1 Customer Engagement Plan Stakeholder Collaboration Meeting July 15,
2 Agenda Recap Collaboration No. 3 Goal and Objectives Topic Update and Collaboration Summary of Costs Next Steps 2
3 Recap Collaboration Timeline Jun 02 Jun 14 Jul 6 Jul 15 Jul 29 Collaboration 1 Provide level set between utilities and ext. collaboration stakeholders on upcoming filing Collaboration 2 Collaborate on key focus areas of the Customer Engagement Plan Progress Update Address new stakeholder comments received outside of group collaboration Collaboration 3 Review applicable sections of the Customer Engagement Plan File Plan File Customer Engagement Plan with NY PSC 3
4 Recap Customer Engagement Plan Goal and Objectives Goal Empower customers with knowledge and access to AMI benefits and provide for continuing engagement of customers and third parties Objectives: Acceptance, improved utilization, and ease of AMI implementation Clear and apparent benefits: control, choice and convenience Integrate active participation of third-party partners 4
5 Recap Customer Engagement Plan Topic Areas Customer Engagement Plan Customer Education Customer awareness, information and engagement Green Button Connect Green Button Connect My Data implementation plan and data collaboration Innovative Rate Design Innovative pricing proposals and pilot project Cost Savings and Revenue Opportunities Framework for 3rd parties to identify alternative opportunities Data Privacy Privacy assessment and data access and control principles Sub-metering Proposal to maximize AMI benefits for submetered customers AMI Opt-Out Proposed amendments to current AMR/AMI Opt-Out Tariff Local Law 84 Evaluate options to reduce or eliminate charge through automation NOTE: AMI Opt-Out, Sub-metering and Local Law 84, Topic Areas not applicable to O&R filing Focus of Collaborative Effort 5
6 Collaboration No. 3 Goal and Objectives Focus for Meeting Goal Provide external stakeholders with a summary of collaboration to date and current progress on the Customer Engagement Plan Objectives: Discuss how collaboration to date has informed current Plan Provide summary of current progress for each topic 6
7 Customer Education Overview Goal Empower customers with AMI-enabled benefits control, choice and convenience through customer education Key Aspects Education strategy: aware, informed and engaged Education plan Communication campaigns Audience segmentation Messaging and channels 7
8 Customer Education Collaboration Themes and Responses Engaging community leaders Accommodating diverse customer segments Customer notification During Aware phase, Companies will contact various consumer, government, and advocacy organizations to provide an AMI overview and to identify appropriate venues to share AMI information prior to deployment. This presence and open dialogue will continue throughout the Inform and Engage phases Education Plan will use a wide range of channels, digital and non-digital, as well as multi-lingual interpreters, to engage various customer segments (e.g., LMI and seniors) Customers will be notified in writing 90 days and 45 days prior to receiving a smart meter 8
9 Customer Education Collaboration Themes and Responses Local AMI outreach Integrated outreach and education Further details around plan In addition to Companies call center support, an outreach presence will be available following regional meter installations to address individual customer / community questions and concerns Customer education campaigns will advance integrated education on Digital Customer Experience, Green Button, innovative rate pilots and various other initiatives surrounding AMI deployment Education plan will specify key messaging, audiences, communication channels and example material 9
10 Customer Education Proposed Strategy (Per Deployment Area) AMI Deployment Milestones Communication Network Rollout Begin Smart Meter Rollout End Smart Meter Rollout Global Messaging Our Energy Future Communicate the benefits of smart grid and smart meters to promote engagement Aware Deployment Messaging Notify customers of smart meter deployment and benefits Informed Prepare customers for smart meter deployment, provide information on available opportunities Engaged Equip customers with knowledge to participate in smart meter opportunities 10
11 Customer Education Communication Campaigns by Phase AWARE INFORMED ENGAGED Government / Community Leadership Awareness and education Regional Messaging Education and smart meter benefits and opportunities Non-adopter Mitigation Prepare response (e.g., health and privacy) Schedule and Deploy Deployment details by region Opt-out Coordination Provide customers with a clear process Inconvenience Mitigation Prepare response (e.g., appointments) Customer Segment Participation Channels to reach the following: Low income Non-English Non-digital Housing Types Commercial Types Digital Experience DCX Energy Reports Third Party Collaboration Enable third parties to engage with customers 11
12 Customer Education Example Detail: Aware Phase: Regional Messaging Campaign MESSAGE: Notify customers of smart meter deployment and educate on smart meter benefits and opportunities to raise awareness, increase acceptance and ease meter deployment. Channels Audience Example Material Direct mail Intro Notification Bill Messages and Inserts (Customer News) Media Local and Community Leaders Community Meetings / Events Companies Website Advertising Deployment area population Intro Notification Fact sheet Infographic FAQ Deployment Overview / Map Generic customer messages (alerts) Website demonstrations 12
13 Customer Education Example Detail: Informed Phase: Schedule and Deploy Campaign MESSAGE: Timing of meter replacement, customer benefits and expectations, available opportunities, how to access Portal, opt-out information and data security and privacy Channels Audience Example Material Direct mail (45-day notification) Con Edison AMI website (deployment map, FAQs, customer data access) Local AMI outreach presence Company and meter installer call center Residential Commercial Tin-Case (Con Edison Only) Life Support Equipment Utility Installed Meters Phase 1 Utility Installed Meters Phase 2 45-day notification Door Hanger install complete Door Hanger Sorry we missed you Talking points for meter deployment vendor Meter installer call center scripting Company call center scripting 13
14 Customer Education Example Detail: Engaged Phase: Customer Segment Participation MESSAGE: Effective messages tailored to specific customer segments about current benefits and opportunities and how to participate, third party-benefits, available customer communication channels and new services as they roll out Channels Audience Example Material Direct Mail Community Events Social Media Bill Messages Tools: Web and Messaging (1) Hourly Data Presentment (2) Bill Compare and Forecast (3) Personalized Tips (4) Account Settings (5) Alerts (6) Rates Calculator (7) Load Disaggregation Targeted Customers: (1) LMI (2) Non-English (3) Seniors (4) Non-digital (5) Housing type (6) Commercial type (7) Usage type (8) Plug in electric vehicle (9) Solar Customized customer education report Customized usage information and tools (website and alerts) Informative material on smart meter offerings Phone talking points Benefits fact sheet (specific to offerings) Spokesperson talking points Website demo 14
15 Customer Education Preliminary Cost Estimate (Con Edison ) 2018 Scope Cost AMI METER DEPLOYMENT Electric: Gas: CUSTOMER EDUCATION ACTIVITIES Market Research: Customer Outreach and Support: Community Outreach: Media and Advertising: 530 K 160 K Surveys, focus groups, research and analysis Letters, bill inserts, hangers (design, print, postage, etc.) Communication material, presentations, events, etc. Print, video, digital, social media and press, etc. $0.8 M $2.1 M $0.3 M $1.3 M TOTAL COST $4.6 M 15
16 Customer Education Cost Benchmarking Based on several IOU planned AMI customer education and outreach costs 16
17 Green Button / Customer Data Sharing Overview Goal Implementation plan for Green Button Connect My Data and conduct stakeholder collaboration with third parties Key Aspects Implementation plan Budget Timeline Additional data sets 17
18 Green Button / Customer Data Sharing Collaboration Themes and Responses Data for Phase 1 Implementation Additional data sets Ease of customer authorization Phase 1 will include interval usage data per Green Button standard The Companies have considered data sets requested during collaboration (bill data, tariff data, etc.); implement additional data sets will be addressed in the Plan Companies acknowledge that convenient and easy use is important to marketplace animation and will look to such processes as CA s click-through electronic signature process for guidance when developing their own 18
19 Green Button / Customer Data Sharing Collaboration Themes and Responses Registration/ onboarding third parties Companies acknowledge that simple third-party registration rules will enable broader participation and will look to best practices, similar to those exercised by CA IOUs, in developing a streamlined process that minimizes administrative burden Also, the Plan includes adequate staffing to assist third parties with technical interoperability during onboarding during implementation and beyond 19
20 Green Button / Customer Data Sharing Phase 1 Implementation PSC decision timeframe Critical milestone Dependency 20
21 Green Button / Customer Data Sharing Phase 1 Implementation Updated Cost Lower data store costs Lower capital software costs (shifted to O&M due to software as a service) Additional O&M for onboarding and support for third parties 21
22 Green Button / Customer Data Sharing Additional Data Sets Overview Collaboration Results Key Considerations Implementation Plan Next Steps Requested Data: Bill cost data Tariff data Account info Bill component data Customer info NYS standard Governance Data privacy Liability Technical Cost Companies are committed to implementing additional data sets in Phase 2 starting in 2018 Include bill cost data as a starting point Work w/ NYS Joint Utilities to develop a standard approach Monitor Green Button Alliance capabilities File implementation plan in Q
23 Green Button / Customer Data Sharing Cost of Additional Data Sets Discussions with other utilities indicate the estimated cost for implementing additional data sets beyond usage data is approximately $1M - Under the condition these data sets are already available in the Companies data warehouse Cost will be updated Q when an implementation plan for additional data sets is developed 23
24 Innovative Rate Design Overview Goal Pilot that identifies how innovative rate structures can enhance customer benefits of the AMI system in a cost effective manner Key Aspects Purpose and metrics Pilot design Participation Time and location Variables 24
25 Innovative Rate Design Collaboration Themes and Responses Piloting urban areas Including small commercial Pilot communications with LMI A pilot is planned for Brooklyn to represent urban population in the CECONY service territories Pricing pilot now includes small commercial customers for both Companies Companies are aware of perception that LMI customers maybe disproportionately impacted by innovative rate structures, and will consider such perceptions when designing the customer engagement, recruitment and design elements of the rate pilot 25
26 Innovative Rate Design Definition of the Rate Pilots Purpose: Determine whether price signals, information and technology can affect customer behavior to drive more efficient use of the electric grid Evaluate how new rates provide customers with added control, choice and convenience in managing usage and costs Use the lessons learned to inform future rate design Metrics: Customer peak shifting and usage changes Customer responses to pilot surveys Components: RATES PARTICIPATION EVALUATION TIME & LOCATION COST EDUCATION TECHNOLOGY 26
27 Innovative Rate Design Overview of Pilot Components Components Decisions Rationale Rates Participation Evaluation Time-varying demand-based delivery (different time/subscription bases) SC-1 opt-in and opt-out SC-2 opt-out Summer baseline period (opt-in) Longer baseline period (opt-out) Time & Locations CECONY: Staten Island & Westchester ( ); Brooklyn ( ) O&R: Rockland ( ) 6 mo. Lag between opt-in and opt-out Education Not a variable Treatment groups to receive specific education and messaging Evaluated via surveys Demand drives delivery system costs Not addressed in previous pilots SC-2 added for small commercial SC-1 opt-in since demand rate is new; opt-out to gather results applicable to larger population Need interval data history for demand rates Helps correct for bias in control (EPRI) Must wait for enough meters to start pilot Time determined by meter rollout Locations selected for broad representation Lag between opt-in and opt-out to apply lessons learned Education critical in earlier pilots Design effective messaging for each group via surveys and focus groups Evaluate via survey to improve for future Technology Not a variable Evaluated via surveys Options available, details follow Technology for demand rates still evolving Customers will receive information on options and select their own Technology and success assessed in survey 27
28 Innovative Rate Design Timeline AMI Rollout Baseline Opt-In Pilot Opt-Out Pilot A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Summer Summer Summer Summer A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Summer Summer Summer Summer A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Summer Summer Summer Summer 28
29 Innovative Rate Design Preliminary Cost Estimate - Brooklyn Pilot Brooklyn Pilot ( ) Scope Cost RATE PILOT ACTIVITIES Marketing: Research and Rate Design: Enrollment and Customer Support: Implementation-Enabling Technologies: Customer Opinion and Satisfaction Research: Evaluation and Reporting: Reporting-Data Management: Systems and Project Management: TOTAL COST Education, recruitment and retention Statistical usage analysis, study design, IT sys development Enrollment, billing and customer service support Enabling technologies and support Market research, customer opinion and satisfaction Evaluating study results and reports Setup database, data analytics and regular reporting System infrastructure upgrades and project mgmt. $2.4 M $0.6 M $1 M TBD $0.5 M $1.7 M $0.2 M $1.3 M $7.6 M 29
30 Innovative Rate Design Pilot Costs Preliminary Cost Estimates Based on several utilities' AMI rate pilot costs 30
31 Innovative Rate Design Customer Education and Engagement 1. Pre-enrollment 2. Enrollment 3. In-pilot 4. Post-pilot Groups: SC-1 (opt-in/opt-out) SC-2 (opt-out) Market research: Segmentation Message testing Pre-pilot surveys Opt-in or out and assignment to control or treatment groups Pre-bill education (messaging and channels to depend on segmentation and group assignment) Messaging in-pilot will depend on treatment group assignment Drop-outs: Messaging and strategies Survey design Design post-pilot survey to assess: Success of messaging Interest in adopting rates Overall satisfaction Behavior changes Use of technologies (if applicable) 31
32 Enabling Technologies Company Approach Con Edison and O&R has offered Connected Device programs to customers since 2009 Follow market in enabling technology Evaluate on key criteria: Cost EE/DR Benefits Reliability Security Choice, Control, Convenience 32 32
33 Enabling Technologies Current Approaches View and control remotely via Internet Customer 33
34 Enabling Technologies Con Edison Smart AC Program smartac Kit View and control remotely via Internet Makes window ACs controllable View energy used by ACs Control ACs by time or temperature Customer
35 Enabling Technologies Con Edison Direct Load Control and BYOT
36 Enabling Technologies Future Direction Additional Devices and Applications PTACs Mini-/ Multi-Splits Master metered buildings Small Commercial Additional Devices Residential Demand Response Management System launching 2017 Launching Standing Connected Devices RFI next week AMI Rollout 36 36
37 Cost Savings and Revenue Opportunities Overview Goal Facilitate new cost saving and revenue opportunities directly related to AMI for customers, third party vendors, and the utility Key Aspects For potential opportunities, define: Eligibility criteria Proposal process (submission, selection, review, etc.) 37
38 Cost Savings and Revenue Opportunities Collaboration Themes and Responses Request for more frequent solicitation Third party notification Structured schedule and process The framework prescribes an annual solicitation window consistent other programs (e.g., REV Demo project) -- require sufficient time and attention commensurate with utility resources Companies propose using their website as done in previous solicitations, which has proven successful. Similar channels to REV demos are also being considered Framework will follow approval process for Platform Service Revenues under Track II Order Timeframe for process will remain consistent to increase third-party participation and success 38
39 Cost Savings and Revenue Opportunities Framework Overview 1. Outreach 2. Application 3. Review Goal: Encourage qualified third parties to submit proposals consistent with AMI network communication opportunities Goal: Ensure necessary data are requested for effective evaluation of pilot projects Includes: 1) Project narrative 2) Business case 3) Proposed metrics 4) Vendor Security Assessment Goal: Identify projects consistent with eligibility criteria Includes: 1) Review applications 2) Score projects 3) Select projects for interview 4. Interview 5. Selection 6. Measurement Goal: Refine project selection for gaps and/or intangibles Includes: 1) Meet proposal team 2) Consider proposal updates 3) Re-score projects 4) Identify finalists Goal: Negotiate with finalists for project selection and execution Includes: 1) Approve project plan (metrics, budget, timeline, etc.) 2) Finalize network integration requirements 3) Approve investment terms, if applicable Goal: Verify benefits meet expectations Includes: 1) Project team reports on metrics 2) Hold QA and check-in meetings 39
40 O&R CECONY Cost Savings and Revenue Opportunities Framework Timeline Program Timeline Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Program Cycles Year 1 Year 2 Year 3 Year 4 Year 5 AMI Rollout Staten Island Westchester Brooklyn Manhattan Bronx Queens Program Cycles AMI Rollout Rockland Year 1 Year 2 Year 3 Year 4 Year 5 Orange and Sullivan Annual Review Timeline (Detail) A S O N D J F M A M J J A S O N D Outreach Review Interview Selection Application Measurement 40
41 Data Privacy Overview Goal Complete formal data privacy assessment and propose data privacy and access principles relating to implementation of AMI Key Aspects Perform data privacy assessment, in accordance with: NISTIR 7628 Guidelines Propose data access principles, using: Well-established Fair Information Practice Principle (FIPP) frameworks 41
42 Data Privacy Assessment COMPLETED ACTIVITIES Reviewed 116 current policies and procedures across Con Ed and O&R Reviewed 29 AMI design documents Compared current policies and procedure with 44 NISTIR 7628 recommendations CURRENT FINDINGS Presently aligned w/ 21 NIST recommendations 7 recommendations will require further action by Companies prior to implementing AMI 12 third-party requirements 4 recommendations are not applicable 42
43 Data Privacy OECD Fair Information Practice Principles (FIPP) Collection Limitation Limits collection of personal data Safeguard that collection is lawful Obtain customer consent when possible Purpose Specification Timely notification to customers of use and purpose of data Notification of changes in purpose or use Data Quality Data collected should be accurate, complete, timely Relevant to the purpose for which it is used Use Limitation Personal data should not be disclosed or used for purposes other than those stated Security Safeguards Personal data should be protected with appropriate safeguards and technologies. Individual Participation Customers have control and rights over their personal data Customers will be provided means to access and review their data Openness The utility will make reasonable efforts for transparency and openness about changes to data access practices and policies Accountability The utility will be accountable for following and adhering to these principles OECD FIPP framework was used to guide the development of company-specific AMI data access principles 43
44 Data Privacy Access Principles (Examples) Collection Limitation Principle CECONY and O&R collect AMI smart meter data for the purposes of managing and servicing our customers accounts. The smart meter does not store or transmit PII or customer identifying information. Additionally, the AMI smart meter does not record how electricity is used or what appliances/devices customers may use. Security Safeguards Principle CECONY and O&R will endeavor to provide appropriate measures and security technologies to safeguard customer information and allow only authorized entities access to customer information collected via AMI smart meters. Additional details regarding the safeguards used for customer information can be found in our Privacy Statement. 44
45 Sub-metering Overview Goal Explore opportunities for sub-metered tenants to benefit from AMI Key Points AMI will provide direct benefits to Con Edison customers Sub-metered tenants will indirectly benefit through their building s billing allocation Sub-meter companies can enable sub-metered tenants to directly experience AMI benefits 45
46 Sub-metering Collaboration Themes and Responses AMI benefits for sub-meter tenants Expanding vendor offerings Plan summarizes research and collaboration performed w/ numerous sub-meter vendors regarding benefits available to sub-metered tenants Plan describes additional opportunities for vendors to enhance benefits for sub-metered tenants Additionally, Plan provides a process for identifying new partnership opportunities between vendors and utilities ` 46
47 Sub-metering Benefits from Con Edison s AMI Benefits made available to sub-metered tenants as a result of Con Edison s AMI implementation: Health Outage Response Cost Savings Reduced emissions from conservation voltage optimization (CVO), distributed energy resources (DER) and reduced truck rolls Improved outage response due to AMI and enhanced communication Due to multi-family building participation in AMIenabled alternative rate programs as well as CVO and DER 47
48 Sub-metering Vendor-Enabled Benefits Additional research and collaboration indicates vendors provide a spectrum of benefits. Select vendors can provide AMI-like benefits: Interval Energy Usage Demand Response Vendors can provide interval energy usage data to tenants through various channels (e.g., mailed reports, online customer portal and in-home devices) Vendors can provide tenants with demand response signals and bill based on participation Alternative Rates Vendors can provide tenants with demand-based and time-of-use pricing signals and bill based on response 48
49 Opt-Out Tariff Overview Goal Propose tariff amendments necessary to accommodate customers wishing to opt out of AMI meters for privacy and security concerns Key Aspects Proposed amendments to current tariffs, such as: Eligibility Cost Application Responsibility 49
50 Opt-Out Tariff Collaboration Themes and Responses Updating gas tariff Meter reading fee for customers w/ both services Plan will include proposed tariff changes to both electricity and gas services Proposed tariff changes will reflect that the monthly meter reading fee will only be charged once for customers with both electricity and gas services 50
51 AMI Opt-Out Key Elements of Proposed Program Current Tariffs (Electric and Gas) Proposed Changes (Electric and Gas) EILIGIBILITY Residential customers in oneto four-family homes All residential customers COST Electric: $9.50 monthly; $ one-time cost if AMR/AMI meter must be replaced Gas: $9.50 monthly; $93.81 one-time cost if remote communications must be removed No change in fees Adding language to clarify customers with both services will only pay one $9.50 fee per month for meter reading RESPONSIBILITY Completed opt-out form and ensure regular access for monthly meter reading No change 51
52 Local Law 84 Overview Goal Reduce or eliminate costs for aggregated building data required to comply with Local Law 84 Key Aspects Current and future state assessments of the financial impact of Local Law 84, including: Labor cost Vendor cost IT maintenance fees Capital investments 52
53 Local Law 84 Assessment of Current Cost Simplified process Increased efficiency Reduced headcount Outsourced billing Automated processes Improved data quality 53
54 Vendor Solution In-House Solution Local Law 84 Additional Functionality Automatic Upload Incremental labor and maint. costs for set up of APIs and transition Incremental vendor costs Y1 allocation of dev. costs Y1 maint. costs Inc. labor (new process, Q&A) New vendor mgmt. Small labor cut Low est. of Y1 costs (imp. and fees) Costs to collect data and assure compatibility Small change in vendor expenses 54
55 Summary of Preliminary Costs Annual Allocation (Con Edison) Cost Element Total Cost Customer Education $30.8 $1.0 $4.6 $8.3 $9.2 $7.3 $0.5 Green Button Connect My Data $9.5 $ Additional Data Sharing (Phase 2) $0.9 - $ Innovative Rate Design Pilots $17.4 $2.3 $4.3 $3.2 $2.9 $3.3 $1.4 Staten Island / Westchester $9.8 $2.3 $2.9 $1.1 $2.0 $1.4 - Brooklyn $7.6 - $1.4 $2.1 $0.9 $1.8 $1.4 Cost Saving and Revenue Opportunities $6.2 $0.5 0 $1.2 0 $1.2 0 $1.2 0 $1.2 0 $1.1 0 Total Cost: $64.8 $13.2 $10.9 $12.6 $13.2 $11.7 $3.1 Less Green Button Connect My Data : $9.5 $ Net Cost: $55.3 $3.7 $10.9 $12.6 $13.2 $11.7 $3.1 Figures in Millions 55
56 Summary of Preliminary Costs Annual Allocation (Orange and Rockland) Cost Element Total Cost Customer Education $1.0 $0.4 $0.4 $ Green Button Connect My Data $0.7 $ Additional Data Sharing (Phase 2) $0.1 - $ Innovative Rate Design Pilot $7.4 $1.8 - $1.8 - $0.7 - $1.6 - $ Total Cost: $9.2 $2.9 $2.2 $1.0 $1.6 $1.4 - Figures in Millions 56
57 Next Steps 57
58 Next Steps Collaboration Timeline Jun 02 Jun 14 Jul 6 Jul 15 Jul 29 Collaboration 1 Provide level set between utilities and ext. collaboration stakeholders on upcoming filing Collaboration 2 Collaborate on key focus areas of the Customer Engagement Plan Progress Update Provide and address new comments received outside of group collaboration Collaboration 3 Review applicable sections of the Customer Engagement Plan File Plan File Customer Engagement Plan with NY PSC 58
Customer Engagement Plan
Customer Engagement Plan Stakeholder Collaboration Meeting June 02, 2016 1 Agenda AMI Project Update Collaboration Goal & Objectives Customer Engagement Plan Overview Topic Areas Next Steps 2 AMI Project
More informationCampbell Hawkins, Senior Manager, Edison SmartConnect Program Office
Edison SmartConnect AMI Deployments from Around the World Southern California Edison: Edison SmartConnect Campbell Hawkins, Senior Manager, Edison SmartConnect Program Office Southern California Edison
More informationEngaging Customers to Adopt Distributed Energy Resources
Engaging Customers to Adopt Distributed Energy Resources Marisa Uchin, Opower Cristina Coltro, Consolidated Edison ABSTRACT Increasing penetration of distributed energy resources (DER), new technologies,
More informationMeter Data Management Systems. Position. Vice President, Product Management. November 29 December 1, 2010 Santo Domingo Dominican Republic
Meter Data Management Systems Speakers Andy Zetlan name Position Company Aclara Country USA Vice President, Product Management November 29 December 1, 2010 Santo Domingo Dominican Republic Welcome Thank
More informationSmart Meters The Impact on Customer Service Operations
Smart Meters The Impact on Customer Service Operations James Barnes Utility Customer Service Administrator City of Tallahassee Utilities Copyright 2010 Accenture All Rights Reserved. Accenture, its logo,
More informationOpen Data Access Framework
Open Data Access Framework Purpose Scope The purpose of the Open Access Data Framework ( the Framework ) is to clarify the types of usage data all Illinois retail electricity customers and authorized third-parties
More informationInitial Distributed System Implementation Plan
Initial Distributed System Implementation Plan Orange and Rockland Utilities, Inc. Case No. 14-M-0101 June 30, 2016 Table of Contents Introduction... 2 Executive Summary... 9 Chapter 1 Distribution System
More informationLONG ISLAND LONG ISLAND
Utility 2.0 Long Range Plan 1 The proposed Utility 2.0 investments are designed to benefit all Long Island customers. Our Utility 2.0 proposal is a component of a broader set of solutions to improve reliability
More informationCON EDISON, INC. Edison Electric Institute Finance Conference. November 6-8, 2016
CON EDISON, INC. Edison Electric Institute Finance Conference November 6-8, 2016 Forward-Looking Statements This presentation contains forward-looking statements that are intended to qualify for the safe-harbor
More informationSmart Utility Meters And The Movement Toward Dynamic Pricing: The Need For Effective Consumer Protections
Smart Utility Meters And The Movement Toward Dynamic Pricing: The Need For Effective Consumer Protections Janee Briesemeister, AARP John Howat, National Consumer Law Center Jessica Hiemenz National Consumer
More informationRESULTS OF CL&P PLAN-IT WISE ENERGY PILOT
Table of Contents..... PAGE INTRODUCTION...2 DECISION ORDERS...2 EXECUTIVE SUMMARY...3 A. RATE PILOT RESULTS... 5 B. ADVANCED METER STUDY RESULTS... 9 C. NEXT STEPS... 10 D. CONCLUSION... 11 Tables TABLE
More informationCon Edison. Evolution of Con Edison efforts in Energy Efficiency and Demand Management:
Evolution of Con Edison efforts in Energy Efficiency and Demand Management: Innovative programs and technologies, and their impacts on customers, contractors and the markets Con Edison Con Edison - Overview
More informationUtility 2.0 Long Range Plan 2016 Annual Update Prepared for Long Island Power Authority. December 29, 2016
Utility 2.0 Long Range Plan 2016 Annual Update Prepared for Long Island Power Authority December 29, 2016 Table of Contents Executive Summary... 2 Section 1 Utility 2.0 Plan Filings... 4 1.1. 2014 Filings...
More informationSiebel CRM On Demand Administrator Rollout Guide
Siebel CRM On Demand Administrator Rollout Guide This Administrator Rollout Guide consolidates tips and lessons learned from implementing Siebel CRM On Demand, discusses your role as an administrator,
More informationAdvanced Metering Infrastructure (AMI) Cost Recovery and Customer Engagement. Dave Defide April 28, 2014
Advanced Metering Infrastructure (AMI) Cost Recovery and Customer Engagement Dave Defide April 28, 2014 Overview of Duquesne Light Company Duquesne Light Company is a leader in the transmission and distribution
More informationVodafone Global M2M. Smart utilities solutions
Vodafone Global M2M Smart utilities solutions Vodafone Global M2M 3 Vodafone Global M2M empowers organisations to transform their operations and business potential - giving freedom to explore new market
More informationMINIMIZING DISTRIBUTED ENERGY RESOURCES (DER) ACQUISITION COST THROUGH AUCTIONS
MINIMIZING DISTRIBUTED ENERGY RESOURCES (DER) ACQUISITION COST THROUGH AUCTIONS 34TH PLMA CONFERENCE: DISTRIBUTED ENERGY RESOURCE INTEGRATION INTEREST GROUP NOVEMBER 7, 2016 DAN BRADLEY MANAGING DIRECTOR
More informationIBM Clinical Trial Management System for Sites
Service Description IBM Clinical Trial Management System for Sites This Service Description describes the Cloud Service IBM provides to Client. Client means the contracting party and its authorized users
More informationTVA Smart Communities
TVA Smart Communities Summary of Benchmarking Study May 2014 Table of Contents TVA Overview Objectives Study Approach Extreme Energy Makeovers Market Overview Business Models Key Findings Smart Energy
More informationTable of. Contents 2015 FINANCIAL REPORT ANNUAL REPORT TO THE MEMBERS. Letter from the CEO...3. Something New to Serve You Better...
2015 ANNUAL REPORT Table of Contents ANNUAL REPORT TO THE MEMBERS Letter from the CEO...3 Something New to Serve You Better...4 Something New to Help Our Members Save Money...6 Deploying Distribution Automation...8
More informationSmart Pricing Program
Smart Pricing Program Customer Outreach and Education Quarterly Briefing - Monday, March 4, 2013 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. SDG&E Business Overview
More informationMs Sinead Mangan Western Australia Economic Regulation Authority PO Box 8469 PERTH BC WA December 2017
AGL Energy Limited ABN: 74 115 061 375 Level 24, 200 George St Sydney NSW 2000 Locked Bag 1837 St Leonards NSW 2065 t: 02 9921 2999 f: 02 9921 2552 agl.com.au Ms Sinead Mangan Western Australia Economic
More informationInformation Technology Services Project Management Office Operations Guide
Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...
More informationCase Study. Madison Water Utility s Advanced Metering Infrastructure (AMI) Project
Case Study Madison Water Utility s Advanced Metering Infrastructure (AMI) Project Outline Project Planning and Preparation Implementation Real World Benefits Looking Ahead PROJECT PLANNING The before state
More informationSample of DER information available in DERMS ->
1 2 3 Distributed Energy Resource Management System - DERMS Distributed Energy Resource Management System Siemens/TIBCO Demand Response & Distributed Generation resources integrated with distributed system
More informationSmart Grid Small Generator Interconnection Procedure (SGIP) Updates. December 06, 2016
Smart Grid Small Generator Interconnection Procedure (SGIP) Updates December 06, 2016 1 Agenda Background on Interconnection Procedure Modification on SGIP process Interconnection Online Application Portal
More informationCity of Tucson. March 15, 2013
City of Tucson March 15, 2013 Agenda Introduction and Approach Executive Summary Recommendations Summary / Next Steps 2 City of Tucson Smarter Cities Challenge IBM Smarter Cities Challenge Launched in
More informationSmart Grid Beyond Meter to Cash Siemens Smart Grid Solutions Using EnergyIP
Smart Grid Beyond Meter to Cash Siemens Smart Grid Solutions Using EnergyIP Answers for infrastructure and cities. emeter, A Siemens Business and SAP Extended relation with SAP On-going Joint Solution
More informationAppExchange Packaging Guide
Salesforce.com: Salesforce Summer '09 AppExchange Packaging Guide Last updated: July 6, 2009 Copyright 2000-2009 salesforce.com, inc. All rights reserved. Salesforce.com is a registered trademark of salesforce.com,
More informationHow is technology changing the water utility industry? SC Rural Water Conference Sept , 2015
How is technology changing the water utility industry? SC Rural Water Conference Sept. 14-16, 2015 2014 Badger Meter, Inc. Today s Learning Objectives Expose you to new technologies that are available
More informationWHITE PAPER February Pay-for-Performance Solutions A Delivery Model for a Risk-free, Turnkey Customer Acquisition Channel
WHITE PAPER February 2009 Pay-for-Performance Solutions Introduction Though the success of live chat is generally well-documented, many ecommerce managers today have deep concerns about implementing it
More informationInnovating for the Road Ahead. Oracle Utilities Customer Solution
Innovating for the Road Ahead Oracle Utilities Customer Solution 2 Complete Customer Platform for Today s Utilities Deliver outstanding service in every customer interaction. Streamline operations from
More informationDOWNTOWN AUSTIN PARKING STRATEGY DETAILED IMPLEMENTATION PLAN
DOWNTOWN AUSTIN PARKING STRATEGY DETAILED IMPLEMENTATION PLAN RECOMMENDATION Adopt a formal policy and program parameters, including the availability target for on- and off-street parking. Draft policy
More informationREQUEST FOR PROPOSALS FOR AUTOMATED METERING INFRASTRUCTURE
REQUEST FOR PROPOSALS FOR AUTOMATED METERING INFRASTRUCTURE October 16, 2017 Revised October 27, 2017 Northern Wasco County People s Utility District ( NWCPUD ) is issuing this Request for Proposal (RFP)
More informationSmart Grid Education and California California Public Utilities Commission
Smart Grid Education and California California Public Utilities Commission Smart Grid Customer Education Symposium June 17, 2013 1 Opening Statements Customers are an integral part of meeting the various
More informationPG&E s General Comments on Demand Response Vision Update. January 11, 2008
PG&E s General Comments on Demand Response Vision Update January 11, 2008 This document provides PG&E s comments on the draft California Demand Response: A Vision of the Future. The comments are divided
More informationItron Enterprise Edition Meter Data Management SMART METER / AMI ROADMAP
Itron Enterprise Edition Meter Data Management SMART METER / AMI ROADMAP IEE AMI MDM Roadmap: 2007-2011 5.3 Q3 2007 6.0 Q2 2008 Q2 2009 8.0 2011 > AMI System Integration for Readings and Events > AMI Readings
More informationInvitation to Negotiate (ITN) Statewide Travel Management System ITN No D. Questions and Answers ITN Amendments
Invitation to Negotiate (ITN) ADDENDUM NO. 1 Questions and Answers ITN Amendments September 2016 Contained herein are the responses to the questions submitted to the Department of Management Services (Department).
More informationUNDERSTANDING YOUR UTILITY PARTNERS UTILITY ENERGY EFFICIENCY DRIVERS AND DESIGN CONSIDERATIONS
UNDERSTANDING YOUR UTILITY PARTNERS UTILITY ENERGY EFFICIENCY DRIVERS AND DESIGN CONSIDERATIONS CEE INDUSTRY PARTNERS MEETING MINNEAPOLIS, SEPTEMBER 2017 WHY INTENTIONALLY SELL LESS ENERGY? DRIVER #1:
More informationHow to Do Business with the Ontario Government
To hear the audio for this presentation: please call 416-212-8010 or 1-866-602-5423, and enter access code 2564577# How to Do Business with the Ontario Government A Few Notes Before We Get Started To hear
More informationMemorandum. Specifically, this memo addresses the following research questions:
Memorandum To: Peter Franzese; CPUC From: Olivia Patterson, Mary Sutter; Opinion Dynamics Date: September 30, 2014 Re: Energy Efficiency and Demand Response Behavior Market Characterization Study Preliminary
More informationElectric Program Investment Charge (EPIC)
Pacific Gas and Electric Company EPIC Final Report Program Electric Program Investment Charge (EPIC) Project Name Project Reference Name EPIC 1-23 Demonstrate Additive Billing with Submetering for PVs
More informationTennessee CASA Association, Inc Strategic Plan
Tennessee CASA Association, Inc. 2015-2018 Strategic Plan GOAL # 1: Cultivate a Collaborative and Cohesive Network that mitigates distance and delivers effective training and retention at all levels. OF
More informationGET MORE PAYMENTS WITH ACI VIRTUAL COLLECTION AGENT
FEATURES AT A GLANCE EFFECTIVE Emulates the interactions of your best collection agent Strategy Manager lets you build and adapt collection strategies, based on rule sets and consumer information Live
More informationThe Definitive Buyer s Guide for a. Customer Success Platform
The Definitive Buyer s Guide for a Customer Success Platform Table of Contents Customer Success Platform Overview 3 Getting Started 4 Making the case 4 Priorities and problems 5 Key Components of a Successful
More informationDATA AND THE ELECTRICITY GRID A ROADMAP FOR USING SYSTEM DATA TO BUILD A PLUG & PLAY GRID
0000 DATA AND THE ELECTRICITY GRID A ROADMAP FOR USING SYSTEM DATA TO BUILD A PLUG & PLAY GRID DATA AND THE ELECTRICITY GRID: A ROADMAP FOR USING SYSTEM DATA TO BUILD A PLUG & PLAY GRID ARAM SHUMAVON,
More informationMASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY TARIFF FOR BASIC SERVICE
Sheet 1 MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY TARIFF FOR BASIC SERVICE 1. General This Tariff may be revised, amended, supplemented or supplanted in whole or in part from time to time
More informationPROPOSAL EVALUATION: BWL ADVANCED DISTRIBUTION MANAGEMENT SYSTEM (ADMS)
November 28, 2016 PROPOSAL EVALUATION: BWL ADVANCED DISTRIBUTION MANAGEMENT SYSTEM (ADMS) The BWL has completed the evaluation for BWL Advanced Distribution Management System (ADMS) and the work has been
More informationRequest for Qualifications. Career Pathways for English Language Learners. April 21, 2014
Request for Qualifications Career Pathways for English Language Learners April 21, 2014 To organizations, businesses, and community colleges in the Seattle area working with English language learner populations:
More informationRFP NO A CONTRACT FOR THE PROCUREMENT AND INSTALLATION OF AN ENTERPRISE RESOURCE PLANNING SYSTEM PART V. EVALUATION CRITERIA AND PROCESS
1.0 OVERALL PROPOSER EVALUATION CRITERIA 1.1 OVERALL PROPOSER EVALUATION AND CRITERIA The evaluation committee will select a best solution based on a weighted scoring system. The following table presents
More informationOracle Taleo Business Edition Implementation Fixed Scope Offerings
Oracle Taleo Business Edition Implementation Fixed Scope Offerings Date Email Website : Dec-2015 : info@kovaion.com : www.kovaion.com Kovaion Consulting Kovaion A Snapshot Oracle Alliance Certified Consultants
More informationIMPLEMENTATION SCHEDULE
GOAL 1: IMPROVE INTERNAL COMMUNICATIONS TO BETTER SERVE THE PUBLIC 1. Continue to proactively inform Council on management meeting outcomes and department highlights. Identify new tools and practices to
More informationFrom Blah to Aha! Developing Effective E&C Training that Resonates with Diverse Audiences
From Blah to Aha! Developing Effective E&C Training that Resonates with Diverse Audiences Consolidated Edison, Inc. Agenda Training: Determining your audience and the best way to reach them Training on
More informationSmart Grid Concept, Applications and Lessons Learned from Recent Deployments
GE Energy POWERING POTENTIA L Smart Grid Concept, Applications and Lessons Learned from Recent Deployments Gagan KAKKAR General Manager India Region GE Energy What is Smart Grid P O W E R I N G P O T E
More informationDynamic Reallocation of Portfolio Funds
Complete Perspective. Smart Decisions. #StrategicPMO Dynamic Reallocation of Portfolio Funds Ben Chamberlain Chief Product & Marketing Officer Ben.Chamberlain@umt360.com Agenda What s wrong with traditional
More informationOpportunities for Home Energy Management Systems (HEMS) in Advancing Residential Energy Efficiency Programs
Opportunities for Home Energy Management Systems (HEMS) in Advancing Residential Energy Efficiency Programs August 2015 Executive Summary Home Energy Management Systems (HEMS) are an invention of the internet
More informationSAN DIEGO GAS & ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY REPORT ON DEMAND RESPONSE INTEGRATION INTO CAISO WHOLESALE MARKETS January 31, 2011 Contents 1. Executive Summary... 3 2. Status of Program Transition to Wholesale Market
More informationUsing Low Voltage Smart System (LVSS) Data for Intelligent Operations and Customer Support
Using Low Voltage Smart System (LVSS) Data for Intelligent Operations and Customer Support Author & Presenter: Hartmut Bohmer- Engineering Projects Lead Co-author: Haneefa Motani- Marketing and Sales Administrator
More informationSan Diego Gas & Electric MDM Project Approach
San Diego Gas & Electric MDM Project Approach Jerry Sugerman October 21, 2008 What s Driving our AMI Project? California has a significant issue meeting the current and anticipated future demand for electricity
More informationMEETING TODAY S GROWING NEED TO UNDERSTAND ENERGY CONSUMPTION
Connected Industrial MEETING TODAY S GROWING NEED TO UNDERSTAND ENERGY CONSUMPTION Meter Data Management (MDM) web service helps utilities do more with smart metering data White Paper PAGE 1 Abstract/Introduction
More informationAPP IDEA GUIDE. Mobile app ideas to keep business moving
APP IDEA GUIDE Mobile app ideas to keep business moving INTRODUCTION The world s gone mobile. Now your employees are asking for mobile apps so they can access company data and functions wherever they go.
More informationTHAT Council adopt the Congestion Management Strategy as outlined in this report
RR3 ADMINISTRATIVE REPORT Report Date: May 2, 2017 Contact: Winston Chou Contact No.: 604.873.7913 RTS No.: 011564 VanRIMS No.: 08200020 Meeting Date: May 16, 2017 TO: FROM: SUBJECT: Vancouver City Council
More informationMicrosoft Enterprise. Support Services Description. November 2017
Microsoft Enterprise Support Services Description November 2017 Table of content 1 About this document... 2 2 Support services... 3 2.1 How to purchase support... 3 2.2 Description of support services...
More informationPortfolio Marketing. Research and Advisory Service
Portfolio Marketing Research and Advisory Service SiriusDecisions Team Jeff Lash VP and Group Director, Go-to-Market Christina McKeon Service Director, Portfolio Marketing Tyler Anderson Team Leader, Account
More informationMarch Combining Utility Customer Analytics with Smart Implementation
March 2017 Combining Utility Customer Analytics with Smart Implementation EXECUTIVE SUMMARY Combining Utility Customer Analytics with Smart Implementation to Dramatically Improve Utility Program Metrics
More informationBGE EmPOWER Maryland 2014 Q3/Q4 Semi- Annual Report. May 2015 Hearings
BGE EmPOWER Maryland 2014 Q3/Q4 Semi- Annual Report May 2015 Hearings 2014 BGE Demand Side Management Awards Platts Global Energy Award Finalist AESP s Energy Award for Outstanding Achievement in Pricing
More informationCentralizing Your Energy Supply Spend
HAPPY NEW YEAR! The entire team at Siemens Retail & Commercial Systems wishes you all the best for a prosperous 2016. If saving more money is on your list of resolutions, then contact us. We d love to
More informationData analytics: How BGE is benefiting from AMI data. March 26, 2013
Data analytics: How BGE is benefiting from AMI data March 26, 2013 Today s Presenters Jesse Berst Host & Moderator SmartGridNews.com Matt Comte Senior Manager Accenture Tom Humphreys Project Manager, Advanced
More informationPeriodic Comprehensive Review of the External Auditor
Periodic Comprehensive Review of the External Auditor TOOL FOR AUDIT COMMITTEES January 2014 ENHANCING AUDIT QUALITY AUDIT COMMITTEES iii Table of Contents Introduction 1 1. Determine the scope, timing
More informationThe Road to Shared IT Services. John Gohsman, Vice Chancellor and CIO
The Road to Shared IT Services John Gohsman, Vice Chancellor and CIO John Gohsman Vice Chancellor of Information Technology and Chief Information Officer 2 IT @ WUSTL Vision (draft) 3 Current Trends core
More informationREFINING A UTILITIES VOICE OF THE CUSTOMER (VOC) PROGRAM APPROACH USING THE LADDER OF INFERENCE. by Torin Lacher with contributions from Paul Hagen
REFINING A UTILITIES VOICE OF THE CUSTOMER (VOC) PROGRAM APPROACH USING THE LADDER OF INFERENCE by Torin Lacher with contributions from Paul Hagen A recent Energy & Utilities newsletter article, discussed
More informationIMPROVING DISTRIBUTION SYSTEM PLANNING TO INCORPORATE DISTRIBUTED ENERGY RESOURCES
JULY 2017 IMPROVING DISTRIBUTION SYSTEM PLANNING TO INCORPORATE DISTRIBUTED ENERGY RESOURCES The Second in SEIA's Improving Opportunities for Solar Through Grid Modernization Whitepaper Series AUTHORS:
More informationRMF is scheduled to operate for three years, from January December 2017.
Responsible Microfinance Facility Funded by the Agence Française de Développement and Managed by the Social Performance Task Force, in collaboration with the Smart Campaign Frequently Asked Questions 1.
More informationCHECKLIST. 6. Consult relevant resources to strengthen your approach. The tool will point you to resources that can support you in taking next steps.
WEPs Gender Gap Analysis Tool From Principles to Practice CHECKLIST This guidance document is to help companies understand the steps to prepare and complete the self-assessment. It is recommended that
More informationAPI Gateway Digital access to meaningful banking content
API Gateway Digital access to meaningful banking content Unlocking The Core Jason Williams, VP Solution Architecture April 10 2017 APIs In Banking A Shift to Openness Major shift in Banking occurring whereby
More informationWhat s Going On With Customer Management? Marcia Corner, IBS Product Management April 19, 2017
What s Going On With Customer Management? Marcia Corner, IBS Product Management April 19, 2017 Agenda Introductions What is Customer Management (CM)? Feature Overview of First Release Timeline Total Customer
More informationEmployer Implementation Overview
Employer Implementation Overview ConnectYourCare is committed to making the on-boarding process as simple and quick as possible. We have put significant resources behind the development and testing of
More informationAligning Process Redesign and Change Management with Project Management (System Implementation Projects)
Aligning Redesign and Change Management with Project Management (System Implementation Projects) Kim Brant-Lucich Director of Redesign St. Joseph Health System Information Services HIMSS 2009: Project
More informationIntegrated Capacity Analysis Working Group - Long Term Refinement Topics Scoping Document
Integrated Capacity Analysis Working Group - Long Term Refinement Topics Scoping Document Prepared for the ICA Working Group by More Than Smart Background: A June 7, 2017 Assigned Commissioner Ruling (ACR)
More informationLearning Spotlight Presentation #4. Vendor Communications, Onboarding and Portal Demo October 5, 2016
Learning Spotlight Presentation #4 Vendor Communications, Onboarding and Portal Demo October 5, 2016 Agenda & Overview 1 Overview of Learning Spotlight and Future Topics 2 Vendor Communications & Onboarding
More informationONCOR INTERCONNECTION APPLICATION AND PROCESS FOR DISTRIBUTED RESOURCES
ONCOR INTERCONNECTION APPLICATION AND PROCESS FOR DISTRIBUTED RESOURCES 2016 Commercial and Residential Solar Programs Kickoff Meeting November 11-12, 2015 Ken Brunkenhoefer Oncor Asset Planning OVERVIEW
More informationHosted VoIP Buyer s Guide
Hosted VoIP Buyer s Guide Before you buy a business phone system Your enterprise needs a phone system that not only matches your current business requirements it should also grow alongside your ambitions.
More informationExecutive Steering Committee Meeting. Department of Revenue Building 2, Room 1250 July 27, 2016
Executive Steering Committee Meeting Department of Revenue Building 2, Room 1250 Roll Call and Opening Remarks Facilitator: Robert (Budd) Kneip, Chair Review of June 2016 Meeting Minutes Facilitator: Robert
More informationBenchmarking of Demand Response Potentials Final Report:
Benchmarking of Demand Response Potentials Final Report: Adaptation of FERC s NADR Model to Xcel Energy s Public Service Company of Colorado Territory Prepared for Xcel Energy May 9, 2012 Table of Contents
More informationAdvanced Metering Infrastructure Business Plan
Advanced Metering Infrastructure Business Plan April 19, 2016 AMI Business Plan Table of Contents 1 Introduction... 3 2 AMI Project Goals... 4 2.1 Increase Operational Efficiency and Performance... 4 2.2
More informationAgenda. Next & Now Yahoo Bing Search Alliance Microsoft. Bing Ads Product Update. Advertising Excellence. World-class marketing
Agenda Next & Now Yahoo Bing Search Alliance Bing @ Microsoft Bing Ads Product Update Strategy & Roadmap Advertising Excellence World-class marketing Bing Ads Product Strategy Listening and delivering
More informationIBM Commerce Insights
IBM Terms of Use SaaS Specific Offering Terms IBM Commerce Insights The Terms of Use ( ToU ) is composed of this IBM Terms of Use - SaaS Specific Offering Terms ( SaaS Specific Offering Terms ) and a document
More informationSmart Thermostats and the Triple Bottom Line: People, Planet, and Profits
Smart Thermostats and the Triple Bottom Line: People, Planet, and Profits Carlyn Aarish and Mitt Jones, Cadmus ABSTRACT It is no secret in the world of energy utilities: Faced with the challenges of declining
More informationIntroduction to the Demand Response Auction. IESO Training
Introduction to the Demand Response Auction IESO Training May 2017 Introduction to the Demand Response Auction AN IESO TRAINING PUBLICATION This guide has been prepared to assist in the IESO training of
More informationUltiPro 2016 Fall Release Payroll Processing, Tax Compliance, and Time Management
To listen to a recording of this webcast, click here. UltiPro 2016 Fall Release Payroll Processing, Tax Compliance, and Time Management Version: 12.1.2 Presenter: Christopher Pacini Susan Grier Phone:
More informationHow Much Will Serialization Really Cost? AN INTRODUCTION TO THE TOTAL COST OF OWNERSHIP
How Much Will Serialization Really Cost? AN INTRODUCTION TO THE TOTAL COST OF OWNERSHIP TABLE OF CONTENTS Introduction Breaking down the whole iceberg What is Total Cost of Ownership? Acquisition is Just
More informationBRITISH COLUMBIA INSTITUTE OF TECHNOLOGY
BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY THREE-YEAR BUSINESS PLAN 2014 /15 2016 /17 September 2014 95% Employment among recent degree graduates One of BC s Top Employers since 2011 TABLE OF CONTENTS Executive
More informationSmart Grid Program. Andres Carvallo, CIO. Austin Energy. November Austin Energy All Rights Reserved
Austin Energy Smart Grid Program Andres Carvallo, CIO Austin Energy November 2008 1 Agenda About Austin Energy About IT at AE What is the Smart Grid? Why do we need the Smart Grid? AE Smart Grid Austin
More informationWEF Digital Transformation Initiative 2016 The electricity industry: uncovering value through digital transformation
WEF Digital Transformation Initiative 2016 The electricity industry: uncovering value through digital transformation Shalabh Srivastava Principal Director 1 Analytics Opportunities for the Indian Utility
More informationAEP Ohio gridsmart Phase 2 FAQs
AEP Ohio gridsmart Phase 2 FAQs External FAQs What is advanced metering infrastructure (AMI) and an automated meter reading (AMR)? What is the difference between them? AMI, also known as smart meters,
More informationMicrosoft FastTrack. Customer Guide. This guide contains step-by-step instructions to help customers navigate and perform tasks on the FastTrack site.
Microsoft FastTrack Customer Guide Updated: March 2017 This guide contains step-by-step instructions to help customers navigate and perform tasks on the FastTrack site. Contents Introduction to FastTrack...
More informationUtility-Wind Energy Marketer Partnerships: A New Model for Building Wind Facilities. WINDPOWER 2003 Conference
Utility-Wind Energy Marketer Partnerships: A New Model for Building Wind Facilities WINDPOWER 2003 Conference Session 8C Green Marketing & Community Involvement May 20, 2003; 3:40-5:00 PM Authors: John
More informationSubmitted to: Pennsylvania Public Utility Commission
PECO Exhibit No. 1 PECO PROGRAM YEARS 2016-2020 ACT 129 - PHASE III ENERGY EFFICIENCY AND CONSERVATION PLAN Submitted to: Pennsylvania Public Utility Commission Submitted by: November 30, 2015 Table of
More informationRequest for Proposal For: 2018 American Bar Association Temporary Services
Table of Contents Bid Timetable [2] 1.0 General Bid Information [3] 2.0 Proposal Requirements [5] 3.0 Criteria for Selection [7] 4.0 Specifications and Work Statement [7] Appendix A: Bidder Response Sheet
More informationFixed Scope Offering for Oracle Fusion Procurement. Slide 1
Fixed Scope Offering for Oracle Fusion Procurement Slide 1 Today s Business Challenges Adopt leading Global SCM practices & strategies across the entire enterprise value chain to move into the future.
More information