Size: px
Start display at page:

Download "APPENDIX H. Capital Improvement Program Detail Project Costs NORTH PERRY AIRPORT MASTER PLAN UPDATE APPENDICES"

Transcription

1 MASTER PLAN UPDATE APPENDICES APPENDIX H Capital Improvement Program Detail Project Costs Montgomery Consulting Group August 11, 2009 Appendix H

2 CAPITAL IMPROVEMENT PROGRAM Short Term (0-5 years) SUB- CONSTRUCTION COSTS DEVELOPMENT COSTS 1 SECURITY FENCING AND GATE UPGRADES $207,000 $300,200 2 RUNWAY 18L-36R PAVEMENT REHABILITATION $914,000 $1,325,300 3 LANDSCAPING PLAN & LANDSCAPING IMPROVEMENTS - PHASE 1 (South Areas) $185,800 $419,500 4 UPGRADE ARFF VEHICLE $0 $0 (SURPLUS) 5 LANDSCAPING IMPROVEMENTS - PHASE 2 (North & West Areas) $157,600 $228,600 6 TAXIWAY 'N' PAVEMENT REHABILITATION $442,100 $641,100 7 LIGHTED WINDSOCKS PROJECT $58,600 $85,000 8 DEMOLISH MISC. BUILDINGS $54,400 $78,900 9 PERIMETER ROAD SECURITY LIGHTING PROJECT PHASE 1 (South Area) $111,900 $162, PERIMETER ROAD SECURITY LIGHTING PROJECT PHASE 2 (North & West Areas) $92,600 $134, NW APRON PAVEMENT OVERLAY $577,800 $850, SE APRON PAVEMENT OVERLAY $839,300 $1,217, SEWER CONNECTION STUDY $0 $109, AIRPORT ROAD REALIGNMENT $436,298 $632, STORMWATER MANAGEMENT PLAN $0 $163, ENVIRONMENTAL ASSESSMENT FOR RUNWAY 9R-27L ADDITIONAL PAVEMENT $0 $152, AIRPORT WAYFINDING SIGN PROJECT $15,800 $23, INSTALLATION OF RELOCATED VOR $63,100 $91,500 GRAND SHORT-TERM CAPITAL IMPROVEMENT PLAN $4,156,298 $6,615,800 CAPITAL IMPROVEMENT DETAILED PROJECT COSTS APPENDIX H Pg. 1

3 CAPITAL IMPROVEMENT PROGRAM Mid-Term (6-10 years) SUB- 19 TAXIWAY 'P' REHABILITATION $481,800 $698, RUNWAY 9L-27R REHABILITATION $963,000 $1,396, UPDATE LANDSCAPING IMPROVEMENTS & SIGNAGE PLAN $0 $106, CONSTRUCT ADDITIONAL PAVEMENT TAXIWAY 'A' - PHASE 1 $752,500 $1,091, CONSTRUCT ADDITIONAL PAVEMENT AT RUNWAY 9R END AND EXTEND TAXIWAY 'L' TO NEW TAKEOFF END $1,077,000 $1,561, CONSTRUCT ADDITIONAL PAVEMENT AT RUNWAY 27L END AND EXTEND TAXIWAYS 'L' TO NEW TAKEOFF END $881,000 $1,277, CONSTRUCT TAXIWAY 'M' REHABILITATION $564,400 $818, UPGRADE PAPI'S RUNWAYS 9L-27R $113,600 $164, UPGRADE PAPI'S RUNWAYS 18R-36L $90,600 $131, REPLACE PAPI's FOR RUNWAY 9L-27RL $90,600 $131, UPGRADE PAPI'S RUNWAYS 18L-36R $90,600 $131, NW APRON PAVEMENT SEALCOAT $161,200 $233, SE APRON PAVEMENT SEALCOAT $251,100 $364, LIGHT TAXIWAYS 'N' $328,000 $475, LIGHT TAXIWAY 'L' $485,000 $703, INSTALL REFLECTORS ON UNLIT TAXIWAYS $23,000 $33, UPGRADE SECURITY FENCING & ACCESS CONTROL GATES $207,000 $300, LANDSCAPING AND SIGNAGE IMPROVEMENTS $185,800 $269, DEMOLISH MISCELLANEOUS BUILDINGS $54,400 $78, SEWER CONNECTION PROJECT PHASE 1 (NORTH SIDE) $484,200 $702, SEWER CONNECTION PROJECT PHASE 2 (SOUTH SIDE) $1,434,700 $2,080, MASTER PLAN UPDATE $0 $575,000 GRAND MID-TERM CAPITAL IMPROVEMENT PLAN (RND) $8,719,500 $13,325,300

4 CAPITAL IMPROVEMENT PROGRAM Long-Term (11-20 years) SUB- 41 RUNWAY 9R-27L PAVEMENT REHABILITATION $1,145,200 $1,660, RUNWAY 18R-36L REHABILITATION $1,066,300 $1,546, TAXIWAY 'D' REHABILITATION $439,700 $637, TAXIWAY 'E' REHABILITATION $402,000 $582, TAXIWAY 'L' REHABILITATION $557,900 $809, UPGRADE AIR TRAFFIC CONTROL TOWER/UPS $345,000 $501, CONSTRUCT HELIPAD $11,500 $35, SEAL-COAT NW APRON $161,200 $233, SEAL-COAT SE APRON $251,100 $364, LANDSCAPING IMPROVEMENTS $185,800 $269, OVERLAY AIRPORT ROADWAYS $927,800 $1,345, EXTEND AIRPORT PERIMETER ROAD TO SE QUADRANT $330,700 $479, CONSTRUCT TAXIWAY 'A' - PHASE 2 $648,400 $940, UPGRADE SECURITY FENCING & ACCESS CONTROL GATES $207,000 $300, MASTER PLAN UPDATE $0 $575, UPGRADE ARFF VEHICLE $45,000 $45, REPLACE ROTATING BEACON $75,000 $30, TAXIWAY 'B' REHABILITATION $644,000 $933,800 GRAND LONG-TERM CAPITAL IMPROVEMENT PLAN (RND) $7,443,600 $11,289,200 GRAND CAPITAL IMPROVEMENT PLAN (RND) $20,319,398 $31,230,300

5 NORTH PERRY AIRPORT SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 1 - SECURITY FENCING & GATES UPGRADES Project includes replacement of 5,000 ft. of security fencing and upgrade and/or installation of 5 electronic, card-controlled access security gates located around airport. Project includes modifications to existing access control system. Fencing installation per FAA specifications. 1 L-853 Upgrade and Replace Security Access Gates 5 EA $14, $71, L-853 Provide Electrical to Access Gates 5 EA $2, $14, L-853 Modify Access Control System 1 LS $17, $17, F-162 Fence Removal 5,000 LFT $1.73 $8, F ft. Chain Link Fence w/3 Strand Barbed Wire 5,000 LFT $18.98 $94, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $207, A Permitting 5% $10, B Professional Fees 25% $51, C Contingency 15% $31, DEVELOPMENT COSTS (ROUNDED) $300, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY ELECTRONIC CARD-CONTROLLED ACCESS SECURITY GATE

6 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 2 - RUNWAY 18L-36R PAVEMENT PAVEMENT REHABILITATION LINE Project includes rehabilitation of RW 18L-36R Pavement (100 ft. x 3,260 ft.) plus 9 taxiway/runway intersections (out to 125 ft. either side of RW 18L-36R centerline). Rehabilitation assumed to include milling 1½" of existing asphalt surface and overlay of 2" asphalt surface. Project includes sodding at pavement edge and new pavement markings. Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $17, $17, P-102 Closed Runway Signs 2 EA $1, $2, P-104 Prevention, Control & Abatement of Erosion 1 LS $28, $28, P-490 Pavement Milling, 1 1/2" Min. 41,500 SY $6.90 $286, P-401 Bituminous Surface Course 4,600 TN $98.90 $454, P-602 Bituminous Prime Coat 18,000 GAL $2.30 $41, P-620 Runway and Taxiway Painting 15,000 SF $2.01 $30, T-904 Sodding 10,250 SY $4.60 $47, T-901 Seeding &M Mulching 3 AC $1, $5, SUB- CONSTRUCTION COSTS (ROUNDED) $914, A Permitting 5% $45, B Professional Fees 25% $228, C Contingency 15% $137, DEVELOPMENT COSTS (ROUNDED) $1,325, RUNWAY 18L-36R REHABILITATION 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

7 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 3 - LANDSCAPING IMPROVEMENTS - PHASE 1 (South Areas) Project consists of landscaping including installation of trees, bushes, and grasses, along approximately 9,100 ft. of the airport perimeter road on the south side of the airport as depicted in the exhibit below. Trees are not recommended in the runway protection zones. Focal landscaping is recommended for 3 connections of airport perimeter road with Pembroke Road and more focused landscaping along 4,500 ft adjacent to Pembroke Road. Irrigation assumed along 4,500 ft. adjacent to Pembroke Road from water mains, as no grey water system known to be available. 1 T-907 Trees w/braces 30 EA $ $12, T-907 Large Bush for focal points 150 EA $ $25, T-907 Small Bush for focal points 150 EA $97.75 $14, T-907 Decorative Grasses for focal points 300 EA $28.75 $8, T-904 Sodding for focal points 5,000 SY $5.75 $28, T-904 Misc. Decorative Feature 6 EA $1, $8, SP Irrigation System for focal points 3 EA $28, $86, SP Compliance with Florida State Trench Safety Act 1 LS $0.00 SUB- CONSTRUCTION COSTS (ROUNDED) $185, B Landscape Plan Professional Fees LS $150, A Permitting 5% $9, B Professional Fees (Design) 25% $46, C Contingency 15% $27, DEVELOPMENT COSTS (ROUNDED) $419, LANDSCAPING PROJECT PHASE 1 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007

8 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 4 - UPGRADE ARFF VEHICLE LINE 1 SP Obtain new or upgraded Fire/Rescue vehicle 1 LS $0.00 $0.00 SURPLUS EQUIPMENT $0.00

9 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 5 - LANDSCAPING IMPROVEMENTS - PHASE 2 (North & West Areas) Project consists of landscaping including installation of trees, bushes, and grasses, along approximately 6,700 ft. of the airport perimeter road on the north and west sides of the airport and SW 77th Way as depicted in the exhibit below. Trees are not recommended in the runway protection zones. Focal landscaping is recommended for two connections of airport perimeter road with Pines Blvd. and University Blvd. Irrigation assumed only at focal points from water mains as no grey water system known to be available. 1 T-907 Trees w/braces 30 EA $ $12, T-907 Large Bush for focal points 200 EA $ $34, T-907 Small Bush for focal points 200 EA $97.75 $19, T-907 Decorative Grasses for focal points 200 EA $28.75 $5, T-904 Sodding for focal points 3,500 SY $5.75 $20, T-904 Misc. Decorative Feature 5 EA $1, $7, SP Irrigation System for focal points 2 EA $28, $57, SP Compliance with Florida State t Trench Safety Act 1 LS $4, $4, SUB- CONSTRUCTION COSTS (ROUNDED) $157, A Permitting 5% $7, B Professional Fees 25% $39, C Contingency 15% $23, DEVELOPMENT COSTS (ROUNDED) $228, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007 LANDSCAPING PLAN - PH. 2

10 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 6 - TAXIWAY 'N' PAVEMENT REHABILITATION Project includes the rehabilitation of TW 'N' pavement (40 ft. x 2,750 ft.) including associated taxiway connectors as depicted in exhibit below, excluding pavement within 125 ft. of RW 18R-36L and RW 18L-36R. Rehabilitation assumed to include milling 1½" of existing asphalt surface and overlay of 2" asphalt surface. Project includes sodding at pavement edges and new taxiway markings. Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $17, $17, P-104 Prevention, Control & Abatement of Erosion 1 LS $28, $28, P-490 Pavement Milling, 1 1/2" Min. 18,700 SY $6.90 $129, P-401 Bituminous Surface Course 2,100 TN $98.90 $207, P-602 Bituminous Prime Coat 8,385 GAL $2.30 $19, P-620 Runway and Taxiway Painting 8,400 SF $2.01 $16, T-904 Sodding 3,900 SY $4.60 $17, T-901 Seeding & Mulching 3 AC $1, $5, SUB- CONSTRUCTION COSTS (ROUNDED) $442, A Permitting 5% $22, B Professional Fees 25% $110, C Contingency 15% $66, DEVELOPMENT COSTS (ROUNDED) $641, TAXIWAY 'N' REHABILITATION 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

11 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 7 - LIGHTED WINDSOCKS PROJECT Project includes the installation of a lighted windsock at 3 locations, including near thresholds of RW 18R, RW 18L, and RW 27R. Assumed power available from nearby taxiway lighting circuits. Assumed construction conducted per FAA specifications. 1 L-806 Wind Cone - 8' Lighted 3 EA $6, $18, L-108 Power Cable in Duct 3,000 LF $5.75 $17, L-108 1/C #8 5 KV Cable 3,000 LF $1.50 $4, L-108 3/C #6 600 V Cable 3,000 LF $1.15 $3, L-108 Associated Vault Work 1 LS $5, $5, SP Compliance with Florida State Trench Safety Act 1 LS $1, $1, T-904 Sodding 1,500 SY $4.60 $6, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $58, A Permitting 5% $2, B Professional Fees 25% $14, C Contingency 15% $8, DEVELOPMENT COSTS (ROUNDED) $85, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: LIGHTED WINDSOCK 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

12 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 8 - DEMOLISH MISCELLANEOUS BUILDINGS Project includes the demolition of two existing buildings at North Perry Airport. Assumed demolition per City of Pembroke Pines and Broward County specifications. 1 SP Prevention, Control, and Abatement of Erosion 2 EA $1, $3, SP Utility Disconnects 2 EA $ $1, SP Demolition of Building 50,000 CF $0.40 $20, SP Haul Cost 130 LD $86.25 $11, SP Dump Fees (Off Site) 400 YD $46.00 $18, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $54, A Permitting 5% $2, B Professional Fees 25% $13, C Contingency 15% $8, DEVELOPMENT COSTS (ROUNDED) $78, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

13 NORTH PERRY AIRPORT SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 9 - PERIMETER ROAD SECURITY LIGHTING PROJECT PHASE 1 (South Area) Project includes the installation of low mounted shielded street lighting along 9, ' Intervals along the Airport Perimeter Road on the southside of the airport as depicted in the exhibit. High mast lighting should not be used in and around the runway protection zones and all lighting should be shielded from runway approaches. 1 E-1 Electrical Supply System for Perimeter Rd. Lighting 1 LS 17, $17, E-2 Low-mounted Pole & Shielded Luminaire (complete) 40 EA $36, E-3 Power Cable in Trench 25,000 LF $2.01 $50, SP Compliance with Florida State Trench Safety Act 1 LS 7, $7, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $111, A Permitting 5% $5, B Professional Fees 25% $27, C Contingency 15% $16, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $162, AIRPORT PERIMETER ROAD LIGHTING PROJECT - PHASE 1 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

14 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 10 - PERIMETER ROAD SECURITY LIGHTING PROJECT PHASE 2 (North & West Areas) Project includes the installation of low mounted shielded street lighting along 6, ' Intervals along the Airport Perimeter Road & SW 77th Way as depicted in the exhibit. High mast lighting should not be used in and around the runway protection zones and all lighting should be shielded from runway approaches. 1 E-1 Electrical Supply System for Perimeter Rd. Lighting 1 LS 17, , E-2 Low-mounted Pole & Shielded Luminaire (complete) 30 EA , E-3 Power Cable in Trench 20,000 LF $2.01 $40, SP Compliance with Florida State Trench Safety Act 1 LS 7, , SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $92, A Permitting 5% $4, B Professional Fees 25% $23, C Contingency 15% $13, DEVELOPMENT COSTS (ROUNDED) $134, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY AIRPORT PERIMETER ROAD LIGHTING PROJECT - PHASE 2

15 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 11 - NW APRON PAVEMENT OVERLAY Project includes the rehabilitation of the NW Apron pavement (925 ft. x 300 ft.) Rehabilitation assumed to include milling 1½" of existing asphalt surface and overlay of 1½" asphalt surface. Project includes sodding at pavement edges, new apron markings, surface sealcoat, and installation of new tie-down anchor system. Project also includes installation of new high-mast apron lights. Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $2, $2, P-104 Prevention, Control & Abatement of Erosion 1 LS $14, $14, P-490 Pavement Milling, 1 1/2" Min. 22,000 SY $6.90 $151, P-401 Bituminous Surface Course 1,850 TN $98.90 $182, P-602 Bituminous Prime Coat 9,900 GAL $2.30 $22, A-300 Removal Tie Down Anchors 100 EA $57.50 $5, A-300 Tie Down Anchors (Installed) 100 EA $ $34, P-620 Apron Marking and Painting 1,250 SF $1.73 $2, M-2 Protective Micro-Surfacing (Seal Coat) 22,000 SY $4.89 $107, M-4 Apron Floodlighting Pole w/two-250w.fixtures - 18' Ht. 4 EA $2, $11, L-108 Power Cable in Duct 3,400 LF $5.75 $19, L-108 Associated Vault Work 1 LS $11, $11, SP Compliance with Florida State Trench Safety Act 1 LS $5, $5, T-904 Sodding 1,000 SY $4.60 $4, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $577, A Permitting 5% $28, B Professional Fees 25% $144, C Contingency 17% $99, DEVELOPMENT COSTS (ROUNDED) $850, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY NW APRON REHABILITATION

16 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 12 - SE APRON PAVEMENT OVERLAY Project includes the rehabilitation of the SE Apron pavement (1,565 ft. x 215 ft.) Rehabilitation assumed to include milling 1½" of existing asphalt surface and overlay of 1½" asphalt surface. Project includes sodding at pavement edges, new apron markings, surface sealcoat, and installation of new tie-down anchor system. Project also includes installation of new high-mast apron lights. Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $2, $2, P-104 Prevention, Control & Abatement of Erosion 1 LS $20, $20, P-490 Pavement Milling, 1 1/2" Min. 34,300 SY $6.90 $236, P-401 Bituminous Surface Course 2,900 TN $98.90 $286, P-602 Bituminous Prime Coat 15,500 GAL $2.30 $35, A-300 Removal Tie Down Anchors 100 EA $57.50 $5, A-300 Tie Down Anchors (Installed) 100 EA $ $34, P-620 Apron Marking and Painting 2,000 SF $1.73 $3, M-2 Protective Micro-Surfacing (Seal Coat) 34,300 SY $4.89 $167, M4 M-4 Apron Floodlighting Pole w/two-250w.fixtures - 18' Ht. 5 EA $2, $14, L-108 Power Cable in Duct 1,000 LF $5.75 $5, L-108 Associated Vault Work 1 LS $11, $11, SP Compliance with Florida State Trench Safety Act 1 LS $4, $4, T-904 Sodding 2,000 SY $4.60 $9, SUB- CONSTRUCTION COSTS (ROUNDED) $839, A Permitting 5% $41, B Professional Fees 25% $209, C Contingency 15% $125, DEVELOPMENT COSTS (ROUNDED) $1,217, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY SE APRON REHABILITATION

17 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 13 - SANITARY SEWER CONNECTION STUDY Professional Services to investigate, coordinate and prepare prelimiany concept for sanitary sewer connections for North Perry Airport at both north and southsides of the airport. No construction included in budget, professional services only SUB- ESTIMATED 0.00 $0.00 $0.00 SUB- CONSTRUCTION COSTS (ROUNDED) 1 A Professional Fees Budget Estimate $95, C Contingency 15% $14, PROFESSIONAL SERVICES COSTS (ROUNDED) $109, COSTS ARE BASED ON S DETERMINED AS OF JULY 2007

18 BROWARD COUNTY AVIATION DEPARTMENT -- NORTH PERRY AIRPORT PROJECT 14 - ROPOSED REALIGNMENT OF AIRPORT ROAD -- SW CORNER The project consists of construction of a paved road, approximately 1,450 ft long by 28 ft wide (approx. 38,500 sf) realigning the Airport Road at the southwest corner of the property to increase the Commercial Development area. Assumed pavement section includes: 12 LBR=40 subbase, 8" LBR=100 limerock base material, and 1½ bituminous surface course. Removal of existing Airport Road (as shown) and fill, sod or seed as indicated. Installation of a new 6 ft-high chain-link fence (approx. 1,450 ft). Installation of FDOT standard street lights at 200 ft spacing and appropriate traffic signage. No landscaping proposed for portion of road. 1 Mobilization 1 LS $33, $33,600 2 Maintenance of Traffic 1 LS $5, $5,750 3 Clear & Grubb (Approx. 1.5 Ac. Trees & Brush) 2 AC $ $900 4 Saw-Cut and Connect to Existing Pavement 60 FT $28.75 $1,725 5 Remove Existing Perimeter Road Pavement & Dispose 1,600 CY $51.75 $82,800 6 Fill and Compact 2,000 CY $11.50 $23,000 7 LBR=40 Subbase (12") 4,280 SY $8.62 $36,894 8 LBR=100 Limerock Base (8") 4,280 SY $17.25 $73,830 9 Hot Mix Asphaltic Concrete Pavement (1.5" thk) 355 TN $ $88, Roadway Marking 5,000 SF $1.32 $6, ' Chain Link Fence w/barbed Wire 1,500 LF $18.97 $28, Power Cable in Conduit in Trench 1,500 LF $5.75 $8, Compliance with Florida State Trench Safety Act 1 LS $8, $8, /4" Dia. x 10' Long Copper Clad Ground Rod 5 EA $ $ Low Mtd. Pole & Shielded Luminaire (Complete) 5 EA $1, $5, W2" Conc.-Encased Duct 70 LF $51.75 $3, Stop Sign 1 EA $ $ Information Signs 2 EA $ $1, Seeding 2 AC $2.01 $4 20 Sodding 3,000 SY $4.60 $13, Stormwater Drainage System Modifications 1 Allowance $11, $11,500 SUB- ESTIMATED CONSTRUCTION COST (rounded) $436, Permitting 5% $21, Professional Fees 25% $109, Contingency Fees 15% $65,445 ESTIMATED PROJECT COST WITH CONTINGENCY $632, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 15% DETAILING AND PRICING ALLOWANCE 2. COSTS BASED ON S DETERMINED AS OF JULY 2007, AND DO NOT INCLUDE ANY COST ESCALATION.

19 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 15 - STORMWATER MANAGEMENT PLAN Professional Services to prepare a stormwater management plan for the Airport, including preparing the conceptual permitting for the short-term CIP projects No construction included in budget, professional services only 0.00 SUB- CONSTRUCTION COSTS (ROUNDED) $ A Permitting for SFWMD Budget Estimate $7, B Professional Fees Budget Estimate $135, C Contingency 15% $21, PROFESSIONAL SERVICES COSTS (ROUNDED) $163, COSTS ARE BASED ON S DETERMINED AS OF JULY 2007

20 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 16 - ENVIRONMENTAL ASSESSMENT FOR RUNWAY 9R-27L ADDITIONAL PAVEMENT Professional Services for the development of an Environmental Assessment and/or DRI (if needed) for construction of additional pavement at each end of Runway 9R-27L. No construction included in budget, professional services only 0.00 SUB- CONSTRUCTION COSTS (ROUNDED) $ A Permitting Budget Estimate $7, B Professional Fees Budget Estimate $125, C Contingency 15% $19, PROFESSIONAL SERVICES COSTS (ROUNDED) $152, COSTS ARE BASED ON S DETERMINED AS OF JULY 2007

21 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 17 - AIRPORT WAYFINDING SIGN PROJECT LINE Project includes the installation of 4 FDOT-Approved Informational Signs (not lighted) with 'North Perry Airport' and a Directional Arrow on nearby streets (assumed 2 north and 2 south). Project also includes 3 customized marquees signs (not lighted) indicating tenant and buildings. 1 FDOT Install Direction Signs 4 EA $ $3, SP Install Custom Information/Direction Signs 3 EA $4, $12, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $15, A Permitting 5% $ B Professional Fees 25% $3, C Contingency 15% $2, DEVELOPMENT COSTS (ROUNDED) $23, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: North Perry Airport 2. COSTS ARE BASED ON S DETERMINED AS OF JULY AIRPORT WAYFINDING SIGN PROJECT

22 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 18 - INSTALLATION OF RELOCATED VOR Project includes installation of a VOR (VHF Omni-directional Radio Range). No cost is included for the VOR equipment, which has been assumed to originate from another airport. Assumed VOR siting requires relocation of the following existing equipment: wind measuring equipment, lighted windsock, and automated surface observation system (ASOS) to locations elsewhere at airport. Project includes electrical cabling and vault modifications for relocated VOR and other equipment. Project does not include any modifications to FAA procedure information. 1 SP Transport VOR to Airport 1 LS $8, $8, SP Install Relocated VOR 1 LS $17, $17, SP Relocate Existing Wind Measuring Equipment 1 LS $2, $2, SP Relocate Lighted Windsock 1 LS $2, $2, SP Relocate ASOS 1 LS $2, $2, L-108 Power Cable in Duct 1,000 LF $5.75 $5, L-108 1/C #8 5 KV Cable 1,000 LF $1.50 $1, L-108 3/C #6 600 V Cable 1,000 LF $1.15 $1, L-108 Associated Vault Work 1 LS $11, $11, SP Compliance with Florida State t Trench Safety Act 1 LS $1, $1, T-904 Sodding 1,500 SY $4.60 $6, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $63, A Permitting 5% $3, B Professional Fees 25% $15, C Contingency 15% $9, DEVELOPMENT COSTS (ROUNDED) $91, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY INSTALLATION OF RELOCATED VOR

23 NORTH PERRY AIRPORT MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 19 - CONSTRUCT TAXIWAY 'P' REHABILITATION Project includes rehabilitation of TW 'P' Pavement (35 ft. x 2,850 ft.) including associated taxiway connectors as depicted in exhibit below, excluding pavement within 125 ft. of RW 18L-36R and 18R-36L and RW 27R and RW 18L. Rehabilitation assumed to include milling 1½" of existing asphalt surface and overlay of 2" asphalt surface. Project includes sodding at pavement edges and new taxiway markings. Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $17, $17, P-104 Prevention, Control & Abatement of Erosion 1 LS $28, $28, P-490 Pavement Milling, 1 1/2" Min. 22,100 SY $6.90 $152, P-401 Bituminous Surface Course 2,450 TN $98.90 $242, P-602 Bituminous Prime Coat 10,000 GAL $2.30 $23, P-620 Runway and Taxiway Painting 1,500 SF $2.01 $3, T-904 Sodding 2,500 SY $4.60 $11, T-901 Seeding & Mulching 2 AC $1, $3, SUB- CONSTRUCTION COSTS (ROUNDED) $481, A Permitting 5% $24, B Professional Fees 25% $120, C Contingency 15% $72, DEVELOPMENT COSTS (ROUNDED) $698, TAXIWAY 'P' REHABILITATION 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

24 MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 20 - RUNWAY 9L - 27R PAVEMENT REHABILITATION Project includes rehabilitation of RW 9L-27R Pavement (100 ft. x 3,255 ft.) plus 6 taxiway/runway intersections (out to 125 ft. either side of RW 9L-27R centerline, excluding a 125' area each side of RW 18L-36R). Rehabilitation assumed to include milling 1½" of existing asphalt surface and overlay of 2" asphalt surface. Project includes sodding at pavement edge and new pavement markings. Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $17, $17, P-102 Closed Runway Signs 2 EA $1, $2, P-104 Prevention, Control & Abatement of Erosion 1 LS $28, $28, P-490 Pavement Milling, 1 1/2" Min. 43,600 SY $6.90 $300, P-401 Bituminous Surface Course 4,800 TN $98.90 $474, P-602 Bituminous Prime Coat 19,600 GAL $2.30 $45, P-620 Runway and Taxiway Painting 20,500 SF $2.01 $41, T-904 Sodding 10,250 SY $4.60 $47, T-901 Seeding & Mulching 3 AC $1, $5, SUB- CONSTRUCTION COSTS (ROUNDED) $963, A Permitting 5% $48, B Professional Fees 25% $240, C Contingency 15% $144, DEVELOPMENT COSTS (ROUNDED) $1,396, RUNWAY 9R-27L REHABILITATION 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

25 MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 21 - UPDATE LANDSCAPING AND WAYFINDING PLAN Professional Services to prepare an update of existing landscaping plan; and include developing a current tenant signage and wayfinding plan. No construction included in budget, professional services only. $0.00 SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) None 1 A Permitting 5% $7, B Professional Fees 25% $85, C Contingency 15% $13, DEVELOPMENT COSTS (ROUNDED) $106, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: North Perry Airport 2. COSTS ARE BASED ON S DETERMINED AS OF JULY AIRPORT WAYFINDING SIGN PROJECT

26 MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 22 - CONSTRUCT ADDITIONAL PAVEMENT TAXIWAY 'A' - PHASE 1 Project consists of construction of a new asphalt Taxiway A (35 ft x 1,875 ft) from Taxiway N to Taxiway L parallel to R/W 18L-36R including connection with Taxiway M. Project also assumes connection to new runway end pavement for RW9R. Assumed pavement section includes: 12" LBR=40 subbase, 8" limerock base material, and 2" bituminous surface course. Taxiway A assumed to have connecting taxiways at RW 9R to RW 9L. Project Includes taxiway marking, lighting and signage. Assumed construction provided per FAA specifications. 1 SP Prevention, Control and Abatement of Erosion 1 LS $16, $16, SP Security & Traffic Control during Construction 1 LS $2, $2, P-152 Clear & Grub 10,000 SY $5.75 $57, P-152 Earthwork (off-site fill) 6,300 CY $15.53 $97, P-154 LBR=40 Subbase (12") 9,450 SY $8.63 $81, P-211 Limerock Base (8") 9,200 SY $17.25 $158, P-401 Bituminous Surface Course 1,100 TN $98.90 $108, P-602 Bituminous Prime Coat 4,100 GAL $2.30 $9, P-630 Saw-Cut Existing Pavement and Connect New Pvmt. 500 LF $1.73 $ P-620 Runway and Taxiway Painting 3,000 SF $2.01 $6, L-108 8, 5000 V., L-824 Type 'C' Conductor, in Conduit 3,800 LF $1.73 $6, L Bare Stranded Copper Counterpoise Wire 3,800 LF $2.76 $10, L-108 Trench in Unpaved Area (For 1 Conduit) 3,200 LF $3.45 $11, L-108 3/4" Dia. x 10' Long Copper Clad Ground Rod 18 EA $ $1, L-109 Vault Modifications and Upgrades 1 LS $16, $16, L-110 2" PVC Conduit, In Trench 2,800 LF $2.30 $6, L-110 1W2" Concrete-Encased Duct in Unpaved Area 250 LF $28.75 $7, L-110 1W2" Conc.-Encased Duct In Exist Pvmt. w/repair 135 LF $51.75 $6, L-861 Medium-Intensity, Elevated Base-Mounted 19 L-125 Taxiway Edge Light 65 EA $ $63, L-125 L-867 Junction Box, 12" Diameter, In Unpaved Area 6 EA $ $3, L-858 Internally-Illuminated Sign, 3 or 4 Module, Size 2, 21 L-125 Style 2, with Concrete Pad 5 EA $6, $31, L-125 L-858 Internally-Illuminated Sign, 1 or 2 Module, Size 2, Style 2, with Concrete Pad 6 EA $5, $34, L-125 Remove and Dispose Exist. Stake-Mtd. Edge Lights 6 EA $57.50 $ T-904 Sodding 1,500 SY $4.60 $6, T-901 Seed & Mulching 3 AC $1, $5, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $752, A Permitting 5% $37, B Professional Fees 25% $188, C Contingency 15% $112, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $1,091, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY TAXIWAY 'A' - PHASE 1

27 MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 23 - CONSTRUCT ADDITIONAL PAVEMENT AT RUNWAY 9R END AND EXTEND TAXIWAY 'L' TO NEW TAKEOFF END Project includes the construction of additional pavement at Runway 9R (100 ft. x 700 ft.) including extensions of Taxiway L (35 ft. x 700 ft. plus end connector) to new takeoff end at R/W 9R. New full-strength runway construction assumed to includes: 12" LBR=40 subbase, 8" limerock base material, and 2" bituminous surface course. Project includes runway and taxiway marking, runway and taxiways lighting and signage. Assumed construction provided per FAA specifications. 1 SP Prevention, Control and Abatement of Erosion 1 LS $11, $11, SP Security & Traffic Control during Construction 1 LS $7, $7, P-152 Clear & Grub 14,800 SY $5.75 $85, P-152 Earthwork (off-site fill) 10,000 CY $15.53 $155, P-154 LBR=40 Subbase (12") 14,800 SY $8.63 $127, P-211 Limerock Base (8") 14,600 SY $17.25 $251, P-401 Bituminous Surface Course 1,600 TN $98.90 $158, P-602 Bituminous Prime Coat 6,500 GAL $2.30 $14, P-630 Saw-Cut Existing Pavement and Connect New Pvmt. 500 LF $1.73 $ P-620 Runway and Taxiway Painting 7,500 SF $2.01 $15, L-108 8, 5000 V., L-824 Type 'C' Conductor, in Conduit 3,250 LF $1.73 $5, L Bare Stranded Copper Counterpoise Wire 3,250 LF $2.76 $8, L-108 Trench in Unpaved Area (For 1 Conduit) 3,250 LF $3.45 $11, L-108 3/4" Dia. x 10' Long Copper Clad Ground Rod 12 EA $ $1, L-109 Vault Modifications and Upgrades 1 LS $28, $28, L-110 2" PVC Conduit, In Trench 3,250 LF $2.30 $7, L-110 1W2" Concrete-Encased Duct in Unpaved Area 500 LF $28.75 $14, L-110 1W2" Conc.-Encased Duct In Exist Pvmt. w/repair 135 LF $51.75 $6, L-861 Medium-Intensity, Elevated Base-Mounted 19 L-125 Taxiway Edge Light 40 EA $ $39, L-861 Medium-Intensity, Elevated Base-Mounted 20 L-125 Runway Edge Light 14 EA $ $13, L-125 L-867 Junction Box, 12" Diameter, In Unpaved Area 4 EA $ $2, L-858 Internally-Illuminated Sign, 3 or 4 Module, Size 22 L-125 2, Style 2, with Concrete Pad 10 EA $6, $63, L-858 Internally-Illuminated Sign, 1 or 2 Module, Size 23 L-125 2, Style 2, with Concrete Pad 5 EA $5, $28, L-125 Remove and Dispose Exist. Stake-Mtd. Edge Lights 6 EA $57.50 $ T-904 Sodding 1,800 SY $4.60 $8, T-901 Seed & Mulching 5 AC $1, $8, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $1,077, A Permitting 5% $53, B Professional Fees 25% $269, C Contingency 15% $161, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $1,561, ADDITIONAL PAVEMENT AT END OF RUNWAY 9R FOR TAKEOFF 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

28 MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 24 - CONSTRUCT ADDITIONAL PAVEMENT AT RUNWAY 27L END AND EXTEND TAXIWAYS 'L' TO NEW TAKEOFF END Project includes the construction of additional pavement at Runway 27L (100 ft. x 655 ft.) including extensions of Taxiways L (40 ft. x 655 ft. plus end connectors) to new takeoff end at R/W 27L. New full-strength runway construction assumed to includes: 12" LBR=40 subbase, 8" limerock base material, and 2" bituminous surface course. Project includes runway and taxiway marking, runway and taxiways lighting and signage. Assumed construction provided per FAA specifications. 1 SP Prevention, Control and Abatement of Erosion 1 LS $11, $11, SP Security & Traffic Control during Construction 1 LS $7, $7, P-152 Clear & Grub 12,000 SY $5.75 $69, P-152 Earthwork (off-site fill) 7,900 CY $15.53 $122, P-154 LBR=40 Subbase (12") 11,800 SY $8.63 $101, P-211 Limerock Base (8") 11,700 SY $17.25 $201, P-401 Bituminous Surface Course 1,300 TN $98.90 $128, P-602 Bituminous Prime Coat 5,200 GAL $2.30 $11, P-630 Saw-Cut Existing Pavement and Connect New Pvmt. 400 LF $1.73 $ P-620 Runway and Taxiway Painting 5,600 SF $2.01 $11, L-108 8, 5000 V., L-824 Type 'C' Conductor, in Conduit 3,400 LF $1.73 $5, L Bare Stranded Copper Counterpoise Wire 3,400 LF $2.76 $9, L-108 Trench in Unpaved Area (For 1 Conduit) 3,400 LF $3.45 $11, L-108 3/4" Dia. x 10' Long Copper Clad Ground Rod 18 EA $ $1, L-109 Vault Modifications and Upgrades 1 LS $28, $28, L-110 2" PVC Conduit, In Trench 3,400 LF $2.30 $7, L-110 1W2" Concrete-Encased Duct in Unpaved Area 1,000 LF $28.75 $28, L-110 1W2" Conc.-Encased Duct In Exist Pvmt. w/repair 250 LF $51.75 $12, L-861 Medium-Intensity, Elevated Base-Mounted 19 L-125 Taxiway Edge Light 26 EA $ $25, L-125 L-861 Medium-Intensity, Elevated Base-Mounted Runway Edge Light 16 EA $ $15, L-125 L-867 Junction Box, 12" Diameter, In Unpaved Area 8 EA $ $4, L-858 Internally-Illuminated Sign, 4 Module, Size 2, 22 L-125 Style 2, with Concrete Pad 2 EA $6, $12, L-858 Internally-Illuminated Sign, 3 Module, Size 2, 23 L-125 Style 2, with Concrete Pad 1 EA $5, $5, L-858 Internally-Illuminated Sign, 2 Module, Size 2, 24 L-125 Style 2, with Concrete Pad 2 EA $5, $10, L-858 Internally-Illuminated Sign, 1 Module, Size 2, 25 L-125 Style 2, with Concrete Pad 2 EA $4, $9, L-125 Remove and Dispose Exist. Stake-Mtd. Edge Lights 12 EA $57.50 $ T-904 Sodding 2,700 SY $4.60 $12, T-901 Seed & Mulching 6 AC $1, $10, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $881, A Permitting 5% 44, B Professional Fees 25% 220, C Contingency 15% 132, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $1,277, PAVEMENT EXTENSION FOR RW 27L WITH TW 'L' EXTENSION FOR RUNWAY TAKE-OFF 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

29 NORTH PERRY AIRPORT MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 25 - CONSTRUCT TAXIWAY 'M' REHABILITATION Project includes the rehabilitation of TW M pavement (35 ft. x 3,150 ft.) including associated taxiway connectors as depicted in exhibit below, excluding pavement within 125 ft. of RW 18R-36L, RW 18L-36R, and RW9R-36L. Rehabilitation assumed to include milling 1½" of existing asphalt surface and overlay of 2" asphalt surface. Project includes sodding at pavement edges and new taxiway markings. Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $17, $17, P-104 Prevention, Control & Abatement of Erosion 1 LS $28, $28, P-490 Pavement Milling, 1 1/2" Min. 25,600 SY $6.90 $176, P-401 Bituminous Surface Course 2,800 TN $98.90 $276, P-602 Bituminous Prime Coat 11,500 GAL $2.30 $26, P-620 Runway and Taxiway Painting 8,500 SF $2.01 $17, T-904 Sodding 3,500 SY $4.60 $16, T-901 Seeding & Mulching 3 AC $1, $5, SUB- CONSTRUCTION COSTS (ROUNDED) $564, A Permitting 5% $28, B Professional Fees 25% $141, C Contingency 15% $84, $818, DEVELOPMENT COSTS (ROUNDED) REHABILITATION TW 'M' 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

30 MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 26 - REPLACE PAPI's FOR RUNWAY 9R-27L Project includes replacing the existing PAPI-2 System for Runway 27L and replacing the existing PAPI-4 system at Runway 9R. Assumed construction conducted per FAA specifications. 1 A Mobilization and Maintenance of Traffic 1 LS 6, , B Remove and Dispose of Existing PAPI Systems 2 EA 2, , L-108 8, 5000 V., L-824 Type "C" Conductor, in Conduit 4,000 LF , L Bare-Stranded Copper Counterpoise Wire, in Trench 1,800 LF , L-108 Trench in Unpaved Area 1,600 LF , L-108 Trench in Existing Pavement, with Pavement Repair 300 LF , L-108 3/4" x 10' Long Copper Clad Ground Rod with Connector 6 EA L-110 2" PVC Conduit, in Trench 2,000 LF , L-125 New PAPI-2 System, Installed 1 EA 32, , L-125 New PAPI-4 System, Installed 1 EA 55, , L-125 New L " Diameter Junction Box 4 EA , SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $113, Permitting 5% $5, Professional Fees 10% $28, Contingency 15% $17, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $164, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY Efficient Optics High output Simple maintenance 2. Modular Projectors Minimal system downtime Improved Maintenance 3. Rigid Base Interchangeable projectors Stable optical reference 4. Level Screw Assembly Quick adjustment Precise setting 5. Three Leg Support Inherently rigid No induced stress or fatigue

31 MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 27 - REPLACE PAPI's FOR RUNWAY 18R-36L Project includes replacing the PAPI-2 Systems for both Runway 18R & 36L. per FAA specifications. Assumed construction conducted 1 A Mobilization and Maintenance of Traffic 1 LS $6, $6, B Remove and Dispose of Existing PAPI Systems 2 EA $2, $5, L-108 8, 5000 V., L-824 Type "C" Conductor, in Conduit 4,000 LF $0.86 $3, L Bare-Stranded Copper Counterpoise Wire, in Trench 1,800 LF $0.58 $1, L-108 Trench in Unpaved Area 1,600 LF $1.73 $2, L-108 Trench in Existing Pavement, with Pavement Repair 300 LF $5.75 $1, L-108 3/4" x 10' Long Copper Clad Ground Rod with Connector 6 EA $80.50 $ L-110 2" PVC Conduit, in Trench 2,000 LF $1.38 $2, L-125 New PAPI-2 System, Installed 2 EA $32, $64, L-125 New L " Diameter Junction Box 4 EA $ $1, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $90, Permitting 5% $4, Professional Fees 10% $22, Contingency 15% $13, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $131, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY Efficient Optics High output Simple maintenance 2. Modular Projectors Minimal system downtime Improved Maintenance 3. Rigid Base Interchangeable projectors Stable optical reference 4. Level Screw Assembly Quick adjustment Precise setting 5. Three Leg Support Inherently rigid No induced stress or fatigue 6. Frangible Feet

32 MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 28 - REPLACE PAPI's FOR RUNWAY 9L-27RL Project includes replacing the PAPI-2 Systems for both Runway 18L & 27R. Assumed construction conducted per FAA specifications. 1 A Mobilization and Maintenance of Traffic 1 LS 6, $6, B Remove and Dispose of Existing PAPI Systems 2 EA 2, $5, L-108 8, 5000 V., L-824 Type "C" Conductor, in Conduit 4,000 LF 0.86 $3, L Bare-Stranded Copper Counterpoise Wire, in Trench 1,800 LF 0.58 $1, L-108 Trench in Unpaved Area 1,600 LF 1.73 $2, L-108 Trench in Existing Pavement, with Pavement Repair 300 LF 5.75 $1, L-108 3/4" x 10' Long Copper Clad Ground Rod with Connector 6 EA $ L-110 2" PVC Conduit, in Trench 2,000 LF 1.38 $2, L-125 New PAPI-2 System, Installed 2 EA 32, $64, L-125 New L " Diameter Junction Box 4 EA $1, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $90, Permitting 5% $4, Professional Fees 10% $22, Contingency 15% $13, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $131, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY Efficient Optics High output Simple maintenance 2. Modular Projectors Minimal system downtime Improved Maintenance 3. Rigid Base Interchangeable projectors Stable optical reference 4. Level Screw Assembly Quick adjustment Precise setting 5. Three Leg Support Inherently rigid No induced stress or fatigue 6. Frangible Feet Minimal ground hazard Certified performance

33 NORTH PERRY AIRPORT MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 29 - REPLACE PAPI's FOR RUNWAY 18L-36R Project includes replacing the PAPI-2 Systems for both Runway 18L & 36R. FAA specifications. Assumed construction conducted per 1 A Mobilization and Maintenance of Traffic 1 LS $6, $6, B Remove and Dispose of Existing PAPI Systems 2 EA $2, $5, L-108 8, 5000 V., L-824 Type "C" Conductor, in Conduit 4,000 LF $0.86 $3, L Bare-Stranded Copper Counterpoise Wire, in Trench 1,800 LF $0.58 $1, L-108 Trench in Unpaved Area 1,600 LF $1.73 $2, L-108 Trench in Existing Pavement, with Pavement Repair 300 LF $5.75 $1, L-108 3/4" x 10' Long Copper Clad Ground Rod with Connector 6 EA $80.50 $ L-110 2" PVC Conduit, in Trench 2,000 LF $1.38 $2, L-125 New PAPI-2 System, Installed 2 EA $32, $64, L-125 New L " Diameter Junction Box 4 EA $ $1, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $90, Permitting 5% $4, Professional Fees 10% $22, Contingency 15% $13, ESTIMATED CONSTRUCTION COSTS (ROUNDED) 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: $131, COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

34 MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 30 - NW APRON PAVEMENT SEALCOAT Project includes sealcoat of NW Apron pavement (925 ft. x 300 ft.) Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $2, $2, P-104 Prevention, Control & Abatement of Erosion 1 LS $14, $14, A-300 Tie Down Anchors Removal 100 EA $17.25 $1, A-300 Tie Down Anchors Installed 100 EA $ $34, P-620 Apron Marking and Painting 1,250 SF $1.73 $2, M-2 Protective Micro-Surfacing (Seal Coat) 22,000 SY $4.60 $101, T-904 Sodding 1,000 SY $4.60 $4, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $161, A Permitting $8, B Professional Fees $40, C Contingency $24, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $233, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY NW APRON REHABILITATION

35 MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT SE APRON PAVEMENT SEALCOAT Project includes sealcoat of SE Apron pavement (925 ft. x 300 ft.) Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $2, $2, P-104 Prevention, Control & Abatement of Erosion 1 LS $14, $14, A-300 Tie Down Anchors Removal 100 EA $17.25 $1, A-300 Tie Down Anchors Installed 100 EA $ $34, P-620 Apron Marking and Painting 2,000 SF $1.73 $3, M-2 Protective Micro-Surfacing (Seal Coat) 37,900 SY $4.89 $185, T-904 Sodding 2,000 SY $4.60 $9, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $251, A Permitting 12, B Professional Fees 62, C Contingency 37, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $364, SE APRON REHABILITATION 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

36 MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT TAXIWAY 'N' LIGHTING PROJECT Project consists of installing medium intensity taxiway lighting (MITL) Taxiway 'N' from Runway 18R-36L to Runway 27R (3,100 ft + 3 connectors to Runway 9R-27L). Assumed construction conducted per FAA specifications. 1 B4 Compliance with State of Florida Trench Safety Act 1 LS $2, $2, L-108 8, 5000 V., L-824 Type 'C' Conductor, Installed in Conduit 8,000 LF $2.88 $20, L Bare Stranded Copper Counterpoise Wire, In Trench 8,000 LF $0.69 $4, L-108 Trench in Unpaved Area (For 1 Conduit) 8,000 LF $2.30 $16, L-108 3/4" Dia. x 10' Long Copper Clad Ground Rod 32 EA $92.00 $2, L-110 2" PVC Conduit, In Trench 8,000 LF $2.30 $16, L-110 2W3" Concrete-Encased Duct In Pavement with Pavement Repair 500 LF $ $92, L-110 2W3" Concrete-Encased Duct In Unpaved Area 120 LF $ $18, L-125 New L-861 Medium-Intensity, Elevated Base-Mtd. TW Edge Lt. 150 EA $ $120, L-125 L-867 Junction Box, 12" Diameter, In Unpaved Area 40 EA $ $20, Sodding 4,000 SY $4.03 $16, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $328, Permitting 5% $16, Professional Fees 25% $82, Contingency 15% $49, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $475, TAXIWAY 'N' LIGHTING PROJECT 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

37 MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 33 - TAXIWAY 'L' LIGHTING PROJECT Project consists of replacing existing medium intensity taxiway lighting (MITL) along Taxiway 'L' from Runway 9R to 27L including 8 connectors to Runway 9R-27L. Assumed construction conducted per FAA specifications. 1 B4 Compliance with State of Florida Trench Safety Act 1 LS $2, $2, L-108 8, 5000 V., L-824 Type 'C' Conductor, Installed in Conduit 10,865 LF $2.88 $31, L Bare Stranded Copper Counterpoise Wire, In Trench 10,865 LF $0.69 $7, L-108 Trench in Unpaved Area (For 1 Conduit) 10,300 LF $2.30 $23, L-108 3/4" Dia. x 10' Long Copper Clad Ground Rod 55 EA $92.00 $5, L-110 2" PVC Conduit, In Trench 10,865 LF $2.30 $24, L-110 2W3" Concrete-Encased Duct In Pavement with Pavement Repair 600 LF $ $127, L-110 2W3" Concrete-Encased Duct In Unpaved Area 120 LF $ $20, L-125 New L-861 Medium-Intensity, Elevated Base-Mounted Taxiway Edge Light 190 EA $ $174, L-125 L-867 Junction Box, 12" Diameter, In Unpaved Area 32 EA $ $18, Sodding 12,000 SY $4.03 $48, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $485, Permitting $24, Professional Fees $121, Contingency $72, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $703, TAXIWAY 'L' LIGHTING PROJECT 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

38 MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 34 - INSTALL REFLECTORS ON UNLIT TAXIWAYS Project includes Installation and/or replacement of taxiway retro reflective markers along edges of unlit taxiways. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $5, $5, L-853 Retro reflective Edge Markers 150 EA $ $17, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $23, A Permitting 5% $1, B Professional Fees 25% $5, C Contingency 15% $3, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $33, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY RETROREFLECTIVE EDGE\ MARKER

39 NORTH PERRY AIRPORT MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 35 - SECURITY FENCING & GATES UPGRADES Project includes replacement of 5,000 ft. of security fencing and upgrade and/or installation of 5 electronic, card-controlled access security gates located around airport. Project includes modifications to existing access control system. Fencing installation per FAA specifications. 1 L-853 Upgrade and Replace Security Access Gates 5 EA $14, $71, L-853 Provide Electrical to Access Gates 5 EA $2, $14, L-853 Modify Access Control System 1 LS $17, $17, F-162 Fence Removal 5,000 LFT $1.73 $8, F ft. Chain Link Fence w/3 Strand Barbed Wire 5,000 LFT $18.98 $94, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $207, A Permitting 5% $10, B Professional Fees 25% $51, C Contingency 15% $31, DEVELOPMENT COSTS (ROUNDED) $300, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY ELECTRONIC CARD-CONTROLLED ACCESS SECURITY GATE

40 MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 36 - LANDSCAPING & WAYFINDING IMPROVEMENTS Project consists of landscaping including installation of trees, bushes, and grasses as determined in the landscape plan. Trees are not recommended in the runway protection zones. 1 T-907 Trees w/braces 30 EA $ $12, T-907 Large Bush for focal points 200 EA $ $34, T-907 Small Bush for focal points 200 EA $97.75 $19, T-907 Decorative Grasses for focal points 200 EA $28.75 $5, T-904 Sodding for focal points 3,500 SY $5.75 $20, T-904 Misc. Decorative Feature 5 EA $1, $7, SP Irrigation System for focal points 2 EA $28, $57, SP Compliance with Florida State Trench Safety Act 1 LS $4, $4, SP Install Custom Information/Direction Signs 6 EA $4, $24, SUB- CONSTRUCTION COSTS (ROUNDED) $185, A Permitting 5% $9, B Professional Fees 25% $46, C Contingency 15% $27, DEVELOPMENT COSTS (ROUNDED) $269, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

41 MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 37 - DEMOLISH MISCELLANEOUS BUILDINGS Project includes the demolition of two existing buildings at North Perry Airport. Assumed demolition per City of Pembroke Pines and Broward County specifications. 1 SP Prevention, Control, and Abatement of Erosion 2 EA $1, $3, SP Utility Disconnects 2 EA $ $1, SP Demolition of Building 50,000 CF $0.40 $20, SP Haul Cost 130 LD $86.25 $11, SP Dump Fees (Off Site) 400 YD $46.00 $18, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $54, A Permitting 5% $2, B Professional Fees 25% $13, C Contingency 15% $8, DEVELOPMENT COSTS (ROUNDED) $78, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

42 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 14 - SEWER CONNECTION PROJECT PHASE 1 (North Area) LINE Scope of Project includes providing sanitary sewer line with lift station on the north side of airport along SW 77th Way including approximately 3,500 ft. which will tie-in to existing Sanitary Sewer Force Main along Pines Blvd. Assumed connections to existing force main located along Pines Boulevard operated by the City of Pembroke Pines. 1 SP Compliance with Florida Trench Safety Act 1 LS $9, $9, SS-1 Core/Bore Existing Manhole & Install New & Seal 1 EA $ $ SS-2 Trench & Backfill (no pavement) 5,000 CY $17.25 $86, LS Lift Station (complete) 1 LS $40, $40, SS-3 Sanitary Sewer (12") SS 3,500 LF $94.30 $330, SS-4 Sanitary Manhole 4 EA $4, $16, T-901 Seeding & Mulching 1 AC $1, $1, SUB- CONSTRUCTION COSTS (ROUNDED) $484, A Permitting 5% $24, B Professional Fees 25% $121, C Contingency 15% $72, DEVELOPMENT COSTS (ROUNDED) $702, SEWER CONNECTION PROJECT PHASE 1 (North Area) 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

43 SHORT TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 13 - SEWER CONNECTION PROJECT PHASE 2 (South Area) LINE Scope of Project includes providing sanitary sewer line with lift station on the south side of airport including approximately 10,000 ft. which will tie-in to existing Sanitary Sewer Force Main. Assumed connections to existing force main located along Pembroke Road operated by City of Miramar. 1 SP Compliance with Florida Trench Safety Act 1 LS $9, $9, SS-1 Core/Bore Existing Manhole & Install New & Seal 1 EA $ $ SS-2 Trench & Backfill (no pavement) 22,500 CY $17.25 $388, LS Lift Station (complete) 1 LS $40, $40, SS-3 Sanitary Sewer (12") SS 10,000 LF $94.30 $943, SS-4 Sanitary Manhole 12 EA $4, $48, T-901 Seeding & Mulching 3 AC $1, $5, SUB- CONSTRUCTION COSTS (ROUNDED) $1,434, A Permitting 5% $71, B Professional Fees 25% $358, C Contingency 15% $215, DEVELOPMENT COSTS (ROUNDED) $2,080, SEWER CONNECTION PROJECT PHASE 2 (South Area) 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

44 NORTH PERRY AIRPORT MID-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 40 - MASTER PLAN UPDATE Professional Services to prepare a Master Plan Update for the Airport, including review of minimum standards and leasing and development policies. No construction included in budget, professional services only 0.00 SUB- CONSTRUCTION COSTS (ROUNDED) $ A Permitting for SFWMD None $ B Professional Fees Budget Estimate $500, C Contingency 15% $75, PROFESSIONAL SERVICES COSTS (ROUNDED) $575,000.00

45 LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 41 - RUNWAY 9R - 27L PAVEMENT REHABILITATION Project includes rehabilitation of RW 9R-27L Pavement (100 ft. x 3,255 ft.) plus 8 taxiway/runway intersections (out to 125 ft. either side of RW 9R-27L centerline). Assumed to exclude additional overruns constructed in mid-term. Rehabilitation assumed to include milling 1½" of existing asphalt surface and overlay of 2" asphalt surface. Project includes sodding at pavement edge and new pavement markings. Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $17, $17, P-102 Closed Runway Signs 2 EA $1, $2, P-104 Prevention, Control & Abatement of Erosion 1 LS $28, $28, P-490 Pavement Milling, 1 1/2" Min. 51,300 SY $6.90 $353, P-401 Bituminous Surface Course 5,700 TN $98.90 $563, P-602 Bituminous Prime Coat 23,000 GAL $2.30 $52, P-620 Runway and Taxiway Painting 36,500 SF $2.01 $73, T-904 Sodding 10,250 SY $4.60 $47, T-901 Seeding & Mulching 3 AC $1, $5, SUB- CONSTRUCTION COSTS (ROUNDED) $1,145, A Permitting 5% $57, B Professional Fees 25% $286, C Contingency 15% $171, DEVELOPMENT COSTS (ROUNDED) $1,660, RUNWAY 9R-27L REHABILITATION 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

46 LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 42 - RUNWAY 18L-36R PAVEMENT PAVEMENT REHABILITATION LINE Project includes rehabilitation of RW 18L-36R Pavement (100 ft. x 3,260 ft.) plus 9 taxiway/runway intersections (out to 125 ft. either side of RW 18L-36R centerline). Rehabilitation assumed to include milling 1½" of existing asphalt surface and overlay of 2" asphalt surface. Project includes sodding at pavement edge and new pavement markings. Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $17, $17, P-102 Closed Runway Signs 2 EA $1, $2, P-104 Prevention, Control & Abatement of Erosion 1 LS $28, $28, P-490 Pavement Milling, 1 1/2" Min. 49,300 SY $6.90 $340, P-401 Bituminous Surface Course 5,500 TN $98.90 $543, P-602 Bituminous Prime Coat 22,100 GAL $2.30 $50, P-620 Runway and Taxiway Painting 15,000 SF $2.01 $30, T-904 Sodding 10,250 SY $4.60 $47, T-901 Seeding & Mulching 3 AC $1, $5, SUB- CONSTRUCTION COSTS (ROUNDED) $1,066, A Permitting 5% $53, B Professional Fees 25% $266, C Contingency 15% $159, DEVELOPMENT COSTS (ROUNDED) $1,546, RUNWAY 18L-36R REHABILITATION 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

47 NORTH PERRY AIRPORT LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 43 - CONSTRUCT TAXIWAY 'D' REHABILITATION Project includes rehabilitation of TW 'D' Pavement (40 ft. x 2,840 ft) including associated taxiway connectors as depicted in exhibit below, excluding pavement within 125 ft. of RW 9L-27R and RW 9R-27L and RW 18L. Rehabilitation assumed to include milling 1½" of existing asphalt surface and overlay of 2" asphalt surface. Project includes sodding at pavement edges and new taxiway markings. Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $17, $17, P-104 Prevention, Control & Abatement of Erosion 1 LS $28, $28, P-490 Pavement Milling, 1 1/2" Min. 20,000 SY $6.90 $138, P-401 Bituminous Surface Course 2,200 TN $98.90 $217, P-602 Bituminous Prime Coat 9,000 GAL $2.30 $20, P-620 Runway and Taxiway Painting 1,500 SF $2.01 $3, T-904 Sodding 2,750 SY $4.60 $12, T-901 Seeding & Mulching 1 AC $1, $1, SUB- CONSTRUCTION COSTS (ROUNDED) $439, A Permitting 5% $21, B Professional Fees 25% $109, C Contingency 15% $65, DEVELOPMENT COSTS (ROUNDED) $637, TAXIWAY 'D' REHABILITATION 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

48 NORTH PERRY AIRPORT LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 44 - CONSTRUCT TAXIWAY 'E' REHABILITATION Project includes rehabilitation of TW 'E' Pavement (35 ft. x 2,840 ft) including associated taxiway connectors as depicted in exhibit below, excluding pavement within 125 ft. of RW 9L-27R and RW 9R-27L and RW 18L. Rehabilitation assumed to include milling 1½" of existing asphalt surface and overlay of 2" asphalt surface. Project includes sodding at pavement edges and new taxiway markings. Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $17, $17, P-104 Prevention, Control & Abatement of Erosion 1 LS $28, $28, P-490 Pavement Milling, 1 1/2" Min. 17,900 SY $6.90 $123, P-401 Bituminous Surface Course 2,000 TN $98.90 $197, P-602 Bituminous Prime Coat 8,000 GAL $2.30 $18, P-620 Runway and Taxiway Painting 1,500 SF $2.01 $3, T-904 Sodding 2,500 SY $4.60 $11, T-901 Seeding & Mulching 1 AC $1, $1, SUB- CONSTRUCTION COSTS (ROUNDED) $402, A Permitting 5% $20, B Professional Fees 25% $100, C Contingency 15% $60, DEVELOPMENT COSTS (ROUNDED) $582, TAXIWAY 'E' REHABILITATION 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

49 LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 45 - CONSTRUCT TAXIWAY 'L' REHABILITATION Project includes rehabilitation of TW 'L' Pavement (35 ft. x 3,200 ft.) including associated taxiway connectors as depicted in exhibit below, excluding pavement within 125 ft. of RW 9R-27L. Rehabilitation assumed to include milling 1½" of existing asphalt surface and overlay of 2" asphalt surface. Project includes sodding at pavement edges and new taxiway markings. Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $17, $17, P-104 Prevention, Control & Abatement of Erosion 1 LS $28, $28, P-490 Pavement Milling, 1 1/2" Min. 25,300 SY $6.90 $174, P-401 Bituminous Surface Course 2,800 TN $98.90 $276, P-602 Bituminous Prime Coat 11,300 GAL $2.30 $25, P-620 Runway and Taxiway Painting 4,500 SF $2.01 $9, T-904 Sodding 4,000 SY $4.60 $18, T-901 Seeding & Mulching 4 AC $1, $6, SUB- CONSTRUCTION COSTS (ROUNDED) $557, A Permitting 5% $27, B Professional Fees 25% $139, C Contingency 15% $83, DEVELOPMENT COSTS (ROUNDED) $809, TAXIWAY 'L' REHABILITATION 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

50 NORTH PERRY AIRPORT LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 46 - IMPROVEMENTS TO AIR TRAFFIC CONTROL TOWER & SUPPORT BUILDING Budget amount for improvements to ATCT and support building. 1 SP Building Improvements 1 LS $345, $345, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $345, A Permitting $17, B Professional Fees $86, C Contingency $51, ESTIMATED CONSTRUCTION COSTS (ROUNDED) 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: $501, COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

51 NORTH PERRY AIRPORT LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 47 - CONSTRUCT AIRPORT HELIPAD Design and construct helipad per FAA Heliport Design Guide, FAA AC 150/ M-1-1 Paint Helipad Markings 1 LS 11, , SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $11, A Permitting Budget Estimate $5, B Professional Fees Budget Estimate $15, C Contingency 15% $3, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $35, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: CONSTRUCT HELIPAD 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

52 LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 48 - NW APRON PAVEMENT SEALCOAT Project includes sealcoat of NW Apron pavement (925 ft. x 300 ft.) Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $2, $2, P-104 Prevention, Control & Abatement of Erosion 1 LS $14, $14, A-300 Tie Down Anchors Removal 100 EA $17.25 $1, A-300 Tie Down Anchors Installed 100 EA $ $34, P-620 Apron Marking and Painting 1,250 SF $1.73 $2, M-2 Protective Micro-Surfacing (Seal Coat) 22,000 SY $4.60 $101, T-904 Sodding 1,000 SY $4.60 $4, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $161, A Permitting $8, B Professional Fees $40, C Contingency $24, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $233, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY NW APRON REHABILITATION

53 LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 49 - SE APRON PAVEMENT SEALCOAT Project includes sealcoat of SE Apron pavement (925 ft. x 300 ft.) Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $2, $2, P-104 Prevention, Control & Abatement of Erosion 1 LS $14, $14, A-300 Tie Down Anchors Removal 100 EA $17.25 $1, A-300 Tie Down Anchors Installed 100 EA $ $34, P-620 Apron Marking and Painting 2,000 SF $1.73 $3, M-2 Protective Micro-Surfacing (Seal Coat) 37,900 SY $4.89 $185, T-904 Sodding 2,000 SY $4.60 $9, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $251, A Permitting $12, B Professional Fees $62, C Contingency $37, ESTIMATED CONSTRUCTION COSTS (ROUNDED) 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: $364, COSTS ARE BASED ON S DETERMINED AS OF JULY SE APRON REHABILITATION

54 LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 50 - LANDSCAPING & WAYFINDING IMPROVEMENTS Project consists of landscaping including installation of trees, bushes, and grasses as determined in the landscape plan. Trees are not recommended in the runway protection zones. 1 T-907 Trees w/braces 30 EA $ $12, T-907 Large Bush for focal points 200 EA $ $34, T-907 Small Bush for focal points 200 EA $97.75 $19, T-907 Decorative Grasses for focal points 200 EA $28.75 $5, T-904 Sodding for focal points 3,500 SY $5.75 $20, T-904 Misc. Decorative Feature 5 EA $1, $7, SP Irrigation System for focal points 2 EA $28, $57, SP Compliance with Florida State Trench Safety Act 1 LS $4, $4, SP Install Custom Information/Direction Signs 6 EA $4, $, $24, SUB- CONSTRUCTION COSTS (ROUNDED) $185, A Permitting 5% $9, B Professional Fees 25% $46, C Contingency 15% $27, DEVELOPMENT COSTS (ROUNDED) $269,500.00

55 NORTH PERRY AIRPORT LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 51 - OVERLAY AIRPORT ROADWAYS (AIRPORT ROAD & SW 77TH WAY) Project includes overlay of Airport Road and SW 77th Way (approximately 15,800 ft. x 24 ft.) as depicted in exhibit below. Assumed overlay includes 1 1/2 inch FDOT asphalt surface. Assumed construction conducted per Broward County specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $40, $40, P-104 Prevention, Control & Abatement of Erosion 1 LS $172, $172, FDOT Joint-Filling Compound, Type '6' 53,250 SY $1.73 $91, FDOT Bituminous Surface Course 4,400 TN $89.70 $394, FDOT Bituminous Prime Coat 20,000 GAL $1.73 $34, FDOT Roadway Marking 23,700 SF $1.15 $27, T-904 Sodding 17,500.0 SY $4.60 $80, T-901 Seeding & Mulching 10 AC $1, $17, FDOT Pavement Milling for Connections (0 To 1 3/4" Dp.) 10.0 DAYs $6, $69, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $927, A Permitting 5% $46, B Professional Fees 10% $231, C Contingency 15% $139, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $1,345, Perimeter Road So. Perimeter Road 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

56 NORTH PERRY AIRPORT LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 52 - EXTEND AIRPORT PERIMETER ROAD IN SE QUADRANT Project includes extension of perimeter road from SE quadrant towards Maxwell Park, and around perimeter of Park (1,750 ft x 24 ft) as depicted below. Connection of this extension to S.W. 72nd Avenue is not recommended due to potential traffic impacts on residential 72nd Avenue. Assumed pavement section includes 6" LBR=40 subbase, 8" base material and 1 1/2 inch FDOT asphalt surface. Assumed extension of roadway lighting system. No lights recommended within runway protection zone for Runway R/W27L. Assumed construction conducted per Broward County specifications. 1 SP Prevention, Control and Abatement of Erosion 1 LS $16, $16, SP Security & Traffic Control during Construction 1 LS $2, $2, FDOT Clear & Grub 5,000 SY $5.75 $28, FDOT Earthwork (off-site fill) 4,100 CY $15.53 $63, FDOT LBR=40 Subbase (12") 4,900 SY $8.63 $42, FDOT Limerock Base (8") 4,900 SY $17.25 $84, FDOT Bituminous Surface Course 400 TN $89.70 $35, FDOT Bituminous Prime Coat 2,000 GAL $1.73 $3, FDOT Saw-Cut Existing Pavement and Connect New Pvmt. 200 LF $1.73 $ FDOT Roadway Marking 875 SF $1.15 $1, FDOT Sodding 2,000.0 SY $4.60 $9, FDOT Seeding & Mulching 3 AC $1, $5, E-1 Electrical Supply System for Perimeter Rd. Lighting 1 LS $17, $17, E-2 Low-mounted Pole & Shielded Luminaire (complete) 8 EA $ $7, E-3 Power Cable in Trench 3,500 LF $2.01 $7, SP Compliance with Florida State Trench Safety Act 1 LS $5, $5, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $330, A Permitting 5% $16, B Professional Fees 25% $82, C Contingency 15% $49, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $479, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY EXTEND AIRPORT PERIMETER ROAD

57 NORTH PERRY AIRPORT LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 53 - CONSTRUCT TAXIWAY 'A' PAVEMENT - PHASE 2 Project consists of construction of a new asphalt Taxiway A (35 ft x 2,000 ft) from Taxiway N to R/W 18R including by-pass connector at R/W 18R. Assumed pavement section includes: 12" LBR=40 subbase, 8" limerock base material, and 2" bituminous surface course. Project Includes taxiway marking, lighting and signage. Assumed construction provided per FAA specifications. 1 SP Prevention, Control and Abatement of Erosion 1 LS $16, $16, SP Security & Traffic Control during Construction 1 LS $2, $2, P-152 Clear & Grub 8,000 SY $5.75 $46, P-152 Earthwork (off-site fill) 4,500 CY $15.53 $69, P-154 LBR=40 Subbase (12") 6,500 SY $8.63 $56, P-211 Limerock Base (8") 6,500 SY $17.25 $112, P-401 Bituminous Surface Course 750 TN $98.90 $74, P-602 Bituminous Prime Coat 2,900 GAL $2.30 $6, P-630 Saw-Cut Existing Pavement and Connect New Pvmt. 500 LF $1.73 $ P-620 Runway and Taxiway Painting 2,400 SF $2.01 $4, L-108 8, 5000 V., L-824 Type 'C' Conductor, in Conduit 4,600 LF $1.73 $7, L Bare Stranded Copper Counterpoise Wire 4,600 LF $2.76 $12, L-108 Trench in Unpaved Area (For 1 Conduit) 4,600 LF $3.45 $15, L-108 3/4" Dia. x 10' Long Copper Clad Ground Rod 16 EA $ $1, L-109 Vault Modifications and Upgrades 1 LS $16, $16, L-110 2" PVC Conduit, In Trench 4,600 LF $2.30 $10, L-110 1W2" Concrete-Encased Duct in Unpaved Area 750 LF $28.75 $21, L-110 1W2" Conc.-Encased Duct In Exist Pvmt. w/repair 250 LF $51.75 $12, L-861 Medium-Intensity, Elevated Base-Mounted Taxiway Edge 19 L-125 Light 100 EA $ $97, L-125 L-867 Junction Box, 12" Diameter, In Unpaved Area 12 EA $ $6, L-858 Internally-Illuminated Sign, 4 Module, Size 2, Style 2, 21 L-125 with Concrete Pad 3 EA $6, $18, L-858 Internally-Illuminated Sign, 3 Module, Size 2, Style 2, 22 L-125 with Concrete Pad 3 EA $5, $17, L-125 Remove and Dispose Exist. Stake-Mtd. Edge Lights 12 EA $57.50 $ T-904 Sodding 2,250 SY $4.60 $10, T-901 Seed & Mulching 4 AC $1, $6, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $648, A Permitting 5% $32, B Professional Fees 25% $162, C Contingency 15% $97, ESTIMATED CONSTRUCTION COSTS (ROUNDED) $940, TW 'A' PHASE 2 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2 COSTS ARE BASED ON S DETERMINED AS OF JULY 2007

58 NORTH PERRY AIRPORT LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 54 - SECURITY FENCING & GATES UPGRADES Project includes replacement of 5,000 ft. of security fencing and upgrade and/or installation of 5 electronic, card-controlled access security gates located around airport. Project includes modifications to existing access control system. Fencing installation per FAA specifications. 1 L-853 Upgrade and Replace Security Access Gates 5 EA $14, $71, L-853 Provide Electrical to Access Gates 5 EA $2, $14, L-853 Modify Access Control System 1 LS $17, $17, F-162 Fence Removal 5,000 LFT $1.73 $8, F ft. Chain Link Fence w/3 Strand Barbed Wire 5,000 LFT $18.98 $94, SUB- CONSTRUCTION COSTS $207, SUB- ESTIMATED CONSTRUCTION COSTS (ROUNDED) $207, A Permitting 5% $10, B Professional Fees 25% $51, C Contingency 15% $31, DEVELOPMENT COSTS $300, DEVELOPMENT COSTS (ROUNDED) $300, THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY ELECTRONIC CARD-CONTROLLED ACCESS SECURITY GATE

59 LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 55 - MASTER PLAN UPDATE ITE Professional Services to prepare a Master Plan Update for the Airport, including review of minimum standards and leasing and development policies. No construction included in budget, professional services only 0.00 SUB- CONSTRUCTION COSTS (ROUNDED) $ A Permitting None $ B Professional Fees Budget Estimate $500, C Contingency 15% $75, PROFESSIONAL SERVICES COSTS (ROUNDED) $575,000.00

60 LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 56 - UPGRADE ARFF VEHICLE LINE 1 SP Obtain new or upgraded Fire/Rescue vehicle 1 LS $45, $45, EQUIPMENT $45,000.00

61 LONG-TERM CAPITAL IMPROVEMENT PROGRAM PROJECT 57 - REPLACE ROTATING BEACON Professional Services to prepare a Master Plan Update for the Airport, including review of minimum standards and leasing and development policies. No construction included in budget, professional services only 75, SUB- CONSTRUCTION COSTS (ROUNDED) $75, A Permitting None $ B Professional Fees 25% $18, C Contingency 15% $11, DEVELOPMENT COSTS (ROUNDED) $105,000.00

62 PROJECT 58 - TAXIWAY 'B' PAVEMENT PAVEMENT REHABILITATION Project includes the rehabilitation of TW 'B' pavement (40 ft. x 2,800 ft.) including associated taxiway connectors as depicted in exhibit below, excluding pavement within 125 ft. of RW 9R-27L and RW 9L-27R. Rehabilitation assumed to include milling 1½" of existing asphalt surface and overlay of 2" asphalt surface. Project includes sodding at pavement edges and new taxiway markings. Assumed construction conducted per FAA specifications. 1 P-102 Safety, Security, Traffic Control & Barricades 1 LS $17, $17, P-104 Prevention, Control & Abatement of Erosion 1 LS $28, $28, P-490 Pavement Milling, 1 1/2" Min. 30,000 SY $6.90 $207, P-401 Bituminous Surface Course 3,300 TN $98.90 $326, P-602 Bituminous Prime Coat 13,500 GAL $2.30 $31, P-620 Runway and Taxiway Painting 3,800 SF $2.01 $7, T-904 Sodding 4,500 SY $4.60 $20, T-901 Seeding & Mulching 3 AC $1, $5, SUB- CONSTRUCTION COSTS (ROUNDED) $644, A Permitting 5% $32, B Professional Fees 25% $161, C Contingency 15% $96, DEVELOPMENT COSTS (ROUNDED) $933, TAXIWAY 'B' REHABILITATION 1. THE FOLLOWING MARK-UPS ARE INCLUDED IN THE COSTS SHOWN IN THE ESTIMATES: 2. COSTS ARE BASED ON S DETERMINED AS OF JULY 2007.

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008 BT-1 of 7 Clearing and Grubbing L.S. $50,000.00 $50,000.00 $5,335.00 $5,335.00 $14,560.00 $14,560.00 $20,000.00 $20,000.00 $10,600.00 $10,600.00 Class 1 Excavation 4300 C.Y. $20.00 $86,000.00 $15.00 $64,500.00

More information

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number) EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form. ADDENDUM #2 JUNE 30, 2017 APRON REHABILITATION PHASE 3 HENRY E. ROHLSEN AIRPORT ST. CROIX, U.S. VIRGIN ISLANDS FAA AIP No.: 3-78-0002-037-2017 This addendum modifies or interprets the proposal documents

More information

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the

More information

Alternative No. 1 Total Cost DRAFT

Alternative No. 1 Total Cost DRAFT OPINION OF PROBABLE PROJECT COSTS SUMMARY OF ALL THREE ALTERNATIVE ALIGNMENTS Item Description Alternative No. 1 Total Cost Alternative No. 2 Total Cost Alternative No. 3 Total Cost Design Phase 1. Preliminary

More information

UTILITY UNDERGROUNDING GRAUWYLER IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2

UTILITY UNDERGROUNDING GRAUWYLER IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2 UTILITY UNDERGROUNDING GRAUWYLER ROAD @ IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. ADDENDUM IS

More information

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, 2018 5:30 PM 600 S. Commerce Ave. Sebring, FL 33870 AGENDA 1 MEETING CALLED TO ORDER: Invitation to fill out "citizens not on the agenda

More information

1. Approved Manufacturers: Carlon Electrical Products, Cantex, or approved equal.

1. Approved Manufacturers: Carlon Electrical Products, Cantex, or approved equal. PART 1: GENERAL 1.01 Scope of Standard A. This standard provides general guidance concerning the specific preferences of Texas State University for for Electrical System. B. Texas State University recognizes

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $984,032.05 Gordon Contracting - Sangerville, ME $985,607.00 CPM Constructors - Freeport, ME $1,177,689.54 Page 1 of 7 Wyman & Simpson

More information

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17 S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

CHAPTER 11 CONDUITS AND FITTINGS

CHAPTER 11 CONDUITS AND FITTINGS CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1

More information

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

ENGINEERING DESIGN & IMPROVEMENT STANDARDS ENGINEERING DESIGN & IMPROVEMENT STANDARDS 2016 Prepared by: Engineering Division For latest edition of these Improvement Standards, refer to City of Visalia website at: www.visalia.city/engineeringdocuments

More information

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS PAGE : 133-1 CONTRACT TIME : 12/20/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-080-5(094) ROUTE 80 BRIDGE OVER ROUTE 287 NORTHBOUND AND SMITH ROAD GRADING, PAVING & STRUCTURRS CONTRACT

More information

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BID TABULATION SUMMARY JOB 940094 PAGE 1 STATE PROJECT NO. 162-080-04 BIDS RECEIVED UNTIL 11:00 A.M. ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BETWEEN 2ND STREET NORTH AND 15 STREET NORTH IN ST.

More information

CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION 7.1 TREE PROTECTION AREAS

CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION 7.1 TREE PROTECTION AREAS CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION Urban trees need to be protected from damage to maximize their health, safety, benefits and functionality. Mature, young and newly transplanted trees need

More information

ADDENDUM NO. 1 APRIL 24, 2017

ADDENDUM NO. 1 APRIL 24, 2017 DERBY DESTINATION DEVELOPMENT PUBLIC PROJECT NO. 1 EAST FREEDOM STREET PUBLIC PROJECT NO. 2 WEST FREEDOM STREET PUBLIC PROJECT NO. 3 WATERLINE IMPROVEMENTS PUBLIC PROJECT NO. 4 SANITARY SEWER IMPROVEMENTS

More information

HERNANDO COUNTY COMMUNICATION TOWER, ANTENNA & EQUIPMENT CABINET REVIEW REQUIREMENTS

HERNANDO COUNTY COMMUNICATION TOWER, ANTENNA & EQUIPMENT CABINET REVIEW REQUIREMENTS HERNANDO COUNTY COMMUNICATION TOWER, ANTENNA & EQUIPMENT CABINET REVIEW REQUIREMENTS The tower permit is based on the following: 1. The architect or engineer, upon request, must submit to the building

More information

Chapter 5.0 Alternatives Analysis

Chapter 5.0 Alternatives Analysis Chapter 5.0 Alternatives Analysis The Master Plan process thus far has accumulated the baseline of existing airport data, presented the outlook for the future in terms of operational activity, and defined

More information

CONDUITS AND FITTINGS

CONDUITS AND FITTINGS CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and

More information

Douglas County Traffic Signal Installation Guidelines (January 2013)

Douglas County Traffic Signal Installation Guidelines (January 2013) Douglas County Traffic Signal Installation Guidelines (January 2013) The following guidelines are minimum requirements for equipment installation. Section A. Poles and Foundations ( Wood, Concrete, Mast

More information

ATTACHMENT 8. Technical Specifications

ATTACHMENT 8. Technical Specifications Attachment 8 May 15, 2017 ATTACHMENT 8 TECHNICAL SPECIFICATIONS TABLE OF CONTENTS TECHNICAL SPECIFICATIONS Section Specification Title Pages No. 1-39 GENERAL 1-20 (not used) -- 21 Method of Determining

More information

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING March 9, 2018 This pamphlet is issued solely for the purpose of circulating advance information

More information

Section 2: Underground

Section 2: Underground Section 2: Underground GENERAL INSTALLATION REQUIREMENTS FOR UNDERGROUND FACILITIES Underground electric service and meter location will be established by NHEC upon site visit. In some instances the type,

More information

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS April 1, 2009 CITY OF PORTSMOUTH Public Works Department Bid #54-09 2009 Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS This Addendum forms part of the original document marked Bid #54-09 2009

More information

ARCHITECT: GENERAL NOTES 1. THE CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS AND ADVISE THE ENGINEER OF ANY CONFLICTS OF REPRESENTATION BETWEEN DRAWINGS AND/OR SPECIFICATIONS PRIOR TO COMMENCING

More information

UTILITY NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: TREE PROTECTION NOTES

UTILITY NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: TREE PROTECTION NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: UTILITY NOTES PROPOSED LEGEND 66.50 66.50 GROUND SPOT ELEVATION GROUND SPOT ELEVATION (MATCH EXISTING GRADE) MATCH EXISTING GRADE MITERED END SECTION

More information

NORTH OF THE PROPERTY ON BOYETTE ROAD, PUBLISHED ELEVATION 92.29' (NAVD88).

NORTH OF THE PROPERTY ON BOYETTE ROAD, PUBLISHED ELEVATION 92.29' (NAVD88). "REUSE OF THIS DOCUMENT: THE IDEAS & DESIGNS INCORPORATED INTO THIS DRAWING ARE PROVIDED AS A PROFESSIONAL SERVICE TO THIS CLIENT AND ARE THE PROPERTY OF MPH THESE IDEAS & DESIGNS ARE NOT TO BE USED FOR

More information

D-1 THE CITY OF HARRISBURG 1 1/2" MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2" MIN. ID-2 BINDER COARSE

D-1 THE CITY OF HARRISBURG 1 1/2 MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2 MIN. ID-2 BINDER COARSE EXISTING STREET SURFACE 1 1/2" MIN. ID-2 BINDER COARSE 1 1/2" MIN. ID-2 WEARING COARSE AC-20 SEALER (ALL AROUND) 8" CLASS A P.C. CONCRETE SAW CUT TOP OF CONCRETE SHALL MEET SURFACE OF EXISTING CONCRETE.

More information

Attachment D-1: Civil/Structural Scope of Work

Attachment D-1: Civil/Structural Scope of Work Attachment D-1: Civil/Structural Scope of Work Project: Location: Targa Sound Renewable Fuels Project Tacoma, WA Prepared by: NORWEST ENGINEERING Consulting Engineers 4110 N.E. 122 nd Avenue, Portland,

More information

Minnesota Airport System Pavement Evaluation 2010 Update

Minnesota Airport System Pavement Evaluation 2010 Update Minnesota Airport System Pavement Evaluation 2010 Update Park Rapids Municipal Airport (PKD) Park Rapids, Minnesota Prepared for: Office of Aeronautics Minnesota Department of Transportation 222 East Plato

More information

Pre-bid Conference Runway 17C-35C Rehabilitation Contract Number 9500514 10.18.17 1 Agenda Pre-Bid Conference Presentation Solicitation Logistics, RFB review, BDDD 11:00-11:30 Project Details 11:30-12:00

More information

10:00 AM, Wednesday, April 8, 2015

10:00 AM, Wednesday, April 8, 2015 NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, April 8, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference

More information

PARKING LOT AND ROADWAY MAINTENANCE

PARKING LOT AND ROADWAY MAINTENANCE Village of Vernon Hills Community Development Engineering Division Phone 847-367-3704 Fax 847-367-2541 PERMIT APPLICATION PROCESS PARKING LOT AND ROADWAY MAINTENANCE Removal and replacement, concrete and

More information

Aviation Capital Construction Program Update

Aviation Capital Construction Program Update Aviation Capital Construction Program Update 2012 Completed Projects 2013 Active Projects Bern Seals Program Manager Parsons Management Consultants April 2013 0 Discussion Agenda Program Safety Performance

More information

Federal Project No.: NONE

Federal Project No.: NONE Schedule of Items Page: 2 0001 BASE BID- STA. 10+00-23+00 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING (CONSTRUCTION) 0030 301 00110 LUMP SUM LUMP SUM CLRING AND

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE Skanska USA Civil West CA Dist. Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066100 DUST CONTROL LS 1 3,000.00

More information

STATE AID GUIDE FOR: Updated: December 16, 2005

STATE AID GUIDE FOR: Updated: December 16, 2005 STATE AID GUIDE FOR: Updated: December 16, 2005 1. AFTER THE FACT RIGHT OF WAY DEPARTMENT OF MINNESOTA TRANSPORTATION 2. MISCELLANEOUS AFTER THE FACT Traffic Signals, Lighting, Retaining Walls, Sidewalk,

More information

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO 42 380 68 coddington ave ledbetter road shawnee creek s patton street ledbetter road wesley ave 68 starr drive 42 twist run 85 35

More information

(Condensed from National Electric Code)

(Condensed from National Electric Code) WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

Perimeter Site Improvements

Perimeter Site Improvements Perimeter Site Improvements Phase 1-5 Architect: W+W Architects and Planners Anticipated Milestone Activities: Phase 1, 2 & 3 Construction Manager: Bernards 08.08.13 Directional Signage Contractor: Woodcliff

More information

Table of Contents for Guide Specifications

Table of Contents for Guide Specifications Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan

More information

Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11

Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11 Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11 Underground Residential Distribution (URD) Index General Discussion... 1-2 Description... 3-7 Drawings (Available

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

A. Product Data shall be provided for each type of product indicated.

A. Product Data shall be provided for each type of product indicated. 32 31 13 CHAIN LINK FENCES AND GATES SECTION 1 GENERAL 1.1 SUMMARY This Section includes the following: 1. Chain Link Fences 2. Gates for Chain Link Fences. See electrical specifications for electrical

More information

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # 2016-04 PROJECT SPECIFICATIONS TABLE OF CONTENTS SECTION 100 GENERAL... 1 SECTION 200 MATERIALS... 1 CONSTRUCTION METHODS... 1 SECTION

More information

CULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix B

CULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix B CULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix B RIVERDALE CITY CAPITAL FACILITIES PLAN CULINARY WATER Engineer's Cost Estimate January 2009 Project Name: Culinary Water Reservoir - Tank

More information

Virginia Department of Transportation. Tabulation of Bids. Counties: REPLACE SUPERSTRUCTURE OVER NORFOLK SOUTHERN RR

Virginia Department of Transportation. Tabulation of Bids. Counties: REPLACE SUPERSTRUCTURE OVER NORFOLK SOUTHERN RR Page 1 of 14 0010 00100 MOBILIZATION 0020 00101 CONSTRUCTION SURVEYING (CONSTRUCTION) 0030 00110 CLEARING AND GRUBBING 0040 00120 REGULAR EXCAVATION 0050 00126 EARTHWORK 0060 00140 BORROW EXCAVATION ACRE

More information

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project RES. NO. PROPOSAL FOR THE COMPLETION OF 2015-28 TO THE SATISFACTION OF THE BUTLER COUNTY COMMISSIONERS AND THE COUNTY ENGINEER: SAID WORK CONSISTING OF TYLERSVILLE ROAD IMPROVEMENTS, PHASE I TO THE COUNTY

More information

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction. General: 1. Construct utilities in accordance to TWA approved plans and shop drawings. Any deviation from the approved plans shall be approved by the DEVELOPER S ENGINEER and TWA 2. A preconstruction meeting

More information

Addendum No. 1 Page 1 of 2

Addendum No. 1 Page 1 of 2 Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT

More information

EXCAVATION PERMIT CHECKLIST

EXCAVATION PERMIT CHECKLIST EXCAVATION PERMIT CHECKLIST Complete These Forms ST. LOUIS COUNTY/MUNICIPAL ZONING APPROVAL FOR PERMIT APPLICATION EXCAVATION PERMIT APPLICATION Present These Documents Drawing showing location of excavation

More information

Preliminary Engineering Study. Richland Avenue Pedestrian Crossing. Volume I: Preliminary Report

Preliminary Engineering Study. Richland Avenue Pedestrian Crossing. Volume I: Preliminary Report Preliminary Engineering Study Richland Avenue Pedestrian Crossing Volume I: Preliminary Report SUBMITTED TO: City of Athens Engineering and Public Works Athens, Ohio SUBMITTED BY: January 12, 2016 Prepared

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

HARD COURT/RUNNING TRACK CONSTRUCTION. A. Section Includes: Tennis courts, basketball/volleyball courts, and running tracks.

HARD COURT/RUNNING TRACK CONSTRUCTION. A. Section Includes: Tennis courts, basketball/volleyball courts, and running tracks. PART 1 GENERAL 1.01 SUMMARY SECTION 02545 HARD COURT/RUNNING TRACK CONSTRUCTION A. Section Includes: Tennis courts, basketball/volleyball courts, and running tracks. B. Related Sections: 1. 02200 - Earthwork.

More information

REQUEST FOR PROPOSAL Asphalt & Concrete Repair

REQUEST FOR PROPOSAL Asphalt & Concrete Repair REQUEST FOR PROPOSAL 2017 Asphalt & Concrete Repair English Landing Elementary School Union Chapel Elementary School Lakeview Middle School Park Hill High School Prairie Point Elementary School Congress

More information

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL: N 1133521.33 E 1689742.43 STA: 10+53.07 INSTALL: 2-10" 90 BENDS CONNECT TO MIDDLEBUSH HALL INTERIOR PLANT PLUMBING MIDDLEBUSH HALL HW1 HWS HWR 10+00 FREDRICK APARTMENTS FINE ARTS INSTALL 422 LF 10" HWS

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 10/16/2014 Project 140522 Addendum No. 1 PID No. 76282 FRA USR 40

More information

CHESSIE BIKE-PED TRAIL - PHASE I TRUESDELL AVENUE TO KIAWANIS TELEDYNE PARK

CHESSIE BIKE-PED TRAIL - PHASE I TRUESDELL AVENUE TO KIAWANIS TELEDYNE PARK ------ TRAFFIC DATA A.A.D.T. (2010) A.A.D.T. (ED 2022) D.H.V. (2022) DIRECTIONAL DISTRIBUTION TRUCKS N/A N/A N/A N/A N/A CHESSIE BIKE-PED TRAIL - PHASE I TRUESDELL AVENUE TO KIAWANIS TELEDYNE PARK DES.

More information

Plan Name Plan No. Submitting Firm Contact Engineer. Review Date ESI Team ENGINEERS AND SURVEYORS INSTITUTE PEER REVIEW CHECKLIST CITY OF ALEXANDRIA

Plan Name Plan No. Submitting Firm Contact Engineer. Review Date ESI Team ENGINEERS AND SURVEYORS INSTITUTE PEER REVIEW CHECKLIST CITY OF ALEXANDRIA EROSION AND SEDIMENT CONTROL CHECKLIST (E&S) VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (1 of 2) Item # Description OK NO N/A 1 Limits of clearing and grading match on all appropriate sheets 2 Construction

More information

REQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY

REQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY REQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY The requirements contained herein are established to provide for orderly and systematic use of the county road rights-of-way within Union

More information

CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS

CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS December 2012 CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions Specifications...

More information

S P E C I F I C A T I O N S

S P E C I F I C A T I O N S Bid Set No. CONSTRUCT RELOCATED ROADWAY AND AIRPORT SERVICE RD. OUTSIDE RUNWAY OBJECT FREE AREA (ROFA); CONSTRUCT RELOCATED PARKING FOR: - AIRPORT PARKING LOT S C & D - FREUDENBERG-NOK - AMMON CENTER AIP

More information

TECHNICAL PROCEDURE TABLE OF CONTENTS

TECHNICAL PROCEDURE TABLE OF CONTENTS TECHNICAL PROCEDURE No. Page DATE: 07/3/5 CATEGORY UNDERGROUND STRUCTURES SUBJECT OF SMUD s UNDERGROUND TRANSMISSION TABLE OF CONTENTS PURPOSE... 2 2 REFERENCES... 2 3 MINIMUM REQUIREMENTS... 2 4 RELATED

More information

City of Wentzville. Standard Specifications and Construction Details Amendment List

City of Wentzville. Standard Specifications and Construction Details Amendment List Amendment No. 1 Standard Specifications and Construction Details Amendment List Date: September 21, 2009 Subject: SCD 700.23 - Residential Entrance Layout and drawing revised to more clearly show the location

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS TECHNICAL SPECIFICATIONS RUNWAY 1-19 RUNWAY SAFETY AREA (RSA) IMPROVEMENTS Construction Services At Farmingdale, New York Prepared by: URS Corporation NY An AECOM Company One Penn Plaza, Suite 600 New

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

The following is a summary of parameters for preparation of a traffic impact analysis when such analysis is required by the City of Highland:

The following is a summary of parameters for preparation of a traffic impact analysis when such analysis is required by the City of Highland: 9.0 TRAFFIC Traffic studies shall be prepared in accordance with criteria adopted by the City of Highland. Check with the City Engineer for details before starting any traffic reports. Traffic signals

More information

APPENDIX F: CALTRANS COST ESTIMATE TEMPLATE (included in Appendix AA of the CALTRANS Project Development Procedures Manual)

APPENDIX F: CALTRANS COST ESTIMATE TEMPLATE (included in Appendix AA of the CALTRANS Project Development Procedures Manual) APPENDIX F: CALTRANS COST ESTIMATE TEMPLATE (included in Appendix AA of the CALTRANS Project Development Procedures Manual) PROJECT DESCRIPTION: (Enter Type of Project Planning Cost Estimate as Title)

More information

At a minimum, the cost estimate should address the following specific items if applicable to your project:

At a minimum, the cost estimate should address the following specific items if applicable to your project: The Pennsylvania Department of Transportation s application process for the Green Light Go program requires the development of a project cost estimate. In order to provide consistency in the cost estimating

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

BILL NO. 1 GENERAL ITEMS. Item No. Description Lump Sum Prices Excluding HST

BILL NO. 1 GENERAL ITEMS. Item No. Description Lump Sum Prices Excluding HST Page 1 SECTION 00 72 00 - GENERAL CONDITIONS BILL NO. 1 GENERAL ITEMS 1 Bonds... $ 2 Insurance... $ 3 Permits and fees... $ 4 Warranty certificates... $ 5 Supervision... $ SECTION 01 32 17 - SCHEDULE 6

More information

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS UNINCORPORATED JACKSON COUNTY BUILDING PERMITS May, 2014 Department of Public Works Planning and Environmental Health PREFACE The purpose of this manual is to provide an overview of the procedures to apply

More information

Standard of Practice - Campus Electrical Distribution System

Standard of Practice - Campus Electrical Distribution System A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT MAINE TURNPIKE AUTHORITY ADDENDUM NO. CONTRACT 08.09 BRIDGE REPAIRS RUNNING HILL ROAD UNDERPASS (MILE 5.) BLACKSTRAP ROAD UNDERPASS (MILE 58.3) WEYMOUTH ROAD UNDERPASS (MILE 66.) SUPERSTRUCTURE REPLACEMENT

More information

CONTRACT AGREEMENT. This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the

CONTRACT AGREEMENT. This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the CONTRACT AGREEMENT This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the "City") and Contractor as of the date the last party to this Contract Agreement signed below. W I T N E

More information

PRIMARY LINE EXTENSION

PRIMARY LINE EXTENSION PRIMARY LINE EXTENSION Installation of new electric service to an empty parcel/lot or extending a transformer to within 150' of proposed meter location. This includes installing a permanent branch, addition,

More information

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application Good for 90 days from the Date Issued This permit is only required if the work location is owned or controlled by the City of Homestead and

More information

Residential Engineering P.O. Box 430 Memphis, TN (Deliveries at 5791 Summer Trees Memphis, TN 38134) (901) / (901) Fax

Residential Engineering P.O. Box 430 Memphis, TN (Deliveries at 5791 Summer Trees Memphis, TN 38134) (901) / (901) Fax MEMPHIS LIGHT, GAS, AND WATER DIVISION Application for Utility Services for Residential Subdivisions Residential Engineering P.O. Box 430 Memphis, TN 38101-0430 (Deliveries at 5791 Summer Trees Memphis,

More information

SECTION CONSTRUCTION SERVICES

SECTION CONSTRUCTION SERVICES SECTION 01100 CONSTRUCTION SERVICES PART 1 GENERAL 1.01 - Section Includes A. Mobilization. B. Construction Surveys. C. Record Documents. 1.02 Description Of Work A. Mobilization: includes the preparatory

More information

Underground Service Requirements and Instructions

Underground Service Requirements and Instructions This packet includes all FKEC underground service requirements, instructions, procedures and drawings. If you are considering underground power service please review this document in its entirety (3 page

More information

The existing land use surrounding North Perry Airport can be described as follows:

The existing land use surrounding North Perry Airport can be described as follows: 7.1 INTRODUCTION This land use evaluation will accomplish the following: Identify existing and future land uses in the Airport environs; Document existing land use, future land use, and zoning around the

More information

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

SECTION IV. PIPELINE EXCAVATION AND BACKFILL SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include

More information

SHERWIN WILLIAMS ROCHESTER, MN CIVIL DESIGN PLANS FOR: SITE, GRADING, UTILITIES & EROSION CONTROL

SHERWIN WILLIAMS ROCHESTER, MN CIVIL DESIGN PLANS FOR: SITE, GRADING, UTILITIES & EROSION CONTROL ROCHESTER, MN CIVIL DESIGN PLANS FOR: SITE, GRADING, UTILITIES & EROSION CONTROL VICINITY MAP HIGHWAY 63 SE AND 28TH ST. SE, ROCHESTER, MN SHEET INDEX C0-1 COVER SHEET C1-1 EXISTING CONDITIONS PLAN C1-2

More information

WESTERN ENGINEERING CONSULTANTS, Inc LLC

WESTERN ENGINEERING CONSULTANTS, Inc LLC WESTERN ENGINEERING CONSULTANTS, Inc LLC 127 S. Denver Avenue, Ft. Lupton CO 80621 2501 Mill St. Brush, CO 80723 Ph. 303-913-7341, Fax 720-294-1330 Email: firstname.lastname@westerneci.com August 24, 2017

More information

Electric Service Handbook

Electric Service Handbook Electric Service Handbook Revised August 2017 Contact Information Telephone (253): Electrical Inspection Office 502-8277 7:30 am - 4:30 pm Electrical Inspectors Area Map on Website 7:30 am - 8:30 am Automated

More information

Airport Construction Project Risk Management. Presented by: Mindy Price- Direct Effect Solutions

Airport Construction Project Risk Management. Presented by: Mindy Price- Direct Effect Solutions Airport Construction Project Risk Management Presented by: Mindy Price- Direct Effect Solutions Topics ACRP 01-22 Research Background Research Findings and Conclusions Project Risk Management Recommendations

More information

TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS

TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS TORONTO TRANSPORTATION January 2012 TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS 1. DRAWINGS TTD 801.001 ELECTRICAL ABBREVIATIONS AND SYMBOLS TTD 801.005 ELECTRICAL LEGEND I TTD 801.006 ELECTRICAL

More information

COMMERCIAL CONDUIT RULES AND REGULATIONS

COMMERCIAL CONDUIT RULES AND REGULATIONS Electric Engineering Division COMMERCIAL CONDUIT RULES AND REGULATIONS S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies B - 1 1805 NE 30th Ave., Bldg. 400 Ocala, FL 34470-4875

More information

PART 1 - GENERAL 1.01 General Provisions A. The Conditions of the Contract and all Sections of Division 1 are hereby made a part of this Section.

PART 1 - GENERAL 1.01 General Provisions A. The Conditions of the Contract and all Sections of Division 1 are hereby made a part of this Section. Specification Sheet Grass Paver TECHNICAL SPECIFICATION - Grass Covered Flexible Porous Paver with 92% Void Space and Soil Conditioner/Fertilizer Mixture CSI Master Format 32 12 43 Flexible Porous Pavement

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

DIVISION 1100 TRAFFIC

DIVISION 1100 TRAFFIC SECTION 1102 STREET LIGHTING GENERAL INFORMATION The Idaho State Electrical Board has determined that all street lights are to be provided with an external fuse disconnect, in a junction box between the

More information

Effective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O.

Effective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O. Siemens, Model # SUAS877-PG (or Landis & Gyr # UAS877-PG) Eaton-Durham Model # UTRS223ACH Milbank Midwest Model # U980-O UTRS223AMEP These are some examples of the single meter sockets we require for underground