AMERICAN RED CROSS EMERGENCY PREPAREDNESS ACADEMY Presented by Michael J. Griffin, P.E. Principal CCS Group, Inc.

Size: px
Start display at page:

Download "AMERICAN RED CROSS EMERGENCY PREPAREDNESS ACADEMY Presented by Michael J. Griffin, P.E. Principal CCS Group, Inc."

Transcription

1 Life-Safety Risks to Schools from Nonstructural Earthquake & Tornado Damage AMERICAN RED CROSS EMERGENCY PREPAREDNESS ACADEMY 2013 Presented by Michael J. Griffin, P.E. Principal CCS Group, Inc.

2 Presentation Outline Natural hazards affecting the Central US tornados and earthquakes Life-safety risks Building structure Nonstructural components? Historical performance Benefits of mitigation Questions and answers

3 Natural Hazards Affecting Central US

4 Tornado Hazard

5 Tuscaloosa, Alabama April 27, Fatalities University Place Elementary School School canceled for the day 1997 Vintage 2-story wings - roof damaged & interior walls collapsed Gymnasium - roof and exterior walls completely removed. Ref. Prevatt, et. al. Damage Study and Future Direction for Structural Design Following the Tuscaloosa Tornado of 2011 Tornado Damage

6 Tornado Damage Joplin, MO May 25, EF mph winds 161 fatalities, 1,150 injured Joplin Hope High School 7 Students & 1 Educator 10 Bldgs. damaged $150 Million in damage Photos courtesy of Ted Preuss

7 Tornado Risk Excellent meteorological prediction and tracking tools available Dissemination of risk and warning information through media outlets mature Ample warning through tornado warning siren system Greatest challenge for schools where is a safe place for students, teachers and staff?

8 Tornado Safety - School Safe Room

9 Earthquake Hazard Shaking Intensity Minimal Low Moderate High

10 Central US Earthquake History : M7.7+, New Madrid, MO 1843: M6.0, Marked Tree, AR 1865: M5.0, Memphis, TN 1895: M6.6, Charleston, MO 1941: <M5.0, Covington, TN 1952: <M5.0, Dyersburg, TN 1956: <M5.0, Covington, TN 2008: M5.4, Mt Carmel, IN Little bldg damage has occurred Sparsely populated (early 1800s) Chimneys, windows, contents

11 Earthquake Damage Mineral, VA: M5.8 (2011) Even small EQs can be damaging

12 Tornado / Earthquake Comparison Awareness High Region Affected Local Resources Available locally & regionally Warning 10 s mins to hrs Awareness Low Region Affected Large geographic areas impacted Resources Limited due to large geographic impact Warning ESSENTIALLY NONE

13 Life-Safety Risks

14 Structural Components Structural components resist gravity loads, lateral loads (wind & earthquake), and other types of loads Structural components include: Roof Floors Beams Columns Braces Concrete / masonry walls (Load bearing only) Foundation

15 Nonstructural Components Nonstructural components include all portions of the facility that are not load-carrying / structural components Roof Beam Floor Slab-on-grade Column Footing Ref. FEMA E-74

16 Categories of Nonstructural Components Architectural Components Mechanical, Electrical, Plumbing Components & Process Equipment Furniture, Fixtures, and Contents

17 Architectural Components Parapets Partition walls Screen walls Ceilings Glazing Cladding Veneers Chimneys Stairs Interior contents and ceiling damage

18 Mechanical, Electrical, & Plumbing Fire Protection Equipment Generators Chillers & boilers Distribution panels Transformers Fans & heaters Air handling units Ductwork & conduit Piping & plumbing Diesel emergency generator (unanchored)

19 Furniture, Fixtures, & Contents Desks & chairs Bookcases & file cabinets Storage cabinets & racks Furniture Computers Smart boards Projection equipment Lakeside School Library Kern County Earthquake Photo Credit M. Knox

20 Structural & Nonstructural Components Structural building systems Designed by civil or structural engineer Structural elements are shown on the construction drawings including the seismic lateral force resisting systems Construction oversight to ensure bldg conforms to design drawings Nonstructural components & systems Specified by design team (architect, mechanical / electrical engineer, interior designer, IT engineer, fire protection engineer, etc.) Seismic design is via performance specifications TO BE IMPLEMENTED BY THE RESPECTIVE CONSTRUCTION TRADES Performance specifications provide limited guidance on seismic design for contractor implementation Little inspection or oversight to ensure proper installation

21 Nonstructural Component EQ Performance

22 Historic Performance

23 Earthquake Damage Concerns Life Safety Paramount: Children & Staff Could anyone be hurt by this building or component in an earthquake? Property Loss Could a large property loss result? Functional Loss Community Shelter Could the loss of this building or component result in an outage, interruption or loss of use?

24 1933 Long Beach, CA Earthquake Moderate Magnitude 6.3M URM buildings heavily damaged Property damage estimated at $40 million 115 fatalities Jefferson Junior H.S. Photo Credit EERC 120 schools damaged 70 schools destroyed John Muir School Photo Credit Unknown

25 California s Response 1933 Long Beach Earthquake 1 month later California adopted the Field Act All school design, plans and construction authorized and supervised by the California State Department of Works Division of Architecture 6 years later Garrison Act enacted to regulate all school construction in the state Jefferson Junior H.S. Photo Credit TJ Maher

26 Sichuan, China Earthquake 2008 Magnitude Mw 7.9 6,900 school rooms collapsed 9,000 students & teachers perished More than 1,000 students along perished at the Beichuan Middle School in Mianyang

27 Mineral, VA Earthquake M5.8 Small magnitude event Region of infrequent activity for moderate and large events No fatalities 6 schools 2 lost (EL & HS) 40% of classroom space lost Estimated losses $200-$300 million Nonstructural damage to Louisa County High School

28 Louisa County High School

29 Primary Contributors to Nonstructural Damage 1. Code Design Philosophy Life safety performance Nonstructural Design Importance Factor: - Life safety system - Contains or transports hazardous materials - Required to operate/function following an earthquake event

30 Primary Contributors to Nonstructural Damage 1. Code Design Philosophy 2. Not all components governed by code - Bookcases - Screen - Projector - Desks

31 Primary Contributors to Nonstructural Damage 1. Code Design Philosophy 2. Not all components governed by code 3. Design Professional Knowledge of seismic design & responsibility

32 Knowledge & Responsibility? Engineers Structural Mechanical Plumbing Fire protection Electrical Telecom Architects Building Officials Owners General Contractor Subcontractors Fire Protection Cladding Mechanical Plumbing Electrical Drywall Ceiling Telecom Installers Equipment vendors Inspectors Tenants Facility Managers Office Manager

33 Responsibility?

34 Primary Contributors to Nonstructural Damage 1. Code Design Philosophy 2. Not all components governed by code 3. Design Professional Knowledge of seismic design & responsibility 4. Construction quality & enforcement

35 Benefits of Mitigation

36 Benefits of Mitigation - Nonstructural Costs Majority of facility cost

37 Benefits of Nonstructural Mitigation 1. Life-safety risks significantly reduced and controlled - Students - Staff - Visitors

38 Benefits of Nonstructural Mitigation 1. Life-safety risks significantly reduced and controlled 2. Repair & recovery costs significantly reduced - Average: $1 mitigation cost saves $9 repair & recovery costs 3. Availability as a community shelter in time of need 4. Greatest cost-benefits achieved - FEMA National Average: $1 cost achieves $4 benefit 5. Many mitigation measures are easily implemented by staff 6. Largest financial investment in your school

39 Mitigation Measures Implement good housekeeping policies and implementation measures Relocate contents to lower risk Egress routes Restrain contents Cabinets Library shelving TV s / Smart Boards Install equipment anchorage properly

40 Summary Benefits of Nonstructural Mitigation 1. Life-safety risks significantly reduced and controlled 2. Repair & recovery costs significantly reduced - Average: $1 mitigation cost saves $9 in repair & recovery costs 3. Availability as a community shelter in time of need 4. Greatest cost-benefits achieved - FEMA National Average: $1 mitigation cost achieves $4 in benefit 5. Many mitigation measures are easily implemented by staff 6. Largest financial investment in your school AND 7. Life-safety risks are significantly reduced and controlled

41 Nonstructural Mitigation Resources FEMA E-74 FEMA 412 Installing Seismic Restraints for Mechanical Equipment FEMA 413 Installing Seismic Restraints for Electrical Equipment FEMA 414 Installing Seismic Restraints for Duct & Pipe FEMA 395: Incremental Seismic Rehabilitation of School Buildings (K-12) ASCE Earthquake Protection of Building Equipment and Systems, by Gatscher, McGavin & Caldwell

42 Tornado Resources Prepare, Plan & Stay Informed: FEMA 361 Design and Construction Guidance for Community Shelters FEMA 320 Taking Shelter from the Storm

43 Conclusions Tornado: Monitor weather Practice drills Respond to tornado sirens Consider having a risk assessment performed to determine: - Vulnerability of your existing building stock, and - Identify the safest locations in your existing buildings as safe areas Consider the design & construction of interior safe rooms within your schools (FEMA grant money potentially available)

44 Conclusions Earthquakes: NO WARNING! Practice, practice & practice Drop, Cover & Hold-on Consider performing a risk assessment to identify vulnerable building stock and interior nonstructural component life-safety risks Consider implementing a nonstructural component life-safety risk reduction program State and Federal grants potentially available for mitigation projects

45 Final Thoughts Ensure Design Professionals incorporate seismic design provisions for ANYTHING NEW going forward. Perform construction inspection to verify seismic provisions have been installed correctly anchorage, bracing, etc. Incorporate and implement a housekeeping policy to reduce the life-safety risks reduce clutter. Review and properly anchor existing equipment when the opportunity is available maintenance activities, equipment replacements, relocated equipment and furnishings, etc.

46 Questions? IF YOU HAVE ADDITIONAL QUESTIONS PLEASE CONTACT ME AT: MIKE GRIFFIN, P.E. (636) EXT. 105

Life Safety Risks to Schools from Nonstructural Earthquake Damage

Life Safety Risks to Schools from Nonstructural Earthquake Damage Life Safety Risks to Schools from Nonstructural Earthquake Damage 2012 EERI ANNUAL MEETING AND NATIONAL EARTHQUAKE CONFERENCE Presented by Michael J. Griffin, P.E. Principal CCS Group, Inc. School Safety!

More information

2012 VOICES OF EXPERIENCE W hen I nfrastructure F ails. Presented by Michael J. Griffin, P.E. Principal CCS Group, Inc.

2012 VOICES OF EXPERIENCE W hen I nfrastructure F ails. Presented by Michael J. Griffin, P.E. Principal CCS Group, Inc. Natural Hazards Risk Understanding the impacts and the benefits of mitigation 2012 VOICES OF EXPERIENCE W hen I nfrastructure F ails Presented by Michael J. Griffin, P.E. Principal CCS Group, Inc. Outline

More information

Available at: Last Modified: December 2012

Available at:  Last Modified: December 2012 6.3 Architectural Components 6.3.7 Chimneys and Stacks 6.3.7.1 Unreinforced Masonry Chimney Unreinforced masonry (URM) chimneys are extremely vulnerable to earthquake damage; their behavior has long been

More information

E. Nonstructural Seismic Risk Ratings

E. Nonstructural Seismic Risk Ratings E. Nonstructural Seismic Risk Ratings The risk ratings that appear in this Appendix are provided as an aid to establishing priorities. Nonstructural components are organized by component type, and estimates

More information

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION: SECTION 13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED 1-25-13 PART 1 GENERAL 1.1 DESCRIPTION: A. Provide seismic restraint in accordance with the requirements of this section

More information

Summary of Modifications/Changes in this Update

Summary of Modifications/Changes in this Update Summary of Modifications/Changes in this Update This Summary of Changes is for information only. It is not a part of the referenced document, and should not be used for project documentation. U.S. Department

More information

7 NON-STRUCTURAL ELEMENTS

7 NON-STRUCTURAL ELEMENTS Non-Structural Elements 85 7 NON-STRUCTURAL ELEMENTS Edited by Timothy P. McCormick, P.E. 86 Non-Structural Elements Non-Structural Elements 87 NON-STRUCTURAL ELEMENTS CHIMNEYS The first nonstructural

More information

3. SURVEY AND ASSESSMENT PROCEDURES FOR EXISTING BUILDINGS

3. SURVEY AND ASSESSMENT PROCEDURES FOR EXISTING BUILDINGS 3. SURVEY AND ASSESSMENT PROCEDURES FOR EXISTING BUILDINGS The first step toward reducing the nonstructural hazards in an existing building is to perform a survey to assess the extent and magnitude of

More information

SAFETY CONCERNS AT THE ORANGE COUNTY EMERGENCY OPERATIONS CENTER

SAFETY CONCERNS AT THE ORANGE COUNTY EMERGENCY OPERATIONS CENTER SUMMARY SAFETY CONCERNS AT THE ORANGE COUNTY EMERGENCY OPERATIONS CENTER The County, as owner and occupant of the Orange County Emergency Operations Center at Loma Ridge, has taken too few steps to reduce

More information

Available at: Last Modified: December 2012

Available at:   Last Modified: December 2012 6.4 Mechanical, Electrical, and Plumbing Components 6.4.9 Light Fixtures 6.4.9.4 Heavy Light Fixtures This category covers heavy or special purpose overhead light fixtures that require engineered support

More information

Available at: Last Modified: December 2012

Available at:   Last Modified: December 2012 6.4 Mechanical, Electrical, and Plumbing Components 6.4.1 Mechanical Equipment 6.4.1.3 HVAC Equipment with Vibration Isolation This includes HVAC equipment, typically of sheet metal construction, that

More information

Available at: Last Modified: December 2012

Available at:   Last Modified: December 2012 6.4 Mechanical, Electrical, and Plumbing Components 6.4.3 Pressure piping 6.4.3.3 Flexible Connections, Expansion Joints, and Seismic Separations This category covers the flexible piping connections required

More information

Facility Improvements

Facility Improvements CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation

More information

FEMA 356 Life Safety Building Performance Evaluation & PML Analysis

FEMA 356 Life Safety Building Performance Evaluation & PML Analysis FEMA 356 Life Safety Building Performance Evaluation & PML Analysis For 2 Dinkelspiel Station Ln. Atherton, California September 24, 2009 Prepared for: Prepared by: Town of Atherton Crosby Group Office

More information

Available at: Last Modified: December 2012

Available at:   Last Modified: December 2012 6.5 Furniture, Fixtures, Equipment and Contents 6.5.4 Hazardous Materials Storage 6.5.4.1 Hazardous Materials Storage Unsecured or improperly stored hazardous materials resulting in a release may close

More information

Seattle Public Schools Building Excellence IV Projects Under Construction

Seattle Public Schools Building Excellence IV Projects Under Construction Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee

More information

Structural Assessment Report 2118 Milvia Street Berkeley, California

Structural Assessment Report 2118 Milvia Street Berkeley, California 2118 Milvia Street Berkeley, California REPORT PREPARED FOR: PERALTA COMMUNITY COLLEGE DISTRICT REPORT PREPARED BY: KPW STRUCTURAL ENGINEERS, INC KPW PROJECT NO. 14C199.00 19 JUNE 2014 Table of Contents

More information

Available at: Last Modified: December 2012

Available at:   Last Modified: December 2012 6.4 Mechanical, Electrical, and Plumbing Components 6.4.8 Electrical and Communications Distribution Equipment 6.4.8.1 Electrical Raceways, Conduit, and Cable Trays This category covers electrical raceways,

More information

Mitigation Measures for Natural Hazards

Mitigation Measures for Natural Hazards Mitigation Measures for Natural Hazards Mitigation measures are actions that eliminate or reduce risks from future disaster events, including: Physical construction projects such as replacing a highly

More information

Available at: Last Modified: December 2012

Available at:   Last Modified: December 2012 6.4 Mechanical, Electrical, and Plumbing Components 6.4.9 Light Fixtures 6.4.9.2 Surface-Mounted lighting This category covers surface-mounted light fixtures that are overhead in a finished ceiling. The

More information

2. Are your buildings built with the possibility of an earthquake in mind?

2. Are your buildings built with the possibility of an earthquake in mind? EARTHQUAKE Although New England does not have the high frequency of earthquakes of California or Japan, it has experienced its fair share of tremors. Something to consider is that the reason why most businesses

More information

4. NONSTRUCTURAL RISK REDUCTION FOR EXISTING BUILDINGS

4. NONSTRUCTURAL RISK REDUCTION FOR EXISTING BUILDINGS 4. NONSTRUCTURAL RISK REDUCTION FOR EXISTING BUILDINGS Nonstructural risk reduction programs may vary depending on whether the nonstructural components in question are in an existing building, a historic

More information

CALIFORNIA CASE STUDY CHILDREN AT RISK DISASTER IMPACTS FINDING SOLUTIONS SAFETY INITIATIVES TAKING ACTION

CALIFORNIA CASE STUDY CHILDREN AT RISK DISASTER IMPACTS FINDING SOLUTIONS SAFETY INITIATIVES TAKING ACTION CALIFORNIA CASE STUDY Children at Risk in California Few would disagree that our children deserve the right to a safe education Children at Risk in California Indeed, California has been at the forefront

More information

SECTION 11 Architectural and Nonstructural Elements Field Investigation

SECTION 11 Architectural and Nonstructural Elements Field Investigation SECTION 11 Architectural and Nonstructural Elements Field Investigation Types of Data to Be Collected and Recorded Research in these fields should be directed at determining the effect that architecture

More information

5. Nonstructural Risk Reduction for New Buildings

5. Nonstructural Risk Reduction for New Buildings 5. Nonstructural Risk Reduction for New Buildings Nonstructural risk reduction programs may vary depending on whether the nonstructural components in question are in an existing building, an historic facility,

More information

DESIGN OF NON-STRUCTURAL PARTS AND COMPONENTS OF BUILDINGS FOR SEISMIC LOADS IN AUSTRALIA

DESIGN OF NON-STRUCTURAL PARTS AND COMPONENTS OF BUILDINGS FOR SEISMIC LOADS IN AUSTRALIA DESIGN OF NON-STRUCTURAL PARTS AND COMPONENTS OF BUILDINGS FOR SEISMIC LOADS IN AUSTRALIA John Woodside FIEAust, F.ASCE, FICE, FIStrucE, NER, RPEQ Principal, J Woodside Consulting Pty Ltd INTRODUCTION

More information

STRUCTURAL EVALUATION OF DOVER ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD)

STRUCTURAL EVALUATION OF DOVER ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD) STRUCTURAL EVALUATION OF DOVER ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD) For WLC Architects Kaiser Building 1300 Potrero Avenue Richmond, CA 94804 By DASSE Design, Inc. 33 New

More information

Structural Observation Program Based on the 2013 California Building Code (CBC) Chapter 17 Published 2013

Structural Observation Program Based on the 2013 California Building Code (CBC) Chapter 17 Published 2013 Structural Observation Program Based on the 2013 California Building Code (CBC) Chapter 17 Published 2013 City of Pismo Beach, Building Division 760 Mattie Road Pismo Beach, CA 93449 (805) 773-7040 Fax:

More information

STRUCTURAL EVALUATION OF WASHINGTON ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD)

STRUCTURAL EVALUATION OF WASHINGTON ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD) STRUCTURAL EVALUATION OF WASHINGTON ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD) For WLC Architects Kaiser Building 1300 Potrero Avenue Richmond, CA 94804 By DASSE Design, Inc.

More information

CALIFORNIA STRUCTURAL ENGINEERS URGE COMMERCIAL BUILDING OWNERS TO PREPARE NOW TO AVERT PROBLEMS IN FUTURE EARTHQUAKES

CALIFORNIA STRUCTURAL ENGINEERS URGE COMMERCIAL BUILDING OWNERS TO PREPARE NOW TO AVERT PROBLEMS IN FUTURE EARTHQUAKES ASSOCIATION ENGINEERS STRUCTURAL CALIFORNIA CALIFORNIA STRUCTURAL ENGINEERS URGE COMMERCIAL BUILDING OWNERS TO PREPARE NOW TO AVERT PROBLEMS IN FUTURE EARTHQUAKES JUNE 16, 2010--SACRAMENTO, CA The Structural

More information

INSTRUCTORS GUIDE. FEMA P-593 CD, Seismic Rehabilitation Training for One- and Two-Family Wood-Frame Dwellings

INSTRUCTORS GUIDE. FEMA P-593 CD, Seismic Rehabilitation Training for One- and Two-Family Wood-Frame Dwellings INSTRUCTORS GUIDE FEMA P-593 CD, Seismic Rehabilitation Training for One- and Two-Family Wood-Frame Dwellings ****************************************************************************** This Instructors

More information

Available at: Last Modified: December 2012

Available at:   Last Modified: December 2012 6.5 Furniture, Fixtures, Equipment and Contents 6.5.3 Computer and Communication Equipment 6.5.3.1 Computer Access Floors and Equipment Computer access floors are raised floor systems used in many facilities

More information

Available at: Last Modified: December 2012

Available at:   Last Modified: December 2012 6.5 Furniture, Fixtures, Equipment and Contents 6.5.1 Storage Racks 6.5.1.2 Industrial Storage Racks This subcategory includes heavy duty steel pallet storage racks such as those found in public warehouse

More information

LATERAL DRIFT DESIGN IN COLD FORMED STEEL WALL SYSTEMS

LATERAL DRIFT DESIGN IN COLD FORMED STEEL WALL SYSTEMS 1 LATERAL DRIFT DESIGN IN COLD FORMED STEEL WALL SYSTEMS Thomas Castle, S.E. 2 This presentation is published by the Cold-Formed Steel Engineers Institute ( CFSEI ). The information herein shall not constitute

More information

INVENTORY FORMS FOR NONSTRUCTURAL ELEMENTS

INVENTORY FORMS FOR NONSTRUCTURAL ELEMENTS INVENTORY FORMS FOR NONSTRUCTURAL ELEMENTS This section can be duplicated and provided for inclusion in a separate Training Packet. This will enable the inventory forms to be copied more easily, keep the

More information

Streamlined Hazard Mitigation Cost Assessment Framework for Residential Buildings

Streamlined Hazard Mitigation Cost Assessment Framework for Residential Buildings Streamlined Hazard Mitigation Cost Assessment Framework for Residential Buildings Mehdi Noori Jeremy Gregory Randolph Kirchain Reed Miller FLASH 2017 Costs from hazards are enormous Slide 2 Costs from

More information

SUBSTANTIAL IMPROVEMENT

SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT General Discussion The following discussion addresses several of the issues surrounding the NFIP regulations concerning substantial improvement and substantial damage. The attached

More information

Facility Improvements

Facility Improvements AL-SI-02 ASPHALT PLAY AREA UPGRADE AL-SI-09 CURB RAMP ADDITIONS Asphalt improvements needed around building and playshed to provide a safe play area. Curb ramps needed to provide wheelchair access and

More information

GAPS Guidelines SEISMIC BRACING GAP INTRODUCTION POSITION. A Publication of Global Asset Protection Services LLC

GAPS Guidelines SEISMIC BRACING GAP INTRODUCTION POSITION. A Publication of Global Asset Protection Services LLC GAP.2.0.9.1 A Publication of Global Asset Protection Services LLC SEISMIC BRACING INTRODUCTION The potential for earthquake damage necessitates damage mitigation measures or seismic bracing. These measures

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

RESIDENTIAL SEISMIC RETROFITS

RESIDENTIAL SEISMIC RETROFITS RESIDENTIAL Barry H. Welliver Structural Engineer BHW Engineers SEAU 6th Annual Education Conference Davis Conference Center - Layton, Utah February 21st, 2018 TOPICS Introduction to Seismic Retrofits

More information

LEAD DESIGN PROFESSIONAL:

LEAD DESIGN PROFESSIONAL: 2009 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:

More information

STATEMENT OF SPECIAL INSPECTION FORM

STATEMENT OF SPECIAL INSPECTION FORM Project Title: Permit #: Project Address: STATEMENT OF SPECIAL INSPECTION FORM This Statement of Special Inspections is submitted in fulfillment of the requirements of CBC Sections 1704 and 1705. Special

More information

Nonstructural Components

Nonstructural Components Nonstructural Components Architectural, Mechanical and Electrical Components supported by or located within buildings or other structures. In 2003 NEHRP Recommended Provisions: Chapter 6 Architectural,

More information

BOND CONSTRUCTION UPDATE

BOND CONSTRUCTION UPDATE BOND CONSTRUCTION UPDATE March 31, 2015 PROJECTS: 1. CIBOLO VALLEY ELEMENTARY SCHOOL BOND 2013 2. STEELE HIGH SCHOOL ADDITIONS & RENOVATIONS BOND 2013 3. DOBIE MIDDLE SCHOOL ADDITIONS & RENOVATIONS BOND

More information

Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION

Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Division of Design, 35 th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242 Phone: (518)

More information

Structural Engineering

Structural Engineering Structural Engineering 4 4.0 TABLE OF CONTENTS 4.1 General Approach 115 Submission Requirements 4.2 Codes and Standards 116 Structural Design of New Buildings 116 Use of Recycled Materials 4.3 Structural

More information

CHAPTER 34 EXISTING BUILDINGS

CHAPTER 34 EXISTING BUILDINGS CHAPTER 34 EXISTING BUILDINGS SECTION 3401 GENERAL 3401.1 Scope. Provisions of this chapter shall govern the application of this code to existing buildings. Exception: Buildings and structures located

More information

Chapter 2 QUALITY ASSURANCE

Chapter 2 QUALITY ASSURANCE Chapter 2 QUALITY ASSURANCE 2.1 GENERAL 2.1.1 Scope. This chapter provides minimum requirements for quality assurance for seismic-forceresisting systems and designated seismic systems. These requirements

More information

Non-Structural Vulnerability Mitigation in Hospital and Experience in Recent Medium Intensity Earthquake

Non-Structural Vulnerability Mitigation in Hospital and Experience in Recent Medium Intensity Earthquake Non-Structural Vulnerability Mitigation in Hospital and Experience in Recent Medium Intensity Earthquake Dev Kumar MAHARJAN 1, Hima SHRESTHA 2 and Ramesh GURAGAIN 3 1 Earthquake Engineer, National Society

More information

SPECIAL INSPECTION AGREEMENT FORM

SPECIAL INSPECTION AGREEMENT FORM CITY OF TRACY DEVELOPMENT & ENGINEERING SERVICES 333 CIVIC CENTER PLAZA, TRACY, CA 95376 P :( 209) 831-6400 F :( 209) 831-6439 http://www.ci.tracy.ca.us SPECIAL INSPECTION AGREEMENT FORM Prior to issuance

More information

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will

More information

SPECIAL INSPECTION AGREEMENT

SPECIAL INSPECTION AGREEMENT DEVELOPMENT SERVICES DEPARTMENT BUILDING AND SAFETY DIVISION 156 S. BROADWAY, SUITE 130 TURLOCK, CALIFORNIA 95380 PHONE 209-668-5560 FAX 209-668-5107 SPECIAL INSPECTION AGREEMENT PERMIT NUMBER: DATE: OWNER:

More information

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) 2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:

More information

Home Not Anchored to Foundation

Home Not Anchored to Foundation IDENTIFY WEAKNESSES Home Not Anchored to Foundation Houses that are not bolted to the foundation can move off their foundations during earthquakes. Go down into the crawl space the area between the first

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

Pre-schematic Considerations. Who. What. Where

Pre-schematic Considerations. Who. What. Where Who What Where Who, What & Where Who are the users? Church School Manufacturers Researchers Who, What & Where What is the purpose? Fellowship Teaching Manufacturing Production Who, What & Where Location,

More information

CLEAR CREEK COUNTY BUILDING DEPARTMENT REQUIREMENTS FOR A SINGLE FAMILY RESIDENCE

CLEAR CREEK COUNTY BUILDING DEPARTMENT REQUIREMENTS FOR A SINGLE FAMILY RESIDENCE CLEAR CREEK COUNTY BUILDING DEPARTMENT REQUIREMENTS FOR A SINGLE FAMILY RESIDENCE After all of your other permits have been issued and your construction plans and site plan have been approved by the other

More information

Background and Purpose Acknowledgments. 1.1 Background The Architect s Role in Seismic Design Contents The Bottom Line 1-8

Background and Purpose Acknowledgments. 1.1 Background The Architect s Role in Seismic Design Contents The Bottom Line 1-8 FOREWORD AND ACKNOWLEDGMENTS Background and Purpose Acknowledgments i iii CHAPTER 1 INTRODUCTION Christopher Arnold 1.1 Background 1-1 1.2 The Architect s Role in Seismic Design 1-4 1.3 Contents 1-5 1.4

More information

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) 2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:

More information

Structural Investigation Report

Structural Investigation Report Structural Investigation Report State University Hospital of Haiti and Two Ministry of Public Health Buildings Structural Investigation Ministry of Public Health Buildings Port-au-Prince, Haiti April 18,

More information

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1% CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE EXAM ID: I1 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 6% 0101. Project Administration 1% Verify that

More information

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the

More information

TABLE OF CONTENTS DESCRIPTION PAGE NO. INTRODUCTION AND PROJECT SCOPE... 1 BUILDING DESCRIPTION... 1 OBSERVATIONS

TABLE OF CONTENTS DESCRIPTION PAGE NO. INTRODUCTION AND PROJECT SCOPE... 1 BUILDING DESCRIPTION... 1 OBSERVATIONS TABLE OF CONTENTS DESCRIPTION PAGE NO. INTRODUCTION AND PROJECT SCOPE... 1 BUILDING DESCRIPTION... 1 OBSERVATIONS... 2-5 STRUCTURAL EVALUATIONS... 5 10 GENERAL SUMMARY AND RECOMMENDATIONS... 11 APPENDIX

More information

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE: S FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE: Included Costs: Items that must be included in the costs of improvement or costs to repair are those that are directly associated with the

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

FEMA P 50 & FEMA P 50 1

FEMA P 50 & FEMA P 50 1 & Seismic Retrofit Guidelines for Detached, Single Family, Wood Frame Dwellings FEMA P 50 & FEMA P 50 1 & Seismic Retrofit Guidelines for Detached, Single Family, Wood Frame Dwellings FEMA P 50 1 & Seismic

More information

James Lick High School

James Lick High School James Lick High School Campus Master Plan March 15, 2004 Volume II: Campus Master Plan James Lick High School Master Plan Contents Volume I: District Master Plan Volume II: Campus Master Plan Andrew P.

More information

By Doug Markussen, P.E. UAA Director EHSRMS&EM, UAA Risk Manager, Registered Civil Engineer

By Doug Markussen, P.E. UAA Director EHSRMS&EM, UAA Risk Manager, Registered Civil Engineer By Doug Markussen, P.E. UAA Director EHSRMS&EM, UAA Risk Manager, Registered Civil Engineer About UAA Buildings University of Alaska established in 1917 in Fairbanks UAA is even newer - oldest buildings

More information

* RESIDENTIAL PLAN REVIEW *

* RESIDENTIAL PLAN REVIEW * CITY OF DES MOINES, IOWA COMMUNITY DEVELOPMENT DEPARTMENT PERMIT AND DEVELOPMENT CENTER 602 Robert D. Ray Drive DES MOINES, IOWA 50309 Phone: 515.283.4200 Facsimile: 515.283.4270 Based on the scope of

More information

COMMERCIAL TENANT IMPROVEMENTS

COMMERCIAL TENANT IMPROVEMENTS Town of Corte Madera 300 Tamalpais Drive Corte Madera, CA 94925 (P) 415-927-5062 (F) 415-927-5039 COMMERCIAL TENANT IMPROVEMENTS The following information pertains to the Building Plan Check and Permit

More information

SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address:

SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address: SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division Permit Application #: Project Address: Purpose: To meet the requirements of City of Walnut Creek Municipal Code Section

More information

PROJECT STATUS REPORT De Anza High School - Replacement Campus Period Ending: 2/10/2011 Scope: Replacement Campus Construction Status: Architect: DLM Architects Project Manager: Jose Chapa, SGI Construction

More information

Statement of Special Inspections

Statement of Special Inspections Statement of Special Inspections SUCF Project No: Project Title: Registered Design Professionals in Responsible Charge: (Name) (Address) Architect: Structural Engineer: Mechanical Engineer: Identification

More information

BUILDING INTEGRITY SUMMARY REPORT

BUILDING INTEGRITY SUMMARY REPORT BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME Karnafuli Shoes Industries Ltd (Garments Unit) SUPPLIER ADDRESS Building No 17, Building No 16, Canteen Building No 2, Canteen Building No 1; Building No

More information

NONSTRUCTURAL EARTHQUAKE MITIGATION GUIDANCE MANUAL

NONSTRUCTURAL EARTHQUAKE MITIGATION GUIDANCE MANUAL F I N A L R E P O R T NONSTRUCTURAL EARTHQUAKE MITIGATION GUIDANCE MANUAL Prepared for Federal Emergency Management Agency 500 C Street, SW Washington, D.C. 20472 May 28, 2004 URS Group, Inc. 200 Orchard

More information

Project. San Jose City College Physical Education Building. Prepared For. Prepared By PLACE IMAGE HERE. Ken Bauer, AIA Principal

Project. San Jose City College Physical Education Building. Prepared For. Prepared By PLACE IMAGE HERE. Ken Bauer, AIA Principal Project San Jose City College Physical Education Building PLACE IMAGE HERE Prepared For Ken Bauer, AIA Principal LPAS 2484 Natomas Park Drive Sacramento, CA 95833 916.443.0335 Prepared By Steve Ratchye,

More information

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist

More information

Project Seismic Evaluation Services, Desert Regional Medical Center, Phase 0, Palm Springs, CA

Project Seismic Evaluation Services, Desert Regional Medical Center, Phase 0, Palm Springs, CA 1 September 2018 Mr. Chris Christensen Chief Financial Officer Desert Healthcare District 1140 N. Indian Canyon Drive Palm Springs, CA 92262 Project 187112 Seismic Evaluation Services, Desert Regional

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee Hill Elementary

More information

ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax:

ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax: ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA 02144 Tel: 617.628.1700 Fax: 617.628.1711 March 3, 2016 Mr. Jeff Hoover, Principal Tappe Architects, 6 Edgerly Place

More information

Chapter 1: Application and Administration

Chapter 1: Application and Administration Chapter 1: Application and Administration General Comments This chapter provides provisions regarding the purpose, scope, application, and administration of subsequent requirements of ICC 500. In addition

More information

D. CHECKLIST OF NONSTRUCTURAL SEISMIC HAZARDS

D. CHECKLIST OF NONSTRUCTURAL SEISMIC HAZARDS D. CHECKLIST OF NONSTRUCTURAL SEISMIC HAZARDS This checklist is intended to be used in surveying buildings to assess whether the nonstructural elements (architectural, MEP, FF&E, or contents) pose a danger

More information

BERKELEY UNIFIED SCHOOL DISTRICT (BUSD) Chapter 3. Structural Evaluations

BERKELEY UNIFIED SCHOOL DISTRICT (BUSD) Chapter 3. Structural Evaluations BERKELEY UNIFIED SCHOOL DISTRICT (BUSD) Chapter 3 Structural Evaluations Solar Master Plan November 2011 Chapter Three Structural Evaluations Once a school district has identified the buildings that it

More information

Santa Teresa High School

Santa Teresa High School Santa Teresa High School Campus Master Plan March 15, 2004 Volume II: Campus Master Plan Santa Teresa High School Master Plan Contents Volume I: District Master Plan Volume II: Campus Master Plan Andrew

More information

Structural Redesign Gravity System

Structural Redesign Gravity System Redesign Gravity System Design Considerations A composite floor system was used for this design to maximize the efficiency of the material being used. This type of system requires less material and provides

More information

Real Property Acquisition Loss Control Checklist

Real Property Acquisition Loss Control Checklist The following checklist will help identify items that have an important bearing on the safety of the building and to protect contents from damage. It is not intended as an all inclusive list of protection

More information

Capital Projects Update

Capital Projects Update Issaquah School District Issaquah High School Reconstruction March 2010 Installation of exterior masonry and siding panels continues on the classroom wings. Library windows are complete. Window and storefront

More information

SPECIAL INSPECTION AGREEMENT

SPECIAL INSPECTION AGREEMENT PART 1 STATEMENT OF SPECIAL INSPECTIONS When special inspection is required to be performed in accordance with International Building Code Chapter 17, a building permit cannot be issued until a statement

More information

Project Seismic Vulnerability Assessment For SFCC District Building 33 Gough Street San Francisco, California 94103

Project Seismic Vulnerability Assessment For SFCC District Building 33 Gough Street San Francisco, California 94103 Project For SFCC District Building 33 Gough Street San Francisco, California 94103 Prepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103 Prepared By Thornton

More information

Simplified Seismic Assessment & Seismic Retrofit Guidelines for Detached, Single-Family, Wood-Frame Dwellings FEMA P-50 & FEMA P-50-1

Simplified Seismic Assessment & Seismic Retrofit Guidelines for Detached, Single-Family, Wood-Frame Dwellings FEMA P-50 & FEMA P-50-1 & Seismic Retrofit Guidelines for Detached, Single-Family, Wood-Frame Dwellings FEMA P-50 & FEMA P-50-1 & Seismic Retrofit Guidelines for Detached, Single-Family, Wood-Frame Dwellings FEMA P-50 & Seismic

More information

ANNEX 24 ESF 24 - BUSINESS AND INDUSTRY

ANNEX 24 ESF 24 - BUSINESS AND INDUSTRY ANNEX 24 ESF 24 - BUSINESS AND INDUSTRY PRIMARY: SUPPORT: SC Department of Commerce South Carolina Emergency Management Division (SCEMD), SC Parks, Recreation and Tourism (PRT), SC Department of Insurance

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls

More information

The following information is provided by Lieutenant Ernest Jones, the Emergency Management Coordinator and the Federal

The following information is provided by Lieutenant Ernest Jones, the Emergency Management Coordinator and the Federal The following information is provided by Lieutenant Ernest Jones, the Emergency Management Coordinator and the Federal Emergency Management Agency What to Do Before an Earthquake Earthquakes strike suddenly,

More information

SAVE YOURSELF TIME AND MONEY! PLEASE READ THE FOLLOWING INFORMATION:

SAVE YOURSELF TIME AND MONEY! PLEASE READ THE FOLLOWING INFORMATION: TOWN OF SURFSIDE BEACH, SC SUBSTANTIAL IMPROVEMENT NOTICE TO PROPERTY OWNERS Rebuilding your Home or Non-residential structure after the storm? Adding on, renovating, or remodeling your home or business?

More information

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. FEMA 50% RULE - SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT/DAMAGE Z101-0410 NOTICE TO PROPERTY OWNERS Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information

More information

STRUCTURAL/SEISMIC REPORT Roosevelt Elementary School. Report prepared by DCI Engineers. For. Medford School District. Completed By: DCI Engineers

STRUCTURAL/SEISMIC REPORT Roosevelt Elementary School. Report prepared by DCI Engineers. For. Medford School District. Completed By: DCI Engineers J. Mark D Amato Guy A. Conversano Elizabeth A. Jensen Roger L. Heeringa Mark D. Aden Harry Jones II Troy E. Bean Tom C. Xia, Ph.D. Richard L. Hemmen Grant C. Buckingham Wade W. Younie STRUCTURAL/SEISMIC

More information

REDUCING EARTHQUAKE VULNERABILITY OF NON-ENGINEERED BUILDINGS: CASE STUDY OF RETROFITTING OF SCHOOL BUILDING IN INDONESIA

REDUCING EARTHQUAKE VULNERABILITY OF NON-ENGINEERED BUILDINGS: CASE STUDY OF RETROFITTING OF SCHOOL BUILDING IN INDONESIA REDUCING EARTHQUAKE VULNERABILITY OF NON-ENGINEERED BUILDINGS: CASE STUDY OF RETROFITTING OF SCHOOL BUILDING IN INDONESIA D. Kusumastuti 1, K.S. Pribadi 1, and Rildova 1 1 Faculty of Civil and Environmental

More information

COST ANALYSIS AND BENEFIT STUDIES OF CODES AND STANDARDS FOR EARTHQUAKE-RESISTANT CONSTRUCTION IN MEMPHIS, TENNESSEE

COST ANALYSIS AND BENEFIT STUDIES OF CODES AND STANDARDS FOR EARTHQUAKE-RESISTANT CONSTRUCTION IN MEMPHIS, TENNESSEE 10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska COST ANALYSIS AND BENEFIT STUDIES OF CODES AND STANDARDS FOR EARTHQUAKE-RESISTANT

More information

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Billing Requirements G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Sitework / Paving Excavation and Grading Labor

More information