1 AL-SI-02 ASPHALT PLAY AREA UPGRADE AL-SI-09 CURB RAMP ADDITIONS Asphalt improvements needed around building and playshed to provide a safe play area. Curb ramps needed to provide wheelchair access and to meet ADA requirements. AL-SI-14 IRRIGATION SYSTEM UPGRADE Connection of irrigation system to the school s energy management system will reduce water consumption and utility costs. AL-SI-17 PAVEMENT MARKING UPGRADE New pavement markings needed for traffic control, disabled parking stalls and pedestrian safety. AL-SI-22 SANITARY SEWER LINE REPLACEMENT New sewer line from building to street needed to replace existing line that is failing and requires frequent maintenance. AL-EX-03 EXTERIOR DOOR HARDWARE UPGRADE New exterior door locks will improve building security. Alpac Elementary School Page 1 of 7

2 AL-EX-05 PLAYSHED WALL IMPROVEMENTS AL-EX-06 ROOF FALL ARREST ANCHOR ADDITION Exterior wall improvements at playshed needed to replace damaged siding and deteriorated wall structure. Fall arrest anchors needed at roof to provide protection for workers performing inspections and roof maintenance. AL-EX-09 WOOD TRIM REPLACEMENT New wood trim needed at edge of roofs to replace existing trim that is deteriorated. AL-EX-10 SKYLIGHT UPGRADE New structurally-rated skylight needed to replace existing skylight that is vulnerable to collapse if stood upon. AL-EX-11 ROOF UPGRADE SHINGLES New roof shingles needed to replace existing shingles that are over 20 years old and failing. AL-IN-09 VINYL WALL COVERING ADDITIONS Tackable vinyl wall covering needed in corridors for classroom displays, art work and students projects. Alpac Elementary School Page 2 of 7

3 AL-EQ-02 CLASSROOM TACKBOARD ADDITIONS AL-EQ-03 COMPUTER FURNITURE UPGRADE Additional tackboards needed in five classrooms to provide adequate space for classroom displays. Computer furniture needed to properly accommodate students and computer equipment. AL-EQ-04 DESK FURNITURE UPGRADE New desks needed for teachers and office staff to replace existing desks that are over 35 years old and lack needed features. AL-EQ-08 ADA SIGNAGE UPGRADE New room signs needed in selected area to replace existing signs that do not meet ADA requirements. AL-EQ-10 PLAYSHED BASKETBALL BACKBOARD UPGRADE Additional basketball backboards in playshed needed for recess and community use. AL-EQ-13 WINDOW COVERING UPGRADE New window coverings needed to replace existing curtains that are worn and do not block out light. Alpac Elementary School Page 3 of 7

4 AL-EQ-14 STAFF RESTROOM GRAB BAR ADDITIONS AL-ME-01 AUTOMATIC CONTROLS UPGRADE Vertical grab bars needed in staff restrooms to assist disabled individuals and meet ADA requirements. Improvements to mechanical system controls will reduce maintenance costs, energy consumption and utility costs. AL-ME-02 CO2 CONTROL ADDITION Installation of CO2 controls for the ventilation systems in the Gym and Library will reduce energy consumption and utility costs. AL-ME-03 DUCT LEAKS REPAIR Repair of leaks in the ventilation system ductwork will reduce energy consumption and utility costs. AL-ME-07 OCCUPANCY SENSOR TEMP. CONTROL ADDITION Installation of occupancy sensors for the heating system in Gym and Library will reduce energy consumption and utility costs. AL-ME-09 PLUMBING FIXTURE RETROFIT Upgrading and replacing plumbing fixtures will reduce water consumption and utility costs. Alpac Elementary School Page 4 of 7

5 AL-ME-10 ROOFTOP AIR HANDLING UNIT REPLACEMENT AL-ME-11 TESTING, AIR BALANCING, AND COMMISSIONING New air handing units needed to replace existing units that do not function reliably, leak water and require frequent maintenance. Testing and commissioning of mechanical system will improve operations while reducing energy consumption and utility costs. AL-ME-12 WASTE LINE IMPROVEMENTS New sewage waste lines needed to replace existing lines located below the concrete floor that are failing, settling and drain poorly. AL-ME-14 DOMESTIC WATER TANK REPLACEMENT New domestic hot water tanks needed to replace existing water tanks that are failing and cause rust colored water. AL-EL-04 DAYLIGHT CONTROL ADDITION Installation of daylight controls that reduce the use of artificial lighting will also reduce energy consumption and utility costs. AL-EL-06 EXIT SIGN REPLACEMENT Replacement of EXIT signs with LED fixtures will reduce energy consumption and utility costs. Alpac Elementary School Page 5 of 7

6 AL-EL-07 EXTERIOR LIGHTING LEVEL IMPROVEMENTS AL-EL-08 GYM LIGHTING UPGRADE Additional lighting needed at portions of building exterior for safety and security. Replacement of Gym light fixtures with energy efficient fixtures will reduce energy consumption and utility costs. AL-EL-14 OCCUPANCY SENSOR LIGHTING CONTROL ADDITION Installation of occupancy sensors to control interior lights will reduce energy consumption and utility costs. AL-EL-17 INTERIOR LIGHTING IMPROVEMENTS Replacement of interior lights with energy efficient fixtures will improve lighting and reduce energy consumption and utility costs. AL-MD-21 SPECIAL EDUCATION CLASSROOM MODERNIZATION A restroom and testing room are needed in the Special Education classroom for use by students with special needs. AL-MD-26 STUDENT RESTROOM IMPROVEMENTS EAST WING New toilets and vertical grab bars needed at student restrooms 401 and 402 to assist the disabled and meet ADA requirements. Alpac Elementary School Page 6 of 7

7 AL-MD-27 STUDENT RESTROOM MODERNIZATION WEST WING AL-MD-33 GYM AREA IMPROVEMENTS Modernization needed to improve room surfaces, replace deficient equip. and provide access that meets ADA requirements. Modernization needed to increase storage, replace floor, add PE office and backboards, and provide ADA compliant restroom. AL-MD-34 KITCHEN IMPROVEMENTS AL-MD-35 MAIN OFFICE AND HEALTH AREA IMPROVEMENTS Modernization needed to improve kitchen equipment, work area and room surfaces. Modernization needed to correct Health Room deficiencies and improve visual supervision in Main Office area. Alpac Elementary School Page 7 of 7

Facility Improvements

Facility Improvements CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation

More information

Facility Improvements

Facility Improvements AR-SI-08 CURB RAMP ADDITIONS AR-SI-10 DISCUS THROW MODIFICATIONS Curb ramps needed to provide wheelchair access and to meet ADA requirements. Modifications are needed at the discus throw pad to comply

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls

More information

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment Summary of Findings The Matthew A. Henson ES Facility located at 1600 N. Payson Street in Baltimore, Maryland, was built in 1964. It comprises 75,228 gross square feet. The total current deficiencies for

More information

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017 Chenango Bridge Elementary School Phase 1 Asphalt Pavement Reconstruction Reconstruct asphalt parking located on west side of building including access drive. Sidewalk Replacement Replace cracked sections

More information

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades $300,000 C. Tilden Entrance Upgrades $50,000 D. Door and Glass Improvements $500,000 E. Alert Systems $800,000

More information

AUBURN SCHOOL DISTRICT NO. 408 CAPITAL PROJECTS DEPARTMENT. WORK IN PROGRESS August 2011

AUBURN SCHOOL DISTRICT NO. 408 CAPITAL PROJECTS DEPARTMENT. WORK IN PROGRESS August 2011 AUBURN SCHOOL DISTRICT NO. 408 CAPITAL PROJECTS DEPARTMENT WORK IN PROGRESS August 2011 Masonry and Concrete Improvements Status: Contractor: Pioneer Masonry Restoration Inc., Seattle WA. Construction

More information

MADELEY RANCH ELEMENTARY SCHOOL

MADELEY RANCH ELEMENTARY SCHOOL MADELEY RANCH ELEMENTARY SCHOOL CAMPUS DATA MADELEY RANCH ELEMENTARY SCHOOL 3500 Madeley Ranch Road, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 94,750 Pre-K - 4 th

More information

Board Work Session Feasibility Study. January 9, 2017

Board Work Session Feasibility Study. January 9, 2017 Board Work Session Feasibility Study January 9, 2017 1 Process Staff Input Sessions at all schools What can you tell us about your building, your site, your space? Group collaboration exercise looking

More information

Edmonton Public School District No. 7

Edmonton Public School District No. 7 EXECUTIVE SUMMARY 1. Overall Impressions The 1966 non-core school has actively pursued an ongoing maintenance and upgrade program to improve a number of past problem areas within the school. Extensive

More information

STUART-HOBSON MIDDLE SCHOOL

STUART-HOBSON MIDDLE SCHOOL INITIAL YEAR BUILT 1927 BUILDING AREA 105,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 399 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan STUART-HOBSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School HILLSIDE ELEMENTARY SCHOOL Overview: The is located at 98 Belmont Drive and consists of a two-story building which has had a number of additions added to it over the years, the latest of which was a two-story

More information

BALLOU SENIOR HIGH SCHOOL

BALLOU SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE

More information

SHEPHERD ELEMENTARY SCHOOL

SHEPHERD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1932 BUILDING AREA 79,700 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 355 WARD 4 PROPOSED PROGRAM CAPACITY 400 Site Plan SHEPHERD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Piping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement.

Piping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement. NW Corridor Transit Planning Union Station Existing Conditions Technical Memorandum (Physical and Operational Assessments) Executive Summary Capitol Region Council of Governments Prepared in cooperation

More information

SEATON ELEMENTARY SCHOOL

SEATON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1969 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 428 ENROLLMENT 2008 280 WARD 2 PROPOSED PROGRAM CAPACITY 325 Site Plan SEATON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Collins Middle School

Collins Middle School Contents Collins Middle School...2 General comments, campus capacity, and student demographics:...2 1.0 School Site...4 2.0 Building Systems and Components...5 3.0 Building Safety and Security...19 4.0

More information

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School HERITAGE MIDDLE SCHOOL Overview: The is located at 20 Foxcroft Drive and consists of a three-story building with Three-Story Classroom and Multi-Purpose Room Additions completed in 2002. The building has

More information

Edmonton Public School District No. 7

Edmonton Public School District No. 7 EXECUTIVE SUMMARY 1. Overall Impressions Sherwood Elementary School resides in a quiet residential neighborhood with a shared parking area adjacent to the community league on the north and a generous play

More information

NALLE ELEMENTARY SCHOOL

NALLE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1950 BUILDING AREA 83,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 372 WARD 7 PROPOSED PROGRAM CAPACITY 400 Site Plan NALLE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Manchester-Shortsville Central School District Red Jacket Excellence Every Student, Every Class, Every Day WHY NOT DO A CAPITAL PROJECT?

Manchester-Shortsville Central School District Red Jacket Excellence Every Student, Every Class, Every Day WHY NOT DO A CAPITAL PROJECT? Manchester-Shortsville Central School District Red Jacket Excellence Every Student, Every Class, Every Day WHY NOT DO A CAPITAL PROJECT? That is the real question. Manchester-Shortsville Central School

More information

The Report: Priority 1 thru 5 $ 2,933,064 New Construction $ 6,797,031 Less Redlined Items $ 218,060

The Report: Priority 1 thru 5 $ 2,933,064 New Construction $ 6,797,031 Less Redlined Items $ 218,060 Building Condition Assessment Facilities Feasibility Study 124 - Leonelo H. Gonzalez Elementary Educational Needs $ 6,881,962 Safety & Security Needs $ 532,225 Exterior Needs $ 893,302 Needs $ 471,995

More information

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Facilities Feasibility Study Frederick Douglass HS Condition Assessment Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies

More information

WATKINS ELEMENTARY SCHOOL

WATKINS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 69,300 SF CURRENT PROGRAM CAPACITY 578 ENROLLMENT 2008 550 WARD 6 PROPOSED PROGRAM CAPACITY 550 Site Plan WATKINS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary

More information

Architect and Engineer: Friar Associates inc.

Architect and Engineer: Friar Associates inc. Architect and Engineer: Friar Associates inc. BACKGROUND In June, after soliciting and interviewing several professional firms, Friar Associates was hired to perform an Existing Conditions Survey and Facilities

More information

Cupertino Union School District

Cupertino Union School District Cupertino Union School District Update For Citizens Bond Oversight Committee September 21, 2016 WORK IN PROGRESS 1 STEVENS CREEK KINDERGARTEN CLASSROOM STEVENS CREEK KINDERGARTEN CLASSROOM 2 STEVENS CREEK

More information

RAYMOND EDUCATION CAMPUS

RAYMOND EDUCATION CAMPUS INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District NATATORIUM CAMPUS DATA NATATORIUM 22628 Hwy 105 West, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 30,420 n/a Current Enrollment n/a Building Levels 1 1 MASTER PLAN 2

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3 School and Site Level Deficiencies Site Concrete Walks Are Damaged And Require Replacement 5539 4,000 SF 3 Bus drop-off area does not have a canopy. 14005 250 LF 5 Paved Play Requires Recoating And Resurfacing

More information

POWELL ELEMENTARY SCHOOL

POWELL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1925 BUILDING AREA 38,500 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 319 WARD 4 PROPOSED PROGRAM CAPACITY 325 Site Plan POWELL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-3

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

DAVIS ELEMENTARY SCHOOL

DAVIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-

More information

Chino Valley Unified School District Monthly Construction Update

Chino Valley Unified School District Monthly Construction Update h Construction of One Classroom Wing Cattle Elementary School Architect: WLC Architects, Inc. Contractor: Pacwest Corporation Construction Manager: Bernards Contract Amount: $2,974,000 Contract Start:

More information

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment Summary of Findings The Laurence G. Paquin Building Facility located at 2200 SINCLAIR LANE in Baltimore, Maryland, was built in 1975. It comprises 65,666 gross square feet. The total current deficiencies

More information

Project Status Report Property and Finance Committee Meeting August 6, 2013

Project Status Report Property and Finance Committee Meeting August 6, 2013 Westmont Hilltop School District Project Status Report Property and Finance Committee Meeting August 6, 2013 S. Dwight Knouse II, AIA, LEED AP Russell D. Greaser, Project Manager Matthew T. Filan, PE,

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements % 8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior

More information

2016 BOND INFORMATION

2016 BOND INFORMATION 2016 BOND INFORMATION This publication is provided as a public service by the offices of Operations and Maintenance, Communications and Financial Services. www.svvsd.org @svvsd 395 South Pratt Parkway,

More information

Boynton High School & Blackford Site

Boynton High School & Blackford Site Boynton High School & Blackford Site Balance (E- D) 980075 Blackford Campus Repairs (Asphalt, Plaster, Complete 100% 07/16/18 10/05/18 $725,367.67 $735,233.50 $352,463.56 -$9,865.83 $382,769.94 4 980066

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District ATHLETIC FACILITY CAMPUS DATA ATHLETIC FACILITY 22628 Hwy 105 West, Montgomery TX 77356 1 MASTER PLAN 2 CIVIL - SITE General Existing Conditions and Deficiencies Overall concrete site paving: Good Overall

More information

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2 School and Site Level Deficiencies Site K Play Area Requires Impact Resistant Material 1320 1 Ea. 2 Exterior Basketball Goals Are Damaged And Require Replacement 1322 1 Ea. 4 Bus drop-off area does not

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 54 MINISCHOOL - QUEENS, 86-02 127TH STREET, New York, 11418 Inspection Id Inspection Type Time In Last Edited SA : Architectural

More information

LEWIS ELEMENTARY SCHOOL

LEWIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 49,500 SF CURRENT PROGRAM CAPACITY 550 ENROLLMENT 2008 288 WARD 1 PROPOSED PROGRAM CAPACITY 450 Site Plan LEWIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street CITY OF ANDERSON BUILDING AND CODES 601 South Main Street Plan Review Notes (STREET ADDRESS) ANDERSON, SC Plan Review Number: Building Plans prepared by: Plans Signed by: Project Name: Plans Received:

More information

New Ringgold Middle School. Project Slideshow August 26, 2017

New Ringgold Middle School. Project Slideshow August 26, 2017 New Ringgold Middle School Project Slideshow August 26, 2017 Aerial Photo from West Provided by Hudson Group Taken 8.16.2017 Aerial Photo from North Provided by Hudson Group Taken 8.16.2017 Aerial Photo

More information

Legend. ANTICIPATED LONG-TERM CAPITAL PROJECTS: PER SCHOOL through

Legend. ANTICIPATED LONG-TERM CAPITAL PROJECTS: PER SCHOOL through Legend Highlights Priority 1 Projects Highlights the projects identified through the building conditions survey that have been included in the 2017-18 through 2022-2023 Long Term Capital Plan ANTICIPATED

More information

Stevens High School Pre Bond Presentation Claremont, NH

Stevens High School Pre Bond Presentation Claremont, NH Stevens High School Pre Bond Presentation Claremont, NH Existing Conditions Existing Conditions Existing Conditions Existing Conditions Proposed site features New main entry that is ADA accessible New

More information

MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM

MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM Note: This list should be used as a guide and not considered all inclusive. The offeror should use due diligence for any items

More information

MCKINLEY INSTITUTE OF TECHNOLOGY BRAILSFORD & DUNLAVEY RGM AND ASSOCIATES MEASURE T BOND

MCKINLEY INSTITUTE OF TECHNOLOGY BRAILSFORD & DUNLAVEY RGM AND ASSOCIATES MEASURE T BOND MCKINLEY INSTITUTE OF TECHNOLOGY N E I G H B O R H O O D M E E T I N G A P R I L 2 4, 2 0 1 7 1 1 LPA MASTER PLAN 2 PHASE 1 SCOPE Blue Line 3 PHASE 1 SCOPE Blue Line 4 BOND T REVISED PROGRAM SCOPE 1 Modernize

More information

CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting

CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan Community Information Meeting October 2017 AGENDA Meeting Objectives Draft Plan Overview School Improvements for specific site Feedback/Listening

More information

School Without Walls

School Without Walls INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Mills Elementary School Site Summary

Mills Elementary School Site Summary 1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF

More information

Hinsdale Township High School District 86 Referendum Project Listing April 2, Approved

Hinsdale Township High School District 86 Referendum Project Listing April 2, Approved Hinsdale Township High School District 86 Referendum Project Listing April 2, 2019 - Approved 1-12-2019 Project Category and Description Central South Total Security Replace Intercom System Install a completely

More information

WILKINSON ELEMENTARY SCHOOL

WILKINSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

MAURY ELEMENTARY SCHOOL

MAURY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1886 BUILDING AREA 46,800 SF CURRENT PROGRAM CAPACITY 276 ENROLLMENT 2008 238 WARD 6 PROPOSED PROGRAM CAPACITY 325 Site Plan MAURY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

HIDDEN VALLEY ELEMENTARY SCHOOL

HIDDEN VALLEY ELEMENTARY SCHOOL SCHOOL DATA Address: 3435 Bonita Vista Santa Rosa, CA 95404 Established: 975 Permanent Classrooms: 29 Portable Classrooms: 8 Building Area: Site Area: Satellite Building Area: Satellite Site Area: 48,802

More information

Franklin Elementary School

Franklin Elementary School Facility Information Address: Site Size: Building Area: Construction Date: Improved Parking: Grade Levels Served: Regular Classrooms: Portable Classrooms: Building Capacity: Sept. 2007 Enrollment: 750

More information

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923 INITIAL YEAR BUILT 1923 BUILDING AREA 288,800 SF CURRENT PROGRAM CAPACITY 1,425 ENROLLMENT 2008 565 WARD 6 PROPOSED PROGRAM CAPACITY 1,100 Site Plan EASTERN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

BUILDING CONDITION: INTERIOR

BUILDING CONDITION: INTERIOR Typical interior finishes at the Main Building consist of VCT flooring, plaster walls, and lay in ceilings at classrooms and instructional spaces Corridors have terrazzo flooring and partial height glazed

More information

Administrative Offices

Administrative Offices CUYAHOGA COUNTY PUBLIC LIBRARY EXISTING FACILITY ASSESSMENT December 2009 Administrative Offices 2111 Snow Road, Parma, Ohio 44134 Location Entry Site View of Staff Entrance ADM Administrative Offices

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Deferred Maintenance Plan

Deferred Maintenance Plan Deferred Maintenance Plan 2012-2015 1/5/2012 1 Table of Contents Title Page Introduction 3 Wallace Hall Deferred Maintenance 4 Wallace Hall Building Assessment 6 Wilson Hall Deferred Maintenance 7 Wilson

More information

LLANO ISD SCHOOL BOARD MEETING. January 2016

LLANO ISD SCHOOL BOARD MEETING. January 2016 LLANO ISD SCHOOL BOARD MEETING January 2016 LLANO ELEMENTARY AREAS A & C STUCTURAL STEEL AND EXTERIOR WALLS ARE IN PLACE INSTALLATION OF HVAC DUCT WORK IS ON- GOING ELECTRICAL AND PLUMBING ROUGH-IN IS

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary

More information

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012 Existing Site Aerial Building Developmental History 1981 1966 1939 1977 1978 1955 1966 Exterior Roof: Most of existing roof has multi ply built up roofing. Some areas have gravel ballast, others have cap

More information

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205 5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1951 3,813 Page 1 of 25 1. Architectural / Structural & Site Exec Summary Hillcrest Public School is a two storey structure of masonry

More information

Assessment Report Burgess Park Gymnasium. Summary

Assessment Report Burgess Park Gymnasium. Summary Assessment Report Burgess Park Gymnasium Summary The existing Burgess Park Gymnasium is an approximately 17,460 gross square feet singlestory structure built of concrete, wood and steel. The building,

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S.372 ANNEX - K, 215 FIRST STREET, New York, 11215 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-03-06

More information

DENNIS TOWNSHIP FEASIBILITY STUDY

DENNIS TOWNSHIP FEASIBILITY STUDY DENNIS TOWNSHIP FEASIBILITY STUDY October 29, 2015 TABLE OF CONTENTS I. INTRODUCTION II. EXECUTIVE SUMMARY III. GENERAL FACILITY DATA A. Primary School B. Elementary / Middle School IV. FACILITIES ASSESSMENT

More information

The Report: Priority 1 thru 5 $ 2,124,417 Lifecycle Years 1 thru 3 ½ $ 384,097 New Construction $ 2,451,568 Less Redlined Items $ 43,534

The Report: Priority 1 thru 5 $ 2,124,417 Lifecycle Years 1 thru 3 ½ $ 384,097 New Construction $ 2,451,568 Less Redlined Items $ 43,534 Building Condition Assessment Facilities Feasibility Study 106 - Sam Houston Elementary Educational Needs $ 2,451,568 Safety & Security Needs $ 588,049 Exterior Needs $ 622,503 Interior Needs $ 703,790

More information

LECKIE ELEMENTARY SCHOOL

LECKIE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Cheldelin Middle School

Cheldelin Middle School Facility Information Address: 987 NE Conifer Blvd Corvallis Site Size: Building Area: Construction Date: Improved Parking: Grade Levels Served: Regular Classrooms: Portable Classrooms: Sept. 2007 Enrollment:

More information

HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014

HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014 HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014 1. Upgrade Video Security and Surveillance Systems - Replace with New a. Existing

More information

PATTERSON ELEMENTARY SCHOOL

PATTERSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

National Property Inspections

National Property Inspections National Property Inspections Anywhere, USA (325) 382-8754 Property Location 9375 Burt Street Anywhere USA Prepared for John Investor Consultant Al Standard (325) 382-8754 Page 1 of 27 TABLE OF CONTENTS

More information

UPPER ARLINGTON SCHOOLS 2015 FACILITIES ASSESSMENT. Windermere Elementary School Physical Assessment

UPPER ARLINGTON SCHOOLS 2015 FACILITIES ASSESSMENT. Windermere Elementary School Physical Assessment 2015 FACILITIES ASSESSMENT Windermere Elementary School Physical Assessment December 8, 2015 2015 FACILITIES ASSESSMENT WINDERMERE ELEMENTARY SCHOOL Executive mary The Moody Nolan/Korda/EMH&T/Turner team

More information

Facility Condition Assessment Dr. Harry L. Halliwell Memorial School

Facility Condition Assessment Dr. Harry L. Halliwell Memorial School Dr. Harry L. Halliwell Memorial School October 2016 Address: 358 Victory Highway, Slatersville, RI 02876 D R AF T Report Generated: October 06, 2016 MඵAඵPඵPඵ^ Ξ :ĂĐŽďƐ ϮϬϭϲ 1 Dr. Harry L. Halliwell Memorial

More information

Biddeford School Department

Biddeford School Department Biddeford School Department 5 Plan Buildings, Grounds & Equipment Table of Contents: John F Kennedy Memorial School Page: 1-2 Biddeford Primary School Page: 3-4 Biddeford Intermediate School Page: 5-6

More information

DEL MAR UNION SCHOOL DISTRICT BOND PROJECT DESCRIPTION

DEL MAR UNION SCHOOL DISTRICT BOND PROJECT DESCRIPTION DEL MAR UNION SCHOOL DISTRICT TECHNOLOGY & 21 ST -CENTURY LEARNING INITIATIVE BOND PROJECT DESCRIPTION The Board of Trustees of Del Mar Union School District ("District") has evaluated the need to acquire,

More information

WELD COUNTY SCHOOL DISTRICT RE-1 04/12/2016 BUILDING ASSESSMENT INTRODUCTION

WELD COUNTY SCHOOL DISTRICT RE-1 04/12/2016 BUILDING ASSESSMENT INTRODUCTION PURPOSE OF THIS REPORT: Relationship to the Master Plan: These Building Assessments are part of a Strategic Facilities Master Plan (SFMP). H+L Architecture was hired to assist the District in creating

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: Southside Early Childhood Observed By: Cannon/Carter Principal: Grade

More information

County of Santa Barbara, California Facility Condition Assessment Total: $238,124. Appendix 1 Probable Cost Estimates Detail

County of Santa Barbara, California Facility Condition Assessment Total: $238,124. Appendix 1 Probable Cost Estimates Detail Project No.:P03000.001 Building Number: P03000-Lompoc County Offices Grounds Project Description: Mill and Overlay with some Partial Depth Patching Background: The site comprises asphalt pavement for the

More information

BARNARD ELEMENTARY SCHOOL

BARNARD ELEMENTARY SCHOOL INITIAL YEAR BUILT 2002 BUILDING AREA 67,000 SF CURRENT PROGRAM CAPACITY 520 ENROLLMENT 2008 329 WARD 4 PROPOSED PROGRAM CAPACITY 450 Site Plan BARNARD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

FRIDAY HARBOR ELEMENTARY SCHOOL. Prepared by John Gresseth Architects, Friday Harbor, WA September 22, 2011

FRIDAY HARBOR ELEMENTARY SCHOOL. Prepared by John Gresseth Architects, Friday Harbor, WA September 22, 2011 RECOMMENDATIONS OF CORRECTIVE MEASURES TO THE BUILDING OF FRIDAY HARBOR ELEMENTARY SCHOOL Prepared by John Gresseth Architects, Friday Harbor, WA September 22, 2011 Dear Superintendent Thompson and Members

More information

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data Evansville Public Schools Facility Assessment Report January 28, 2, 2013 SGN/Wendel Architects, Design Tree Engineering and R.A. Morton Construction Managers were retained by the Evansville Public School

More information

NOYES EDUCATION CAMPUS

NOYES EDUCATION CAMPUS INITIAL YEAR BUILT 1930 BUILDING AREA 49,700 SF CURRENT PROGRAM CAPACITY 321 ENROLLMENT 2008 337 WARD 5 PROPOSED PROGRAM CAPACITY 450 Site Plan NOYES - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-8

More information

APPENDIX 3C DOMINION HOTEL SPECIFICATIONS

APPENDIX 3C DOMINION HOTEL SPECIFICATIONS APPENDIX 3C DOMINION HOTEL SPECIFICATIONS 1. GENERAL 1.1 Refer to Section 2.1 of Schedule 3 [Design and Construction Specifications] regarding compliance with Schedule 3 and this Building Specification.

More information

BENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY

BENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY BENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY Prepared for the City of Benson, Minnesota by Widseth Smith Nolting May 2016 City of Benson, Minnesota CITY HALL/POLICE STATION

More information

AGILITAS Property Development

AGILITAS Property Development Hartmann Commons offered by For Infomation and Leasing Mr. Seth T. McDowell 1614 16th Avenue South Nashville, Tennessee 37212 Voice 615-327-8788 Fax 615-327-8789 Hartmann Commons Agilitas Property Development

More information

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: West Hartsville Elementary Observed By: Cannon/Carter Principal:

More information

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good. EAST LYME HIGH SCHOOL Located at 30 Chester Field Road, East Lyme, Connecticut 06333, the High School s original structure was built in 1967. An addition and alterations occurred in 1973. The building

More information

Completed projects. Projects in progress. Program developments

Completed projects. Projects in progress. Program developments 1 Completed projects Projects in progress Program developments 2 Relocation of District administrative offices Interim housing (classrooms and PE facilities) at Cupertino and Lawson Middle Schools Site

More information