1 SECTION STRUCTURAL SOIL PLANTING MIX PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Structural planting soils, mixing and placing. B. Related Sections: 1. Division 32 Section "Concrete Paving for pavement over structural soils. 2. Division 33 Section Storm Utility Drainage Piping for drainage within structural soil profile. 3. Division 32 Section Plants for planting within structural soils. 1.3 SUBMITTALS A. Product Data: For each type of product indicated, including soils. B. Qualification Data: For qualified landscape Installer. Include list of similar projects completed by Installer demonstrating Installer's capabilities and experience. Include project names, addresses, and year completed, and include names and addresses of owners' contact persons. C. Product Certificates: For each type of manufactured product, from manufacturer, and complying with the following: 1. Manufacturer's certified analysis of standard products. 2. Analysis of other materials by a recognized laboratory made according to methods established by the Association of Official Analytical Chemists, where applicable. D. Material Test Reports: For Soil Component of Structural Soil. 1. Provide the Testing Agency with representative samples all soils to be used in the work, at least thirty (30) days prior to planned site use. 2. The Testing Agency shall submit a report for Structural Soil Planting Mix tests. Furnish one copy directly to the Architect, one copy to the Owner s Representative, and one copy to the Contractor, at least two (2) weeks prior to planned site use. 1.4 QUALITY ASSURANCE A. Standards: STRUCTURAL SOIL PLANTING MIX

2 1. Comply with New York Department of Transportation (NYSDOT) Standards except as otherwise specified herein. 2. Comply with State and Local Environmental Standards and as specified herein. B. Installer Qualifications: A qualified landscape Installer whose work has resulted in successful mixing and placement of structural soils. It is the responsibility of the Contractor to provide such personnel. 1. Experience: Eight (8) previous installations of structural soils, described as mixing and placement, in addition to requirements in Division 01 Section "Quality Requirements." a. Provide a list of projects of similar quality, schedule requirements and construction detailing over the last five years. Qualifications shall include: the names of all similar projects, year completed, location, description of the scope of work including the types and quantities of planting mix/pavement material installed and the name, address and telephone number of the owner or the owner s representative 2. Installer's Field Supervision: Require Installer to maintain an experienced full-time supervisor on Project site when work is in progress. C. Testing Laboratory Qualifications: All testing and analysis shall be at the expense of the Contractor 1. Testing Laboratory Qualifications: An independent or university laboratory, recognized by the State Department of Agriculture, with the experience and capability to conduct the testing indicated and that specializes in types of tests to be performed. a. The testing laboratory for soil component of structural shall be approved by the Architect. 2. Geotechnical Testing Agency Qualifications: An independent testing agency qualified according to ASTM E 329 to conduct soil materials and rock-definition testing, as documented according to ASTM D 3740 and ASTM E 548. D. Structural Soil Analysis: For each unamended soil type, furnish soil and chemical analyses and a written report by a qualified soil-testing laboratory, performed in accordance with current AOAC Standards, including the following: 1. ph and Buffer ph. 2. Percent organic matter as determined by the loss of ignition of oven dried samples. Test samples shall be oven dried to a constant weight at a temperature of 230 degrees F, plus or minus 9 degrees. 3. Analysis for nutrient levels by parts per million including nitrate nitrogen, ammonium nitrogen, phosphorus, potassium, magnesium, manganese, iron, zinc, calcium and extractable aluminum. Nutrient test shall include the testing laboratory recommendations for supplemental additions to the soil as calculated by the amount of material to be added per volume of soil for the type of plants to be grown in the soil. 4. Analysis for levels of toxic elements and compounds including arsenic, boron, cadmium, chromium, copper, lead, mercury, molybdenum, nickel, zinc and PCB. Test results shall be cited in milligrams per kilogram. 5. Soluble salt by electrical conductivity of a 1:2 soil/water sample measured in Millimho per cm. 6. Cation Exchange Capacity (CEC). 7. Carbon/Nitrogen Ratio. 8. Report suitability of tested soil for plant growth. STRUCTURAL SOIL PLANTING MIX

3 a. Based upon the test results, state all recommendations for soil treatments and soil amendments to be incorporated. State recommendations in weight per 1000 sq. ft. (92.9 sq. m) or volume per cu. yd. (0.76 cu. m) for nitrogen, phosphorus, and potash nutrients and soil amendments to be added to produce satisfactory planting soil suitable for healthy, viable plants. 9. Report presence of problem salts, minerals, or heavy metals, including aluminum, arsenic, barium, cadmium, chromium, cobalt, lead, lithium, and vanadium. If such problem materials are present, provide additional recommendations for corrective action. E. Bulk Density: Submit a bulk density of the sample and particle size analysis including the following gradient of mineral content: USDA Designation Gravel Sand Silt Clay Size in mm +2 mm 0.05 to 2 mm to 0.05 mm minus mm Sieve analysis shall be performed and compared to USDA Soil Classification System. Sieve analysis shall be done by a combined hydrometer and wet sieving using sodium hexametaphosphate as a dispersant in compliance with ASTM D422 after destruction of organic matter by hydrogen peroxide. F. Moisture Density: Submit 5-point minimum moisture density curve AASHTO T 99 test results for each Structural Soil sample without removing oversized aggregate. G. Bearing Ratio: Submit California Bearing Ratio test results for each Structural Soil sample compacted to peak standard density. The soaked CBR shall equal or exceed a value of 50. H. Stone Ratio: Submit measured dry-weight percentage of stone in the mixture. I. The approved Structural Soil samples shall be the standard for each lot of 500 cubic yards of material. J. Submit one cubic foot sample per each 500 cubic yards of required material, and for each sample, the following analysis for all Crushed Stone. 1. Provide a particle size analysis including the following gradient of mineral content: USDA Designation Size in mm 3@ +76 mm 2-1/2@ mm 2@ mm 1-1/2@ mm STRUCTURAL SOIL PLANTING MIX

4 mm Fine gravel Sand Silt Clay mm 2-19 mm mm mm minus mm K. Provide the manufacturer s analysis of the following: 1. Loose and rodded unit weight. 2. Bulk specific gravity and absorbency. 3. Stone dimension and surface texture description. 4. Documentation of acceptance for use as NYS DOT approved aggregate. L. Provide a percent pore space analysis defined as follows: 1. Rodded Unit Weight divided by the Bulk Specific Gravity multiplied by 100 M. Submit one pound sample of each type of fertilizer and three certificates showing composition and analysis. Submit the purchasing receipt for each fertilizer showing the total quantity purchased for the project prior to installation. N. Submit to the Architect for review a proposed plan and vertical section layout of all Structural Soil. O. Preinstallation Conference: Conduct conference at Project site. 1.5 DELIVERY, STORAGE AND HANDLING A. Store materials on a paved surface near the surface that will be used for mixing, or use a wood or fabric barrier to prevent mixing with other materials. Do not deliver or place soils in frozen, wet, or muddy conditions. B. Material shall be delivered at or near optimum compaction moisture content as determined by AASHTO T99 (ASTM D 698). Do not deliver or place materials in an excessively moist condition (Beyond two percent above optimum compaction moisture content as determined by AASHTO T 99 (ASTM D 698). C. Protect soils and mixes from absorbing excess water and from erosion at all times. Do not store materials unprotected from large rainfall events. Do not allow excess water to enter site prior to compaction. If water is introduced into the material after grading, allow material to drain or aerate to optimum compaction moisture content. STRUCTURAL SOIL PLANTING MIX

5 1.6 COOPERATION A. Examine drawings and specifications for other contracts, to determine nature of proposed construction. Perform work to conform with construction called for in such a manner as not to interfere or delay work of other Contractors. 1.7 PROJECT CONDITIONS A. All areas to receive Structural Soil shall be inspected by the Contractor before starting work and all defects such as incorrect grading, compaction and inadequate drainage etc. shall be reported to the Architect prior to beginning this work. B. The Contractor shall be responsible for judging the full extent of work requirements involved, including but not limited to the potential need for temporary storage and staging of soils, including moving soil stockpiles at the site to accommodate scheduling of other work and the need to protect installed soils from compaction, erosion and contamination. 1.8 MAINTENENCE A. Maintenance Instructions: Prior to the time of Final Acceptance of the Work, submit maintenance instructions for the use, removal and replacement of Structural Soil for the Owner s use. The instructions shall be reviewed by the Project Architect as a pre-condition for Final Acceptance of the Work. PRODUCTS 2.1 GENERAL A. Prior to acceptance, the contractor shall have the soil analyzed for chemical/nutrient levels using Morgan's Extraction procedure. Furnish analysis that can be recognized from laboratory tests made in accordance with methods established by the Association of Official Agricultural Chemists. Levels of the following nutrients shall fall within the following: Nutrients Acceptable Levels Nitrate 1 to 2.5 ppm Phosphorus 0.1 to 0.3 ppm Potassium 6 to 14 ppm Magnesium 50 to 70 ppm Manganese 2 to 5 ppm STRUCTURAL SOIL PLANTING MIX

6 Iron 0.5 to 2.0 ppm Zinc to 0.1 ppm Calcium 400 to 800 ppm If the soil is deficient in any nutrient, supplementary fertilizer shall be added to meet these requirements. 2.2 CLAY LOAM A. Clay Loam shall be a loam based on the USDA classification system as determined by mechanical analysis (ASTM D-422) and it shall be of uniform composition, without admixture of subsoil. It shall be free of stones greater than one-half inch, lumps, plants and their roots, debris and other extraneous matter over one inch in diameter or excess of smaller pieces of the same materials as determined by the Architect. It shall not contain toxic substances harmful to plant growth. It shall be obtained from naturally well-drained areas, which have never been stripped of topsoil before and have a history of satisfactory vegetative growth. Clay loam shall contain not less than 2% nor more than 5% organic matter as determined by the loss on ignition of over-dried samples. Test samples shall be oven-dried to a constant weight at a temperature of 230 degrees F., plus or minus 9 degrees. B. Mechanical analysis for a Loam/Clay Loam shall be as follows: Textural Class % of Total Weight Gravel less than 5% Sand 20-45% Silt 20-50% Clay 20-40% C. Chemical analysis: Meet or be amended to meet the following criteria: 1. ph between 5.5 to Percent organic matter 2-5% by dry weight. 3. Nutrient levels as required by the testing laboratory recommendations for the type of plants to be grown in the soil. 4. Toxic elements and compounds below the United States Environmental Protection Agency Standards for Exceptional Quality sludge or local standard; whichever is more stringent. 5. Soluble salt less than 1.0 Millimho per cm. 6. Cation Exchange Capacity (CEC) greater than Carbon/Nitrogen Ratio less than 33:1. D. Loam/Clay Loam shall be the product of a commercial processing facility specializing in production of stripped natural topsoil. No topsoil shall come from USDA - classified prime farmland. STRUCTURAL SOIL PLANTING MIX

7 2.3 FERTILIZER A. Commercial fertilizer complying with State and United States fertilizer laws. Deliver fertilizer in original unopened containers, which shall bear the manufacturer s certificate of compliance covering analysis, which shall be furnished to the Architect. Fertilizer shall be formulated for mixing into the soil and be certified by the manufacturer to provide controlled release of nitrogen continuously for a period of no less than nine months and no more than 12 months. B. Fertilizer percentages of weight of ingredients and application rates shall be as recommended by the soil testing results. 2.4 SULFUR (if needed) A. Sulfur shall be commercial granular, 96% pure sulfur, delivered in containers with the name of the manufacturer, material and analysis appearing on the container. B. Sulfur used to lower soil ph above 6.5 shall be ferrous sulfate formulation. C. LIME (if needed) D. Agricultural limestone containing a minimum of 85% carbonates. Minimum gradation: 100% passing 10 mesh sieve; 98% passing 20 mesh sieve; 55% passing 60 mesh sieve and 40% passing 100 mesh sieve. 2.5 CRUSHED STONE A. Crushed Stone shall be a DOT certified crushed stone. Granite and limestone have been successfully used in this application. Select and angular stone % of the stone should pass the 1.5 inch sieve, 20-55% should pass the 1.0 inch sieve and 10% should pass the 0.75 inch sieve. A ratio of nominal maximum to nominal minimum particle size of 2 is required. B. Acceptable aggregate dimensions will not exceed 2.5:1.0 for any two dimensions chosen. C. Minimum 90% with one fractured face, minimum 75% with two or more fractured faces. D. Results of Aggregate Soundness Loss test shall not exceed 18%. E. Losses from LA Abrasion tests shall not exceed 40%. 2.6 HYDROGEL A. Hydrogel/Wetting Agent - Shall be a potassium propenoate-propenamide copolymer hydrogel such as: 1. Gelscape, Amereq Corporation, 19 Squadron Blvd., New York, NY 10956, Soil Moist, JRM Chemical Inc., 4881 Neo Parkway, Cleveland, OH 44128, SuperSorb, Aquatrols Corporation of America, 5 North Olney Avenue, Cherry Hill, NJ 08003, Or approved equal. STRUCTURAL SOIL PLANTING MIX

8 2.7 WATER A. The Contractor shall be responsible to furnish his own supply of water to the site at no extra cost. All work inured or damaged due to the lack of water, or the use of too much water, shall be the Contractor s responsibility to correct. Water shall be free from impurities injurious to vegetation. 2.8 STRUCTURAL SOIL A. A uniformly blended mixture of crushed Stone, Clay Loam and Hydrogel, mixed to the following proportion: Material Crushed Stone Loam Hydrogel Total moisture Unit of Weight 100 units dry weight as determined by the test of the mix (approx. 20 units dry weight) 0.03 units dry weight AASHTO T-99 optimum moisture B. The initial mix design for testing shall be determined by adjusting the ratio between the Crushed Stone and the clay loam. Adjust final mix dry weight mixing proportion to decrease soil in mixture if CBR test results fail to meet acceptance (CBR #50). EXECUTION 3.1 SITE PREPARATION A. Do not proceed with the installation of the Structural Soil material until all walls, curb footings and utility work in the area have been installed. For site elements dependent on Structural Soil for foundation support, postpone installation until immediately after the installation of Structural Soil. B. Install subsurface drain lines as shown on the Drawings prior to installation of Structural Soil material. C. Excavate and compact the proposed subgrade to depths, slopes and widths as shown on the Drawings. Maintain all required angles of repose of the adjacent materials as shown on the drawings. Do not over excavate compacted subgrades of adjacent pavement or structures. D. Confirm that the subgrade is at the proper elevation and compacted as required. Subgrade elevations shall slope parallel to the finished grade and or toward the subsurface drain lines as shown on the drawings. E. Clear the excavation of all construction debris, trash, rubble and any foreign material. In the event that fuels, oils, concrete washout silts or other material harmful to plants have been spilled into the STRUCTURAL SOIL PLANTING MIX

9 subgrade material, excavate the soil sufficiently to remove the harmful material. Fill any over excavation with approved fill and compact to the required subgrade compaction. F. Do not proceed with the installation of Structural Soil until all utility work in the area has been installed. All subsurface drainage systems shall be operational prior to installation of Structural Soils. G. Protect adjacent walls, walks and utilities from damage or staining by the soil. Use ½ plywood and or plastic sheeting as directed to cover existing concrete, metal and masonry work and other items as directed during the progress of the work. H. Clean up all trash and any soil or dirt spilled on any paved surface at the end of each working day. I. Any damage to the paving or architectural work caused by the soils installation Contractor shall be repaired by the general contractor at the soils installation contractor s expense. J. Maintain all silt and sediment control devices required by applicable regulations. Provide adequate methods to assure that trucks and other equipment do no track soil from the site onto adjacent property and the public right of way. 3.2 MIXING OF STRUCTURAL SOIL PLANTING MIX A. Crushed stone, soil, hydrogel, organic material, water and any fertilizer or limestone necessary to meet the requirements of this specification shall be mixed prior to placement. Mixing shall uniformly blend the specified components in the approximate ratio indicated below and shall meet the additional following requirements. B. Approximate ratio of structural soil planting mix components - Units of Weight - Stone, Soil and Hydrogel ratios are dry weight basis: Material Composition: Crushed Stone 100 Soil 20 Hydrogel 0.03 Total Moisture 10 C. The dry hydrogel shall be mixed with a sufficient amount of water to form a slurry. The slurry shall be allowed to set for at least one hour with periodic agitation/mixing to assure hydration of the hydrogel. D. Mixing is to occur with a front-end loader on a flat, paved surface. 1. The stone shall be spread in a 12 inch layer. 2. Spread the hydrogel evenly onto the stone, followed by a layer of moist soil. 3. Continue layering in this fashion if the front-end loader is large enough to mix the material effectively, up to a six-layer pile. 4. Mix and turn the pile until uniformly blended. Uniformly add moisture to assist mixing if the system is too dry, but do not exceed optimal moisture content for compaction as determined by testing. STRUCTURAL SOIL PLANTING MIX

10 E. Mixing is to occur with a front end loader or by hand on a flat, paved surface. 1. The hydrogel slurry shall be evenly spread onto the crushed stone before the soil is added. Mixing shall continue for a sufficient time, but not less than ten (10) minutes to assure the crushed stone is completely coated with the hydrogel slurry. 2. The soil shall be added to the crushed stone and slurry mixture in a manner that assures the resulting mix is free of clods. The mixing shall be controlled to assure over-mixing does not cause the material to become pelletized. F. The resulting Structural Soil Planting Mix (crushed stone, hydrogel and soil mixture) shall be protected from drying prior to placement. 3.3 PLACEMENT AND COMPACTION OF STRUCTURAL SOIL PLANTING MIX A. The Structural Soil Planting Mix shall be placed in locations as indicated on Plan(s). It shall be the contractor's responsibility to properly compact the mixture. The contractor shall determine the type, size and weight of compactor best suited to the work and select and control the lift thickness. The contractor shall also exert proper control over the moisture content of the mixture and other details necessary to obtain satisfactory results. B. The Architect and Owner s Representative will inspect the contractor's operations and will permit the work to continue where: 1. Lift thickness is controlled and is consistent with the compaction equipment selected. 2. The compactive effort is uniformly applied. 3. The Architect and Owner s Representative concludes from visual observation that proper compaction has been obtained. 4. Compaction and test density of the compacted material to meet or exceed 95% of Maximum Dry Density. C. Whenever the contractor's operations do not conform to the above criteria, the Owner s Representative will prohibit placement of additional material until the contractor takes corrective action. D. When the Owner s Representative determines density tests are necessary, the contractor shall provide any assistance required to facilitate such tests. Such assistance shall include, but will not be limited to, excavation and backfill of test holes. This work shall be considered to be incidental to construction. 3.4 ACCEPTANCE STANDARDS A. The Architect will inspect the work upon the request of the Contractor. Request for inspection shall be received by the Architect at least 10 days before the anticipated date of inspection. 3.5 CLEANING A. Upon completion of the Structural Soil installation operations, clean areas within the contract limits. Remove all excess fills, soils and mix stockpiles and legally dispose of all waste materials, trash and debris. Remove all tools and equipment and provide a clean, clear site. Sweep, do not wash, all paving and other exposed surfaces of dirt and mud until the paving has been installed over the STRUCTURAL SOIL PLANTING MIX

11 Structural Soil material. Do no washing until finished materials covering Structural Soil material are in place. END OF SECTION STRUCTURAL SOIL PLANTING MIX

UNHSC Bioretention Soil Specification February, SOIL PREPARATION (PERFORMANCE SPECIFICATION) for Bioretention Systems

UNHSC Bioretention Soil Specification February, SOIL PREPARATION (PERFORMANCE SPECIFICATION) for Bioretention Systems SOIL PREPARATION (PERFORMANCE SPECIFICATION) for Bioretention Systems PART 1 - GENERAL 1.1 SUMMARY A. Section includes soil media for the bioretention systems and rain gardens specified according to performance

More information

Section 1I-3 - Bioswales

Section 1I-3 - Bioswales BIOSWALES (Numbering pending) These specifications compliment the bioswale design portion of the Iowa Stormwater Management Manual in Chapter 2, Section 2I-3. Sections of the following documents, as referenced

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

SECTION AGGREGATES

SECTION AGGREGATES SECTION 32 05 00 AGGREGATES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Aggregate base 2. Engineered fill 3. Backfill 4. Fine filter aggregate (non-frost susceptible fill) 5. Riprap 6. Recreational

More information

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 1.0 EXCAVATION AND FILL 1.1 GENERAL.1 The excavation or fill shall be made to provide proper grade, lines and crosssection for the laying of

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

SECTION RIPRAP, BOULDERS, AND BEDDING

SECTION RIPRAP, BOULDERS, AND BEDDING SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and

More information

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase.

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase. SECTION 20.22 LEVELING COURSE Article 22.1 General The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase. Article

More information

SECTION FLEXIBLE PAVING

SECTION FLEXIBLE PAVING SECTION 321200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Include GENERAL CONDITIONS and applicable parts of Division 1 as part of this Section. B. Examine all Drawings and other Sections of the Specifications

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

SECTION CONTROLLED LOW STRENGTH MATERIAL

SECTION CONTROLLED LOW STRENGTH MATERIAL SECTION 03300 CONTROLLED LOW STRENGTH MATERIAL PART 1 GENERAL 1.1 DESCRIPTION A. This Section specifies Controlled Low Strength Material (CLSM) to be used as described in this specification, including

More information

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO)

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO) SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO) This guide specification for U.S. applications describes construction of bio-infiltration bump outs (or bioretention ) systems. From the surface down to the

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

SECTION BITUMINOUS CONCRETE PAVEMENT

SECTION BITUMINOUS CONCRETE PAVEMENT SECTION 321216 BITUMINOUS CONCRETE PAVEMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

SECTION 3: SUB BASE AND BASE COURSES

SECTION 3: SUB BASE AND BASE COURSES SECTION 3: SUB BASE AND BASE COURSES Page i TABLE OF CONTENTS SECTION 3: SUB BASE AND BASE COURSES i SECTION 3.01 MATERIALS FOR SUB-BASE AND BASE COURSES 1 3.01.01 SCOPE 1 3.01.02 GENERAL 1 3.01.03 GRANULAR

More information

CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE

CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE 1.0 GENERAL 1.1 Scope A. This specification guideline covers the technical requirements for furnishing all labor, materials, equipment, and incidentals

More information

BITUMEN-SET PRECAST CONCRETE PAVING SLABS

BITUMEN-SET PRECAST CONCRETE PAVING SLABS SECTION 32 14 13.16 BITUMEN-SET PRECAST CONCRETE PAVING SLABS (1995 MasterFormat Section 02784) NOTE: This guide specification is the U.S. for concrete paving slabs adhered with a neoprene mastic to a

More information

PAVING SLABS ON A CONCRETE BASE

PAVING SLABS ON A CONCRETE BASE SECTION 32 14 13.16 PAVING SLABS ON A CONCRETE BASE (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs on a sand bed over concrete for pedestrian applications.

More information

BUILDING DEVELOPMENT POLICIES AND PROCEDURES ADMINISTRATIVE/GENERAL

BUILDING DEVELOPMENT POLICIES AND PROCEDURES ADMINISTRATIVE/GENERAL GEOTECHNICAL GUIDELINES FOR THE USE OF LIME DURING CONSTRUCTION Section Page 4-0X0l Applicability and Restrictions 2 4-0X02 Expansive Soil Determination 5 4-0X03 Mixture Design for Lime Stabilization of

More information

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary

More information

Attachment 6 DETAILED SPECIFICATIONS

Attachment 6 DETAILED SPECIFICATIONS GROUP 33700 Fine and Coarse Aggregates PAGE 1 of 15 Attachment 6 DETAILED SPECIFICATIONS REFERENCES: References are made herein to the New York State Department of Transportation Standard Specifications,

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 321216 - ASPHALT PAVING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CS 3-01 GENERAL: A. The foundation, bedding and backfill for all trenches shall conform with the requirements of the City Standard

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

SECTION 904 AGGREGATES

SECTION 904 AGGREGATES SECTION 904 AGGREGATES 904.01 Aggregates. Aggregates shall consist of natural or manufactured materials produced from but not limited to limestone, dolomite, gravels, sandstones, steel furnace slag (SF),

More information

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM SECTION 32 32 23 SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM PART 1: GENERAL 1.01 Scope Work includes furnishing all materials, labor, equipment, and supervision to install a Stonebridge segmental

More information

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES AGGREGATE BASES PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, accessories, and equipment necessary

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method 3.56 COLD IN-PLACE RECYCLING 3.56.1 GENERAL This specification covers the requirements for Cold In-Place Recycling (CIR) which consists of reclaiming the existing asphalt pavement; sizing the reclaimed

More information

Cement Stabilized Soil (CSS) (Portland cement)

Cement Stabilized Soil (CSS) (Portland cement) Cement Stabilized Soil (CSS) (Portland cement) 1.0 DESCRIPTION. This specification shall govern the process known as Cement Stabilized Soil (CSS). CSS consists of mixing the existing base, subbase and

More information

Construction Specification for Utility Adjustments

Construction Specification for Utility Adjustments Engineering & Construction Services Division Standard Specifications for Road Works TS 4.50 September 2017 for Utility Adjustments Table of Contents TS 4.50.01 SCOPE... 2 TS 4.50.02 REFERENCES... 2 TS

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information

Section 25 Aggregate Subbase

Section 25 Aggregate Subbase Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION A. GRANULAR

More information

SECTION INTERLOCKING CONCRETE PAVERS

SECTION INTERLOCKING CONCRETE PAVERS SECTION 23 14 13 INTERLOCKING CONCRETE PAVERS (1995 MasterFormat Section 02780) Note: This guide specification for concrete paver applications in the U.S. for concrete pavers and bedding sand over a compacted

More information

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section 300 - Trench Excavation and Backfill TRENCH EXCAVATION AND BACKFILL PART - GENERAL.0 SECTION INCLUDES A. Trench Excavation

More information

Recommended Specifications For Portland Cement Pervious Pavement

Recommended Specifications For Portland Cement Pervious Pavement Recommended Specifications For Portland Cement Pervious Pavement Foreword Portland Cement Pervious Concrete Pavements have become increasingly popular as a method to meet water quality water run off regulations

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1 SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL TABLE OF CONTENTS 2.1 General...2-1 2.2 Materials...2-1 2.2.1 Compacted Non-granular Material...2-1 2.2.2 Gravel Material and Crushed Aggregate

More information

Construction Specification for Concrete Unit Pavers

Construction Specification for Concrete Unit Pavers Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS

More information

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014 1 0 1 0 1 0 1 SECTION 1. TRENCHING BASED ON DFD MASTER SPECIFICATION DATED // P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment,

More information

SECTION SITE CONCRETE

SECTION SITE CONCRETE SECTION 321313 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

PERMEABLE INTERLOCKING PAVERS

PERMEABLE INTERLOCKING PAVERS PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement

More information

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT): SECTION 31 32 13.16 CEMENT STABILIZATION PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the specifications for cement stabilization of sandy or silty soil and consists of pulverizing, addition

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

BIO-AQUIFER STORM SYSTEM

BIO-AQUIFER STORM SYSTEM BIO-AQUIFER STORM SYSTEM Specifications for Construction PART 1 GENERAL 1.01 SECTION INCLUDES A. Providing labor, materials, tools and equipment to furnish and install a permeable concrete paving stone

More information

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,

More information

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings SECTION 32 12 36 SEAL COATS PART 1 GENERAL 1.1 RELATED WORK A. Section 31 10 00: Site Preparation B. Section 32 12 00: Flexible Paving C. Section 32 17 23 01: Traffic Striping and Pavement Markings 1.2

More information

SECTION INTERLOCKING PRECAST CONCRETE UNIT PAVERS

SECTION INTERLOCKING PRECAST CONCRETE UNIT PAVERS SECTION 321413.13 INTERLOCKING PRECAST CONCRETE UNIT PAVERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Interlocking concrete paver units. 2. Sand setting bed. 3. Sand joint

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

COMPOST. Supplemental Technical Specification for. SCDOT Designation: SC-M (03/08) 1.0 Compost. 1.1 Description

COMPOST. Supplemental Technical Specification for. SCDOT Designation: SC-M (03/08) 1.0 Compost. 1.1 Description Supplemental Technical Specification for COMPOST SCDOT Designation: SC-M-815-3 (03/08) 1.0 Compost 1.1 Description This specification covers compost produced from various organic by-products, for use as

More information

Aggregate Specifications

Aggregate Specifications Qualified Aggregate Technician Kentucky Specifications Aggregate Specifications State, FHWA, FAA, Contractor Kentucky Transportation Cabinet 107 Aggregate Size Designations Nominal Maximum Size The largest

More information

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

BASE CONSTRUCTION MATERIALS A Aggregate

BASE CONSTRUCTION MATERIALS A Aggregate BASE CONSTRUCTION 2211 AGGREGATE BASE 2211.1 DESCRIPTION This work consists of placing aggregate base. 2211.2 MATERIALS A Aggregate... 3138 Provide the class of aggregate as required by the contract. 2211.3

More information

CHAPTER 7 PAVEMENT DESIGN. 1. Gradation (sieve and hydrometer analysis) 3. Moisture density relationships and curves

CHAPTER 7 PAVEMENT DESIGN. 1. Gradation (sieve and hydrometer analysis) 3. Moisture density relationships and curves CHAPTER 7 PAVEMENT DESIGN 7.0 GENERAL The purpose of this chapter is to define the requirements for design of pavement within proposed and existing roadways for new subdivision streets and secondary roads.

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B401: DELETED B402: DELETED B403: DELETED B404: STRUCTURE/CULVERT IDENTIFICATION SIGNS B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B406: ITEM 514 - FIELD PAINTING, MISC.; REPAIR PAINTING

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR OPEN-GRADED DRAINAGE COURSE, MODIFIED FOR JOB NUMBER 110616 (PORTLAND CEMENT-TREATED PERMEABLE BASE USING CRUSHED CONCRETE) CFS:JFS 1 of 5 APPR:ARB:TES:11-06-14

More information

SECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES

SECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES GUIDE SPECIFICATION SECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES PART 1 - SCOPE 1.01 WORK INCLUDED: 1.1.1 This guide covers the

More information

CRUSHED AGGREGATE BLENDED WITH GRANITECRETE ADMIXTURE SURFACING

CRUSHED AGGREGATE BLENDED WITH GRANITECRETE ADMIXTURE SURFACING Guide Specification CRUSHED AGGREGATE BLENDED WITH GRANITECRETE ADMIXTURE SURFACING COORDINATE WITH DRAWINGS: Show location and extent of stabilized aggregate surfacing. Show details required at adjoining

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

2.1 Backfill - General

2.1 Backfill - General 2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately

More information

Guideline Specifications To Turfgrass Sodding

Guideline Specifications To Turfgrass Sodding Guideline Specifications To Turfgrass Sodding Is a modification of an original publication by TURFGRASS PRODUCERS INTERNATIONAL (TPI) This publication may be copied in part or whole, with the implied permission

More information

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS STANDARD SPECIFICATIONS SECTION 02950 PAVEMENT REQUIREMENTS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for removing, replacing and providing new paving for roads, driveways, parking

More information

5. Partially filled fuel tanks within the building shall be pumped empty. The oil and tanks shall be removed and deposed of in a legal manner.

5. Partially filled fuel tanks within the building shall be pumped empty. The oil and tanks shall be removed and deposed of in a legal manner. Page 1 of 1. A pre bid site walk though was held at the site, 200 West Street, Ware MA, at 2:00pm August 24, 2011. The following attended: a. Chief Thomas Coulombe Ware Fire Department b. Mr. Thomas Martens

More information

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007 Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION March 22, 2007 Description: This work consists of furnishing and applying asphalt rubber binder followed by an application of treated cover aggregate

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

SPECIAL SPECIFICATION 3048 Permeable Concrete

SPECIAL SPECIFICATION 3048 Permeable Concrete 2004 Specifications CSJ 0713-02-007 SPECIAL SPECIFICATION 3048 Permeable Concrete 1. Description. Furnish permeable concrete with hydraulic cement and chemical admixture for use in permeable concrete pavements.

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCESA / NASA UFGS-32 11 10 (August 2008) --------------------------- Preparing Activity: USACE Superseding UFGS-32 11 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION A. Section Includes B. References C. Quality Assurance D. Submittals E. Delivery, Storage and Handling F. Environmental Conditions G. Summary H. Concrete

More information

SECTION POROUS PAVEMENT SYSTEM

SECTION POROUS PAVEMENT SYSTEM SECTION 02795 POROUS PAVEMENT SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. Porous grass paving grid system. 1.2 RELATED SECTIONS A. Section 02300 - Earthwork. B. Section 02620 Sub-Drainage System. C.

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

Attachment 10 Detailed Specifications Group IFB (Revised December 8, 2017) Fine and Coarse Aggregates (Statewide)

Attachment 10 Detailed Specifications Group IFB (Revised December 8, 2017) Fine and Coarse Aggregates (Statewide) Attachment 10 Detailed Specifications Group 33700 IFB 23097 (Revised December 8, 2017) Fine and Coarse Aggregates (Statewide) GROUP 33700 FINE AND COARSE AGGREGATES Page 2 of 14 CONTENTS REFERENCES:...

More information

A. Submittal Procedures: See Article 13 of the General Conditions.

A. Submittal Procedures: See Article 13 of the General Conditions. SECTION 321313 - CONCRETE PAVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Driveways. 2. Roadways. 3. Parking lots. 4. Curbs and gutters. 5. Walks. B. Proposed Substitutions: See Article 2,

More information

B. Samples: Submit, for verification purposes, samples of the following:

B. Samples: Submit, for verification purposes, samples of the following: SECTION 04500 - MASONRY RESTORATION AND CLEANING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings, photos and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

COMPACTED CLAY LINERS

COMPACTED CLAY LINERS Technical Reference Document for Liquid Manure Storage Structures COMPACTED CLAY LINERS Table of Contents SECTION 1 - PURPOSE AND SCOPE 1.1. Purpose of the Technical Reference Document 1.2. Requirement

More information

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation. SECTION 312333 TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 SUMMARY A. Excavate trenches for new electric and telephone conduits, gas lines, and their appurtenances from at least 5 feet outside the building

More information

SECTION EARTH MOVING

SECTION EARTH MOVING SECTION 312000 -EARTH MOVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Section,

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

B. Subsurface data is available from the *Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the *Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 22 13 SITE GRADING PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the earthwork generally consisting of excavation, filling, backfilling and subgrade preparation as required for

More information

A. Work of this Section is affected by unit prices for earth moving specified in Section "Unit Prices."

A. Work of this Section is affected by unit prices for earth moving specified in Section Unit Prices. SECTION 312000 EARTH MOVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

Bindex BFM HYDRAULICALLY APPLIED EROSION CONTROL PRODUCT SPECIFICATION

Bindex BFM HYDRAULICALLY APPLIED EROSION CONTROL PRODUCT SPECIFICATION PART I - GENERAL 1.01 Summary Bindex BFM HYDRAULICALLY APPLIED EROSION CONTROL PRODUCT SPECIFICATION A. The hydraulically applied Bindex BFM (Bonded Fiber Matrix) is made from natural wood fibers (including

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL Section Number Title 801 GENERAL 802 STANDARD METHODS OF EROSION AND SEDIMENT

More information

STATE PROJECT NUMBER TZ MnDOT

STATE PROJECT NUMBER TZ MnDOT 1.1 NOTICE TO RESPONDERS ADDENDUM NUMBER SIX DATED 24 October 2014 MnDOT LITTLE FALLS TRUCK STATION 15038 Pine Avenue, Little Falls MN 56345 STATE PROJECT NUMBER TZ 90468 WIDSETH SMITH NOLTING 610 Fillmore

More information

SECTION BRICK MASONRY ASSEMBLIES

SECTION BRICK MASONRY ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Face brick. 2. Mortar and grout. 3. Ties and anchors. 4. Miscellaneous masonry accessories. 1.2 SUBMITTALS A. Product Data: For each type

More information

DOCUMENT SPECIAL PROVISIONS

DOCUMENT SPECIAL PROVISIONS DOCUMENT 00813 SPECIAL PROVISIONS ADDENDUM NO. 1, DECEMBER 16, 2016 PRICE ADJUSTMENTS FOR STRUCTURAL STEEL AND REINFORCING STEEL FOR CONTRACTS BID ON OR AFTER APRIL 5, 2011 ENGLISH UNITS December 12, 2016

More information

SECTION CONCRETE PAVING SLABS SET IN MORTAR

SECTION CONCRETE PAVING SLABS SET IN MORTAR SECTION 32 14 13.16 CONCRETE PAVING SLABS SET IN MORTAR (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs mortared to a concrete base and grouted joints

More information

The GREENBOOK 2015 Standard Specifications for Public Works Construction

The GREENBOOK 2015 Standard Specifications for Public Works Construction 203-3.4.4 Rubberized Polymer Modified Emulsion (RPME). 203-4.4.4.1 General. RPME shall consist of a mixture of emulsified asphalt, crumb rubber, and latex. RMPE shall contain between 0.55 pounds per gallon

More information

SECTION MONITORING WELL ABANDONMENT

SECTION MONITORING WELL ABANDONMENT SECTION 027300 MONITORING WELL ABANDONMENT PART I GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 1 - GENERAL REQUIREMENTS,

More information