1 C-1714 SPECIFICATIONS FOR SHRIVER CENTER PREPARED FOR: MIAMI UNIVERSITY OXFORD, OHIO PREPARED BY: ARCHITECTURE ENGINEERING INTERIOR DESIGN PLANNING 300 WEST FOURTH STREET! CINCINNATI, OHIO PHONE: (513) ! FAX: (513) APRIL
2 SECTION TABLE OF CONTENTS SHRIVER CENTER PARTIAL ROOF REPLACEMENT - PHASE 2 AT MIAMI UNIVERSITY Prepared by: SFA Architects, Inc. 300 West Fourth Street Cincinnati, Ohio Section Section Table of Contents List of Drawings SPECIFICATIONS DIVISION 1 - GENERAL REQUIREMENTS Section Section Section Section Section Section Section Section Section Summary of Work Unit Prices Photographic Documentation Submittal Procedures References Temporary Facilities and Controls Execution Closeout Procedures Project Record Documents DIVISION 6 - WOOD, PLASTICS AND COMPOSITES Section Rough Carpentry DIVISION 7 - THERMAL/MOISTURE PROTECTION Section Section Section Section Section Section Preparation for Reroofing Ethylene-Propylene-Diene-Monomer (EPDM) Roofing Non-penetrating Portable Rooftop Supports and Walkways Sheet Metal Flashing and Trim Roof Specialties Joint Sealants END OF SECTION TOC C Miami University - Shriver Center
3 SECTION LIST OF DRAWINGS A0 A1 A2 A3 TITLE SHEET ROOF PLAN DETAILS DETAILS LIST OF DRAWINGS C Miami University - Shriver Center
4 SECTION SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes: 1. Project information. 2. Work covered by Contract Documents. 3. Phased construction. 4. Work by Owner. 5. Work under separate contracts. 6. Future work. 7. Purchase contracts. 8. Owner-furnished products. 9. Contractor-furnished, Owner-installed products. 10. Access to site. 11. Coordination with occupants. 12. Work restrictions. 13. Specification and drawing conventions. B. Related Section: 1. Division 01 Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities. 1.3 PROJECT INFORMATION A. Project Identification: Shriver Center - 1. Project Location: Shriver Center, Miami University, Oxford, Ohio. SUMMARY C Miami University - Shriver Center
5 B. Owner: Miami University 1. Owner's Representative: Howard Bradley Planning & Construction Miami University Cole Services Building, 127 Oxford, Ohio (513) C. Architect: Dan Montgomery SFA Architects, Inc. 300 West Fourth Street Cincinnati, Ohio WORK COVERED BY CONTRACT DOCUMENTS A. The Work of the Project is defined by the Contract Documents and consists of the following: 1. Roofing Contractor to remove existing roofing system to the structure. Remove and reinstall equipment as required to perform the work. Roofing Contractor to confirm that the mechanical units are operational after the project is complete. Removal to include, but is not limited to, membrane, flashing, ballast, BUR, etc. 2. Roofing contractor to install a new EPDM roof system with tapered insulation as indicated on the roof plan. 3. Replace all metal roof edges surround roof areas that are included in this project. 4. The roofing contractor is responsible for the removal and reinstallation of the existing lightning protection system in order to perform the work as well as recertification of the system. It will be the responsibility of the roofing contractor to bring the existing lightning protection system up to current code requirements which may include modifications to the existing electrical system. The lightning protection system work may extend out side of the roof area indicated as included in this work. The roofing contractor will be responsible for maintaining the lightning protection to the building throughout the duration of the project. 5. The roof contractor is to relocate an existing roof hatch and ladder. Contractor to provide new wood framing as required to install the relocated roof hatch and ladder. The roofing contractor is also to provide a new roof scuttle and new interior metal ladder as indicated on the drawings. 6. The roofing contractor is to provide a weather tight system with a twenty year total system warranty and puncture resistance warranty including roof edge metal. B. All roof areas that are part of this contract are to receive a 20-year total system warranty and a 20-year puncture warranty. The roofing contractor is to provide everything necessary to obtain this warranty. SUMMARY C Miami University - Shriver Center
6 C. Type of Contract 1. Project will be constructed under a single prime contract. D. Contractor is to remove and reinstall any lightning system component in order to complete the work. Contractor is to re-certify the entire building system at the end of the project. 1.5 PHASED CONSTRUCTION A. Before commencing Work of each phase, submit an updated copy of the Contractor's construction schedule showing the sequence, commencement and completion dates for all roof areas of the Work. 1.6 WORK BY OWNER A. General: Cooperate fully with Owner so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner. 1.7 WORK UNDER SEPARATE CONTRACTS A. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract or other contracts. Coordinate the Work of this Contract with work performed under separate contracts. 1.8 ACCESS TO SITE A. General: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform work or to retain other contractors on portions of Project. B. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section. C. Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. SUMMARY C Miami University - Shriver Center
7 1. Limits: Confine construction operations to contract limits. 2. Driveways, Walkways and Entrances: Keep driveways, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. a. Schedule deliveries to minimize use of driveways and entrances by construction operations. b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site. D. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations. 1.9 COORDINATION WITH OCCUPANTS A. Full Owner Occupancy: Owner will occupy site and existing building(s) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated. 1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction. 2. Notify the Owner not less than 72 hours in advance of activities that will affect Owner's operations. B. Partial Owner Occupancy: Owner will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations. Maintain existing exits unless otherwise indicated. 1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and authorities having jurisdiction. 2. Provide not less than 72 hours' notice to Owner of activities that will affect Owner's operations. C. Owner Limited Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not interfere with SUMMARY C Miami University - Shriver Center
8 completion of the Work. Such placement of equipment and limited occupancy shall not constitute acceptance of the total Work. 1. Architect will prepare a Certificate of Substantial Completion for each specific portion of the Work to be occupied prior to Owner acceptance of the completed Work. 2. Obtain a Certificate of Occupancy from authorities having jurisdiction before limited Owner occupancy. 3. Before limited Owner occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed. On occupancy, Owner will operate and maintain mechanical and electrical systems serving occupied portions of Work. 4. On occupancy, Owner will assume responsibility for maintenance and custodial service for occupied portions of Work WORK RESTRICTIONS A. Work Restrictions, General: Comply with restrictions on construction operations. 1. Comply with limitations on use of public streets and other requirements of authorities having jurisdiction. B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 7:30 a.m. to 5:00 p.m., Monday through Friday, except as otherwise indicated. 1. Weekend Hours: 8:00 a.m. to 5:00 p.m. C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated: 1. Notify Owner not less than two days in advance of proposed utility interruptions. 2. Obtain Owner's written permission before proceeding with utility interruptions. D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner. 1. Notify Owner not less than two days in advance of proposed disruptive operations. 2. Obtain Owner's written permission before proceeding with disruptive operations. E. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes. F. Controlled Substances: Use of tobacco products and other controlled substances on campus is not permitted. SUMMARY C Miami University - Shriver Center
9 1.11 SPECIFICATION AND DRAWING CONVENTIONS A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows: 1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase. 2. Specification requirements are to be performed by Contractor unless specifically stated otherwise. 3. Provide means to supply and install. B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications. C. Drawing Coordination: Requirements for materials and products identified on the Drawings are described in detail in the Specifications. One or more of the following are used on the Drawings to identify materials and products: 1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections. 2. Abbreviations: Materials and products are identified by abbreviations published as part of the U.S. National CAD Standard and scheduled on Drawings. 3. Keynoting: Materials and products are identified by reference keynotes referencing Specification Section numbers found in this Project Manual. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION SUMMARY C Miami University - Shriver Center
10 SECTION UNIT PRICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes administrative and procedural requirements for unit prices. 1.3 DEFINITIONS A. Unit price is an amount incorporated in the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased. 1.4 PROCEDURES A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit. B. Measurement and Payment: Refer to individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections. C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor. D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price. PART 2 - PRODUCTS (Not Used) UNIT PRICES C Miami University - Shriver Center
11 PART 3 - EXECUTION 3.1 SCHEDULE OF UNIT PRICES A. Unit Price No. 1: Replace existing wood roof deck. 1. Description: Replace existing wood roof deck with 2 x 6 tongue and groove decking. 2. Unit of Measurement: Square feet. B. Unit Price 2: Removal and replacement of existing 2-2" x 6" wood nailers. 1. Description: Replace existing 2-2" x6" with new 2-2" x 6" wood nailer fastened as per I Unit of Measurement: Linear Feet. END OF SECTION UNIT PRICES C Miami University - Shriver Center
12 SECTION PHOTOGRAPHIC DOCUMENTATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes administrative and procedural requirements for the following: 1. Preconstruction photographs. B. Related Sections: 1. Division 01 Section "Closeout Procedures" for submitting photographic documentation as project record documents at Project closeout. 2. Division 07 Section Preparation for Reroofing. 3. Division 07 Section EPDM 1.3 INFORMATIONAL SUBMITTALS A. Key Plan: Submit key plan of Project site and building with notation of vantage points marked for location and direction of each photograph. Indicate elevation or story of construction. Include same information as corresponding photographic documentation. B. Digital Photographs: Submit image files within three days of taking photographs. 1. Digital Camera: Minimum sensor resolution of 10 megapixels. 2. Format: 400 dpi minimum, in unaltered original files, with same aspect ratio as the sensor, uncropped, date- and time- stamped, in folder named by date of photograph, accompanied by key plan file. 3. Identification: Provide the following information with each image description in file metadata tag: a. Name of Project. b. Name and contact information for photographer. c. Name of Architect and Owner. d. Name of Contractor. e. Date photograph was taken. PHOTOGRAPHIC C Miami University - Shriver Center DOCUMENTATION
13 f. Description of vantage point, indicating location, direction (by compass point), and elevation or story of construction. g. Unique sequential identifier keyed to accompanying key plan. C. Construction Photographs: Submit two prints of each photographic view within seven days of taking photographs. 1.4 QUALITY ASSURANCE A. Photographer Qualifications: An individual who has been regularly engaged as a professional photographer of construction projects for not less than three years. B. Web-Based Photographic Documentation Service Provider: A firm specializing in providing photographic equipment, Web-based software, and related services for construction projects, with record of providing satisfactory services similar to those required for Project. 1.5 COORDINATION A. Auxiliary Services: Cooperate with photographer and provide auxiliary services requested, including access to Project site and use of temporary facilities, including temporary lighting required to produce clear, well-lit photographs. 1.6 USAGE RIGHTS A. Obtain and transfer copyright usage rights from photographer to Owner for unlimited reproduction of photographic documentation. PART 2 - PRODUCTS 2.1 PHOTOGRAPHIC MEDIA A. Digital Images: Provide images in JPG format, produced by a digital camera with minimum sensor size of 10 megapixels, and at an image resolution of not less than 400 dpi. PHOTOGRAPHIC C Miami University - Shriver Center DOCUMENTATION
14 PART 3 - EXECUTION 3.1 CONSTRUCTION PHOTOGRAPHS A. Photographer: Engage a qualified photographer to take construction photographs. B. General: Take photographs using the maximum range of depth of field, and that are in focus, to clearly show the Work. Photographs with blurry or out-of-focus areas will not be accepted. 1. Maintain key plan with each set of construction photographs that identifies each photographic location. C. Digital Images: Submit digital images exactly as originally recorded in the digital camera, without alteration, manipulation, editing, or modifications using image-editing software. 1. Date and Time: Include date and time in file name for each image. 2. Field Office Images: Maintain one set of images accessible in the field office at Project site, available at all times for reference. Identify images in the same manner as those submitted to Architect and Owner. D. Preconstruction Photographs: Before starting construction, take photographs of Project site and surrounding properties, including existing items to remain during construction, from different vantage points, as directed by Architect or Owner. 1. Take photographs of existing buildings to accurately record physical conditions at start of construction. 2. Take additional photographs as required to record settlement or cracking of adjacent structures, pavements, etc. END OF SECTION PHOTOGRAPHIC C Miami University - Shriver Center DOCUMENTATION
15 SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals. B. Related Sections include the following: 1. Division 01 Section "Photographic Documentation" for submitting construction photographs and construction videotapes. 2. Division 01 Section "Closeout Procedures" for submitting warranties. 3. Division 01 Section "Project Record Documents" for submitting Record Drawings, Record Specifications, and Record Product Data. 4. Divisions 07 Sections for specific requirements for submittals in those Sections. 1.3 DEFINITIONS A. Action Submittals: Written and graphic information that requires Architect's responsive action. B. Informational Submittals: Written information that does not require Architect's responsive action. Submittals may be rejected for not complying with requirements. 1.4 SUBMITTAL PROCEDURES A. General: Electronic copies of CAD Drawings of the Contract Drawings will be provided by Architect for Contractor's use in preparing submittals. B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. 1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity. 2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination. a. Architect reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received. SUBMITTAL PROCEDURES C Miami University - Shriver Center
16 C. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Architect's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals. 1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Architect will advise Contractor when a submittal being processed must be delayed for coordination. 2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal. 3. Resubmittal Review: Allow 15 days for review of each resubmittal. 4. Sequential Review: Where sequential review of submittals by Architect allow 21 days for initial review of each submittal. D. Identification: Place a permanent label or title block on each submittal for identification. 1. Indicate name of firm or entity that prepared each submittal on label or title block. 2. Provide a space approximately 6 by 8 inches on label or beside title block to record Contractor's review and approval markings and action taken by Architect. 3. Include the following information on label for processing and recording action taken: a. Project name. b. Date. c. Name and address of Architect. d. Name and address of Contractor. e. Name and address of subcontractor. f. Name and address of supplier. g. Name of manufacturer. h. Submittal number or other unique identifier, including revision identifier. 1) Submittal number shall use Specification Section number followed by a decimal point and then a sequential number (e.g., ). Resubmittals shall include an alphabetic suffix after another decimal point (e.g., A). i. Number and title of appropriate Specification Section. j. Drawing number and detail references, as appropriate. k. Location(s) where product is to be installed, as appropriate. l. Other necessary identification. E. Deviations: Highlight, encircle, or otherwise specifically identify deviations from the Contract Documents on submittals. F. Additional Copies: Unless additional copies are required for final submittal, and unless Architect observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal. 1. Submit one copy of submittal to concurrent reviewer in addition to specified number of copies to Architect. 2. Additional copies submitted for maintenance manuals will not be marked with action taken and will be returned. SUBMITTAL PROCEDURES C Miami University - Shriver Center
17 G. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Architect will return submittals, without review, received from sources other than Contractor. 1. Transmittal Form: Provide locations on form for the following information: a. Project name. b. Date. c. Destination (To:). d. Source (From:). e. Names of subcontractor, manufacturer, and supplier. f. Category and type of submittal. g. Submittal purpose and description. h. Specification Section number and title. i. Drawing number and detail references, as appropriate. j. Transmittal number, numbered consecutively. k. Submittal and transmittal distribution record. l. Remarks. m. Signature of transmitter. 2. On an attached separate sheet, prepared on Contractor's letterhead, record relevant information, requests for data, revisions other than those requested by Architect on previous submittals, and deviations from requirements in the Contract Documents, including minor variations and limitations. Include same label information as related submittal. H. Resubmittals: Make resubmittals in same form and number of copies as initial submittal. 1. Note date and content of previous submittal. 2. Note date and content of revision in label or title block and clearly indicate extent of revision. 3. Resubmit submittals until they are marked "No Exceptions or Reviewed and Noted." I. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms. J. Use for Construction: Use only final submittals with mark indicating "No Exceptions or Reviewed and Noted" taken by Architect. 1.5 CONTRACTOR'S USE OF ARCHITECT'S CAD FILES A. General: At Contractor's written request, copies of Architect's CAD files will be provided to Contractor for Contractor's use in connection with Project, subject to the following conditions: 1. Files will present information corresponding to bid documents and will not be modified after bids are opened, unless the Architect deems it necessary to incorporate revisions. SUBMITTAL PROCEDURES C Miami University - Shriver Center
18 2. Information provided is limited to background information containing architectural floor plans and reflected ceiling plans. Any additional information requested will be provided at the discretion of the Architect and its consultants. 3. Files will be in the following format: AutoCAD release 2000i. 4. Files will be provided on one CD per prime contractor. Each prime contractor will be responsible for distribution to their sub-contractors. 5. If the contractor requests delivery of files by courier, the contractor is responsible for all courier fees. 6. CAD files furnished by the architect are furnished "AS-IS" WITHOUT ANY WARRANT OR WARRANTIES, EXPRESSED OR IMPLIED INCLUDING, WITHOUT LIMITATIONS, NO WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. The information set forth in the files is part of the Architect s instruments of service and is not intended for use for projects other than the project covered exclusively by these specifications, for additions to this project, or for completion of this project by another design professional. Any use or reuse of the CAD files by the contractor will be at the contractor s sole risk and without liability or legal exposure to Architect. The contractor shall, to the fullest extent permitted by law, indemnify and hold harmless the Architect, its subsidiaries, officers, directors, employees, and consultants for all claims, damages, losses, and expenses including attorneys fees arising out of or resulting from use or re-use of this information by or through the contractor. 7. Because data stored on electronic media can deteriorate undetected or can be modified without the consultant's knowledge, the Architect will not be held liable for the completeness or correctness of the electronic media. The Architect will not be held responsible for accuracy, viruses, defects in media, or any other complications arising from the transfer of this electronic information. 8. The contractor is to provide that any and all references to the Architect and/or its consultants contained in these files will be removed by the contractor prior to the contractor s re-use of the other information contained therein. Said removal shall include but not be limited to professional seals, title blocks, and cover sheets. PART 2 - PRODUCTS 2.1 ACTION SUBMITTALS A. General: Prepare and submit Action Submittals required by individual Specification Sections. B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment. 1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data. 2. Mark each copy of each submittal to show which products and options are applicable. 3. Include the following information, as applicable: a. Manufacturer's written recommendations. b. Manufacturer's product specifications. c. Manufacturer's installation instructions. d. Standard color charts. SUBMITTAL PROCEDURES C Miami University - Shriver Center
19 e. Manufacturer's catalog cuts. f. Wiring diagrams showing factory-installed wiring. g. Printed performance curves. h. Operational range diagrams. i. Mill reports. j. Standard product operation and maintenance manuals. k. Compliance with specified referenced standards. l. Testing by recognized testing agency. m. Application of testing agency labels and seals. n. Notation of coordination requirements. 4. Submit Product Data before or concurrent with Samples. 5. Number of Copies: Submit four copies of Product Data, unless otherwise indicated. Architect will return two copies. Mark up and retain one returned copy as a Project Record Document. C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data, unless submittal of Architect's CAD Drawings are otherwise permitted. 1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable: a. Dimensions. b. Identification of products. c. Fabrication and installation drawings. d. Roughing-in and setting diagrams. e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring. f. Shopwork manufacturing instructions. g. Templates and patterns. h. Schedules. i. Design calculations. j. Compliance with specified standards. k. Notation of coordination requirements. l. Notation of dimensions established by field measurement. m. Relationship to adjoining construction clearly indicated. n. Seal and signature of professional engineer if specified. o. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring. 2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches but no larger than 30 by 40 inches. 3. Number of Copies: Submit four opaque copies of each submittal, unless copies are required for operation and maintenance manuals. Architect will retain two copies; remainder will be returned. D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed. SUBMITTAL PROCEDURES C Miami University - Shriver Center
20 1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package. 2. Identification: Attach label on unexposed side of Samples that includes the following: a. Generic description of Sample. b. Product name and name of manufacturer. c. Sample source. d. Number and title of appropriate Specification Section. 3. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set. a. Samples not incorporated into the Work, or otherwise designated as Owner's property, are the property of Contractor. 4. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available. a. Number of Samples: Submit one full set(s) of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. Architect will return submittal with options selected. 5. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection. a. Number of Samples: Submit two sets of Samples. Architect will retain one Sample set; remainder will be returned. 1) Submit a single Sample where assembly details, workmanship, fabrication techniques, connections, operation, and other similar characteristics are to be demonstrated. 2) If variation in color, pattern, texture, or other characteristic is inherent in material or product represented by a Sample, submit at least three sets of paired units that show approximate limits of variations. E. Product Schedule or List: As required in individual Specification Sections, prepare a written summary indicating types of products required for the Work and their intended location. Include the following information in tabular form: 1. Type of product. Include unique identifier for each product. 2. Number and name of room or space. 3. Location within room or space. SUBMITTAL PROCEDURES C Miami University - Shriver Center
21 4. Number of Copies: Submit four copies of product schedule or list, unless otherwise indicated. Architect will return two copies. a. Mark up and retain one returned copy as a Project Record Document. F. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form: 1. Name, address, and telephone number of entity performing subcontract or supplying products. 2. Number and title of related Specification Section(s) covered by subcontract. 3. Drawing number and detail references, as appropriate, covered by subcontract. 4. Number of Copies: Submit four copies of subcontractor list, unless otherwise indicated. Architect will return two copies. a. Mark up and retain one returned copy as a Project Record Document. 2.2 INFORMATIONAL SUBMITTALS A. General: Prepare and submit Informational Submittals required by other Specification Sections. 1. Number of Copies: Submit four copies of each submittal, unless otherwise indicated. Architect will not return copies. 2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity. 3. Test and Inspection Reports: Comply with requirements specified in Division 01 Section "Quality Requirements." B. Contractor's Construction Schedule: Comply with requirements specified in Division 01 Section "Construction Progress Documentation." C. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified. D. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements in the Contract Documents. Submit record of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) on AWS forms. Include names of firms and personnel certified. E. Installer Certificates: Prepare written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project. F. Manufacturer Certificates: Prepare written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required. SUBMITTAL PROCEDURES C Miami University - Shriver Center
22 G. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents. H. Material Certificates: Prepare written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents. I. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents. J. Product Test Reports: Prepare written reports indicating current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency. K. Preconstruction Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Contract Documents. L. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. M. Design Data: Prepare written and graphic information, including, but not limited to, performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Include page numbers. N. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer. Include the following, as applicable: 1. Preparation of substrates. 2. Required substrate tolerances. 3. Sequence of installation or erection. 4. Required installation tolerances. 5. Required adjustments. 6. Recommendations for cleaning and protection. O. Insurance Certificates and Bonds: Prepare written information indicating current status of insurance or bonding coverage. Include name of entity covered by insurance or bond, limits of coverage, amounts of deductibles, if any, and term of the coverage. P. Construction Photographs and Videotapes: Comply with requirements specified in Division 01 Section "Photographic Documentation." Q. Material Safety Data Sheets (MSDSs): Submit information directly to Owner; do not submit to Architect. SUBMITTAL PROCEDURES C Miami University - Shriver Center
23 1. Architect will not review submittals that include MSDSs and will return the entire submittal for resubmittal. 2.3 DELEGATED DESIGN A. Performance and Design Criteria: Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, provide products and systems complying with specific performance and design criteria indicated. 1. If criteria indicated are not sufficient to perform services or certification required, submit a written request for additional information to Architect. PART 3 - EXECUTION 3.1 CONTRACTOR'S REVIEW A. Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Architect. B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents. 3.2 ARCHITECT'S ACTION A. General: Architect will not review submittals that do not bear Contractor's approval stamp and will return them without action. B. Action Submittals: Architect will review each submittal, make marks to indicate corrections or modifications required, and return it. Architect will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action taken, as follows: 1. No Exceptions: The submittal conforms to the contract documents. 2. Reviewed and Noted: The submittal conforms to the contract documents with the consideration of comments indicated by the Architect. 3. Revise and Resubmit: The submittal does not conform to the contract documents and require corrections as indicated by the Architect. 4. Rejected: The submittal does not conform to the contract documents and is to be resubmitted in its entirety. C. Informational Submittals: Architect will review each submittal and will not return it, or will return it if it does not comply with requirements. Architect will forward each submittal to appropriate party. SUBMITTAL PROCEDURES C Miami University - Shriver Center
24 D. Partial submittals are not acceptable, will be considered nonresponsive, and will be returned without review. E. Submittals not required by the Contract Documents may not be reviewed and may be discarded. END OF SECTION SUBMITTAL PROCEDURES C Miami University - Shriver Center
25 SECTION REFERENCES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 DEFINITIONS A. General: Basic Contract definitions are included in the Conditions of the Contract. B. "Approved": When used to convey Architect's action on Contractor's submittals, applications, and requests, "approved" is limited to Architect's duties and responsibilities as stated in the Conditions of the Contract. C. "Directed": A command or instruction by Architect. Other terms including "requested," "authorized," "selected," "required," and "permitted" have the same meaning as "directed." D. "Indicated": Requirements expressed by graphic representations or in written form on Drawings, in Specifications, and in other Contract Documents. Other terms including "shown," "noted," "scheduled," and "specified" have the same meaning as "indicated." E. "Regulations": Laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction, and rules, conventions, and agreements within the construction industry that control performance of the Work. F. "Furnish": Supply and deliver to Project site, ready for unloading, unpacking, assembly, installation, and similar operations. G. "Install": Operations at Project site including unloading, temporarily storing, unpacking, assembling, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar operations. H. "Provide": Furnish and install, complete and ready for the intended use. I. "Project Site": Space available for performing construction activities. The extent of Project site is shown on Drawings and may or may not be identical with the description of the land on which Project is to be built. REFERENCES C Miami University - Shriver Center
26 1.3 INDUSTRY STANDARDS A. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference. B. Publication Dates: Comply with standards in effect as of date of the Contract Documents unless otherwise indicated. C. Copies of Standards: Each entity engaged in construction on Project should be familiar with industry standards applicable to its construction activity. Copies of applicable standards are not bound with the Contract Documents. 1. Where copies of standards are needed to perform a required construction activity, obtain copies directly from publication source. 1.4 ABBREVIATIONS AND ACRONYMS A. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities indicated in Thomson Gale's "Encyclopedia of Associations" or in Columbia Books' "National Trade & Professional Associations of the U.S." B. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web sites are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents. AA Aluminum Association, Inc. (The) (703) AAMA American Architectural Manufacturers Association (847) ABAA Air Barrier Association of America (866) BIA Brick Industry Association (The) (703) BICSI BICSI, Inc. (800) (813) REFERENCES C Miami University - Shriver Center
27 BIFMA BIFMA International (616) (Business and Institutional Furniture Manufacturer's Association International) CCRC Cool Roof Rating Council (866) (202) CPA Composite Panel Association (301) CSI Construction Specifications Institute (The) (800) (703) ISO International Organization for Standardization Available from ANSI (202) NAAMM National Association of Architectural Metal Manufacturers (630) NACE NACE International (800) (National Association of Corrosion Engineers International) (281) NAIMA North American Insulation Manufacturers Association (703) NECA National Electrical Contractors Association (301) NeLMA Northeastern Lumber Manufacturers' Association (207) REFERENCES C Miami University - Shriver Center
28 NEMA National Electrical Manufacturers Association (703) NETA InterNational Electrical Testing Association (888) (269) NFPA NFPA (National Fire Protection Association) (800) (617) NHLA National Hardwood Lumber Association (800) (901) NLGA National Lumber Grades Authority (604) PDCA Painting & Decorating Contractors of America (800) (314) SPFA Spray Polyurethane Foam Alliance (800) (Formerly: SPI/SPFD - The Society of the Plastics Industry, Inc.; Spray Polyurethane Foam Division) UL Underwriters Laboratories Inc. (877) (847) WWPA Western Wood Products Association (503) C. Code Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web sites are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents. IAPMO International Association of Plumbing and Mechanical Officials (909) REFERENCES C Miami University - Shriver Center
29 D. Federal Government Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web sites are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION REFERENCES C Miami University - Shriver Center
30 SECTION TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities. B. Related Sections: 1. Division 01 Section "Summary" for work restrictions and limitations on utility interruptions. 1.3 USE CHARGES A. General: Installation and removal of and use charges for temporary facilities shall be included in the Contract Sum unless otherwise indicated. Allow other entities to use temporary services and facilities without cost, including, but not limited to, Owner's construction forces, Architect, occupants of Project, testing agencies, and authorities having jurisdiction. B. Electric Power Service: Owner will pay electric power service use charges for electricity used by all entities for construction operations. C. Water and Sewer Service from Existing System: Water from Owner's existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations. D. Electric Power Service from Existing System: Electric power from Owner's existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations. TEMPORARY FACILITIES C Miami University - Shriver Center AND CONTROLS
1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.
SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,
More informationUNIVERSITY OF ROCHESTER DIVISION 01 SPECIFICATIONS April 15, 2015
SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,
More informationCITY OF RICHMOND EDI BUILDING WINDOW REPLACEMENT PROJECT MANUAL. Commonwealth Architects
CITY OF RICHMOND EDI BUILDING WINDOW REPLACEMENT 701 North 25th Street Richmond, Virginia 23223 PROJECT MANUAL PERMIT SET FEBRUARY 27, 2017 Commonwealth Architects 101 Shockoe Slip Richmond, VA 23219 CITY
More informationCITY OF RICHMOND EDI BUILDING WINDOW REPLACEMENT 701 North 25th Street Richmond, Virginia PROJECT MANUAL BID SET April 4, 2018
CITY OF RICHMOND EDI BUILDING WINDOW REPLACEMENT 701 North 25th Street Richmond, Virginia 23223 PROJECT MANUAL BID SET April 4, 2018 Commonwealth Architects 101 Shockoe Slip, Fl 3 Richmond, VA 23219 CITY
More information1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.
SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,
More informationTOWNES + architects, P.A.
TOWNES + architects, P.A. 2421 North 12th Avenue, Pensacola, Florida 32503 Telephone: (850) 433-0203 Florida Registration AA-26001051 PROJECT MANUAL City of Pensacola Fleet Maintenace Garage Re ovation
More informationPROJECT MANUAL UNIVERSITY HALL BOILER REPLACEMENT PROJECT NO. EM 610
PROJECT MANUAL For UNIVERSITY HALL BOILER REPLACEMENT PROJECT NO. EM 610 Prepared For: UNIVERSITY OF COLORADO AT COLORADO SPRINGS September 27, 2010 Prepared By: SCHENDT ENGINEERING CORP. 2912 Beacon Street
More informationBeverly Gardens Park City of Beverly Hills, CA. Block #9: Elm Foothill Garden
Beverly Gardens Park Block #9: SPECIFICATIONS 100% CD / BID SET TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION No. TITLE 011000.Summary. 3 012213.Unit Prices...1 012500.Substitution Procedures
More informationDeKalb County Library Dunwoody Library Staff Area Renovation
PROJECT MANUAL DeKalb County Library Dunwoody Library Staff Area Renovation OWNER: DeKalb County Library Email: kimbroj@dekalblibrary.org Contact: Jackee Kimbro 404-508-719-, ext. 2236 ARCHITECT: MEP ENGINEER:
More informationPROJECT MANUAL POINT BLANK RANGE & GUN SHOP. 600 Corporate way Knoxville, TN. Bid/Permit Set
PROJECT MANUAL POINT BLANK RANGE & GUN SHOP 600 Corporate way Knoxville, TN Bid/Permit Set Division Section Title SPECIFICATIONS GROUP DIVISION 01 - GENERAL REQUIREMENTS 011000 SUMMARY 012600 CONTRACT
More informationPROJECT SPECIFICATIONS. for. Grossmont Community College. Main Chiller Plant Repair. El Cajon, CA. Bid Number B18.014
PROJECT SPECIFICATIONS for Grossmont Community College El Cajon, CA Bid Number B18.014 Grossmont College Specification TOC 07/11/2018 DIVISION 01 GENERAL REQUIREMENTS 01 10 00 ~ Summary 01 14 00 ~ Work
More informationUniversity of Oklahoma Sarkeys Energy Center Atriums Waterproofing Project mass project no Set no. project manual.
University of Oklahoma Sarkeys Energy Center Atriums Waterproofing Project mass project no. 1801.01 07 12 2018 Set no. project manual. University of Oklahoma Sarkeys Energy Center Atriums Waterproofing
More informationWEST GATE ENTRANCE EXTERIOR IMPROVEMENTS BEXAR COUNTY ARENAS - FENCING PACKAGE
PROJECT MANUAL / TECHNICAL SPECIFICATIONS WEST GATE ENTRANCE EXTERIOR IMPROVEMENTS - FENCING PACKAGE 3201 E. HOUSTON STREET SAN ANTONIO, TEXAS 78219 OCTOBER 6, 2017 HUMBERTO SALDANA & ASSOCIATES, INC.
More informationNew Mexico State University Herritage Farm Interpretive Trail
PROJECT MANUAL PROJECT MANAGER: SHELLEY ZIVKOVICH 575-646-1991 shelleyz@nmsu.edu New Mexico State University Herritage Farm Interpretive Trail APRIL 28, 2017 PROJECT #206-88 WDG ARCHITECTS 1014 South Main
More informationAIR CONDITIONING SYRACUSE JUNIOR HIGH SCHOOL
PROJECT MANUAL FOR AIR CONDITIONING DAVIS SCHOOL DISTRICT 1450 S. 2000 W. Syracuse, UT 84075 January 2017 BLANK PAGE TABLE OF CONTENTS DIVISION 01 GENERAL CONDITIONS 01 1000 Summary 01 2900 Payment Procedures
More informationTRUMAN STATE UNIVERSITY SITE IMPROVEMENTS, KIRK BLDG, MISSOURI HALL & STUDENT REC CENTER LTD RENOVATIONS
SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,
More information1. Division 1 Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.
CFA A HVAC PROJECT SECTION 01100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationRWA, Inc. TECHNICAL SPECIFICATIONS NORTH COLLIER BOULEVARD PAVING AND DRAINAGE IMPROVEMENTS Willow Park Drive Suite 200 Naples, FL 34109
RWA, Inc. TECHNICAL SPECIFICATIONS NORTH COLLIER BOULEVARD PAVING AND DRAINAGE IMPROVEMENTS 6610 Willow Park Drive Suite 200 Naples, FL 34109 MAY 23, 2012 NORTH COLLIER BOULEVARD PAVING AND DRAINAGE IMPROVEMENTS
More informationSSM Project: Centennial School District Issued for Bid AC Unit Replacements 05/16/2014 Klinger and Log College Middle Schools
Division Section Title SPECIFICATIONS GROUP General Requirements Subgroup DIVISION 01 GENERAL REQUIREMENTS 011000 SUMMARY 012500 SUBSTITUTION PROCEDURES 012600 CONTRACT MODIFICATION PROCEDURES 012900 PAYMENT
More informationPROJECT SPECIFICATIONS PENSACOLA INTERNATIONAL AIRPORT PARKING GARAGE REHABILITATION
PROJECT SPECIFICATIONS PENSACOLA INTERNATIONAL AIRPORT PARKING GARAGE REHABILITATION CITY OF PENSACOLA November 2018 SECTION 011000- SUMMARY OF WORK PART 1 - GENERAL 1.1 DOCUMENTS A. Drawings and general
More informationGADSDEN ELEMENTARY SCHOOL PHOTOVOLTAIC SYSTEM PROJECT
GADSDEN ELEMENTARY SCHOOL PHOTOVOLTAIC SYSTEM PROJECT JUNE 13, 2018 PROJECT MANUAL SAVANNAH-CHATHAM COUNTY PUBLIC SCHOOL SYSTEM DULOHERY WEEKS GADSDEN ELEMENTARY SCHOOL PHOTOVOLTAIC SYSTEM PROJECT TABLE
More informationruby ridge terrace apartments
p r o j e c t m a n u a l for: ruby ridge terrace apartments 550 South, 12th Street 89801 Re-Bid Package 01 May 14, 2014 TABLE OF CONTENTS 1. Title page 2. Table of Contents 3. Invitation to Bid 4. Bid
More informationGrossmont-Cuyamaca College District Bldg. D Central Chilled Water Loop Tie-in SPECIFICATION MANUAL CUYAMACA COLLEGE, EL CAJON, CA
Grossmont-Cuyamaca College District SPECIFICATION MANUAL CUYAMACA COLLEGE, EL CAJON, CA PREPARED FOR: Cuyamaca College PREPARED BY: SC Engineers, Inc. 17075 Via Del Campo San Diego, CA 92127 P: 858.946.0333
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 4000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationSaint Anselm College Lower Level Cooling Carr Center Manchester, New Hampshire. Project No April 18, % Review.
Saint Anselm College Lower Level Cooling Carr Center Manchester, New Hampshire Project No. 17343 April 18, 2017 100% Review 2017 Harriman This Page Intentionally Left Blank DIVISION 01 - GENERAL REQUIREMENTS
More informationBOWIE STATE UNIVERSITY CAR PARKING LOT
BOWIE STATE UNIVERSITY CAR PARKING LOT TECHNICAL SPECIFICATIONS 100% CD SUBMISSION NOVEMBER 2, 2018 Prepared by WHITNEY, BAILEY COX & MAGNANI, LLC 300 East Joppa Road, Suite 200 Baltimore, Maryland 21286
More informationROOF REPLACEMENT FIRE AND EMERGENCY SERVICES BUILDING
FIRE AND EMERGENCY SERVICES BUILDING PROJECT MANUAL BID AND CONSTRUCTION DOCUMENT Bid Documents PREPARED FOR City of Titusville Facilities Department South Washington Street Titusville, Florida 32796 February
More informationELECTRICAL CONSULTANT
INFRASTRUCTURE BUILDINGS 36 & 41 GROSSMONT COLLEGE GROSSMONT CUYAMACA COMMUNITY COLLEGE DISTRICT #B19.005 CLIENT 8800 Grossmont College Drive El Cajon, CA 92021 ELECTRICAL CONSULTANT Johnson Consulting
More informationSANTA FE STATION KDOT Grant No. 23 TE
SANTA FE STATION KDOT Grant No. 23 TE-0373-01 PRESERVATION PROJECT 413 E 7 TH Street - Lawrence, Kansas Project Manual Issue Date: July 15, 2015 KANSAS DEPT. OF TRANSPORTATION Dwight D. Eisenhower State
More information1) Unified School District No. 489 reserves the right to reject any or all bids and to waive any informalities in the bid procedure.
Prospective bidders: The Board of Education, Unified School District No. 489, will receive bids for the fabrication and construction of two pre-manufactured metal building in the designated area at the
More informationGeorge Washington Middle School - HVAC Replacement 100% Construction Documents May 7, 2018 TABLE OF CONTENTS
TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS 011000 SUMMARY 012500 SUBSTITUTION PROCEDURES 012900 PAYMENT PROCEDURES 013100 PROJECT MANAGEMENT AND COORDINATION 013200 CONSTRUCTION PROGRESS DOCUMENTATION
More informationSECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS
SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.
More informationOSNI PONCA OFFICE REMODEL
OSNI PONCA OFFICE REMODEL PROJECT MANUAL OCTOBER 2016 SCHEMMER PROJECT NO. 06571.002 OSNI PONCA OFFICE REMODEL TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000115 LIST OF DRAWING
More informationOgden Regional Medical Center Courtyard Remodel. Construction Documents. MountainStar Healthcare PROJECT MANUAL FOR
PROJECT MANUAL FOR Ogden Regional Medical Center 5475 South 500 East Ogden, UT 84405 for MountainStar Healthcare Construction Documents NJRA Architects, Inc. 5272 South College Dr. Murray, Utah 84123 Telephone:
More informationBUNCOMBE COUNTY SCHOOLS
BUNCOMBE COUNTY SCHOOLS PREPARING STUDENTS FORTHEIRTOMORROW Tony Baldwin, Ed.D., Superintendent 175 Bingham Rd., Asheville, NC 28806 P: 828-255-5921 F: 828-255-5923 buncombeschools.org PROJECT MANUAL FOR
More informationThe University of Texas Southwestern Medical Center
194 of 491 195 of 491 THE UNIVERSITY OF TEXAS SOUTHWESTERN MEDICAL CENTER F3.118 OFFICE SUITE RENOVATION FOR THE PEDIATRICS DEPARTMENT SECTION SECTION TITLE ISSUE DATE DIVISION 1 - GENERAL REQUIREMENTS
More informationASPIRE HEALTH PARTNERS. Project Specifications. Patient Tower Reroof 1800 Mercy Drive Orlando, Florida August 31, 2016
ASPIRE HEALTH PARTNERS Patient Tower Reroof 1800 Mercy Drive 32808 Project Specifications August 31, 2016 RS&H, Inc. 301 East Pine Street, Suite 350 32801 (407) 893.5800 RS&H Project # 504-0052-000 TABLE
More informationTRUMAN STATE UNIVERSITY BALDWIN HALL, PERSHING BLDG AND VIOLETTE HALL ROOFING & EXT. RENOV.
SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,
More informationProject Manual OVERLAND PARK BRANCH & ESIS RELOCATION. for
Project Manual OVERLAND PARK BRANCH & ESIS RELOCATION for Chubb Floor 4 34 Corporate Woods 10950 Grandview Drive Overland Park KS 66210 Issued for Bid & Permit July 18, 2016 SECTION 000110 TABLE OF CONTENTS
More informationBeverly Gardens Park City of Beverly Hills, CA. Block #14: Lily Pond Garden
Beverly Gardens Park Block #14: SPECIFICATIONS 100% CD / BID SET TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION No. TITLE 011000.Summary. 3 012213 Unit Prices.. 1 012500.Substitution Procedures
More informationWEAVER MOUNTAIN FIRE STATION OPERATIONS BUILDING SOUTH HIGHWAY 89 WICKENBURG, AZ PROJECT NO. L140D00737 BUREAU OF LAND MANAGEMENT
WEAVER MOUNTAIN FIRE STATION OPERATIONS BUILDING 33501 SOUTH HIGHWAY 89 WICKENBURG, AZ 85390 PROJECT NO. L140D00737 BUREAU OF LAND MANAGEMENT PROJECT SPECIFICATIONS VOLUME 1 U.S. DEPARTMENT OF THE INTERIOR
More informationSPECIFICATIONS. September 27, 2016 Bid Set
SPECIFICATIONS September 27, 2016 Bid Set CITY HALL SUITE 100 & 102 RENOVATIONS TABLE OF CONTENTS (Refer to Project Book under separate cover for additional requirements) SPECIFICATIONS DIVISION 1 - GENERAL
More informationQUALITY REQUIREMENTS
SECTION 014000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationPROJECT MANUAL WAYNE STATE UNIVERSITY FACILITIES PLANNING & MANAGEMENT DESIGN SERVICES 5454 CASS AVENUE DETROIT, MICHIGAN 48202
PROJECT MANUAL FACILITIES PLANNING & MANAGEMENT DESIGN SERVICES 5454 CASS AVENUE DETROIT, MICHIGAN 48202 ROOF REPLACEMENT SCHOOL OF SOCIAL WORK BUILDING 5447 WOODWARD AVENUE, DETROIT, MICHIGAN 48202 WSU
More informationMUSIC BUILDING ROOF REPLACEMENT
MUSIC BUILDING ROOF REPLACEMENT PROJECT MANUAL PREPARED FOR 1 DREXEL DR NEW ORLEANS, LA 70125 08/08/2016 Gale Associates, Inc. 160 N. Westmonte Drive, Suite 1200 Altamonte Springs, FL 32714 GALE JN 678038
More informationScope of Repair Davenport Grade School Roof Repair
Scope of Repair Grade School Roof Repair Prepared for: Graehm Wallace Perkins Coie LLP 1201 Third Avenue, Suite 4900 Seattle, WA 98101-3099 Date of Issuance: March 19, 2018 SECTION 011000 SUMMARY OF WORK
More informationStudent Services & Classroom Addition
SECTION 014000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for quality assurance and quality control. B. Testing and inspecting services
More information1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.
CSB 7th Floor Orthopaedic Surgery Office Renovation Phase 2 SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary
More informationROOF REPLACEMENT 4660 SISSON ROAD
4660 SISSON ROAD PROJECT MANUAL BID AND CONSTRUCTION DOCUMENT Bid Documents PREPARED FOR City of Titusville Facilities Department South Washington Street Titusville, Florida 32796 October 7, 2011 Gale
More informationSECTION SUMMARY OF WORK
SECTION 011000- SUMMARY OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 01 Specification Sections
More informationRANDOLPH COMMUNITY CENTER GYMNASIUM FLOOR REPLACEMENT
PROJECT MANUAL RANDOLPH COMMUNITY CENTER GYMNASIUM FLOOR REPLACEMENT CITY OF RICHMOND Richmond, Virginia Architect s Project No. 563107 ARCHITECT/ENGINEER RICHMOND, VIRGINIA A/E s Project No. 563107 set
More informationCHAPEL HILL TOWN HALL RENOVATIONS UPPER LEVEL, SOUTH CHAPEL HILL, NORTH CAROLINA
SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,
More informationSPECIFICATIONS. Permit Set RICHMOND CITY HALL: SUITE 110 RENOVATIONS. City of Richmond, Virginia Architect s Project No
SPECIFICATIONS Permit Set RICHMOND CITY HALL: SUITE 110 RENOVATIONS ARCHITECT RICHMOND, VIRGINIA MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL ENGINEERS GLEN ALLEN, VIRGINIA A/E s Project No. 563109
More informationSPECIFICATIONS May 25, Ellicott Station Redevelopment Brewery Building - 40 Ellicott Street Ellicott Street Batavia, New York United States
SPECIFICATIONS May 25, 2018 Ellicott Station Redevelopment Brewery Building - 40 Ellicott Street Ellicott Street Batavia, New York United States Ellicott Station Development, LLC 500 Seneca Street Suite
More informationPIKES PEAK PARKING RESTORATION TABLE OF CONTENTS
23 HEATING, VENTILATING AND AIR CONDITIONING TABLE OF CONTENTS TABLE OF CONTENTS DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING - Basic HVAC Requirements 238239.19 - Wall and Ceiling Unit Heaters
More informationPhenolic Exterior Wall Cladding
Phenolic Exterior Wall Cladding SECTION 07 42 43 COMPOSITE WALL PANELS This specification includes hidden text for editing for a project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Phenolic wall
More informationBOONE COUNTY PUBLIC LIBRARY (859) 342-BOOK (2665)
ROOF Boone County Public Library is seeking competitive sealed bids to replace an existing Shingle Roof and EPDM membrane roof on the Florence Branch located at 7425 U.S. 42, Florence, KY 41042. The successful
More informationAmphitheater High School Roof Replacement
Amphitheater Public Schools Amphitheater High School Roof Replacement BG Project No: 17.14.06 Construction Document Specifications Amphitheater High School Roof Replacement SPECIFICATIONS INDEX DIVISION
More informationPROJECT MANUAL. for. NEW MEXICO STATE UNIVERSITY GERALD THOMAS HALL Fume Hood Replacement at the MAIN CAMPUS for LAS CRUCES, NEW MEXICO
PROJECT MANUAL for NEW MEXICO STATE UNIVERSITY GERALD THOMAS HALL Fume Hood Replacement at the MAIN CAMPUS for LAS CRUCES, NEW MEXICO FOR REVIEW ONLY NOT FOR CONSTRUCTION December 2016 SET NO. 6501 Americas
More informationA. This Section includes administrative and procedural requirements for quality assurance and quality control.
SECTION 01400 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationSECTION QUALITY REQUIREMENTS
SECTION 014000 - PART 1 - GENERAL 1.1 SUMMARY A. Defines SRP requirements for Contractor Quality Control and Owner Quality Assurance. As an Electric and Water Utility, SRP has many critical facilities.
More information1ARCHITECTURE TABLE OF CONTENTS
TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 0102 COVER 00 0107 SEALS PAGE 00 0111 TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 1000 01 2000 01 2100 01 2300 01
More informationSECTION EXTERIOR SOLID PHENOLIC RAINSCREEN PANELS
SECTION 074233 EXTERIOR SOLID PHENOLIC RAINSCREEN PANELS PART 1 - GENERAL 1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationC. Samples: For each exposed product and for each color and texture specified, <Insert dimensions> in size.
SECTION 08 12 16 - ALUMINUM DOOR FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES
SECTION 07 4243 - PART 1 GENERAL 1.01 SECTION INCLUDES A. Composite wall panel system consisting of aluminum-faced composite panels in a rainscreen application as part of the assembly described below.
More informationPROJECT MANUAL. Phi Delta Theta Phase NW 13 th Street Corvallis, OR Varitone Architecture LLC
PROJECT MANUAL Phi Delta Theta Phase 2 120 NW 13 th Street Corvallis, OR 97330 Varitone Architecture LLC 231 SW 2nd Ave. PO Box 3420 Albany, Oregon 97321 Project Contacts Owner Phi Delta Theta Chapter
More informationMain Building Auditorium
Main Building Auditorium Theatre and Lighting Upgrade Moberly Area Community College 101 College Avenue Moberly, Missouri This document contains all necessary instructions and specifications to perform
More informationRAY-CORE Structural Insulated Roof and Wall Panels
SUBMITTAL 20180101 RAY-CORE Structural Insulated Roof and Wall Panels Closed Cell Polyurethane Foam Insulation Douglas Fir Studs STANDARD FEATURES Insulation, Framing and Wrap in a 4 wide panel Available
More informationWillow Oak Veterinary Hospital
Project Manual For Willow Oak Veterinary Hospital Durham, North Carolina Linton Architects Project #1219 September 11, 2013 Linton Architects 331 West Main Street, Suite 608 Durham, North Carolina 27701
More informationDocument B252TM 2007
Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation
More informationA New Barn for Brian & Julie Sims FM 2590 Canyon, TX. Gregg Bliss, Architect 1001 S.E. 3rd Ave. Amarillo, TX
A New Barn for Brian & Julie Sims 21400 FM 2590 Canyon, TX Gregg Bliss, Architect 1001 S.E. 3rd Ave. Amarillo, TX 79102 806-372-2966 14-020 Division Section Title Pages PROCUREMENT AND CONTRACTING DOCUMENTS
More informationDIVISION 10 - SPECIALTIES Toilet, Bath, and Laundry Accessories Fire Extinguishers
DIVISION 01 GENERAL REQUIREMENTS 012500 Substitution Procedures 012600 Contract Modification Procedures 013100 Project Management and Coordination 013150 Requests for Information 013200 Construction Progress
More informationNMSU Carlsbad Campus Main Building and Computer Building DDC Control Upgrade. Project Manual Technical Specifications Review Submittal May 12, 2017
NMSU Carlsbad Campus Main Building and Computer Building DDC Control Upgrade NMSU Facilities and Services Department P.O. Box 30001 Las Cruces, NM 88003-8001 Project Manual Technical Specifications Review
More informationYork Risk Services Group
1080 Eldridge Parkway Houston, Texas 77077 PROJECT MANUAL : May 4, 2018 Owner: York Risk Services Group One Upper Pond Rd Bldg F, 4 th Floor Parsippany, NJ 07054 Architect: HOK 5 Bryant Park 1065 Avenue
More informationBID ADDENDUM. 1 of 1. State Project No: H27-Z381 ADDENDUM NO.: PROJECT NAME: 1600 Hampton St. Building Roof Replacement
BID ADDENDUM State Project No: H27-Z381 PROJECT NAME: 1600 Hampton St. Building Roof Replacement ADDENDUM NO.: One ADDENDUM ISSUE DATE: January 24, 2019 TO ALL BIDDERS: This addendum is issued for the
More informationMASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS
SECTION 016000 - PRODUCT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for selection of products for use in Project; product delivery, storage,
More information1.4 USE OF EXISTING ELEVATORS FOR CONSTRUCTION PURPOSES (NO ELEVATOR CONTRACTOR IS CONTRACTED FOR THE PROJECT)
1.4 USE OF EXISTING ELEVATORS FOR CONSTRUCTION PURPOSES (NO ELEVATOR CONTRACTOR IS CONTRACTED FOR THE PROJECT) The use of an existing elevator during construction shall be strictly prohibited. Any deviation
More informationRichard B. Wilson K-8 School Roof Restoration
Amphitheater Public Schools Richard B. Wilson K-8 School Roof Restoration BG Project No: 17.14.24 Construction Document Specifications Richard B. Wilson K-8 School Roof Restoration SPECIFICATIONS INDEX
More informationSECTION SUPPLEMENTARY GENERAL CONDITIONS
SECTION 00800 SUPPLEMENTARY GENERAL CONDITIONS PART 1 - GENERAL 1.1 SCOPE OF WORK In general, the Work consists of application of a fluid applied membrane, installation of new tapered insulation, installation
More informationCounty of Elko, Nevada Requirements, Specifications and Contract Documents. Mechanical System Upgrade, Project Manuel. Jackpot, Elko County, Nevada
1 County of Elko, Nevada Requirements, Specifications and Contract Documents for Jackpot Recreation Center Mechanical System Upgrade 2016 Project in Jackpot, Elko County, Nevada Department of Community
More informationDocument B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition
Document B132 2009 Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN
More informationHard Rock Hotel and Casino - Tulsa Casino 3 and Suite Hotel Exterior Painting Bid Issue Issue Date: 18 March 2013 Project Number
Hard Rock Hotel and Casino - Tulsa Casino 3 and Suite Hotel Exterior Painting Issue Date: 18 March 2013 Project Number 13-201.1 9400 Gateway Drive, Suite B Reno, NV 89521 775.852.3977 (p) 775.852.6543
More informationNorthern Lights Park and Ride Lot
PROJECT MANUAL For the Northern Lights Park and Ride Lot Central Ohio Transit Authority (COTA) Cleveland Avenue Columbus, Ohio BID SET June 5, 2017 Page 1 of 2 06/05/17 DESIGN TEAM Owner/Project Manager:
More informationINVITATION FOR BIDS FOR
********************************************************************************************** IFB NO. Y18-749-RM ISSUED: March 16, 2018 INVITATION FOR BIDS FOR EAST ORANGE HEAD START MODULAR RELOCATION
More informationORANGE COUNTY UTILITIES RS&H OPERATIONS CENTER PEMB PACKAGE TABLE OF CONTENTS
ORANGE COUNTY UTILITIES RS&H 107-0745-001 OPERATIONS CENTER PEMB PACKAGE TABLE OF CONTENTS 100% PERMIT SUBMITTAL March 15, 2013 PART DESCRIPTION SECTION H TECHNICAL PROVISIONS DIVISION 1 GENERAL REQUIREMENTS
More informationTENOCHCA HALL - FAN COIL UNITS, RESTROOM AND FINISH RENOVATION PROJECT NO
SECTION 26 05 00 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL REQUIREMENTS 1.1 RELATED DOCUMENTS A. The general conditions and Division 1 are part of this section and the contract for this work and
More informationProject Manual. Beaverton School District Beaverton High School Gymnasium Improvement Beaverton, Oregon. Issue date: December 21st 2017
Project Manual Beaverton School District Beaverton High School Gymnasium Improvement Beaverton, Oregon Issue date: December 21st 2017 18241 Beaverton High School Gymnasium Improvement TABLE OF CONTENTS
More informationSECTION METAL WALL PANELS
Unience USA, Inc. 2115 Linwood Avenue, Suite 500 Fort Lee, NJ 07024 Phone: 201-676-2467 Fax: 201-944-3660 Email: alfrex@alfrexusa.com Web: www.alfrexusa.com SECTION 07 42 13 METAL WALL PANELS PART 1 GENERAL
More informationLCCC MAIN PLANT BOILER BURNER UPGRADES
LCCC MAIN PLANT BOILER BURNER UPGRADES FOR Laramie County Community College (LCCC) 1400 East College Drive Cheyenne, WY 82007 ENGINEERS Cator, Ruma & Associates 420 West Lincolnway Cheyenne, WY 82001 PROJECT
More informationSECTION DOOR HARDWARE
SECTION 087100 -DOOR HARDWARE PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSECTION ROOF MOUNTED ATTIC EXHAUST VENT
SECTION 07 72 00 ROOF MOUNTED ATTIC EXHAUST VENT **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to suit your particular
More informationPRODUCT SPECIFICATIONS
PART 1 GENERAL 1.01 SUMMARY A. Section Includes: High density cast resin architectural products, including columns, panels, caps, bases, trim elements and balustrade systems. Specifier Note: Article below
More informationSECTION PRODUCT REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 01600 - PRODUCT REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationSECTION INTUMESCENT MASTIC FIREPROOFING
PART 1 GENERAL 1.01 SUMMARY SECTION 07 81 23 - INTUMESCENT MASTIC FIREPROOFING A. Section Includes: 1. Intumescent Mastic Fireproofing for Application to Exposed Steel 2. Protection of Adjacent Surfaces
More informationTown of Atkinson, New Hampshire INVITATION TO BID. Town Garage Roof Replacement Issued: June 30, 2015
Town of Atkinson, New Hampshire INVITATION TO BID Town Garage Roof Replacement Issued: June 30, 2015 The Town of Atkinson invites qualified contractors to bid on the replacement of the roof of the Town
More informationUniversity Apartments on Brooklyn PROJECT MANUAL
Section 011000 - Summary PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Project information. 2. Work covered by Contract Documents. 3. Phased construction. 4. Work under separate contracts. 5. Access
More informationSECTION TURBINE VENTILATORS
SECTION 07 72 00 TURBINE VENTILATORS **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to suit your particular project.
More informationSPECIFICATIONS FOR. CareSpot Urgent Care
SPECIFICATIONS FOR CareSpot Urgent Care 8132 Lee Vista Boulevard, Suite 102 Orlando, Florida 32801 Project No: 1821 29 October 2018 PREPARED BY: RENEE LYNN + GLOTTA 2232 Dana Drive Flower Mound, Texas
More informationSECTION ELECTRICAL POWER ATTIC EXHAUST VENTILATOR
SECTION 07 72 00 ELECTRICAL POWER ATTIC EXHAUST VENTILATOR **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to delete
More informationRICHMOND PUBLIC SCHOOLS
PROJECT MANUAL RICHMOND PUBLIC SCHOOLS E.S.H. GREENE ELEMENTARY SCHOOL CONSTRUCTION PROJECT DEPT. OF EDUCATION NO. 123-144-00-100 DIVISION 1 (DRAFT SPECIFICATIONS) PREPARED BY RRMM ARCHITECTS ARCHITECTURE
More information