South Dakota Department of Transportation Average Unit Prices from Low Bids
|
|
- Brooke Willis
- 6 years ago
- Views:
Transcription
1 Unit Prices from Low s January 0, 0 to December, 0 Office of Project Development - Letting
2 00E00 Blading Hour.00 $,0. $. 00E000 Construction and Maintenance of Detour(s) LS.00 $0,. $,. 00E000 Maintenance of Traffic Diversion(s) LS.00 $,00.00 $,0. 00E000 Remove Traffic Diversion(s) LS.00 $,.0 $,. 00E00 Mobilization LS.0 $,0,0. $,. 0 00E Restoration of Stockpile Site LS.00 $,. $,. 00E00 Construction Staking LS.00 $,. $,. 00E Construction Staking Mile. $,. $,.0 00E0 Reestablish Property Corner Each.00 $,0. $. 00E0 Grade Staking Mile. $,0,. $,. 00E0 Graded Centerline Staking Mile.0 $,. $,. 00E Final Cross Section Survey Mile. $,. $,. 00E0 Miscellaneous Staking Mile. $,,.0 $,0.0 00E0 Miscellaneous Staking LS.00 $,. $,0. 00E0 Slope Staking Mile. $,. $,0. 00E0 Structure Staking Each.00 $,0. $,. 00E Bridge Elevation Survey LS.00 $,0. $,. 00E0 Checker LS.00 $,0,. $,. 00E00 Construction Schedule, Category II LS.00 $,0.0 $,0. 00E0 Project Management, Category II LS.00 $,.0 $,.0 00E00 Construction Schedule, Category III LS.00 $,0. $,.0 00E0 Project Management, Category III LS.00 $,00,. $,. 00E000 Concrete Penetrating Sealer SqYd,.0 $,,. $. 00E00 Training Program Hour,00.00 $,.00 $.0 0E00 Clear and Grub Stump Each.00 $,0.00 $.0 0E000 Clear and Grub Tree Each,.00 $,0. $. 0E00 Clearing LS.00 $,0,.0 $,. 0E00 Remove Concrete Bridge Approach Slab SqYd,.0 $,,. $. 0E000 Remove Bridge Railing Ft,.00 $,0. $. 0E00 Remove Thrie Beam Bridge Rail for Reset Ft $,00.00 $.00 0E000 Remove Bridge Rail End Each.00 $,.00 $. 0E000 Remove Concrete Bridge Slab SqYd.0 $,. $. 0E00 Remove Partial Bridge Joint Each.00 $,. $,.0 0E000 Remove Rubberized Asphalt Chip Seal SqYd,.0 $,. $. 0E00 Remove Concrete Footing(s) LS.00 $0,. $,. 0E0 Remove Traffic Sign Each,.00 $,. $.0 0E0 Remove Delineator Each,.00 $,. $. 0E000 Remove Building Each.00 $,00.00 $,0.00 0E0 Remove Building(s) LS.00 $,. $,. 0E000 Remove Concrete Curb and/or Gutter Ft,0.00 $,. $. 0E0 Remove Concrete Curb Ft 0.00 $,0. $. 0E00 Remove Concrete Gutter Ft,.00 $,.0 $.00 0E00 Remove Asphalt Concrete Curb Ft,00.00 $,. $.0 0E00 Remove Curb Stop Each.00 $,. $.0 0E000 Remove Drop Inlet Each.00 $,. $. 0E0 Remove Edge Drains LS.00 $,.0 $,.0 0E00 Remove Manhole Each.00 $,.0 $. 0E000 Remove Pipe Culvert Ft,.00 $,0. $0. 0E0 Remove Pipe End Section Each.00 $,. $. 0E00 Remove Sewer Pipe Ft,.00 $,0. $. 0E00 Remove Storm Sewer Pipe Ft,.00 $,0. $.0 0E00 Remove Cattle Guard Each.00 $,0.00 $,.00 0E00 Remove Cattle Pass Ft $,0.00 $.0 0E0 Remove Cattle Pass End Section Each.00 $,.00 $. 0E000 Remove Fence Ft,.00 $,. $0. 0E00 Remove Chain Link Fence Ft,.00 $,0. $. 0E0 Remove Interim Crossover Closure Ft,.00 $,.00 $. 0E000 Remove Cable Guardrail Ft,.00 $,.00 $.0 0E00 Remove Cable Guardrail Ft,.00 $,. $.0 0E00 Remove Beam Guardrail Ft,.00 $0,. $. 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
3 0E00 Remove Cable Guardrail Anchor Assembly Each.00 $0,. $.0 0E0 Remove Cable Guardrail Slip Base Anchor Assembly Each 0.00 $,0. $.0 0E00 Remove Beam Guardrail Trailing End Terminal Each.00 $. $. 0E00 Remove W Beam Guardrail Breakaway Cable Terminal Each.00 $,0. $. 0E000 Remove W Beam Guardrail End Terminal Each.00 $,0. $0. 0E0 Remove Rubrail Ft 0.00 $,.00 $. 0E Remove Asphalt Concrete Pavement SqYd,.0 $,,. $. 0E0 Remove Asphalt Concrete Pavement CuYd,.0 $,. $.0 0E00 Remove Concrete Pavement SqYd,0,.0 $,,. $.0 0E0 Remove Concrete Pavement CuYd 0,0.0 $,. $. 0E Remove Concrete Approach Pavement SqYd,0.0 $,. $. 0E0 Remove Concrete Median Pavement SqYd.0 $. $. 0E0 Remove Concrete Driveway Pavement SqYd,0.0 $,. $. 0 0E0 Remove Concrete Sidewalk SqYd 0,.0 $,. $. 0E0 Remove Concrete Median Barrier Ft,00.00 $,. $. 0E0 Remove Concrete Retaining Wall Ft,.0 $,. $. 0E0 Remove Luminaire Pole Each 0.00 $,0. $0. 0E Remove Luminaire Arm Each.00 $. $. 0E Remove Signal Equipment LS.00 $,. $,0. 0E Remove Signal Pole Footing Each.00 $,.0 $. 0E Remove Luminaire Pole Footing Each.00 $,0. $0. 0E Remove Granular Material CuYd,.0 $,.0 $.0 0E Remove Bank and Channel Protection Gabion Each 0.00 $,0.00 $.0 0E0 Remove Sediment CuYd,.0 $,0. $. 0E Remove Erosion Control Wattle Ft,0.00 $,. $. 0E Remove Sediment Filter Bag Ft,.00 $,0. $0. 0 0E Remove Triangular Silt Barrier Ft,0.00 $,. $. 0E0 Remove Silt Fence Ft,.00 $,0. $0. 0E0 Remove Concrete Vault Lid SqFt,0.00 $,.00 $. 0E Remove Fire Hydrant Each 0.00 $,. $. 0E0 Remove Contaminated Water MGal 0.00 $,. $. 0E0 Remove Valve Box Each.00 $,. $. 0E Remove Gate Valve Each 0.00 $,.0 $. 0E0 Remove Water Main Ft,.00 $,. $. 0E000 Salvage Crash Cushion Each.00 $,.0 $,. 0E0 Salvage Cable Guardrail Ft,.00 $,. $. 0E0 Salvage Beam Guardrail Ft,.0 $,0. $. 0E Salvage Thrie Beam Guardrail Ft,.00 $,.0 $. 0E0 Salvage W Beam Guardrail Ft,0.00 $,0. $. 0E0 Salvage W Beam to Thrie Beam Guardrail Transition Each.00 $,0.0 $. 0E0 Salvage Beam Guardrail Trailing End Terminal Each.00 $.00 $.00 0E0 Salvage W Beam Guardrail Flared End Terminal Each.00 $,. $0. 0E0 Salvage W Beam Guardrail Tangent End Terminal Each.00 $,. $. 0 0E0 Salvage Delineator Each,00.00 $0,.0 $. 0E00 Salvage Traffic Sign Each,.00 $,,.0 $. 0E00 Salvage Extruded Panel Sign Each.00 $0,. $0. 0E0 Salvage Luminaire Pole Each.00 $,. $. 0E Salvage Luminaire Each.00 $0.00 $.0 0E0 Salvage Signal Equipment LS 0.00 $,. $,. 0 0E Salvage Riprap Ton,.00 $,. $.0 0E0 Salvage Drop Inlet Frame and Grate Assembly Each.00 $,0.00 $. 0E0 Salvage Fire Hydrant Each.00 $,. $. 0E Salvage Valve and Valve Box Each.00 $,. $0. 0E0 Salvage Water Main Fitting Each.00 $,. $. 0E00 Salvage Fence Ft.00 $,.00 $. 0E000 Remove Cable Guardrail for Reset Ft,.00 $0,.0 $. 0E0 Remove Cable Guardrail Anchor Assembly for Reset Each.00 $. $. 0E00 Remove Double Thrie Beam Guardrail for Reset Ft,.00 $,. $. 0E0 Remove Double W Beam Guardrail for Reset Ft,0.00 $,0.0 $. 0E0 Remove W Beam Guardrail for Reset Ft,0.00 $,. $. 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
4 0E0 Remove W Beam to Thrie Beam Guardrail Transition for Each.00 $,0.0 $. Reset 0E0 Remove Beam Guardrail Trailing End Terminal for Reset Each.00 $.00 $.00 0E0 Remove W Beam Guardrail Breakaway Cable Terminal for Each.00 $,.00 $. Reset 0E0 Remove W Beam Guardrail Flared End Terminal for Reset Each.00 $0,. $. 0 0E0 Remove W Beam Guardrail Tangent End Terminal for Reset Each.00 $,0.00 $.00 0E00 Remove Rubrail for Reset Ft $,. $. 0E000 Remove Crossover Closure for Reset Ft,00.00 $,0.00 $. 0E00 Remove Interim Crossover Closure for Reset Ft,.00 $,0. $. 0E00 Remove Gate for Reset Each.00 $,.00 $. 0E00 Remove MSE Segmental Modular Wall for Reset SqFt,.00 $,. $. 0E Remove Sign for Reset Each.00 $,. $. 0E Remove Delineator for Reset Each.00 $,.0 $. 0E00 Remove Pipe for Reset Ft,.00 $,.0 $. 0E Remove Pipe End Section for Reset Each,.00 $,. $. 0E0 Remove Cattle Pass for Reset Ft 0.00 $,0.0 $. 0E0 Remove Cattle Pass End Section for Reset Each.00 $,.0 $. 0E00 Remove Drop Inlet Frame and Grate Assembly for Reset Each.00 $,. $. 0E Remove Manhole Frame and Lid for Reset Each.00 $,0.00 $.00 0E00 Remove Chain Link Fence for Reset Ft,0.00 $,.0 $.0 0E0 Remove Fence for Reset Ft,.00 $,0.0 $. E00 Unclassified Excavation CuYd,,.00 $,,. $. 0 E000 Unclassified Excavation LS.00 $0,0.00 $,00.00 E000 Borrow Unclassified Excavation CuYd,.00 $,,. $. E000 Select Subgrade Topping CuYd,00.00 $,0,0. $. E00 Contractor Furnished Select Subgrade Topping CuYd,0.00 $,0,0. $. E000 Option Borrow Excavation CuYd,,.00 $,,. $. E000 Contractor Furnished Borrow Excavation CuYd,0,.00 $,,. $. E000 Contaminated Material Excavation CuYd, $,0.00 $. E00 Muck Excavation CuYd 0,.00 $0,. $. E00 Unclassified/Rock Excavation CuYd,.00 $,,0. $. E000 Undercutting CuYd,,.00 $,,.0 $. E000 Placing Embankment CuYd,.00 $,,0. $. E0 Reprofiling Ditch Sta.0 $,.0 $. E00 Water for Granular Material MGal,0.0 $,,. $. E00 Water for Vegetation MGal.0 $,. $0. E000 Pit Run Ton,.0 $,,. $. 0 0E00 Dust Control Chloride Lb,.00 $0,.0 $0. E00 Shoulder Preparation Mile.0 $,. $. E0 Surface Preparation Mile. $,. $,. E000 Shoulder Shaping Mile 00. $,. $,. E00 Ordinary Roadway Shaping SqYd.00 $,.00 $.00 E00 Heavy Roadway Shaping Mile. $,.00 $,. E Heavy Roadway Shaping SqYd,0.0 $,. $.0 0E00 Placing Topsoil CuYd,,.00 $,,. $.0 0E000 Contractor Furnished Topsoil CuYd,0.00 $,,00. $. 0E00 Remove and Replace Topsoil LS.00 $,,. $,. 0E00 Obliterate Old Road Sta 0.00 $,. $. 0E00 Incidental Work LS.00 $,,. $,.0 0E000 Incidental Work, Grading LS.00 $,,. $,. 0E000 Incidental Work, Structure LS.00 $,,. $,. 0E Base Course Ton,0,.0 $0,0,. $0. 0 0E0 Base Course, Salvaged Ton,.0 $,0,. $. 0E0 Base Course, Salvaged Asphalt Mix Ton 0,.0 $,,0. $. 0E0 Base Course, Salvaged, State Furnished Ton,.0 $,. $0. 0E0 Gravel Cushion Ton,.0 $,,. $.0 0E00 Gravel Cushion, Salvaged Ton,.0 $,0,. $. 0E0 Gravel Surfacing Ton,.0 $,,. $. 0E00 Gravel Surfacing, Salvaged Ton,.00 $,0. $. 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
5 0E000 Granular Material, Furnish Ton,.0 $,,0. $.0 0E0 Granular Material Ton,00.00 $,. $. 0E000 Salvage and Stockpile Asphalt Mix Material Ton,.0 $,,. $. 0E000 Salvage and Stockpile Asphalt Mix and Granular Base Ton,,.0 $,,. $. Material 0E00 Salvage Asphalt Mix and Granular Base Material Ton,0.0 $,. $. 0E00 Salvage and Stockpile Granular Material Ton,.0 $,. $.0 0 0E000 Blend, Haul, and Stockpile Granular Material Ton,0.0 $,0,. $. 0E0 Haul and Stockpile Granular Material Ton,.0 $,0,. $. 0E00 Blend and Stockpile Granular Material Ton,.00 $0,. $. 0E000 Haul Material CuYd,.00 $,. $. 0E0 Haul Material Ton,.00 $,. $. 0E00 Full Depth Reclamation SqYd,,.00 $,,. $0. 0E000 Full Depth Reclamation, Shoulder SqYd,.00 $,.0 $0. 0E000 PG - Asphalt Binder Ton,.0 $,,. $. 0 0E000 PG - Asphalt Binder Ton,.00 $,0,. $. 0E000 PG - Asphalt Binder Ton.0 $,.0 $0. 0E000 PG - Asphalt Binder Ton,.0 $,,. $. 0E000 PG - Asphalt Binder Ton,0.0 $0,,. $. 0E000 Asphalt Emulsion for Microsurfacing Gal,,.00 $,,.0 $. 0E00 Asphalt Repair Mastic Type Lb,,0.00 $,,.0 $.0 0E0 Class Q Hot Mixed Asphalt Concrete Ton,,. $,,. $0. 0E0 Class Q Hot Mixed Asphalt Concrete Ton,0.00 $,,0.00 $. 0E0 Class Q Hot Mixed Asphalt Concrete Ton,.00 $,0,. $. 0E0 Class E Asphalt Concrete Ton 0,.0 $,,00. $. 0E0 Class G Asphalt Concrete Ton,.0 $,,. $. 0E0 Class HR Asphalt Concrete Ton 0,0.0 $,,0. $. 0E0 Class S Asphalt Concrete Ton,00,.00 $,00,. $.00 0E0 Asphalt Concrete Composite Ton,.0 $,,. $. 0 0E Class QR Hot Mixed Asphalt Concrete Ton,0,. $,,0. $. 0E Class QR Hot Mixed Asphalt Concrete Ton,,.0 $0,,. $. 0E00 Asphalt Concrete Blade Laid Ton,. $,,. $. 0 0E Asphalt Concrete Leveling Lift Ton,.0 $,00,. $.0 0E000 Maintenance Patching Ton,0.0 $,0,0. $. 0E000 Compaction Sample Each.00 $,. $.0 0E0 Stabilizing Additive for Asphalt Concrete Ton,.00 $,,0. $. 0E000 Hydrated Lime Ton,0.0 $,0,. $. 0E Mineral Aggregate for Microsurfacing Ton,.0 $,,0. $. 0E0 Saw and Seal Shoulder Joint Ft,,.00 $,,0. $0. 0E00 Saw Joint in Asphalt Concrete Ft,.00 $0,. $0. 0E00 Grind " Rumble Strip or Stripe in Asphalt Concrete Mile,.0 $,,. $. 0E0 Grind " Rumble Strip or Stripe in Asphalt Concrete Mile,.0 $,,0. $0. 0E00 Grind Sinusoidal Centerline Rumble Stripe in Asphalt Mile.0 $,. $,. Concrete 0E Asphalt Bridge Joint Ft 0.00 $,0.00 $0. 0E00 MC-0 Asphalt for Prime Ton,.0 $,0,. $. 0E00 SS-h or CSS-h Asphalt for Tack Ton 0,.0 $,,. $. 0 0E0 SS-h or CSS-h Asphalt for Flush Seal Ton,.0 $,0,. $. 0E000 SS-h or CSS-h Asphalt for Fog Seal Ton,.0 $,,. $. 0E00 Blotting Sand for Prime Ton,.0 $,. $.0 0E000 Sand for Flush Seal Ton,.0 $,,. $. 0E000 Sand for Fog Seal Ton,0.00 $,0. $. E00 Cold Milling Asphalt Concrete SqYd,,.00 $,,. $0. E00 Cold Milling Asphalt Concrete and Placing Cold Milled Material SqYd,,.00 $,. $0. E00 Cold Milling Asphalt Concrete and Placing Cold Milled Material Ton,.00 $,00,.0 $. 0E00 Asphalt Concrete Crack Sealing Lb,,.00 $,,. $. 0E000 AES Asphalt for Surface Treatment Ton,.0 $,,. $.0 0E00 CRS-P Asphalt for Surface Treatment Ton,.0 $,,. $. 0E Type A Cover Aggregate Ton 0,.0 $,,. $. 0 0E0 Type B Cover Aggregate Ton,00.0 $,,.0 $. 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
6 0E0 Type A Cover Aggregate Ton,.0 $,,. $. 0E0 Type B Cover Aggregate Ton,.0 $,,. $0. 0E0 Modified Cover Aggregate Ton,. $,,. $. 0E000 " Nonreinforced PCC Pavement SqYd,.0 $,,. $. 0E000." Nonreinforced PCC Pavement SqYd,.0 $,,. $. 0E000 " Nonreinforced PCC Pavement SqYd,0.00 $0,0,. $. 0E000 " Nonreinforced PCC Pavement SqYd,0.0 $,0,. $. 0E00." Nonreinforced PCC Pavement SqYd.00 $,.00 $. 0E00 " Nonreinforced PCC Pavement SqYd,.0 $,,0. $. 0E0." Nonreinforced PCC Pavement SqYd,0.00 $,,.0 $. 0E000 Colored Nonreinforced PCC Pavement SqYd,.0 $,. $. 0E000 PCC Shoulder Pavement SqYd,. $,,0.0 $. 0E00 " Miscellaneous PCC Pavement SqYd.0 $,0.0 $. 0E0 " Miscellaneous PCC Pavement SqYd,.00 $,. $. 0E0 " Miscellaneous PCC Pavement SqYd,00.0 $,,0.0 $. 0E0 " Miscellaneous PCC Pavement SqYd,.00 $,. $0. 0E0 PCC Overlay, Furnish CuYd,.0 $,,. $. 0E " PCC Overlay, Placement SqYd,.0 $,,. $. 0E." PCC Overlay, Placement SqYd 0,.00 $,,. $. 0E0 Fast Track PCC Overlay, Furnish CuYd,0.00 $,. $. 0E0 Fast Track PCC Overlay, Placement SqYd 0,.0 $,. $. 0E " Barrier Type Median PCC Pavement SqYd.0 $0,.0 $. 0E " Barrier Type Colored Median PCC Pavement SqYd,0.0 $,,. $. 0E " Barrier Type Colored Median PCC Pavement SqYd.00 $,. $. 0E " Barrier Type Colored and Patterned Median PCC SqYd,. $,. $.0 Pavement 0E000 " PCC Driveway Pavement SqYd.0 $,.0 $.00 0E00 " PCC Driveway Pavement SqYd,. $,0. $. 0E00 " PCC Driveway Pavement SqYd,.0 $0,. $.0 0E0 " Fast Track Concrete Driveway Pavement SqYd.0 $,0. $. 0E0 " PCC Approach Pavement SqYd,.0 $,. $.0 0E0 " PCC Approach Pavement SqYd.00 $,.0 $0. 0E0 " PCC Approach Pavement SqYd,.0 $,,0. $. 0E " Fast Track Concrete Approach Pavement SqYd,.0 $,. $.0 0E0 " PCC Fillet Section SqYd,.0 $,. $. 0E00 " PCC Fillet Section SqYd,.0 $,. $. 0E00." PCC Fillet Section SqYd,.0 $,. $. 0E00 " PCC Fillet Section SqYd.0 $,. $. 0E00 " PCC Fillet Section SqYd,0. $,. $. 0E0 Fast Track Concrete SqYd,.0 $,,. $. 0E00 Fast Track Concrete for PCC Pavement Repair SqYd,.0 $,,. $0. 0E00 Nonreinforced PCC Pavement Repair SqYd,.00 $,0,. $. 0E00 PCC Pavement Partial Depth Patch SqFt,.00 $,0.0 $.0 0E000 Dowel Bar Each,00,.00 $,,. $.0 0E0 Insert Steel Bar in PCC Pavement Each,.00 $,,. $. 0E Tie Bar Retrofit Each,.00 $,. $. 0E00 Tie Bar Retrofit, Stitching Each,0.00 $0,00. $.0 0E00 Reseal PCC Pavement Joint - Silicone Ft,,.00 $,,0. $. 0E0 Reseal PCC Pavement Joint - Hot Pour Ft,0.00 $,. $. 0E Seal Random Cracks in PCC Pavement Ft,0.00 $,. $. 0 0E00 Planing PCC Pavement SqYd 0,.0 $,. $.0 0E Grinding PCC Pavement SqYd,0.00 $,.0 $.0 0E0 Temporary Gravel Crossing Each.00 $,.0 $,.0 0E00 Saw and Seal Joint Ft,,.00 $,,. $. 0E000 Repair Type A Spall SqFt,. $,0,. $. 0E0 Repair Type B Spall SqFt.0 $,0.00 $.00 E000 Structural Steel, Miscellaneous LS.00 $,,.0 $,. E0 Fatigue Retrofit Steel Girder, Type C Each,.00 $,0.00 $.0 E00 Field Weld In.00 $,.0 $.0 E0 Grind Weld In 0.00 $,.0 $. 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
7 E00 Jack Superstructure, Steel Girder Bridge LS.00 $,0.0 $,. E00 Bridge End Support LS.00 $,00. $,0.0 E000 Abutment Joint Drain Each.00 $,.0 $,0. E Laminated Elastomeric Bearing Pad Each.00 $,. $,. E0 Finger Type Expansion Joint Assembly Each.00 $,,. $,0.0 E0 Replace Expansion Device Each.00 $,0,. $,0. E00 Membrane Sealant Expansion Joint Ft,.0 $,,.0 $. E0 Magnetic Particle Weld Inspection In,.00 $,.00 $.0 E00 Bridge Repainting, Class I LS.00 $0,.0 $,. E0 Bridge Repainting, Class II LS.00 $,,. $,.0 E000 Rust Penetrating Sealer LS.00 $,. $,. E000 Paint Residue Containment LS.00 $,,.0 $,. 0E00 Structure Excavation, Bridge CuYd,.00 $,,. $0. 0E000 Structure Excavation, Box Culvert CuYd,0.00 $,. $.0 0E000 Structure Excavation, Retaining Wall CuYd,0.00 $0,.0 $.0 0E000 Structure Excavation, Miscellaneous CuYd.00 $,. $. E000 Box Culvert Undercut CuYd,.00 $,0,. $. E00 Footing Undercut CuYd,00.00 $,0.0 $. 0E000 Bridge End Embankment CuYd,.00 $,0,. $. 0E000 Granular Bridge End Backfill CuYd,.00 $,,0. $. 0E000 Bridge End Backfill Underdrain Pipe Ft 0.00 $,.0 $. 0E000 Bridge End Backfill Excavation CuYd 0.00 $,.0 $.0 0E0 Approach Slab Underdrain Excavation CuYd.0 $0,. $.0 0E000 Precast Concrete Headwall for Drain Each,00.00 $,. $. 0E0 " RCP Class, Furnish Ft.00 $,. $. 0E0 " RCP Class, Furnish Ft 0.00 $,. $. 0E00 " RCP, Install Ft.00 $,0. $. 0E0 " RCP Class, Furnish Ft.00 $,0. $.0 0E0 " RCP, Install Ft.00 $,. $. 0E0 " RCP Class, Furnish Ft,00.00 $,0,.0 $. 0E0 " RCP Class, Furnish Ft,.00 $,0. $. 0E0 " RCP, Install Ft,.00 $,,.00 $. 0E0 " RCP Class, Furnish Ft,.00 $,,. $.0 0E0 " RCP Class, Furnish Ft,.00 $0,. $. 0E0 " RCP Class, Furnish Ft,0.00 $,0. $. 0E0 " RCP, Install Ft 0,.00 $,,0.00 $. 0E0 0" RCP Class, Furnish Ft,0.00 $,00. $.0 0E0 0" RCP Class, Furnish Ft 0.00 $,.0 $. 0E0 0" RCP Class, Furnish Ft 0.00 $0,.00 $.00 0E0 0" RCP, Install Ft,0.00 $0,. $. 0E0 " RCP Class, Furnish Ft,.00 $,,. $.0 0E0 " RCP Class, Furnish Ft,.00 $,. $. 0E0 " RCP Class, Furnish Ft.00 $,. $.0 0E00 " RCP, Install Ft,.00 $,. $. 0E0 " RCP Class, Furnish Ft,.00 $,. $. 0E0 " RCP Class, Furnish Ft 0.00 $,0. $. 0E000 " RCP, Install Ft,.00 $,. $. 0E00 " RCP Class, Furnish Ft,.00 $0,0. $.0 0E00 " RCP Class, Furnish Ft,.00 $,. $. 0E00 " RCP Class, Furnish Ft 0.00 $,0. $. 0E0 " RCP, Install Ft,.00 $,0. $. 0E0 " RCP Class, Furnish Ft 0.00 $,0.00 $.0 0E0 " RCP Class, Furnish Ft.00 $,. $. 0E00 " RCP, Install Ft.00 $,0.0 $. 0E0 0" RCP Class, Furnish Ft.00 $,0. $. 0E0 0" RCP Class, Furnish Ft 0.00 $,.00 $. 0E0 0" RCP Class, Furnish Ft,00.00 $0,.0 $.0 0E00 0" RCP, Install Ft,.00 $,.0 $.0 0E0 " RCP Class, Furnish Ft.00 $,.00 $.0 0E00 " RCP, Install Ft.00 $0,.00 $.0 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
8 0E0 " RCP Class, Furnish Ft.00 $,.00 $.0 0E0 " RCP Class, Furnish Ft 0.00 $,00.00 $00.0 0E00 " RCP, Install Ft.00 $,.00 $.0 0E0 " RCP Class, Furnish Ft.00 $,.00 $0.0 0E00 " RCP, Install Ft.00 $,.00 $.0 0E0 " RCP Class, Furnish Ft 0.00 $,. $.0 0E00 " RCP, Install Ft,00.00 $0,.0 $. 0E00 " RCP Class, Furnish Ft 0.00 $,.0 $. 0E0 " RCP, Install Ft 0.00 $,. $0. 0E00 " RCP Bend, Furnish Each.00 $,0. $.0 0E00 " RCP Bend, Install Each.00 $,0. $. 0E0 " RCP Bend, Furnish Each.00 $,. $.0 0E0 " RCP Bend, Install Each.00 $,0. $.0 0E0 0" RCP Bend, Furnish Each.00 $,. $. 0E0 0" RCP Bend, Install Each.00 $,0. $. 0E0 " RCP Bend, Furnish Each.00 $,. $,. 0E0 " RCP Bend, Install Each.00 $,00. $. 0E000 RCP Tee, Furnish Each.00 $,0. $,. 0E00 RCP Tee, Install Each.00 $,. $. 0E000 RCP Cross, Furnish Each.00 $,. $,0. 0E00 RCP Cross, Install Each.00 $,0. $. 0E0 RCP Increaser, Furnish Each.00 $,. $. 0E RCP Increaser, Install Each.00 $,. $.0 0E0 RCP Reducer, Furnish Each.00 $,. $,0. 0E RCP Reducer, Install Each.00 $,. $. 0E00 " RCP Flared End, Furnish Each.00 $,. $. 0E00 " RCP Flared End, Install Each.00 $.00 $0. 0E00 " RCP Flared End, Furnish Each.00 $,. $. 0E00 " RCP Flared End, Install Each.00 $,. $. 0E0 " RCP Flared End, Furnish Each.00 $,0. $00. 0E0 " RCP Flared End, Install Each.00 $,. $. 0E0 0" RCP Flared End, Furnish Each.00 $,. $.0 0E0 0" RCP Flared End, Install Each.00 $,. $. 0E0 " RCP Flared End, Furnish Each.00 $,. $. 0E0 " RCP Flared End, Install Each.00 $,0.0 $. 0E0 " RCP Flared End, Furnish Each.00 $,. $0. 0E0 " RCP Flared End, Install Each.00 $,00. $. 0E0 " RCP Flared End, Furnish Each.00 $,. $,0. 0E0 " RCP Flared End, Install Each.00 $,. $0. 0E00 " RCP Flared End, Furnish Each.00 $,0.00 $,0. 0E0 " RCP Flared End, Install Each.00 $,.00 $. 0E0 0" RCP Flared End, Furnish Each.00 $,. $,. 0E0 0" RCP Flared End, Install Each.00 $,. $.0 0E0 " RCP Flared End, Furnish Each.00 $,00.00 $,.0 0E0 " RCP Flared End, Install Each.00 $,.00 $.00 0E0 " RCP Flared End, Furnish Each.00 $,0.00 $,0.00 0E0 " RCP Flared End, Install Each.00 $,.00 $.00 0E0 " RCP Flared End, Furnish Each.00 $,0.00 $,.00 0E0 " RCP Flared End, Install Each.00 $,.00 $.0 0E00 " RCP Flared End, Furnish Each.00 $,. $,. 0E0 " RCP Flared End, Install Each.00 $,. $,. 0E00 " RCP Sloped End, Furnish Each.00 $0,0. $. 0E0 " RCP Sloped End, Install Each.00 $,. $. 0E0 0" RCP Sloped End, Furnish Each.00 $0,0. $. 0E0 0" RCP Sloped End, Install Each.00 $,. $.0 0E0 " RCP Sloped End with Bars, Furnish Each 0.00 $,. $,. 0E0 " RCP Sloped End, Furnish Each.00 $,0. $,0. 0E0 " RCP Sloped End, Install Each.00 $,. $0. 0E " RCP Sectional End, Furnish Each.00 $0,0. $,0.0 0E " RCP Sectional End, Install Each.00 $,.0 $,. 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
9 0E0 " RCP Safety End with Bars, Furnish Each 0.00 $,.0 $. 0E0 " RCP Safety End, Install Each 0.00 $,.0 $. 0E0 " RCP Safety End, Furnish Each.00 $,.0 $. 0E0 " RCP Safety End with Bars, Furnish Each.00 $,. $,0. 0E0 " RCP Safety End, Install Each.00 $,0. $. 0E0 " RCP Safety End, Furnish Each.00 $,.0 $. 0E " RCP Safety End, Install Each.00 $,. $. 0E00 RCP Arch to Round Transition Furnish Each.00 $,. $,. 0E0 RCP Arch to Round Transition Install Each.00 $,.0 $. 0E00 " RCP Arch Class, Furnish Ft,.00 $,.0 $. 0E00 " RCP Arch Class, Furnish Ft,.00 $0,. $. 0E00 " RCP Arch Class, Furnish Ft.00 $,00.00 $0.00 0E0 " RCP Arch, Install Ft,.00 $,0.0 $. 0E0 " RCP Arch Class, Furnish Ft.00 $,.0 $.0 0E0 " RCP Arch Class, Furnish Ft.00 $,00. $.0 0E0 " RCP Arch Class, Furnish Ft.00 $,.0 $.0 0E00 " RCP Arch, Install Ft,0.00 $,.0 $.0 0E0 0" RCP Arch Class, Furnish Ft,.00 $,0. $. 0E0 0" RCP Arch Class, Furnish Ft,.00 $,. $. 0E00 0" RCP Arch, Install Ft,.00 $,0. $.00 0E0 " RCP Arch Class, Furnish Ft,.00 $,. $.0 0E0 " RCP Arch Class, Furnish Ft,.00 $,0. $. 0E00 " RCP Arch, Install Ft,.00 $,0. $. 0E0 " RCP Arch Class, Furnish Ft,.00 $,0. $.0 0E0 " RCP Arch Class, Furnish Ft,.00 $,. $.0 0E00 " RCP Arch, Install Ft,0.00 $,0.00 $. 0E0 " RCP Arch Class, Furnish Ft $,.00 $. 0E0 " RCP Arch Class, Furnish Ft,0.00 $,. $. 0E00 " RCP Arch, Install Ft,0.00 $,. $. 0E0 " RCP Arch Class, Furnish Ft.00 $,. $. 0E0 " RCP Arch Class, Furnish Ft,0.00 $,00.00 $. 0E00 " RCP Arch, Install Ft,.00 $,00. $. 0E0 0" RCP Arch Class, Furnish Ft,.00 $,.00 $. 0E00 0" RCP Arch, Install Ft,.00 $0,.0 $. 0E0 " RCP Arch Class, Furnish Ft,0.00 $,0. $. 0E00 " RCP Arch, Install Ft,0.00 $,.0 $. 0E0 " RCP Arch Bend, Furnish Each.00 $,.0 $. 0E0 " RCP Arch Bend, Install Each.00 $,.00 $. 0E00 " RCP Arch Flared End, Furnish Each.00 $,0.0 $. 0E0 " RCP Arch Flared End, Install Each.00 $,. $0. 0E0 0" RCP Arch Flared End, Furnish Each.00 $,. $. 0E0 0" RCP Arch Flared End, Install Each.00 $,. $.0 0E " RCP Arch Flared End, Furnish Each.00 $,. $,0. 0E " RCP Arch Flared End, Install Each.00 $,. $.0 0E " RCP Arch Flared End, Furnish Each.00 $,00.00 $, E " RCP Arch Flared End, Install Each.00 $,.00 $.00 0E0 " RCP Arch Flared End, Furnish Each.00 $,0. $,0. 0E " RCP Arch Flared End, Install Each.00 $,0.00 $.00 0E " RCP Arch Flared End, Furnish Each.00 $,0. $,. 0E " RCP Arch Flared End, Install Each.00 $,0.0 $. 0E " RCP Arch Flared End, Furnish Each.00 $,0.0 $,. 0E " RCP Arch Flared End, Install Each.00 $,. $,. 0E00 " RCP Arch Sloped End, Furnish Each.00 $,.00 $0.0 0E0 " RCP Arch Sloped End, Install Each.00 $,.00 $.0 0E0 0" RCP Arch Sloped End, Furnish Each.00 $,. $. 0E0 0" RCP Arch Sloped End, Install Each.00 $,. $0. 0E0 " RCP Arch Sloped End, Furnish Each.00 $,00.00 $, E0 " RCP Arch Sloped End, Install Each.00 $,0.00 $.00 0E0 " RCP Arch Safety End, Furnish Each.00 $,0.00 $.00 0E " RCP Arch Safety End, Install Each.00 $,0.00 $.00 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
10 0E Tie Bolts for RCP Each,.00 $,. $. 0E " CMP Gauge, Furnish Ft.00 $,.0 $. 0E0 " CMP, Install Ft.00 $,.0 $. 0E " CMP Gauge, Furnish Ft.00 $,. $. 0E " CMP Gauge, Furnish Ft,00.00 $0,.0 $. 0E " CMP Gauge, Furnish Ft,.00 $,0. $. 0E0 " CMP, Install Ft,.00 $,0.00 $. 0E " CMP Gauge, Furnish Ft.00 $,.0 $.0 0E " CMP Gauge, Furnish Ft.00 $,. $0. 0E " CMP Gauge, Furnish Ft,0.00 $,. $. 0E0 " CMP, Install Ft,.00 $,0. $. 0E 0" CMP Gauge, Furnish Ft 0.00 $,00.00 $.00 0E 0" CMP Gauge, Furnish Ft,0.00 $,.0 $.0 0E0 0" CMP, Install Ft,0.00 $,.0 $.0 0E " CMP Gauge, Furnish Ft.00 $,0.00 $. 0E " CMP Gauge, Furnish Ft 0.00 $,. $. 0E0 " CMP, Install Ft.00 $,0.0 $. 0E " CMP Gauge, Furnish Ft.00 $,. $. 0E " CMP Gauge, Furnish Ft.00 $,.0 $. 0E00 " CMP, Install Ft.00 $,. $. 0E00 " CMP Elbow, Furnish Each.00 $,. $. 0E00 " CMP Elbow, Install Each.00 $,. $0. 0E0 " CMP Elbow, Furnish Each.00 $,. $0. 0E0 " CMP Elbow, Install Each.00 $,. $. 0E0 " CMP Elbow, Furnish Each.00 $,. $. 0E0 " CMP Elbow, Install Each.00 $,. $.0 0E00 0" CMP Elbow, Furnish Each.00 $,. $0. 0E0 0" CMP Elbow, Install Each.00 $,. $. 0E0 " CMP Elbow, Furnish Each.00 $,0. $. 0E0 " CMP Elbow, Install Each.00 $. $0. 0E0 CMP Tee, Furnish Each.00 $,0. $. 0E CMP Tee, Install Each.00 $,0. $. 0E0 " CMP Flared End, Furnish Each.00 $00. $.0 0E0 " CMP Flared End, Install Each.00 $,0.0 $. 0E " CMP Flared End, Furnish Each.00 $,.0 $. 0E " CMP Flared End, Install Each.00 $,. $. 0E " CMP Flared End, Furnish Each.00 $,.0 $. 0E " CMP Flared End, Install Each.00 $,. $. 0E 0" CMP Flared End, Furnish Each.00 $,0.0 $0. 0E0 0" CMP Flared End, Install Each.00 $,0. $0. 0E " CMP Flared End, Furnish Each.00 $,. $. 0E " CMP Flared End, Install Each.00 $,.0 $0.0 0E " CMP Flared End, Furnish Each.00 $,0. $.0 0E " CMP Flared End, Install Each.00 $,00. $.0 0E0 " CMP Sloped End, Furnish Each.00 $,0.00 $0.00 0E0 " CMP Sloped End, Install Each.00 $,00.00 $. 0E " CMP Sloped End, Furnish Each.00 $0,0.00 $. 0E " CMP Sloped End, Install Each.00 $,0.00 $. 0E 0" CMP Sloped End, Furnish Each.00 $,00.00 $.0 0E 0" CMP Sloped End, Install Each.00 $00.00 $.00 0E " CMP Sloped End with Bars, Furnish Each.00 $,00.00 $, E " CMP Sloped End, Install Each.00 $,0.00 $.00 0E " CMP Sloped End with Bars, Furnish Each.00 $,0.00 $,0.00 0E " CMP Sloped End, Install Each.00 $,.00 $.00 0E0 " CMP Safety End, Furnish Each 0.00 $,. $.0 0 0E0 " CMP Safety End, Install Each 0.00 $,. $. 0 0E " CMP Safety End, Furnish Each.00 $,.0 $. 0E " CMP Safety End, Install Each.00 $,. $. 0E0 " CMP Arch Gauge, Furnish Ft,.00 $,0.0 $.0 0E " CMP Arch, Install Ft,.00 $0,.0 $.0 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
11 0E " CMP Arch Gauge, Furnish Ft.00 $,.0 $. 0E0 " CMP Arch, Install Ft.00 $,.0 $.0 0E 0" CMP Arch Gauge, Furnish Ft.00 $,.0 $0.0 0E0 0" CMP Arch, Install Ft.00 $,.00 $0. 0E " CMP Arch Gauge, Furnish Ft.00 $,0.0 $0. 0E0 " CMP Arch, Install Ft.00 $,0. $. 0E " CMP Arch Gauge, Furnish Ft 0.00 $,0. $.0 0E0 " CMP Arch, Install Ft 0.00 $,0.0 $.0 0E0 " CMP Arch Flared End, Furnish Each.00 $.0 $.0 0E0 " CMP Arch Flared End, Install Each.00 $.00 $.00 0E " CMP Arch Flared End, Furnish Each.00 $,0. $. 0E " CMP Arch Flared End, Install Each.00 $,00. $. 0E 0" CMP Arch Sloped End, Furnish Each.00 $,. $. 0E 0" CMP Arch Sloped End, Install Each.00 $,0. $. 0E " CMP Arch Sloped End with Bars, Furnish Each.00 $0,. $,. 0E " CMP Arch Sloped End, Install Each.00 $,.00 $0. 0E00 " CMP Arch Safety End, Furnish Each.00 $,.0 $. 0E00 " CMP Arch Safety End, Install Each.00 $,.00 $.0 0E0 " CMP Arch Safety End, Furnish Each.00 $,0.00 $.00 0E0 " CMP Arch Safety End, Install Each.00 $,.00 $.0 0E0 0" CMP Arch Safety End with Bars, Furnish Each.00 $,.00 $,.0 0E0 0" CMP Arch Safety End, Install Each.00 $0.00 $.0 0E00 " CMP Arch Safety End, Furnish Each.00 $,0.00 $,. 0E0 " CMP Arch Safety End, Install Each.00 $,.00 $. 0E0 " CMP Arch Safety End with Bars, Furnish Each.00 $,. $,. 0E0 " CMP Arch Safety End, Install Each.00 $,.0 $.0 0E " Slotted CMP Gauge, Furnish Ft,0.00 $,.00 $. 0E " Slotted CMP, Install Ft,0.00 $,0.00 $. 0E " High Density Polyethylene Pipe, Furnish Ft.00 $. $. 0E000 " High Density Polyethylene Pipe, Install Ft.00 $,.0 $. 0E00 " High Density Polyethylene Pipe, Furnish Ft.00 $,0. $. 0E00 " High Density Polyethylene Pipe, Install Ft.00 $,. $0. 0E00 " High Density Polyethylene Pipe, Furnish Ft.00 $,.0 $.0 0E00 " High Density Polyethylene Pipe, Install Ft.00 $,.00 $. 0E00 " High Density Polyethylene Pipe, Furnish Ft,.00 $,. $. 0E0 " High Density Polyethylene Pipe, Install Ft,.00 $,0. $.0 0E0 " High Density Polyethylene Pipe, Furnish Ft.00 $,.00 $. 0E00 " High Density Polyethylene Pipe, Install Ft.00 $,.00 $. 0E0 " High Density Polyethylene Pipe, Furnish Ft.00 $,0.00 $. 0E00 " High Density Polyethylene Pipe, Install Ft.00 $,.00 $.00 0E00 High Density Polyethylene Pipe Bend, Furnish Each.00 $,0.0 $. 0E0 High Density Polyethylene Pipe Bend, Install Each.00 $,.00 $.0 0E00 High Density Polyethylene Pipe Tee, Furnish Each.00 $,.0 $. 0E0 High Density Polyethylene Pipe Tee, Install Each.00 $,.00 $. 0E " Steel Pipe, Furnish Ft 0.00 $,. $. 0E " Steel Pipe, Furnish Ft.00 $,.0 $. 0E " Steel Pipe, Furnish Ft,0.00 $,.0 $. 0E00 " RCP to CMP Transition, Furnish Each.00 $,0. $. 0E0 " Pipe Transition, Install Each.00 $,. $0. 0E0 " CMP to RCP Transition, Furnish Each.00 $.00 $0.00 0E0 " RCP to CMP Transition, Furnish Each.00 $,. $. 0E0 " Pipe Transition, Install Each.00 $,. $. 0E0 0" RCP to CMP Transition, Furnish Each.00 $,. $. 0E00 0" Pipe Transition, Install Each.00 $,. $0. 0E00 " Pipe Transition, Install Each.00 $,. $. 0E " Smooth Tapered Sleeve, Furnish Each.00 $,0. $0.0 0E " Smooth Tapered Sleeve, Install Each.00 $,. $. 0E00 Culvert Joint Cleaning Ft,.00 $,00. $. 0E0 Repair Culvert Joint Ft,.00 $,. $. 0E Chemical Grout Void Fill Gal,0.0 $,.0 $0. 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
12 0E0 Storm Sewer Video Inspection Ft,0.00 $,0.0 $.0 0E00 Trash Guard, Furnish Each.00 $,0.0 $.0 0E0 Trash Guard, Install Each.00 $. $. 0E00 Flap Gate Each.00 $,.00 $,0. 0E00 Cleanout Pipe Culvert Each.00 $,. $,0.0 0E000 Reset Pipe Ft,.00 $,0.0 $. 0E00 Reset Pipe End Section Each,.00 $,.0 $.0 0E Slipline " Pipe Ft,.00 $,00.00 $.00 0E Slipline " Pipe Ft.00 $,0.00 $0.00 E000 " PVC Encasement Pipe Ft,0.00 $,. $0. E00 " PVC Encasement Pipe Ft.00 $,. $. E0 " Steel Encasement Pipe Ft,00.00 $,. $. E000 Install Carrier Pipe Ft 0.00 $,.0 $.0 E00 Pipe Encasement Each.00 $,00. $,.00 E00 /" High Density Polyethylene Pipe Ft.00 $,. $0. E00 " High Density Polyethylene Pipe Ft.00 $,.0 $. E00." PVC Pipe Ft $,.00 $. E0 " PVC Pipe Ft,00.00 $,00.00 $. E0 " PVC Pipe Ft.00 $,. $. E0 " PVC Pipe Ft.00 $,0. $. E0 " PVC Pipe Ft.00 $,. $. E0 " PVC Pipe Ft.00 $,. $. E00 " PVC Water Main Ft 0.00 $,.0 $.0 E00 " PVC Water Main Ft,.00 $0,. $.0 E00 " PVC Water Main Ft,0.00 $,. $. E0 " PVC Water Main Ft,0.00 $,.0 $. E0 " PVC Water Main Ft,.00 $0,0.0 $. E0 " PVC Water Main Ft,00.00 $,0.00 $0.0 E0 " PVC Restrained Joint Water Main Ft.00 $,. $. E0 " PVC Restrained Joint Water Main Ft,0.00 $,. $. E0 " PVC Restrained Joint Water Main Ft,.00 $,0,.0 $. E00 " PVC Restrained Joint Water Main Ft.00 $,. $. E0 " PVC Restrained Joint Water Main Ft,0.00 $,0. $.0 E0 " PVC Restrained Joint Water Main Ft,.00 $,0.0 $. E0 " Water Main Restraining Device Each.00 $,. $. E0 " Water Main Restraining Device Each 0.00 $,.0 $. E0 " Water Main Restraining Device Each.00 $,00. $. E0 " Water Main Restraining Device Each.00 $0,0. $. E00 " Copper Pipe Ft,.00 $,. $. E00." Copper Pipe Ft.00 $,0.00 $.0 E00 " Copper Pipe Ft.00 $,.0 $. E0 " PVC Sewer Pipe Ft,0.00 $,. $0. E0 " PVC Sewer Pipe Ft,0.00 $,0,0. $. E " PVC Sewer Pipe Ft.00 $,0.00 $. E " PVC Sewer Pipe Ft.00 $,. $. E " PVC Force Main Ft,.00 $,.00 $.0 E " Sewer Service Ft,.00 $0,. $0. E " Sewer Service Ft,.00 $,. $. E " Water Service Each.00 $0,0. $,. E." Water Service Each.00 $0,. $,. E " Water Service Each.00 $,. $. E " Sanitary Sewer Service Cleanout Each.00 $,. $. E Sanitary Sewer Video Inspection Ft 0,.00 $,. $. E0 "x" Pipe Wye Each.00 $,.0 $.0 E0 "x" Pipe Wye Each.00 $,0. $. E00 "x" Pipe Wye Each.00 $,00. $00. E0 "x" Pipe Tee Each.00 $,. $. E "x" Pipe Tee Each.00 $,. $. E "x" Pipe Tee Each.00 $0,.0 $0. E "x" Pipe Tee Each.00 $,. $. 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
13 E "x" Pipe Tee Each.00 $,. $. E "x" Pipe Tee Each.00 $,. $. E0 "x" Pipe Tee Each.00 $,. $,. E "x" Pipe Tee Each.00 $,. $,0. E "x" Pipe Tee Each.00 $,. $,. E "x" Pipe Tee Each.00 $,. $,. E "x" Pipe Tee Each.00 $,. $,. E "x" Pipe Cross Each.00 $,. $. E "x" Pipe Cross Each.00 $,. $. E "x" Pipe Cross Each.00 $,0.0 $. E "x" Pipe Cross Each.00 $,. $.0 E "x" Pipe Cross Each.00 $,. $. E "x" Pipe Cross Each.00 $,0. $,0. E "x" Pipe Cross Each.00 $,.0 $,0.0 E "x" Pipe Cross Each.00 $,. $,.0 E "x" Pipe Cross Each.00 $,. $,. E0 "x" Pipe Reducer Each.00 $,.0 $.0 E "x" Pipe Reducer Each.00 $,. $.0 E "x" Pipe Reducer Each.00 $,. $. E "x" Pipe Reducer Each.00 $,. $. E "x" Pipe Reducer Each.00 $,. $. E "x" Pipe Reducer Each.00 $,. $. E "x" Pipe Reducer Each.00 $,. $. E "x" Pipe Reducer Each.00 $,.0 $. E00 Tapping Saddle Each.00 $,.0 $. E0 " Corporation Stop with Tapping Saddle Each.00 $,. $. E0." Corporation Stop with Tapping Saddle Each.00 $,0. $. E0 " Corporation Stop with Tapping Saddle Each.00 $,. $. E0 " Curb Stop with Box Each.00 $,. $. E0." Curb Stop with Box Each.00 $,. $. E0 " Curb Stop with Box Each.00 $,. $. E00 " Pipe Bend Each.00 $,0. $. E00 " Pipe Bend Each.00 $,. $0. E00 " Pipe Bend Each.00 $,. $. E0 " Pipe Bend Each.00 $,00. $. E0 " Pipe Bend Each.00 $0,. $,0. E " Pipe Cap Each.00 $,0.0 $. E " Pipe Cap Each.00 $,. $0. E " Pipe Cap Each.00 $,. $. E0 " Pipe Cap Each.00 $,0. $. E " Pipe Cap Each.00 $,.0 $. E " Pipe Cap Each.00 $,.0 $. E0 " Pipe Coupling Each.00 $,0. $0. E0 " Pipe Coupling Each.00 $0,. $.0 E0 " Pipe Coupling Each 0.00 $,. $. E " Pipe Coupling Each.00 $,. $0. E " Pipe Coupling Each.00 $,. $. E0 " Pipe Transition Coupling Each.00 $,0. $. E0 " Pipe Transition Coupling Each.00 $,0. $. E0 " Pipe Transition Coupling Each.00 $,0. $.0 E " Pipe Plug Each.00 $,. $. E " Pipe Plug Each.00 $,. $.0 E " Pipe Plug Each.00 $,. $.0 E " Pipe Plug Each.00 $,. $. E0 " Pipe Sleeve Each.00 $,. $.0 E0 " Pipe Sleeve Each.00 $,00. $.0 E0 " Pipe Sleeve Each.00 $,. $. E " Pipe Sleeve Each.00 $,.0 $. E0 " Oversize Pipe Sleeve Each.00 $,. $. E0 " Air Release Valve Assembly Each.00 $,00.00 $,.00 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
14 E0 " Air Release Valve Assembly Each.00 $0,0.00 $,.00 E " Butterfly Valve with Box Each.00 $,00.00 $,00.00 E " Butterfly Valve with Box Each.00 $,0.00 $,00.00 E0 " Gate Valve with Box Each.00 $,0.00 $,.00 E0 " Gate Valve with Box Each.00 $,. $,. E0 " Gate Valve with Box Each.00 $,00.0 $,. E0 " Gate Valve with Box Each.00 $,0. $,. 0 E " Gate Valve with Box Each 0.00 $,0. $,. E " Gate Valve with Box Each.00 $,. $,. E " Gate Valve with Box Each.00 $,. $,. E0 Tracer Wire Access Box Each.00 $,. $. E00 Pipe Insulation SqFt,.00 $,.0 $.0 E0 " Fire Hydrant Extension Each.00 $,0. $. E " Fire Hydrant Extension Each.00 $,0. $. E " Fire Hydrant Extension Each.00 $,0. $. E " Fire Hydrant Extension Each.00 $,.0 $. E0 0" Fire Hydrant Extension Each.00 $,. $,. E " Fire Hydrant Extension Each.00 $,. $,. E " Fire Hydrant Extension Each.00 $,0. $,. E " Fire Hydrant Extension Each.00 $,.0 $,. E0 Standard Fire Hydrant Each.00 $,. $,0. E Temporary Fire Hydrant Each.00 $,. $. E Fire Hydrant with Auxiliary Valve & Box Each.00 $0,. $,. E Thrust Block Each.00 $,. $. E0 Casing Pipe Spacer Each.00 $,. $. E0 Meter Pit Each.00 $,0. $,. E0 Type Bedding Material Ton.00 $,. $.0 E0 Type Foundation Material Ton,0.00 $,.00 $. E0 Type Foundation Material Ton,.00 $,0. $. E0 Trench Stabilization Material Ton $,0.00 $. E Imported Trench Backfill CuYd,00.00 $,.0 $. 0 E0 Pipe Bedding Material Ton 0.00 $,.0 $. E Water Main Bedding Material Ft,0.00 $,. $. E " Sewer Pipe Bedding Material Ft,.00 $,. $. E " Sewer Pipe Bedding Material Ft,.00 $,. $. E " Sewer Pipe Bedding Material Ft,.00 $,. $. E " Sewer Pipe Bedding Material Ft.00 $,. $. E0 Rock Excavation, Trench CuYd $,.00 $0. E0 Trench ' to ' Deep Ft.00 $,. $. E0 Trench ' to ' Deep Ft,0.00 $,. $. E0 Trench ' to ' Deep Ft.00 $,. $. E Bore and Jack " Pipe Ft.00 $,0. $. E Bore and Jack " Pipe Ft $,00.00 $.00 E Bore and Jack " Pipe Ft 0.00 $,.00 $.0 E Bore and Jack " Pipe Ft 0.00 $, $.00 E Bore and Jack " Pipe Ft 0.00 $,.0 $. E Bore and Jack " Pipe Ft 0.00 $0,. $. E Bore and Jack " Pipe Ft.00 $,. $. E00 " Water Service, Connect Charge Each.00 $,. $.0 E00 Adjust Water Valve Box Each 0.00 $,. $. E0 Reconnect Water Service Each.00 $,. $. E Abandon Water Main Each.00 $,. $. E Connect To Existing Water Main Each.00 $,. $,. E Cut and Tie to Existing Water Main Each 0.00 $,. $,. E Temporary Water Main Bypass Each.00 $,. $,. E Remove and Reset Fire Hydrant Each.00 $,0.00 $,.00 E00 Abandon Sewer Service Each.00 $,. $. E00 Adjust Sewer Service Each.00 $,. $,0. E0 Reconnect Sewer Service Each.00 $,0. $. E0 Connect Sewer Service Each.00 $,0. $0. 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
15 E0 Connect to Existing Sewer Main Each.00 $,. $. 0 E00 Sewer Bypass Pumping LS.00 $,. $,. E0 Test Station Each.00 $,. $0. E00 Locate Utilities Each.00 $,. $. E Verify Utilities Each.00 $0. $. E0 Exploratory Excavation Hour 0.00 $,0.0 $. E000 PVC Pipe Deflection Test Ft 0,.00 $,. $0. E0 Pipe Exfiltration Test Ft,.00 $,. $0. 0E000 Class A Concrete, Bridge Deck CuYd,.0 $,,00.00 $. 0E000 Class A Concrete, Bridge CuYd 0,.0 $0,,. $0.0 0E000 Class A Concrete, Self Consolidating CuYd.0 $0,.0 $,. 0E000 Class A Concrete, Bridge Repair CuYd.0 $0,. $,. 0E00 Class A Concrete, Miscellaneous CuYd.00 $,. $,0. 0E0 Class A Concrete, Box Culvert CuYd,0.0 $,0,0. $. 0E0 Concrete Approach Slab for Bridge SqYd,0.00 $,0,. $.0 0E0 Concrete Approach Sleeper Slab for Bridge SqYd,.0 $,,. $. 0E0 Concrete Patching Material, Bridge Deck CuFt,.0 $,,. $. 0E0 Concrete Patching Material, Miscellaneous CuFt,.00 $,0,.0 $. 0E00 Concrete Crack Injection/Sealing In.00 $,.00 $.0 0E000 Special Surface Finish SqFt,0.00 $0,0. $.0 0E00 Anti-Graffiti Coating SqFt,.00 $,.00 $. 0E000 Breakout Structural Concrete CuYd,.0 $,,. $,.0 0 0E0 Breakout and Replace Grout Pad Each.00 $,00.00 $,. 0E00 Install Dowel in Concrete Each,.00 $,.0 $. 0E0 Install Dowel in Rock Ft,0.00 $,.00 $. 0E000 Deck Drain, Girder Bridge Each.00 $0,. $. 0E00 Roadway Canopy LS.00 $,. $,. 0E00 Composite Fabric Wrap, Concrete Repair SqFt,.00 $,0. $. E00 Class M Concrete CuYd,. $,0,. $,0.0 E00 Cellular Grout CuYd.0 $,0.0 $. E00 Controlled Density Fill CuYd,.0 $,,. $.0 E00 Class A Concrete, Drilled Shaft CuYd,0.0 $,,. $. E000 Drilled Shaft Excavation CuYd,.0 $,,. $. E000 Crosshole Sonic Log (CSL) Test Each.00 $,. $,. E " Permanent Casing Ft.00 $,.00 $0.00 E " Permanent Casing Ft,.00 $,0. $.0 0E000 Pipe Handrail Ft,0.0 $0,.0 $. 0E000 Steel Pedestrian Railing Ft,00. $0,. $. 0E000 Steel Bicycle Railing Ft 0.00 $,.0 $. 0E0 Steel Pedestrian Railing on Sidewalk Ft,.00 $,. $. 0E00 Steel Pedestrian Railing on Concrete Barrier Ft.0 $,. $. 0E0 Type SL- Bridge Railing Ft,.00 $,.0 $. 0E00 Type T Bridge Railing Ft,.00 $,.0 $. 0E00 Type T Bridge Railing Ft.00 $,.0 $. 0E00 Reset Thrie Beam Bridge Rail Ft $,.0 $. 0E00 Reinforcing Steel Lb,0,.00 $,,. $. 0E000 Epoxy Coated Reinforcing Steel Lb,0,.00 $,,. $.0 0E000 Stainless Reinforcing Steel Lb 0,00.00 $,,.0 $. 0E00 No. Rebar Splice Each,0.00 $,. $. 0E00 No. Rebar Splice Each,0.00 $,. $0. 0E00 No. Rebar Splice Each,.00 $,0.0 $. 0E00 No. Rebar Splice Each,0.00 $0,0. $. 0E0 No. Rebar Splice Each,.00 $,.0 $. 0E0 No. Rebar Splice Each.00 $,.0 $. 0E000 Galvanic Anode Each,.00 $,. $. E000 Two Coat Bridge Deck Polymer Chip Seal SqYd,,0.0 $,0,0. $. E000 Two Coat Bridge Deck Polymer High Friction Chip Seal SqYd,.0 $,. $. E00 Bridge Deck Polymer Chip Seal SqYd,.00 $,0.0 $0.0 E00 Bridge Deck Polymer Chip Seal Placed on Existing Chip Seal SqYd,.0 $,.0 $. E000 Spot Repair of Existing Bridge Deck Chip Seal SqYd.00 $,.0 $. 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
16 E00 Abrasive Blasting of Bridge Deck SqYd,,. $,0,. $. E0 Bridge Deck Grinding SqYd,,. $,,. $.0 E0 Concrete Removal, Class A SqYd,.0 $,0,0. $. E0 Concrete Removal, Class B SqYd,.0 $,,0. $. E00 Extract Pile Each $,00. $0.00 E000 Preboring Pile Ft,00.00 $,.0 $. E0 Micropile Verification Load Test Each.00 $,,. $0,. E0 Micropile Proof Load Test Each 0.00 $,,.0 $,. E Micropile Each,.00 $,0,00.0 $,. E HP Pile Tip Reinforcement Each 0.00 $,. $00. E HP x Steel Test Pile, Furnish and Drive Ft,.00 $,0.0 $.0 E HP x Steel Bearing Pile, Furnish and Drive Ft,.00 $,,.0 $. E0 HP x Steel Test Pile, Furnish and Drive Ft,00.00 $,.0 $.0 E0 HP x Steel Bearing Pile, Furnish and Drive Ft,0.00 $,,.0 $.0 E HP x Steel Test Pile, Furnish and Drive Ft.00 $,. $. E HP x Steel Bearing Pile, Furnish and Drive Ft,.00 $,,. $. E HP x Steel Test Pile, Furnish and Drive Ft 0.00 $,.0 $. E HP x Steel Bearing Pile, Furnish and Drive Ft,0.00 $,. $.0 E000 Dynamic Pile Test (during driving) Each.00 $,0.00 $,.00 E0 Dynamic Pile Test (during restrike) Each.00 $,00.00 $,0.00 E00 Static Pile Load Test Each.00 $,0.00 $,0.00 E00 Sheet Piling, Furnish and Drive SqFt,.00 $0,.0 $0. 0E000 Type C Concrete Retaining Wall SqFt,.00 $,. $. 0E0 Special Type C Concrete Retaining Wall SqFt,0.00 $,0,. $. 0E0 Reset MSE Segmental Block Wall SqFt,.00 $0,00. $. 0E00 MSE Large Panel Wall, Furnish SqFt,.00 $,,.0 $. 0E0 MSE Large Panel Wall, Install SqFt,.00 $,0.0 $. 0E00 Gravity Segmental Block Wall SqFt,0.00 $,0.00 $. 0E00 Gravity Large Concrete Block Wall SqFt,.00 $0,0. $. 0E00 Granular Backfill for MSE Large Panel Wall CuYd,.00 $,,. $.0 0E00 Low Slump Dense Concrete Bridge Deck Overlay CuYd,.00 $,0,. $. 0E00 Concrete Removal Type A SqYd,.0 $,,. $0. 0E0 Concrete Removal Type A SqYd,.0 $0,0.0 $. 0E00 Concrete Removal Type B SqYd,.0 $,. $. 0E0 Concrete Removal Type C SqYd,.0 $,0.0 $. 0E0 Concrete Removal Type D SqYd,.0 $,0. $. 0E0 Concrete Removal Type B Ft,.00 $,. $. 0E000 Class A Concrete Fill CuYd.0 $,. $0. 0E000 Finishing and Curing SqYd,.0 $,0,0. $. 0E0 'x' Precast Concrete Box Culvert, Furnish Ft.00 $,0.00 $.0 0E0 'x' Precast Concrete Box Culvert, Install Ft.00 $,.00 $.00 0E0 'x' Precast Concrete Box Culvert, Furnish Ft 0.00 $,.00 $0.0 0E0 'x' Precast Concrete Box Culvert, Install Ft 0.00 $,0.00 $.00 0E0 'x' Precast Concrete Box Culvert, Furnish Ft.00 $,. $. 0E0 'x' Precast Concrete Box Culvert, Install Ft.00 $,.0 $. 0E 'x' Precast Concrete Box Culvert End Section, Furnish Each.00 $,0.00 $,0.00 0E 'x' Precast Concrete Box Culvert End Section, Install Each.00 $,0.00 $,0.00 0E 'x' Precast Concrete Box Culvert End Section, Furnish Each.00 $,00.00 $, E 'x' Precast Concrete Box Culvert End Section, Install Each.00 $,0.00 $,0.00 0E 'x' Precast Concrete Box Culvert End Section, Furnish Each.00 $,0. $,0. 0E 'x' Precast Concrete Box Culvert End Section, Install Each.00 $0,. $,.0 0E00 -'x' Precast Concrete Box Culvert, Furnish Ft.00 $, $,.0 0E0 -'x' Precast Concrete Box Culvert, Install Ft.00 $,.00 $.00 0E -'x' Precast Concrete Box Culvert, Furnish Ft.00 $,. $,0.0 0E -'x' Precast Concrete Box Culvert, Install Ft.00 $,0.00 $. 0E -'x' Precast Concrete Box Culvert, Furnish Ft.00 $,0.00 $,. 0E -'x' Precast Concrete Box Culvert, Install Ft.00 $,00.00 $.0 0E -'x' Precast Concrete Box Culvert, Furnish Ft 0.00 $,.0 $,.0 0E -'x' Precast Concrete Box Culvert, Install Ft 0.00 $0,0.0 $.0 0E -'x' Precast Concrete Box Culvert, Furnish Ft.00 $,. $,. 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
17 0E -'x' Precast Concrete Box Culvert, Install Ft.00 $,.00 $.0 0E0 -'x' Precast Concrete Box Culvert, Furnish Ft.00 $,0,. $,. 0E -'x' Precast Concrete Box Culvert, Install Ft.00 $,0. $. 0E00 -'x' Precast Concrete Box Culvert End Section, Furnish Each.00 $,0.00 $,.00 0E0 -'x' Precast Concrete Box Culvert End Section, Install Each.00 $,0.00 $,0.00 0E -'x' Precast Concrete Box Culvert End Section, Furnish Each.00 $,. $,.0 0E -'x' Precast Concrete Box Culvert End Section, Install Each.00 $,00.00 $,0.00 0E -'x' Precast Concrete Box Culvert End Section, Each.00 $0,. $,. Furnish 0E -'x' Precast Concrete Box Culvert End Section, Install Each.00 $,0.00 $,.0 0E -'x' Precast Concrete Box Culvert End Section, Furnish Each.00 $,. $,. 0E -'x' Precast Concrete Box Culvert End Section, Install Each.00 $,00.00 $,. 0E -'x' Precast Concrete Box Culvert End Section, Each.00 $0,.0 $,.0 Furnish 0E -'x' Precast Concrete Box Culvert End Section, Install Each.00 $,.0 $,. 0E0 -'x' Precast Concrete Box Culvert End Section, Each.00 $,0. $0,. Furnish 0E -'x' Precast Concrete Box Culvert End Section, Install Each.00 $,.0 $,. 0E00 'x' Reinforced Concrete Cattle Pass, Furnish Ft 0.00 $,. $. 0E00 'x' Reinforced Concrete Cattle Pass, Install Ft 0.00 $,. $. 0E00 'x' Reinforced Concrete Cattle Pass, Furnish Ft.00 $,0.00 $0.0 0E00 'x' Reinforced Concrete Cattle Pass, Install Ft.00 $,.00 $.0 0E0 'x' Reinforced Concrete Cattle Pass End Section, Furnish Each.00 $,0.00 $,0.00 0E0 'x' Reinforced Concrete Cattle Pass End Section, Install Each.00 $,0.00 $.00 0E0 Reset Reinforced Concrete Cattle Pass Ft 0.00 $,. $. 0E Reset Reinforced Concrete Cattle Pass End Section Each.00 $,.0 $. 0E0 " Minnesota Shape Prestressed Concrete Beam Ft,0.00 $,0,. $. 0E0 " Minnesota Shape Prestressed Concrete Beam Ft,00.00 $,,. $. 0E0 " Minnesota Shape Prestressed Concrete Beam Ft,0.00 $,,. $.00 0E '-" Wide Deck Prestressed Concrete Bulb Tee Ft $,00.00 $.00 0E '-" Wide Deck x " Prestressed Concrete Double Tee Ft,0.00 $,.00 $. 00E00 Type I Field Laboratory Each.00 $,. $,. 00E000 Type II Field Laboratory Each.00 $0,0. $,.0 00E000 Type III Field Laboratory Each.00 $,,.0 $,. E00 ' Cattle Guard Each.00 $,00.00 $,0.00 E000 0' Cattle Guard Each.00 $,00.00 $,00.00 E00 Reset Cattle Guard Each.00 $,.0 $,0. 0E000 Type Right-of-Way Fence Ft,.00 $0,. $. 0E000 Type Right-of-Way Fence Ft,0.00 $0,. $. 0E000 Type Right-of-Way Fence Ft,.00 $,. $. 0E000 Type Right-of-Way Fence Ft 0.00 $,0.00 $. 0E000 Type Right-of-Way Fence Ft,0.00 $,0.0 $. 0E0 Type s Right-of-Way Fence Ft,0.00 $,.0 $. 0E00 Modified Type Right-of-Way Fence Ft,0.00 $,.0 $. 0E00 Modified Type Right-of-Way Fence Ft,.00 $,0.00 $.0 0E0 Type Temporary Fence Ft,.00 $,0. $. 0E0 Type A Temporary Fence Ft,.00 $,.00 $.0 0E00 Type Temporary Fence Ft,.00 $,. $. 0E0 Post Panel Each,.00 $,0. $. 0E0 Post Panel Each,.00 $,00.0 $. 0E0 ' Tubular Gate Each.00 $,.00 $.00 0E0 Reset Gate Each.00 $,0.00 $0.00 0E0 Reset Fence Ft,.00 $,.0 $. E000 ' Chain Link Fence with Top Rail Ft,0.00 $,. $. E000 ' Chain Link Fence with Top Rail Ft.00 $,0. $. E0 ' Chain Link Fence with Tension Wired Top Ft,.00 $,0. $. E00 ' Chain Link Fence with Tension Wired Top Ft 0.00 $,.00 $. E0 ' Chain Link Fence with Tension Wired Top Ft,.00 $,0.0 $.0 E00 Special ' Chain Link Fence Ft.00 $,.0 $. E000 Chain Link Fence for Bridge Sidewalk Ft,0.00 $,.0 $0. 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
18 E0 Pedestrian Swing Gate Each.00 $,. $,. E00 Double Vehicular Swing Gate Each.00 $,. $,. E00 Reset Chain Link Fence Ft,0.00 $,. $0.0 E0 Concrete Barrier End Protection Each.00 $,. $,. E0 Concrete Barrier End Protection Module Set or Repair Kit Each.00 $,. $,00. E00 Cable Guardrail Ft,.00 $,0. $. E00 NCHRP 0 Test Level High Tension Cable Guardrail Ft,0.00 $,0. $. E000 Reset Cable Guardrail Ft 0,.00 $0,. $. E00 NCHRP 0 Test Level High Tension Cable Guardrail Each.00 $,. $,.0 Anchor Assembly E000 Cable Guardrail Slip Base Anchor Assembly Each.00 $,. $,. E000 Cable Guardrail Anchor Assembly Each.00 $,. $,. E0 Reset Cable Guardrail Anchor Assembly Each.00 $,. $. E000 W Beam to High Tension Cable Guardrail Transition Each.00 $,00.00 $,00.00 E0 Furnish High Tension Cable Guardrail Post and Sleeve Each 0.00 $,.0 $. E000 Cable Guardrail Ft 0,0.00 $,.0 $. E0 Interim Crossover Closure Ft,.00 $,. $. E00 Reset Crossover Closure Ft,00.00 $,.0 $. E00 Reset Interim Crossover Closure Ft,.00 $,00. $.0 0E00 Straight Class A Thrie Beam Guardrail with Wood Posts Ft 0.00 $,0.00 $.0 0E00 Straight Double Class A Thrie Beam Guardrail with Wood Ft,0.00 $,.0 $. Posts 0E Straight Class A W Beam Guardrail with Wood Posts Ft,0.0 $,. $. 0E Straight Class A W Beam Guardrail with CRT Posts Ft.00 $,0. $. 0E Curved Class A W Beam Guardrail with CRT Posts Ft.00 $,. $. 0E0 Straight Class B W Beam Guardrail with Wood Posts Ft.0 $,. $.0 0E0 Straight Double Class B W Beam Guardrail with Wood Posts Ft,.0 $,. $. 0E000 W Beam to Thrie Beam Guardrail Transition Each.00 $,. $. 0E0 W Beam Guardrail Flared End Terminal Each 0.00 $0,0. $,. 0E00 W Beam Guardrail Tangent End Terminal Each.00 $,.0 $,0. 0E00 W Beam Guardrail Breakaway Cable Terminal Each.00 $,. $,0. 0E0 W Beam Guardrail Special Anchor Assembly Each.00 $,.0 $.00 0E00 Beam Guardrail Trailing End Terminal Each.00 $,. $. 0E0 Beam Guardrail Post and Block Each,.00 $0,0. $. 0E0 Reset Double Thrie Beam Guardrail with Wood Posts Ft 0.00 $,.00 $. 0E Reset Double Thrie Beam Rail Ft,00.00 $,. $. 0E Reset W Beam Guardrail with Wood Posts Ft $,.00 $. 0E Reset W Beam Rail Ft 0,.00 $,. $.0 0E Reset Double W Beam Rail Ft,0.00 $,0.0 $.0 0E0 Reset W Beam Guardrail Breakaway Cable Terminal Each.00 $,0.00 $. 0E0 Reset W Beam to Thrie Beam Guardrail Transition Each.00 $,.0 $. 0E00 Reset W Beam to Thrie Beam Transition Rail Each.00 $,. $. 0E0 Reset W Beam Guardrail Flared End Terminal Each.00 $,. $0. 0 0E0 Reset W Beam Guardrail Tangent End Terminal Each.00 $,.00 $,. 0E Reset Beam Guardrail Trailing End Terminal Each.00 $.00 $.00 0E0 Reset Rubrail Ft.00 $,.00 $. E00.' Diameter Breakaway Support Concrete Footing Ft 0.00 $,0. $0. E00.' Diameter Breakaway Support Concrete Footing Ft.00 $,.0 $. E00 ' Diameter Breakaway Support Concrete Footing Ft.00 $,0. $. E000.' Diameter Fixed Support Concrete Footing Ft.00 $,. $. E00. Lb/Ft Flanged Channel Post Ft.00 $,. $. E0 Sx. Steel Post Ft.00 $,. $.0 E Wx Steel Post Ft,.0 $,. $0. E Wx Steel Post Ft.00 $,.0 $0. E Wx0 Steel Post Ft 0.00 $,.00 $. E Wx Steel Post Ft.00 $,0.00 $.0 E Wx Steel Post Ft 0.0 $,0. $. E Wx Steel Post Ft.00 $,0.00 $.00 E Wx Steel Post Ft.0 $,0.0 $. E Wx Steel Post Ft.0 $,.0 $. 0/0/0 ::PM Page of Standard s with for all accepted bids HC-Letting-AvgUnitPrice.rp
Minimum Sample and Test Requirements (MSTR)
South Dakota Department of Transportation Minimum Sample and Test Requirements (MSTR) Table of Contents Page 1. Asphalt Construction:... 1 1.1 Asphalt Concrete, Hot Mix... 3 A. Aggregate, Composite...
More informationSOUTH DAKOTA DEPARTMENT OF TRANSPORTATION ABSTRACT OF BIDS RECEIVED 06/06/2018 LETTING CONTENTS
SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION ABSTRACT OF BIDS RECEIVED 06/06/2018 LETTING CONTENTS ITEM PROJECT NO. COUNTY TYPE OF WORK 1. P 0010(00)18 (PCN 04UV) Deuel, Faulk, Roberts, Spink Replace Bridge
More informationMAY 11, 2017 T-MC-107A & T-MC-107B1
Schedule of Bid Items - Part A ROADWAY 107A 201(A) - CLEARING AND GRUBBING - LSUM 1.00 30,000.00 30,000.00 $100,000.00 $100,000.00 $65,000.00 $65,000.00 $120,000.00 $120,000.00 $50,000.00 $50,000.00 $18,262.05
More informationMaine Turnpike Authority
Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $3,379,844.00 Scott Construction Corporation - Portland, ME $3,572,184.50 CPM Constructors - Freeport, ME $3,732,667.25 Page 1 of 16 Wyman
More informationDIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS
OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006
More informationOKLAHOMA TURNPIKE AUTHORITY JUNE 7, 2018 SCHEDULE OF BID ITEMS EOC JP 26422(10) INTERCHANGE AT I-40
PART A - ROADWAY - EOC 2461 201(A) CLEARING AND GRUBBING LSUM 1.00 $500,000.00 $500,000.00 202(A) UNCLASSIFIED EXCAVATION CY 651,706.00 $4.00 $2,606,824.00 202(D) UNCLASSIFIED BORROW CY 7,500.00 $8.00
More informationBids JANUARY 10, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $29,000,000.00) Miller Bros. Const., Inc. $27,699,031.59
General Info Number: PROJECT NO. 43-19-07 Description: BRIDGE REHABILITATION AND 3RD LANE WIDENING OHIO TURNPIKE OVER AI CREEK M.P. 47.4, OHIO TURNPIKE OVER S.R. 64 (N. MAIN ST.) M.P. 47.5 MILEPOST 46.50
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016138 TRACS No. Project No. County District Gross
More informationMERCED COUNTY CAMPUS PARKWAY SEGMENT 2
MERCED COUNTY BID LIST CAMPUS PARKWAY SEGMENT 2 CONTRACT 2017191 The bidder must provide unit prices for each bid item listed below, based on the specified unit of measure. The unit price for each item
More informationCITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***
00005B *** *** BOLD ITALICIZED Item is bound within this specification manual. Regular non-italicized Item is not bound within this specification manual, however item is part of the contract. Contents
More informationPAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS.
PAY QUANTITY NOTES (F-1) (F-2) (F-3) (F-4) (F-5) (F-6) (F-7) (F-8) (F-9) (F-10) (F-11) (F-12) (F-13) (F-14) (F-15) (F-16) (F-17) (F-18) (F-19) INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS
More informationCITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition
CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION PURPOSE, INTENT AND INTERPRETATION OF SPECIFICATIONS The purpose of these Specifications is to establish, where applicable, minimum acceptable standards
More informationFEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96
General Info Number: PROJECT NO. 43-19-02 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE OVER ABANDONED RAILROAD M.P. 34.2, OHIO TURNPIKE OVER STATE ROUTE 108 M.P. 34.5, COUNTY ROUTE
More informationDECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids
General Info Number: PROJECT NO. 43-17-04 : BRIDGE DECK REPAIR AND BRIDGE REMOVAL OHIO TURNPIKE OVER QUARRY ROAD, M.P. 138.0 OHIO TURNPIKE OVER INACTIVE RAILROAD, M.P. 138.2 LORAIN COUNTY, OHIO Deadline:
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25
201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 1 EA 202-00035 Removal of Pipe 30 LF 202-00200 Removal of Sidewalk 431 SY 202-00203 Removal of Curb and Gutter 973 LF 202-00205 Removal of
More informationADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02
ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON April 28, 2015 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 30, 2015, in accordance
More informationNorth Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title
TABLE OF CONTENTS CONTRACT DOCUMENTS 00001 Inside Title Page 00003 Table of Contents 00004 List of Drawings 00020 Invitation to Bid 00100 Instructions to Bidders 00300 Bid 00500 Agreement 00610 Construction
More informationADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02
ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON April 23, 2015 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 30, 2015, in accordance
More informationTABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER
Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB
More informationElectrical Work. NOV Embankments Over Swamps and Compressible Soils
GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification
More informationMaine Turnpike Authority
PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing
More information04/19/2010 NEW YORK STATE DEPARTMENT OF TRANSPORTATION PAGE 1 DIVISION OF CONSTRUCTION CONSTRUCTION CONTRACT ESTIMATE (CONR20)
04/19/2010 NEW YORK STATE DEPARTMENT OF TRANSPORTATION PAGE 1 DOT CONTRACT NUMBER: D261458 NYS PROJECT NUMBER: 1805.81.000 FISCAL SHARE: 01 ENGINEERING SHARE: 001 ENGINEERING SHARE TITLE: BRIDGE SHARE
More informationVILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL
Page 312 VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS-12-01 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the IL ROUTE
More informationPage 1 of 7 Contract No.: 0216 OCPW Schedule Of Prices Addendum Date Created 1 07/11/2016 9:28 AM Project Number: SP 055-609-018 Project Title or Road Number: CSAH 9 Mill, Grade, Overlay Work Type: Grading,
More informationMISSOURI HIGHWAY and TRANSPORTATION COMMISSION
MISSOURI HIGHWAY and TRANSPORTATION COMMISSION JEFFERSON CITY, MISSOURI LISTING OF BID ITEMS FOR HIGHWAY CONSTRUCTION EFFECTIVE July 1, 2018 (ISSUED May 21, 2018) MISSOURI DEPARTMENT OF TRANSPORTATION
More informationMISSOURI HIGHWAY and TRANSPORTATION COMMISSION
MISSOURI HIGHWAY and TRANSPORTATION COMMISSION JEFFERSON CITY, MISSOURI LISTING OF BID ITEMS FOR HIGHWAY CONSTRUCTION EFFECTIVE October 1, 2018 (ISSUED August 1, 2018) MISSOURI DEPARTMENT OF TRANSPORTATION
More informationMISSOURI HIGHWAY and TRANSPORTATION COMMISSION
MISSOURI HIGHWAY and TRANSPORTATION COMMISSION JEFFERSON CITY, MISSOURI LISTING OF BID ITEMS FOR HIGHWAY CONSTRUCTION EFFECTIVE January 1, 2019 (ISSUED October 22, 2018) MISSOURI DEPARTMENT OF TRANSPORTATION
More informationMaine Turnpike Authority
Company Name Total Bid Amount CPM Constructors - Freeport, ME $13,984,117.36 Reed & Reed, Inc. - Woolwich, ME $14,883,139.00 Page 1 of 11 CPM Constructors Freeport, ME 201.11 Clearing AC 2.00 10000.00
More informationSUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????
SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? 102.10 Minimum Rate of Wage Scale Typo. Several paragraphs were repeated. 105.5 Inspection of Work Clarified that the contractor
More informationHALIFAX REGIONAL MUNICIPALITY SECTION
Delete Section 01 22 00 of the Standard Specifications for Municipal Services, as developed and published by the Nova Scotia Road Builders Association and the Consulting Engineers of Nova Scotia (CENS)
More informationSUPPLEMENTAL DRAWINGS
CITY OF GREATER SUDBURY SUPPLEMENTAL DRAWINGS TO THE ONTARIO PROVINCIAL STANDARD DRAWINGS Rev: February 2012 CITY OF GREATER SUDBURY STANDARD DRAWINGS TABLE OF CONTENTS Greater Sudbury Standard Drawings
More informationKansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max:
Page 1 of 18 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025600 FIELD OFFICE AND LABORATORY (TYPE A) 4 012340 FOUNDATION STABILIZATION (SET PRICE) 5 020100 CONTRACTOR CONSTRUCTION
More informationSANBORN COUNTY
Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178
More informationFranklin County Engineer's Office - Highway Design FRA-Hamilton Road Bid Tabulation
7/07/2015 Page 1 of 20 Group: A Roadway 005 201E11000 Clearing And Grubbing 008 202E20010 Headwall Removed 10.00 EA 010 202E23000 Pavement Removed, 88.00 SQYD Concrete 012 202E23010 Pavement Removed, Asphalt
More informationChapter 3: Permit Procedures and Requirements
Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8
More informationProject Location: Various, Anywhere, PA Bid Date: 7/16/ Rock Construction Entrance
To: Project Name: Bidding Company Site Work Project Contact: Address: Various Phone: Fax: Bid Number: Project Location: Various, Anywhere, PA Bid Date: 7/16/2014 Clarifications: This takeoff does not include
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT
MAINE TURNPIKE AUTHORITY ADDENDUM NO. CONTRACT 08.09 BRIDGE REPAIRS RUNNING HILL ROAD UNDERPASS (MILE 5.) BLACKSTRAP ROAD UNDERPASS (MILE 58.3) WEYMOUTH ROAD UNDERPASS (MILE 66.) SUPERSTRUCTURE REPLACEMENT
More informationCITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION
CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall
More informationADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works
ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON - April 24, 2017 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 25, 2017 in accordance
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 01025 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.01. BASIS FOR MEASUREMENT AND PAYMENT Measurement and Payment will be made for only those items included in the Schedule of Unit Prices or Contract
More informationBaseline Document Change Announcement
BDC16D-01 Page 1 of 7 New Jersey Department of Transportation 1035 Parkway Avenue, PO Box 600, Trenton, New Jersey 08625-0600 Baseline Document Change Announcement ANNOUNCEMENT: BDC16D-01 DATE: September
More informationCHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION.
Standard Drawings Index NOTE: The specifications for materials and workmanship shall conform to the latest edition or the "Standard Specifications for Public Works Construction" published by the North
More informationSECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.
SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section
More informationSECTION STORM DRAINAGE
SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation
More informationSignificant Changes. 101 Definitions and Terms. 102 Bidding Requirements and Conditions 105 Control of Work
1 SIGNIFICANT CHANGES IN CDOT's 2017 STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION The following are significant changes from the 2011 Standard Specifications Book to the new 2017 Standard Specifications
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following
More informationADVERTISEMENT SET DECEMBER 2013
Sheet List Table GREELEY CANAL #2 WCR 21 PROJECT AREA N SH-392 ADVERTISEMENT SET DECEMBER 2013 LINE DESCRIPTION PROPOSED LINE POWER / COMMUNICATIONS EXISTING LINE LINE DESCRIPTION PROPOSED LINE BOUNDARY
More informationADDENDUM #3. STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No ; Federal Project No.
ADDENDUM #3 STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No. 2016-003; Federal Project No. DEM10L-5209(008) November 9, 2017 Addendum for: AND IA STATE ROUTE 60 AT POTRERO
More informationCITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER
CITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER WATER MAIN 1. All open cut water main shall be polyvinyl chloride plastic (PVC) pressure pipe per AWWA specification
More informationCompany Page 1 of 13
ITEM NO. REVISION WBS (ITEM) DESCRIPTION UNIT QUANTITY (WRITTEN) MC-001-5.1 Mobilization/Demobilization and Construction Layout Surveying LS 1 MC-003-6.1 Temporary Construction Items LS 1 MC-003-6.2 Taxiway
More informationNOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST
NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INSTALL MANHOLE LIDS FLUSH WITH EXISTING GROUND SURFACE.
More informationDepartment of Transportation Mitchell Region Office
Connecting South Dakota and the Nation Department of Transportation Mitchell Region Office PO Box 1206 Mitchell, SD 57301-7206 605/995-8129 FAX: 605/995-8135 September 28, 2018 TO: Interested Bidders (pdf
More informationRiverside County Transportation Department Summary of Bids
1 COUNTY'S ESTIMATE Skanska USA Civil West CA Dist. Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066100 DUST CONTROL LS 1 3,000.00
More informationMANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following:
MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL EFFECTIVE DATE: OCTOBER 14, 2011 200.07 Contractor Quality Control - is replaced with the following: (a) (b) (c) Scope: These requirements
More informationContractor Construction Staking 1.0 Lump Sum. Granular Backfill (Wingwalls) (Set Price) 1.0 Cu.Yds $50.00 $ Mobilization 1.
KTA Contract No. 5677 KANSAS TURNPIKE AUTHORITY ALT 1 Schedule of Prices Contract No. 5677 County Leavenworth Type of Work: Remove and reconstruct Bridge 221.542 (120'-170'-170'-120' Weathering Steel Spans).
More informationSECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation
SECTION 33 40 00 STORM DRAINAGE UTILITIES 1. PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 00: Excavation and Fill B. Section 32 00 01: Site Restoration and Rehabilitation C. Special Conditions for
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2018026 TRACS No. Project No. County District Gross
More informationCITY OF FARGO SPECIFICATIONS REMOVALS
REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation
More informationESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority
PAY DESCRIPTION GENERAL 1 1200 Construction Traffic Control and Barricading: including any and all access signs and permitting by the City of LS 1 Rio Rancho, 2 1504 Temporary Pollution Control: NPDES
More informationCITY OF FARGO SPECIFICATIONS REMOVALS
REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation
More informationMEASUREMENT & PAYMENT (CITY FUNDED PROJECTS)
00950 - Measurement & Payment Page 00950-1 00950 - MEASUREMENT & PAYMENT (CITY FUNDED PROJECTS) (Last revised 5/20/10) SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Base Course & Paving Curb & Gutter,
More informationUNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION
UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION Effective September 9, 2014 The General Trade Knowledge portion of the examination is administered daily in Computer
More informationSTEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810
STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS 3 East Pulteney Square Bath, New York 14810 County Route 22 over Canisteo River Bridge Replacement Project BIN 3333290 D035511 PIN 6755.06 ADDENDUM #1 October
More informationAlberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.
STANDARD BRIDGE & CULVERT COMPONENTS Alberta Bridge Inventory In Alberta there are about 13,300 bridges. Types of bridges in Alberta: Standard bridges 3521 (26%) Bridge size culverts 8348 (63%) Major bridges
More informationMaine Turnpike Authority
Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,417,760.75 Scott Construction - Falmouth, ME $1,418,884.50 T Buck Construction - Auburn, ME $1,520,203.00 Page 1 of 16 CPM Constructors
More informationRiverside County Transportation Department Summary of Bids
Bids Open: 2:00 pm DATE: October 8, 2000 PROJECT: RTHQUAKE RETROFIT PROJECT NOS. A2-0663 & A9-06, STPLNZP-96(03) STPLNZP-96(03) 2 3 6 7 8 9 0 2 3 6 7 8 9 9A 9B SCHEDULE "A" (RTHQUAKE RETROFIT) 9030 WORK
More informationPlease note the requirement for alternate bids as described in Section 3 of the Instructions to Bidders portion of the contract specifications.
Kansas Turnpike Authority Project 5677 Note regarding schedule of prices: Please note the requirement for alternate bids as described in Section 3 of the Instructions to Bidders portion of the contract
More information3Bureau of Construction and Maintenance
Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result
More informationITEM QUANTITY UNITS UNIT PRICE AMOUNT. Contractor Construction Staking 1.0 Lump Sum
KTA Contract No. 5677 KANSAS TURNPIKE AUTHORITY ALT 1 Schedule of Prices Contract No. 5677 County Leavenworth Type of Work: Remove and reconstruct Bridge 221.542 (120'-170'-170'-120' Weathering Steel Spans).
More informationDOCUMENT ADDENDA AND MODIFICATIONS
DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications
More informationPITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008
BT-1 of 7 Clearing and Grubbing L.S. $50,000.00 $50,000.00 $5,335.00 $5,335.00 $14,560.00 $14,560.00 $20,000.00 $20,000.00 $10,600.00 $10,600.00 Class 1 Excavation 4300 C.Y. $20.00 $86,000.00 $15.00 $64,500.00
More informationImprovement Plan Cost Estimate
Building and Engineering Division Development Services Department 214 S. C Street, Oxnard CA 93030 ph: 805.385.7925 fax 805.385.7854 Improvement Plan Cost Estimate Land Development Permit No. (Tract or
More informationSection 403. DRAINAGE STRUCTURES
403.01 Section 403. DRAINAGE STRUCTURES 403.01. Description. This work consists of adjusting, constructing, or temporarily lowering drainage structures and cleaning existing drainage structures and leads
More informationProposer shall make note of and/or incorporate all changes listed below into the requested
Request for Proposal (RFP) Bid No: 18-10-1940LE Addendum No. 4 Date: November 27, 2018 To: All Proposers Subject: Addendum No. 4 Consisting of nine (9) Pages RFP No.: Project Name: Owner: 18-10-1940LE
More information3Bureau of Construction and Maintenance
Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result
More informationADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013
ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME
More informationPERMANENT PAVEMENT REPAIR NO SCALE
SAWCUT EXISTING PAVEMENT 2" BITUMINOUS CONCRETE SURFACE COURSE, CLASS 2 (MIN) CLEAN EDGE PRIOR TO PAVING AND PAINT WITH LIQUID BITUMEN. INSTALL SEALANT OVER JOINT UPON COMPLETION 2" BITUMINOUS CONCRETE
More informationDOCUMENT ADDENDUM No. 2
DOCUMENT ADDENDUM No. 2 PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Clarifications 1.2 CONSTRUCTION CONTRACT A. The Construction Contract is known as SU095 9 th Street and SU096 Downs Drive Storm Drain Projects.
More informationGeneral Info Number: PROJECT NO Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST TRUMBULL COUNTY, OHIO
General Info Number: PROJECT NO. 59-18-03 Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST 209.20 TRUMBULL COUNTY, OHIO Deadline: April 25, 2018 at 2:00 P.M. (Eastern) (Estimated Cost: $3,100,000.00)
More informationIndex to Technical Specifications
Index to Technical Specifications Item Number Subject I II EXCAVATION 1.01 Trenching and Excavation Regulations 1.02 Site Grading or General Excavation 1.03 Structural Excavation 1.04 Trench Excavation
More informationAmendments to the January 2016 Design Criteria Manual & Supplementary Master Municipal Construction Documents
General Figure 2.3.1 16 Revise Revised Figure 2.3.1: New Development Areas where Secondary Suites Apply to include two new areas (#4 and 5). Water 3.3.2 Watermains 31 Add Added wording in Section 3.3.2.3
More informationSAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6
SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO. 18-4501 SOLICITATION NO. CO-00198 ADDENDUM 6 (September 10, 2018) To Respondent of Record: This addendum, applicable to work referenced
More informationFinal Estimates Level 2
Florida Department of TRANSPORTATION Final Estimates Level 2 Module 6: Structures 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 6 1 6-1 Module Content Concrete Structures Bridges Substructure
More informationBID TABULATION ( BIDS OPENED MONDAY, APRIL 24, 1:00 P.M. ) CONSTRUCT PARALLEL TAXIWAY - PHASE 3 HABERSHAM COUNTY AIRPORT, CORNELIA, GEORGIA
BASE BID 1 01000 MOBILIZATION 1.00 L. SUM $799,945.96 $799,945.96 $1,150,000.00 $1,150,000.00 2 01510 FIELD ENGINEER'S OFFICE 1.00 L. SUM $40,000.00 $40,000.00 $5,000.00 $5,000.00 3 ALL-1 4 ALL-2 5 MISC-1
More informationCONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 507 JULY 1991 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES 507.01 SCOPE 507.02 REFERENCES 507.03 Not Used 507.04 Not Used
More informationUNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
More informationAPPENDIX A MEASUREMENT AND PAYMENT
P-150 DEMOLITION 4.01 Removal of pavement shall be measured per square yard based on the area shown on the plans. Any pavement removed outside the designed limits of removal because the pavement was damaged
More informationTABLE OF CONTENTS 1.02 SPECIFICATIONS CONFLICT IN DRAWINGS AND SPECIFICATIONS OR DOCUMENTS PHYSICAL DATA...
TABLE OF CONTENTS SECTION 1 GENERAL 1.01 SCOPE... 1-1 A. Intent... 1-1 B. Taxes... 1-1 C. Permits... 1-1 D. 24 Hour Contact... 1-2 E. Emergency Project Identification Sign... 1-2 F. Notification to City
More informationCHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS
CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS Section Title Page 20.1 General... 20-1 20.2 Units and Costs... 20-1 20.2.1 Erosion Control...20-1 20.2.2 Street Improvements...20-1 20.2.3
More informationSUPPLEMENTAL SPECIFICATIONS AND DRAWINGS TO THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION TABLE OF CONTENTS
PREFACE AND CITY ENGINEER S LETTER INDEX OF STANDARD DRAWINGS DIVISION 100 GENERAL CONDITIONS ARTICLE 1 DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms ARTICLE 2 PRELIMINARY MATTERS 2.01 Delivery of Bonds
More informationLIST OF ACTIVE OPSSs
LIST OF ACTIVE OPSSs DIVISION 1 - GENERAL SPECIFICATIONS 100 PROV MTO General Conditions of Contract Nov 2016 Jan 12, 2017 102 COMM Weighing of Materials Oct 1992 Mar 17, 1994 106 PROV Electrical Work
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 04/03/17 Comp. Dt: 10/06/17
Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 6216-127 Contract ID: Contract Description: Contract Location: Recommendation: 170023 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationDESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General
DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA
106-5(a-f) 09 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA These Special Provisions amend, revise, and where in conflict, supersede applicable sections of the 2009 Standard
More informationAPPENDIX B STANDARD CONSTRUCTION DRAWING NOTES
APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES B-1 General Notes: SACWSD Standard Construction Drawing Notes 1. No work shall begin on any water or wastewater construction project until the construction
More informationYES, we received Addendum No. 1
TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION
More informationDrainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.
403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage
More informationTENDER WELLCOX ACCESS ROAD ADDENDUM 1
TENDER 2336-2019 WELLCOX ACCESS ROAD ADDENDUM 1 This addendum shall be read in conjunction with and considered as an integral part of the Tender Contract 2336-2019. Revisions supersede the information
More information1 Revised: 2019 Edition
STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with
More informationOhio Department of Transportation - Prebid Questions
Project No. 110467 Sale Date - 8/25/2011 HAM-83469 - CR-CR 239-9.49 (WINTON/ S. GILMORE ROAD) 8/22/2011 9:56:54 AM Pole E on plan page 323 shows that 2" anchor bolts should be used for this pole. However,
More information