BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST COST COST

Size: px
Start display at page:

Download "BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST COST COST"

Transcription

1 PAGE 1 BID OPENING: JULY 27, 2010 ENGINEER'S ESTIMATE: $18,092, CONTRACT NO SPEEDWAY BOULEVARD, CAMINO SECO TO HOUGHTON ROAD IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL IN SPECIFICATION BOOK* NAC CONSTRUCTION EAGLE ROCK BORDERLAND CONSTRUCTION MARKHAM BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST COST COST F.A. PARTNERING , , , , HR RESTAKING FEES $ MARKET PRICE ADJUSTMENT , , , , L.SUM CLEARING AND GRUBBING 6, , , , , , , , L.SUM REMOVAL OF STRUCTURAL CONCRETE 3, , , , , , , , F.A. REMOVAL OF UNKNOWN STRUCTURES AND OBSTRUCTIONS , , , , L.FT. REMOVAL OF CONCRETE CURB AND GUTTER , , , , SQ.FT. REMOVAL OF CONCRETE SIDEWALKS, DRIVEWAYS AND SLABS , , , , SQ.YD. REMOVAL OF ASPHALTIC CONCRETE PAVEMENT , , , , L.FT. REMOVAL OF PIPE (SANITARY SEWER) , , , , L.FT. REMOVAL OF PIPE (STORM DRAIN)(CMP) , , , , SQ.YD. REMOVE RIPRAP , , SQ.YD. REMOVE GROUTED RIPRAP , EACH REMOVE, SALVAGE, AND RELOCATE MAILBOX , , EACH REMOVE AND SALVAGE POST BARRICADES L.FT. REMOVE AND SALVAGE GUARD RAIL , , , L.FT. REMOVE AND SALVAGE FENCE , , L.FT. REMOVE EXISTING BLOCK WALL (& RECONSTRUCT END) , EACH REMOVE EXISTING PIPE HEADWALL , , , , L.FT. REMOVAL OF HANDRAIL & BRIDGE RAILING , , , , SQ.YD. REMOVE (CONCRETE CHANNEL LINING) , , , , CU.YD. ROADWAY EXCAVATION , , , , CU.YD. DRAINAGE EXCAVATION , , , , CU.YD. AGGREGATE BASE , , , , TON BITUMINOUS TACK COAT 1, , , , , F.A. ASPHALTIC CONCRETE (MIX NO. 1)TEMPORARY , , , , TON ASPHALTIC CONCRETE (MIX NO. 1) ,005, , , , TON ASPHALTIC CONCRETE (MIX NO.2) , , , , TON ASPHALTIC CONCRETE (ASPHALT-RUBBER) , , , , L.FT. PIPE, CORRUGATED METAL, 24" , , , , L.FT. PIPE, CORRUGATED METAL, 36" , , , , L.FT. PIPE, REINFORCED CONCRETE, CLASS II, 24" , , , , L.FT. PIPE, REINFORCED CONCRETE, CLASS III, 24" , , , , L.FT. PIPE, REINFORCED CONCRETE, CLASS IV, 24" , , , , L.FT. PIPE, REINFORCED CONCRETE, CLASS II, 30" , , , , L.FT. PIPE, REINFORCED CONCRETE, CLASS III, 30" , , , , L.FT. PIPE, REINFORCED CONCRETE, CLASS IV, 30" , , , , L.FT. PIPE, REINFORCED CONCRETE, CLASS II, 36" , , , , L.FT. PIPE, REINFORCED CONCRETE, CLASS III, 36" , , , , L.FT. PIPE, REINFORCED CONCRETE, CLASS II, 42" , , , , L.FT. PIPE, REINFORCED CONCRETE, CLASS III, 42" , , , ,480.00

2 PAGE 2 NAC CONSTRUCTION EAGLE ROCK BORDERLAND CONSTRUCTION MARKHAM BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST COST COST L.SUM CONCRETE COLLAR 1, , , , , , EACH CONCRETE CATCH BASIN (CB 104) 5, , , , , , , , EACH CONCRETE CATCH BASIN (STD.308)SUMP ONLY 3, , , , , , , , EACH CONCRETE CATCH BASIN (STD.309) 4, , , , , , , , EACH CONCRETE CATCH BASIN (STD.308) 4' WING, SINGLE 4, , , , , , , , EACH CONCRETE CATCH BASIN (STD.308) 4' WING, DOUBLE 5, , , , , , , , EACH CONCRETE CATCH BASIN (STD.308) 8' WING, SINGLE 5, , , , , , , , EACH CONCRETE CATCH BASIN (STD.308) 12' WING, SINGLE 5, , , , , , , , EACH CONCRETE CATCH BASIN (STD.308) 12' WING, DOUBLE 8, , , , , , , , EACH CONCRETE CATCH BASIN (STD.308) 16' WING, SINGLE 7, , , , , , , , EACH CONCRETE CATCH BASIN (STD.308) 16' WING, DOUBLE 10, , , , , , , , EACH CONCRETE CATCH BASIN (DETAIL DC, DQ, & DU) 6, , , , , , , , EACH CONCRETE CATCH BASIN (DETAIL DD) 17, , , , , , , , EACH CONCRETE CATCH BASIN (DETAIL DE) 10, , , , , , , , EACH CONCRETE CATCH BASIN (DETAIL DF) 8, , , , , , , , EACH CONCRETE CATCH BASIN (DETAIL DL) 9, , , , , , , , L.SUM CONCRETE CATCH BASIN (DETAIL DP) 29, , , , , , , , EACH CONCRETE CATCH BASIN (DETAIL DS) 15, , , , , , , , EACH CONCRETE CATCH BASIN (DETAIL DT) 20, , , , , , , , EACH CONCRETE CATCH BASIN (DETAIL DZ) 12, , , , , , , , EACH CONCRETE CATCH BASIN (DETAIL DAA) 7, , , , , , , , EACH CONCRETE CATCH BASIN (DETAIL DAG) 7, , , , , , , , EACH CONCRETE CATCH BASIN (DETAIL DAI) 11, , , , , , , , EACH CONCRETE CATCH BASIN (DETAIL DAJ) 12, , , , , , , , EACH CONCRETE CATCH BASIN (DETAIL DAK) 17, , , , , , , , L.FT. SIDEWALK SCUPPER, TYPE 1 (STD 204) , , , EACH SIDEWALK SCUPPER, TYPE 3 (STD 205.5) 2, , , , , , , , L.SUM SCUPPERS, DETAIL DAF(REMOVE & CAP EXIST, 3 NEW INLETS) 7, , , , , , , , L.FT. SPILLWAY (DETAIL DI) , , , EACH MANHOLE (STD. 302) (STORM DRAIN) 3, , , , , , , , EACH FLOW MANAGEMENT PLANS , , , , , F.A. SEWER BYPASS PUMPING , , , , L.FT. SEWER PIPE (8")(DUCTILE IRON) , , , , F.A. RECONSTRUCT HOUSE CONNECTION SEWER , , , , EACH MANHOLE FRAME AND COVER (WATERPROOF)(STD. WWM 213.2) , , , , EACH RESET FRM & COVER FOR MANHOLE (SEWER) (CLASS S , , , , EACH RESET FRAME AND COVER FOR CLEAN OUT (CLASS S CONC. COLLAR) L.FT. RECONSTRUCT MANHOLE (STD. WWM 305) (SEWER) , , , , , EACH MANHOLE (WWM 209) (SEWER) 4, , , , , , , , EACH UNPAVED AREA CONCRETE COLLAR (STD. WWM 212) , , , , SQ.YD. PAVEMENT REPLACEMENT FOR NEW WATER MAINS , , , , L.FT. PIPE, DUCTILE IRON, 4" (CLASS 350) , , , , L.FT. PIPE, DUCTILE IRON, 6" (CLASS 350) , , , , L.FT. PIPE, DUCTILE IRON, 8" (CLASS 350) , , , , L.FT. PIPE, DUCTILE IRON, 24" (CLASS 350) , , , , L.FT. PIPE, 4" PVC (CLASS 305) , , , , L.FT. PIPE, 6" PVC (CLASS 305) , , , , L.FT. PIPE, 8" PVC (CLASS 305) , , , , L.FT. PIPE, COPPER, 3/4", W/FITTINGS L.FT. PIPE, COPPER, 1", W/FITTINGS , , , , L.FT. PIPE, COPPER, 1 1/2" W/ FITTINGS , , ,200.00

3 PAGE 3 NAC CONSTRUCTION EAGLE ROCK BORDERLAND CONSTRUCTION MARKHAM BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST COST COST L.FT. PIPE, COPPER, 2", W/FITTINGS , , , , EACH TAPPING SLEEVE & VALVE, 6"X 6" 2, , , , , , , , EACH TAPPING SLEEVE & VALVE, 12"X 6" 2, , , , , , , , EACH TAPPING SLEEVE & VALVE, 12"X 8" 2, , , , , , , , EACH VALVE, GATE 4", BOX & COVER , , EACH VALVE, GATE 6", BOX & COVER , , , , , EACH VALVE, GATE 8", BOX & COVER 1, , , , , , , , EACH COMBINATION AIR RELEASE VALVE (ARV) 1" , , , , EACH COMBINATION AIR RELEASE VALVE (ARV) 2" 2, , , , , , , , EACH REMOVAL OF EXISTING VALVE AND PLUG FLANGE END , , , , , EACH DRAIN VALVE ASSEMBLY , , EACH ADJUST EXISTING VALVE BOX AND COVER (CLASS S CONC. COLLAR) , , , , EACH FIRE HYDRANT 2, , , , , , , , L.FT. CONCRETE CAP , , , , L.FT. REMV & DISPOSE NON-CEMENT ASBESTOS (CA) WATER PIPE 10" & SMALLER , , , , L.FT. REMV & DISPOSE NON-CEMENT ASBESTOS (CA) WATER PIPE 12" & LARGER , , , , L.FT. REMOVE & DISPOSE CEMENT ASBESTOS (CA) WATER PIPE 10" & SMALLER , , , , EACH REMOVE & DISPOSE EXISTING FIRE HYDRANT , , , , EACH CONNECTIONS, 4" , , , , EACH CONNECTIONS, 6" , , , , , , EACH CONNECTIONS, 8" , , , , , , EACH NEW 24" DI TO EXISTING CCP 5, , , , , , , , EACH CORROSION REPORT 5, , , , , , , , EACH CORROSION TEST STATION (CTS), NEW, BELOW GROUND , , , , , , , EACH FLANGE INSULATING KIT (FIK), 24" , , , , EACH TIE OVER (T), 1" , , , , EACH TIE OVER (T), 2" 1, , , , , , EACH METER RELOCATION, SERVICE LINE RENEWAL (M/R), 1 " , , , , EACH METER RELOCATION, SERVICE LINE RENEWAL (M/R), 1 1/2" , , , , EACH METER RELOCATION, SERVICE LINE RENEWAL (M/R), 2" 1, , , , , , , , EACH METER ADJUSTMENT (M/A), 1" EACH STUB(S) 2" , , , , L.FT. TEMPORARY HIGHLINE (BYPASS) 4" , , , , L.FT. PIPE, DUCTILE IRON, 16" (CLASS 350) (RECLAIMED) , , , , L.FT. PIPE, 12" PVC (CLASS 305) (RECLAIMED) , , , , L.FT. PIPE, COPPER, 1", W/FITTINGS (RECLAIMED) , L.FT. PIPE, COPPER, 2", W/FITTINGS (RECLAIMED) , , , , EACH GATE VALVE, 16" (RECLAIMED) 6, , , , , , , , EACH COMBINATION AIR RELEASE VALVE (ARV) 1" (RECLAIMED) , , EACH COMBINATION AIR RELEASE VALVE (ARV) 2" (RECLAIMED) 1, , , , , , , , EACH ADJ. EXISTING VALVE BOX & COVER (RECL. WATER) (CLASS S CONC. COLLAR) , , , , L.FT. CONCRETE CAP (RECLAIMED WATER)(5' WIDE) , , , , L.FT. REMV & DISPS NON-CEMENT ASBESTOS (CA) WATER PIPE 12" & LRGR (RECLAIMED) , , , , L.FT. REMOVE & DISPOSE OF 32" STEEL CASING (RECLAIMED) EACH CONNECTIONS, 12" (RECLAIMED) 1, , , , , , , EACH NEW 16" DI TO EXISTING DI (RECLAIMED) 1, , , , , , , , EACH CORROSION TEST STATION (CTS), NEW, BELOW GROUND (RECLAIMED) , , , , , , , EACH CORROSION TEST STATION (CTS), REMOVE & SPLICE (RECLAIMED) , , , , , , , F.A. UTILITY POTHOLING BY TRENCHING , , , , EACH HEADWALL (PIPE INLET) 4, , , , , , , , EACH HEADWALL (PIPE INLET) 4, , , , , , , ,200.00

4 PAGE 4 NAC CONSTRUCTION EAGLE ROCK BORDERLAND CONSTRUCTION MARKHAM BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST COST COST EACH HEADWALL (PIPE OUTLET) 6, , , , , , , , EACH HEADWALL (PIPE INLET) 6, , , , , , , , EACH HEADWALL (PIPE OUTLET) 6, , , , , , , , EACH HEADWALL (PIPE OUTLET) 9, , , , , , , , L.FT. REINFORCED CONCRETE BOX CULVERT (1-10' X 4')(EXTENSION) , , , , L.SUM WINGWALLS & OUTLET APRON (RCBC 6 - OUTLET) 9, , , , , , , , L.FT. REINFORCED CONCRETE BOX CULVERT (2-10' X 5') , , , , L.SUM WINGWALLS & OUTLET APRON (RCBC 3 - INLET & OUTLET) 35, , , , , , , , L.FT. REINFORCED CONCRETE BOX CULVERT (3-10' X 5') 1, , , , , , , L.SUM WINGWALLS & OUTLET APRON (RCBC 2 - INLET & OUTLET) 37, , , , , , , , L.FT. REINFORCED CONCRETE BOX CULVERT (4-10' X 4') 1, , , , , , , , L.SUM WINGWALLS & OUTLET APRON (RCBC 5 - INLET & OUTLET) 24, , , , , , , , L.FT. REINFORCED CONCRETE BOX CULVERT (4-10' X 6') 1, , , , , , , , L.SUM WINGWALLS & OUTLET APRON (RCBC 4 - INLET & OUTLET) 29, , , , , , , , EACH PIPE CONNECTION TO NEW BOX CULVERT (DETAIL DA) , , , , , , L.FT. SIGN POST (P1) , , , , EACH SIGN POST (P1) FOUNDATION , , , , EACH RELOCATE SIGNS (NEIGHBORHOOD WATCH) , SQ.FT. WARNING SIGN PANEL , , , , SQ.FT. REGULATORY SIGN PANEL , , , , SQ.FT. GUIDE SIGN PANEL & SPECIAL SIGNS , , , , EACH PUSH BUTTON PLACARD , EACH STREET NAME SIGNS (PC/COT SIGNING STDS SHT 9-22) , , , , L.SUM MAINTENANCE AND PROTECTION OF TRAFFIC 18, , , , , , , , $ FURNISH AND INSTALL TEMPORARY TRAFFIC CONTROL DEVICES , , , , L.FT. TEMPORARY CONCRETE BARRIER (INSTALLATION OR REMOVAL) , , , , L.FT/DAY TEMPORARY CONCRETE BARRIER (IN USE) , , , , L.FT. PAVEMENT MARKING (WHITE SPRAYED THERMOPLASTIC) (0.060") , , , , L.FT. PAVEMENT MARKING (YELLOW SPRAYED THERMOPLASTIC) (0.060") , , , , L.FT. PAVEMENT MARKING (TRANSVERSE) (THERMOPLASTIC) (ALKYD)(0.090") , , , , EACH PAVEMENT LEGEND (ONLY) , , , , EACH PAVEMENT SYMBOL , , , , EACH PAVEMENT MARKER, RAISED, BLUE, TYPE F EACH PAVEMENT MARKER, RAISED, TYPE C , , , , EACH PAVEMENT MARKER, RAISED, TYPE D , , , EACH PAVEMENT MARKER, RAISED, TYPE G , , , , EACH PAVEMENT MARKER, RAISED, TYPE H , , , , L.FT. ELECTRICAL CONDUIT(INSTALL 2" RISER)(COX) , , L.FT. ELECTRICAL CONDUIT(2-1/2" RIGID METAL RISER)(TEP SR-220) , EACH ELECTRICAL CONDUIT(2-1/2" RIGID METAL BEND)(TEP SR-220) , L.FT. ELECTRICAL CONDUIT(4" RIGID METAL RISER)(TEP SR-220) , EACH ELECTRICAL CONDUIT(4" RIGID METAL BEND)(TEP SR-220) , L.FT. ELECTRICAL CONDUIT(4" RIGID METAL RISER)(INET) , , , , L.FT. ELECTRICAL CONDUIT(INSTALL 4" RISER)(QWEST) L.FT. ELECTRICAL CONDUIT(INSTALL 4" RISER)(COX) , EACH ELECTRICAL CONDUIT(4" RIGID METAL BEND)(INET) , L.FT. ELECTRICAL CONDUIT(6" RIGID METAL RISER)(TEP SR-220) , , , , EACH ELECTRICAL CONDUIT(6" RIGID METAL BEND)(TEP SR-220) , , , , L.FT. ELECTRICAL CONDUIT(2")(INSTALL)(COX) , , , , L.FT. ELECTRICAL CONDUIT(2-1/2")(TEP) , , , , L.FT. ELECTRICAL CONDUIT(2-1/2")(INSTALL)(COX)

5 PAGE 5 NAC CONSTRUCTION EAGLE ROCK BORDERLAND CONSTRUCTION MARKHAM BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST COST COST L.FT. ELECTRICAL CONDUIT(4") (TEP) , , , , L.FT. ELECTRICAL CONDUIT(4") (INET) , , , , L.FT. ELECTRICAL CONDUIT(4")(INSTALL) (QWEST) , , , , L.FT. ELECTRICAL CONDUIT(4")(INSTALL) (COX) , , , , L.FT. ELECTRICAL CONDUIT(6")(TEP) , , , , L.FT. CONCRETE ENCASEMENT FOR UTILITY DUCTS(2-6" TEP) , , , , L.FT. CONCRETE ENCASEMENT FOR UTILITY DUCTS(OVER RCBC) , , , , EACH BOX PAD (TEP SR-240) 1, , , , , , , , EACH PME TRANSFORMER PAD (TEP SR-209)(SINGLE PHASE) , , , , , , EACH CAPACITOR PAD (TEP SR-233 FIGURE 1) , , , , EACH JUNCTION CABINET BASE (J1) (TEP SR-235) , , , , , EACH JUNCTION CABINET BASE (J2) (TEP SR-234) , , , , , EACH INSTALL PEDESTAL (COX) , , , , , EACH INSTALL 10K VAULT (COX) , , , , , EACH INSTALL POWER SUPPLY CABINET & PAD (COX) 2, , , , , , EACH INSTALL FIBER NODE CABINET & PAD (COX) 2, , , , , , EACH PULL BOX (TEP SR-225 TYPE B) 9, , , , , , , , EACH PULL BOX (PENCELL) (INET) , , , , , , L.FT. TRENCHING (UTILITY CONDUIT) , , , , EACH POLE (TYPE A) , , , , EACH POLE (STRAIN POLE) 2, , , , , , , , EACH POLE (TYPE G) 1, , , , , , , , EACH POLE (TYPE Q) 2, , , , , , , , EACH POLE (T 445,TYPE B WITH ARM) 1, , , , , , , , EACH POLE (RELOCATE TYPE E, T 446) EACH POLE FOUNDATION (TYPE A) , , , , EACH POLE FOUNDATION (STRAIN POLE) 1, , , , , , , , EACH POLE FOUNDATION (TYPE G) , , , , EACH POLE FOUNDATION (TYPE Q) 2, , , , , , , , EACH POLE FOUNDATION (T 445) , , , , EACH POLE FOUNDATION (T 445)(MODIFIED)(DETAIL A) 1, , , , , EACH POLE FOUNDATION (T 446) , , , , EACH MAST ARM (15 FT.)(TAPERED) EACH MAST ARM (20 FT.)(TAPERED) , , , , EACH MAST ARM (30 FT.) (TAPERED) 1, , , , , , , , EACH MAST ARM (35 FT.) (TAPERED) 1, , , , , , , , EACH MAST ARM (40 FT.) (TAPERED) 2, , , , , , , , L.FT. ELECTRICAL CONDUIT (1 1/2")(PVC)(LIGHTING & SIGNALS) , , , , L.FT. ELECTRICAL CONDUIT (2") (PVC)(LIGHTING & SIGNALS) , , , , L.FT. ELECTRICAL CONDUIT (2 1/2") (PVC)(SIGNALS) , , , L.FT. ELECTRICAL CONDUIT (3") (PVC)(LIGHTING & SIGNALS) , , , , L.FT. ELECTRICAL CONDUIT (4") (PVC)(TRAFFIC SIGNALS) , , , , EACH ELECTRICAL SERVICE INSTALLATION 1, , , , , , , , EACH PULL BOX (NO. 3 1/2) , , , , EACH PULL BOX (NO. 7) , , , , EACH PULL BOX (NO. 7) (WITH EXTENSION) , , , , L.FT. CONDUCTORS (BARE BOND)(NO. 8)(STREET LIGHTING) , , , , L.SUM CONDUCTORS (HAWK SIGNAL AT SPEEDWAY & CUMMINGS) 4, , , , , , , , L.SUM CONDUCTORS (TRAFFIC SIGNAL AT SPEEDWAY & HARRISON) 11, , , , , , , , L.SUM CONDUCTORS (HAWK SIGNAL AT SPEEDWAY & SCHRADER) 4, , , , , , , , L.SUM CONDUCTORS (TRAFFIC SIGNAL AT SPEEDWAY & HOUGHTON) 9, , , , , , , ,200.00

6 PAGE 6 NAC CONSTRUCTION EAGLE ROCK BORDERLAND CONSTRUCTION MARKHAM BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST COST COST L.FT. CONDUCTORS (NO. 6 THW)(STREET LIGHT SYSTEM) , , , , L.FT. CONDUCTORS (4 CONDUCTOR SHIELDED CABLE) (INTERCONNECT) , , , , EACH TRAFFIC SIGNAL FACE (TYPE F) , , , , EACH TRAFFIC SIGNAL FACE (TYPE F, MODIFIED)(HAWK SIGNAL) , , , , EACH TRAFFIC SIGNAL FACE (TYPE Q) , , , , EACH TRAFFIC SIGNAL FACE (TYPE Q)(MODIFIED) 1, , , , , EACH TRAFFIC SIGNAL FACE (PEDESTRIAN) (MAN/HAND) , , , , EACH PEDESTRIAN PUSH BUTTON (2" ADA) , , , , EACH TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE II) , , , , EACH TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE V) , , , , EACH TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE VI) , , , , EACH TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE VII) , , , , EACH TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE XI) , , , , EACH TRAFFIC SIGNAL MOUNTING ASSEMBLY (TERM HANGER) , , , , L.SUM REMOVE AND SALVAGE TRAFFIC SIGNALS 4, , , , , , , , L.SUM SPAN WIRE (INTERSECTION AT SPEEDWAY & HOUGHTON) 4, , , , , , , , EACH BEACON , , , , EACH PRE-EMPT SENSOR 2, , , , , EACH PHOTO ELECTRIC CELL EACH CONTROL CABINET (TYPE V)(INSTALL, CITY SUPPLIED) , , , , EACH CONTROL CABINET FOUNDATION , , , , EACH METER SERVICE PEDESTAL CABINET 1, , , , , , , , EACH SERVICE PEDESTAL FOUNDATION , , , , EACH VIDEO DETECTION SYSTEM (INSTALL, CITY SUPPLIED) 1, , , , , , , , EACH LUMINAIRE (HORIZONTAL MOUNT) (HPS 400 WATT, 120V, 1PH) , , , , EACH SIGN BANDS (FOR POLE MOUNTS) , , , , EACH INTERNALLY ILLUMINATED STREET NAME SIGN 1, , , , , , , , EACH LOAD CENTER CABINET (TYPE 1) 11, , , , , , , , L.SUM MAINTAIN EXISTING TRAFFIC SIGNAL & LIGHTING SYSTEMS 3, , , , , , , , L.SUM TEMPORARY TRAFFIC SIGNALS 11, , , , , , , , SQ.YD. LANDSCAPE GRADING , , , , SQ.YD. DECOMPOSED GRANITE SURFACING , , , , SQ.YD. SEEDING - CLASS II - SEED MIX A , , , , EACH TREE - NURSERY STOCK - 15 GALLON , , , , EACH TREE STAKING AND GUYING (2 STAKES PER TREE) , , , , EACH SHRUB - NURSERY STOCK - 1 GALLON SIZE , , , , EACH SHRUB - NURSERY STOCK - 5 GALLON SIZE , , , , EACH ACCENT PLANT - NURSERY STOCK - 5 GALLON SIZE , , , , EACH SAGUARO CACTUS FROM OFF-SITE SOURCES (4' - 6') L.SUM LANDSCAPE ESTABLISHMENT 11, , , , , , , , F.A. MISC WORK (LANDSCAPE ESTABLISHMENT) , , , , EACH PROVIDE WATER SERVICE (NEW 1 1/2" METER - IRRIGATION) 1, , , , , , , , EACH SPIN FILTER - 2" 1, , , , , , , , EACH MASTER VALVE ASSEMBLY - 1 1/4" SIZE 1, , , , , , EACH CONTROLLER IN SECURITY CABINET - 24 STATION 16, , , , , , , , L.SUM ELECTRICAL SERVICE TO IRRIGATION CONTROLLER 1, , , , , , , , L.SUM TELEPHONE SERVICE TO IRRIGATION CONTROLLER / CCU , , , , EACH BALL / ISOLATION VALVE ASSEMBLY - 1-1/2" , , , , EACH DRIP ZONE REMOTE CONTROL VALVE ASSEMBLY - 1" , , , , L.FT. PIPE, PVC, SCHEDULE 40 (1")(MAINLINE) , , , , L.FT. PIPE, PVC, SCHEDULE 40 (1 1/2")(MAINLINE) , , , ,025.60

7 PAGE 7 NAC CONSTRUCTION EAGLE ROCK BORDERLAND CONSTRUCTION MARKHAM BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST COST COST L.FT. PIPE, PVC, SCHEDULE 40 (2")(MAINLINE) , , , , L.FT. PIPE, PVC, SCHEDULE 40 (3/4")(LATERAL) , , , , L.FT. PIPE, PVC, SCHEDULE 40 (1")(LATERAL) , , , , L.FT. PIPE (SLEEVE) PVC, SCHEDULE 40 (2") , , , , L.FT. PIPE (SLEEVE) PVC, SCHEDULE 40 (4") , , , , EACH MULTI-OUTLET DRIP EMITTER ASSEMBLY , , , , EACH FLUSH CAP ASSEMBLY , , , , EACH SALVAGE NATIVE TREE - 66" BOX , EACH SALVAGE NATIVE TREE - 60" BOX EACH SALVAGE NATIVE TREE - 54" BOX EACH SALVAGE NATIVE TREE - 48" BOX EACH SALVAGE NATIVE TREE - 42" BOX , , , , EACH SALVAGE NATIVE TREE - 36" BOX EACH SALVAGE NATIVE TREE - 30" BOX , , , , EACH SALVAGE NATIVE TREE - 24" BOX , , , , EACH SALVAGE SAGUARO SPEAR (<6 FT.) EACH SALVAGE BARREL CACTUS , EACH SALVAGE YUCCA , , , , EACH REPLANT SALVAGED NATIVE TREE - 66" BOX EACH REPLANT SALVAGED NATIVE TREE - 60" BOX EACH REPLANT SALVAGED NATIVE TREE - 54" BOX EACH REPLANT SALVAGED NATIVE TREE - 48" BOX EACH REPLANT SALVAGED NATIVE TREE - 42" BOX , , , , EACH REPLANT SALVAGED NATIVE TREE - 36" BOX EACH REPLANT SALVAGED NATIVE TREE - 30" BOX , , , , EACH REPLANT SALVAGED NATIVE TREE/SHRUB - 24" BOX , , , , EACH REPLANT SALVAGED SAGUARO SPEAR (<6 FT.) EACH REPLANT SALVAGED BARREL CACTUS , EACH REPLANT SALVAGED YUCCA , , , , L.SUM ESTABLISH / REMOVE TEMPORARY HOLDING NURSERY 11, , , , , , , , MO. OPERATE TEMPORARY HOLDING NURSERY 1, , , , , L.SUM AZPDES SWPPP 55, , , , , , , , $ AZPDES SWPPP MODIFICATIONS , , , , L.SUM MOBILIZATION 164, , , , , , ,465, ,465, L.FT. BARBED WIRE FENCE , , , , L.FT. CONCRETE CURB (STD. 209)(VERTICAL)(TYPE 2) , , , , L.FT. CONCRETE CURB (COT/PC STD. 209) (24" WEDGE) , , , , L.FT. CONCRETE CURB AND GUTTER (STD. 209) , , , , EACH CONCRETE TRANSITION CURB (STD. 210) , , , , EACH CONCRETE TRANSITION CURB (DETAIL B) SQ.FT. CONCRETE SIDEWALK (STD. NO. 200) , , , , SQ.FT. CONCRETE BUS PAD (6") , , , , EACH CURB ACCESS RAMP (STD. NO SHEET 4C OF 5 ) , , , , , , EACH CURB ACCESS RAMP (STD. NO SHEET 4B OF 5 ) , , , , EACH CURB ACCESS RAMP (STD. NO SHEET 4A OF 5 ) , , , , , EACH CURB ACCESS RAMP (DETAIL C ) , , , , , EACH CURB ACCESS RAMP (DETAIL F ) , , , SQ.FT. TRUNCATED DOMES , , , , SQ.FT. CONCRETE DRIVEWAYS (STD. 206) , , , , L.FT. CONCRETE HEADER (STD. 213) , , , , L.FT. CONCRETE FORD WALL , , , ,200.00

8 PAGE 8 NAC CONSTRUCTION EAGLE ROCK BORDERLAND CONSTRUCTION MARKHAM BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST COST COST EACH SURVEY MONUMENT (STD. 103) , , , , EACH FRAME & COVER FOR SURVEY MONUMENT , , , SQ.YD. SHOTCRETE (4") , , , , SQ.YD. SHOTCRETE (6") , , , , CU.YD. RIPRAP (DUMPED) , , , , CU.YD. RIPRAP (GABIONS) , , , , CU.YD. RIPRAP (GROUTED) , , , , L.FT. CONCRETE CUT-OFF WALL , , , , SQ.FT. RETAINING WALLS , , , , SQ.YD. CONCRETE CHANNEL LINING (6") , , , , $ MISC. WORK (MINOR ALTERATIONS IN DETAILS OF CONSTRUCTION) , , , , L.SUM CONTRACTOR QUALITY CONTROL 90, , , , , , , , L.SUM MISCELLANEOUS WORK (COORDINATION WITH ARTISTS) 1, , , , , , , , L.SUM ENGINEERS FIELD OFFICE 23, , , , , , , , SQ.FT. PRECAST CONCRETE UNIT PAVERS , , , , L.FT. CONCRETE HEADER (6"X 6")(LANDSCAPE) , , , , L.FT. METAL HANDRAIL (STD DETAIL DN) , , , , L.FT. METAL HANDRAIL (DETAIL DAE) , , , , TOTAL BID 13,937, ,336, ,712, ,523,800.00

9 PAGE 9 BID OPENING: JULY 27, 2010 ENGINEER'S ESTIMATE: $18,092, CONTRACT NO SPEEDWAY BOULEVARD, CAMINO SECO TO HOUGHTON ROAD IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL IN SPECIFICATION BOOK* MERIDIAN ENGINEERING HUNTER CONSTRUCTION ENGINEER'S ESTIMATE BID ITEM ESTIMATED NO. QUANTITY UNIT ITEM F.A. PARTNERING HR RESTAKING FEES $ MARKET PRICE ADJUSTMENT L.SUM CLEARING AND GRUBBING L.SUM REMOVAL OF STRUCTURAL CONCRETE F.A. REMOVAL OF UNKNOWN STRUCTURES AND OBSTRUCTIONS L.FT. REMOVAL OF CONCRETE CURB AND GUTTER SQ.FT. REMOVAL OF CONCRETE SIDEWALKS, DRIVEWAYS AND SLABS SQ.YD. REMOVAL OF ASPHALTIC CONCRETE PAVEMENT L.FT. REMOVAL OF PIPE (SANITARY SEWER) L.FT. REMOVAL OF PIPE (STORM DRAIN)(CMP) SQ.YD. REMOVE RIPRAP SQ.YD. REMOVE GROUTED RIPRAP EACH REMOVE, SALVAGE, AND RELOCATE MAILBOX EACH REMOVE AND SALVAGE POST BARRICADES L.FT. REMOVE AND SALVAGE GUARD RAIL L.FT. REMOVE AND SALVAGE FENCE L.FT. REMOVE EXISTING BLOCK WALL (& RECONSTRUCT END) EACH REMOVE EXISTING PIPE HEADWALL L.FT. REMOVAL OF HANDRAIL & BRIDGE RAILING SQ.YD. REMOVE (CONCRETE CHANNEL LINING) CU.YD. ROADWAY EXCAVATION CU.YD. DRAINAGE EXCAVATION CU.YD. AGGREGATE BASE TON BITUMINOUS TACK COAT F.A. ASPHALTIC CONCRETE (MIX NO. 1)TEMPORARY TON ASPHALTIC CONCRETE (MIX NO. 1) TON ASPHALTIC CONCRETE (MIX NO.2) TON ASPHALTIC CONCRETE (ASPHALT-RUBBER) L.FT. PIPE, CORRUGATED METAL, 24" L.FT. PIPE, CORRUGATED METAL, 36" L.FT. PIPE, REINFORCED CONCRETE, CLASS II, 24" L.FT. PIPE, REINFORCED CONCRETE, CLASS III, 24" L.FT. PIPE, REINFORCED CONCRETE, CLASS IV, 24" L.FT. PIPE, REINFORCED CONCRETE, CLASS II, 30" L.FT. PIPE, REINFORCED CONCRETE, CLASS III, 30" L.FT. PIPE, REINFORCED CONCRETE, CLASS IV, 30" L.FT. PIPE, REINFORCED CONCRETE, CLASS II, 36" L.FT. PIPE, REINFORCED CONCRETE, CLASS III, 36" L.FT. PIPE, REINFORCED CONCRETE, CLASS II, 42" L.FT. PIPE, REINFORCED CONCRETE, CLASS III, 42" UNIT TOTAL UNIT TOTAL UNIT TOTAL COST COST COST COST COST COST , , , (150.00) 0.00 (150.00) , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,910.00

10 PAGE 10 MERIDIAN ENGINEERING HUNTER CONSTRUCTION ENGINEER'S ESTIMATE BID ITEM ESTIMATED NO. QUANTITY UNIT ITEM L.SUM CONCRETE COLLAR EACH CONCRETE CATCH BASIN (CB 104) EACH CONCRETE CATCH BASIN (STD.308)SUMP ONLY EACH CONCRETE CATCH BASIN (STD.309) EACH CONCRETE CATCH BASIN (STD.308) 4' WING, SINGLE EACH CONCRETE CATCH BASIN (STD.308) 4' WING, DOUBLE EACH CONCRETE CATCH BASIN (STD.308) 8' WING, SINGLE EACH CONCRETE CATCH BASIN (STD.308) 12' WING, SINGLE EACH CONCRETE CATCH BASIN (STD.308) 12' WING, DOUBLE EACH CONCRETE CATCH BASIN (STD.308) 16' WING, SINGLE EACH CONCRETE CATCH BASIN (STD.308) 16' WING, DOUBLE EACH CONCRETE CATCH BASIN (DETAIL DC, DQ, & DU) EACH CONCRETE CATCH BASIN (DETAIL DD) EACH CONCRETE CATCH BASIN (DETAIL DE) EACH CONCRETE CATCH BASIN (DETAIL DF) EACH CONCRETE CATCH BASIN (DETAIL DL) L.SUM CONCRETE CATCH BASIN (DETAIL DP) EACH CONCRETE CATCH BASIN (DETAIL DS) EACH CONCRETE CATCH BASIN (DETAIL DT) EACH CONCRETE CATCH BASIN (DETAIL DZ) EACH CONCRETE CATCH BASIN (DETAIL DAA) EACH CONCRETE CATCH BASIN (DETAIL DAG) EACH CONCRETE CATCH BASIN (DETAIL DAI) EACH CONCRETE CATCH BASIN (DETAIL DAJ) EACH CONCRETE CATCH BASIN (DETAIL DAK) L.FT. SIDEWALK SCUPPER, TYPE 1 (STD 204) EACH SIDEWALK SCUPPER, TYPE 3 (STD 205.5) L.SUM SCUPPERS, DETAIL DAF(REMOVE & CAP EXIST, 3 NEW INLETS) L.FT. SPILLWAY (DETAIL DI) EACH MANHOLE (STD. 302) (STORM DRAIN) EACH FLOW MANAGEMENT PLANS F.A. SEWER BYPASS PUMPING L.FT. SEWER PIPE (8")(DUCTILE IRON) F.A. RECONSTRUCT HOUSE CONNECTION SEWER EACH MANHOLE FRAME AND COVER (WATERPROOF)(STD. WWM 213.2) EACH RESET FRM & COVER FOR MANHOLE (SEWER) (CLASS S EACH RESET FRAME AND COVER FOR CLEAN OUT (CLASS S CONC. COLLAR) L.FT. RECONSTRUCT MANHOLE (STD. WWM 305) (SEWER) EACH MANHOLE (WWM 209) (SEWER) EACH UNPAVED AREA CONCRETE COLLAR (STD. WWM 212) SQ.YD. PAVEMENT REPLACEMENT FOR NEW WATER MAINS L.FT. PIPE, DUCTILE IRON, 4" (CLASS 350) L.FT. PIPE, DUCTILE IRON, 6" (CLASS 350) L.FT. PIPE, DUCTILE IRON, 8" (CLASS 350) L.FT. PIPE, DUCTILE IRON, 24" (CLASS 350) L.FT. PIPE, 4" PVC (CLASS 305) L.FT. PIPE, 6" PVC (CLASS 305) L.FT. PIPE, 8" PVC (CLASS 305) L.FT. PIPE, COPPER, 3/4", W/FITTINGS L.FT. PIPE, COPPER, 1", W/FITTINGS L.FT. PIPE, COPPER, 1 1/2" W/ FITTINGS UNIT TOTAL UNIT TOTAL UNIT TOTAL COST COST COST COST COST COST 1, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,600.00

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008 BT-1 of 7 Clearing and Grubbing L.S. $50,000.00 $50,000.00 $5,335.00 $5,335.00 $14,560.00 $14,560.00 $20,000.00 $20,000.00 $10,600.00 $10,600.00 Class 1 Excavation 4300 C.Y. $20.00 $86,000.00 $15.00 $64,500.00

More information

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number) EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY

More information

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BID TABULATION SUMMARY JOB 940094 PAGE 1 STATE PROJECT NO. 162-080-04 BIDS RECEIVED UNTIL 11:00 A.M. ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BETWEEN 2ND STREET NORTH AND 15 STREET NORTH IN ST.

More information

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

ENGINEERING DESIGN & IMPROVEMENT STANDARDS ENGINEERING DESIGN & IMPROVEMENT STANDARDS 2016 Prepared by: Engineering Division For latest edition of these Improvement Standards, refer to City of Visalia website at: www.visalia.city/engineeringdocuments

More information

South Dakota Department of Transportation Average Unit Prices from Low Bids

South Dakota Department of Transportation Average Unit Prices from Low Bids Unit Prices from Low s January 0, 0 to December, 0 Office of Project Development - Letting 00E00 Blading Hour.00 $,0. $. 00E000 Construction and Maintenance of Detour(s) LS.00 $0,. $,. 00E000 Maintenance

More information

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August

More information

VIRGINIA UTILITY PROTECTION SERVICE, INC. Title: Ticket Entry - Work Type List Working Document

VIRGINIA UTILITY PROTECTION SERVICE, INC. Title: Ticket Entry - Work Type List Working Document Printed copies are for reference only. Please refer to the electronic copy for the latest version. Purpose: To provide instructions for editing the work type list through Newtin administrator accounts

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

RICHFIELD CITY CONSTRUCTION STANDARDS

RICHFIELD CITY CONSTRUCTION STANDARDS CONSTRUCTION STANDARDS REVISED OCTOBER 2015 Jones & DeMille Engineering, Inc. [0711-211] 1535 South 100 West Richfield, UT 84701 Ph. 435-896-8266 Fax 435-896-8268 1675 South Highway 10 Price, UT 84501

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

Engineering Design Center. Standard Drawings. 1st Edition -January 2016

Engineering Design Center. Standard Drawings. 1st Edition -January 2016 Engineering Design Center Standard Drawings 1st Edition -January 2016 Golden State Water Company Standard Drawings 1/11/2016 Table of Contents PART A STANDARD DRAWINGS Section I Pipeline Construction P-1

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE Skanska USA Civil West CA Dist. Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066100 DUST CONTROL LS 1 3,000.00

More information

City of Wentzville. Standard Specifications and Construction Details Amendment List

City of Wentzville. Standard Specifications and Construction Details Amendment List Amendment No. 1 Standard Specifications and Construction Details Amendment List Date: September 21, 2009 Subject: SCD 700.23 - Residential Entrance Layout and drawing revised to more clearly show the location

More information

CHAPTER 11 CONDUITS AND FITTINGS

CHAPTER 11 CONDUITS AND FITTINGS CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1

More information

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17 S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00

More information

D-1 THE CITY OF HARRISBURG 1 1/2" MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2" MIN. ID-2 BINDER COARSE

D-1 THE CITY OF HARRISBURG 1 1/2 MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2 MIN. ID-2 BINDER COARSE EXISTING STREET SURFACE 1 1/2" MIN. ID-2 BINDER COARSE 1 1/2" MIN. ID-2 WEARING COARSE AC-20 SEALER (ALL AROUND) 8" CLASS A P.C. CONCRETE SAW CUT TOP OF CONCRETE SHALL MEET SURFACE OF EXISTING CONCRETE.

More information

CONDUITS AND FITTINGS

CONDUITS AND FITTINGS CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit

More information

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # 2016-04 PROJECT SPECIFICATIONS TABLE OF CONTENTS SECTION 100 GENERAL... 1 SECTION 200 MATERIALS... 1 CONSTRUCTION METHODS... 1 SECTION

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83

BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83 Item No. BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83 DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL PRICE GENERAL BID ITEMS 1 Per Plans and Specifications

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

COMMERCIAL CONDUIT RULES AND REGULATIONS

COMMERCIAL CONDUIT RULES AND REGULATIONS Electric Engineering Division COMMERCIAL CONDUIT RULES AND REGULATIONS S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies B - 1 1805 NE 30th Ave., Bldg. 400 Ocala, FL 34470-4875

More information

PORT OF LONG BEACH UNIQUE DESIGN STANDARDS

PORT OF LONG BEACH UNIQUE DESIGN STANDARDS PORT OF LONG BEACH UNIQUE DESIGN STANDARDS As with most organizations the Port of Long Beach has many standards or policies which are unique to our organization. Most of these are due to the peculiarities

More information

STATE AID GUIDE FOR: Updated: December 16, 2005

STATE AID GUIDE FOR: Updated: December 16, 2005 STATE AID GUIDE FOR: Updated: December 16, 2005 1. AFTER THE FACT RIGHT OF WAY DEPARTMENT OF MINNESOTA TRANSPORTATION 2. MISCELLANEOUS AFTER THE FACT Traffic Signals, Lighting, Retaining Walls, Sidewalk,

More information

HANDHOLES, PULLING VAULTS AND JUNCTION BOXES

HANDHOLES, PULLING VAULTS AND JUNCTION BOXES Handholes and pulling vaults perform several important functions: Provide drainage for the conduit system so that freezing water does not damage the conduit or wires. Provide a location for bending the

More information

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION 601.00 RIPRAP 600.00 GENERAL CONSTRUCTION 601.01 DESCRIPTION. This work shall consist of furnishing and placing riprap protection of the type specified at the locations and in reasonably close conformity

More information

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO 42 380 68 coddington ave ledbetter road shawnee creek s patton street ledbetter road wesley ave 68 starr drive 42 twist run 85 35

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 10/16/2014 Project 140522 Addendum No. 1 PID No. 76282 FRA USR 40

More information

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects 2.0 ROADWAYS 2.1 Road Classification 2.1.1 Standard Drawing Classification All Road Widths and Road Allowances shall be designed in accordance with the most recent Town of New Tecumseth Standards: TNT.SD

More information

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

INSPECTION AND ACCEPTANCE FOR MAINTENANCE Inspection and Acceptance For Maintenance Page 1 (Last revised 6/29/10) INSPECTION AND ACCEPTANCE FOR MAINTENANCE SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Acceptance Sewer As Built Drwg Example

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

2001 Insertable Sheet List For Use With The 2001 Imperial Road and Bridge Standards February 2008

2001 Insertable Sheet List For Use With The 2001 Imperial Road and Bridge Standards February 2008 2001 Insertable Sheet List For Use With The 2001 Imperial Road and Bridge Standards February 2008 The following is a complete list of special design IMPERIAL insertable sheets that will be used with the

More information

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations. COACHELLA VALLEY WATER DISTRICT DOMESTIC WATER CHECKLIST Tract/Parcel No: Project Common Name: Developer: Engineer: Engineer Signature: Date: Phone: Phone: Print: This is only a general checklist; please

More information

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL: N 1133521.33 E 1689742.43 STA: 10+53.07 INSTALL: 2-10" 90 BENDS CONNECT TO MIDDLEBUSH HALL INTERIOR PLANT PLUMBING MIDDLEBUSH HALL HW1 HWS HWR 10+00 FREDRICK APARTMENTS FINE ARTS INSTALL 422 LF 10" HWS

More information

Cranes. Mobile Cranes Lattice boom or telescopic boom Crane capacity is controlled by its operating radius Operating radius is:

Cranes. Mobile Cranes Lattice boom or telescopic boom Crane capacity is controlled by its operating radius Operating radius is: Cranes Cranes Mobile Cranes Mechanical or hydraulic types Mechanical also referred to as conventional crane Mechanical cranes have greater capacity Hydraulic cranes have greater mobility and require less

More information

SERVICE LINES, METERS AND APPURTENANCES

SERVICE LINES, METERS AND APPURTENANCES AUGUST02 SECTION 02646 SERVICE LINES, METERS AND APPURTENANCES PART 1 - GENERAL 1.1 DESCRIPTION A. This section concerns materials and installation of corporation stops, curb stops, service lines, meters,

More information

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

CITY OF EAU CLAIRE WISCONSIN STANDARD GENERAL CONDITIONS AND SPECIFICATIONS FOR STREET AND UTILITY CONSTRUCTION

CITY OF EAU CLAIRE WISCONSIN STANDARD GENERAL CONDITIONS AND SPECIFICATIONS FOR STREET AND UTILITY CONSTRUCTION CITY OF EAU CLAIRE WISCONSIN STANDARD GENERAL CONDITIONS AND SPECIFICATIONS FOR STREET AND UTILITY CONSTRUCTION ISSUED MARCH, 2016 CITY OF EAU CLAIRE TABLE OF CONTENTS FOR SPECIFICATIONS DIVISION DESCRIPTION

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $984,032.05 Gordon Contracting - Sangerville, ME $985,607.00 CPM Constructors - Freeport, ME $1,177,689.54 Page 1 of 7 Wyman & Simpson

More information

TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS

TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS TORONTO TRANSPORTATION January 2012 TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS 1. DRAWINGS TTD 801.001 ELECTRICAL ABBREVIATIONS AND SYMBOLS TTD 801.005 ELECTRICAL LEGEND I TTD 801.006 ELECTRICAL

More information

Plan Name Plan No. Submitting Firm Contact Engineer. Review Date ESI Team ENGINEERS AND SURVEYORS INSTITUTE PEER REVIEW CHECKLIST CITY OF ALEXANDRIA

Plan Name Plan No. Submitting Firm Contact Engineer. Review Date ESI Team ENGINEERS AND SURVEYORS INSTITUTE PEER REVIEW CHECKLIST CITY OF ALEXANDRIA EROSION AND SEDIMENT CONTROL CHECKLIST (E&S) VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (1 of 2) Item # Description OK NO N/A 1 Limits of clearing and grading match on all appropriate sheets 2 Construction

More information

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

TOWN OF PARKER, COUNTY OF DOUGLAS, STATE OF COLORADO N.T.S.

TOWN OF PARKER, COUNTY OF DOUGLAS, STATE OF COLORADO N.T.S. 8" W 8" SAN 8" SAN STM E E E PROPOSED WATER LINE EXISTING WATER LINE PROPOSED FIRE HYDRANT PROPOSED VALVE EXISTING WATER WELL PROPOSED WATER METER EXISTING WATER METER EXISTING CLEANOUT PROPOSED SANITARY

More information

VOLKERT, INC. Page 1 of 12

VOLKERT, INC. Page 1 of 12 . MOBILE COUNTY FOR MOBILE COUNTY PROJECT NO. MCR-2008 003 VOLKERT CONTRACT NO. 87B200.10 SCHIUJNGER SOUTH FROM 0.2 MILES SOUTH OF HALLS MILL CREEK TO COTTAGE HILL ROAD Ikaros, LLC Hosea 0. Weaver & John

More information

Attachment D-1: Civil/Structural Scope of Work

Attachment D-1: Civil/Structural Scope of Work Attachment D-1: Civil/Structural Scope of Work Project: Location: Targa Sound Renewable Fuels Project Tacoma, WA Prepared by: NORWEST ENGINEERING Consulting Engineers 4110 N.E. 122 nd Avenue, Portland,

More information

Summary of the 2011 Changes

Summary of the 2011 Changes The following is a list of amendments to the Residential Site Improvement s, N.J.A.C. 5:21, adopted in 2011. The Notice of Adoption of these changes appeared in the New Jersey Register on May 16, 2011.

More information

ARCHITECT: GENERAL NOTES 1. THE CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS AND ADVISE THE ENGINEER OF ANY CONFLICTS OF REPRESENTATION BETWEEN DRAWINGS AND/OR SPECIFICATIONS PRIOR TO COMMENCING

More information

Lump Sum L.S. (15") EA

Lump Sum L.S. (15) EA Page of 6 ROADWAY ITEMS 000 000000000-N 800 MOBILIZATION Lump Sum L.S. 000 000000000-N 80 CONSTRUCTION SURVEYING 0003 009000000-N SP REINFORCED BRIDGE APPROACH FILL, STATION ************ (5+6.0) 000 0050000000-E

More information

DIVISION 1100 TRAFFIC

DIVISION 1100 TRAFFIC SECTION 1102 STREET LIGHTING GENERAL INFORMATION The Idaho State Electrical Board has determined that all street lights are to be provided with an external fuse disconnect, in a junction box between the

More information

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist If this is a re-submittal, please provide a point-by-point response to previous review comments, identifying how each comment has been addressed, location in the plan set of the changes made to address

More information

February 22, 2018 BIDDERS WILL ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED ON THE PROPOSAL PAGE

February 22, 2018 BIDDERS WILL ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED ON THE PROPOSAL PAGE February 22, 2018 Addendum No. 1/Bid Postponement DWM Sewer Improvement P-2017-06 Sewer Improvement Project PN-2017-06 SPECIFICATION NO. 292687 For which bids will be opened in the office of the Department

More information

Preliminary Engineering Study. Richland Avenue Pedestrian Crossing. Volume I: Preliminary Report

Preliminary Engineering Study. Richland Avenue Pedestrian Crossing. Volume I: Preliminary Report Preliminary Engineering Study Richland Avenue Pedestrian Crossing Volume I: Preliminary Report SUBMITTED TO: City of Athens Engineering and Public Works Athens, Ohio SUBMITTED BY: January 12, 2016 Prepared

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

CULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix B

CULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix B CULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix B RIVERDALE CITY CAPITAL FACILITIES PLAN CULINARY WATER Engineer's Cost Estimate January 2009 Project Name: Culinary Water Reservoir - Tank

More information

Alternative No. 1 Total Cost DRAFT

Alternative No. 1 Total Cost DRAFT OPINION OF PROBABLE PROJECT COSTS SUMMARY OF ALL THREE ALTERNATIVE ALIGNMENTS Item Description Alternative No. 1 Total Cost Alternative No. 2 Total Cost Alternative No. 3 Total Cost Design Phase 1. Preliminary

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

Federal Project No.: NONE

Federal Project No.: NONE Schedule of Items Page: 2 0001 BASE BID- STA. 10+00-23+00 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING (CONSTRUCTION) 0030 301 00110 LUMP SUM LUMP SUM CLRING AND

More information

CHAPTER 12: DRAINAGE

CHAPTER 12: DRAINAGE CHAPTER 12: DRAINAGE CHINOOK WINDS AND WINTER SNOWS A combination which frequently results in hazardous winter conditions on shaded portions of roadways under bridges. Icing conditions are a danger in

More information

SECTION CONSTRUCTION SERVICES

SECTION CONSTRUCTION SERVICES SECTION 01100 CONSTRUCTION SERVICES PART 1 GENERAL 1.01 - Section Includes A. Mobilization. B. Construction Surveys. C. Record Documents. 1.02 Description Of Work A. Mobilization: includes the preparatory

More information

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges. STANDARD BRIDGE & CULVERT COMPONENTS Alberta Bridge Inventory In Alberta there are about 13,300 bridges. Types of bridges in Alberta: Standard bridges 3521 (26%) Bridge size culverts 8348 (63%) Major bridges

More information

OKLAHOMA TURNPIKE AUTHORITY STANDARD SPECIFICATIONS PAY ITEM LIST revised 11/27/2012

OKLAHOMA TURNPIKE AUTHORITY STANDARD SPECIFICATIONS PAY ITEM LIST revised 11/27/2012 OKLAHOMA TURNPIKE AUTHORITY STANDARD SPECIFICATIONS -2010 PAY ITEM LIST revised 11/27/2012 Pay Item List includes all of the pay items listed in the 2010 OTA Specifications and Special Provisions. Pay

More information

TROPICAL PARKWAY IMPROVEMENT

TROPICAL PARKWAY IMPROVEMENT SHEET INDEX DEPARTMENT OF PUBLIC WORKS TROPICAL PARKWAY IMPROVEMENT I-15/215 INTERCHANGE TO LINN LN LINN LN FROM TROPICAL PKWY TO EL CAMPO GRANDE AVE FEDERAL PROJECT NO. DE-003(196) REVIEWED AND APPROVED

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is

More information

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction. General: 1. Construct utilities in accordance to TWA approved plans and shop drawings. Any deviation from the approved plans shall be approved by the DEVELOPER S ENGINEER and TWA 2. A preconstruction meeting

More information

ADDENDUM NO. 1 APRIL 24, 2017

ADDENDUM NO. 1 APRIL 24, 2017 DERBY DESTINATION DEVELOPMENT PUBLIC PROJECT NO. 1 EAST FREEDOM STREET PUBLIC PROJECT NO. 2 WEST FREEDOM STREET PUBLIC PROJECT NO. 3 WATERLINE IMPROVEMENTS PUBLIC PROJECT NO. 4 SANITARY SEWER IMPROVEMENTS

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

ADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities

ADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities ADDENDUM NO. TO Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities Date of Addendum: December, 00 Hethcoat & Davis, Inc. 78 Franklin Road,

More information

SECTION WATER MAINS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

SECTION WATER MAINS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA SECTION 6900 - WATER MAINS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA 6901 DESIGN CRITERIA A. General 1. The design standards presented in the City of Lee's Summit Design Criteria are the minimum standards

More information

TYPE "A" CATCH BASIN

TYPE A CATCH BASIN 27" 1.67' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3250-BV OR APPROVED EQUAL. "INFI SHIELD" SEAL OR APPROVED EQUAL RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR). PLASTER OUTSIDE,

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES January 18, 2013 811.01 Conduit Description 811.02 Conduit Materials 811.03 Conduit Definitions

More information

BILL NO. 1 GENERAL ITEMS. Item No. Description Lump Sum Prices Excluding HST

BILL NO. 1 GENERAL ITEMS. Item No. Description Lump Sum Prices Excluding HST Page 1 SECTION 00 72 00 - GENERAL CONDITIONS BILL NO. 1 GENERAL ITEMS 1 Bonds... $ 2 Insurance... $ 3 Permits and fees... $ 4 Warranty certificates... $ 5 Supervision... $ SECTION 01 32 17 - SCHEDULE 6

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

PRIMARY LINE EXTENSION

PRIMARY LINE EXTENSION PRIMARY LINE EXTENSION Installation of new electric service to an empty parcel/lot or extending a transformer to within 150' of proposed meter location. This includes installing a permanent branch, addition,

More information

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee

More information

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE BE IT ORDAINED by the Town Council of the Town of Plainville: SECTION 1. SUBDIVISIONS. All subdivisions hereinafter developed within

More information

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project RES. NO. PROPOSAL FOR THE COMPLETION OF 2015-28 TO THE SATISFACTION OF THE BUTLER COUNTY COMMISSIONERS AND THE COUNTY ENGINEER: SAID WORK CONSISTING OF TYLERSVILLE ROAD IMPROVEMENTS, PHASE I TO THE COUNTY

More information

Storm Drainage

Storm Drainage University of New Hampshire University of New Hampshire Scholars' Repository Division 33 Utilities Chapter 5 Technical Construction and Renovation Standards 4-23-2015 334100 - Storm Drainage Sandra Hickey

More information

ATTACHMENT 8. Technical Specifications

ATTACHMENT 8. Technical Specifications Attachment 8 May 15, 2017 ATTACHMENT 8 TECHNICAL SPECIFICATIONS TABLE OF CONTENTS TECHNICAL SPECIFICATIONS Section Specification Title Pages No. 1-39 GENERAL 1-20 (not used) -- 21 Method of Determining

More information

Standard Specifications for Road and Bridge Construction. Adopted January 1, 2012

Standard Specifications for Road and Bridge Construction. Adopted January 1, 2012 Standard Specifications for Road and Bridge Construction Adopted January 1, 2012 Pipe Culverts Art. 542.02 SECTION 542. PIPE CULVERTS 542.01 Description. This work shall consist of furnishing and installing

More information

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 February 27, 2014 ITB NO. 14-33 WAKEFIELD PUMPING STATION UPGRADE ADDENDUM NUMBER

More information

Douglas County Traffic Signal Installation Guidelines (January 2013)

Douglas County Traffic Signal Installation Guidelines (January 2013) Douglas County Traffic Signal Installation Guidelines (January 2013) The following guidelines are minimum requirements for equipment installation. Section A. Poles and Foundations ( Wood, Concrete, Mast

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

10:00 AM, Wednesday, April 8, 2015

10:00 AM, Wednesday, April 8, 2015 NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, April 8, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference

More information

CHAPTER 5: UTILITIES

CHAPTER 5: UTILITIES CHAPTER 5: UTILITIES GENERAL UTILITY INFORMATION Experience shows that proactive utility coordination early in the design of a project minimizes the amount of effort needed later in the design life and

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

SECTION IV. PIPELINE EXCAVATION AND BACKFILL SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include

More information

GV 001 Equipment Bases and Enclosures General Information

GV 001 Equipment Bases and Enclosures General Information Eq u ip me n tba s e s a n d En c lo s u re s Ge n e ra lin fo rma tio n E n g in e e r :R.An th o n GV0 0 1 Ap p r o v e r :Jo s h u a Jo n e s Ap r 1 7 2 0 Ap r1 7 GV 001 Equipment Bases and Enclosures

More information

AMERA COURT RESIDENTIAL SUBDIVISION

AMERA COURT RESIDENTIAL SUBDIVISION Prepared By: LOCATION MAP N.T.S. PROJECT SITE N 000 Gulf to Bay Boulevard, Suite 0 Clearwater, FL Tel. ()- AMERA COURT RESIDENTIAL SUBDIVISION Grant Street Dunedin, Florida FEMA MAP PANEL NO. 0C-00-C FLOOD

More information

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS April 1, 2009 CITY OF PORTSMOUTH Public Works Department Bid #54-09 2009 Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS This Addendum forms part of the original document marked Bid #54-09 2009

More information

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE 3.33' 3.0' 2.0' 4.33' 4.0' 3.0' 1.00' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3067-V OR AS NOTED ON PLANS. "INFA-SHIELD" SEAL OR EQUAL. RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR).

More information

BUREAU Joe Iuviene, AIA January 20, 2017

BUREAU Joe Iuviene, AIA January 20, 2017 architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

Table of Contents for Guide Specifications

Table of Contents for Guide Specifications Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan

More information

Table of Contents. Section 10,010 - Demolition of Building Structures Section Includes Description of Work 1. 1.

Table of Contents. Section 10,010 - Demolition of Building Structures Section Includes Description of Work 1. 1. Table of Contents Page No. Part 1 - General 1.01 Section Includes 1 1.02 Description of Work 1 1.03 Submittals 1 1.04 Substitutions 1 1.05 Delivery, Storage, and Handling 1 1.06 Scheduling and Conflicts

More information

Storm. Section. B. General Design and Drawing Standards Design

Storm. Section. B. General Design and Drawing Standards Design Section Storm 5 General Plans for the existing stormwater system are maintained in digital and printed form by the City. Copies may be obtained from the Utility Division of the Public Works Department.

More information

STANDARD SPECIFICATIONS

STANDARD SPECIFICATIONS STANDARD SPECIFICATIONS An Addendum to the WSDOT/APWA 2017 Standard Specifications for Road, Bridge, and Municipal Construction and Amendments (English) Adopted by the City of Redmond Public Works Department

More information

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY

More information