1 Groundwater Replenishment with Purified Water Injection Provides Drought Protection & Environmental Benefits Santa Margarita Groundwater Replenishment Project PNW AWWA Conference 3 May 2017
2 Presentation Overview Introduction & Project Benefits Groundwater Recharge (GWR) Regulations Advanced Purification Treatment Review of Hydro-geologic modeling for injection Environmental Benefits from GWR Estimated Project and Life-cycle Costs Questions
3 The Santa Margarita GW Basin supplies water to ~40,000 people in northern Santa Cruz County, California
4 The objective is to recharge the Lompico Aquifer which is the primary water supply source for the area.
5 The SMGB Lompico Aquifer groundwater levels have dropped significantly over the past 25 years
6 A Groundwater Recharge Project for the Santa Margarita GW Basin would provide multiple benefits to the region. Replenish over-drafted aquifers Provide up to 6,000 AF of drought storage. Reduce energy needed for well pumping. Benefits SVWD, SLVWD, MHA, and all other pumpers in the Santa Margarita GW Basin. Higher groundwater levels provide increased base flows in streams and springs, and help riparian habitats. Increased stream flow provides more flow for endangered species in San Lorenzo River. Benefits SLVWD, SCWD, other surface water stakeholders.
7 Current Available RW for Groundwater Replenishment ranges from 0.4 to 0.9 mgd 1.20 Scotts Valley WRF Average Daily Flows, Flow, MGD Influent Flow Secondary Effluent Flow Recycled Water Demand
8 Projected Available Source Water for Advanced Purification Facility (APF) and Injection Water for GWR Year Annual Available Source for APF, AFY Available Purified Water for Injection, AFY (a) (a) Assumes 80-percent recovery for the APF treatment processes
9 Recycled Water quality is relatively good and can be treated to meet Primary and Secondary drinking water MCLs. Constituent Units MCL Ave Max (95th %ile) General Physical Constituents Turbidity NTU Biochemical Oxygen Demand (BOD) mg/l Total Suspended Solids (TSS) mg/l Total Organic Carbon (TOC) mg/l Color CU 15 (b) Temperature ºC ph units Odor (at 60 C) TON 3 (b) Langelier Index (at 25 C) General Mineral Constituents Total Dissolved Solids (TDS) mg/l 500 (a) Alkalinity (as CaCO3) mg/l Calcium (Ca) mg/l Magnesium (Mg) mg/l Sodium (Na) mg/l Potassium (K) mg/l Ammonia (NH4) mg-n/l Bicarbonate (HCO3) mg/l Sulfate (SO4) mg/l 250 (a) Phosphate (PO4) mg/l Chloride (Cl) mg/l 250 (a) Min
10 June 2014 Regulations for Groundwater Replenishment Reuse Projects Treatment Requirements Water Quality Requirements Prior to Recharge Spreading (i.e., surface application) Oxidation Filtration Disinfection Soil aquifer treatment Injection with FAT* (i.e., subsurface application) Oxidation, Filtration Reverse Osmosis 12-log virus reduction ( %) 10-log Giardia cyst reduction ( %) 10-log Crypto oocyst reduction ( %) Drinking water MCLs 10 mg/l total nitrogen Action levels for lead and copper TOC 0.5 mg/l for injection TOC 0.5/RWC for spreading Advanced Oxidation Process (AOP) *FAT = full advanced treatment, i.e., advanced water purification (AWP)
11 June 2014 Regulations for Groundwater Replenishment Reuse Projects Other Requirements: Underground Retention Time minimum of 2 months. Blending Water for injection, up to 100% purified water; for spreading, initial max 20% recycled water blend. APF Treatment Train must have at least 3 separate processes to achieve the log removal. Long-Term Monitoring - must have monitoring wells and regular sampling plan to confirm the underground retention time requirements are being met.
12 Advanced Purification Facility Treatment Process Flow Diagram City of Scotts Valley Secondary Effluent Existing Media Filtration / UV Disinfection RW Equalization Tank UF RO AOP PW Tank Injection Well Existing Facilities Treatment Processes Scotts Valley WWTP Target Process Log Removal / Inactivation Credits Scotts Valley WRF UF RO UV/ AOP Aquifer Total Log Removal/ Inactivation DDW Required Log Removal/ Inactivation Additional Safety Factor Log Above DDW Pathogen Virus Giardia Cryptosporidium
13 APF modular treatment processes provide operational flexibility and relatively small facility footprint. Ultrafiltration System Reverse Osmosis System UV / AOP System
14 Groundwater Injection Capacity and Travel Time Study SVWD is exploring injection of purified water to replenish the over-drafted Lompico GW aquifer. The Santa Margarita GW Basin Groundwater Model (2015) was used to evaluate the potential for injection into the Lompico aquifer. The model evaluated: The injection rate of ~650 AFY and the ability of the aquifer to receive and retain the purified water The underground retention time to the nearest drinking water wells The long-term storage capacity of the Lompico aquifer
15 The shut-down Hanson Quarry property is at the southern end of the SM Basin and could be an appropriate location for injection.
16 Injection wells to provide direct recharge of the Lompico Aquifer were modeled with the hydro-geological MODFLOW model and database. Existing Drinking Water Well Proposed Purified Water Injection Well
17 GW Model results show underground retention time to nearest drinking water wells is significantly greater than the required 2 months minimum. Existing Drinking Water Well Proposed Purified Water Injection Well Extent of ~6-month Underground Retention Time
18 GW Model results show underground retention time to nearest drinking water wells is significantly greater than the required 2 months minimum. Existing Drinking Water Well Proposed Purified Water Injection Well Extent of ~1-year Underground Retention Time
19 GW Model results show underground retention time to nearest drinking water wells is significantly greater than the required 2 months minimum. Existing Drinking Water Well Proposed Purified Water Injection Well Extent of ~2.5-year Underground Retention Time
20 GW Model results show underground retention time to nearest drinking water wells is significantly greater than the required 2 months minimum. Existing Drinking Water Well Proposed Purified Water Injection Well Extent of 5-year Underground Retention Time
21 The GW Model shows that the Lompico Aquifer under HQ can continue to receive the volumes of injection water for over 20 years. Lowest Surface Elevation in Hanson Quarry feet Elevation of SM/Lompico Contact feet
22 Additional groundwater storage in the Lompico aquifer portion of the Santa Margarita Basin plateaus at approximately 6,000 AF. Groundwater Storage for drought
23 After ~10 to 15 years, injected water starts to provide greater increases to base flows in local streams and springs.
24 The stored groundwater could be used for additional drought pumping for regional water partners.
25 Injecting water into the Lompico aquifer at the southern end helps to raise water levels throughout the basin over time. 2012
26 Injecting water into the Lompico aquifer at the southern end helps to raise water levels throughout the basin over time. Future 10-Years Model assumes injection of ~650 AFY at Hanson Quarry
27 Injecting water into the Lompico aquifer at the southern end helps to raise water levels throughout the basin over time. Future 20-years Injection in the south helps to raise water levels in the north as well.
28 Injecting water into the Lompico aquifer at southern end helps to raise water levels throughout the basin over time. Future 28-years The entire Santa Margarita Basin benefits from raised water levels, even though injection is just in the south.
29 GW Model shows that recharge of purified water benefits the overall Santa Margarita GW basin Injected water can provide drought storage up to approximately 6,000 AF. Injection of purified water creates a local mound that helps raise levels throughout the Lompico aquifer. Higher groundwater levels reduce pumping energy use and cost. Higher groundwater levels provide increased base flows in streams and springs, and helps endangered species in San Lorenzo River. SLVWD could increase GW pumping to reduce withdrawals from the San Lorenzo River.
30 Project Alternative No. 1: APF at City WRF and Associated Infrastructure
31 Estimated Life Cycle Costs for Alternatives Alt. Description Potential Supply (AFY) Conceptual-Level Project Cost (mil $) Annualized Cost ($/AF) 1.a Advanced Purification Facility at SV WRF 560 $19.5 $2,090 2.a 2.b 2.c 2.d Advanced Purification Facility at Hanson Quarry, Pipeline Alternative A. Recycled Water line extension, Concentrate disposal tie-in to existing outfall at Graham Hill Rd. Advanced Purification Facility at Hanson Quarry, Pipeline Alternative B. Recycled Water pipeline replacement, Concentrate disposal tie-in to existing outfall at Graham Hill Rd. Advanced Purification Facility at Hanson Quarry, Pipeline Alternative C. Recycled Water pipeline extension, Concentrate disposal tie-in to existing outfall at Estrella Dr. Advanced Purification Facility at Hanson Quarry, Pipeline Alternative D. Recycled Water pipeline replacement, Concentrate disposal tie-in to existing outfall at Estrella Dr. 560 $19.7 $2, $21.2 $2, $19.7 $2, $20.8 $2,250
32 SMGB GWR Program Schedule
33 Questions and Discussion Flow, MGD Scotts Valley WRF Average Daily Flows, 2014 January February March April May June July August September October November December Influent Flow Secondary Effluent Flow Recycled Water Demand
SANTA MARGARITA GROUNDWATER BASIN ADVISORY COMMITTEE MEETING
SANTA MARGARITA GROUNDWATER BASIN ADVISORY COMMITTEE MEETING Notice is hereby given by the Scotts Valley Water District of a meeting of the Santa Margarita Groundwater Basin Advisory Committee Wednesday,
More informationThe Ozone Process for Potable Reuse Applications. Mike Oneby, Erin Mackey, Wendy Broley
The Ozone Process for Potable Reuse Applications Mike Oneby, Erin Mackey, Wendy Broley Outline Definitions US Regulations Log Removal Credits Potable Reuse Treatment Trains Case Study: City of Los Angeles
More informationSubsurface Desalination Intake & Potable Reuse Feasibility Studies. TAP Workshop #3 City of Santa Barbara, California October 26, 2016
Subsurface Desalination Intake & Potable Reuse Feasibility Studies TAP Workshop #3 City of Santa Barbara, California October 26, 2016 Agenda Feasibility Study Background & Objectives Update following TAP
More informationIndirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project
ABSTRACT & POWERPOINT PRESENTATION Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project Tim Smith Principal Engineer Helix Water District La Mesa,
More informationSTATUS OF POTABLE REUSE IN CALIFORNIA: HISTORY, REGULATIONS AND PROJECTS. Abstract. Key Words. Indirect Potable Reuse Projects in California
STATUS OF POTABLE REUSE IN CALIFORNIA: HISTORY, REGULATIONS AND PROJECTS Ufuk G. Erdal, CH2M 6 Hutton Centre Dr. Suite 700, Santa Ana, CA 92707 Email: uerdal@ch2m.com, Phone: 714 435-6149 Larry Schimmoller,
More informationThe Evolution of the World s Largest Advanced Water Purification Project for Potable Reuse
The Evolution of the World s Largest Advanced Water Purification Project for Potable Reuse Denis R. Bilodeau, P.E. President Orange County Water District July 30, 2018 ORANGE COUNTY WATER DISTRICT (OCWD)
More informationIPR Case Studies and Issues for DPR
IPR Case Studies and Issues for DPR WateReuse 2013 San Diego Chapter May 8, 2013 San Diego, California Greg Bradshaw Innovative Solutions for Water and the Environment Agenda AWT, AWPF or FAT Public Perception
More informationSoquel Creek Water District s Groundwater Recharge Feasibility Study. Lydia Holmes
Soquel Creek Water District s Groundwater Recharge Feasibility Study Lydia Holmes Soquel Creek Water District (SqCWD) Filename.ppt/2 Small beach community east of Santa Cruz 37,000 residents 100% reliant
More informationProp 50 Project Completion Report Project 50-4 Ray Stoyer Water Recycling Facility Demonstration Project
Prop 50 Project Completion Report Project 50-4 Ray Stoyer Water Recycling Facility Demonstration Project June 1, 2016 Presentation to IRWM Regional Advisory Committee Padre Dam s IPR Program Goals Produce
More informationRegulatory & Research Aspects of the San Gabriel Valley Indirect Reuse Replenishment Project (IRRP)
Regulatory & Research Aspects of the San Gabriel Valley Indirect Reuse Replenishment Project (IRRP) CA-NV AWWA AFC15 Session 12A Research 10:00 am October 28, 2015 Outline Background Project Description
More informationImplementing Recycled Water at SFIA with a Long-Term Goal of 100% Reuse
Implementing Recycled Water at SFIA with a Long-Term Goal of 100% Reuse CA-NV AWWA Conference October, 2014 Todd Reynolds, P.E. Dawn Taffler, P.E., LEED AP San Francisco International Airport (SFO) SFO
More informationWater and Energy in Arizona
Water and Energy in Arizona Bob Lo&s Arizona Public Service Company Mul: States Salinity Coali:on Summit 3/2/2017 1 Redhawk Power Plant (APS) 1,000 MW CC Mesquite Power Plant (SRP & Sempra) 1,000 MW CC
More informationCypress Chamber of Commerce. John Kennedy Executive Director of Engineering & Water Resources Orange County Water District July 11, 2017
Cypress Chamber of Commerce John Kennedy Executive Director of Engineering & Water Resources Orange County Water District July 11, 2017 California Imported Water Central Valley Project 1931 State Water
More informationPrakruti Environmental Engineers (Environmental Laboratory), 1, Utkanth Society, B/H Alkapuri Club, Alkapuri, Vadodara, Gujarat
Prakruti Environmental Engineers (Environmental ), Last Amended on - Page 1 of 7 I. WATER 1. Water (Ground Water/ Surface Water/ Drinking Water/ Treated Water) ph APHA 4500-H + B, Temperature APHA 2550
More informationPNW AWWA Conference 2009 Todd Reynolds, PE, BCEE
Startup and 1 st Year of Operation at the Ventura Avenue UF WTP PNW AWWA Conference 2009 Todd Reynolds, PE, BCEE Acknowledgements Aileen Kondo, Kennedy/Jenks Consultants Jim Passanisi and Mike Oakley,
More informationSupplemental Supply Option: Desalination DEEP WATER DESAL PROJECT
Supplemental Supply Option: Desalination DEEP WATER DESAL PROJECT CONCEPT: The Deep Water Desalination (DWD) Project would consist of a Desalination Facility at the Moss Landing Area and co-located with
More informationFinal Report: Graham Hill Water Treatment Plant Source Water Quality Monitoring Study
Final Report: Graham Hill Water Treatment Plant Source Water Quality Monitoring Study Prepared for: City of Santa Cruz Prepared by: Trussell Technologies, Inc. Brian Pecson, Ph.D., P.E. Sarah Triolo Samantha
More informationEl Paso s Advanced Water Purification Facility America s First Direct-to-Distribution Potable Reuse
El Paso s Advanced Water Purification Facility America s First Direct-to-Distribution Potable Reuse WESTCAS 2017 Fall Conference October 25, 2017 - Tucson, AZ Presentation Outline Water Resources and Challenges
More informationIssues in the Provision of Sanitation Services and Wastewater Reuse Iranian/US Workshop on Water Management
Issues in the Provision of Sanitation Services and Wastewater Reuse Iranian/US Workshop on Water Management William R. Mills, General Manager, Retired (1987 2002) Orange County Water District August, 2008
More informationWATER QUALITY STATUTORY AND REGULATORY COMPLIANCE OVERVIEW
CHAPTER 3 WATER QUALITY STATUTORY AND REGULATORY COMPLIANCE OVERVIEW Table 3-1 Proposed Project Treatment Barriers As described in Chapter 2, Project Description, the Pure Water Monterey Groundwater Replenishment
More informationAppendix D Pure Water Monterey Groundwater Replenishment Project Water Quality Statutory and Regulatory Compliance Technical Report
Appendix D Pure Water Monterey Groundwater Replenishment Project Water Quality Statutory and Regulatory Compliance Technical Report Pure Water Monterey GWR Project April 2015 Draft EIR Denise Duffy & Associates,
More informationCity of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:
FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:
More informationCity of Wichita Falls Water Conservation and Emergency Direct Potable Reuse. Daniel K. Nix Utilities Operations Manager
City of Wichita Falls Water Conservation and Emergency Direct Potable Reuse Daniel K. Nix Utilities Operations Manager The Last Drought 1995-2000 Lessons Learned City constructed Reverse Osmosis Plant.
More informationWarm Mineral Springs Sampling by Sarasota County
Warm Mineral Springs Sampling by Sarasota County John Ryan, Kathryn Meaux, Rene Janneman and Jon S. Perry Sarasota County Environmental Services Sarasota, Florida September 11 Warm Mineral Springs is a
More informationGuidance Framework Document for Direct Potable Reuse in Arizona
Guidance Framework Document for Direct Potable Reuse in Arizona Jeff Mosher National Water Research Institute jmosher@nwri-usa.org About NWRI 501c3 Nonprofit located in Fountain Valley, CA Experience with
More informationSLVWD Water Supply Master Plan. 1 Introduction
SLVWD Water Supply Master Plan 1 Introduction Nicholas M. Johnson, PhD, RG, CHg This report provides a comprehensive description and assessment of the water supply of San Lorenzo Valley Water District
More informationThe National Trend towards Direct Potable Reuse
The National Trend towards Direct Potable Reuse RMWEA/RMSAWWA JTAC March 19, 2015 Larry Schimmoller/CH2M Hill Global Technology Leader for Water Reuse John Rehring/Carollo Vice President Agenda Introduction
More informationSummary of Florida s Indirect Potable Reuse Regulations Part V
Summary of Florida s Indirect Potable Reuse Regulations 62-610 Part V David Ammerman, Carollo Engineers, Inc. Jeff Greenwell, Hillsborough County MARCH 16, 2018 Florida Administrative Code Chapters Chapter
More informationZero Liquid Discharge Project Extends Potable Water Supplies
http://dx.doi.org/10.5991/opf.2014.40.0078 Ryan R. Popko, PE, and Phillip J. Locke, PE, are with McKim & Creed (www.mckimcreed.com), Clearwater, Fla. Fred J. Greiner is with the city of Palm Coast, Fla.
More informationGroundwater Recharge Permits Past, Present, Future
Groundwater Recharge Permits Past, Present, Future January 22, 2008 Southern California Alliance of POTW (SCAP) Hoover Ng, Water Replenishment District Presentation Outline WRD Past - Montebello Forebay
More informationInnovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings
Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings Robert T. Shoaf, P.E., BCEE AECOM (Columbus, Ohio) Scott Hoover, Plant Superintendent Napoleon,
More informationPathogen Removal Mechanisms and Pathogen Credits in MBR-Based Potable Reuse Trains
Pathogen Removal Mechanisms and Pathogen Credits in MBR-Based Potable Reuse Trains Ufuk G. Erdal, PhD, PE 2017 NWRI Clarke Conference 10/20/2017 1 Outline Background Objectives Comparison of Pathogen Credits
More informationTREATING BRACKISH WATER IN SANDOVAL COUNTY FEBRUARY 19, 2010
TREATING BRACKISH WATER IN SANDOVAL COUNTY FEBRUARY 19, 2010 Project Background Sandoval County drilled two exploratory wells in 2007 in Rio Puerco Basin/SE portion of San Juan Basin Penetrated brackish
More informationUpdate on Pilot Testing of the Advanced Water Purification Facility in El Paso, TX
Imagine Arcadis 2015 the result Update on Pilot Testing of the Advanced Water Purification Facility in El Paso, TX Gilbert Trejo & Daniel Olson Presented at the Multi-State Salinity Coalition Summit January
More informationEvaluation of Risk Reduction Principles to Direct Potable Reuse
Evaluation of Risk Reduction Principles to Direct Potable Reuse WateReuse Research Association Webinar November 14, 2013 Andy Salveson, P.E. Erin Mackey, Ph.D., P.E. Acknowledgements Sponsor. o WateReuse
More informationSpecial Publication SJ2004-SP22 St. Johns River Water Supply Project Surface Water Treatment and Demineralization Study
Special Publication SJ2004-SP22 St. Johns River Water Supply Project Surface Water Treatment and Demineralization Study Preliminary Raw Water Characterization TECHNICAL MEMORANDUM PRELIMINARY RAW WATER
More informationOcean Outfall Legislation Compliance
Ocean Outfall Legislation Compliance City of Hollywood Department of Public Utilities LARGE USER MEETING October 2, 2008 1 Agenda Regulatory Review Baseline Establishment Nutrient Reduction Options Reuse
More informationWater Reuse in the USA. Shivaji Deshmukh, P.E. Orange County Water District Istanbul, Turkey March 20, 2009
Water Reuse in the USA Shivaji Deshmukh, P.E. Orange County Water District Istanbul, Turkey March 20, 2009 Water Reuse in the USA Whittier Narrows Orange County Water District Irvine Ranch Water District
More informationWater Reuse: Solution for Water Supply
Water Reuse: Solution for Water Supply Chamindra Dassanayake (CD), PhD, P.E. Kevin Alexander, P.E. August 22, 2014 The Membrane Technology Consultants Overview Water Reuse Definitions Drivers Mature Technology
More informationChemical Contaminants in Treated Wastewater including Groundwater Dimension
Chemical Contaminants in Treated Wastewater including Groundwater Dimension Jörg E. Drewes (Germany) Chair, IWA Water Reuse Specialist Group Water Reuse in Agricultural Irrigation and Aquifer Recharge
More informationDeveloping the Design Basis for the World s Largest Full-Scale UV/HOCl AOP System
Developing the Design Basis for the World s Largest Full-Scale UV/HOCl AOP System David Hokanson, Ph.D., P.E. 1, Yan Qu, Ph.D. 1, Aleks Pisarenko, Ph.D. 2, Shane Trussell, Ph.D., P.E. 2, Anthony Van 3
More informationKirill Ukhanov, GE Water & Process Technologies, Russia, describes how advanced membrane technology is helping a Russian refinery to meet stringent
Kirill Ukhanov, GE Water & Process Technologies, Russia, describes how advanced membrane technology is helping a Russian refinery to meet stringent wastewater requirements. In Russia, there are strict
More informationThe Use of Electro-Coagulation Technology to Treat Hydrofracturing Flowback Water and Other Oil and Gas Field Wastewaters
The Use of Electro-Coagulation Technology to Treat Hydrofracturing Flowback Water and Other Oil and Gas Field Wastewaters Randy D. Horsak, PE Principal Engineer Marcellus Shale Water Group, LLC Houston,
More informationWater Reuse: identifying the optimal solution for the desired water quality. Didier PERRIN Technical & Marketing Director Degremont Asia
Water Reuse: identifying the optimal solution for the desired water quality Didier PERRIN Technical & Marketing Director Degremont Asia MIECF Macao - March 21, 2013 Content Water reuse: a wide range of
More informationOcean Outfall Rule Compliance. Piloting Alternative Technologies for Recharge of the Floridan Aquifer. July 8, PD-Sw202w
Ocean Outfall Rule Compliance Piloting Alternative Technologies for Recharge of the Floridan Aquifer July 8, 2014 1 Outfall rule mandates are significant Reduce outfall nutrients by December 31, 2018 Eliminate
More informationReclaimed Water ASR Permitting
Reclaimed Water ASR Permitting Presented by Mark B. McNeal, P.G. February 11, 2004 Presented at the Environmental Permitting Short Course Sponsored by Florida Chamber of Conference Rosen Plaza Hotel Orlando,
More informationSince the 1920s, the City of Clearwater
FWRJ City of Clearwater s Groundwater Replenishment Program of Direct Recharge to the Aquifer Using Purified Reclaimed Water David A. Wiley, Robert Fahey, and Nan Bennett Since the 1920s, the City of Clearwater
More informationDRAFT Master Water Reclamation Plan. City Council Meeting March 28, 2017
DRAFT Master Water Reclamation Plan City Council Meeting March 28, 2017 Presentation Overview Tonight s Overall Goals Acknowledge Input City has Received Reminder: Where We are in the Process Present the
More informationEPA Primary. (mg/l as CaCO3) (mg/l as CaCO3)
NORTH TEXAS MUNICIPAL WATER DISTRICT - Wylie Water Analysis Jan-2018 Mineral Analysis Raw Treated Standards Residue on Evaporation 412 456 500 1000 Silica (SiO2) 3.63 3.41 Iron (Fe) 0.378 0.259 0.3 0.3
More informationDisinfection By-Products Reduction and SCADA Evaluation and WTP Sludge Removal System and Dewatering Facility
SOUTH GRANVILLE WATER & SEWER AUTHORITY Disinfection By-Products Reduction and SCADA Evaluation and WTP Sludge Removal System and Dewatering Facility Presentation to the SGWASA Board October 10, 2017 TTHM
More informationLecture 1: Introduction
Islamic University of Gaza Environmental Engineering Department Water Treatment EENV 4331 Lecture 1: Introduction Dr. Fahid Rabah 1 1.1 Water Cycle and Water Resources 2 1.2 Water Distribution on Earth
More informationIntegrated Ozone Enhanced Biofiltration for Water Reuse
Integrated Ozone Enhanced Biofiltration for Water Reuse Abigail Antolovich WateReuse AZ Conference 2016 Flagstaff, AZ Agenda Potable Reuse Overview Advanced Treatment for Water Reuse Performance Data The
More informationOcean Outfall Rule Compliance. Piloting Alternative Technologies for Recharge of the Floridan Aquifer. June 20, PD-Sw202w
Ocean Outfall Rule Compliance Piloting Alternative Technologies for Recharge of the Floridan Aquifer June 20, 2014 PD-Sw202w 1 City of Hollywood SRWWTP was significantly affected by the Ocean Outfall Rule
More informationAquifer Storage and Recovery: A Management Tool for Upstream Operators. Presented by: Lindsay Atkinson, PE James Dwyer, PE, D.W.R.
Aquifer Storage and Recovery: A Management Tool for Upstream Operators Presented by: Lindsay Atkinson, PE James Dwyer, PE, D.W.R.E Outline Water Management Lifecycle in Unconventional E&P Incorporate ASR
More informationSulaibiya world s largest membrane water reuse project
Water Technologies & Solutions technical paper Sulaibiya world s largest membrane water reuse project background In May 2001, a consortium including Mohammed Abdulmohsin Al-Kharafi and Sons (The Kharafi
More informationConcentration mg/l TDS mg/l 10, ,000 Recovery 75% Waste TDS mg/l 44,000 COD mg/l 3,500 0 BOD NTU 1,250 0 Power Used kwh/m3 2.
1326 North Trinity San Antonio, TX 78207 1 Test Report Frac/Produced Water September 2012 A test was run in 2012 using model P-6 four stages in series. The test was run at 900 LPH (approx 4 GPM, 135 BPD).
More informationFrom No to Go. Getting a Direct Potable Reuse (DPR) Project Approved and Operational in Texas
From No to Go Getting a Direct Potable Reuse (DPR) Project Approved and Operational in Texas Wichita Falls Overview Population 104,000 Serves Total 150,000 customers 104,000 City of WF 36,000 Potable Wholesale
More informationInfluent preheating (note that the heat will be recovered before discharge);
TO Rick Schryer - Fortune Minerals Limited DATE 23 February 2012 CC Jen Gibson FROM Bridgette Hendricks, Kevin Conroy PROJECT No. 09-1373-1004.9600 UNDERTAKING #1 EFFLUENT TREATMENT SYSTEM INFORMATION
More informationA joint effort of the Orange County Water District and Orange County Sanitation District
A joint effort of the Orange County Water District and Orange County Sanitation District Orange County Water District OCWD, formed in 1933, is responsible for managing and protecting the Orange County
More informationOrange County Water District. SCAP May 4, 2015
Orange County Water District SCAP May 4, 2015 Orange County Water District Created in 1933 Manage and protect the groundwater basin Serve approximately 2.4 million residents 19 Groundwater Producers 10
More informationAs Needed Technical Engineering and Environmental Services for East County Regional Potable Reuse Project. Pre Proposal Meeting August 27, 2015
As Needed Technical Engineering and Environmental Services for East County Regional Potable Reuse Project Pre Proposal Meeting August 27, 2015 Presentation Outline Introductions Padre Dam MWD Description
More informationDEALING WITH THE PAST, MANAGING THE PRESENT, AND PLANNING FOR THE FUTURE
DEALING WITH THE PAST, MANAGING THE PRESENT, AND PLANNING FOR THE FUTURE Eric Owens, West Basin Municipal Water District, 17140 S. Avalon Blvd, Carson, CA 90746 Email: erico@westbasin.org Phone: 310-660-6223
More informationQUESTIONNAIRE FOR GENERAL WTP REQUESTED DATA FOR THE WATER TREATMENT PLANT (WTP) - Application : groundwater (well pit); urban wastewater;
REQUESTED DATA FOR THE WATER TREATMENT PLANT (WTP) - Application : ENVIRONMENTAL DATA - Temperature min. : C - Temperature max. : C - Altitude (m.a.s.l) : m - Plant location (geographic area, seismic zone,
More informationAppendix D JWPCP Background and NDN
Appendix D JWPCP Background and NDN JWPCP Background JWPCP Water Quality Primary Clarifiers HPO Reactors Final Clarifiers Unit Influent Primary Effluent Secondary Effluent BOD mg/l 460 240
More informationENVIPRO Laboratories, 2nd Floor, Sy. No. 63/4, Site No. 5, P&T Layout Road, Ashwath Nagar, Srigandhada Kaval, Sunkadakatte, Bangalore, Karnataka
Certificate Number TC-6325 Page 1 of 5 Range ing / CHEMICAL TESTING I. WATER 1. Surface Water, Ground Water, Industrial Water, Drinking Water, Irrigation Water, Water From Purifiers & Swimming Pool Water
More informationProduct Models & Specifications
water Treatment Technology for the Upstream Oil & Gas Industry Business Philosophy The AquaTex COG product line is proprietary reclamation, pretreatment, advanced treatment and recycling technology designed
More informationDirect Potable Reuse. Drivers, Regs, and Economics. RMWEA/RMSAWWA JTAC Luncheon. John Rehring, P.E. Denver, CO March 19, 2015
Direct Potable Reuse Drivers, Regs, and Economics RMWEA/RMSAWWA JTAC Luncheon Denver, CO March 19, 2015 John Rehring, P.E. Potable Reuse Indirect Potable Reuse Environmental Buffer DPR mmwd1013i1.pptx/2
More informationWater Advisory Board. May 10, 2016
Water Advisory Board May 10, 2016 Background on potable reuse implementation and technology Indirect potable reuse (IPR) Other Water Sources Environmental Buffer Water Treatment Drinking Water Wastewater
More informationA Vision for Recycled Water at Oro Loma
A Vision for Recycled Water at Oro Loma Jason Warner WateReuse Association Northern California Chapter Meeting March 1, 2019 Oro Loma Sanitary District 2 Agenda A Big Thanks Sara Rhodes Background Status
More informationOhio Section AWWA NW District Fall Meeting April 20, City of Delaware Water Plant Improvements
April 20, 2016 City of Delaware Water Plant Improvements 1 NW District Fall Meeting April 20, 2016 Delaware Water Plant Project Overview Converted 6.0 MGD Lime Softening Plant to 7.2 MGD Ultrafiltration
More informationWater Reliability for Tucson s Future
Water Reliability for Tucson s Future Water Supply Water Quality Water Operations Customers & Systems Water Conservation & Efficiency Water Resources Research Center March 9, 2015 Water Reliability means
More informationMeeting SB1 Requirements and TP Removal Fundamentals
Meeting SB1 Requirements and TP Removal Fundamentals June 5, 2017 Agenda SB1 requirements for P TP removal mechanisms Biological removal Chemical removal SB No. 1 Requirements for Phosphorus ** WWTP /
More informationCALIFORNIA S DRAFT CRITERIA FOR GROUNDWATER RECHARGE WITH RECYCLED WATER & EMERGING CONTAMINANTS. September 30, 2009
CALIFORNIA S DRAFT CRITERIA FOR GROUNDWATER RECHARGE WITH RECYCLED WATER & EMERGING CONTAMINANTS September 30, 2009 Gary Yamamoto, P.E. Division of Drinking Water and Environmental Management California
More informationAdvanced Oxidation with UV Light and Peroxide for Indirect Potable Water Reuse
Advanced Oxidation with UV Light and Peroxide for Indirect Potable Water Reuse David Murray, Brown and Caldwell Robert Chalmers, CDM Mehul Patel, OCWD October 27, 2010 Pacific Northwest Clean Water Association
More informationCoachella Valley Regional Water Management Group (CVRWMG)
April 13, 2015 SNMP Overview Introduction Regulatory Framework Water Quality Objectives Basin Characterization Ambient Water Quality and Assimilative Capacity Estimate of Future Water Quality Salt and
More informationCERTIFICATE OF ANALYSIS
1 CERTIFICATE OF ANALYSIS ATTENTION: Water Purification Solutions DATE: 29 November 2018 1. GENERAL: Table-1: Tierkloof Borehole & Product - Sampled 1 November 2018 Results expressed in parts per million
More informationTransforming Wastewater to Drinking Water: How Two Agencies Collaborated to Build the World s Largest Indirect Potable Reuse Project
Transforming Wastewater to Drinking Water: How Two Agencies Collaborated to Build the World s Largest Indirect Potable Reuse Project Adam Hutchinson, P.G., C.HG. Recharge Planning Manager April 13, 2017
More informationSPECIFICATION NO.1197S Addendum No.4 Attachment D. Appendix L- Ground Water Quality Data and Revised Construction Groundwater Discharge Plan
SPECIFICATION NO.1197S Addendum No.4 Attachment D Appendix L- Ground Water Quality Data and Revised Construction Groundwater Discharge Plan Page 1 of 2 Specification No. 1197S Addendum No. 4 ATTACHMENT
More informationPOTABLE WATER SUPPLY DEFINITIONS
Definitions POTABLE WATER SUPPLY DEFINITIONS AQUIFER. A porous, water-bearing geologic formation. Generally restricted to materials capable of yielding an appreciable supply of water. BASIN. A natural
More informationEVALUATION OF MF/UF CHEMICAL CLEANING STRATEGIES IN DIRECT POTABLE REUSE APPLICATIONS. Introduction
EVALUATION OF MF/UF CHEMICAL CLEANING STRATEGIES IN DIRECT POTABLE REUSE APPLICATIONS Chelsea M. Francis, Arcadis, 401 E Main Dr Suite 400 El Paso, TX, 79901 E-mail: chelsea.francis@arcadis.com Phone:
More informationOrange County Chapter
Orange County Chapter Potable Reuse for Inland Applications: Pilot Testing Results from a New Potable Reuse Treatment Scheme (WRRF-13-09) Ufuk G. Erdal, Ph.D., PE, CH2M HILL December 18, 2014 Outline Potable
More informationNadeem Shakir Qatar Petroleum. The 2nd Joint Qatar Japan Environmental Symposium, QP JCCP The 21st Joint GCC Japan Environmental Symposium
Nadeem Shakir Qatar Petroleum Scheme of Presentation General Overview of QP Refinery, Mesaieed. Challenges in Treatment Existing Waste Water Treatment Facilities Capacity Expansion and Upgradation of WWTP
More informationPetro-Canada Re-Uses Treated Edmonton Waste Water. Coking.com Safety Seminar Calgary September 2008
Petro-Canada Re-Uses Treated Edmonton Waste Water Coking.com Safety Seminar Calgary September 2008 1 Membrane-Treated Waste Water Project Petro-Canada has completed modifications at its Edmonton refinery
More informationImplementing Direct Potable Reuse in the Arid Southwest: El Paso s Advanced Water Purification Facility
Implementing Direct Potable Reuse in the Arid Southwest: El Paso s Advanced Water Purification Facility Imagine the result July 31, 2015 Acknowledgements El Paso Water Utilities: John Balliew Gilbert Trejo
More informationIndirect Potable Reuse for Groundwater Recharge Succession Strategy for Recycled Water
EASTERN MUNICIPAL WATER DISTRICT Indirect Potable Reuse for Groundwater Recharge Succession Strategy for Recycled Water Paul D. Jones II, P.E. General Manager, Eastern Municipal Water District March 11,
More information2015 American Water Works Association
SUNNY WANG, MEHUL PATEL, BILL DUNIVIN, JAMES CLARK, STEVEN FOELLMI, AND CATHERINE (SPENCER) DIPIETRO Post-treatment Optimization to Enhance Groundwater Recharge Operations A RECENT EXPANSION OF ORANGE
More informationBushy Park Industrial Complex Bushy Park, South Carolina
Utilities Availability - Electrical Power Available at site via SCE&G (distributed by Cooper River - Natural Gas - Available at site via South Carolina Electric & Gas (SCE&G) - Steam Available (6 bar and
More informationJoel E. Bowdan III, P.E WateReuse California CII Pre-Conference Workshop
ALTERNATIVE TREATMENT TECHNOLOGY FOR RECIRCULATING COOLING TOWERS USING RW A BIO-TECH FIRM S STORY Presented By: Joel E. Bowdan III, P.E. 2012 WateReuse California CII Pre-Conference Workshop PRESENTATION
More informationMAKING THE SWITCH FROM LIME TO MEMBRANE SOFTENING: WHEN IS IT THE RIGHT TIME? Introduction
MAKING THE SWITCH FROM LIME TO MEMBRANE SOFTENING: WHEN IS IT THE RIGHT TIME? Joseph R. Elarde CH2M HILL 5801 Pelican Bay Blvd., Suite 505 Naples, FL 34108 joe.elarde@ch2m.com 239-431-9225 Jeff Poteet,
More informationGWRS Final Expansion Challenges
GWRS Final Expansion Challenges Sandy Scott-Roberts, PE Orange County Water District AMTA/AWWA 1 OCWD GWRS Projects GWRS Project (Completed 2008) Construction of 70 MGD Treatment Facility with future expansion
More informationUsing Municipal Reclaimed Water for Cooling Water Applications: Review of Two Case Studies
Using Municipal Reclaimed Water for Cooling Water Applications: Review of Two Case Studies McIlvaine Company Hot Topic Hour on Power Plant Cooling Towers and Cooling Water Issues Thursday Feb. 16, 2012
More informationAL-KAWTHER INDUSTRIES LTD
AL-KAWTHER INDUSTRIES LTD 1 Presentation On Recycle Of Industrial Wastewater With Media Filtration And Reverse Osmosis By Al- Kawther Industries Ltd. March 2004 2 INTRODUCTION 3 EFFLUENT DISCHARGE STANDARDS
More informationLOW FOULING REVERSE OSMOSIS MEMBRANES: EVIDENCE TO THE CONTRARY ON MICROFILTERED SECONDARY EFFLUENT
LOW FOULING REVERSE OSMOSIS MEMBRANES: EVIDENCE TO THE CONTRARY ON MICROFILTERED SECONDARY EFFLUENT ABSTRACT Kevin L. Alexander, P.E., Separation Processes, Inc., San Marcos, CA Steve Alt, Separation Processes,
More informationWater Treatment Technology
Lecture 4: Membrane Processes Technology in water treatment (Part I) Water Treatment Technology Water Resources Engineering Civil Engineering ENGC 6305 Dr. Fahid Rabah PhD. PE. 1 Membrane Processes Technology
More informationATTACHMENT 1. MRWPCA Responses to August 22, 2016 Public Hearing Comments
ATTACHMENT 1 MRWPCA Responses to August 22, 2016 Public Hearing Comments Responses Related to Pure Water Monterey Groundwater Replenishment Project MRWPCA Letter to DDW September 16, 2016 Topics #1, #2:
More informationWhere is it? Groundwater Replenishment System Map
What is the Ground Replenishment (GWR) System? Orange County Ground Replenishment System s Environmental Impact Assessment GWR is a new project (approved October 2002) of the Orange County Water District
More informationKKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana
Last Amended on - Page 1 of 7 I. AIR, GASES & ATMOSPHERE 1. Ambient Air Monitoring RSPM ( PM 10) IS 5182 (Part 23): 2006 (RA ) 5 µg/m 3 to 750 µg/m 3 PM 2.5 SOP 11 dated 17.11.2014 12.5 µg/m 3 to 500 µg/m
More informationInnovative Groundwater Treatment. Sarah Wilson, Anna Comerton and Elia Edwards OWWA/OMWA Joint Annual Conference London, ON; May 4-7, 2014
Innovative Groundwater Treatment Sarah Wilson, Anna Comerton and Elia Edwards OWWA/OMWA Joint Annual Conference London, ON; May 4-7, 2014 Typical Groundwater Quality Chemical composition of GW influenced
More informationUV Disinfection of Cryptosporidium for Newly Reclassified Bin 2 Systems in Illinois. Bryan Townsend UV Technology Leader B&V Water Technology Group
UV Disinfection of Cryptosporidium for Newly Reclassified Bin 2 Systems in Illinois Bryan Townsend UV Technology Leader B&V Water Technology Group Acknowledgements Coauthors Ben Freese (Black & Veatch)
More informationSan Diego s Advanced Water Purification Demonstration Project: Performance & Integrity
Arizona Water Association Water Treatment Committee Seminar Series Next Horizons in Water Treatment Wednesday February 11 th, 2015 GateWay Community College San Diego s Advanced Water Purification Demonstration
More information