1 Chapter 3: Design Guidelines in this chapter apply to Capital projects. Consult with the Owner to identify variations for other project types. CHAPTER CONTENTS 3.1 GENERAL A. Administration of Design Services B. Bid Target C Project Identification D. Design Phase and Issue Date Identification E. Design Phase Approval F. Meeting Notes G. Drawing Size, Scale, and North Arrow 3.2 REGULATORY A. Codes and Regulations B. State Fire Marshal Office (SFMO) Review C. Storm Water Permits 3.3 MECHANICAL DESIGN CRITERIA 3.4 SUSTAINABLE DESIGN A. State Requirements B. Sustainable Design Process C. Indoor Lighting Design D. Outdoor Lighting Design E. Material Recycling Collection Design 3.5 SPACE EFFICIENCY AND COST ANALYSIS 3.6 PROGRAM PHASE A. Owner-Prepared Program Information B. Program Phase Services C. Program Phase Communications D. Program Phase Space Efficiency and Cost Analysis 3.7 SCHEMATIC DESIGN PHASE A. Owner-Provided Information B. Site Studies and Other Services C. Schematic Design Phase Services D. Schematic Design Phase Communications E. Schematic Design Phase Space Efficiency and Cost Analysis 3.8 DESIGN DEVELOPMENT PHASE A. Design Development Phase Services B. Design Development Phase Communications C. Design Development Phase Space Efficiency and Cost Analysis D. Design Presentation to the SBC 3.9 CONSTRUCTION DOCUMENT PHASE A. Construction Document Phase Services B. Construction Document Phase Communications C. Construction Document Phase Space Efficiency and Cost Analysis D. Transition to Bidding Phase The University of Tennessee Chapter 3: Design, Page 1 of 19

2 3.10 FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) ADDITIONAL SERVICES A. Additional Services for FF&E Design B. Program Phase FF&E Additional Services C. Schematic Design Phase FF&E Additional Services D. Design Development Phase FF&E Additional Services E. Construction Document Phase FF&E Additional Services 3.11 DESIGN PHASE DOCUMENTS CHECKLISTS 3.1 GENERAL A. Administration of Design Services: Design the project to meet the authorized scope, budget, and schedule. Upon initiation of the project, arrange to review with the Owner the service and administrative requirements. This review will typically be a meeting in which the following topics are addressed. 1. The project s State Building Commission (SBC) project budget information form and the project scope and budget requirements established by the form including definition of key terms and concepts such as Bid Target. Obtain a copy of this form from the Owner. 2. Agreement(s) between Owner and Designer. 3. Roles and responsibilities of the Owner, the Designer, and the user. 4. The procedural guidance of this Designers' Manual. 5. Designer Invoices and Payments. 6. Procedures for Design Phase reviews. 7. Testing laboratory services and special consultants provided under the Owner- Designer Agreement such as soil testing and consultants for special features or systems. 8. Schedule for services. 9. Any required clarification of the requirements. B. Bid Target: Design the project to not exceed the authorized project Bid Target. The Designer s construction cost estimate shall include any Designer-determined estimating contingency. (This is not the same as the Owner s contingency which is added to the Bid Target to calculate the MACC. The Owner s contingency is solely designated for the Owner s exclusive control and use for unanticipated project costs.) C. Project Identification: The exact title of the project and SBC Number shall be used on all documents including invoices and correspondence. Subject lines of correspondence shall include the exact title of the project. Abbreviations of words or names in project titles may be used on correspondence inasmuch as the complete title is readily understood. D. Design Phase and Issue Date Identification: Design document submittals to the Owner shall be labeled to identify the design phase for which they are provided and shall indicate the date of issue. E. Design Phase Approval: When providing services for multiple Design Phases, obtain written approval of the Owner before proceeding with the next phase. F. Meeting Notes: Prepare meeting notes from each meeting with the Owner and transmit them to the Owner within seven calendar days of the meeting. This includes meetings The University of Tennessee Chapter 3: Design, Page 2 of 19

3 with user groups or occupants, regardless of the attendance of a representative of the Division of Facilities Planning. G. Drawing Size, Scale, and North Arrow: Unless otherwise requested, reduce drawings submitted on paper to the Owner to an accurately scalable half size for submittal. For example, a drawing at 1/4 scale submitted at half size shall be scalable at 1/8 scale. Lettering on drawings shall be legible when reduced to half size. Minimum lettering size after reduction shall be 1/16. Graphically illustrate scale on plan drawings. On plan drawings, regardless of design discipline or building system represented, include a north arrow with the preferable method representing both true north and building north. H. Testing Laboratory Services: Follow the requirements of Section 6.4 for the selection and payment of testing laboratory services. 3.2 REGULATORY A. Codes and Regulations: Applicable codes and regulations are listed in Basic Regulatory Requirements, as exhibited in Appendix 3. Other codes or regulations may also apply. Designers are responsible for designing in accordance with the codes and regulations applicable to the project. B. State Fire Marshal Office (SFMO) Review: The SFMO has responsibility for reviewing construction documents to approve the fire, building, life safety, and accessibility code compliance of state owned facilities. The Rules of the Tennessee Department of Commerce and Insurance defines construction and requires plans and specifications to be submitted by the SFMO prior to commencing construction of a state building. (SFMO review is not required for state leased facilities in exempt jurisdictions, i.e., those jurisdictions that are approved by the SFMO to run their own codes enforcement program). The Owner will cooperate with the Designer and the SFMO to meet the codes requirements and user requirements for the project. Additional guidance is as follows: 1. SFMO contact information: Tennessee Department of Commerce and Insurance State Fire Marshal s Office Davy Crockett Tower 10 th Floor, 500 James Robertson Parkway Nashville, TN Telephone: Fax: Web site for the SFMO Codes Enforcement Section, Plans Review Information: 2. Upon project initiation, discuss with the Owner the process for communication and review with the SFMO. The Owner may request, as a component of Basic Services, that the Designer initiate communication and technical coordination with the SFMO in Design Phases prior to the Construction Document phase to allow for early identification of issues. 3. For SFMO reviews, the Designer shall utilize the SFMO s required submittal process after obtaining Owner approval to proceed with the SFMO submittal. 4. The Designer does not pay the SFMO review fee. The Owner pays the review fee through internal state administrative processes. In estimating the review fee, the Designer must give careful attention to the fee table and exemption provisions. The University of Tennessee Chapter 3: Design, Page 3 of 19

4 5. The SFMO s approval letter must be obtained before a bid date will be assigned by the Owner. C. Storm Water Permits: Storm water permits are regulated by the Tennessee Department of Environment and Conservation (TDEC). Submit projects that involve a project work site of one acre or more to TDEC for an initial review as soon as a preliminary site plan is available for evaluation of permitting applicability. A full submittal shall be concurrent with the SFMO review. 3.3 MECHANICAL DESIGN Upon project initiation, discuss with the Owner the application of the Mechanical Design Criteria as provided in Appendix SUSTAINABLE DESIGN A. State Requirements: Upon project initiation, discuss with the Owner the application of the Tennessee High Performance Building Requirements (HPBr) as provided in Appendix 2 and follow required HPBr procedures and the additional guidance in this Section 3.4. B. Sustainable Design Process: 1. Use a graded approach when evaluating the feasibility of incorporating design criteria, as enumerated and described in the HPBr, to select the most cost-effective features among the credits available. 2. Conduct a Pre-design HPBr Review of (1) the Program, (2) the HPBr requirements, and (3) any other relevant project information and meet with the Owner to report on the review results at the earliest opportunity in the design schedule. At this meeting, request of the Owner any needed clarification of the Program and provide to the Owner the Designer s preliminary HPBr Checklist/Tracking Form with identification of applicable design features. 3. Based on the Owner s review and comments from the meeting described above, conduct a workshop which shall include the project s principal designers and all design consultants. At this meeting, provide to the Owner for review and approval (1) a listing of applicable HPBr criteria, (2) an assessment of the feasibility of the options based on the Program and Bid Target, and (3) the Designer s recommended action. 4. Report on HPBr implementation in successive design review meetings and obtain the Owner s approval at appropriate milestones. 5. Complete HPBr checklist form after Schematic Design, Design Development, and Construction Document phases. Submit checklist to owner with each phase submittal. C. Indoor Lighting Design: 1. Endeavor to exercise creativity and ingenuity within the reasonable limits of the project scope, site, Program, and budget to maximize daylighting and exterior views for building occupants in regularly occupied building areas in accordance with the HPBr 2. Early efforts related to indoor lighting shall focus on the analysis of design strategies to minimize building energy required for artificial lighting as well as for cooling due to the interior heat generated by artificial lighting. 3. Where reasonable, endeavor to reduce general ambient illumination to a minimum and favor user-controlled task and focused-function illumination. The University of Tennessee Chapter 3: Design, Page 4 of 19

5 4. Incorporate lighting control methods such as daylighting control (e.g., half level) ambient lighting and motion sensor switches for ambient lighting in offices and classrooms. These control methods shall focus on reducing the building s lighting energy demand by digitally controlled sensing, dimming, or modulating artificial lighting levels based on occupancy, need, and available natural light. D. Outdoor Lighting Design: 1. Endeavor to design creatively to focus outdoor lighting on (1) the time of need through daylight sensor controls or timers adjusted for varying natural light conditions, and (2) the functional need for lighting for vehicular access, exterior parking areas, pedestrian access paths and walkways, building entrances and exits, grounds security, and building feature highlighting for identification and wayfinding. 2. Through careful and considerate design of exterior lighting fixtures, avoid the three types of recognized light pollution: (1) Sky Glow, (2) Light Trespass, and (3) Glare, as described in the Illuminating Engineering Society Standard RP-33-99, Lighting for the Exterior Environments: Make purposeful selection of lighting fixtures and luminaires, cutoffs or baffles, to focus outdoor lighting on its purpose rather than using fixtures such as wallpaks for general illumination that may create light pollution. E. Material Recycling Collection Design: 1. Design areas distributed throughout the building for material recycling receptacles to preclude later accommodation in unplanned locations which may obstruct or diminish required fire egress paths or reduce planned functionality. 2. Provide a dedicated interior building recycling material collection room appropriate for building function and size adjacent to the main building service access point or loading dock. For multi-story buildings with large floor areas, secondary recycling collection rooms adjacent to service elevators may also be required. Consult with the Owner to ascertain campus-specific requirements. 3.5 SPACE EFFICIENCY AND COST ANALYSIS Guidelines for Space Efficiency and Cost Analysis are detailed in the applicable Design Phase sections below. Application of these guidelines will vary in specifics by project. In conducting these analyses, refer to the Postsecondary Education Facilities Inventory and Classification Manual (FICM): 2006 Edition, Chapter 3, for building area measurement guidance. Review with the Owner the application of the terms in the FICM. At this writing, a free download of the FICM is available through the following Web site PROGRAM PHASE A. Owner-Prepared Program Information: As described in the Agreement, the Owner will normally have Program information to provide to the Designer that will establish the Owner s functional objectives including space requirements and relationships, time and budget constraints, and other special criteria. B. Program Phase Services: The Designer s Basic Services requirements for the Program Phase are generally defined by the Agreement but will vary in specifics by project. Specific requirements may include, but are not limited to, the following. The University of Tennessee Chapter 3: Design, Page 5 of 19

6 1. Project initiation by a Pre-Design Conference with the Owner. 2. Verification of Program requirements and advisement as specified in the Agreement. 3. Validation or development of a project Problem Statement based on the Program requirements. 4. Definition of allocations and constraints regarding project scope, budget, and time. 5. Program Phase HPBr implementation. 6. Program Phase Space Efficiency and Cost Analysis as described below. 7. Consultation on site selection, site relationships, and site issues as follows. Risk assessment of Owner-provided information on existing conditions. Identification of real property considerations. Existing and project-required utility easements. Restrictions regarding project site usage, staging, work hours, and continued occupancy. 8. Identification of code and regulatory compliance requirements. 9. Consultation on functional aspects of the Program and preliminary concepts for developing functional design solutions. C. Program Phase Communications: The following are potential topics for communications between the Owner and the Designer: 1. Obtaining soils testing, surveys, information on utilities, etc. 2. Establishment of schedule for design. 3. Establish possible construction schedule and procurement method (Design, Bid, Build, Best Value, or Construction Manager / General Contractor (CM/GC). If using CM/GC, establish schedule for Request for Proposal process. 4. Potential additional services that may be required of the Designer. 5. The Designer s completion of Program Phase requirements. 6. The Owner s written approval of the Program Phase and requirements for further services. D. Program Phase Space Efficiency and Cost Analysis: 1. Based on the project s State Building Commission (SBC) project budget information form, calculate the project s Efficiency Ratio (ER) by dividing the form s listed Net Square Feet (NSF) by the form s listed Gross Square Feet (GSF). 2. Research and document a minimum of three other similarly designed and constructed university projects in the United States in regards to project budget and ER. Comparative project cost data from the other projects shall be escalated to the midpoint of the planned project construction period. 3. Evaluate the Program s Net Assignable Square Feet (NASF) and the Program s descriptions of design feature quality levels for consistency with (1) the SBC form s Bid Target, GSF, NSF, and calculated ER and (2) the Designer s comparative research. Report the evaluation by either of the following actions: a. If the Designer concludes that there is consistency and the SBC form s Bid Target is adequate, report this conclusion in writing to the Owner along with the other The University of Tennessee Chapter 3: Design, Page 6 of 19

7 documents required for completion of Program Phase services. b. If the Designer concludes that there is inconsistency and the SBC form s Bid Target is inadequate this conclusion shall immediately be reported in writing to the Owner along with the Designers recommendations to reconcile inconsistencies by (1) reconsideration of the Bid Target, (2) an adjustment to the Program s NASF, (3) alteration of the target ER, (4) adjustments to design feature quality levels, or (5) a combination of the above. 3.7 SCHEMATIC DESIGN PHASE A. Owner-Provided Information: Verify existing conditions as practicable and discuss with the Owner the types of additional investigations that are needed to adequately design the project. B. Site Studies and Other Services: Early in the Schematic Design Phase, prepare and submit to the Owner a written proposal for land, environmental, archaeological and other surveys, geotechnical and hazardous materials investigations, and other such special services needed to design the project. The proposal may recommend preliminary studies and detailed follow-up studies. Discuss service and receive qualifications with at least three qualified firms before making a service provider written recommendation. Owner approval of the firm is required before the cost of services is negotiated. After negotiation and a price is agreed upon, the Designer will be given written authorization to hire the selected firm. Recommendations should meet the following requirements in the proposal. 1. Identify firms that submitted proposals, their qualifications, and the recommended firm for providing services. 2. Identify a timetable for obtaining services that provides adequate time for the Owner to review and approve the qualifications. 3. Once the Owner and Designer reach a consensus on the best qualified provider then the firm will be asked to submit an hourly not to exceed cost proposal which includes an itemization of direct cost along with a total fee. 4. Identify the projected maximum Owner's cost including applicable Designer multiplier. 5. For Testing Laboratory Services follow additional guidance in Chapter 6. C. Schematic Design Phase Services: The Designer s Basic Services requirements are generally defined by the Agreement but will vary in specifics by project. Specific requirements may include, but are not limited to, the following. 1. A schematic design communicated as specified in the Agreement. 2. An analysis of the site including the following: Analysis and descriptions as specified in the Agreement. Flood zone designations. Local zoning. Applicable permits. 3. Fire and life safety requirements and design concepts. 4. Conceptual diagrams of alternate approaches to Program requirements. 5. Visual studies in diagrammatic or model form. The University of Tennessee Chapter 3: Design, Page 7 of 19

8 6. Dimensioned schematic floor plan drawings of the approved design concept. 7. A narrative description of building systems. 8. Schematic Design Phase HPBr implementation. 9. Schematic Design Phase Space Efficiency and Cost Analysis as described below. 10. Review of applicability and criteria for building commissioning. 11. Schematic Design Phase coordination with the SFMO. 12. Determination of TDEC Storm Water Permit applicability. 13. Communication of the results of site studies and other services. D. Schematic Design Phase Communications: The following are potential topics for communications between the Owner and the Designer. 1. Site analysis implications. 2. Flood zone risks and implications. 3. Relationship to master plans, land use, local zoning, permits, environment, circulation, mass transportation, traffic, parking, telecommunications, utilities, fire, and life safety. 4. Functional relationships. 5. Visual studies in diagrammatic form or in model form. 6. Development and review of design concepts fulfillment of Program requirements. 7. Selection of a design concept and completion of Schematic Design. 8. Consideration of the need for third party scheduling or commissioning. 9. Project schedule. 10. Consideration of site usage restrictions and effects such as noise, vapors, user operation routines and special events, and closures. 11. Consideration of existing and project-required utility easements. 12. The Owner s written approval of the Schematic Design Phase and requirements for further services. E. Schematic Design Phase Space Efficiency and Cost Analysis: 1. Calculate the GSF, NASF, and ER of the schematic design. Compare the calculated ER with the target ER and Bid Target established in the Program phase. 2. Develop a Cost/GSF Estimate and utilize such to estimate the Probable Total Construction Cost as required by the Agreement. The Designer s Cost/GSF Estimate shall be based on comparisons to other similar and recently completed projects. Comparative project cost data from other projects shall be escalated to the midpoint of the planned project construction period based on an escalation factor developed after researching a minimum of three industry sources current escalation projections. 3. Resolve any inconsistencies between the Bid Target, the Probable Total Construction Cost, ER, and quality levels requirements. 4. Provide this analysis to the Owner in writing. 3.8 DESIGN DEVELOPMENT PHASE The University of Tennessee Chapter 3: Design, Page 8 of 19

9 A. Design Development Phase Services: The Designer s Basic Services requirements are generally defined by the Agreement but will vary in specifics by project. Specific requirements may include, but are not limited to, the following services. 1. A fully developed and communicated design concept as specified in the Agreement. 2. A site plan with contours, applicable cross sections, and definition of extent of site disturbance and demolition. 3. Design Development Phase Space Efficiency and Cost Analysis as described below. 4. Significant typical design details. 5. Narrative summary descriptions for materials, equipment, and building systems. 6. Design Development Phase HPBr implementation. 7. Design Development Phase coordination for SFMO review and TDEC Storm Water Permit. 8. Design presentation to the SBC. B. Design Development Phase Communications: The following are potential topics for communications between the Owner and the Designer. 1. Early in the Design Development Phase, establishing or clarifying Owner design guidelines and user requirements for building systems and equipment which may include the following: Telecommunications, security, and computer network systems. Geotechnical conditions and design requirements. Interior design including furniture, fixtures, and equipment. Energy management systems. Hazardous material management. Building signage including naming, dedication, or building plaques. 2. External coordination requirements such as those for land rights, utility service and connections, site staging, and restricted access. 3. Building and site closures or disruptions for normal user operations. 4. Special quality controls and possible third party delivery methods. 5. Necessity and preliminary definition of construction phases, allowances, and unit prices. 6. Necessity and preliminary definition of Bid Alternates for distinct optional design features. 7. Schedule for Request for Proposal Process if using Best Value procurement method. 8. Procedures for bidding and administration of contract documents. 9. Project schedule. 10. The Owner s written approval of the Design Development Phase and requirements for further services. C. Design Development Phase Space Efficiency and Cost Analysis: 1. Precisely calculate the GSF, NASF, and ER of the developed design. Develop a The University of Tennessee Chapter 3: Design, Page 9 of 19

10 summary of changes from the Schematic Design Phase design with a brief description of the influences causing the change. 2. Use an experienced and qualified cost estimator to prepare the Construction Cost Estimate as required by the Agreement which shall be based on material quantity takeoffs and current industry pricing for the midpoint of the planned project construction period with application of escalation factors as appropriate. Additionally, apply the developed design s GSF to the previously developed Cost/GSF Estimate and compare the resultant amount to the Construction Cost Estimate. 3. Resolve any inconsistencies between the Bid Target, the Construction Cost Estimate, ER, and quality levels requirements. 4. Provide this analysis to the Owner in writing. D. Design Presentation to the SBC: The Owner will inform the Designer of the specific requirements for the Designer to make a design presentation to the State Architect and to the SBC in Nashville. The Owner may request that a rehearsal presentation be made to the Owner prior to the SBC presentation. Presentation requirements are specific to each project but may include the following. 1. Presentations in digital format (.ppt or.pdf) for projection in the SBC meeting. 2. Brief oral comments on any project aspect in response to questions from SBC members. 3. Preliminary drawings as listed below communicating design concepts accurately but not so detailed as to detract from understanding the form and function of structures. A vicinity plan showing the relationship of the project to the surrounding campus or community. A site plan showing relationships to site features and adjacent structures. Floor plans. Elevations or perspective (preferred). 4. Project Summary: Purpose of project, brief project description, and general program spaces, along with overall square footage. The site, its location, and the results of geotechnical investigations and other test reports. The facility plan, relation to Master Plan, and major functional relationships of the building. The systems used for foundation, structure, walls, roof, windows, finishes, plumbing, HVAC, and electrical service. Energy efficiencies and applicability of the HPBr. Fire protection systems, barrier-free accommodations, and other special features contributing to the solution. Commissioning scope, if required. Efficiency analysis of gross, net, and usable square footage. SBC approved bid target versus Designer s construction cost estimate. Building cost estimate and cost per square footage. Site cost estimate The University of Tennessee Chapter 3: Design, Page 10 of 19

11 Anticipated construction start date and completion date and compliance with schedule. 3.9 CONSTRUCTION DOCUMENT PHASE A. Construction Document Phase Services: The Designer s Basic Services requirements are generally defined by the Agreement but will vary in specifics by project. Specific requirements may include, but are not limited to, the following services. 1. Plan for the Construction Schedule Whenever possible, the construction Contract Time shall be planned to run without imposed schedule impacts such as interruptions, sequences, or dependencies. If such schedule impacts are unavoidable then accommodations for these impacts shall be made in the Bidding Documents and reviewed with the Owner early in the Construction Document Phase. Establishing construction phases is a viable accommodation for a schedule impact. Designer services for phased construction schedules shall include the control of construction commencement and/or acceptance through phase-specific Notices to Proceed, Substantial Completion inspections, and Certifications for Payment. 2. Plan Alternates as Required and Approved The use of Alternates requires review and approval by the Owner. When necessary, Alternates are used to protect the Bid Target and improve the chance for an awardable bid. When authorized by the Owner, Alternates shall be established, evaluated, and awarded according to SBC Policy: limited to four in number, additive, and listed in priority order in bidding documents. If alternates are used, the Base Bid and Alternate One must be estimated by the Designer to cost less than the Bid Target. 3. Plan Quantity Allowances and Unit Prices as Required and Approved The use of Quantity Allowances and Unit Prices requires review and approval by the Owner. 4. Avoid Lump Sum Allowances. Do not use Lump Sum Allowances unless approved by the Owner. 5. Construction Documents and a Project Manual required for receiving bids as specified in the Agreement. Prepare required Drawings including, unless otherwise approved, a title sheet, location map, and list of drawings matching that in the Project Manual. Follow the guidance in Chapter 4, Project Manual Guide, and Chapter 5, Bidding. 6. Submittal of documents to the SFMO. 7. A final revision of the narrative summary descriptions required in the Design Development Phase. 8. Construction Document Phase Space Efficiency and Cost Analysis as described below. 9. Construction Document Phase HPBr implementation. The University of Tennessee Chapter 3: Design, Page 11 of 19

12 B. Construction Document Phase Communications: The following are potential topics for communications between the Owner and the Designer. 1. Media and sizes for submitted Contract Documents. 2. Verification that required submittals have been made to authorities, such as the SFMO and TDEC, and that approvals are in-hand or are due prior to release for bids. 3. Status of required external coordination such as those for utility easements. 4. Review construction staging, phasing, coordination of work by the user, accommodations required of the user, and functional impacts upon the user or others. 5. Impacts of construction on existing facility warranties. For example, a project requiring penetrations to an existing roof may affect the roofing system warranty. 6. The construction timetable, Contract Time, and Liquidated Damages. 7. Commissioning specifications and implementation issues, if required. 8. The timetable for completion of the Construction Document Phase and commencing to the Bid Phase. The Designer shall make revisions identified by the Owner prior to printing. 9. Reviews of final draft bidding documents and preparations for the Bidding Phase including coordination of the following. Invitation to Bid advertisement by the Owner. Instructions to Bidders. Bid Pack deposit. Cost for additional Bidding Documents requested by Bidders. Document distribution to Bidders. Pre-Bid Conference agenda. Bid opening date and procedures. Bid Tab. Communications including notifications and recommendations. 10. The Owner s written approval of the Construction Document Phase and requirements for further services. C. Construction Document Phase Space Efficiency and Cost Analysis: 1. Precisely calculate the GSF, NASF, and ER of the final detailed design. Develop a summary of changes from the Design Development Phase design with a brief description of the influences causing the change. 2. Review the Construction Cost Estimate submitted to the Owner in the Design Development Phase as required by the Agreement. Based on this review, take either of the following actions: a. Provide a written confirmation of the continued validity of the Construction Cost Estimate submitted to the Owner in the Design Development Phase with the Designer s recommendations regarding applicability. Or b. Use the same cost estimator who prepared the Construction Cost Estimate in the The University of Tennessee Chapter 3: Design, Page 12 of 19

13 Design Development Phase to update the Construction Cost Estimate for the final detailed design. This update shall include identifying and applying changes in material quantity take-offs, changes in industry pricing and escalation factors, additional detailing, and any other factor causing a change in the Construction Cost Estimate. 3. Apply the final detailed design s GSF to the previously developed Cost/GSF Estimate and compare the resultant amount to the Construction Cost Estimate as updated. Provide this analysis in writing to the Owner with the Designer s recommendations regarding applicability. D. Transition to Bidding Phase: The following is a typical sequence of events for the transition from the Construction Document Phase to the Bidding Phase. 1. The Designer incorporates the Owner s comments on the draft Bidding Documents in appropriate revisions. 2. The Designer submits to the Owner the final, signed and sealed, Bidding Documents, a copy of the SFMO approval letter, and a copy of the TDEC Storm Water Permit Application. 3. The Bidding Phase begins with the assignment of the Bid Date by the Owner. The Owner sends the bid envelope cover with completed header information to the Designer. The Owner places an Invitation to Bid advertisement in a newspaper. The Designer adds the Bid Date to the Bidding Documents, sends the documents to the printing service, and sends Bidding Documents to plan rooms and the Owner FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) ADDITIONAL SERVICES A. Additional Services for FF&E Design: The Owner and Designer shall jointly review the project to determine the applicability of additional services for FF&E design. If applicable, submit to the Owner a written proposal for additional services for FF&E design, prepared in accordance with the Agreement and to accommodate the specific requirements of the project. Services may commence only after written approval by the Owner. FF&E design services shall be coordinated with and mutually responsive to other services of the Designer to result in an integrated project delivery. Typical services for FF&E design are described below. B. Program Phase FF&E Additional Services: 1. Meet with the Owner s user group representatives to discuss program requirements for FF&E including the following: a. Functional standards and quality levels. b. Personnel space standards and/or workstation systems. c. General requirements related to power and data systems, telecommunications, and reproduction equipment. d. Interior signage scope. 2. Following determination of user needs, prepare FF&E budget estimates and an outline schedule indicating milestone dates for completion of project FF&E work. The University of Tennessee Chapter 3: Design, Page 13 of 19

14 3. Determine scope and images required for interior signage. 4. Confirm the scope, schedule, and fee for FF&E design services. 5. Submit a written summary of results for Owner approval. C. Schematic Design Phase FF&E Additional Services: 1. Prepare schematic design documents including the following: a. Alternative design floor plans at 1/8 scale indicating FF&E types and quantities. b. Illustrations (e.g., drawings, photographs, samples) of proposed types of finishes, materials, and fabrics. c. Illustrations of interior signage design concepts. d. Documentation of the user s specific FF&E requirements related to power and data systems, telecommunications, and reproduction equipment. e. Preliminary listing of manufacturer recommendations. 2. Coordinate FF&E design with power and communications design for accurate understanding and compatibility across disciplines. 3. Schedule necessary meetings with user groups for confirmation of design direction. 4. Confirm FF&E schedule and budget. 5. Culminate Schematic Design Phase FF&E services with a presentation to the Owner s project manager and user group representatives for approval. D. Design Development Phase FF&E Additional Services: 1. Prepare final floor plans for all FF&E features. 2. Make final written recommendations for approved manufacturers for FF&E specifications including specifications for finishes and fabrics. 3. Submit a final written recommendation for furniture and fabric selections. Selections shall be based on user input from a minimum of one initial recommendation review meeting and two revised recommendation review meetings. Additional interaction with user representatives shall be conducted as necessary to develop recommendations. 4. Provide interior signage location plans, typical drawings, and descriptions of style and wording for each sign. Interior signage design shall be based on user input from a minimum of one initial design review meeting and two revised design review meetings. 5. Provide illustrations for recommended locations and types of art. 6. Develop and communicate with appropriate project design personnel to ensure proper coordination between FF&E and building systems including, but not limited to, electrical, communications, mechanical, and structural designers. 7. Confirm FF&E schedule and budget. 8. Culminate Design Development Phase FF&E services with a presentation to the Owner s project manager and user group representatives for approval. E. Construction Document Phase FF&E Additional Services: 1. Develop FF&E specifications and bid documents. 2. Develop interior signage specifications and bid documents. 3. Make arrangements with Owner for final selection and purchase of approved art. The University of Tennessee Chapter 3: Design, Page 14 of 19

15 4. Confirm FF&E schedule and budget. 5. Collaborate with the Owner s project manager and purchasing personnel to develop appropriate bidder lists. 6. Submit Construction Documents for Owner approval DESIGN PHASE DOCUMENTS CHECKLISTS Follow the Design Phase Document Checklists on the following pages for guidance regarding the required documents for completion of services in the Schematic, Design Development, and Construction Documents phases of design. Review the checklists with the Owner for confirmation or revision of document requirements. The University of Tennessee Chapter 3: Design, Page 15 of 19

16 SCHEMATIC DESIGN PHASE DOCUMENT CHECKLIST Project: Prepared By: SBC No.: Date Prepared: General Information Building Elevations Occupancy Classifications/Const. Type(s) Exterior Bldg. Elevations with locations of doors, operable/fixed/spandrel glazing, Life Safety Plan with fire separations/walls, floor-to-floor and overall heights egress routes, ADA accessibility Occupant Loads Exterior Finish Materials Code Analysis Sheet with GSF for each level Exterior Cladding Systems Drawing Set Sheet Index Exterior Lighting Locations Room Numbering System Roof Profile and Finish Materials Interior Elevations of major/complex spaces Space Efficiency and Cost Analysis Typical Casework Elevations Calculated GSF, NASF, and ER Comparison of Calculated ER with Bid Target Building & Wall Sections Comparative Project Cost Data Bldg. Sections showing floor-to-floor heights, space relationships, mechanical Escalation Factor Information plenums Cost/GSF Estimate Preliminary Typical Exterior Wall Sections Probable Total Construction Cost Stair, Elevator, and Shaft Sections Site Plans Details Site Survey of existing topography Preliminary Significant Exterior Wall Details Site Location Plan with parking/site features Significant Structural Details Site Grading/Drainage Plan Preliminary MEP Equipment Schedules Site Utilities/Civil Engineering Plan including Easement Requirements Reflected Ceiling Plans for major/typ. spaces Site Landscaping Sketch Plan Specialty Wall Details (blast/dust/visual) Site Detail Sheets Project Manual Building Floor Plans Basis of Design Description 1/8" Floor Plans with gross dimensions, Basic Building Materials List building columns, and door swings Outline Specifications 1/8" minimum Roof Plan Interior Finish Narrative Description Occupancy Separation/Rated Wall Plans Soils Investigation Report Structural Foundation/Column Plans Storm Water Erosion Control Plan/Prelim. Structural Framing Plans Storm Water Pollution Prevention Plan Preliminary Furniture/Equipment Plans Traffic Study & Description (if required by UT) Reflected Ceiling Plans, major/typical spaces Signage/Wayfinding Narrative (if required) Mechanical Single-Line Distribution Plans Vibration Analysis (if required) Mech/Elect/Telecomm Room Layouts Fume Hood/Lab Equipt. Inventory (if required) Vertical Circulation, Shafts, and Chases Preliminary Lab Equipment Plans (if required) Prelim. Kitchen/Specialty Equipment Plans The University of Tennessee Chapter 3: Design, Page 16 of 19

17 DESIGN DEVELOPMENT PHASE DOCUMENT CHECKLIST Project: SBC No.: Prepared By: Date Prepared: General Information Building Elevations Occupancy Classifications/Const. Type(s) Exterior Bldg. Elevations with locations of doors, Life Safety Plan with fire separations/walls, egress routes, operable/fixed/spandrel glazing, floor-to-floor and ADA accessibility overall heights Occupant Loads Exterior Finish Materials Code Analysis Sheet with GSF for each level Exterior Cladding Systems Drawing Set Sheet Index Exterior Lighting Locations Room Numbering System Roof Profile and Finish Materials Interior Elevations of major/complex spaces Space Efficiency and Cost Analysis Typical Casework Elevations Calculated GSF, NASF, and ER Summary of changes from Schematic Design and description of causes of change Construction Cost Estimate Building & Wall Sections Bldg. Sections showing floor-to-floor heights, space relationships, mechanical plenums Comparison of Estimate to design's GSF applied to Typical Exterior Wall Sections previous Cost/GSF Estimate Stair, Elevator, and Shaft Sections Site Plans Details Site Survey of existing topography Prelim. Significant Exterior Wall Details Site Location Plan incl. parking, accessible spaces, bike Wall Types & Interior Details (plans/sections) racks, MEP Units, & site features Window Types (exterior and interior) Site Grading/Drainage Plan Significant Structural Details Site Utilities/Civil Engineering Plan Reflected Ceiling Plan/Section Details Site Landscaping Sketch Plan Specialty Wall Details (blast/dust/visual) Site Detail Sheets All Final Ref. Detail Sheets (not yet developed) Building Floor Plans 1/8" Floor Plans with gross dimensions, building columns, Project Manual door swings and labels Basis of Design Description (including MEP) 1/4" Enlarged Plans Preliminary Construction Specifications 1/4" Enlarged Stair and Elevator Plans Interior Finish Narrative Description 1/8" min. Roof Plan, with roof pads/drains Soils Investigation Report Occupancy Separation/Rated Wall Plans Storm Water Erosion Control Plan/Prelim. Storm Utility Main and Entrance Locations Water Pollution Prevention Plan Structural Foundation/Column Plans Traffic Study & Description (if required by UT) Structural Framing Plans with shear walls Signage/Wayfinding Specifications (if required) Refined Furniture/Equipment Plans Lighting Levels/Acoustical Specifications Interior Finish Plans/Schedules Vibration Analysis (if required) Reflected Ceiling Plans Fume Hood/Lab Equipt. Inventory (if required) Mechanical Single-Line Distribution Plans Mech/Elect/Telecomm Room Layouts Vertical Circulation, Shafts, and Chases Electrical Power/Distribution Plans Electrical Lighting Plans Casework Location Plans Lab Equipment Plans (if required) Kitchen/Specialty Equipment Plans A/V, Security/CCTV Equipment Plans The University of Tennessee Chapter 3: Design, Page 17 of 19

18 CONSTRUCTION DOCUMENT PHASE DOCUMENT CHECKLIST Project: SBC No.: Prepared By: Date Prepared: General Information All Final Schedules, Keys, and Legends Occupancy Classifications/Const. Type(s) Fire Alarm and Sprinkler Shop Drawings Life Safety Plan with fire separations/walls, egress routes, Building Elevations ADA accessibility Exterior Bldg. Elevations with locations of doors, operable/fixed/spandrel glazing, floor-to-floor Occupant Loads and overall heights Code Analysis Sheet with GSF for each level Drawing Set Sheet Index Exterior Finish Materials (indicated) Room Numbering System Exterior Cladding Systems (indicated) Space Efficiency and Cost Analysis Exterior Lighting Locations Calculated GSF, NASF, and ER Roof Profile and Finish Materials Summary of changes from Developed Design and Interior Elevations of major/complex spaces description of causes of change Typical Casework Elevations Confirmed validity of DD Cost Estimate -or- Updated Construction Cost Estimate Building & Wall Sections Comparison of Estimate to design's GSF applied to Bldg. Sections showing floor-to-floor heights, space previous Cost/GSF Estimate relationships, mechanical plenums Site Plans All Exterior Wall Sections (referenced) Site Survey of existing topography Stair, Elevator, and Shaft Sections Site Location Plan incl. parking, accessible spaces, bike Sections for HVAC & Unique Systems, including racks, MEP Units, & site features sections at air handling units Site Grading/Storm Drainage Plan Details Site Utilities/Civil Engineering Plan All Exterior Const. Details incl. Roof Details Site Landscaping & Irrigation Plans Wall Types & Interior Details (plans/sections) Mech/Elect/Plumbing Site Plans Door/Frame/Window Schedules (ext. and int.) Site Detail Sheets (All) All Structural Details (coordinated) Building Floor Plans MEP Equipment Schedules 1/8" Floor Plans w/ dimensions and ref. marks, building Reflected Ceiling Plan/Section Details columns, door swings & labels Specialty Wall Details (blast/dust/visual) 1/4" Enlarged Plans for req'd areas/systems Referenced Detail Sheets (all systems) 1/4" Enlarged Stair and Elevator Plans 1/8" min. Roof Plan, with roof pads/drains Project Manual Occupancy Separation/Rated Wall Plans Basis of Design Description (including MEP) Utility Main and Entrance Locations Final Construction Specifications Structural Foundation/Column Plans Required Accessibility Details/Specs Structural Framing Plans with shear walls Interior Finish Narrative Description Refined Furniture/Equipment Plans Soils Investigation Report/Specifications Interior Finish Plans/Schedules/Details Storm Water Erosion Control Plan/Storm Water Pollution Prevention Plan Reflected Ceiling Plans & Details Traffic Study & Description (if required by UT) Mechanical Single-Line Distribution Plans and Double-Line Signage/Wayfinding Specifications (if required) Ductwork Plans Lighting Levels/Acoustical Specifications Mech/Elect/Telecomm Room Plans Vibration Damping Specifications (if required) Vertical Circulation, Shafts, and Chases Fume Hood/Lab Equipt. Inventory (if required) Electrical Power/Distribution Plans Electrical Lighting Plans Casework Location Plans & Details Lab Equipment Plans (if required) Kitchen/Specialty Equipment Plans The University of Tennessee Chapter 3: Design, Page 18 of 19

19 END OF CHAPTER The University of Tennessee Chapter 3: Design, Page 19 of 19

CHAPTER 3: DESIGN. TN Higher Education Designers Manual October 2018 Page 1 of 12

CHAPTER 3: DESIGN. TN Higher Education Designers Manual October 2018 Page 1 of 12 3.01 GENERAL A. Design the project to meet the authorized scope, budget, and schedule. B. Upon initiation of the project, arrange to review with the Owner the service and administrative requirements as

More information

Chapter 3 DESIGN. C. Project Scope: The Designer may proceed only with the authorized scope of work. Scope changes must be approved by the OFD-PM.

Chapter 3 DESIGN. C. Project Scope: The Designer may proceed only with the authorized scope of work. Scope changes must be approved by the OFD-PM. Chapter 3 DESIGN 3.01 INTRODUCTION A. The Designer, in providing professional services for the project in accordance with the terms and conditions of the Owner/Designer Agreement, should adhere to the

More information

Chapter 3 DESIGN. C. Project Scope: The Designer may proceed only with the authorized scope of work. CPCA must approve scope changes.

Chapter 3 DESIGN. C. Project Scope: The Designer may proceed only with the authorized scope of work. CPCA must approve scope changes. Chapter 3 DESIGN 3.01 INTRODUCTION A. The Designer, in providing professional services for the project in accordance with the terms and conditions of the Owner/Designer Agreement, shall adhere to the following

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

STATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist

STATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist STATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist The following checklist shows the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the

More information

PLANNING AND EVALUATION PRELIMINARY DESIGN

PLANNING AND EVALUATION PRELIMINARY DESIGN PLANNING AND EVALUATION Project Initiation Discuss and refine client requirements Project brief, Schedule, Budget Confirm client's space needs and program Establish scope of work Obtain client-supplied

More information

Document B252TM 2007

Document B252TM 2007 Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation

More information

2.3.6 Design Development

2.3.6 Design Development 2.3 Management of the Project 2.3.6 Design Development Canadian Handbook of Practice for Architects 2.3.6 Introduction Design Development Tasks Engineering Services for Design Development Structural Mechanical

More information

1.0 ABOUT THE NU GUIDELINES

1.0 ABOUT THE NU GUIDELINES Construction Policies & Procedures Northeastern University Guidelines for Capital Project Design & Implementation.0 ABOUT THE NU GUIDELINES This document is intended to describe in a comprehensive manner

More information

NAME OF PROJECT Design Development. General Objectives of Phase. Phase Task Checklist. Quality Management Phase

NAME OF PROJECT Design Development. General Objectives of Phase. Phase Task Checklist. Quality Management Phase General Objectives of Phase Drawings and other documents to fix and describe the size and character of the project as to architectural, structural, mechanical and electrical systems, materials and such

More information

General Objectives of Phase. Phase Task Checklist Integral Consulting Page 1 Schematic Design Checklist. Action

General Objectives of Phase. Phase Task Checklist Integral Consulting Page 1 Schematic Design Checklist. Action Project Number: Prepared By: Action General Objectives of Phase Drawings and other documents indicating the scale and relationships of Project components in conformance with program Building areas and

More information

COMMERCIAL PLAN SUBMITTAL GUIDELINES JAN 2018

COMMERCIAL PLAN SUBMITTAL GUIDELINES JAN 2018 COMMERCIAL PLAN SUBMITTAL GUIDELINES JAN 2018 CONSTRUCTION CODES The City of Colleyville has adopted and enforces the following codes which are applicable to building construction activities within the

More information

Chapter 6, Construction

Chapter 6, Construction Chapter 6, Construction CHAPTER CONTENTS 6.1 OWNER-CONTRACTOR AGREEMENT A. Preparation B. Owner Signature C. Award 6.2 PRE-CONSTRUCTION CONFERENCE A. Administration B. Attendees C. Pre-Construction Conference

More information

CHAPTER 4: PROJECT MANUAL GUIDE

CHAPTER 4: PROJECT MANUAL GUIDE 4.01 GENERAL A. The Designer s requirements for preparation of a Project Manual are defined by the Agreement. This chapter provides the Owner s guidance for procedures and use of standard documents in

More information

DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST

DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Design Development Review Package. Provide a written explanation for any omissions. The following items,

More information

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding

More information

INSTRUCTIONS FOR DIVISION 00 DOCUMENTS

INSTRUCTIONS FOR DIVISION 00 DOCUMENTS INSTRUCTIONS FOR DIVISION 00 DOCUMENTS Division 00 is the first section of the specifications for construction. For each advertised bid project, the College/University must direct the Architect/Engineer

More information

600 - Phase C Intermediate Review Checklist for the Architect- Engineer

600 - Phase C Intermediate Review Checklist for the Architect- Engineer 600 Phase C Intermediate Review Checklist for the Architect Engineer This checklist is to be used by the ArchitectEngineer during Phase C of the Project and shall be included in the Intermediate Review

More information

City of Roanoke. Commercial Permit Submittal Guidelines

City of Roanoke. Commercial Permit Submittal Guidelines City of Roanoke Commercial Permit Submittal Guidelines These guidelines are for information purposes only. The contractor is obligated to comply with all adopted codes and ordinances BUILDING INSPECTIONS

More information

CHAPTER 4: PROJECT MANUAL GUIDE

CHAPTER 4: PROJECT MANUAL GUIDE 4.01 GENERAL A. The Designer s requirements for preparation of a Project Manual are defined by the Agreement. This chapter provides the Owner s guidance for procedures and use of standard documents in

More information

Attachment 1 Architectural Services

Attachment 1 Architectural Services A. Phase 1, Programming and Schematic Design: 1. Ascertain the requirements for each project through a meeting with the COUNTY, and a review of an existing schematic layout of each project, if such layout

More information

S CHEDULE G - D OCUMENTS S UBMITTAL R EQUIREMENTS

S CHEDULE G - D OCUMENTS S UBMITTAL R EQUIREMENTS S CHEDULE G - D OCUMENTS S UBMITTAL R EQUIREMENTS This Attachment lists the items to be provided by the Architect in accordance with Owner/Architect Agreement. This list is not all-inclusive, nor is it

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 I DATE: May 9-11, 2017 ****************************************************************************** SUBJECT: SDSU Harding Hall Renovation

More information

Chapter 1, Introduction

Chapter 1, Introduction Chapter 1, Introduction CHAPTER CONTENTS 1.1 THE DESIGNERS MANUAL A. Purpose B. Contents 1.2 THE DIVISION OF FACILITIES PLANNING 1.3 THE UNIVERSITY AS OWNER A. The Owner B. Owner Agency 1.4 CAPITAL IMPROVEMENTS

More information

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER. A. Basic Services... A-2. B. Architectural Programming... A-5

EXHIBIT A RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER. A. Basic Services... A-2. B. Architectural Programming... A-5 EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER A. Basic Services... A-2 B. Architectural Programming... A-5 1. Project Initiation... A-5 C. Design Services... A-6 1. Schematic Design Phase...

More information

DESIGN DEVELOPMENT PHASE

DESIGN DEVELOPMENT PHASE UNIVERSITY OF MICHIGAN DESIGN DELIVERABLES FEBRUARY 2012 As part of the deliverables for formal UM review at each of the major phases of design listed below, the Design Professional shall submit this "Design

More information

STATE OF NEW MEXICO Public School Facilities Authority Albuquerque Field Station 1312 Basehart Drive, SE., Suite 200 Albuquerque, NM 87106

STATE OF NEW MEXICO Public School Facilities Authority Albuquerque Field Station 1312 Basehart Drive, SE., Suite 200 Albuquerque, NM 87106 STATE OF NEW MEXICO Public School Facilities Authority Albuquerque Field Station 1312 Basehart Drive, SE., Suite 200 Albuquerque, NM 87106 Johathan Chamblin, Director Telephone: (505) 843-6272 vacant,

More information

CODE COMPLIANCE PLAN REVIEW PROCEDURES

CODE COMPLIANCE PLAN REVIEW PROCEDURES CODE COMPLIANCE PLAN REVIEW PROCEDURES 1. All construction for state agencies on state-owned or state leased-purchased properties or facilities are to submit design documents for code compliance plan reviews

More information

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS

EXHIBIT A RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS A. SCOPE OF PROJECT... 1 B. BASIC SERVICES... 1 C. PRE-DESIGN AND START-UP SERVICES... 4 D. SCHEMATIC DESIGN PHASE... 7 E. DESIGN

More information

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS

EXHIBIT A RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS A. SCOPE OF PROJECT... 1 B. BASIC SERVICES... 1 C. PRE-DESIGN AND START-UP SERVICES... 4 D. SCHEMATIC DESIGN PHASE... 7 E. DESIGN

More information

Exhibit A Scope of Services and Deliverables

Exhibit A Scope of Services and Deliverables Exhibit A Scope of Services and Deliverables Attachment to MnDOT Contract No. for Project Name Project # 16-TZ dated Scope of Services includes: Programming / Schematic Design Phase Design Development

More information

RFQ for Architectural Services - Attachment 5 North Campus Student Housing Phase IV(b) Haggett Hall Replacement and Oak Hall Project No.

RFQ for Architectural Services - Attachment 5 North Campus Student Housing Phase IV(b) Haggett Hall Replacement and Oak Hall Project No. SPECIAL CONDITIONS Article I, Section A delete this paragraph in its entirety and replace it with the following language: Owner s representative to act on its behalf with respect to this Agreement shall

More information

RFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018

RFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018 Question & Answer: #1 The RFP calls for a survey of the building to gain a comprehensive understanding of the existing building, utilities, building systems, occupancies and all existing conditions as

More information

PLEASE NOTE: The cover sheet must include the occupancy type, construction type, and square footage of the area of work.

PLEASE NOTE: The cover sheet must include the occupancy type, construction type, and square footage of the area of work. New Commercial and/or Commercial Tenant Improvements, Remodels, Additions and Alterations Plan Check Submittal Non-Residential Additions/Alterations Design Criteria Seismic Design Category D (most cases)

More information

Civil Engineering and Architecture Detailed and Performance Objective Outline

Civil Engineering and Architecture Detailed and Performance Objective Outline Civil Engineering and Architecture Detailed and Performance Objective Outline Deadlines Unit 1: 11 Blocks 1/20/2015 Unit 2: 27 Blocks 2/27/2015 Unit 3: 28 Blocks 4/15/2015 Unit 4: 17 Blocks 5/8/2015 Unit

More information

Addendum #02 New County Office Building Responses to RFP Questions

Addendum #02 New County Office Building Responses to RFP Questions Sam Lin Manager Project Development Unit 1402 Maple Street Redwood City, CA 94063 650-369-4766 September 22, 2017 slin@smcgov.org Addendum #02 New County Office Building Responses to RFP Questions To All

More information

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST Department of Urban Planning & Codes Enforcement City of Coatesville - 1 City Hall Place - Coatesville, Pennsylvania 19320 Phone: 610.384.0300 Fax: 610.384.6051 COMMERCIAL BUILDING PLAN REVIEW CHECKLIST

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

Commercial Remodel Permit

Commercial Remodel Permit Commercial Remodel Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts, each

More information

City Of Mendota Construction Procedures

City Of Mendota Construction Procedures City Of Mendota Construction Procedures Building Permit Application: A permit shall be obtained prior to commencing work of any type. Failure to do so may result in doubling the permit fees. At the time

More information

BUCKNELL UNIVERSITY PROCEDURES FOR RENOVATIONS AND NEW CONSTRUCTION

BUCKNELL UNIVERSITY PROCEDURES FOR RENOVATIONS AND NEW CONSTRUCTION I. PURPOSE BUCKNELL UNIVERSITY PROCEDURES FOR RENOVATIONS AND NEW CONSTRUCTION To ensure the proper process to request and obtain approval for all renovation or new construction projects within Bucknell

More information

EXHIBIT 6 Preconstruction Work

EXHIBIT 6 Preconstruction Work EXHIBIT 6 Preconstruction Work The following tasks shall be accomplished by the CM/GC as part of its obligations during the preconstruction phase. The work is to be coordinated with the services requirements

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

4. Number of drawings required: ( ) Locations of nearest streets

4. Number of drawings required: ( ) Locations of nearest streets CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us COMMERCIAL BUILDING PLAN REQUIREMENTS

More information

Volume II- Project Development Processes

Volume II- Project Development Processes Volume II- Project Development Processes This section outlines the procedures that are expected of capital projects at The University of Chicago. These requirements supplement the planning procedures required

More information

AGREEMENT FOR DESIGN CONSULTANT SERVICES BETWEEN NEW HANOVER COUNTY BOARD OF EDUCATION. hereinafter referred to as the Owner AND

AGREEMENT FOR DESIGN CONSULTANT SERVICES BETWEEN NEW HANOVER COUNTY BOARD OF EDUCATION. hereinafter referred to as the Owner AND AGREEMENT FOR DESIGN CONSULTANT SERVICES BETWEEN NEW HANOVER COUNTY BOARD OF EDUCATION hereinafter referred to as the Owner AND hereinafter referred to as the Design Consultant PROJECT: OWNER'S PROJECT

More information

ALBUQUERQUE PUBLIC SCHOOLS. General Conditions of the Agreement between APS and the Design Professional

ALBUQUERQUE PUBLIC SCHOOLS. General Conditions of the Agreement between APS and the Design Professional ALBUQUERQUE PUBLIC SCHOOLS General Conditions of the Agreement between APS and the Design Professional (Part B of the Agreement) TABLE OF CONTENTS Article 1 Article 2 Definitions Design Professional s

More information

Science Technology Engineering and Mathematics (STEM) Initiative

Science Technology Engineering and Mathematics (STEM) Initiative DEPARTMENT of FACILITIES DESIGN December 17, 2013 and CONSTRUCTION REQUEST for PROPOSAL Science Technology Engineering and Mathematics (STEM) Initiative PRE-CONSTRUCTION SERVICES Facilities Design and

More information

Name of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) - Owned By: Select one Code Enforcement Jurisdiction: Select one

Name of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) -  Owned By: Select one Code Enforcement Jurisdiction: Select one 2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:

More information

Name of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) - Owned By: Select one Code Enforcement Jurisdiction: Select one

Name of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) -  Owned By: Select one Code Enforcement Jurisdiction: Select one 2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:

More information

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL

More information

Archdiocesan Procedures For Building and Renovation Projects

Archdiocesan Procedures For Building and Renovation Projects Archdiocesan Procedures For Building and Renovation Projects - 1 - JULY 31, 2006 ARCHDIOCESAN PROCEDURES FOR BUILDING AND RENOVATION PROJECTS TABLE OF CONTENTS 2 1. Introduction 3 2. General Requirements

More information

Archdiocesan Procedures For Building and Renovation Projects

Archdiocesan Procedures For Building and Renovation Projects Archdiocesan Procedures For Building and Renovation Projects - 1 - JULY 31, 2006 ARCHDIOCESAN PROCEDURES FOR BUILDING AND RENOVATION PROJECTS TABLE OF CONTENTS 2 1. Introduction 3 2. General Requirements

More information

Change of Coordinating Registered Professional (CRP) or Registered Professional (RP)

Change of Coordinating Registered Professional (CRP) or Registered Professional (RP) January, 2019 BUILDING DIVISION Change of Coordinating Registered Professional (CRP) or Registered Professional (RP) General Information In the event that there is a change of the Coordinating Registered

More information

Thule Prototype BIM Manual for Dormitories. February 5, 2010

Thule Prototype BIM Manual for Dormitories. February 5, 2010 Thule Prototype BIM Manual for Dormitories February 5, 2010 TABLE OF CONTENTS INTRODUCTION Executive Summary 2 Goals 2 Scope and Use 2-4 Program Assumptions Kit of Parts GUIDELINE INTEGRATION Site Design

More information

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction - State of Ohio Professional Services Agreements for Public Facility Construction TABLE OF CONTENTS ARTICLE 1 - BASIC SERVICES... 1 ARTICLE 2 - PROGRAM VERIFICATION STAGE... 2 ARTICLE 3 - SCHEMATIC DESIGN

More information

COMMISSIONING, OPERATION AND MAINTENANCE

COMMISSIONING, OPERATION AND MAINTENANCE CHAPTER 9 COMMISSIONING, OPERATION AND MAINTENANCE THIS CHAPTER IS PROVIDED FOR REFERENCE ONLY. IT IS NOT ADOPTED AS A REQUIREMENT OF THE CODE. SECTION 901 GENERAL 901.1 Scope. The provisions of this chapter

More information

UCC Permit Application Procedures

UCC Permit Application Procedures How do I apply for a permit? UCC Permit Application Procedures 1. Please complete the CodeMaster Pan Review Application 2. Please provide the scope of work description and/or construction documents/plans.

More information

CHAPTER 4 - GENERAL BUILDING REQUIREMENTS

CHAPTER 4 - GENERAL BUILDING REQUIREMENTS CHAPTER 4 - GENERAL BUILDING REQUIREMENTS HOUSING PLAN AND SPACE REQUIREMENTS The proposed facility will house the Armed Forces Retirement Home (AFRH), Gulfport, MS. Interviews and work sessions were conducted

More information

3,740. Demonstrating Competent Performance SIX EXPERIENCE AREAS. INTRODUCTION What is the Architectural Experience Program?

3,740. Demonstrating Competent Performance SIX EXPERIENCE AREAS. INTRODUCTION What is the Architectural Experience Program? What is the Architectural Experience Program? The Architectural Experience Program (AXP ) is an essential step in the path to becoming an architect. Through the AXP, you will learn about the daily realities

More information

ATTACHMENT D SCOPE OF SERVICES

ATTACHMENT D SCOPE OF SERVICES ATTACHMENT D SCOPE OF SERVICES OBJECTIVE Owner s Capital Improvement Program (major capital, minor construction, repair, and rehabilitation projects) includes numerous construction and renovation projects.

More information

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER. A. Basic Services...A-1. B. Pre-Design and Start-Up Services...

EXHIBIT A RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER. A. Basic Services...A-1. B. Pre-Design and Start-Up Services... EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER A. Basic Services...A-1 B. Pre-Design and Start-Up Services...A-3 1. Project Initiation...A-3 2. Development of Architectural Program...A-4

More information

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA 94596 (925) 943-5834 phone (925) 256-3500 fax Issued July 22, 2010 Information Bulletin No. IB-016 DOCUMENT SUBMITTAL

More information

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION 1 PLAN INFORMATION Residential plans must be legible and capable of digital scanning. All sheets shall be the same size and distinctly labeled with a sheet title and number. The minimum dimension of the

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

Plan Submittal Checklist 2015 I-Codes

Plan Submittal Checklist 2015 I-Codes City of Aurora Building Division Public Works Department LIMITED PLAN REVIEW Plan Submittal Checklist 2015 I-Codes Permit Center 15151 E. Alameda Parkway, Ste 2400 Aurora, CO 80012 303.739.7420 Fax: 303.739.7412

More information

RESIDENTIAL REMODELS ADDITIONS AND ALTERATIONS

RESIDENTIAL REMODELS ADDITIONS AND ALTERATIONS RESIDENTIAL REMODELS ADDITIONS AND ALTERATIONS PLAN CHECK SUBMITTAL RESIDENTIAL ADDITIONS/ALTERATIONS Design Criteria Seismic Design Category D (Most cases) Basic Wind Speed 85 mph Exposure B or C Maximum

More information

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION OFFICIAL USE ONLY Date: Permit #: Received by: For Staff Use Only: OFD ELEC Planning SITE LOCATION Site Address: Tax Parcel Number: TYPE OF WORK Building

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 2-1 Issue date: September 2012 1. General SITEWORK OVERVIEW This Directive outlines the Fund s requirements for the Consultant relative to the development, design and presentation of documents

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

City of South Pasadena COMMUNITY IMPROVEMENT

City of South Pasadena COMMUNITY IMPROVEMENT City of South Pasadena COMMUNITY IMPROVEMENT Office Address: Mailing Address: 6940 Hibiscus Ave S 7047 Sunset Dr S South Pasadena, FL 33707 South Pasadena, FL 33707 *PHONE: (727) 343-4192 * FAX: (727)

More information

Career Center Advance Planning/Design Services Code Item 321

Career Center Advance Planning/Design Services Code Item 321 The University of North Carolina at Charlotte Temporary Office Space Facilities Management - Capital Projects Hickory Building (Building #536 on Campus Map) 9316 Mary Alexander Road Charlotte, NC 28223

More information

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition Document B132 2009 Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN

More information

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Contract Documents Review Package. Provide a written explanation for any omissions. The following items,

More information

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION SECTION 02 41 14 SELECTIVE BUILDING DEMOLITION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for systematic removal of site improvements or portions of exterior and interior of buildings

More information

PENNSAFE BUILDING INSPECTION SERVICES LLC NEW COMMERCIAL BUILDING UCC PLAN REVIEW HANDOUT AND CHECKLIST

PENNSAFE BUILDING INSPECTION SERVICES LLC NEW COMMERCIAL BUILDING UCC PLAN REVIEW HANDOUT AND CHECKLIST PENNSAFE BUILDING INSPECTION SERVICES LLC NEW COMMERCIAL BUILDING UCC PLAN REVIEW HANDOUT AND CHECKLIST Every item below must be checked as completed (if applicable), or marked n/a (if not applicable),

More information

Dick s Sporting Goods Demolition Package

Dick s Sporting Goods Demolition Package REQUEST FOR PROPOSAL FOR COMPETITIVE SEALED PROPOSALS TO PROVIDE: Dick s Sporting Goods Demolition Package at Salt Lake City, UT 2425 E. Camelback Rd. Suite 750 Phoenix AZ 85016 Notice of Extended Payment

More information

MINIMUM REQUIREMENTS FOR CONSTRUCTION PLANS, GRADING AND/OR DRAINAGE PLANS, LOW IMPACT DEVELOPMENT PLANS, AND WATER EFFICIENT LANDSCAPE PLANS

MINIMUM REQUIREMENTS FOR CONSTRUCTION PLANS, GRADING AND/OR DRAINAGE PLANS, LOW IMPACT DEVELOPMENT PLANS, AND WATER EFFICIENT LANDSCAPE PLANS Planning and Community Preservation Department Public Works Department 232 West Sierra Madre Boulevard Sierra Madre, CA 91024 (626)355-7135 MINIMUM REQUIREMENTS FOR CONSTRUCTION PLANS, GRADING AND/OR DRAINAGE

More information

PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL

PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL Permit Application #: Date: mm/dd/yy Project Address Applicant s Name NOTE TO PERMIT APPLICANTS: All permit applications must

More information

Commercial Construction Reference Guide

Commercial Construction Reference Guide Commercial Construction Reference Guide City of Murphy Customer Service Department 206 N Murphy Road Murphy, TX 75094 Ph. 972 468 4100 * Fax 972 468 4104 customerservice@murphytx.org Prior to submittal

More information

Plan Routing Information:

Plan Routing Information: Plan Routing Information: BUILDING INSPECTIONS 800 4 TH AVENUE EAST WEST FARGO, ND 58078 PHONE: 701-433-5480 The Inspections Department receives and routes plans to the various departments. The plan holder

More information

THE PROCESS. Phase 1 Pre-Design Objective: Determine the owner s criteria for the project. Fee Breakdown: 5-10% of total fee.

THE PROCESS. Phase 1 Pre-Design Objective: Determine the owner s criteria for the project. Fee Breakdown: 5-10% of total fee. Considerations on Hiring an Architect How the Design Process Works Page 1 of 9 This guide explains the progression of a typical project from an idea through construction of an actual building. Projects

More information

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility RFP Components CLIENT: TradePort International Corporation, Operators of John C. Munro

More information

Charter Township of Garfield Grand Traverse County

Charter Township of Garfield Grand Traverse County Charter Township of Garfield Grand Traverse County 3848 VETERANS DRIVE TRAVERSE CITY, MICHIGAN 49684 PH: (231) 941-1620 FAX: (231) 941-1588 SPECIAL USE PERMIT APPLICATION APPLICANT INFORMATION Name: Address:

More information

School Assessment Report

School Assessment Report School Assessment Report School: Morningside Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:29:07 AM FOR OFFICIAL USE ONLY Final School Assessment

More information

Science Building Advance Planning/Design Services Code Item 301

Science Building Advance Planning/Design Services Code Item 301 The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0615 PROJECT: UNC Charlotte Science Building Advance

More information

Project Information. Nominations of Artists. University of Houston

Project Information. Nominations of Artists. University of Houston UNIVERSITY OF HOUSTON SYSTEM SYSTEM WIDE ART ACQUISTION COMMITTEE AGENDA ITEM ITEM: UH University Center Transformation Project Artwork-Artists Nominations DATE PREVIOUSLY SUBMITTED: NA SUMMARY: Nominations

More information

Commercial Permit Process

Commercial Permit Process . Commercial Permit Process 1 Permit Office Commercial Subdivision Large-Scale Development 2 Plan Submittal - City Planner - Engineering - Building Official - Fire Marshal - City Corporation 3 Plan Review

More information

Special Land Use Permit Application Planning Division Form will not be processed until it is completely filled out.

Special Land Use Permit Application Planning Division Form will not be processed until it is completely filled out. Special Land Use Permit Application Planning Division Form will not be processed until it is completely filled out. 1. Applicant Name:_ Address: Phone Number: Fax Number: Email address: 3. Applicants Attorney/Contact

More information

Initial Design & Size

Initial Design & Size Want to Save time and money on your next building project? Careful planning will help you to anticipate problems, make the right decisions, and to speed construction. If you don t know the answers to all

More information

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Florida Army National Guard Construction Facilities Management Office. Scope of Work: Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines September 2011 Scope of Work: To provide complete design for the renovation/alterations

More information

/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions

/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions Page 1 7-101 Definition A. Alternative Construction Delivery Methods: Building Delivery Processes that vary from the more standard Design-Bid-Build model. These may include Construction Manager-At-Risk

More information

PRIVATE PLAN ROOM. Document Information Sheet

PRIVATE PLAN ROOM. Document Information Sheet PRIVATE PLAN ROOM Document Information Sheet Job Name: Partial Renovation for Lewes Streets Department Breakroom Bid Date: October 22, 2018 2:00 pm Placed on file by: George, Miles, and Buhr Contact: Lee

More information

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist

More information

Special Land Use Permit Application Planning Division

Special Land Use Permit Application Planning Division Special Land Use Permit Application Planning Division Form will not be processed until it is completely filled out. 1. Applicant Name:_ Address: Phone Number: Fax Number: Email address: 3. Applicant s

More information