XXXXXXXXXXX Solar (XXX) Generation Interconnection

Size: px
Start display at page:

Download "XXXXXXXXXXX Solar (XXX) Generation Interconnection"

Transcription

1 Facility Study For XXXXXXXXXXX Solar (XXX) Generation Interconnection Prepared For: Randy Harlas, Substation Manager El Paso Electric Company El Paso, TX September 2010

2 Table of Contents 1. GENERAL FOREWORD DISCLAIMER SCOPE OF WORK... 2 Transmission Diablo to Santa Teresa 115 kv Line Tap... 2 Station XXXXXXXXXXX Solar 115 kv Switching Station... 2 Table 1 Network Upgrades Material Costs... 5 Table 2 EPE Interconnection Facilities Material Costs COST SUMMARIES... 6 Table 3 Network Upgrades Installation Costs... 7 Table 4 EPE Interconnection Facilities - Installation Costs CONCLUSIONS... 8 Project Schedule-Transmission... 8 Project Schedule-Switching Station... 8 Overall Project Cost LIST OF ATTACHMENTS... 8 Documents... 8 Substation Preliminary Design Drawings... 8

3 CERTIFICATION Texas State - Certification I hereby certify, as a Professional Engineer in the state of Texas, that the information in this document was assembled under my direct personal charge. This report is not intended or represented to be suitable for re-use by El Paso Electric Company or others without specific verification or adaptation by the Engineer (Burns & McDonnell). This certification is made in accordance with the provisions of the laws and rules of the Texas State Board of Engineers Administrative Code. Electrical Engineer Approved P.E. Seal (Electrical) Kirk Saint Alwyn Powell, P.E. TX License No Date: September 30, 2010 Civil/Structural Engineer Kristie J Green, P.E. TX License No Date: September 30, 2010 Approved P.E. Seal (Civil/Structural)

4 1. GENERAL El Paso Electric Company (Transmission Provider) has requested Burns & McDonnell Engineering (Engineer) to provide a Facilities Study to estimate the Transmission Provider s system upgrades required for the interconnection of the proposed XXXXXXXXXXX Solar Thermal Generating Station (Interconnection Customer) to Transmission Provider s Electric Transmission System. The Interconnection Customer proposes to connect an ultimate 99.8MW solar thermal steam generation facility to Transmission Provider s electric grid. The proposed interconnection requires the installation of a new 115kV Switching Station by tapping the existing Diablo-Santa Teresa 115kV transmission line approximately 5.7 miles from the Diablo Substation and 3.2 miles from the Santa Teresa Substation. The Point of Interconnection (POI) will be located at this Facility. Per the attached preliminary oneline diagram (XX_OOL), the POI has been designated to be the point at which the Interconnection Customer s Electrical Facilities connect to the Transmission Provider s 115 kv bus. The following tasks and associated costs are not included in this Facility Study and are assumed to be the responsibility of the Interconnection Customer: Land Acquisition and Surveying. Design and installation of the new 115kV transmission line from the Interconnection Customer s Generation Facilities to the line terminal at the POI. 2. FOREWORD This estimate has been prepared with +/- 15% accuracy as requested by the Transmission Provider. A 10% contingency has been added to the estimate which is to be applied before any adder is considered. All assumptions are clearly defined within this document and should be duly noted. Due to market conditions, costs (material and labor) have been increasing. The equipment and labor costs included in this document reflect budgetary quotes received from prospective construction contractors. These are the most up-to-date costs to the Engineer s knowledge, but are subject to change based on market conditions. Due to market conditions, prices of both copper and construction labor have been fluctuating. 3. DISCLAIMER Estimates, forecasts, projections, and schedules relating to costs, quantities, demand pricing (including but not limited to, property costs, construction, operation or maintenance costs, and/or energy or commodity demand and pricing), are opinions based on the Engineer s experience, qualifications and judgment. In using the term Network Upgrades in this report, it is assumed that all facilities at or beyond the Point of Interconnection are Network Upgrades. The Engineer has not evaluated and has formed no opinion on whether the facilities described as Network Upgrades are integrated with and support EPE s overall transmission system for the general benefit of all users. 1 P age

5 The Engineer has no control over the weather, cost and availability of labor, materials and equipment, labor productivity, energy or commodity pricing, demand or usage, population demographics, market conditions, change in technology, and other economic or political factors affecting such estimates or projections. The Transmission Provider acknowledges that actual results may vary significantly from the representations and opinions herein. Nothing herein will be construed as a guarantee or warranty (actual or implied) that rates, demand, pricing, costs, performance schedules, quantities, technology, or any other related items will not vary from the opinions contained in the report prepared by the Engineer. 4. SCOPE OF WORK Transmission Diablo to Santa Teresa 115 kv Line Tap This new substation will require the 115kV Diablo-Santa Teresa Line to turn into the new substation in an in-and-out configuration. Turning the 115kV line into the new station will require the line to pass under the existing 345kV Luna to Diablo transmission line. The proposed two transmission towers shall be self supporting structure. The structures shall be capable of supporting 3 phases of 2-bundled 954 kcmil ACSR Cardinal conductor with one OPGW. The foundations for the dead-end structures shall be drilled shaft concrete foundations with steel reinforcement. Geotechnical information is not available, so foundation sizes and costs were estimated based on data from other projects previously performed in the area. Transmission Engineering Assumptions The location of the new XXXXXXXXXXX Switching Station shall be immediately adjacent to the existing 115 kv Diablo to Santa Teresa transmission line ROW. Two (2) dead-end structures will be required to terminate the line adjacent to the new XXXXXXXXXXX Switching Station and no modification of the existing structures is required. The conductors shall be in a horizontal bundle configuration and will require spacers and dampers. All hardware assemblies shall use polymer insulators. The dead-end assemblies shall use compression fittings. Station XXXXXXXXXXX Solar 115 kv Switching Station The new XXXXXXXXXXX Solar 115 kv Switching Station is proposed to be installed as shown below: One (1) three-position ring bus. o o Two (2) positions designated for the termination of the Transmission Provider s 115 kv transmission lines to Diablo and Santa Teresa substations. One (1) position designated for the termination of the 115 kv transmission line to the Interconnection Customer s Generation Facilities. It is assumed that the Interconnection Customer s incoming transmission line will be slack-spanned into the switching station. 2 P age

6 Control building (20 x 28-6 ) with the necessary power, relaying and communication equipment One (1) lot of 115 kv Revenue Metering equipment to be installed on the 115 kv line to the Interconnection Customer s Facilities. Metering equipment includes PT/CT combo units, foundations and support structures for the PT/CT units, Metering Panel, cables, etc. The costs for metering equipment are included in Table 2 below. Site Survey The Engineer will secure the services from a Transmission Provider-approved Survey company to perform a site and access road survey. Survey data will be used in grading design, soil cut-and-fill calculations and transmission structure positioning. Geotechnical Field Investigations and Engineering The Engineer will secure services from a Transmission Provider-approved Geotechnical Firm to perform field investigations. Geotechnical investigations and engineering calculations will be performed to establish the design basis for foundation and electrical grounding design. Site Preparation, Grading and Drainage Design The proposed XXXXXXXXXXX Solar 115 kv Switching Station location will require the installation of an approximately 2 mile gravel drive to provide all weather access from an existing public road to the site. It is proposed that the new access road will be an upgrade of an existing dirt track starting where the 345 kv Diablo to Luna transmission line crosses the Pete Dominici Blvd (Hwy 136) and continuing roughly in an easterly direction to the POI. It is assumed that the existing dirt track is within the existing transmission ROW and no land purchases are required. The proposed 20-foot wide access drive will consist of 8-inch well-graded crushed stone. The estimated 4,498 square yard substation will require a gravel surface assumed to consist of 3-inch thick gap-graded aggregate with a base of 4-inch thick well-graded crushed stone. The station site is assumed to be crowned in the center to drain across the surface of the site outward. Because of the remote location of the station site, a detention pond is not envisaged. Drainage structures may include driveway culverts, rip-rap rocks, detention pond outlet structures, or grate inlets with outlet pipes if necessary. An 8-foot chain link fence will be constructed around the perimeter of the station site. Civil/Structural Design Engineer shall design the required foundations as shown on the layout drawing and according to Transmission Provider s or Engineer s specifications. Refer to the substation major materials list and preliminary design drawings for the various foundations to be installed on this project. Engineer shall perform the studies necessary to assure that the bus system is adequately supported by the structures, fittings, and insulators selected when placed under the site specific environmental and short circuit fault forces. 3 P age

7 Note. Custom structures will be designed by the Engineer as required however the Engineer assumes that all structures installed will be per Transmission Provider s Standards and current practices. The requirement of customized structures will translate to additional project costs which are not covered herein. Electrical Design Engineer shall design the substation per Transmission Provider s Standards. The following are general tasks required to complete the electrical design: Install the electrical facility and equipment as indicated on the preliminary design drawings. Install the required insulation, conductors and fittings to inter-connect new equipment in the substation. Install a new station ground grid to adequately protect personnel and also the Transmission Provider s electrical infrastructure. Engineer will perform grounding calculations to verify that the new grid layout provides adequate personnel and equipment protection. Grounding installation shall be per Transmission Provider s standard practices. Install lightning protection (shielding) to adequately protect the new equipment. Perform the necessary calculations to design and verify the adequacy of the lightning protection. Install lightning masts as required. Install static wire between structures as needed. Lightning masts and line terminals will be fitted with 15 lightning spires on top (of each leg). Protection and Control Design The protection and control design shall follow Transmission Provider s Standards. The design is intended to provide a means of local and remote control of the equipment and electrical system (by means of switching) by the Transmission Provider. It is also intended to fulfill the purpose of protecting human life, electrical infrastructure under abnormal system conditions and minimize system outages and disturbances. The following are general tasks required to complete the protection and control design: Install a new control house which will be used to store all control and communication equipment, the batteries and associated equipment for the DC system (located in a separated area of the house), personnel safety equipment, etc. Install three (3) new Transmission Provider Standard transmission line protection racks for the new 115 kv transmission lines at this new station. Relay communication for the transmission lines to Santa Teresa and Diablo shall as well as for the transmission line to the Interconnection Customer s Solar Thermal Generation Facilities will be over Fiber Optic conductors. Install revenue metering for the 115 kv line to Interconnection Customer s Solar Generating Station. Install a Digital Fault Recorder (DFR) also known as a Transient Recorder. Install a new Communications Rack. Install relay serial communications as needed to connect the new relays to the communication rack. Provide relay settings for all new relays. 4 P age

8 Install fiber optic cables, conduit and termination equipment for all three (3) transmission lines at the new switching station. Install SCADA control, monitoring and indication per Transmission Provider s standard practice. Install a new AC/DC Station Power system. Both the AC and DC systems will be designed and installed with redundancy (for reliability purposes). There shall be two sources of AC and two DC battery systems installed. These systems will provide the necessary auxiliary power for the station. Both the primary and back-up AC Station Service will be connected to the 115 kv bus at XXX station. An automatic transfer switch shall be installed between the two sources. Connect the new equipment, racks, yard lights to the new AC/DC station service systems as needed. Install a new raceway system from the control house to the new field equipment. The raceway system will be comprised of cable trench, one large pull box and 3 PVC conduit installed per Transmission Provider s current practices. Install the necessary control and power cable using this raceway system to connect the field equipment to the control house equipment. Install floodlight assemblies in order to provide adequate lighting for the substation equipment. Lights will be installed at lightning masts and line terminal structures. Table 1 Network Upgrades Material Costs Equipment Description XXXXXXXXXXX Solar 115 kv Switching Station 1,2 Unit Est. Qty. Lead Time (Weeks ARO) Unit Cost ($) Total Cost ($) 115kV 2000A GCB's EA , ,000 Structural Steel LOT , , kV, 2000A, Disc. Sw. EA ,000 88,000 50KVA Station Service XFMR EA ,000 50, kV CCVT's EA ,000 36, kV Surge Arresters EA ,191 7,146 Other Elect/Site Materials 4 LOT 1-1,274,294 1,274,294 Station Materials (Sub-Total) 1,801,000 Diablo-Santa Teresa 115 kv Transmission Line Tap 1,2 3-Pole Dead-end Structures EA ,000 90,000 Dead-end Assemblies EA , kcmil ACSR "Rail" FT 14, ,550 3/8" EHS 7-Strand OHGW FT 2, ,125 OHGW Deadends EA OPGW 24-Count FT 3, ,500 OPGW Deadends EA ,100 Fiber Optic Splice Box EA ,500 5 P age

9 Other XMS Materials LOT 1-26,365 26,365 Transmission Materials (Sub-Total) 163,700 Total Major Material Costs - EPE Network Upgrades 1,964,700 Table Notes 1. This table is included to show major substation equipment lead times and associated costs only. 2. No installation (labor) costs are included in this table. Labor costs are included in the cost summary unless otherwise noted. 3. Number of weeks after drawing approval. 4. Other Elect/Site Material cost include estimated pricing for geotechnical investigations, site preparation, foundations, grounding, bus work, fittings and connectors, control house, raceway, station service minor equipment, DC system, protective relay racks, SCADA racks, communication equipment, etc associated with Network Upgrades. These materials generally have shorter procurement lead times. Table 2 EPE Interconnection Facilities Material Costs Equipment Description XXXXXXXXXXX Solar 115 kv Switching Station 1,2 Unit Est. Qty. Lead Time (Weeks ARO) Unit Cost ($) Total Cost ($) Structural Steel LOT ,000 72, kV, 2000A, Disc. Sw. EA ,000 11, kV CT/PT Combo Unit EA ,000 60, kV Surge Arresters EA ,191 3,573 Other Elect Materials 3 LOT 1-133, ,427 Total Major Material Costs - EPE Interconnection Upgrades 280,000 Table Notes 1. This table is included to show major substation equipment lead times and associated costs only. 2. No installation (labor) costs are included in this table. Labor costs are included in the cost summary unless otherwise noted. 3. Other Elect Material cost include estimated pricing for foundations, grounding, bus work, fittings and connectors, protective relay racks, Revenue Metering System (PT/CT units, Metering Panel and associated equipment) associated with Interconnection Facilities. These materials generally have shorter procurement lead times. Milestone Schedule Please refer to Attachment No. 1 and conclusions. 5. COST SUMMARIES The estimated project Network Upgrade and EPE Interconnection Facilities costs are outlined below. 6 P age

10 Table 3 Network Upgrades Installation Costs Project Task Cost ($) Transmission Labor 1 180,250 Transmission Material 2 163,700 Transmission Construction Management 3 35,000 Transmission Engineering 4 35,000 Transmission Installation (Sub-Total) 5 413,950 Station Labor 6 1,519,000 Station Material 6 1,801,000 Station Construction Management 7 240,000 Station Engineering 8 300,000 Station Installation (Sub-Total) 3,860,000 Total Network Upgrade Cost 4,273,950 10% 427,395 Total Network Upgrade Cost w/contingency 4,701,345 Table Notes 1. Transmission Labor Cost includes all labor required to construction transmission line including erection, foundations, stringing, right-of-way preparation, construction incidentals and grounding. 2. Transmission Material Cost includes all material required to construction transmission line including, steel, hardware, conductor, dampers, spacers and other miscellaneous material. 3. Transmission Construction Management Costs include costs associated with procurement, bidding, construction supervision and management of the construction process. 4. The Transmission Engineering Line Item includes costs associated with transmission line design, owner s overhead engineering costs, survey, geotechnical investigations, construction support, environmental evaluations and permit applications. 5. Transmission Right-of-way acquisition and land management costs are not included in the Total Installed Cost. 6. Station Labor and material costs include Site Preparation costs. 7. Station Construction Management cost includes supervision and management of the construction process. 8. Station Engineering costs are budgetary. Final engineering costs will be provided when an RFP is issued to Engineer. Table 4 EPE Interconnection Facilities - Installation Costs Project Task Cost ($) Station Labor 99,000 Station Material 280,000 Station Construction Management - Station Engineering - Total Interconnection Facilities Cost 379,000 10% 37,900 Total Interconnection Facilities Cost w/contingency 416,900 7 P age

11 6. CONCLUSIONS Project Schedule-Transmission With only two (2) structures to be installed, the transmission schedule is incorporated into the switching station schedule. Project Schedule-Switching Station The attached preliminary Milestone Schedule assumes a project start date (Notice-to- Proceed) of January 2, The estimated duration of the project is fifteen (15) months from Notice-to-Proceed to project completion at the end of March, Overall Project Cost The overall estimated project costs for the installation of XXX Switching Station is approximately US$5,118,245 which includes 10% contingency. 7. LIST OF ATTACHMENTS Documents Attachment No.1 XXXXXXXXXXX Solar 115 kv Switching Station Project Milestone Schedule Substation Preliminary Design Drawings XXXXXXXXXXX Solar Switching Station Operation One-Line Diagram XX_OOL XXXXXXXXXXX Solar Switching Station General Location Plan XX_GLP 8 P age

Facilities Study. For. XXXXXXXXXXXX Wind Park Interconnection Switching Station

Facilities Study. For. XXXXXXXXXXXX Wind Park Interconnection Switching Station Facilities Study For XXXXXXXXXXXX Wind Park Interconnection Switching Station Prepared For: Randy Harlas, Substation Manager El Paso Electric Company El Paso, TX September 2010 Table of Contents CERTIFICATION...

More information

Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014

Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014 Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014 1040 O Street, P.O. Box 80869 p: 402.475.4211 Lincoln, NE 68501-0869 www.les.com

More information

4301 Wilson Blvd. Arlington, VA tel:

4301 Wilson Blvd. Arlington, VA tel: To: SUNDA Project Cooperatives From: February 3, 2015 Re: Reference Block Design for Utility Scale PV Solar System Purpose: Provides a reference block design with simple, convenient features, which is

More information

Information Document Service Proposals and Cost Estimating ID # R

Information Document Service Proposals and Cost Estimating ID # R Information Documents are not authoritative. Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between an Information Document

More information

ACCR. More Amps. More Confidence. Glenmar E. Cambri, REE Senior Applications Engineer

ACCR. More Amps. More Confidence. Glenmar E. Cambri, REE Senior Applications Engineer TM ACCR More Amps More Confidence Glenmar E. Cambri, REE Senior Applications Engineer What is 3M ACCR? A high voltage, overhead transmission conductor designed as a drop-in replacement for ACSR and other

More information

Telecommunication Spaces

Telecommunication Spaces Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the

More information

Minimum Transmission Design Standards f or Competitive Upgrades Rev 2

Minimum Transmission Design Standards f or Competitive Upgrades Rev 2 Minimum Transmission Design Standards f or Competitive Upgrades Rev 2 December, 2016 Minimum Design Standards Task Force Revision History Date or Version Number 12/17/2014 Revision IR Author Change Description

More information

Facility Interconnection Requirements

Facility Interconnection Requirements Facility Interconnection Effective 1/1/2016 1. Purpose Facility Interconnection Facility Interconnection (FAC-001-2) To avoid adverse impacts on the reliability of the Bulk Electric System (BES), RPU documents

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

The Narragansett Electric Company d/b/a National Grid. and Clear River Energy LLC. (Burrillville Interconnection Project) RIPUC Dkt. No.

The Narragansett Electric Company d/b/a National Grid. and Clear River Energy LLC. (Burrillville Interconnection Project) RIPUC Dkt. No. d/b/a National Grid and Clear River Energy LLC (Burrillville Interconnection Project) RIPUC Dkt. No. Testimony of David J. Beron, P.E., P.M.P. November, 0 0-v R.I.P.U.C. Dkt. No. 0 0 INTRODUCTION Q. Please

More information

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and

More information

V. Design, Application, Maintenance & Operation Technical Requirements

V. Design, Application, Maintenance & Operation Technical Requirements V. Design, Application, Maintenance & Operation Technical Requirements V.A PJM Design & Application of Overhead Transmission Lines 69 kv & Above These design criteria have been established to assure acceptable

More information

MATERIAL ALLOWANCES AND UNIT PRICES

MATERIAL ALLOWANCES AND UNIT PRICES PART 1 - GENERAL 1.1 SECTION INCLUDES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 SECTION 012200 MATERIAL ALLOWANCES AND UNIT PRICES A. Measurement and payment criteria applicable to

More information

Specification Lightning Protection Systems

Specification Lightning Protection Systems Specification Lightning Protection Systems General: Summary A) This Section specifies the lightning protection system for the building(s) or structure(s). This system provides safety for the building and

More information

1. Approved Manufacturers: Carlon Electrical Products, Cantex, or approved equal.

1. Approved Manufacturers: Carlon Electrical Products, Cantex, or approved equal. PART 1: GENERAL 1.01 Scope of Standard A. This standard provides general guidance concerning the specific preferences of Texas State University for for Electrical System. B. Texas State University recognizes

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11

Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11 Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11 Underground Residential Distribution (URD) Index General Discussion... 1-2 Description... 3-7 Drawings (Available

More information

Audit Approach to FAC Transmission Vegetation Management FRCC Webinar

Audit Approach to FAC Transmission Vegetation Management FRCC Webinar Audit Approach to FAC-003-2 Transmission Vegetation Management FRCC Webinar September 2013 Ground Rules All participants will be muted upon sign-on Please keep your phone on mute unless asking a question

More information

TABLE OF CONTENTS. LIST OF FIGURES Figure 4-1: Alternative 1 System Overview Figure 4-2: Alternative 3 System Overview...

TABLE OF CONTENTS. LIST OF FIGURES Figure 4-1: Alternative 1 System Overview Figure 4-2: Alternative 3 System Overview... TABLE OF CONTENTS 4 DESCRIPTION AND EVALUATION OF ALTERNATIVES... 4-1 4.1 INTRODUCTION... 4-1 4.2 METHODOLOGY... 4-1 4.3 DESCRIPTION OF ALTERNATIVES... 4-2 4.3.1 No Project Alternative... 4-2 4.3.2 Alternative

More information

Section ARMORED MEDIUM VOLTAGE CABLES SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR

Section ARMORED MEDIUM VOLTAGE CABLES SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR PART 1 - GENERAL Section 26 05 15 SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR 1.1 Cable shall be 15 kv, shielded, three conductor with ground, stranded copper, with continuously welded and corrugated

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content

Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content Purpose The purpose of this Detailed Requirements Document (DRD) is to provide

More information

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL). 16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the

More information

PIP PCEPA003 Process Analyzer System Field Installation Guidelines

PIP PCEPA003 Process Analyzer System Field Installation Guidelines January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

ATTACHMENT 13 NORTHEAST-POCONO RELIABILITY PROJECT PPL DESIGN CRITERIA AND SAFETY PRACTICES

ATTACHMENT 13 NORTHEAST-POCONO RELIABILITY PROJECT PPL DESIGN CRITERIA AND SAFETY PRACTICES ATTACHMENT 13 NORTHEAST-POCONO RELIABILITY PROJECT PPL DESIGN CRITERIA AND SAFETY PRACTICES The National Electrical Safety Code (NESC) is a set of rules to safeguard people during the installation, operation,

More information

POTOMAC ELECTRIC POWER COMPANY

POTOMAC ELECTRIC POWER COMPANY POTOMAC ELECTRIC POWER COMPANY FERC Form 715 (Part 4) - Transmission Planning Study Guidelines Transmission Reliability Guidelines 1. General Overview The reliability guidelines used to plan the transmission

More information

XXXXX. Bremner Trio Small Hydro Project. Interconnection Facilities Study and Project Plan

XXXXX. Bremner Trio Small Hydro Project. Interconnection Facilities Study and Project Plan XXXXX Bremner Trio Small Hydro Project Interconnection Facilities Study and Project Plan June 25, 2011 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2011. All rights

More information

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

Standard TPL Transmission System Planning Performance Requirements

Standard TPL Transmission System Planning Performance Requirements A. Introduction 1. Title: Transmission System Planning Performance Requirements 2. Number: TPL-001-4 3. Purpose: Establish Transmission system planning performance requirements within the planning horizon

More information

Penn State Forestland Management Office Multi-Strand High-Tensile Wire Fence Specifications

Penn State Forestland Management Office Multi-Strand High-Tensile Wire Fence Specifications Penn State Forestland Management Office Multi-Strand High-Tensile Wire Fence Specifications 1. FENCE REQUIREMENTS Hazard Trees All hazard trees, which are within tree length of the fence, must be felled

More information

TYPICAL INSTALLATION INSTRUCTIONS

TYPICAL INSTALLATION INSTRUCTIONS TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect

More information

DA concept for higherquality. supplies. 24 ABB Review 4/1996

DA concept for higherquality. supplies. 24 ABB Review 4/1996 DA concept for higherquality power supplies Low power network losses and an uninterrupted supply of electricity are no longer enough to satisfy today s consumers, who take a highquality power supply for

More information

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and

More information

A. Product Data shall be provided for each type of product indicated.

A. Product Data shall be provided for each type of product indicated. 32 31 13 CHAIN LINK FENCES AND GATES SECTION 1 GENERAL 1.1 SUMMARY This Section includes the following: 1. Chain Link Fences 2. Gates for Chain Link Fences. See electrical specifications for electrical

More information

(Condensed from National Electric Code)

(Condensed from National Electric Code) WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,

More information

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS 1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new

More information

Standard of Practice - Campus Electrical Distribution System

Standard of Practice - Campus Electrical Distribution System A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all

More information

Addendum No. 1 Page 1 of 2

Addendum No. 1 Page 1 of 2 Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT

More information

02800 SHADE STRUCTURES

02800 SHADE STRUCTURES 02800 SHADE STRUCTURES for PLAY AREAS ****************************************** SPECIFIER: The shade structure shall utilize a four point hypar system with four columns located a minimum of 10 feet from

More information

Building Codes in Effect: 2010 California Building, Residential, Fire, Energy and Electrical Codes, including Article 690.

Building Codes in Effect: 2010 California Building, Residential, Fire, Energy and Electrical Codes, including Article 690. AGUA CALIENTE BAND OF CAHUILLA INDIANS A SOVEREIGN TRIBAL GOVERNMENT Planning & Development Department Building and Safety Division 5401 Dinah Shore Drive Palm Springs, CA 92264 (760) 669-6800 RESIDENTIAL

More information

Communications Page 1 of 9

Communications Page 1 of 9 Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

Division II Contractors

Division II Contractors Division II Contractors (d) "Sheet metal contractor" means a contractor whose services are unlimited in the sheet metal trade and who has the experience, knowledge, and skill necessary for the manufacture,

More information

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES SECONDARY Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-

More information

Review Zone Application for D&R Canal Commission Decision

Review Zone Application for D&R Canal Commission Decision Review Zone Application for D&R Canal Commission Decision MEETING DATE: December 21, 2016 DRCC #: 16-4345 Latest Submission Received: December 7, 2016 Applicant: Robert McCarthy, PE PSE&G 4000 Hadley Road,

More information

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification. SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,

More information

Section 2: Underground

Section 2: Underground Section 2: Underground GENERAL INSTALLATION REQUIREMENTS FOR UNDERGROUND FACILITIES Underground electric service and meter location will be established by NHEC upon site visit. In some instances the type,

More information

Pratt & Whitney. Power Systems MOBILEPAC. Gas Turbine Package. It s in our power.

Pratt & Whitney. Power Systems MOBILEPAC. Gas Turbine Package. It s in our power. Power Systems Pratt & Whitney Power Systems MOBILEPAC Gas Turbine Package TM It s in our power. Pratt & Whitney FT8 MOBILEPAC Gas Turbine Package The MOBILEPAC gas turbine package requires the smallest

More information

Document No Issue Date: May 15, 2012

Document No Issue Date: May 15, 2012 Professional Engineer Authenticated TELUS Residential Service Conduit Requirements For Stand-Alone Homes and Duplexes in Fibre Only Communities Beginning in January 2010 TELUS began designing new subdivisions

More information

INVITATION TO BID CITY OF HOPKINSVILLE

INVITATION TO BID CITY OF HOPKINSVILLE INVITATION TO BID CITY OF HOPKINSVILLE Office of the Procurement Specialist 715 South Virginia Street P. O. Box 707 Hopkinsville, Kentucky 42241-0707 TITLE: DESIGN BUILD BUIDLING FOR THE CITY OF HOPKINSVILLE,

More information

Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION

Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION PART I - GENERAL 1.01 Summary A. The erosion control blanket contains excelsior wood fiber for the purpose of erosion control and revegetation

More information

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less)

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less) SECTION 260523 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less) PART 1 - GENERAL 1.1 SUMMARY A. Related Documents: 1. Drawings and general provisions of the Subcontract apply

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 6/15/16 Updated division section from 16124 to 2605 - mgl44 13, removed references to other section 10/17/14

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

Substation Grounding. Presented by: Bruce Kayser, PE Assisted by Danny Seele

Substation Grounding. Presented by: Bruce Kayser, PE Assisted by Danny Seele Substation Grounding Presented by: Bruce Kayser, PE 785-633-5756 Assisted by Danny Seele Introduction Bruce Kayser, PE BSEE from KSU in 1989 Licensed Professional Engineer in KS Employed by ElectriComm,

More information

Curlex II EROSION CONTROL BLANKET SPECIFICATION

Curlex II EROSION CONTROL BLANKET SPECIFICATION Curlex II EROSION CONTROL BLANKET SPECIFICATION PART I - GENERAL 1.01 Summary A. The erosion control blanket contains excelsior wood fiber for the purpose of erosion control and revegetation as described

More information

Benchmarking and Control Indicators for Electrical Substation Projects

Benchmarking and Control Indicators for Electrical Substation Projects Benchmarking and Control Indicators for Electrical Substation Projects Submitted by: Justin R. Nettesheim A thesis submitted in partial fulfillment of the requirements for the degree of Master of Civil

More information

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703) Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA 20155 Phone (703) 754-6750 Work Request # UNDERGROUND DISTRIBUTION FACILITIES AGREEMENT (FOR COMMERCIAL CUSTOMER) Developer/Builder/Owner

More information

Barilla Cogeneration Power Plant main tips

Barilla Cogeneration Power Plant main tips main tips Client Location Total contract Scope of work Fenice SpA Contract value 13.3 M$ Contract period 2007-2010 The Plant has been built within the premises of the Barilla factory in Parma (IT), at

More information

SPECIAL SPECIFICATION 7600 Grade Crossing Signal System Rehabilitation with Warranty

SPECIAL SPECIFICATION 7600 Grade Crossing Signal System Rehabilitation with Warranty 2004 Specifications CSJ 7107-09-003, etc. SPECIAL SPECIFICATION 7600 Grade Crossing Signal System Rehabilitation with Warranty 1. Description. This Item shall govern for the railroad grade crossing signal

More information

Member Service Electric Wiring Guidelines

Member Service Electric Wiring Guidelines Member Service Electric Wiring Guidelines Table of Contents A. Definitions... 2 B. Member Service Wiring Guidelines... 2 C: Meter located on the house from an underground source - pad transformer or j-box....

More information

NOTICE OF ADDENDUM ADDENDUM 2 CONTRACT NO PROJECT NO UNIT WELL 31 WATER TREATMENT PLANT

NOTICE OF ADDENDUM ADDENDUM 2 CONTRACT NO PROJECT NO UNIT WELL 31 WATER TREATMENT PLANT February 20, 2017 NOTICE OF ADDENDUM ADDENDUM 2 CONTRACT NO. 7500 PROJECT NO. 10434 UNIT WELL 31 WATER TREATMENT PLANT Revise and amend the contract document(s) for the above project as stated in this

More information

Distribution System Design General Requirements

Distribution System Design General Requirements Electricity Policy Document 279 Issue 7 September 2017 Distribution System Design General Requirements Contents 1 Introduction 2 Scope 3 Definitions 4 General Requirements 5 Documents Referenced 6 Keywords

More information

International ejournals

International ejournals ISSN 2249 5460 Available online at www.internationalejournals.com International ejournals International Journal of Mathematical Sciences, Technology and Humanities 21 (2011) 205 212 ENERGY CONTROL CENTER

More information

A. This section includes building wire and cable rated 600V and less Full Short Circuit Device, Coordination and Arc Fault Study

A. This section includes building wire and cable rated 600V and less Full Short Circuit Device, Coordination and Arc Fault Study PART 1: GENERAL 1.01 Underground Ducts and Manholes A. The work included in this section of the construction standards consists of the design requirements for the complete layout and installation of a

More information

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

ENGINEERING DESIGN & IMPROVEMENT STANDARDS ENGINEERING DESIGN & IMPROVEMENT STANDARDS 2016 Prepared by: Engineering Division For latest edition of these Improvement Standards, refer to City of Visalia website at: www.visalia.city/engineeringdocuments

More information

Engineering Data for Copper and Aluminum Conductor Electrical Cables

Engineering Data for Copper and Aluminum Conductor Electrical Cables 2018 Edition Engineering Data for Copper and Aluminum Conductor Electrical Cables THE OKONITE COMPANY Okonite Cables...A higher Standard! The Okonite Company, 2018 Okonite Cables Table of Contents SECTION

More information

SPECIAL SPECIFICATION 8826 Self Supporting Communications Tower (20 to 100 feet)

SPECIAL SPECIFICATION 8826 Self Supporting Communications Tower (20 to 100 feet) 2004 Specifications CSJ 2103-01-030 SPECIAL SPECIFICATION 8826 Self Supporting Communications Tower (20 to 100 feet) 1. Description. Furnish and install 100 foot tall or less, self-supporting light duty

More information

Proposals and Process 2017 National Electrical Code

Proposals and Process 2017 National Electrical Code Proposals and Process 2017 National Electrical Code for Solar America Board for Codes and Standards Stakeholder Meeting; October 23, 2014 Ward Bower Ward Bower Innovations LLC Introduction The New NFPA

More information

AEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION

AEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION AEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION PART I - GENERAL 1.01 Summary A. The erosion control blanket contains agricultural straw fibers for the purpose of erosion control

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

Micro Hydroelectricity Installer Skills Assessment

Micro Hydroelectricity Installer Skills Assessment Micro Hydroelectricity Installer Skills Assessment Philip V. Hofmeyer August 2011 Page 1 Overview: This document contains an extensive skills assessment for renewable energy professionals who intend to

More information

SWIMMING POOL PERMIT AND INSPECTION REQUIREMENTS

SWIMMING POOL PERMIT AND INSPECTION REQUIREMENTS Building Inspections SWIMMING POOL PERMIT AND INSPECTION REQUIREMENTS Permit Applications Pool permit applications are now being accepted online at http://etrakit.flower-mound.com/. Starting November 1,

More information

Public Utility District Number 1 of Snohomish County

Public Utility District Number 1 of Snohomish County Public Utility District Number 1 of Snohomish County Facility Connection Requirements September 29, 2011 1 Revision History: Number Date Description Original Sept. 29, 2011 Document Origination Compilation

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

Public Utility District Number 1 of Snohomish County. Facility Connection Requirements February 9, 2018

Public Utility District Number 1 of Snohomish County. Facility Connection Requirements February 9, 2018 Public Utility District Number 1 of Snohomish County Facility Connection Requirements February 9, 2018 1 Revision History: Number Date Description By Reviewed by Approved by: Original Sept. 29, 2011 Document

More information

Foundation Manual. Part Number: Version: Updated: July 5, S. Meadows Pkwy. A-9, #329 Reno, NV

Foundation Manual. Part Number: Version: Updated: July 5, S. Meadows Pkwy. A-9, #329 Reno, NV Foundation Manual Part Number: 150002 Version: 1.22 Updated: July 5, 2009 748 S. Meadows Pkwy. A-9, #329 Reno, NV 89521 775-831-9463 www.mariahpower.com July 2009, Mariah Power, All Rights Reserved Dear

More information

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE SECTION 13125 PART 1 - GENERAL 1.1 SUMMARY A. Section includes the design, engineering, fabrication and erection of a frame-supported, tensilemembrane structure complete with entrance and exit doors and

More information

Training Certification Categories

Training Certification Categories Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and

More information

Customer Requirements Customer-owned Transformer Vault Room

Customer Requirements Customer-owned Transformer Vault Room Scope This standard documents the requirements for customer-owned vault rooms containing transformers and switches that are owned, operated, and maintained by Tacoma Power. It does not address transformer

More information

INSTALLATION INSTRUCTIONS CMP SERIES

INSTALLATION INSTRUCTIONS CMP SERIES INSTALLATION INSTRUCTIONS CMP 25677 SERIES 1. PRODUCT OVERVIEW Thank you for choosing our 25677 Series Brilliant Wonders LED Waterfall. This lighted waterfall will add a unique ambiance to your pool or

More information

Technical Requirements for Distributed Generation Connection

Technical Requirements for Distributed Generation Connection Technical Requirements for Distributed Generation Connection Distributed Generation Connection Requirements SECTION 1: INTRODUCTION 1.1 General Purpose This document defines the requirements for connecting

More information

Unit Substation Transformer Construction Checklist (under 500 kva)

Unit Substation Transformer Construction Checklist (under 500 kva) Unit Substation Transformer Checklist (under 500 kva) Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.

More information

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY

More information

3M Ground Plane Cable.050" 28 AWG Stranded, One Drain, PVC 3476 Series

3M Ground Plane Cable.050 28 AWG Stranded, One Drain, PVC 3476 Series M Ground Plane Cable.050" 28 AWG Stranded, One Drain, PVC 476 Series 28 AWG wire on.050 inch centers permits mass termination to a broad line of IDC connectors Ground plane construction for increased signal

More information

SECTION UTILITY MANHOLES AND STRUCTURES

SECTION UTILITY MANHOLES AND STRUCTURES SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition

More information

Clean Line Energy Partners

Clean Line Energy Partners Clean Line Energy Partners 2012 Transmission investment is required to connect the best wind resources to load centers Clean Line projects Rock Island CA Centennial West Grain Belt Express Plains & Eastern

More information

Underground Service Requirements and Instructions

Underground Service Requirements and Instructions This packet includes all FKEC underground service requirements, instructions, procedures and drawings. If you are considering underground power service please review this document in its entirety (3 page

More information

LARGE STORAGE TANK PROJECT

LARGE STORAGE TANK PROJECT INTRODUCTION The Fairbanks Large Storage Tank is part of the Interior Energy Project (IEP) designed to expand natural gas distribution in Fairbanks and Interior Alaska. A tank with a capacity of 0.44 Bcf

More information

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number) EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY

More information

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information

The University of Texas at Austin September 30, 2011

The University of Texas at Austin September 30, 2011 SECTION 27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS PART 1 - GENERAL 1.1 SUMMARY A. This section governs the products and execution requirements relating to furnishing and installing grounding and

More information

Converting square ft to cubic yards concrete

Converting square ft to cubic yards concrete Converting square ft to cubic yards concrete Search Cubic Yards Calculator. Area Shape:. Where ( ft 2) = square foot, ( ft 3) = cubic foot, (yd 3) = cubic yard; Cubic Yards Formulas and Images for Different

More information

Wolverine Power Supply Cooperative, Inc. Senior Transmission System Operator

Wolverine Power Supply Cooperative, Inc. Senior Transmission System Operator I. OBJECTIVE Wolverine Power Supply Cooperative, Inc. Senior Transmission System Operator A. The Senior Transmission System Operator is responsible for the reliable and safe operation of Wolverine s transmission

More information