Transcription
1 UNDERGROUND CONSTRUCTION MANUAL IBRE OPTIC CONSTRUCTION Back to MAIN INDEX Go to SECTION INDEX
2
3
4
5 IBRE OPTIC CABLE UNDERGROUND - CONSTRUCTION CODE OCU36 CABLE CODE OCU2 OCU36 OCU48 CABLE DESCRIPTION = ibre Optic Cable Underground with 2 ibres = ibre Optic Cable Underground with 36 ibres = ibre Optic Cable Underground with 48 ibres I.I. NUMBER A ORIGINAL ISSUE B HARD COPY UNCONTROLLED Ergon Energy Corporation Ltd ABN APPROVED DATE PASSED DRAWN 7/2/05 D. M K. c C.Lindsay UNDERGROUND DISTRIBUTION IBRE OPTIC CONSTRUCTION CONSTRUCTION CODE GUIDE IBRE OPTIC CABLE Dwg ILE: Sh4 B
6
7
8
9 Kerb Kerb Pit Pole Alignment ootpath ootpath Real Property Boundary O/H - O/H JOINTING PIT ON POLE ALIGNMENT UP / O / W / P UP / O / C / P UJ Pit Real Property Boundary U/G TO U/G JOINTING PIT Electricity ootpath Allocation UP / U / U / E UJ Kerb NOTES: ootpath Pit Real Property Boundary ootpath Kerb Electricity ootpath Allocation O/H - O/H JOINTING PIT ON ELECTRICAL ALLOCATION UP / O / W / E UP / O / C / E UJ OUNDATION. Bed the pit in a 00mm min. layer of stabilised sand or stabilised fine crushed rock (20:). Particle size shall not exceed 5mm. 2. Ensure the level of the foundation will leave the top edge of the pit flush with the finished surface after installation. BACKILL. Backfill material shall be a granular material (not clay) suitable for compaction. 2. Material to be compacted using a mechanical rammer. Care to be taken to ensure no distortion to pit. 3. Cable bearers and covers must be installed prior to backfilling. IBRE OPTIC CABLE. A 2 metre length of each cable shall be left coiled in the pit for jointing. 2. Cable left coiled in a pit shall be in a 500mm minimum diameter loop. 3. In a through pit with no cable joints, leave 24 metres of cable coiled in the pit. Pit Real Property Boundary O/H TO U/G JOINTING PIT Electricity ootpath Allocation UP / OU / W / P UP / OU / C / P UP / OU / W / E UP / OU / C / E UJ CONDUIT INSTALLATION. Conduit shall be installed to a depth of cover of 450mm minimum and 550mm maximum from the finished surface level and separated from existing communication conduits by 00mm. Ramp conduit down at pit to inable entry 50 to 00mm from bottom. A ORIGINAL ISSUE B HARD COPY UNCONTROLLED Ergon Energy Corporation Ltd ABN APPROVED DATE PASSED DRAWN 2/5/03 c D. M K. D. Hower UNDERGROUND DISTRIBUTION IBRE OPTIC CABLE CONSTRUCTION PITS AND JOINTS - INSTALLATION DETAILS Dwg ILE: Sh B
10 MATERIAL - PIT CONSTRUCTION ASSY DESCRIPTION Conduit communication 50 dia. (white) Conduit bend communication 90 Pit No. 8 Cable guard 25mm single to conc.pole Cable guard 25mm double to conc. pole Cable guard 25mm to wood pole QTY UP/O UP/O UP/O UP/O UP/OU UP/OU UP/U /W/P /C/P /W/E /C/E /W/E /C/E /U/E MATERIAL - JOINT ENCLOSURE CONSTRUCTION ASSY DESCRIPTION Splicing enclosure 48 fibres Splicing enclosure 36 fibres QTY UJ/36 UJ/48 MATERIAL - METAL CABLE GUARD ASSY DESCRIPTION Guard, Metal (00) to wood pole Guard, metal (00) to concrete pole UP/O UP/O /W/P /C/P UP/O /W/E QTY UP/O /C/E UP/OU /W/E Connector PG 6/50mm Cu main to 6/50mm Cu tap UP/OU /C/E A ORIGINAL ISSUE B HARD COPY UNCONTROLLED DATE APPROVED PASSED Ergon Energy Corporation Ltd DRAWN ABN /5/03 D. M K. c C.Lindsay UNDERGROUND DISTRIBUTION IBRE OPTIC CABLE CONSTRUCTION PITS AND JOINTS - MATERIAL Dwg ILE: Sh 2 B
11 2m Min Refer Note 2 Sheet Conduit Installation Assy Selection 562-, 6, or Joint enclosure Assy or 0 Assy 56-5 OC Compacted Backfill 450mm Min 550mm Max 50 to 00mm 50mm 50 to 00mm Compacted Backfill Joint enclosure Assy or 0 Assy 56-5 Assy Assy Stabilised Sand OC 450mm Min 550mm Max Assy mm Stabilised Sand 50 to 00mm Pit Construction Type UP / OU / W / P UP / OU / C / P UP / O / W / P UP / O / C / P UP / O / W / E UP / O / C / E UP / OU / W / E UP / OU / C / E UP / U / U / E Joint Construction Type UJ A ORIGINAL ISSUE B.08.0 HARD COPY UNCONTROLLED Ergon Energy Corporation Ltd ABN APPROVED DATE PASSED DRAWN 24/8/05 D. M K. c C.Lindsay UNDERGROUND DISTRIBUTION IBRE OPTIC CABLE CONSTRUCTION PITS AND JOINTS Dwg ILE: Sh 3 B
12
13
14 0305 MATERIAL ASSY DESCRIPTION QTY Warning sign A and post U/G fibre optic cable BURIED IBRE OPTIC CABLES IN THIS VICINITY OBTAIN CABLE LOCATION DETAILS LOCATION O SIGNS: Assy Cable warning signs shall be used in areas remote from Electricity ootpath Allocation. e.g. parkland, carparks, easements. Signs shall be located to clearly identify the cable route. Locate a sign at each change of direction and at 00m maximum centres, provided signs are visible, one to the next. Warning signs may be mounted directly on walls where allowable. inished surface line NOTES: 500. Concrete not included in material. Minimum concrete volume = 0.06m 3 Mass concrete footing 2. Concrete shall be grade N To prevent damage to sign when tightening bolts and nuts, compress flanges of grommets to half their normal thickness only. 4. After fixing sign to post, deform thread of bolt to prevent removal of nut by vandals dia UNDERGROUND IBRE OPTIC WARNING SIGNS TYPE A Construction Type UWSP A ORIGINAL ISSUE HARD COPY UNCONTROLLED DATE APPROVED PASSED Ergon Energy Corporation Ltd DRAWN ABN /2/05 D. M K. c C.Lindsay UNDERGROUND DISTRIBUTION IBRE OPTIC CONSTRUCTION UNDERGROUND IBRE OPTIC CABLE WARNING SIGN POST Dwg ILE: Sh
Operational Update. In all cases Ergon Energy assets are to be located on common land within the community title and not within individual lots.
Operational Update Community Title Developments Update #1095-25 Nov 2015 Target Audience: ield Crews, Work Group Leaders, Customer Delivery Managers, Line Managers, ield Assessors, Customer Connection
More informationCONSTRUCTION SPECIFICATION FOR GROUNDING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 609 NOVEMBER 2001 CONSTRUCTION SPECIFICATION FOR GROUNDING TABLE OF CONTENTS 609.01 SCOPE 609.02 REFERENCES 609.03 DEFINITIONS - Not Used 609.04 DESIGN
More informationUNDERGROUND CONSTRUCTION MANUAL PADMOUNTED SUBSTATIONS
UNDERGROUND CONSTRUCTION MANUAL PADMOUNTED SUBSTATIONS Back to MAIN INDEX Go to SECTION INDEX CONSTRUCTION DESCRIPTION DWG CONSTRUCTION DESCRIPTION DWG PM11 Construction code guide - 11kV Padmounted substations
More informationCable Protection Systems
Cable Protection Systems Installation Guide V.1 2018 GR-WI-601 Page 1 Introduction This guide addresses the acceptable methods and details for the installation of CABLEprotect ducting & troughing systems.
More informationDemarcation Points. Example 1
Example 1 control of distribution equipment including connection assets, ending at the customer. REVISION 03 14/04/10 Example 2 ROAD The transformer is normally at the property line. If the transformer
More informationCable Protection Systems
Cable Protection Systems Installation Guide V.1 2018 GR-WI-602 Page 1 Introduction This guide addresses the acceptable methods and details for the installation of ducting & troughing systems. The purpose
More informationRough-in frame and flush-mount panel installation instructions
Welch Allyn, Inc. 3 State Street Road Skaneateles Falls, NY 33 USA Rough-in frame and flush-mount panel installation instructions 726080 DIR 8002869 Ver. A Revised 206- The Welch Allyn In-Floor Scale models
More informationUnderground Distribution Construction Manual
Underground Distribution Construction Manual Section C3 Padmount Transformer Sites Approved by: C Noel ENERGEX Limited 2018 ABN 40 078 849 055 MANUAL 00305 For 200 to 500kVA 11kV433 250V, concrete bored
More informationLIGHTING CONSTRUCTION MANUAL FLOOD LIGHTING
CONSTRUCTION MNUL LOOD Back to MIN INDEX Go to SECTION INDEX TYPE DESCRIPTION PGE TYPE DESCRIPTION PGE Construction Type Guide - Pedestrian Crossing - Ergon Construction Type Guide - Watchman loodlight
More informationTechnical Data Sheet NEC/GRAN/95:01
Technical Data Sheet NEC/GRAN/95:01 Installation Guidance Notes Granular Surround Note : These guidance notes refer only to the installation of Granular surround underground tanks. These guidance notes
More informationOVERHEAD CONSTRUCTION MANUAL L.V. CONSTRUCTION
OVERHEAD CONSTRUCTION MANUAL Back to MAIN INDEX Go to SECTION INDEX CONSTRUCTION DWG CONSTRUCTION DWG Construction Code guide - 06/ Pole top LVABC and Open wire Construction Code Guide - 06/2 Normal Bridge
More informationSTANDARD DESIGN NOTES 1 / 2
ISIONS STANDARD DESIGN NOTES / 2 N/A ISIONS STANDARD DESIGN NOTES 2 / 2 N/A 2 FENCE AS REQUIRED BY OWNER. SEE DETAIL 8 / DWG. 9 CAP BLOCK LEVEL WEDGE FOR CAP AS REQUIRED FINAL SITE GRADING MATERIAL BY
More informationUNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2015 REVISIONS
, NEVADA YEAR 2015 REVISIONS SECTION TITLE AND REVISIONS SUMMARY EFFECTIVE DATE 217.S2 "Residential Curb and Gutter, R-Type" - New drawing to accommodate ADA requirements. 223 "Residential Driveway" -
More informationTS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE
TORONTO TRANSPORTATION March 2012 TS 803 DUCTS TABLE OF CONTENTS 1. DRAWINGS TTD 803.001 TTD 803.010 DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE 2. CONSTRUCTION
More informationGeneral Symbols, Ducts and Cables
DIVISION 2000 - ABBREVIATIONS 2009 11 2000.001 0 Abbreviations, General 2009 11 2011.101 0 General Symbols, Ducts and Cables 2009 11 2011.201 0 General Symbols, Maintenance Holes, Junction Boxes, Pads,
More informationGeneral Symbols, Ducts and Cables
DIVISION 2000 ABBREVIATIONS 2009 11 2000.001 0 Abbreviations, General 2009 11 2011.101 0 General Symbols, Ducts and Cables 2009 11 2011.201 0 General Symbols, Maintenance Holes, Junction Boxes, Pads, and
More informationGeneral Symbols, Ducts and Cables
MUNICIPAL AND COMMON DIVISION 2000 ABBREVIATIONS 2009 11 2000.001 0 Abbreviations, General 2009 11 2011.101 0 General Symbols, Ducts and Cables 2009 11 2011.201 0 General Symbols, Maintenance Holes, Junction
More informationTYPICAL INSTALLATION INSTRUCTIONS
TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect
More informationUnderground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11
Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11 Underground Residential Distribution (URD) Index General Discussion... 1-2 Description... 3-7 Drawings (Available
More informationFoundation Specifications for 3.6-/3.7-Meter Earth Station Antennas
Installation Instructions Foundation Specifications for 3.6-/3.7-Meter Earth Station Antennas Bulletin 37835A Revision E Introduction This document specifies typical foundation characteristics, designs,
More information30 X 40 POLE BARN 12 HIGH SIDE WALLS 2-12 WIDE X 10 HIGH SECTIONAL GARAGE DOORS OPTIONAL WINDOWS DETAILS INCLUDED
30 X 40 POLE BARN 12 HIGH SIDE WALLS 2-12 WIDE X 10 HIGH SECTIONAL GARAGE DOORS OPTIONAL WINDOWS DETAILS INCLUDED 3 ENTRY DOOR METAL ROOF METAL SIDING GABLE ROOF, 4/12 PITCH INDEX PAGE DESCRIPTION 1 FRONT
More informationSection 7: Specifications
Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required
More informationTS 804 CABLES TABLE OF CONTENTS TRAFFIC SIGNAL EQUIPMENT POLE WIRING DIAGRAM LOCATIONS WITH CENTRE MEDIANS
TORONTO TRANSPORTATION January 2012 TS 804 CABLES TABLE OF CONTENTS 1. DRAWINGS TTD 804.001 TTD 804.002 TTD 804.003 TTD 804.005 TTD 804.006 TTD 804.007 TTD 804.010 TTD 804.015 TTD 804.020 TTD 804.025 TTD
More informationSection 2: Underground
Section 2: Underground GENERAL INSTALLATION REQUIREMENTS FOR UNDERGROUND FACILITIES Underground electric service and meter location will be established by NHEC upon site visit. In some instances the type,
More informationHITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:
N 1133521.33 E 1689742.43 STA: 10+53.07 INSTALL: 2-10" 90 BENDS CONNECT TO MIDDLEBUSH HALL INTERIOR PLANT PLUMBING MIDDLEBUSH HALL HW1 HWS HWR 10+00 FREDRICK APARTMENTS FINE ARTS INSTALL 422 LF 10" HWS
More informationA. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.
ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 05 28 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationOVERHEAD CONSTRUCTION MANUAL CONSTRUCTION PRACTICES
OVERHEAD CONSTRUCTION MANUAL Back to MAIN INDEX Go to SECTION INDEX CONSTRUCTION DESCRIPTION PAGE CONSTRUCTION DESCRIPTION PAGE Construction code guide - Cables 1120/1 CP Single circuit concrete pole with
More informationUNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1
GENERAL: The scope of this document is to provide instruction for the installation and testing of chilled water piping installed for the University of Missouri. DESIGN GUIDELINES: 1. Materials 1.1. Pipe
More informationCONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 616 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03
More informationVillawood Properties Pty Ltd Lakeview Estate - Stage 2
ORIGINAL DRAWINGS (These are the originals only if this text is RED) Pty Ltd Not Yet Approved by Council TATALIA LANE MILGATE LANE INDEX MURRAY RIVER MURRAY RIVER TWENTY FOUR LANE HOLIDAY COTTAGES RICH
More informationWIRING METHODS CHAPTER 38
CHAPTER 38 WIRING METHODS SECTION E3801 GENERAL REQUIREMENTS E3801.1 Scope. This chapter covers the wiring methods for services, feeders and branch circuits for electrical power and distribution. E3801.2
More informationANY SPECIFICATION DRAWINGS OR DATED PRIOR TO SEPTEMBER 2015 WILL NOT BE HONORED.
November 30, 2015 Dear STEMC Member and Contractors, Over the years, STEMC has made many changes to its member requirements for new services and specifications associated with those requirements. As a
More informationCONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 604 NOVEMBER 2004 CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used
More informationTS 805 POLES TTS CONSTRUCTION SPECIFICATION FOR POLE INSTALLATION TTS MATERIAL SPECIFICATION FOR STEEL POLES BASE MOUNTED
TORONTO TRANSPORTATION January 2012 TS 805 POLES TABLE OF CONTENTS 1. DRAWINGS TTD 805.001 POLE HANDHOLE ORIENTATION DETAILS TTD 805.005 WOOD POLE IN EARTH TTD 805.010 BACK GUY MOUNTING DETAILS TTD 805.015
More informationModel AT Modular Linear Anode
Model AT Modular Linear Anode Typical Applications: Underground and aboveground storage tanks, buried pipelines, marine structures Featuring: Design flexibility - modular design permits multitude of anode
More informationJABIRU AIRCRAFT PTY LTD PROPELLER INSTRUCTION MANUAL
JABIRU AIRCRAFT PTY LTD PROPELLER INSTRUCTION MANUAL 1. Approved Installations The following combinations are approved. Airframe Engine Propeller Dia x Pitch Remarks/Limits Jabiru LSA 55/2K KFM 112M 4046092
More informationPlease check with your local inspection authority for any additional requirements before installation.
Specifications for Residential Underground Electric Service Installation This brochure addresses most typical residential underground service installations. Variances for the following specifications must
More informationCONSTRUCTION SPECIFICATION FOR POLE ERECTION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 615 SEPTEMBER 1993 CONSTRUCTION SPECIFICATION FOR POLE ERECTION 615.01 SCOPE 615.02 REFERENCES 615.05 MATERIALS TABLE OF CONTENTS 615.05.01 Concrete.02
More informationApplying for a Kinder Morgan Cochin Canada / UTOPIA Canada Proximity & Crossing Permit. Design and Construction Guidelines
Applying for a Kinder Morgan Cochin Canada / UTOPIA Canada Proximity & Crossing Permit Design and Construction Guidelines A Guide to Applying for a Kinder Morgan Cochin Canada / UTOPIA Canada Proximity
More informationFoundation Specifications
Installation Instructions Foundation Specifications for 3.6-/3.7-Meter Earth Station Antennas ulletin 37835A Revision L Introduction This document specifies typical foundation characteristics, designs,
More informationSTREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy.
General The following general requirements shall apply to street lights installed in new underground residential subdivisions or developments located within the service area of Springville City Power (within
More informationCONSTRUCTION SPECIFICATION FOR POLE ERECTION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 615 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR POLE ERECTION TABLE OF CONTENTS 615.01 SCOPE 615.02 REFERENCES 615.03 DEFINITIONS - Not Used 615.04
More informationSPECIAL SPECIFICATION 6664 Level (3) Communications System
2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6664 Level (3) Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Level (3) Communications,
More informationDate: 13/04/2015 1:14:38 PM
Date: 13/04/2015 1:14:38 PM Cad File No: J:\500-Cad-data\Standard_Drawings\Flow Systems\FSI-1000-FS_On-Lot Infrastructure Installation Set Out Details.dwg Date: 25/02/2015 11:18:14 AM Cad File No: J:\500-Cad-data\Standard_Drawings\Flow
More informationFoundation Specifications
Installation Instructions Bulletin 237684 Foundation Specifications for 5.6-Meter Ka-Band Earth Station Antennas 1.0 INTRODUCTION 1.1 This document specifies typical foundation characteristics, designs,
More informationSPECIAL SPECIFICATION 6658 Time Warner Communications System
2004 Specifications CSJ 1200-05-014 1. Description. SPECIAL SPECIFICATION 6658 Time Warner Communications System A. This Item will govern the installation of all facilities belonging to Time Warner Cable
More informationISSUE DATE JANUARY 1st, 2008 SECTION 5G FIBERGLASS PACKAGE LIFT STATION
ISSUE DATE JANUARY 1st, 2008 SECTION 5G FIBERGLASS PACKAGE LIFT STATION FIBERGLASS PACKAGE LS SITE PLAN PAGE No. 111 NUMBER: FG-LS-SITE-PLN FIBERGLASS PACKAGE LS PIPING PLAN PAGE No. 112 NUMBER: FG-LS-PIPE-PLN
More informationTelecommunications Infrastructure
Telecommunications Infrastructure Table of Contents Contents 1. INTRODUCTION... 2 2. DUCTING CAPACITY... 3 3. SUB DUCT SIZING... 4 4. DUCTING AND SUB DUCTING CONSTRUCTION AND COLOUR... 5 5. BUILDING ENTRANCE:...
More informationSALEM CITY POWER ELECTRICAL REQUIREMENTS & STANDARDS MANUAL
SALEM CITY POWER DEPARTMENT TABLE OF CONTENTS Section 1 General Requirements Purpose...1.1 Codes and Ordinances...1.1 Changes or Conflicts in Requirements and Guidelines...1.1 Application for Service...1.2
More informationNetwork Access Chamber Systems
Network Access Chamber Systems Installation Guide V.1 2018 GR-WI-599 Page 1 Introduction This guide addresses the acceptable methods and details for installation of STAKKAbox TM access pits together with
More informationFoundation Specifications
Installation Instructions Bulletin 237684 Foundation Specifications for 5.6-Meter Ka-Band Earth Station Antennas 1.0 INTRODUCTION 1.1 This document specifies typical foundation characteristics, designs,
More informationCONSTRUCTION SPECIFICATION FOR STEEL BEAM GUIDE RAIL AND CABLE GUIDE RAIL
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 552 NOVEMBER 2002 CONSTRUCTION SPECIFICATION FOR STEEL BEAM GUIDE RAIL AND CABLE GUIDE RAIL TABLE OF CONTENTS 552.01 SCOPE 552.02 REFERENCES 552.03
More informationCONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS
More informationSV24. Submittal Special Precautions Specifications Installation. 12½" (31.8 cm) 12½" (31.8 cm) 12" (30.5 cm) 12" (30.5 cm) 12" (30.
Wastewater Sampling Port Technical Data Submittal Special Precautions Specifications Installation 16½" (31.8 (41.9 cm) 8" (20.3 cm) -L -O SUBMITTAL STANDARD: 4" plain end inlet/outlet Highway traffic load
More informationElectric Service Handbook
Electric Service Handbook Revised August 2017 Contact Information Telephone (253): Electrical Inspection Office 502-8277 7:30 am - 4:30 pm Electrical Inspectors Area Map on Website 7:30 am - 8:30 am Automated
More informationCity of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH)
City of St. Catharines Standard Drawings JULY 2017 Revised July 21, 2017 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 1 Monolithic Curb-Faced Sidewalk for Concrete Road 110-2002
More informationTILT-UP LIFTING PRODUCTS
TILT-UP LIFTING PRODUCTS 37 Super-Lift www.meadowburke.com 877-518-7665 STRONGBACKS When will they be needed? A. If a panel looks like it would fall over when standing up. The strongback acts as a crutch
More information[Type text] Heber Light & Power. Developers & Excavators. Electrical Service Requirements Manual
[Type text] Heber Light & Power Developers & Excavators Electrical Service Requirements Manual May 2017 E.1.1 - GENERAL REQUIREMENTS PURPOSE This section was prepared to aid developers, contractors, engineers
More informationDIVISION 1100 TRAFFIC
SECTION 1102 STREET LIGHTING GENERAL INFORMATION The Idaho State Electrical Board has determined that all street lights are to be provided with an external fuse disconnect, in a junction box between the
More informationEntellus 75 NORTH STREET MERRILL SHERIFF CONSTRUCTION. 181 North 200 West, Suite #4. Bountiful, UT Phone
Entllus DUMPSTER PAD AND REPLACE WITH NEW BETWEEN THESE TWO POINTS SAWCUT ALONG DEMO LINE REMOVE PARKING SPOTS CURB, GUTTER, ASPHALT AND LANDSCAPING, WITHIN HATCHED AREA FOR NEW ADDITION CURB & GUTTER
More informationSPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR
SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR FINANCIAL BID Item DSR Item Description Qty Units No No. Total 1.1.1 Excavating trenches of
More informationCONSTRUCTION SPECIFICATION FOR INSTALLATION OF DUCTS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 603 APRIL 2010 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF DUCTS TABLE OF CONTENTS 603.01 SCOPE 603.02 REFERENCES 603.03 DEFINITIONS 603.04 DESIGN
More informationSECTION GROUNDING AND BONDING
SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and
More informationUNDERGROUND DROP CABLE CONDUIT INSTALLATION AND SPECIFICATION GUIDELINES FOR SINGLE DWELLING RESIDENTIAL APPLICATIONS
UNDERGROUND DROP CABLE CONDUIT INSTALLATION AND SPECIFICATION GUIDELINES FOR SINGLE DWELLING RESIDENTIAL APPLICATIONS 1. SPECIFICATIONS This document details the specifications for the installation of
More informationSpecifications for Electrical Underground Residential Distribution Systems
Specifications for Electrical Underground Residential Distribution Systems Specification DDS-2 Revision 13, February 2010 ONCOR ELECTRIC DELIVERY COMPANY SPECIFICATIONS FOR ELECTRICAL UNDERGROUND RESIDENTIAL
More informationPART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER
PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER COMMUNICATIONS LIGHTING Street Lighting Plan 710 Riser... 287 730 Collar for street light pole... 289 731 Pull box... 291 732 Trench for street light
More informationCONSTRUCTION SPECIFICATION FOR INSTALLATION OF DUCTS
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 603 NOVEMBER 2017 (Formerly OPSS 603, November 2015) Note: The PROV published in November 2017 replaces OPSS 603 COMMON, November 2015 with no technical
More informationVPL-3300B Commercial Vertical Platform Lift Technical Specifications
Page 1 of 5 VPL-3300B Commercial Vertical Platform Lift Technical Specifications MODEL NUMBERS: Unenclosed VPL-3300B Series: Models VPL-3353B and VPL-3375B (DC-powered) 3-Gate VPL-3300B Series: Models
More informationVPL-3200B Residential Vertical Platform Lift Technical Specifications
Page 1 of 5 VPL-3200B Residential Vertical Platform Lift Technical Specifications MODEL NUMBER: VPL-3200B Series: Models VPL-3210B, VPL-3212B and VPL-3214B (DC-powered units) U.S. F.D.A. CLASSIFICATION:
More informationUnderground Service Requirements and Instructions
This packet includes all FKEC underground service requirements, instructions, procedures and drawings. If you are considering underground power service please review this document in its entirety (3 page
More informationCONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING TOOLS AND STRUCTURES
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING TOOLS AND STRUCTURES SPECIFICATION EO-1181 REVISION 6 May 2010 EFFECTIVE DATE June 1, 2010 GENERAL
More informationContact Clark Public Utilities Construction Services department at (360) to initiate a request for service.
CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation
More informationInformation Bulletin:
Equipment Advisory Adv. No. 2015012 R1 Supersedes: Adv. No. 2015012 R0 Issue Date: April 21, 2015 File: 1649.10 Information Bulletin: Backfill Revision Note Revised text since R0 edition is shown with
More informationSpecifications for Residential Underground Electric Service Installation
Specifications for Residential Underground Electric Service Installation This brochure addresses most typical residential underground service installations. Variances for the following specifications must
More informationCW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS
December 2012 CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions Specifications...
More informationWATER 6.1 GUIDELINES
6-1 6.0 WATER 6.1 GUIDELINES The requirements of the Queensland Water Resources Commission Guidelines for Planning and Design of Urban Water Supply Schemes shall be followed in general. The requirements
More informationCONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 604 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used
More informationCHAPTER 12 HANDHOLES, PULLING VAULTS, AND JUNCTION BOXES
CHAPTER 12 HANDHOLES, PULLING VAULTS, AND JUNCTION BOXES HANDHOLES, PULLING VAULTS, AND JUNCTION BOXES The standards and requirements for handholes, pulling vaults, and junction boxes are presented in
More informationCable Protection Systems
Cable Protection Systems Installation Guide V.1 2018 GR-WI-603 Page 1 Introduction This guide addresses the acceptable methods and details for installation of CABLEprotect ducting & troughing systems.
More information4 EXTREME FOUNDATION PANELS
4 EXTREME FOUNDATION PANELS For House Crawl Space On Concrete Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions.
More informationDARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES
PART 1 DESIGN DIRECTIVES 1.1 GENERAL SECTION 02801 MISCELLANEOUS SITE DETAILS A. This section consists of AutoCAD drawings depicting typical landscape details governing the installation of miscellaneous
More informationPERMANENT PAVEMENT REPAIR NO SCALE
SAWCUT EXISTING PAVEMENT 2" BITUMINOUS CONCRETE SURFACE COURSE, CLASS 2 (MIN) CLEAN EDGE PRIOR TO PAVING AND PAINT WITH LIQUID BITUMEN. INSTALL SEALANT OVER JOINT UPON COMPLETION 2" BITUMINOUS CONCRETE
More informationEngineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 105 ELECTRICAL DETAILS. base. base. base.
Schedule H to Bylaw 7452, Subdivision Bylaw Page 105 4.3.7 Electrical Details ELECTRICAL DETAILS MMCD Standard Detail Drawing Saanich Supplemental Specification E1.1 Concrete Base Index E1.2 Type A and
More informationCONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 602 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS
More informationAlberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.
STANDARD BRIDGE & CULVERT COMPONENTS Alberta Bridge Inventory In Alberta there are about 13,300 bridges. Types of bridges in Alberta: Standard bridges 3521 (26%) Bridge size culverts 8348 (63%) Major bridges
More informationROAD CLOSURE GATE PLAN ESTIMATED QUANTITIES CONCRETE FOOTINGS FOR S. D. DEPT. OF TRANSPORTATION DECEMBER 1996 ELEVATION CABLE TIE DOWN FOOTING
ADMIN. S 1 1 13 199 POST Anchor Bolts (4 Required) 1 Pole Base Plate Footing PLAN POST Chamfer on Footing ESTIMATED QUANTITIES ITEM UNIT QUANTITY Footing & Eyebolt Class M5 Concrete CU.YD. 0.5 The quantity
More informationThe better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs November 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements....................................
More information香港電燈有限公司 THE HONGKONG ELECTRIC CO., LTD. ************************************
Page 1 of 7 Revision Date: 08/2010 香港電燈有限公司 THE HONGKONG ELECTRIC CO., LTD. ************************************ GENERAL PRACTICE ON EXECUTION OF EXCAVATION AND CONSTRUCTION WORK NEAR UNDERGROUND ELECTRICITY
More informationTANZANIA BUREAU OF STANDARDS
EDC3 (5238) P3 DRAFT TANZANIA STANDARD (Draft for comments only) Mini-Grid Systems Part 4: Low voltage (LV) underground distribution network TANZANIA BUREAU OF STANDARDS TBS 2017 First Edition 2017 Table
More informationTasman Retaining Wall System
Tasman Retaining Wall System The Tasman Retaining Wall System incorporates purpose made corners and capping units to provide classical reconstructed stone retaining walls for any landscape situation. From
More informationHANDHOLES, PULLING VAULTS AND JUNCTION BOXES
Handholes and pulling vaults perform several important functions: Provide drainage for the conduit system so that freezing water does not damage the conduit or wires. Provide a location for bending the
More informationSECTION 67 SERVICE CONNECTION SYSTEM
2019 - SECTION 67 SERVICE CONNECTION SYSTEM 67.1 GENERAL Building service connections for water and sewer shall be installed in accordance with these Specifications and/or approved Detailed Engineering
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationGas meter clearances and service installation requirements
FEBRUARY 2018 Gas meter clearances and service installation requirements CALL PSE S CUSTOMER CONSTRUCTION SERVICES AT 1-888-321-7779 OR VISIT PSE.COM/CUSTOMERCONSTRUCTION FOR MORE INFORMATION. Builder/owner/developer
More informationSECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph
More informationCONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS
More informationSECTION A1 EXCAVATION AND BACKFILL GENERAL
SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such
More informationSpecifications for Electrical Underground Distribution Systems from Overhead Transformation, Apartments & Condominiums
Specifications for Electrical Underground Distribution Systems from Overhead Transformation, Apartments & Condominiums Specification DDS-3 OH Revision 10, March 2010 ONCOR ELECTRIC DELIVERY COMPANY SPECIFICATIONS
More informationSDCS-02 CONSTRUCTION STANDARD FOR
الشركة السعودية للكهرباء DATE: November 2016 CONSTRUCTION STANDARD FOR UNDERGROUND DISTRIBUTION NETWORK This specification is property of SEC and subject to change or modification without any notice الشركة
More informationPerformance of Mechanically Stabilized Earth walls over compressible soils
Performance of Mechanically Stabilized Earth walls over compressible soils R.A. Bloomfield, A.F. Soliman and A. Abraham The Reinforced Earth Company, Vienna, Virginia, USA ABSTRACT: Two projects have recently
More information