2 PROJECT SHOWING MINUTES Route 7 Widening Project January 15, a.m. NOVA District Building Overview / Welcome: Michael Gleasman, PE, Area Construction Engineer (VDOT) Overview: A question and answer period will be entertained at the end. Attendees asking questions should identify themselves and the company they represent. Everyone must sign the attendance sheet. Contract Completion date is December 16, Project showing agenda today: Design Features Construction Features Environmental Landscape & Architecture Utility Features Project Controls Civil Rights Question and Answers Introduction of Project Team: VDOT Construction Management Area Construction Engineer Michael Gleasman, PE Construction Manager Tim Diliscia, VDOT Design Team: VDOT Design Project Manager Mark Gibney, PE, PMP JMT - Design Engineer of Record Rodney Hayzlett, PE Presenting Today: Michael Gleasman, PE VDOT ACE Mark Gibney, PE, PMP VDOT L&D Project Manager Jeff Cronin, PE Design Consultant, JMT Tim Diliscia VDOT Construction Manager Matt McLaughlin VDOT Utilities Manager Amy Mounkhaty VDOT Project Controls Sheila Brase Civil Rights Page 1

3 Design Features: Mark Gibney, PE, PMP (VDOT) and Jeff Cronin, PE (JMT): Project Location: Project Information: Page 2

4 Design Features: 1.2 mile widening/reconstruction project from Rolling Holly Drive (just east of the Fairfax County Parkway interchange) to 0.15 mile east of Reston Avenue in Fairfax County. Average Daily Traffic 60,000 Widen the existing four (4) lane roadway to six (6) lanes Special design retaining walls with Ashlar stone finish (5 walls) Two (2) storm water management ponds (landscape screening) and storm sewers Complete landscaping for corridor Stamped concrete raised medians (on and approaching Georgetown Pike) Traffic signals (4 existing signals and 1 new signal) Several historical areas along the corridor: Dranesville Historic Tavern, Georgetown Pike roadway, and two (2) residential historic properties (Prame and McFarlane) along the westbound lanes Several homeowners associations along the corridor that are very involved with the project Project Typical Section: GS-5 Urban Principal Arterial with 12 lanes (13 lane adjacent to median) Right and left turn lane improvements and additions Raised 16 grass/landscaped median Closed typical section roadway with curb and gutter (CG-7 curb) 10 Shared use path along the eastbound and westbound lanes Page 3

5 Temporary Traffic Control Plan: A two (2) lane detour will be constructed for the westbound Route 7 traffic within the existing grass median. Bifurcation between the eastbound and westbound lanes will require sheet piling to accommodate construction for some phases of the Temporary Traffic Control Plan. Four (4) of the drainage crossings will need to be jack and bored to minimize traffic disruption. Contractor will be required to maintain access to private residences and commercial businesses along the westbound lanes during all phases of construction. Plans call for a temporary access road. A 24 high pressure gas line runs the length of the project. A gas regulator station is located near the Sugarland Rd intersection. Special provisions have been provided for construction near gas line. A telecommunications duct bank is located within the grassed median. Special provisions have been provided for construction on and around the duct bank. Existing drain fields within the ROW between Sta to RT to be avoided. Construction Features: Tim Diliscia, Construction Manager (VDOT) Special Provisions: Section 108 Prosecution and Progress of Work Page 4

6 Project Features of Note: Construction Safety Uphold all applicable standards and regulations Outreach Keep the public informed User Fees Shall be enforced in accordance with the contract Communication Open line at all times Submittals Timely and diligent Documentation Complete and timely for pay estimates Jack & Bore Different sizes Page 5

7 Waterline New lines 6 to 12 Access Roads Maintenance of these roads during winter months Signals Temporary and permanent signalization Hydraulic Cement Stabilization For sub-grade Demolition Four structures Field Office See Special Provisions Environmental: Mr. Diliscia, Construction Manager (VDOT) Erosion and Sediment Control: VDOT Monitored Implement Approved ESC Plan VDOT Road & Bridge Specifications and Standards pertaining to regulated land disturbing activities DCR Virginia Erosion and Sediment Control Handbook VDOT ESCCC and DCR Inspector Certification Construction Entrances (Std. and Spec. 3.02) Environmental Commitments and Requirements: Disposal Areas: Section Virginia Road & Bridge Specifications and Standards Disposal Site Approval Location and boundaries Page 6

8 Procedures to minimize erosion Haul roads Provisions for environmentally compatible screening Restoration and permanent cover vegetation Drainage pattern Stream/tributaries receiving discharge Sequence and schedule of work Total drainage area for temporary sediment traps *** Sediment Basins (If Required) Landscape & Architecture: Tim Diliscia, Construction Engineer (VDOT) Architectural Finish, Concrete Form Liners and Color Stain Coating: Architectural treatment on Retaining Walls Color Stain Coating for some walls Stamped Concrete Ornate Fencing Landscaping / Planting / Endangered Species Planting Special Provision pages 224 through 230 Trees 500+ Shrubs 2,300+ Plantings 22,000+ Wood Turtle Eastern Box Turtle Page 7

9 Utility Features: Matt McLaughlin, NOVA Utilities Manager (VDOT) Status of Utility Relocation Along Route 7: Name of Utility Status Projected Completion Date Dominion Power In Progress July 01, 2013 Verizon Overhead In Progress July 01, 2013 Cox Waiting on Dominion poles to be moved December 31, 2013 AT&T In Progress July 01, 2013 XO Communication In Progress July 01, 2013 Level 3 Communication In Progress December 31, 2013 Verizon Underground Conduits installed July 01, 2013 Important Special Provisions and Coordination: Section Test pit excavation for paved and unpaved areas to include marker balls provided by VDOT Facilities owned by Verizon, AT&T, XO Communication, Level 3, Cox Cable, Dominion Virginia Power, Washington Gas and Fairfax Water Level 3 Cable Protection of underground cable during excavation and construction of the Retaining Wall between Stations and , EBL of Route 7. Coordination with Virginia Power for hook-up to controller cabinets and electrical services 60 day notice Page 8

10 Project Controls: Amy Mounkhaty (VDOT) Special Provisions Construction Access Release Dates: Special Provisions - CPM Progress Schedule for Category III Projects Preliminary Progress Schedule: Within two (2) days prior to the Scheduling Conference Baseline Progress Schedule: Within thirty (30) days after NTP CPM Schedule Narrative Earnings Monthly Progress Update: Within five (5) days after the progress estimate date Software: No earlier than Primavera P6v2 Other features: Revised Baseline Schedule SIA Special Provisions - Interim Milestones: Substantial Completion date November 12, 2015 Final Completion Date December 16, 2015 Extended Completion Date of Landscaping/Planting April 8, 2016 Page 9

11 Civil Rights: Sheila Brase, Compliance Safety Officer (VDOT) Disadvantaged Business Enterprises: The project has a 18% requirement. Responsible bidder shall submit C-111 form electronically or fax to the Department within two (2) hours of bid opening. If you cannot meet your goal using good faith efforts, the C-111 form must be submitted 24 hours after bid opening, or 10 AM the next business day.. Responsible bidder shall submit C-112 form within two (2) working days after bid opening. Form C- 48 All bidders are required to complete and submit this form to the contract engineer within ten (10) days after the bid opening. DBE Subcontract agreement is to be submitted within fourteen (14) days after contract execution. Special Provision for use of Minority Business Enterprise, Section , is on pages 48 through 71. Special Provision for Performing a Commercially Useful Function (CUF) is on page 57. Payment to Subcontractor The Contractor shall make payment for subcontractor s portion of work within seven (7) days of receipt of payment from VDOT. Labor: Payrolls are required from all Contractors performing work on the contract. Haulers are required to submit payrolls when hauling on the project site. The predetermined wage rates are listed in the bid proposal on pages 5, 6, 7 and 8. Required Contract Provisions, Federal-Aid Construction Contracts (FHWA 1273) is on page 10 through 31 and Executive Order is on pages 32 through 37. Trainees - There are 10 trainees required for this project. Specifications for the training program (Section 518) are on pages 599, 600 and 601 of the 2007 Road & Bridge Specifications. Page 10

12 Questions & Answers: Open Additional Questions Any additional questions that may arise after this project showing shall be addressed through the normal CABB process. Question 1: Sean Maloney (Shirley Construction Co.): When is the C-111 form due? Response: 24 hours after bid opening, or 10 AM the next business day. The presentation slide will be edited. Question 2: Lane Construction: Is geotechnical information provided? Response: Typically contractor requests this information from Materials Section (contact David Shiells, PE). Follow-up comment: Geotechnical information should be available in the bid documents, as it is coming out as an addendum takes longer. Response: Comment has been noted. SITE VISIT Question 1: Are there sound walls in the project? Response: No. Question 2: Is there a significant change in grade? (WB Route 7) Response: The WB lanes will be filled to match the higher grade of the median. Question 3: Will the contractor have anything to do with gas lines/protection? Response: No, contractor will be working around it. Question 4: Can micro-tunneling be used instead of the jack and bore method? Answer: Will need to confirm this (Materials). Contractor has been told to submit any further questions through CABB. Page 11

13

14

Rosslyn Circle Improvements, WB Lee Hwy. - US 29. April 6, :30 a.m North Fort Myer Drive, LL-10, Arlington, VA

Rosslyn Circle Improvements, WB Lee Hwy. - US 29. April 6, :30 a.m North Fort Myer Drive, LL-10, Arlington, VA REQUIRED PROJECT SHOWING MINUTES Project No. 0029-000-859, C501, B605 UPC No. 109813 PROJECT SHOWING MINUTES, WB Lee Hwy. - US 29 Project No. 0029-000-859, C501, B605 UPC No. 109813 April 6, 2017 10:30

More information

PROJECT SHOWING MINUTES

PROJECT SHOWING MINUTES PROJECT SHOWING MINUTES Jones Branch Connector Project No. (NFO) 8102-029-065, P101, R201, C501, B628, B627, B629, D610 UPC No. 103907 September 7, 2016 10:00 a.m. Fairfax County EMS Simulation Center

More information

MEMORANDUM. Garrett Moore, P.E. Helen Cuervo, P.E.

MEMORANDUM. Garrett Moore, P.E. Helen Cuervo, P.E. PROJECT SHOWING MINUTES Project: 0645 029 384, C501, B601, D601 Contract ID Number: C00060864C01 September 19, 2012 MEMORANDUM TO: SUBJECT: Garrett Moore, P.E. Helen Cuervo, P.E. Project Showing Minutes

More information

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016 Rt. 29 Solutions Project Delivery Advisory Panel February 18, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Feb

More information

NEW MARKET HEIGHTS PHASE OF THE VIRGINIA CAPITAL TRAIL PROJECT RFP QUESTIONS AND ANSWERS

NEW MARKET HEIGHTS PHASE OF THE VIRGINIA CAPITAL TRAIL PROJECT RFP QUESTIONS AND ANSWERS NEW MARKET HEIGHTS PHASE OF THE VIRGINIA CAPITAL TRAIL PROJECT RFP QUESTIONS AND ANSWERS Date: 4-13-12 Project: Subject: New Market Heights Phase of the Virginia Capital Trail Project RFP Questions and

More information

ANNE ARUNDEL COUNTY Department of Public Works DATE: 01/25/2017 FROM: Rich Osborn, P.E., Prof.L.S., Project Manager, Bureau of Engineering SUBJECT: Minutes for Pre-Bid Meeting January 19, 2017 South Shore

More information

May 26, Required Attendance Yes_X_ No MEMORANDUM. Mr. Don Silies Attn: Mr. John Jacobs. Salvija Hofheimer. Project Showing

May 26, Required Attendance Yes_X_ No MEMORANDUM. Mr. Don Silies Attn: Mr. John Jacobs. Salvija Hofheimer. Project Showing Project No.: 0264-122-108, C508, B602-5, B616, D604-5 UPC 57048 City of Norfolk and City of Virginia Beach Order #J66 Contract ID #C0000057048C08 Required Attendance Yes_X_ No MEMORANDUM TO: FR: RE: Salvija

More information

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM Each applicant needs to thoroughly review the conditions of development issued by the Planning Division in the format of a Resolution approving your project

More information

PROJECT SHOWING MINUTES

PROJECT SHOWING MINUTES PROJECT SHOWING MINUTES Project No. (NFO) 0267-029-919, P101, C501 UPC No. 98232 January 10, 2013 10 a.m. NOVA District Building Welcome: Chan Basnayake, PE Area Construction Engineer Chan Basnayake opened

More information

NOTICE TO OFFERORS ADDENDUM NO. 1 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH

NOTICE TO OFFERORS ADDENDUM NO. 1 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH November 29, 2018 NOTICE TO OFFERORS ADDENDUM NO. 1 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH To Holders of Bid Proposals: Please make the following clarifications, additions,

More information

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction

More information

Please make the following changes in your copy of the bid proposal for the captioned project:

Please make the following changes in your copy of the bid proposal for the captioned project: Charles A. Kilpatrick, P.E. Commissioner DEPARTMENT OF TRANSPORTATION 1401 ST BROAD STREET RICHMOND, VIRGINIA 23219-2000 June 13, 2017 Order No.: M20 Project: 0564-122-395, C501 District: Hampton Roads

More information

August 9, Required Attendance Yes_X_ No MEMORANDUM. Mr. Don Silies Attn: Mr. John Jacobs. Salvija Hofheimer. Project Showing

August 9, Required Attendance Yes_X_ No MEMORANDUM. Mr. Don Silies Attn: Mr. John Jacobs. Salvija Hofheimer. Project Showing August 9, 2017 Project No.: 0264-134-102, C501, B601-3, B621, D601 UPC 17630/108041 City of Norfolk and City of Virginia Beach Order #K90 Contract ID #C0000017630C01 Required Attendance Yes_X_ No MEMORANDUM

More information

Gloucester Parkway Extension RFQ Information Meeting

Gloucester Parkway Extension RFQ Information Meeting Gloucester Parkway Extension RFQ Information Meeting May 24, 2013 Tim Hartzell, PE District Project Manager Kevin Reichert, PE APD Project Manager and POC Topics Project Location & Overview RFQ Information

More information

Texas Department of Transportation Book 2 Technical Provisions. Grand Parkway Project. Attachment 2-2. Work Breakdown Structure Requirements

Texas Department of Transportation Book 2 Technical Provisions. Grand Parkway Project. Attachment 2-2. Work Breakdown Structure Requirements Texas Department of Transportation Book 2 Technical Provisions Grand Parkway Project Work Breakdown Structure Requirements Table 1 represents the minimum levels of the WBS that all schedule information

More information

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required.

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required. Overview of Section 9 9.0 The GESC Permit Section provides a description of the Small Utility GESC Permit Program. Step 1. Determine if a GESC Permit is Applicable and if a Project Specific GESC Plan is

More information

Table Related Arlington County Standards, Specification and Policies

Table Related Arlington County Standards, Specification and Policies 2.1 GENERAL 2.1.1 DESCRIPTION SITE WORK V02000 2.1 GENERAL 2.1.1 Description This standard identifies minimum requirements that shall be met for all site work in the design and construction of elements

More information

QUANTITIES MOBILIZATION PAVT, REM EROSION CONTROL, INLET PROTECTION, FABRIC DROP 12 EA AGGREGATE BASE AGGREGATE BASE, CONDITIONING SHOULDER, CL II

QUANTITIES MOBILIZATION PAVT, REM EROSION CONTROL, INLET PROTECTION, FABRIC DROP 12 EA AGGREGATE BASE AGGREGATE BASE, CONDITIONING SHOULDER, CL II 7/12/18 GENERAL NOTES SPECIFICATIONS: ALL WORK AND MATERIALS, UNLESS OTHERWISE STATED IN THESE PLANS, SHALL BE IN ACCORDANCE WITH THE MICHIGAN DEPARTMENT OF TRANSPORTATION (MDOT) 2012 STANDARD SPECIFICATIONS

More information

CONSTRUCTION PROPOSAL Vision General Contracting LLC

CONSTRUCTION PROPOSAL Vision General Contracting LLC CONSTRUCTION PROPOSAL Vision General Contracting LLC August 25, 2015 My Site Name 1234 Address Street My City, GA 000000 Horizontal Infrastructure completion! Vision General Contracting LLC 1681 Fernleaf

More information

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STATE OF COLORADO GENERAL PERMIT APPLICATION Updated 11/04 STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY This application is for use by all stormwater dischargers engaged in construction

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 2/25/2014

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 2/25/2014 NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 2/25/2014 Control 0924-35-020 Project C 924-35-20 Highway VA County BREWSTER Ladies/Gentlemen: Attached please find an addendum on the above captioned project.

More information

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices. SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

NAME STREET ADDRESS CITY, STATE & ZIP CODE. GAS ELECTRIC TELEVISION TELECOMMUNICATION OTHER (check one) UNDERGROUND OVERHEAD BOTH (check one)

NAME STREET ADDRESS CITY, STATE & ZIP CODE. GAS ELECTRIC TELEVISION TELECOMMUNICATION OTHER (check one) UNDERGROUND OVERHEAD BOTH (check one) Des Plaines Utility Permit #: PUBLIC WORKS AND ENGINEERING 1420 Miner Street Des Plaines, IL 60016 P: 847.391.5390 F: 847.391.5619 desplaines.org CITY OF DES PLAINES UTILITY PERMIT APPLICATION All entities

More information

VDOT POST-AWARD SCHEDULING GUIDE

VDOT POST-AWARD SCHEDULING GUIDE VDOT POST-AWARD SCHEDULING GUIDE (DRAFT RELEASE 3 October 5, 2012) GUIDELINES FOR ESTABLISHING & MAINTAINING SCHEDULE CONTROL ON PROJECTS DURING THE CONSTRUCTION PHASE CONSTRUCTION DIVISION (SCHEDULING

More information

Project Information Meeting

Project Information Meeting Overview of Contract (RFP) Documents Virginia Capital Trail Park Phase Project Information Meeting December 19, 2013 Doug Harvey, P.E. District Project Manager Steve Kindy, P.E. APD Project Manager and

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall

More information

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL o PUBLIC WORKS DEPARTMENT PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL CIVIL ENGINEERING AND ARCHITECTURE 1. Offsite Improvements - Civil Engineering drawings may be required to show the following: Replacement

More information

ALTERNATIVE PROJECT DELIVERY DIVISION

ALTERNATIVE PROJECT DELIVERY DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION ALTERNATIVE PROJECT DELIVERY DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design-Build Requirements for Advertisement SPECIFIC SUBJECT: APPROVED:

More information

ADDENDUM # 3 DATE: February 16, 2018

ADDENDUM # 3 DATE: February 16, 2018 ADDENDUM # 3 DATE: February 16, 2018 REFERENCE: Invitation for Bid No.: S-LB-18607 IFB Issue Date: January 25, 2018 Title: Stonewall Middle School Addition and Renovations Architect/Engineer: Architecture

More information

GRAYSON COUNTY POLICY, PROCEDURES AND SPECIFICATIONS OF GRAYSON COUNTY, TEXAS FOR THE INSTALLATION OF DRIVEWAY

GRAYSON COUNTY POLICY, PROCEDURES AND SPECIFICATIONS OF GRAYSON COUNTY, TEXAS FOR THE INSTALLATION OF DRIVEWAY GRAYSON COUNTY POLICY, PROCEDURES AND SPECIFICATIONS OF GRAYSON COUNTY, TEXAS FOR THE INSTALLATION OF DRIVEWAY CULVERTS, ROAD BORES, USE OF HEAVY EQUIPMENT AND UTILITY LINES WITHIN GRAYSON COUNTY ROAD

More information

NEPA and Design Public Hearings

NEPA and Design Public Hearings NEPA and Design Public Hearings Monday, December 5, 2016 Washington-Lee High School 1301 N. Stafford Street Arlington, VA 22201 Thursday, December 8, 2016 Mary Ellen Henderson Middle School 7130 Leesburg

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Downtown & Mid-Corridor Project Status Update Meeting Holman United Methodist Church Thursday, July 23, 2009 Phase 1 Project Description 8.6 mile corridor from Downtown

More information

If a new residence s electrical service is not located within 200 feet of existing

If a new residence s electrical service is not located within 200 feet of existing Primary Line Extensions CHAPTER 4 If a new residence s electrical service is not located within 200 feet of existing primary electrical facilities, a primary line extension is required to place a close

More information

Addendum No. 1 Page 1 of 2

Addendum No. 1 Page 1 of 2 Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT

More information

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN SITUATED IN THE SW ¼ OF SECTION 18, T.2S., R.67W., OF THE 6 TH P.M. COUNTY OF ADAMS, STATE OF COLORADO PREPARED FOR: Thornton Cornerstone

More information

Constructability Guidelines

Constructability Guidelines Constructability Guidelines The Constructability Guidelines offer a list of items that should be considered by Constructability function personnel during the Concept Development Phase through the Final

More information

SPECIAL SPECIFICATION 6666 Charter Communications System

SPECIAL SPECIFICATION 6666 Charter Communications System 2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6666 Charter Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Charter Communications,

More information

CHARLES COUNTY GOVERNMENT ITB NO PINEFIELD DRAINAGE IMPROVEMENTS

CHARLES COUNTY GOVERNMENT ITB NO PINEFIELD DRAINAGE IMPROVEMENTS CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 19, 2015 ITB NO. 16-05 PINEFIELD DRAINAGE IMPROVEMENTS ADDENDUM NUMBER TWO

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

PREQUALIFICATION APPLICATION INSTRUCTIONS

PREQUALIFICATION APPLICATION INSTRUCTIONS PREQUALIFICATION APPLICATION INSTRUCTIONS Please read the following instructions carefully as incomplete applications will not be processed. COMPLETE AND RETURN ALL SECTIONS OF THE APPLICATION PACKAGE.

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update

I-64 Capacity Improvements Segment I Financial Plan Annual Update I-64 Capacity Improvements Segment I December 1, 2016 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479), NHA-064-3(479) UPC 104905

More information

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016 Cleveland Opportunity Corridor Project Section 3 Subcontractor Informational Meeting August 12, 2016 Agenda Welcome and Opening Remarks Project Overview Prequalifications & Work Types Procurement Overview

More information

36 JASPER THPMAS ROAD CRAWFORDVILLE, FL.

36 JASPER THPMAS ROAD CRAWFORDVILLE, FL. N ARRAN RD. N US 319 CRAWFORDVILLE HWY SR 61 SHADEVILLE RD. WAKULLA HARVEY MILL ROAD US 319 PREBLE-RISH INC CIVIL SURVEYING SITE PLANNING 36 JASPER THPMAS ROAD CRAWFORDVILLE, FL. 32327 GENERAL NOTES: 1.

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019:

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019: ADDENDUM NO. PROJECT NO. 3-9-07 PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 A.M. ON JANUARY, 209: Q# Plan sheet 2 has a note MAINTENANCE OF TRAFFIC (LOCAL ROADS) which relates to bid item 22 and calls

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Foreword This manual contains

More information

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:

More information

Highway 417 Bridge Replacement

Highway 417 Bridge Replacement Highway 417 Bridge Replacement West of Maitland Avenue to East of Island Park Drive Hampton Iona Community Group June 6, 2006 7:00 p.m. to 9:00 p.m. Overview of Project Area MAITLAND CLYDE CARLING WBL

More information

PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR

PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR 99.0 PUBLIC AND PRIVATE IMPROVEMENTS CODE 99.0 PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR TABLE OF CONTENTS 99.1. ADMINISTRATION AND GENERAL REGULATIONS...2 99.1.1. Title...2

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479),

More information

COLUMBIA WATERSHED MANAGMENT PLAN SWM RETROFIT CONCEPT LE-RRI-015 QUEEN MARIA COURT

COLUMBIA WATERSHED MANAGMENT PLAN SWM RETROFIT CONCEPT LE-RRI-015 QUEEN MARIA COURT 1A. OWNER/ DEVELOPER: COLUMBIA ASSOCIATION 10221 WINCOPIN CIRCLE COLUMBIA, MD. 210443410 HOWARD COUNTY DEPARTMENT OF PUBLIC WORKS 5. Total area of site is: Total area disturbed is: Total area vegetatively

More information

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1 DATE: May 18, 2016 TO: FROM: All Bidders/Proposers Willie Velez, CPPB Procurement Administrator City of Casselberry Purchasing Division SUBJECT: ITB-2016-0023, Oxford Road Complete Street Improvements

More information

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/ CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA 34695 PHONE: 727/724-1555 FAX: 727/724-1566 RIGHT-OF-WAY / EASEMENT USE PERMIT DATE SUBMITTED: EXPIRATION DATE: Submit the following to the

More information

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS 8.1 INTRODUCTION To minimize the detrimental effects of erosion and sedimentation, Henrico County requires that those individuals responsible for

More information

SECTION MAINTENANCE OF EXISTING CONDITIONS

SECTION MAINTENANCE OF EXISTING CONDITIONS SECTION 02 01 00 MAINTENANCE OF EXISTING CONDITIONS PART 1 GENERAL 1.1 GENERAL A. The CONTRACTOR shall protect all existing utilities and improvements not designated for removal and shall restore damaged

More information

3.6 Construction Methods

3.6 Construction Methods Exhibit 144: Birchmount Stop Layout West Don River Bridge - Girders are adequate to accommodate LRT right-of-way and required deck widening. Supplementary support or deck strengthening may be required

More information

RFP QUESTIONS AND ANSWERS PARK AND RIDE LOT AT I-66/ROUTE 15 INTERCHANGE VDOT PROJECT PR CONTRACT ID C DB99 August 817, 2017

RFP QUESTIONS AND ANSWERS PARK AND RIDE LOT AT I-66/ROUTE 15 INTERCHANGE VDOT PROJECT PR CONTRACT ID C DB99 August 817, 2017 Form DB-004 RFP Questions and Answers RFP QUESTIONS AND ANSWERS PARK AND RIDE LOT AT I-66/ROUTE 15 INTERCHANGE VDOT PROJECT PR15-076-236 CONTRACT ID C00109486DB99 August 817, 2017 PROCUREMENT 1. Part 1,

More information

JEFFERSON COUNTY STORM WATER MANAGEMENT

JEFFERSON COUNTY STORM WATER MANAGEMENT JEFFERSON COUNTY STORM WATER MANAGEMENT B-210 Courthouse, Birmingham, Alabama 35203 Telephone: (205) 325-8741 Erosion and Sedimentation Control Measures for Commercial Projects (Plans Requirements) -All

More information

Pre-proposal Meeting

Pre-proposal Meeting Pre-proposal Meeting US ROUTE 15/29 IMPROVEMENTS AT VINT HILL FAUQUIER COUNTY, VIRGINIA UPC 114713 (0029-030-843, P101, R201, C501) Contract ID: C00 114713 DB105 Hal Jones, P.E. Project Manager Joseph

More information

Construction Management Plan

Construction Management Plan P.I.N. 1759.59 TITLE: Geyser Road Safe Routes to School Project LOCATION: City of Saratoga Springs COUNTY: Saratoga County I. Supervision of Project Construction Management Plan a. Roles and Responsibilities:

More information

Port KC RFP NORTHLAND PARK BUILDING V

Port KC RFP NORTHLAND PARK BUILDING V Port KC RFP NORTHLAND PARK BUILDING V 1. The RFP refers to landscaping plans. However, it does not appear that the landscaping plans were issued with the rest of the RFP. Will these be issued with an addendum?

More information

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166 City of Doral 8401 NW 53 rd Ter. Doral, FL 33166 Project Address: (305) 593-6700 Permit Number: National Pollution Discharge Elimination System (NPDES) Construction Site Erosion and Sedimentation Control

More information

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199)) 11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363-4210 Fax: (916) 363-4230 M e m o r a n d u m To: Reena Gohil, Environmental Planner Date: May 30, 2017 California Department of

More information

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2 MERCED COUNTY BID LIST CAMPUS PARKWAY SEGMENT 2 CONTRACT 2017191 The bidder must provide unit prices for each bid item listed below, based on the specified unit of measure. The unit price for each item

More information

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager Interstate 66 Widening from Gainesville to Haymarket RFQ Information Meeting January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager John C. Daoulas, P.E. APD Project Manager and POC Introduction

More information

DOCUMENT ADDENDA AND MODIFICATIONS

DOCUMENT ADDENDA AND MODIFICATIONS DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications

More information

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER FOR SPECIAL CONDITIONS AND PERMIT NUMBERING GENERAL NOTES: HOUSE GREEN HOUSE 1900 S. NORFOLK ST. SUITE 350 GARAGE GRADING

More information

STATE AID GUIDE FOR: Updated: December 16, 2005

STATE AID GUIDE FOR: Updated: December 16, 2005 STATE AID GUIDE FOR: Updated: December 16, 2005 1. AFTER THE FACT RIGHT OF WAY DEPARTMENT OF MINNESOTA TRANSPORTATION 2. MISCELLANEOUS AFTER THE FACT Traffic Signals, Lighting, Retaining Walls, Sidewalk,

More information

LOT GRADING GUIDELINES FOR COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY RESIDENTIAL PROPERTIES

LOT GRADING GUIDELINES FOR COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY RESIDENTIAL PROPERTIES LOT GRADING GUIDELINES FOR COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY RESIDENTIAL PROPERTIES Contents COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY... 1 RESIDENTIAL

More information

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY Guidance on restoration of City Rights-of-Way Public Works Department Directors Office 747 Market Street Suite 408 Tacoma, WA 98402 253-591-5525 Right-of-Way

More information

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS GENERAL PLAN NOTES PERMANENT SIGNS PROJECT SCOPE THIS PROJECT INCLUDES REMOVAL OF PORTIONS OF CONCRETE CURB & GUTTER AND HMA SURFACE; INSTALLATION OF SANITARY AND STORM SEWER AND UNDERDRAIN; EXCAVATION

More information

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 2004 Specifications CSJ: 0932-01-076 SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 1.0 Description of Project 1.1. General. This project provides for the widening of

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

TRANSFORM 66 Outside the Beltway Project Update March 2018

TRANSFORM 66 Outside the Beltway Project Update March 2018 TRANSFORM 66 Outside the Beltway Project Update March 2018 PROJECT OVERVIEW The Transform 66 Outside the Beltway project (the Project) will upgrade 22.5 miles of Northern Virginia s Interstate 66 between

More information

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: --

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: -- ROADWAY CONSTRUCTION NOTES 1. ALL RIGHT-OF-WAY OTHER THAN ROADWAY AREAS SHALL BE SODDED. ALL SLOPE STEEPER THAN 6:1 SHALL REQUIRE SODDING. THE CITY RESERVES THE RIGHT TO REQUIRE SODDING IN SPECIAL AREAS

More information

Park and Ride Lot at I-66/Route 15 Interchange UPC Pre-Proposal Meeting

Park and Ride Lot at I-66/Route 15 Interchange UPC Pre-Proposal Meeting Park and Ride Lot at I-66/Route 15 Interchange UPC 109486 Pre-Proposal Meeting July 12, 2017 Christiana Briganti-Dunn, PE, CCM, NOVA Design-Build Program Manager Mark Gibney, PE, PMP, NOVA Design-Build

More information

City of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH)

City of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH) City of St. Catharines Standard Drawings JULY 2017 Revised July 21, 2017 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 1 Monolithic Curb-Faced Sidewalk for Concrete Road 110-2002

More information

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California 93030 Tel 805.385.8280 October 24, 2018 ADDENDUM NO. 2 Vineyard Avenue Street Resurfacing Project PW 16-12 SCHEDULED

More information

SANBORN COUNTY

SANBORN COUNTY Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178

More information

PUBLIC NOTICE PROFESSIONAL ENGINEERING SERIVCES: DESIGN OF TURF FIELD

PUBLIC NOTICE PROFESSIONAL ENGINEERING SERIVCES: DESIGN OF TURF FIELD PUBLIC NOTICE The Township of Union has adopted the Fair and Open Process of the Pay-to-Play Law (N.J.S.A. 19:44A-20a, et seq.) in its request for proposals and awarding goods and services contracts with

More information

South Carolina Department of Transportation. Engineering Directive

South Carolina Department of Transportation. Engineering Directive South Carolina Department of Transportation Engineering Directive Directive Number: ED-17 Effective: May 5, 2015 Subject: Encroachment Permits References: S.C. Code of Laws, Sections 57-3-110, 57-5-1080,

More information

ULDA Decision Notice

ULDA Decision Notice ULDA Decision Notice Site Address Bowen St, Roma Real property description Lot 143 AP15786 Type of approval UDA development approval subject to conditions Aspects of development Reconfiguring a Lot with

More information

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit 7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit 7.1 E-Permit and U-Permit Permit Description and Purpose The Excavation Permit (E-Permit) and the Utility Permit (U-Permit) are issued to allow construction,

More information

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2 Project: APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) PROJECT: 0029-005-130, C501, B645 RFP QUESTIONS AND ANSWERS-REVISION 2 Date: 12/04/09 Approaches and Bridge over Tye River (Rte. 29 NBL) Subject:

More information

Overview of Section 2

Overview of Section 2 Overview of Section 2 2.0 Section 2 addresses Steps 1 through 3 of the GESC Permit Process: Step 1. Confirm that a Temporary Batch Plant, Standard GESC, Annual Maintenance GESC, or Small Utility GESC Permit

More information

INDIVIDUAL PROJECT ORDER NUMBER 2 January 5, 2010

INDIVIDUAL PROJECT ORDER NUMBER 2 January 5, 2010 INDIVIDUAL PROJECT ORDER NUMBER 2 January 5, 2010 Describing a specific agreement between Kimley-Horn and Associates, Inc. ( KHA or the Consultant ), and The Village Center Community Development District

More information

WAKULLA SITE PLANNING

WAKULLA SITE PLANNING WAKULLA CIVIL SURVEYING SITE PLANNING TRAFFIC CONTROL PLAN WAKULLA ARRAN ROAD WIDENING & RESURFACING UTILITY CONTACT LIST NO. DATE: APPR. REVISION: DATE: CIVIL SURVEYING SITE PLANNING GENERAL NOTES WAKULLA

More information

Civil Construction Pre-Bid and DBE Meet and Greet. November 13, 2017

Civil Construction Pre-Bid and DBE Meet and Greet. November 13, 2017 Civil Construction Pre-Bid and DBE Meet and Greet November 13, 2017 1 Today s Topics Welcome/Introductions Bid Requirements Review of DBE Participation Overview of Project Specifications DBE Meet and Greet

More information

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements. SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction

More information

Operational Analysis of Dulles Toll Road Ramps to Tysons. Board Transportation Committee Meeting September 17, 2013

Operational Analysis of Dulles Toll Road Ramps to Tysons. Board Transportation Committee Meeting September 17, 2013 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County Department of Transportation 1 Agenda Overview & Assumptions

More information

TABLE OF CONTENTS COVER PAGE 1 NO TABLE OF CONTENTS ADDENDUM ACKNOWLEDGEMENT

TABLE OF CONTENTS COVER PAGE 1 NO TABLE OF CONTENTS ADDENDUM ACKNOWLEDGEMENT TABLE OF CONTENTS Sections Description No. of Return with Pages Submittal COVER PAGE 1 NO TABLE OF CONTENTS ADDENDUM ACKNOWLEDGEMENT 1 YES SECTION A CHANGES TO THE CONTRACT DOCUMENTS 1 NO SECTION B PRE-BID

More information

District No.: Applicant: Type of Work:

District No.: Applicant: Type of Work: Fee: Permit No.: District No.: Applicant: Type of Work: FOR DEPARTMENT USE ONLY APPLICATION AND ANNUAL PERMIT FOR TELECOMMUNICATION OCCUPANCY OF NEVADA DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY (Under

More information

ADDENDUM NO. 2 PUBLIC WORKS CONSTRUCTION PROJECT NO

ADDENDUM NO. 2 PUBLIC WORKS CONSTRUCTION PROJECT NO ADDENDUM NO. 2 LANCASTER BOULEVARD AND 15 th STREET WEST ROUNDABOUT This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans,

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION

More information

CITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY

CITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY CITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY The Right-of-Way Encroachment, Excavation & Grading Permit issued by the Public Works Department

More information

Tangerine Road Dove Mountain Boulevard to La Cañada Drive

Tangerine Road Dove Mountain Boulevard to La Cañada Drive Tangerine Road Dove Mountain Boulevard to La Cañada Drive PUBLIC MEETING The Highlands at Dove Mountain November 19, 2015 PRESENTATION OUTLINE 1. Tangerine Road Corridor in Review Project Need Project

More information

City of Glendale Stormwater Management Plan Checklist

City of Glendale Stormwater Management Plan Checklist City of Glendale Stormwater Management Plan Checklist Project: Title of Plan: Date: Date of Plan: Reviewer: Most Recent Revision: Criteria Yes No Identify a SWMP Administrator and an alternate - The SWMP

More information