This presentation provides: An overview of the 2013 version of Green Globes plus Compliance details on the lighting related provisions this

Size: px
Start display at page:

Download "This presentation provides: An overview of the 2013 version of Green Globes plus Compliance details on the lighting related provisions this"

Transcription

1 This presentation provides: An overview of the 2013 version of Green Globes plus Compliance details on the lighting related provisions this sustainability standard 1

2 This presentation is protected. 2

3 This is an AIA Continuing Education System accredited presentation for Health Safety and Welfare. If you are an AIA member, please sign in and be sure to leave your AIA number with us. All other attendees will receive a CEU certificate for their participation. 3

4 This is what we hope to accomplish today [then read them]

5 You see we have a full load today, so let us get started. 5

6 The Green Globes system is a building environmental design and management tool. It delivers an online assessment protocol, rating system and guidance for green building design, operation and management. It claims to be interactive, flexible and affordable, and provide market recognition of a building s environmental attributes through third party verification. You see here the different assessment tools available thru Green Globes; we will be covering the first one today. Specifically we will cover the US version of green Globes for New Construction. 6

7 Green Globes is a green building guidance and assessment program that offers a way to advance the environmental performance and sustainability of a wide variety of building types. Suitable for new construction and major renovation building projects, the Green Globes NC program includes the tools shown here. 7

8 Green Globes for New Construction utilizes weighted criteria in its assessment protocol, comprehensively assessing building environmental impacts on a 1,000 point scale in the seven categories shown here. Each of these categories has an assigned number of points that quantify overall building performance including a comprehensive approach to Energy Performance, and a practical and objective method for Life Cycle Assessment (LCA). 8

9 Eligible buildings must: Score a minimum 35% of the total applicable points through preliminary self evaluation. Have no more than 18 months of occupancy at the time assessment is ordered. Be at least 400 gross square feet in size. 9

10 A third party assessment is required for a Green Globes rating and certification. After meeting the eligibility requirements listed above, new construction and major renovation buildings may seek a Green Globes certification and rating for their environmental sustainability and achievements. Third party assessors with expertise in green building design, engineering, construction and facility operations interface with project teams and building owners during the assessment process by reviewing documentation and conducting on site building tours. Buildings that successfully complete a third party assessment are assigned a rating of one to four Green Globes, which is reflected in a certificate or optional plaque issued by the GBI. 10

11 The steps in this process include: 1. Client completes the online evaluation score > 35% to move forward 2. Stage 1 third party assessment design review includes evaluation report and recommendations 3. Client updates the online questionnaire to reflect design changes, if needed 4. Stage 2 third party assessment onsite meetings and building tour 5. Post Assessment client delivers missing documentation, assessor prepares report with recommendations, GBI issues final report, client reviews findings 6. Certification and public recognition of the achievement 11

12 Here we have the timeline typically associated with the assessment & certification phases of a Green Globes construction project. This timeline totals at between 4 and 7 months NOT including design and construction time. This timings are of course estimates. 12

13 The information on the following slides is from the Technical Reference Manual on Green Globes for New Construction, version 1.1, published July 18, 2013 The criteria discussed here have varying levels of influence on the final score of the project. 13

14 The environmental assessment areas included here will be: Project Management Site Energy, and Indoor environment 14

15 Lighting is involved in two provisions of project management: The Integrated Design Process, and Commissioning 15

16 Ensuring that all goals are established at the beginning of the design process and that all team members are actively involved throughout the entirety of the project is a key factor to designing a sustainable building that meets the client s needs. It is imperative that project team members know the basic goals and aspirations for the project and who will be responsible for ensuring that each criterion is fulfilled. For 3 points, this provision requires that at least 5 of the key disciplines listed above be involved in the IDP, the Integrated Design Process. We see that a lighting designer or illuminating engineer is one of these. 16

17 During the design phase, the commissioning agent should review the OPR, design documents and any Basis of Design (BOD) documents assembled by the design team. The design document reviews focus on the big picture, focusing on operability, accessibility, maintainability, efficiency, coordination between systems and controls. Approximately one third of commissioning field problems can be traced back to design, so this process is key. At this time, the commissioning agent should also help prepare commissioning related specifications for the design team, develop pre functional checklists and functional performance tests for all equipment to be commissioned, and finalize the Commissioning Plan. The commissioning agent will also develop training and systems manual requirements. Points here are awarded based on which systems are included in the commissioning. We see that the lighting systems and their controls are one of these systems. 17

18 Lighting is involved in two provisions of site: Mitigating and ecological impacts, and Minimizing the exterior light pollution 18

19 While lighting is not specifically mentioned in the criteria above, this assessment guidance shows what role lighting can play in this issue. The area of glazing on a façade is the strongest predictor of threat to birds, with lighting also playing a crucial role. To make any building bird friendly some design considerations need to be taken into account: Ensure exposed façade material, especially above 40 feet, is specified to deter bird collisions. Materials should not be highly reflective or mostly transparent. Outside lighting is shielded and directed to minimize attracting nocturnal migrating birds. Interior lighting is turned off at night or windows are shaded to prevent light trespass that can attract nocturnal migrating birds. Do not create transparent/ fully glazed passageways or corridors that allow an unobstructed view from one side to the other. Ensure that atriums and courtyards are designed in ways that do not allow birds to become trapped within. 19

20 Green Globes provides two paths for assessing exterior light pollution: Path A: Lighting Design Performance 7 points Path B: Prescriptive Lighting Requirements 7 points Points cannot be combined between paths. 20

21 The IDA/IES Model Lighting Ordinance (MLO) was created to reduce light pollution and glare and lower excessive light site levels. The MLO uses lighting zone (designated LZ0 to LZ4) which allows the AHJ to vary the stringency of lighting restrictions according to the sensitivity of the area as well as accommodating community intent. The MLO requirements are then broken down into a prescriptive path and a performance path for non residential lighting. The prescriptive path sets limits on total site lumens (Table A and Table B), specifies the ratings and installation requirements for all luminaires (Table C), and specifies light shielding. The performance path to compliance specifies that the total installed luminaire lumens of all lighting systems on the site shall not exceed the allowed total initial site lumens per Tables D and E of the MLO. This method also requires that luminaires need to be rated using one of two options; the design complies if the total lumens on the inside surface of the virtual enclosure are less than 15% of the total site lumen limit and the maximum vertical illuminance on any vertical surface is less than the allowed maximum illuminance per Table F in the MLO. For residential lighting, all outdoor luminaires shall be fully shielded and shall not exceed the allowed lumen output in Table G, row 2 of the MLO. Also, landscape lighting shall comply with Table G and shall not be aimed onto adjacent properties. Existing buildings that are not modifying the exterior lighting design shall comply with Part 21

22 VII of the MLO. During Stage I or 2 review, the lighting designer shall provide a narrative that will describe which lighting zone the property falls under, the path taken for compliance to the MLO, and cut sheets and calculations showing compliance to each applicable section. 21

23 This path has 5 criteria, totaling 7 points if all are complied with: During Stage I or 2 review, the lighting designer shall provide a narrative that will describe which lighting zone the property falls under and calculations showing compliance to Table A and Table Bof the MLO; this is worth 1.5 points. During Stage I or 2 review, the lighting designer shall provide a narrative that will describe which lighting zone the property falls under and cut sheets for all luminaires showing compliance to Table C 1, C 2 and C 3. IESNA defines full cutoff fixtures as those with zero candelas measured at or above 90 above nadir and the candelas measured above 80 above nadir is limited to 10% of the lamp lumens. Designers should look for Dark Sky Compliant fixtures with product submittal sheets that specifically list full cutoff or fully shielded. By ensuring all exterior lights comply with these requirements, glare and skyglow can be mitigated. 22

24 23

25 Green Globes provides four paths for assessing energy performance: Path A: ENERGY STAR TargetFinder 100 points Path B: ASHRAE , Appendix G 100 points Path C: ANSI/GBI Energy Performance Building Carbon Dioxide Equivalent (CO2e) Emissions 100 points, plus 50 bonus points Path D: ASHRAE Building Energy Quotient (beq) 100 points, plus 25 bonus points Depending on the path selected, lighting may have certain mandatory requirements and, for all paths, lighting is a significant contributor to the overall energy efficiency of the building. 24

26 During the Stage I review, the Assessor will review the mechanical and electrical plans. These plans should clearly show what major end uses will be sub metered. Lighting and its controls are worth ahalf a point. 25

27 The Energy Metering Reporting Plan should contain measurement, verification, and metering information for a variety of building systems including lighting and lighting controls. In setting up the Energy Metering Reporting Plan, the anticipated energy demand and consumption values for each of the end uses should be extracted from the energy model created for Energy Performance. From there, the building automation system or other automated building control system should be set up to continually track and report energy usage broken down by major end use. Specialty or process electrical equipment should not be confused or combined with the plug loads end use. Specialty/process electrical equipment refers to hardwired specialty equipment, like MRI machines in Hospitals, or vertical transportation in commercial buildings. Plug loads should only consist of items that are not electrically hard wired but must be physically plugged in to an electrical outlet. 26

28 Being <= to the allowed LPD, using either the Building Area Method or the Space by Space Method is worth 10 points. The values in the tables are adapted from ANSI/ASHRAE/IESNA Standard but have been modified to be more stringent. Since the table of maximum LPD values are based on the ASHRAE criteria, any such allowances and exceptions found in this standard shall be allowed for compliance with this criterion (e.g. decorative lighting in sales areas). LPD calculations and results shall be provided to the Assessor for Stage I review. 27

29 Time scheduling controls can be provided via a centralized system or via a digital fullyaddressable system. Centralized controls can be used to automatically turn on, turn off, and/or dim lighting at specific times. Centralized control strategies can also integrate lighting controls with other building systems such as mechanical or security systems. A digital fully addressable lighting control system can speak to an individual ballast or groups of ballasts. These systems are local, or integral, to the luminaire itself and are not housed in a central cabinet. The "control wiring" is independent of the "power wiring" and generally provides the highest degree of flexibility. When space configuration or occupant needs change, the system can respond by reassigning the ballasts accordingly. They can integrate with building automation or energy management system. For Stage I review, the project manager can submit the electrical engineer s lighting plans as long as there is sufficient controls information listed or noted on the plan. In lieu of controls information on the drawings, a separate lighting controls plan should be created that outlines different lighting controls zones and the control strategy used in each. 28

30 We see here that, for 4 points, all interior, non daylighted areas must have lighting controls that can reduce the lighting load by at least 50% from full lighting using any of 4 methodologies, as listed above. For Stage I review, the project manager can submit the electrical engineer s lighting plans as long as there is sufficient controls information listed or noted on the plan. If there is not sufficient information, then a lighting controls plan should be created that outlines the different lighting controls zones and the control strategy used in each. 29

31 There are three ways to earn points in this section: 3 points if the regularly occupied side lit daylighted areas (vertical fenestration) and the top lit daylighted areas (skylights) equal to at least 10% of the net building area 3 points if the effective aperture for vertical fenestration is sufficient given the climate zone, and Up to 2 points based on what percentage of the roof consists of skylights 30

32 3 points are available if: all small daylighted areas have manual or automatic photocell lighting controls, and all large daylighted areas have automatic photocell lighting controls Small daylighted area means 250 sq.ft to 2,500 sq.ft. Manual photocell lighting controls include: switching of each luminaire and switching of individual lamps independently of adjacent lamps within a luminaire. Automatic lighting photocell controls include: stepped switching, stepped dimming, and continuous dimming. Large daylighted area means larger than 2,500 sq.ft. 31

33 This section has 4 criteria, compositely worth up to 5 points. This first criteria earns 1 point if all exterior luminaires have lamps with an initial system efficacy of at least 60 lumens per watt. T5 and T8 fluorescent lamps are limited to being no more than 80 picograms per lumen hour and Mercury vapor lamps may not be used 32

34 Another point is available if all exterior lighting uses LED. 33

35 Mercury content in lamps is typically reported in milligrams. The largest factors contributing to mercury content in the lamps are the shape (avoid non standard shapes), the size (avoid non standard sizes), and the manufacturer. Not all lamps contain mercury; mercury free lamps include incandescent, halogen, low pressure sodium, and LEDs. It is important to note that not all lamps marked as compliant with the EPA s Toxicity Characteristic Leaching Procedure, (TCLP) are not necessarily low mercury since some lamps contain additives in end caps to prevent mercury from leaching during the test. Also, not all high efficiency lamps have low mercury content. Each lamp specification should be written to ensure low mercury levels for each lamp type. Another way to comply with this criterion is to select lamps based on the mercury content index. This number shows how much mercury is in a particular bulb in relation to the amount of light the bulb produces over its life. This number is specific for each manufacturer and model number. The aim is to use bulbs with the lowest level of mercury per lumen hour possible. For compliance with this criterion, all individual lamps or the total average of all lamps on the project should have mercury content of 90 picograms per lumen hour or less. For Stage I review, the lighting designer or electrical engineer should put together a list of all lamps specified on the project. Either each lamp must have a mercury content less than that listed above, 90 picograms per lumen hour or less, or the weighted average of all lamps should be less than or equal to 90 picograms per lumen hour. 34

36 Up to 2 points are also available for using certain controls on the exterior lighting. For Stage I review, provide electrical exterior/site lighting plans and specifications for time switch/photo sensor used. 35

37 Has the building s energy efficiency been increased through the use of one or more of the energy efficient equipment types listed here. This criterion applies to plug in equipment and fixed building equipment. For plug in equipment, preference should be given to ENERGY STAR and FEMP designated energy efficient equipment. Any equipment addressed for energy efficiency elsewhere in Green Globes for New Construction is ineligible for points under this criterion. Process energy, often referred to as plug loads, can be a significant contributor to a building s overall energy use. Projects should look to install ENERGY STAR appliances. Additionally, this criterion can be used for any other HVAC or lighting energy efficiency measure that has not already been covered by Green Globes criteria. 36

38 37

39 This section is worth up to 17 points, spread out over 5 criteria. This first criteria provides up to 7 points depending on what percent of the floor area, occupied for critical visual tasks, achieves a minimum daylight factor (DF) of 2 (excluding all direct sunlight penetration). Daylight factor means the ratio of internal light level to external light level. Levels between 2 and 5 indicate adequate daylighting and possibly the need for artificial lighting for part of the time. Levels greater than 5 indicate a well daylighted area, but glare and solar gain may cause problems. Consult the Whole Building Design Guide for recommended DF for various types of spaces. The assessor may request percentages and calculations for occupied areas with daylight illumination levels as well as lighting plans. 38

40 Here, Green Globes is concerned with what percentage of task areas were designed to have views to the exterior or atria within 25 ft. (7.6 m) from a window. The percentage is based on the number of task areas that have a view to the building exterior over the total number of task areas in the building. Providing exterior views to occupants enhances their wellbeing and work place comfort. Projects should utilize glazing on interior partitions to allow for the maximum number of regularly occupied spaces to have a direct line of sight to the outdoors or an atrium. Green Globes further specifies that the maximum distance from the occupant to the view shall be 25 feet. The assessor may request percentages and calculations for view to building exterior or atria. 39

41 This third criteria within daylighting gives up to one point for putting shading devices on all southern, western, and eastern exposures 40

42 And here Green Globes is looking for shading devices to eliminate direct sunlight from reaching task areas. The assessor may request: percentages and calculations for primary occupied spaces with IESNA recommended task lighting levels; specifications for solar shading devices and luminaries; and lighting plans. 41

43 And this last criteria within the daylighting section is looking for photo sensors in daylighted areas to maintain consistent lighting levels throughout the day using both daylighting and artificial lighting. The number of points awarded is based on the % of spaces so controlled. This applies to areas with a Daylight Factor of at least 2. 42

44 This first criteria within the Lighting Design section asks if primary occupied spaces have the prescribed lighting levels for the types of tasks anticipated in the various building spaces. Prescribed lighting levels are found in the most recent IESNA Lighting Handbook and in Tables A (IESNA Illuminance Categories) and B (IESNA Location/Task Categories). Lighting levels should take into account special needs and circumstances. The lighting design for the project should take into account a number of factors including: IESNA recommended light levels Owner s Project Requirements for light levels (see Pre Commissioning) Applicable energy code s maximum lighting power density Lighting designers and electrical engineers should also keep in mind that the lighting design also needs to meet energy code lighting power density watts per square foot values. With the advances within the lighting industry, designing a lighting system that meets both the energy codes and recommended illuminance values can be achieved. Illuminance level verification can be sent in Stage I review via calculations and/or lighting plans showing illuminance values or during Stage II handheld measurements can be recorded and presented to the Assessor for verification. If any areas have special circumstances, a narrative should be provided during Stage I review. 43

45 The assessor may also request percentages and calculations for primary occupied spaces with IESNA recommended task lighting levels (IES HB 10) as well as lighting plans. 43

46 In this criteria, a maximum limit has been set on certain luminaire ratios. For Stage II review, point by point computer calculations can be provided to accurately predict the illuminance levels for the project s specific parameters. Alternatively, handheld readings can be taken from a controlled mock up of a typical project space. These readings should be properly documented and submitted to the Assessor for review. 44

47 For this last criteria within the Lighting Design section, Green Globes is looking for a design showing that where there is direct lighting, the average luminance of the luminaire does not exceed the values above for given luminaire angles. Mark N/A if spaces are designed such that source/task eye geometry does not require IESNA Standard VDT compliant luminaires. For Stage I review, photometric data and/or product submittals for all interior luminaires should be provided showing luminance and luminaire angles. Glare levels will also be spot checked during the Stage II review. The assessor may also request percentages and calculations for primary occupied spaces with IESNA recommended task lighting levels; percentages and calculations for occupied areas with daylight illumination levels; and lighting plans. 45

48 This last criteria covers the noise associated with lighting equipment by covering: Low noise ballasts are installed in quiet areas and all other areas where speech intelligibility is important, and Noise from light fixtures and other electrical fixtures that do not exceed values indicated in ANSI/ASA S /Part 1 46

49 Here we see just a few of the resources available other than this training series. 47

50 So, what did we learn today? ============================================= Three basic points: 1. Green Globes, like LEED, is a sustainability system, where points are earned towards various levels of certification 2. Green Globes has placed less emphasis on the need for prerequisites, and 3. Lighting plays a significant role within the Green Globes system 48

51 Any questions. 49

We see that the BD+C category is made up of two kinds of construction: New Construction, and Core and Shell

We see that the BD+C category is made up of two kinds of construction: New Construction, and Core and Shell We see that the BD+C category is made up of two kinds of construction: New Construction, and Core and Shell And while applicable to almost any building type, it has specific requirements for 6 types of

More information

IDA-Criteria for Community-Friendly Outdoor Sports Lighting v1.0

IDA-Criteria for Community-Friendly Outdoor Sports Lighting v1.0 IDA-Criteria for Community-Friendly Outdoor Sports Lighting v1.0 1. Compliance with all applicable Codes and Standards (e.g. Underwriter Laboratories, CEC, National Building Codes with Local Amendments)

More information

Light Pollution Reduction

Light Pollution Reduction [STRATEGY] BRIEF DESCRIPTION Light pollution reduction is minimizing light trespass from the building and site and reducing sky-glow and glare. It increases night sky access, improves nighttime visibility,

More information

MANDATORY MEASURES OUTDOOR LIGHTING CONTROLS. (Reference: Sub-Chapter 4, Section 130.2)

MANDATORY MEASURES OUTDOOR LIGHTING CONTROLS. (Reference: Sub-Chapter 4, Section 130.2) MANDATORY MEASURES CONTROLS (Reference: Sub-Chapter 4, Section 130.2) BACKLIGHT, UPLIGHT, AND GLARE (BUG) RATINGS The BUG system is used to evaluate luminaire performance in relation to lighting trespass,

More information

OUT OF THE DARKNESS, INTO THE LIGHTING

OUT OF THE DARKNESS, INTO THE LIGHTING OUT OF THE DARKNESS, INTO THE LIGHTING Commissioning Lighting Systems in the Predesign & Design Phase James Donson P.E. LC Senior Engineer, kw Engineering 21 st National Conference on Building Commissioning

More information

MANDATORY MEASURES OUTDOOR LIGHTING CONTROLS. (Reference: Sub-Chapter 4, Section 130.2)

MANDATORY MEASURES OUTDOOR LIGHTING CONTROLS. (Reference: Sub-Chapter 4, Section 130.2) MANDATORY MEASURES CONTROLS (Reference: Sub-Chapter 4, Section 130.2) PARKING GARAGES Parking garages are considered interior nonresidential spaces, except for the top level of a multi-tier garage. General

More information

INTERIORS GREEN GLOBES FOR SUSTAINABLE INTERIORS. Green Globes for SUSTAINABLE GREEN GLOBES TECHNICAL REFERENCE MANUAL

INTERIORS GREEN GLOBES FOR SUSTAINABLE INTERIORS. Green Globes for SUSTAINABLE GREEN GLOBES TECHNICAL REFERENCE MANUAL GREEN GLOBES TECHNICAL REFERENCE MANUAL Green Globes for SUSTAINABLE SI INTERIORS GREEN GLOBES FOR SUSTAINABLE INTERIORS Technical Reference Manual Version 1.1 March 4th, 2016 2016 2016 Green Building

More information

Light Control and LEED

Light Control and LEED Light Control and LEED How light control helps achieve LEED certification in new construction and major renovations of commercial buildings AIA Program Number LCAL10 1.0 Learning Unit HSW/SD Approved by

More information

MANDATORY MEASURES OUTDOOR LIGHTING CONTROLS. (Reference: Sub-Chapter 4, Section 130.2)

MANDATORY MEASURES OUTDOOR LIGHTING CONTROLS. (Reference: Sub-Chapter 4, Section 130.2) MANDATORY MEASURES CONTROLS (Reference: Sub-Chapter 4, Section 130.2) Additions and Alterations Over 50% replaced Mandatory Controls 130.0, 130.2, 130.4 + Prescriptive Requirements LPD allowances of 140.7

More information

MANDATORY MEASURES OUTDOOR LIGHTING CONTROLS. (Reference: Sub-Chapter 4, Section 130.2)

MANDATORY MEASURES OUTDOOR LIGHTING CONTROLS. (Reference: Sub-Chapter 4, Section 130.2) MANDATORY MEASURES CONTROLS (Reference: Sub-Chapter 4, Section 130.2) Additions and Alterations Over 50% replaced Mandatory Controls 130.0, 130.2, 130.4 + Prescriptive Requirements LPD allowances of 140.7

More information

Implementing Lighting Management Technologies and Practices to Drive Building Efficiency. NEMA Enlighten America 2011

Implementing Lighting Management Technologies and Practices to Drive Building Efficiency. NEMA Enlighten America 2011 Implementing Lighting Management Technologies and Practices to Drive Building Efficiency NEMA Enlighten America 2011 Learning Objectives 1. Understand the latest lighting control technologies 2. Learn

More information

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations LEEDv4 Guideline February 1, 2017 Tony Sparks David Ritchey Stuart Ingham Karen Alarid Kris Callori Noreen Richards

More information

optimize daylighting Opportunities

optimize daylighting Opportunities optimize daylighting Opportunities DESIGN STRATEGIES DESIGN STRATEGIES NATURAL LIGHTING FOR ENERGY EFFICIENCY DAYLIGHTING Using indirect natural light to illuminate indoor spaces as an alternative to electric

More information

CONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability

CONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability 01352 Sustainable Design Requirements This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications

More information

GARFIELD COUNTY, COLORADO

GARFIELD COUNTY, COLORADO LIGHTING PLAN RIVER EDGE COLORADO GARFIELD COUNTY, COLORADO O W N E R / A P P L I C A N T : C A R B O N D A L E I N V E S T M E N T S, L L C 7 9 9 9 H W Y 8 2 C A R B O N D A L E C O 8 1 6 2 3 970-456-

More information

Prerequisite. prerequisite.

Prerequisite. prerequisite. LEED v4 for Building Operations and Maintenance Summary of changes from LEED 2009 LOCATION AND TRANSPORTATION SUSTAINABLE SITES Alternative Transportation Site Management Policy LEED Certified Design and

More information

Alpen Windows - LEED Impact Analysis

Alpen Windows - LEED Impact Analysis ALPEN WINDOWS MATERIALS: Energy Efficient Windows Alpen Windows - LEED Impact Analysis SECTION I. PRODUCT IDENTIFICATION Product Name: Alpen Windows Manufacturer: Alpen High Performance Products 6268 Monarch

More information

How to Interpret this Report

How to Interpret this Report How to Interpret this Report Purpose The Leadership in Energy and Environmental Design (LEED) Rating System was designed by the US Green Building Council to encourage and facilitate the development of

More information

Rhode Island Commercial Codes FAQs

Rhode Island Commercial Codes FAQs Rhode Island Commercial Codes FAQs When does the new code go into effect? The new suite of building codes (including the new state energy conservation code, SBC-8) was adopted on July 1, 2013. A brief

More information

Introducing a major update for New Construction. Sharene Rekow VP of Business Development Kevin Stover Technical Advisor

Introducing a major update for New Construction. Sharene Rekow VP of Business Development Kevin Stover Technical Advisor ADEQ Headquarters, North Little Rock, Arkansas Introducing a major update for New Construction Sharene Rekow VP of Business Development Kevin Stover Technical Advisor Agenda The Green Building Initiative

More information

Lighting Simulation - An Effective Approach for Energy Efficiency

Lighting Simulation - An Effective Approach for Energy Efficiency Lighting Simulation - An Effective Approach for Energy Efficiency Archit Saxena, Manvendera Singh Chandel, Pushpendra Chaudhary Demand Side Management Consultant, Energy Efficiency Services Limited, Noida,

More information

MAKING DAYLIGHTING WORK IN SCHOOLS

MAKING DAYLIGHTING WORK IN SCHOOLS MAKING DAYLIGHTING WORK IN SCHOOLS PRESENTERS: MELANIE ROSS AND ALI SYED SEPTEMBER 25, 2015 OUTLINE WHAT IS DAYLIGHTING SCHOOL LIGHTING LEVELS AND TYPICAL ENERGY USE DAYLIGHTING DESIGN PARAMETERS IMPACTS

More information

Fifteen Year Plan for Energy Efficiency and Conservation Projects

Fifteen Year Plan for Energy Efficiency and Conservation Projects Fifteen Year Plan for Energy Efficiency and Conservation Projects Presented to the Board of Trustees of the Northeastern Ohio Universities Colleges of Medicine and Pharmacy, December, 2008, in accordance

More information

Title 24: Where We're Headed with the 2013 Standards. Featuring: Martyn C. Dodd EnergySoft, LLC

Title 24: Where We're Headed with the 2013 Standards. Featuring: Martyn C. Dodd EnergySoft, LLC Title 24: Where We're Headed with the 2013 Standards Featuring: Martyn C. Dodd EnergySoft, LLC www.energysoft.com Overall Changes in Scope and Application Welcome Overall Changes in Scope and Application

More information

Green Globes SI Final CD Review CSU Center for the Arts Fort Collins, CO

Green Globes SI Final CD Review CSU Center for the Arts Fort Collins, CO 2016 Green Globes SI Final CD Review CSU Center for the Arts Fort Collins, CO Stage I Assessment Ron Lincoln, AIA, Green Globes Assessor, LEED AP A3C Collaborative Architecture 3/8/2016 March 8, 2016 Helene

More information

General Lighting Recommendations

General Lighting Recommendations General Lighting Recommendations DESIGN GUIDELINES FOR ENERGY EFFICIENT LIGHTING SYSTEMS According to the US Department of Energy, 51 percent of the energy used in commercial buildings is consumed by lighting

More information

Draft April 10, Outdoor Lighting Regulations. Purpose and Intent

Draft April 10, Outdoor Lighting Regulations. Purpose and Intent 142.0740 Outdoor Lighting Regulations Purpose and Intent (1) Outdoor lighting fixtures shall be installed in a manner that minimizes negative impacts from light pollution including light trespass, glare,

More information

How LEED v4 Impacts Energy Professionals and Mirrors Broader Sustainability Trends. Dan LeBlanc Senior Sustainability Manager

How LEED v4 Impacts Energy Professionals and Mirrors Broader Sustainability Trends. Dan LeBlanc Senior Sustainability Manager How LEED v4 Impacts Energy Professionals and Mirrors Broader Sustainability Trends Dan LeBlanc Senior Sustainability Manager dleblanc@yrgxyz.com LEED CERTIFICATION TRENDS MARKET SECTOR ADAPTATIONS Data

More information

Lighting for Now and for the Future

Lighting for Now and for the Future Lighting for Now and for the Future Lighting Today s Office Environment Presented by Jeffrey Schwartz, LC, IES Manager Lighting Specialist ICF International Today s Topics The Why = Code, Standards, and

More information

HPBS [ HIGH PERFORMANCE BUILDING STANDARD]

HPBS [ HIGH PERFORMANCE BUILDING STANDARD] HPBS [ HIGH PERFORMANCE BUILDING STANDARD] STATE OF MONTANA HIGH PERFORMANCE BUILDING STANDARDS MINIMUM REQUIREMENTS FOR ALL PROJECTS UNDER 17-7-201, MCA PART 2 1.1 DESIGN AND DOCUMENTATION A. Incorporate

More information

Energy Code Compliance:

Energy Code Compliance: Energy Code Compliance: Wood-Frame Buildings and the IECC Presented 4 March 2015 by Andrew Klein, P.E. Disclaimer: This presentation was developed by a third party and is not funded by WoodWorks or the

More information

POLICY TRAILS LIGHTING

POLICY TRAILS LIGHTING POLICY TRAILS LIGHTING Policy C7002 Adopted by Council: 2017.04.10 Administrative Responsibility: Planning and Development Council Resolution #: COU17-68 Last Review Date: Modified by Resolution #: Next

More information

LEED BD+C Integrative Process. Lori A. Brown, LEED AP BD+C Power Jam Study! Lorisweb.com 1

LEED BD+C Integrative Process. Lori A. Brown, LEED AP BD+C Power Jam Study! Lorisweb.com 1 LEED BD+C Integrative Process Lori A. Brown, LEED AP BD+C Power Jam Study! Lorisweb.com 1 IP Prerequisite Integrative Project Planning and Design HC Intent Maximize opportunities for integrated, cost-effective

More information

Green Globes for New Construction Course Number: GBIGGNCFeb16

Green Globes for New Construction Course Number: GBIGGNCFeb16 Columbia Square, Portland OR The Green Building Initiative AIA Provider Number: G478 Green Globes for New Construction Course Number: GBIGGNCFeb16 Date Recorded: 4/26/16 Presenter: Dianne Elliott Kevin

More information

COMPLIANCE OVERVIEW. Module 2: Compliance Overview 4/6/2017 COMPLIANCE AND ENFORCEMENT

COMPLIANCE OVERVIEW. Module 2: Compliance Overview 4/6/2017 COMPLIANCE AND ENFORCEMENT COMPLIANCE OVERVIEW 1. Compliance and enforcement 2. Permitting and certification 3. Compliance approaches 4. Required forms 5. New additions and major changes COMPLIANCE AND ENFORCEMENT Primary responsibility

More information

Light Control Solutions & LEED

Light Control Solutions & LEED E. info@ Light Control Solutions & LEED Potential Contribution LEED CANADA-NC & CS 2009 Mission CRISTAL CONTROLS manufactures energy management systems, low voltage lighting control systems, temperature

More information

and LEED Energy and Atmosphere Credits Jean Ascoli, LEED AP BD+C Architect, Energy Specialist

and LEED Energy and Atmosphere Credits Jean Ascoli, LEED AP BD+C Architect, Energy Specialist ASHRAE University of Illinois Student Chapter April 20, 2011 Building Energy Efficiency and LEED Energy and Atmosphere Credits Jean Ascoli, LEED AP BD+C Architect, Energy Specialist Building Research Council,

More information

A. General Design and Construction Requirements

A. General Design and Construction Requirements A. General Design and Construction Requirements 1. Introduction This portion of the Facility Standards includes general design and construction requirements for use by the Consultant in the course of a

More information

Lighting controls, coupled with

Lighting controls, coupled with Lighting controls: Best practices begins with a strategy ASHRAE Standard 90.1 requires lighting professionals to include power allowances, daylighting controls, functional testing, and submittals in their

More information

Making Daylighting Work Applying Cx to Improve the Design and Implementation Process

Making Daylighting Work Applying Cx to Improve the Design and Implementation Process Making Daylighting Work Applying Cx to Improve the Design and Implementation Process the weidt group collaboration analysis research Jason Steinbock jasons@twgi.com The Deringer Group Joseph Deringer,

More information

GEW1-14 Chapter 6, , 302.1, 903.1, 904.3, , , , , , , , A106

GEW1-14 Chapter 6, , 302.1, 903.1, 904.3, , , , , , , , A106 GEW1-14 Chapter 6, 302.1.1, 302.1, 903.1, 904.3, 1007.3, 1007.3.1, 1007.3.2, 1007.3.3, 1007.3.3.1, 1007.3.3.2, 1007.3.3.3, A106 Proponent: Shaunna Mozingo, Colorado Code Consulting, LLC, representing Colorado

More information

LIGHTING TECHNICAL SHEET

LIGHTING TECHNICAL SHEET GENERAL INFORMATION LIGHTING TECHNICAL SHEET SMECO's Business Solutions program is designed to help commercial and industrial customers maximize energy efficiency and manage energy costs. With cost-saving

More information

ASHRAE/USGBC/IES Standard What Does It Mean for Commissioning Providers?

ASHRAE/USGBC/IES Standard What Does It Mean for Commissioning Providers? ASHRAE/USGBC/IES Standard 189.1-2009 What Does It Mean for Commissioning Providers? Kent W. Peterson, PE, FASHRAE, LEED AP P2S Engineering, Inc. kent.peterson@p2seng.com What is Standard 189.1? ANSI standard

More information

Photo courtesy of Green Building Initiative.

Photo courtesy of Green Building Initiative. Photo courtesy of Green Building Initiative. 34 www.professionalroofing.net AUGUST 2016 SUSTAINABLE by design THE GREEN GLOBES BUILDING CERTIFICATION SYSTEM GAINS MOMENTUM BY JASON WILEN, AIA, CDT, RRO

More information

LEED v4 Workshop April 9, Wade Bevier, FCSI, CCS, LEED-AP BD+C, SCIPa, USGBC

LEED v4 Workshop April 9, Wade Bevier, FCSI, CCS, LEED-AP BD+C, SCIPa, USGBC LEED v4 Workshop April 9, 2014 As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C, SCIPa, USGBC gwbevier@earthlink.net (919-741-0060) MANY SHADES OF GREEN Program Objectives Introduction to the Fundamentals

More information

Commercial Lighting Renovation Guide

Commercial Lighting Renovation Guide A GUIDE TO MAXIMIZE LIGHTING EFFICIENCY Commercial Lighting Renovation Guide How to confidently select your lighting contractor, select products and maximize lighting efficiency in your facility. Unless

More information

Decorative Division. GANA Decorative Glass LEED White Paper Page 1 of 23

Decorative Division. GANA Decorative Glass LEED White Paper Page 1 of 23 Decorative Division White Paper on the Relevance of Decorative Glass Products to the U. S. Green Building Council Leadership in Energy and Environmental Design Green Building Rating System LEED NC Version

More information

E3T Energy. Task/Vertical/Ambient Lighting. Emerging Technologies Showcase

E3T Energy. Task/Vertical/Ambient Lighting. Emerging Technologies Showcase 1 Task/Vertical/Ambient Lighting Showcase September 18, 2013 Presenters: Jerry Mix Finelite, Inc Kelly Cunningham California Lighting Technology Center Welcome. Today s webinar is being recorded and will

More information

Reminder Electric Lighting System Components

Reminder Electric Lighting System Components LUMINAIRES Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 Reminder Electric Lighting System Components Source lamp and luminaire Path space geometry and reflectances Receiver illuminated task

More information

Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1

Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1 Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1 Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam

More information

Title 24 Part 6 and Part 11 Building Code Triggers

Title 24 Part 6 and Part 11 Building Code Triggers Title 24 Part 6 and Part 11 Building Code Triggers Presented by: Moe Fakih Director, LEED AP, CCP, BPI Wayne Alldredge Assoc. Director, LEED AP, CBCP, CEM, CMVP Agenda Environmental Laws When is CALGreen

More information

Light levels should be appropriate for the task and per the following guide in Part 1 - General.

Light levels should be appropriate for the task and per the following guide in Part 1 - General. DIVISION 16 - ELECTRICAL Section 16510 - Lighting Design Introduction Lighting utilizes approximately 40% of the electrical energy consumed here at the university. In order to conserve the energy it is

More information

LiDe 3 Berlin October 8, 2015

LiDe 3 Berlin October 8, 2015 LiDe 3 Berlin October 8, 2015 Influence of lighting in green building certification Dr. Dorin BEU Technical University of Cluj-Napoca, Romania Why do we need environmental rating systems? Rating and certification

More information

BUILDING LIGHTING Modeling Requirements Appendix G. 1 Exceeding Standard ASHRAE Learning Institute

BUILDING LIGHTING Modeling Requirements Appendix G. 1 Exceeding Standard ASHRAE Learning Institute BUILDING LIGHTING Modeling Requirements 90.1-2007 Appendix G 1 Exceeding Standard 90.1-2007 2003-2008 ASHRAE Learning Institute Appendix G: Modeling Requirements Lighting - Proposed Design Lighting System

More information

Transitioning to LED Lighting Technology Helps Facilities Reduce Lighting Energy Consumption and Costs

Transitioning to LED Lighting Technology Helps Facilities Reduce Lighting Energy Consumption and Costs Transitioning to LED Lighting Technology Helps Facilities Reduce Lighting Energy Consumption and Costs Overview e Lighting Industry and its Benefits to Facility Managers Reduce costs by replacing existing

More information

m nlighting Compliance Documentation Page 1

m nlighting Compliance Documentation Page 1 m nlighting Compliance Documentation Page 1 Project Name: Lighting Sample renovation project (ASHRAE 90.1 2010) Project Address: 565 Sample St Date: Designer of Record: Email: Telephone: Contact Person:

More information

Daylight Harvesting in Tropic

Daylight Harvesting in Tropic Daylight Harvesting in Tropic Daylight space when done right is much nicer environment than electrically lit spaces. Efficacy lm/watt Daylight is Cool & Free 280 Luminous Efficacy 280 230 180 130 80 30

More information

2010 CA Higher Education Sustainability Conference

2010 CA Higher Education Sustainability Conference 2010 CA Higher Education Sustainability Conference Energy Efficiency Partnership Program Best Practice Awards Application Project Category 11 Rendering Used Courtesy of Cannon Design I. Contact Information

More information

Business Energy Rebates Application

Business Energy Rebates Application Business Energy Rebates Application Business Energy Rebates make it easy and affordable for you to select energy efficient products for your business. and mail-in rebates are available for energy efficient

More information

The Web Shop. AE 482 Submission 1. Eric Anderson Lighting/Electrical. AE Faculty Consultant Dr. Kevin Houser. 4 February 2011

The Web Shop. AE 482 Submission 1. Eric Anderson Lighting/Electrical. AE Faculty Consultant Dr. Kevin Houser. 4 February 2011 The Web Shop AE 482 Submission 1 Eric Anderson Lighting/Electrical AE Faculty Consultant Dr. Kevin Houser 4 February 2011 Files Located at P:\AE482 General Building Statistics: Work Space Open Plan Office

More information

Guidelines for Design and Construction of Energy Efficient County Facilities

Guidelines for Design and Construction of Energy Efficient County Facilities APPENDIX C - DAYLIGHTING The role of daylighting in the total energy balance and performance of a building is a significant one. The admission of useful daylight means that electrical lighting fixtures

More information

Allowance Table for: General:

Allowance Table for: General: Allowance Table for: Adopting Credits from LEED Canada for New Construction and Major Renovations (NC) 2009 and LEED Canada for Core and Shell Development (CS) 2009 for LEED Canada-NC v1.0 (with or without

More information

Retail Effects of ANSI/ASHRAE/IES Standard

Retail Effects of ANSI/ASHRAE/IES Standard Retail Effects of ANSI/ASHRAE/IES Standard 90.1-2016 Prepared by Dialectic Inc. INTRODUCTION Background ANSI/ASHRAE/IES 90.1-2016 Energy Standard for Buildings Except Low-Rise Residential Buildings replaces

More information

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST ENVELOPE REQUIREMENTS Project: Date: Instructions RECOMMENDED: List performance values, note exceptions that were applied, or provide other

More information

N/A. ENERGY STAR Data Verification Checklist. Circle Star Plaza. 1. Review of Whole Property Characteristics. Property & Contact Information

N/A. ENERGY STAR Data Verification Checklist. Circle Star Plaza. 1. Review of Whole Property Characteristics. Property & Contact Information ENERGY STAR Data Verification Checklist N/A ENERGY STAR Score 1 Circle Star Plaza Primary Function: Office Gross Floor Area (ft²): 207,896 Built: 2000 For Year Ending: 03/31/2014 Date Generated: 05/12/2014

More information

Jim Sinopoli, PE, RCDD, LEED AP Managing Principal Smart Buildings, LLC

Jim Sinopoli, PE, RCDD, LEED AP Managing Principal Smart Buildings, LLC Jim Sinopoli, PE, RCDD, LEED AP Managing Principal Smart Buildings, LLC LEED is an voluntary Rating System with Design Guidance The intent of ASHRAE 189.1 is to: Codify the minimum requirements of a high

More information

SAGEGLASS VARIABLE TINTED GLAZING INPUT SHEET FOR DIAL+ SOFTWARE

SAGEGLASS VARIABLE TINTED GLAZING INPUT SHEET FOR DIAL+ SOFTWARE SAGEGLASS VARIABLE TINTED GLAZING INPUT SHEET FOR DIAL+ SOFTWARE V1 dated 21/04/2017 The following procedure describes data input and handling for SageGlass in DIAL+ natural lighting and thermal dynamic

More information

LEED BD+C: NC, CS, S, R, DC, WDC, HOS, HC

LEED BD+C: NC, CS, S, R, DC, WDC, HOS, HC LEED Building Design and Construction Activity #6 Energy and Atmosphere (EA) Before completing this Activity Read: Reference Guide for Building Design and Construction v4 Pages 318-465 Note the following

More information

Commissioning Lighting Control Systems

Commissioning Lighting Control Systems AABC Commissioning Group AIA Provider Number 50111116 Commissioning Lighting Control Systems Course Number: CXENERGY1727 Jesse Felter, SSRCx Tom Divine, P.E., SSR April 27, 2017 Credit(s) earned on completion

More information

Green Globes NC Criteria Comparison to LEED 2009 and LEED v4

Green Globes NC Criteria Comparison to LEED 2009 and LEED v4 Comparison of the Criteria for the New Release of for New Construction ( ),, and (As of 02/02/15) Overview of and Certification Requirements Both versions of have prerequisites for certification, and certification

More information

White Paper on Outdoor Lighting Issues and Quality Lighting Applications

White Paper on Outdoor Lighting Issues and Quality Lighting Applications A NEMA Lighting Systems Division Document LSD 11-2010 White Paper on Outdoor Lighting Issues and Quality Lighting Applications Prepared by NEMA Lighting Systems Division National Electrical Manufacturers

More information

Newsletter. Siemens EngineeringAdvantage. Introduction. Issue In This Issue:

Newsletter. Siemens EngineeringAdvantage. Introduction. Issue In This Issue: Siemens EngineeringAdvantage Newsletter Issue 2 2018 Introduction Lighting control systems generally serve two purposes: (1) Occupant needs i.e., provide the right amount of light where and when it is

More information

2009 IECC Commercial Lighting Requirements

2009 IECC Commercial Lighting Requirements BUILDING ENERGY CODES UNIVERSITY 2009 IECC Commercial Lighting Requirements Ken Baker ken@kenergy.us PNNL-SA-66170 Learning(Objec-ves(( ( 1. List(2(exemp-ons(to(mee-ng(ligh-ng(and(power( requirements.(

More information

LEED Application Guide for Multiple Buildings and On-Campus Building Projects

LEED Application Guide for Multiple Buildings and On-Campus Building Projects LEED Application Guide for Multiple Buildings and On-Campus Building Projects For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Released October 31, 2011

More information

NATIONAL TECHNICAL UNIVERSITY OF ATHENS School of Electrical and Computer Engineering. Lighting Controls. Lambros T. Doulos.

NATIONAL TECHNICAL UNIVERSITY OF ATHENS School of Electrical and Computer Engineering. Lighting Controls. Lambros T. Doulos. NATIONAL TECHNICAL UNIVERSITY OF ATHENS School of Electrical and Computer Engineering Lighting Controls Lambros T. Doulos Energy management Electric lighting consumes a significant amount of energy. About

More information

IECC 2006 with Hawaii Amendments

IECC 2006 with Hawaii Amendments IECC 2006 with Hawaii Amendments COMMERCIAL PLAN REVIEW CHECKLIST ENVELOPE REQUIREMENTS Instructions This form is intended for use by energy code plan reviewers. Please see also a separate set of checklists

More information

B. Prismatic acrylic diffusers for fluorescent fixtures shall be A12 pattern and at least 1/8 thick. Do not use styrene lenses.

B. Prismatic acrylic diffusers for fluorescent fixtures shall be A12 pattern and at least 1/8 thick. Do not use styrene lenses. PART 1: GENERAL 1.01 Luminaires A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design for new construction and renovations.

More information

Obtaining LEED Points with Addressable Dimming Controls. A White Paper for Building Owners, Managers, and Engineers

Obtaining LEED Points with Addressable Dimming Controls. A White Paper for Building Owners, Managers, and Engineers Obtaining LEED Points with Addressable Dimming Controls A White Paper for Building Owners, Managers, and Engineers Obtaining LEED Points with Addressable Dimming Controls Contributors: Terry Mocherniak,

More information

INTUITIVE AND OBJECTIVE APPROACHES TO DAYLIGHTING A NEW ENGLAND ELEMENTARY SCHOOL Michael Rosenfeld 1

INTUITIVE AND OBJECTIVE APPROACHES TO DAYLIGHTING A NEW ENGLAND ELEMENTARY SCHOOL Michael Rosenfeld 1 Best2 - Daylighting a New England Elementary School - Session EE 7-3 INTUITIVE AND OBJECTIVE APPROACHES TO DAYLIGHTING A NEW ENGLAND ELEMENTARY SCHOOL Michael Rosenfeld 1 ABSTRACT The Town of Concord,

More information

PRESCRIPTIVE APPROACH. 1. Actual and Allowed LPD 2. Complete Building Method 3. Area Category Method 4. Tailored Method

PRESCRIPTIVE APPROACH. 1. Actual and Allowed LPD 2. Complete Building Method 3. Area Category Method 4. Tailored Method PRESCRIPTIVE APPROACH 1. Actual and Allowed LPD 2. Complete Building Method 3. Area Category Method 4. Tailored Method THE COMPLIANCE PROCESS There are two major steps to Title 24 compliance: 1. Meet all

More information

2016 LEED Equivalency Analysis for Stanford Campus

2016 LEED Equivalency Analysis for Stanford Campus 6 LEED Equivalency Analysis for Stanford Campus Analysis performed by: Moira Hafer, LEED AP O+M Office of Sustainability Department of Sustainability & Energy Management Stanford University Category Type

More information

IECC 2006 with Hawaii Amendments

IECC 2006 with Hawaii Amendments IECC 2006 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST ENVELOPE REQUIREMENTS Instructions RECOMMENDED: List performance values, note exceptions that were applied, or provide other notes to the reviewer.

More information

Energy Efficiency: Comparison between GREENSHIP and LEED

Energy Efficiency: Comparison between GREENSHIP and LEED Energy Efficiency: Comparison between GREENSHIP and LEED Baharuddin and Ramli Rahim Department of Architecture, Faculty of Engineering, Hasanuddin University, Makassar Indonesia Email address of corresponding

More information

Dayton Chapter February 9, Bob Thomson, P.E., LEED-AP, CDT

Dayton Chapter February 9, Bob Thomson, P.E., LEED-AP, CDT Dayton Chapter February 9, 2009 Bob Thomson, P.E., LEED-AP, CDT World Population is estimated to be 6,000,000,000 people U.S. Population is estimated to be 3,000,000 people U.S. makes up 5% of the world

More information

2015 WSEC: Electrical and Lighting Systems

2015 WSEC: Electrical and Lighting Systems 2015 WSEC: Electrical and Lighting Systems Presented by: Andrew Pultorak, LC, MIES Senior Energy Management Engineer, Puget Sound Energy January 19, 2017 Agenda Reading and Interpreting Code Section C406:

More information

NONRESIDENTIAL LIGHTING Key Changes to mandatory and prescriptive lighting requirements in California s 2016 Building Energy Efficiency Standards

NONRESIDENTIAL LIGHTING Key Changes to mandatory and prescriptive lighting requirements in California s 2016 Building Energy Efficiency Standards LIGHTING BEST PRACTICES WHAT S NEW IN THE 2016 CODE? NONRESIDENTIAL LIGHTING Key Changes to mandatory and prescriptive lighting requirements in California s 2016 Building Energy Efficiency Standards California's

More information

EFFICIENT LIGHTING DESIGN

EFFICIENT LIGHTING DESIGN EFFICIENT LIGHTING DESIGN PAUL LEVEILLE Buisiness Energy Innovation Conference GOALS Establish a fundamental understanding of LED lighting design and controls Terminology The math behind the savings LED

More information

LEED v4 LEED BD+C Credit-by-Credit Review

LEED v4 LEED BD+C Credit-by-Credit Review LEED v4 LEED BD+C Credit-by-Credit Review Location & Transportation Sustainable Sites Water Efficiency Energy & Atmosphere Materials & Resources Indoor Environmental Quality Innovation & Integrative Process

More information

The baseline building system for compliance with Senate Bill 668 is defined by Appendix G,

The baseline building system for compliance with Senate Bill 668 is defined by Appendix G, Project: North Carolina A&T State University New Student Health Center SCO #: 08-08109-01A 1.0 Heating, Ventilating and Air Conditioning (HVAC) Baseline Building Systems Senate Bill 668 Compliance The

More information

Light levels should be appropriate for the task and per the following guide in Part 1 - General.

Light levels should be appropriate for the task and per the following guide in Part 1 - General. DIVISION 16 - ELECTRICAL Section 16510 - Lighting Design Introduction Lighting utilizes approximately 40% of the electrical energy consumed here at the university. In order to conserve the energy it is

More information

[DLCX] UNIQUENESS OF COMMISSIONING DAYLIGHTING: WHOLE BUILDING INTEGRATION REQUIRED

[DLCX] UNIQUENESS OF COMMISSIONING DAYLIGHTING: WHOLE BUILDING INTEGRATION REQUIRED [DLCX] UNIQUENESS OF COMMISSIONING DAYLIGHTING: WHOLE BUILDING INTEGRATION REQUIRED Joseph Deringer, AIA, LEED AP Building Science Analytics LLC 21 st National Conference on Building Commissioning AIA

More information

Lighting Energy Management

Lighting Energy Management SBS5312 Lighting Technology http://ibse.hk/sbs5312/ Lighting Energy Management Ir. Dr. Sam C. M. Hui Faculty of Science and Technology E-mail: cmhui@vtc.edu.hk Sep 2017 Content Lighting Energy Use Energy

More information

A Cover. lighting ENERGY EFFICIENT

A Cover. lighting ENERGY EFFICIENT A Cover lighting ENERGY EFFICIENT EQUIPMENT toolkit 1 CONTENTS & Summary 2 Introduction 3 equipment & processes 3 Manage load 4 Manage load CONT. 5 upgrade equipment 5 Use daylight 6 EFFICIENT light 7

More information

PacifiCorp s Planned Changes to wattsmart Business in Idaho May 2016

PacifiCorp s Planned Changes to wattsmart Business in Idaho May 2016 PacifiCorp s Planned Changes to wattsmart Business in Idaho May 2016 PacifiCorp is planning modifications to the wattsmart Business energy efficiency incentive program, which is offered through Schedule

More information

Review. Setting the Stage

Review. Setting the Stage ICC Green Code Public Version 1.0 Spring 2009: ICC Board approval Completed negotiations with Cooperating Sponsors (AIA & ASTM) Organized cross functional & joint development team Review Setting the Stage

More information

What s New in LEED O+M v4: Get Ready for the Future! A Presentation by The Sustainability Experts Leonardo Academy At NFMT Las Vegas

What s New in LEED O+M v4: Get Ready for the Future! A Presentation by The Sustainability Experts Leonardo Academy At NFMT Las Vegas What s New in LEED O+M v4: Get Ready for the Future! A Presentation by The Sustainability Experts Leonardo Academy At NFMT Las Vegas Today s Speakers Michael Arny, P.E., LEED AP President & Director of

More information

Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort

Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort Please add relevant logo here Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort Presented by: Peter J. Arsenault, FAIA, NCARB, LEED-AP Disclaimer: This presentation was developed by

More information

Duke Sustainability Sands Parking Garage

Duke Sustainability Sands Parking Garage Duke Sustainability Sands Parking Garage Building Information Architect: Walker Parking Consultants (with design teams from Ratio Architects and Stewart Engineering) Construction: Bovis Lend Lease Purpose:

More information

LEED Application Guide for Multiple Buildings and On Campus Building Projects

LEED Application Guide for Multiple Buildings and On Campus Building Projects LEED Application Guide for Multiple Buildings and On Campus Building Projects For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Released October 31, 2011

More information

Sustainability and Energy Use

Sustainability and Energy Use AIA Provider #: 40108008 Sustainability and Energy Use AIA Course #: SUS101 Presented by: Jason Borowski, PE LEED AP BD+C, Vice President jborowski@centuryeng.com 1 Sustainability and Energy Use Credit(s)

More information