OVERHEAD CONSTRUCTION MANUAL L.V. CONSTRUCTION
|
|
- Roderick Cox
- 6 years ago
- Views:
Transcription
1 OVERHEAD CONSTRUCTION MANUAL Back to MAIN INDEX Go to SECTION INDEX
2 CONSTRUCTION DWG CONSTRUCTION DWG Construction Code guide - 06/ Pole top LVABC and Open wire Construction Code Guide - 06/2 Normal Bridge LVABC and Open wire Construction Code guide - 06/3 Jumper Bridge LVABC and Open wire LVABC CONSTRUCTION LVBI Intermediate 2 x LVBI Intermediate 4 x LVBI Intermediate 2 x LVBI Intermediate 4 x L.V. OPEN WIRE CONSTRUCTION LVP Intermediate 07 LVA Angle 08 LVT Termination 09 LVS Strain 020 L.V. BRIDGING ARRANGEMENTS Normal Bridging Arrang ts ABC and Open wire 02 Normal Bridging Arrang ts Open wire 022 Jumper Bridging Arrang ts ABC and Open wire 023 LVBA Angle 2 x LVBA Angle 4 x LVBA Angle 2 x LVBA Angle 4 x LVBT Termination material 04/ LVBT Termination 2 x 50 04/2 LVBT Termination 4 x 50 04/2 LVBT Termination 2 x 95 04/2 LVBT Termination 4 x 95 04/2 LVBS Strain material 05/ LVBS Strain 2 x 50 05/2 LVBS Strain 4 x 50 05/2 LVBS Strain 2 x 95 05/2 LVBS Strain 4 x 95 05/2 B J. Brooks INDEX DRAWN M. Kavanagh FILE: Index Sh B
3 POLE TOP LVABC - CONSTRUCTION CODE Code shown within dashed box appears on relevant construction detail drawings in this manual. A LV BI /495 VOLTAGE LV CONSTRUCTIONS BI = Intermediate BA = Angle BS = Strain BT = Termination CABLE SIZE 250 = 2x50mm 295 = 2x95mm 450 = 4x50mm 495 = 4x95mm 2495 = 2-4x95mm EXAMPLE:- LVBI/495 = LV bundled intermediate construction, 4x95 LVABC POLE TOP OPEN WIRE - CONSTRUCTION CODE Code shown within dashed box appears on relevant construction detail drawings in this manual. A LV P 3/ 50/ MAR VOLTAGE LV CONSTRUCTIONS P = Pin A = Angle S = Strain T = Termination CP = Cantilever Pin CA = Cantilever Angle No. OF PHASES = Single 2 = Two 3 = Three CROSSARM SIZE - WOOD 50 = 2400x00x00 5 = 2400x50x00 CROSSARM SIZE - COMPOSITE FIBRE 70 = 2400x00x00 7 = 2400x25x25 80 = 2700x00x00 (Cantilever Only) EXAMPLE:-LVP3/50/MAR = LV intermediate pin construction,3 phase 2400x00x00 x-arm, Mars conductor CONDUCTOR CODE LIB = Libra 7/3.0 AAC MAR = Mars 7/3.75 AAC MOO = Moon 7/4.75 AAC PLU = Pluto 9/3.75 AAC CHL = Chlorine 7/2.5 AAAC FLU = Fluorine 7/3.0 AAAC HEL = Helium 7/3.75 AAAC IOD = Iodine 7/4.75 AAAC NEO = Neon 9/3.75 AAAC 000 = No conductor ittings B C D HARD COPY UNCONTROLLED DRAWN C. Noel C. Avenell L. Burton CONSTRUCTION CODE GUIDE POLE TOP LVABC AND OPEN WIRE FILE: 5 Dwg06 Sh D
4 NORMAL BRIDGE LVABC - CONSTRUCTION CODE Code shown within dashed box appears on relevant construction detail drawings in this manual. A LV NB S/250-MOO VOLTAGE BRIDGE TYPE BRIDGE CONDUCTOR MAINS LV NBS = Normal Bridge Strain NBT = Normal Bridge Termination 250 = 2x50mm ABC 450 = 4x50mm ABC 295 = 2x95mm ABC 495 = 4x95mm ABC ABC = LV ABC LIB = Libra 7/3.0 AAC MAR = Mars 7/3.75 AAC MOO = Moon 7/4.75 AAC PLU = Pluto 9/3.75 AAC CHL = Chlorine 7/2.5 AAAC FLU = Fluorine 7/3.0 AAAC HEL = Helium 7/3.75 AAAC IOD = Iodine 7/4.75 AAAC NEO = Neon 9/3.75 AAAC EXAMPLE:-LVNBS/250-MOO = LV Normal bridge, strain, 2x50mm ABC to Moon mains NORMAL BRIDGE OPEN WIRE - CONSTRUCTION CODE Code shown within dashed box appears on relevant construction detail drawings in this manual. A LV NB S 3/LIB-MOO VOLTAGE BRIDGE TYPE PHASES BRIDGE CONDUCTOR MAINS LV NBS = Normal Bridge Strain NBT = Normal Bridge Termination = Single 2 = Two 3 = Three LIB = Libra 7/3.0 AAC MAR = Mars 7/3.75 AAC MOO = Moon 7/4.75 AAC PLU = Pluto 9/3.75 AAC LIB = Libra 7/3.0 AAC MAR = Mars 7/3.75 AAC MOO = Moon 7/4.75 AAC PLU = Pluto 9/3.75 AAC CHL = Chlorine 7/2.5 AAAC FLU = Fluorine 7/3.0 AAAC HEL = Helium 7/3.75 AAAC IOD = Iodine 7/4.75 AAAC NEO = Neon 9/3.75 AAAC EXAMPLE:-LVNBS3/LIB-MOO = LV Normal bridge,strain, 3 phase Libra to Moon mains B C HARD COPY UNCONTROLLED DRAWN C. Noel C. Avenell L. Burton CONSTRUCTION CODE GUIDE NORMAL BRIDGING LVABC AND OPEN WIRE FILE: 5 Dwg06 Sh C
5
6
7
8
9
10
11
12 F F MATERIAL LVP LVP Phase 2 Phase LVP 3 Phase Assy Crossarm (00) LV single to wood pole Brace double to LV x-arm (00) and wood pole Pin L.V. to X-Arm Crossarm Predrilled 2400x00x00 Crossarm Composite Fibre 2400x00x Stay position T-o position LVABC Only required with additional circuits Assy 2- Assy or Working steps NOTES:. All metalwork that passes through or into wood shall be greased or the entire length that may come into contact with the wood. 2. Ater tightening each nut on its bolt, the thread immediately behind the nut shall be burred to eectively prevent loosening o the nut. 3. For wood pole attachments and oundations reer to Construction Practices. 4. Reer to L.V. construction drawing 022 or 023 or bridging arrangements. 5. Painted side o crossarm is to be the top surace when itted. 00 Construction Type LVP B C D E 7.. HARD COPY UNCONTROLLED DRAWN C. Noel C. Avenell E. Newton INTERMEDIATE Dwg FILE: Sh B /2 DISC B /2 /2 DISC E
13
14 MATERIAL 24-0 or LVT LVT LVT Phase2 Phase 3 Phase or Crossarm (50) LV single to wood pole 2-3 Crossarm (25) LV single to wood pole 22-2 Brace double to LV x-arm (25/50) and wood pole Stay position T-o position LVABC F 2-2 or Termination LV to single (00) x-arm Termination LV to single (25) x-arm Assy Crossarm Predrilled 2400x50x Crossarm Composite Fibre 2400x25x To upgrade to strain use Assy 24-5 or 6 50 Working steps NOTES:. All metalwork that passes through or into wood shall be greased or the entire length that may come into contact with the wood. For uture mains extension, erect additional shackle straps and position as shown. 2. Ater tightening each nut on its bolt, the thread immediately behind the nut shall be burred to eectively prevent loosening o the nut. 3. For wood pole attachments and oundations reer to Construction Practices. (Composite only) Reer to L.V. construction drawing 022 or 023 or bridging arrangements. 5. Painted side o crossarm is to be the top surace when itted. Construction Type LVT B C D 7.. E HARD COPY UNCONTROLLED DRAWN C. Noel C. Avenell E. Newton TERMINATION FILE: Dwg 09 Sh E
15 MATERIAL LVS LVS LVS Phase2 Phase 3 Phase or 53-5 or Crossarm (50) LV single to wood pole 2-3 Crossarm (25) LV single to wood pole Brace double to LV x-arm (25/50) and wood pole Strain LV to single (00) x-arm Strain LV to single (25) x-arm Stay position T-O position LVABC Switch/use position Reer Note or 3 Assy Crossarm Predrilled 2400x50x Crossarm Composite Fibre 2400x25x25 50 Working steps NOTES:. All metalwork that passes through or into wood shall be greased or the entire length that may come into contact with the wood. 2. Ater tightening each nut on its bolt, the thread immediately behind the nut shall be burred to eectively prevent loosening o the nut. (Composite only) For wood pole attachments and oundations reer to Construction Practices. 4. Reer to L.V. construction drawing 022 or 023 or bridging arrangements. 5. Mounting position or LVABC Switch/Fuse (I req d) Reer Switches Drawing Painted side o crossarm is to be the top surace when itted. Construction Type LVS C D E 7.. F HARD COPY UNCONTROLLED DRAWN C. Noel STRAIN C. Avenell E. Newton FILE: Dwg020 Sh F
16 MATERIAL Assy Crossarm LV single (00) to wood pole Brace single to composite crossarm (00) Pin LV to Crossarm Crossarm composite ibre cantilever inter 2700x00x Stay Position T-o position LVABC Only required with additional circuits Assy 30- Assy2- Assy22-5 Reer note Working Steps NOTES:. All metalwork that passes through or into wood shall be greased or the entire length that may come into contact with the wood. 2. Ater tightening each nut on its bolt, the thread 00 immediately behind the nut shall be burred to eectively prevent loosening o the nut. 3. For wood pole attachments and oundations reer to Construction Practices. 4. Kick end o crossarm up 50mm during construction. 5. Not to be used or new constructions. Use only or clearance to structure remediation 6. A maximum span o 00m apply s to Libra, Moon, Pluto, 7/0.064, 7/0.080 and 7/0.04 and equivalent conductors. 7. For single phase constructions use the 2 insulator positions that provide the maximum conductor clearance rom the structure / building. Construction Type LVCP HARD COPY UNCONTROLLED DRAWN C. Noel 2/8/7 C. Avenell L. Burton CANTILEVER INTERMEDIATE CONSTRUCTION Dwg FILE: Sh
17 MATERIAL Crossarm LV single (00) to wood pole Brace single to composite crossarm (00) Shackle to LV crossarm Crossarm composite ibre cantilever inter 2700x00x Stay Position T-o position LVABC Only required with additional circuits Assy 30- Assy 2- Assy 22-5 Assy 79-3 Reer note Working Steps NOTES:. All metalwork that passes through or into wood shall be greased or the entire length that may come into contact with the wood. 2. Ater tightening each nut on its bolt, the thread immediately behind the nut shall be burred to eectively prevent loosening o the nut. 3. For wood pole attachments and oundations reer to Construction Practices. 4. Mount crossarm on bisect. 5. Kick end o crossarm up 50mm during construction. 6. Not to be used or new constructions. Use only or clearance to structure remediation. Reer Note 4 = = A maximum span o 00m apply s to Libra, Moon, Pluto, 7/0.064, 7/0.080, 7/0.04 and equivalent conductors. 8. For single phase constructions use the 2 insulator positions that provide the maximum conductor clearance rom the structure / building. Construction Type LVCA HARD COPY UNCONTROLLED DRAWN C. Noel 8/8/7 C. Avenell L. Burton CANTILEVER ANGLE CONSTRUCTION Dwg 205 Sh FILE:
18 MATERIAL - NORMAL BRIDGE - TERMINATION ABC/ABC Phase 3 Phase ABC Assy 8-0 Reer Note Connector IPC 2 4 MATERIAL - NORMAL BRIDGE - TERMINATION ABC/OPEN WIRE Phase 3 Phase 20- or Connector Al/IPC Connector Cu/IPC 2 4 ABC MATERIAL - NORMAL BRIDGE - STRAIN ABC/ABC NORMAL BRIDGE - TERMINATION ABC/ABC Phase 3 Phase 99- or 3 Sleeve ull tension preinsulated compression 2 4 OPEN WIRE ABC ABC F 99- and 3 ABC 20- to 3 Reer note 3 NORMAL BRIDGE - STRAIN ABC/ABC NORMAL BRIDGE - TERMINATION ABC/OPEN WIRE NOTES:. Bridges to be made using strung conductor. 2. Use compression sleeve on Neutral joints where possible. 3. All bridging within 3km o the coast on the neutral mains conductor must be double clamped. Construction Type LVNB B C.0.7 HARD COPY UNCONTROLLED DRAWN C. Noel C. Avenell L. Burton NORMAL BRIDGING ARRANGEMENT ABC AND OPEN WIRE FILE: Dwg 02 Sh C
19 MATERIAL - NORMAL BRIDGE - TERMINATION Phase 2 Phase 3 Phase 87- to 2 Connector P.G. Al/steel/Cu-Cu 88- to 7 Connector P.G. Al/steel-Al/steel 27-5 Conduit PVC Flexible - 25mm MATERIAL - NORMAL BRIDGE - STRAIN AR AR AR Phase 2 Phase 3 Phase Assy 27-5 Assembly Selection 87- to 2 or 88- to 7 Reer note to to to 3 Connector P.G. Al/steel/Cu-Cu Connector P.G. Al/steel-Al/steel Sleeve non tension compression 2 3 NORMAL BRIDGE - TERMINATION 27-5 Conduit PVC Flexible - 25mm AR AR AR PHASE NEUTRAL 90- to to 2 or 88- to 7 Reer note 3 NOTES: Assy 27-5 NORMAL BRIDGE - STRAIN Assy Bridges to be made using strung conductor. 2. Use compression sleeve on Neutral joints where possible. 3. All bridging within 3km o the coast on the neutral mains conductor must be double clamped. Construction Type LVNB B C.0.7 HARD COPY UNCONTROLLED DRAWN C. Noel C. Avenell L. Burton NORMAL BRIDGING ARRANGEMENT OPEN WIRE MAINS FILE: Dwg 022 Sh C
20 MATERIAL - JUMPER BRIDGE - INTERMEDIATE ABC/ABC ABC 8-0 MATERIAL - JUMPER BRIDGE - INTERMEDIATE ABC/OPEN WIRE 20- or Connector IPC Connector Al/IPC Connector Cu/IPC Connector IPC Phase 3 Phase Assy Reer note 2 Phase 3 Phase JUMPER BRIDGE - ABC/ABC ABC MATERIAL - JUMPER BRIDGE - INTERMEDIATE OPEN WIRE/OPEN WIRE 87- to 2 Connector P.G. Al/steel/Cu-Cu Phase 3 Phase 88- to Connector P.G. Al/steel-Al/steel Conduit PVC Flexible 25mm 4 AR 8 AR Assembly Selection 87- to 2 or 88- to 7 Reer note 2 OPEN WIRE OPEN WIRE ABC Assy 8-0 Assembly Selection 87- to 2 or 88- to 7 Reer note 2 JUMPER BRIDGE - ABC/OPEN WIRE OPEN WIRE Assy 27-5 JUMPER BRIDGE - OPEN WIRE/OPEN WIRE NOTES:. Bridges to be made using strung conductor. 2. All bridging within 3km o the coast on the neutral mains conductor must be double clamped. Construction Type LVJB B C.0.7 HARD COPY UNCONTROLLED DRAWN C. Noel C. Avenell JUMPER BRIDGING ARRANGEMENT ABC AND OPEN WIRE L. Burton Dwg023 Sh FILE: C
OVERHEAD CONSTRUCTION MANUAL CONSTRUCTION PRACTICES
OVERHEAD CONSTRUCTION MANUAL Back to MAIN INDEX Go to SECTION INDEX CONSTRUCTION DESCRIPTION PAGE CONSTRUCTION DESCRIPTION PAGE Construction code guide - Cables 1120/1 CP Single circuit concrete pole with
More informationCHAPTER 14 STEELWORK
CHAPTER 14 STEELWORK 1. FOREWORD 2. SCOPE 3. GENERAL 4. CROSSARMS 4.1 New build 4.2 Refurbishment 4.2.1 LV wood pole overhead lines 4.2.2 Light duty HV overhead lines 4.2.3 Heavy duty HV overhead lines
More informationLIGHTING CONSTRUCTION MANUAL FLOOD LIGHTING
CONSTRUCTION MNUL LOOD Back to MIN INDEX Go to SECTION INDEX TYPE DESCRIPTION PGE TYPE DESCRIPTION PGE Construction Type Guide - Pedestrian Crossing - Ergon Construction Type Guide - Watchman loodlight
More informationUNDERGROUND CONSTRUCTION MANUAL FIBRE OPTIC CONSTRUCTION
UNDERGROUND CONSTRUCTION MANUAL IBRE OPTIC CONSTRUCTION Back to MAIN INDEX Go to SECTION INDEX IBRE OPTIC CABLE UNDERGROUND - CONSTRUCTION CODE OCU36 CABLE CODE OCU2 OCU36 OCU48 CABLE DESCRIPTION =
More informationPart 4 High Voltage Overhead DISTRIBUTION CONSTRUCTION STANDARDS HANDBOOK
DISTRIBUTION CONSTRUCTION STANDARDS HANDBOOK Drawing Register Number Revision DESCRIPTION H01-1 H 3 PHASE INTERMEDIATE WITH RUNNING EARTH H01-3 K 3 PHASE INTERMEDIATE ANTI-SWAN CROSSARM GUIDE H01-4 A 3
More informationPart 4 High Voltage Overhead DISTRIBUTION CONSTRUCTION STANDARDS HANDBOOK
DISTRIBUTION CONSTRUCTION STANDARDS HANDBOOK Drawing Register Number Revision DESCRIPTION H01-1 G 3 PHASE INTERMEDIATE WITH RUNNING EARTH H01-3 J 3 PHASE INTERMEDIATE ANTI-SWAN CROSSARM GUIDE H01-4 A 3
More informationSTANDARD TECHNIQUE: OH4K/1
Company Directive STANDARD TECHNIQUE: OH4K/1 Relating to the Design of Insulated Aerial Bundle Conductor For LV Overhead Distribution Systems ST:OH4K/1 13 September 2007-1 of 35 - Document Revision & Review
More informationSTANDARD TECHNIQUE : OH4L/1
Company Directive STANDARD TECHNIQUE : OH4L/1 Relating to Stay Strands and Fittings for Overhead Lines ST:OH4L/1 March 2012-1 of 21 - Document Revision & Review Table Date Comments Author 06/06/13 Note
More informationTESTING PTE EARTHING
1 SCOPE This section of the Power Systems Live Working Manual details the procedures to be followed to achieve Safety from the System when carrying out examination, testing and remedial work on PTE (Pole
More informationPRICE BID FOR TENDER NOTICE NO- CONSTRUCTION OF 11KV LINE, LT LINE & SUBSTATION FOR SAMBALPUR FLYOVER PROJECT- WESCO / INSTALLATION / WORKS
PRICE BID FOR TENDER NOTICE NO- CONSTRUCTION OF 11KV LINE, LT LINE & SUBSTATION FOR SAMBALPUR FLYOVER PROJECT- / INSTALLATION / A - DIG BUILDING TO LAXMI TALKIES CHOWK 1 2 Supply & of 3-ph 3-wire 11KV
More informationTransmission Line General Requirements Including Typical Overhead Line Structures. Document Number: 1-03-FR-09
Transmission Line General Requirements Including Typical Overhead Line Structures Document Number: 1-03-FR-09 VERSION 1.0 June 2018 This functional requirements document is in line with the organisation's
More informationCutouts and Fuse Links Equipment to protect against faults and over-current conditions on power distribution systems. Open-Type Cutouts Linkbreak Cutouts Loadbreak Cutouts Cutout-Arrester Combinations
More informationNPS/001/024 Technical Specification for Low Voltage Aerial Bundled Conductor Fittings
Version:- 5.0 Date of Issue:- July 2017 Page 1 of 12 NPS/001/024 Technical Specification for Low Voltage Aerial Bundled Conductor Fittings 1. Purpose The purpose of this document is to outline the technical
More informationDuke Energy Carolinas Distribution Construction Standards Reference Guide
Duke Energy Carolinas Distribution Construction Standards Reference Guide The Duke Energy Carolinas (DEC) Distribution Construction Standards are available on the My Duke Energy Contractor Portal. Access
More informationCS-21 STREET STRUCTURES TABLE OF CONTENTS
TABLE OF CONTENTS CS-21.0 Street Structures... 1 CS-21.1 Road Signs... 1 CS-21.2 Safety Barriers... 1 CS-21.3 Bollards and Removable Bollards... 1 CS-21.4 Pedestrian Barrier Rails and Handrails... 1 CS-21.5
More informationCompression Joints & Lugs
Compression Mid Span Joints - Full Tension for Hexagonal Compression s in accordance with AS54 AF L type AAC AAC Full Tension Midspan Joints, are manufactured from an Aluminium extrusion, equivalent in
More informationOVERHEAD SERVICES - SECONDARY
OVERHEAD SERVICES - SECONDARY Contents - Overhead Services... O-1 General Requirements for Overhead Service... O-2 Names of Parts for Overhead Service... O-3 Service Attachment on an Unguyed Service Mast...
More informationNew Construction Units. a. Includes the furnishing of all labor and equipment for the installation of new construction units.
1 All construction is to follow design and construction documents approved by the Engineer and marked approved for construction. All construction shall also follow the National Electrical Safety Code,
More informationHPC-9DJ
Manual Distribution Design Manual Volume 2: Low Voltage Aerial Bundle Cable Standard Number: HPC-5DC-07-0002-2014 Document Control Author Name: Anthony Seneviratne Position: Standards Engineer Document
More informationTABLE OF CONTENTS. Page FOREWORD INTRODUCTION SCOPE NORMATIVE REFERENCES
TITLE SPECIFICATION FOR POLE FITTINGS FOR USE WITH LV ABC & ASC REFERENCE CP_TSSPEC_080 DATE: PAGE: 1 REV 1 NOVEMBER 2008 OF 13 TABLE OF CONTENTS Page FOREWORD...... 2 INTRODUCTION...... 3 1 SCOPE......
More informationRehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL Bill of Quantity : Package2 - Lot 3
ITB 2016-279 Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL-10-00098764 Bill of Quantity : Package2 - Lot 3 Package 2 Lot1- Installation, Connection
More informationTS 805 POLES TTS CONSTRUCTION SPECIFICATION FOR POLE INSTALLATION TTS MATERIAL SPECIFICATION FOR STEEL POLES BASE MOUNTED
TORONTO TRANSPORTATION January 2012 TS 805 POLES TABLE OF CONTENTS 1. DRAWINGS TTD 805.001 POLE HANDHOLE ORIENTATION DETAILS TTD 805.005 WOOD POLE IN EARTH TTD 805.010 BACK GUY MOUNTING DETAILS TTD 805.015
More informationTECHNICAL SPECIFICATION A.B. CABLE
TECHNICAL SPECIFICATION A.B. CABLE 1.0 NATURE OF WORK The work covered by this Specification is for L.T lines in A.B cable as specified herein and in the attached Schedules. The overhead distribution lines
More informationSWER OVERHEAD CONDUCTOR DISTRIBUTION SYSTEM AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED
PART B-04 TITLE: SWER OVERHEAD CONDUCTOR DISTRIBUTION SYSTEM SPECIFICATION NO: B-04 INCEPTION DATE: AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) AMENDMENTS / REVISIONS DATE PAGE PARAGRAPH DESCRIPTION
More informationNSP/004/105 (OHI 5) - Guidance on the selection, erection and sagging of O/H line conductors
Version:- 4.0 Date of Issue:- January 2018 Page 1 of 21 NSP/004/105 (OHI 5) - Guidance on the selection, erection and sagging of O/H line conductors 1. Purpose The purpose of this document is to provide
More informationSECTION EARTHING AND EARTH FAULT PROTECTION
SECTION 16660 PART 1 - GENERAL 1.01 DESCRIPTION A. The work to be performed includes, but is not necessarily limited to, all work involved with the construction and assembly of a complete electrical earthing
More informationCONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF SIGN LUMINAIRES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 612 SEPTEMBER 1984 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF SIGN LUMINAIRES 612.01 SCOPE 612.02 REFERENCES 612.03 Not Used 612.04 Not Used
More information04.00 GENERAL SECONDARIES & SERVICES SECONDARY AND SERVICE CABLE SPLICES INSULATED SERVICE ENTRANCE COMPRESSION CONNECTORS 04.
4. GENERAL SECONDARIES & SERVICES 4.- TIE COLOR CODING 4.-6 SECONDARY AND SERVICE CABLE SPLICES 4.- INSULATED SERVICE ENTRANCE COMPRESSION CONNECTORS 4.- 4. POLE ATTACHMENTS POLE ATTACHMENT DEVICES NEUTRAL
More informationTEMPORARY METER POLE INSTALLATION
TEMPARY METER POLE INSTALLATION MEMBER PROVIDED Location to be made by REMC within 50' of our transformer or existing service Temporary pole to be properly braced 24" 3 wire weatherhead (located 24" from
More informationCONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 604 NOVEMBER 2004 CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used
More informationTitle Transmission Line Maintenance Standards. Reference Number PMP 17 - (RIC Standard: EP SP)
Discipline Engineering Standard - NSW Category Electrical Title Reference Number PMP 17 - (RIC Standard: EP 10 01 00 02 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards
More informationAREMA C&S Manual 2018 (Includes 2018 Revisions) Volume 4 Index SECTION 14 - ELECTRICAL DEVICES, FOUNDATIONS, HARDWARE
SECTION 14 - ELECTRICAL DEVICES, FOUNDATIONS, HARDWARE 14.1 Recommended Wire Connectors, Terminals 14.1.1 37-2 Recommended Design Criteria and Functional/Operating Guidelines for Solderless Crimp-Type
More informationA. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).
16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the
More informationSTANDARD DRAWINGS. September 2013 UPDATED FEBRUARY 2016
STANDARD DRAWINGS September 2013 UPDATED FEBRUARY 2016 CONSTRUCTION STANDARD DRAWINGS DIVISION 15 LIST OF DRAWINGS: 1. 01 2004-1 Rev. A - Concrete Standards General Outline and Reinforcement Notes 2. 01
More informationPART 7 Technical Specification for Overhead and Underground Service Connection works for the Year
PART 7 Technical Specification for Overhead and Underground Service Connection works for the Year 2016-17 Technical Specification for Overhead and Underground Service Connection works for the Year 2016-17
More informationPower Systems 2 ELE3015. Lecture 1: Transmission Lines
Power Systems 2 ELE3015 Lecture 1: Transmission Lines Transmission Lines: Introduction Use to carry electrical power from point of generation to the point of use. Usually over large distances. Made with
More informationCHAPTER 13 GROUNDING AND BONDING
GROUNDING AND BONDING CHAPTER 13 GROUNDING AND BONDING Grounding and bonding must be in accordance with Article 250 of the National Electrical Code (NEC). Bonding is defined in the NEC as the permanent
More informationEffective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O.
Siemens, Model # SUAS877-PG (or Landis & Gyr # UAS877-PG) Eaton-Durham Model # UTRS223ACH Milbank Midwest Model # U980-O UTRS223AMEP These are some examples of the single meter sockets we require for underground
More informationUNDERGROUND SERVICES SECONDARY
Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-
More informationCONSTRUCTION SPECIFICATION FOR POLE ERECTION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 615 SEPTEMBER 1993 CONSTRUCTION SPECIFICATION FOR POLE ERECTION 615.01 SCOPE 615.02 REFERENCES 615.05 MATERIALS TABLE OF CONTENTS 615.05.01 Concrete.02
More informationResidential Electric Policy
Residential Electric Policy 7/19/16 1 Table of Contents General Information..3 Construction.3 Ownership....3 Underground Service...3 Apartments/Multi-Unit Dwellings..3 Modular and Manufactured Homes...3
More informationA. This Section includes steel cable trays and accessories.
SECTION 26 05 36 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationInnovative New Live Line Tool and Framing Designs Facilitating Safe and Efficient Cross-arm Replacement
Innovative New Live Line Tool and Framing Designs Facilitating Safe and Efficient Cross-arm Replacement A.J. Carreira, P.Eng., SMIEEE President Toronto, Canada carreira@k-line.net ISSUES WITH CURRENT CROSS
More informationAERIAL BUNDLED CONDUCTOR ACCESSORIES
KENYA STANDARD KS 2704: 2016 ICS 29.035.01 AERIAL BUNDLED CONDUCTOR ACCESSORIES PUBLIC REVIEW DRAFT, DECEMBER 2016 KEBS 2016 First Edition 2016 KS 2704: 2016 TECHNICAL COMMITTEE REPRESENTATION The following
More informationTemporary Wiring. Low-Voltage Electrical Safety Orders
Temporary Wiring Low-Voltage Electrical Safety Orders 2405.1. Scope. Except as specifically modified in this Article, all other requirements of this Order for permanent wiring shall also apply to temporary
More informationOVERHEAD SERVICE. Table of Contents - Section 400
OVERHEAD SERVICE Table of Contents - Section 400 PARAGRAPH 400.0 OVERHEAD SERVICES (0-600 VOLTS)... 1 400.1 GENERAL 1 400.2 IDENTIFICATION OF CONDUCTORS. 1 400.3 MAXIMUM SERVICE ENTRANCE CONDUCTOR SIZE
More informationSkyWrap In-line Bypass Ground Wire
SkyWrap In-line Bypass Ground Wire Aluminum Balehanger SkyWrap cable is passed around the tower top using a specially designed bypass accessory known as a balehanger. The aluminum balehanger is clamped
More information(Condensed from National Electric Code)
WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,
More informationRESIDENTIAL QUICK REFERENCE
RESIDENTIAL QUICK REFERENCE PROVO CITY POWER STANDARDS ELECTRICAL ENGINEERING UPDATED: 2016 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTIFICATION. 18" MIN. OF TAIL. (NEUTRAL CONDUCTOR MUST BE WHITE OR
More informationCONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 617 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES TABLE OF CONTENTS 617.01 SCOPE 617.02 REFERENCES 617.03 DEFINITIONS
More informationAmphenol PT, SP, MS/PT Proprietary/MIL-C-26482, Series 1 solder type
Amphenol PT, SP, MS/PT Proprietary/MIL-C-26482, Series 1 solder type Amphenol solder contact miniature cylindrical connectors meet the most critical application needs. esign versatility combined with high
More informationEssex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationThis guide can be used to prepare a specification for incorporating wall bracket jib cranes into a competitively bid construction project.
SECTION 14654 WALL BRACKET JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial
More informationCrimping Type Copper Tubular Cable Terminal Ends - Bell Mouth Bell Mouth Terminal ends / Bell Mouth Cable Lugs
Crimping Type Copper Tubular Cable Terminal Ends - Bell Mouth Bell Mouth Terminal ends / Bell Mouth Cable Lugs We manufacture and export Crimping Type Copper Tubular Cable Terminal Ends - Bell Mouth. Our
More informationTS 804 CABLES TABLE OF CONTENTS TRAFFIC SIGNAL EQUIPMENT POLE WIRING DIAGRAM LOCATIONS WITH CENTRE MEDIANS
TORONTO TRANSPORTATION January 2012 TS 804 CABLES TABLE OF CONTENTS 1. DRAWINGS TTD 804.001 TTD 804.002 TTD 804.003 TTD 804.005 TTD 804.006 TTD 804.007 TTD 804.010 TTD 804.015 TTD 804.020 TTD 804.025 TTD
More informationNEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) Distribution and Consumer Services Butwal Regional Office
NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) Distribution and Consumer Services Butwal Regional Office VOLUME II OF II Supply, Delivery, Installation/Erection, Testing and Commissioning
More informationSteel Square Box, Height 4 Inch; Width 4 Inch; Depth 1-1/2 Inch; Capacity 21 Cu Inch; 17 Knockout(S); Knockout Location (5) Bottom, (12) Side
3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 Catalog Number Manufacturer Description Weight per unit Product Category Features Knockout Location Knockout Size 4SSPLDR
More informationSpecifications for Residential Overhead Electric Service Installation
Specifications for Residential Overhead Electric Service Installation This brochure addresses most typical residential overhead service installations. Variances for the following specifications must be
More informationCONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 617 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES TABLE OF CONTENTS 617.01 SCOPE 617.02 REFERENCES 617.03 DEFINITIONS
More informationCONSTRUCTION SPECIFICATION FOR GROUNDING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 609 NOVEMBER 2001 CONSTRUCTION SPECIFICATION FOR GROUNDING TABLE OF CONTENTS 609.01 SCOPE 609.02 REFERENCES 609.03 DEFINITIONS - Not Used 609.04 DESIGN
More informationAnnexure-A to VOLUME I : Section-VII General Technical Instructions
Annexure-A to VOLUME I : Section-VII (This document is meant for the exclusive purpose of bidding against this Package and shall not be transferred, reproduced or otherwise used for purposes other than
More informationCONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 604 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used
More informationUnit Price Labor. INSTALL 138KV DISCONNECT SWITCH WITH MOTOR OPERATOR AND AUXILIARY SWITCHES ON EXISTING STRUCTURE 1 ea.
SUBSTATION B UPGRADE CONSTRUCTION MAJOR MATERIAL NOTES: Contractor to fill in line item column "Est. Qty." for items left blank. Construction Unit No. Description Est. Qty. Unit Labor 100 INSTALL 138KV
More informationSPECIAL SPECIFICATION 1924 Neighborhood Friendly High Mast Illumination System
1993 Specifications CSJ 2374-01-154 SPECIAL SPECIFICATION 1924 Neighborhood Friendly High Mast Illumination System 1. Description. This Item shall govern for furnishing and installing the various types
More informationRef:. CESU.H.Qrs./P&S/Capex-Turnkey/527/12-13/ Dt CORRIGENDUM - I
CENTRAL ELECTICITY SUPPLY UTILITY OF ODISHA Regd. Office: 2 nd Floor, IDCO TOWERS, Bhubaneswar-751022 Phone- (0674)2541727, 2543721, Fax: (0674)2543125 Web Site: www.cesuodisha.com Ref:. CESU.H.Qrs./P&S/Capex-Turnkey/527/12-13/
More informationENGINEERING SPECIFICATION EE SPEC
/. Company Directive ENGINEERING SPECIFICATION EE SPEC : 84/1 Relating to Surge Arresters EE SPEC : 84/1 20 December 2013-1 of 7 - IMPLEMENTATION PLAN Introduction This document defines the surge arresters
More informationSECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph
More information4. POINTS ON SWITCH AND CIRCUIT BREAKER PLATFORM GROUNDING.
4. POINTS ON SWITCH AND CIRCUIT BREAKER PLATFORM GROUNDING. 4.1 All equipment (i.e., switches, breakers, control cabinets, etc.) inside switchyards or substations which require operations by workers must
More informationDiploma in Electrical Installations. (Buildings and Structures) Unit 204 Workbook PRE-ATTENDANCE REVISION V1
2365-02 Diploma in Electrical Installations (Buildings and Structures) Unit 204 Workbook PRE-ATTENDANCE REVISION V1 Welcome This booklet is designed to outline the areas that you will study when you complete
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section
More informationI. CLARIFICATIONS. This tender addendum and clarification forms part of the Request for Proposal and Contract documents, and modifies them as follows:
This tender addendum and clarification forms part of the Request for Proposal and Contract documents, and modifies them as follows: I. CLARIFICATIONS 2 294 Evaluation and Qualification criteria: Experience
More informationSECTION 4 - SECONDARY CONSTRUCTION OVERHEAD TABLE OF CONTENTS
4. GENERAL SECONDARIES & SERVICES 4.- INDIVIDUAL PHASE SECONDARY OVERHEAD LINE EXTENSIONS 4.- SECONDARY AND SERVICE CABLE SPLICES 4.- INSULATED SERVICE ENTRANCE COMPRESSION CONNECTORS 4.- 4. POLE ATTACHMENTS
More informationSECTION ENCLOSED BUS ASSEMBLIES
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the
More information4CS12 4CS-1/2 4X1-7/8D Handybox. Features. Dimensions and Weight. Long Description. Catalog Number
3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 AllenWatson@elliottelectric.com 4CS12 4CS-1/2 4X1-7/8D Handybox Appleton/Oz Gedney Catalog Number 4CS12 Manufacturer Appleton/Oz
More informationAn Insight into Design, Development & Testing of Insulation Piercing Connectors for LV Application
An Insight into Design, Development & Testing of Insulation Piercing Connectors for LV Application Introduction Designed for Indoor and outdoor applications Non-tension tap and splice applications Used
More informationELECTRICAL SAFETY INSPECTION REPORT.
ELECTRICAL SAFETY INSPECTION REPORT. SREERAMPUR, DHAKA, BANGLADESH Factory List: Graphics Textiles Limited Inspected on May 20, 2014 SUMMARY Graphics Textiles Limited is located in Sreerampur, Dhaka. Reportedly,
More informationOVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE. See Chapter 3, Section 3.01 for more information about point of entrance (POE).
6.01 GENERAL OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE See Chapter 3, Section 3.01 for more information about point of entrance (POE). In all cases, the customer installs, owns, and maintains the
More informationCONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 604 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used
More informationFORM B. Last Updated: Procurement Details 1. Expected Date of launching of Bid. Procurement
Last Updated: Indicative Procurement Plan for Financial Year 2009 (Procurement to be undertaken through Open Advertised Bidding) (To be updated at least every six months) FORM B S.No. 1 2 3 5 6 7 8 9 10
More informationImplementation of Rural Electrification Scheme RGGVY, in Uttar Pradesh
16th NATIONAL POWER SYSTEMS CONFERENCE, 15th-17th DECEMBER, 2010 567 Implementation of Rural Electrification Scheme RGGVY, in Uttar Pradesh A.K. Sahani Abstract-- Based on a survey of more than 2000 villages,
More informationSECTION GROUNDING
SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment
More informationIndianapolis Power & Light Company
Indianapolis Power & Light Company Electric Service and Meter Manual The Electric Service & Meter Manual is not copyrighted and permission is hereby given to reproduce this document. However, the Indianapolis
More informationCompany Replaces previous document Document ID Issue E.ON Elnät Sverige AB Ny engelsk utgåva D
Document type Page Verksamhetsstyrande 1 (5) Company Replaces previous document Document ID Issue E.ON Elnät Sverige AB Ny engelsk utgåva D17-0008968 1.0 Organisation Valid from Valid until Regionnätsaffärer
More informationSECTION CHAIN-LINK FENCES AND GATES 02821/1
SECTION 02821 - CHAIN-LINK FENCES AND GATES 02821/1 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Chain-Link Fences: 2. Gates: horizontal slide or swing. 3. Fences installed where
More information8461C 4SQ, 1"RSD Rndopnw/Ers CVR
3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 4SQ, 1"RSD Rndopnw/Ers CVR Appleton/Oz Gedney Catalog Number Manufacturer Appleton/Oz Gedney Description Steel Square
More informationNP001.4 General Specification for Overhead Rural Residential Subdivisions
NP001.4 General Specification for Overhead Rural Residential Subdivisions This document is extracted from Network Policy NP 001, Design and Construction of Network Assets. Other documents in this series
More informationSpecifications for the Secondary Installation of Communication Equipment on MLGW Transmission Structures
Page 1 of 7 Specifications for the Secondary Installation of Communication Equipment on MLGW Transmission Structures 1. Request and Approval Procedure 1.1. The telecommunications provider Carrier will
More informationProposed Facility Study Report. Project: A380_A383_A415_A414_A413 MISO # F088. Prepared for Midwest ISO
Proposed Facility Study Report Project: A380_A383_A415_A414_A413 MISO # F088 Prepared for Midwest ISO January 15 th, 2010 Great River Energy Contact: Greg Schutte, Project Manager Great River Energy 1
More informationGalvanised Fabricated Metalwork
Joint Workings JTS01-03-01 Technical Specification For Contents 1. Purpose & Scope... 1 1.1 General... 1 2. Applicable Standards... 1 3. Drawings... 2 4. Service Conditions... 2 4.1 Environmental Conditions...
More informationAddendum-2
Office of the (Dist. Special Project Cell) Maharashtra State Electricity Distribution Co. Ltd. Prakashgad, 4th Floor, Station Road, Bandra (East), Mumbai - 400 051. Telephone : (P) 022-2658 2340 (O) 2647
More information1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.
ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 11 00 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationBuilding Attachments and Services
Part Four. Other Electrical Procedures CHAPTER 11 Building Attachments and Services All electrical energy supplied to power-consuming devices and appliances within a building must pass through the electrical
More information(3) 1/2 INCH CONDUIT BOTTOM, (2) 3/4 INCH CONDUIT BOTTOM, (8) 1 INCH CONDUIT SIDES Box
3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 4SD1 4S Box 1"Ko 2-1/8DP Appleton/Oz Gedney Catalog Number 4SD1 Manufacturer Appleton/Oz Gedney Description Steel Square
More informationSECTION GROUNDING AND BONDING
SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and
More informationCONTENTS INSTRUCTIONS. UK POWER NETWORKS LV JOINTING MANUAL I Version Section Index I Page 1
CONTENTS 1 INTRODUCTION 2 JOINTING INSTRUCTIONS 2.1 Conductor Sizes 1 2.2 Comparison of Cable Ratings Based on Cable Type and Size 2 2.3 Jointers Tool Kit 3 2.4 New Harmonised Phase Colours 4 2.4.1 Single-Phase
More informationUNIT RATE ( IN Rs. ) Sl. No ITEM DESCRIPTION QTY UNIT AMOUNT. 80 Nos.
(SECTION : A :- SUPPLY OF EQUIPMENTS/MATERIALS/ITEMS) TENDER NO. BHEL: NR (SCT): BAWANA:11 KV RING MAIN:579 1(A) POLES FOR STRAIGHT RUN / DP STRUCTURE / Four pole structure- Supply of Steel Tubular swaged
More informationDUPLEX INSTALLATION. Customer provides single service lateral attachment point in trough.
DUPLEX INSTALLATION A. GENERAL NOTES: The device shown may be used when the inspection authority having jurisdiction requires the installation of a service disconnecting means adjacent to the meter. MPC
More informationIntroduction to Substation Design TADP 542
Introduction to Substation Design TADP 542 Substation Structures- Introduction Instructor: Dr. Yenumula Prasad Transmission & Distribution Program Substation Structures Reference Substation Structure Design
More informationSERVICES - SERVICE EQUIPMENT- PANELBOARDS
NO: D-E3 101110 1 THIS DIRECTIVE SUPERSEDES DIRECTIVES D-E3 070302 5 & D-E3 070302 6 SERVICES - SERVICE EQUIPMENT- PANELBOARDS This Directive is being issued by a provincial safety manager pursuant to
More informationCONTENTS. B. System Design and Performance Requirements
16060 Grounding and Bonding This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or
More information