1 QC Analytical Water Treatment/Distribution Conference May 23, 2016 QC Analytical Training Facility LeClaire, IA
2 by Brian Roth, P.E. Principal Civil Engineer Stanley Consultants, Inc. Muscatine, IA
3 Alice: Which road should I take? Cheshire Cat: That depends on where you are going. Alice: I don t know where I m going. Cheshire Cat: Then it doesn t matter which road you take! Adapted from Lewis Carroll, Through the Looking Glass, As Water Utility, do you feel like Alice?
4 Provides a framework for decision making to direct future short- and long-range development of the water system. Includes history, trends, projections and goals; Blueprint for the future (guides growth); Puts your utility decisions on Target!
5 What does this mean for you as a Water Utility? Master Planning Goals IMPROVE utilities capacity to predict flow and pressure DETERMINE system improvements needed to meet current and projected water demands and meet regulatory requirements. PRIORITIZE capital improvement projects that will sustain reliable water supply, treatment and distribution into the future. DELIVER high quality water to all customers
6 Audience Pole Questions What type of water system do you have? Municipal Industrial Institutional (college/university) Military
7 Audience Pole Questions What population size do you serve? Less than 1,000 Between 1,000 to 5,000 Between 5,000 to 10,000 More than 10,000
8 Audience Pole Questions How many pressure zones do you serve? One Two More than Two
9 Audience Pole Questions Who has a master plan within last 10 years? Yes No
10 Audience Pole Questions Who has water system issues that worry you? Yes No
11 Who needs to Master Plan? Every water system responsible for delivery of adequate & safe water to customers Addresses Demand/Supply Issues Addresses Treatment/Quality Issues Addresses Regulatory Compliance Addresses Aging Infrastructure
12 Why Plan At All? Required by Regulating Agencies Iowa DNR Construction Permit Preliminary Engineering Report (PER) i.e., Master Plan for major improvements or technical information justifying improvement for smaller projects Iowa State Revolving Fund (SRF) Requires PER
13 Why Plan At All? Financial Planning Rate setting (allows income to meet current and expected future system expenditures) Permits orderly growth Needed as responsible action by Water Utility to rate payers, utility boards and city councils Training, Transitions Communicates institutional knowledge When it is needed What type of training required
14 Why Plan At All? Operation and Maintenance Places emphasis on Preventive Maintenance instead of Reactive Maintenance/Repairs
15 Why Plan At All? It s the Right Thing to Do!
16 Vision Phase Information Gathering Phase Analysis and Decision-Making Phase Facility Master Plan and Capital Improvement Plan Phase
17 Vision Phase Define Goals (where do we want to be in 20 years?) Extent of service area Level of technology SCADA Meter Reading GIS Resource Allocation Funds Personnel Equipment
18 Vision Phase (cont.) Anticipate ways to meet expected regulation System Operations Maintain Status Quo Change in Direction New WTP? Sell/Buy water to/from another utility Water supply source
19 Collect Data Information Gathering Phase Previous reports, records, logs Pumping records Demand from meter/billing records Fire demand (from Insurance Services Office and/or fire department) Population data (trends, land us, projections) Water quality information including source and treated water Maintenance records/programs
20 Information Gathering Phase (cont.) Collect Data Facility condition reports including: Water mains, fire hydrants, valves, storage, wells, pumps, treatment, surface water intake Maps (pipe network, topographic) Pump curves Storage tank data (capacity, operating levels) IDNR, 10 State Standards, local rules, regulations and criteria Water treatment unit capacity, operating conditions, etc. Water supply capacity, sustainability, operating conditions, etc.
21 Analysis and Decision-Making Phase Water Use Projections Compile water billed from previous 5-10 years Compile water pumped from previous 5-10 years Determine Average day water use Maximum day water use Peak hour water use Results Project water use based on anticipated population growth Evaluate fire demands (location and amount) Identify top 10 or 15 water users Calculate unmetered/unbilled/unaccounted for water Data Entry
22 Analysis and Decision-Making Phase (cont.) Existing Facilities Pressure Zones Take into account service area, topography, desired pressure Storage Condition assessment (when last inspected, painted, cathodic protection, etc.) Establish how each is used (control pumps, effective capacity, turnover, etc.) High Service Pumps Number, capacity, duty and standby (determine firm capacity) How operated (sequencing, soft start/stop, manual/automatic control) Distribution System Pipe location, sizes (accurate mapping) Pipe age and material Maintenance programs (hydrant flushing, valve exercising) W.Q. issues (red water complaints) Maintenance issues (break history)
23 Analysis and Decision-Making Phase (cont.) Raw Water Sources Groundwater (number, depth, capacity, W.Q.) Maintenance issues (reduction in yield, etc.) Pump condition Water quality Reliability Surface Water Condition and maintenance of intake, pumps, etc. Water quality (seasonal variations) Maintenance issues Reliability
24 Analysis and Decision-Making Phase (cont.) Treatment Facilities Schematic flow diagram (processes, chemical addition) Condition and maintenance issues Redundancy/flexibility Operational control Type of chemicals and quantities Capacity (max day)
25 Analysis and Decision-Making Phase (cont.) Regulation Water supply/water quality Safe Drinking Water Act Lead & Copper Rule Total Coliform Rule Comprehensive Surface Water Treatment Rules Stage 1 Disinfectants & Disinfection Byproducts Rule Consumer Confidence Report Rule Stage 2 Disinfectants & Disinfection Byproducts Rule Long Term 2 Enhanced Surface Treatment Rule Ten State Standards Iowa Administrative Code & IDNR Guidelines Future Regulations
26 Analysis and Decision-Making Phase (cont.) Water Distribution Ten State Standards Pumps, storage, water mains, pressure Iowa DNR (Guidelines) Pumps, storage, water mains, pressure Insurance Services Office (ISO) Use recommended by Ten State Standards & Iowa DNR
27 Analysis and Decision-Making Phase (cont.) Water Supply & Treatment Evaluations Establish W.Q. target for finished water Determine capacity of supply and WTP unit processes Compare to design criteria from regulation (loading and W.Q.) Identify deficiencies Recommend improvements Develop cost Prioritize
28 Analysis and Decision-Making Phase (cont.) Water Distribution System The heart of a water distribution system analysis is a computer model of the network Software (model) selection is important first step Used to identify and make decisions on: Deficiencies (pipes, storage, pumps, pressure zone boundaries) Pipe sizing Pump operations Storage location & effectiveness
29 Analysis and Decision-Making Phase (cont.) Water Distribution System Enter all characteristics of network into model Pipes, pumps, storage, PRVs, demands, hydrants, operating conditions Analyze and evaluate water system performance for: Average day demand Maximum day demand Peak hour demand Fire demand Storage refilling Compare performance to design criteria from regulation/guidelines Identify deficiencies Recommend improvements Develop cost Prioritize
30 Capital Improvement Plan Phase Develop list of deficiencies Develop list of improvements to correct deficiencies Cost each improvement Prioritize Improvements Develop a timeline for implementation Summarize MASTER PLAN in final report (PER)
31 Typical Report Table of Content General Water Quality Water Demands Water Supply Water Treatment Water Storage Water Pumping Water Transmission/Distribution Cost Estimating Recommendations
32 Rule of Thumb Planning Horizon 20 Years
33 Rule of Thumb - Frequency Update Every 10 Years At major milestone events: New regulations Adding new demands Losing major water customer Major capital improvements
34 Rule of Thumb Average Day Demand Source Design Criteria General (default) 100 gpcpd Iowa Water Supply Facilities Design Standards 10 States Standards 100 gpcpd (>500 people) 80 gpcpd ( people) 60 gpcpd (<100 people) None
35 Rule of Thumb Maximum Day Demand Source Design Criteria General 2 x average day Iowa Water Supply Facilities Design Standards 10 States Standards 2 x average day (>500 people) 2.5 x average day (<500 people) None
36 Rule of Thumb Peak Hour Demand Source Design Criteria General Varies with water system Iowa Water Supply Facilities Design Standards 9.0 x average day (< 220 people) 7/P x average day (>220 people) Where P= population in 1,000s 7.0 for 1K 4.8 for 10K 3.2 for 100K 10 States Standards None
37 Rule of Thumb Fire Demand Source Insurance Services Office (ISO) (see Fire Suppression Rating Schedule for details) Design Criteria 3,500 gpm (Maximum Basic Fire Flow) Needed Fire Flow for specific buildings: Up to 2,500 gpm for 2 hrs. (300 K gal) 3,000-3,500 gpm for 3 hrs. (630 K gal) >3,500 gpm for 4 hrs. (840 K gal) Iowa Water Supply Facilities Design Standards 10 States Standards Use State ISO Recommendations Minimum: 500 gpm In accordance with State ISO Requirements
38 Rule of Thumb Maximum Day + Fire Demand Compare to peak hour Typically more demanding due to concentrate, localized water demands Assume elevated storage is near empty (end of fire)
39 Rule of Thumb Prioritization Flow Condition Current Future Average Day Priority 1 Priority 5 Maximum Day Priority 2 Priority 6 Peak Hour Priority 3 Priority 7 Max Day & Fire Priority 4 Priority 8 Prioritization sets the order of improvement implementation. Improvements needs to be designed to accommodate future peak hr/max day & fire flow conditions.
40 Rule of Thumb Unaccounted for Water Source Design Criteria General <10 percent Iowa Water Supply Facilities Design Standards 10 States Standards None None
41 Rule of Thumb Working Pressure Source General Design Criteria Normal range: psi Optimum: 60 psi Minimum during fire flow: 20 psi Iowa Water Supply Facilities Design Standards 10 States Standards Working pressure: 60 psi Minimum working pressure: 35 psi Minimum during fire flow: 20 psi Normal working pressure: psi Minimum working pressure: 35 psi Minimum pressure: 20 psi
42 Rule of Thumb Topography Effects Static HGL H1 = 120 ft System Pressure (PSI) = H (ft) x 0.43 (PSI/ft) Example: H1 = 120 ft H2 = 100 ft H1 120 ft x 0.43 (PSI/ft) 52 PSI H2 = 100 ft H2 100 ft x.43 (PSI/ft) 43 PSI 20 ft change in topography 9 PSI
43 Rule of Thumb Pipe Size Source General Design Criteria Absolute minimum: 4" Minimum serving hydrants: 6" Iowa Water Supply Facilities Design Standards 10 States Standards Absolute minimum: 2" Minimum serving hydrants: 6" Absolute minimum: None Minimum serving hydrants: 6"
44 Rule of Thumb System Pipe Velocity Average/Max Day limit to 2 ft/sec Fire limit to 5 ft/sec Higher velocities result in higher headlosses/lower system pressures Localized high velocities (ex. Pump Discharge) is ok Maximum 10 ft/sec
45 Rule of Thumb Friction Factor Estimates the system headlosses Varies by pipe material Varies by pipe age Typically includes minor headlosses for fittings/valves
46 Rule of Thumb Quick Pipe Capacity Comparison Pipe Flow = Pipe Area x Pipe Velocity Pipe Area = R² Pipe Dia (inch) Pipe Area ( Sq Ft ) Pipe Velocity Flow Rate (Ft/Sec) (Cu Ft/Sec) GPM 6 (3/12)² = (4/12)² = (6/12)² =
47 Rule of Thumb Supply Water quality is dependent upon the supply source Surface water typically more variable in water quality/temperature Well water typically harder in water quality Supply rate - firm capacity greater than Maximum day Requires redundant power supply Reclaimed water gaining in use/popularity
48 Rule of Thumb Treatment Water treatment is dependent upon the supply source/quality Treatment rate - firm capacity greater than Maximum Day Requires redundant power supply Membrane Treatment gaining in use/popularity, pretreatment requirements vary based on water source/quality
49 Rule of Thumb Storage Storage volume is dependent upon water demands and fire flows Storage volume is to simplify pumping/treatment requirements from peak hour to maximum day Elevated water storage can have water quality impacts Need to purposely let the tank fill/empty over typical day Can take advantages of off peak electrical rates
50 Rule of Thumb Storage Location Typically located away from pumping to reduce system headlosses Typically located on high ground to reduce tank height/construction costs HGL HGL Pump Station Flow Flow
51 Rule of Thumb Storage Volume Source Design Criteria General Per Procedures in " AWWA M32, Section 5 Iowa Water Supply Facilities Design Standards Effective storage = maximum day demand Minimum total storage = average day demand for systems not providing fire protection For systems providing fire protection, storage is larger of the following: Effective storage = average day demand or QfTf+0.8QiTf Qf = fire flow demand rate (gpm) Tf = fire flow duration (min.) Qi = instantaneous peak flow (gpm) (These values may be reduced if additional source, pumping, and emergency power is available)
52 Rule of Thumb Storage Volume (cont) Source Design Criteria 10 States Standards Minimum storage: average day demand (where no fire protection provided)
53 Rule of Thumb Pumping Pumping capacity is dependent upon the water storage type Pumping rate = firm capacity greater than Maximum Day with elevated water storage Pumping Capacity = firm capacity greater than Peak Hr without elevated water storage Requires redundant power supply
54 Rule of Thumb Pumping Source Design Criteria General Maximum day rate with largest pump out of service Iowa Water Supply Facilities Design Standards a) If adequate effective elevated storage is available, each ground storage facility is equipped with 2 service pumps each capable of pumping at maximum day rate. b) If effective storage is less than minimum required, high services pumping is determined as: HSP Capacity = Q P24 + (Q i Q P24 +Q f )(1-Actual Effective Elevated Storage/Storage per d)
55 Rule of Thumb Pumping (Cont) Source Iowa Water Supply Facilities Design Standards Design Criteria Where: HSP = High Service Pump Firm Capacity QP 24 = Maximum day demand rate (gpm) Qi = Instantaneous peak flow rate (gpm) Qf = Fire flow demand rate (gpm) Storage per Chap 7.1.3d: = QfTf x maximum day demand (gallons) when adequate emergency power is available and Tf = fire flow duration 10 States Standards Minimum of 2 pumping units providing maximum daily pumping demand with largest pump out of service
56 Rule of Thumb Hydrant Coverage Source Design Criteria General Spacing: 1 every 400 feet Iowa Water Supply Facilities Design Standards 10 States Standards None Spacing: at each street intersection and 1 every 350 to 600 feet depending on area served
57 Modeling Estimating water supply under various water demand conditions is difficult Water modeling provides tool to estimate system response Results need to make sense on a gut level
58 Rate Study Water master planning typically results in capital improvement projects Water system should be a self funding enterprise Rates need to cover capital improvement projects
59 CONCLUSION Don t ever be in Alice s position and have to ask, Which road should I take? Master Planning will make the direction clear and the road straight!
60 Thank you! For any questions or support, please contact Brian Roth
Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge. Presentation to Board April 21, 2011
Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge Presentation to Board April 21, 2011 PRESENTATION OUTLINE Master Plan Overview Purpose and Approach Supply and Demand
More informationSYSTEM ID: KY 10 NARRATIVE DESCRIPTION
SYSTEM ID: KY 10 NARRATIVE DESCRIPTION KY 10 is primarily a branched system in Kentucky with the following assets: 13 Tanks, 13 Pumps, 1 Water Treatment Plant, and approximately 1353879 feet of pipe. KY
More informationSYSTEM ID: KY 3 NARRATIVE DESCRIPTION
SYSTEM ID: KY 3 NARRATIVE DESCRIPTION KY 3 is primarily a grid system in Kentucky with the following assets: 3 Tanks, 5 Pumps, 1 Water Treatment Plant, and approximately 277,022 feet of pipe. KY 3 provides
More informationUtilities are constantly striving to
Comprehensive Approach to Increase Effectiveness & Efficiency of Flushing Programs Using Latest Hydraulic & Water Quality Monitoring Tools Kelcia D. Mazana, Edward H. Talton Jr., and C. Robert Reiss Utilities
More informationIvins City Standard Specifications for Design and Construction Part 2 Engineering and Design Standards
2.9. WATER SYSTEM DESIGN Ivins City Standard Specifications for Design and Construction All culinary water mains and appurtenances shall be designed to provide for adequate future service for all contiguous
More informationSection 7 Hydraulic Model Development and Evaluation Criteria
Section 7 Hydraulic Model Development and Evaluation Criteria The hydraulic evaluation conducted to develop this master plan was performed using a computer model of the reclaimed water distribution system.
More informationHydraulic Modeling, PUDs & Managing Water System Growth
Hydraulic Modeling, PUDs & Managing Water System Growth American Water Resources Association Intermountain Section October 9, 2013 Utah Division of Drinking Water Ying-Ying Macauley Presentation Topics
More informationFREELAND WATER & SEWER DISTRICT BERCOT ROAD INTERTIE STUDY
FREELAND WATER & SEWER DISTRICT ISLAND COUNTY WASHINGTON BERCOT ROAD INTERTIE STUDY G&O #13507 NOVEMBER 2013 FREELAND WATER & SEWER DISTRICT ISLAND COUNTY WASHINGTON BERCOT ROAD INTERTIE STUDY G&O #13507
More informationTable of Contents. 3.1 Source Capacity Analysis
Table of Contents 3.1 Source Capacity Analysis... 3-1 3.1.1. Design Criteria... 3-1 3.1.2. Source Capacity Evaluation... 3-1 3.1.2.1 Plateau Zone... 3-1 3.1.2.2 Cascade View Zone... 3-4 3.2 Storage Capacity
More informationSYSTEM ID: New York Tunnels System
SYSTEM ID: New York Tunnels System NARRATIVE DESCRIPTION The New York Tunnels System represents the major water supply transmission tunnels for the City of New York in 1969. The system consists of 1 reservoir
More informationHydraulic Modeling and System Optimization
DRINKING WATER ENERGY MANAGEMENT WORKSHOP SERIES TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: Hydraulic Modeling and System Optimization Steven Jones, M.S., P.E. September 4, 2013 What is a Water System
More informationHydraulic Analysis Comparing Efficiency of One and Two Zone Pressure Water Systems
Hydraulic Analysis Comparing Efficiency of One and Two Zone Pressure Water Systems 1 Agenda: - Background - Objectives - Water Distribution System Overview - GIS and Hydraulic Modeling Relationship - Hydraulic
More informationCHAPTER 4 HYDRAULIC ANALYSIS
CHAPTER 4 HYDRAULIC ANALYSIS This chapter presents information on the computer hydraulic model of the City s water system and the results of hydraulic analyses. The purpose of the hydraulic analysis is
More informationChapter 4: Regulatory Requirements & Design Criteria
Chapter 4: This chapter summarizes the City s regulatory requirements and minimum design criteria as established by the Washington Administration Code (WAC) Chapter 246-290 for Group A Public Water Supplies.
More informationVILLAGE OF BEAR LAKE. Water Reliability Study & General Plan Update
VILLAGE OF BEAR LAKE MANISTEE COUNTY, MICHIGAN Water Reliability Study & General Plan Update November 2013 Project No. 811320 TABLE OF CONTENTS PAGES I. EXECUTIVE SUMMARY..........................................
More informationADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT
H A E S T A D M E T H O D S ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT F i r s t E d i t i o n Table of Contents Preface Continuing Education Units About the Software xv xix xxi Chapter 1 Introduction
More informationCITY OF MILTON PIERCE/KING COUNTY, WASHINGTON WATER SYSTEM PLAN
CITY OF MILTON PIERCE/KING COUNTY, WASHINGTON WATER SYSTEM PLAN G&O #08474 July 2010 EXECUTIVE SUMMARY TABLE OF CONTENTS CHAPTER 1 DESCRIPTION OF THE WATER SYSTEM INTRODUCTION... 1-1 SYSTEM OWNERSHIP
More informationReport. Lake Water Supply Hydraulic Modeling. Village of. Lindenhurst, IL. April 2012
Lake Water Supply Hydraulic Modeling Report Village of Lindenhurst, IL April 2012 R:\MAD\Documents\Reports\Archive\2012\Lindenhurst, IL\Lake Water Supply.HM.1290.039.mjf.jan\Report\!Front Cover (Blue=Water)
More informationPRESSURIZED IRRIGATION SYSTEM MASTER PLAN
PRESSURIZED IRRIGATION SYSTEM MASTER PLAN (HAL Project No.: 314.04.100) FINAL REPORT January 2009 ACKNOWLEDGMENTS Successful completion of this study was made possible by the cooperation and assistance
More informationNeed-to-Know Criteria Water Distribution Operator Class I
2017 Need-to-Know Criteria Water Distribution Operator Class I A Need-to-Know Guide when preparing for the ABC Water Distribution Operator Class I Certification Exam Before You Dive In What is ABC s Need-to-Know
More informationCity of Richland Comprehensive Water System Plan
City of Richland June 2010 RH2 Engineering, Inc 114 Columbia Point Drive, Suite C Richland, WA 99352 Contact: Paul R. Cross, P.E. (509) 946-5181 Prepared by: June 2010 Signed: 6/28/2010 Signed: 6/28/2010
More informationAbout Me. Overview. Seattle Regional Water System. Seattle Regional Water System. Water System Analysis and Design at Seattle Public Utilities
About Me Water System Analysis and Design at Seattle Public Utilities Jon C. Ford, P.E. CEE 481 October 1, 8 Senior Civil Engineer, Seattle Public Utilities BSCE, Seattle University MSCE, University of
More informationPresentation Summary. What, Why, and How. Building the Model. Facility Data Acquisition. Model Calibration. Real World Applications/Case Studies
Uday Khambhammettu Randolph Rostas VA AWWA Presentation Summary What, Why, and How Building the Model Facility Data Acquisition Model Calibration Real World Applications/Case Studies Model Maintenance
More informationHydraulic Analysis Comparing Efficiency of One and Two Zone Pressure Water Systems
Hydraulic Analysis Comparing Efficiency of One and Two Zone Pressure Water Systems 1 Ahmed Husain, PE MGIS Program Penn State University July 22, 2015 Energy Pressures Implementation Advisor Professor
More informationFair Oaks Water District
Fair Oaks Water District Request for Proposal To develop a set of construction drawings, construction specifications and bid documents for a Skyway Well in Fair Oaks. (FOWD Job #C19WTSTSTHD) Prepared by:
More information4A General Information A. Concept... 1 B. Conditions... 1
Design Manual Chapter 4 - Water Mains Table of Contents TOC Table of Contents Chapter 4 - Water Mains 4A General Information 4A-1---------------------------------General Information A. Concept....... 1
More informationStorage and pumping capacity analysis using hydraulic modeling
Storage and pumping capacity analysis using hydraulic modeling G. MacPherson City of Chilliwack, B.C., Canada W. de Schaetzen & S. Cripps GeoAdvice Inc., Vancouver, B.C., Canada ABSTRACT: This paper summarizes
More informationSALEM CITY REQUEST FOR PROPOSAL CULINARY AND SECONDARY WATER MASTER PLAN 5/2/2018
SALEM CITY REQUEST FOR PROPOSAL CULINARY AND SECONDARY WATER MASTER PLAN 5/2/2018 Salem City (City) is now accepting Proposals for the development of a comprehensive Salem City Culinary Water and Secondary
More informationChapter 109 Update. Water Supplier Challenges and Unintended Consequences
Chapter 109 Update Water Supplier Challenges and Unintended Consequences Jeffrey R. Hines, P.E. President and CEO The York Water Company jeffh@yorkwater.com D: 717-718-2953 1 Chapter 109 Current Current
More informationGEOGRAPHIC INFORMATION SYSTEMS (GIS) INVENTORY OF ASSETS
GEOGRAPHIC INFORMATION SYSTEMS (GIS) INVENTORY OF ASSETS Presented by Sherry Loos, GISP, RCAP State Coordinator David Garretson, GIS Database Administrator You have a lot of stuff to maintain and manage.
More informationONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008
ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6 BEST PRACTICE SUMMARY REPORT February, 2008 Water and Wastewater PROJECT APPROACH The focus of the
More informationHydraulic Modeling Assisting in Water Quality. Jinghua Jing Xiao, Ph.D., P.E. Senior Planning Engineer SE PA-AWWA Fall Conference 2018
Hydraulic Modeling Assisting in Water Quality Jinghua Jing Xiao, Ph.D., P.E. Senior Planning Engineer SE PA-AWWA Fall Conference 2018 WHO WE ARE We are the largest and most geographically diverse publicly
More informationDRINKING WATER CONSTRUCTION PERMIT APPLICATON
DRINKING WATER CONSTRUCTION PERMIT APPLICATON Addition to existing water system New drinking water system Facilities to be added Surface Plant (new or expansion) New Well or Spring Source Booster Pump
More informationWATER DISTRIBUTION SYSTEM MATHEMATICS
WATER DISTRIBUTION SYSTEM MATHEMATICS OTCO Distribution Workshop December 9, 2015 Nick Pizzi Aqua Serv The Math Basics for this Module Use some formulas Area = Π R 2 Area = 0.785 X D 2 Volume = Area X
More informationVILLAGE OF BEAR LAKE
VILLAGE OF BEAR LAKE MANISTEE COUNTY, MICHIGAN USDA/RD Preliminary Engineering Report Water System Improvements March, 2015 Project No. 821870 TABLE OF CONTENTS PAGES PROJECT PLANNING AREA... 1 EXISTING
More informationDivision of Drinking and Ground Waters
Division of Drinking and Ground Waters Asset Management Program Division: DDAGW General Template Guidance Number: OPR - 07-001 Category: Operations Guidance Status: Final Issued: November 8, 2018 I. PURPOSE:
More informationJanuary 2003 DRAFT - 9/30/99 1
Concerns in GW Treatment Systems Calculating and Reporting CT forgroundwatersystems under GWR Fecal Contamination from contaminated water sources Fecal contamination from tanks open to the atmosphere during
More informationEPA / WERF/ WaterRF Framework
EPA / WERF/ WaterRF Framework 1. What is the current state of my assets? 2. What is the required LOS? System layout Data hierarchy Standards inventory Condition assessment Protocol Rating methodologies
More informationPublic Water System Description. Contact Information Contact Type Name Phone Current Address. Public Water System Name: PWS ID: Date:
MHP and Homeowners Association Asset Management Program This template is intended for small, community public water systems. It incorporates the Asset Management Plan requirements in Ohio Administrative
More informationENGINEERING REPORT WATER SUPPLY
PROPOSED RESIDENTIAL DEVELOPMENT, CORAL SPRINGS TRELAWNY FCS #: 1124/76/C ENGINEERING REPORT WATER SUPPLY PREPARED FOR Gore Developments Limited 2c Braemar Ave, Kingston 10 FEBRUARY 2012 1 TABLE OF CONTENTS
More informationVolume 1 Executive Summary
2013 Cheyenne Water and Wastewater Master Plans Final November 27, 2013 Prepared for: City of Cheyenne Board of Public Utilities 2416 Snyder Ave. Cheyenne, WY 82001 Prepared by: HDR Engineering AMEC Earth
More informationA Balancing Act: Complex Distribution System Planning in the Western North Carolina Foothills Tina Whitfield - HDR
A Balancing Act: Complex Distribution System Planning in the Western North Carolina Foothills Tina Whitfield - HDR 2017 HDR, Inc., all rights reserved. Agenda 01 Overview 02 Approach 03 Findings 04 Alternatives
More informationSECTION 5 Design Criteria & Preliminary Analysis
SECTION 5 Design Criteria & Preliminary Analysis This section of the report describes the hydraulic design criteria used during the system hydraulic modeling evaluation described in Section 6. This section
More informationSession 2 Pump Selection. Mark Markham, P.E. Gresham, Smith and Partners September 14, 2017
Session 2 Pump Selection Mark Markham, P.E. Gresham, Smith and Partners September 14, 2017 Quick Refresh System Curves graphically show the relationship between flow rates and associated total dynamic
More informationOverview of Drinking Water Regulations
Overview of Drinking Water Regulations REGULATIONS William (Bill) Sullivan, Sanitary Engineer 3 Connecticut Department of Public Health Enforcement & Compliance Unit Purpose and Authority The Regulations
More informationWATER MAIN EXTENSION DESIGN REQUIREMENTS
This guideline provides minimum requirements for the design of new water main extensions. This guide is not to be used as a substitution for the detailed design of the water system. The Developer s Engineer
More informationUni-Directional Flushing Program Planning, Development, and Implementation. July 12, 2018
Uni-Directional Flushing Program Planning, Development, and Implementation July 12, 2018 Agenda Introductions UDF Overview Kevin Williams Example Sequence Water Quality Considerations Planning for UDF
More informationSt. John the Baptist Parish
St. John the Baptist Parish Conceptual Engineering of Mississippi River Water Source for LaPlace March 26, 2015 digital engineering 1 Major Water System Components Conceputalized Laplace Water System New
More informationLeveraging Hydraulic Models
Leveraging Hydraulic Models presented by Melissa Brunger, P.E. GAWP Fall Conference November 14, 2017 Hydraulic Modeling Applications Case Studies Conclusions/Lessons Learned AGENDA System curves for pump
More informationSection 9 Distribution System Analysis
Section 9 Distribution System Analysis This section presents the analysis of the City of Sunnyside s (City) distribution system. Hydraulic modeling was performed to evaluate the adequacy of existing facilities
More informationWATER SYSTEM STORAGE TANK EVALUATION. Southborough, Massachusetts PREPARED FOR:
R EPORT Pare Project No. 0876.8 WATER SYSTEM STORAGE TANK EVALUATION Southborough, Massachusetts PREPARED FOR: Town of Southborough Department of Public Works 8 Cordaville Road Southborough, MA PREPARED
More informationRectangular Basin = Volume, gal (Length, ft) x (Width, ft) x (Height, ft) x7.48 gal/cu.ft.
Units and Conversion Factors 1 cubic foot of water weighs 62.3832 lb 1 gallon of water weighs 8.34 lb 1 liter of water weighs 1,000 gm 1 mg/l = 1 part per million (ppm) 1% = 10,000 ppm ft 2 = square feet
More informationSECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN
3.1 GENERAL SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN 3.1.1 The following specifications cover the general design, review of plans and specifications, and acceptance of
More informationDEEP BAY IMPROVEMENT DISTRICT ANNUAL WATER SYSTEM REPORT Mountainview Road Phone/Fax:
ANNUAL WATER SYSTEM REPORT 2015 5031 Mountainview Road Phone/Fax: 250-757-9312 Bowser, BC V0R 1G0 www.dbid.ca 1 Introduction This annual report describes the Deep Bay Improvement District (DBID) water
More informationWATER SYSTEM MASTER PLAN 11. STORAGE CAPACITY EVALUATION
WATER SYSTEM MASTER PLAN 11. STORAGE CAPACITY EVALUATION The District uses water supplied from both storage and wells to help meet peak demands. In this section District operational, emergency, and fire
More informationSAWS WATER PROJECTS MODELING CRITERIA GUIDELINES
SAWS WATER PROJECTS MODELING CRITERIA GUIDELINES July 2016 2800 U.S. Highway 281 North San Antonio, Texas 78212 Modeling Criteria Guidelines, July 2016 TABLE OF CONTENTS MODELING CRITERIA GUIDELINES FOR
More informationCalculate the Costs of Piping System Elements
Calculate the Costs of Piping System Elements by Ray Hardee, Engineered Software, Inc. Last month s column described the process of creating an energy cost balance sheet for a piping system (see Figure
More informationSection 1 - Introduction...7. Section 2 - Raw Water Supply Section 3 - Water Treatment Section 4 - Water Distribution System...
Table of Contents Section 1 - Introduction...7 1.1 Population Growth...7 1.1.1 Service Area...7 1.1.2 Past Population...7 1.1.3 Projected Population Growth...9 1.2 Water Demands...9 1.2.1 Past Water Demands...9
More informationTOWN OF RICHMOND PRELIMINARY ENGINEERING REPORT UPDATES FOR WATER STORAGE IMPROVEMENTS DECEMBER, 2013
TOWN OF RICHMOND PRELIMINARY ENGINEERING REPORT UPDATES FOR WATER STORAGE IMPROVEMENTS DECEMBER, 2013 Prepared by: Green Mountain Engineering 1438 South Brownell Road Williston, VT 05495 Phone: (802) 862-5590
More informationSection 8 Storage Analysis
Section 8 Storage Analysis This section presents the analysis of the City of Sunnyside s storage facilities. Adequacy of the existing facilities is examined first, followed by recommendations for future
More informationENERGY EFFICIENY OF WATER DISTRIBUTION SYSTEMS
ENERGY EFFICIENY OF WATER DISTRIBUTION SYSTEMS A limited number of options exist to save energy in water distribution operation. Turning off lights in pump stations and using pickup trucks with small engines
More informationCEE 371 Fall 2009 Design Problem 1 (work in teams of 3) DESIGN OF AMHERST TRANSMISSION MAIN
CEE 371 Fall 2009 Design Problem 1 (work in teams of 3) DESIGN OF AMHERST TRANSMISSION MAIN Background The drinking water sources for the Town of Amherst include two surface water (reservoir) supplies
More informationTABLE OF CONTENTS. 5 WATER SUPPLY 5-1 Sources of Supply TOC-1 City of Ontario Water Master Plan. R:Reports\Ontario\Water Master Plan
Section Page 1 EXECUTIVE SUMMARY 1-1 Purpose... 1-1 1-2 Study Area... 1-1 1-3 Water Use... 1-2 1-4 Water Supply... 1-9 1-5 Existing System... 1-11 1-6 Service Criteria... 1-16 1-7 Hydraulic Model... 1-18
More informationMUNICIPAL WATER CONSERVATION PLAN FOR THE CITY OF CHANUTE JUNE 2010
MUNICIPAL WATER CONSERVATION PLAN FOR THE CITY OF CHANUTE JUNE 2010 Municipal Water Conservation Plan For the City of Chanute TABLE OF CONTENTS INTRODUCTION LONG TERM WATER USE EFFICIENCY Water Use Conservation
More informationUDF is Easier in the Office: Pilot Testing a System with Wells Equipped with Variable Frequency Drives
UDF is Easier in the Office: Pilot Testing a System with Wells Equipped with Variable Frequency Drives Jeremy Cox City of Woodland Irene Suroso,P.E. West Yost Associates Flushing Program City of Woodland
More informationThis is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.
This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact
More informationWest Bountiful City. Water System Capital Facilities Plan
Water System Capital Facilities Plan August 2008 TABLE OF CONTENTS 1.0 Executive Summary... 1 2.0 Definition of Terms and Abbreviations... 2 3.0 Introduction... 3 3.1 Background...3 3.2 Scope of Investigation...3
More informationGENERAL SERVICE WORKER
GENERAL SERVICE WORKER The City of Jefferson, IA (Pop. 4,323) is taking applications for a full-time General Service Worker for the Streets, Water, Sewer and Parks Departments. Duties include all aspects
More informationAPPENDIX M VANDEN MEADOWS PROJECT WATER MODELING STUDY AND TECHNICAL MEMORANDUM
APPENDIX M VANDEN MEADOWS PROJECT WATER MODELING STUDY AND TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Date: March 16, 2011 FROM: Victor M. Alaniz, P.E. Nolte Associates, Inc. 2495 Natomas Park Drive, Fourth
More informationPermit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System
Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System INSTRUCTIONS: This form shall be completed and submitted (in duplicate)
More informationSection V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES
Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES A. GENERAL 1. The following water system design guidelines are based on Federal, State and local health requirements and the Hilton Head No. 1 Public
More informationFire Protection Underground Piping. ASCE Meeting 12/17/14 Columbia, SC
Fire Protection Underground Piping Columbia, SC What We ll Cover Today 2 Applicable NFPA standards Shop Drawing Requirements State Fire Marshal s Review Sprinkler Act Fire Sprinkler System Specification
More informationIrrigation Tech II HYDRAULIC TROUBLESHOOTING
Irrigation Tech II HYDRAULIC TROUBLESHOOTING How much water & pressure is needed? 2 Water Flow http://www.irrigationtutorials.com 3 Water Pressure Pressure is the force that moves water through a pipe
More informationPRESSURIZED IRRIGATION SYSTEM MASTER PLAN. (HAL Project No.: )
PRESSURIZED IRRIGATION SYSTEM MASTER PLAN (HAL Project No.: 348.09.200) May 2012 TABLE OF CONTENTS TABLE OF CONTENTS... i LIST OF TABLES... ii LIST OF FIGURES... ii ACKNOWLEDGEMENTS... iii GLOSSARY OF
More informationDescription of Water Systems
Description of Water Systems 1 WATER SYSTEM OWNERSHIP AND MANAGEMENT The City is a Washington State municipal corporation that owns and operates a Group A community water system within the boundaries of
More informationBasic Irrigation Design
Basic Irrigation Design Basic Irrigation Design Table of Contents Introduction............................ii Terminology...........................iii System Diagram.........................1 Hydraulics..............................2
More informationKentucky Drinking Water Program Water System Standards and Development
Kentucky Drinking Water Program Water System Standards and Development Presentation to the Georgian National Energy and Water Supply Regulatory Commission Batumi, Georgia August 2011 Julie W. Roney Drinking
More informationUSING DESIGN-BUILD TO MITIGATE RISK TO A MAJOR WATER DELIVERY SYSTEM ROCKY MOUNTAIN DBIA PRESENTATION MAY 20, 2016
USING DESIGN-BUILD TO MITIGATE RISK TO A MAJOR WATER DELIVERY SYSTEM ROCKY MOUNTAIN DBIA PRESENTATION MAY 20, 2016 PRESENTATION OVERVIEW Utilities / Water System Overview Project Requirements Team Selection
More informationUNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS
UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS DESIGN STANDARDS SECTION 2 INDEX ITEM DESCRIPTION 2.00 GENERAL STATEMENT 2.01 WATER DISTRIBUTION
More informationMEETING MINUTES VILLAGE OF HOOSICK FALLS/TOWN OF HOOSICK ENGINEERING REPORTS FOR: WATER EXPANSION SEWER EXPANSION
www. mrbgroup.com Engineering / Architecture / Surveying, P.C. : WATER EXPANSION SEWER EXPANSION REVIEW SESSION Date: Time: 1 pm Location: Municipal Building (24 Main St, Hoosick Falls, NY 12090) Attendees:
More informationWATER LOSS CONTROL PROGRAMS
WATER LOSS CONTROL PROGRAMS EPD Guidance Document August 2007 TABLE OF CONTENTS PART 1: Overview of Water Loss Control Programs 3 SUMMARY 3 BASIC DATA AND INFRASTRUCTURE REQUIREMENTS 3 ACTIVITIES TO REDUCE
More informationPumps and Pumping Stations
Pumps and Pumping Stations Pumps add energy to fluids and therefore are accounted for in the energy equation Energy required by the pump depends on: Discharge rate Resistance to flow (head that the pump
More information2013 ANNUAL WATER REPORT
2013 ANNUAL WATER REPORT May 2014 TABLE OF CONTENTS Page 2 1.0 INTRODUCTION... 3 2.0 PARKSVILLE WATER SYSTEM... 3 3.0 DISTRIBUTION SYSTEM... 6 4.0 SCADA... 9 5.0 WATER SAMPLING AND TESTING... 10 6.0 WATER
More informationHydraulic Modeling Predicting and Resolving Water Quality Issues
Alliance of Indiana Rural Water September 21, 2016 Hydraulic Modeling Predicting and Resolving Water Quality Issues Jim McNulty, P.G. Strand Associates, Inc. The content of this presentation is not to
More informationDW Module 11: Administration Answer Key
DW Module 11: Administration Answer Key What is an example of the use of a grab sample to cross calibrate a continuous sample? One example might be that the continuous chlorine residual analyzer should
More informationHall County Environmental Health SWIMMING POOL HYDRAULIC ANALYSIS POOL ADDRESS
Hall County Environmental Health SWIMMING POOL HYDRAULIC ANALYSIS POOL NAME DATE POOL ADDRESS Shape Perimeter Width Length Min. Depth Break Depth Max. Depth Slope = 1ft in ft Area = Volume = Gunite Poured
More informationEXECUTIVE SUMMARY. The capital improvements costs through Year 2025 have been summarized as follows: RECOMMENDED IMPROVEMENTS (Ref.
EXECUTIVE SUMMARY This report evaluates the ability of the Dothan Water System to adequately meet the City s short range and future water supply, infrastructure and maintenance needs. The report evaluated
More informationGETTING A GRIP ON PRESSURE. Background
GETTING A GRIP ON PRESSURE James W. Dettmer, P.E., Malcolm Pirnie, Inc., Tucson, Arizona Karen K. Dotson, AICP, Tucson Water, Tucson, Arizona Todd J. Schram, P.E., Malcolm Pirnie, Inc., Tucson, Arizona
More informationTechniques for Developing a Rate Structure. Water & Wastewater Utility Operation and Management for Tribes
Techniques for Developing a Rate Structure Water & Wastewater Utility Operation and Management for Tribes Rate Structure Overview Introduction Revenue requirements Cost allocation methods Distributing
More informationCITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413
Page: 1 of 5 CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413 COMMERCIAL/RESIDENTIAL UTILITY PLAN COMPLETENESS CHECK LIST Updated
More informationCHAPTER 6 Evaluation of Future Water System at Buildout
CHAPER 6 Evaluation of Future Water System at Buildout 6.1 OVERVIEW his chapter presents an evaluation of the City s future expanded water distribution system and its ability to meet recommended water
More informationSECTION 5 MINIMUM DESIGN CRITERIA
5.1 INTRODUCTION Minimum design criteria for Water District 19 s water system is in accordance with the standards and requirements put forth by the U.S. Department of Environmental Protection Agency (EPA),
More informationWATER SUPPLY CHALLENGES FOR AN ISLAND COMMUNITY
WATER SUPPLY CHALLENGES FOR AN ISLAND COMMUNITY Britton Corbin, P.E. Janet McSwain, P.E. AUTHORS: Britton Corbin, Project Engineer, Earth Tech AECOM 2456 Remount Rd. Charleston, SC 29406 Janet McSwain,
More informationObservations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities
147 Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities Todd Stong PE 1, Ron R. Jorgenson 2, and Jacob Sauer 3 1 Senior Engineer,
More informationMcDuff WTP High Service Pump Replacement
T E C H N I C A L M E M O R A N D U M 642-03 MCDUFF WTP HIGH SERVICE PUMP REPLACEMENT 642-03 McDuff WTP High Service Pump Replacement PREPARED FOR: PREPARED BY: Capital Budget Planning Craig Jones DATE:
More informationAquifer Storage and Recovery (ASR) Implementation and Operations in a Water System. Tiffanie Hawley, CFPUA Randy Plummer, HDR
Aquifer Storage and Recovery (ASR) Implementation and Operations in a Water System Tiffanie Hawley, CFPUA Randy Plummer, HDR NC AWWA Spring Conference 2014 Background Data CFPUA Water System Fear Public
More information2015 DW Module 1: General Overview VOLUME III Answer Key
2015 DW Module 1: General Overview VOLUME III Answer Key Unit 1 Unit 1 Exercise 1) Coliform bacteria make good indicator organisms because: a) They are always present when pathogens are present. b) The
More informationKUM & GO 300 SUBDIVISION THORNTON, COLORADO
FINAL UTILITY STUDY KUM & GO 300 SUBDIVISION THORNTON, COLORADO PREPARED FOR: KUM & GO, L.C. 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 PH: (515) 457-6232 CONTACT: RYAN J. HALDER PREPARED BY: OLSSON
More information