1 2013 BARGE ALLISION AT MARSEILLES LOCK AND DAM MARSEILLES, ILLINOIS ASCE ENVIRONMENTAL AND WATER RESOUCES CONFERENCE Toby Hunemuller Chief, Hydrologic Engineering Section 6 April 2017 The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.

2 AGENDA 2 Site Overview & Maps 2013 Flood Event and Allision Emergency Response Recovery & Repairs Forensic Study

3 DEFINITION 3 Allision - maritime law. The running of one vessel against another. It is distinguished from collision in this, that the latter means the running of two vessels against each other (The Law Dictionary.org)

4 LOCATION 4

5 MARSEILLES LOCK AND DAM 5 Island Headraces Marseilles, IL Lock Dam Earthen Dike

6 EARTHEN DIKE Constructed as a feature of the dam Mitigate for pool created by the dam 3 to 5 feet high embankment Marseilles, IL 6 Earthen Dike Illinois River

7 DAM 7 Founded on competent shale Eight Tainter Gates Trunnion Anchor system Load transferred to pier Trunnion Beam and anchor system Post-stressed tendons Marseilles Dam Pool

8 THE EVENT 8 Marseilles USGS Flow Comparisons 120,000 USGS Apr2013 Provisional 110,000 USGS Sep2008 Observed 100,000 USGS Aug2007 Observed USGS May2002 Observed 90,000 80,000 Flow (CFS) 70,000 60,000 50,000 40,000 30,000 20,000 10,000 Date 26-May 24-May 22-May 20-May 18-May 16-May 14-May 12-May 10-May 8-May 6-May 4-May 2-May 30-Apr 28-Apr 26-Apr 24-Apr 22-Apr 20-Apr 18-Apr 16-Apr 14-Apr 12-Apr 10-Apr 0

9

10

11

12

13

14

15

16

17 MARSEILLES FLOODING APRIL 19 Headrace s Loc k Dam Earth Dike

18 MARSEILLES FLOODING APRIL 19 Headrace s Loc k Dam Earth Dike

19 MARSEILLES FLOODING APRIL 19 1 P1 2 P2 3 P3 4 P4 5 P5 6 P6 7

20 MARSEILLES FLOODING APRIL P1 2 2 P2 3 3 P3 4 4 P4 5 5 P5 6 6 P6 7 7 P7 8 8

21 INITIAL ASSESSMENT APRIL 20 21

22 INITIAL ASSESSMENT - APRIL 20 22

23 DAMAGE SUMMARY & RESPONSE Public, commercial, and residential structures damaged WLS-TV Chicago News Story, Foundations collapsed, erosion of roads and yards 6 of 8 Tainter gates heavily damaged 2 Tainter gates inoperable with sunken barges Erosion of earthen dike Erosion around lock structure Erosion around the boiler house

24 NOW WHAT DO WE DO.. 24 Unified Command set up Coast Guard (lead), USACE and Navigation Industry Evaluate river forecasts and estimate discharges through the partially open gates Begin developing and refining hydraulic models Assess ways to stop flow through the dam and control pool, facilitate barge removal Assess flood risk and mitigation options due to inoperable gates Assess condition and damage to earthen dike Public meetings to communicate status and risks

25 NOW WHAT DO WE DO April barges impact dam 27 April begin work on rock dike 9 May bulkhead fabrication and earth dike repairs commence 14 May rock dike completion, navigation resumes 21 May public meeting to discuss flood risk 30 May begin raise of earth dike and rock dike 1 June complete raise of earth dike and rock dike 11 June downstream scour survey completed 17 June remove last barge 18 June upstream scour survey completed, bulkhead placed at Gate #2 27 June bulkhead placed at Gate #3 16 July rock work platform completed at Pier #2 1 August complete temp trunnion repair 1 August assessment of Gates #2 & #3 1 August complete trunnion assess field work

26 ROCK DIKE CONSTRUCTION April to 14 May Video

27 ROCK DIKE CONSTRUCTION 27

28 ROCK DIKE CONSTRUCTION RIVER DRAWDOWN PHOTOS 28

29 PREPARING FOR PUBLIC MTG 29

30 PUBLIC MEETING May Provide updates and best available information. 4 gates operational (thru July 2013) Timeframe contingent on barge removal, bulkhead placement, and rock dike removal Evaluation of measures to reduce flood risk Normal flows (42,000 cfs) passed at flat pool ft. 1 in 5 annual chance occurrence of a flood that exceeds the current low point (487.5) 1 in 10 annual chance occurrence of a flood that exceeds top of dike (488.6). Probability of overtopping (488.6) is 20 times greater with 4 gates operational than 8 gates operational. Provide the City with best estimate of discharges to implement voluntary / mandatory evacuation Monitor hydrologic conditions

31 RISK REDUCTION 31 Team evaluated ways to provide additional capacity for high flows to offset inoperable/damaged gates Reopen the mill race not feasible Emergency spillway over island not feasible Temporarily raise earthen dike HESCO s ~ Constructed 30 May 1 June Install temporary anchorage for gates 2 & 3 ~ 1 August

32 FINAL BARGE REMOVED June

33 BULKHEAD FABRICATION & INSTALLATION 33 Start: 9 May Install:18-27 June

34 TAINTER GATE INSPECTION & TEMPORARY ANCHORAGE 34 1 August

35 TAINTER GATE INSPECTION & DAMAGE 35 1 August

36 TAINTER GATE INSPECTION & DAMAGE 36

37 PERMANENT REPAIR CONTRACT - DAM 37 Replace 3 Tainter gates Repair 2 Tainter gates Fabricate & Install new Tainter gate anchorage New control/communications line from lock to dam Repair concrete piers Remove rock dike/platform material downstream of dam Solicitation and award dependent on funding Best value contract Gate repairs, fabrication & gate installation were key factors Ensure 6 gates were operable at all times Awarded 23 September 2014 Massman Construction Company $20.7M Wrapping up work this spring.

38 DAM REPAIRS TAINTER GATE ANCHORAGE BEAM 38

39 DAM REPAIRS TAINTER GATE ANCHORAGE BEAM 39

40 DAM REPAIRS - TAINTER GATES 40

41 PHASE I & PHASE II EARTHEN DIKE REPAIRS Phase I 9 May Repairs to restore integrity of dike Remove 20 trees Identify critical encroachments Phase II FY17 Award 41

42 PHASE II EARTHEN DIKE REPAIRS 42 Award FY17 Remove HESCO s Remove 42 trees Grub tree roots from Phase I Remove boat ramps Restore section & elevation

43 COSTS 43 Approximate Total Costs (Design, Construction, Oversight) Temporary repairs: $10 million Dam repairs: $25 million Earth Dike repairs: $8 million Total Cost: $43 million

44 FORENSIC ANALYSIS 44 Study to document, simulate and analyze the 2013 flood event HEC-RAS model with dam gate operations to simulate 2008 (calibration) and 2013 events Estimate the change in water surface due to barges and gate operations Surveillance footage to estimate gate operations and timing of event as it occurred Concluded 2013 event would have likely overtopped the earthen dike Magnitude and duration increased due to blockage caused by barges Gate operations to reduce outdraft would likely not increase overtopping (depth/duration) when compared to normal operations

45 QUESTIONS? 45

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 80 119 27 252 174.59 110 135 120 112 92 56 IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

More information

USACE LEVEE AND DAM SAFETY PROGRAM AND ISSUES

USACE LEVEE AND DAM SAFETY PROGRAM AND ISSUES USACE LEVEE AND DAM SAFETY PROGRAM AND ISSUES 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130

More information

US ARMY CORPS OF ENGINEERS ACTIONS DURING 2016 TEXAS SPRING FLOOD

US ARMY CORPS OF ENGINEERS ACTIONS DURING 2016 TEXAS SPRING FLOOD 1 US ARMY CORPS OF ENGINEERS ACTIONS DURING 2016 TEXAS SPRING FLOOD 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

More information

Reservoir Drought Operations

Reservoir Drought Operations Reservoir Drought Operations Kevin J. Landwehr, P.E., D.WRE Chief, Hydrology and Hydraulics Branch 4 March 2013 Purpose Awareness of Drought Contingency Plans 2012/13 Reservoir Operations Drought Management

More information

Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam

Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam ASDSO September 10, 2008 John Rutledge - Freese & Nichols, Inc. Chuck Easton - Freese & Nichols, Inc. Janis Murphy - Freese & Nichols, Inc.

More information

SACRAMENTO SUPPLEMENTAL PROJECTS OVERVIEW

SACRAMENTO SUPPLEMENTAL PROJECTS OVERVIEW 1 SACRAMENTO SUPPLEMENTAL PROJECTS OVERVIEW 131 132 122 8 119 27 252 174.59 11 135 12 112 92 56 CAMERON SESSIONS SUPPLEMENTAL PROGRAM MANAGER 239 65 53 18 October 218 - American River Common Features WRDA

More information

Upper Mississippi River Basin Environmental Management Program Workshop

Upper Mississippi River Basin Environmental Management Program Workshop Presentation to the Upper Mississippi River Basin Environmental Management Program Workshop by Kara Mitvalsky Environmental Engineer US Army Corps of Engineers, Rock Island District August 18, 2005 Engineering

More information

FACT SHEET. 1/ The Recovery Act stipulates that Recovery Act funds for IWTF projects will not be cost shared.

FACT SHEET. 1/ The Recovery Act stipulates that Recovery Act funds for IWTF projects will not be cost shared. SUBJECT: Chickamauga Lock, Tennessee River, TN PROJECT DESCRIPTION: Chickamauga Lock is seven miles northeast of Chattanooga, TN, Hamilton County, Tennessee River mile 471. A new 110 x 600 lock will replace

More information

Pier (TYP) Tainter Gate (TYP) Chapter 2 Applications General

Pier (TYP) Tainter Gate (TYP) Chapter 2 Applications General Chapter 2 Applications 2-1. General a. Application. Controlled spillways include crest gates that serve as a movable damming surface allowing the spillway crest to be located below the normal operating

More information

TOLEDO BEND PROJECT FERC NO DRAFT LICENSE APPLICATION EXHIBIT E - ENVIRONMENTAL EXHIBIT 2.0 PROPOSED ACTION AND ALTERNATIVES

TOLEDO BEND PROJECT FERC NO DRAFT LICENSE APPLICATION EXHIBIT E - ENVIRONMENTAL EXHIBIT 2.0 PROPOSED ACTION AND ALTERNATIVES TOLEDO BEND PROJECT FERC NO. 2305 DRAFT LICENSE APPLICATION EXHIBIT E - ENVIRONMENTAL EXHIBIT 2.0 PROPOSED ACTION AND ALTERNATIVES May 2011 Copyright 2011.Sabine River Authority of Texas and Sabine River

More information

Mill Pond Dam Modifications Feasibility Study

Mill Pond Dam Modifications Feasibility Study May 1, 2013 Mill Pond Dam Modifications Feasibility Study Village of Goodrich, MI Table of Contents 1. Background...1 1.1 Michigan Department of Environmental Quality (MDEQ) Regulation Dam Safety Unit

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-ED Regulation No. 1110-2-8152 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design PLANNING AND DESIGN OF TEMPORARY COFFERDAMS AND BRACED EXCAVATIONS

More information

Mossyrock Dam/Riffe Lake Update

Mossyrock Dam/Riffe Lake Update Mossyrock Dam/Riffe Lake Update Generation Manager Pat McCarty Mossyrock Community Center March 3, 2017 AGENDA Overview Background Seismicity Current risks Temporary risk reduction methods Path forward

More information

Via October Mr. William Neal, P.E. Technological Specialist DTE Electric Company One Energy Plaza Detroit, MI 48226

Via October Mr. William Neal, P.E. Technological Specialist DTE Electric Company One Energy Plaza Detroit, MI 48226 17 October 2016 134 N. La Salle Street, Suite 300 Chicago, Illinois 60602 PH 312.658.0500 FAX 312.658.0576 www.geosyntec.com Via Email Mr. William Neal, P.E. Technological Specialist DTE Electric Company

More information

Appendix J Hydrology and Hydraulics

Appendix J Hydrology and Hydraulics Appendix J Hydrology and Hydraulics Marsh Lake Dam Ecosystems Restoration Feasibility Study Hydraulics & Hydrology Appendix January 2011 Contents List of Figures iii List of Tables iii I. General 1 II.

More information

Fargo-Moorhead Metropolitan Area Flood Risk Management Project

Fargo-Moorhead Metropolitan Area Flood Risk Management Project Fargo-Moorhead Metropolitan Area Flood Risk Management Project 52ND ANNUAL IOWA ASCE ENVIRONMENTAL & WATER RESOURCES CONFERENCE 03 April 2014 Aaron W. Buesing Senior Hydraulic Engineer Corps of Engineers,

More information

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp Geneva Dam Design of a Steep, Temporary, Riprap Ramp A Run-of of-river Dam Analysis for Geneva Dam Credit to: Yu-Chun Su, Ph.D., P.E., CFM David T. Williams. Ph.D., P.E, CFM Presentation Purpose History

More information

Spring Forecast Based Operations, Folsom Dam, California

Spring Forecast Based Operations, Folsom Dam, California Spring Forecast Based Operations, Folsom Dam, California Paul E. Pugner, P.E. Chief, Water Management Section Sacramento District U.S. Army 1325 J Street, Room 1126 Sacramento, CA 95814-2922 Tel: (916)

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Final Report September 2005 Prepared by Center for Ecosystem Management and Restoration, Oakland,

More information

DAM SAFETY Chena River Lakes Flood Control Project U.S. Army Corps of Engineers, Alaska District

DAM SAFETY Chena River Lakes Flood Control Project U.S. Army Corps of Engineers, Alaska District DAM SAFETY Chena River Lakes Flood Control Project U.S. Army Corps of Engineers, Alaska District COL Reinhard Koenig, PE Commander, USACE Alaska District Patricia S. Opheen, PE Chief, Engineering Division

More information

CODORUS CREEK FLOOD RISK MANAGEMENT PROJECT - STAKEHOLDERS MEETING

CODORUS CREEK FLOOD RISK MANAGEMENT PROJECT - STAKEHOLDERS MEETING CODORUS CREEK FLOOD RISK MANAGEMENT PROJECT - STAKEHOLDERS MEETING 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 Ray Tracy, P.E. 163 163 163 131 132 122 239 65 53 110 135

More information

HYDRAULIC CONNECTIVITY (HC) ENGINEERING & HYDRAULICS PERSPECTIVES

HYDRAULIC CONNECTIVITY (HC) ENGINEERING & HYDRAULICS PERSPECTIVES HYDRAULIC CONNECTIVITY (HC) ENGINEERING & HYDRAULICS PERSPECTIVES Presented at the UMRR HREP Team Meeting September 28, 2016 Jon Hendrickson Regional Technical Specialist, Eco-Hydraulics & WQ USACE, Mississippi

More information

VII - WATER CONTROL PLAN

VII - WATER CONTROL PLAN VII - WATER CONTROL PLAN 7-01. General Objectives. Regulation of Saylorville Lake in conjunction with Lake Red Rock provides flood control benefits along both the Des Moines and Mississippi Rivers. Additionally,

More information

East Branch Dam Safety Initiative

East Branch Dam Safety Initiative East Branch Dam Safety Initiative STATUS REPORT November 2016 SUMMARY The primary objective of our Dam Safety Program is to maintain public safety by ensuring the dams we own and operate are safe and risks

More information

4. Present Activities and Roles

4. Present Activities and Roles 4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified

More information

List of Appendices APPENDIX A: WY 2000 LAKE MICHIGAN DIVERSION ACCOUNTING REPORT APPENDIX B: WY 2001 LAKE MICHIGAN DIVERSION ACCOUNTING REPORT

List of Appendices APPENDIX A: WY 2000 LAKE MICHIGAN DIVERSION ACCOUNTING REPORT APPENDIX B: WY 2001 LAKE MICHIGAN DIVERSION ACCOUNTING REPORT EXECUTIVE SUMMARY This document is the Water Year (WY) 2000 Annual Report of the Chicago District, U. S. Army Corps of Engineers activities in the monitoring and review of the accounting of Lake Michigan

More information

United States Army Corps of Engineers. Addicks and Barker Dam Safety Update

United States Army Corps of Engineers. Addicks and Barker Dam Safety Update United States Army Corps of Engineers Addicks and Barker Dam Safety Update COL Richard P. Pannell District Commander, Galveston District U.S. Army Corps of Engineers March 9, 2016 US Army Corps of Engineers

More information

WEST POINT PERTINENT DATA. GENERAL Location (damsite) Troup County GA, Chambers County AL, miles above mouth of Chattahoochee River

WEST POINT PERTINENT DATA. GENERAL Location (damsite) Troup County GA, Chambers County AL, miles above mouth of Chattahoochee River WEST POINT PERTINENT DATA GENERAL Location (damsite) Troup County GA, Chambers County AL, miles above mouth of Chattahoochee River 201.4 Drainage area, Buford Dam to West Point Dam, square miles 2,406

More information

Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District. Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas

Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District. Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas March 2016 1. PURPOSE AND REQUIREMENTS 1.1 PURPOSE This

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

EXHIBIT B PROJECT OPERATIONS

EXHIBIT B PROJECT OPERATIONS EXHIBIT B PROJECT OPERATIONS HOLT HYDROELECTRIC PROJECT FERC NO. 2203 DRAFT LICENSE APPLICATION Alabama Power Company Birmingham, Alabama Prepared by: July 2012 EXHIBIT B PROJECT OPERATIONS HOLT HYDROELECTRIC

More information

Analyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure

Analyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure Analyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure Tiffany Coleman, PE Senior Project Engineer Stantec/STARR September 10, 2015 How

More information

Strategies to Mitigate Scour Critical Structures

Strategies to Mitigate Scour Critical Structures U.S. Department of Transportation Federal Highway Administration Strategies to Mitigate Scour Critical Structures Dan Ghere Hydraulics Engineer (708) 283-3557 dan.ghere@dot.gov Support Material HEC 23,

More information

PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS

PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS 1 255 255 255 237 237 237 217 217 217 200 200 200 Part 1: Summary of Floodplain Analysis for Los 0 Angeles 163 131 River239 110 112

More information

Lower American River Task Force Briefing. 10 March 2009

Lower American River Task Force Briefing. 10 March 2009 US Army Corps of Engineers Lower American River Task Force Briefing American River Waterways Folsom Dam Modifications / Dam Raise Joint Federal Project 10 March 2009 The Partnership Partner Agencies USACE

More information

Dredge and Fill Standards on the Highland Lakes

Dredge and Fill Standards on the Highland Lakes www.lcra.org Dredge and Fill Standards on the Highland Lakes Lake Buchanan Inks Lake Lake LBJ Lake Marble Falls Lake Travis Introduction The Lower Colorado River Authority (LCRA) no longer requires that

More information

GIWW Brazos River Floodgates - Colorado River Locks System Feasibility Study

GIWW Brazos River Floodgates - Colorado River Locks System Feasibility Study GIWW Brazos River Floodgates - Colorado River Locks System Feasibility Study 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112

More information

Inland Waters User s Board. Mississippi River Valley Division Prioritized Backlog Maintenance

Inland Waters User s Board. Mississippi River Valley Division Prioritized Backlog Maintenance Presentation to Inland Waters User s Board Mississippi River Valley Division Prioritized Backlog Maintenance by Steve Jones, Mississippi River Valley Division Leon F. Mucha, P.E., St. Paul District 13

More information

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction Technical Memorandum Hydraulic Analysis Smith House Flood Stages 1.0 Introduction Pacific International Engineering (PIE) performed a hydraulic analysis to estimate the water surface elevations of the

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

Presentation Overview

Presentation Overview Little Dry Creek Restoration Deep River Flood Risk Management Final Presentation to LCRBDC June 10, 2015 Presentation Overview Project Overview & Background Information Data Collection Model Development

More information

The River Runs Through It : Rehabilitation of the Harvie Passage Project. Chuck Slack, P.Eng., Principal, Manager Water Resources & Civil Projects

The River Runs Through It : Rehabilitation of the Harvie Passage Project. Chuck Slack, P.Eng., Principal, Manager Water Resources & Civil Projects The River Runs Through It : Rehabilitation of the Harvie Passage Project Chuck Slack, P.Eng., Principal, Manager Water Resources & Civil Projects 1. Project Background 2. June 2013 Flood Harvie Passage:

More information

EXHIBIT B PLANT OPERATION AND RESOURCES UTILIZATION

EXHIBIT B PLANT OPERATION AND RESOURCES UTILIZATION EXHIBIT B PLANT OPERATION AND RESOURCES UTILIZATION TABLE OF CONTENTS PAGE LIST OF FIGURES... i 1.0 PLANT OPERATION AND RESOURCES UTILIZATION... 1 1.1 PLANT OPERATION... 1 1.1.1 Adverse Flow... 1 1.1.2

More information

Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar. SUMMARY: This notice is provided in accordance with the Council on

Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar. SUMMARY: This notice is provided in accordance with the Council on This document is scheduled to be published in the Federal Register on 08/29/2013 and available online at http://federalregister.gov/a/2013-21134, and on FDsys.gov BILLING CODE 8120-08-P TENNESSEE VALLEY

More information

Dam. Construction Services

Dam. Construction Services Dam Construction Services Marine Professionals Since 1919 J.F. Brennan Company, Inc. (Brennan) is a marine construction and environmental remediation firm that specializes in dam construction and repair

More information

Manhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas

Manhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas Manhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas Tuttle Creek Dam and Lake Kansas City District Project Development Team Manhattan, KS US Army Corps of Engineers 1

More information

ROLE OF THE FIRM IN THE PROJECT

ROLE OF THE FIRM IN THE PROJECT PROJECT DESCRIPTION Lake Loramie Dam is a Class I dam located in Lake Loramie State Park in Minster, Ohio. Lake Loramie originally served as the high feeder water supply for the Miami-Erie Canal that began

More information

American Water Resources Association Philadelphia Metropolitan Area Section

American Water Resources Association Philadelphia Metropolitan Area Section American Water Resources Association Philadelphia Metropolitan Area Section Levee Evaluation and Certification under the NFIP November 18, 2010 Insert picture(s) here Agenda Background and Overview Flood

More information

Flood Fighting and Surveillance

Flood Fighting and Surveillance Flood Fighting and Surveillance Don Moses Civil Engineer February 2016 US Army Corps of Engineers 1 Agenda Levee Design Common Failure Modes Surveillance/Inspection Flood Fighting 2 Levee Design Issues

More information

Environmental Protection (NJDEP) The Louis Berger Group, Inc.

Environmental Protection (NJDEP) The Louis Berger Group, Inc. Hydraulic Modeling for Preliminary Evaluation of Potential Flooding Impacts for Various Dredging, Capping and Armoring Scenarios of The Lower Passaic River Restoration Abdulai Fofanah, PE, D.WRE, CFM Murat

More information

Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014

Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014 ASFPM 2014 Annual Conference Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014 Agenda Overview and Background Hydrology

More information

Filter Tube Barriers (Instream)

Filter Tube Barriers (Instream) Filter Tube Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo

More information

Exploring the Possibilities At Prado Dam

Exploring the Possibilities At Prado Dam Exploring the Possibilities At Prado Dam Greg Woodside, P.G., C.HG. Executive Director of Planning & Natural Resources December 5, 2017 The Orange County groundwater basin lies at the base of the Santa

More information

STATUS OF MAJOR PROJECT INVESTMENTS BRIEFING TO INLAND WATERWAYS USERS BOARD

STATUS OF MAJOR PROJECT INVESTMENTS BRIEFING TO INLAND WATERWAYS USERS BOARD STATUS OF MAJOR PROJECT INVESTMENTS BRIEFING TO INLAND WATERWAYS USERS BOARD February 20, 2009 Sandy Gore Project Programs Team 1 $ Million 450 400 350 300 250 200 150 100 50 0-50 -100-150 IWTF HISTORY

More information

John Menniti, PE, PMP Senior Project Manager. Nov. 21, U.S. Army Corps of Engineers BUILDING STRONG

John Menniti, PE, PMP Senior Project Manager. Nov. 21, U.S. Army Corps of Engineers BUILDING STRONG John Menniti, PE, PMP Senior Project Manager Nov. 21, 2014 U.S. Army Corps of Engineers A. Project Purpose B. Project Plan C. Project Schedule D. Environmental Review & Public Involvement Timeline E. Proposed

More information

CHAPTER 7. San Dieguito River Flooding Adaptation

CHAPTER 7. San Dieguito River Flooding Adaptation CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,

More information

Albuquerque District

Albuquerque District US ARMY CORPS OF ENGINEERS Albuquerque District Government 237 217 200 to Business 80 252 Outreach 237 217 200 119 174 237 217 200 27.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120

More information

Civil Engineer USACE, Omaha District. 28 February 2017 FLOOD FIGHTING AND SURVEILLANCE

Civil Engineer USACE, Omaha District. 28 February 2017 FLOOD FIGHTING AND SURVEILLANCE 217 FLOOD FIGHTING AND SURVEILLANCE 237 200 237 217 200 Don Moses, 237 P.E. 217 200 Civil Engineer USACE, Omaha District 255 0 163 131 255 0 163 132 255 0 163 122 28 February 2017 239 65 53 80 119 27 110

More information

M EMORANDUM O CTOBER 5, 201 7

M EMORANDUM O CTOBER 5, 201 7 M EMORANDUM O CTOBER 5, 201 7 TO: FROM: SUBJECT: BOARD OF DIRECTORS ERIC KUHN, GENERAL MANAGER PETER FLEMING, ESQ. GENERAL COUNSEL RAY TENNEY, P.E., DON MEYER, P.E. WOLFORD MOUNTAIN RESERVOIR AND ELKHEAD

More information

Low Inflow Protocol for the Yadkin & Yadkin-Pee Dee River Hydroelectric Projects

Low Inflow Protocol for the Yadkin & Yadkin-Pee Dee River Hydroelectric Projects Low Inflow Protocol for the Yadkin & Yadkin-Pee Dee River Hydroelectric Projects GOAL The fundamental goal of this Low Inflow Protocol (LIP) is to take staged actions in the Yadkin- Pee Dee River Basin

More information

Coal Combustion Facility Assessment Report. October 20, 2010

Coal Combustion Facility Assessment Report. October 20, 2010 Coal Combustion Facility Assessment Report October 20, 2010 Introduction Stantec Consulting Services Inc. North American Consulting Firm 10,000 Engineers, Geologists, Architects, Scientists and Technicians

More information

MILL CREEK LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

MILL CREEK LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010056 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: SEPTEMBER 23, 2013

More information

Water Supply Reallocation Workshop

Water Supply Reallocation Workshop Water Supply Reallocation Workshop Determining Yield and Storage Requirement June 2, 2009 Tulsa, OK James Hathorn, Jr Redistribution of Water The function of a reservoir system is to redistribute the natural

More information

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that US ARMY Corps Of Engineers Little Rock District JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF MISSOURI Application Number: SWL 2013-00260 Date: April 15, 2014 Comments Due: May 6, 2014 TO WHOM IT MAY

More information

Great Lakes Navigation Stakeholder Meeting

Great Lakes Navigation Stakeholder Meeting Great Lakes Navigation Stakeholder Meeting David Wright U.S. Army Corps of Engineers Chief of Operations Detroit District April 9, 2014 US Army Corps of Engineers Agenda FY14 Key FY14 O&M Activities Soo

More information

SECTION 7.0 PROJECT FEASIBILITY, ENGINEER S RECOMMENDATION AND DESIGN ISSUES NEEDING RESOLUTION

SECTION 7.0 PROJECT FEASIBILITY, ENGINEER S RECOMMENDATION AND DESIGN ISSUES NEEDING RESOLUTION SECTION 7.0 PROJECT FEASIBILITY, ENGINEER S RECOMMENDATION AND DESIGN ISSUES NEEDING RESOLUTION 7.1 PROJECT FEASIBILITY The determination of project feasibility is based upon several criteria established

More information

Volume II: Hazard Annex Dam Failure

Volume II: Hazard Annex Dam Failure Volume II: Hazard Annex Dam Failure Causes and Characteristics of Dam Failure Dam Characteristics Dams are impervious structures that block the flow of water in a river or stream, capturing water behind

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

TECHNICAL MEMORANDUM Summerhill Rd Texarkana, Texas fax

TECHNICAL MEMORANDUM Summerhill Rd Texarkana, Texas fax TECHNICAL MEMORANDUM 5930 Summerhill Rd Texarkana, Texas 75503 903 838 8533 fax 903 832 4700 TO: Becky Griffith, Jon Jarvis FROM Spandana Tummuri SUBJECT: Technical Memorandum on IP Analysis PROJECT: Sulphur

More information

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project IAFSM 2010 Annual Conference City of Rockford Keith Creek Greenway Flood Mitigation Project March 10, 2010 Introduction Problem Overview 1890 s Building of homes along Keith Creek 1920 s Home construction

More information

Dallas Floodway Improvements

Dallas Floodway Improvements TRINITY RIVER CORRIDOR PROJECT Dallas Floodway Improvements Refinement of the Balanced Vision Plan - Update to the Trinity River Committee 01-March March-2004 Status of the Urban Design Study As result

More information

Ducks Unlimited M&T Ranch / Llano Seco Intake Project Final Alternatives

Ducks Unlimited M&T Ranch / Llano Seco Intake Project Final Alternatives Ducks Unlimited M&T Ranch / Llano Seco Intake Project Final Alternatives M&T Ranch / Llano Seco Intake Project Final Alternatives Draft Engineering Analysis Technical Memorandum Ducks Unlimited September,

More information

McElroy s Run Impoundment Structural Stability Assessment Report

McElroy s Run Impoundment Structural Stability Assessment Report Allegheny Energy Supply Company, LLC A FirstEnergy Company Pleasants Power Station Pleasants County, West Virginia October 2016 Prepared for: Allegheny Energy Supply Company, LLC A FirstEnergy Company

More information

CHAPTER 7. San Dieguito River Flooding Adaptation

CHAPTER 7. San Dieguito River Flooding Adaptation CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,

More information

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part

More information

Mark Twain Lake Water Control Manual Update

Mark Twain Lake Water Control Manual Update Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control US Army Corps of Engineers WATER CONTOL PLAN Overall Objectives Project Purposes Flood Control Hydroelectric Power

More information

Relicensing Study 3.8.1

Relicensing Study 3.8.1 Relicensing Study 3.8.1 Evaluate the Impact of Current and Potential Future Modes of Operation on Flow, Water Elevation and Hydropower Generation Study Report Northfield Mountain Pumped Storage Project

More information

Norfolk District Regulatory Office

Norfolk District Regulatory Office Norfolk District Regulatory Office Stream Bank Stabilization/ Stream Restoration Regena Bronson Norfolk District, Fredericksburg Field Office November 2011 Rivers and Harbors Act of 1899, Section 10 Requires

More information

Chakachamna Hydro. AEA Geothermal Conference

Chakachamna Hydro. AEA Geothermal Conference Chakachamna Hydro AEA Geothermal Conference August 2007 Chakachamna Hydro 300+ MW hydro opportunity identified Preliminary FERC License application filed in May 2006 Initial scoping/informational meetings

More information

Project Summary: - Hydrologic Models. - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall

Project Summary: - Hydrologic Models. - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall Project Summary: - Hydrologic Models Phase 2 Underway Nearly Completed (Park/Pembina EOY) - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall Phase

More information

MONTEREY PENINSULA WATER MANAGEMENT DISTRICT PROJECT DESCRIPTION FOR SELECTIVE VEGETATION MANAGEMENT AND BANK RESTORATION (RANCHO SAN CARLOS AREA)

MONTEREY PENINSULA WATER MANAGEMENT DISTRICT PROJECT DESCRIPTION FOR SELECTIVE VEGETATION MANAGEMENT AND BANK RESTORATION (RANCHO SAN CARLOS AREA) MONTEREY PENINSULA WATER MANAGEMENT DISTRICT PROJECT DESCRIPTION FOR SELECTIVE VEGETATION MANAGEMENT AND BANK RESTORATION (RANCHO SAN CARLOS AREA) IN THE CARMEL RIVER CHANNEL, SUMMER AND FALL 2014 SELECTIVE

More information

OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT

OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 COLUMBIA RIVER BASIN 131 132 122 239 65 53 80 119 27 110 135 120 252 174.59

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

Restoring an Urban River in a Historic Setting Lower Pawtuxet River, R.I.

Restoring an Urban River in a Historic Setting Lower Pawtuxet River, R.I. Restoring an Urban River in a Historic Setting Lower Pawtuxet River, R.I. Thomas Ardito Narragansett Bay Estuary Program Sam Whitin, Andy Lipsky EA Engineering, Science & Technology Rita L. Holahan, Pawtuxet

More information

Welcome STEP 1: STEP 2: STEP 3:

Welcome STEP 1: STEP 2: STEP 3: Welcome Displays are placed around the room. Each display focuses on federally authorized project purposes and particular issues related to the draft Alabama, Coosa, and Tallapoosa River Basin (ACT) Master

More information

Abstract. 1. Main features of the Cua Dat scheme. Hong Giang VNCOLD. Hanoi Vietnam. the Northern Central The reservoir storage purposes: - water

Abstract. 1. Main features of the Cua Dat scheme. Hong Giang VNCOLD. Hanoi Vietnam. the Northern Central The reservoir storage purposes: - water The diversion works for the Cua Dat CFRD in Vietnam Michel Ho Ta Khanh, Dinh Sy Quat, Prof Pham Hong Giang VNCOLD No 95/10 Chua Boc Street Dong Da District Hanoi Vietnam Abstract The Cua Dat CFRD is constructed

More information

Missouri River Basin Water Management Monthly Update

Missouri River Basin Water Management Monthly Update Missouri River Basin Water Management Monthly Update Participating Agencies 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 National Oceanic and Atmospheric

More information

COACHELLA VALLEY WATER DISTRICT GUIDELINE K-2 SLOPE (BANK) PROTECTION DESIGN GUIDANCE

COACHELLA VALLEY WATER DISTRICT GUIDELINE K-2 SLOPE (BANK) PROTECTION DESIGN GUIDANCE COACHELLA VALLEY WATER DISTRICT GUIDELINE K-2 SLOPE (BANK) PROTECTION DESIGN GUIDANCE K.2.1 General Requirements The design and construction of slope protection works may be required for several types

More information

Failure Consequence Classification

Failure Consequence Classification Failure Consequence Classification Audience: Dam Safety Officers (DSO) Owners of small dams Community emergency preparedness coordinators Introduction This document provides an overview of failure consequence

More information

Wapato Access Feasibility Study

Wapato Access Feasibility Study Wapato Access Feasibility Study David Gorman, PE Michael Rounds, PE August 5, 2011 Lower Columbia River Estuary Partnership (LCREP) Non-profit two state public-private initiative Primary Responsibility:

More information

February 9, David Wright. U.S. Army Corps of Engineers Chief of Operations Detroit District. US Army Corps of Engineers BUILDING STRONG

February 9, David Wright. U.S. Army Corps of Engineers Chief of Operations Detroit District. US Army Corps of Engineers BUILDING STRONG Great Lakes Waterways Conference February 9, 2016 David Wright U.S. Army Corps of Engineers Chief of Operations Detroit District US Army Corps of Engineers Agenda FY16/FY17 PBUD Maintenance Work Recent

More information

Upper Lightning Lake Water Level Management Environmental Assessment Worksheet. Attachment D Design Report for Upper Lightning Lake

Upper Lightning Lake Water Level Management Environmental Assessment Worksheet. Attachment D Design Report for Upper Lightning Lake Upper Lightning Lake Water Level Management Environmental Assessment Worksheet Attachment D Design Report for Upper Lightning Lake DESIGN REPORT for Upper Lightning Lake Wetland Enhancement MN-332-2 I

More information

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation Lessons [being] learnt 2016 Flood in Cedar Rapids Sandy Pumphrey Project Engineer II Flood Mitigation 319 286 5363 s.pumphrey@cedar-rapids.org Agenda 2008 Flood Event 2016 Flood Event [Long Term] Flood

More information

TECHNICAL SUMMARY UPPER LAKE DIADROMOUS FISHERIES RESTORATION BROOKHAVEN, NEW YORK MMI # May 2013

TECHNICAL SUMMARY UPPER LAKE DIADROMOUS FISHERIES RESTORATION BROOKHAVEN, NEW YORK MMI # May 2013 BROOKHAVEN, NEW YORK MMI #4791-01-5 May 2013 Prepared for: Town of Brookhaven One Independence Hill Farmingville, New York 11738 Prepared by: MILONE & MACBROOM, INC. 99 Realty Drive Cheshire, Connecticut

More information

APPENDIX III Hydrologic and Hydraulic Evaluations

APPENDIX III Hydrologic and Hydraulic Evaluations APPENDI III Hydrologic and Hydraulic Evaluations Hydrologic and Hydraulic Analysis Related to Compliance Requirements South Fly Ash Pond, Boiler Slag Pond and Clearwater Pond Kyger Creek Power Plant, Gallia

More information

SAN GABRIEL RIVER 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

SAN GABRIEL RIVER 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010031 PERIODIC INSPECTION REPORT NO. 2 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: APRIL 19, 2017 PERIODIC

More information

APPENDIX G DIVERSION AND PELICAN LAKE CUTOFF CHANNELS HYRAULICS AND BRIDGE TECHNICAL MEMORANDUM

APPENDIX G DIVERSION AND PELICAN LAKE CUTOFF CHANNELS HYRAULICS AND BRIDGE TECHNICAL MEMORANDUM APPENDIX G DIVERSION AND PELICAN LAKE CUTOFF CHANNELS HYRAULICS AND BRIDGE TECHNICAL MEMORANDUM To: File Memo From: Matt Redington, P.E. Project: Watertown South Connector CC: Date: March 6, 2007; revised

More information

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc.

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc. ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975 Source: Hey and Associates, Inc. DEFINITION A bridge or culvert crossing installed across a stream or watercourse for short-term