Cut Depth: Choose the proper equipment to do. Soil Type: Items in the book highlights this

Size: px
Start display at page:

Download "Cut Depth: Choose the proper equipment to do. Soil Type: Items in the book highlights this"

Transcription

1 Division 2 Site Work Estimating Tips Swing angle of equipment - Ideal is 45 degree, for 90 degree swing efficiency could reach to 020 Sub-surface Investigation & 80% while for 120 degree it may reach 70%. Demolition Estimator shall obtain all available information concerning soil type. A site investigation is mandatory to reveal all site conditions, looking in particular for hazardous waste, stream beds, prior dumping, site restrictions and access, flood plains and all other factors that would strongly influence construction methods and costs. As any ground penetration has some risks, test pits, and knowledge gathered tend to control such risk. Demolition usually is executed by speciality contractors if explosives method is involved. Estimator shall consider in costing building demolition all factors that may affect the cost such as work space, rubbish handling, temporary bracing or shoring, dust control, security measures, hauling distance and costs of any required permits. Cut Depth: Choose the proper equipment to do job accordingly. Soil Type: Items in the book highlights this factor, Ideal equipment efficiency is for a sandy soil, if the soil is sand and gravel equipment efficiency is reduced to 90%, while efficiency could be as low as 20% for a poorly blasted rock. Degree of Equipment Operation: Time of equipment service, operator activity, weather factors, project restrictions, etc.. are some key factors affecting efficiency. Stockpile Distance and length of drag as well as maneuvering conditions. Site topography and volume of work Excavation management planning. Others such as specification control requirements, actual slope requirements, distress means and maximum allowable slope and slope configuration requirements. All productivity rates in this book are based on a bank measure. 021 Site Preparation & Excavation Support 025 Paving & Surfacing Site visit will determine the extent and scope of Good management planning for placing the base work required for the site preparation. The esti- course and asphalt layers will result in cost mator shall focus on plantation at site if any, savings for any repair work due to the climate dumped material, need for haul roads, access, conditions. storage of material, limited site size and access problems or any forced restrictions that may 026 Piped Utilities result in lower productivity rates, estimator shall Good planning for proper timing of piped utility also consider all security measures for isolated excavation will result in the best productivity for sites to prevent theft and damage by adding other construction items. Contractor must always fencing or increase the number of guards. keep an easy access to different parts of site, material flow and labor movement to maintain 022 Earthwork good productivity. Contractor shall carefully As there are many factors that affect productivity study the site topography, buildings distribution, rates of earthworks, no productivity rate shall be planned utilities & investigate all discrepancies considered as 100% accurate. This book that may affect productivity and costs. includes many items concerning earthworks in different types of soils as well as different type 029 Landscaping of equipments. We did our best to be very close Establishing a work plan, scheduled properly to an accurate estimate by considering most of will reduce maintenance cost and will guarantee the factors that affect this operation. When better growth of plants. Contractor shall focus preparing the bid, estimators shall focus on the on soil conditions and plant watering requirements following major factors: soil type, water content, as well as the maintenance staff required. dewatering, any required bracing or sheeting to Maintenance cannot be excluded from any excavation banks, hauling distance. Estimator project, because of different plants specified to be shall choose the proper economical piece of planted in different seasons. Contractor must equipment having best efficiency verses lower consider all types of plants specified, scheduled cost. Estimator shall be aware of the following planting plan, needed maintenance time, staff factors that affect equipment efficiency, and watering requirements during the construction productivity and costs. period.

2 020 SUBSURFACE INVESTIGATION & DEMOLITION STANDARD PENETRATION TESTS BORING: Boring job,mobilization & demobilization,average 40 km within city limits Job 1.00 Skilled Foreman 2.00 Building Laborers 1.00 Light Equip. Driver 1.00 Flat Truck W/Auger 1.00 Truck 3 Ton Boring,auger holes in earth,no sample, 100 mm LM Cased boring in earth,with samples, 65 mm Cased boring in earth,with samples; 100 mm Drilling in rock no sampling 1.00 Skilled Foreman 1.00 Building Laborer 1.00 Light Equip. Driver 1.00 Crawler Type Drill 100 mm 1.00 Air Compressor 600 CFM with 15m Air Hose 75 mm dia Drilling in rock with / casing & Sampling " DRILLING,CORE: Drilling core, in 200 mm concrete slab, including layout & setup, diameter 25 mm EA Skilled Laborer Laborer Core Drill Large Drilling core, in 200 mm concrete slab, including layout & setup, diameter 25 mm Drilling core, in 150 mm concrete slab, including layout & setup, diameter 76 mm Drilling core, in 200 mm concrete slab, including layout & setup, diameter 150 mm Drilling core, in 200 mm concrete slab, including layout & setup, diameter 200 mm Drilling core, in 150 mm concrete slab, including layout & setup, diameter 250 mm Drilling core, in 200 mm concrete slab, including layout & setup, diameter 250 mm Drilling core, in 200 mm concrete slab, including layout & setup, diameter 400 mm Core drilling in 200 mm prestressed hollow core plank, including layout & setup, diameter 25mm Core drilling in 200 mm prestressed hollow core plank, including layout & setup, diameter 76 mm Core drilling in 200 mm prestressed hollow core plank, including layout & setup, diameter 150 mm For core drilling horizontally add to above items. 15% 15%

3 TEST PITS: Test Pit, Hand Digging, Light Soil CUM 1.00 Common Laborer 1.00 Tool Set Test Pit, Hand Digging, Heavy Soil " " SITE DEMOLITION SITE DEMOLITION: Remove masonry existing catch basin or manhole, up to 3 m deep EA Building Labors Light Equp. Operator Backhoe loader, 50 HP Remove reinforced concrete existing catch basin or manhole, up to 3 m deep Store catch basin or manhole cover at site storage Remove only chain link, 3 meters high Remove fire hydrants, thrust blocks and sore at site Remove stone wall with mortar, disposal plied on Site CUM Plumbers Equip. operator Common laborer Backhoe 50 HP Tool sets Labor Foreman Building Laborers Equip. operator, light Equip. operator,heavy Air compressor, 250CFM w/ 4 air Tools & Hoses Mechanic F.E Loader, 1.9 M Pavement Removal, Bituminous; 75 mm Thick Remove concrete pavement, 100mm thick; mesh reinforced Remove concrete pavement, 150mm thick; mesh reinforced Remove concrete pavement, 200mm thick; mesh reinforced Remove concrete pavement, 200 mm To 600 mm thick, reinforced Remove curbs pavement,concrete; reinforced LM Building Labors Light equip. operator Backhoe, loader 50 HP

4 Remove curbs, granite LM Building Labors Light equip. operator Backhoe, loader 50 HP Pipe removal,concrete, no excavation, 600 mm Railroad track removal, ties & track For congested sites or small quantities,removal add to above items Disposal of removed material 32 KM round trip CUM BUILDING DEMOLITION BUILDING DEMOLITION: Demolition large urban steel buildings including 32 KM haul CUM Equip. operator Truck Driver Shovel, 1.7 M Dump Truck, 10 Ton 0.25 Labor Foreman 3.00 Building Laborers 2.00 Equipment Operator 2.00 Truck Drivers 1.00 Hydraulic Crane 23 Ton 1.00 F.E Loader, T.M 1.91 CUM 2.00 Dump Trucks 10 Ton Demolition large urban concrete buildings including 32 KM haul Small buildings, no salvage included - steel bldg Small buildings, no salvage included concrete building Small buildings, no salvage included wood building EXPLOSIVE DEMOLITION: Explosive demolition,not including disposal haul to 32 km - concrete building CUM 0.25 Skilled Foreman 8.00 Skilled Workers 2.00 Building Laborers 1.00 Equipment operator 2.00 Heavy Truck Drivers 1.00 F.E. Loader, T.M 2 CUM 2.00 Dump trucks 16 ton Explosive demolition,not including disposal haul to 32 km - masonry building,, Disposal of removed material 60 KM round trip SELECTIVE DEMOLITION CEILING DEMOLITION: Demolition ceiling plaster on concrete ceiling SQM DOOR DEMOLITION: Equip. operator Truck Driver Shovel, 1.7 M Dump Truck, 10 Ton 2.00 Laborers 2.00 Power Tools

5 Demolition exterior door, in masonry wall, double leaf 44 mm, 1.8 m X 2.1 m EA 1.00 Laborer 1.00 Tool Set Demolition hollow metal, exterior door, in masonry wall, double leaf 44 mm, 1.8m X m Demolition Roll-up or overhead door Demolition Revolving door, 1.2 meter ELECTRICAL DEMOLITION: Demolition of galvanized rigid steel conduit,exposed 50 mm to 100 mm LM 1.00 Electrician 1.00 Tool Set Electricians Demolition copper busduct 3000A 2.00 Tool Sets Electrician Demolition transformer,3phase, 750 kva 1.00 Tool Set Removal fluorescent lighting fixture, 600 mm x 1200 mm, 4 lamps " FRAMING AND CONCRETE DEMOLITION: Concrete Beams, or columns, reinforced, disposal removal to 32 km off site CUM 0.25 Labor Foreman 3.00 Building Laborers 2.00 Equipment Operator 2.00 Truck Drivers 1.00 Hydraulic Crane 23 Ton 1.00 F.E Loader, T.M 1.91 CUM 2.00 Dump Trucks 10 Ton Steel framing beam, columns, girders, stored on site storage TON " GUTTING: Gutting building interior,including disposal,residential buildings,average SQM Building Labors Truck Driver Dump Truck 10 Ton Gutting building interior,including disposal,commercial buildings,average,,,, HVAC DEMOLITION: Demolition air conditioning package unit,rooftop EA Steamfitters Laborer Tool Sets Laborer Demolition ductwork, 750 mm high, 900 mm wide LM Tool Set Demolition ductwork, 750 mm high, 1.8 m wide ",, PLUMBING DEMOLITION:

6 Demolition bath tub,cast iron with average of 3 m piping EA Plumber Laborer Tool Set Demolition lavatory wall hung with 3 m average piping Demolition water closet wall hung with 3 m average piping Demolition piping upto 50 mm LM 2.00 Plumbers 1.00 Laborer 2.00 Tool Sets Demolition piping mm,,,, SAW CUTTING: Saw cutting,asphalt over 300 LM; 75 mm deep LM Foreman Equip. Operator Truck Driver Truck 3 Ton Concrete Saw Water Tanker Saw cutting concrete slab,with mesh reinforcement, per 25 mm depth " Saw cutting,concrete wall,reinforced per 25 mm depth CONCRETE REMOVAL FOOTINGS AND FOUNDATIONS DEMOLITION: Demolition of reinforced concrete footing CUM Building Laborer Concrete Saw Labor Foreman Building Laborers Equip. operator, light Equip. operator, heavy Air compressor, 250 CFM w/ 4 air Tools & Hoses Mechanic F.E Loader, 1.9 M Demolition of concrete footing with heavy reinforcement,,,, REMOVAL OF UNDERGROUND STORAGE TANKS: Remove fuel tank including excavation & loading on trailer,capacity upto 8000 gallon EA Remove fuel tank including excavation & loading on trailer,capacity 8001 to 11, gallon 021 SITE PREPARATION: SITE CLEARING Laborers Equip. Operator Backhoe Loader, 50HP ,,,,

7 STRIPPING: Stripping top soil to 150 mm deep, and stock piling, sandy loam soil, with 200 HP dozer, normal conditions Stripping top soil to 150 mm deep, and stockpiling, sandy loam soil, with 200 HP dozer, adverse conditions Stripping top soil to 150 mm deep, and stockpiling, clay dry and soft soil, with 200 HP dozer normal conditions Stripping top soil to 150 mm deep, and stockpiling, clay dry and soft soil, with 200 HP dozer, adverse conditions. Stripping top soil to 150mm deep, and stockpiling, very hard soil, with 320 HP dozer, adverse conditions MOVING MOVING BUILDINGS: Move & set on ready foundation,prefabricated building 7.3 m wide,12 m long EA DEWATERING DEWATERING: Excavate drainage trench, 600 mm wide, 900 mm deep,with backhoe loader LM CUM 1.00 Equip. operator 1.00 Building Laborer 1.00 Dozer, 200 HP Equip. operator Building Laborers Crane 23 Ton Platform Trailer 1.00 Eqpt.Oper.(med.) 1.00 Laborer 1.00 Backhoe Loader,35 kw Building Labors Re-lay,corrugated metal pipe,including excavation 1m deep, 450 mm diameter (18") Light Equp. Operator Backhole loader, 50 HP Lay, corrugated metal pipe, including 300 mm collar gravel and 1 m deep excavation, pipe 300 mm diameter, 16 ga Lay, corrugated metal pipe, including 300 mm collar gravel and 1 m deep excavation, pipe 450 mm diameter, 16 ga Lay, corrugated metal pipe, including 300 mm collar gravel and 1 m deep excavation, pipe 600 mm diameter, 16 ga Sump hole pit construction, including excavation and gravel CUM WELLPOINTS WELLPOINTS: Wellpoints,pump operation, 4 shifts, 6 hours each, 24 hours daily DAY Skilled Foreman Skilled Workers

8 Complete well point installation, including first month operation for 24 hrs daily, fuel m long header 150 mm dia., at 1.5 m o.c., ground water level at 2.4 m, excavation depth 8.5 meters. LM HEADER Skilled Foreman Skilled Workers Truck Driver Common laborer Auger Drill Bed Truck Tools Set Complete well point installation, including first month operation for 24 hrs daily, fuel m long header 200 mm dia., well points 50 mm dia, at 1.5 m O.C, ground water level at 2.4 m, excavation depth 8.5 meters Complete well point installation, including first month operation for 24 hrs daily, fuel m long header 200 mm dia., well points 50 mm dia, at 1.5 m O.C, ground water level at 2.4 m, excavation depth 8.5 meters Complete well point installation, including first month operation for 24 hrs daily, fuel m long header 200 mm dia., well points 50 mm dia, at 1.5 m O.C, ground water level at 2.4 m, excavation depth 8.5 meters Complete well point installation, including first month operation for 24 hrs daily, fuel m long header 200 mm dia., well points 50 mm dia, at 1.5 m O.C, ground water level at 2.4 m, excavation depth 8.5 meters SHEET PILING SHEET PILING: Skilled Foreman Pile Drivers Equip. Oper. Light Sheet piling steel,including wales, 130 kg/m2; 6m deep excavation, left in place MET.TON Equip. Oper.Heavy Crane,36 metric ton Vibratory Hammer & Gen Bed Truck Sheet piling steel,including wales, 130 kg/m2; 6m deep excavation, including pull out Sheet piling steel,including wales, 156 kg/m2; 7.6m deep excavation, including pull out Sheet piling steel,including wales, 185 kg/m2; 12 m deep excavation,including pull out Sheet piling steel,including wales, 107 kg/m2; 4.5 m deep excavation,including pull out SQM Sheet piling steel,including wales, 130 kg/m2; 6 m deep excavation,left in place Sheet piling steel,including wales, 130 kg/m2; 6 m deep excavation, including pull out Sheet piling steel,including wales, 156 kg/m2; 7.6 m deep excavation, left in place MET.TON Sheet piling steel,including wales, 156 kg/m2; 7.6 m deep excavation, pull & salvage SQM Sheet piling steel,including wales, 185 kg/m2; 12 m deep excavation, including pull out

9 Wood.solid sheeting,including wales,braces and spacers,pull & salvage, 2.4 m deep, m wide excavation Wood.solid sheeting,including wales,braces and spacers,pull & salvage, 3 m deep, m wide excavation Wood.solid sheeting,including wales,braces and spacers,pull & salvage, 4.3 m deep, m wide excavation Wood.solid sheeting,including wales,braces and spacers,pull & salvage, 5.3 m deep, m wide excavation Wood.solid sheeting,including wales,braces and spacers,pull & salvage, 6.0 m deep, wide excavation Wood.solid sheeting,including wales,braces and spacers, left in place, 4.90 m deep, m wide excavation Wood.solid sheeting,including wales,braces and spacers, left in place, 6.00 m deep, m wide excavation Wood. solid sheeting for basement excavation, including wales, braces and spacers, pull & savage, 4.90 m deep, excavation Wood. solid sheeting for basement excavation, including wales, braces and spacers, pull & savage, 6.00 m deep, excavation SLURRY WALL SLURRY TRENCH: Slurry trench excavated slurry trench in wet soils backfilled with 21 MPa concrete, no reinforcing steel,average DEWATERING: Sand Drains Well Points French Drains Relief Wells SHORING & UNDERPINNING: Shores Needle Beams Grillage Underpinning CUM Foreman Laborer Pile Driver Truck Driver Air Compressor 354 L/s W/ attachments Truck 3 Ton, Handling Laborers Cement Finisher Equip. Operator Gas Engine Vibrators Hyd. Crane, 23 metric ton

10 Slabjacking EXCAVATION & SUPPORT SYSTEMS: Cribbing & Walers Soil & Rock Anchors Anchor Tieback Systems Ground Freezing Reinforced Earth Slurry Wall Construction COFFERDAMS: Double Wall Cofferdams Cellular Cofferdams Piling With Intermediate Lagging Sheet Piling Cofferdams 022 EARTHWORK: GRADING Site excavation & fill,see div Fine grading see div EXCAVATING,BACKFILLING & COMPACTING BACKFILL: Backfill by hand light soil CUM 1.00 Common Laborer 1.00 Tool Set Backfill by hand heavy soil CUM 1.00 Common Laborer 1.00 Tool Set Backfill light soil by hand & compaction in 150 mm layers, hand tamp, soft soil " Backfill light soil by hand & compaction by roller Backfill light soil by hand & compaction by vibrating pate BACKFILL STRUCTURAL: Backfill from existing stockpile,no compaction,by 75 Hp dozer; 15 Lm haul, sand & gravel CUM 1.00 Common Laborer 1.00 Equip. operator 1.00 Tools Set 1.00 Roller Compact, 1000 kg Common laborer Equip. operator Tools set Gas engine vibrating plate 1.00 Equip. Operator 0.05 Building Laborer 1.00 Dozer, 75 HP

11 Backfill from existing stockpile,no compaction,by 75 Hp dozer; 15 Lm haul, common earth Backfill from existing stockpile,no compaction,by 75 Hp dozer; 15 Lm haul, clay earth Backfill from existing stockpile,no compaction,by 75 Hp dozer; 100 Lm haul, clay earth Backfill from existing stockpile,no compaction,by 225 Hp dozer; 15 Lm haul, sand & gravel 1.00 Equip. Operator 0.05 Building Laborer 1.00 Dozer, 225 HP Backfill from existing stockpile,no compaction,by 225 Hp dozer; 15 Lm haul, common earth Backfill from existing stockpile,no compaction,by 225 Hp dozer; 15 Lm haul, clay earth Backfill from existing stockpile,no compaction,by 225 Hp dozer; 100 Lm haul, sand & gravel For Compaction See Div For Trench Backfill See Div & BORROW: Borrow common earth, shovel, 2 CUM bucket,no haul,bank measure CUM Equipment Operator Truck Drivers Common Laborers Dump Truck Power shovel, 2 m3 bucket Borrow topsoil or loam from stockpile,shovel, 2 CUM bucket,no haul,bank measure " " COMPACTION: Compaction by riding, vibrating roller, 150 mm lifts, 2 passes, more than 300 cum CUM Equip. operator Truck Driver Building Laborer Vibratory drum roller, 100 HP Water Tanker.25 M Compaction by riding, vibrating roller, 150 mm lifts, 3 passes Compaction by riding,vibrating roller, 150 mm lifts, 4 passes Compaction by riding, vibrating roller, 300 mm lifts, 2 Passes Compaction by riding, vibrating roller, 300 mm lifts, 3 passes Compaction by riding,vibrating Roller, 300 mm Lifts, 4 Passes Compaction by towed vibrating roller, 150 mm l Lifts, 2 passes CUM 1.00 Equip. Operator 1.00 Truck Driver 0.50 Building laborer 1.00 Sheepfoot Roller, 300 HP 1.00 Water Tanker, 25M

12 Compaction by towed vibrating roller, 150 mm l Lifts, 4 passes Compaction by towed vibrating roller, 300 mm l Lifts, 2 passes Compacting,vibrating roller, 600 mm wide,150 mm lifts, 2 passes Compacting,vibrating roller, 600 mm wide,150 mm lifts, 4 passes Compacting,vibrating roller, 600 mm wide,300 mm lifts, 4 passes Building Labor Compaction by rammer tamper, 300 to 450 mm, 200 mm lifts, 2 passes 1.00 Gas Engine, Power Tool DRILLING: Drilling Hole Only 50 mm for Rock Bolts, hard rock,average LM Blast foreman Equip. Operator Light Crawler Type Drill,102mm Air Compressor L/s with 15m Hoses, 76 mm dia Drilling only in open rock face by,jackhammer, easy rock Drilling only in open rock face by,jackhammer, moderate rock Drilling only in open rock face by,jackhammer, dense rock DRILLING & BLASTING: Drilling & blasting only,in open rock face, moderate rock,over 1000 CUM CUM Blast foreman Equip. Operator Light Truck Driver Common Laborer Crawler Type Drill,102mm Air Compressor L/s with 15m Hoses, 76 mm dia Bed Truck Content, capacity, reduction could be between 15 % to 60 % less than sand soil Drilling & Blasting only, in open rock face, dense rock, over 1000 cum Drilling & blasting only,in open rock face, moderate rock,over 1000 CUM, deep hole method Drilling & blasting only,in open rock face, moderate rock,over 1000 CUM, restricted areas EXCAVATING, BULK BANK MEASURE: Excavation only, bulk bank measure, by crawler excavator, hydraulic, self-propelled, cum capacity in common earth. Excavation only, bulk bank measure, by crawler excavator, hydraulic, self-propelled, cum capacity in soft earth. Excavation only, bulk bank measure, by crawler excavator, hydraulic, selfpropelled,2.29 cum capacity in common earth. CUM 1.00 Equip. Operator 1.00 Hydraulic Excavator 0.76 cum

13 Excavation only,bulk bank measure,by backhoe,hydraulic,crawler Mtd CUM capacity in common earth Excavation only,bulk bank measure by Wheel Mtd. excavator 0.57 m3 capacity in common earth Excavation only,bulk bank measure by Wheel Mtd. excavator 0.57 m3 capacity in heavy soil and stiff clay Excavation only, bulk bank measure, by crawler clamshell excavator, hydraulic, cum capacity in common earth. Excavation only, bulk bank measure, by crawler clamshell excavator, hydraulic, cum capacity in sand and gravel earth Excavation only, bulk bank measure, by crawler clamshell excavator, hydraulic, cum capacity in soft earth Excavation only, bulk bank measure, by crawler clamshell excavator, hydraulic, cum capacity in common earth 1 Equip. Operator 1 Hydraulic Excavator 2.29 CUM 2 Equip. Operator 1 Hydraulic Excavator 0.57CUM 1.00 Equip. Operator 1.00 Clamshell Excavator 0.57cum 1.00 Equip. Operator 1.00 clamshell Excavator 1.15cum Excavation only, bulk bank measure, by Power Shovel, 0.57 M3 capacity in M Equip. Operator 1.00 Shovel 0.57 cum w/attachment 0.57 cum Excavation only, bulk bank measure, by Power Shovel, 0.57 M3 capacity in soft soil Excavation only, bulk bank measure, by Power Shovel, 0.57 M3 capacity in heavy soil or stiff clay Excavation only, bulk bank measure, by Power Shovel, 1.15 M3 capacity in common earth Excavation only, bulk bank measure, by Power Shovel, 1.15 M3 capacity in wet clay soil & sticky Excavation only, bulk bank measure, by Power Shovel, 1.15 M3 capacity in poorly blasted rock soil Excavation only, bulk bank measure, by Power Shovel, 1.15 M3 capacity in well blasted rock soil Excavation only, bulk bank measure, by Power Shovel, 1.90 M3 capacity in common earth Excavation only, bulk bank measure, by Power Shovel, 1.90 M3 capacity in heavy soil or stiff clay Excavation only, bulk bank measure, by Power Shovel, 1.90 M3 capacity in well blasted rock soil Excavation only, bulk bank measure, by Power Shovel, 2.29 M3 capacity in common earth Excavation only, bulk bank measure, by Power Showel,3.25 M3 capacity in common earth Excavation only, bulk bank measure, by Power Showel,3.25 M3 capacity in common earth with rocks Excavation only, bulk bank measure, by Power Showel,4.00 M3 capacity in common earth CUM 1.00 Equip. Operator 1.00 Shovel 1.15 cum w/attachment 1.15 cum 1.00 Equip. Operator 1.00 Shovel 1.90 cum w/attachment 1.90 cum 1.00 Equip. Operator 1.00 Shovel 2.29 cum w/attachment 2.29 cum 1.00 Equip. Operator 1.00 Shovel 3.25 cum w/attachment 3.25 cum 1.00 Equip. Operator 1.00 Shovel 4.00 cum w/attachment 4.00 cum "

14 Excavation only, bulk bank measure, by Power Showel,4.00 M3 capacity in wet sticky clay earth. Excavation only, bulk bank measure, by Power Showel,4.00 M3 capacity in poorly blasted rock earth Loading Excavated Material On Trucks & Hauling Material To 32 Km Round Trip Equip. Operator Truck Drivers Common laborer Dump Truck 15 ton Power Shovel, 2 m3 Bucket Loading Excavated Material On Trucks & Hauling Material To 64 Km Round Trip Loading Excavated Material On Trucks & Hauling Material To 80 Km Round Trip EXCAVATING BULK DOZER,OPEN SITE: Excavating only & haul in pile by dozer 75 HP, 15 meters haul, sand & gravel CUM 1.00 Equip. Operator 0.50 Laborer Dozer 75 HP Excavating only & haul in pile by dozer 75 HP, 15 meters haul, common earth " " Excavating only & haul in pile by dozer 75 HP, 15 meters haul, clay earth CUM 1.00 Equip. Operator 0.50 Laborer Dozer 75 HP Excavating only & haul in pile by dozer 75 HP, 90 meters haul, clay earth " Excavating only & haul in pile by dozer 200 HP, 15 meters haul, sand and gravel 1.00 Equip. Operator 0.50 Laborer Dozer 225 HP Excavating only & haul in pile by dozer 200 HP, 15 meters haul, common earth Excavating only & haul in pile by dozer 200 HP, 15 meters haul, clay earth Excavating only & haul in pile by dozer 200 HP, 45 meters haul, common earth Excavating only & haul in pile by dozer 700 HP,15 meters haul, sand & gravel 1.00 Equip. Operator 0.50 Laborer Dozer 700 HP Excavating only & haul in pile by dozer 700 HP,15 meters haul, common earth Excavating only & haul in pile by dozer 700 HP,15 meters haul, clay earth Excavating only & haul in pile by dozer 700 HP, 45 meters haul, sand & gravel EXCAVATING STRUCTURAL: Excavating hand pits, to 2 Meter Deep, Sandy Soil CUM 1 Common Laborer 1 Tool set Excavating hand pits, to 2 meter deep, heavy or clay soil Excavating hand pits, to 2 meter deep, sandy soil,wet Excavating Piers, to 1.8 meter deep, heavy or clay soil

15 Excavating hand pits in rocky area using air compressor Laborers Air Compressor 118 L/s with Hoses & Accessories Common Laborer Loading hauling trucks by labor from stockpile. 1 Tool set Machine excavation for spread,raft footings,elevator pits and small building 1 Equip. Operator foundation,common earth,hydraulic backhoe 1.15 M3 1 Hydraulic Excavator 1.15 CUM Machine excavation for spread,raft footings,elevator pits and small building foundation,sand & gravel,hydraulic backhoe 1.15 M Machine excavation for spread,raft footings,elevator pits and small building foundation,clay or blasted rock,hydraulic backhoe 1.15 M Trimming foundation & pit bottoms and sides. SQM 1 Common Laborer 1 Tool set For Hauling See EXCAVATING TRENCH OR CONTINOUS FOOTING: No Sheeting Or Dewatering Included: Excavating trench up to 1.2 meter deep, 0.57 M3 hydraulic backhoe,common earth CUM 1 Equip. Operator 1 Hydraulic Excavator 0.57 CUM Excavating trench 1.20 to 2.00 meter deep, 0.57 M3 hydraulic backhoe,common earth Excavating trench 2 to 3.00 meter deep, 0.57 M3 hydraulic backhoe,common earth Equip. Operator Excavating trench 2 to 3.00 meter deep, 1.15 M3 hydraulic backhoe,common earth 1 Hydraulic Excavator 1.15 CUM Equip. Operator Excavating trench 3 to 4.00 meter deep, 1.15 M3 hydraulic backhoe,common earth 1 Hydraulic Excavator 1.15 CUM Equip. Operator Excavating trench 3 to 4.00 meter deep, 2.29 M3 hydraulic backhoe,common earth 1 Hydraulic Excavator 2.67 CUM Equip. Operator Excavating trench 4 to 6.00 meter deep, 1.15 M3 hydraulic backhoe,common earth 1 Hydraulic Excavator 1.15 CUM Equip. Operator Excavating trench 4 to 6.00 meter deep,2.29 M3 hydraulic backhoe,common earth 1 Hydraulic Excavator 2.29 CUM Common Laborer Excavating trench by hand with pick & shovel, 2 meter deep, light soil. 1 Tool set Building Laborer For tamping backfilled trenches, air tamp add 1 Gas Engine, Power Tool For tamping backfilled trenches, by vibrating plate add For trim sides & bottom of trench,common earth Backfill trench, F.E. loader, wheel Mtd M3 bucket, average haul area 30 meters For Backfill With Dozer See Div For Compaction Of Backfill See Div EXCAVATING UTILITY TRENCH: Excavating utility trench,common earth with chain trencher, 12 HP, 150 mm wide, mm deep CUM LM 1 Equip. Operator 1 F.E. Loader, W.M 0.76 CUM 1 Equip. Operator 1 Trencher,Chain, 12 HP (9 KW)

16 Excavating utility trench,common earth with chain trencher, 12 HP, 200 mm wide, mm deep Excavating utility trench,common earth with chain trencher, 12 HP, 200 mm wide, mm deep Backfill utility trench 150 mm wide, 450 mm deep,by hand including compaction Building Laborer 1 Gas Engine, Power Tool Backfill utility trench 200 mm wide, 600 mm deep,by hand including compaction " Backfill utility trench 200 mm wide, 900 mm deep,by hand including compaction LM 1 Building Laborer 1 Gas Engine, Power Tool Excavating utility trench,common earth with chain trencher,operator riding, 40 HP,150 1 Equip. Operator mm wide, 600 mm deep 1 Trencher,Chain, 40 HP (30 KW) Excavating utility trench,common earth with chain trencher,operator riding, 40 HP, Equip. Operator mm wide, 1200 mm deep 1 Trencher,Chain, 40 HP (30 KW) Excavating utility trench, common earth with ditching M/C, 135 HP, crawler, 400 mm 1 Equip. Operator wide, 2400 mm deep. 1 Ditching Trencher, 135 HP FILL: Spread fill dumped material, by dozer, no compaction CUM Spread fill dumped material, by hand, no compaction Spread fill dumped material from a stockpile with dozer, 300 HP, 90 m haul 1 Equip. Operator 0.5 Laborer 1 Dozer 200 HP 1 Common Laborer 1 Tool set 1 Equip. Operator.5 Labor 1 Dozer, 300HP (224KW) 1 Labor Foreman 4 Laborers Gravel fill compacted under floor slabs, 100 mm deep 1 Equip. Operator 1 Tandem Roller 4.5 Ton Alternate pricing method,for gravel fill per M3,gravel fill compacted under floor slabs, mm deep For Fill Under Exterior Paving See Div HAULING: Avg Speed 40 Km/Hr, Highway Hauler. Bank MeasureIncluding Loading Hauling excavated or borrow material, 4.58 M3 dump truck,swell factor 20%, round trip Km Hauling excavated or borrow material, 4.58 M3 dump truck,swell factor 20%, round trip Km Hauling excavated or borrow material, 4.58 M3 dump truck,swell factor 40%, round trip Km Hauling excavated or borrow material, 9.17 M3 dump truck,swell factor 20%, round trip Km Hauling excavated or borrow material, 9.17 M3 dump truck,swell factor 20%, round trip Km CUM Truck Driver Equipment Operator Truck Driver Dump Truck 5 CUM CAP Shovel, Bucket 2.92 CUM

17 Hauling excavated or borrow material,15.28 M3 dump truck,swell factor 20%, round trip Km Hauling excavated or borrow material, M3 dump truck,swell factor 40%, round trip 24 Km Hauling excavated or borrow material,15.28 M3 dump truck,swell factor 20%, round trip Km Hauling excavated or borrow material,15.28 M3 dump truck,swell factor 20%, round trip Km Hauling excavated or borrow material,15.28 M3 dump truck,swell factor 40%, round trip Km Hauling excavated or borrow material, m3 dump truck, swell factor 20%, round trip 80 km. Hauling excavated or borrow material,15.28 M3 dump truck,swell factor 20%, round trip Km,medium traffic,25 km/hr. Hauling excavated or borrow material,15.28 M3 dump truck,swell factor 40%, round trip Km, heavy traffic 15 km/hr LOAM OR TOPSOIL: Remove and stockpile loam or topsoil,on site, 200 HP dozer, mm deep, 90 meters haul Spread loam or topsoil from stockpile to rough finished grade, with 1.15 CUM F.E loader Spread loam or topsoil from stockpile to rough finished grade, up to 60 M radius, by hand PAVEMENT BASE: BASE: Prepare and rolll Sub-base, small areas upto 2000 SQM SQM Prepare And Roll Sub-base, large areas above 2000 SQM SQM BASE COURSE: FOR ROADWAYS AND LARGE PAVED AREAS CUM Truck Driver Equipment Operator Truck Driver Dump Truck 5 CUM CAP Shovel, Bucket 2.92 CUM 1Equip. Operator 0.5 Laborer 1 Dozer 200 Hp 1Equip. Operator 1 F.E. Loader, W.M CUM 1 Common Laborer 1 Tool set Labor Foreman Surveyor Laborer Equipment Operator Grader Tandem Roller, 9 ton Dozer 200 HP Water Tanker Labor Foreman Surveyor Laborer Equipment Operator Grader Tandem Roller, 9 ton Dozer 200 HP Water Tanker

18 Base course, 20 mm Stone,compacted, for paved & large areas,150 mm deep SQM Alternate pricing for base course, 20 mm stone,compacted, per CUM CUM Labor Foreman Surveyor Laborer Equipment Operator Aggregate Spreader Tandem Roller, 9 ton Dozer 225 HP Water Tanker Labor Foreman Surveyor Laborer Equipment Operator Aggregate Spreader Tandem Roller, 9 ton Dozer 225 HP Water Tanker Base course, crushed 40 mm stone, compacted,for paved & large area, 200 mm deep Alternate pricing for base course, crushed 40 mm stone, compacted, per CUM Base course,bank run gravel, spread and compacted, 200 mm deep SQM Base course bituminous concrete, 100 mm thick Labor Foreman Surveyor Laborer Equipment Operator Grader Tandem Roller, 9 ton Dozer 200 HP Water Tanker Labor Foreman Surveyor Laborers Equip. operator Asphalt paver Tandem Roller, 9 ton Roller, Pneumatic Wheel Base course bituminous concrete, 250 mm thick,, For cold laid asphalt pavement, See Div Liquid application to gravel base, asphalt emulsion GAL Common Laborer Truck Driver Asphalt Tanker Liquid application prime & seal cut back asphalt,, Macadam Penetration Crushed Stone, 9 liter/ M2, 100 mm Thick SQM Macadam penetration crushed stone, 18 liter/ M2, 200 mm thick SQM

19 Alternate pricing for base course, 20 mm stone, compacted, 150 mm thick, per CUM CUM Labor Foreman Surveyor Laborer Equipment Operator Aggregate Spreader Tandem Roller, 9 ton Dozer 225 HP Water Tanker Alternate pricing for base course, 20 mm stone, Compacted, 230 mm thick, per CUM Alternate pricing for base course, 20 mm stone, compacted, 300 mm thick, percum Alternate pricing for base course, crushed 40 mm stone, compacted, per CUM Alternate base course bank run gravel, spread and compacted. Alternate pricing for base course bituminous concrete, metric ton, average thickness mm SOIL STABILIZATION GROUTING PRESSURE: Grouting,cement & sand 1:1 mix,average CUM Soil stabilization,including scarifying compaction, asphalt 75 mm deep, 1.00 gallon per SQM TON SQM Labor Foreman Surveyor Laborer Equipment Operator Grader Tandem Roller, 9 ton Dozer 200 HP Water Tanker Labor Foreman Surveyor Laborers Equip. operator Asphalt paver Tandem Roller, 9 ton Roller, Pneumatic Wheel Asphalt Tanker 3 Laborers 1 Equip.Oper.(light) 1 Cement mixer,1.53 m Common Laborers Equipment Operators Truck Drivers Grader kg with ripper attachment Stabilizers,310 HP Truck 10 ton Water Tank 20 CUM

20 Soil stabilization,including scarifying compaction, asphalt 75 mm deep, 1.50 gallon per SQM Soil stabilization,including scarifying compaction, asphalt 200 mm deep, 6 gallon per SQM Soil stabilization,icluding scarifying compaction, cement 4% To % mix by volume, 150 mm deep. SQM Common Laborers Equipment Operators Truck Drivers Grader kg with ripper attachment Stabilizers,310 HP Truck 10 ton Water Tank 20 CUM " " SQM 1 Labor Foreman 2 Laborer 4 Equip. Operator 3 Truck Driver 1 Grader Kg with ripper attachment 1 Flat Truck, 3 Ton 1 Cement Spreader, Towed 1 Vibrating Roller 2 Stabilizers, 310 HP 1 Truck 27 Ton 1 Water Tank 20 CUM Soil stabilization,including compaction, cement 4% To % mix by volume, 300 mm deep. " Geotextile fabric, woven, 90 Kg tensile strength Common Laborers Tool sets Geotextile fabric, woven,heavy duty, 270 Kg tensile strength Geotextile fabric,non-woven, 55 Kg tensile strength Hydrated lime, for base, 2% To 6% mix by weight, mm deep Hydrated lime,for base, 2% to 6% mix by weight, mm deep SLOPE PROTECTION & EROSION CONTROL CUT DRAINAGE: Cut drainage ditch in common earth,10 meters wide, mm deep,including ditch cleaning SQM 1 Labor Foreman 2 Laborer 4 Equip. Operator 3 Truck Driver 1 Grader Kg 1 Flat Truck, 3 Ton 1 Cement Spreader, Towed 1 Vibrating Roller 2 Stabilizers, 310 HP 1 Truck 27 Ton 1 Water Tank 20 CUM " " LM Equipment Operator Laborers Grader, 13.6 Ton

21 EROSION CONTROL: Jute mesh,1200 mm wide, 85 SQM /roll, stapled. SQM Common Laborers Tool Sets Polypropylene mesh,stapled, 220 gram/sqm Silt fence,polypropylene, adverse conditions RETAINING WALLS: Concrete gravity wall with vertical face, including excavation & backfill, non- reinforced, 1.8 meter high,level embankment. Concrete gravity wall,with vertical face,including excavation & backfill, non- reinforced, 2.40 meter high, level embankment. Concrete gravity wall,with vertical face,including excavation & backfill, non- reinforced, 2.40 meter high,33 degree sloped embankment. Concrete gravity wall, including excavation & backfill, non- reinforced, 3.00 meter high,33degree sloped embankment. Reinforced concrete, cantilever wall, including excavation & backfill, 1.8 meter high, 33 degree sloped embankment. Reinforced concrete, cantilever wall, including excavation & backfill, 3 meter high, 33 degree sloped embankment. Reinforced concrete, cantilever wall, including excavation & backfill, 6.00 meter high, 33 degree sloped embankment Concrete filled slurry trench,see division RIP-RAP: SQM Skilled Foreman Skilled Labors Common Laborers Cement Finisher Equip. Operator Crane 50 Ton Gas Engine Vibrator Concrete Pump & tansit mixer Truck 25 ton Power Tools Trencher Rip-rap, random broken stone, machine placed,for slope protection, 0.29 to 0.19 cum pieces,grouted CUM Skilled Labor Equip. Operator Common laborer Shovel 0.57 cum Clamshell Backhoe, 0.57 m Grout Machine Rip-rap, random broken stone, machine placed,for slope protection, 450 mm thick,not grouted SQM 5 Laborers 1 Equip. Operator 1 Hydraulic Crane Gabions, galvanized steel mesh, stone filled, 300 mm deep

22 Gabions, galvanized steel mesh,stone filled, 900 mm deep STONE WALL: Stone wall, including excavation,concrete footing and stone, 900 mm below grade, exposed area measure. cut stone, 2 meters high, 450 mm thick, morter set SOIL TREATMENT TERMITE PRETREATMENT: Termite treatment, slabs complete with insecticides for control,average Termite treatment, walls complete with insecticides for control,average 023 TUNNELING,PILES & CAISSONS PILES DRIVING MOBILIZATION: Mobilization & demobilization of driven pile equipment from warehouse to site within city limit, 3 days mobilization PILING SPECIAL COSTS: Cutoffs of plain concrete pile, 500 mm diameter EA SQM SQM Skilled Foreman Skilled labor Common laborer Equip. Operator Crane 80 ton Backhoe, 057 M Skilled Worker Power Tools " " LM Skilled Foreman Skilled Workers Equip. Operator Mechanist Truck Driver Common Laborers Crane 135 ton Bed Truck Concrete Saw Cutoffs of plain with thin shell Cutoffs of steel pile Note: Add for pile testing as specified DRIVEN PILES PILES CONCRETE: 200 Piles,18 Meter Long

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION Effective September 9, 2014 The General Trade Knowledge portion of the examination is administered daily in Computer

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

Hydraulic Excavators

Hydraulic Excavators Chapter 8 Hydraulic Excavators Hydraulic excavators are designed to excavate below the ground surface on which the machine rests. These machines have good mobility and are excellent for general-purpose

More information

Detailed Estimating-Introduction. Dr. Al-Hammad

Detailed Estimating-Introduction. Dr. Al-Hammad Detailed Estimating-Introduction By Dr. Al-Hammad Outline Introduction Successful Construction Estimating The Detailed Estimating Procedure The stretch - out - Length concept (SOL) Site Work and Excavation

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $13,984,117.36 Reed & Reed, Inc. - Woolwich, ME $14,883,139.00 Page 1 of 11 CPM Constructors Freeport, ME 201.11 Clearing AC 2.00 10000.00

More information

Site Chapter Development Introduction to Site Development Demolition Drainage Earthwork Fencing Landscaping Roads - Slabs - Paving Piling Railroads

Site Chapter Development Introduction to Site Development Demolition Drainage Earthwork Fencing Landscaping Roads - Slabs - Paving Piling Railroads Chapter Site 25 Development Introduction to Site Development... 25-3 Demolition... 25-4 Drainage... 25-5 Earthwork General... 25-6 Excavation...25-7 Fencing... 25-9 Landscaping... 25-10 Roads - Slabs -

More information

- Earthwork Operations & Equipments

- Earthwork Operations & Equipments - Earthwork Operations & Equipments Earthwork Operations Those construction processes that involve the soil or earth in its natural form and that precede the building of the pavement structure itself Basic

More information

Item No. Description Unit Quantity Rate (EUR) Amount (EUR) No 2

Item No. Description Unit Quantity Rate (EUR) Amount (EUR) No 2 BILL NO.1 : PRELIMINARY AND SUPERVISORY SERVICES 1.01 Allow a prime cost sum for material testing to be spent in whole or part as directed by the Resident Engineer. PC Sum 1 1,351.35 1,351.35 1.02 Contractor's

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984 1 TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION June 1984 1. DEFINITIONS APPROVAL, APPROVED, ACCEPTED OR WORDS OR TERMS OF SIMILAR MEANING: Written approval of the Highway Superintendent. BASE

More information

Sector: AGRICULTURE Sub-Sector: IRRIGATION Activity: Maintenance and Rehabilitation of Irrigation projects. Qty. in unit

Sector: AGRICULTURE Sub-Sector: IRRIGATION Activity: Maintenance and Rehabilitation of Irrigation projects. Qty. in unit ANNEX AGR I - 7 Sector: AGRICULTURE Sub-Sector: IRRIGATION Activity: Maintenance and Rehabilitation of Irrigation projects Priority within the Sector: First Total requested fund : Code Item Description

More information

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

Drainage, Road Drainage and Collection Pit A - EXCAVATION: 57 Drainage, Road Drainage and Collection Pit SCHEDULE OF QUANTITY Sl.N o. 1 Particulars Qty Unit Rate Amount A - EXCAVATION: Earth work in EXCAVATION IN FOUNDATION TRENCHES IN ALL KIND OF SOIL including

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS 219-1.1 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION This item consists of a base course composed of crushed recycled concrete aggregate, crushed to meet a particular gradation,

More information

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing. SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom

More information

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL 13.01 GENERAL The work included in this section shall consist of furnishing all materials and equipment and performing all labor

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

SECTION BITUMINOUS CONCRETE PAVING

SECTION BITUMINOUS CONCRETE PAVING PART 1 GENERAL 1.1 SECTION INCLUDES: SECTION 02400 BITUMINOUS CONCRETE PAVING A. The intent of this specification section is to provide requirements for materials, equipment, and methods for constructing

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

Section 14 EARTHWORK, EXCAVATION, EMBANKMENT AND SUB-GRADE

Section 14 EARTHWORK, EXCAVATION, EMBANKMENT AND SUB-GRADE Section 14 EARTHWORK, EXCAVATION, EMBANKMENT AND SUB-GRADE 14-1 ROADWAY EXCAVATION AND BACKFILL In the Contract this item shall consist of excavating, removing, and satisfactory disposal of all material

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $3,379,844.00 Scott Construction Corporation - Portland, ME $3,572,184.50 CPM Constructors - Freeport, ME $3,732,667.25 Page 1 of 16 Wyman

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.

More information

Special Provision Item P-152 Excavation and Embankment

Special Provision Item P-152 Excavation and Embankment Special Provision Item P-152 Excavation and Embankment DESCRIPTION This item shall be constructed in conformity with FAA Standard Specification "Item P-152 Excavation and Embankment, except as herein modified

More information

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M. Bill of Quantities Nature of work : Construction of Health Center with 8 rooms (Clinics, Pharmacy, Labs, Fence & Latrines) Location: Shakreen- El Fasher Town- North Darfur State No. Description Qty Unit

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING AFTER NOVEMBER 1, 2008 ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING 252.1 Description. This work shall consist of a stabilized base course composed of a mixture of the existing bituminous

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 12 16 ASPHALT CONCRETE PAVING PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for placing a hot laid plant mix asphalt surface course upon either an asphalt stabilized

More information

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS CS-2-01. GENERAL: Trench excavation shall conform with the City Standard Specifications. In general a trench is defined as an excavation in which

More information

Underground Exhaust System

Underground Exhaust System Operation and Maintenance Manual Underground Exhaust MONOXIVENT - SOURCE CAPTURE SYSTEMS - info@ Oct. - 2015 Underground Duct Construction Standards 1. Dig trench depth to allow for minimum distance from

More information

Estimate FOR THE SEPTIC TANK

Estimate FOR THE SEPTIC TANK Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks

More information

Maine Turnpike Authority

Maine Turnpike Authority PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SECTION A-A NTS. Figure 4.1 Alternative Flow Dispersal Trench NOTES:

SECTION A-A NTS. Figure 4.1 Alternative Flow Dispersal Trench NOTES: Figure 4.1 Alternative Flow Dispersal Trench NOTES: galvanized bolts 2" x 12" pressure treated grade board 2" x 2" notches 18" O.C. *20% max 12" min. 36" max 1' - 6" min *20% max 4" x 4" support post clean

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

EXHIBIT E SCHEDULE OF UNIT PRICES

EXHIBIT E SCHEDULE OF UNIT PRICES SCHEDULE OF UNIT PRICES TO ACCOMPANY THE BID OF (Bidder/Contractor) ON CALL UTILITY SERVICES AND MISCELLANEOUS CONSTRUCTION FOR SEWER AND WATER LINES SOLICITATION NO.: IFB SA1703 Any bidder who enters

More information

This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations.

This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations. SPEC-1100 1/9 1.0 PURPOSE This specification describes the minimum requirements for general grading, excavation of earth, rock and solid slag, embankment construction, ditching, use of explosives, and

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

SECTION FLEXIBLE PAVING

SECTION FLEXIBLE PAVING SECTION 321200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Include GENERAL CONDITIONS and applicable parts of Division 1 as part of this Section. B. Examine all Drawings and other Sections of the Specifications

More information

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 31 23 00 EXCAVATION AND BACKFILL, GENERAL PART 1 GENERAL... 2 1.1 Description... 2 1.2 Submittals... 2 1.3 Reference

More information

Index to Technical Specifications

Index to Technical Specifications Index to Technical Specifications Item Number Subject I II EXCAVATION 1.01 Trenching and Excavation Regulations 1.02 Site Grading or General Excavation 1.03 Structural Excavation 1.04 Trench Excavation

More information

freestone eco Prestige & quality DIY vertical wall Large blocks - 10/m 2 Smooth surface finish No concrete footings

freestone eco Prestige & quality DIY vertical wall Large blocks - 10/m 2 Smooth surface finish No concrete footings freestone eco Retaining Wall SystemTM The Freestone ECO Retaining Wall System TM is a more sustainable DIY, vertical retaining wall which is manufactured with up to 40% recycled glass aggregate to provide

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to

More information

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.)

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) Based on. I to IV w.e.f. 10 May 2012 Length of the Road =250 m, ROW 18 m Abstract Estimate S.No. Description of Item SOR Item Cost 1

More information

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES 1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all

More information

FREESTONE ECOTM. Retaining Wall SystemTM. No one knows Blocks and Pavers better

FREESTONE ECOTM. Retaining Wall SystemTM. No one knows Blocks and Pavers better FREESTONE ECOTM Retaining Wall SystemTM The Freestone ECO Retaining Wall System TM is a more sustainable DIY, vertical retaining wall which is manufactured with up to 40% recycled glass aggregate to provide

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,417,760.75 Scott Construction - Falmouth, ME $1,418,884.50 T Buck Construction - Auburn, ME $1,520,203.00 Page 1 of 16 CPM Constructors

More information

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.

More information

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount EXTERNAL WORKS DEMOLITION AND ALTERATIONS EXTERNALLY Pulling down to ground level; removing debris from Site a 200 mm thick masonry wall finished both sides with plaster and paint; net total area 158 square

More information

SECTION 14 EMBANKMENT

SECTION 14 EMBANKMENT SECTION 14 EMBANKMENT 14.1 DESCRIPTION A. General: This work consists of constructing roadway embankments, including preparation of the areas upon which embankments are to be placed; the construction of

More information

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB

More information

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4 City of Columbia Engineering Regulations PART 25: SPECIFICATIONS FOR ALTITUDE VALVE VAULT Table of Contents Paragraph Description Page No. 25.1 General 25-1 25.2 Materials 25-1 25.3 Concrete Masonry Work

More information

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 SECTION 2 BID TOTAL

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 SECTION 2 BID TOTAL FOR: Bridge Construction (Structures) ROAD NO.: 345 & 445 BRIDGE SITE NO.: 0534-10, 1350-10 SUMMARY OF PRICES CONTRACTOR SECTION 1 SECTION 2 BID TOTAL Armcon Ltd 893,542.68 2,135,575.82 3,029,118.50 M.D.

More information

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority PAY DESCRIPTION GENERAL 1 1200 Construction Traffic Control and Barricading: including any and all access signs and permitting by the City of LS 1 Rio Rancho, 2 1504 Temporary Pollution Control: NPDES

More information

Excavation. Stages. Surprises

Excavation. Stages. Surprises Excavation Stages Layout the excavation Strip the topsoil within building lines - store separately Begin excavation Hit water - de-water Slope sides of excavation according to the angle of repose for the

More information

Tasman Retaining Wall System

Tasman Retaining Wall System Tasman Retaining Wall System The Tasman Retaining Wall System incorporates purpose made corners and capping units to provide classical reconstructed stone retaining walls for any landscape situation. From

More information

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: EPI/WRO/CON/757/0119 FOR Construction of Boundary Wall and allied works for DHH & MCH Hospital at Kendrapara at Odisha state VOLUME III PRICE BID

More information

2016 HEAVY / HIGHWAY DEFINITIONS

2016 HEAVY / HIGHWAY DEFINITIONS 2016 HEAVY / HIGHWAY DEFINITIONS 1 Asphalt Distributor Operator Drives distributor truck, sets spray bars and operates valves and levers to control distribution of bituminous material for highway surfacing.

More information

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION A. Section Includes B. References C. Quality Assurance D. Submittals E. Delivery, Storage and Handling F. Environmental Conditions G. Summary H. Concrete

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

Installation Guidelines

Installation Guidelines 815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Guidelines Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles (optional),

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

Chapter 3 - Excavation

Chapter 3 - Excavation Chapter 3 - Excavation South Dakota Department of Transportation Structures Construction Manual Excavation - Chapter 3 The What and Where of Excavation What is Excavation The removal of Earth material

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 00252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING 252.1 Description. This work shall consist of a stabilized base course composed of a mixture of the existing bituminous

More information

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS 16.01 GENERAL Specifications in this section shall apply to the construction of storm sewer systems including excavation, trenching, backfilling,

More information

PERMEABLE INTERLOCKING PAVERS

PERMEABLE INTERLOCKING PAVERS PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement

More information

SECTION TRENCHING AND BACKFILLING. A. Earth excavation and backfilling for construction of pipe and appurtenances, and for required removals.

SECTION TRENCHING AND BACKFILLING. A. Earth excavation and backfilling for construction of pipe and appurtenances, and for required removals. SECTION 312333 - TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

CIVIL ENGINEERING CONSTRUCTION SBC2253

CIVIL ENGINEERING CONSTRUCTION SBC2253 CIVIL ENGINEERING CONSTRUCTION SBC2253 EARTHWORKS Sr Dr. Mohd Saidin Misnan Department of Quantity Surveying Faculty of Built Environment Universiti Teknologi Malaysia b-saidin@utm.my-earthworks INTRODUCTION

More information

Dewatering & Foundations. Water. Low tech

Dewatering & Foundations. Water. Low tech Dewatering & Foundations Water It seems every time we dig a hole it fills up with rainwater, or groundwater.if we re lucky we hit an underground river or spring that keeps the hole nice and wet. But a

More information

10 EXTREME BASEMENT PANELS

10 EXTREME BASEMENT PANELS 10 EXTREME BASEMENT PANELS On Granular Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions. Soils are classified

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

EXISTING CONDITIONS. Town of Bedford, NH Sand Volleyball Courts Existing Conditions Sheet 2 of 5 GENERAL NOTES

EXISTING CONDITIONS. Town of Bedford, NH Sand Volleyball Courts Existing Conditions Sheet 2 of 5 GENERAL NOTES GENERAL NOTES 1. THE CONTRACTOR SHALL VERIFY AND DETERMINE THE LOCATION, SIZE AND ELEVATION OF ALL EXISTING UTILITIES SHOWN OR NOT SHOWN ON THESE PLANS PRIOR TO THE START OF ANY CONSTRUCTION. THE CONTRACTOR

More information

Contract Identification No. and Package 1. SUHEP-067/68-Lot No.1-AR: Package B 2. SUHEP-067/68-Lot No.1-AR: Package C

Contract Identification No. and Package 1. SUHEP-067/68-Lot No.1-AR: Package B 2. SUHEP-067/68-Lot No.1-AR: Package C Notice of Amendment No.1 Addendum No.1 to the following Contract Packages has been made in the Bids, for which the first date notice was published in the Gorkhapatra daily on December 14, 2010 by Sanjen

More information

SECTION ASPHALT PAVING

SECTION ASPHALT PAVING SECTION 02500 ASPHALT PAVING PART 1 GENERAL 1.1 RELATED DOCUMENTS a) Drawings and general provisions of the Contract, including the General and Supplementary General Conditions and Division 00 & 01 specification

More information

StormTech Construction Guide

StormTech Construction Guide M /M 00 35 C- A division of REQUIRED MATERIALS AND EQUIPMENT LIST 00 45 C- StormTech Construction Guide Detention Retention Water Quality Acceptable fill materials per Table 1 Woven and non-woven geotextiles

More information

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS TEXAS STANDARD CONSTRUCTION NOTES DRWN. BY: DSGN. BY: KJW 1 of 2 *Place geotextile fabric as a permeable seperator to prevent mixing of coarse aggregate and underlying soil. (as needed). 1. GEOTEXTILE

More information

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES AFTER MARCH 1, 2012 ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES 430.1 Description. This item shall govern for all excavation required for the construction of sewers, sewer structures, pipe culverts,

More information

Attachment D-1: Civil/Structural Scope of Work

Attachment D-1: Civil/Structural Scope of Work Attachment D-1: Civil/Structural Scope of Work Project: Location: Targa Sound Renewable Fuels Project Tacoma, WA Prepared by: NORWEST ENGINEERING Consulting Engineers 4110 N.E. 122 nd Avenue, Portland,

More information

PUBLIC WORKS DEPARTMENT ARUNACHAL PRADESH

PUBLIC WORKS DEPARTMENT ARUNACHAL PRADESH PUBLIC WORKS DEPARTMENT ARUNACHAL PRADESH ANALYSIS OF RATES FOR ROAD AND BRIDGE WORKS 2010 ZERO LEAD BASED: (EXCLUDING CARTAGE COST) PUBLISHED UNDER THE AUTHORITY OF THE CHIEF ENGINEER (DESIGN & PLANNING)

More information

CW 3615 RIPRAP TABLE OF CONTENTS

CW 3615 RIPRAP TABLE OF CONTENTS December 2014 SPECIFICATION CW 3615 R4 CW 3615 RIPRAP TABLE OF CONTENTS 1. GENERAL CONDITIONS... 1 3. DESCRIPTION... 1 5. MATERIALS... 1 5.1 General... 1 5.2 Rock... 1 5.3 Random Stone Riprap... 1 5.4

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS

More information

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : 012777.00 PROJECTS ------------------------------ STP-1277(700)S COUNTY : ANDROSCOGGIN CONTRACT ID : 012777.00 MAINE

More information

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title TABLE OF CONTENTS CONTRACT DOCUMENTS 00001 Inside Title Page 00003 Table of Contents 00004 List of Drawings 00020 Invitation to Bid 00100 Instructions to Bidders 00300 Bid 00500 Agreement 00610 Construction

More information

ITEM 432 TUNNEL CONSTRUCTION

ITEM 432 TUNNEL CONSTRUCTION AFTER MARCH 1, 2012 ITEM 432 TUNNEL CONSTRUCTION 432.1 Description. This Item shall govern for tunnel lines under railroads, state highways, and concrete paved streets or other obstructions indicated.

More information