1 C3-3 April 6, 2017 Re: ABB Intervener Evidence ABB Enterprise Sftware 400 Perimeter Center Terrace Suite 500 Atlanta, Gergia United States (t) (f) Dear, D. A. Cte, Cmmissiner f the BC Utilities Cmmissin: ABB wuld like t take this pprtunity t address and rectify several errneus statements made in Exhibits B-1 and B-3, which bring int questin the methdlgy and basis fr a decisin t mve t the SAP platfrm fr Supply Chain (and eventually Wrk Management). Such analysis has far-reaching and brad implicatins, including the perceived benefits and near-term prject csts, as well as lnger-term supprt and future upgrade csts. Related t Exhibit B-1: A. Gap Analysis: ABB will detail hw Asset Suite (fka Passprt) can address the 13 gaps, as detailed in Chapter 3, Alternative Analysis. B. Risk Analysis: ABB will debunk the myth that an Asset Suite upgrade has high business and delivery risk. C. Cst f Alternatives: ABB discusses the cst perceptin. Related t Exhibit B-3, ABB will share cmment n market reprts, related t prject justificatin. As yu mve frward in review f this critical prject, please feel free t reach ut at any time with questins. Sincerely, Summer Trudell Accunt Executive Mbile: (404) Summer.Trudell@us.abb.cm

2 Exhibit B-1 Rebuttal (A) Gap Analysis (Sectin 3.3) The 13 gaps, identified by BC Hydr as part f their review, are nt true Asset Suite sftware gaps, but issues derived frm ineffective r incmplete use f current sftware. Thus, the Passprt ptin (knwn as Alternative 2) des nt reflect accurate scring. If BC Hydr bases its cst/benefit analysis n errneus gaps, then there is a high likelihd f less benefit and mre cst than anticipated in replacing Asset Suite with the SAP system. It is ABB s strng belief and experience that an upgrade f Asset Suite is a far mre cst-effective means f capturing the benefits f eliminating r reducing the impacts f the 13 identified gaps. It is imprtant t nte that the scring and weighting f these gaps has an enrmus impact n perceived benefits and derivatin f Net Present Value (NPV), thus accurate representatin f gaps is f paramunt imprtance. Otherwise, the NPV and related csts are misinfrmed and the basis fr apprving such a large-scale prject becmes less sund. Please see belw respnses t each gap: 1 - Inability t manage service-related spend Limited cntract management Limited ability t manage inventry levels Limited ability t manage individual supplier perfrmance Difficulty managing the supply chain fr capital prjects Lack f rder, delivery and payment tracking Inability t supprt sales and returns f unused materials Inability t supprt pre-packaging f materials fr field crews Lack f wireless access t inventry infrmatin N self-serve ptin fr rutine service requests Inability t pay suppliers withut an invice Inability t streamline cntrls and apprvals prcess Inability t integrate the wrk management systems 3 3 Ttal Scre (ut f 52) 50 SAP vs 36 Asset Suite (r Passprt) 1 - Inability t manage service-related spend The ability t manage service related expenditures depends n the ability t define 8 the scpe f wrk fr service cntracts as manageable wrk units. PassPrt culd be readily cnfigured t allw certain services t be 1 defined as manageable wrk 2 units, but nt thse that are variable (e.g. cnstructin services). In cntrast, SAP 3 readily allws fr all services t be defined as manageable wrk units, including 4 thse that are variable. Fr these reasns Alternative 2 (PassPrt) scres 2 and 5 Alternative 1 (SAP) scres 4. Respnse: The Asset Suite Cntract Management applicatin represents ne piece f the Asset Suite applicatins. Cntract Management is integrated with Accunts Payable, Actin Tracking, Design Engineering, Financial Integratin, Labr Entry, Prject Management, Purchasing, and Wrk Management. 2

3 Asset Suite Cntract Management prvides prcurement tls fr service rders and bilateral agreements. It is used t establish the scpe f wrk, distribute accunting charges, and prvide meaningful cntrls fr tracking cntracted services. The fllwing features list demnstrates techniques that streamline effrt and prvide a cmpetitive edge thrugh system integratin: Requisitin fr Cntract Services Request fr Prpsal Prcessing Vendr Bid Prpsals Requisitin Backlg Cntract Prfile Cntract Change Requests Amendments Payment Authrizatins t track cntract activities, including cntractr Labr Entry time sheet rll-ups Cntract Perfrmance Evaluatin Management Reprting Cntract Payment and Clsure, including full integratin with Accunts Payable Financial Integratin The Asset Suite Cntract Management applicatin prvides a standard apprach fr requesting cntract services and effectively managing all aspects f the cntract prcess. Cntract Management prvides the functinality t request, create, and manage standard cntracts, blanket master cntracts, and cntract releases. The cntract prcessing flw may include cntract requisitins and requests fr prpsals (RFPs). Prcesses t plan and apprximate resurce csts, create milestnes t track the prgress f wrk being perfrmed fr a cntract, and create payment authrizatins that allw accunts payable t make a prgress r full payment are included as part f the Cntract Management applicatin. Apprval and infrmatinal ruting capabilities are als an integral part f the Cntract Management prcess. In additin, the Asset Suite Cmpse tl allws BC Hydr t add, update, r rename fields, which shuld readily allw fr all services t be defined as manageable wrk units. Fr these reasns, it is questinable as t why Asset Suite wuld scre a Limited cntract management SAP has an advantage ver PassPrt in the way that key cntract infrmatin is 7 made available t users and the manner in which materials and services are 8 requisitined. In SAP, mre real-time peratinal cntract infrmatin is available t 9 users and requisitins allw fr bth services and materials in ne prcess unlike 10 PassPrt. Bth these advantages allw better cntract management in SAP than in 11 PassPrt. 12 The remaining functinality required t address this capability gap is present in SAP. 13 Fr these reasns Alternative 1 (SAP) scred 4 and Alternative 2 (PassPrt) 14 scred 3. Respnse: As part f Purchased Materials, users can enable the viewing f real-time peratinal cntract infrmatin f bth materials and services, if designed and setup apprpriately. 3

4 Materials used fr a cntract are ften cntrlled cmpletely by the vendr within the scpe f the cntract; hwever, if there are Purchase Orders related t cntract materials r equipment, it is imprtant fr the cntract analyst t be knwledgeable f the status f these POs. Smetimes, materials are prcured specifically fr cntractr wrk, fr example in a cnstructin prject. At ther times, the cntract is a build-and-install cntract and a PO is needed t receive the built equipment. When a cntract requires cnsumables as part f an nging maintenance service agreement, ne r mre POs may als be tied t the cntract. When a PO is intended fr cntract use, the cntract is referenced n the Purchase Order Header page. This page prvides visibility int thse POs. Hence, the ability t identify cntract material status by navigatin between the cntract and PO is prvided in bth directins, frm PO t Cntract and frm Cntract t POs. 3 Limited ability t manage inventry levels 4 Limited ability t manage individual supplier perfrmance 5 Difficulty managing the supply chain fr capital prjects 3Thrugh BC Hydr s PPM prject, the SAP Prject Systems mdule was deplyed 4 t supprt capital prject delivery. By its nature this capability requires integratin. 5 BC Hydr has previusly investigated, during bth the Finance and Prject and 6 Prtfli Management SAP mdule prjects, building additinal integratin between 7 PassPrt and SAP Prject Systems mdule and determined that additinal 8 integratin was nt feasible. As such the PassPrt ptin was given a scre f 0. 9 BC Hydr sees this as a critical shrtcming in PassPrt s capabilities given the 10 direct impact this wuld have n BC Hydr s ability t mre effectively manage its 11 majr capital prjects, particularly cnsidering the significant increase in capital 12 spending in recent years and the expectatin fr this t cntinue fr at least the next years, as discussed in sectin Alternative 1 (SAP) has been given a scre f 4 as it wuld allw fr direct 15 integratin between the SAP supply chain mdule and the SAP Prject Systems 16 mdule. Respnse: Asset Suite is designed t supprt the effective management f inventry levels, supplier perfrmance, and supply chain fr bth capital and peratinal and maintenance (O&M) prjects. ABB has a standard wrkflw fr bth mnitring cntracts and evaluating supplier perfrmance. This data culd be pulled int an in-applicatin reprt r BI platfrm, such as SAP Business Objects r Micrsft PwerBI, and then shared acrss the rganizatin, as required. In additin, Asset Suite has multiple avenues fr integrating t ther business infrmatin systems (such as SAP Prject Systems), as well as numerus capabilities t manage the items as detailed in gaps 3-5 (a summary f which is detailed belw). Numerus installatins can testify t this functinality, which is used in a variety f electricity utility types (e.g. T&D, Fssil and Nuclear Generatin, etc.) Design Engineering Applicatin Overview Utility persnnel are increasingly challenged t prvide cmpetitive designs and estimates t custmers and ptential custmers. The marketplace requires that these deliverables be available in real time. Best practice mandates that designs and estimates be based n apprved standards and current cst data. Asset Suite prvides these capabilities in its Design Engineering applicatin. The applicatin enables the cnversin f a custmer request fr service int suitable alternative designs fr cnstructin wrk. The design can then be ruted fr apprval befre cnstructin begins. Status tracking is maintained thrughut the cycle frm the creatin f a request thrugh design and estimating. Integratin with the 4

5 Asset Suite Prject Management and Wrk Management applicatins prvides extended tracking f the wrk thrugh the cmpletin f the cnstructin phase. The result ensures quick respnse t requests fr service with the mst cst-effective design slutin, in accrdance with standards and guidelines. Applicatin Business Flw The Design Engineering prcess begins with the receipt f a request fr service that requires design wrk fr a cnstructin prject. Preliminary infrmatin is gathered frm a client and is related t any billing required. A service request is created in the system fr the cnstructin prject, and is reviewed, apprved, and linked electrnically t a design header. A number f design versins are created t identify, fr client apprval, the lcatins, materials, labr resurces, permits, equipment, and wrk standards needed t cmplete the prject fr a client. Nte: The design may be started at this pint withut using a service request, but is nly recmmended if a billing request is nt being used.) The design versins are then prcessed t shw the steps needed t transfer the apprved design t a wrk rder. If an apprval grup r persn is in place, Asset Suite can send design AAAs (Actin/Awareness/Alert messages) fr apprval. Only ne design may be selected and issued. The system des nt allw yu t add additinal designs. A single design is used t create a Wrk Order r t be cnverted t a task n a Wrk Order. The high-level business flw includes the fllwing basic functins: The Design Engineering applicatin prvides integratin with the fllwing Asset Suite applicatins: Dcument Management - Within Design Engineering, dcuments defined within the Dcument Management applicatin may be identified as references fr the fllwing bjects: Cmpatible Units Service Requests Design Versins The Asset Suite Dcument Management applicatin has been designed t manage Dcuments. Dcuments cnvey infrmatin in graphical and text frmats, and may exist as electrnic r paper versins, r bth. In any event, dcuments have numerus attributes including the ability t be uniquely identified. Cntract Management - Within Design Engineering, cntracts and cntract requisitins defined within the Cntract Management applicatin may be identified as references fr Cmpatible Units and Design Versins. Nte that if the Asset Suite Cntract Management applicatin is unavailable, entries may be made fr references within Design Engineering but are nt be validated. In this situatin, cntract definitin allws entry f a cntract title within Design Engineering. If the Cntract Management is available, the designer may navigate frm the Cntracts and Miscellaneus Cst page t the Cntract Requisitin page, where a new Cntract Requisitin may be initiated. Inventry Management - The Design Engineering applicatin is functinally tied t the Inventry Management applicatin in several key areas: Cmpatible Unit Materials: When defining a cmpatible unit, the list f catalg items that make up the cmpatible unit may be identified. When listing materials, the user may indicate whether the material item is t be reserved when transferred t a material request. Cmments may be entered t cmmunicate, fr example, special-issue instructins t warehuse persnnel. 5

6 Design Material Requirements: The designer may list cmpatible units, and recrd fr a design any additinal material requirements (thse materials nt identified within a cmpatible unit). In develping the cst estimate fr the design, Asset Suite calculates the estimated csts based n the current average unit cst f materials fund in the Master Materials Catalg at the time the CU r material is entered fr the design. If there is a lng delay befre cnstructin begins, the designer may chse t rebuild the cst estimate (using a pull-dwn ptin frm the Design Versin Details page) t btain an updated cst estimate fr the design. As wrk begins and materials are issued t the wrk rders fr the design, materials are issued fr the wrk rder based n the real-time average unit cst f materials, nt the cst at the time the estimate was built. Transfer f Cmpatible Unit Material t the Material Request: The CU indicatr n the Material Request page allws navigatin t the Cmpatible Unit Material List, which supprts the viewing f materials cmprising a specified cmpatible unit r cmpatible unit grup. Once a multiplier is entered, the material request can be updated. The quantity f each catalg item is calculated by multiplying the CU quantity required by the multiplier. This catalg item is appended t the Material Request, r where the catalg item already exists n the Material Request, and then the calculated CU quantity is added t the existing quantity required. Transfer f Material frm the Design t the Material Request: The design can identify individual material requirements as well cmpatible units that are assemblies f multiple catalg items. These materials may be transferred t the material request nce the design has been issued fr planning cnstructin. When the cnstructin planner plans the wrk rder tasks, material can be transferred t either a new material request r an existing material request fr wrk rder task. When a new material request is created, the planner reviews it t update the date materials are required. Als, catalg IDs and quantities can be appended t the material request. Wrk Management - The Design Engineering applicatin is functinally tied t the Wrk Management applicatin in the fllwing key areas: Transfer f Design Cmpatible Unit infrmatin t the wrk rder task: This transfer may affect resurce requirements, material requirements, task accunt distributin, and assciated prperty units. The transfer f the design t a wrk rder may be accmplished frm the design r frm within an existing wrk rder task. At the time f transfer, the design cmpnents related t each design based task (a specific design task r a task based n a design task type/crew type cmbinatin) gruping are transferred t wrk rder tasks. The designer may specify a mdel wrk rder r an existing wrk rder as the target fr the transfer. When n wrk rder is specified, a wrk rder is generated using nly the design details. When a mdel wrk rder is specified, a wrk rder is generated using details frm the mdel, and the design details. When an existing wrk rder is specified, the design details are transferred int existing tasks (if matching tasks exist), r generated as new tasks within the existing wrk rder when the design based task des nt already exist as a wrk rder task. Transfer f additinal Resurce Requirements: Additinal resurces that were specified within the design (that is, resurces that have n relatinship t a cmpatible unit) may be transferred. The planner may select the additinal design resurces fr inclusin int the wrk rder task. Transfer f additinal Material t the Material Request: This includes material required fr cnstructin as well as material returned frm the cnstructin. Material that is planned fr return may be specified as salvage r junk. Transfer f Permit Requirements: The transfer f Design Permits is initiated frm an ptin n the Task Requirements and Permits page. The ptin navigates the planner t the Design Permits page, where permits may be selected. The Cnfirm functin transfers the selected permits back t the task. The csts related t the permits are transferred as miscellaneus expenses int the wrk rder task. Transfer f Cntract Requirements and Miscellaneus Expenses: Fr transfer f Design Cntracts and Design Miscellaneus Expenses, the Task Cntracts/Miscellaneus Expense 6

7 page is used. An ptin navigates the planner t the Design Cntracts and Miscellaneus Csts page, where all relevant data is presented. The planner may select all entries apprpriate t the transfer. The Cnfirm functin transfers the selected items back t the wrk rder task. Transfer f Dcument References: The transfer f Dcument References is initiated frm an ptin n the Task Dcument References page. The ptin navigates the planner t the Design Dcument/Wrk Standards page, where dcument references may be selected. The Cnfirm functin transfers the selected dcuments back t the task. Transfer f Wrk Standards: Wrk Standards specified within the design may be transferred t the wrk rder task frm the Task Standards page. An ptin allws navigatin t the Design Dcuments/Wrk Standards page, where individual wrk standards may be selected and transferred t the wrk rder task. Prject Management - When the design is fr prject-related wrk, the Prject ID is referenced n the design, allwing drill-dwn t the Prject Definitin page. The ppsite is als true: The design can be referenced n the prject definitin, which allws drill-dwn t the Design Develpment page. Actin Tracking - Designs may be referenced frm the Asset Suite Crss Reference table n the Asset Suite Crss Reference page. The Design Develpment page may be directly accessed frm Actin Tracking. 6 - Lack f rder, delivery and payment tracking 17This capability requires that the end-t-end prcess frm rder, t delivery, t 18 payment be under a single system. Currently the rder and delivery prcesses are 19 managed in PassPrt, and the payment prcesses are managed in SAP. This 20 capability gap, by its nature, cannt be clsed under Alternative 2 (PassPrt). 21 Alternative 2 (PassPrt) was given a scre f 3 as nt all f the payment infrmatin 22 can be interfaced back t PassPrt. Alternative 1 (SAP) was given a scre f 4 as 23 the deplyment f SAP fr supply chain wuld allw fr the rder, delivery, and 24 payment prcesses t ccur under ne system. Respnse: Asset Suite shuld nt be given a lwer scre simply because payment prcesses are already cmpleted in SAP. In fact, in many utilities that use Asset Suite, payments are made in systems ranging frm SAP, PepleSft, and thers (including Accunts Payable service cmpanies). Asset Suite can be used t create the payment (including all audit cntrls and matching prcesses). Asset Suite als manages the cst f prjects, which are usually sent t the General Ledger (Fixed Asset r General Ledger, depending n the determinatin f Capital r O&M charges). The recrd f actual payment can be retained in the system used t actually send the payment, and is nt required t be prvided t Asset Suite. Despite the cmments in the evaluatin, this is nt a general requirement at any f the utility cmpanies that utilize Asset Suite. The Asset Suite Accunts Payable applicatin des prvide the functinality t rganize, mnitr and cntrl payment prcessing fr an rganizatin. It prvides the ability t enter invice infrmatin, ensure that the invices are in accrdance with the financial rules, and enables cash disbursement prcessing and payment recnciliatin. Extracts are available t prvide Accunts Payable infrmatin t ther applicatins. Payment requests may take the frm f invices, vuchers, r individual emplyee payment requests in supprt f emplyee advances r expense statements. Cash disbursements may be: manually prepared checks immediate payments batch-generated checks 7

8 EDI r XML transactins prcessed using a third-party payment prcessing system Payments are recnciled against financial institutin infrmatin. These items, alng with defined financial cntrls and accunting classificatins, present a financial picture f the Accunts Payable activities and facilitate the versight f a cmpany's financial cnditin. 7 - Inability t supprt sales and returns f unused materials Alternative 1 (SAP) wuld fully supprt the return f unused 1 materials frm the field 2 and was scred 4. It is assumed that returns prcessing in Passprt culd be 3 imprved. Hwever, Passprt des nt have a sales and distributin mdule, which 4 is required t supprt the sales and returns f unused materials. Fr this reasn, 5 Alternative 2 (PassPrt) was given a scre f 3. Respnse: Asset Suite has tls within Surplus Analysis and Investment Recvery t identify surplus stck and its subsequent remval frm Inventry, thereby reducing carrying csts and releasing capital that is tied up within warehuses. Surplus Analysis prvides methds f identifying surplus candidates and Investment Recvery prvides a methd t recver inventry lsses fr surplus, bslete, r damaged material that is nt returnable t the purchase vendr. Surplus Analysis activities are cmpsed f the fllwing steps: Surplus material is identified and a Surplus Material Request is created and apprved. The material is picked, transferred t, and received at an Investment Recvery facility. A Marketing Plan is created t cnslidate the material and bids are created and sent, if required. A Material Sales Order is generated when a buyer is identified. Surplus material sld is shipped t the vendr. The Surplus Analysis and Investment Recvery prcess uses these pages: The Surplus Candidate Analysis Reprt Submissin (IG01) page is used t launch the batch prgram which will analyze the stcking levels f Catalg IDs that match the specified parameters fr surplus candidates. A reprt is generated with the surplus candidate results. The results are viewed and prcessed nline using the Surplus Planning Wrksheet (I600), which is then used t actively manage ptential surplus candidates int Surplus Recmmendatins fr further analysis, if required. T assist in identifying surplus candidates, the fllwing pages are used: The Surplus Recmmendatin (I610) page prvides a view f all Surplus Candidate lines that have been gruped tgether n a single Surplus Recmmendatin. By displaying a Surplus Recmmendatin, all the Surplus Candidate lines f the recmmendatin and their ttal value can be viewed at a glance. This page is used t prcess ptential surplus candidates. The Surplus Candidates and Analysis (I620) page is used t find candidates fr surplussing. The Material Analyst uses the search functin t btain a list f material pssibly requiring surplus by searching fr material with n usage r n usage frm a certain date. Searches can be perfrmed n Catalg IDs that have never been issued r have nt had activity since the date entered in the Last Issue Date field. The Surplus Recmmendatin Reprt Submissin page (IG02) is used t initiate the printing f Surplus Recmmendatins. The Surplus Recmmendatin Reprt will print by Surplus Number and is srted by the Inventry Value f the Surplus Recmmendatins, in descending rder. 8

9 If Investment Recvery is used t surplus the material and t recrd the sale f the surplus items, a Surplus Material Request is created n page I010. When the Material Request is apprved, the material is picked and transferred t an Investment Recvery Facility. When surplus material is transferred t an Investment Recvery facility, a Marketing Plan is created n page I600 t cnslidate material and identify purchase vendrs. When a Marketing Plan is apprved, vendr bids can be created thrugh the Asset Suite Purchasing Request fr Qutatin pages. Material at an Investment Recvery facility is stred n pallets. The pallets can be assigned a number and referenced n the Marketing Plan. A Pallet Inquiry (I601) page is prvided t view what material is lcated n a pallet. When a vendr is identified t sell the surplus material, a Material Sales Order (MSO) is generated frm the Marketing Plan. The Marketing Plan can be fr mre than ne MSO t take advantage f Vendr qute respnses. The MSO is priced per line item r by lt price. A Terms and Cnditins page (I611) is used t add a shipping address, terms, and standard/prcedure t the MSO reprt. When the MSO is APPROVED, a Shipping Ntice (I200) is generated t ship the material t the vendr. The Vendr Check Number is recrded n the MSO which cmpletes the Investment Recvery transactin. As part f the Surplus prcess, the Shipping Ntice (I200) page is used t ship the surplus material t the vendr (buyer). A Shipping Ntice can be ptinally generated frm the Surplus Recmmendatin (I610) r Surplus Candidates and Analysis (I620) pages if the Investment Recvery ptin is nt pursued. The Shipping Ntice number will be stamped n the Surplus item and displays n the Surplus Recmmendatin (I610) and Surplus Candidates and Analysis (I620) pages. 8 - Inability t supprt pre-packaging f materials fr field crews Respnse: This culd be accmmdated thrugh electrnic wrk packages r setup in ther ways, depending upn specific requirements. 9 - Lack f wireless access t inventry infrmatin Respnse: ABB s Asset Suite has a number f mbile-enabled applicatins, including AnyWare fr Inventry (AWI), Actin Manager, and Mbile Apprvals. AWI allws warehuse persnnel t perfrm duties, such as Material Picks, Cycle Cunts, Material Returns, and Bin Mvement. Actin Manager is a persnal prductivity app t supprt wrk and service requests. Mbile Apprvals allws users t supprt actins related t wrk rders, invices, timesheets, cntracts, etc N self-serve ptin fr rutine service requests 13 Autmatin f rutine prcurement is dependent n a services catalgue and an 14 easy user interface t navigate and wrkflw. Given that Alternative 2 (PassPrt) 15 has mre limited services catalgue capability than SAP, it scred 3 while 16 Alternative 1 (SAP) scred 4. Respnse: It is unclear why Asset Suite is perceived as having a mre limited services catalgue, r why this culdn t be autmated in Asset Suite? 11 - Inability t pay suppliers withut an invice The functinality t pay a supplier withut an invice is called Evaluated Receipt 9

10 18 Settlement (ERS). PassPrt des nt have ERS capability althugh sme limited capability culd likely be custm develped in 1 PassPrt. As a result, Alternative 2 2 (PassPrt) scred 1, while Alternative 1 (SAP) scred 4. Respnse: This analysis is simply incrrect. Asset Suite can be used as the utility client requires, and ERS can be accmmdated if the utility custmer requires it. As shwn in the fllwing paragraphs, the Accunts Payable applicatin sftware is very cmprehensive and flexible, and althugh paying a supplier withut an invice is usually nt best practice, it is ften cmmn practice in sme utilities, requiring cntrls and reprting unique t this situatin. The sftware can be cnfigured fr this capability thrugh business prcess design as the sftware is implemented. Accunts Payable Applicatin Overview The Asset Suite Accunts Payable applicatin prvides the functinality t rganize, mnitr and cntrl payment prcessing fr an rganizatin. It prvides the ability t enter invice infrmatin, insure that the invices are in accrdance with the financial rules, and enables cash disbursement prcessing and payment recnciliatin. Extracts are available t prvide Accunts Payable infrmatin t ther applicatins. Payment requests may take the frm f invices, vuchers, r individual emplyee payment requests in supprt f emplyee advances r expense statements. Cash disbursements may be: manually prepared checks immediate payments batch generated checks EDI r XML transactins prcessed using a third-party payment prcessing system Payments are recnciled against financial institutin infrmatin. These items, alng with defined financial cntrls and accunting classificatins, present a financial picture f the Accunts Payable activities and facilitate the versight f a cmpany's financial cnditin. The primary business activities perfrmed in this applicatin include the fllwing: Invice Prcessing (includes Purchase Order Invices, Signature Purchase Order Invices Prcessing, Cntract Invices Prcessing, and Signature Cntract Invices Prcessing) Rute fr Apprval, if needed Match Prcess Review Invice, if needed Apprve r Reject fr Payment Prcess Payment Vucher Prcessing Create Vuchers Enter r Mdify Accunt Distributin Apprve r Reject fr Payment Nn-PO r Nn-Cntract Related Invice (Vendr-Only) Prcessing Create Invice Header Create Invice Lines 10

11 Enter Accunting Infrmatin Match Prcess Apprve r Reject fr Payment Prcess Payment Evaluated Receipt Settlement (ERS) Invice Prcessing Update Vendr Purchasing Cycle Prcess Receipt Create ERS Invice Match Prcess Apprve r Reject fr Payment Prcess Payment Cnsignment Invice Prcessing Update Catalg Perfrm Material Cycle Cunt r Issue Material Create Cnsignment Invice Match Prcess Apprve r Reject fr Payment Prcess Payment Recurring Invice Prcessing Create Mdel Invice Establish Recurring Schedule Create Recurring Invice Match Prcess Apprve r Reject fr Payment Prcess Payment Credit Invice Prcessing Manually Review Credit Invice Create Credit Invice Match Prcess Apprve r Reject fr Payment Prcess Payment Scheduled Payment Prcessing Print Preliminary Payment Register Manually Review Preliminary Payment Register Update Payment Requests Prduce Batch Payments Special Payment Prcessing 11

12 Prcess Request in Asset Suite Create Immediate Payment --OR-- Manually Create Check Recrd Manual Check Cancel Check Prcessing Manually Stp Payment Cancel Check Review Payment Request Emplyee Payment Prcessing Create Emplyee Payment Request Apprve r Reject Emplyee Request Determine Emplyee Payment Amunt Prcess Payment Bank Accunt Recnciliatin Prcessing Manually Prcess Accunt Transactins Manually Ntify IT t Run Tape with Laded Bank Infrmatin Clear Transactins and Update Accunt Review Results and Prvide Directin, if needed Reslve Discrepancy 1099 Prcessing Manually Review and Crrect 1099 Addresses Review 1099 Amunts Evaluate 1099 Ttals Create 1099 Exprt File Vendr Payment Inquiry Lkup Payment Infrmatin Manually Give Payment Infrmatin t Vendr --OR-- in the case f unapprved r mismatched Invices Cntact User Department Fllw-up With Vendr 12 - Inability t streamline cntrls and apprvals prcess 3 Clsing this capability gap requires wrk t be managed, including apprval, in a 4 single system. Alternative 1 (SAP) will largely allw the financial cntrl and 5 apprval f wrk t ccur in SAP. Alternative 1 (SAP) will nt fully allw the clsure 6 f this capability gap because certain wrk (Distributin Design Wrk and 7 Generatin & Transmissin Statins) will remain in PassPrt unless and until Wrk 8 Management and Asset Management are undertaken in SAP. Alternative 1 (SAP) 12

13 9 was given a scre f 3. Alternative 2 (PassPrt) was given a scre f 2 as much f 10 the wrk will never be managed in PassPrt and there is n Human Resurces 11 mdule in PassPrt t supprt the use f rganizatinal rles t determine apprval 12 authrity. Respnse: There are a number f ways t manage the apprvals prcess in Asset Suite using infrmatin frm SAP s HR mdule withut any negative impacts. Asset Suite has an Actin Awareness Alert (AAA) Ruting prcess that prvides the ability t implement a cmpany's established apprval and infrmatin flw prcedures. A brief review f the cncepts assciated with AAA ruting is cvered belw. Ruting is the ability t submit a package f infrmatin fr review, apprval, and cmment. Electrnic ruting invlves identifying a list f reviewers fr an item requiring review r apprval. Entries in the rute list identify either an individual r a grup f individuals wh must act n the item. The rute list als identifies the type f respnse needed frm each individual r grup. An Alert Grup is a number f individuals wh have equal authrity t take specific actin, such as t apprve a wrk rder. An Alert Grup may be qualified by Facility. Asset Suite ntifies all members f an Alert Grup either serially r simultaneusly. The first member f an Alert Grup t acknwledge a AAA message des s fr all members f the wrk grup. AAA Rute List prcessing fr apprvals can be defined as being Parallel r Sequential. Parallel prcessing means all Alert Type recipients will be sent AAA messages simultaneusly n submissin f the Rute List. These recipients may APPROVE (r take sme ther actin) in randm rder. Sequentially prcessing means serial Alert Type recipients will be sent a AAA Message (1) in the sequence (r rder) that the recipient has been placed n the Rute List, and (2) nly after the prir recipient (if any) has taken sme type f actin. T initialize the AAA Ruting capability fr a cmpany yu must: Establish the ruting parameters Define Rute Grups and Rute Lists Additinal AAA capabilities are prvided fr: Apprval Matrix Ruting definitin Rute List Delinquency Tracking In additin, as discussed under gap #9, there are Mbile Apprval ptins enabling the apprpriate management t respnd t actin requests, wrk requests, invice, timeseheet, and/r cntract requests via a phne r tablet Inability t integrate the wrk management systems 13 Multiple systems exist tday t manage wrk at BC Hydr, all f which are currently 14 integrated with SAP. Additinal integratin culd be built between SAP and PassPrt 15 as well as the ther systems that supprt wrk t partially meet this bjective. 16 Hwever, full seamless integratin f wrk management systems fr BC Hydr s 17 many different types f wrk is nt pssible. As a result, Alternative 2 (PassPrt) 18 was given a scre f While deplying SAP wuld prvide sme initial benefits, sme future effrt t put all 20 wrk rders in SAP wuld still be required. As a result f the remaining wrk, 21 Alternative 1 (SAP) was als given a scre f 3. 13

14 Respnse: It is unclear which types f wrk are perceived as nt being supprted in Asset Suite, nr why full integratin is deemed as nt pssible. ABB als has a mbile wrkfrce management system, Service Suite, t manage scheduling and dispatch f wrk t the field. Gap Analysis Summary The abve gaps were rated based n an internal prject team, wh neither cnsulted ABB nr understand current Asset Suite capabilities; therefre, scring and related calculatins d nt reflect true value, benefits, and csts. In summary, if the Alternative 2 ptin scres higher, as it shuld give the abve infrmatin, the case fr clsing the gaps with SAP Supply Chain ges dwn substantially. (B) Risk Analysis (Sectin 3.3.4) Business Risk The assumptins arund business risk listed are incrrect. There is n reasn that an Asset Suite upgrade wuld pse a greater business risk, if executive leadership supprts the upgrade and the prject is well designed and executed. Further, the reasning in this decisin was made withut any engagement with the Asset Suite sftware vendr and withut a prpsal n hw t implement the prject. Specifically: 1. Change management will equally be a part f either an SAP transitin r an Asset Suite upgrade; 2. Asset Suite can flexibly manage business prcesses, perhaps even mre s than SAP, and the Asset Suite sftware wner generally urges its custmers t utilize best practice, which are cdified and shared with custmers during every implementatin. There is little risk that a utility wuld be restricted in any manner frm achieving best practice, unless lcal situatins dictate deviatins. Technlgy Risk The statement that an Asset Suite upgrade wuld result in greater IT cmplexity and greater challenges arund future mdificatin is simply errneus. The Asset Suite 9 platfrm has actually prven t be a lwer-cst technlgy platfrm t supprt, easing future upgrades by taking advantage f current technlgies and leveraging tls that allw the cnfiguratin f the sftware withut heavy custmizatin csts. In shrt, with Asset Suite 9, ABB s ultimate gal is t future-prf the sftware, meaning that all cde is Generally Available, enabling future patches and upgrades t prgress in an efficient, cst-effective manner. Prject Delivery Risk ABB wrks with a number f Systems Integratrs, including Delitte, PricewaterhuseCpers, Accenture, and ptentially thers, as well as ther niche partners (e.g., Trinr, whm BC Hydr engages tday). While there may nt be as many peple in the marketplace with Asset Suite implementatin experience, the sftware is significantly used arund the wrld in a variety f utility specific situatins. In pint f fact, Asset Suite prjects generally require much less time with smaller team sizes than SAP (ften at a much smaller fractin f cst). 14

15 Lastly, in additin t the System Integratrs shwn abve, ABB has a large number f cnsultants able t deliver the sftware either n its wn r in partnership with ne r mre systems integratin teams. (C) Cst f Alternatives (Sectin 3.3.5) The grss assumptins made in this sectin are simply incrrect. With a large number f systems integratrs and the sftware vendr available, n attempt was made t determine actual csts, and instead, estimates made by BC Hydr penalized the Asset Suite slutin withut accurate results. This is particularly wrng because the system was already in use at BC Hydr, and infrmatin frm the vendr culd easily be discvered if there were genuine interest. It is far mre likely that had this infrmatin been sught, BC Hydr wuld have learned that the sftware culd have perfrmed the business prcesses desired in a cst-effective technlgy platfrm that wuld wrk well with any financial (ERP) system (such as SAP r thers). Further, the requirement f re-training a large grup f emplyees in a new system with a cmpletely different apprach wuld nt be required, actually saving BC Hydr cnsiderable funds. Estimates that are burdened thrugh a mdel based n ne sftware is clearly nt a reasnable apprach fr evaluatin, when the actual data (estimates and references t supprt them) culd be delivered when asked fr. In this instance, the questins were nt asked, and the estimates penalized the Asset Suite (Alternative 2) ptin unreasnably. In the Summary, Sectin 3.3.1, BC Hydr states, as a result f the uncertainly f Alternative 2 csts, it is difficult t draw a cnclusin as t which alternative is preferable based n cst alne. If cst is remved as a factr, and the gaps are nt as great as depicted in the Alterative Analysis, BCUC shuld be cncerned abut the value f such a large expenditure. It is wrth explring whether an upgrade f Asset Suite can indeed clse such gaps at a lwer cst. In the Cnclusin, Sectin 3.3.7, BC Hydr states that Alternative 1 (SAP) is the preferred alternative, based n a number f factrs, many f which are misleading, verstated, r simply untrue. Related t the Cmmn Platfrm Strategy, it may be wrth nting that many f SAP s mdules are actually acquisitins it has made frm smaller cmpanies, which create the perceptin f a Cmmn Platfrm. Much f BC Hydr s Supply Chain applicatin tuts the merits f a Cmmn Platfrm acrss all business functins withut much discussin arund the state f the individual SAP mdules and future implicatins. Having a large cmmn platfrm cmprised f mdules in varius states can actually drive up prject and technical csts, as well as future supprt and upgrade csts. 15

16 Exhibit B-4 Cmments 1. On page 5 f 289, it s wrth nting that the Gartner Magic Quadrant fr Energy and Utilities Enterprise Asset Management Sftware, dated September 2015, was issued prir t ABB s release f Asset Suite 9 platfrm, an iteratin f sftware culminated frm ver 30 years f develpment. The stated cautin that Asset Suite is ne f the highest-cst EAM slutins t deply and maintain has been addressed with the release f Asset Suite 9 and is n lnger true. The secndary cautin that ABB is a niche player in the utility market, this is true. Unlike several f ur cmpetitrs, ur sftware is designed with the needs f a utility in mind. Regarding the stated cautin that There are limited service prvider ptins, mainly ABB itself, and references reprt resurce cnstraints, ABB has endeavred t strengthen its partner netwrk and EAM practice. 2. Regarding EAM market share, if yu lk at the ARC Advisry Grup s Enterprise Asset Management Glbal Market Research Study: Market Analysis and Frecast Thrugh 2020, published in 2016, ABB is a leading supplier f EAM sftware fr pwer generatin. 16

9 Things QuickBooks Users Should Know About Microsoft Dynamics 365

9 Things QuickBooks Users Should Know About Microsoft Dynamics 365 9 Things QuickBks Users Shuld Knw Abut Micrsft Dynamics 365 www.intellitecslutins.cm The past few years has brught extrardinary changes t the way we d business. Web-based business applicatins have matured,

More information

Getting Started. With Exact for Manufacturing, Standard. Exact US LLC 3600 American Blvd W Bloomington, MN United States

Getting Started. With Exact for Manufacturing, Standard. Exact US LLC 3600 American Blvd W Bloomington, MN United States Getting Started With Exact fr Manufacturing, Standard Exact US LLC 3600 American Blvd W Blmingtn, MN 55431 United States T all deliveries, transactins, services and licensing the Exact General Terms and

More information

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap Digital Advisry Services Prfessinal Service Descriptin Sftware Defined Netwrking Strategy and Radmap 1. Descriptin f Services. 1.1 Sftware Defined Netwrking Strategy and Radmap. Verizn will prvide Sftware

More information

The BLOOM Performance Review Decision Guide

The BLOOM Performance Review Decision Guide The BLOOM Perfrmance Review Decisin Guide Intrductin Planning yur perfrmance review prcess needs careful cnsideratin. Sme questins yu might be cnsidering are: 1. Hw ften will the rganizatin cmplete frmal

More information

ITIL FOUNDATION SUMMARY NOTES. Sessions

ITIL FOUNDATION SUMMARY NOTES. Sessions ITIL FOUNDATION SUMMARY NOTES Sessins 2 Service Management as a Practice 2 3 Service Lifecycle 3 4 Service Strategy 4 5 Service Design 5 6 Service Transitin 6 7 Service Operatin 7 8 Cntinual Service Imprvement

More information

How it works. The following pages provide step by step instructions on the main stages of the MYOB Integration Module.

How it works. The following pages provide step by step instructions on the main stages of the MYOB Integration Module. Integrating MYOB with TimePr With TimePr s MYOB Integratin Mdule, yu can imprt TimePr time recrds int MYOB fr invice prcessing r payrll integratin. These recrds are then used t generate: Sales Invices,

More information

Best Practice Quick Base Platform Governance

Best Practice Quick Base Platform Governance Best Practice Quick Base Platfrm Gvernance Overview: Fr all rganizatins with the visin t benefit frm brad use f the Quick Base platfrm, Advantage recmmends a systematic gvernance mdel, fr the reasns utlined

More information

Communications White Paper

Communications White Paper Intrductin The quality and effectiveness f the cmmunicatin between the prject and the stakehlder grups is a significant cntributing factr t prject success r failure. Cmmunicatin is abut sending and receiving

More information

Making the move from Sage Abra Suite (FoxPro) to Sage HRMS (SQL)

Making the move from Sage Abra Suite (FoxPro) to Sage HRMS (SQL) Making the mve frm Sage Abra Suite (FxPr) t Sage HRMS (SQL) 5272 S. LEWIS, SUITE 100 TULSA, OK 74105 918.496.1600 TOLL FREE: 877.496.1600 Making the mve frm Sage Abra Suite (FxPr) t Sage HRMS (SQL) As

More information

SAP standard PS: issues with project lifecycle management

SAP standard PS: issues with project lifecycle management Intrductin Prject System is the mst integrated mdule in SAP ECC. It is seamlessly and in real-time cnnected t almst every SAP mdule: Financial Accunting, Cst Cntrlling, Materials Management and Prcurement,

More information

Pacific Timesheet Sustainability Policy

Pacific Timesheet Sustainability Policy Pacific Timesheet Sustainability Plicy Visin We strive t deliver sftware and services t help ur custmers better achieve their wn sustainability gals, including significantly reducing their use f paper

More information

Oracle Project Portfolio Management Integration Pack for Primavera P6 and Oracle E-Business Suite Release Notes

Oracle Project Portfolio Management Integration Pack for Primavera P6 and Oracle E-Business Suite Release Notes Oracle Prject Prtfli Management Integratin Pack fr Primavera P6 and Oracle E-Business Suite 3.1 - Release Ntes Release 3.1 Part N. E20583-03 January 2012 Oracle Prject Prtfli Management Integratin Pack

More information

End of Year Planning and Checklists

End of Year Planning and Checklists TechnlgyOne Financials End f Year Planning End f Year Planning and Checklists This dcument prvides checklists and discussin pints fr sme f the main Technlgy One mdules. The TechnlgyOne Supprt Centre knwledge

More information

MIS The Expert System Expert System Development

MIS The Expert System Expert System Development Expert System (ES) An Expert System (ES) is a knwledge based infrmatin system that uses its knwledge abut a specific, cmplex applicatin area t act as an expert cnsultant t end users. Expert system prvides

More information

Yale Shared Services. Benefits of Creating a Purchase Order: Procure to Pay Tool Kit

Yale Shared Services. Benefits of Creating a Purchase Order: Procure to Pay Tool Kit Prcure t Pay Tl Kit Benefits f Creating a Purchase Order: Priritized cntract pricing Upfrnt charging validatin Cmmitment is made Details f gds and services prvided Terms and Cnditins are met Wrkflw f payment

More information

B&B Food Distributors Data Synchronization Initiative

B&B Food Distributors Data Synchronization Initiative B&B Fd Distributrs Data Synchrnizatin Initiative Frequently Asked Questins fr B&B Fd Distributrs Suppliers Versin 1 Cpyright 2012. All Rights Reserved. FAQs fr B&B Fds Distributrs Suppliers REVISION HISTORY

More information

OPTIMIZE. Core Banking System Replacement. OPTIMIZE Advisory Note. The Issues. Key Recommendations

OPTIMIZE. Core Banking System Replacement. OPTIMIZE Advisory Note. The Issues. Key Recommendations Building a Business Case fr Cre Banking Systems Renewal Mark Flynn, 7 th Feb 2012 DcID: 122105028 The Issues Cre banking system replacement is the mst challenging IT prjects that a Bank can face. Such

More information

Kast Distributors Data Synchronization Initiative

Kast Distributors Data Synchronization Initiative Kast Distributrs Data Synchrnizatin Initiative Frequently Asked Questins fr Kast Distributrs Suppliers Versin 1 Cpyright 2015. All Rights Reserved. Kast Distributrs FAQs fr Suppliers REVISION HISTORY Date

More information

PROACTIS Integration Framework

PROACTIS Integration Framework PROACTIS Integratin Framewrk Overview T: +44 (0)20 7121 4704 e: inf@tuchstnespendmanagement.c.uk w: tuchstnespendmanagement.c.uk Table f Cntents Intrductin 3 Integratin Overview 3 Typical Infrmatin Flws

More information

IBM Global Services. Server Optimization ... Trends and Value Proposition That Can Drive Efficiencies and Help Businesses Gain A Competitive Edge

IBM Global Services. Server Optimization ... Trends and Value Proposition That Can Drive Efficiencies and Help Businesses Gain A Competitive Edge IBM Glbal Services Server Optimizatin.......... Trends and Value Prpsitin That Can Drive Efficiencies and Help Businesses Gain A Cmpetitive Edge Intrductin A typical rganizatin s success and ability t

More information

IESBA Meeting (March 2013) Agenda Item

IESBA Meeting (March 2013) Agenda Item Agenda Item 7-A Backgrund Lng Assciatin f Senir Persnnel (Including Partner Rtatin) with an Audit Client Matters fr Cnsideratin 1. Paragraph 290.150 f the IESBA Cde f Ethics fr Prfessinal Accuntants (the

More information

Certificate in Construction Project Management

Certificate in Construction Project Management Certificate in Cnstructin Prject Management Duratin: 6 Mnths Distance Learning Prgramme Language: English RICS Member: $1,235 Nn RICS Member $1,485 Curse Summary This prgramme explres the prject lifecycle

More information

Certificate in Construction Project Management

Certificate in Construction Project Management Certificate in Cnstructin Prject Management Duratin: 6 Mnths Distance Learning Prgramme Language: English RICS Member: 895.00 + VAT Nn RICS Member 1075.00 + VAT Curse Summary This prgramme explres the

More information

ERP Evaluation Request for Proposal Worksheet

ERP Evaluation Request for Proposal Worksheet Use this utline t prepare a request fr prpsal (RFP), a questinnaire, r a meeting with a prspective slutin prvider 1. Vendr infrmatin Cntacts (including name f CEO) Address URLs, e-mail addresses, and phne

More information

BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA

BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA What we are trying t achieve BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA This strategy sets ut hw Birmingham City Cuncil will prvide regular cmprehensive releases f public pen data and hw it will use

More information

MEDICAID SERVICES UPDATE: August 8, 2014

MEDICAID SERVICES UPDATE: August 8, 2014 OKLAHOMA DEPARTMENT OF HUMAN SERVICES Aging Services, Medicaid Services Unit ADvantage Administratin PO Bx 50550 Tulsa, Oklahma 74150-0550 (918) 933-4900 www.kdhs.rg MEDICAID SERVICES UPDATE: August 8,

More information

Manual 11: Energy & Ancillary Services Market Operations Revision History

Manual 11: Energy & Ancillary Services Market Operations Revision History 2.3.4 Minimum Generatr Operating Parameters Parameter Limited Schedules Belw is the list f business rules t require units t submit schedules that meet minimum accepted parameters. Market Sellers are required

More information

Procurement Gateway & I Want Doc User Guide https://gateway.procurement.cornell.edu/

Procurement Gateway & I Want Doc User Guide https://gateway.procurement.cornell.edu/ Prcurement Gateway & I Want Dc User Guide https://gateway.prcurement.crnell.edu/ Prcurement Gateway Once yu lg int the Prcurement Gateway, the system will identify wh yu are and yur primary FTC/BSC yu

More information

White Paper on Distributor Inventory Why distributors have too much Inventory

White Paper on Distributor Inventory Why distributors have too much Inventory 2014 White Paper n Distributr Inventry Why distributrs have t much Inventry Since 2007 the United States has been In and wrking its way ut f a recessin In 2013-14 Whlesalers are finding that THINGS are

More information

MLGCA Requirements for the Microsoft Dynamics SL Upgrade. Summary: Vendor Minimum Qualifications: Scope of Work: General:

MLGCA Requirements for the Microsoft Dynamics SL Upgrade. Summary: Vendor Minimum Qualifications: Scope of Work: General: Summary: The Maryland Lttery and Gaming Cntrl Agency (MLGCA) will prcure a vendr t upgrade the Agency s current Micrsft Dynamics SL (Slmn) applicatin t the mst recent versin (SL 2015), as well as implement

More information

Demo Script. Project Management Classification: Internal and for Partners. SAP Business ByDesign Reference Systems. <Business Scenario Name>

Demo Script. Project Management Classification: Internal and for Partners. SAP Business ByDesign Reference Systems. <Business Scenario Name> Dem Script Classificatin: Internal and fr Partners SAP Business ByDesign Reference Systems SAP AG 2012 Octber 23, 2017 1 Table f Cntent 1 Dem Script Overview... 3 1.1 Dem Overview...

More information

Network Services and Their Distributors Data Synchronization Initiative Frequently Asked Questions for Suppliers

Network Services and Their Distributors Data Synchronization Initiative Frequently Asked Questions for Suppliers Netwrk Services and Their Distributrs Data Synchrnizatin Initiative Frequently Asked Questins fr Suppliers June 2012 Cpyright 2011. All Rights Reserved. FAQs fr Netwrk Services Suppliers REVISION HISTORY

More information

Customer Service in Microsoft Dynamics CRM 2013

Customer Service in Microsoft Dynamics CRM 2013 Custmer Service in Micrsft Dynamics CRM 2013 Custmer Service in Micrsft Dynamics CRM 2013 Curse Cde: 80545 Certificatin Exam: MB2-700 Duratin: 1 Day Certificatin Track: N/A Frmat: Classrm Level: 300 Abut

More information

Customer best practices

Customer best practices Custmer dcument Custmer best practices Recmmendatins fr new Basware transactin services custmers Basware Crpratin Cpyright Basware Crpratin All rights reserved 1 (11) 1 Intrductin Our best advice This

More information

Release Notes for SAP ERP Financial Accounting and Operations 2.0

Release Notes for SAP ERP Financial Accounting and Operations 2.0 Release Ntes fr SAP ERP Financial Accunting and Operatins 2.0 What's New? Release Ntes Cpyright 2013 SAP AG r an SAP affiliate cmpany. All rights reserved. N part f this publicatin may be reprduced r transmitted

More information

Resource Tracker User Guide

Resource Tracker User Guide Revisin: 05 Effective Date: 02/22/2019 Prepared By: PJM Client Management [Type text] PJM User Guide: Resurce Tracker Table f Cntents Apprval... 2 Current Revisin... Errr! Bkmark nt defined. Intrductin...

More information

SAP SD Course Curriculum

SAP SD Course Curriculum SAP SD Curse Curriculum Day-1: Sales / Enterprise Overview, Master Data What is SAP What is enterprise resurce planning What is financial accunting What is Human Capital Management SAP GUI Navigatin 2010

More information

UCF Financials Xpansion Meeting Contracts Module Fit/Gap Design Meeting MINUTES

UCF Financials Xpansion Meeting Contracts Module Fit/Gap Design Meeting MINUTES UCF Financials Xpansin Meeting Cntracts Mdule Fit/Gap Design Meeting MINUTES Date: April 9, 2012 Time: Lcatin: Facilitatr: Attendees: Minutes: 09:00 a.m. RP-302 Parker Madden Mullins, Nimmathta, Wray,

More information

Project Charter. Current 8/23/2006. Version 2

Project Charter. Current 8/23/2006. Version 2 Prject Charter Current 8/23/2006 Versin 2 Dcument Cntrl Dcument Title: Authr(s): Prject Charter CMS Prject Team Date By Actin Versin Pages 8/23/06 SKC Template applied 1.0 All 9/13/06 KKee Updated TOC

More information

Port Manager. Microsoft Dynamics CRM for Ports

Port Manager. Microsoft Dynamics CRM for Ports Prt Manager Micrsft Dynamics CRM fr Prts February 2015 Overview Celedn Partners Prt Manager encapsulates the functinality f many prt related prcesses int an easy t learn and easy t use tl. The slutin leverages

More information

In this fact sheet we answer the four most common questions new clients ask:

In this fact sheet we answer the four most common questions new clients ask: Wrking With Federal Prpsals Intrductin In this fact sheet we answer the fur mst cmmn questins new clients ask: What tasks d yu perfrm and what d yu need frm us? Hw d we use the Virtual War Rms? Hw much

More information

USER MANUAL Magento Australia Post eparcel Extension

USER MANUAL Magento Australia Post eparcel Extension USER MANUAL Magent Australia Pst eparcel Extensin Versin: 1.0.0 TABLE OF CONTENTS 1. Intrductin...1 2. Benefits f Magent Australia Pst eparcel Extensin...1 3. Back end Cnfiguratin:...2 4. Features... 16

More information

JOB DESCRIPTION. Senior Project Manager Proposed band

JOB DESCRIPTION. Senior Project Manager Proposed band Jb title Jb family Senir Prject Manager Prject Management Prpsed band D Jb purpse T deliver a prject, r multiple prjects and expected utcmes, t stakehlder expectatins, within the agreed brief, and within

More information

Procedure for Approval, Purchase, Payment and Inventory of Wireless Communication Devices (WCD*) and Services

Procedure for Approval, Purchase, Payment and Inventory of Wireless Communication Devices (WCD*) and Services Prcedure fr Apprval, Purchase, Payment and Inventry f Wireless Cmmunicatin Devices (WCD*) and Services Backgrund: In rder t cmply with the Gergia Office f Planning and Budget Plicy Memrandum N. 4 (Revisin

More information

Managing Supply Chain with Third Party Logistics Provider an Overview of the Integration

Managing Supply Chain with Third Party Logistics Provider an Overview of the Integration Managing Supply Chain with Third Party Lgistics Prvider an Overview f the Integratin Applies t: Supply Chain Management Summary Businesses have t manage their Supply Chain effectively t prvide Rapid Respnse

More information

Kootenai River Restoration Master Plan: Master Plan Overview

Kootenai River Restoration Master Plan: Master Plan Overview Ktenai River Restratin Master Plan: Master Plan Overview Ktenai River Restratin Prject #200200200 Restre Natural Recruitment Ktenai River White Sturgen Prject Overview In late 2006, the KTOI received prject

More information

INVITATION TO NEGOTIATE NUMBER ITN/FNW-16/17-21 FNW INVENTORY MANAGEMENT AND SCHOOL FOOD AUTHORITY ORDER SYSTEM

INVITATION TO NEGOTIATE NUMBER ITN/FNW-16/17-21 FNW INVENTORY MANAGEMENT AND SCHOOL FOOD AUTHORITY ORDER SYSTEM September 15, 2016 ADDENDUM 1 TO: FROM: RE: Vendrs Vianka Clin, Purchasing Directr INVITATION TO NEGOTIATE NUMBER ITN/FNW-16/17-21 FNW INVENTORY MANAGEMENT AND SCHOOL FOOD AUTHORITY ORDER SYSTEM This addendum

More information

VENDOR DISPLAY SERVICE LEVEL AGREEMENT

VENDOR DISPLAY SERVICE LEVEL AGREEMENT OBJECTIVE: T ensure Vendr prvided displays are maintained in a fully functinal state by the Vendr fr life f display in Best Buy retail stres. It is in the best interest f bth Vendrs and Best Buy t ensure

More information

Financial Management Meeting December 15, Standard UW-Madison Winter Headwear

Financial Management Meeting December 15, Standard UW-Madison Winter Headwear Financial Management Meeting December 15, 2016 Standard UW-Madisn Winter Headwear Financial Management Meeting Agenda Welcme & Intrductins Capital Equipment Imprvements Update Amy Wilsn 45 minutes Amy

More information

ECNG Energy Group. Performance Review Plan

ECNG Energy Group. Performance Review Plan ECNG Energy Grup Perfrmance Review Plan Cntents Overview 3 Summary 3 Purpse 3 Key Phases and Timelines 4 1) Perfrmance Planning: Start f Q1 4 Setting Individual Objectives 5 2) Onging Caching and Mid-year

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directrate B Grwth and Innvatin Circular Ecnmy and Industrial Leadership Seville, 6 th April 2018 Level(s) testing phase Guidance and rules

More information

Request for Quotes PennDOT Leadership Academy for Managers (PLAM) Solicitation Number:

Request for Quotes PennDOT Leadership Academy for Managers (PLAM) Solicitation Number: www.dt.state.pa.us Request fr Qutes PennDOT Leadership Academy fr Managers (PLAM) Slicitatin Number: 6100041372 Curse Title: Curse Date(s) & Lcatins: PennDOT Leadership Academy fr Managers (PLAM) This

More information

Introduction & Services Overview

Introduction & Services Overview Academy Cnsulting Grup Intrductin & Services Overview Agenda Intrductin t Academy Cnsulting Grup Our Services t meet yur business needs Prject Management and PMO IT System Develpment Lifecycle (SDLC) Prject

More information

Personal Computing Services FAQ s

Personal Computing Services FAQ s What s cvered under the PCS cntract? PCS will generally cver all f the Break/Fix services n the Cre Hardware that is lcated at the schls. Cre Hardware cnsists f: DESKTOPS, LAPTOPS, SERVERS, and PRINTERS.

More information

Target Data Synchronization Initiative

Target Data Synchronization Initiative Target Data Synchrnizatin Initiative Frequently Asked Questins fr Suppliers Versin 1.1 April 2013 Cpyright 2010. All Rights Reserved. REVISION HISTORY FAQs fr Target Suppliers Date Ver # Descriptin f Change

More information

Reinhart Foodservice, L.L.C. Data Synchronization Initiative

Reinhart Foodservice, L.L.C. Data Synchronization Initiative Reinhart Fdservice, L.L.C. Data Synchrnizatin Initiative Frequently Asked Questins fr Suppliers Versin 1 June 2016 Cpyright 2016. All Rights Reserved. FAQs fr Reinhart Suppliers REVISION HISTORY Date Ver

More information

OPTIMIZE 2009 TOC Optimize and its affiliates. All rights reserved. Page 1 of 10

OPTIMIZE 2009 TOC Optimize and its affiliates. All rights reserved.   Page 1 of 10 Enterprise Architecture Prcess Nthing is permanent except change. Heraclitus (ca. 535 475 BC) Jean-Luc Caste, 24 August 2009 DcID: 092101005 The Issues Decisin makers arund the wrld have cme t understand

More information

Family Support Service Provider Quick Reference Guide to CYBER

Family Support Service Provider Quick Reference Guide to CYBER Welcme Page: Family Supprt Service Prvider Quick Reference Guide t CYBER Links t Mnitr Regularly: Authrizatin Current: Will list all currently pen authrizatins; shuld include nly thse yuth currently receiving

More information

0XXX: Meter Reading Submission for Advanced & Smart Metering. Stage 01: Request

0XXX: Meter Reading Submission for Advanced & Smart Metering. Stage 01: Request Stage 01: Request 0XXX: Meter Reading Submissin fr Advanced & Smart Metering At what stage is this dcument in the prcess? The rllut f Advanced and Smart Metering delivers the pprtunity t utilise mre frequent

More information

Call for Bids. No. PROC-B IS Security and Authorization concept for ERP

Call for Bids. No. PROC-B IS Security and Authorization concept for ERP Call fr Bids N. PROC-B-5818-10-IS Security and Authrizatin cncept fr ERP Questins & Answers Mr. Dietmar PLESSE, Head, Prcurement Divisin, ITU Date: 17 March 2010 Questins Answers General Questins We understand

More information

Disaster Recovery Planning Guide

Disaster Recovery Planning Guide Disaster Recvery Planning Guide Disaster Recvery Planning Guide A Business Cntinuity Plan (BCP) is a written strategy which ensures that persnnel and assets are prtected and able t functin in the event

More information

Project Status Report

Project Status Report Prject Status Reprt Fr perid: March 2007 Defining and Delivering a Service Level Agreement Submitted by: Ann Berry-Kline Distributin: ITSMG Status Item Current Status Prir Status Status Ntes: Overall Prject

More information

Special Report. Debunking. the Top. Eight Myths. in Your DSD Mobile. Security Strategy. Surrounding Small-Business. Warehouse Management Systems

Special Report. Debunking. the Top. Eight Myths. in Your DSD Mobile. Security Strategy. Surrounding Small-Business. Warehouse Management Systems Special Reprt Debunking the Tp in Yur DSD Mbile Security Strategy Surrunding Small-Business Eight Myths Warehuse Management Systems Intrductin The era f manual warehuse peratins is drawing t a clse with

More information

Advanced Solutions of Microsoft SharePoint Server 2013

Advanced Solutions of Microsoft SharePoint Server 2013 Curse Cde: 20332 Certificatin Exam: 70-332 Duratin: 5 Days Certificatin Track: N/A Frmat: Classrm Level: 300 Abut this curse: This five-day curse examines hw t plan, cnfigure, and manage a Micrsft SharePint

More information

CDM Plan Submission and Review Criteria Rules

CDM Plan Submission and Review Criteria Rules Cnservatin First Framewrk LDC Tl Kit Final v4.0 January 17, 2018 CDM Plan Submissin and Review Rules 1) Purpse and definitins 1.1 These Rules set ut: a) the rles, respnsibilities and timing fr CDM Plan

More information

Appendix A outlines what Bankline can offer to schools, in terms of online payments.

Appendix A outlines what Bankline can offer to schools, in terms of online payments. Access fr Schls t Make Online Payments by Bankline A number f maintained schls have requested that the LA makes a prcess fr undertaking nline payments available t them (currently they undertake payments

More information

Time is Money Profiting from Reduced Cycle Time

Time is Money Profiting from Reduced Cycle Time Time is Mney Prfiting frm Reduced Cycle Time Yur retail custmers are demanding smaller, mre frequent shipments, which increases yur cst-t-serve them. While this makes their inventry mre predictable and

More information

Frequently Asked Questions (FAQs) Goals and Performance

Frequently Asked Questions (FAQs) Goals and Performance AUDIENCE BACKGROUND Frequently Asked Questins (FAQs) Gals and Perfrmance mycareer @CHOP Gals and mycareer @CHOP Perfrmance are electrnic, integrated tls that supprt develping gals and tracking perfrmance.

More information

INTERMEDIATE WORD PROCESSING (205)

INTERMEDIATE WORD PROCESSING (205) Page 1 f 6 Cntestant Number: Time: Rank: INTERMEDIATE WORD PROCESSING (205) REGIONAL 2017 Prductin Prtin: Jb 1: Letter Jb 2: Mem Jb 3: Table Jb 4: Title Page (100 pints) (100 pints) (100 pints) (100 pints)

More information

Buildertrend/Xero Integration Guidelines. Buildertrend/Xero integration guidelines v1.0 February 2018 pg. 1

Buildertrend/Xero Integration Guidelines.   Buildertrend/Xero integration guidelines v1.0 February 2018 pg. 1 Buildertrend/Xer Integratin Guidelines www.luckman.c.nz Buildertrend/Xer integratin guidelines v1.0 February 2018 pg. 1 Cntents Xer Integratin... 3 Prcess Xer Integratin... 4 Buildertrend Training Vides

More information

Transfers THIS PAPER EXPLORES THE CURRENT ISSUES AND PROPOSALS FOR AUTOMATION. Findel Transfers Working Group

Transfers THIS PAPER EXPLORES THE CURRENT ISSUES AND PROPOSALS FOR AUTOMATION. Findel Transfers Working Group Transfers THIS PAPER EXPLORES THE CURRENT ISSUES AND PROPOSALS FOR AUTOMATION. Findel Transfers Wrking Grup PUBLISHED OCTOBER 2017 0 CONTENTS Intrductin... 2 Challenges... 3 Current Prcess... 4 The Vice

More information

Call for Papers SYSTEMS DO FOR YOU? Portland, OR June 13 15, Submit abstracts to:

Call for Papers SYSTEMS DO FOR YOU? Portland, OR June 13 15, Submit abstracts to: Call fr Papers TES 2017 THE 2017 4 TH INTERNATIONAL TRANSACTIVE ENERGY SYSTEMS CONFERENCE AND WORKSHOP MAXIMIZING YOUR VALUE: WHAT CAN TRANSACTIVE ENERGY SYSTEMS DO FOR YOU? Prtland, OR June 13 15, 2017

More information

The EMS Workflow: Five Critical Phases of EMS Software

The EMS Workflow: Five Critical Phases of EMS Software The EMS Wrkflw: Five Critical Phases f EMS Sftware Wrkflw autmatin uses EMS sftware t link tgether the elements f wrkflw (events, tasks, resurces) in an attempt t increase the speed, visibility and crdinatin

More information

1. Why can I modify a purchase requisition although I set the changeability of the release indicator to '1' ('Cannot be changed')?

1. Why can I modify a purchase requisition although I set the changeability of the release indicator to '1' ('Cannot be changed')? Nte Language: English Versin: 10 Validity: Valid Since 25.08.2009 Summary Symptm FAQ Release Strategy List f questins : 1. Why can I mdify a purchase requisitin althugh I set the changeability f the release

More information

Company Policy Buying Additional Annual Leave

Company Policy Buying Additional Annual Leave Cmpany Plicy Buying Additinal Annual Leave Dcument Cntrl Table Dcument title: Buying Additinal Annual Leave Versin number: 2.3 Date apprved: 22.11.17 Apprved by: D Wythe Date f last review: 22.11.17 Departments

More information

Extended Inventory Items

Extended Inventory Items Extended Inventry Items Using the Item Number SmartFinder buttn Extended Inventry Items Extended Inventry Items is an enhanced replacement fr the Sage I/C Items screen. It prvides yu with mre functinality

More information

Agenda. 1. Introduce the Contract Request Form & Process. 2. Learn how to initiate & submit Contract Requests

Agenda. 1. Introduce the Contract Request Form & Process. 2. Learn how to initiate & submit Contract Requests WELCOME EPIC Cntract Request Training Agenda In this sessin we will : 1. Intrduce the Cntract Request Frm & Prcess Definitins When d I use? 2. Learn hw t initiate & submit Cntract Requests The Frm vs.

More information

Selling and Purchasing Items

Selling and Purchasing Items Selling and Purchasing Items Selling t custmers invlves the fllwing dcuments: Dcument Qute Invice Custmer Credit Ntes Definitin Qutes are ptinal. A qute is an ffer t sell ne r mre items t a custmer at

More information

Executive Summary European Union s General Data Protection Regulation (EU GDPR) January 2018

Executive Summary European Union s General Data Protection Regulation (EU GDPR) January 2018 Executive Summary Eurpean Unin s General Data Prtectin Regulatin (EU GDPR) January 2018 Legal Disclaimer The infrmatin in this presentatin is cnfidential and prprietary t SAP and may nt be disclsed withut

More information

Release Notes for SAP enhancement package 7 for SAP ERP 6.0, Support Package 2

Release Notes for SAP enhancement package 7 for SAP ERP 6.0, Support Package 2 Release Ntes fr SAP enhancement package 7 fr SAP ERP 6.0, Supprt Package 2 What's New? Release Ntes Cpyright 2013 SAP AG r an SAP affiliate cmpany. All rights reserved. N part f this publicatin may be

More information

Sage 300 ERP Payroll Sage HRMS Link Integration Guide. April 2014

Sage 300 ERP Payroll Sage HRMS Link Integration Guide. April 2014 Sage 300 ERP Payrll Sage HRMS Link Integratin Guide April 2014 This is a publicatin f Sage Sftware, Inc. Dcument versin: April 16, 2014 Cpyright 2014. Sage Sftware, Inc. All rights reserved. Sage, the

More information

Examiner Tip Sheet Independent Review

Examiner Tip Sheet Independent Review Examiner Tip Sheet Independent Review Welcme t Independent Review! The purpse f Independent Review is fr each team member t independently evaluate the applicant s prcesses and results by identifying areas

More information

Guidance notes for completing the International Start-up Form

Guidance notes for completing the International Start-up Form Guidance ntes fr cmpleting the Internatinal Start-up Frm These guidance ntes are designed t supprt yu in cmpleting the Internatinal start-up frm. Yu will als need t refer t a) yur Stage 2 applicatin frm

More information

Request for Proposal

Request for Proposal Request fr Prpsal DMDII-17-02 Advanced Analytics fr Supply Chain Operatins Technlgy Thrust Area: Agile, Resilient Supply Chain Revisin 1.0 Release Date: 4 August 2017 POC: Sctt Kruse Prject Innvatin Engineer

More information

Completing a 90 Day Evaluation Review Using the Online Performance Appraisal System Standard Form

Completing a 90 Day Evaluation Review Using the Online Performance Appraisal System Standard Form Cmpleting a 90 Day Evaluatin Review Using the Online Perfrmance Appraisal System Standard Frm Step One: Cmpleting Perfrmance Expectatins Standard Frm Yu will receive an email frm HR Manager alerting yu

More information

q-erp Information Sheet Version 2.0 q-erp Information Sheet

q-erp Information Sheet Version 2.0 q-erp Information Sheet q-erp Infrmatin Sheet Versin 2.0 q-erp Infrmatin Sheet 1. OVERVIEW 1.1 General System Features This lists the general features f the system regardless f what mdule is accessed. Architecture - Client/Server

More information

PÖTTINGER Information - Configuration

PÖTTINGER Information - Configuration PÖTTINGER Infrmatin - Cnfiguratin Shrt Manual fr PÖTIC in Online- and Offline-Mde This material is intended fr the staff in the Distributin netwrk f PÖTTINGER Versin January 2016 General infrmatin: PÖTIC

More information

UDI Compliance Service

UDI Compliance Service UDI Cmpliance Service What is UDI? The US Fd and Drug Administratin (FDA) has issued a ruling that medical devices must cnfrm t a Unique Device Identificatin (UDI) standard. The UK Department f Health

More information

Unlocking the value of BIM for asset management

Unlocking the value of BIM for asset management Unlcking the value f BIM fr asset management In New Zealand the benefits f using Building Infrmatin Mdelling (BIM) during the design and cnstructin phases f a building s life cycle are increasingly understd.

More information

TAG Training Provider Program

TAG Training Provider Program Thank yu fr yur interest in becming a TAG Training Prvider. The prcess t becme part f this prgram is the fllwing: 1. Cmplete and submit this applicatin t Amanda Shk ashk@tagnline.rg 2. Upn invice r receipt

More information

January 28, Tonya Modlin Contracting Specialist Department of Veterans Affairs Spotsylvania Ave, Suite 400 Fredericksburg, VA 22408

January 28, Tonya Modlin Contracting Specialist Department of Veterans Affairs Spotsylvania Ave, Suite 400 Fredericksburg, VA 22408 January 28, 2019 Tnya Mdlin Cntracting Specialist Department f Veterans Affairs 10300 Sptsylvania Ave, Suite 400 Fredericksburg, VA 22408 Subject: RFI MSPV 2.0 Distributin Draft SOW Dear Ms. Mdlin, Thank

More information

2017 Co-Op Advertising Program

2017 Co-Op Advertising Program 2017 C-Op Advertising Prgram Applicatin Highlights: Designed t enhance marketing effrts with award amunts up t $3,000 in 50% matching funds Activities with a lcal fcus: May be apprved fr up t $1,000 i.e.,

More information

The purpose of IPRO 304 is to create a software package to assist A. Finkl & Sons in tracking of parts in heat treatment furnaces.

The purpose of IPRO 304 is to create a software package to assist A. Finkl & Sons in tracking of parts in heat treatment furnaces. Prject Plan Reprt: Heat Treat Subgrup 1.0 Objective The purpse f IPRO 304 is t create a sftware package t assist A. Finkl & Sns in tracking f parts in heat treatment furnaces. Objective fr Spring 2008:

More information

EAGLE SCOUT CANDIDATE PREPARATION GUIDE. The Eagle Scout Service Project

EAGLE SCOUT CANDIDATE PREPARATION GUIDE. The Eagle Scout Service Project September 2018 ~ Previus versins nt valid Sufflk Cunty Cuncil By Scuts f America EAGLE SCOUT CANDIDATE PREPARATION GUIDE T maintain the high standards f excellence recgnized in thse wh have achieved the

More information

Table of Contents. Section 1 - I am a Manager in an ETB, how will the ESBS affect me & what do I need to know?

Table of Contents. Section 1 - I am a Manager in an ETB, how will the ESBS affect me & what do I need to know? ESBS ETB Payrll Shared Services FREQUENTLY ASKED QUESTIONS Nvember 2018 Table f Cntents Sectin 1 - I am a Manager in an ETB, hw will the ESBS affect me & what d I need t knw? 1.1. What are the risks assciated

More information

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority Request fr Prpsals t Develp a New Persnnel Plicy Manual fr the Red Wing Husing and Redevelpment Authrity March 20, 2015 Red Wing Husing and Redevelpment Authrity 428 West Fifth Street Red Wing, MN 55066

More information

Guidance on the Privacy and Electronic Communications (EC Directive) Regulations

Guidance on the Privacy and Electronic Communications (EC Directive) Regulations Infrmatin Security Guidance Title: Status: Guidance n the Privacy and Electrnic Cmmunicatins (EC Directive) Regulatins Released 1. Purpse This guidance n the Privacy and Electrnic Cmmunicatins (EC Directive)

More information

Best Practices for Safety Action Review Boards

Best Practices for Safety Action Review Boards Best Practices fr Safety Actin Review Bards By Brian Hughes, Vice President f Slgic A versin f this article appeared in the May 2011 issue f Prfessinal Safety magazine. Many safety departments I wrk with

More information

TITLE: SMU IWMS/CMMS RFI QUESTIONS & ANSWERS DATE POSTED: 6/28/2018 LAST UPDATED: 06/28/2018

TITLE: SMU IWMS/CMMS RFI QUESTIONS & ANSWERS DATE POSTED: 6/28/2018 LAST UPDATED: 06/28/2018 TITLE: SMU IWMS/CMMS RFI 2018 - QUESTIONS & ANSWERS DATE POSTED: 6/28/2018 LAST UPDATED: 06/28/2018 SMU wuld like t remind all vendrs and cnsultants that this is a Request fr Infrmatin (RFI) in lieu f

More information

Integration of SAP TM with SAP Global Trade Services

Integration of SAP TM with SAP Global Trade Services SAP Transprtatin Management Integratin f SAP TM with SAP Glbal Trade Services CUSTOMER Dcument Versin: 2.1 December 2013 SAP AG 1 Cpyright Cpyright 2013 SAP AG. All rights reserved. SAP Library dcument

More information