1

2

3 PART 1 - GENERAL 1.01 SCOPE The work covered by this section shall include furnishing and/or installation of all electrical and instrumentation equipment and necessary wiring systems required to provide the Owner with a complete and operating system and shall consist of the following basic items of work: A. Main Circuit Breaker B. Manual Transfer Switch C. Pump Control Panels D. Disconnect Switches E. Magnetic Flow Meter and Accessories F. Gauge pressure indicating transmitters G. Conduit and Fittings H. Low Voltage Wire, 600V Wire I. Area Lighting J. Grounding System K. Racks and Supports L. Junction Boxes M. Duct Lines and Pull Boxes The power supplied by Entergy to the Pleasure Bend site is 240VAC, single phase, Delta service. PART 2 PRODUCTS 2.01 MAIN CIRCUIT BREAKER The Contractor shall furnish and install a main circuit breaker as specified below, and as shown on the drawings. A. 2 pole THERMO MAGNETIC B. 240 volts C. Amp rating as shown on drawings D. NEMA 3R painted steel enclosure E. NON-ELECTRONIC TRIP F. Service entrance rated circuits EES-PB docx 16020A-1

4 2.02 MANUAL TRANSFER SWITCH The Contractor shall furnish and install a manual transfer switch as specified below, and as shown on the drawings. A. Non fused B. 2 pole double throw C. 240 volts D. Amp rating as shown on drawings E. NEMA 3R painted steel enclosure F. Center off position G. Heavy duty HP rated for motor H. Cutler Hammer DTxxxURK, Siemens DTNFxxxR or approved equal I. Install a Quick Connect Tap Box, Trystar GDS-02-S or equivalent for a portable generator connection Do not submit general duty switches or those that are not rated for the total HP connected PUMP CONTROL PANELS The Contractor shall furnish and install new control panels with automatic controls as specified in these specifications, and as shown on the drawings. Unless more stringent requirements are required in other sections or articles of these specifications, all control panels shall be manufactured by an Underwriters Laboratory (UL) Certified 508A panel manufacturer. Provide UL Certification number with submittals. A. General: Panel shall enclose and be wired for all motor branch components, circuit breakers, switches, pilot lights, relays, and other AC and DC control components as shown on diagrams and as required to perform functions as described in this and other sections of the specifications. Terminal strips shall be provided for connection of all external wiring. Terminal strips shall be heavy-duty types with barriers between points. Nameplates shall have white letters on black laminated phenolic plastic background glued to enclosure. Each enclosure, including RTU enclosures (if used) shall be protected with Hoffman or equal corrosion inhibitors. Control equipment shall be Allen Bradley, Cutler Hammer, ABB, SQ.D or equal as follows: 1. Push Buttons Flush Button, Momentary Contact 2. Selector Switches Standard Operator, Maintained Contact 3. Toggle Switches Maintained Contact 4. Pilot Lights Direct or Transformer Type Push to Test or LED Each panel shall be furnished with the following spare parts: 1. Two (2) of each size control and power fuses 2. Six (6) of each size indication lights 3. One (1) of each size control transformer EES-PB docx 16020A-2

5 Deliver spare parts to Owner, have Owner sign for them and supply copy of document to the Engineer. B. Panel: The following operation description is basic and the minimum required. Contractor shall coordinate all panel work with other vendor s equipment to which they interface or control and provide all necessary components such that operation is as desired and recommended by the other vendors. Provide auxiliary contacts and analog outputs wired to terminal strips as shown on drawings to interface with PLC and other equipment if specified. All electrical devices shall be finger safe or have finger safe covers to prevent incidental contact with energized components while troubleshooting an energized panel. Panels shall consist of the following: 1. NEMA 3, fiberglass enclosure with 3 point or ¼ turn latches. 2. Circuit breaker (thermal magnetic) for each pump with shunt trip to trip on soft start failure. 3. Main distribution block for incoming cables sized as shown on the drawings. 4. Lightning arrester. 5. Hand-Off- Auto switch 6. Elapsed time meter. 7. Auxiliary relays as required 8. Terminals for connection of all external devices. Only one external wire will be allowed in each terminal. 9. Soft start starter with loss of phase and overload protection for each motor ABB PST series or equal with an SCR in each phase. 10. NEMA rated bypass contactor with overloads 11. Phase monitor operational only when in bypass mode. 12. SOFT START BYPASS selector switch 13. Control Power Transformer (CPT) with 3 fuses 14. Prelube circuit, if required, that will energize a solenoid valve for 1 minute before the motor starts and de-energize it 1 minute after the motor starts. Both times shall be adjustable. Control Panel RO: Panel controls RO Unit pumps and is provided pre-wired by the RO vendor. Contractor shall install power and control wiring to panel. See project drawings for panel location. Control Panel WCP: Panel controls a Water Well pump. Mount all controls and indicators on an inner swing-out panel. No devices shall be mounted on the control panel front door. See project drawings for panel location. EES-PB docx 16020A-3

6 Operation: In AUTO mode, motor will start on low Ground Storage tank level and stop on high Ground Storage tank level. In MANUAL mode, motor will run continuously, regardless of tank level. In OFF mode, motor will not run. Level signal will come from LT-001, level sensor installed on the Ground Storage tank. Control Panel HSCP: Panel controls High Service pumps and is provided pre-wired on a skid by the HSCP vendor. Contractor shall install power and control wiring to panel. See project drawings for panel location. Operation: In AUTO mode, motor will start on low pressure and stop on high pressure. In MANUAL mode, motor will run continuously, regardless of header pressure. In OFF mode, motor will not run. Pressure signal will come from PT-003, installed on water distribution header. Control Panel BCP: Panel controls Blower pump. Mount all controls and indicators on an inner swing-out panel. No devices shall be mounted on the control panel front door. See project drawings for panel location. Operation: In AUTO mode, motor will operate off of a timer. In MANUAL mode, motor will run continuously. In OFF mode, motor will not run DISCONNECT SWITCHES The Contractor shall furnish and install disconnect switches if and as shown and as sized on the drawings. Switches shall be heavy duty, and horse power rated for the load applied in accordance with NEC. Unless indicated otherwise, all disconnect switches shall be nonfused. Enclosures shall have a hinged door. Switches shall be stainless steel. Switches shall be located in site of and within 50 feet of the load MAGNETIC FLOW METERS AND ACCESSORIES The contractor shall furnish and install all flow meter equipment as shown on the drawings and as specified herein and as required to provide a complete and operational system. A. Magnetic flow meters shall be as follows: The Contractor shall furnish and install all instrumentation equipment as shown on the drawings and as specified herein and as required to provide a complete and operational system. The flow sensor tube shall be made of stainless steel with carbon steel or stainless steel flanges pressure rated as required for the piping system as specified in other sections of the specifications. A wafer style sensor will not be acceptable. The flow sensor shall be to NEMA 6 (IP-68) suitable for permanent submersion to 30 feet. The signal converter shall translate the signal induced in the flow sensor into proportional analog output. There EES-PB docx 16020A-4

7 shall also be provided a digital indicator representing actual flow and total flow. The converter shall be capable of remote mounting. Integral converters are not acceptable. The signal converter shall have automatic zero stability and built-in zero, span, and calibration check circuitry. There shall be no need for external calibration devices. The flow range shall be digitally adjustable from 0-33 fps with a 1/100th resolution. The output signal shall represent the true volumetric flow with a maximum error under application conditions not only under reference or laboratory calibration conditions. Accuracy: ±0.5% of reading for flows 1.0 fps 33 fps. The converter shall have bi-directional flow capability and provide isolated 4-20 ma and scaleable pulse frequency outputs from separate terminals. A reverse flow indicator shall be provided. The signal converter shall be user friendly. No programming knowledge shall be required for its operation. The enclosure shall meet NEMA 4X and IP65 standards. Furnish and install grounding rings where they are required or necessary for proper operation of the system such as where they are used in non-conductive piping or non-conductive piping lining systems. The contractor and vendor shall identify these locations and submit the ring drawings and installation instructions with flow meter submittals. Units and all accessories shall be rated for outdoor service with UV exposure. Transmitters should have a dual compartment housing with the terminal block isolated from the electronics compartment. B. Approved units are as follows: 1. ABB or Rosemount with hard rubber liner and external transmitter or approved equal. C. Magnetic flow meter shall be guaranteed for a period of 3 years after placing into operation. Flow range shall be as shown below, recommended sizing is provided below, Contractor to verify meter sizing. In no case shall a meter smaller than 2 be installed. Contractor shall notify engineer if velocity falls below 0.2 in./s. TAG RECOMMENDED SIZE MFM MFM MFM GAUGE PRESSURE INDICATING TRANSMITTERS A. Gauge pressure transmitters shall be of the piezoresistive type with a process-isolated diaphragm with silicone oil fill, microprocessor-based smart electronics, and a field adjustable rangeability of 20:1 input range. Span and zero shall be continuously adjustable externally over the entire range. Span and zero adjustments shall be capable of being disabled internally. Transmitters shall be NEMA 4X weatherproof and corrosion resistant construction with low-copper aluminum body and 316 stainless steel process wetted parts. Accuracy, including nonlinearity, hysteresis and repeatability errors shall be plus or minus 0.1 percent of calibrated span, zero based. The maximum zero elevation and maximum zero suppression shall be adjustable to anywhere within sensor limits. Output shall be linear isolated 4-20 milliamperes 24 VDC. Power supply shall be 24 VDC, two-wire design. Each transmitter shall be furnished with a 5-digit LCD indicator capable of displaying engineering EES-PB docx 16020A-5

8 units and/or milliamps and mounting hardware as required. Overload capacity shall be rated at a minimum of 25 MPa. Environmental limits shall be -40 to 185 degrees Fahrenheit at 0-100% relative humidity. Each transmitter shall have a stainless-steel tag with a calibration data attached to body. B. The piezoresistive silicon pressure sensor shall be mechanically, electrically, and thermally isolated from the process and the environment, shall include an integral temperature compensation sensor, and shall provide a digital signal to the transmitter s electronics for further processing. Factory set correction coefficients shall be stored in the sensor s non-volatile memory for correction and linearization of the sensor output in the electronics section. The electronics section shall correct the digital signal from the sensor and convert it into a 4-20mA analog signal for transmission to receiving devices. The electronics section shall contain configuration parameters and diagnostic data in non-volatile EEPROM memory and shall be capable of communicating, via a digital signal superimposed on the 4-20 ma output signal, with a remote interface device. Output signal damping shall be provided, with an adjustable time constant of 0-36 seconds. Total Long Term Stability (Frequency of Calibration) shall be no less than 0.10% of URL for 1 year. C. Where scheduled, gauge pressure indicating transmitters shall be calibrated in feet of liquid for liquid level service. D. Gauge pressure indicating transmitters shall be Model 2088 as manufactured by Rosemount, or approved equal CONDUIT AND FITTINGS The Contractor shall furnish and install all conduit as shown on the drawings and as required. All conduit on this Project shall be of the following types: A. Underground Schedule 40 PVC U.L. listed for direct burial. Bury at a depth of 2-0. Install electrical warning tape above conduit 12 above conduit. B. Aboveground Rigid aluminum. C. Chlorine Building - Schedule 40 PVC pipe. Support with all non-corrosive PVC, fiberglass or stainless steel materials. Support at intervals that will produce no discernable sagging D. Hardware and boxes - All non-corrosive hardware and materials shall be utilized in this project. All switch and receptacle boxes shall be cast.600 VOLT WIRE The Contractor shall furnish and install all 600-volt wire as shown on the drawings and as required. Wire is specified in the General Specifications for Electrical Installation of these Specifications AREA LIGHTING EES-PB docx 16020A-6

9 Furnish and install the lights as shown on the drawings. Lights shall be provided with both a photocell and switch GROUNDING The Contractor shall furnish and install a complete grounding system to provide a safe operating environment. Provide ground wire to metal building HEAT TRACE EQUIPMENT The Contractor shall install heat tracing and insulation on the prelube line. Heat trace cable shall be standard plug-in cable. Insulate with split tube insulation and tape with aluminum tape to keep water out. Owner will plug in the cable every winter. Receptacle cover shall be metallic rated for continuous use MONITORING SYSTEM The RO Unit shall be monitored remotely from an existing Water Plant control system. Configuration of the existing control system to allow monitoring of the RO Unit, HMI screen development, and system testing shall be provided by others. The system will consist of inputs from field instrumentation, listed below. A. RO Unit PLC I/O The RO Unit PLC shall be interfaced to a monitoring system. Pressure, level, and pump status will be monitored. The following instrumentation shall be interfaced to the RO Unit PLC: MFM 1 Well Pump Flow MFM 2 Water Well By Pass to Ground Storage Tank Flow MFM 3 - Distribution System Effluent Flow and Pressure (PT-003) Differential Pressure in the RO Treatment Unit Ground Storage Tank Levels High Service Pump No. 1 Running High Service Pump No. 2 Running Chlorine Alarm Tank Level Alarm EES-PB docx 16020A-7

10 PART 3 - EXECUTION 3.01 SUBMITTALS Submittal data shall include, but not be limited to the following requirements: A. Complete materials list and items proposed to be furnished and installed. B. Enclosure dimensions, materials of construction and NEMA ratings. C. A description of operation for the control system. D. Circuit Breaker Interrupting Ratings E. All electrical drawings so that the system can be checked for compatibility with other systems to which it interfaces. F. One drawing entitled External Wiring Interface. It shall clearly identify all terminal strips including physical location and terminal numbers and shall also show external wiring and function. Any submittals that are not complete, causes the Engineer to ponder, or where it is obvious that no effort was made to properly prepare them for easy checking by the Engineer will be rejected in their entirety. Submittals sent to Engineer for processing that require information on equipment that has not been previously submitted for approval may or may not be reviewed before dependent submittals are sent. An example would be motor starter submittals sent before actual motor nameplate data is submitted on the motors that they are to control SUBSTITUTIONS On any proposed substitute to the specified item, it shall be the responsibility of the contractor to show proof to the Engineer, that the proposed substitute is equal to the specified item by making written evaluation comparisons on material, performance, workmanship, maintenance features, energy use, durability, appearance, and the effect on compatibility with the other elements of the system with which the item will be used. All changes required in the wiring and other electrical modifications shall be the responsibility of the contractor GUARANTEE All equipment shall be guaranteed against defects in material and workmanship for a period of one year from date of Owner s final inspection and acceptance, except equipment specifically indicated in these specifications as having an extended warranty period, to the effect that any defective equipment shall be repaired or replaced without cost or obligation to the Owner COORDINATION WITH FACTORY SERVICEMAN The Contractor shall coordinate his work with the factory serviceman of the various vendors and shall provide whatever assistance is necessary to place the entire system in operation. EES-PB docx 16020A-8

11 3.05 COORDINATION WITH THE POWER COMPANY All work on the service entrance from weatherhead or pad mounted transformer to utilization equipment shall be per local power company requirements. Where there is conflict with plans and specifications with the power company requirements, the power company requirements shall govern. The contractor shall notify the engineer in advance of making a change for the Engineer s approval. In some instances, larger wire and conduit sizes may be required. The Contractor shall anticipate this requirement and include it in the bid price. The Contractor shall coordinate all work with the local power company including scheduling and applying for service, furnishing, and/or installing all metering equipment and installing all service entrance weatherheads at elevation as required by power company and NEC. Seal all conduits entering panels with duct seal where it is possible that water or moisture shown on drawings or indicated in these specifications). Utilize weather heads for all overhead service wire entering conduit. Where service conduit is installed by power company, the Contractor shall furnish a properly sized weather head to the power company to prevent water from entering any panel in which it terminates. The Contractor shall furnish and install any terminal boxes as may be required by the power company OTHER PROVISIONS Mechanical and other systems specified and furnished under other sections of these specifications that contain electrical systems shall be connected, wired, and tested by the Contractor in accordance with the drawings or as required by the manufacturer for a complete and operating system. Electrical wire and conduit schedules, and interconnection drawings are prepared by the engineer to assist the Electrical Contractors in estimating the cost of the project and are based on the latest information available from the vendors at the time of design. Once shop drawings are received, changes may be required on the project external wiring to accommodate their latest design and to make the system function properly. Conduit sizes shown are to be the minimum sizes utilized. Verify that the selected wire and cable will meet the NEC if installed in these conduits; otherwise increase conduit sizes as required. It shall be the contractor s responsibility to check with the various vendors before bidding the project and to include monies in his bid to accommodate these requirements since no changes to the contract price will be allowed for these changes. Also, certain items of equipment shown on drawings that are to be furnished by a specific vendor may actually be furnished by another or equal vendor. Wiring changes required by this action shall be done at no additional cost and must be approved by the Engineer. EES-PB docx 16020A-9

12 Where there are conflicts between various sections of the electrical specifications and/or drawings and/or other sections of the specifications, then the more stringent wording for a particular product, material, item of work or guarantee shall apply unless approved otherwise by the Engineer. Should a discrepancy occur, notify the Engineer before proceeding. Provide a 4 high housekeeping curb beneath all free standing electrical equipment. Provide with 6 horizontal clearance all around. The electrical drawings show the general locations of the equipment. The Contractor shall refer to the mechanical and civil drawings to obtain more accurate and the latest location of the equipment as well as to scale the drawings for distances. Should the Contractor deem that a manhole or pull box is required to pull wires and cables then he shall install as shown on the drawings or, if not on drawings, provide a drawing of the proposed installation that meets the requirements of the NEC for the Engineer s approval. Installation shall be at no additional cost to the owner. All conduit entrances into NEMA 3R, 4, and 4X panels shall be made using Meyer (or equal) hubs with approve gaskets. No penetration into the top of this type of enclosure will be allowed. Utilize silicon sealant on conduits that exit chlorine areas to prevent gas travel down conduit. The electrical drawings and specifications contain a design in accordance with the National Electrical Code. Some pump and/or motor manufacturers have additional requirements. The Contractor shall provide all additional electrical devices, equipment, and materials as necessary for any particular manufacturer of equipment supplied on the project to maintain the warranty specified in the plans and specifications. Any changes and/or additions shall be reviewed by the Engineer for conformity with the NEC at the time of shop drawing review. Any and all costs associated with these changes and modifications shall be included in the bid price. EES-PB docx 16020A-10

13 3.07 LIST OF SUBMITTALS REQUIRED FOR E & I REVIEW The following is a list of submittals that are to be submitted on this project. This list may or may not be complete but is to be used as a guide in preparation of the submittal packages. It in no way shall be construed to identify the only equipment or level of submittal details to be furnished in this project. A. All Control Panels and Accessories B. Main Circuit Breaker C. Light Fixture D. Manual Transfer Switch E. MPZ F. Junction Boxes G. 600 Volt Wire H. Conduit I. Conduit Fittings J. Motors K. Any other electrical equipment and devices L. Instrument Installation and Operations Manual M. Instrument Cut Sheets Contractors are cautioned to read and supply to all of his vendors other articles in the electrical sections of the specifications relative to submittals. END OF SECTION EES-PB docx 16020A-11

14

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and

More information

FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR

FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR Section 083713- Four Fold Doors- With Single Overhead Mounted Operator Part 1-General 1.1 Related Document: A. Drawing and general provisions of contract,

More information

SECTION SLUDGE HOLDING TANK DECANTER PUMP

SECTION SLUDGE HOLDING TANK DECANTER PUMP PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor and equipment to put into service the Sludge Holding Tank Decanter Pumping System in accordance with the

More information

Shur-Shot X-Proof Hydrogen Fluoride Alarm Operations Manual

Shur-Shot X-Proof Hydrogen Fluoride Alarm Operations Manual Shur-Shot X-Proof Hydrogen Fluoride Alarm Operations Manual P/N 1000006053 Rev E $7%$QDO\WLFV// //& 733 Dairy Rd. Parkton, Md. 21120 www.atbanalytics.com (410) 733-6365 Table of Contents Chapter 1: Getting

More information

Section ARMORED MEDIUM VOLTAGE CABLES SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR

Section ARMORED MEDIUM VOLTAGE CABLES SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR PART 1 - GENERAL Section 26 05 15 SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR 1.1 Cable shall be 15 kv, shielded, three conductor with ground, stranded copper, with continuously welded and corrugated

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

A. Product Data shall be provided for each type of product indicated.

A. Product Data shall be provided for each type of product indicated. 32 31 13 CHAIN LINK FENCES AND GATES SECTION 1 GENERAL 1.1 SUMMARY This Section includes the following: 1. Chain Link Fences 2. Gates for Chain Link Fences. See electrical specifications for electrical

More information

ELECTRIC METERING GENERAL

ELECTRIC METERING GENERAL 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 EQUIPMENT 5.0 METER REQUIREMENTS 6.0 METER FACILITIES 7.0 ELECTRICAL CONNECTIONS 2.0 SCOPE This guide covers general requirements and codes for

More information

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the

More information

(Condensed from National Electric Code)

(Condensed from National Electric Code) WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less)

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less) SECTION 260523 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less) PART 1 - GENERAL 1.1 SUMMARY A. Related Documents: 1. Drawings and general provisions of the Subcontract apply

More information

Standard of Practice - Campus Electrical Distribution System

Standard of Practice - Campus Electrical Distribution System A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all

More information

Rosemount 1152 Alphaline Nuclear Pressure Transmitter

Rosemount 1152 Alphaline Nuclear Pressure Transmitter Product Data Sheet 00813-0100-4235 Rev BA Rosemount 1152 Rosemount 1152 Alphaline Nuclear Pressure Transmitter INDUSTRY LEADING PERFORMANCE Qualified per IEEE Std 323-1971 and IEEE Std 344-1975 Mild environment

More information

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how? SECTION 08360 SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Glazed Aluminum

More information

Series Sump and Sewage Systems

Series Sump and Sewage Systems Series 000 Sump and Sewage Systems file no: 0. date: may 17, 13 supersedes: 0. date: march 29, 13 Series 000 Sump Series 0 & 2 Armstrong offers a complete range of high performance, easily maintained Column

More information

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification. SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,

More information

ARRANGEMENT AND WORKING OF MULTIPORT FLOW SELECTOR VALVE IN PRODUCTION MANIFOLD:

ARRANGEMENT AND WORKING OF MULTIPORT FLOW SELECTOR VALVE IN PRODUCTION MANIFOLD: GENERAL DESCRIPTION Crude oil well test manifold to be provide as Multiport Flow Selector (MPFS) technology. It provides a cost effective method for selecting and diverting well fluids from an individual

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

Member Service Electric Wiring Guidelines

Member Service Electric Wiring Guidelines Member Service Electric Wiring Guidelines Table of Contents A. Definitions... 2 B. Member Service Wiring Guidelines... 2 C: Meter located on the house from an underground source - pad transformer or j-box....

More information

AS950 ALL-WEATHER REFRIGERATED SAMPLER

AS950 ALL-WEATHER REFRIGERATED SAMPLER AS950 ALL-WEATHER REFRIGERATED SAMPLER Applications Wastewater Collection systems Industrial pretreatment Environmental monitoring Stormwater Sampling has never been this easy. Hach's AS950 sampler controller

More information

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS PART 1 GENERAL 1.01 DESCRIPTION A. General 1. Furnish SST-II Hydraulic Bi-Fold System complete from one manufacturer. Provide all labor, materials, tools and equipment to furnish the SST-II Bi-Fold System

More information

Precision Automatic Vacuum Control (PAVC+)

Precision Automatic Vacuum Control (PAVC+) USER GUIDE UGE105-1216 www.conairgroup.com Precision Automatic Vacuum Control (PAVC+) Corporate Office: 724.584.5500 l Instant Access 24/7 (Parts and Service): 800.458.1960 l Parts and Service: 814.437.6861

More information

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES SECONDARY Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-

More information

PIP PCEPA003 Process Analyzer System Field Installation Guidelines

PIP PCEPA003 Process Analyzer System Field Installation Guidelines January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

GENERAL PROVISIONS: Furnish and install one steel deck platform motor truck scale and associated electronic controls.

GENERAL PROVISIONS: Furnish and install one steel deck platform motor truck scale and associated electronic controls. GENERAL PROVISIONS: Furnish and install one steel deck platform motor truck scale and associated electronic controls. The scale shall have a clear and unobstructed weighing surface of not less than 70

More information

ELVORON LU/LA ELEVATOR

ELVORON LU/LA ELEVATOR Creating An Accessible World ELVORON LU/LA ELEVATOR DESIGN AND PLANNING GUIDE www.garaventalift.com Please note: Dimensions provided in this Guide are for REFERENCE ONLY and should not be used for site

More information

AQUAROBIC MINI-PLANT TM

AQUAROBIC MINI-PLANT TM AQUAROBIC MINI-PLANT TM Process Description The Mini-Plant TM is a Sequential Batch Reactor (SBR) system, controlled by a factory set programmer that regulates aeration, settling, and pump functions. The

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 48-05 Van Dam Street Long Island City, NY 11101 ELECTRIC METER SHOP DEPARTMENT METER ENGINEERING SPECIFICATION MES-350 REVISION 3 June 2016 EFFECTIVE DATE

More information

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

B. Provide liquid-filled secondary substation transformers as indicated on drawings. SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED

More information

Telecommunication Spaces

Telecommunication Spaces Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137

More information

Unit Substation Transformer Construction Checklist (under 500 kva)

Unit Substation Transformer Construction Checklist (under 500 kva) Unit Substation Transformer Checklist (under 500 kva) Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.

More information

G. UNDERWRITERS LABORATORY, INC.: 1. UL 325: Electrical Door, Drapery, Gate, Louver, and Window Operators and Systems

G. UNDERWRITERS LABORATORY, INC.: 1. UL 325: Electrical Door, Drapery, Gate, Louver, and Window Operators and Systems B6.0 DIVISION 8 - DOORS AND WINDOWS SECTION 08460 - AUTOMATIC ENTRANCE DOORS Specifier Note: Coordinate and edit articles and paragraphs below to suit project requirements. Add section numbers and titles

More information

Electric Service Requirements. Residential Overhead. Engineering Specification T002. February

Electric Service Requirements. Residential Overhead. Engineering Specification T002. February Electric Service Requirements Residential Overhead Engineering Specification T002 February 2017 0362-16 ENG. SPEC. T002 REV. 3 RESIDENTIAL OVERHEAD INSTALLATIONS page 1 of 12 Table of Contents 1 GENERAL

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 29 23 (April 2006) -------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-16261 (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 6/15/16 Updated division section from 16124 to 2605 - mgl44 13, removed references to other section 10/17/14

More information

UFGS (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 35 33.00 40 (August 2013) --------------------------------- Preparing Activity: NASA Superseding UFGS-26 35 33.00 40 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

.2 The scales and automated system for each of the three (3) scales shall be supplied from a single manufacturer.

.2 The scales and automated system for each of the three (3) scales shall be supplied from a single manufacturer. New Entrance and Scale Facility Page 1 of 6 1. GENERAL 1.1 Work Included.1 The intent of the work under this section is to supply and install three (3) complete low profile platform (pitless) truck scales

More information

STREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy.

STREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy. General The following general requirements shall apply to street lights installed in new underground residential subdivisions or developments located within the service area of Springville City Power (within

More information

Low Voltage Switchgear Construction Checklist (under 500 kva)

Low Voltage Switchgear Construction Checklist (under 500 kva) Low Voltage Switchgear Checklist (under 500 kva) Project: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.

More information

Series - 1

Series - 1 SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists SECTION 412213- BRIDGE CRANES Part 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

B. Provide a complete conduit system with associated couplings, connectors, and fittings.

B. Provide a complete conduit system with associated couplings, connectors, and fittings. SECTION 26 05 33 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 260500. B. Provide a complete conduit system with associated couplings, connectors, and fittings. 1.02 RELATED

More information

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information

Effective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O.

Effective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O. Siemens, Model # SUAS877-PG (or Landis & Gyr # UAS877-PG) Eaton-Durham Model # UTRS223ACH Milbank Midwest Model # U980-O UTRS223AMEP These are some examples of the single meter sockets we require for underground

More information

Temporary Wiring Practices And Guidelines For NECA. National Electrical Contractors Association Omaha, Nebraska

Temporary Wiring Practices And Guidelines For NECA. National Electrical Contractors Association Omaha, Nebraska Temporary Wiring Practices And Guidelines For NECA National Electrical Contractors Association Omaha, Nebraska Table of Contents I. Planning II. Lighting and Power III. Maintenance IV. Inspections V. Routing

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

Rosemount 1154 Alphaline Nuclear Pressure Transmitter

Rosemount 1154 Alphaline Nuclear Pressure Transmitter Product Data Sheet 00813-0100-4514 Rev BA Rosemount 1154 Rosemount 1154 Alphaline Nuclear Pressure Transmitter INDUSTRY LEADING PERFORMANCE Qualified per IEEE Std. 323-1974 and IEEE Std. 344-1975 1.1 10

More information

Introduction. Disclaimer. Table of contents

Introduction. Disclaimer. Table of contents Updated July 18, 2012 Introduction The Cambridge Elevating Limited-Use / Limited-Application Elevator is designed to service schools, libraries, low rise, low occupancy commercial buildings, churches and

More information

HUP. Performance Data. Wholesale Products Page: Section: Performance Data Dated: January RPM: 1550 Discharge: 1" Solids: 1/8" GPM: TDH:

HUP. Performance Data. Wholesale Products Page: Section: Performance Data Dated: January RPM: 1550 Discharge: 1 Solids: 1/8 GPM: TDH: Performance RPM: 1550 Discharge: 1" Solids: 1/8" Wholesale Products Page: 6660-1 Section: Performance The curves reflect maximum performance characteristics without exceeding full load (Nameplate) horsepower.

More information

Pallet Safe: Installation Supplement Rev

Pallet Safe: Installation Supplement Rev Pallet Safe: Installation Supplement Rev. 4-1-13 Smartscan Incorporated, 33083 Eight Mile Road, Livonia MI 48152 Tel: (248)477-2900 Fax: (248) 477-7453 Web: www.smartscaninc.com SMARTSCAN INCORPORATED

More information

HD-Swing Series 4000 Heavy Duty Aluminum Swing Door System with Electric Operator

HD-Swing Series 4000 Heavy Duty Aluminum Swing Door System with Electric Operator HORTON AUTOMATICS - ARCHITECTURAL SPECIFICATIONS, 1/2008 HD-Swing Series 4000 Heavy Duty Aluminum Swing Door System with Electric Operator DIVISION 08 - OPENINGS SECTION 08 42 29.33 SWINGING AUTOMATIC

More information

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES 7.01 GENERAL UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES Also refer to Chapter 3 (Service Entrances), and Chapter 4 (Metering Installation). OPPD will install,

More information

UNIVERSITY OF ALASKA FAIRBANKS DIVISION 14 - CONVEYING EQUIPMENT DESIGN STANDARDS SECTION

UNIVERSITY OF ALASKA FAIRBANKS DIVISION 14 - CONVEYING EQUIPMENT DESIGN STANDARDS SECTION PART 1 - GENERAL 1.01 Elevator manufacturer to provide equipment and installation warranty and maintenance services for at least one year after acceptance. This requires routine monthly inspection, emergency

More information

GV 001 Equipment Bases and Enclosures General Information

GV 001 Equipment Bases and Enclosures General Information Eq u ip me n tba s e s a n d En c lo s u re s Ge n e ra lin fo rma tio n E n g in e e r :R.An th o n GV0 0 1 Ap p r o v e r :Jo s h u a Jo n e s Ap r 1 7 2 0 Ap r1 7 GV 001 Equipment Bases and Enclosures

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 9 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES

More information

TEMPORARY METER POLE INSTALLATION

TEMPORARY METER POLE INSTALLATION TEMPARY METER POLE INSTALLATION MEMBER PROVIDED Location to be made by REMC within 50' of our transformer or existing service Temporary pole to be properly braced 24" 3 wire weatherhead (located 24" from

More information

800 Series Aluminum Overhead Doors, by Northwest Door Section ALUMINUM SECTIONAL DOORS Digicon Information Inc.

800 Series Aluminum Overhead Doors, by Northwest Door Section ALUMINUM SECTIONAL DOORS Digicon Information Inc. Digicon Information Inc. Page 1 This section includes Model 800 aluminum insulated overhead sectional doors manufactured by Northwest Doors, with manual, chain or electric operation, with our without windows.

More information

Welcome to Douglas County PUD

Welcome to Douglas County PUD Welcome to Douglas County PUD We are committed to providing the best possible utility services at the lowest possible cost consistent with sound business principles. To better serve you, please fill out

More information

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property 2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical

More information

HYDROMATIC W/D/V-A1 SUBMERSIBLE SUMP/EFFLUENT

HYDROMATIC W/D/V-A1 SUBMERSIBLE SUMP/EFFLUENT PERFORMANCE DATA Wholesale Products Page: 6570-1 RPM: 1550 Discharge: 1 ½ Solids: ½ V-A1 W-A1 D-A1 Head, meters 8 4 Head, feet 30 20 10.3 HP 0 0 Capacity, US GPM 0 10 20 30 40 50 60 liters/second 0.0 1.0

More information

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

DIVISION 1100 TRAFFIC

DIVISION 1100 TRAFFIC SECTION 1102 STREET LIGHTING GENERAL INFORMATION The Idaho State Electrical Board has determined that all street lights are to be provided with an external fuse disconnect, in a junction box between the

More information

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

HIGH MAST CAMERA POLE ASSEMBLY GENERAL 10-3.24 HIGH MAST CAMERA POLE ASSEMBLY GENERAL The Contractor must furnish and install the following equipment for high mast camera pole assembly as described herein and as shown on the plans: 1. Camera

More information

SECTION SECTIONAL OVERHEAD DOORS

SECTION SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS PART 1 GENERAL PART 1.1 SECTION INCLUDES A. Overhead doors. B. Bi-fold doors. PART 1.2 RELATED SECTIONS A. Section 03300 - Cast-In-Place Concrete: Prepared opening

More information

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd RAM ELEVATORS Elevator Electrical Planning Guide This guide is intended for people with an understanding of electricity. If you are not, please consult a licensed electrician as errors in application of

More information

Westgate Entrematic, Parking Security Gates Section OVERHEAD SECURITY GATE Prepared by: Digicon Information Inc. Page 1

Westgate Entrematic, Parking Security Gates Section OVERHEAD SECURITY GATE Prepared by: Digicon Information Inc. Page 1 Prepared by: Digicon Information Inc. Page 1 This section includes overhead type Parking Security Gates, as manufactured by Westgate Entrematic, a division of Helton Group of Companies. DISCLAIMER: This

More information

SERVICE ENTRANCE SPECIFICATIONS FOR RESIDENTIAL AND COMMERCIAL

SERVICE ENTRANCE SPECIFICATIONS FOR RESIDENTIAL AND COMMERCIAL SERVICE ENTRANCE SPECIFICATIONS FOR RESIDENTIAL AND COMMERCIAL 0 3000 AMPERES AT SINGLE-PHASE, 3 WIRE THREE-PHASE, 4 WIRE 120/240 VOLTS 120/240 VOLTS * 240/480 VOLTS 277/480 VOLTS Y 120/208 VOLTS 120/208

More information

Nuheat WEATHER-READY ROOF & GUTTER DE - ICING SYSTEM. 13mm Self-Regulating Heating Cable. UV Resistant Polyolefin Outer Jacket

Nuheat WEATHER-READY ROOF & GUTTER DE - ICING SYSTEM. 13mm Self-Regulating Heating Cable. UV Resistant Polyolefin Outer Jacket Nuheat WEATHER-READY ROOF & GUTTER DE - ICING SYSTEM 13mm Self-Regulating Heating Cable UV Resistant Polyolefin Outer Jacket Tinned Copper Braid Polyolefin Inner Jacket Fire Resistant Conductive Core 16

More information

B. System Design and Performance Requirements

B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

A. This Section includes automatic entrance door systems operating as follows: 1. Swinging operation.

A. This Section includes automatic entrance door systems operating as follows: 1. Swinging operation. SECTION 08462 - SWINGING AUTOMATIC ENTRANCE DOORS PART 1 - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division

More information

SECTION VI Duplex Lift Station with Above Grade Valve Pit

SECTION VI Duplex Lift Station with Above Grade Valve Pit SECTION VI Duplex Lift Station with Above Grade Valve Pit DESCRIPTION The contractor shall furnish and install one submersible sewage lift station with concrete wet well, pumps, piping, and factory built

More information

SECTION CHAIN-LINK FENCES AND GATES 02821/1

SECTION CHAIN-LINK FENCES AND GATES 02821/1 SECTION 02821 - CHAIN-LINK FENCES AND GATES 02821/1 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Chain-Link Fences: 2. Gates: horizontal slide or swing. 3. Fences installed where

More information

Global Water Instrumentation, Inc.

Global Water Instrumentation, Inc. Global Water Instrumentation, Inc. 151 Graham Road P. O. Box 9010 College Station, TX 77842-9010 T: 800-876-1172 Int l: (979) 690-5560, F: (979) 690-0440 E-mail : globalw@globalw.com WS700 Sampler 01-455

More information

Switch-Tek. LV41 & LV42 Series Manual. Sump Float Level Switches

Switch-Tek. LV41 & LV42 Series Manual. Sump Float Level Switches Switch-Tek Sump Float Level Switches LV41 & LV42 Series Manual LV41 Series Shown LV42 Series Shown Flowline, Inc. 10500 Humbolt Street, Los Alamitos, CA 90720 p 562.598.3015 f 562.431.8507 w flowline.com

More information

A. This section includes building wire and cable rated 600V and less Full Short Circuit Device, Coordination and Arc Fault Study

A. This section includes building wire and cable rated 600V and less Full Short Circuit Device, Coordination and Arc Fault Study PART 1: GENERAL 1.01 Underground Ducts and Manholes A. The work included in this section of the construction standards consists of the design requirements for the complete layout and installation of a

More information

Fiberglass Cooling Towers

Fiberglass Cooling Towers Fiberglass Cooling Towers Available in sizes from 100 to 240 tons. FC Series 700 Fiberglass Cooling Tower Available in sizes from 170 to 240 tons. No other fiberglass cooling tower comes with as many high-quality

More information

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL). 16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the

More information

C60 Standby UPS. 800VA Models. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved.

C60 Standby UPS. 800VA Models. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved. For more information, visit www.247technology.com/on-line-ups/c60-standby-ups C60 Standby UPS 800VA Models User & Installation Manual 2015. All rights reserved. (Rev 6/23/15) Table of Contents Package

More information

Therma Series Insulated Overhead Doors, by Northwest Door Section SECTIONAL DOORS Digicon Information Inc.

Therma Series Insulated Overhead Doors, by Northwest Door Section SECTIONAL DOORS Digicon Information Inc. Digicon Information Inc. Page 1 This section includes Model 650, 308, 308TM steel insulated overhead sectional doors manufactured by Northwest Doors, with manual, chain or electric operation, with our

More information

Section SECTIONAL INSULATED STEEL DOORS

Section SECTIONAL INSULATED STEEL DOORS 1 GENERAL 1.1 GENERAL REQUIREMENTS General Conditions and Division 01 apply to this section. 1.2 RELATED WORK Section 05500: Miscellaneous Metal Fabrication Section 07900: Joint Sealers Section 09900:

More information

Why Do I Need a Permit? D ID Y OU K N OW? Protects property values. Makes Selling Property Easier. Site Plan Page 2. Plan Requirements Page 2

Why Do I Need a Permit? D ID Y OU K N OW? Protects property values. Makes Selling Property Easier. Site Plan Page 2. Plan Requirements Page 2 Swimming Pools Building Guide for Homeowners Why Do I Need a Permit? D ID Y OU K N OW? There are many important reasons to obtain building permits and to have inspections performed for your construction

More information

MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS

MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS 1.0 MANUFACTURER'S RESPONSIBILITIES: The manufacturer's responsibilities include, but are not limited to: 1.1 Control of UL Mark - Restrict

More information

CONDUITS AND FITTINGS

CONDUITS AND FITTINGS CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit

More information

300828TWP INSTALLATION INSTRUCTIONS MODEL SUBMERSIBLE SUMP PUMP

300828TWP INSTALLATION INSTRUCTIONS MODEL SUBMERSIBLE SUMP PUMP www.burcam.com 2190 Dagenais Blvd. West TEL : 514.337.4415 LAVAL (QUEBEC) FAX : 514.337.4029 CANADA H7L 5X9 info@burcam.com Your pump has been carefully packaged at the factory to prevent damage during

More information

The following is a summary of parameters for preparation of a traffic impact analysis when such analysis is required by the City of Highland:

The following is a summary of parameters for preparation of a traffic impact analysis when such analysis is required by the City of Highland: 9.0 TRAFFIC Traffic studies shall be prepared in accordance with criteria adopted by the City of Highland. Check with the City Engineer for details before starting any traffic reports. Traffic signals

More information

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

1. Vertical reciprocating conveyor, Hydraulic straddle VRC. PART 1: GENERAL 1.01 Section Includes: 1. Vertical reciprocating conveyor, Hydraulic straddle VRC. a. Machine, controller, platform, structural steel hoist frame. b. Wire mesh enclosure and gates. Related

More information

SECTION ROTARY SCREW WATER CHILLERS

SECTION ROTARY SCREW WATER CHILLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS 2190 Dagenais Blvd.West Laval (Quebec) Canada H7L 5X9 Tel. : 514.337.4415 Fax : 514.337.4029 info@burcam.com see us at www.burcam.com VERSION Z MODELS 300500 SUMP PUMPS Your pump

More information

SECTION MEDIUM VOLTAGE TRANSFORMERS

SECTION MEDIUM VOLTAGE TRANSFORMERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

SK75/100. Performance Data TOTAL HEAD IN FEET HEAD-METERS 6 SK100 SK Liters/Second Capacity-U.S. G.P.M.

SK75/100. Performance Data TOTAL HEAD IN FEET HEAD-METERS 6 SK100 SK Liters/Second Capacity-U.S. G.P.M. Performance SK75/100 RPM: 1750 Discharge: 2" Solids: 2" Wholesale Products Page: 6300-1 Section: Performance 12 40 9 30 HEAD-METERS 6 3 TOTAL HEAD IN FEET 20 10 SK75 SK100 0 0 Capacity-U.S. G.P.M. 20 40

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. GORBEL PRODUCT SPECIFICATIONS 2010 Gorbel, Inc., P.O., Box 593, Fisher, New York 14453-0593 PHONE: 800-821-0086, FAX: 585-924-6273; WEBSITE: www.gorbel.com November SECTION 41 22 31PRIVATE FREE STANDING

More information