Schnabel Foundation Company

Size: px
Start display at page:

Download "Schnabel Foundation Company"

Transcription

1 Micropiles for Roadway Support, Bridge Abutments and Metal Signal Poles on US-158 from US-17B to East of Pasquotank River, in Elizabeth City, NC Schnabel Foundation Company Presenter: Stephen Dimino, P.E.

2 Owner -NCDOT Team Prime Contractor-Archer Western Construction Micropile Subcontractor-Schnabel Foundation Company

3

4

5 Project Overview Install micropiles to support the roadway, metal signal poles (MSP), bridge abutment and pump station The roadway and approach micropiles were installed through the concrete roadway deck Bridge micropiles were installed in the river MSP micropiles and the pump station piles were installed in foundation excavation.

6 Project Overview Install 258 Roadway Micropiles Install 16 Bridge Approach Micropiles Install 10 ea. Bridge Abutment Micropiles Install 4 Micropiles at 8 separate MSP foundations for a total of 32 piles. Install 8 Pump Station Support Micropiles Install 4 Generator Slab Support Micropiles Install 4 Electrical Building Micropiles

7 Roadway/Approach Piles Install 258 Roadway Micropiles 8-5/8 x 60 ft. casing with casing tip elevation of -52 ft. Bond length of 28 ft. Full length of corrosion protected Center bar Three sacrificial demonstration piles Fifteen proof tests on production piles

8

9

10 Bridge Piles Install 10 Bridge Abutment Micropiles 10-3/4 x 60 ft. casing with casing tip elevation of -58 ft. Bond length of 40 ft. Full length of corrosion protected center bar tied into pile cap One sacrificial demonstration piles Two proof tests on production piles

11

12 MSP Piles Install 32 Bridge Abutment Micropiles (4 each at 8 separate pile caps) 10-3/4 casing with casing tip elevation varies from -40 ft. to -58 ft. Bond length of 22 ft. Full length of corrosion protected center bar tied into pile cap One proof tests at each of the 8 pile caps

13

14 Pump Station Piles Install 16 Pump Station Micropiles 7 casing with casing tip elevation of -40 ft. Bond length of 20 ft. Full length of corrosion protected center bar tied into pile cap One proof tests at each of the 8 pile caps One demonstration test for the 7 piles

15

16 Design The permanent micropile design is in accordance with FHWA Implementation Manual for Micropile Design and Construction Guidelines (FHWA-SA ), dated June 2000 using the Load Factor Design (LFD) Method; AASHTO LRFD Bridge Design Specifications 2010; and The Recommendations of Prestressed Rock and Soil Anchors, PTI, In this design the micropiles are Type A micropiles

17 Design Design loads and test loads given in Contract Documents Roadway/Approach DL=25T (comp) TL=36T Bridge DL=50T (comp) TL=72T MSP DL=24T (comp) ;14T (tension) Specified casing diameter and thickness based on method of installation

18 Design The overburden soils were very soft/weak. The grout to ground bond strengths are per Table 6.3 in The Recommendations of Prestressed Rock and Soil Anchors, PTI, 2004, and AASHTO Table C The bond strengths of the soils of the pile above the minimum tip elevation shown the plans were neglected. Roadway and Approach Piles 3.8klf Bridge Piles 4.5klf MSP Piles 4.5klf

19

20 Issues

21

22 Design Grout mix design Use either of the two grouts: A neat mix of Portland Cement (Type I/II) and potable water at an approximate mix ratio of 5 to 6 gallons of water per cubic foot of grout. Minimum compressive strength at 28 days, fc=3,500 psi. An approved ready mix grout with a minimum compressive strength at 28 days, fc=3,500 psi

23 Testing Tested per ASTM D Quick Test Roadway Piles-The contract called for 3 Demonstration Tests and 15 Proof Tests. Roadway micropiles test load is 36T (72 kips) Bridge Piles-The contract called for 1 Demonstration Test and 2 Proof Tests. Bridge micropiles test load is 72T (144 kips) MSP Piles-The contract called for 1 Proof Test at each pile cap. MSP micropiles test load is 24T (48 kips)

24 Testing

25 Testing

26

27

28

29 Issues We had to stabilize the hole and the environmental requirements affected our planning Original method was not productive Constraints of working on road deck limited our work process Tight schedule due to MOT Changing methods is time consuming Working near the water

30 Overall view of jobsite

31 Construction Method lf x 11 dia. Continuous Flight Auger Drill down to depth and pump grout through auger Push casing and center bar down through plastic grout Main issue was that the auger walked and we could not put the casing in to depth Cleaning the fat clay off the auger took a long time.

32 Method 1 CFA installation

33 Method 1 CFA Installation

34 Method 1 CFA Installation

35 Construction Method 2 Drill down to pile tip elevation using the casing as the drill string Pump grout through the casing as the casing is pulled up to so that the bottom of casing matches pile tip elevation. The casing and grout stabilize the hole. Push bar through plastic grout. Hooking the casing up at the rotary head took a long time.

36 Method 2 Drilling with Casing

37 Method 2 Drilling with Casing

38 Method 2 Drilling with Casing

39 Construction Method 3 Vibrate casing down to casing tip elevation Drill through casing and down to pile tip elevation. Pump grout through drill string as we retracted the inner rod. Very successful in the soil type. We were able to use smaller equipment.

40 Drilling through the Vibrated Casing

41 Drilling through Vibrated Casing

42 Drilling through Vibrated Casing

43 Vibrated Piles at MSP Pile Cap

44 Completed MSP Micropiles

45

Lesson 4. Construction Techniques and Materials. Learning Outcomes. Basic Construction

Lesson 4. Construction Techniques and Materials. Learning Outcomes. Basic Construction Lesson 4 Construction Techniques and Materials schnabel-eng.com Learning Outcomes Describe sequence of construction for a micropile Identify materials used to construct a micropile Describe principle function

More information

Recent Advances in the Selection and Use of Drilled Foundations

Recent Advances in the Selection and Use of Drilled Foundations Recent Advances in the Selection and Use of Drilled Foundations Dan Brown, P.E., Ph.D. Dan Brown and Associates Overview Micropiles Continuous Flight Auger Piles Drilled Displacement Piles Drilled Shafts

More information

SPECIAL SPECIFICATION 4401 Prestressed Ground Anchors

SPECIAL SPECIFICATION 4401 Prestressed Ground Anchors 2004 Specifications CSJ 0581-02-121 & 0200-11-100 SPECI SPECIFICATION 4401 Prestressed Ground Anchors 1. Description. Install post-tensioned permanent ground anchors in place, with grouting as required

More information

Case Study. The Challenge. Deep Micropile Installation Under Existing Multistory Building

Case Study. The Challenge. Deep Micropile Installation Under Existing Multistory Building The Challenge The Owners of a former warehouse located in the vibrant tech start-up area south of Market St. in San Francisco made the decision to bring the building up to current earthquake standards

More information

STANDARDIZED STRUCTURES

STANDARDIZED STRUCTURES Q, QH & QL TOWERS 16.1 Q, QH, and QL Towers General Description The series includes three and four leg angle towers, which are suited for a variety of antenna mounting positions and load conditions. The

More information

SAS Micropile Manual. Basic dimensioning and design recommendations. Table of Content:

SAS Micropile Manual. Basic dimensioning and design recommendations. Table of Content: SAS Micropile Manual Basic dimensioning and design recommendations Table of Content: Page System Description 2 Load Capacities 2 Minimum Drill Hole Diameter 3 Load Transfer to Ground 4 Corrosion Protection

More information

MICROPILE FOUNDATIONS FOR RECONSTRUCTION OF HISTORIC LA LOMA BRIDGE IN PASADENA, CALIFORNIA. Casey Garneau 1

MICROPILE FOUNDATIONS FOR RECONSTRUCTION OF HISTORIC LA LOMA BRIDGE IN PASADENA, CALIFORNIA. Casey Garneau 1 MICROPILE FOUNDATIONS FOR RECONSTRUCTION OF HISTORIC LA LOMA BRIDGE IN PASADENA, CALIFORNIA ABSTRACT: Casey Garneau 1 The historic La Loma Bridge, which crosses the Arroyo Seco in Pasadena, California,

More information

Learning Outcomes. Background Definitions. Lesson 2 & 3. Definitions, Background, Classification, Applications and Costs

Learning Outcomes. Background Definitions. Lesson 2 & 3. Definitions, Background, Classification, Applications and Costs Lesson 2 & 3 Definitions, Background, Classification, Applications and Costs schnabel-eng.com Learning Outcomes Define a micropile Describe the characteristics, advantages and limitations of micropiles

More information

SPECIAL SPECIFICATION 4492 Tie Back Anchors

SPECIAL SPECIFICATION 4492 Tie Back Anchors 2004 Specifications CSJ 0504-02-022 SPECI SPECIFICATION 4492 Tie Back Anchors 1. Description. This Item shall govern for the installation of tie-back anchors in place, with grouting as required in accordance

More information

Foundation Strengthening Of Bascule Piers At The Bridge Of Lions

Foundation Strengthening Of Bascule Piers At The Bridge Of Lions Paper No. 22 Foundation Strengthening Of Bascule Piers At The Bridge Of Lions Structural Elements Jian Huang, Ph.D., P.E. G. Alan Klevens, P.E. Lichtenstein Consulting Engineers TENTH BIENNIAL SYMPOSIUM

More information

Rehabilitation of Masonry Piers at Nipigon, Ontario

Rehabilitation of Masonry Piers at Nipigon, Ontario Rehabilitation of Masonry Piers at Nipigon, Ontario Daniel E. J. Adamson, P. Eng. Canadian Pacific Railway 2881 Alyth Road SE Calgary, AB Canada, T2G 5S3 Phone (403) 303-8835 Fax (403) 303-8830 ABSTRACT

More information

STANDARD SPECIFICATION FOR MICROPILE CONSTRUCTION

STANDARD SPECIFICATION FOR MICROPILE CONSTRUCTION Section 67.0 Knoxville, Tennessee March 2013 1. Description STANDARD SPECIFICATION FOR MICROPILE CONSTRUCTION a) This work shall consist of constructing micropiles as shown on the Contract plans in accordance

More information

DESIGN-BUILD-TEST PROCESS FOR HIGH CAPACITY MICROPILES: CONSTRUCTION CASE STUDY ON DUTCHESS RAIL TRAIL BRIDGE FOUNDATIONS, POUGHKEEPSIE, NEW YORK

DESIGN-BUILD-TEST PROCESS FOR HIGH CAPACITY MICROPILES: CONSTRUCTION CASE STUDY ON DUTCHESS RAIL TRAIL BRIDGE FOUNDATIONS, POUGHKEEPSIE, NEW YORK ABSTRACT DESIGN-BUILD-TEST PROCESS FOR HIGH CAPACITY MICROPILES: CONSTRUCTION CASE STUDY ON DUTCHESS RAIL TRAIL BRIDGE FOUNDATIONS, POUGHKEEPSIE, NEW YORK James Barron 1, P.E., Thomas Hattala 2, P.E.,

More information

CASE STUDY: LOAD TRANSFER ANALYSIS ON AN INSTRUMENTED AUGERCAST PILE USING EDC STRAIN GAUGES AND GEOKON REBAR STRAINMETERS

CASE STUDY: LOAD TRANSFER ANALYSIS ON AN INSTRUMENTED AUGERCAST PILE USING EDC STRAIN GAUGES AND GEOKON REBAR STRAINMETERS CASE STUDY: LOAD TRANSFER ANALYSIS ON AN INSTRUMENTED AUGERCAST PILE USING EDC STRAIN GAUGES AND GEOKON REBAR STRAINMETERS Swamy Avasarala 1, Santosh Mummaneni 2, Vamshi Vemula 3, Dr. Sastry Putcha 4 1

More information

This drawing. is preliminary. and not for. construction or. implementation. purposes. project number 170 END VIEW DESIGN STRENGTHS: PLAN

This drawing. is preliminary. and not for. construction or. implementation. purposes. project number 170 END VIEW DESIGN STRENGTHS: PLAN project number 70 Reference Line 2-0" Reference 3 -" 6-0" 6-0" 3 -" Line Box Culvert Roadway Finished Channel -0" -0" E VIEW 20-0" Riprap 0-0" Riprap Outlet Invert El 87.0 Sta 233+00.00 Inlet Invert El

More information

Micropile Lateral Load Testing in the Charleston, SC Area

Micropile Lateral Load Testing in the Charleston, SC Area Micropile Lateral Load Testing in the Charleston, SC Area A special thanks to: William B. Wright, PE, Bryan T. Shiver, PE, Kenneth J. Zur, PE, Jackson C. Gosnell, PE, Theodore G. Padgett, PE, and William

More information

John James Audubon Bridge

John James Audubon Bridge John James Audubon Bridge Cable-Stayed Main Span Over the Mississippi River Johns Hopkins University Whiting School of Engineering September 10, 2008 The Project Scheduled Time to Complete Estimated Number

More information

Non-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method

Non-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method Non-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method Specifications for Grouting Mixtures and Procedures for Soil Nail Installations Research Project Number 0-4484 Research Product

More information

Final Estimates Level 2

Final Estimates Level 2 Florida Department of TRANSPORTATION Final Estimates Level 2 Module 6: Structures 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 6 1 6-1 Module Content Concrete Structures Bridges Substructure

More information

HIGH CAPACITY MICROPILES IN WEAK DOLOMITIC LIMESTONE FOR CRANE FOUNDATION SUPPORT

HIGH CAPACITY MICROPILES IN WEAK DOLOMITIC LIMESTONE FOR CRANE FOUNDATION SUPPORT HIGH CAPACITY MICROPILES IN WEAK DOLOMITIC LIMESTONE FOR CRANE FOUNDATION SUPPORT A Case History in Temporary Foundations 12 th International Workshop on Micropiles Krakow, Poland June 14, 2014 Terence

More information

CONSTRUCTION SPECIFICATIONS FOR ALABAMA STATE PORT AUTHORITY MCDUFFIE TERMINALS CONVEYOR 44 PILING INSTALLATION

CONSTRUCTION SPECIFICATIONS FOR ALABAMA STATE PORT AUTHORITY MCDUFFIE TERMINALS CONVEYOR 44 PILING INSTALLATION CONSTRUCTION SPECIFICATIONS FOR ALABAMA STATE PORT AUTHORITY MCDUFFIE TERMINALS CONVEYOR 44 PILING INSTALLATION INDEX SECTION 1 GENERAL PROVISIONS... 1-1 1.0 GENERAL... 1-1 SECTION 2 - PRESTRESSED CONCRETE

More information

DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS

DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS DUCTILE IRON PILES DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS Designed to resist both compression and tension loads in either end-bearing or friction,

More information

Figure 1. Horst Aschenbroich, President/CEO, Con-Tech Systems Ltd.

Figure 1. Horst Aschenbroich, President/CEO, Con-Tech Systems Ltd. Root Pile Support of Vancouver s Hollow Tree Parallels to Wind Turbine Foundations Horst Aschenbroich Dipl. Ing, President Con-Tech Systems Ltd, Delta, BC, Canada Abstract One of Vancouver s famous landmarks,

More information

PIANC UK Seminar Design Developments and Specification for Steel. Duncan Nicholson Arup Fellow 9/3/17 ICE London

PIANC UK Seminar Design Developments and Specification for Steel. Duncan Nicholson Arup Fellow 9/3/17 ICE London PIANC UK Seminar Design Developments and Specification for Steel Duncan Nicholson Arup Fellow 9/3/17 ICE London Contents 1. Design Issues 2. SPERWall Edition 3 (2016) 1. Steel Sheet Piles (Section 14)

More information

The requirements for the above tender items are contained in OPSS 942.

The requirements for the above tender items are contained in OPSS 942. B942 - - OPSS 942 942.1 GENERAL Ground anchors are systems used to transfer tensile loads to soil or rock. These systems comprise prestressing steel tendons, steel anchorages, spacers, centralizers and

More information

Earth Retention Systems

Earth Retention Systems haywardbaker.com Earth Retention Systems Mark W. Goodsell, P.E., D.GE Senior Engineer 2 Earth Retention Systems Focus of Presentation Different Types and Purposes of Earth Retention Systems Design Considerations/Geotechnical

More information

CONCRETE TECHNOLOGY CORPORATION

CONCRETE TECHNOLOGY CORPORATION PRECAST, PRESTRESSED HOLLOW CORE SLABS DESIGN CRITERIA & SPAN-LOAD CHARTS FOR STORM WATER DETENTION VAULT LIDS (CHARTS REVISED /18/08) Introduction Design Criteria for Development of the Span-Load Charts

More information

DRILLED-IN DISPLACEMENT MICROPILES INSTALLED WITH NO VIBRATION + NO NOISE

DRILLED-IN DISPLACEMENT MICROPILES INSTALLED WITH NO VIBRATION + NO NOISE DRILLED-IN DISPLACEMENT MICROPILES INSTALLED WITH NO VIBRATION + NO NOISE GREATER LOADS. LESSER DEPTHS. IN LESS TIME. HOW IT WORKS STELCOR Drilled-In Displacement Micropiles are installed using hydraulic

More information

Lesson 7 & 8 Construction Inspection/ Quality Control (QA/QC) Load Testing. Learning Outcomes. Quality Assurance and Quality Control (QA/QC)

Lesson 7 & 8 Construction Inspection/ Quality Control (QA/QC) Load Testing. Learning Outcomes. Quality Assurance and Quality Control (QA/QC) Lesson 7 & 8 Construction Inspection/ Quality Control (QA/QC) Load Testing schnabel-eng.com Learning Outcomes Identify proper approaches to inspect, monitor and document construction and testing of micropile

More information

Pushing the Envelope For 100 Years

Pushing the Envelope For 100 Years Pushing the Envelope For 100 Years Tunneling under the Chesapeake Bay The Parallel Thimble Shoal Highway Tunnel Presented by: Kevin Abt, PE Chesepeake Bay Bridge and Tunnel District Mike Kling, PE, PTOE

More information

Modjeski and Masters, Inc. Consulting Engineers 04/18/06 St. Croix River Bridge 3D Analysis Report Introduction

Modjeski and Masters, Inc. Consulting Engineers 04/18/06 St. Croix River Bridge 3D Analysis Report Introduction Introduction This memo presents a summary of a three dimensional (3D) analysis of the Organic concept for the proposed St. Croix River bridge project. The Organic concept has several attributes that are

More information

Case Histories. Cap and Compaction Grouting for Sinkhole Remediation R.M. Bivens, P.E. Rembco Geotechnical Contractors, Inc.

Case Histories. Cap and Compaction Grouting for Sinkhole Remediation R.M. Bivens, P.E. Rembco Geotechnical Contractors, Inc. Case Histories Cap and Compaction Grouting for Sinkhole Remediation R.M. Bivens, P.E. Rembco Geotechnical Contractors, Inc. Cap Grouting Capping the top of the rock surface with grout to provide a barrier

More information

7 Bridges in 74 Days. NC 12 Detour

7 Bridges in 74 Days. NC 12 Detour 7 Bridges in 74 Days (Or Less) NC 12 Detour Ocracoke NC 12 Bridges Ocracoke NC 12 Bridges Existing 7 bridges built in 1950's Timber structures w/ ACP Clear width 22.5 ft. 36 to 152 ft. long Limited redirective

More information

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures Preferred QC/QA Procedures The Federal Highway Administration (FHWA) has provided QC/QA guidance for this technology as noted below. The reference document also contains information about construction

More information

John James Audubon Bridge. Introduction

John James Audubon Bridge. Introduction John James Audubon Bridge Introduction The Project Why build the bridge? The bridge--proposed to be the longest cable-stayed bridge in America--will replace an existing ferry between the communities of

More information

Rak Production Technology of Concrete Structures (2015) Concrete Reinforcement

Rak Production Technology of Concrete Structures (2015) Concrete Reinforcement Rak-82-2121 Production Technology of Concrete Structures (2015) Concrete Reinforcement 09.10.2015 1 Learning Outcomes To acquaint the student with concrete reinforcement 2 Reinforcement The of concrete

More information

Environmental Management Chapter

Environmental Management Chapter Environmental Management Chapter 335-9-1 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER WELL STANDARDS PROGRAM ADMINISTRATIVE CODE CHAPTER 335-9-1 LICENSING AND CERTIFICATION OF

More information

Foundation Innovations Ensure Successful Bridge Replacement

Foundation Innovations Ensure Successful Bridge Replacement COVER STORY Foundation Innovations Ensure Successful Bridge Replacement Rhode Island s new $163.7 million, 2,265 ft (690 m) long, fourlane Sakonnet River Bridge sits just south of the existing bridge in

More information

SEISMIC RETROFIT OF AN UNDERGROUND RESERVOIR. Robert Small 1, Rob Jameson 2

SEISMIC RETROFIT OF AN UNDERGROUND RESERVOIR. Robert Small 1, Rob Jameson 2 ABSTRACT SEISMIC RETROFIT OF AN UNDERGROUND RESERVOIR Robert Small 1, Rob Jameson 2 Seismic Upgrade of the University Mound Reservoir North Basin included 542 micropiles with 1335 KN (300 kip) design capacity

More information

MICROPILE LATERAL LOAD TESTING IN CHARLESTON, SOUTH CAROLINA, USA

MICROPILE LATERAL LOAD TESTING IN CHARLESTON, SOUTH CAROLINA, USA MICROPILE LATERAL LOAD TESTING IN CHARLESTON, SOUTH CAROLINA, USA William B. Wright, et. al. 1 ABSTRACT With increasing frequency, micropiles are being used as a foundation solution within the Charleston,

More information

Design of Deep Foundations for Slope Stabilization

Design of Deep Foundations for Slope Stabilization Design of Deep Foundations for Slope Stabilization J. Erik Loehr, Ph.D., P.E. University of Missouri Annual Kansas City Geotechnical Conference Overland Park, Kansas April 23, 215 Stability analysis for

More information

A. Installer Qualifications: A firm shall have a minimum of five projects successfully constructed in the last ten (10) years.

A. Installer Qualifications: A firm shall have a minimum of five projects successfully constructed in the last ten (10) years. NORWOOD HALL EXTERIOR RESTORATION MISSOURI S&T ISSUED FOR BID SECTION 316300 - BORED PILES PART 1 - GENERAL 1.1 SUMMARY A. Section includes resistance piers, couplings, and brackets. 1.2 ACTION SUBMITTALS

More information

DRILLED-IN DISPLACEMENT MICROPILES INSTALLED WITH NO VIBRATION + NO NOISE

DRILLED-IN DISPLACEMENT MICROPILES INSTALLED WITH NO VIBRATION + NO NOISE DRILLED-IN DISPLACEMENT MICROPILES INSTALLED WITH NO VIBRATION + NO NOISE GREATER LOADS. LESSER DEPTHS. IN LESS TIME. The STELCOR pile takes advantage of the strengths of steel and grout, uses relatively

More information

6 CONTRACTOR, EQUIPMENT & PILES ARRIVE ON-SITE

6 CONTRACTOR, EQUIPMENT & PILES ARRIVE ON-SITE Lesson 6 CONTRACTOR, EQUIPMENT & PILES ARRIVE ON-SITE 6-1 Version 1.0-1/15 6-1 Learning Outcomes Verify and Document Equipment Matches Approved Pile Installation Plan Document Contractor Compliance with

More information

NPTEL Course GROUND IMPROVEMENT USING MICROPILES

NPTEL Course GROUND IMPROVEMENT USING MICROPILES Lecture 22 NPTEL Course GROUND IMPROVEMENT USING MICROPILES Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Email: gls@civil.iisc.ernet.in Contents

More information

Deep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project

Deep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project Deep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project Darrin Beckett, P.E. Kentucky Transportation Cabinet 49 th Southeastern Transportation Geotechnical Engineering Conference October

More information

HAMMER GROUT PILES FOR THE BRONX WHITESTONE BRIDGE

HAMMER GROUT PILES FOR THE BRONX WHITESTONE BRIDGE Deep Foundation Institute 35 th Annual Conference Hollywood, California October 2010 HAMMER GROUT PILES FOR THE BRONX WHITESTONE BRIDGE Andrew J. Burns, PE Ameir Altaee, PhD, PE, Urkkada Technology Ltd.

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Corrosion Resistant Reinforcing Steels (CRR) SPECIFIC SUBJECT: Plan Modifications

More information

REINFORCED CONCRETE MASONRY SECTION

REINFORCED CONCRETE MASONRY SECTION SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification

More information

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE September 1, 2003 CONCRETE MANUAL 5-694.800 5-694.810 GENERAL SPECIAL TYPES OF CONCRETE 5-694.800 In the general use of the word concrete, the idea implied is the conventional placement of the material

More information

SECTION NONPRESTRESSED ROCK ANCHORS. 1. Placing drawings. 2. Bar details. 3. Manufacturer s data, and recommendations for grout.

SECTION NONPRESTRESSED ROCK ANCHORS. 1. Placing drawings. 2. Bar details. 3. Manufacturer s data, and recommendations for grout. SECTION 02261 NONPRESTRESSED ROCK ANCHORS PART 1 GENERAL 1.1 THE REQUIREMENT A. The Work in this Section consists of all construction operations relating to designing, furnishing, and installing, complete

More information

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS Dipl.-Wirt.Ing. Oliver Freudenreich Friedr. Ischebeck GmbH phone: ++49 2333 8305-0 Loher Str. 31 79 fax: ++49 2333 8305-55 e-mail: freudenreich@ischebeck.de D-58256 Ennepetal www.ischebeck.com INNOVATIVE

More information

Ellis Powell, PE NCDOT State Construction Engineer

Ellis Powell, PE NCDOT State Construction Engineer 7 Bridges in 74 Days (Or Less) Ellis Powell, PE NCDOT State Construction Engineer NC 12 Detour Ocracoke Island Former hangout of Blackbeard late 1600 s to early 1700 s National Seashore owned and controlled

More information

SECTION PORTLAND CEMENT CONCRETE

SECTION PORTLAND CEMENT CONCRETE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the supplemental documents as indicated in the Site Work General Provisions, apply to work of this

More information

LOAD FACTOR RESISTANCE DESIGN

LOAD FACTOR RESISTANCE DESIGN LRFD LOAD FACTOR RESISTANCE DESIGN HOW CONSTRUCTION ACTIVITIES & SPECIFICATIONS ARE AFFECTED LOUISIANA TRANSPORTATION CONFERENCE 2009 Kim Martindale Garlington, P.E. LADOTD Pavement and Geotechnical Engineer

More information

Bridge Manual - Part I - June CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE

Bridge Manual - Part I - June CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE Bridge Manual - Part I - June 2007 5-1 CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE 5.1 GENERAL This chapter is intended to instruct the Designer in the preparation and submission of Special Provisions and

More information

Construction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed

Construction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed Construction Measurement III SBQ3314 Precast Pre stressed Concrete Works Dr. Sarajul Fikri Mohamed Table of Contents 1. Pre stressed concrete in bridgeworks: technological aspects 2. SMM2 measurement rules

More information

Structural Lightweight Concrete for Accelerated Bridge Construction

Structural Lightweight Concrete for Accelerated Bridge Construction Structural Lightweight Concrete for Accelerated Bridge Construction AASHTO T-4 Meeting June 28, 2005 Reid W. Castrodale, PhD, PE Carolina Stalite Company ROTARY KILN PRODUCED STRUCTURAL LIGHTWEIGHT AGGREGATE

More information

BORED MICROPILES. I.S.M 2009 London (10 th to 13 th may) 9 th International worksop on micropiles - by A. Jaubertou -

BORED MICROPILES. I.S.M 2009 London (10 th to 13 th may) 9 th International worksop on micropiles - by A. Jaubertou - BORED MICROPILES FRENCH PRACTICE MICROPILES Definition Construction principles (type of micropile) Grouting effect Capacity ( structural and geotechnical ) Load test Connection considerations Mauritius

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2015

More information

Specialty Applications. for Keystone Walls

Specialty Applications. for Keystone Walls for Walls SHEET INDEX Title Sheet Sheet 1 Soil Nail Facing Sheet 2 Rock/Shotcrete Facing Sheet 3 Manta Ray Anchor Wall Sheet 4 H-Pile Wall Facing Sheet 5 Sheet Pile Wall Facing Sheet 6 Railing per Site

More information

THE EVOLUTION OF MICRO PILES IN AMERICA

THE EVOLUTION OF MICRO PILES IN AMERICA THE EVOLUTION OF MICRO PILES IN AMERICA PETER J NICHOLSON Nicholson Consulting DAVID E PINYOT Pinyot Consulting EARLY YEARS FOR LOAD CARRYING MICRO PRE 1980 In U.S. Nicholson/Fondedile typically 100-180

More information

TECHNICAL ASSISTANCE REPORT EFFECT OF CONCRETE REMOVAL EQUIPMENT AND METHODS ON THE CONDITION OF DECK CONCRETE LEFT IN PLACE

TECHNICAL ASSISTANCE REPORT EFFECT OF CONCRETE REMOVAL EQUIPMENT AND METHODS ON THE CONDITION OF DECK CONCRETE LEFT IN PLACE TECHNICAL ASSISTANCE REPORT EFFECT OF CONCRETE REMOVAL EQUIPMENT AND METHODS ON THE CONDITION OF DECK CONCRETE LEFT IN PLACE Michael M. Sprinkel, P.E. Research Manager (The opinions, findings, and conclusions

More information

US-131 Over the Muskegon River. Corey Rogers, P.E. Bridge Construction Engineer

US-131 Over the Muskegon River. Corey Rogers, P.E. Bridge Construction Engineer US-131 Over the Muskegon River Corey Rogers, P.E. Bridge Construction Engineer NB and SB US-131 Each bridge is a three-span, 580 foot long, cast-in-place, post-tensioned concrete box girder structure resting

More information

Bond Strength of Hollow-Core Bar Micropiles

Bond Strength of Hollow-Core Bar Micropiles Missouri University of Science and Technology Scholars' Mine International Conference on Case Histories in Geotechnical Engineering (28) - Sixth International Conference on Case Histories in Geotechnical

More information

Chapter 8 Anchoring Structures

Chapter 8 Anchoring Structures Chapter 8 Anchoring Structures 8-1. General Structural anchors are often used to improve the stability of existing structures but, generally, should not be used as a primary means to stabilize new, large

More information

Report D4.3. Field demo of bridge in Florida

Report D4.3. Field demo of bridge in Florida SEACON Sustainable concrete using seawater, salt-contaminated aggregates, and non-corrosive reinforcement Start date: October 1, 2015 Duration: 30 months Report D4.3 Field demo of bridge in Florida Author(s)

More information

Analysis of Four Load Tests on Augered Cast-in-Place Piles in the Texas Gulf Coast Soils Raghu Dass, PE, Woodward Vogt, PE, and Frank Ong, PE

Analysis of Four Load Tests on Augered Cast-in-Place Piles in the Texas Gulf Coast Soils Raghu Dass, PE, Woodward Vogt, PE, and Frank Ong, PE Analysis of Four Load Tests on Augered Cast-in-Place Piles in the Texas Gulf Coast Soils Raghu Dass, PE, Woodward Vogt, PE, and Frank Ong, PE Presented By: Raghu N. Dass, Ph. D., P.E. TSI Laboratories,

More information

Halls River Bridge Update

Halls River Bridge Update 2018 FTBA Construction Conference February 8 & 9, 2018 Orlando, FL 2017 FTBA Construction Conference Registration February 2 & 3, 2017 Orlando, FL Halls River Bridge Update Antonio Nanni, U. Miami, nanni@miami.edu

More information

TYPICAL INSTALLATION INSTRUCTIONS

TYPICAL INSTALLATION INSTRUCTIONS TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect

More information

Design of Buchanan County, Iowa, Bridge Using Ultra High Performance Concrete and PI Girders

Design of Buchanan County, Iowa, Bridge Using Ultra High Performance Concrete and PI Girders Design of Buchanan County, Iowa, Bridge Using Ultra High Performance Concrete and PI Girders Brian Keierleber Buchanan County Engineer 1511 First Street Independence, IA 50644 bcengineer@bcch.sbt.net Dean

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014

More information

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012 PROJECT UPDATE Rendering View from the City of Chesapeake Elizabeth River Boat Landing and Park looking across the Elizabeth River at Portsmouth CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA The new 5,375

More information

PRECAST CONCRETE GIRDER ERECTION

PRECAST CONCRETE GIRDER ERECTION 7.1 Precast Concrete Girder Erection - General Erection of precast concrete girders includes transporting the girders to the site, handling and temporary storage, installing anchor bolts, shear blocks

More information

Exploration, Sampling, and In Situ Soil Measurements. Dr. Omar Al-Hattamleh

Exploration, Sampling, and In Situ Soil Measurements. Dr. Omar Al-Hattamleh Exploration, Sampling, and In Situ Soil Measurements Dr. Omar Al-Hattamleh Purpose of Soil Exploration Information to determine the type of foundation required (shallow or deep). Information to allow the

More information

HIGH CAPACITY ROCK ANCHORS IMPLEMENTATION OF QA/QC PROGRAMS. JULIO DIAMANTE, P.E.

HIGH CAPACITY ROCK ANCHORS IMPLEMENTATION OF QA/QC PROGRAMS. JULIO DIAMANTE, P.E. JULIO DIAMANTE, P.E. In a broad sense, foundation engineering is the ART of selecting, designing, and constructing the elements that transfer the weight of a structure to the underlying soil or rock. Peck,

More information

703 - DRILLED SHAFTS SECTION 703 DRILLED SHAFTS

703 - DRILLED SHAFTS SECTION 703 DRILLED SHAFTS SECTION 703 DRILLED SHAFTS 703.1 DESCRIPTION Construct drilled shafts by the cased or uncased method depending upon site conditions and Contract Document requirements. BID ITEMS Drilled Shaft (*) (**)

More information

* The use of these areas can vary from car park space, where little waterproofing is required through to store rooms or plant rooms where a high

* The use of these areas can vary from car park space, where little waterproofing is required through to store rooms or plant rooms where a high 1 2 Demand for space in cities often makes it essential to use space below buildings. The concept of deep basement technology has been employed since the middle of last century, but is becoming more popular

More information

CHEMICAL /4" 3/8" to 5/8" /8" 3/4" to 1-1/4" 1 10

CHEMICAL /4 3/8 to 5/8 /8 3/4 to 1-1/4 1 10 194 ASTM A193 GRADE B7 HIGH-STRENGTH CARBON, ZINC PLATED (ASTM B 633 YELLOW DICHROMATE) B7 (AISI 414) anchor rod is supplied with nuts meeting the requirements of ASTM Specification A 194, Grade 2H (ASTM

More information

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects The Chief Estimator Software Item Cost Summary Bridge & Overpass Projects Elevated Transit Guideways Precast Girder Elevated Guideway 10 Abutment Excavation & Backfill 1,500.00 m3 222 10,368 8,634 1,309

More information

Special Requirements for Precast Bent Cap Connections C General

Special Requirements for Precast Bent Cap Connections C General Attachment CS1. Proposed Article 8.13.8 Special Requirements for Precast Bent Cap Connections (AASHTO LRFD Bridge Construction Specifications, 2 nd Edition with 2006, 2007, 2008, and 2009 Interims) 8.13.8

More information

Design Specifications- Micropile Foundation System. Geopier Calculations

Design Specifications- Micropile Foundation System. Geopier Calculations Design Specifications- Micropile Foundation System Zone Total Piles Average Length (ft) Total Length 1- Primary Area 233 65 15145 2-Radiotherapy Area (Linac Valuts) 70 65 4550 3-Shell Space & ED Canopy

More information

SR 600 (US 92) Concrete Slab Replacement Reconstruction Project with Precast Pre-Stressed. Florida Department of Transportation District Five

SR 600 (US 92) Concrete Slab Replacement Reconstruction Project with Precast Pre-Stressed. Florida Department of Transportation District Five SR 600 (US 92) Concrete Slab Replacement Reconstruction Project with Precast Pre-Stressed Florida Department of Transportation District Five Project Overview Location SR 600 / US 92, Volusia County FPN:

More information

Section REINFORCING STEEL

Section REINFORCING STEEL Section 03210 PART 1 GENERAL 1.01 SUMMARY This Section includes the furnishing and subsequent placing of reinforcing steel, deformed and smooth, chairs, ties, splicing devices, and other reinforcing accessory

More information

I-495 HOT LANES PROJECT VIRGINIA CONCRETE CONFERENCE CONCRETE: LEADING THE WAY. Dan Staron, P.E. HNTB Corporation MARCH 4, 2010

I-495 HOT LANES PROJECT VIRGINIA CONCRETE CONFERENCE CONCRETE: LEADING THE WAY. Dan Staron, P.E. HNTB Corporation MARCH 4, 2010 VIRGINIA CONCRETE CONFERENCE CONCRETE: LEADING THE WAY Dan Staron, P.E. HNTB Corporation MARCH 4, 2010 PRESENTATION OVERVIEW Project Background/Highlights Design Challenges Technical Details Concrete Applications/Details

More information

GEOTECHNICAL RESISTANCE FACTORS

GEOTECHNICAL RESISTANCE FACTORS Chapter 9 GEOTECHNICAL RESISTANCE FACTORS Final SCDOT GEOTECHNICAL DESIGN MANUAL 9-i Table of Contents Section Page 9.1 Introduction... 9-1 9.2 Soil Properties... 9-2 9.3 Resistance Factors for LRFD Geotechnical

More information

Bi-Directional Static Load Testing of Driven Piles

Bi-Directional Static Load Testing of Driven Piles Bi-Directional Static Load Testing of Driven Piles Paul J. Bullock, PhD Fugro Consultants Inc. Loadtest Bi-Directional Osterberg Cell Testing Specialized jack in pile uses bearing to mobilize side shear

More information

Appendix VIII. Guidelines for groundwater bores and wells

Appendix VIII. Guidelines for groundwater bores and wells Appendix VIII Guidelines for groundwater bores and wells Appendix VIII Guidelines for groundwater bores and wells 1. Construction Bores used for water supply are normally constructed by drilling, either

More information

CONCRETE TECHNOLOGY CORPORATION

CONCRETE TECHNOLOGY CORPORATION PRECAST, PRESTRESSED HOLLOW CORE SLABS DESIGN CRITERIA & SPAN-LOAD CHARTS Introduction 2 Design Criteria for Development of the Span-Load Charts 2 Related Publications 3 Manufacturing Tolerances 4 8" Bare

More information

Our Tour Stops. A Foundation Engineering gtrip down the Mississippi River. Dan Brown, P.E. Dan Brown and Associates 9/6/2010.

Our Tour Stops. A Foundation Engineering gtrip down the Mississippi River. Dan Brown, P.E. Dan Brown and Associates 9/6/2010. A Foundation Engineering gtrip down the Mississippi River Dan Brown, P.E. Dan Brown and Associates Our Tour Stops I 35W Minneapolis US U.S. 61 Bridge, Hastings, MN New Mississippi River Bridge (I 70),

More information

B. Extent of the Work: The Work specified in this Section shall include, but is not limited to, the following principal items:

B. Extent of the Work: The Work specified in this Section shall include, but is not limited to, the following principal items: RIVERSIDE MEDICAL CENTER EAST EXPANSION KANKAKEE, ILLINOIS SECTION 02382 - DRILLED PIERS PART 1 - GENERAL 1.01 DESCRIPTION OF WORK A. Work Included: Provide all labor, materials, equipment, transportation

More information

Design Construction Of Bored Pile Foundation

Design Construction Of Bored Pile Foundation We have made it easy for you to find a PDF Ebooks without any digging. And by having access to our ebooks online or by storing it on your computer, you have convenient answers with design construction

More information

CHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted September 5, Part 1 Introduction...2

CHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted September 5, Part 1 Introduction...2 CHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA Adopted September 5, 1989 Table of Contents Page Part 1 Introduction...2 32-1 Purpose...2 32-2 Applicability...2 32-3 Definitions...2 32-4

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

CW 3615 RIPRAP TABLE OF CONTENTS

CW 3615 RIPRAP TABLE OF CONTENTS December 2014 SPECIFICATION CW 3615 R4 CW 3615 RIPRAP TABLE OF CONTENTS 1. GENERAL CONDITIONS... 1 3. DESCRIPTION... 1 5. MATERIALS... 1 5.1 General... 1 5.2 Rock... 1 5.3 Random Stone Riprap... 1 5.4

More information

ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems LTD. Titan Hollow Bar

ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems LTD. Titan Hollow Bar Advances in Hollow Thread Bar Micro Pile Installation Techniques, Equipment, Materials, Testing and Monitoring ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 6 - RICE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 6 - RICE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 66532 227 th STREET (TWP 45) OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY SEPTEMBER 12, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Over the last decade, drilled and postgrouted micropile foundations have

Over the last decade, drilled and postgrouted micropile foundations have Seismic Design of Micropile Foundation Systems Leo Panian, S.E., and Mike Korolyk, S.E. Over the last decade, drilled and postgrouted micropile foundations have come to be increasingly relied on for resisting

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 616 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03

More information

WELCOME TO THE PILE DRIVING INSPECTOR COURSE

WELCOME TO THE PILE DRIVING INSPECTOR COURSE Lesson 1 WELCOME TO THE PILE DRIVING INSPECTOR COURSE 1-1 Welcome to the Pile Driving Inspector Course. This is a course designed to assist students to understand the specifications and inspection practices

More information