1 Pre Qualification Management Best Practices Presented by: Herb Brownett CCIFP

2 What is Prequalification Management (PQM)? The process by which contractors are screened and evaluated by General Contractors for inclusion in bid requests for a project For General Contractors it is Risk Management For contractors it is Marketing 2

3 General Contractors Risk Management Typically 80 90% of job cost is subcontracted Most catastrophic project losses are sub related contractor risk management options: Bond Contractor Default Insurance (Zurich Guard/Arch) Self Insure 3

4 contractor Marketing Maintain relationship with current GC s and renew Prequalification as required Monitor market activity and Prequalify with GC s for targeted projects Monitor targeted geography and Prequalify with GC s in targeted markets Strong qualifications are a strategic advantage 4

5 Current Economic Environment Requires Improved PQM Economic environment requires re thinking pre qualification Greater numbers of contractor failures have occurred and are predicted Financial health will change more rapidly than before Significantly increased demand for better risk management Underwriters and financial institutions are demanding improved pre qualification General Contractors all looking for ways to better manage risk Changes in pre qualification needed Obtaining more frequent updates and more data Shifting pre qualification from an episodic event to an ongoing process 5 Confidential

6 In the current economy, assume nothing! We do not prequalify the subs we deal with regularly because we know them so well. CFO of soon to be in trouble GC 6

7 Industry Pre Qualification Manual Process contractors obtain copy of each GC s Prequal Form (some are available online) contractor completes each form and submits (+99% of data requested is the same) GC evaluates data (may involve multiple people) Evaluation and data filed somewhere that is not accessible on bid day 7

8 Standard Data Requirements General Information Business Classification Capabilities Product Service Segments Employees General Diversity Information Geographic Areas LEED Accreditation Union Agreements Licenses Performance Information Bank Information Financial Information Financial Statements References Litigation Information Quality Assurance Bonding Compliance Requirement Automobile Insurance Contractor s Pollution Insurance Employers Liability Insurance General Liability Insurance Professional Liability Insurance Umbrella Insurance Worker s Compensation Insurance Additional Insurance Lien History Safety 8

9 Challenges of Current PQM Process An inefficient mostly manual process contractors provide the same data on different forms to many General Contractors Visibility of collected information at GC is limited Data is not updated as frequently as it should be Monitoring updates is difficult for both parties 9

10 Industry View of Pre qualification Today GC GC GC Confidential

11 Pre Qualification Conundrum General Contractors need to collect more information, from more subcontractors, more often, with less people contractors need to provide more information, to more General Contractors, more often, with less people Something has to change!! 11

12 What Pre Qualification Options Do We Have? Point Solutions GCs or Accounting Software Develop Own Solutions contractors still have heavy burden to learn multiple systems and continue high manual data entry effort General Contractors are limited to their existing subcontractors 12

13 What Pre Qualification Options Do We Have? Best Practice Industry Network Solution Improves pre qualification for everyone Delivers greatest value to everyone Dramatically lowers cost for everyone 13

14 Social/Business Networking Facebook LinkedIn CFMA Connection 14

15 GC Pre Qualification with Network PQM General Contractor contractor 1. Enter Document Templates Into Network 2. Populate Library with Prequal Data One Time! 3. Request s to Prequalify 5. Receive Completed Pre Qual Documents for Approval 7. Automatically Receive Updates N E T W O R K P Q M PQM Data 1. Financials 2. Project Details 3. References 4. Safety 5. Insurance Auto Populate GC Request 6. Enter Updates 8. Generate Pre Qual Documents for Non PQM GC s 15 Confidential

16 contractor Pre Qualification with Network PQM contractor General Contractors One Time Entry: Data Attachments PQM Data 1. Financials 2. Project Details 3. References 4. Safety 5. Insurance 6. PQM Data N E T W O R K P Q M Automatic Generation of: Standard GC Pre Qual Docs with Attachments GC 1 GC 2 GC 3 16 Confidential

17 GC Configure: Requirements & Packages Requirement Objects 1. Financial Information Banking Info Financial Statements 2. Project Details Active Contracts Value Duration / Completion 3. References 4. Safety 5. Insurance 6. Bonding 7. Litigation History Requirement Packages Standard Package # 1, 2, 3, 4 Commercial Contracts Package # 5, 7 Civil Contracts Package # 5, 6, 8 17

18

19 Transact: Fulfilling a Request contractor Invitation Off-System GC Registration Pre-Fill Data in Library Receive Request Enter / Copy from Library 1. Financial Information 2. Project Details 3. References 4. Safety 5. Insurance 6. Bonding 7. Litigation History Auto Build mittal Form Print Electronic Signature (if Req d) mit to Network GC 19

20 GC: Organization Approvals Single Approver Many Approvers 20

21

22 Industry Pre qualification Today GC GC GC Confidential

23 Industry Pre qualification with Network PQM GC 1 GC 2 GC 3 N E T W O R K P Q M Confidential

24 General Contractor Value Proposition Improved Risk Mitigation More frequent updates Improved flexibility to define requirements Better communication internally and with contractors Improved Information Accessibility Easy means to capture contractor project performance Dramatically improved visibility On line history search ability Lower Costs stantial process efficiencies Automated and definable workflow Automated expiration management with reminders Enhanced Capabilities Green paperless pre qualification Search for subcontractors in new geographies Generate bid lists 24 Confidential

25 contractor Value Proposition Greater Effectiveness Satisfy varied General Contractor PQM requirements but only enter the information once Automated PQM package creation Automated distribution Automated update capability Better insight to current status Same process for Network PQM GCs and non Network GCs Significant Cost Savings stantial process efficiencies communication, data entry, document creation / distribution, follow up Enhanced Capabilities Prequalify with more General Contractors with little additional effort 25

26 Will Your Company Survive? It is not necessary to change, as survival is not mandatory. W. Edwards Deming 26

PREQUALIFICATION OF CONTRACTORS FOR EDUCATIONAL FACILITIES CONSTRUCTION 8.502

PREQUALIFICATION OF CONTRACTORS FOR EDUCATIONAL FACILITIES CONSTRUCTION 8.502 PREQUALIFICATION OF CONTRACTORS FOR EDUCATIONAL FACILITIES CONSTRUCTION 8.502 The School Board shall prequalify contractors for a one (1) year period or for a specific project. This policy prescribes uniform

More information

UNIVERSITY OF MASSACHUSETTS BUILDING AUTHORITY

UNIVERSITY OF MASSACHUSETTS BUILDING AUTHORITY UNIVERSITY OF MASSACHUSETTS BUILDING AUTHORITY ADDENDUM NO. 1 TO REQUEST FOR QUALIFICATIONS TRADE CONTRACTORS CM AT RISK G.L. C. 149A 8 FOR RENOVATION OF EXISTING ACADEMIC BUILDINGS (REAB) FOR THE UNIVERSITY

More information

CHAPTER AUXILIARY SERVICES. Prequalification of Contractors for Educational Facilities Construction 8.272

CHAPTER AUXILIARY SERVICES. Prequalification of Contractors for Educational Facilities Construction 8.272 Prequalification of Contractors for Educational Facilities Construction 8.272 The School Board shall prequalify contractors for a one (1) year period or for a specific project in accordance with the following:

More information

End of Prequalification Clarification #1

End of Prequalification Clarification #1 PREQUALIFICATION CLARIFICATION #1 December 17, 2018 DUE DATE: January 10, 2018 TIME: 2:00 p.m. PROJECT: On-Call Trade HVAC Contractor Program $100K - $500K Project Number: OC.HVAC2018 LOCATION: University

More information

Verified Network By Pantera Global Technology. Pantera s Prequalification and Elite Subcontractor Network

Verified Network By Pantera Global Technology. Pantera s Prequalification and Elite Subcontractor Network Verified Network By Pantera Global Technology Pantera s Prequalification and Elite Subcontractor Network A Word from Pantera s President Over the past two years, our team has been working day and night

More information

SUBCONTRACTOR / SUPPLIER (Circle one) PRE-QUALIFICATION FORM

SUBCONTRACTOR / SUPPLIER (Circle one) PRE-QUALIFICATION FORM SUBCONTRACTOR / SUPPLIER (Circle one) PRE-QUALIFICATION FORM Company Legal Name: Street Address: City, State, Zip Code: Mailing Address): (if different from above) City, State, Zip: Phone: Fax: Website

More information

NASCIO Award Application. Section A: Cover Page. NCDOT Vendor Prequalification System. Digital Government: Government to Business (G to B)

NASCIO Award Application. Section A: Cover Page. NCDOT Vendor Prequalification System. Digital Government: Government to Business (G to B) NASCIO Award Application Section A: Cover Page NCDOT Vendor Prequalification System Digital Government: Government to Business (G to B) North Carolina Contact Information: Name Role Phone Email Tim Frost

More information

ConstructNYC Training RFP. Info Session Presentation October 25, 2017

ConstructNYC Training RFP. Info Session Presentation October 25, 2017 ConstructNYC Training RFP Info Session Presentation October 25, 2017 Agenda Program Overview RFP Details - Scope - Payment Schedule - M/WBE Requirements - Timeline Q&A 2 Program Overview Opportunity M/W/DBE

More information

PUBLIC CONTRACT CODE SECTION

PUBLIC CONTRACT CODE SECTION PUBLIC CONTRACT CODE SECTION 22160 22169 22160. (a) The Legislature finds and declares that the design build method of project delivery, using a best value procurement methodology, has been authorized

More information

MARYLAND STADIUM AUTHORITY

MARYLAND STADIUM AUTHORITY MARYLAND STADIUM AUTHORITY REQUEST FOR QUALIFICATIONS (RFQ) GENERAL CONTRACTOR RENOVATIONS TO OPERATIONS OFFICE M&T BANK STADIUM MSA Project No. 19-013 ISSUE DATE: October 9, 2018 MARYLAND STADIUM AUTHORITY

More information

Incorporating the subcontractor prequalification program

Incorporating the subcontractor prequalification program Incorporating the subcontractor prequalification program into project life cycles and the corporate culture is critical to the successful management of subcontractors. ZURICH FEATURE JEFF GREWING Are You

More information

MIAMI-DADE COUNTY PUBLIC SCHOOLS OFFICE OF ECONOMIC OPPORTUNITY PREQUALIFICATION SEMINAR

MIAMI-DADE COUNTY PUBLIC SCHOOLS OFFICE OF ECONOMIC OPPORTUNITY PREQUALIFICATION SEMINAR MIAMI-DADE COUNTY PUBLIC SCHOOLS OFFICE OF ECONOMIC OPPORTUNITY PREQUALIFICATION SEMINAR THURSDAY, February 1, 2018 M-DCPS CONTRACTOR PREQUALIFICATION OVERVIEW 2 The Prequalification Certification process

More information

TECHNOLOGY IN CONSTRUCTION RISK MANAGEMENT. Using Technology in Subcontractor Prequalification Management

TECHNOLOGY IN CONSTRUCTION RISK MANAGEMENT. Using Technology in Subcontractor Prequalification Management Workshop T4 Tuesday, November 19 9:00 a.m. noon and 1:30 4:30 p.m. TECHNOLOGY IN CONSTRUCTION RISK MANAGEMENT Using Technology in Subcontractor Prequalification Management Workshop T4 Presented by Maria

More information

CENTRAL MICHIGAN UNIVERSITY

CENTRAL MICHIGAN UNIVERSITY CENTRAL MICHIGAN UNIVERSITY 2017 ASBESTOS CONSULTANT INITIAL PREQUALIFICATION APPLICATION Consultants interested in providing asbestos related services to Central Michigan University (CMU) must first be

More information

Business Process and Compliance Audits

Business Process and Compliance Audits Business Process and Compliance Audits 2014 Business Process Compliance Audits (BPCA) Safeguard has implemented BPCA s to ensure: Ensure Vendors screen, train and have quality controls over employees and

More information

JOB ORDER CONTRACTING (JOC)

JOB ORDER CONTRACTING (JOC) JOB ORDER CONTRACTING (JOC) A LEAN Best Management Practice for Efficient Construction Project Delivery All product and company names are trademarks or registered trademarks of their respective holders.

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL ACQUISITION & IMPLEMENTATION OF A CORPORATE WIDE BOX STYLED STANDARD LOCKERS Proposal Release Date: March 25, 2008 Proposal Due Date: April 25, 2008 Page - 1 - of 9 TABLE OF CONTENTS

More information

Release & Deployment Management PinkVERIFY

Release & Deployment Management PinkVERIFY RDM-11-G-001 General Criteria Does the tool use ITIL 2011 Edition process terms and align to ITIL 2011 Edition workflows and process integrations? RDM-11-G-002 Does the tool have security controls in place

More information

4 Secrets to Pain-Free Payment Management

4 Secrets to Pain-Free Payment Management 4 Secrets to Pain-Free Payment Management Textura is the leading provider of collaboration and productivity tools for the construction industry. Our solutions serve all construction industry professionals

More information

Lockton S.C.O.R.E. System

Lockton S.C.O.R.E. System Lockton S.C.O.R.E. System Product Overview Lockton Companies About Lockton Companies Lockton is the largest private, independently Overview of Lockton s S.C.O.R.E. System owned insurance and risk management

More information

PREQUALIFICATION QUESTIONNAIRE

PREQUALIFICATION QUESTIONNAIRE PREQUALIFICATION QUESTIONNAIRE FOR HUENEME ROAD RECYCLED WATER PIPELINE PROJECT PHASE II THE PROJECTS AND PREQUALIFICATION In the coming months, the City of Oxnard ( City ) will be bidding a project for

More information

NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION

NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION University of California, Irvine 2016-17 State Funded Reroof Multiple Buildings Project No. 5110248 NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION The University of California, Irvine (UCI) requests

More information

City of Hartford Hartford School Building Committee

City of Hartford Hartford School Building Committee City of Hartford Hartford School Building Committee Hartford School Building Committee/ Arcadis/O&G and Procurement Services Unit Outreach Effort City of Hartford Minority Women Business Enterprise (MWBE)

More information

EJCDC Contract Documents for America s Infrastructure Buy online at

EJCDC Contract Documents for America s Infrastructure Buy online at EJCDC Contract Documents for America s Infrastructure Buy online at www.booksforengineers.com N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction

More information

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA 95132 408-923-1871 OFC 408-926-8329 FAX PREQUALIFICATION PACKAGE INSTRUCTIONS FOR PROSPECTIVE MEP SUBCONTRACTORS FEBRUARY

More information

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Harshman Demolition Response Deadline 3/28/18

More information

PREQUALIFICATION APPLICATION

PREQUALIFICATION APPLICATION COMPANY INFORMATION BUSINESS INFORMATION Company Name: Parent Company: Previous Company Name(s): Type of Company: Corporation Partnership Sole Proprietor Joint Venture Other If Other, please specify: State

More information

Fax: (949) Phone: (949)

Fax: (949) Phone: (949) Marissa Lidyoff From: Sent: To: Subject: Attachments: Marissa Lidyoff on behalf of Marissa Lidyoff Monday, February

More information

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION Section 14.01: Definitions 14.02: Application for Prequalification of Contractors 14.03: Aggregate Bonding Capacity and Single

More information

Client Management for Commercial (CPM)

Client Management for Commercial (CPM) Client Management for Commercial (CPM) RFMS has created a version of CMM for commercial oriented clients called Commercial Project Manager (CPM). In addition to the features available in CMM for Retail

More information

Public Private Partnerships. Chicago Federation of Labor

Public Private Partnerships. Chicago Federation of Labor Public Private Partnerships Chicago Federation of Labor Illinois AFL-CIO - Neutral Chicago Federation of Labor - Neutral Individual Unions Some individual Building and Construction Trade Unions supported

More information

Construction Family of Documents

Construction Family of Documents Construction Family of Documents The EJCDC Construction Family Documents (C-Series) is intended for engineered construction projects. The current edition (2013) is endorsed by both the Construction Specifications

More information

Pre-qualification Reform Project. Briefing Document Common Assessment Standard

Pre-qualification Reform Project. Briefing Document Common Assessment Standard Pre-qualification Reform Project Briefing Document Build UK believe that a key enabler of pre-qualification reform is the creation of a for the industry, providing a common benchmark for auditing pre-qualification

More information

UNIVERSITY OF CALIFORNIA, LOS ANGELES REQUEST FOR PREQUALIFICATION

UNIVERSITY OF CALIFORNIA, LOS ANGELES REQUEST FOR PREQUALIFICATION UNIVERSITY OF CALIFORNIA, LOS ANGELES REQUEST FOR PREQUALIFICATION TEACHING AND LEARNING CENTER FOR HEALTH SCIENCES BP 15 CAST IN PLACE CONCRETE & REINFORCING STEEL UCLA PROJECT NUMBER 944020.02 Advertisement:

More information

PREQUALIFICATION OF BIDDERS FOR SUPPLY/PROVISION OF GOODS, SERVICES AND WORKS FOR 2016 FINANCIAL YEAR ENDING DECEMBER 2016 CATEGORY CHS/..

PREQUALIFICATION OF BIDDERS FOR SUPPLY/PROVISION OF GOODS, SERVICES AND WORKS FOR 2016 FINANCIAL YEAR ENDING DECEMBER 2016 CATEGORY CHS/.. PREQUALIFICATION OF BIDDERS FOR SUPPLY/PROVISION OF GOODS, SERVICES AND WORKS FOR 2016 FINANCIAL YEAR ENDING DECEMBER 2016 CATEGORY CHS/..2016 DECEMBER 2015 TABLE OF CONTENTS 1.1 SECTION 1: PREQUALIFICATION

More information

EJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center

EJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center EJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction

More information

STRATEGIES FOR EFFECTIVELY WORKING WITH THIRD-PARTIES. September 2017

STRATEGIES FOR EFFECTIVELY WORKING WITH THIRD-PARTIES. September 2017 STRATEGIES FOR EFFECTIVELY WORKING WITH THIRD-PARTIES September 2017 Your presenters Nancy Aubrey Partner Boston, MA Nancy.aubrey@rsmus.com Rick Shriner Principal McLean, VA Rick.shriner@rsmus.com 2 Agenda

More information

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Campus Wide HVAC Upgrades - Steam Lines Response

More information

Albany Unified School District Contractor Prequalification

Albany Unified School District Contractor Prequalification Albany Unified School District Contractor Prequalification The Albany Unified School District ( District ) has determined that contractors providing construction services ( Contractor(s) or Firm(s) ) must

More information

HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners)

HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners) HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners) SOLICITATION TYPE: DESCRIPTION: Request For Proposals Paperless Invoice Automation Software ISSUE DATE: 04/03/2018 DUE DATE: 04/20/2018

More information

This document describes how Austin implements projects using The Austin Method. Step 1 Preliminary Design and Engineering

This document describes how Austin implements projects using The Austin Method. Step 1 Preliminary Design and Engineering The Austin Company offers multiple approaches in implementing a project. These generally can be classified into either a design-bid-construct or design-build project approach. In addition, Austin offers

More information

Prequalification Statement 11.16

Prequalification Statement 11.16 COMPANY INFORMATION Prequalification Statement 11.16 It is recommended that you have the Adobe Acrobat Reader version 8 or newer installed on your computer to complete this Fillable Adobe PDF form. Adobe

More information

Client Procedure for Prequalification (New Application) & Renewal GREEN BUILDING COMMISSIONING / ALLIED SPECIALIST

Client Procedure for Prequalification (New Application) & Renewal GREEN BUILDING COMMISSIONING / ALLIED SPECIALIST Revision: 06 Feb 2017 Page 1 of 5 Client Procedure for Prequalification (New Application) & Renewal GREEN BUILDING COMMISSIONING / ALLIED SPECIALIST 1. PURPOSE: Environment, Health and Safety (EHS) Department

More information

OAKLAND UNIFIED SCHOOL DISTRICT FOR NON-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL

OAKLAND UNIFIED SCHOOL DISTRICT FOR NON-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL OAKLAND UNIFIED SCHOOL DISTRICT FOR N-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL OAKLAND UNIFIED SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY

More information

Supplier Risk Management. Do You Really Have the Right Level of Visibility to Minimise Risk?

Supplier Risk Management. Do You Really Have the Right Level of Visibility to Minimise Risk? Supplier Risk Management Do You Really Have the Right Level of Visibility to Minimise Risk? Contents 3 4 Introduction What Kind of Risk Are We Talking About? 5 How Do You Manage Such a Diversity of Risk?

More information

Audit and Risk Management Committee Charter

Audit and Risk Management Committee Charter Audit and Risk Management Committee Charter This Charter sets out the role, responsibilities, structure and processes of the Audit and Risk Management Committee (Committee), which the Board of CI Resources

More information

Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011)

Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011) Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011) Sec. 153.65. As used in sections 153.65 to 153.73 of the Revised Code: (A)(1)

More information

Step 1 Preliminary Design and Engineering

Step 1 Preliminary Design and Engineering The Austin Company offers a variety of approaches in implementing a project. These generally can be classified into either a design-bid-construct or design-build project approach. In addition, Austin offers

More information

INSTRUCTIONS Column A: Column B: Mandatory Preferred Optional Information Column C: Column D: Column F:

INSTRUCTIONS Column A: Column B: Mandatory Preferred Optional Information Column C: Column D: Column F: INSTRUCTIONS One vendor may propose one or more potential solution packages (product configurations) to meet the Department's requirements. Please complete a separate workbook for each proposed solution

More information

GENERAL INFORMATION. Yrs. Yrs. Yrs. How many years has your organization been in business under your present firm name:

GENERAL INFORMATION. Yrs. Yrs. Yrs. How many years has your organization been in business under your present firm name: SUBCONTRACTOR / SUPPLIER PREQUALIFICATION FORM Complete all portions of this form and return to AlliedCook Construction Corp. with a copy of your Certificate of Insurance indicating current limits. This

More information

Construction Documents Education Program

Construction Documents Education Program PLANNING AND PRE-DESIGN THE CONSTRUCTION SPECIFICATIONS INSTITUTE 110 South Union Street, Suite 100 Alexandria, VA 22314-3351 www.csinet.org CDEP 1.0.1: 03-1 Copyright Materials This presentation is protected

More information

Safety Management in the Construction Industry: Preliminary Findings

Safety Management in the Construction Industry: Preliminary Findings TAUC State of the Union Construction Industry Forum December 9, 2015 Safety Management in the Construction Industry: Preliminary Findings Stephen A. Jones Senior Director Industry Insights Research Dodge

More information

Contractor Selection & Management Guideline Rev01. Revision 00. April 2011

Contractor Selection & Management Guideline Rev01. Revision 00. April 2011 Contractor Selection and Management Guideline Revision 00 April 2011 Document Details and Issue Record Rev No. Details Date Author 00 Draft 10/04/2011 CJMD Checked Text Calcs Approved Document Reference:

More information

RFP ATTACHMENT 3 For Best Value Procurement Option One Fine Arts Mechanical & Electrical Improvements UT Chattanooga SBC No.

RFP ATTACHMENT 3 For Best Value Procurement Option One Fine Arts Mechanical & Electrical Improvements UT Chattanooga SBC No. RFP ATTACHMENT 3 For Best Value Procurement Option One Fine Arts Mechanical & Electrical Improvements UT Chattanooga SBC No. 540/005-05-2017 TECHNICAL PROPOSAL SECTION A: MANDATORY REQUIREMENTS MANDATORY

More information

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund State Historic Preservation Office Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund April 2014 Table of Contents Conflict of Interest... 3 Floodplains... 3 Hazardous

More information

RFP ATTACHMENT 3 For Best Value Procurement Option One Academic Classroom Buildings Renovation (Lupton Library) UT Chattanooga SBC No.

RFP ATTACHMENT 3 For Best Value Procurement Option One Academic Classroom Buildings Renovation (Lupton Library) UT Chattanooga SBC No. RFP ATTACHMENT 3 For Best Value Procurement Option One Academic Classroom Buildings Renovation (Lupton Library) UT Chattanooga SBC No. 540/005-01-2015 TECHNICAL PROPOSAL SECTION A: MANDATORY REQUIREMENTS

More information

RFP No HAWS. Addendum #2. Revision No. Two AUTOMATED PAYROLL SERVICES

RFP No HAWS. Addendum #2. Revision No. Two AUTOMATED PAYROLL SERVICES Addendum #2 DESCRIPTION OF ADDENDUM. Revision No. Two AUTOMATED PAYROLL SERVICES This Addendum is to provide notice of changes to the RFP and answers to questions received from prospective proposers. RFP

More information

Subcontractor Pre-Qualification Form

Subcontractor Pre-Qualification Form Subcontractor Pre-Qualification Form Page 1 of 3 Today s Date (MO/DAY/YEAR): / / Person Completing Form: Company Information Company Name: Company Website: President/Owner/Partner Name: Other Contact Name/Title:

More information

SCADA System Procurement Alternatives

SCADA System Procurement Alternatives SCADA System Procurement Alternatives 2017 Automation Committee Seminar August 24, 2017 Terry M. Draper, PE, PMP Discussion Topics SCADA Overview System Hardware / Software Procurement Additional System

More information

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN/BUILD TRADE PARTNERS

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN/BUILD TRADE PARTNERS ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN/BUILD TRADE PARTNERS PROJECT NOTICE Skanska USA Inc. hereinafter called SKANSKA, intends to award design-build subcontracts to HVAC, Electrical,

More information

Invoice and Voucher Janel Carey, Jennifer Abinette, Shannon Soja, Moet Slaughter (OSC) Liz Vandenburg (SFS) James West (BSC)

Invoice and Voucher Janel Carey, Jennifer Abinette, Shannon Soja, Moet Slaughter (OSC) Liz Vandenburg (SFS) James West (BSC) Invoice and Voucher Janel Carey, Jennifer Abinette, Shannon Soja, Moet Slaughter (OSC) Liz Vandenburg (SFS) James West (BSC) 1 Roadmap Proper Invoice Validating Receipt of Goods and Services Key Dates

More information

Invoice and Voucher. Janel Carey, Jennifer Abinette, Shannon Soja, Moet Slaughter (OSC) Liz Vandenburg (SFS) James West (BSC)

Invoice and Voucher. Janel Carey, Jennifer Abinette, Shannon Soja, Moet Slaughter (OSC) Liz Vandenburg (SFS) James West (BSC) Invoice and Voucher Janel Carey, Jennifer Abinette, Shannon Soja, Moet Slaughter (OSC) Liz Vandenburg (SFS) James West (BSC) 1 Roadmap Proper Invoice Validating Receipt of Goods and Services Key Dates

More information

SUBCONTRACTOR PREQUALIFICATION REV G. If insufficient space, attach details of request and reference them in the space provided.

SUBCONTRACTOR PREQUALIFICATION REV G. If insufficient space, attach details of request and reference them in the space provided. MasterConstruction_ChecklistForms_SubcontracorPrequalification_AN SUBCONTRACTOR PREQUALIFICATION REV G 1.Company Name: (Attach current Business Registration Certificate to verify correct / exact information)

More information

Using Subcontractor Prequalification to Help Mitigate Risk and Increase Success

Using Subcontractor Prequalification to Help Mitigate Risk and Increase Success Industry Focus. Powerful Results ṬM Using Subcontractor Prequalification to Help Mitigate Risk and Increase Success By Gabriel Valls The rebounding construction market demands even greater discipline and

More information

REQUEST FOR PROPOSAL MAY 31, Cruise the Great Lakes

REQUEST FOR PROPOSAL MAY 31, Cruise the Great Lakes REQUEST FOR PROPOSAL MAY 31, 2018 ADDRESS: 20 NORTH WACKER DRIVE SUITE 2700 CHICAGO, IL 60606 USA TELEPHONE: 312-407-0177 E-MAIL ADDRESS: RFP FILE NAME/TITLE: gsgp@gsgp.org Cruise the Great Lakes 1. OVERVIEW:

More information

JD Edwards EnterpriseOne Payroll for US Rel 9.x

JD Edwards EnterpriseOne Payroll for US Rel 9.x Oracle University Contact Us: 0845 777 7711 JD Edwards EnterpriseOne Payroll for US Rel 9.x Duration: 5 Days What you will learn The JD Edwards EnterpriseOne Payroll for US Rel 9.x Ed 1 training covers

More information

Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS

Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS RFQ Term: 1/1/2016 1/1/2020 Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS Denver Water (DW), in an effort to improve the administration and efficiency, has initiated

More information

Sage MyAssistant - Construction Tasks

Sage MyAssistant - Construction Tasks Sage MyAssistant - Construction Tasks Accounts Payable Invoice Management Banks with insufficient cash Commitments with unsigned change orders and are selected to be paid Invoices from the same vendor,

More information

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build

More information

VICTOR VALLEY UNION HIGH SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR

VICTOR VALLEY UNION HIGH SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR VICTOR VALLEY UNION HIGH SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR GENERAL CONTRACTOR AND MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION AND UNDERGROUND PIPELINE SUBCONTRACTOR LICENSEES (License

More information

RFP NO A CONTRACT FOR THE PROCUREMENT AND INSTALLATION OF AN ENTERPRISE RESOURCE PLANNING SYSTEM PART V. EVALUATION CRITERIA AND PROCESS

RFP NO A CONTRACT FOR THE PROCUREMENT AND INSTALLATION OF AN ENTERPRISE RESOURCE PLANNING SYSTEM PART V. EVALUATION CRITERIA AND PROCESS 1.0 OVERALL PROPOSER EVALUATION CRITERIA 1.1 OVERALL PROPOSER EVALUATION AND CRITERIA The evaluation committee will select a best solution based on a weighted scoring system. The following table presents

More information

INCORPORATING SERVICES PROCUREMENT INTO A TECHNOLOGY SOLUTION AN SAP FIELDGLASS WHITEPAPER

INCORPORATING SERVICES PROCUREMENT INTO A TECHNOLOGY SOLUTION AN SAP FIELDGLASS WHITEPAPER INCORPORATING SERVICES PROCUREMENT INTO A TECHNOLOGY SOLUTION AN SAP FIELDGLASS WHITEPAPER Services procurement is a large, growing area of spend at many organizations and encompasses a variety of engagement

More information

Identify the accountable executive and the safety accountabilities of managers (ref to Chapt.xx)

Identify the accountable executive and the safety accountabilities of managers (ref to Chapt.xx) APPENDIX xx to Doc 9859 GUIDANCE ON THE DEVELOPMENT OF AN SMS IMPLEMENTATION PLAN FOR SERVICE PROVIDERS 1. Background As of November 23, 2006 States shall require, as part of their safety programme, that

More information

PREQUALIFICATION PACKAGE FOR MECHANICAL, ELECTRICAL OR PLUMBING CONTRACTORS WARM SPRINGS/ SOUTH FREMONT COMMUNITY NEW ELEMENTARY SCHOOL PROJECT

PREQUALIFICATION PACKAGE FOR MECHANICAL, ELECTRICAL OR PLUMBING CONTRACTORS WARM SPRINGS/ SOUTH FREMONT COMMUNITY NEW ELEMENTARY SCHOOL PROJECT PREQUALIFICATION PACKAGE FOR MECHANICAL, ELECTRICAL OR PLUMBING CONTRACTORS WARM SPRINGS/ SOUTH FREMONT COMMUNITY NEW ELEMENTARY SCHOOL PROJECT JUNE 23, 2016 NOTICE TO CONTRACTORS TO PREQUALIFY FOR MECHANICAL,

More information

Performance Management System Reference Guide Administrators

Performance Management System Reference Guide Administrators Performance Management System Reference Guide Administrators Administration 6 Manage Company Information... 6 Navigation... 6 Company Data... 6 Company Logo... 6 Password Settings... 6 Review Settings...

More information

Question & Answers on Invitation to tender for Framework Contract 2007/S

Question & Answers on Invitation to tender for Framework Contract 2007/S Question & Answers on Invitation to tender for Framework Contract 2007/S 130-158835 Impact Assessment and Evaluation (ex-ante, intermediate and ex-post) Updated: 02/08/2007 Before submitting any written

More information

MARYLAND STADIUM AUTHORITY

MARYLAND STADIUM AUTHORITY MARYLAND STADIUM AUTHORITY REQUEST FOR QUALIFICATIONS (RFQ) DESIGN CONSULTANT FOR EXPANSION JOINT REPLACEMENT Small Business Reserve Procurement M&T BANK STADIUM MSA Project No. 19-021 ISSUE DATE: October

More information

Contractor Pre-qualification profile and Questionnaire

Contractor Pre-qualification profile and Questionnaire Contractor Pre-qualification profile and Questionnaire Company Name Date Vale Pre-Qualification and Profile Questionnaire Feb 2014 Page 1 of 13 1. GENERAL INFORMATION Company Name: Telephone Number: Web

More information

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Agency Project Name Stadium Project Response Deadline 1/9/14 12 pm local time

More information

IBM Emptoris Supplier Lifecycle Management on Cloud

IBM Emptoris Supplier Lifecycle Management on Cloud Service Description IBM Emptoris Supplier Lifecycle Management on Cloud This Service Description describes the Cloud Service IBM provides to Client. Client means the contracting party and its authorized

More information

DOCUMENT BID PROPOSAL

DOCUMENT BID PROPOSAL DOCUMENT 00 41 13 BID PROPOSAL TO: SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT, a California Community College District, acting by and through its Board of Trustees ("the District"). FROM: (Name of

More information

LEVEL I PREQUALIFICATION DOCUMENTS

LEVEL I PREQUALIFICATION DOCUMENTS Project No. LEVEL I PREQUALIFICATION DOCUMENTS for MUIR BIOLOGY BUILDING 3RD FLOOR RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La Jolla,

More information

Maintenance and Operations 1302 Service Road Tustin, California (714) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

Maintenance and Operations 1302 Service Road Tustin, California (714) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 Maintenance and Operations 1302 Service Road Tustin, California 92780 (714) 730-7515 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 The Tustin Unified School District ( District ) has determined that

More information

A REFRESHER ON OFCCP S NEW SECTION 503 & VEVRAA REGULATIONS: ARE YOU READY FOR SUBPARTS C?

A REFRESHER ON OFCCP S NEW SECTION 503 & VEVRAA REGULATIONS: ARE YOU READY FOR SUBPARTS C? A REFRESHER ON OFCCP S NEW SECTION 503 & VEVRAA REGULATIONS: ARE YOU READY FOR SUBPARTS C? Presented by Cara Crotty, Esq. April 28, 2015 Constangy, Brooks, Smith & Prophete LLP Constangy, Brooks, Smith

More information

As a state agency, the College administration is required to develop procedures for Construction Manager selection.

As a state agency, the College administration is required to develop procedures for Construction Manager selection. COLLEGE of CENTRAL FLORIDA ADMINISTRATIVE PROCEDURE Title: Construction Management Selection Process Page 1 of 2 Implementing Procedure For F.S. 1013.45 Date Approved: 09/11/02 Division: Administration

More information

INSURANCE DEFENSE PRACTICE AREA TEMPLATE for Time Matters /Total Practice Advantage By IP ASSOCIATES, LLC

INSURANCE DEFENSE PRACTICE AREA TEMPLATE for Time Matters /Total Practice Advantage By IP ASSOCIATES, LLC INSURANCE DEFENSE PRACTICE AREA TEMPLATE for Time Matters /Total Practice Advantage By IP ASSOCIATES, LLC Why do you need a Practice Template? Tired of using the one size fits all setup that shipped with

More information

Saudi Aramco s Registration and Prequalification for Service Suppliers. Copyright 2016, Saudi Aramco. All rights reserved.

Saudi Aramco s Registration and Prequalification for Service Suppliers. Copyright 2016, Saudi Aramco. All rights reserved. Saudi Aramco s Registration and Prequalification for Service Suppliers Copyright 2016, Saudi Aramco. All rights reserved. Objective - Registration Process Overview of Saudi Aramco s General Bid Slates

More information

PREQUALIFICATION OF CONSTRUCTION CONTRACTORS QUESTIONNAIRE PACKET

PREQUALIFICATION OF CONSTRUCTION CONTRACTORS QUESTIONNAIRE PACKET Exhibit A PREQUALIFICATION OF CONSTRUCTION CONTRACTORS QUESTIONNAIRE PACKET Submission of Pre-Qualification Packet Deadline: TBD Newcomb Academy AB300 New Construction Project Place of Pre-Qualification

More information

Compliance Management

Compliance Management Compliance Management Reporting on legal and regulatory compliance 15 April 2015 Contact: Rahul Lovell; Partner; rahul.lovell@in.ey.com Jignesh Thakkar; Partner; jignesh.thakkar@in.ey.com Page 2 Business

More information

ADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION)

ADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION) ADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION) Subject to conditions prescribed by the University of California, San Francisco (the University or UCSF ), bids for a Construction Manager at Risk Agreement

More information

SANTA PAULA UNIFIED SCHOOL DISTRICT 201 S. Steckel Drive Santa Paula, California (805)

SANTA PAULA UNIFIED SCHOOL DISTRICT 201 S. Steckel Drive Santa Paula, California (805) SANTA PAULA UNIFIED SCHOOL DISTRICT 201 S. Steckel Drive Santa Paula, California 93060 (805) 933-3908 Annual Pre-Qualification for MEP Contractors per Public Contract Code 20111.6 License Classifications:

More information

SUBCONTRACTOR MANAGEMENT PLAN

SUBCONTRACTOR MANAGEMENT PLAN Doc : SMP Revision. 0 Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 10 Purpose The purpose of this program is to improve subcontractor health, safety and environmental

More information

Printing and Packaging

Printing and Packaging Epicor for Printing and Packaging Supporting Key Initiatives for the Printing and Packaging Industries With increased global competition and the growth of the Internet, it s a print buyer s market. Customers

More information

LIMA. Maintenance Manager User Manual. Microsoft Dynamics NAV LIMA 1

LIMA. Maintenance Manager User Manual. Microsoft Dynamics NAV LIMA 1 LIMA Maintenance Manager User Manual Microsoft Dynamics NAV LIMA 1 contents 1 Introduction... 3 2 Maintenance Menu... 4 3 Set-up... 7 4 Defining preventive plans... 11 5 Planning Preventive Maintenance...

More information

JD Edwards EnterpriseOne Payroll for Canada Rel 9.x

JD Edwards EnterpriseOne Payroll for Canada Rel 9.x Oracle University Contact Us: Local: 1800 103 4775 Intl: +91 80 4108 4709 JD Edwards EnterpriseOne Payroll for Canada Rel 9.x Duration: 5 Days What you will learn The JD Edwards EnterpriseOne Payroll for

More information

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS) (BUILDING 590 Deep Foundations)

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS) (BUILDING 590 Deep Foundations) ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS) (BUILDING 590 Deep Foundations) PROJECT NOTICE Skanska USA Inc. hereinafter called SKANSKA, intends to award

More information

CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE

CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE AZUSA UNIFIED SCHOOL DISTRICT 1 TABLE OF CONTENTS Filing of PreQualifications Submittals 3 PREQUALIFICATION QUESTIONNAIRE 6 Page Part I:

More information

Control Copy No: TRF/P2P/1.1/01

Control Copy No: TRF/P2P/1.1/01 !"##!$ %TRF/P2P/1.1&''()'' End User Training Manual for SAP MM Material Management Process Name: PR PROCESSING Process No: TRF/P2P/1.1 Control Copy No: TRF/P2P/1.1/01 *+*% Doc Version Description Prepared

More information

TECHNICAL PROPOSAL SECTION A: MANDATORY REQUIREMENTS PROPOSER NAME: Evaluation By Owner. Proposal Page Number By Proposer MANDATORY REQUIREMENTS

TECHNICAL PROPOSAL SECTION A: MANDATORY REQUIREMENTS PROPOSER NAME: Evaluation By Owner. Proposal Page Number By Proposer MANDATORY REQUIREMENTS RFP ATTACHMENT 3 For Best Value Procurement Option One UT Chattanooga SBC No. 540/005-01-2015 TECHNICAL PROPOSAL SECTION A: MANDATORY REQUIREMENTS MANDATORY REQUIREMENTS A.1 Describe your firm s form of

More information