&E 256866-1 Segment 2A 256997-1 SR 686 (Roosevelt Blvd.) from 49th St. Bridge to north

More information

Village of Winnetka Flood Risk Reduction Assessment. Christopher B. Burke Engineering, Ltd. (CBBEL) October 11, 2011

Village of Winnetka Flood Risk Reduction Assessment. Christopher B. Burke Engineering, Ltd. (CBBEL) October 11, 2011 Village of Winnetka Flood Risk Reduction Assessment October 11, 2011 Christopher B. Burke Engineering, Ltd. (CBBEL) Thomas T. Burke, Jr., PhD, PE David Buckley, PE, CFM Introduction The September 2008

More information

City of North Royalton Ohio Turnpike 3 rd Lane Expansion Investigation Study

City of North Royalton Ohio Turnpike 3 rd Lane Expansion Investigation Study City of North Royalton Ohio Turnpike 3 rd Lane Expansion Investigation Study Followup Neighborhood Meeting November 10, 2005 1 Agenda Study Objectives and Methodology Evaluation of Flooding Problems Relationship

More information

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

South Florida Resilient Redesign

South Florida Resilient Redesign South Florida Resilient Redesign Suburban Community Western Miami-Dade County Site Overview This place was once the Everglades, and when it rains, it remembers! Low-lying inland suburban area that is currently

More information

SBSA. DATE: 31 May 2016 HILL AIR FORCE BASE CEN/CEIE PLAN REVIEW CHECKLIST FOR NEW DEVELOPMENT AND REDEVELOPMENT CONSTRUCTION

SBSA. DATE: 31 May 2016 HILL AIR FORCE BASE CEN/CEIE PLAN REVIEW CHECKLIST FOR NEW DEVELOPMENT AND REDEVELOPMENT CONSTRUCTION SBSA PROJECT TITLE: KRSM095002, wo54127 Construct Clubhouse near Bldg 720; KRSM150043, wo54127 Replace Piping Utilities near Bldg 720, KRSM130012, wo54127 Demo Golf Clubhouse Bldg 720. General: DATE: 31

More information

Modified FY ,100, ,329,791

Modified FY ,100, ,329,791 Retail/North Andrews Gardens Neighborhood Improvement Program Expenses Through FY 4 Modified FY 5 Budget FY 26-21 North Andrews Gardens Neighborhood Improvement Project 21,524,34 22,75,757 --- 6,1, 6 ---

More information