1 Types of Linings The various types of s can be grouped into two categories: (i) Exposed and Hard Surface Linings, and (ii) Buried Membrane Linings. The advantages and disadvantages of various types of s which need to be kept in view while deciding on the type of to be adopted are indicated below. Exposed and Hard Surface Linings Exposed s include all s exposed to wear, erosion and deterioration effect of the flowing water, operation and maintenance equipment and other hazards. Such s are constructed across of cement concrete and mortars, asphaltic materials, bricks, stones and exposed membranes. Although the initial cost of all these s is generally high, the reinforced cement concrete s are costliest and are usually recommended for use only where structural safety is the primary consideration. Cement Concrete The in situ concrete is one of the most conventional type of which has successfully been used in India and other parts of the world. Cement concrete is more preferable than any other where channel is to carry high velocity water because of its greater resistance to erosion. Velocities up to 2.5 m/sec are generally considered permissible with adequate water depth although higher velocities up to 5.0 m/sec in case of Kosi Feeder in U.P. have been provided. Cement concrete eliminates weed growth and thereby improves flow characteristics. Provision of concrete reduces maintenance charges to a minimum. Frequent cracks due to contraction taking place from temperature change, drying and shrinkage and settlement of sub-grade. It is also likely to be damaged from alkaline water. Cement concrete without reinforcement may be damaged due to excessive external water pressure. The reinforced concrete can withstand the external water pressure but at a very high cost. When unexpected water pressures are encountered, un-reinforced will crack more easily than the reinforced and will relieve the pressure thereby reducing the area of damage.
2 Shot crete Spacing In this type of cement mortar is applied by pneumatic pressure. The may be considered with or without reinforcement (in the form of mesh or expanded metal), although reinforcement (in the form of mesh or expanded metal), although reinforcement increases its useful life, especially, when laid over earth sub-grade. Since the thickness of is limited to 5.0 cm mostly such s are applied on smaller channels or where operational requirements are not severe. Soil Cement This type of is made up of a mixture of cement and natural sandy soil. This type of may sometimes result in considerable saving as compared to cement concrete. It is not weather-resistant. Asphaltic Concrete Asphaltic concrete has greater ability to withstand changes in the subgrade. Asphaltic concrete can be used for repairing cement concrete by placing a resurfacing layer of asphaltic concrete. Velocities for this are limited to 1.5 m/s. Weed growth results in puncturing of ; sliding during hot season. Brick This type of has been extensively used in India and elsewhere. This type of is economical where aggregates for concrete are not available. Exposed Membrane Linings The various types of exposed membrane s are: sprayed in-place asphalt cements, prefabricated sheets of asphaltic materials and films of plastic and synthetic rubber. Exposed membranes have low resistance to puncturing and disintegrate rapidly, thicker sheets with greater resistance are expensive. Earth Linings Thick compacted earth is durable and can withstand considerable external hydrostatic pressure. Bentonite has shown considerable promise for use as a good material. Bentonite containing large percentage of montmorillonite, is characterised by high water absorption accompanied by swelling and imperviousness. It
3 can be used as 5.0 cm thick membrane covered by protective blanket or as a mixed inplace layer of soil bentonite and well compacted. Buried Membrane Linings Hot-applied asphaltic, prefabricated asphalt materials, plastic film and a layer of bentonite or other types of clays protected by earth or gravel cover are cheap s. These s can be provided immediately after completion of excavation or even later. Membrane s are susceptible to damage by weed root and permissible water velocity is limited to avoid erosion. The life of the is uncertain. Consideration for Selection Type of sub-grade, position of water table, climatic conditions, availability of materials, size of canal, service requirements and experience are the major factors affecting the economy and selection of suitable material REINFORCED PORTLAND CEMENT CONCRETE ASPHALTIC CONCRETE UNREINFORCED PORTLAND CEMENT CONCRETE 50 Shot crete steps of 6 mm CANAL CAPACITY (m 3 /s) Determination of thickness of hard-surface based on canal capacity (after U.S.B.R. - Linings for Irrigation Canals), 1963 Specifications of Linings The method of preparation of sub grade in different soil reaches of a canal based on IS: Thickness The minimum thickness of concrete based on canal capacity should be as given below:
4 Capacity m 3 /s Thickness of M 15 Concrete, mm Thickness of M 10 Concrete, mm Controlled Ordinary Controlled Ordinary 0 < Q < < Q < < Q < < Q < Q > Assessment of Seepage Losses from Canals Introduction The possible benefits from canal are saving in water, elimination of water logging, and reduction in maintenance cost. The reduction in seepage losses and prevention of water logging is becoming more and more important because of limited supply and increased demand of water for Irrigation and crops. Observations on Ganga Canal in U.P. and canals in Punjab have shown the only percent of the head discharge reaches the fields. The seepage losses from unlined canals in India have been found to vary from 0.3 to 7.0 m3/sec/106 m2 for different soil and drainage conditions. The following table gives the details of seepage losses measured in the field. Sl.No Canal Method Seepage loss in m 3 / sec / 10 6 m 2 1 Ganga Canal at km 37.6 Tracer Hardoi Branch between Inflow-outflow km and km Bokarheri Distributary between km 0.06 and km Inflow-outflow and seepage meter Tasipur Distributary Seepage meter (Saharanpur) and ponding Tubewell water courses: (i) Dehradun Group Ponding 6.60 (ii) Saharanpur Ponding 5.30 (iii) Roorkee Ponding 4.06
5 t = Thickness of the Permeability of K 1 Permeability of subsoil K H h 1 b 2 FREE SURFACE WITHOUT LINING FREE SURFACE WITH LINING Distance in km Effect of on seepage Manual on Canal Linings h project/ canal Type of (i) Bed width (m) (v) (i) Discharge (ii) Velocity (iii) Value of Manning's n Nangal Hydel (Punjab) Sundernagar Hydel, Beas Project (Punjab) Yamuna Power Gandak Canal & & : : 1 1.5: : 1 N.A / in 6666 NA NA NA NA (i) 49.9 km of concrete (ii) 14.4 km of tile Concrete and tile NA 13.6 km From km to km Cement concrete 10 cm thick in the bed and 12.7 cm in the bottom Concrete in bed, brick and concrete tile on sides. Brick tile
6 project/ canal Type of (i) Bed width (m) (v) (i) Discharge (ii) Velocity (iii) Value of Manning's n Lower Ganga Canal-Link Canal Kosi Feeder Rajasthan Feeder Main Canal Dantiwada Project (Gujarat) (Cement Concrete Lining) to to in upper reaches and 6.4 in lower reaches : 1 1 : 1 1.5:1 1.5: /9250 1/675 to NA NA 1/ NA NA NA km 10 km 64.3 km 0.48 Sandwiched Ist class brick. Cement concrete tile Single tile in bed and double tile in sides 1:3 cement concrete
7 project/ canal Type of (i) Bed width (m) (v) (i) Discharge (ii) Velocity (iii) Value of Manning's n Banaskantha Left Bank Main Canal Dantiwada Project (Gujarat) (Brick Lining) Mahi Right Bank Canal (Gujarat) Shetrunji Canal Project (Gujarat) (Masonry Lining) Shetrunji Canal Project (Gujarat) (Lime Concrete Lining) /2 : :1 2 : 1 1 : NA NA NA NA 1 in in NA NA NA km km 0.12 km 0.43 km cm thick sandwiched brick on bed and sides 13.3 cm thick sandwiched brick tile on bed and sides cm thick masonry Concrete on bed and sides
8 project/ canal Type of (i) Bed width (m) (v) (i) Discharge (ii) Velocity (iii) Value of Manning's n Tungabhadra Project (A.P) Krishnarajasagar Canal (Karnataka) Krishnarajasagar Right Bank Low Level Canal (Karnataka) (Soil Cement Lining) Krishnarajasagar Right Bank Low Level Canal (Karnataka) (Lime Surkhi Concrete Lining) NA : : : : NA NA NA NA NA NA 2.89 NA NA NA NA NA NA NA NA 0.64 km NA NA 180 m NA Cement concrete in bed and sides. In reaches of deep cutting rubble masonry 1 : 4 has been provided on sides. 1 : 5: 10 cement concrete, Top has been plastered with 1 :6 cement mortar, 12 mm thick. 100 mm thick soil - cement. Lime surkhi concrete 1 : 4 : 8, 89 mm thickness, slabs of different widths of 0.762, 1.524, 2.286, 3.048, 3.8, 4.5, m.
9 project/ canal Type of (i) Bed width (m) (v) (i) Discharge (ii) Velocity (iii) Value of Manning's n Manniaru Canal (Tamil Nadu) Pattanamkal Mail Canal (Tamil Nadu) Rathapuram (Tamil Nadu) PAMBA IRRIGATION PROJECT Left Bank Main Canal, Pamba Irrigation Project :1 1 : 1 1 : 1 1 : cm in in in in NA NA NA 10 km In situ cement concrete. 7.6 cm thick. 1:6:10, Cast insitu plastered with cement mortar 1:4, 12 mm thick on the bed. The side slope of the canal is lined with cement concrete 1:4:7 using 60 percent of 38 mm metal and 40 percent of 19 mm metal. The top finished with cement mortar plaster 1:4. The bed of the canal is lined with cement concrete 1:6:10 using 60 percent of 38 mm metal and 40 percent of 19 mm metal. The top of the bed is finished with 1:4 cement mortar plaster. The thickness of is 7.6 cm. Randon rubble masonry has been provided in places where the canal is taken through row cutting. The side slope of the canal is lined with cement concrete 1:4:7 using 60 percent of 38 mm metal and 40 percent of 19 mm metal. The top finished with cement mortar plaster 1:4. The bed of the canal is lined with cement concrete 1:6:10 using 60 percent of 38 mm metal and 40 percent of 19 mm metal. The top of the bed is finished with 1 :4 cement mortar plaster. The thickness of provided for the main canal is 7.0 cm Random Rubble. masonry has been provided in places where the canal is taken through rock cutting R.R. Masonry and C.C.
10 project/ canal Type of References: (i) Bed width (m) (v) (i) Discharge (ii) Velocity (iii) Value of Manning's n Kuttiady Irrigation Project Partially completed by 2/73 Peechi Irrigation Scheme Left Bank Canal 1953 March 1972 Kuthanur Branch March : 1 1 vertical to 0.5 horizontal average 1 : 1 1 : m m 0.3 average 0.24 / / / in 5280 app. average km m (Main canal) precast C.C. slabs Rubble masonry in cement mortar km m Precast slabs and blocks. Bitumen and cement Manual on Canal Linings Technical Report No. 14. Research Scheme Applied to River Valley Projects, Central Board of Irrigation and Power.
HYDRAULIC STRUCTURES
7 th Semester B.TECH. [ CIVIL ENGINEERING ] HYDRAULIC STRUCTURES A hydraulic structure is a structure submerged or partially submerged in any body of water, which disrupts the natural flow of water. They
More informationBuilding materials. 1. Rock is one building material that has been used in building structures for centuries.
Building materials Introduction: The engineering structures are composed of materials. These materials are known as the engineering materials or building materials or materials of construction. It is necessary
More informationAppendix J: Storm Conveyance Design Parameters
Appendix J: Storm Conveyance Design Parameters Drain Commissioner 39 February 2005 STORM DRAINAGE DESIGN CRITERIA A. STORM SEWERS 1. The required discharge capacity shall be determined by the Rational
More informationLime Cement Aggregates Mortar
Lime Cement Aggregates Mortar Lime Preparation of lime mortar Cement Ingredients Manufacturing process Types and Grades Properties of cement and Cement mortar Hydration Compressive strength Tensile strength
More informationGeneral Technical Specification
GENERAL For calculating the requirements of cement in various items of work the following standards will be adopted. Over the above theoretical quantity of cement, additional allowance upto plus or minus
More informationDefinition of Wall. A continuous, vertical structure Thin relatively to its length and height
Walls & Partition Learning Objectives Briefly explain the functions & functional requirements of walls Differentiate and compare between load bearing and non-load bearing walls Briefly describe the characteristics,
More informationBituminous mix design
Bituminous mix design Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew Contents 1 Overview 1 2 Evolution of road surface 2 2.1 Objectives of mix design..............................
More informationRoads and Transport Department Pavement Design 3 rd Year TYPES OF PAVEMENT FLEXIBLE AND RIGID PAVEMENT
TYPES OF PAVEMENT FLEXIBLE AND RIGID PAVEMENT There are two types of pavements based on design considerations i.e. flexible pavement and rigid pavement. Difference between flexible and rigid pavements
More informationChapter 4. Main problems in a canal network 4.1 INTRODUCTION
Canals 21 Chapter 4 4.1 INTRODUCTION This chapter looks at problems which are frequently encountered in irrigation canal systems. Some of these are described in detail. The last section of this chapter
More informationScanned by CamScanner
JODHPUR MUNICIPAL CORPORATION G-SCHDULE NIT No. Date Sr No. Last Date of Sale :- Earnest Money : Rs... Date of Receipt :- CR No. Dated.. Copy issued to M/s STORM WATER DRAINAGE MASTER PLAN FOR THE CITY
More informationIrrigation Design (1) IHD302
Irrigation Design (1) IHD302 Instructors : 1-Prof Dr. Kamal Abou Alhasan 2- Dr. Ashraf Saad 3- Dr. Soha Elayoty 4- Dr. Mohamed Attia 5- Dr. Hany Gomaa Topics Design of irrigation system Design of Bridge
More informationWater Control Structures Selected Design Guidelines Alberta Environment Page 13-1
Alberta Environment Page 13-1 13.0 DROP INLET SPILLWAYS 13.1 General The drop inlet spillway is commonly used for providing flood protection for earth dams which have smaller reservoirs and/or smaller
More informationA Design Review of Waterproofing Codes
A Design Review of Waterproofing Codes Section 1807 of Chapter 18 of the International Building Code addresses waterproofing under the section title of Dampproofing and Waterproofing. The section defines
More informationBuilding Construction
Building Construction Shallow Foundations Module-III Introduction The foundation can be classified broadly into two types: Shallow foundations Deep foundations Shallow foundations Shallow Foundations When
More informationInstallation of Ceramic Tile in Swimming Pools
Installation of Ceramic Tile in Swimming Pools TDS 192 DESIGN CONSIDERATIONS I. Primary types of swimming pool structures A. Cast-in-place reinforced concrete 1. Definition concrete placed or pumped on-site
More informationConcrete Repair & Restoration
Concrete Repair & Restoration The ProSpec Product Portfolio ProSpec offers a broad range of cement-based, high-quality products to meet your project needs. The ProSpec portfolio includes a full line of
More informationTable of Contents. Chapter 1 : Introduction 1. Chapter 2 : Structure and design 15
Table of Contents Chapter 1 : Introduction 1 1-1 Overview of Japan 1 1-1-1 Topography 1 1-1-2 Climate 1 1-1-3 Population 3 1-1-4 Economy 3 1-2 History and current status of roads in Japan 5 1-2-1 Road
More informationBituminous Pavements and Surfaces
PART ONE Bituminous Pavements and Surfaces Bituminous pavements and surfaces are composed of compacted aggregate and bitumen. The aggregate transmits the load from the surface to the base, takes the abrasive
More informationSHOTCRETE DESIGN FOR IRRIGATION CANAL LINING
SHOTCRETE DESIGN FOR IRRIGATION CANAL LINING Syed Hasan 1, Gunvant Vaghela 2, James Yip 3, Ben Chung 4 ABSTRACT: The major artery of Lake Wyangan irrigation system is the 16km long Lake View Branch Canal
More informationA.2.a Random Riprap... Table
3601 RIPRAP MATERIAL 3601.1 SCOPE Provide stone and filter layer material for use in random or hand-placed riprap, gabion, and revet mattress construction. 3601.2 REQUIREMENTS A Stones A.1 Quality Provide
More informationDRAINAGE & DESIGN OF DRAINAGE SYSTEM
Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means
More informationGUIDELINES FOR RETAINING WALLS 4-0 IN HEIGHT OR LESS
GUIDELINES FOR RETAINING WALLS 4-0 IN HEIGHT OR LESS Version 2014-11-11 Prepared by: Building Development Division Department of Development Services 5 County Complex Ct. Suite 120 Prince William, VA 22192
More information(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08
(b) Discuss in brief shaft spillway with neat sketches. Marks 04 OR Q (2) Explain in brief USBR stilling basin. Marks 08 Stilling Basins The basins are usually provided with special appurtenances including
More informationprospec.com Concrete Repair & Restoration
prospec.com Concrete Repair & Restoration Table of Contents Product Portfolio 3 Product Enhancements 4 Product Selection Matrices 5 Construction Grout & Precast Non-shrink grouts C-1107 Construction Grout
More informationCLASS: II YEAR / IV SEMESTER CIVIL SUBJECT CODE AND NAME: CE 6401 CONSTRUCTION MATERIALS UNIT I STONES-BRICKS-CONCRETE BLOCKS
CLASS: II YEAR / IV SEMESTER CIVIL SUBJECT CODE AND NAME: CE 6401 CONSTRUCTION MATERIALS UNIT I STONES-BRICKS-CONCRETE BLOCKS PART-A 1. What are the important uses of stones? 2. What are the different
More informationNATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT
NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI 620 015 ESTATE MAINTENANCE DEPARTMENT NOTICE INVITING TENDERS NO: NITT/EMD//Civil works / 2015 TENDER NOTIFICATION Ref: NITT/EMD/ CoW/Civil Works /15-16
More informationLow Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]
Diversion Channels DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] The design of permanent
More informationSECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.
SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract
More informationLINED WATERWAY OR OUTLET (Feet) Code 468
LINED WATERWAY OR OUTLET (Feet) Code 468 Natural Resources Conservation Service Conservation Practice Standard I. Definition A waterway or outlet having an erosion-resistant lining of concrete, stone,
More informationNote on the assessment:
EXCERPTS Note on the assessment: The following is an excerpt from the book Post-disaster shelter: 10 Designs, IFRC, 2013. Inclusion of this design is for information purposes and does not necessarily imply
More informationTYPES OF PAVEMENT FLEXIBLE AND RIGID PAVEMENT
TYPES OF PAVEMENT FLEXIBLE AND RIGID PAVEMENT There are two types of pavements based on design considerations i.e. flexible pavement and rigid pavement. Difference between flexible and rigid pavements
More informationInterior Finish Materials
Ceramic Tile Ceramic tiles are relatively small, modular surfacing units made of clay or other ceramic material The tiles are fired in a kiln at very high temperatures The result is a durable, dense material
More informationroofing ROOFING Design of the base ROOFING DETAILS
DETAILS The general arrangement details and the principles to be followed at skirtings, upstands, abutments, verges, gutters and expansion joints are as details illustrated. SELECTION PARAMETERS It is
More informationCHAPTER 8. Concrete Work
Concrete Work Clay Bricklaying Made Easy CONCRETE WORK Foundations for walls and piers All loadbearing walls and piers are required to stand on a concrete foundation, which must be able to receive and
More informationFoundations. Foundations form the major part of a buildings substructure (along with the rising walls, hardcore and ground floors)
Foundations Foundations form the major part of a buildings substructure (along with the rising walls, hardcore and ground floors) Once the substructure is complete the building is out of the ground and
More informationSERIES NG 2400 brickwork, blockwork and
MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 2 NOTES FOR GUIDANCE ON THE SPECIFICATION FOR HIGHWAY WORKS SERIES NG 2400 brickwork, blockwork and stonework Contents Clause Title Page NG 2401 Cement
More informationOver-coming differential settlement in soft grounds using Floating Semi-Rigid Pavement
14 th REAAA Conference 2013, 26 28 March 2013, Kuala Lumpur, Malaysia Over-coming differential settlement in soft grounds using Floating Semi-Rigid Pavement Dato Ir Dr Safry Kamal Ahmad, Dr Wu DQ, Francis
More informationGroundwater Seepage. Causes of Basement Seepage and Leaks Hydrostatic Pressure
Groundwater Seepage The following guide can be used by you and your crews when assessing seepage at a property. Bear in mind that this guide is not all-inclusive, and should be used in a supplementary
More informationCONCRETE SEGMENTAL RETAINING WALLS
32 32 23.13 CONCRETE SEGMENTAL RETAINING WALLS 1.00 GENERAL 1.01 DESCRIPTION A. The work shall consist of furnishing and installing concrete segmental retaining wall (CSRW) units to the lines, grades and
More informationWaterproofing Products for UNDERGROUND STRUCTURES
Waterproofing Products for Underground structures level: the parts of a building which are most often in contact with water and aggressive elements in the ground. All structures below ground level come
More informationCurrent Developments in Pre-Applied and Post- Applied Waterproofing of Concrete. Presented by. Kobus Botma
Current Developments in Pre-Applied and Post- Applied Waterproofing of Concrete Presented by Kobus Botma Cost of Potable Water Potable Water Potable water is expensive Collection Storage Transportation
More informationAPPENDIX 5: CONSTRUCTION CHECKLISTS
APPENDIX 5: CONSTRUCTION CHECKLISTS This appendix presents the construction checklists for the various retaining wall mitigation strategies: 10.1 Void Fill 10.2 Surface Bond Overlay 10.3 Reinforced Overlay
More informationLIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS. Diagram 1: Standard Membrane Continuation 150 mm Overlap
LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS Diagram 1: Standard Membrane Continuation 150 mm Overlap Ensure Membrane to Membrane Contact Diagram 2: Membrane Continuation
More informationGeneral Brick Installation Instructions
Excellent Resource for Clay Paver Installation: http://www.bia.org/resources/clay-brick-pavers/clay-paver-informational- Resources These are general guidelines only. Check your paver manufacturer's recommendations
More informationLAYING IBSTOCK CLAY PAVERS FOR PERMEABLE PAVEMENTS
PERMEABLE PAVEMENTS (SUDS) This leaflet highlights the basic requirements for laying Ibstock clay pavers to form a permeable pavement. Ibstock clay pavers are intended for domestic use only i.e. patios
More informationFundamentals of Building Construction: Materials and Methods
Fundamentals of Building Construction: Materials and Methods Allen, Edward ISBN-13: 9780470074688 Table of Contents Preface. Chapter 1: Making Buildings. Learning to Build. Sustainability. The Work of
More informationSPECIFICATIONS FOR STRUCTURAL EXCAVATION
SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition
More information7.1 Flexible Pavement Design. 7.2 Rigid Pavement Design TRANSPORTATION SYSTEM ENGINEERING 1, 61360
7.1 Flexible Pavement Design 7.2 Rigid Pavement Design 1 Highway pavements are divided into two main categories: Flexible -Bituminous concrete Rigid -Portland cement concrete- Flexible pavements usually
More informationWaterproofing and Types of Drains
Waterproofing and Types of Drains 4 PVC Downspout Burial w/ Y Fitting for Future Clean-out Yard Drain Box 12 Drain Box 12885 Old Frederick Road Sykesville, MD 21784 Office 410-442-2445 Fax 410-489-4312
More informationGeotech Services, X-18, MIDC, Hingna, Nagpur, Maharashtra. Discipline Mechanical Testing Issue Date
Last Amended on 11.01.2014 Page 1 of 14 I. BUILDING MATERIALS 1. Soil / Rock Plate Load Test IS 1888 1982 (Reaffirmed-2007) Cyclic Plate Load Test IS 5249 1992 Clause 6 (Reaffirmed-2010) Load Test On In-Situ
More informationModule 11: Plastered walls
Module 11: Plastered walls Module Objectives By the end of this session, participants will understand: 1. The requirements for good plastering. 2. Additives used in plaster. 3. How to key the substrate
More informationSlab on Grade. Introduction CHAPTER 10
CHAPTER 10 Slab on Grade Introduction A concrete slab on grade is a level surface of concrete that lies directly on the ground. Slabs on grade are used for roads, sidewalks, patios, airport runways and
More informationConstruction Specification 62 Grouted Rock Riprap
Construction Specification 62 Grouted Rock Riprap 1. Scope The work consists of furnishing, transporting, and the installation of grouted rock riprap revetments and blankets, including filter or bedding
More informationCONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS
More informationContents BRICKWORK, BLOCKWORK AND STONEWORK. Series NG 2400 Brickwork, Blockwork and Stonework
BRICKWORK, BLOCKWORK AND STONEWORK Contents Clause Title Page NG2401 Cement 320 NG2404 Mortar 320 NG2405 Lime Mortar 320 NG2406 Bricks 320 NG2407 Blocks 321 NG2408 Reconstructed Stone 321 NG 2409 Natural
More informationreinforced besser block retaining walls
reinforced besser block retaining walls Preface The designs shown in the brochure are based on limit state design in accordance with the provisions of AS4678-2002 Earth retaining structures standard including
More informationCity of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING
January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01
More informationFinish Flooring- Hard Flooring Materials
Finish Flooring- Hard Flooring Materials The most desirable types of flooring by designers and building owners Types of Hard Flooring Materials Concrete Stone Ceramic Tiles Quarry Tiles Bricks and Brick
More informationTECHNICAL INFORMATION CEMSCREED 5
TECHNICAL DATA SHEET CEMSCREED 5 Ver May 2016 TECHNICAL INFORMATION CEMSCREED 5 Product Data Sheet No. 110/03 INTRODUCTION Tarmac Cemscreed 5 is a rapid drying floor screed developed by Tarmac to fulfil
More informationSECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.
PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and
More informationPRODUCT DATA SHEET SikaProof Bentonite
PRODUCT DATA SHEET NATURAL SODIUM BENTONITE BELOW GROUND WATERPROOFING SYSTEM (ONLY TO BE APPLIED BY A SIKA APPROVED CONTRACTOR) PRODUCT DESCRIPTION SikaProof Bentonite is a needle punched thermally locked
More informationConstruction Specification for Utility Adjustments
Engineering & Construction Services Division Standard Specifications for Road Works TS 4.50 September 2017 for Utility Adjustments Table of Contents TS 4.50.01 SCOPE... 2 TS 4.50.02 REFERENCES... 2 TS
More information1 Doc WRD 13 ( 594 ) GUIDELINES FOR DESGIN ANDS CONSTRUCTION OF WATER COURSES
DRFT STNDRD IN WIDE CIRCULTION SPEED POST Document Dispatch dvice Ref. Date WRD 13/T-53 DEC 2013 TECHNICL COMMITTEE: Canals & Cross Drainage Works Sectional Committee, WRD 13 ------------------------------------------------------------------------------------------------------------------------
More informationB. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.
SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 850 CEMENT TREATED FREE DRAINING BASE APRIL 18, 2008
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 850 CEMENT TREATED FREE DRAINING BASE APRIL 18, 2008 850.01 Description 850.02 Materials 850.03 Proportioning, Mixing, and Transporting
More informationUNIT III Earthwork Estimation & Reinforcement Estimation
SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : ECV(13A01605) Year & Sem: IV-B.Tech & I-Sem Course & Branch: B.Tech
More informationCONCRETE BLOCK PAVING FOR STEEP SLOPES Technical Note
CONCRETE BLOCK PAVING FOR STEEP SLOPES Technical Note CONSTRUCTION OF STEEP SLOPES The construction of roads on steep slopes poses particularly interesting challenges for road engineers. The horizontal
More informationSeptic Tank Guidelines
Septic Tank Guidelines Septic tanks are suitable for conditions where the wastewater can drain away and be absorbed into the soil without contaminating ground water where it is extracted. Sealed solid
More informationPROGRAMME OF WORK : STANDARDS
Report : 09-0- Of 7 08 08/SC 0 470 (SABS 470) 4.0 Concrete poles for telephone, power and lighting purposes 08-08-0 508.0 Concrete retaining blocks 08-08-0 54 (SABS 54) 4.0 Concrete roofing tiles 08-08-0
More informationD1 Earth roofing. Syria 1/5 PRÉSENTATION. Geographical Influence. Definition
Building techniques : Country : D1 Earth roofing Syria PRÉSENTATION Geographical Influence Definition Earth Roofing - Roof with very weak slope covered with one or more layers of earth or mixture of earth,
More informationWater Control Structures Selected Design Guidelines Alberta Environment Page 17-1
Alberta Transportation Water Control Structures Selected Design Guidelines Alberta Environment Page 17-1 17.0 MAIN CANAL CONVEYANCE STRUCTURES 17.1 General Conveyance structures typically employed on main
More informationMagnumStone Specifications Gravity
MagnumStone Specifications Gravity SPECIFICATION FOR MAGNUMSTONE GRAVITY MECHANICALLY STABILIZED EARTH SYSTEM PART 1: GENERAL.01Description The work consists of supplying and installing all aspects of
More informationComparison of plastic type grassed pavements vs. Bomanite Grasscrete Systems
Comparison of plastic type grassed pavements vs. Bomanite Grasscrete Systems This document describes the primary differences between the Bomanite Grasscrete Systems and competitive plastic type grassed
More informationEstimate FOR THE SEPTIC TANK
Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks
More information2/23/2009 R15-R20R20
Foundations What is important to know about foundations? You (probably) won t design it What are the components that make up a properly designed and built foundation? Determine whether house has a good
More informationCivil Engineering Construction Chapter 5
Civil Engineering Construction Chapter 5 Introduction to Floor Dr Mohamad Syazli Fathi Department of Civil Engineering UTM RAZAK School of Engineering & Advanced Technology UTM International Campus August
More informationPartial Replacement of Sea and Desert Sand in Place of River Sand for Mortar in Construction
GRD Journals- Global Research and Development Journal for Engineering Volume 2 Issue 7 June 2017 ISSN: 2455-5703 Partial Replacement of Sea and Desert Sand in Place of River Sand for Mortar in Construction
More informationA. The work of this section includes, but is not limited to, the following:
SECTION 07 14 00 FLUID APPLIED WATERPROOFING SYSTEM PART 1: GENERAL 1.1 RELATED DOCUMENTS A. All of the Contract Documents, including General and Supplementary Conditions and Division 01 General Requirements,
More informationContract18. Vitrified paving FLAT ROOF BALCONY ROOF TERRACE DISPLAY AREA
Contract18 Vitrified paving FLAT ROOF BALCONY ROOF TERRACE DISPLAY AREA Contract 18 Vitrified Paving Installation Methods Installation Method 1 Dry Installation Using Our Range of Paving Support Pads Installation
More informationSECTION 1. AS MASONRY STRUCTURES CODE
mortarless masonry Design Manual Part 1 (AS 3700:2011) Section 1 Page: 1 SECTION 1. AS 3700 - MASONRY STRUCTURES CODE AS 3700:2011 Masonry structures is the current Australian standard for the design of
More informationSparks Engineering, Inc. S T R U C T U R A L E V A L U A T I O N, D E S I G N A N D T E S T I N G
Sparks Engineering, Inc. S T R U C T U R A L E V A L U A T I O N, D E S I G N A N D T E S T I N G February 29, 2008 Ms. Leslie Wolfenden Save Austin's Cemeteries PO Box 41814 Austin, TX 78704 (512) 917-1666
More informationPOND SEALING OR LINING COMPACTED SOIL TREATMENT
NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE STANDARD POND SEALING OR LINING COMPACTED SOIL TREATMENT CODE 520 (FT. 2 ) DEFINITION A liner for an impoundment constructed using compacted
More informationBuilding Construction 7. Dr Nabil El-Sawalhi Associate professor Engineering Projects Management
Building Construction 7 Dr Nabil El-Sawalhi Associate professor Engineering Projects Management Walls A wall is a continuous, usually vertical structure, which is thin relative to its length and height.
More informationBELMURO WALL SYSTEM INSTALLATION GUIDE
BELMURO WALL SYSTEM INSTALLATION GUIDE TABLE OF CONTENTS TABLE OF CONTENTS... 1 SYSTEM DESCRIPTION... 2 DRY STACK SYSTEM: INSTALLATION GUIDE... 5 GEOGRID WALL SYSTEM: INSTALLATION GUIDE... 9 MASONRY WALL
More information10/11/2017. Identify Processes or Materials Causing Distress or Failure. Portland Cement Association. References
// Concrete Surface Defects: Causes, Prevention, and Cure. Presented to: Wednesday, October, Presented by: Michelle L. Wilson Director, Concrete Technology Portland Cement Association www.cement.org Identify
More informationTACAMP 2014 CONCRETE. Presented by Rick Wheeler
TACAMP 2014 CONCRETE Presented by Rick Wheeler HISTORY OF CONCRETE 2000 years and still working Concrete is the longest lasting Man-made construction material The Roman Pantheon is the largest (43.4m dia.)
More informationConcrete. Copyright: Quasar Management Services Pty Ltd
Concrete This training package provides information on basic concrete, including materials, reinforcement, formwork, concrete mix, placement and curing for village infrastructure and houses common in South-
More informationInstallation Guidelines
815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Guidelines Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles (optional),
More informationEarth Retaining Walls CIVL455 CHAPTER I: INTRODUCTION
Earth Retaining Walls CIVL455 CHAPTER I: INTRODUCTION Earth retaining structures are designed to overcome significant variation in ground levels to provide either a sloping or flat ground on the retained
More informationMunicipality of Waterville Public Sidewalk Repair Policy
Municipality of Waterville Public Sidewalk Repair Policy Purpose - The purpose of this policy is to protect the public health, safety and welfare of the citizens and inhabitants of the Municipality by
More informationPrinciples of Soil Stabilization
Principles of Soil Stabilization by E. J. Y oder, R esearch E ngineer Joint Highway Research Project Purdue University A problem continually facing an engineer is that dealing with procedures and techniques
More informationPART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT]
PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT] A. - General. B. - Streets. C. - Stormwater drainage system. D. - Water
More informationSECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS
SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction
More informationEXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.
CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related
More informationSPECIFICATION FOR PIPE CULVERT CONSTRUCTION
SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.
More informationSERIES 1100 KERBS, FOOTWAYS AND PAVED AREAS
MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 1 THE SPECIFICATION FOR HIGHWAY WORKS SERIES 1100 KERBS, FOOTWAYS AND PAVED AREAS Contents Clause Title Page 1100 (02/17) General 2 #1101 Precast Concrete
More informationDESIGN AND MASONRY BASIC DESIGN GUIDELINES FOR CSEB. General principles for a good design
DESIGN AND MASONRY BASIC DESIGN GUIDELINES FOR CSEB Good boots and a good hat. General principles for a good design That means built a good basement: (Minimum 25-cm high) And good overhangs: (Minimum 25
More informationSWPPP Cut Sheet: Filtrexx Vegetated Retaining Walls
2: Storm Water Management Post-Construction SWPPP Cut Sheet:.10Section Filtrexx Vegetated Retaining Walls Vegetated Mechanically Stabilized Earth (MSE) Technology PURPOSE & DESCRIPTION Vegetated retaining
More informationNOVEMBER 2016 GRANDWALL. retaining walls installation guide
NOVEMBER 2016 GRANDWALL retaining walls installation guide RETAINING WALL INSTALLATION GUIDE RETAINING WALL information Austral Masonry Grandwall retaining wall blocks are an ideal choice for retaining
More informationAN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR
AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: EPI/WRO/CON/757/0119 FOR Construction of Boundary Wall and allied works for DHH & MCH Hospital at Kendrapara at Odisha state VOLUME III PRICE BID
More information