Application of Accelerated Bridge Construction for Local Agencies

Size: px
Start display at page:

Download "Application of Accelerated Bridge Construction for Local Agencies"

Transcription

1 Application of Accelerated Bridge Construction for Local Agencies APWA Public Works Conference November 9, 2017 Dorie Mellon Senior Bridge Engineer, Caltrans Matt Randall Senior Engineer, County of Placer

2 Accelerated deployment of innovation that meets customers needs and increase efficiency of project delivery Accelerated Bridge Construction Workgroup: Gary Antonucci - Moffatt & Nichol/ACEC Dorie Mellon - Caltrans - Structure Policy & Innovation Ryan Moore - City of Sacramento Linda Newton - Caltrans - Local Assistance Matt Randall - Placer County

3 Accelerated Bridge Construction (ABC) ABC uses the most efficient combination of innovative planning, design, materials and construction to significantly reduce construction related impacts by reducing the number of onsite construction days and/or minimizing traffic disruption. Minimize Construction Impacts Project Goals & Constraints 3

4 FHWA Every Day Counts (EDC) FHWA set of initiatives to deploy innovation aimed at: Shorten the project delivery process Enhanced roadway safety Reduced congestion Improve environmental sustainability

5 Elements of a Bridge from Foundation to Superstructure ABUTMENT SUPERSTRUCTURE Bent 2 Bent 3 COLUMN BENT CAP Bent 4 Abutment 1 PILING FOOTING Abutment 5 A bridge is a structure that spans an opening greater than 20 feet.

6 Conventional Construction Falsework TYP FW SYSTEM

7 Conventional Construction Reinforcing Steel (Rebar)

8 Conventional Construction Cast-in-Place Concrete

9 ABC Methods Prefabricated Large Bridge Move Slide-In Launch

10 ABC Prefabricated Bridge Elements & Systems Bridge elements are manufactured at an off site facility and assembled at the project location

11 Ultra-high Performance Concrete (UHPC) connections for prefabricated bridge elements PROPERTIES Strong Flexible Durable Excellent Bonding Self Consolidating ADVANTAGES Robust connections Simplified construction Better long term performance 11

12 Slide-In Bridge Construction The new bridge is constructed next to the old bridge and then slid into place overnight or during off peak hours Nevada I-15 Bridge Hartford I-91 Bridge Replacement, Vermont

13 Large Bridge Move Self Propelled Modular Transporters Bridges or large portions of bridges are built off site and moved in to place with self propelled modular transporters (SPMT s) Space Shuttle SPMT move through downtown LA I-215 Highgrove Underpass San Bernardino County 4500 South Bridge, Utah 2007

14 ABC Incremental Launching Bridge superstructure is assembled at one end of the bridge and launched across to the other end of the bridge.

15 Pfeiffer Canyon Bridge Launch

16 ABC Advantage - Time Minimize construction impacts by reducing the amount of construction time. Traffic impacts reduced from years to months and from months to days. Saving time while minimizing headaches for motorists.

17 ABC Advantage - Safety (Fewer Construction Days = Increased Safety) ABC technologies help improve motorist and worker safety by shortening lane restrictions and by performing construction away from traffic. Each year approximately 600 fatal crashes occur in USA work zones. On average 1000 CT vehicles are struck each year.

18 ABC Advantage - Mobility Conventional construction typically leads to heavy congestion and long travel delays ABC dramatically reduces mobility impacts Minimize Lane closures Duration of onsite construction activities Need for detours Realizes savings in user costs to the public Local businesses Transportation of goods Air quality Noise

19 ABC Advantage - Constructability Less sensitive to weather conditions More likely to deliver single season construction Effectively addresses unique and challenging site conditions

20 ABC Advantage - Environment Reduced Environmental Impact Reduced construction time allows scheduling around crucial times for plant growth and animal life. Eliminating falsework keeps construction activities out of the stream. Conduct construction activities offsite Reduce wetland mitigation

21 Cost Considerations ABC can be the most cost effective means of construction when considering total project cost. Maintenance of traffic Project Administration Environmental Compliance Lowered vertical profile Environmental Mitigation 21

22 Case Study: MassDot Fast14 Replaced 14 bridges in 10 weekend closures along Interstate 93 through the city of Medford Project was completed on budget and ahead of schedule The I-93 Fast 14 project proves that America is ready, willing, and able to dream big and build big. US Secretary of Transportation Ray LaHood

23 Case Study: Nevada I-15 Bridge ABC saved $10M and 6 months COST MORE, SAVE MORE As stated by the contractor who proposed the use of ABC: "We knew that ABC would cost more, but we could make up the difference saving on lane rentals, building the crossovers, limiting excavation and reducing time and overhead."

24 San Mateo Bridge Replacement Project 2016 Caltrain track parallel to Route 82 Replace four 100 year old structures over 4 weekends Bridges assembled near the site and moved into place by SPMT during 16 hour track closure

25 Poplar Avenue Improve vertical clearance and road width below bridge Original Structure 1903 Replacement Structure 2016

26 Construction Sequencing Beyond the bridge (typ) Existing Abutment Stage I Activities Stage Complete Stage II IV Activities VI Activities Structure Stage Stage III V Activities Track is raised to final elevation prior to 1. Install Build Roll Install in roll-out crash new bridge. beams temporary and restraining roll-in (not supporting shown) system system where change Lift over temporary (by PCJPB). restraining system. excavation (prior Finish Remove and to backfilling roll change existing out central taking over). bents behind span. and the supporting abutmens system. with soilcement Complete mix. existing roadworks place. 2. All Construct Crane utilities lift existing abutment relocated. end walls. spans Complete Remove footing track. including side walks. construction Place precast Excavate Complete Open to road behind pile trackwork. traffic abutment installation. seat units and secure in the for walls. optimum use. place. 4. Disengage Test run. existing bridge Backfill Open to behind traffic. the abutments with soil-cement mix.

27 Bridge Construction Substructure Strengthening Prior to Track Shutdown Bridge Demolition 5 AM Installation of Abutments 11 AM SPMT bridge move 2 PM 16 Hour Construction Window

28 ABC in California

29 Programmatic Approach ABC Evaluated for Every Bridge Project ABC Decision Making Guidance (2015) Construction Time Environmental User Costs and Delays Site Conditions Risk Management Economy of Scale The evaluation of ABC is triggered during preliminary project development when adjustments to funding, right of way requirements and the environmental document can be accomplished with relative ease.

30 Working Days (ABC vs Conventional) Construction Completion Time (CCT): Estimate of the number of total onsite construction working days required for the bridge construction work. Construction Impact Time (CIT): Estimate of the number of working days that a construction activity will affect a specified impact such as traffic or environmental constraints.

31 Choosing the right ABC solution Early consideration of ABC Identify project goals, constraints, and resources Communicate with stakeholders Do the benefits balance the costs? Improving delivery through Innovation

32 ABC Single Span Programmed Projects Hardscrabble Creek Slide-In Craig Creek Prefabricated North Fork Mill Creek Prefabricated ABC methods delivered: One season construction Significantly reduced environmental impact Minimal traffic disruption Well suited to streambed restoration

33 Fort Goff Creek Bridge Siskiyou County Route 96 Streambed Restoration Project GOALS: Restore Fish Passage Single Season Construction Reduce Environmental Impacts Quality Concrete in Remote Location SOLUTION: Prefabricated Design

34 Fort Goff Construction: Prefabricated Bridge 02-SIS Bridge No

35 Hardscrabble Creek Lateral Slide DN-199 GOAL: Reduce Construction to a Single Season Reduce Traffic Disruption from months to hours SOLUTION: Lateral Slide WHAT SUPPORTED THE SOLUTION?: Room Adjacent to Route for Construction Additional $ for Bridge Construction

36 Caltrans Multi-Span Precast Pilot Projects 2 projects under construction D4 Laurel Street OC D6 Route 46/99 Sep Focus on connections & constructability Gather lessons learned Improve efficiency & reduce risk Educate project development staff, construction staff and contractors 36

37 Laurel Street Overcrossing Pilot Project Vallejo CA, Route 780 Precast columns and cap were set in 3 hours under full night closure of 780

38 Laurel Street Overcrossing Pilot Project Vallejo CA, Route 780 Rapid strength concrete deck. Concrete cures in 4 hours Precast Wide Flange Girders set in 2 nights

39 UHPC connection mock up

40 ABC Impact on Cost CAPITAL & SUPPORT COSTS Maintenance of traffic Wetland mitigation Storm water Contract administration Construction inspection Temporary right of way USER COSTS Traffic delays Access to essential services Impact to local business Air quality Noise Transportation of goods

41 User Cost Consideration CONVENTIONAL METHODS ABC METHODS Lengthy detours and traffic delays Long term frontage business impacts Reduced detours and delays Reduced time of business impact Negative public perception of lengthy construction duration Positive perception of speedy construction Environmental impacts over multiple seasons of construction Reduced environmental impacts due to single season construction (plants, animals, air quality, water quality, noise)

42 Full Road Closure for Work Zone Operations Accelerate construction Cost savings (MOT, more efficient work area) Improve quality (full access to roadway results in higher standards in efficiency and quality) Enhance safety (separate construction activities from through traffic) Increase favorable public sentiment

43 Public Outreach for ABC BENEFITS Traffic avoidance Increased awareness Decreasing impatient behavior Building trust Project buy-in METHODS Signage Project specific websites Local newspaper & radio Social media* Mobile apps* Town hall meetings*

44 Keys to ABC success Embrace Innovation Define project goals Early consideration Total Project Cost Identify user cost benefits Include in initial HBP application when appropriate Communicate with stakeholders

45 ABC Resources FHWA Center for Accelerating Innovation: Every Day Counts STIC Network AID Demonstration Resources FHWA ABC: 2/abc.cfm ABC University Transportation Center: STIC ABC: Coming Soon: AASHTO Guide Specification for ABC

Accelerated Bridge Construction (ABC) National Status

Accelerated Bridge Construction (ABC) National Status Accelerated Bridge Construction (ABC) National Status by Mary Lou Ralls, P.E., Ralls Newman, LLC 88 th Annual Transportation Short Course Texas A&M University College Station, Texas Session: Construction

More information

SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal

SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal FEHRL Long Life Bridges SQUARE (Brussels) Thursday June 10, 2010 Objective RAPID RENEWAL Bridge Systems WHAT IS THE BIG IDEA? Manufactured Bridges

More information

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan

More information

Innovative Bridge Designs in Colorado by Pete Chomsrimake, P.E. ABC Project SME, CDOT Staff Bridge

Innovative Bridge Designs in Colorado by Pete Chomsrimake, P.E. ABC Project SME, CDOT Staff Bridge Innovative Bridge Designs in Colorado by Pete Chomsrimake, P.E. ABC Project SME, CDOT Staff Bridge ABC History in Colorado 1. Promote Using Prefabricated Bridge & CBC Members since Early 1990 (Partnership

More information

Accelerated and Innovative Bridge Construction In Washington State

Accelerated and Innovative Bridge Construction In Washington State Accelerated and Innovative Bridge Construction In Washington State Bijan Khaleghi Bijan.Khaleghi@WSDOT.WA.Gov Washington State Department of Transportation Bridge and Structures Office Olympia Washington

More information

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa 2014 HDR Architecture, 2014 HDR, Inc., all rights reserved. ASCE STRUCTURAL ENGINEERING CONFERENCE Ames Iowa WHAT DO YOU DO IF YOU HAVE MORE PROJECT THAN BUDGET? DESIGN BUILDER SELECTION METHOD Fixed Price

More information

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN

More information

RESILIENT INFRASTRUCTURE June 1 4, 2016

RESILIENT INFRASTRUCTURE June 1 4, 2016 RESILIENT INFRASTRUCTURE June 1 4, 2016 WESTMINSTER DRIVE UNDERPASS ACCELERATED BRIDGE CONSTRUCTION USING GIGO (GET IN-GET OUT) BRIDGE CONCEPT Mark D Andrea, M.Sc., P.Eng. Stantec Consulting Ltd., Canada

More information

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead ABC, FHWA SHRP2 R04: Project update, lessons learned Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead January 11, 2015 Goals for ABC Enhanced Mobility Safety Reduced Costs***

More information

Accelerated Bridge Construction Award

Accelerated Bridge Construction Award Accelerated Bridge Construction Award PBES SR 288 Main Street Bridge Project Wampum Borough, Pennsylvania This is a first for PADOT to incorporate an all precast project built in an accelerated manner

More information

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction

More information

Get In, Get Out, Stay Out!

Get In, Get Out, Stay Out! Get In, Get Out, Stay Out! FHWA Accelerated Bridge Construction Program By Gary Jakovich, P.E. Senior Bridge Engineer, FHWA Virginia Concrete Conference Richmond, VA March 6-7, 2007 Federal Highway Administration

More information

Accelerated Bridge Construction Research, Design and Practice

Accelerated Bridge Construction Research, Design and Practice Accelerated Bridge Construction Research, Design and Practice University it of Buffalo April 2011 Presented by: Presented by: Carmen Swanwick, SE UDOT Chief Structural Engineer Presentation Outline Research

More information

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017 VT 14 East Montpelier Bridge Project Informational Meeting February 22, 2017 Welcome & Introductions VTrans Mark Sargent, Project Manager Wayne Symonds, Structures Program Manager Chris Barker, Resident

More information

Programmatic Implementation of ABC: Module 3 Innovative Contracting and ABC

Programmatic Implementation of ABC: Module 3 Innovative Contracting and ABC Programmatic Implementation of ABC: Module 3 Innovative Contracting and ABC 2 Presentation Outline Construction Manager/General Contractor (CM/GC) and ABC CM/GC Project Highlights Hartford Bridge Replacement

More information

Experiences and Practices: Bridge Moves. Presentation Outline

Experiences and Practices: Bridge Moves. Presentation Outline Experiences and Practices: Bridge Moves Carmen Swanwick, S.E., Chief Structural Engineer Utah Department of Transportation 1 Presentation Outline ABC Implementation Contracting Methods Contract Documents

More information

An Overview of the SIBC Process and Projects. Presented By: Rebecca Nix, SE Michael Arens, SE Michael Baker International February 2015

An Overview of the SIBC Process and Projects. Presented By: Rebecca Nix, SE Michael Arens, SE Michael Baker International February 2015 An Overview of the SIBC Process and Projects Presented By: Rebecca Nix, SE Michael Arens, SE UDOT Michael Baker International February 2015 ABC Development to Standard Practice Procurement Tools to Implement

More information

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure. Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE

More information

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) SPECIAL PROVISION August 31, 2009 PROJECT # S-R399(42) PROJECT # S-R399(59) PIN # 6697/7236 SECTION 03253S BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) Add Section 03253S: PART

More information

Fairfax Bridge Rehabilitation Program - Bridge Preventive Maintenance Program. January 29, 2014

Fairfax Bridge Rehabilitation Program - Bridge Preventive Maintenance Program. January 29, 2014 Fairfax Bridge Rehabilitation Program - Bridge Preventive Maintenance Program - Creek Road Bridge Presented by the Team of January 29, 2014 Bridge Design Process Project team explores both repair and replace

More information

Welcome! Route 1 Viaduct Rehabilitation Project Chelsea Project File No

Welcome! Route 1 Viaduct Rehabilitation Project Chelsea Project File No Welcome! Route 1 Viaduct Rehabilitation Project Chelsea Project File No. 605287 25% Design Public Hearing Chelsea City Hall January 24, 2018 6:30 p.m. Introduction Welcome & Introductions by MassDOT PM

More information

Jeffrey D. Knueppel, P.E. General Manager. Robert L. Lund, Jr., P.E. Assistant General Manager EM&C

Jeffrey D. Knueppel, P.E. General Manager. Robert L. Lund, Jr., P.E. Assistant General Manager EM&C Accelerated Design-Build Replacement of SEPTA s Crum Creek Viaduct Jeffrey D. Knueppel, P.E. General Manager Robert L. Lund, Jr., P.E. Assistant General Manager EM&C Key Presentation Take-Aways NEED TO

More information

BRIDGE CONSTRUCTION APPROACHES

BRIDGE CONSTRUCTION APPROACHES SYNTHESIS ON THE USE OF ACCELERATED BRIDGE CONSTRUCTION APPROACHES FOR BRIDGE REHABILITATION By: Meghan Cronin July 29 th, 2016 Outline 2 Introduction Deck Joints Decks Girders Piers and Columns Abutments

More information

Every Day Counts Market Ready Options

Every Day Counts Market Ready Options Every Day Counts Market Ready Options Every Day Counts (EDC ) is a state-based model to identify and rapidly deploy proven, but underutilized innovations to shorten the project delivery process, enhance

More information

Oatman Highway at Sacramento Wash Crossing Federal Aid No. 000-MMO-0(216)T ADOT Project No MO MMO T C

Oatman Highway at Sacramento Wash Crossing Federal Aid No. 000-MMO-0(216)T ADOT Project No MO MMO T C 87-Hour Bridge Construction in Arizona ABC and ARC at the Speed of Commerce Mohave County (Topock), Arizona Oatman Highway at Sacramento Wash Crossing Federal Aid No. 000-MMO-0(216)T ADOT Project No. 0000

More information

MODULAR STEEL SUPERSTRUCTURES FOR ACCELERATED BRIDGE CONSTRUCTION - IOWA DOT CASE STUDIES

MODULAR STEEL SUPERSTRUCTURES FOR ACCELERATED BRIDGE CONSTRUCTION - IOWA DOT CASE STUDIES MODULAR STEEL SUPERSTRUCTURES FOR ACCELERATED BRIDGE CONSTRUCTION - IOWA DOT CASE STUDIES NORM McDONALD CURTIS CARTER AHMAD ABU-HAWASH BIOGRAPHY Norm McDonald is the director of the Office of Bridges and

More information

SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT. Srdjan Brasic, M.Sc., P.Eng.

SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT. Srdjan Brasic, M.Sc., P.Eng. SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT Srdjan Brasic, M.Sc., P.Eng. UMA Engineering Ltd. Paper prepared for presentation at the Technical

More information

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the

More information

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY Detailing of ABC Bridges for Simplicity and Durability Michael P. Culmo, P.E. CME Associates, Inc. East Hartford, CT DETAILS This presentation contains many preferred details My favorite details will be

More information

Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction

Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction Gregory A. Banks, Myles Parrish, Charles W. Spry WSDOT ABC Workshop April 2015 Project Overview Location Located in Renton, WA PROJECT

More information

ABC Techniques for Rapid Bridge Replacement. Bala Sivakumar HNTB Corporation. Purdue Road School 2017

ABC Techniques for Rapid Bridge Replacement. Bala Sivakumar HNTB Corporation. Purdue Road School 2017 ABC Techniques for Rapid Bridge Replacement Bala Sivakumar 03.08.2017 HNTB Corporation Purdue Road School 2017 Outline Introduction to ABC ABC Technologies Precast Decks SHRP2 ABC Toolkit Implementing

More information

American Society of Civil Engineers

American Society of Civil Engineers American Society of Civil Engineers More than 26%, or one in four, of the nation s bridges are either structurally deficient or functionally obsolete. While some progress has been made in recent years

More information

Grade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc.

Grade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc. Grade Separation Systems Single-Span Rail Bridge Construction Procedure An innovation from art engineering inc. GSS Single-Span Example Shown: An existing railroad grade crossing. Existing railroad Existing

More information

The FHWA Long-Term Bridge Performance Program

The FHWA Long-Term Bridge Performance Program The FHWA Long-Term Bridge Performance Program by John M. Hooks, J. M. Hooks & Associates An ever-growing volume of cars and trucks move people and goods on modern bridges spanning highways and topographical

More information

Steve Haines, P.E., Parsons, (303) , James Studer, Kiewit, (926) ,

Steve Haines, P.E., Parsons, (303) , James Studer, Kiewit, (926) , PLACEMENT OF PRECAST PRESTRESSED CONCRETE GIRDER BRIDGE SPANS WITH SELF PROPELLED MODULAR TRANSPORTERS PIONEER CROSSING DESIGN/BUILD PROJECT, AMERICAN FORK, UT Steve Haines, P.E., Parsons, (303) 831-8100,

More information

Review of Plans and Specs from a Constructability Perspective

Review of Plans and Specs from a Constructability Perspective Review of Plans and Specs from a Constructability Perspective The Executive Regional Manager and the Project Manager, with approval of the Director of Project Management, may request the Constructability

More information

CASE STUDY. Amish Sawmill Bridge: An Innovative Steel Solution for Short Span Bridge Design

CASE STUDY. Amish Sawmill Bridge: An Innovative Steel Solution for Short Span Bridge Design CASE STUDY Amish Sawmill Bridge: An Innovative Steel Solution for Short Span Bridge Design Project Overview Visitors traveling near Fairbank, Iowa take a step back in time as they pass by large farms and

More information

New Development in Accelerated Bridge Design and Construction in WA

New Development in Accelerated Bridge Design and Construction in WA Delivery of Accelerated Bridge Construction WSDOT Workshop Wednesday April 1st, 2015 New Development in Accelerated Bridge Design and Construction in WA Washington State Department of Transportation Bridge

More information

Contractor Experience with Precast Bridge Elements in Utah. Eric Wells. Granite Construction

Contractor Experience with Precast Bridge Elements in Utah. Eric Wells. Granite Construction Contractor Experience with Precast Bridge Elements in Utah Utah DOT s Accelerated Bridge Program Contractor s Perspective Eric Wells Area Manager Granite Construction Eric Wells Granite Construction ABC

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

Cost Implications of Rapid Renewal Projects

Cost Implications of Rapid Renewal Projects Cost Implications of Rapid Renewal Projects Discussion on Total Project Cost Michael P. Culmo VP Transportation and Structures CME Associates, Inc. REALITY In general, bid prices for ABC are higher than

More information

Accelerated Bridge Construction in USA

Accelerated Bridge Construction in USA Accelerated Bridge Construction in USA Abstract Rush hour traffic is a common daily occurrence in the USA. Highway and bridge construction further aggravates the situation. The Federal Highway Administration

More information

Precast Concrete Pavement (R05)

Precast Concrete Pavement (R05) Precast Concrete Pavement (R05) 1 Agenda SHRP2 Overview What is SHRP2? Focus Areas Implementation Assistance Technical Product Description Product Implementation Implementation Timeline Questions Source:

More information

Automated Machine Guidance

Automated Machine Guidance House Select Committee on Strategic Planning and Long Term Funding Solutions October 24, 2016 Automated Machine Guidance Lamar Sylvester, PE State Construction Engineer Automated Machine Guidance (AMG)

More information

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE Keith Donington, P.E. October 2012 1 Sibley Pond - Bridge Elevation 2 Bridge Open to Traffic November 2011 3 Bridge Highlights

More information

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead ABC, FHWA SHRP2 R04: Project update, lessons learned Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead September 9, 2015 Goals for ABC Enhanced Mobility Safety Reduced Costs***

More information

Boeing North Bridge in Washington State

Boeing North Bridge in Washington State Boeing North Bridge in Washington State Gregory A. Banks ABC-UTC Webinar May 2015 Project Overview -Location Located in Renton, WA PROJECT SITE RENTON 2 Project Overview Site Layout Lake Washington Existing

More information

Opens Possibilities by Kevin Harper, California Department of Transportation

Opens Possibilities by Kevin Harper, California Department of Transportation Devil s Slide Opens Possibilities by Kevin Harper, California Department of Transportation The segmental cantilevers of the west bridge (southbound) extend out over the environmentally sensitive valley

More information

Applications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction

Applications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction Applications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction 2018 Virginia Concrete Conference March 2, 2018 Bardia Emami, PE Outline Projects

More information

Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts...

Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts... Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts... LECTURE 13 May 17, 2005 May 17, 2005 1 Where we have been Basics Allowable Stress Ultimate Strength Shear Camber

More information

7 Bridges in 74 Days. NC 12 Detour

7 Bridges in 74 Days. NC 12 Detour 7 Bridges in 74 Days (Or Less) NC 12 Detour Ocracoke NC 12 Bridges Ocracoke NC 12 Bridges Existing 7 bridges built in 1950's Timber structures w/ ACP Clear width 22.5 ft. 36 to 152 ft. long Limited redirective

More information

Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects. Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School

Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects. Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School Presented By: County of El Dorado Community Development Agency Transportation

More information

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your

More information

Russell Street Design STPU M 8105(8) UPN

Russell Street Design STPU M 8105(8) UPN May 24, 2012 MORRISON MAIERLE,INC. Russell Street Design STPU M 8105(8) UPN 4128000 Missoula, Montana Project Understanding Key Project Elements Major urban arterial 1 of 5 river crossings over the Clark

More information

SOUTH MEDFORD INTERCHANGE BRIDGES

SOUTH MEDFORD INTERCHANGE BRIDGES Eleven bridges were required for the project THe I-5 south medford Interchange by Keith Kaufman, Knife River Corporation Northwest and Daniel J. McIntier, formerly with H.W. Lochner Inc. Interstate 5 is

More information

I-70 over SR 121 Bridge Slide Construction and Engineering

I-70 over SR 121 Bridge Slide Construction and Engineering I-70 over SR 121 Bridge Slide Construction and Engineering March 6, 2018 Kevin Gorak, American Structurepoint Pete Jerrell, Walsh Construction Project Overview Project Location I-70 in Richmond, IN Project

More information

West Virginia s First ABC Deck Replacement Project Bill Manuel & Johann Aakre HNTB Corporation

West Virginia s First ABC Deck Replacement Project Bill Manuel & Johann Aakre HNTB Corporation West Virginia s First ABC Deck Replacement Project Bill Manuel & Johann Aakre 10.26.2016 HNTB Corporation Outline Overview of WV TPK Ghent NB Bridge Existing Conditions ABC Deck Replacement Alternatives

More information

PRECAST CONCRETE GIRDER ERECTION

PRECAST CONCRETE GIRDER ERECTION 7.1 Precast Concrete Girder Erection - General Erection of precast concrete girders includes transporting the girders to the site, handling and temporary storage, installing anchor bolts, shear blocks

More information

ACCELERATED BRIDGE CONSTRUCTION IN NEW ZEALAND THE DESIGN PROCEDURE

ACCELERATED BRIDGE CONSTRUCTION IN NEW ZEALAND THE DESIGN PROCEDURE ACCELERATED BRIDGE CONSTRUCTION IN NEW ZEALAND THE DESIGN PROCEDURE JOHN MITCHELL, MEHEDI CHOWDHURY, MICHAEL CHAN, PETER WILES Opus International Consultants Ltd SUMMARY Adopting an Accelerated Bridge

More information

Whittier Bridge/I-95 Improvement Project. Public Information Meeting

Whittier Bridge/I-95 Improvement Project. Public Information Meeting Whittier Bridge/I-95 Improvement Project Public Information Meeting October 23, 2013 Agenda: WHITTIER BRIDGE / I-95 IMPROVEMENT PROJECT Introduce the Design-Build Team Current Project Schedule Design Project

More information

Construction Coordination & Management Planning MassDOT-Highway/MBTA. 495/MetroWest Partnership Briefing July 11, 2018

Construction Coordination & Management Planning MassDOT-Highway/MBTA. 495/MetroWest Partnership Briefing July 11, 2018 Construction Coordination & Management Planning MassDOT-Highway/MBTA 495/MetroWest Partnership Briefing July 11, 2018 Overview The Construction Coordination and Management Planning exercise was a 100-day

More information

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2017 to December 31, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,

More information

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT July 1, 2017 to September 30, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,

More information

Economical Design / Case Studies

Economical Design / Case Studies Economical Design / Case Studies Alabama Technology Transfer Center Workshop Michael Barker, PE University of Wyoming & SSSBA Bridge Technology Center Outline of Today s Presentation Competitiveness of

More information

Lessons Learned Meeting Notes

Lessons Learned Meeting Notes EXTERNAL MEMORANDUM Lessons Learned Meeting Notes Distribution Date: April 24, 2017 Date of Meeting: April 19, 2017 Project: Sacramento Wash Crossing at Oatman Highway TRACS No. T0021 01D Federal Project

More information

PUBLIC INFORMATION MEETING June 24, 2015

PUBLIC INFORMATION MEETING June 24, 2015 Gallows Road (RTE. 650) over Arlington Boulevard (RTE. 50) Fairfax County Bridge Rehabilitation, Preventive Maintenance and Pier Repairs Phase 1 - Project No. 0650-029-235; UPC 106956, Pier Repair Phase

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

Prestressed/Precast Florida-Slab- Beams for Robust Local Bridges and Accelerated Construction

Prestressed/Precast Florida-Slab- Beams for Robust Local Bridges and Accelerated Construction Welcome to Webinar on Accelerated Bridge Construction Prestressed/Precast Florida-Slab- Beams for Robust Local Bridges and Accelerated Construction Sponsored by Accelerated Bridge Construction University

More information

ABC Technology and Steel Bridges

ABC Technology and Steel Bridges ABC Technology and Steel Bridges Accelerated Bridge Construction (ABC) Technologies C. C. Fu, Ph.D., P.E. Director/Research Professor Bridge Engineering Software & Technology (BEST) Center Department of

More information

I-94 Advanced Bridge Replacement

I-94 Advanced Bridge Replacement ScholarWorks at WMU Honors Theses Lee Honors College 12-6-2016 I-94 Advanced Bridge Replacement Saleem Alsharari Western Michigan University, saleem.alsharari@gmail.com Follow this and additional works

More information

MEMORANDUM. From: Moffatt & Nichol. Date: April 3, Subj: Wharf J-10 Evaluation of Structure for EIR Document. M&N File No:

MEMORANDUM. From: Moffatt & Nichol. Date: April 3, Subj: Wharf J-10 Evaluation of Structure for EIR Document. M&N File No: 2001 North Main St, Ste 360, Walnut Creek, CA 94596 Ph: 925-944-5411 ; Fax: 925-944-4732 MEMORANDUM To: Ed Byrne From: Moffatt & Nichol Date: April 3, 2006 Subj: Wharf J-10 Evaluation of Structure for

More information

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION PRELIMINARY DESIGN SUBMISSION REPORT For U.S. Route 130 Over Raccoon Creek Bridge Township of Logan Gloucester County, New Jersey Prepared By: Structural

More information

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199)) 11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363-4210 Fax: (916) 363-4230 M e m o r a n d u m To: Reena Gohil, Environmental Planner Date: May 30, 2017 California Department of

More information

Broadway Grade Separation Study. Palo Alto Rail Committee Meeting November 29, 2017

Broadway Grade Separation Study. Palo Alto Rail Committee Meeting November 29, 2017 Palo Alto Rail Committee Meeting November 29, 2017 Slide 1 Project Area Millbrae Station City Limits Existing Railroad Crossing at Broadway Caltrain Operational Constraint Major Constraints Millbrae Station

More information

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION Vireak Hinh, P.Eng. R.V. Anderson Associates Ltd., Toronto, Canada Jennifer Trimble Region of Halton, Oakville, Canada

More information

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Washington State s Skagit River Bridge Emergency Slide Bijan Khaleghi

More information

LRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE. Mark S. Mahan 1

LRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE. Mark S. Mahan 1 LRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE Mark S. Mahan 1 Abstract The newly approved AASHTO Guide Specification for LRFD Seismic Bridge Design (referred to as LRFD Seismic Guide Spec), July 2007,

More information

Carpinteria Avenue Bridge Replacement Project Description Introduction

Carpinteria Avenue Bridge Replacement Project Description Introduction Carpinteria Avenue Bridge Replacement Project Description Introduction The City of Carpinteria is proposing to replace the existing Carpinteria Avenue Bridge over Carpinteria Creek (Br. No. 51C 0172) with

More information

Short Span Steel Bridges

Short Span Steel Bridges Short Span Steel Bridges MINK 2015 Michael Barker, PE University of Wyoming & SSSBA Bridge Technology Center Outline of Today s Presentation SSSBA & espan140 Design Competitiveness of Steel Bridges Economics

More information

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE G. Keith Donington, PE, Parsons Brinckerhoff, Manchester, NH Hany L. Riad, PhD, PE, Parsons Brinckerhoff, Boston, MA

More information

COUNTY ENGINEERS ASSOCIATION OF MARYLAND SPRING 2016 CONFERENCE. Conference Center at the Maritime Institute Anne Arundel County, Maryland

COUNTY ENGINEERS ASSOCIATION OF MARYLAND SPRING 2016 CONFERENCE. Conference Center at the Maritime Institute Anne Arundel County, Maryland COUNTY ENGINEERS ASSOCIATION OF MARYLAND SPRING 2016 CONFERENCE Conference Center at the Maritime Institute Anne Arundel County, Maryland Thursday, April 28, 2016 Two bridges in Two Months - Accelerated

More information

2009 Domestic Scan of Accelerated Construction Practices

2009 Domestic Scan of Accelerated Construction Practices 2009 Domestic Scan of Accelerated Construction Practices Objective Agencies are seeking ways to accelerate project delivery. You hear about: Get in, Get out, and Stay Out. The scan focus was on how to

More information

ABC MODULAR BRIDGE DEMONSTRATION PROJECT DESIGN AND CONSTRUCTION

ABC MODULAR BRIDGE DEMONSTRATION PROJECT DESIGN AND CONSTRUCTION ABC MODULAR BRIDGE DEMONSTRATION PROJECT DESIGN AND CONSTRUCTION Michael D. LaViolette, PE, HNTB Corporation, Omaha, NE David Evans, PE, Iowa Department of Transportation, Ames, IA James Nelson, PE, Iowa

More information

ABC in Nevada PBES/ABC Practices in Nevada Past, Present and Future. Nevada Department of Transportation

ABC in Nevada PBES/ABC Practices in Nevada Past, Present and Future. Nevada Department of Transportation ABC in Nevada PBES/ABC Practices in Nevada Past, Present and Future Nevada Department of Transportation Mark Elicegui, Chief Structures Engineer Troy Martin, Asst. Chief Structures Engineer - Design May

More information

Michael Lewis Director, Rhode Island Department of Transportation

Michael Lewis Director, Rhode Island Department of Transportation Michael Lewis Director, Rhode Island Department of Transportation AASHTO Subcommittee on Construction August 14, 2013 Today s Session Rhode Island s Engagement in the Implementation Assistance Program

More information

In Service Replacement of Box Girder Bottom Slab

In Service Replacement of Box Girder Bottom Slab In Service Replacement of Box Girder Bottom Slab WSDOT Bridge No. 5/537S - Span 11 Craig R. Boone, P.E., S.E. Lynn Peterson Secretary of Transportation 2015 Western Bridge Engineers Seminar Reno, Nevada

More information

STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE

STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE Code Pre/Route AFE Function Part 0 1000 7116 1174 N Hadley Eisenbeisz Bridge Construction Engineer Rick Brandner Mitchell Area Darrell utter Assistant

More information

Presenter: Contributing Authors: Guy C. Nelson PE, SE TEG Engineering, LLC Structural Engineer

Presenter: Contributing Authors: Guy C. Nelson PE, SE TEG Engineering, LLC Structural Engineer Presenter: Guy C. Nelson PE, SE TEG Engineering, LLC Structural Engineer Contributing Authors: Bill Hazelton St. Clair County Road Commission Director of Engineering Dewayne Rogers St. Clair County Road

More information

Maryland Transportation Authority (MDTA)

Maryland Transportation Authority (MDTA) Maryland Transportation Authority (MDTA) I-95 Major Deck and Superstructure Rehabilitation South of the Fort McHenry Tunnel Northeast Bridge Preservation Partnership Conference September 20, 2016 David

More information

STRUCTURAL CONCRETE - LIGHTWEIGHT

STRUCTURAL CONCRETE - LIGHTWEIGHT SPECIAL PROVISION May 27, 2010 Add Section 03312: PROJECT #MP-I15-6(178)245 PIN #7037 SECTION 03312S STRUCTURAL CONCRETE - LIGHTWEIGHT PART 1 GENERAL 1.1 SECTION INCLUDES A. Materials and procedures for

More information

March 24, 2015; 11:00am-noon (MST)

March 24, 2015; 11:00am-noon (MST) March 24, 2015; 11:00am-noon (MST) Today s Agenda: >Welcome/Overview (~5 min.) >Owner/Policy Maker Perspective Presentation (~40 min.) >Questions & Answers (~15 min.) >Next Steps (~3 min.) TARGET AUDIENCE:

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update July 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The entails the construction of a cast in place

More information

Town of Moraga Canyon Road Bridge Replacement Project October 10, 2018 Town Council Presentation

Town of Moraga Canyon Road Bridge Replacement Project October 10, 2018 Town Council Presentation Town of Moraga Canyon Road Bridge Replacement Project October 10, 2018 Town Council Presentation OVERVIEW History of Events 2018 Bridge Redesign Construction Schedule 2 ACRONYMS AND TERMINOLOGY FHWA =

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2013 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

SEGMENTAL CONTRUCTION IN THE INNER CITY: THE BQE CONNECTOR RAMP TO WILLIAMSBURG BRIDGE

SEGMENTAL CONTRUCTION IN THE INNER CITY: THE BQE CONNECTOR RAMP TO WILLIAMSBURG BRIDGE SEGMENTAL CONTRUCTION IN THE INNER CITY: THE BQE CONNECTOR RAMP TO WILLIAMSBURG BRIDGE Paul Gauvreau University of Toronto, Canada (formerly J. Muller International) Thomas E. Kelly, Jr. Earth Tech/J.

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update September 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: September

More information

Railway Bridge: Design and Detailing for Construction

Railway Bridge: Design and Detailing for Construction Railway Bridge: Design and Detailing for Construction R. A. Presland 1, D. A. Fleming 1, M. A. Callaghan 1, R. J. T. Park 1 and W.R. Rushbrook 2 Abstract Holmes Consulting Group have been involved in a

More information

ACCELERATED BRIDGE CONSTRUCTION: TECHNIQUES. Kevin Pruski TxDOT Bridge Division 2018 Transportation Planning Conference

ACCELERATED BRIDGE CONSTRUCTION: TECHNIQUES. Kevin Pruski TxDOT Bridge Division 2018 Transportation Planning Conference ACCELERATED BRIDGE CONSTRUCTION: TECHNIQUES Kevin Pruski TxDOT Bridge Division 2018 Transportation Planning Conference 2018 TxDOT Transportation Planning Conference June 7, 2018 ine (ABC Accelerated Bridge

More information

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center Traffic Management Guide to Concrete Overlay Solutions December 5, 2014 ACPA Annual Meeting Dale S. Harrington P.E. Representing CP Tech Center Traffic Management- Concrete Overlays Traffic Management

More information

Contract Administration Section

Contract Administration Section Contract Administration Section 1 Challenges 25,000+ bridges statewide PENNDOT S BRIDGE PROGRAM Currently at 3,200 structurally deficient bridges Approximately 300 bridges become structurally deficient

More information