To be confirmed. Extent of any underbuild Gas regime

Size: px
Start display at page:

Download "To be confirmed. Extent of any underbuild Gas regime"

Transcription

1 To be confirmed. Extent of any underbuild Gas regime S.O.P Provide "hyrib" at beam / beam intersections to first pour (Typical) S.O.P Gas membrane Gas Venting TBC TBC THIS DRAWING IS COPYRIGHT AND MUST NOT BE REPRODUCED Insulslab SFRC Foundation Installation WHOLLY OR IN PART WITHOUT PRIOR PERMISSION. Methodology GHW CONSULTING ENGINEERS LTD. / INSUL SIG Described below is a method of construction to utilise the INSUL form of waffle slab foundation in conditions General Notes. where the foundation is supported at shallow depth directly by. Insulslab foundation to be placed on minimum 50mm the underlying soils. For piled foundations using INSUL Type 2 granular material to be compacted in accordance with similar methods apply. the specification. Whilst accepting that individual interpretation and innovation All soft spots to be excavated to competent formation and may well give rise to alternative methods to suit site specific back filled with compacted Type 2 granular material. conditions, it is felt that what is described, will clearly and 2. All works to be undertaken in accordance with the accurately achieve the end product. recommendations contained within the geotechnical report Severely sloping sites will introduce individual conditions to and NHBC Standards. Where trees are present, ground be addressed which can be readily accounted for by referring conditions may require the placing of an additional hardcore to Insulslab technical, however for the purposes of this bed under the whole area to overcome the influence of exercise we have assumed a relatively level site. trees/shrinkable soils in accordance with the NHBC Standards Chapter 4.2 and Excavate to reduce general level to suit site layout 3. For depths of sub-base required beneath edge beams refer drawings, by others. to sections. 4. The Insulslab pods have a load bearing requirement and 2. Set the plot out as normal, ensuring that you have a are protected by a patent. Online technical data and ordering completed 'CONSTRUCTION ISSUE' drawing showing the information can be found on the website Insulslab foundation layout and the standard details drawing. 5. Slab to be cured under a spray application of curing / 3. Excavate to reduce general level to a depth of 600 mm sealing solution, Permaban Pro-Seal or similar. below top of slab level over the pod area and 675mm under 6. Where ground levels have been adjusted to suit site set-out edge beams and party walls. Sub-base should be prepared requirements, it has been assumed that infill / regrade using methods 2, 3 or 4 from table 6/4 of the Specification of material has been suitabilty engineered and consolidated in Highway Works Volume Series 600 Earthworks and in order to achieve a minimum ground bearing capacity of accordance with NHBC recommendations. Additional fill may 50kN/m 2 also be necessary to ensure that all topsoil, degradable 7. For all general details and sections see drawing No.. material and soft spots are removed. 8. For on site setting out of units, orientation / handing and co-ordination, see Architects detail drawings and relevant site 4. Position, excavate & install all services and drainage setting out drawings by others. entries. The accuracy of this operation is paramount, as 9. For all finished ground levels and slab levels, see correction of inaccuracies is very difficult. Architects / Set-out drawings by others. 0. For setting out of all services, drainage and utilities see 5. Place granular hardcore and compact to a level 550mm Architects and specialists detail drawings. below top of slab level. Compaction with a Wacker plate or Specification for Concrete and Fibres. trench roller to the hardcore in the trenches or a. The concrete mix shall follow the recommendations as larger twin drummed roller to the whole of the formation area noted in the ArcelorMittal Sheffield Ltd. BBA Certification 2 / is acceptable. Tolerances on top of the finished sub-base 4894 product sheet 2 "ArcelorMittal - Insulslab foundation should be within +0/-20 mm with an average of -5 mm. system for housing applications using SFRC" page 3, Table Concrete Specifications along with the following mix design 6. Install thick insulation under all edge / internal beams. guide lines. These are to be considered together and neither is to be considered complete without the other. 7. Set up and install the first stage edge shutter on top of the 2. Concrete mix design shall be based on the use of 20mm horizontal edge insulation to the perimeter of the plot aggregate. Other aggregate sizes or blends may be used on further review by ArcelorMittal in conjunction with the monolithic pour) readymix supplier and only formal written confirmation from ArcelorMittal. The proportions will depend on the gradation of 8. Fill in between the Edge and internal insulation with the local materials. granular hardcore and compact. 3. The concrete grade to be a C30 / 37 - C35 with a maximum 9. Install a minimum 200g dpm, or gas membrane as water cement ratio of 0.55 using super-plasticiser. All required by the site investigation, to whole area extending admixtures used should be from the same manufacturer and 300 to 500mm beyond the edge of the shutter. used as per manufacturers instructions. 4. Permitted cement type shall be Portland cement or blends 0. Starting from one corner of un-cut pods, the pods must be of up to 20% replacement using GGBS or PFA. This placed to the prescribed layout, completing all full pods corresponds to the following cement types to BS EN 97-: before installing the cut-pods as required. Widened internal CEM I, CEM II/A-S OR CEM II/A-V. Minimum cement quantity beams should be separate by spacers in order to minimise risk of movement. 5. The slump shall be between 80 and 230mm (S4 type EN206 / BS8500) at the time of delivery. The addition of. Hyrib is to be installed and fixed in position across face of water on site is prohibited, except where the additional water internal ribs/beams in order to contain initial pour to edge is allowable water remaining from the original batch target. beam. Any water added to the concrete shall be recorded on the delivery ticket. 2. Timber bracing is required from the top of the pod to the 6. The fines content shall be aproximately 50% by weight of shutter in corner locations and every perimeter pod during the total aggregate content. Total fines content shall be concreting to ensure no lateral movement occurs. These are 450kg/m 3 fines graded at or below 200 Please refer to the removed when the concrete reaches the top of the pods. required sieve curve analysis for optimum aggregate Reinforcement to be cast into the first stage pour to provide a gradation to be used when investigating the suitability of the shear connection between the two pours. given mix. 3. The concrete is to be placed to the outer toe section first NOTE: of the two stage pour, prior to installing the remaining LAYOUT SHOWN IS INDICATIVE AND SUBJECT concrete to the full height in the usual manner. (The concrete can either be pumped or placed directly) TO CONFIRMATION AND CO-ORDINATION WITH ARCHITECTS DRAWINGS AND SPECIALISTS 4. Once set, the lower shutter can be stripped and installed LINE LOADS to form the second shutter. The foundation is then ready for the internal ribs, slab, beams and remaining external beam to be completed. Sacrificial bar or blocks may be introduced to support the second stage pour shutter. DM Preliminary - Costing S.O.P S.O.P 5. When the placement is completed, level carefully and finish by bull float or skip float in order to improve flatness and to hide visible fibres under the superficial mortar. If required the slab may be finished by power, bull or skip floated. 6. Apply a spray application of curing & sealing membrane such as Permaban Permaseal or similar approved. REV BY AMENDMENTS PRELIMINARY DATE 7. Strike the shutter and place aside for re-use. F o u n d a t i o n P l a n (Housetype Example) S.O.P Denotes 'Setting Out Point' of Pod Units 8. The DPM is then lapped up the outside vertical face of the toe. The horizontal and inside vertical face of the toe is painted with two coats of RIW LAC or similar. 9. The vertical insulation is then placed against the outside face of the toe and backfilled against. 20. The contractor shall record and retain on site, all concrete mix delivery tickets for onward submission to the statutory body for their approval. NOTE: Where ground levels have been raised / adjusted, it is assumed that a suitable engineered material has been laid and consolidated in order to achieve a minimum ground bearing pressure 50kN/m 2 Hatched areas denotes pour one of two stage pour - see plan & sections Hatched areas denote insulslab pods cut on site to suit. THIS DRAWING IS FOR COSTING PURPOSES ONLY AND MUST NOT BE USED FOR CONSTRUCTION New Development Insulslab Foundation Layout Example Housetype DM A - :25 A3 - :50 AW Nov AW FOR CONSTRUCTION DETAIL INFORMATION CONTACT GHW CONSULTING ENGINEERS Ltd. INS

2 To be confirmed. Extent of any underbuild Gas regime S.O.P Provide "hyrib" at beam / beam intersections to first pour (Typical) S.O.P Gas membrane Gas Venting TBC TBC THIS DRAWING IS COPYRIGHT AND MUST NOT BE REPRODUCED Insulslab SFRC Foundation Installation WHOLLY OR IN PART WITHOUT PRIOR PERMISSION. Methodology GHW CONSULTING ENGINEERS LTD. / INSUL SIG Described below is a method of construction to utilise the INSUL form of waffle slab foundation in conditions General Notes. where the foundation is supported at shallow depth directly by. Insulslab foundation to be placed on minimum 50mm the underlying soils. For piled foundations using INSUL Type 2 granular material to be compacted in accordance with similar methods apply. the specification. Whilst accepting that individual interpretation and innovation All soft spots to be excavated to competent formation and may well give rise to alternative methods to suit site specific back filled with compacted Type 2 granular material. conditions, it is felt that what is described, will clearly and 2. All works to be undertaken in accordance with the accurately achieve the end product. recommendations contained within the geotechnical report Severely sloping sites will introduce individual conditions to and NHBC Standards. Where trees are present, ground be addressed which can be readily accounted for by referring conditions may require the placing of an additional hardcore to Insulslab technical, however for the purposes of this bed under the whole area to overcome the influence of exercise we have assumed a relatively level site. trees/shrinkable soils in accordance with the NHBC Standards Chapter 4.2 and Excavate to reduce general level to suit site layout 3. For depths of sub-base required beneath edge beams refer drawings, by others. to sections. 4. The Insulslab pods have a load bearing requirement and 2. Set the plot out as normal, ensuring that you have a are protected by a patent. Online technical data and ordering completed 'CONSTRUCTION ISSUE' drawing showing the information can be found on the website Insulslab foundation layout and the standard details drawing. 5. Slab to be cured under a spray application of curing / 3. Excavate to reduce general level to a depth of 600 mm sealing solution, Permaban Pro-Seal or similar. below top of slab level over the pod area and 675mm under 6. Where ground levels have been adjusted to suit site set-out edge beams and party walls. Sub-base should be prepared requirements, it has been assumed that infill / regrade using methods 2, 3 or 4 from table 6/4 of the Specification of material has been suitabilty engineered and consolidated in Highway Works Volume Series 600 Earthworks and in order to achieve a minimum ground bearing capacity of accordance with NHBC recommendations. Additional fill may 50kN/m 2 also be necessary to ensure that all topsoil, degradable 7. For all general details and sections see drawing No.. material and soft spots are removed. 8. For on site setting out of units, orientation / handing and co-ordination, see Architects detail drawings and relevant site 4. Position, excavate & install all services and drainage setting out drawings by others. entries. The accuracy of this operation is paramount, as 9. For all finished ground levels and slab levels, see correction of inaccuracies is very difficult. Architects / Set-out drawings by others. 0. For setting out of all services, drainage and utilities see 5. Place granular hardcore and compact to a level 550mm Architects and specialists detail drawings. below top of slab level. Compaction with a Wacker plate or Specification for Concrete and Fibres. trench roller to the hardcore in the trenches or a. The concrete mix shall follow the recommendations as larger twin drummed roller to the whole of the formation area noted in the ArcelorMittal Sheffield Ltd. BBA Certification 2 / is acceptable. Tolerances on top of the finished sub-base 4894 product sheet 2 "ArcelorMittal - Insulslab foundation should be within +0/-20 mm with an average of -5 mm. system for housing applications using SFRC" page 3, Table Concrete Specifications along with the following mix design 6. Install thick insulation under all edge / internal beams. guide lines. These are to be considered together and neither is to be considered complete without the other. 7. Set up and install the first stage edge shutter on top of the 2. Concrete mix design shall be based on the use of 20mm horizontal edge insulation to the perimeter of the plot aggregate. Other aggregate sizes or blends may be used on further review by ArcelorMittal in conjunction with the monolithic pour) readymix supplier and only formal written confirmation from ArcelorMittal. The proportions will depend on the gradation of 8. Fill in between the Edge and internal insulation with the local materials. granular hardcore and compact. 3. The concrete grade to be a C30 / 37 - C35 with a maximum 9. Install a minimum 200g dpm, or gas membrane as water cement ratio of 0.55 using super-plasticiser. All required by the site investigation, to whole area extending admixtures used should be from the same manufacturer and 300 to 500mm beyond the edge of the shutter. used as per manufacturers instructions. 4. Permitted cement type shall be Portland cement or blends 0. Starting from one corner of un-cut pods, the pods must be of up to 20% replacement using GGBS or PFA. This placed to the prescribed layout, completing all full pods corresponds to the following cement types to BS EN 97-: before installing the cut-pods as required. Widened internal CEM I, CEM II/A-S OR CEM II/A-V. Minimum cement quantity beams should be separate by spacers in order to minimise risk of movement. 5. The slump shall be between 80 and 230mm (S4 type EN206 / BS8500) at the time of delivery. The addition of. Hyrib is to be installed and fixed in position across face of water on site is prohibited, except where the additional water internal ribs/beams in order to contain initial pour to edge is allowable water remaining from the original batch target. beam. Any water added to the concrete shall be recorded on the delivery ticket. 2. Timber bracing is required from the top of the pod to the 6. The fines content shall be aproximately 50% by weight of shutter in corner locations and every perimeter pod during the total aggregate content. Total fines content shall be concreting to ensure no lateral movement occurs. These are 450kg/m 3 fines graded at or below 200 Please refer to the removed when the concrete reaches the top of the pods. required sieve curve analysis for optimum aggregate Reinforcement to be cast into the first stage pour to provide a gradation to be used when investigating the suitability of the shear connection between the two pours. given mix. 3. The concrete is to be placed to the outer toe section first NOTE: of the two stage pour, prior to installing the remaining LAYOUT SHOWN IS INDICATIVE AND SUBJECT concrete to the full height in the usual manner. (The concrete can either be pumped or placed directly) TO CONFIRMATION AND CO-ORDINATION WITH ARCHITECTS DRAWINGS AND SPECIALISTS 4. Once set, the lower shutter can be stripped and installed LINE LOADS to form the second shutter. The foundation is then ready for the internal ribs, slab, beams and remaining external beam to be completed. Sacrificial bar or blocks may be introduced to support the second stage pour shutter. DM Preliminary - Costing S.O.P S.O.P 5. When the placement is completed, level carefully and finish by bull float or skip float in order to improve flatness and to hide visible fibres under the superficial mortar. If required the slab may be finished by power, bull or skip floated. 6. Apply a spray application of curing & sealing membrane such as Permaban Permaseal or similar approved. REV BY AMENDMENTS PRELIMINARY DATE 7. Strike the shutter and place aside for re-use. F o u n d a t i o n P l a n (Housetype Example) S.O.P Denotes 'Setting Out Point' of Pod Units 8. The DPM is then lapped up the outside vertical face of the toe. The horizontal and inside vertical face of the toe is painted with two coats of RIW LAC or similar. 9. The vertical insulation is then placed against the outside face of the toe and backfilled against The contractor shall record and retain on site, all concrete mix delivery tickets for onward submission to the statutory body for their approval Max Pile Load = 360kN See drawing /5 for reinforcement details NOTE: Where ground levels have been raised / adjusted, it is assumed that a suitable engineered material has been laid and consolidated in order to achieve a minimum ground bearing pressure 50kN/m 2 Hatched areas denotes pour one of two stage pour - see plan & sections Hatched areas denote insulslab pods cut on site to suit. THIS DRAWING IS FOR COSTING PURPOSES ONLY AND MUST NOT BE USED FOR CONSTRUCTION FOR CONSTRUCTION DETAIL INFORMATION CONTACT GHW CONSULTING ENGINEERS Ltd. New Development Insulslab Foundation Layout Example Housetype DM A - :25 A3 - :50 AW Nov AW INS

3 THIS DRAWING IS COPYRIGHT AND MUST NOT BE REPRODUCED WHOLLY OR IN PART WITHOUT PRIOR PERMISSION GHW CONSULTING ENGINEERS LTD. / INSUL SIG General Notes.. For notes refer to drg /0 REINFORCED CONCRETE NOTES. FOR CONCRETE NOTES REFER TO GA DRAWING. 27H0-300 LINKS 2. CONCRETE COVER: GROUND S - 30 TOP, SIDES AS SHOWN, 75 BTM 2H6-B 2H6-B COVER TO REINFORCEMENT IS TO BE ACHIEVED AND MAINTAINED BY USE OF PROPRIETORY ACCESSORIES IN ACCORDANCE WITH BS WHERE APPLICABLE, REBAR LAP LENGTHS ARE NOT TO BE LESS THAN 40 x BAR DIA. WHERE ONE BAR LAPS WITH ANOTHER OF A DIFFERENT DIAMETER, THEN USE THE LAP LENGTH FOR THE SMALLER BAR. PREWELDED MESH LAP LENGTHS ARE TO BE NOT LESS THAN 400mm. 2H6-B 6. CONCRETE SURFACE FINISHES ARE TO BE IN ACCORDANCE WITH THE SPECIFICATION. 7. LAYER ABBREVIATIONS (WHERE USED) 3H0-300 LINKS BTM - BOTTOM FACE TOP - TOP FACE B - OUTERMOST LAYER IN BTM B2 - SUBSEQUENT LAYER IN BTM T - OUTERMOST LAYER IN TOP T2 - SUBSEQUENT LAYER IN TOP NF - OUTERMOST LAYER IN NEAR FACE NF2 - SUBSEQUENT LAYER IN NEAR FACE FF - OUTERMOST LAYER IN FAR FACE FF2 - SUBSEQUENT LAYER IN FAR FACE EF - EACH FACE EW - EACH WAY STG - STAGGERED ABR - ALTERNATE BARS REVERSED 8. REBARS TO BE PRE-FIXED BY THE DRAWING NUMBER. 27H0-300 LINKS 2H6-B 27H0-300 LINKS 2H6-B 27H0-300 LINKS 09. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH GHW Drg. No. 0, IN ADDITION TO OTHER DRAWINGS REFERENCED THEREIN. 0. REINFORCEMENT NOMENCLATURE: 5H T ABR COMMENT LOCATION OF BARS BAR CENTRES (mm) BAR MARK BAR DIAMETER (mm) TYPE OF STEEL NUMBER OF BARS 2H0-300 LINKS NOTE: LAYOUT SHOWN IS INDICATIVE AND SUBJECT TO CONFIRMATION AND CO-ORDINATION WITH ARCHITECTS DRAWINGS AND SPECIALISTS LINE LOADS 2H6-B DM Preliminary - Costing REV BY AMENDMENTS DATE PRELIMINARY 2H6-B 27H0-300 LINKS 2H6-B 75 MIN COVER REMOVE LIP ON S ADJACENT S H2 H0 Link LINK POSITIONED 50 OFF TOE FACE 50 Typical Edge Beam Section Scale :0 H MIN COVER LINK POSITIONED CENTRALLY ON REMOVE LIP ON S ADJACENT S No. OFF AND SIZE OF BARS TO BTM OF S VARIES - REFER TO PLAN H2 Typical Internal Beam Section Scale :0 H0 Link 75 MIN H NOTE: Where ground levels have been raised / adjusted, it is assumed that a suitable engineered material has been laid and consolidated in order to achieve a minimum ground bearing pressure 50kN/m 2 Hatched areas denotes pour one of two stage pour - see plan & sections Hatched areas denote insulslab pods cut on site to suit. THIS DRAWING IS FOR COSTING PURPOSES ONLY AND MUST NOT BE USED FOR CONSTRUCTION FOR CONSTRUCTION DETAIL INFORMATION CONTACT GHW CONSULTING ENGINEERS Ltd. New Development Reinforcement details for Example Housetype DM A - :25 A3 - :50 AW Nov AW INS

4 CAVITY INSULATION AND DPC IN ACCORDANCE WITH ARCH DETAILS 75 MIN / 50 MAX SIDE COVER TO Z BAR H2 'Z' BARS AT crs MAX. PUSHED INTO FIRST POUR. CONTRACTOR TO ENSURE STABILITY DURING CONSTRUCTION COVER LEVEL MIN TO EDGE 75 MIN 50 INSUL CB INSULATION POUR 2 POUR ROCKER PIPE IN ACCORDANCE WITH NHBC GUIDELINES 50 MIN TYPICAL EDGE DETAIL LOWER SECTION OF CAST FIRST TEMPORARY BLOCK TO ENSURE CORRECT COVER INSUL 'HYRIB' STANDARD OR EXTENDED CLOSER FIXED ACROSS FACE OF INTERNAL S / RIBS TO CONTAIN FIRST STAGE POUR 50 COMPACTED SUB-BASE WITH BLINDED CLOSED SURFACE AT MEMBRANE TYPICAL EDGE DETAIL AT SERVICE ENTRY POINTS (SECTION ) 75 INSUL MIN OPTIONALLY INSTALL HARDCORE TO BUILDING FOOTPRINT INSUL ACD HORIZONTAL EDGE INSULATION VARIES - SEE PLAN 050 FOR FULL 50 DPM TUCKED INTO FIRST POUR COATS OF RIW LAC OR SIMILAR 3RD PARTY ACCREDITED LIQUID DPM INSTALLED AS PER MANUFACTUERS RECOMMENDATIONS 200 DPM DETAIL (WHERE GAS MEMBRANE REFER TO PLOT SPECIFIC DRGS)

5 CAVITY INSULATION AND DPC IN ACCORDANCE WITH ARCH DETAILS 75 MIN / 50 MAX SIDE COVER TO Z BAR H2 'Z' BARS AT crs MAX. CONTRACTOR TO ENSURE STABILITY DURING CONSTRUCTION TO SUIT SITE LEVELS POUR 2 INSUL 50 INSUL CB INSULATION POUR LOWER SECTION OF CAST FIRST 50 COMPACTED SUB-BASE WITH BLINDED CLOSED SURFACE AT MEMBRANE 50 MIN TO EDGE INSUL ACD HORIZONTAL EDGE INSULATION VARIES - SEE PLAN INSUL ACD INSULATION MIN TYPICAL EDGE DETAIL AT DEEPENED EDGE (SECTION 3 - ALSO REFER TO /02) TYPICAL EDGE DETAIL AT DEEPENED EDGE /UNDERBUILD 202

6 MONAFLOOR BRIDGESTOP SYSTEM, INSTALLED IN ACCORDANCE WITH MANUFACTURERS DETAILS LEVEL 50 INSUL INSUL MIN INSUL ACD HORIZONTAL EDGE INSULATION MIN 50 COMPACTED SUB-BASE WITH BLINDED CLOSED SURFACE AT MEMBRANE TYPICAL DETAIL AT INTERNAL/PARTY WALLS (SECTION 5) TYPICAL DETAIL AT INTERNAL/PARTY LOAD BEARING WALLS 203

7 MONAFLOOR BRIDGESTOP SYSTEM, INSTALLED IN ACCORDANCE WITH MANUFACTURERS DETAILS LEVEL AS PLAN DAY JOINT INSUL INSUL LOWER SECTION OF CAST FIRST 50 INSUL ACD INSULATION MIN MIN 50 COMPACTED SUB-BASE WITH BLINDED CLOSED SURFACE AT MEMBRANE INSUL ACD HORIZONTAL EDGE INSULATION TYPICAL DETAIL AT CHANGE IN LEVEL AT PARTY WALLS (SECTION 6) CHANGE IN LEVEL AT PARTY WALL S 204

8 TIMBER FORMER TIED TO REINFORCEMENT TO FORM STEP IN TO REMAIN TRUE AND ALLIGNED AT ALL TIMES CAST GARAGE FLOOR LEVEL PRIOR TO MAIN HOUSE AS PLAN TEMP BARS FIXED INTO STAGE POUR AT 450crs TO PROVIDE RESTRAINT TO FORMER. CUT DOWN TO FFL FOLLOWING CONSTRUCTION LEVEL OPTIONAL DAY JOINT INSUL INSUL LOWER SECTION OF CAST FIRST 50 INSUL ACD INSULATION MIN MIN 50 COMPACTED SUB-BASE WITH BLINDED CLOSED SURFACE AT MEMBRANE INSUL ACD HORIZONTAL EDGE INSULATION TYPICAL DETAIL AT CHANGE IN LEVEL TO GARAGE - 50 STEP MAX (SECTION 7) TYPICAL CHANGE IN LEVEL ADJACENT GARAGE 205

9 EXTERNAL AND INTERNAL S ONLY. IS DESIGNED TO SPAN BETWEEN S MAX SPACING LEVEL INSUL 75 MIN TYPE TYPICAL VIBRO PLAN 75 COMPACTED SUB-BASE WITH BLINDED CLOSED SURFACE AT MEMBRANE ON VIBRO PILING MAT OR ENG. FILL DESIGNED BY OTHERS PILING MAT/ ENGINEERED GROUND DETAIL SHOWING REDUCED HARDCORE ON VIBRO OR ENGINEERED GROUND TYPICAL EDGE DETAIL FOR VIBRO OR ENGINEERED FILL SITES 20

10 CAVITY INSULATION AND DPC IN ACCORDANCE WITH ARCH DETAILS 25 TO PILE TYPICAL 50 MAX DUCT THROUGH EDGE S REFER SEPARATE DRG FOR REINFORCEMENT DETAILS PILE REINFORCEMENT TO BE RETAINED TO ACHIEVE FULL ANCHORAGE LENGTH INTO PILE CAP LEVEL MIN TO EDGE 75 MIN 50 INSUL CB INSULATION POUR 2 POUR ROCKER PIPE IN ACCORDANCE WITH NHBC GUIDELINES 50 MIN TYPICAL EDGE DETAIL LOWER SECTION OF CAST FIRST INSUL INSUL 'HYRIB' STANDARD OR EXTENDED CLOSER FIXED ACROSS FACE OF INTERNAL S / RIBS TO CONTAIN FIRST STAGE POUR MIN 75 MIN COMPACTED SUB-BASE WITH BLINDED CLOSED SURFACE AT MEMBRANE ON PILING MAT DESIGNED BY OTHERS INSUL ACD HORIZONTAL EDGE INSULATION VARIES - SEE PLAN 050 FOR FULL 50 TYPICAL EDGE DETAIL AT SERVICE ENTRY POINTS (SECTION ) 2 COATS OF RIW LAC OR SIMILAR 3RD PARTY ACCREDITED LIQUID DPM INSTALLED AS PER MANUFACTUERS RECOMMENDATIONS DPM TUCKED INTO FIRST POUR PILING MAT 220 DPM DETAIL (WHERE GAS MEMBRANE REFER TO PLOT SPECIFIC DRGS)

11 CAVITY INSULATION AND DPC IN ACCORDANCE WITH ARCH DETAILS REFER SEPARATE DRG FOR REINFORCEMENT DETAILS TO SUIT SITE LEVELS POUR 2 INSUL 50 INSUL CB INSULATION POUR LOWER SECTION OF CAST FIRST INSUL ACD INSULATION 75 MIN TO EDGE INSUL ACD HORIZONTAL EDGE INSULATION VARIES - SEE PLAN 75 MIN COMPACTED SUB-BASE WITH BLINDED CLOSED SURFACE AT MEMBRANE ON PILING MAT DESIGNED BY OTHERS MIN TYPICAL EDGE DETAIL AT DEEPENED EDGE (SECTION 3 - ALSO REFER /03) TYPICAL EDGE DETAIL AT DEEPENED EDGE /UNDERBUILD 222

12 MONAFLOOR BRIDGESTOP SYSTEM, INSTALLED IN ACCORDANCE WITH MANUFACTURERS DETAILS LEVEL INSUL INSUL MIN MIN INSUL ACD HORIZONTAL EDGE INSULATION TYPICAL DETAIL AT INTERNAL/PARTY WALLS (SECTION 5) TYPICAL DETAIL AT INTERNAL/PARTY LOAD BEARING WALLS 223

13 IF DAY JOINT REQUIRED USE H2 'Z' BARS AT crs MAX. CONTRACTOR TO ENSURE STABILITY DURING CONSTRUCTION MONAFLOOR BRIDGESTOP SYSTEM, INSTALLED IN ACCORDANCE WITH MANUFACTURERS DETAILS LEVEL AS PLAN DAY JOINT INSUL INSUL MIN LOWER SECTION OF CAST FIRST MIN 75 INSUL ACD INSULATION PILING MAT INSUL ACD HORIZONTAL EDGE INSULATION TYPICAL DETAIL AT CHANGE IN LEVEL AT PARTY WALLS (SECTION 6) CHANGE IN LEVEL AT PARTY WALL S 224

14 TIMBER FORMER TIED TO REINFORCEMENT TO FORM STEP IN TO REMAIN TRUE AND ALLIGNED AT ALL TIMES TEMP BARS FIXED INTO STAGE POUR AT 450crs TO PROVIDE RESTRAINT TO FORMER. CUT DOWN TO FFL FOLLOWING CONSTRUCTION LEVEL CAST GARAGE FLOOR LEVEL PRIOR TO MAIN HOUSE AS PLAN INSUL INSUL LOWER SECTION OF CAST FIRST 75 MIN INSUL ACD INSULATION MIN PILING MAT INSUL ACD HORIZONTAL EDGE INSULATION TYPICAL DETAIL AT CHANGE IN LEVEL TO GARAGE - 50 STEP MAX (SECTION 7) TYPICAL CHANGE IN LEVEL ADJACENT GARAGE

15 CAVITY INSULATION AND DPC IN ACCORDANCE WITH ARCH DETAILS 2 COATS OF RIW LAC OR SIMILAR 3RD PARTY ACCREDITED LIQUID DPM INSTALLED AS PER MANUFACTUERS RECOMMENDATIONS WALL TIES AT 900crs HORIZONTAL AND 450crs VERTICAL (TYPE TBC BY PROJECT ENGINEER) TO BE SHOT FIRED WITH HILTI DS-27 OR FIXED USING HPS-R 6/25x50 HAMMER SCREW FIXINGS OR SIMILAR APPROVED TO SFRC. 50 INSUL CB INSULATION MIN TO EDGE 450dp MAIN POUR 3 TO SUIT SITE LEVELS POUR 2 POUR INSUL ACD HORIZONTAL EDGE INSULATION VARIES - SEE PLAN 75 MIN / 50 MAX SIDE COVER TO Z BAR 5 CONST JOINT CONST JOINTS AS REQUIRED 4 CONST JOINT 3 INSUL TYPICAL EDGE DETAIL AT DEEPENED EDGE OPTION H2 'Z' BARS AT crs MAX. CONTRACTOR TO ENSURE STABILITY DURING CONSTRUCTION INSUL ACD INSULATION COVER TEMPORARY BLOCK TO TOP OF TO ENSURE CORRECT COVER TEMPORARY FORMWORK COMPACTED SUB-BASE WITH BLINDED CLOSED SURFACE AT MEMBRANE. INSTALL TEMPORARY FORMWORK 2. BACKFILL WITH GEN0 LEAN MIX 3. CAST POUR IN SFRC 4. CAST POUR 2 IN SFRC 5. CAST MAIN IN SFRC LEAN MIX CONCRETE TO FORM SHUTTER TO INSULATION/DOWNSTAND ROUGH TAMP FINISH BETWEEN POURS DAY JOINT MINIMUM EMBEDMENT OF H2 TIE BAR INTO EACH POUR DETAIL BETWEEN POURS TYPICAL RAFT DETAILS AT UNDERBUILD 240

16 CAVITY INSULATION AND DPC IN ACCORDANCE WITH ARCH DETAILS WALL TIES AS OPTION 450dp MAIN POUR 3 75 MIN / 50 MAX SIDE COVER TO U BAR 5 CONST JOINT COVER TEMPORARY BLOCK TO TOP OF TO ENSURE CORRECT COVER INSUL ROUGH TAMP FINISH BETWEEN POURS DAY JOINT MINIMUM EMBEDMENT OF H2 TIE BAR INTO EACH POUR DETAIL BETWEEN POURS 50 TO SUIT SITE LEVELS POUR INSUL ACD INSULATION 3 50 COMPACTED SUB-BASE WITH BLINDED CLOSED SURFACE AT MEMBRANE SUITABLE WELL COMPACTED BACKFILL TO WORKING SPACE 50 INSUL CB INSULATION MIN TO EDGE POUR CONST JOINT 0N BLOCKWORK WITH MORTAR DESIGNATION (iii) TO PROVIDE TEMPORARY SHUTTER. CAST POUR IN SFRC 2. BUILD BLOCKWORK OR SIMILAR SUIT POUR 2 HEIGHT AND INSTALL INSULATION 3. BACKFILL WITH SUITABLE WELL COMPACTED FILL 4. CAST POUR 2 IN SFRC 5. CAST MAIN IN SFRC VARIES - SEE PLAN TYPICAL EDGE DETAIL AT DEEPENED EDGE OPTION 2 50 TYPICAL RAFT DETAILS AT UNDERBUILD OPTION 2 24

17 CAVITY INSULATION AND DPC IN ACCORDANCE WITH ARCH DETAILS 2 COATS OF RIW LAC OR SIMILAR 3RD PARTY ACCREDITED LIQUID DPM INSTALLED AS PER MANUFACTUERS RECOMMENDATIONS WALL TIES AT 900crs HORIZONTAL AND 450crs VERTICAL (TYPE TBC BY PROJECT ENGINEER) TO BE SHOT FIRED WITH HILTI DS-27 OR FIXED USING HPS-R 6/25x50 HAMMER SCREW FIXINGS OR SIMILAR APPROVED TO SFRC. 50 INSUL CB INSULATION MIN TO EDGE 450dp MAIN POUR 3 TO SUIT SITE LEVELS POUR 2 POUR INSUL ACD HORIZONTAL EDGE INSULATION VARIES - SEE PLAN 75 MIN / 50 MAX SIDE COVER TO Z BAR 5 CONST JOINT CONST JOINTS AS REQUIRED 4 CONST JOINT 3 INSUL TYPICAL EDGE DETAIL AT DEEPENED EDGE OPTION H2 'Z' BARS AT crs MAX. CONTRACTOR TO ENSURE STABILITY DURING CONSTRUCTION INSUL ACD INSULATION COVER TEMPORARY BLOCK TO TOP OF TO ENSURE CORRECT COVER TEMPORARY FORMWORK COMPACTED SUB-BASE WITH BLINDED CLOSED SURFACE AT MEMBRANE. INSTALL TEMPORARY FORMWORK 2. BACKFILL WITH GEN0 LEAN MIX 3. CAST POUR IN SFRC 4. CAST POUR 2 IN SFRC 5. CAST MAIN IN SFRC LEAN MIX CONCRETE TO FORM SHUTTER TO INSULATION/DOWNSTAND ROUGH TAMP FINISH BETWEEN POURS DAY JOINT MINIMUM EMBEDMENT OF H2 TIE BAR INTO EACH POUR DETAIL BETWEEN POURS TYPICAL PILE DETAILS AT UNDERBUILD OPTION 242

18 CAVITY INSULATION AND DPC IN ACCORDANCE WITH ARCH DETAILS WALL TIES AS OPTION 450dp MAIN POUR 3 75 MIN / 50 MAX SIDE COVER TO U BAR 5 CONST JOINT COVER TEMPORARY BLOCK TO TOP OF TO ENSURE CORRECT COVER INSUL ROUGH TAMP FINISH BETWEEN POURS DAY JOINT MINIMUM EMBEDMENT OF H2 TIE BAR INTO EACH POUR DETAIL BETWEEN POURS TO SUIT SITE LEVELS POUR INSUL ACD INSULATION COMPACTED SUB-BASE WITH BLINDED CLOSED SURFACE AT MEMBRANE SUITABLE WELL COMPACTED BACKFILL TO WORKING SPACE R F P 50 INSUL CB INSULATION MIN TO EDGE POUR CONST JOINT 0N BLOCKWORK WITH MORTAR DESIGNATION (iii) TO PROVIDE TEMPORARY SHUTTER. CAST POUR IN SFRC 2. BUILD BLOCKWORK OR SIMILAR TO SUIT POUR 2 HEIGHT AND INSTALL INSULATION 3. BACKFILL WITH SUITABLE WELL COMPACTED FILL 4. CAST POUR 2 IN SFRC 5. CAST MAIN IN SFRC VARIES - SEE PLAN TYPICAL EDGE DETAIL AT DEEPENED EDGE OPTION 2 50 TYPICAL PILE DETAILS AT UNDERBUILD OPTION 2 243

19 Slab Level Cellcore HX S grade 3/8 under slab. Plasticity Depth Low 90 Medium 60 High THIS DRAWING IS COPYRIGHT AND MUST NOT BE REPRODUCED WHOLLY OR IN PART WITHOUT PRIOR PERMISSION GHW CONSULTING ENGINEERS LTD. / INSUL SIG Slab Level Insulslab ACD horizontal insulation Insulslab ACD horizontal insulation Cellcore HX B grade 3/8 under edge beams. Plasticity Depth Low 85 Medium 55 High 220 Typical Edge Detail Two Stage Pour 50 Typical Internal Beam Detail Cellcore HX B grade 3/8 under internal beams. Plasticity Depth Low 85 Medium 55 High 220 TYPICAL DETAIL OF VOID FORMER UNDER INSUL PILED FOUNDATION 244

Section 02 SUBSTRUCTURE

Section 02 SUBSTRUCTURE 02 Section 02 SUBSTRUCTURE 1. Trenches to be level, square and free from loose material and standing water. Steps and sides of foundations must be plumb. 2. All tree roots must be removed. Trench depths

More information

Part 5 Substructure and ground floors. Chapter 5.2. Suspended ground floors

Part 5 Substructure and ground floors. Chapter 5.2. Suspended ground floors Part 5 Substructure and ground floors Chapter CONTENTS SCOPE Clause Page DESIGN - General Design standards D1 1 Statutory and other requirements D2 1 Resistance to ground contaminants D3-D4 1 This Chapter

More information

Ground Heave Solutions

Ground Heave Solutions Ground Heave Solutions Who are Cordek? Cordek provides technical solutions for a range of construction requirements. Innovative thinking, engineering expertise and extensive CAD/CAM capabilities enable

More information

Design Guidance for TAB-Deck Composite Slabs using SMD Metal Decking reinforced with ArcelorMittal Steel Fibres

Design Guidance for TAB-Deck Composite Slabs using SMD Metal Decking reinforced with ArcelorMittal Steel Fibres Design Guidance for TAB-Deck Composite Slabs using SMD Metal Decking reinforced with ArcelorMittal Steel Fibres Version 2 Revised October 2008 Design Guidance for TAB-Deck Composite Slabs using SMD Metal

More information

Concrete Slab-on-Ground

Concrete Slab-on-Ground Concrete Slab-on-Ground This training package provides information on concrete slab-on-ground construction, including reinforcement, formwork, mix, placement and curing, for village infrastructure and

More information

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes.

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes. SECTION 033053 - CONCRETE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

CHAPTER 8. Concrete Work

CHAPTER 8. Concrete Work Concrete Work Clay Bricklaying Made Easy CONCRETE WORK Foundations for walls and piers All loadbearing walls and piers are required to stand on a concrete foundation, which must be able to receive and

More information

SECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION

SECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION ARDEX GUIDE SPECIFICATION ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) Cast-In-Place Concrete to Receive the ARDEX Concrete Management Systems including ARDEX Self-Leveling Underlayments SECTION 03 30 00

More information

Construction Specification for Unshrinkable Fill

Construction Specification for Unshrinkable Fill Engineering and Construction Services Division Standard Specifications for Road Works TS 13.10 April 2014 for Table of Contents TS 13.10.01 SCOPE... 2 TS 13.10.02 REFERENCES... 2 TS 13.10.03 DEFINITIONS...

More information

BEAM & BLOCK SYSTEM. 108mm. 175mm Deep (160mm) Wide Beam. 160mm

BEAM & BLOCK SYSTEM. 108mm. 175mm Deep (160mm) Wide Beam. 160mm RH F RACKHAM HOUSEFLOORS BEAM & BLOCK SYSTEM BEAM & BLOCK SYSTEM 1. THE BEAMS 60mm 108mm 90mm 75mm 75mm 100mm 175mm 100mm 175mm 125mm 100mm 175mm Deep Beam 175mm Deep (160mm) Wide Beam 225mm Deep Beam

More information

ARCELORMITTAL STEEL-FIBRE-REINFORCED CONCRETE ARCELORMITTAL INSULSLAB STEEL-FIBRE-REINFORCED CONCRETE

ARCELORMITTAL STEEL-FIBRE-REINFORCED CONCRETE ARCELORMITTAL INSULSLAB STEEL-FIBRE-REINFORCED CONCRETE ArcelorMittal Sheffield Ltd Vulcan Works Birley Vale Close Sheffield S12 2DB Tel: 0114 239 2601 Fax: 0114 264 2514 e-mail: fibres.support.uk@arcelormittal.com website: www.arcelormittal.com/steelfibres

More information

Post-tensioned Concrete Design PT Installation Guidance

Post-tensioned Concrete Design PT Installation Guidance Post-tensioned Concrete Design PT Installation Guidance Lee Maartensz Construction Manager - Structural Systems UK Ltd PT Installation Bonded Flat Slabs Installation 1 Flat Slabs Beam and Slab Installation

More information

POST TENSIONED SLABS. Imagineering the possibilities

POST TENSIONED SLABS. Imagineering the possibilities POST TENSIONED SLABS Imagineering the possibilities imagineering... CCL post - tensioned slab solutions represent continuous development through involvement in building structures worldwide. CCL systems

More information

Jabfloor 70, 100, 150, 200, 250

Jabfloor 70, 100, 150, 200, 250 Jabfloor 70, 100, 150, 200, 250 Floor insulation below ground supported slab Jabfloor is a closed cell expanded polystyrene (EPS) insulation board for use in all floor constructions. Available in a range

More information

Polyfoam Floorboard For thermal insulation of floors

Polyfoam Floorboard For thermal insulation of floors Strong Water resistant Versatile Lightweight Ozone friendly Recyclable Description is a high performance, 100% ozone friendly, extruded polystyrene, rigid board insulation. It is lightweight, yet has excellent

More information

APPENDIX 5: CONSTRUCTION CHECKLISTS

APPENDIX 5: CONSTRUCTION CHECKLISTS APPENDIX 5: CONSTRUCTION CHECKLISTS This appendix presents the construction checklists for the various retaining wall mitigation strategies: 10.1 Void Fill 10.2 Surface Bond Overlay 10.3 Reinforced Overlay

More information

WARMFLOOR. Installation Guide.

WARMFLOOR. Installation Guide. WARMFLOOR Installation Guide 9 7 8 5 3 1 Damp Proof Membrane (supplied by others to suit wall) 9 Air Brick / Vent (supplied by others) Product overview The Lynx Warmfloor system is a cost effective highly

More information

WARMFLOOR. Installation Guide.

WARMFLOOR. Installation Guide. WARMFLOOR Installation Guide 9 7 8 5 3 1 Damp Proof Membrane (supplied by others to suit wall) 9 Air Brick / Vent (supplied by others) Product overview The Lynx Warmfloor system is a cost effective highly

More information

SPECIFICATION FOR PRECAST/ COMPOSITE CONCRETE FLOORS/ ROOF DECKS SECTION E60

SPECIFICATION FOR PRECAST/ COMPOSITE CONCRETE FLOORS/ ROOF DECKS SECTION E60 SPECIFICATION FOR SECTION E60 A 2007-09-26 S.W. Revision Date Issue Authorised By Approved for Issue SW Date 24.09.07 clarkebond Page 1 of 6 To be read with Preliminaries/ General Conditions. GENERAL 10

More information

SECTION 303 CULVERTS

SECTION 303 CULVERTS 303.01 Scope - This section covers the construction of pipe culverts. 303.01.01 Definitions for the purposes of this section, the following general terms are defined as follows: a) Backfilling means the

More information

Regulations Detail Sheet 1

Regulations Detail Sheet 1 Roger Bullivant Ltd Walton Road Drakelow Burton-on-Trent Staffordshire DE15 9UA Tel: 01283 511115 Fax: 01283 543395 CI/SfB (17.9) Ef2 Agrément Certificate No 02/3894 Designated by Government to issue European

More information

Construction Specification for Concrete Curb and Concrete Curb and Gutter

Construction Specification for Concrete Curb and Concrete Curb and Gutter Engineering & Construction Services Division Standard Specifications for Road Works TS 3.50 September 2017 for Concrete Curb and Table of Contents TS 3.50.01 SCOPE... 3 TS 3.50.02 REFERENCES... 3 TS 3.50.03

More information

Jablite Structural Board Thermal Floor System

Jablite Structural Board Thermal Floor System Jablite Structural Board Thermal Floor System Key Benefits BBA Certified (14/5094 Product 4) Fast and easy installation achieves specified U-Values Outstanding Psi Values assist with Part L Compliance

More information

LANDSCAPE RETAINING WALLS

LANDSCAPE RETAINING WALLS SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9070 - Landscape Retaining Walls LANDSCAPE RETAINING WALLS PART - GENERAL.0 SECTION INCLUDES A. Modular Block Retaining Walls

More information

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS Underground Electric Distribution Standards I. SCOPE This section includes the standards for concrete, reinforcing steel, formwork, concrete placement, curing, and construction joints. Concrete work for

More information

Section 11 FIRE STOPPING

Section 11 FIRE STOPPING Section 11 This section highlights the key points relating to Fire Stopping. It is imperative that sites teams understand the importance of fire stopping and check it is completed correctly. It is to be

More information

Joint Free Slabs On Grade Website:

Joint Free Slabs On Grade Website: Joint Free Slabs On Grade Website: www.jointfreeslabs.com Specification Revised March 2014 Warwick Colefax Robert Colefax Phone (02) 9999 6688 Phone (07) 4051 9466 Fax (02) 9999 6680 Fax (07) 4051 9477

More information

Stylite. T-Beam Suspended Floor Insulation Technical Datasheet. Stylite T-Beam Floor Insulation

Stylite. T-Beam Suspended Floor Insulation Technical Datasheet. Stylite T-Beam Floor Insulation T-Beam Floor Insulation Lambda from 0.030 W/mK Reduces cold bridging Lightweight Cost effective Can be used on all suspended floors Quick & easy installation Use in commercial & residential property Minimal

More information

CONSTRUCTION SPECIFICATION

CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES GENERAL C220 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C220 ISSUE: NO:3 July 2018 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL...

More information

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones.

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones. ITEM 432 RIPRAP 432.1. Description. This Item shall govern for the furnishing and placing of riprap of the type and details shown on the plans and in accordance with this Item. 432.2. General. Riprap furnished

More information

PENTABLOCK Technical Information 190mm Series

PENTABLOCK Technical Information 190mm Series PENTABLOCK Technical Information 190mm Series The PENTABLOCK Walling System was developed in consultation with masonry construction stakeholders with an aim of reducing labor time and material costs required

More information

Building Construction

Building Construction Building Construction Shallow Foundations Module-III Introduction The foundation can be classified broadly into two types: Shallow foundations Deep foundations Shallow foundations Shallow Foundations When

More information

Construction Specification for Unshrinkable Fill

Construction Specification for Unshrinkable Fill Engineering & Construction Services Division Standard Specifications for Road Works TS 13.10 September 2017 for Table of Contents TS 13.10.01 SCOPE... 2 TS 13.10.02 REFERENCES... 2 TS 13.10.03 DEFINITIONS...

More information

Heavy Rib. Page 1 of 6. Expanded Mesh & Metal Products. Key Product Features:

Heavy Rib. Page 1 of 6. Expanded Mesh & Metal Products. Key Product Features: TMI- is used widely in construction work for joints, stop-end, retaining walls and columns. It creates a strong bond base for successive pours. is fixed as permanent formwork. Key Product Features: Unique

More information

PAGE 415. Part 9. External works. 9.1 Garages. 9.2 Drives, paths and landscaping

PAGE 415. Part 9. External works. 9.1 Garages. 9.2 Drives, paths and landscaping PAGE 415 Part 9 External works 9.2 Drives, paths and landscaping Part 9 External works Chapter CONTENTS SCOPE Clause DESIGN Design standards D1 1 Statutory requirements D2 1 Garage foundations D3 1 Garage

More information

Features and Benefits

Features and Benefits KingFlor KF40 Features and Benefits Fielders KF40 is a revolutionary steel formwork solution suitable for concrete slabs in all types of construction. KF40 combines the performance of a traditional flat

More information

Metal Decking Specialists

Metal Decking Specialists Metal Decking Specialists Technical Design. Manual Manufacture. and Guidance Installation. Notes Contents Introduction 03 Introduction 04 SMD Product Selector Technical and Design Support 05 How can SMD

More information

SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS Common Usage.

SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS Common Usage. SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS. 1-3.2 Common Usage. Abbreviations Word or Words PAV.Pressure Aging Vessel PCC..Portland Cement Concrete PE.Polyethylene

More information

50948-RHN Putney. 06 January This document includes: F30. Accessories/ sundry items for brick/ block/ stone walling. Code Section Revision Dated

50948-RHN Putney. 06 January This document includes: F30. Accessories/ sundry items for brick/ block/ stone walling. Code Section Revision Dated 50948-RHN Putney 06 January 2018 This document includes: Code Section Revision Dated F30 Accessories/ sundry items for brick/ block/ stone walling 1 Table of Contents Title F30 Accessories/ sundry items

More information

1.02 RELATED WORK: Refer to the following sections for related work:

1.02 RELATED WORK: Refer to the following sections for related work: SECTION 4200 - CONCRETE STRUCTURES PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of header curb, retaining walls, energy dissipation structures for drainage channels, reinforced concrete

More information

This specification refers to the latest (current) edition of the following: For the purposes of this specification the following definitions apply:

This specification refers to the latest (current) edition of the following: For the purposes of this specification the following definitions apply: APPENDIX I SPECIFICATION FOR UNSHRINKABLE FILL MT 13.10.01 SCOPE This Specification covers the requirements for the supply of all materials, labour ad equipment necessary for the placing of Unshrinkable

More information

9 Revision B

9 Revision B JJI-JOIST TECHNICAL BULLETIN SUBJECT: Ground Floor Design & Restraint Bulletin Number: Date Issued: Sheet 1 of 11 Introduction When designing the ground floor of a residential dwelling using I-Joists,

More information

ALL-IN-ONE THERMAL FLOOR SYSTEM NON STRUCTURAL TOPPING (NST)

ALL-IN-ONE THERMAL FLOOR SYSTEM NON STRUCTURAL TOPPING (NST) ALL-IN-ONE THERMAL FLOOR SYSTEM NON STRUCTURAL TOPPING (NST) Jablite All-in-One Thermal Floor System Non Structural Topping (NST) is an innovation-update on the patented Jablite All-in-One Thermal Floor

More information

Rev 19. Guide to the installation of Beamshield Plus and Platinum Beamshield Plus Suspended Floor Insulation

Rev 19. Guide to the installation of Beamshield Plus and Platinum Beamshield Plus Suspended Floor Insulation Rev 19 Guide to the installation of Beamshield Plus and Platinum Beamshield Plus Suspended Floor Insulation CONTENTS Introducing Beamshield Plus Step 1 Beam layout Step 2 Starter units Step 3 Full & Half

More information

Seven Wonders of the Ancient World

Seven Wonders of the Ancient World Seven Wonders of the Ancient World Pyramid of Meidum shed 250,000 tons of limestone outer casings Typical Pyramid Pyramid at Meidum Mexico Alameda buildings Palace of Fine Arts National Theater

More information

Public Works Manual. Revised September Concrete & Asphalt

Public Works Manual. Revised September Concrete & Asphalt Public Works Manual Revised September 2015 Concrete & Asphalt Where it must cross domestic it must cross above and with a 1 minimum separation. Nonpotable water tape. 10.00 PORTLAND CEMENT CONCRETE 10.01

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

The difference is Guidance for the preparation of Deck Manufacturing Schedules

The difference is Guidance for the preparation of Deck Manufacturing Schedules The difference is Guidance for the preparation of Deck Manufacturing Schedules innovation, commitment, support. 2 Guidance for the preparation of Deck Manufacturing Schedules Minimum Requirements for Schedule

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

CONCRETE BLOCK MASONRY

CONCRETE BLOCK MASONRY CONCRETE BLOCK MASONRY CONTENT Introduction Types Manufacturing process Properties Advantages Introduction These are the concrete blocks either hollow or solid. A hollow unit is that unit which has core

More information

tried tested trusted since 1982 manufacturing

tried tested trusted since 1982 manufacturing tried tested trusted F O R 3 0 Y E A R S Developed in the early 80 s Pecafil was patented by the FRANK Group in 1982 and has been developed into a complete permanent formwork system that primarily speeds

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

CF50/100 KW TURBINE ACCESS ROAD, CRANE PLATFORM, CONCRETE, AND LIFTING SPECIFICATIONS C&F GREEN ENERGY REVISION PREPARED BY APPROVED BY DATE

CF50/100 KW TURBINE ACCESS ROAD, CRANE PLATFORM, CONCRETE, AND LIFTING SPECIFICATIONS C&F GREEN ENERGY REVISION PREPARED BY APPROVED BY DATE CF50/100 KW TURBINE ACCESS ROAD, CRANE PLATFORM, CONCRETE, AND LIFTING SPECIFICATIONS C&F GREEN ENERGY REVISION PREPARED BY APPROVED BY DATE 001 First Draft W Hession 12.02.2014 Introduction This document

More information

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10 CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES 283 Chapter 10 FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS 10.1 PLASTERWORK Workmanship i. All workmanship must be within the tolerances

More information

SECTION PORTLAND CEMENT CONCRETE

SECTION PORTLAND CEMENT CONCRETE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the supplemental documents as indicated in the Site Work General Provisions, apply to work of this

More information

OS Thermal System Installation Guide

OS Thermal System Installation Guide OS Thermal System Installation Guide cube6.co.uk 2 A thermal resistance many times greater than aerated concrete blocks It s more than just insulation CUBE6 Oversheet Thermal Floor System (OS) is the innovative,

More information

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

Drainage, Road Drainage and Collection Pit A - EXCAVATION: 57 Drainage, Road Drainage and Collection Pit SCHEDULE OF QUANTITY Sl.N o. 1 Particulars Qty Unit Rate Amount A - EXCAVATION: Earth work in EXCAVATION IN FOUNDATION TRENCHES IN ALL KIND OF SOIL including

More information

TECHNICAL DATA SHEET CIVILS & INFRASTRUCTURE CLAY HEAVE PROTECTION

TECHNICAL DATA SHEET CIVILS & INFRASTRUCTURE CLAY HEAVE PROTECTION Claymaster Building Substructure - Below ground clay heave protection Claymaster is an EPS compressible-fill material used to reduce the pressure against foundations due to clay heave. Supplied coloured

More information

Rev 3. Guide to the installation of Beamshield Plus and Platinum Beamshield Plus Suspended Floor Insulation

Rev 3. Guide to the installation of Beamshield Plus and Platinum Beamshield Plus Suspended Floor Insulation Rev 3 Guide to the installation of Beamshield Plus and Platinum Beamshield Plus Suspended Floor Insulation CONTENTS!" # $ & ' ( ) )*) )+ ), -./ - '0 '0 Page 1 INTRODUCING BEAMSHIELD PLUS Beamshield Plus

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3 CITY OF TORONTO TS 3.70 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS 3.70.01 SCOPE...3 TS

More information

MagnumStone Specifications Gravity

MagnumStone Specifications Gravity MagnumStone Specifications Gravity SPECIFICATION FOR MAGNUMSTONE GRAVITY MECHANICALLY STABILIZED EARTH SYSTEM PART 1: GENERAL.01Description The work consists of supplying and installing all aspects of

More information

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES CONTENTS 10.1 PLASTERWORK 10.2 2 ND AND 3 RD FIX FINISHES FUNCTIONAL REQUIREMENT 10.1 Plasterwork Workmanship Design Technical Manual TS-011-09-010412 i. All workmanship must be within defined tolerances

More information

Pulaski County, Virginia

Pulaski County, Virginia Pulaski County, Virginia Typical Retaining Wall Details Based on the 2009 International Residential Code CONTENTS Timber Retaining Wall... 2 General Requirements... 2 Wall Construction... 2 Deadmen...

More information

chapter Principles of building OVERVIEW

chapter Principles of building OVERVIEW Principles of building chapter 4 OVERVIEW Whatever type of building is being constructed there are certain principles/elements that must be included, for example a block of 75 Carpentry and Joinery NVQ

More information

Building Design Data

Building Design Data Building Design Data.. 1. Building Design The KORE ICF System is designed to meet the requirements of the Building Regulations 1997-2006, in the case of two storeys, single occupancy dwellings. If the

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 03300 - A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 requirements are applicable to

More information

Strengthened Soil Wall Construction Manual

Strengthened Soil Wall Construction Manual Strengthened Soil Wall Construction Manual This information has been prepared by Shaw Technologies, Inc. as an aid in constructing their Strengthened Soil Wall system. Final determination of the suitability

More information

CONCRETE BLOCKS Lignacite

CONCRETE BLOCKS Lignacite A range of fine textured, loadbearing units, suitable for facing and general purpose applications. Select from a range of sizes, strengths and grades for total design flexibility. Paint Grade General Properties

More information

CORDEK BENTONITE WM A UNIQUE WATERPROOFING SYSTEM

CORDEK BENTONITE WM A UNIQUE WATERPROOFING SYSTEM CORDEK BENTONITE WM A UNIQUE WATERPROOFING SYSTEM For all below ground waterproofing applications BENTONITE WM MEMBRANES BENTOSTRIP CONSTRUCTION JOINTS The Optimum Waterproofing Solution Cordek BENTONITE

More information

Requirements for Measuring and Pricing of Structural Concrete

Requirements for Measuring and Pricing of Structural Concrete Requirements for Measuring and Pricing of Structural Concrete October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing

More information

THE CUPOLEX SOLUTION EXPANSIVE SOILS. www. cupolex.ca

THE CUPOLEX SOLUTION EXPANSIVE SOILS. www. cupolex.ca THE CUPOLEX SOLUTION EXPANSIVE SOILS www. cupolex.ca EXPANSIVE SOILS IDENTIFYING THE PROBLEM The problem of expansive soils is well known to engineers and builders. It affects construction sites throughout

More information

PRELIMINARY INSPECTION FRAMEWORK

PRELIMINARY INSPECTION FRAMEWORK PRELIMINARY INSPECTION FRAMEWORK 1. Oversite Striping of topsoil Forming site entrance Clearing off topsoil for service roadway Roadside drainage continued under entrance bay Any mature trees in vicinity

More information

30 X 40 POLE BARN 12 HIGH SIDE WALLS 2-12 WIDE X 10 HIGH SECTIONAL GARAGE DOORS OPTIONAL WINDOWS DETAILS INCLUDED

30 X 40 POLE BARN 12 HIGH SIDE WALLS 2-12 WIDE X 10 HIGH SECTIONAL GARAGE DOORS OPTIONAL WINDOWS DETAILS INCLUDED 30 X 40 POLE BARN 12 HIGH SIDE WALLS 2-12 WIDE X 10 HIGH SECTIONAL GARAGE DOORS OPTIONAL WINDOWS DETAILS INCLUDED 3 ENTRY DOOR METAL ROOF METAL SIDING GABLE ROOF, 4/12 PITCH INDEX PAGE DESCRIPTION 1 FRONT

More information

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE SECTION 033053- MISCELLANEOUS CAST-IN-PLACE CONCRETE PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

Jabfloor High Performance (HP) 70 and 100

Jabfloor High Performance (HP) 70 and 100 Jabfloor High Performance (HP) 70 and 100 Floor insulation below ground supported slab Jabfloor HP is a closed cell expanded polystyrene (EPS) insulation board suitable for use in all floor constructions.

More information

Installation Information 2016

Installation Information 2016 Installation Information 2016 DENDRO-SCOTT Root Barrier... why use anything else? DENDRO-SCOTT Root Barrier, recognised by the Environment Agency, is known for its quality and reliability. It is flexible

More information

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows:

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows: Section 02775 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Reinforced concrete sidewalks. B. Wheelchair ramps. C. Reinforced slope paving. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete

More information

SikaProof Bentonite Plastic DPM overlap - Compacted Backfill Scale 1:5. Detail no: SB01 - Nov 2013

SikaProof Bentonite Plastic DPM overlap - Compacted Backfill Scale 1:5. Detail no: SB01 - Nov 2013 100 100 1.1 Metre wide piece of fully bonded to cast concrete 300 SikaSwell P Profile 2010H Compacted backfill Plastic DPM Min. 300mm overlap with Bentonite Paste in the lap 300 300 Plastic DPM overlap

More information

BISON PRECAST FLOORING SPECIFICATION

BISON PRECAST FLOORING SPECIFICATION BISON PRECAST FLOORING SPECIFICATION 1.0 SCOPE OF THE SPECIFICATION 1.01 Relates to: This specification covers the design, manufacture and associated site work of the following types of floors:- Hollowcore

More information

Stone and Masonry Veneer

Stone and Masonry Veneer Stone and Masonry Veneer R703.7 Stone and masonry veneer, general. Stone and masonry veneer shall be installed in accordance with this chapter, Table R703.4 and Figure R703.7. These veneers installed over

More information

CONCRETE BLOCKS Lignacite

CONCRETE BLOCKS Lignacite A range of fine textured, loadbearing units, suitable for facing and general purpose applications. Select from a range of sizes, strengths and grades for total design flexibility. Paint Grade General Properties

More information

APPLICATION FOR A BUILDING PERMIT (Retaining Wall/Garden Wall Construction Details)

APPLICATION FOR A BUILDING PERMIT (Retaining Wall/Garden Wall Construction Details) APPLICATION FOR A BUILDING PERMIT (Retaining Wall/Garden Wall Construction Details) City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 951.487.7330 fax 951.654.9896 Must print legibly, submit

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE ROAD BASE

CONSTRUCTION SPECIFICATION FOR CONCRETE ROAD BASE CITY OF TORONTO STANDARD CONSTRUCTION SPECIFICATIONS FOR ROADS TS 3.40 November 2009 CONSTRUCTION SPECIFICATION FOR CONCRETE ROAD BASE INDEX TS 3.40.01 SCOPE... 3 TS 3.40.02 REFERENCES... 3 TS 3.40.03

More information

PECAFIL APPLICATION PRODUCT DESCRIPTION ADVANTAGES SITE SAFETY BENEFITS SIZES

PECAFIL APPLICATION PRODUCT DESCRIPTION ADVANTAGES SITE SAFETY BENEFITS SIZES PRODUCT DESCRIPTION The form work of the future is here now! The innovative solution to conventional formwork is the result of many years of intensive research and development overseas. The basic material

More information

CLAYMASTER COMPRESSIBLE FILL CLAYMASTER COMPRESSIBLE FILL LOW DENSITY EXPANDED POLYSTYRENE BOARDS

CLAYMASTER COMPRESSIBLE FILL CLAYMASTER COMPRESSIBLE FILL LOW DENSITY EXPANDED POLYSTYRENE BOARDS Jablite Limited Infinity House Anderson Way Belvedere Kent DA17 6BG Tel: 020 8320 9100 Fax: 020 8320 9110 website: www.jablite.co.uk APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL APPROVALS FOR CONSTRUCTION

More information

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals.

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals. As a customer service initiative, the Kansas City, Missouri, City Planning and Development Department/Development Services, in cooperation with the Greater Kansas City Home Builders Association, has developed

More information

Reinforced Earth wall Construction Manual

Reinforced Earth wall Construction Manual COVER PAGE CT-PE-W02 Rev: 5 Reinforced Earth wall Construction Manual Concrete Facing Reinforced Earth Malaysia Sdn Bhd 80-1, Jalan 8/62A Bandar Menjalara 52200 Kuala Lumpur Tel : 03-62746162, Fax : 03-62747212

More information

Redi Rock Specification and Installation Manual

Redi Rock Specification and Installation Manual Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as

More information

SECTION SITE CONCRETE

SECTION SITE CONCRETE SECTION 321313 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

University of Delaware

University of Delaware University Contact: Energy & Engineering Group (302) 831-1744 SECTION 03 45 00_PRECAST CONCRETE STRUCTURES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including

More information

RIBRAFT TECHNICAL MANUAL

RIBRAFT TECHNICAL MANUAL RIBRAFT TECHNICAL MANUAL CBI 3100/3111/3112/4711 JAN 2012 1 INSTRUCTIONS ON THE USE OF THIS MANUAL This Manual consists of three Sections: Section 1: Firth RibRaft Floor System Design Information Section

More information

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES PRECAST BOX CULVERTS CONSTRUCTION SPECIFICATION

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES PRECAST BOX CULVERTS CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C222 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C222 ISSUE: NO:3 July 2018 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL... 2 C222.01

More information

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis. PART 1 GENERAL 1.01 SUMMARY A. This Section includes the following: Section 02775 1. Reinforced concrete sidewalks. 2. Wheelchair Ramps. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete

More information

RIBRAFT TECHNICAL MANUAL

RIBRAFT TECHNICAL MANUAL RIBRAFT TECHNICAL MANUAL CBI 3100/3111/3112/4711 JAN 2012 1 INSTRUCTIONS ON THE USE OF THIS MANUAL CONTENTS This Manual consists of three Sections: Section 1: Firth RibRaft Floor System Design Information

More information

HOLLOW CORE FLOORS SPEED AND STRENGTH

HOLLOW CORE FLOORS SPEED AND STRENGTH HOLLOW CORE FLOORS SPEED AND STRENGTH CONTENTS 2 3 4 5 7 8 9 10 12 13 14 INTRODUCTION PRECAST CONCRETE FLOORS T HE A DVANTAGES BISON HOLLOW CORE FLOORS BEARINGS FALSE CEILINGS AND SOFFIT FIXINGS BISON

More information

The designer shall also submit additional information required by the University as described and underlined below.

The designer shall also submit additional information required by the University as described and underlined below. I. Structural Engineering Submissions The designer shall submit all information required by the State Construction Office (SCO) as described in the State Construction Manual Chapter 300 - Project Design

More information

Temporary & Permanent Anchorage Designs in Working Excavations All Diameters up to 2 bar

Temporary & Permanent Anchorage Designs in Working Excavations All Diameters up to 2 bar Temporary & Permanent Anchorage Designs in Working Excavations All Diameters up to 2 bar triio l QFM311 Remember it is for YOUR Safety! Issue 2 February 2018 Safety starts with Me This document is solely

More information

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00 Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type

More information

Concrete. Copyright: Quasar Management Services Pty Ltd

Concrete. Copyright: Quasar Management Services Pty Ltd Concrete This training package provides information on basic concrete, including materials, reinforcement, formwork, concrete mix, placement and curing for village infrastructure and houses common in South-

More information

SELF-ASSESSMENT EXERCISE FOR CHAPTER 24: PREPARATION OF BILLS OF QUANTITIES

SELF-ASSESSMENT EXERCISE FOR CHAPTER 24: PREPARATION OF BILLS OF QUANTITIES SELF-ASSESSMENT EXERCISE FOR CHAPTER 24: PREPARATION OF BILLS OF QUANTITIES Abstract the quantities and prepare a BQ for the basement measurement in Chapter 5. Please prepare a query sheet of problems

More information