FIRST TIME APPLICATION OF EXPANDED POLYSTYRENE IN HIGHWAY PROJECTS IN GREECE

Size: px
Start display at page:

Download "FIRST TIME APPLICATION OF EXPANDED POLYSTYRENE IN HIGHWAY PROJECTS IN GREECE"

Transcription

1 FIRST TIME APPLICATION OF EXPANDED POLYSTYRENE IN HIGHWAY PROJECTS IN GREECE Georgios Papacharalampous, Civil Engineer MSc, Sotiropoulos & Associates SA, Greece, Elias Sotiropoulos, Civil Engineer MSCE, Sotiropoulos & Associates SA, Greece ABSTRACT The first application of expanded polystyrene (EPS) in civil engineering projects in Greece was completed recently for the construction of an embankment in a section of the Athens- Thessaloniki highway, very close to the historical site of Thermopylae. At a length of about 1km the highway, including an interchange, was planned on 8.5m high embankments at a flat, swampy area, with an elevation close to the sea level, covered by recent marine deposits. When the construction of the initially planned earth fill, resting on ground improved by stone columns, reached 4m height, a deep seated failure of the underlying soft clay and total collapse of the constructed embankment at its whole 200m length took place. A new design had to face short term stability, but also long term consolidation settlements and resistance to earthquake. Furthermore, due to its major importance and serious traffic problems at this area, the project had to be finished in the shortest possible time. A lightweight fill solution with EPS fulfilled all above requirements. By a substantial application of EPS100 type blocks (γ=20kg/m 3, σ c10 = 100kPa) at a total length of 1000m and a volume of 65,000m 3, short and long term stability was ensured, settlements were minimized and construction time was drastically reduced to a total period of 2.5 months. The current paper presents the ground conditions in the area, design criteria and requirements, EPS material specifications, the proposed quality control and data and conclusions from the construction and monitoring. PROJECT DESCRIPTION HISTORICAL AND GEOLOGICAL BACKGROUND A lightweight fill by expanded polysterene (EPS) blocks has been designed and constructed for a 1km long section of Athens-Thessaloniki E75 major highway during This was the first and still is the only application of EPS in highway projects in the country. The project is located in central Greece, south of Maliakos Gulf and the city of Lamia, very close to the area of the historical battle of Thermopylae (480 B.C.), where Leonidas, king of Sparta with a few heroic warriors hindered the Persian invasion to Europe. The battle took place at a narrow passage between the sea and the mountains, a clear evidence that the extended marine and deltaic deposits, which now cover the area did not exist at that time (Figure 1). The highway crosses a plain, swampy area, with very poor ground characteristics and mechanical properties. Ground elevation is +1.0m above sea level and the ground water table is almost at surface. The area is also suffering from strong earthquakes. -1-

2 Figure 1. Location of the project and layout of the site The initial design anticipated a highway embankment up to 7.5m high to allow underpass of local road and culverts and an even higher 8.5m approach embankment for Thermopylae interchange branch overpass. It was foreseen replacement of the top soil to the depth of 1m by granular material and soil improvement by stone columns of 80cm diameter, 11-15m length, at 3m spacing in a triangular grid. When construction of the highway embankment reached a height of 4 4,5m in a relatively short period a global failure at its whole 200m length took place. A continuous, more than 2m wide rupture, appeared at the crown, parallel to the alignment and at a distance 10 14m from the edge. The outer part subsided about 1m (Figures 2 and 3). GROUND CONDITIONS AND FAILURE ANALYSIS Investigation of the observed failure mechanism and the ground conditions included: (a) survey mapping and deformation monitoring, (b) geotechnical investigation of the subsoil and the stone columns by trial pits and boreholes and (c) back analysis of stability. Ground properties were found much more adverse than the rest of the deltaic area, where both the highway and the railway have been constructed. The soil profile is shown in Figure 3. The embankment is founded on a very soft, clay, of high plasticity, to a depth of 10 12m, underlain by compressible, normally consolidated, clayey deposits to a depth 25m. Figure 2. View of failure Collapse is attributed to deep seated, undrained failure of the very soft clay (Α) to depth 5-10m from GL. Failure surface is not typically circular, but more complex, due to -2-

3 the stone columns effect. Soil resistance was evidently overestimated and soil improvement method has not functioned as planned. The stone columns had a negligible contribution to total resistance, since the soft clay exhibits limited side support. They were found to retain their integrity out of the failed area, but with reduced diameter and inferior quality with depth. Below the failed embankment they were highly mixed with clay, with a distinct rupture at depth 3 5m. The undrained strength of clay Figure 3. Typical section at failure - Soil profile was estimated by back analysis of observed failure (Figure 4a). Stone columns were introduced with a reduced diameter ( m) and strength (friction angle φ=32 ). A scenario of lower soil strength of the upper layer, where important organic content was identified, was also examined. A safe design had to ensure both short term and long term stability and also to minimize consolidation settlements, expected to take place in clay layers to 25m depth. Magnitude and rate of settlements were estimated by taking into account the geotechnical investigation and testing data, pre-failure settlement recordings and also monitoring data of higher embankments of the neighbouring railway project. The railway embankments suffered significant long term settlements (Fig.4b), although the ground conditions were quite better and plastic drains were implemented. A total settlement in the order of 1.5m for a 7.5m high earth embankment was estimated. Analysis showed only 20 25% of this settlement to take place during construction and the rest to be quite slow, with an expected degree of consolidation U = 50% in the first year and a total consolidation period greater than 10 years. 20% S/H (settlement/ embankment height) 18% 16% 14% 12% 10% 8% 6% 4% 2% 0% time (days) (a) (b) Figure 4. a) Back analysis of failure, b) Recorded settlements of railway embankments -3-

4 SELECTION OF A SOLUTION SATISFYING THE PROJECT S REQUIREMENTS The project had to fulfil the following criteria and requirements: - Stability and safe foundation on 10m thick very soft clay layer (safety factor 1.20 short term) - Post construction settlement to be 10cm according to Greek guidelines for highways - Necessity of rapid completion, due to serious traffic problems, with political and social impact At first a change of the longitudinal alignment was achieved, by removing the Underpass out of the critical area. Consequently the highway embankment was lowered to 4.5m height, though the interchange branch had to remain at 8.5m. Alternative geotechnical improvement solutions have been examined, such as: i) stage construction and preloading and use of vertical drains and stabilizing berms, ii) soil improvement by a denser vibroreplacement stone columns grid, iii) improvement by deep soil mixing combined with vertical drains and iv) lightweight EPS fill. The EPS solution has been found highly advantageous, in terms of bothsafety, time and maintenance cost, with a considerably lower construction cost from alternatives (ii) and (iii). Solution (i) has been considered very slow and uncertain, mainly in time programming, being almost impractical for the higher I/C embankment. Some basic conclusions of the comparison of the various alternatives are briefly given in Table 1 concerning only the highway section. For the much higher branch embankment the EPS solution proved the only realistic one. Table 1: Comparison of alternative solutions (only for the highway section) Solution Constr. time Cost ( ) Advantages Limitations Preloading, PVD, berms, stage constr. 9 months (incl.preload) 3.6 M Cost, experience Time, uncertainties, expropriation, installation Stone columns l=20m, s=1,5m > 1 year (incl.preload) 10.6 M - Cost, time, reliability of SC, maintenance Deep mixing l=10m, PVD l=25m > 9 months (incl.preload) 6.2 M - Cost, time, success depended on ground EPS fill 2 months 5.8 M Time, maintenance, unrelated to subsoil Cost, lack of experience Hence authorities and involved engineers were convinced for the EPS unconventional solution, despite their initial concern about strength, durability and sustainability to hazards like fire, water absorption, oil spill or attack by rats, being also informed about satisfactory behaviour in other projects worldwide. It should be noted that an EPS application proposal, some years earlier in 2003, for high embankments at a neighbouring area was rejected, for the reasons of doubt about above virtues of EPS. EPS fill was applied at 820m length of the Highway and 210m of the I/C branch. Solution (i) was chosen at the rest 500m, where the lower (H 2.5m) embankments rest on slightly better ground, since construction time was found reasonable and berms were not necessary. LIGHTWEIGHT FILL DESIGN EPS fill design aimed to eliminate restrictions imposed by a heavy earth embankment, taking also into account the steep one way cross slope of the road surface ( 5%). Proposed scheme as shown schematically in typical section of Fig. 5 below comprised the following: -4-

5 - Complete removal of the existing fill and the top soil to a depth 0.75m from GL - Placement of granular material at the base, of total thickness 50cm, comprising from bottom to top by: a) 25cm selected material serving as working platform, b) separation geotextile and tensile reinforcement geogrid, c) drainage-foundation and levelling granular layer of thickness varying from 25cm to 75cm, with a slightly inclined roof oriented parallel to road surface - Placement of EPS 100 type blocks, with minimum dimensions 0.5x1.0x2.0m, on top of the inclined levelling surface. Consecutive layers are placed at right angles to each other in order to avoid continuous vertical joints, with the upper row aligned transversal to the axis direction. A stepped side slope similar to embankment s final slope 2:3 (v:h) is formed. Steel fasteners prevent blocks from moving out of position during the construction process. - Side slopes are protected by 1mm polyethylene membrane and a geotextile cloth covered with 0.5m lightly compacted fine granular soil and 0.3m top soil - By casting a 15cm lightly reinforced concrete slab C20/25 on top of EPS fill, protection of fill against solvents and pavement s proper foundation and drainage is achieved. - Pavement retained its characteristics as determined by the original design: 22cm asphalt layers, 40cm granular base layer, 50cm foundation and drainage layer on top of inclined slab. At the junction of lightweight and earth embankment a stepped surface is formed every 0.5m of the earth fill and a drainage pipe is placed at the base. The stepped interface is covered by granular material, geotextile and sealing membrane and EPS blocks are placed on top. Figure 5: Typical section of proposed EPS fill Material Requirements Initially the material properties were specified on the basis of ASTM standards [2] and NRRL recommendations [3]. Gradually the recent European Standard ΕΝ [1] was adopted. Hence material type EPS 100 RF of density 20kg/m 3, nominal compressive strength σ c10 = 100kPa at 10% strain, allowable stress σ c2 = 50kPa at 2% elastic deformation and long term water absorption Wdv 5% has been specified. This type satisfies the design criteria and is also the most commonly used in relevant projects worldwide. Flame-retardant material of Euroclass B (EN ) was chosen, in order to exclude fire hazards. Properties are summarized in Table

6 Table 2: Properties and Quality control for EPS Description Test method Symbol - unit Requirement Tolerance Control frequency Dimensions EN LxWxT 2.0x 1.0x0.5 ± 0,5% every 50 (m) blocks Squareness EN 824 (x,y,z) 3mm/ 500mm length Evenness EN 825 (±d/l) 10mm/ 3m or 5mm / consecutive blocks Cross section every 10m Unit Density ΕΝ 1602 ρ (kg/m 3 ) 20 Compressive σ every ΕΝ 826 c10 (kpa) 100 ± 10% strength σ c2 (kpa) m3 Bending strength EN12089 σ b (kpa) 150 DIMENSIONING AND ANALYSIS Dimensioning of EPS fill was made on the basis of the following analyses and checks based on European Standard [1] and USA [4] and Norwegian [3] recommendations: External Stability and Soil Settlements The global stability of the lightweight embankment interacting with the foundation soil, was checked on typical cross-sections, for circular sliding surfaces through the very soft clay layer A. Both short term, undrained conditions, long term effective stress analysis and earthquake loading according to Greek Seismic Code have been examined by Bishop s slices method and the use of software SLIDE. An equivalent shear strength Su=100kPa and a bulk density γ = 0.5 kn/m 3 was considered for the EPS fill, where soil parameters were taken according to geotechnical investigation results and back analysis. Analysis yielded very high safety factors for all cases. A factor of safety F.S. =4.3 was calculated for the 8.5m highest embankment for the case of undrained, deep seated failure compared to 0.73 for an earth embankment (critical case). Total and long term consolidation settlements of the compressible subsoil to 25m depth was calculated by 2D plane strain analysis with software FOSSA. Preloading by the 1 1.5m previously constructed earth fill was taken into account for the estimation of post construction settlements. Total settlement was estimated 20cm, almost exclusively in upper layer A, since there is negligible influence to deeper layers. Post construction settlement after preloading was found less than 5cm compared to respective settlement >1.5m for an earth embankment. Buoyancy - uplift Base drainage layer and side ditches protect lightweight fill from the incident of flooding and uplift failure due to buoyancy forces. Further to the protection measures, the case was checked by the following calculations, based on NRRL [3] and TRB [4] recommendations: Global stability: F.S. = {W p + W sl + W eps }/ A = 1.96 > 1.3 (1a) Local slope uplift : F.S. = (γ H sl )/ [γ w x (D+HWL)] > 1.2 (1b) W p = pavement and slab weight, W sl = slope earth cover weight, γ = soil unit weight = 20kN/m 3-6-

7 W eps = EPS fill weigth, considering unit weight γ eps =0.2kN/m 3, A = buoyancy force = γ w x (D+HWL) x B w (B w = bottom embankment width) H sl = minimum slope cover = 0.8m, D = maximum depth of EPS below ground level = 0.25m, HWL = maximum probable water level above GL = 1.0m, γ w = water unit weigth = 10kN/m 3 Since construction took place in summer period and protection ditches and pumping was foreseen neither uplift during construction nor transition due to an unbalanced water pressure, were considered as potential risks and have not been analytically examined. Uplift check due to wind forces was also omitted, due to lack of consistent methodology in the literature and reporting of relevant problems worldwide (ΤRB, [4]) Internal stability Sliding between two consecutive EPS layers was checked. The critical surface lies between the upper layers, where both minimum overburden weight and friction resistance and utmost seismic action occur. On the basis of TRB recommendations [4] three loading cases were examined: static (due to inclined layers): F.S.s = W p x tan(δ)/w t 2,0 (2a) wind force: F.S.w = W p x b x tan(δ)/(pxh+w t xb) 1,2 (2b) seismic: F.S.e = [W p E h sin(α)-ε v cos(α)] b x tan(δ) / (Wt+Ε h cos(α) +Ε v cos(α)) 1.0 (2c) W p,t = overburden pressure (weight of pavement and concrete slab) acting in direction perpendicular and parallel to sliding surface respectively, δ = friction angle between EPS layers = 30 0, α = inclination (cross fall) of EPS layers = 3.15º P = wind force at fill crown, perpendicular to slope, b, h = width and height of EPS layer, E v,h = vertical and horizontal earthquake force according to Greek Seismic Code Stresses and deformations in EPS Allowable stresses and deformations in EPS fill were checked for the three cases below: a) Control of permanent loads to allowable limits in order to avoid considerable creep deformations. Pavement and concrete slab loads (p) acting on top of EPS do not exceed 20-25kPa. For stresses of that order, which correspond to p < 30% σ c10 = 30kPa (Frydenlund [5]) and to <1% immediate strain (TRB [4]), tolerable creep deformations are expected. b) Estimation of elastic, immediate deformation, taking place mainly during construction. Calculation formula: s EPS = pxh EPS / E EPS 20x8/5000, assuming a deformation modulus E EPS = 5 MPa, (TRB [4]), provided settlements in the order of 1 3cm, which is negligible compared to the settlement of the subsoil c) Deformations under repetitive traffic loads to be within acceptable elastic limits. Traffic loading (q) on top of EPS was roughly estimated by considering a load distribution coefficient of I c = 1 for the pavement of thickness T p,min =0,77m and I c = 2 for the concrete slab of thickness T c = 0,15cm. Exctracted traffic load q 15.5kPa << 0.35 σ c10 and total load q+p 35 kpa < σ e =50 kpa, where σ e = minimum elastic limit stress (TRB [4]), were found to be within acceptable limits with a considerable safety margin. -7-

8 Analytical calculations for Pavement design and foundation were not performed. Since this was the first application of EPS fill in Greece, it was decided to keep the original pavement scheme for the earth embankment, with a requirement of CBR=3, disregarding the presence of the concrete slab below. That was a conservative consideration and no further check has been required. CONSTRUCTION DATA Contractor was ATTIKAT S.A. and owner of the project the Greek State, Ministry of Public Works. Design of EPS fill was made by geotechnical office Sotiropoulos & Associates SA. Technical experts K.Flaate, Τ.E. Frydenlund and A. Sagbakken from Norwegian Public Roads Administration, as consultants both during design and construction in situ, offered valuable technical support and confidence for the project s success. Construction of lightweight fill was completed in 2.5 months (06-08/2008) and the road was opened to traffic, inaugurated by the Minister of Public Works at 18/09/08. Figure 7: View of EPS construction A total volume of 65,000 m 3 of EPS was applied at a total length of 1,030m (Figure 7), with average production rate 1000 m 3 /day, including protection measures and quality control. Despite the big controversy and initial hesitations about the first use of an EPS fill, regarding its strength, suitability and durability, rapid and successful application impressed the relevant authorities and the press which was interested in this peculiar construction. Block dimensions were adapted to production availability, taking into account the large volume required and the need of construction acceleration. Hence blocks of various dimensions were used, of length 3 5m, width m and thickness m, with the thicker blocks placed at the upper layer. Application design noted block types at every layer in the whole area. Adjusting block dimensions on site was generally avoided and wherever necessary, i.e. at junctions or adjacent to structures, it was achieved by an electric wire cutting system proved to be effective, fast and providing a fairly accurate cut with straight and even cutting surfaces. Gaps between blocks were eliminated and at points of curvature triangular gaps up to 5cm were filled with sand. With the exception of edge sections a minimum of 2 layers was used. At initial construction stage the following refinement actions took place to overcome some identified problems: - observed curvature on some blocks originated from the way blocks were stored at the factory, has been overcome by placing two longitudinal wooden beams beneath the bottom block Figure 8: Positioning of blocks -8-

9 - rearrangement of some blocks to avoid continuous transverse joints by placing the blocks shifted about half a block length, by making adjustments to block lengths and by placing the shorter blocks to the inner side of the fill (Figure 8) - random gaps between EPS fill and adjacent concrete structures was filled by polyurethane foam and sealing membrane was fixed on EPS QUALITY CONTROL AND MONITORING Quality control and frequent testing as shown on table 2 was based on relevant recommendations of EN14933 [1], whether frequency and tolerances were specified according to TRB [4] and NRRL [3] recommendations. Dimensions, squareness, density and bending and compressive strength were tested and controlled at the production plant and flatness was checked on site, following the specifications of Table 2. The quality control performed at the production plant was both automatic and manual and well organized both regarding the actual production process and the quality control checks on the finished EPS product. In addition the owner performed individual tests assisted by an independent third party laboratory. Quality certificates were submitted for blocks delivered to the construction site. Initially strength of the delivered EPSblocks was determined at 10 % strain following EN 13163:2001 (for buildings). A need of compliance to recent ΕΝ14933 and control of stress corresponding to elastic behaviour led to modification of control at three different strain levels: 2 %, 5 % and 10 %, by examining the whole load deformation curve and an additional requirement of σ c 2% 50 kpa. Tests were performed on 50mm cubic samples. 3 measurements were assessed for each test result [1], on specimens taken both from inner and the outer areas of the block according to recommendations [3]. Compressive stress (kpa) Figure 9: Summary of compression test results Rel. Deformation (%) Specification Production Plant 1 Production Plant 2 Independent Laboratory 100 The extensive QC program proved full compliance of the design requirements. Designated strength σ c10 varied from 112 to 121kPa, unit density kg/m3 and bending strength >>150kPa. Material exhibited an almost linear behavior up to 4% strain, with σ c2 >50kPa and σ c5 0,9σ c10 100kPa. Figure 9 shows load-deformation curves in compression by average results from various plants and independent laboratory compared to design criteria. Geotechnical instrumentation and settlement s monitoring was provided by 11 benchmarks installed on top of EPS fill, at regular spacing every m along the road. Measurements had to be taken at weekly basis. Recorded settlements were almost uniform and very low, in the order of 1cm after the project s completion, much lower than design s prediction (Figure 10a). This is attributed to low applied loading, stiffer behaviour of preloaded soil at small strains and uniform distribution achieved through EPS and rigid base layer. Figure 10b compares recorded settlements of LW fill in the first 3 months after construction, with relevant recordings at two neighboring sections of the highway, where earth fill 4m and 7m high respectively, was founded on soil improved by stone columns. It should be noted that -9-

10 ground conditions in these two areas are much better than the EPS area, emphasizing EPS solution s superiority in terms of time and maintenance. The section exhibits today, 3 years after its completion very satisfactory performance, best among the various highway sections in the valley area and no settlements or other problems have been observed. settlement (cm) settlement (cm) EPS, avg.10 rec. SC, h=3.5-4m, avg. 2 rec. SC, h=6.5-7m, avg. 6 rec /09/08 09/10/08 29/10/08 18/11/08 08/12/08 28/12/08 date (a) time after end of construction (days) (b) Figure 10: Settlement measurements and comparison with neighbouring earth embankments CONCLUSIONS The first application of lightweight fill by expanded polystyrene in Greece was realized in an extended area with very poor ground conditions, in order to face important foundation problems, to overcome observed failures and to comply with project s time schedule. Construction of embankments up to 8.5m by the use of a substantial EPS amount proved very successful in terms of safety, construction time and overall post construction performance after 3 years. The effectiveness of this first application, despite initial controversy and hesitations about the solution and the use of EPS in highway projects in general, honored a positive reputation to the project and the material. EPS became quite attractive to designers, contractors and many authorities for future application in road embankments and even more in bridge abutments. REFERENCES 1. ΕΝ 14933, Thermal insulation and Light Weight fill products for Civil Engineering applications - Factory made products of Expanded Polystyrene (EPS), Specification, ASTM D578-95, Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation, Vol , USA, Norwegian Road Research Laboratory, Expanded Polystyrene used in road embankments, Code of Practice, Form 482E, Oslo, Transportation Research Board NA, Geofoam Applications in the Design and Construction of Highway Embankments, NCHRP65, Illinois, Frydenlund, Τ.Ε. and Aaboe, R., Long term performance and durability of EPS as a lightweight filling material, EPS Geofoam 3rd Intern. Conf., Salt Lake City, Utah,

FIRST TIME APPLICATION OF EXPANDED POLYSTYRENE IN HIGHWAY PROJECTS IN GREECE

FIRST TIME APPLICATION OF EXPANDED POLYSTYRENE IN HIGHWAY PROJECTS IN GREECE 4th International Conference on Geofoam Blocks in Construction Applications EPS 2011 Norway FIRST TIME APPLICATION OF EXPANDED POLYSTYRENE IN HIGHWAY PROJECTS IN GREECE Georgios Papacharalampous, Civil

More information

Design of Geofoam Embankment for the. Steven F. Bartlett, Ph.D., P.E. Research Project Manager, UDOT

Design of Geofoam Embankment for the. Steven F. Bartlett, Ph.D., P.E. Research Project Manager, UDOT Design of Geofoam Embankment for the I-15 Reconstruction Steven F. Bartlett, Ph.D., P.E. Research Project Manager, UDOT I-15 Reconstruction - Quick Facts Single Largest Highway Contract t in U.S. 17 Miles

More information

Long-Term Settlement Performance Monitoring, I-15 Reconstruction Project, Salt Lake City, UT. Steven Bartlett, University of Utah

Long-Term Settlement Performance Monitoring, I-15 Reconstruction Project, Salt Lake City, UT. Steven Bartlett, University of Utah 1 Long-Term Settlement Performance Monitoring, I-15 Reconstruction Project, Salt Lake City, UT Steven Bartlett, University of Utah Roadway Widening (I-15 Project) Salt Lake City Utah, USA 2002 Host of

More information

TRB Webinar: Guidelines for Geofoam Applications in Slope Stability Projects

TRB Webinar: Guidelines for Geofoam Applications in Slope Stability Projects TRB Webinar: Guidelines for Geofoam Applications in Slope Stability Projects David Arellano, University of Memphis Steven Bartlett, University of Utah Ben Arndt, Yeh & Associates, Inc. Moderated by: Mohammed

More information

EXPANDED POLYSTYRENE (EPS GEOFOAM) EMBANKMENT DIVISION 31 EARTHWORK

EXPANDED POLYSTYRENE (EPS GEOFOAM) EMBANKMENT DIVISION 31 EARTHWORK (Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying AMVIC GEOFOAM products and execution. The specifier needs to edit the guide specifications to

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

Design and monitoring of EPS embankment on D1 near Ivanovice in the Czech Republic

Design and monitoring of EPS embankment on D1 near Ivanovice in the Czech Republic Design and monitoring of EPS embankment on D1 near Ivanovice in the Czech Republic Abstract Ing. Vítězslav Herle, ARCADIS Geotechnika, a.s., Czech Republic herle@arcadisgt.cz The D1 motorway east of Brno

More information

Table 1. Typical Soil Parameters Description Bulk Density, kn/m 3 Liquid Limit, % Plastic limit, % Natural Moisture Content, % Cohesion, kn/m 2 Compre

Table 1. Typical Soil Parameters Description Bulk Density, kn/m 3 Liquid Limit, % Plastic limit, % Natural Moisture Content, % Cohesion, kn/m 2 Compre CASE STUDY CONSTRUCTION OF HIGH ROAD EMBANKMENT OVER THICK SOFT SILTY CLAY- A CASE STUDY Radhakrishnan R, Geo-Enviro Engineers P Ltd, Chennai, Tamil Nadu, India, 044-24483522, geoenviro2012@gmail.com.

More information

PILE DESIGN METHOD FOR IMPROVED GROUND USING THE VACUUM CONSOLIDATION METHOD

PILE DESIGN METHOD FOR IMPROVED GROUND USING THE VACUUM CONSOLIDATION METHOD PILE DESIGN METHOD FOR IMPROVED GROUND USING THE VACUUM CONSOLIDATION METHOD K Tomisawa, Civil Engineering Research of Hokkaido, Japan S Nishimoto, Civil Engineering Research of Hokkaido, Japan Abstract

More information

Construction and Long Term Performance of Transportation Infrastructure Constructed Using EPS Geofoam on Soft Soil

Construction and Long Term Performance of Transportation Infrastructure Constructed Using EPS Geofoam on Soft Soil Construction and Long Term Performance of Transportation Infrastructure Constructed Using EPS Geofoam on Soft Soil Sites in Salt SltLk Lake Valley, Vll Utah S. Bartlett, E. Lawton, C. Farnsworth, D. Negussey,

More information

Geoguide 6 The New Guide to Reinforced Fill Structure and Slope Design in Hong Kong

Geoguide 6 The New Guide to Reinforced Fill Structure and Slope Design in Hong Kong Geoguide 6 The New Guide to Reinforced Fill Structure and Slope Design in Hong Kong Geotechnical Engineering Office Civil Engineering Department The Government of the Hong Kong Special Administrative Region

More information

Stability of a Mechanically Stabilized Earth Wall

Stability of a Mechanically Stabilized Earth Wall Stability of a Mechanically Stabilized Earth Wall GEO-SLOPE International Ltd. www.geo-slope.com 1400, 633-6th Ave SW, Calgary, AB, Canada T2P 2Y5 Main: +1 403 269 2002 Fax: +1 403 266 4851 Introduction

More information

Construction and Long Term Performance of Transportation Infrastructure Constructed Using EPS Geofoam on Soft Soil Sites in Salt Lake Valley, Utah

Construction and Long Term Performance of Transportation Infrastructure Constructed Using EPS Geofoam on Soft Soil Sites in Salt Lake Valley, Utah Construction and Long Term Performance of Transportation Infrastructure Constructed Using EPS Geofoam on Soft Soil Sites in Salt Lake Valley, Utah Bartlett, Steven 1, Negussey, Dawit 2, Farnsworth, Clifton

More information

Ground Improvement Using Steel Reinforcing Strips

Ground Improvement Using Steel Reinforcing Strips SAICE Geotechnical Division: Seminar on Ground Improvement Johannesburg, South Africa 8 & 9 October, 2001 Ground Improvement Using Steel Reinforcing Strips ACS Smith Reinforced Earth (Pty) Ltd, Johannesburg,

More information

BEHAVIOR IMPROVEMENT OF FOOTINGS ON SOFT CLAY UTILIZING GEOFOAM

BEHAVIOR IMPROVEMENT OF FOOTINGS ON SOFT CLAY UTILIZING GEOFOAM BEHAVIOR IMPROVEMENT OF FOOTINGS ON SOFT CLAY UTILIZING GEOFOAM G. E. ABDELRAHMAN AND A. F. ELRAGI Department of Civil Engineering, Fayoum University Fayoum, Egypt ABSTRACT: EPS, expanded poly-styrene

More information

Performance of Mechanically Stabilized Earth walls over compressible soils

Performance of Mechanically Stabilized Earth walls over compressible soils Performance of Mechanically Stabilized Earth walls over compressible soils R.A. Bloomfield, A.F. Soliman and A. Abraham The Reinforced Earth Company, Vienna, Virginia, USA ABSTRACT: Two projects have recently

More information

LIGHTWEIGHT FILL DESIGN GUIDANCE

LIGHTWEIGHT FILL DESIGN GUIDANCE Preferred Design Procedure LIGHTWEIGHT FILL The Federal Highway Administration (FHWA) and National Cooperative Highway Research Program (NCHRP) have two documents for this technology that contain design

More information

BEHAVIOUR OF AN OLD EPS LIGHT-WEIGHT FILL AT VAMMALA, FINLAND. Seppo Saarelainen 1 and Heikki Kangas 2

BEHAVIOUR OF AN OLD EPS LIGHT-WEIGHT FILL AT VAMMALA, FINLAND. Seppo Saarelainen 1 and Heikki Kangas 2 BEHAVIOUR OF AN OLD EPS LIGHT-WEIGHT FILL AT VAMMALA, FINLAND Seppo Saarelainen 1 and Heikki Kangas 2 ABSTRACT Characteristics of a pavement and its EPS compensation fill were investigated in the fall

More information

Bridge articulation No. 1.04

Bridge articulation No. 1.04 Bridge articulation Scope This Guidance Note gives advice on the selection of the articulation arrangements, the choice of bearing types and dispositions of bearings, for bridges where relative movement

More information

Passage under Lövstavägen at Bypass Stockholm From Design to Realization

Passage under Lövstavägen at Bypass Stockholm From Design to Realization Passage under Lövstavägen at Bypass Stockholm From Design to Realization Roslin Mattias 1, Borio Luca 2 and Tomas Hellström 3 1 Swedish Transport Administration, Solna Strandväg 98, 171 54 Solna, mattias.roslin@trafikverket.se

More information

ICBO Evaluation Service, Inc Workman Mill Road, Whittier, California

ICBO Evaluation Service, Inc Workman Mill Road, Whittier, California ER-5435 Reissued May 1, 2002 ICBO Evaluation Service, Inc. 5360 Workman Mill Road, Whittier, California 90601 www.icboes.org Filing Category: DESIGN Masonry MESA RETAINING BLOCK WALL SYSTEM TENSAR EARTH

More information

Basal Reinforcement Constructing embankments over weak ground

Basal Reinforcement Constructing embankments over weak ground Basal Reinforcement Constructing embankments over weak ground 2 Tensar. The value engineered solution In Tensar you ll find a partner with the experience and flexibility to respond to your project requirements.

More information

Steel screw settlement reduction piles for a raft foundation on soft soil

Steel screw settlement reduction piles for a raft foundation on soft soil Proc. 18 th NZGS Geotechnical Symposium on Soil-Structure Interaction. Ed. CY Chin, Auckland Alexei Murashev Opus International Consultants Limited, Wellington, New Zealand. Keywords: piled raft, settlement

More information

Level 6 Graduate Diploma in Engineering Structural analysis

Level 6 Graduate Diploma in Engineering Structural analysis 9210-111 Level 6 Graduate Diploma in Engineering Structural analysis Sample Paper You should have the following for this examination one answer book non-programmable calculator pen, pencil, ruler, drawing

More information

STRUCTURAL ANALYSIS. PSDS s.r.o. IČ: TRABANTSKÁ 673/18, PRAHA 9. for building permit. March 2012 NUMBER OF PAGES 15

STRUCTURAL ANALYSIS. PSDS s.r.o. IČ: TRABANTSKÁ 673/18, PRAHA 9. for building permit. March 2012 NUMBER OF PAGES 15 2012 CONSTRUCTION DEGREE for building permit STRUCTURAL ANALYSIS March 2012 PERSON RESPONSIBLE Ing. Jiří Surovec NUMBER OF PAGES 15 PSDS s.r.o. IČ: 280 980 64 www.psds.cz TRABANTSKÁ 673/18, 190 15 PRAHA

More information

REPORT STATUS: DATE: Report n :

REPORT STATUS: DATE: Report n : REPORT: Expanded clay LWA in CEA Lightweight fill and thermal insulation products for civil engineering applications. Installation and structural quality control on site. STATUS: Technical report DATE:

More information

Reinforced Concrete Design. A Fundamental Approach - Fifth Edition

Reinforced Concrete Design. A Fundamental Approach - Fifth Edition CHAPTER REINFORCED CONCRETE Reinforced Concrete Design A Fundamental Approach - Fifth Edition Fifth Edition REINFORCED CONCRETE A. J. Clark School of Engineering Department of Civil and Environmental Engineering

More information

Study of Various Techniques for Improving Weak and Compressible Clay Soil under a High Earth Embankment

Study of Various Techniques for Improving Weak and Compressible Clay Soil under a High Earth Embankment MATEC Web of Conferences 11, 03006 ( 2014) DOI: 10.1051/ matecconf/ 20141103006 C Owned by the authors, published by EDP Sciences, 2014 Study of Various Techniques for Improving Weak and Compressible Clay

More information

EFFECT OF DEEP EXCAVATION SUPPORTED BY CONCRETE SOLIDER PILE WITH STEEL SHEET PILE LAGGING WALL ON ADJACENT EXISTING BUILDINGS

EFFECT OF DEEP EXCAVATION SUPPORTED BY CONCRETE SOLIDER PILE WITH STEEL SHEET PILE LAGGING WALL ON ADJACENT EXISTING BUILDINGS EFFECT OF DEEP EXCAVATION SUPPORTED BY CONCRETE SOLIDER PILE WITH STEEL SHEET PILE LAGGING WALL ON ADJACENT EXISTING BUILDINGS Mostafa Abdou 1 *, Ahamed Rushedy Towfeek 2, Waleed Hassan 3 1 prof. Dr.,

More information

BEARING CAPACITY IMPROVEMENT USING MICROPILES A CASE STUDY

BEARING CAPACITY IMPROVEMENT USING MICROPILES A CASE STUDY BEARING CAPACITY IMPROVEMENT USING MICROPILES A CASE STUDY G.L. Sivakumar Babu 1, B. R.Srinivasa Murthy 2, D.S. N. Murthy 3, M.S. Nataraj 4 ABSTRACT Micropiles have been used effectively in many applications

More information

SERIES 1100 KERBS, FOOTWAYS AND PAVED AREAS

SERIES 1100 KERBS, FOOTWAYS AND PAVED AREAS MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 1 THE SPECIFICATION FOR HIGHWAY WORKS SERIES 1100 KERBS, FOOTWAYS AND PAVED AREAS Contents Clause Title Page 1100 (02/17) General 2 #1101 Precast Concrete

More information

Evaluation of Geosynthetic Forces in GRSRW under Dynamic Condition

Evaluation of Geosynthetic Forces in GRSRW under Dynamic Condition Evaluation of Geosynthetic Forces in GRSRW under Dynamic Condition Kooshyar Passbakhsh, Maryam Yazdi Abstract Geosynthetics have proved to be suitable for reinforced soil retaining walls. Based on the

More information

FEASIBILITY OF EPS AS A LIGHTWEIGHT SUB-BASE MATERIAL IN RAILWAY TRACK STRUCTURES

FEASIBILITY OF EPS AS A LIGHTWEIGHT SUB-BASE MATERIAL IN RAILWAY TRACK STRUCTURES FEASIBILITY OF EPS AS A LIGHTWEIGHT SUB-BASE MATERIAL IN RAILWAY TRACK STRUCTURES Coenraad Esveld 1, Valeri Markine 2 Milan Duškov 3 Abstract The paper presents results of a study on feasibility of Expanded

More information

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of Civil Engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module-13 LECTURE-

More information

APPENDIX B ABC STRUCTURES DESIGN GUIDE

APPENDIX B ABC STRUCTURES DESIGN GUIDE APPENDIX B ABC STRUCTURES DESIGN GUIDE The Cohos Evamy Partners TABLE OF CONTENTS Page No. DISCLAIMER... I 1. STRUCTURAL DESIGN GUIDELINES... 1 2. GENERAL REQUIREMENTS (FIGURE B.2, STEP 1)... 1 3. GENERAL

More information

DESIGN OF TEMPLETON OVERPASS FOR THE CANADA LINE. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng.,P.Eng., SNC-Lavain Inc.

DESIGN OF TEMPLETON OVERPASS FOR THE CANADA LINE. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng.,P.Eng., SNC-Lavain Inc. DESIGN OF TEMPLETON OVERPASS FOR THE CANADA LINE Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng.,P.Eng., SNC-Lavain Inc. Roger Woodhead, PhD, P.Eng., SNC-Lavain Inc. Paper prepared for

More information

Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway

Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway Jeff Sizemore, P.E. Geotechnical Design Support Engineer SCDOT Ed Tavera, P.E. Principal Geotechnical Engineer Geoengineers

More information

Introduction to Structural Analysis TYPES OF STRUCTURES LOADS AND

Introduction to Structural Analysis TYPES OF STRUCTURES LOADS AND AND Introduction to Structural Analysis TYPES OF STRUCTURES LOADS INTRODUCTION What is the role of structural analysis in structural engineering projects? Structural engineering is the science and art

More information

ICSS(4): A DESIGN APPLIED FOR A SUPER LONG MULTI-SPAN BRIDGE

ICSS(4): A DESIGN APPLIED FOR A SUPER LONG MULTI-SPAN BRIDGE ICSS(4): A DESIGN APPLIED FOR A SUPER LONG MULTI-SPAN BRIDGE D. Tsushima IHI Infrastrucure Systems Co., Ltd., Japan A. Igarashi Kyoto University, Japan H. Ouchi, T. Ueda & Y. Wada West Nippon Expressway

More information

Application of Vibro Techniques for Infrastructure Projects in India

Application of Vibro Techniques for Infrastructure Projects in India Application of Vibro Techniques for Infrastructure Projects in India Rainer Wegner Contract Manager, Keller Grundbau GmbH, Germany Dr. V.R. Raju Director, Keller Ground Engineering India Pvt Ltd, India

More information

TEST AND ANALYSIS OF A SHORT-SPAN RAILWAY BRIDGE

TEST AND ANALYSIS OF A SHORT-SPAN RAILWAY BRIDGE Proceedings of the 6th International Conference on Mechanics and Materials in Design, Editors: J.F. Silva Gomes & S.A. Meguid, P.Delgada/Azores, 26-30 July 2015 PAPER REF: 5756 TEST AND ANALYSIS OF A SHORT-SPAN

More information

NPTEL Course GROUND IMPROVEMENT USING MICROPILES

NPTEL Course GROUND IMPROVEMENT USING MICROPILES Lecture 22 NPTEL Course GROUND IMPROVEMENT USING MICROPILES Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Email: gls@civil.iisc.ernet.in Contents

More information

CHAPTER 11: PRESTRESSED CONCRETE

CHAPTER 11: PRESTRESSED CONCRETE CHAPTER 11: PRESTRESSED CONCRETE 11.1 GENERAL (1) This chapter gives general guidelines required for the design of prestressed concrete structures or members with CFRM tendons or CFRM tendons in conjunction

More information

Downloaded from Downloaded from /1

Downloaded from  Downloaded from  /1 PURWANCHAL UNIVERSITY VI SEMESTER FINAL EXAMINATION-2003 LEVEL : B. E. (Civil) SUBJECT: BEG359CI, Foundation Engineering. Full Marks: 80 TIME: 03:00 hrs Pass marks: 32 Candidates are required to give their

More information

Utilization of EPS Geofoam for Bridge Approach Structure on Soft Bangkok Clay

Utilization of EPS Geofoam for Bridge Approach Structure on Soft Bangkok Clay 2 Geotechnical Safety and Risk V T. Schweckendiek et al. (Eds.) 2015 The authors and IOS Press. This article is published online with Open Access by IOS Press and distributed under the terms of the Creative

More information

Geotechnical Solutions for High Speed Track Embankment A Brief Overview

Geotechnical Solutions for High Speed Track Embankment A Brief Overview Geotechnical Solutions for High Speed Track Embankment A Brief Overview Ir. Dr. Gue See Sew Managing Director, Gue & Partners Sdn Bhd & Ir. Tan Yean Chin Associate Director, Gue & Partners Sdn Bhd ABSTRACT:

More information

Lecture Retaining Wall Week 12

Lecture Retaining Wall Week 12 Lecture Retaining Wall Week 12 Retaining walls which provide lateral support to earth fill embankment or any other form of material which they retain them in vertical position. These walls are also usually

More information

Sabah Shawkat Cabinet of Structural Engineering 2017

Sabah Shawkat Cabinet of Structural Engineering 2017 3.9 Concrete Foundations A foundation is a integral part of the structure which transfer the load of the superstructure to the soil without excessive settlement. A foundation is that member which provides

More information

Inclusion Effect on Heterogeneity of Excess Pore Water Pressure Distribution in Composite Clay

Inclusion Effect on Heterogeneity of Excess Pore Water Pressure Distribution in Composite Clay Inclusion Effect on Heterogeneity of Excess Pore Water Pressure Distribution in Composite Clay J. Jalili Payame Noor University, Iran M. K. Jafari & A. Shafiee International Institute of Earthquake Engineering

More information

Atterberg limits Clay A Clay B. Liquid limit 44 % 55% Plastic limit 29% 35% Natural water content 30% 50%

Atterberg limits Clay A Clay B. Liquid limit 44 % 55% Plastic limit 29% 35% Natural water content 30% 50% CE 6405 SOIL MECHANICS UNIT I INTRODUCTION Part A 1. Distinguish between Residual and Transported soil. 2. Give the relation between γ sat, G, γ w and e 3. A compacted sample of soil with a bulk unit weight

More information

Roads and Transport Department Pavement Design 3 rd Year TYPES OF PAVEMENT FLEXIBLE AND RIGID PAVEMENT

Roads and Transport Department Pavement Design 3 rd Year TYPES OF PAVEMENT FLEXIBLE AND RIGID PAVEMENT TYPES OF PAVEMENT FLEXIBLE AND RIGID PAVEMENT There are two types of pavements based on design considerations i.e. flexible pavement and rigid pavement. Difference between flexible and rigid pavements

More information

Design Data 6. Loads and Supporting Strengths Elliptical and Arch Pipe. Values of B d

Design Data 6. Loads and Supporting Strengths Elliptical and Arch Pipe. Values of B d Design Data 6 Loads and Supporting Strengths Elliptical and Arch Pipe The hydraulic and structural characteristics of elliptical and arch shapes offer advantages, under certain conditions, over the circular

More information

Stylite. EPS Geofill - Civil Engineering. EPS Geofill - Civil Engineering. Technical Datasheet

Stylite. EPS Geofill - Civil Engineering. EPS Geofill - Civil Engineering. Technical Datasheet Stylite EPS Geofill is a lightweight, cellular plastic alternative to traditional fill materials such as soil or concrete. Manufactured off site it gives you the greatest possible control of your project

More information

Compressibility of Soil. Chapter 11

Compressibility of Soil. Chapter 11 Compressibility of Soil Chapter 11 TOPICS INTRODUCTION ELASTIC SETTLEMENT Stress distribution in soil masses CONSOLIDATION SETTLEMENT Fundamentals of consolidation Calculation of 1-D Consolidation Settlement

More information

Dr. P. NANJUNDASWAMY Department of Civil Engineering S J College of Engineering Mysore

Dr. P. NANJUNDASWAMY Department of Civil Engineering S J College of Engineering Mysore Dr. P. NANJUNDASWAMY Department of Civil Engineering S J College of Engineering Mysore 570 006 pnswamy@yahoo.com In this presentation Rigid pavement design considerstions Wheel load and temperature stresses

More information

TUNNEL LINER PLATE INTRODUCTION GENERAL APPLICATIONS CHAPTER 11

TUNNEL LINER PLATE INTRODUCTION GENERAL APPLICATIONS CHAPTER 11 CHAPTER 11 INTRODUCTION The open-trench method of placing underground conduits is commonly used on new construction of culverts, sewers and underpasses. Interference with traffic, as well as inconvenience

More information

SECTION ( ) MODULAR CONCRETE RETAINING WALL SYSTEM WEATHERED MULTI SHAPE 8 (203mm) HIGH UNITS

SECTION ( ) MODULAR CONCRETE RETAINING WALL SYSTEM WEATHERED MULTI SHAPE 8 (203mm) HIGH UNITS SECTION 02834 (32 32 23) MODULAR CONCRETE RETAINING WALL SYSTEM WEATHERED MULTI SHAPE 8 (203mm) HIGH UNITS 1.0 GENERAL 1.1 Description The work includes furnishing and constructing a 8 inch high multi-shape

More information

Evaluation of negative skin friction on sheet pile walls at the Rio Grande dry dock, Brazil

Evaluation of negative skin friction on sheet pile walls at the Rio Grande dry dock, Brazil Geotechnical Aspects of Underground Construction in Soft Ground Viggiani (ed) 2012 Taylor & Francis Group, London, ISBN 978-0-415-68367-8 Evaluation of negative skin friction on sheet pile walls at the

More information

SUBSOIL IMPROVEMENT WORKS AT DVIZ, HAIPHONG, VIETNAM

SUBSOIL IMPROVEMENT WORKS AT DVIZ, HAIPHONG, VIETNAM Subsoil Improvement Works at DVIZ, Haiphong, Vietnam 3 ALICE MONTULET, LUCIEN HALLEUX AND NGUYEN VAN NGOC SUBSOIL IMPROVEMENT WORKS AT DVIZ, HAIPHONG, VIETNAM ABSTRACT This article describes the subsoil

More information

Shear Strength of Tire Derived Aggregate (TDA) California State University, Chico

Shear Strength of Tire Derived Aggregate (TDA) California State University, Chico Shear Strength of Tire Derived Aggregate (TDA) California State University, Chico Background Information At the end of 2005, the U.S. generated approximately 300 million scrap tires Historically, these

More information

Tailings dam raise with reinforced walls

Tailings dam raise with reinforced walls Tailings dam raise with reinforced walls Jorge Alvarez Tiburcio Anddes Asociados S.A.C.,Peru ABSTRACT This paper presents the design of a tailings dam raise with reinforced walls lined with geomembrane,

More information

geopier Lateral resistance

geopier Lateral resistance technical bulletin No. 4 geopier Lateral resistance This Technical Bulletin discusses the behavior of Geopier supported shallow foundation systems when subjected to lateral loads. Lateral loads are applied

More information

Construction and Geotechnical Issues

Construction and Geotechnical Issues AECOM port project images here Original must be proportionate to 25.4cm x 8cm Image here Original must be square Image here Original must be square Image here Original must be square Construction and Geotechnical

More information

Comparison of Seismic Behavior of Multi-Storey R/C Buildings With and Without Internal Beams

Comparison of Seismic Behavior of Multi-Storey R/C Buildings With and Without Internal Beams Comparison of Seismic Behavior of Multi-Storey R/C Buildings With and Without Internal Beams I. A. Tegos Department of Civil Engineering, Aristotle University of Thessaloniki, Greece V. P. Panoskaltsis

More information

A THREE DIMENSIONAL STUDY OF THE EFFECT OF SOIL EROSION ON RIGID PIPES

A THREE DIMENSIONAL STUDY OF THE EFFECT OF SOIL EROSION ON RIGID PIPES North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper F-1-04 A THREE DIMENSIONAL STUDY OF THE EFFECT OF SOIL EROSION ON RIGID PIPES Sherif Kamel

More information

Test of Rectangular Confined Concrete Columns for Strength and Ductility

Test of Rectangular Confined Concrete Columns for Strength and Ductility Test of Rectangular Confined Concrete Columns for Strength and Ductility E.R. Thorhallsson & P.V. Bjarnason Reykjavik University, Iceland SUMMARY: This paper outlines a research testing the ductility and

More information

A park with a basement Creating green space in an urban environment

A park with a basement Creating green space in an urban environment September 2013 A park with a basement Creating green space in an urban environment From regulatory compliance to sustainability 18 Preparing the firm for internal transition 26 Patenting civil engineering

More information

The Bearing Capacity of Soils. Dr Omar Al Hattamleh

The Bearing Capacity of Soils. Dr Omar Al Hattamleh The Bearing Capacity of Soils Dr Omar Al Hattamleh Example of Bearing Capacity Failure Omar Play the move of bearing Capacity failure The Philippine one Transcona Grain Silos Failure - Canada The Bearing

More information

BS EN :2004 EN :2004 (E)

BS EN :2004 EN :2004 (E) Contents List 1. General 1.1 Scope 1.1.1 Scope of Eurocode 2 1.1.2 Scope of Part 1-1 of Eurocode 2 1.2 Normative references 1.2.1 General reference standards 1.2.2 Other reference standards 1.3 Assumptions

More information

APPENDIX A - SIZING OF BRIDGE AND SUPPORT SYSTEM

APPENDIX A - SIZING OF BRIDGE AND SUPPORT SYSTEM APPENDIX A - SIZING OF BRIDGE AND SUPPORT SYSTEM Steel Bridge Selection of Type of Steel Bridge Acrow Bridge From the personal communication with Acrow bridges regional office in Colorado (Needham, Randy),

More information

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure

More information

DIVISION: EXTERIOR IMPROVEMENTS SECTION: RETAINING WALLS SECTION: SEGMENTAL RETAINING WALLS REPORT HOLDER:

DIVISION: EXTERIOR IMPROVEMENTS SECTION: RETAINING WALLS SECTION: SEGMENTAL RETAINING WALLS REPORT HOLDER: 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-1784 Issued 02/2018 This report is subject to renewal 02/2019. DIVISION: 32 00 00

More information

GEOSYTHETIC SLOPE SPEC-V0704rev.doc STANDARD SPECIAL PROVISION FOR GEOSYNTHETIC REINFORCED SLOPE CONSTRUCTION

GEOSYTHETIC SLOPE SPEC-V0704rev.doc STANDARD SPECIAL PROVISION FOR GEOSYNTHETIC REINFORCED SLOPE CONSTRUCTION GEOSYTHETIC SLOPE SPEC-V0704rev.doc STANDARD SPECIAL PROVISION FOR GEOSYNTHETIC REINFORCED SLOPE CONSTRUCTION I. DESCRIPTION - This work consists of furnishing the required materials and construction of

More information

Response Analysis of an RC Cooling Tower Under Seismic and Windstorm Effects D. Makovička

Response Analysis of an RC Cooling Tower Under Seismic and Windstorm Effects D. Makovička Response Analysis of an RC Cooling Tower Under Seismic and Windstorm Effects D. Makovička The paper compares the RC structure of a cooling tower unit under seismic loads and under strong wind loads. The

More information

Behavior of Geosynthetic-Reinforced Earth

Behavior of Geosynthetic-Reinforced Earth Behavior of Geosynthetic-Reinforced Earth Presented by Kousik Deb Assistant Professor Department of Civil Engineering IIT Kharagpur Problems for Foundations on Weak Soils Experience excessive settlement

More information

Design and construction of NATM underground station tunnel by using the forepoling method in difficult conditions for Athens Metro

Design and construction of NATM underground station tunnel by using the forepoling method in difficult conditions for Athens Metro Design and construction of NATM underground station tunnel by using the forepoling method in difficult conditions for Athens Metro P. Kontothanassis, N. Koronakis, A. Karinas & S. Massinas Omikron Kappa

More information

EPS in CIVIL ENGINEERING APLLICATIONS: Product properties and performance requirements connected

EPS in CIVIL ENGINEERING APLLICATIONS: Product properties and performance requirements connected EPS in CIVIL ENGINEERING APLLICATIONS: Product properties and performance requirements connected ABSTRACT Since decades expanded polystyrene (EPS) is successfully applied as light weight fill for roads

More information

Active crack control in continuously reinforced concrete pavements (CRCP)

Active crack control in continuously reinforced concrete pavements (CRCP) fib_symposium_2017, 245, v2 (final): Active crack control in continuously reinforced co... 1 Active crack control in continuously reinforced concrete pavements (CRCP) Pieter De Winne 1, Hans De Backer

More information

NOTE. This manuscript is a preprint of the following article:

NOTE. This manuscript is a preprint of the following article: NOTE This manuscript is a preprint of the following article: Leshchinsky, D., Design software for soft soils, Geotechnical Fabrics Report, March, 2004, Vol. 22, Number 2, 18-23. The actual article included

More information

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module - 9

More information

1.364 ADVANCED GEOTECHNICAL ENGINEERING HOMEWORK No. 5

1.364 ADVANCED GEOTECHNICAL ENGINEERING HOMEWORK No. 5 .364 ADVANCED GEOTECHNICAL ENGINEERING HOMEWORK No. Due: Friday December 2. This question concerns the stability of an open slope cutting that will be used to provide construction access for a 3.2m deep

More information

In-plane testing of precast concrete wall panels with grouted sleeve

In-plane testing of precast concrete wall panels with grouted sleeve In-plane testing of precast concrete wall panels with grouted sleeve P. Seifi, R.S. Henry & J.M. Ingham Department of Civil Engineering, University of Auckland, Auckland. 2017 NZSEE Conference ABSTRACT:

More information

3.4.2 DESIGN CONSIDERATIONS

3.4.2 DESIGN CONSIDERATIONS 3.4.2 DESIGN CONSIDERATIONS Formwork Where Flatdeck sheet is used as formwork, the profile provides resistance to wet concrete (G) and construction loads (Q). Maximum formwork spans given in Section 3.4.4.1

More information

COLUMNS 1- Definition: The Egyptian code defines columns as : 2- Types of concrete columns

COLUMNS 1- Definition: The Egyptian code defines columns as : 2- Types of concrete columns COLUMNS 1- Definition: Columns are vertical compression members which carry primarily axial compression load; the axial load may be associated with bending moments in one or two directions, as shown in

More information

GEOTECHNICAL ENGINEERING CHALLENGES FOR HIGHWAY DESIGN AND CONSTRUCTION ON SOFT GROUND

GEOTECHNICAL ENGINEERING CHALLENGES FOR HIGHWAY DESIGN AND CONSTRUCTION ON SOFT GROUND GEOTECHNICAL ENGINEERING CHALLENGES FOR HIGHWAY DESIGN AND CONSTRUCTION ON SOFT GROUND Ir. Dr. Gue, See-Sew, Dr. Wong, Shiao-Yun & Ir. Tan, Yean-Chin G&P Geotechnics Sdn. Bhd. gnp-geo@gnpgeoup.com.my ABSTRACT:

More information

The design and construction of a 60m high reinforced soil retaining wall in the UAE

The design and construction of a 60m high reinforced soil retaining wall in the UAE The design and construction of a 60m high reinforced soil retaining wall in the UAE Ir Chaido Doulala-Rigby (Yuli) MHKIE CEng FICE Chief Civil Engineer Outline 1. A few words about Tensar 2. Case Study

More information

Serviceability considerations

Serviceability considerations Serviceability considerations Presented by: Jan Wium / John Robberts Stellenbosch University NUCSE Table of contents Stress limitation (Chapter 7) Crack control (Chapter 7) Deflection control (Chapter

More information

Seismic Performance of Hollow-core Flooring: the Significance of Negative Bending Moments

Seismic Performance of Hollow-core Flooring: the Significance of Negative Bending Moments Seismic Performance of Hollow-core Flooring: the Significance of Negative Bending Moments L.J. Woods University of Canterbury and Holmes Consulting Group, New Zealand. R.C. Fenwick University of Canterbury,

More information

DESIGN AND DETAILING OF RETAINING WALLS

DESIGN AND DETAILING OF RETAINING WALLS DESIGN AND DETAILING OF RETAINING WALLS (For class held from nd April 07) Dr. M. C. Nataraja, Professor, Civil Engineering Department, Sri Jayachamarajendra Collge of Engineering, Mysore-5a70 006 Phone:

More information

RETAINING WALL SYSTEM. ViaWall. ViaWall A. ViaWall B. ViaBlock

RETAINING WALL SYSTEM. ViaWall. ViaWall A. ViaWall B. ViaBlock RETAINING WALL SYSTEM ViaWall ViaWall A ViaWall B ViaBlock Table of contents Introduction page 1 ViaWall type A Elements of the system 1. Reinforced concrete panel 2. Reinforcing meshes 3. U-bolts Additional

More information

TYPES OF PAVEMENT FLEXIBLE AND RIGID PAVEMENT

TYPES OF PAVEMENT FLEXIBLE AND RIGID PAVEMENT TYPES OF PAVEMENT FLEXIBLE AND RIGID PAVEMENT There are two types of pavements based on design considerations i.e. flexible pavement and rigid pavement. Difference between flexible and rigid pavements

More information

Draft. Not Yet Approved SECTION 10.1 GENERAL SCOPE DEFINITIONS

Draft. Not Yet Approved SECTION 10.1 GENERAL SCOPE DEFINITIONS SECTION 10.1 GENERAL 10.1.1 SCOPE This part of the Manual covers the structural design and installation of reinforced concrete pipe for railway culverts. Pipe geometry may be circular, arch, or elliptical.

More information

Geotechnical Analysis of Stepped Gravity Walls

Geotechnical Analysis of Stepped Gravity Walls Geotechnical Analysis of Stepped Gravity Walls Baleshwar Singh 1 * and Birjukumar Mistri 2 1 Associate Professor, Civil Engineering Department, IIT Guwahati, India 2 Former Post-Graduate Student, Civil

More information

CHAPTER 11: WALLS.

CHAPTER 11: WALLS. CHAPTER 11: WALLS MODULAR BLOCK WALL (DRY CAST) Rather than being pre-approved as systems, the components of Modular block walls (dry cast) are pre-approved separately. The approved MBW components are

More information

Static Response of Reinforced Soil Retaining Walls with Modular Block Facing

Static Response of Reinforced Soil Retaining Walls with Modular Block Facing Static Response of Reinforced Soil Retaining Walls with Modular Block Facing Morteza Sabet 1, Amir M. Halabian 2, Kazem Barkhordari 3 1 Graduate Student, Department of Civil Engineering, Yazd University

More information

Product Information Bulletin

Product Information Bulletin Product Information Bulletin CCMC Evaluation Report 13101-R Advantage Insulating Concrete Forming (ICF) System BULLETIN NO. ISSUED: REPLACES: 201 November 25, 2010 January 2, 2009 Canadian Construction

More information

DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM

DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM Istanbul Bridge Conference August 11-13, 2014 Istanbul, Turkey DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM T. C. NEEL and K.BOZKURT ABSTRACT This work shall consist of the design, manufacture

More information

Long-term Stress of Simply Supported Steel-concrete Composite Beams

Long-term Stress of Simply Supported Steel-concrete Composite Beams The Open Construction and Building Technology Journal, 2011, 5, 1-7 1 Open Access Long-term Stress of Simply Supported Steel-concrete Composite Beams Min Ding 1,2, Xiugen Jiang 1, Zichen Lin 3 and Jinsan

More information

Design and Installation Guidelines for Retaining Walls. 1 P age. Geo Products, LLC 8615 Golden Spike Lane Houston, TX Phone:

Design and Installation Guidelines for Retaining Walls. 1 P age. Geo Products, LLC 8615 Golden Spike Lane Houston, TX Phone: Design and Installation Guidelines for Retaining Walls 1 P age Geo Products, LLC 8615 Golden Spike Lane Houston, TX 77086 Phone: 281.820.5493 2011 Geo Products, Fax: 281.820.5499 LLC www.geoproducts.org

More information

GEOTECHNICAL ENGINEERING CHALLENGES ON SOFT GROUND. For Myanmar Engineering Society 2012 CONTENTS

GEOTECHNICAL ENGINEERING CHALLENGES ON SOFT GROUND. For Myanmar Engineering Society 2012 CONTENTS GEOTECHNICAL ENGINEERING CHALLENGES ON SOFT GROUND For Myanmar Engineering Society 2012 G&P Professional Sdn Bhd (www.gnpgroup.com.my) By Engr. Dr. Gue See Sew (P.Eng) Engr. Dr. Wong Shiao Yun (G.Eng)

More information