1 Page 1 of 17 Previous Next Contents ESDEP WG 15A STRUCTURAL SYSTEMS: OFFSHORE OBJECTIVE\SCOPE to classify different types of piles to understand main design methods to cover various methods of installation PREREQUISITES Lecture 15A.6: Foundations Lecture 1B.2.2: Limit State Design Philosophy and Partial Safety Factors Lectures 10.6: Shear Connection Lectures 12.4: Fatigue Behaviour of Hollow Section Joints Lecture 15A.12: Connections in Offshore Deck Structures Lecture 17.5: Requirements and Verifications of Seismic Resistant Structures A general knowledge of design in offshore structures and an understanding of offshore installation are also required. SUMMARY In this lecture piled foundations for offshore structures are presented. The lecture starts with the classification of soil. The main steps in the design of piles are then explained. The different kinds of piles and hammers are described. The three main execution phases are briefly discussed: fabrication, transport and installation. 1. INTRODUCTION 1.1 Classification of Soils The stratigraphy of the sea bed results from a complex geological process during which various materials were deposited, remoulded and pressed together. Soil texture consists of small mineral or organic particles basically characterized by their grain size and mutual interaction (friction, cohesion). The properties of a specific soil depend mainly on the following factors: density. water content. over consolidation ratio. For design purposes the influence of these factors on soil behaviour is expressed in terms of two fundamental parameters: friction angle. undrained shear strength C u. Since the least significant of either of these parameters is often neglected, soils can be classified within "ideal" categories: granular soils. cohesive soils. 1.2 Granular Soils Granular soils are non-plastic soils with negligible cohesion between particles. They include: sands : characterized by large to medium particle sizes (1mm to 0,05mm) offering a high permeability, silts : characterized by particle sizes between 0,05 and 0,02mm; they are generally over-consolidated; they may exhibit some cohesion. 1.3 Cohesive Soils

2 Page 2 of 17 Clays are plastic soils with particle sizes less than 0,002mm which tend to stick together; their permeability is low. 1.4 Multi-Layered Strata The nature and characteristics of the soil surrounding a pile generally vary with the depth. For analysis purposes, the soil is divided into several layers, each having constant properties throughout. The number of layers depends on the precision required of the analysis. 2. DESIGN Steel offshore platforms are usually founded on piles, driven deep into the soil (Figure 1). The piles have to transfer the loads acting on the jacket into the sea bed. In this section theoretical aspects of the design of piles are presented. Checking of the pile itself is described in detail in the Worked Example. 2.1 Design Loads These loads are those transferred from the jacket to the foundation. They are calculated at the mudline Gravity loads Gravity loads (platform dead load and live loads) are distributed as axial compression forces on the piles depending upon their respective eccentricity Environmental loads

3 Page 3 of 17 Environmental loads due to waves, current, wind, earthquake, etc. are basically horizontal. Their resultant at mudline consists of: shear distributed as horizontal forces on the piles. overturning moment on the jacket, equilibrated by axial tension/ compression in symmetrically disposed piles (upstream/downstream) Load combinations The basic gravity and environmental loads multiplied by relevant load factors are combined in order to produce the most severe effect(s) at mudline, resulting in: vertical compression or pullout force, and lateral shear force plus bending. 2.2 Static Axial Pile Resistance The overall resistance of the pile against axial force is the sum of shaft friction and end bearing Lateral friction along the shaft (shaft friction) Skin friction is mobilized along the shaft of the tubular pile (and possibly also along the inner wall when the soil plug is not removed). The unit shaft friction: for sands: is proportional to the overburden pressure, for clays: is calculated by the "alpha" or "lambda" method and is a constant equal to the shear strength C u at great depth. Lateral friction is integrated along the whole penetration of the pile End bearing End bearing is the resultant of bearing pressure over the gross end area of the pile, i.e. with or without the area of plug if relevant. The bearing pressure: for clays: is equal to 9 C u. for sands: is proportional to the overburden pressure as explained in Section of API-RP2A [1] Pile penetration The pile penetration shall be sufficient to generate enough friction and bearing resistance against the maximum design compression multiplied by the appropriate factor of safety. No bearing resistance can be mobilized against pull-out: the friction available must be equated to the pull out force multiplied by the appropriate factor of safety. 2.3 Lateral Pile Resistance The shear at the mudline caused by environmental loads is resisted by lateral bearing of the pile on the soil. This action may generate large deformations and high bending moments in the part of the pile directly below the mudline, particularly in soft soils P-y curves P-y curves represent the lateral soil resistance versus deflection. The shape of these curves varies with the depth and the type of soil at the considered elevation. The general shape of the curves for increasing displacement features: elastic (linear) behaviour for small deflections, elastic/plastic behaviour for medium deflections, constant resistance for large deflections or loss of resistance when the soil skeleton deteriorates (clay under cyclic load in particular) Lateral pile analysis For analysis purposes, the soil is modelled as lumped non-linear springs distributed along the pile. The fourth order differential equation which expresses the pile deformation is integrated by successive iterations, the secant stiffness of the soil springs being updated at each step. For large deformations, the second order contribution of the axial compression to the bending moment (P-Delta effect) shall be taken into account. 2.4 Pile Driving Piles installed by driving are forced into the soil by a ram hitting the top. The impact is transmitted along the pile in the form of a wave, which

4 Page 4 of 17 reflects on the pile tip. The energy is progressively lost by plastic friction on the sides and bearing at the tip of the pile Empirical formulae A considerable number of empirical formulae exist to predict pile driveability. Each formula is generally limited to a particular type of soil and hammer Wave equation This method of analysing the driving process consists of representing the ensemble of pile/soil/hammer as a one-dimensional assembly of masses, springs and dashpots: the pile is modelled as a discrete assembly of masses and elastic springs. the soil is idealized as a massless medium characterized by elastic-perfectly-plastic springs and linear dashpots. the hammer is modelled as a mass falling with an initial velocity. the cushion is represented by a weightless spring (see Figure 3). the pile cap is represented by a mass of infinite rigidity.

5 Page 5 of 17 The energy of the ram hitting the top of the pile generates a stress wave in the pile, which dissipates progressively by friction between the pile and the soil and by reflection at the extremities of the pile. The plastic displacement of the tip relative to the soil is the set achieved by the blow. Curves can be drawn to represent the number of blows per unit length required to drive the pile at different penetrations. The wave equation, though representing the most rigorous assessment to date of the driving process, still suffers a lack of accuracy, mostly caused by the inaccuracies in the soil model. 3. DIFFERENT KINDS OF PILES Driven piles are the most popular and cost-efficient type of foundation for offshore structures. As shown in Figure 2, the following alternatives may be chosen when driving proves impractical: insert piles.

6 Page 6 of 17 drilled and grouted piles. belled piles. 3.1 Driven Piles Piles are usually made up in segments. After placing and driving the first long segment, extension segments called add-ons are set on piece by piece as driving proceeds until the overall design length is achieved. In recent years one-piece piles have been widely used in the North Sea since the offshore work is considerably reduced. Wall thickness may vary. A thicker wall is sometimes required: in sections from mudline down to a specified depth within which bending stresses are especially high, at the pile tip (driving shoe) to resist local bearing stresses while driving. Uniform wall thickness is however preferable thus avoiding construction and installation problems. 3.2 Insert Piles Insert piles are smaller diameter piles driven through the main pile from which the soil plug has been previously drilled out. They are therefore not subjected to skin friction over the length of the main pile and can reach substantial additional penetration. The insert pile is welded to the main pile at the top of the jacket and the annular space between the tubes is grouted. This type of pile is used: in a preplanned situation: performance is good although material and installation costs are higher than for normal driven piles.

7 Page 7 of 17 as an emergency procedure: when scheduled piles cannot be driven to the required penetration, resulting therefore in one of the following drawbacks. a thicker wall section of the main pile will be within the jacket height instead of below the mudline. reduced friction area and end bearing pressure, difficulties often noted for the setting-in of all the required volume of grouting, i.e. the concern is the leakage of grout or the impossibility to fill with the calculated volume of grout. 3.3 Drilled and Grouted Piles This procedure is the only means of installing piles with tension resistance in hard soils or soft rocks; it resembles that for drilling a conductor well. An oversized hole is initially drilled to the proposed pile penetration depth. The pile is then lowered down, sometimes centred in the hole by spacers and the annular space between the pile shaft and the surrounding soil is grouted. Design uncertainty results because: hard soil formation softens when exposed to the water or mud used during drilling and exhibits lower skin friction resistance. in case of calcareous sand, external grouting just crushes the sand, slightly extending the effective pile diameter but not increasing the friction significantly. 3.4 Belled Piles While belled piles, on land, are used to decrease the bearing stress under a pile, offshore belled piles provide a large bearing area to increase tip uplift resistance. The main pile, normally driven, serves here as a casing through which a rig drills a slightly oversized hole ahead. A belling tool (underreamer) then enlarges the socket to a conical bell with a base diameter a few times that of the main pile. A heavy reinforcement cage is lowered inside the bell which is subsequently filled with concrete made using fine aggregate (maximum size 10mm). 4. FABRICATION AND INSTALLATION 4.1 Fabrication The piles are usually made up of "cans" - cylinders of rolled plate with a longitudinal seam. Single cans are typically 1,5m long or more. Longitudinal seams of two adjacent segments are rotated 90 apart at least. Bevelling is mandatory should the wall thickness difference exceed 3mm between adjacent cans. Maximum deviation from straightness is specified (0.1% in length). Commonly used steel grade is X52 or X60. The outside surface of grouted piles should be free of mill scale and varnished. In certain instances, steel piles are protected underwater by sacrificial anodes or by impressed current. In the splash zone additional thickness to allow for corrosion (3mm for example) and epoxy or rubberized coating, monel or copper-nickel sheeting are provided. 4.2 Transportation Barge transportation Pile segments are choked and fastened to the barge to prevent them from falling overboard under severe seastates. Pile plate should be thick enough to prevent any deformation caused by stacking Self floating mode This method is attractive where long segments of pile are to be lifted and set in guides far below the sea surface (skirt piles for example). The ends of the piles are sealed by steel closure plates or rubber diaphragms which should be able to resist wave slamming during the tow Transport within the jacket The piles are pre-set inside the main legs or in the guides/sleeves, generating additional weight and possibly buoyancy (if closed). They are held in place by shims which prevent them from escaping from their guides during launch and uprighting of the jacket.

8 Page 8 of 17 Several piles are driven immediately after the jacket has touched down, providing initial stability against the action of waves and current. 4.3 Hammers Piles are positioned: either inside the jacket legs, extending the full height of the jacket, or encased in sleeves protruding at the bottom of the jacket, running vertical or parallel to the legs (typical batter 1/12 to 1/6). Piles can then be driven using any type of hammer (or a combination of types). Hammers are illustrated in Figure Steam hammers Steam hammers are widely used for offshore installation of jackets. They are generally single acting with rates of up to 40 blows/minute. Energies of current hammers range from to ft lb/blow. (82KNm to 1725KNm per blow). During driving, the hammer with attached driving head rides the pile rather than being supported by leads. The hammer line from the crane boom is slackened so as to prevent transmission of impact and vibration into the boom Diesel hammers Diesel hammers are much used at offshore terminals. They are lighter to handle and less energy consuming than steam hammers, but their effective energy is limited Hydraulic hammers Hydraulic hammers are dedicated to underwater driving (skirt piles terminating far below the sea surface). Menck hydraulic hammers are widely used. They utilize a solid steel ram and a flexible steel pile cap to limit impact forces. They are double acting. Hydraulic fluid under high pressure is used to force a piston or set of pistons, and in turn, the ram up and down. Properties of some hammers used offshore are shown in Table 1. A selection of large offshore pile driving hammers driving on heavy piles is also shown in Table Selection of hammer size Selection of hammer size is based on: experience of similar situations (see Quality Control: Section 4.6), numerical modelling of driving for each particular site (see Pile Driving: Section 2.4) Typical values of pile sizes, wall thicknesses, and hammer energies for steam hammers are shown in Table Installation Pile handling and positioning Figure 4 shows the different ways of providing lifting points for positioning pile sections. Padeyes are generally used (welded in the fabrication yard; their design should take into account the changes in load direction during lifting). Padeyes are then carefully cut before lowering the next pile section.

9 Page 9 of 17 Sketch E shows the different steps for the positioning of pile sections: pile or add-on lifted from the barge deck. rotation of the crane to position add-on. installing and lowering of the pile add-on Pile connections Different solutions for connecting pile segments back-to-back are used: either by welding, Shielded Metal Arc Welding (SMAW) or flux-cored, segments held temporarily by internal or external stabbing guides as shown in Figure 4. Welding time depends upon: - pile wall thickness: 3 hours for 1in. thick (25,4mm); 16 hours for 3in. thick, (76,2mm) (typical). - number and qualification of the welders. - environmental conditions.

10 Page 10 of 17 or by mechanical connectors (as shown in Figure 4): - breech block (twisting method). - lug type (hydraulic method) Hammer placement Figure 5 shows the different steps of this routine operation: lifting from the barge deck. positioning over pile by booming out or in (the bell of the hammer acts as a stabling guide... very helpful in rough weather). alignment of the pile cap. lowering leads after hammer positionment. Each add-on should be designed to prevent bending or buckling failure during installation and in-place conditions Driving Some penetration under the self weight of the pile is normal. For soft soil conditions, particular measures are taken to avoid an uncontrolled run. Piles are then driven or drilled until pile refusal. Pile refusal is defined as the minimum rate of penetration beyond which further advancement of the pile is no longer achievable because of the time required and the possible damage to the pile or to the hammer. A widely accepted rate for defining refusal is 300 blows/foot (980 blows/metre). 4.5 Pile-to-Jacket Connections Welded shims The shims are inserted at the top of the pile within the annulus between the pile and jacket leg (see Figure 6) and welded afterwards.

11 Page 11 of Mechanical locking system This metal-to-metal connection is achieved by a hydraulic swaging tool lowered inside the pile and expanding it into machined grooves provided in the sleeves at two or three elevations as shown on Figure 7.

12 Page 12 of 17 This type of connection is most popular for subsea templates. It offers immediate strength and the possibility to re-enter the connection should swaging prove incomplete Grouting This hybrid connection is the most commonly used for connecting piles to the main structure (in the mudline area). Forces are transmitted by shear through the grout. Figure 8 shows the two types of packers commonly used. The expansive, non-shrinking grout must fill completely the annulus between the pile and leg (or sleeve).

13 Page 13 of 17 Bonding should be excellent; it is improved by shear connectors (shear keys, strips or weld beads disposed on the surface of the sleeve and pile in contact with the grout). The width of the annulus between pile and sleeve should be maintained constant by use of centralizers and be limited to: 1,5in. minimum, (38,1mm) about 4in. (101,6mm) maximum (to avoid destruction of the tensile strength of the grout by internal microcracking). Packers are used to confine the grout and prevent it from escaping at the base of the sleeve. Packers are often damaged during piling and are therefore: installed in a double set. attached to the base of the sleeve to protect them during pile entry and driving. Thorough filling should be checked by suitable devices, e.g. electrical resistance gauges, radioactive tracers, well-logging devices or overflow pipes checked by divers. 4.6 Quality Control Quality control shall: confirm the adequacy of the foundation with respect to the design. provide a record of pile installation for reference to subsequent driving of nearby piles and future modifications to the platform. The installation report shall mention: pile identification (diameter and thickness). measured lengths of add-ons and cut-offs. self penetration of pile (under its own weight and under static weight of the hammer).

14 Page 14 of 17 blowcount throughout driving with identification of hammer used and energy, as shown in Figure 9. record of incidents and abnormalities: - unexpected behaviour of the pile and/or hammer. - interruptions of driving (with set-up time and blowcount subsequently required to break the pile loose). - pile damage if any. elevations of soil plug and internal water surface after driving. information about the pile/structure connection: - equipment and procedure employed. - overall volume of grout and quality. - record of interruptions and delays. 4.7 Contingency Plan Contingency documents should provide back-up solutions in case "unforeseen" events occur such as: impossibility to get the required pile penetration. mechanical breakdown of the hammer. grout pipe blockage. 5. CONCLUDING SUMMARY This lecture has described:

15 Page 15 of 17 the difficult aspects of foundations in a variety of soils. the multiplicity of solutions and the different kind of piles and hammers. the complexity of the process from design to installation. 6. REFERENCES [1] API-RP2A, "Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms", American Petroleum Institute, Washington, D.C., 18th ed., ADDITIONAL READING 1. McClelland, B. and Reifel, M. D., Planning and design of fixed offshore platforms, Von Mostrand Reinhold Company (1982). 2. Bowles, J. E., Foundation analysis and design, MacGraw Hill Book Company (4th edition 1988). 3. Bowles, J. E., Analytical and computer methods in Foundation Engineering, MacGraw Hill Book Company (1983). 4. Poulos, H. G. and Davis, E. H., Pile foundation analysis and design, John Wiley and Sons (1980). 5. Graff, W. J., Introduction to offshore structures, Gulf Publishing Company (1981). 6. Le Tirant, P., Reconnaissance des sols en mer pour l'implantation des ouvrages Pétroliens, Technip (1976) 7. Pieux dans les formatines carbonates - Technip ARGEMA (1988). 8. Capacité patante des pieux - Technip ARGEMA (1988). 9. Dawson, T. H., Offshore Structural Engineering, Prentice Hall Inc (1983). 10. Gerwick, Ben C., Construction of Offshore Structures, John Wiley and Sons (1986). A. Air/Steam Hammers Make Model Rated Ram Max. Std. Pilecap Typical Rated Operating Steam Air Hose Rated Energy Weight Stroke Weight Hammer Weight Pressure Consumption Consumption ST/F BPM (ft-lbs) (kips) (m) (kips) (w/leads) (kips) (psi) (lbs ht) (lbs ht)... Conmaco , , , , , Menck , , (MRBS) , , , , , , , , , , , , , , , MKT OS OS OS , C. Hydraulic Hammers Make Model Rated Energy Ram Weight Standard Hammer Weight Typical Operating Rated Rated Pilecap Weight Pressure Oil Flow BPM (ft-lb) (kips) (kips) (kips) (psi) (gal. min)

16 Page 16 of 17 HMB A , , ,5 1,1 27,5 Menck MRBU MHU MHU MH ,0 6, MH ,0 6, MH ,5 6, MH ,9 6, MH ,0 1, MH ,3 1, TABLE 1 Properties of some hammers used offshore Hammer Type Blows per Minute Weight including Offshore Cage, if any (metric tons) Rated Striking Energy (ft-lb x 1000) Expected Net Energy (ft-lb x 1000) KNm On Anvil On Pile Vulcan 3250 Single-acting steam HBM 3000 Hydraulic underwater HBM 3000 A Hydraulic underwater HBM 3000 P Slender hydraulic underwater Menck MHU 900 Slender hydraulic underwater Menck MRBS 8000 Single-acting steam Vulcan 4250 Single-acting steam HBM 4000 Hydraulic underwater Vulcan 6300 Single-acting steam Menck MRBS Single-acting steam Menck MHU 1700 Slender hydraulic underwater IHC S-300 Slender hydraulic underwater IHC S-800 Slender hydraulic underwater IHC S-1600 Slender hydraulic underwater IHC S-2000 Slender hydraulic underwater IHC S-2300 Slender hydraulic underwater TABLE 2 Large pile driving hammers Pile Outer Diameter Wall Thickness Hammer Energy

17 Page 17 of 17 (in.) (mm) (in.) (mm) (ft-lb) (kn-m) /8-7/ ¾ / ¼ ¾ ¾ ¼ ¼ ¼ ½ - 2½ ½ - 2½ Note 1: With the heavier hammers in the range given, the wall thicknesses must be near the upper range of those listed in order to prevent overstress (yielding) in the pile under hard driving. Note 2: With diesel hammers, the effective hammer energy is from one-half to two-thirds the values generally listed by the manufacturers and the above table must be adjusted accordingly. Diesel hammers would normally only be used on 36-in. or less diameter piles. Note 3: Hydraulic hammers have a more sustained blow, and hence the above table can be modified to fit the stress wave pattern. TABLE 3 Typical values of pile sizes, wall thickness and hammer energies Previous Next Contents

Offshore Windfarm Design OE Foundations

Offshore Windfarm Design OE Foundations Offshore Windfarm Design OE 5662 Foundations 1 Design of Foundation Ringhorne platform Norway DECK 20.000 mt WAVE LOAD 41.5 MN JACKET 7.200 mt FOUNDATION 2.880 mt 128.5 m 41.5 m 2 STEEL TUBULAR DIA. 2500

More information

Offshore pile acceptance using dynamic pile monitoring

Offshore pile acceptance using dynamic pile monitoring Offshore pile acceptance using dynamic pile monitoring Webster, S. & Givet, R. GRL Engineers, Inc. Charlotte, NC, USA Griffith, A. Saudi Aramco, Dhahran, Saudi Arabia ABSTRACT: Dynamic pile monitoring

More information

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT CHAPTER Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT Sixth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering 19 By Dr. Ibrahim

More information

Bi-Directional Static Load Testing of Driven Piles

Bi-Directional Static Load Testing of Driven Piles Bi-Directional Static Load Testing of Driven Piles Paul J. Bullock, PhD Fugro Consultants Inc. Loadtest Bi-Directional Osterberg Cell Testing Specialized jack in pile uses bearing to mobilize side shear

More information

Proceedings of the ASME nd International Conference on Ocean, Offshore and Arctic Engineering OMAE2013 June 9-14, 2013, Nantes, France

Proceedings of the ASME nd International Conference on Ocean, Offshore and Arctic Engineering OMAE2013 June 9-14, 2013, Nantes, France Proceedings of the ASME 2013 32nd International Conference on Ocean, Offshore and Arctic Engineering OMAE2013 June 9-14, 2013, Nantes, France Driveability Analysis Techniques for Offshore Pile Installations

More information

METHOD STATEMENT for INSTALLATION OF MICROPILE

METHOD STATEMENT for INSTALLATION OF MICROPILE METHOD STATEMENT for INSTALLATION OF MICROPILE A. MATERIAL TO BE USED 1. Grout Grout shall be mixed from Ordinary Portland Cement and clean water free from harmful substances. Usage of other cement which

More information

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICE EVALUATION CRITERIA FOR

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICE EVALUATION CRITERIA FOR INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICE EVALUATION CRITERIA FOR HELICAL PILES FOR USE UNDER THE INTERNATIONAL RESIDENTIAL CODE EC027-2017 (Adopted November

More information

INFLUENCE OF BNWF SOIL MODELLING ON DYNAMIC BEHAVIOUR OF PILE FOUNDATION FOR RC FRAME WITH STRUCTURAL WALL

INFLUENCE OF BNWF SOIL MODELLING ON DYNAMIC BEHAVIOUR OF PILE FOUNDATION FOR RC FRAME WITH STRUCTURAL WALL ICOVP, 3 th International Conference on Vibration Problems 29 th November 2 nd December, 27, Indian Institute of Technology Guwahati, INDIA INFLUENCE OF BNWF SOIL MODELLING ON DYNAMIC BEHAVIOUR OF PILE

More information

DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS

DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS DUCTILE IRON PILES DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS Designed to resist both compression and tension loads in either end-bearing or friction,

More information

In-plane testing of precast concrete wall panels with grouted sleeve

In-plane testing of precast concrete wall panels with grouted sleeve In-plane testing of precast concrete wall panels with grouted sleeve P. Seifi, R.S. Henry & J.M. Ingham Department of Civil Engineering, University of Auckland, Auckland. 2017 NZSEE Conference ABSTRACT:

More information

4.6 Procedures for Connections

4.6 Procedures for Connections 4.6 Procedures for Connections This section provides Tier 2 evaluation procedures that apply to structural connections: anchorage for normal forces, shear transfer, vertical components, interconnection

More information

SITE INVESTIGATION Validation and Interpretation of data

SITE INVESTIGATION Validation and Interpretation of data SITE INVESTIGATION Validation and Interpretation of data Dr. G.Venkatappa Rao The Impact 1 The Need To determine the type of foundation To assess bearing capacity/settlement Location of Ground water table,issues

More information

ITEM 404 DRIVING STEEL PILING

ITEM 404 DRIVING STEEL PILING AFTER MARCH 1, 2012 ITEM 404 DRIVING STEEL PILING 404.1 Description. This Item shall govern the driving of steel piling. The piling shall be of the size and weight shown on the plans and shall be in accordance

More information

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights 1 Exam Prep Placing Reinforcing Bars Tabs and s These 1 Exam Prep Tabs are based on the CRSI Placing Reinforcing Bars Recommended Practices, 9 th Edition. Each 1 Exam Prep tabs sheet has five rows of tabs.

More information

Subsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015

Subsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015 Subsurface Investigations PDCA Professor s Driven Pile Institute Loren R. Anderson Utah State University June 25, 2015 Ralph B. Peck (1962) Subsurface engineering is an art; soil mechanics is an engineering

More information

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX B-2 FLOODWALL PILE ANALYSES EAST WALLS

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX B-2 FLOODWALL PILE ANALYSES EAST WALLS HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX B-2 FLOODWALL PILE ANALYSES EAST WALLS Revised March 2015 Preliminary Flood Wall Pile Analysis

More information

Implementation of this Special Provision requires a complete understanding of the following documents:

Implementation of this Special Provision requires a complete understanding of the following documents: VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR Quality Assurance/Quality Control (QA/QC) for the Construction of Deep Foundation Systems for Design-Build and PPTA Contracts November 10, 2009

More information

ACCEPTANCE CRITERIA FOR HELICAL PILE SYSTEMS AND DEVICES PREFACE

ACCEPTANCE CRITERIA FOR HELICAL PILE SYSTEMS AND DEVICES PREFACE www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council ACCEPTANCE CRITERIA FOR HELICAL PILE SYSTEMS AND DEVICES AC358 Approved June 2012 Compliance date December 1,

More information

Council on Tall Buildings

Council on Tall Buildings Structure Design of Sino Steel (Tianjin) International Plaza Xueyi Fu, Group Chief Engineer, China Construction Design International 1 1 Brief of Project 2 Location: Tianjin Xiangluowan Business District

More information

Testing Methods of Driven Piles on INDOT Demonstration Projects

Testing Methods of Driven Piles on INDOT Demonstration Projects 66 Testing Methods of Driven Piles on INDOT Demonstration Projects by Firooz Zandi, P.E. Chief Geotechnical Engineer Division of Materials & Tests, I NDOT INTRODUCTION: This paper provides an overview

More information

NPTEL Course GROUND IMPROVEMENT USING MICROPILES

NPTEL Course GROUND IMPROVEMENT USING MICROPILES Lecture 22 NPTEL Course GROUND IMPROVEMENT USING MICROPILES Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Email: gls@civil.iisc.ernet.in Contents

More information

CHAPTER 3 ANALYSIS METHOD

CHAPTER 3 ANALYSIS METHOD CHAPTER 3 ANALYSIS METHOD 3.1 ELASTIC STATIC ANALYSIS Elastic static analysis is done to calculate stress ratio between before and after subsidence. The structure will behave elastic when the first yield

More information

Foundation Innovations Ensure Successful Bridge Replacement

Foundation Innovations Ensure Successful Bridge Replacement COVER STORY Foundation Innovations Ensure Successful Bridge Replacement Rhode Island s new $163.7 million, 2,265 ft (690 m) long, fourlane Sakonnet River Bridge sits just south of the existing bridge in

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

Fragility Curves for Seismically Retrofitted Concrete Bridges

Fragility Curves for Seismically Retrofitted Concrete Bridges Fragility Curves for Seismically Retrofitted Concrete Bridges S.-H. Kim Department of Civil and Environmental Engineering, University of California, Irvine, USA. ABSTRACT: This study presents the development

More information

Pipe Pile. New Jersey Department of Transportation, Brielle, NJ. Route 70 Bridge over the Manasquan River, Brielle, NJ. USACE, Santa Maria, CA

Pipe Pile. New Jersey Department of Transportation, Brielle, NJ. Route 70 Bridge over the Manasquan River, Brielle, NJ. USACE, Santa Maria, CA Pipe Pile Similar to H-piles, pipe piles are also designed to transfer structural loads through the foundation to soils below. Where H-piles are typically classified as point bearing, pipe piles are most

More information

GEOTECHNICAL RESISTANCE FACTORS

GEOTECHNICAL RESISTANCE FACTORS Chapter 9 GEOTECHNICAL RESISTANCE FACTORS Final SCDOT GEOTECHNICAL DESIGN MANUAL 9-i Table of Contents Section Page 9.1 Introduction... 9-1 9.2 Soil Properties... 9-2 9.3 Resistance Factors for LRFD Geotechnical

More information

Design Data 4. Jacking Concrete Pipe

Design Data 4. Jacking Concrete Pipe Design Data 4 Jacking Concrete Pipe FOREWORD Jacking or tunneling concrete pipe is an increasingly important construction method for installing concrete pipelines without interrupting commerce, or disturbing

More information

TUNNEL LINER PLATE INTRODUCTION GENERAL APPLICATIONS CHAPTER 11

TUNNEL LINER PLATE INTRODUCTION GENERAL APPLICATIONS CHAPTER 11 CHAPTER 11 INTRODUCTION The open-trench method of placing underground conduits is commonly used on new construction of culverts, sewers and underpasses. Interference with traffic, as well as inconvenience

More information

SECTION DUCTILE IRON PILES

SECTION DUCTILE IRON PILES SECTION 31 66 13 DUCTILE IRON PILES PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents. B.

More information

Seismic Behaviour of RC Shear Walls

Seismic Behaviour of RC Shear Walls Ductile Detailing of RC Structures :: IS:13920-1993 1993 Short Course on Seismic Design of RC Structures Durgesh C. Rai Department of Civil Engineering, IIT Kanpur The material contained in this lecture

More information

Over the last decade, drilled and postgrouted micropile foundations have

Over the last decade, drilled and postgrouted micropile foundations have Seismic Design of Micropile Foundation Systems Leo Panian, S.E., and Mike Korolyk, S.E. Over the last decade, drilled and postgrouted micropile foundations have come to be increasingly relied on for resisting

More information

Development of New H-Section Steel Shape with Inner Rib, J-grip H, and Its Application to Steel Concrete Composite Diaphragm Wall

Development of New H-Section Steel Shape with Inner Rib, J-grip H, and Its Application to Steel Concrete Composite Diaphragm Wall JFE TECHNICAL REPORT No. 16 (Mar. 2011) Development of New H-Section Steel Shape with Inner, J-grip H, and Its Application to Steel Concrete Composite Diaphragm Wall ONDA Kunihiko *1 KOJO Rinya *2 AOKI

More information

UNDERPINNING A CRANE FOUNDATION

UNDERPINNING A CRANE FOUNDATION UNDERPINNING A CRANE FOUNDATION Donald R. McMahon, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New York, USA Andrew J. Nichols, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New

More information

Modelling of a pile row in a 2D plane strain FE-analysis

Modelling of a pile row in a 2D plane strain FE-analysis Numerical Methods in Geotechnical Engineering Hicks, Brinkgreve & Rohe (Eds) 2014 Taylor & Francis Group, London, 978-1-138-00146-6 Modelling of a pile row in a 2D plane strain FE-analysis J.J.M. Sluis,

More information

Design Data 4M. Jacking Concrete Pipe

Design Data 4M. Jacking Concrete Pipe Design Data 4M Jacking Concrete Pipe FOREWORD Jacking or tunneling concrete pipe is an increasingly important construction method for installing concrete pipelines without interrupting commerce, or disturbing

More information

USE OF DIPP PILES FOR A NEW SUP BRIDGE IN WEST MELBOURNE

USE OF DIPP PILES FOR A NEW SUP BRIDGE IN WEST MELBOURNE USE OF DIPP PILES FOR A NEW SUP BRIDGE IN WEST MELBOURNE If you want to put a photo on the title slide use this layout with colour photos (delete this box) Michael Wei, Jawad Zeerak & David Barton 8 th

More information

Foundation Engineering

Foundation Engineering Foundation Engineering P.C. Varghese Foundation Engineering P.C. VARGHESE Honorary Professor, Anna University, Madras Formerly, Professor and Head, Department of Civil Engineering Indian Institute of Technology

More information

OFFICE OF STATE AID ROAD CONSTRUCTION MISSISSIPPI DEPARTMENT OF TRANSPORTATION

OFFICE OF STATE AID ROAD CONSTRUCTION MISSISSIPPI DEPARTMENT OF TRANSPORTATION Supplemental Specification 901-S-803-1 LFRD Driven Pile Specifications. DATE: May 24, 2010 OFFICE OF STATE AID ROAD CONSTRUCTION MISSISSIPPI DEPARTMENT OF TRANSPORTATION SUBJECT: LRFD Driven Pile Specifications

More information

SECTION DRIVEN PILES

SECTION DRIVEN PILES SECTION 31 62 00 SPEC WRITER NOTE: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

In-Plane and Out-of-Plane Performance of the MINI-MC Flange Connector

In-Plane and Out-of-Plane Performance of the MINI-MC Flange Connector Lehigh University Lehigh Preserve ATLSS Reports Civil and Environmental Engineering 7-1-2009 In-Plane and Out-of-Plane Performance of the MINI-MC Flange Connector Clay Naito Ruirui Ren Follow this and

More information

Modelling of RC moment resisting frames with precast-prestressed flooring system

Modelling of RC moment resisting frames with precast-prestressed flooring system Modelling of RC moment resisting frames with precast-prestressed flooring system B.H.H. Peng, R.P. Dhakal, R.C. Fenwick & A.J. Carr Department of Civil Engineering, University of Canterbury, Christchurch.

More information

Deep Foundation. Deep Foundation Applications

Deep Foundation. Deep Foundation Applications Deep Foundation Deep Foundation Applications 1. Soils with: High compression Low shear strength Swelling/shrinkage 2. Resist lateral loads 3. Surface erosion 4. Resist tension (anchors) 1 Typical Applications

More information

Module - CE 3132 Geotechnical Engineering Assignment Triaxial Test Marks 10% Learning Outcome

Module - CE 3132 Geotechnical Engineering Assignment Triaxial Test Marks 10% Learning Outcome Module - CE 3132 Geotechnical Engineering Assignment Triaxial Test Marks 10% Learning Outcome Ability to conduct a Unconsolidated Undrained (UU) triaxial test Ability to evaluate the undrained shear strength

More information

techie-touch.blogspot.com www.vidyarthiplus.com CE2305 FOUNDATION ENGINEERING 2 MARKS QUESTIONS & ANSWERS 16 MARKS QUESTIONS UNIT -1 1. What are components of total foundation settlement? elastic settlement,

More information

SITE INVESTIGATION. Foundation Engineering

SITE INVESTIGATION. Foundation Engineering SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface

More information

Comparative Study of R.C.C and Steel Concrete Composite Structures

Comparative Study of R.C.C and Steel Concrete Composite Structures RESEARCH ARTICLE OPEN ACCESS Comparative Study of R.C.C and Steel Concrete Composite Structures Shweta A. Wagh*, Dr. U. P. Waghe** *(Post Graduate Student in Structural Engineering, Y.C.C.E, Nagpur 441

More information

Hamburg, GERMANY. Predöhlkai extension project Berth 1

Hamburg, GERMANY. Predöhlkai extension project Berth 1 Hamburg, GERMANY Predöhlkai extension project Berth 1 As one of the world s most important ports, Hamburg will handle an expected 14 million TEU by 2010. This represents a major rise from today s 8.5 million

More information

Seismic Response of a Typical Fixed Jacket-Type Offshore Platform (SPD1) under Sea Waves

Seismic Response of a Typical Fixed Jacket-Type Offshore Platform (SPD1) under Sea Waves Open Journal of Marine Science, 211, 1, 36-42 http://dx.doi.org/1.4236/ojms.211.124 Published Online July 211 (http://www.scirp.org/journal/ojms) Seismic Response of a Typical Fixed Jacket-Type Offshore

More information

SPECIFICATIONS FOR THE CONSTRUCTION OF NEW PASSENGER EQUIPMENT CARS PREFACE

SPECIFICATIONS FOR THE CONSTRUCTION OF NEW PASSENGER EQUIPMENT CARS PREFACE SPECIFICATIONS FOR THE CONSTRUCTION OF NEW PASSENGER EQUIPMENT CARS Standard ADOPTED 1939; ADVANCED TO STANDARD, 1945. PREFACE The specifications have been prepared on the basis that they will be used

More information

ABSTRACT. KEY WORDS: Tubular piles; composite behavior; offshore structures; push-out strength; bond strength; slip.

ABSTRACT. KEY WORDS: Tubular piles; composite behavior; offshore structures; push-out strength; bond strength; slip. Proceedings of The Twelfth (22) International Offshore and Polar Engineering Conference Kitakyushu, Japan, May 26 31, 22 Copyright 22 by The International Society of Offshore and Polar Engineers ISBN 1-88653-58-3

More information

GREEN THREAD Piping Systems

GREEN THREAD Piping Systems Bulletin No. A1300 February 15, 2006 SMITH FIBERCAST GREEN THREAD Piping Systems PRODUCT GREEN THREAD pipe is filament wound using an amine cured epoxy resin and fiberglass and has a resin-rich liner reinforced

More information

ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems LTD. Titan Hollow Bar

ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems LTD. Titan Hollow Bar Advances in Hollow Thread Bar Micro Pile Installation Techniques, Equipment, Materials, Testing and Monitoring ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems

More information

Monotonic Tests of Long Shear Walls with Openings

Monotonic Tests of Long Shear Walls with Openings Monotonic Tests of Long Shear Walls with Openings Virginia Polytechnic Institute and State University Department of Wood Science and Forests Products Brooks Forest Products Research Center Timber Engineering

More information

Application of Vibro Techniques for Infrastructure Projects in India

Application of Vibro Techniques for Infrastructure Projects in India Application of Vibro Techniques for Infrastructure Projects in India Rainer Wegner Contract Manager, Keller Grundbau GmbH, Germany Dr. V.R. Raju Director, Keller Ground Engineering India Pvt Ltd, India

More information

h Installation Manual

h Installation Manual h Installation Manual 1 General Information The installation of HOBAS GRP Pipes is subject to applicable standards and guidelines such as EN 1610 and ISO/ TS 10465-1. Correct installation always requires

More information

LATERAL CAPACITY OF SKIRT FOUNDATION ON LOOSE SUBMERGED SAND

LATERAL CAPACITY OF SKIRT FOUNDATION ON LOOSE SUBMERGED SAND Int. J. Chem. Sci.: 14(S1), 2016, 295-301 ISSN 0972-768X www.sadgurupublications.com LATERAL CAPACITY OF SKIRT FOUNDATION ON LOOSE SUBMERGED SAND R. MANOJ KANNAN and S. CHEZHIYAN * Department of Civil

More information

Design of Blowout Preventer Lifting Frame

Design of Blowout Preventer Lifting Frame www.daoe-journal.org Development and Applications of Oceanic Engineering (DAOE) Volume 2 Issue 4, November 2013 Design of Blowout Preventer Lifting Frame Krishna Baireddy *1 Former Student of Ocean Engineering

More information

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: GOLIATHTECH INCORPORATED 175B RUE PELADEAU MAGOG, QUEBEC J1X 5G9 CANADA

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: GOLIATHTECH INCORPORATED 175B RUE PELADEAU MAGOG, QUEBEC J1X 5G9 CANADA 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3726 Issued 10/2017 This report is subject to renewal 10/2018. DIVISION: 31 00 00

More information

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch SEMINAR Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013 Facilitator: Martin Larisch 1 Brief History of Piling Contractors, its capabilities and market Introduction to CFA piling

More information

Reinforced Concrete Design. A Fundamental Approach - Fifth Edition

Reinforced Concrete Design. A Fundamental Approach - Fifth Edition CHAPTER REINFORCED CONCRETE Reinforced Concrete Design A Fundamental Approach - Fifth Edition Fifth Edition REINFORCED CONCRETE A. J. Clark School of Engineering Department of Civil and Environmental Engineering

More information

CHAPTER III METHODS AND MATERIALS

CHAPTER III METHODS AND MATERIALS CHAPTER III METHODS AND MATERIALS 3.1: Tensile Tests 3.1.1: Introduction The first phase of testing for the experimental program, was to conduct tensile tests of No. 4, No. 5, and No. 6 nominal diameter

More information

SPECIAL SPECIFICATION 4385 Railroad Bridge Construction

SPECIAL SPECIFICATION 4385 Railroad Bridge Construction 2004 Specifications CSJ 0912-71-622 SPECIAL SPECIFICATION 4385 Railroad Bridge Construction 1. Description. Construct Railroad bridges following the recommendations in the applicable Chapters of the current

More information

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: HELICAL ANCHORS, INC BOONE AVENUE, NORTH MINNEAPOLIS, MINNESOTA 55428

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: HELICAL ANCHORS, INC BOONE AVENUE, NORTH MINNEAPOLIS, MINNESOTA 55428 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3982 Reissued 09/2017 This report is subject to renewal 09/2019. DIVISION: 31 00

More information

Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations

Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations Issued: Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations Introduction Proper installation and anchorage of Flygt pumps and installation accessories is critical to limiting vibration

More information

Florida Method of Test for NONREPETITIVE STATIC PLATE LOAD TEST OF SOILS AND FLEXIBLE PAVEMENT COMPONENTS

Florida Method of Test for NONREPETITIVE STATIC PLATE LOAD TEST OF SOILS AND FLEXIBLE PAVEMENT COMPONENTS Florida Method of Test for NONREPETITIVE STATIC PLATE LOAD TEST OF SOILS AND FLEXIBLE PAVEMENT COMPONENTS 1. SCOPE Designation: FM 5-527 Modified AASHTO T-222-78 1.1 This method covers the making of nonrepetitive

More information

MECHANICS OF MATERIALS

MECHANICS OF MATERIALS Lecture Notes: Dr. Hussam A. Mohammed Al- Mussiab Technical College Ferdinand P. Beer, E. Russell Johnston, Jr., and John T. DeWolf Introduction Concept of Stress The main objective of the study of mechanics

More information

SUPPLEMENTAL TECHNICAL SPECIFICATION

SUPPLEMENTAL TECHNICAL SPECIFICATION July 14, 2015 HIGH STRAIN DYNAMIC LOAD TESTING OF DRILLED SHAFTS 1.0 GENERAL This work shall consist of performing high-strain dynamic testing using a drop weight loading system on a test drilled shaft

More information

Dynamic Design of the Foundation of Reciprocating Machines for Offshore Installations in Persian Gulf

Dynamic Design of the Foundation of Reciprocating Machines for Offshore Installations in Persian Gulf Dynamic Design of the Foundation of Reciprocating Machines for Offshore Installations in Persian Gulf Mohammad AHANGAR Univrsity Of Tehran, Mohammad_ahangar_84@yahoo.com Hesam Sharifian JAZE Univrsity

More information

ROOFING APPLICATION STANDARD (TAS) No. 102(A)-95

ROOFING APPLICATION STANDARD (TAS) No. 102(A)-95 ROOFING APPLICATION STANDARD (TAS) No. 102(A)-95 TEST PROCEDURE FOR STATIC UPLIFT RESISTANCE OF MECHANICALLY ATTACHED, CLIPPED, RIGID, ROOF SYSTEMS (For Methods of Mechanical Attachment Excluding Clips,

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

APPENDIX B. LOAD FRAME. This Appendix will describe the philosophy in the design and operation of the loading system.

APPENDIX B. LOAD FRAME. This Appendix will describe the philosophy in the design and operation of the loading system. APPENDIX B. LOAD FRAME This Appendix will describe the philosophy in the design and operation of the loading system. LOAD FRAME The large-scale gusset plate testing required a unique loading fixture. A

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

Jet Grouting to Increase Lateral Resistance of Pile Group in Soft Clay

Jet Grouting to Increase Lateral Resistance of Pile Group in Soft Clay GROUND MODIFICATION, PROBLEM SOILS, AND GEO-SUPPORT 265 Jet Grouting to Increase Lateral Resistance of Pile Group in Soft Clay Kyle M. Rollins 1, Matthew E. Adsero 2, and Dan A. Brown 3 1 Prof. Civil &

More information

ACCEPTANCE CRITERIA FOR HELICAL FOUNDATION SYSTEMS AND DEVICES PREFACE

ACCEPTANCE CRITERIA FOR HELICAL FOUNDATION SYSTEMS AND DEVICES PREFACE ICC EVALUATION SERVICE, INC. Evaluate P Inform P Protect ACCEPTANCE CRITERIA FOR HELICAL FOUNDATION SYSTEMS AND DEVICES AC358 Approved June 2007 Effective July 1, 2007 PREFACE Evaluation reports issued

More information

An Experimental Study on Vertically Loaded Driven and Cast- In-Situ Piles

An Experimental Study on Vertically Loaded Driven and Cast- In-Situ Piles IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 2320-334X, Volume 11, Issue 2 Ver. III (Mar- Apr. 2014), PP 43-48 An Experimental Study on Vertically Loaded Driven

More information

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS Dipl.-Wirt.Ing. Oliver Freudenreich Friedr. Ischebeck GmbH phone: ++49 2333 8305-0 Loher Str. 31 79 fax: ++49 2333 8305-55 e-mail: freudenreich@ischebeck.de D-58256 Ennepetal www.ischebeck.com INNOVATIVE

More information

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle Overall Information Location: Singapore Date of Completion: 2010 Cost: $5.7 billion Architect: Moshe Safdie Executive Architect: Aedas, Pte

More information

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures Preferred QC/QA Procedures The Federal Highway Administration (FHWA) has provided QC/QA guidance for this technology as noted below. The reference document also contains information about construction

More information

STRENGTHENING OF INFILL MASONRY WALLS USING BONDO GRIDS WITH POLYUREA

STRENGTHENING OF INFILL MASONRY WALLS USING BONDO GRIDS WITH POLYUREA I.1 June 2005 STRENGTHENING OF INFILL MASONRY WALLS USING BONDO GRIDS WITH POLYUREA SUMMARY Glass fiber reinforced polymer (GFRP) grids reinforced polyurea was used to strengthen unreinforced concrete

More information

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall

More information

Optimized High-Performance Concrete in Grouted Connections

Optimized High-Performance Concrete in Grouted Connections Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Optimized High-Performance Concrete in Grouted Connections S. Anders Bilfinger Berger

More information

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: CANTSINK MANUFACTURING, INC. 71 FIRST AVENUE LILBURN, GEORGIA 30047

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: CANTSINK MANUFACTURING, INC. 71 FIRST AVENUE LILBURN, GEORGIA 30047 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-1559 Reissued 12/2016 This report is subject to renewal 12/2018. DIVISION: 31 00

More information

SOIL PRESSURE IN EMBANKMENT STABILIZATIONS

SOIL PRESSURE IN EMBANKMENT STABILIZATIONS SOIL PRESSURE IN EMBANKMENT STABILIZATIONS Analysis of the 3D shadowing effect of piles Dipl.-Ing. M. Filus Fides DV-Partner GmbH ABSTRACT: Pile checks required by the codes alone are usually not sufficient

More information

Journal of Asian Scientific Research EVALUATION OF RECTANGULAR CONCRETE-FILLED STEEL-HOLLOW SECTION BEAM-COLUMNS

Journal of Asian Scientific Research EVALUATION OF RECTANGULAR CONCRETE-FILLED STEEL-HOLLOW SECTION BEAM-COLUMNS Journal of Asian Scientific Research journal homepage: http://www.aessweb.com/journals/5003 EVALUATION OF RECTANGULAR CONCRETE-FILLED STEEL-HOLLOW SECTION BEAM-COLUMNS Kamyar Bagherinejad 1 ---- Emad Hosseinpour

More information

CHAPTER 23 PILES TABLE OF CONTENTS TABLE OF CONTENTS. 23.TOC Table of Contents... 30Jan Introduction... 30Jan2018

CHAPTER 23 PILES TABLE OF CONTENTS TABLE OF CONTENTS. 23.TOC Table of Contents... 30Jan Introduction... 30Jan2018 CHAPTER 23 TABLE OF CONTENTS FILE NO. TITLE DATE TABLE OF CONTENTS 23.TOC Table of Contents... 30Jan2018 23.00 Introduction... 30Jan2018 DESIGN GUIDE FOR LATERALLY UNSUPPORTED 23.01-1 Notes and Definitions...

More information

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: EMPIRE PIERS 2656 EAST HWY 47 WINFIELD, MO EVALUATION SUBJECT:

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: EMPIRE PIERS 2656 EAST HWY 47 WINFIELD, MO EVALUATION SUBJECT: 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-4050 Issued 12/2017 This report is subject to renewal 12/2018. DIVISION: 31 00 00

More information

ALLOWABLE STRESS DESIGN OF CONCRETE MASONRY LINTELS. TEK 17-1C Structural (2009) Related TEK: Uniform load. Triangular load. Concentrated loads

ALLOWABLE STRESS DESIGN OF CONCRETE MASONRY LINTELS. TEK 17-1C Structural (2009) Related TEK: Uniform load. Triangular load. Concentrated loads An information series from the national authority on concrete masonry technology ALLOWABLE STRESS DESIGN OF CONCRETE MASONRY LINTELS TEK 17-1C Structural (2009) INTRODUCTION Lintels and beams are horizontal

More information

6 CONTRACTOR, EQUIPMENT & PILES ARRIVE ON-SITE

6 CONTRACTOR, EQUIPMENT & PILES ARRIVE ON-SITE Lesson 6 CONTRACTOR, EQUIPMENT & PILES ARRIVE ON-SITE 6-1 Version 1.0-1/15 6-1 Learning Outcomes Verify and Document Equipment Matches Approved Pile Installation Plan Document Contractor Compliance with

More information

APPROXIMATE ANALYSIS OF PILED RAFT. Rameez Gahlot1, Roshni J John2

APPROXIMATE ANALYSIS OF PILED RAFT. Rameez Gahlot1, Roshni J John2 APPROXIMATE ANALYSIS OF PILED RAFT Rameez Gahlot1, Roshni J John2 1 PG Student, Dept of Civil Engg, Saraswati College of Engineering, Kharghar-4121, India rameezgahlot@gmail.com.2 Head of Civil Engineering

More information

UHS Ultra High-strength Seamless, Hot Rolled Hollow Sections from ISMT

UHS Ultra High-strength Seamless, Hot Rolled Hollow Sections from ISMT UHS Ultra High-strength Seamless, Hot Rolled Hollow Sections from ISMT UHS Ultra High strength, Seamless, Hot Rolled Hollow Sections from ISMT (conforming to EN 10210) Widen your possibilities Modern architectural

More information

Recent Developments in Stay Cable Systems

Recent Developments in Stay Cable Systems Recent Developments in Stay Cable Systems PTI Technical Conference, Reno- 2006 Khaled Shawwaf, Technical Director (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED Page 1 of 45 * Cable Stayed

More information

Combined Pile Foundation System for a Residential Complex

Combined Pile Foundation System for a Residential Complex Combined Pile Foundation System for a Residential Complex Alvin K.M. Lam, Geotechnical Engineer, Ove Arup & Partners Hong Kong Limited, Hong Kong, China; email: alvin.lam@arup.com Daman D.M. Lee, Civil

More information

TG 10i SOUTH AUSTRALIAN WATER CORPORATION

TG 10i SOUTH AUSTRALIAN WATER CORPORATION TG 10i SOUTH AUSTRALIAN WATER CORPORATION TECHNICAL GUIDELINE GENERAL TECHNICAL INFORMATION FOR GEOTECHNICAL DESIGN ~ Part I ~ Pile Driving Issued by: Manager Engineering Issue Date: SA Water 2007 This

More information

Cintec Ground Anchor Installation at Bridge 325 Abington

Cintec Ground Anchor Installation at Bridge 325 Abington INTRODUCTION: Cintec Ground Anchor Installation at Bridge 325 Abington Search CINTEC.COM: Advanced Search Cintec International Ltd has developed a system of ground anchors incorporating the patented grout

More information

Underwater Concrete in Drilled Shafts: the Key Issues and Case Histories

Underwater Concrete in Drilled Shafts: the Key Issues and Case Histories Underwater Concrete in Drilled Shafts: the Key Issues and Case Histories Sam X. Yao 1 and Robert B. Bittner 2 ABSTRACT: In construction of drilled shafts under water, placing concrete in the shafts is

More information

Redi Rock Specification and Installation Manual

Redi Rock Specification and Installation Manual Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information