MS4 REQUIREMENTS TABLE INSTRUCTIONS

Similar documents
Health Safety Net Updates. Massachusetts Health Care Training Forum January 2018

Family Support Service Provider Quick Reference Guide to CYBER

EID POLICY MANUAL. ADMIN Increases in Irrigation Acres, Criteria and Guidelines Revised Feb [supersedes Jan ]

Verification Summary Report (VSR) Instructions

City of Vancouver Planning By-law Administration Bulletins

Extended Inventory Items

LOCATION AND DESIGN DIVISION

3. Direct the Engineer to prepare a feasibility study that complies with the requirements of the USACE and BCWMC criteria.

CDM Plan Submission and Review Criteria Rules

New Product Approval Process

STAFF REPORT. Peter Zielsdorf

VEHICLE MILES TRAVELED (VMT)

ITEM 10a: WAKE COUNTY HYBRID STORMWATER DESIGN TOOL SUBMITTAL JORDAN LAKE NUTRIANT STRATEGY COMPLIANCE SUBMITTAL SEPTEMBER 10, 2011

MSCM Logistics Services Limited

SUNBURST SKI & SNOWBOARD CLUB PROGRAM PARENT, CLUB MEMBER & ADVISOR INFORMATION

Instructions Fee Schedule

Service Description Transfer of Material XML (C2B)

Initial Draft: National Water Resources Policy for the Fiji Islands

Resource Tracker User Guide

CCE Application Guidelines

EMISSION REDUCTIONS UNDER CAP-AND-TRADE PROPOSALS IN

2017 Co-Op Advertising Program

CCE Application Guidelines

PÖTTINGER Information - Configuration

Procedure for Approval, Purchase, Payment and Inventory of Wireless Communication Devices (WCD*) and Services

TUSCARAWAS COUNTY HEALTH DEPARTMENT ATTACHMENT XII: RESOURCE MANAGEMENT STANDARD OPERATING PROCEDURE

The Basics of Polk County s Impervious Surface Regulations

Activity Insight User Guide

Company Accounts are identified by a 4-5 digit account number and can be used in all company stores nationally.

Company Policy Buying Additional Annual Leave

Manual 11: Energy & Ancillary Services Market Operations Revision History

Greenhouse Gas Reporting Program. XML Reporting Instructions for Subpart HH - Landfills

The BLOOM Performance Review Decision Guide

Inquiry processing. 1. Purpose. 2. Scope. 3. Description

MEDICAID SERVICES UPDATE: August 8, 2014

Release Notes for SAP enhancement package 7 for SAP ERP 6.0, Support Package 2. Information Lifecycle Management

CAPIEL Position Paper - RoHS Scope

Getting Started with General Ledger

Table of Contents. London BRT Transit Project Assessment Process Draft Environmental Project Report

EAGLE SCOUT CANDIDATE PREPARATION GUIDE. The Eagle Scout Service Project

Eagle Scout Notebook Golden Eagle District (October 22, 2012)

Water Body and Riparian Area Boundary Delineation Course

Release Notes. for the Business Function. SAP for Insurance: Collections/Disbursements 5 (INS_FSCD_CI_5)

NEW FERTILIZER REGULATION

You can also click Jobs in the left hand navigation bar and then select Create Job toward the right hand corner.

Consumer Science and Design Technologies. Hospitality and Restaurant Management. o Work Experience, Occupational. o Work Experience, General

Fort McMurray Burned and Unburned Soil Samples

Guidance notes for completing the International Start-up Form

Summary AB 1739 (Dickinson), SB 1168 (Pavley) and SB 1319 (Pavley)

Susan Myerov, AICP Watersheds Program Director Pennsylvania Environmental Council Michael Helbing Staff Attorney Citizens for Pennsylvania s Future

10. Position Management- Mass Reorganization Last revised: March 2016 Last reviewed: June 2017 Next review: June 2018

Apply Documents saves time matching many Sage 300 Accounts Receivable payment documents to A/R Invoices.

Corporate Value Chain (Scope 3) Accounting & Reporting Standard. Summary of Changes

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority

General guidance Time series consistency. Version Guidebook Lead author Justin Goodwin. 4. Time series consistency

Guidelines on Use of Electronic Data Collection in Censuses: Systems for Management and Monitoring Field Operations

MODEL WATER QUALITY MANAGEMENT PLAN (MODEL WQMP) FOR THE CITY OF LAGUNA BEACH

How it works. The following pages provide step by step instructions on the main stages of the MYOB Integration Module.

New Balance Stores New Balance Development Fund *(NBDF) Program & Policy. *(NBDF replaced Coop in 2011)

DNP Student Exxat Training Guide

Guidelines on Use of Electronic Data Collection in Censuses: Systems for Management and Monitoring Field Operations

EVALUATION AND RATING. Guidelines and instructions for completing the application for evaluation and rating via the NRF Online Submission System

Introduction to Enlighten

PRINCIPLES OF PRTR AND AER REPORTING OF ANNUAL ENVIRONMENTAL INFORMATION

NEW LAWS REGARDING BUILDING PRODUCTS (QLD)

Report on Inspection of Grant Thornton LLP (Headquartered in Chicago, Illinois) Public Company Accounting Oversight Board

PFAS PRELIMINARY INVESTIGATION

Personal Computing Services FAQ s

3. Direct the Engineer to prepare a feasibility study that complies with the requirements of the USACE and BCWMC criteria.

Guidelines to Freight Billing valid from

Experian (Data Quality) UK&I Support Policy

Sage 300 ERP Payroll Sage HRMS Link Integration Guide. April 2014

Summary of Nelson City Land Demand and Capacity June 2017

0XXX: Meter Reading Submission for Advanced & Smart Metering. Stage 01: Request

BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA

End of Year Planning and Checklists

Web Financial Office How to Setup a New HR User and Security Specialized Data Systems, Inc Revised Last:

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership

INVITATION TO NEGOTIATE NUMBER ITN/FNW-16/17-21 FNW INVENTORY MANAGEMENT AND SCHOOL FOOD AUTHORITY ORDER SYSTEM

INTERCEPT SURVEY DATA GUIDE JUNE Visitor/Shopper Intercept Survey Data Guide

AAM Direct Suppliers AAM Supplier Portal Basic External Pull Usage

Technical Mathematics in Air Conditioning and Refrigeration. Air Conditioning, Welding and Water Technologies Department. o Work Experience, General

Progressive Intervention Plan for Community-Based Care Stage I

Career Entry and Development Profile Companion Guide. A Guide for ITT Tutors and Induction Tutors

InfoView Reports. Generating InfoView Reports at Columbia University. Training Guide

MS4 NPDES PERMITS FREQUENTLY ASKED QUESTIONS (FAQ) 1

Remote Support Equilibrium Guide

Application Guidelines:

Executive Summary European Union s General Data Protection Regulation (EU GDPR) January 2018

Your available balance is displayed on the lower left-hand side of the myprintcenter, as highlighted below.

Troubleshooting TAC GradeBook Averages

Release Notes for SAP enhancement package 7 for SAP ERP 6.0, Support Package Stack 03. SD Sales and Distribution

Pickup Request Process Update Non-Deposit Bulk Pesticide Containers

*************************************************************************************************************

Waste Water Discharge

Working Families Success Network in Community Colleges Definitions and Expected Design Elements

PM 2.5 Design Values. Data inputs Completeness requirements Calculations Current levels. Mark Schmidt EPA-OAQPS

RunnerStone, LLC. Page1 M E M O R A N D U M

Reregistration of voluntarily deregistered CDM project activities

5. EXAMPLE OF A DEGREE DAY MODEL: HINTEREISFERNER, AUSTRIA

Transcription:

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER MS4 REQUIREMENTS TABLE INSTRUCTIONS Revised, July 29, 2016 Intrductin The Pennsylvania Department f Envirnmental Prtectin (DEP) has develped a table cntaining all municipalities and mst nn-municipal entities in Pennsylvania with regulated small municipal separate strm sewer systems (MS4s) that have applied r are expected t apply fr Natinal Pllutant Discharge Eliminatin System (NPDES) permit cverage and the surface waters the MS4 is believed t discharge t that are cnsidered impaired accrding t DEP s latest Integrated Water Quality Mnitring and Assessment Reprt ( Integrated Reprt ). The MS4 Requirements Table ( Table ) cnsists f tw parts ne fr municipalities and ne fr nnmunicipal entities. The purpse f the MS4 Requirements Table ( Table ) is t identify the specific requirements fr MS4s during the next permit term relating t the remediatin f impaired waters. These requirements g abve and beynd the implementatin f the Minimum Cntrl Measures (MCMs) as part f an MS4 s strmwater management prgram and ther permit cnditins. In general, the next permit term begins in March 2018, althugh sme MS4s have permit cverage extending past this date. The requirements will be cntained in appendices f the NPDES permit r will be required as part f the PAG-13 General Permit Ntice f Intent (NOI) r individual NPDES permit applicatin, as discussed further belw. The Table was develped using GIS by initially drawing a 5-mile buffer arund each municipality s urbanized area (UA) based n the 2010 census layer r, if n 2010 UA existed, the municipal bundary. Drainage areas were then delineated within the buffer thrugh tpgraphical interplatin. If, based n these drainage areas, strmwater frm an urbanized area was expected t flw int impaired waters within the buffer, the impaired waters were selected fr the Table, as were attributes f the impaired waters, including infrmatin n the cause(s) f impairment and Ttal Maximum Daily Lads (TMDLs) that may have been develped fr the waters. See Figure 1, belw, fr a visual example f the analysis undertaken by DEP. DEP did nt utilize any infrmatin submitted by MS4s in develping the Table, as such infrmatin is generally nt in a frmat that can be used fr this purpse at this time. As a result, it is pssible that DEP verestimated discharges f strmwater frm MS4s int impaired waters. DEP is sliciting feedback frm MS4s n this Table. If an MS4 believes an errr has been made, a map identifying all MS4 utfalls and surface waters alng with a narrative descriptin f the errr is necessary and must be sent t the fllwing address s that DEP can review and update the Table as necessary: DEP Bureau f Clean Water Rachel Carsn State Office Building 400 Market Street, PO Bx 8774 Harrisburg, PA 17105-8774 The map and descriptin may als be sent via email t RA-EPPAMS4@pa.gv. Understanding the Table Cunties and municipalities are rdered alphabetically in the Table. The fllwing prvides a descriptin f each clumn: MS4 Name Name f the municipality. Every municipality listed in the Table is expected t currently have NPDES permit cverage, a waiver f NPDES permit cverage, and/r is expected t apply fr NPDES permit cverage by September 2017. NPDES ID The NPDES ID number assigned t the MS4 in DEP s data systems. If an MS4 has been issued an authrizatin t discharge frm DEP, the ID will be the NPDES permit number that is listed n the first - 1 -

MS4 Requirements Table Instructins page. If an MS4 has been issued a waiver, this number shuld be identified in the letter frm DEP apprving the waiver. Current waivers are nted with an asterisk (*) fllwing the ID number. If the NPDES ID N. is blank, DEP des nt have an ID number assigned t the MS4 at this time; where municipalities are listed in the Table because the 2010 census identified an urbanized area fr the first time, the NPDES ID N. will be generated fllwing the MS4 s submissin f an NOI r individual NPDES permit applicatin by September 2017. Nte MS4s with existing waivers may submit their renewal NOI/permit applicatin with a request fr a cntinued waiver, but it is nt a guarantee that a waiver will be granted fr the next permit term. Individual Permit Required? If Yes is indicated in this clumn, the MS4 will be required t submit an individual NPDES permit applicatin by September 2017 (r n later than 180 days prir t expiratin f permit cverage, whichever is later), regardless f the MS4 s existing cverage (i.e., an MS4 currently with PAG-13 General Permit cverage r a waiver will be required t submit an individual permit applicatin). Reasn The reasn an individual permit is required, where applicable. Reasns include: TMDL Plan A TMDL Plan will be required as part f an individual permit applicatin anytime a wastelad allcatin (WLA) fr nutrients and/r sediment (either specific/individual r aggregate/bulk) is specified in a TMDL fr the MS4. SP The MS4 has at least ne utfall that discharges t Special Prtectin (HQ r EV) surface waters. IP The MS4 is currently cvered under an individual permit and it is assumed that the circumstances that led t an individual permit are still in effect. Multiple reasns may be displayed (e.g., TMDL Plan, SP, IP ). If IP is the nly reasn listed fr an individual permit, it is pssible that the MS4 culd qualify fr PAG-13 General Permit cverage fr the next permit term. Impaired Dwnstream Waters r Applicable TMDL Name The name f the surface waters that, accrding t DEP s analysis as described abve, receives strmwater discharges (either directly r within 5 miles dwnstream) frm the MS4 and are cnsidered impaired accrding t DEP s latest Integrated Reprt. In additin, Chesapeake Bay is listed anytime an MS4 discharges strmwater t waters within the Chesapeake Bay watershed. Requirement(s) The requirements applicable t MS4s relating t the remediatin f impaired waters in the next permit term. The infrmatin is presented in the fllwing frmat: Permit Requirement Cause(s) f Impairment (Categry N.) Where: Permit Requirement The appendix (i.e., Appendix A, B, C, D r E) f the PAG-13 General Permit and individual NPDES permit that will be applicable t the MS4 r TMDL Plan (if a nutrient and/r sediment WLA exists fr the MS4 in a TMDL), fr each Impaired Receiving Waters listed. The appendices are cntained in the PAG-13 General Permit available n DEP s website. Instructins fr develping TMDL Plans will be available in a future versin f the individual NPDES permit applicatin. A summary f the requirements is as fllws: - Appendix A Pllutant cntrl measures (i.e., best management practices) must be implemented upn permit cverage t cntrl metals and ph in strmwater discharges t impaired waters (with r withut a TMDL). - Appendix B Pllutant cntrl measures must be implemented upn permit cverage t cntrl pathgens in strmwater discharges t impaired waters (with r withut a TMDL). - 2 -

MS4 Requirements Table Instructins - Appendix C Pllutant cntrl measures must be implemented upn permit cverage t cntrl pririty rganic cmpunds (e.g., PCBs, Chlrdane, etc.) in strmwater discharges t impaired waters (with r withut a TMDL). - Appendix D Chesapeake Bay Pllutant Reductin Plan must be submitted with PAG-13 NOI r individual permit applicatin t cntrl nutrients and sediment in strmwater discharges t waters in the Chesapeake Bay watershed. - Appendix E Pllutant Reductin Plan must be submitted with PAG-13 NOI r individual permit applicatin t cntrl nutrients and/r sediment in strmwater discharges t impaired waters withut a TMDL, r impaired waters with a TMDL but there is n WLA. - TMDL Plan TMDL Plan must be submitted with an individual permit applicatin t cntrl nutrients and/r sediment in strmwater discharges t impaired waters with a TMDL in which there is a WLA fr the MS4. Cause(s) f Impairment The cause f impairment as listed in DEP s data systems. Nte that the terms siltatin, suspended slids and sediment all refer t the same parameter/pllutant (inrganic slids). Als nte that causes f Excessive Algal Grwth and Organic Enrichment/Lw D.O. are surrgates fr nutrients (Nitrgen and Phsphrus). Categry N. The categry assciated with the impairment as cntained in DEP s Integrated Reprt. Categry 4a indicates that the waters are impaired and a TMDL has been cmpleted. Categry 5 indicates that the waters are impaired and a TMDL has nt yet been cmpleted, but is required. If n requirement fr impaired waters is applicable t an MS4, the phrase, N requirements at this time is used. If multiple requirements apply, the requirements are separate by a semicln. Other Cause(s) f Impairment Other causes f impairment, nt related t AMD metals and/r ph, pathgens, pririty rganic cmpunds, nutrients and sediment are shwn in this clumn. It is fr infrmatin purpses nly there will be n specific requirements in the permit t address these ther causes. Examples Example 1 MS4 Name NPDES ID Individual Permit Required? Impaired Receiving Waters Requirement(s) Other Cause(s) f Impairment Chartiers Creek Appendix E - Siltatin (5) TDS (5) Sawmill Run TMDL Plan - Siltatin, DO/BOD, Nutrients, Organic Enrichment/Lw D.O. (4a); Appendix A - Metals, ph (4a) Ohi River Appendix B - Pathgens (5) Dixins (5) EXAMPLE MS4 PAG130000 Yes The MS4 in this example wuld need t submit an individual permit applicatin at least 180 days prir t expiratin f their current permit cverage. The applicatin must include a TMDL Plan fr reducing nutrients and sediment (siltatin) in strmwater discharges t Sawmill Run. The applicatin must als include a Pllutant Reductin Plan (PRP) fr reducing sediment (siltatin) in discharges t Chartiers Creek, and must fllw Appendix E f the permit. Fllwing DEP s issuance f an individual NPDES permit t the MS4, the MS4 wuld need t implement Appendix A t cntrl metals and ph in discharges t Sawmill Run, and Appendix B t cntrl pathgens in discharges t the Ohi River. - 3 -

MS4 Requirements Table Instructins Example 2 MS4 Name EXAMPLE MS4 NPDES ID PAG130000 Individual Permit Required? Impaired Receiving Waters Requirement(s) Appendix C - PCB, Pririty Organics Delaware River (4a) Dnny Brk Appendix E - Siltatin (5) Schlhuse Run Appendix E - Siltatin (5) Perkimen Creek Appendix B - Pathgens (5) Other Cause(s) f Impairment The MS4 in this example may be eligible fr PAG-13 General Permit cverage because a TMDL Plan is nt required; hwever, all ther eligibility criteria must be met. Assuming the MS4 is eligible fr the PAG-13 General Permit, the MS4 must submit a PRP fr reducing sediment (siltatin) in discharges t Dnny Brk and Schlhuse Run with its NOI, and must fllw Appendix E f the permit. The MS4 wuld als need t implement Appendix C t cntrl PCBs and pririty rganics in discharges t the Delaware River and Appendix B t cntrl pathgens in discharges t Perkimen Creek. - 4 -

MS4 Requirements Table Instructins Figure 1: Example GIS-Based Analysis Used t Develp MS4 Requirements Table - 5 -