Coordinated Outdoor Houses Electro/Centers

Size: px
Start display at page:

Download "Coordinated Outdoor Houses Electro/Centers"

Transcription

1 New Information Technical Data Effective: August 1999 Page 1 Coordinated Outdoor Houses Quality Products in a Single Enclosure at a Lower Installed Cost We invented the concept of grouping electrical distribution and control equipment in a modular building called an Electro/Center custom designed to meet each customer s specific requirements. Each Electro/Center Arrives Complete and Ready to Connect Saving Time and Money When an Electro/Center is delivered, all the customer typically needs to do is: (1) place it on the suitable foundation such as a concrete pad or base with similar strength and durability and (2) make the incoming and outgoing load connections. That s because an Electro/Center is a complete unit and can be prewired and factory tested, if required. An Electro/Center provides these significant cost savings: Lower installation cost. Job site labor and material costs are sharply reduced because an Electro/Center arrives complete, ready for connections. Minimal start-up time. Each Electro/Center is checked to assure wiring accuracy, control scheme correctness, and equipment operation. Installation delays reduced. Job site delays caused by trying to coordinate multiple vendors are eliminated. Reduced procurement time. Scheduling and expediting are handled through a single point contact and only one purchase order is required. Customized design. Electro/Center buildings have very few restrictions. They can be of almost any size, shape, or color and in addition to the electrical distribution and control equipment, can include whatever other non- equipment a customer may require. We Are Your Single Source for offers the industry s most complete family of electrical distribution and control equipment and components plus the widest selection of ratings. And we provide that meet or exceed distribution systems requirements. As a single source supplier, we provide these significant advantages: Designing, Assembling, and Testing. certifies that all equipment and components are in compliance with applicable NEMA, IEEE, ANSI, UL, and IEC standards. The building is certified to meet UBC, SBCCI, and BOCA requirements, while the installation of the equipment meets NEC requirements. Consistent Terms and Conditions. provides a single uniform set of terms and conditions for all equipment and components. Additionally, the terms and conditions are compatible with those of other products that may be on the same project providing the benefit of single package negotiation. One Contact Point. The worldwide network of engineers, sales representatives, and authorized distributors provides design and application assistance, pricing, delivery, and warranty information. One Overall Warranty. warrants all Electro/Center equipment and components, plus the structure itself. An Electro/Center Can Be Installed Where You Want Installation flexibility is essential since are often used in applications where a controlled, protective environment is required. However, the actual location of an Electro/Center can often vary from customer-to-customer. have been installed indoors on the main floor or second deck; outdoors on roofs; or as separate detached structure. distribution equipment is seismically tested, seismically qualified, and exceeds requirements of both the Uniform Building Code (UBC) and the California Building Code (CBC).

2 Technical Data Page 2 Effective: August 1999 Typical Equipment that Can Be Installed in an Electro/Center Almost any type of electrical equipment from can be installed in an Electro/Center, including: WLI and WVB Load Interrupter Switchgear Medium Voltage VacClad-W Metal-Clad Switchgear AMPGARD Medium Voltage Starters Medium Voltage Non-Segregated Bus Low Voltage Switchgear Type DSII Low Voltage Switchboards Pow-R-M-S Fixed or Drawout Pow-R-Line C Low Voltage Group Mounted Switchboards Pow-R-Line C Low Voltage Panelboards Freedom 2100 and Advantage Motor Control Centers Dry-Type Distribution Transformers Adjustable Speed Control Automatic Transfer Switches Low Voltage Bus Microprocessor-Based Metering, Protection, Control, and Monitoring Devices Additional Equipment and Modifications Since each Electro/Center is custom designed, we not only provide the electrical gear you specify but can include any additional equipment and modifications requested. Some examples include: HVAC Systems Pressurization Units Battery Systems Annunicators Communications Equipment Security Systems Marshaling Cabinets Installation and Wiring of Customer Furnished PLCs and Analyzers Office or Work Areas Plumbing and Restrooms Doors and Windows Indoor, Outdoor, and Emergency Lights Wireway and Cable Trays Custom Paint Finishes Switches and Receptacles Any Other Equipment Specified by Customer

3 Technical Data Effective: August 1999 Page 3 A Variety of Industries and Service Organizations Communications Food Processing Heavy Industry Materials Handling Medical Mining Petrochemical Pollution Control Public Utilities Pulp and Paper Rail and Mass Transit Water and Waste Treatment Many Others Typical Layout Plan Views 18'-0" 9'- 4'-9" 28'-0" 2'-0" 8'-8" 12'-7" 4080 STORAGE LOUVERED FOLDING S WATER HEATER SHOWER FILE CABINET LOCKERS LOCKER ROOM LAV. COMPUTER WORKSTATION OFFICE KITCHENETTE SINK VANITY BENCH LAV. UNDER COUNTER REFRIGERATOR MICROWAVE 480V MOTOR CONTROL CENTERS EQUIPMENT ROOM 480V MOTOR CONTROL CENTERS WALL SPACE FOR PLUMBING LAV. TRANSFORMER VANITY RESTROOM LIGHTING PANEL 11'-8" 6" 6" 8'-1" 6'-0" 6" 10'-6" With a Broad Range of Applications Control Center Rooms Equipment Skids 30'-0" Generator Systems 4'-10" 20" 6'-6" 20" 20" 20" 20" 20" 6" 21" Motor Control Offshore Platforms Pipelines Power Substations Process Control Pumping Stations Refineries Switchgear Enclosures Many Others 13'-6" 2" 2'-5" 12" 5'-10" 10" 2'-6" 1" TELEPHONE PANEL BATTERY RACK & BATTERIES 3'-6" UPS SYSTEM 2'-10" 2'-8" 2'-8" 2'-6" 2'-6" 1" 2'-6" MAIN CONTROL PANEL (90" W x 30" D x 72" H) 2 3/8" FUTURE FUTURE V MOTOR CONTROL 5 kv "AMPGARD" MCC kva TRANSFORMER FIRE EXTINGUISHER (TYP 2) WALL THICKNESS (TYPICAL) 4160V "VCPW" SWITCHGEAR 3'-1/8" 3'-1/8" 3'-1/8" 3'-1/8" 3'-1/8" 6" 3'-1" 3'-1" 8" '-2" 10" 4'-0" 1" 47'-6" HVAC HVAC 24" #1 #2 6" 12" 12" 24" 16'-6" 9'-0" 7'-6" 1" SECTION A SECTION B 95" 6'-0" 10" C L 6080 BUSDUCT 12" BREAKER TRUCK STORAGE BREAKER TEST CABINET FUTURE 9 213/ / / / '-0" BUSDUCT LOUDSPEAKER 5 kv VCPW SWITCHGEAR T BUSDUCT SPLICE BOLT ACCESS COVER (TYP 3) 2 205/ /52-6 SHIPPING SPLIT 1 201/ /52-4 FUTURE 9" HVAC CONTROL PANEL AUTOMATIC TRANSFER SWITCH 18" EXTERIOR LIGHTING CONTRACTOR & H-O-A SWITCH DC PANEL D 45 kva A1 TRANSFORMER AC PANEL AA AC PANEL A 11" 20" 38" 20" 29" 22" 20" 10" 3'-2" 3'-1" 3'-1" 8'-2" 16'-9" 6'-0" 24'-9" C L CL

4 Technical Data Page 4 Effective: August 1999 Typical Specifications General A. The specification covers requirments applicable to the provision of Electro/ Centers (E/C). The E/C shall be environmentally controlled, and shall consist of a coordinated grouping of electrical power and control equipment as indicated on any accompanying data sheets and/or drawings. Any data sheets, drawings, or any other related documents accompanying this specification shall be considered a part of this specification. B. The supplier shall furnish, install, interconnect and test the equipment specified in any related documents. C. Site conditions shall be shown on the data sheet(s). These conditions shall be considered when sizing and designing equipment. D. Any exceptions to the specification shall be noted in the supplier s quotation, under a separate heading. For any portions of the specification which have not been excepted or clarified, the customer shall construe complete compliance by the supplier. Any exceptions to entire portions of the specification, and any notations of exception to anything which is not in the supplier s quotation shall be deemed non-responsive and shall be rejected. References A. All materials, equipment and labor supplied by the supplier shall be in strict compliance with the statutes, codes and standards listed herein. Where conflicts exist between statutes, codes and standards, the more stringent requirement shall prevail. Applicable statutes, codes and standards are as listed below: 1. American Institute of Steel Construction (AISC). 2. American National Standard Institute (ANSI). 3. American Society of Testing and Materials (ASTM). 4. American Welding Society (AWS). a. AWSD1.1, Structural Welding Code Steel. 5. National Fire Protection Association (NFPA). 6. National Electric Code (NEC) 7. National Electrical Manufacturer s Association (NEMA). 8. Underwriters Laboratories, Inc. (UL). 9. Uniform Building Code (UBC). Quality Requirements A. The E/C shall be manufactured under an established autonomous quality assurance program. The supplier shall have a designated quality assurance (QA) manager. The supplier must be ISO 9002 certified, or have a quality system in place which corresponds with the requirements of ISO The successful bidder shall be prepared to submit for customer approval, any and/or all quality plans, forms, and procedures applicable to the manufacture of the E/C. Construction A. The Electro/Center shall be designed and constructed for outdoor use under wind and seismic load conditions per the UBC guidelines for the jobsite. B. The building and all components mounted thereon shall be designed for and anchored sufficiently for transportation to the jobsite. C. The skid shall be of all welded, seamless construction utilizing ASTM-A36 structural steel members, sized and arranged for proper strength, and able to withstand the stress and loads which will result when lifting the complete factory fabricated and equipped assemblies. Welding shall be in accordance with the requirements of AWSD1.1. All welding shall be performed by welders certified through the 4G position. Suppliers shall be prepared to show welders certificates. 1. Deflection shall be L/240. The building shall be suitable for installation on a concrete pad or on piers. 2. The skid shall be equipped with two (2) stainless steel ground pads located at opposite corners of the skid. 3. The skid shall be provided with a 8-10 mil coverage of bituminous mastic undercoating. D. The floor shall be a minimum of 1/4-inch H.R. ASTM-A36 smooth steel plate welded to the perimeter and longitudinal and/or transverse structural members of the skid. The floor loading shall not be less than 250 PSF. 1. The floor shall be provided with floor cutouts where required for power and control cable entry/exit from the equipment. The cutouts shall be provided with 12 gauge galvanized coverplates. E. Building contruction: 1. Building walls, roof and ceiling shall be fabricated from G90 galvanized steel. Exterior walls, exterior roof and interior ceiling shall be self-framing, interlocking design, with maximum panel width of 16 inches. Buildings of framed construction are not acceptable. 2. Exterior walls shall be minimum of 18 gauge thickness, but rated to withstand the loading requirements of the jobsite. 3. Interior walls shall be minimum of 18 gauge thickness, but rated to withstand the loading requirements of the jobsite. 4. Exterior roof shall be minimum of 18 gauge thickness, but rated to withstand the loading requirements of the jobsite. The roof shall be sloped at 1/4-inch per linear foot, and shall be sloped away from the personnel doors. 5. Interior ceiling shall be minimum of 18 gauge thickness, but rated to withstand the loading requirements of the jobsite. F. For buildings which must be shipped in multiple shipping sections, miscellaneous NEMA 1 junction boxes will be provided at the shipping splits for easy breakdown of the building wiring for shipment and reconnecting at the jobsite. Prior to shipment, the open end/sides of each shipping section will be crated and weatherproofed for transit to the jobsite. The crating must be performed by a company recognized and experienced in the trade.

5 Technical Data Effective: August 1999 Page 5 G. Where wall bulkhead penetrations are required, the cutouts shall be completely framed with 1/4-inch aluminum coverplates with neoprene gasket. All wall penetrations shall be made in the walls prior to bending with the appropriate machinery. No manual cutting of wall penetrations via jigsaw, plasma torch, etc., shall be permitted. H. All fastening hardware shall be zinc plated. Welding of galvanized steel and rivets shall not be an acceptable method of exterior fastening. I. The building shall be provided with a minimum of two (2) entrance doors. The doors shall be double-wall construction, with brushed aluminum panic with cylinder lock and thumblatch, brushed aluminum automatic closure with built-in hold-open device, prime coat hinges, threshold built into the door frame, neoprene gasket, drip shields/water flashing, DANGER, HIGH VOLTAGE, KEEP OUT sign, and a 12-inch removable transom above the equipment door only. The personnel door shall be 36-inch by 84-inch. The equipment door shall be 48-inch by 84-inch. 1. When specified, the supplier shall provide landings and stairs for the building. The stairs shall be built in compliance with the UBC code, and shall be hot-dipped galvanized after fabrication. J. For equipment requiring rear access, the supplier shall provide 14 gauge galvanized steel, gasketed and hinged equipment rear access doors, with 3-point latching system with galvanized padlockable handles, DANGER HIGH-VOLTAGE sign, and drip shields/water flashing. K. The walls, roof and floor shall be fully insulated, with a minimum of R-11 insulation. The walls and roof shall be provided with fiberglass batt type insulation. The floor shall be provided with polyurethane spray foam insulation. L. The building shall be provided with a paint system per the following. 1. The skid shall be sandblasted to remove rust and scale prior to painting. A 2-3 mil application of epoxy iron oxide primer shall be provided. 2. The floor shall be provided with a 2-3 mil application of Red epoxy iron oxide primer, followed by 2-3 mil application of ANSI-61 gray epoxy, with a non-skid finish. 3. The exterior and interior of the building shall be provided with a mil application of vinyl wash primer, followed by a 2-3 mil application of white epoxy paint. M. The building shall be provided with an HVAC system, sized and provided by the supplier, considering the ambient site conditions, the dimensions of the building, the solar heat generated within the building, and the heat generated by the equipment within the building. The system shall be designed such that the sensible cooling capacity, NOT the total cooling capacity, will maintain an ambient temperature within the building of between 55 F winter and 80 F summer at design conditions. The system shall be provided with an electronic, automatic changeover thermostat. When the building is specified to be located in a classified environment, the supplier shall provide a HVAC/ Pressurization system in strict compliance with NFPA 496 requirements. In the event of a classified installation, the supplier shall also provide all exterior electrical apparatuses and proper seals which are rated for use in the environment in which the building shall be installed. N. The supplier shall furnish all electrical distribution equipment necessary for the proper operation of building services within and without the building. The operating voltage of all distribution equipment shall be 120/208, three-phase. The primary side of any distribution transformers shall be 480V, three-phase. O. The building shall be provided with twin tube, rapid start, fluorescent lighting fixtures, controlled via threeway wall switches to be located at each entry door. P. The building shall be provided with 125V, 20A duplex receptacles at each entry door. Q. The building shall be provided with 70 watt high pressure sodium exterior lights at each entry door, controlled via photocell and H-O-A switch. R. All wiring shall be type THWN, #12 AWG minimum for power circuits, minimum #14 AWG for control circuits. For all control interconnection wiring, both ends of the wire shall be provided with polyolefin sleeve type wire markers. S. EMT conduit shall be utilized for interior applications. RGS conduit shall be utilized for outdoor applications. T. Cabletray (if required) shall be aluminum, 6-inch high with 9-inch rung spacing. All fittings shall have a minimum of 12-inch radius. Buildings having cabletray systems shall be provided with structural steel channel supports embedded in the ceiling. The use of unistrut fastened directly to the ceiling for cabletray support shall not be permitted. The support from the channel supports shall be via allthread and unistrut hangers. U. 1/4-inch by 2-inch ground bar running the length of the building shall be provided, mounted approximately 6 inches above floor and connected to each end of the equipment ground bar. A #4/0 green insulated copper ground cable shall be provided from the ground bar to the exterior ground pads. A green insulated copper ground wire/cable will be provided from the ground bar to all auxiliary electrical equipment per NEC Table Testing and Inspection The following testing and inspection shall be performed on the building. A. Continuity checks of all wiring installed by the supplier. B. Operational check of all supplier furnished and installed electrical apparatuses. C. Switchgear and Motor Control Center shipping sections bus shall be respliced, torqued and meggered. D. A certified test report shall be provided by the supplier s Quality Assurance Manager.

6 Technical Data Page 6 Effective: August 1999 E. If necessary, secondary control power shall be provided for customer use. Available control power voltages shall be 480/3/60, /3/60 and /1/160. Submittals The supplier shall provide the following submittals: A. Quality plans, forms, or procedures deemed necessary by the customer. B. Structural drawings including: 1. General notes. 2. Building plan view. 3. Building base skid detail. 4. Building elevations. 5. Stairs and landings detail (if applicable). 6. Certified structural calculations (if applicable). Copyright Inc., All Rights Reserved.

7 Technical Data Effective: August 1999 Page 7 Notes

8 Technical Data Page 8 Effective: August 1999 TD5001ATE Printed in U.S.A. / Z99046

SECTION INTEGRATED POWER ASSEMBLY (IPA)

SECTION INTEGRATED POWER ASSEMBLY (IPA) INTEGRATED POWER ASSEMBLY (IPA) PART 1 GENERAL 1.01 1.02 1.03 SCOPE The specification covers requirements applicable to the provision of Integrated Power Assembly (IPA). The IPA shall be environmentally

More information

Power Control Distribution Building (PCD) Technical Specification General Purpose (Non-Hazardous) Environment

Power Control Distribution Building (PCD) Technical Specification General Purpose (Non-Hazardous) Environment Power Control Distribution Building (PCD) Technical Specification PART I: GENERAL 1. Scope 1.1. The specification covers requirements applicable to the provision of power distribution centers (PCD) suitable

More information

Power Control Distribution Building (PCD) Technical Specification Corrosive Environment

Power Control Distribution Building (PCD) Technical Specification Corrosive Environment PART I - GENERAL 1. SCOPE 1.1. The specification covers requirements applicable to the provision of power distribution centers (PCD) suitable for installation in highly corrosive environments. The PCD

More information

Integrated Power Assemblies - Electro/Centers

Integrated Power Assemblies - Electro/Centers Supersedes TD02300001E 12/02 Contents Integrated Power Assemblies Product Description.................................................................. 2 Integrated Power Assemblies Section View................................................

More information

Power Control Distribution Building (PCD) Technical Specification Classified Environment

Power Control Distribution Building (PCD) Technical Specification Classified Environment PART I - GENERAL 1. SCOPE 1.1. The specification covers requirements applicable to the provision of power distribution centers (PCD) suitable for installation in classified (hazardous) environments. The

More information

Electrical Houses. Coordinated. Coordinated Electrical Houses Integrated Power Assemblies IPAs Contents

Electrical Houses. Coordinated. Coordinated Electrical Houses Integrated Power Assemblies IPAs Contents September 2011 Sheet 001 Coordinated.0-1 Electrical Houses Contents General Description............................................0-2 Technical Data Layout Dimensions..............................0-6

More information

Electrical Houses. Coordinated. Coordinated Electrical Houses Integrated Power Assemblies IPAs Contents

Electrical Houses. Coordinated. Coordinated Electrical Houses Integrated Power Assemblies IPAs Contents Sheet 001 Coordinated.0-1 Electrical Houses Contents General Description............................................0-2 Technical Data Layout Dimensions..............................0-6 Specifications

More information

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information

Power Zone Center. Your solution for power distribution and control systems

Power Zone Center. Your solution for power distribution and control systems Power Zone Center Your solution for power distribution and control systems The Strength of One Powerful When you need to install a new power distribution center in your facility, you need it done in fastest

More information

GE EQUIPMENT CENTERS APPLICATION CONSIDERATIONS

GE EQUIPMENT CENTERS APPLICATION CONSIDERATIONS g GE Electrical Distribution and Control General Electric Company 41 Woodford Avenue, Plainville, CT 06062 860 747-7111 GE EQUIPMENT CENTERS APPLICATION CONSIDERATIONS Introduction For many years the petro/chemical

More information

SECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE

SECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE METAL-ENCLOSED BUS MEDIUM VOLTAGE PART 1 GENERAL 1.01 1.02 1.03 1.04 1.05 SCOPE The Contractor shall furnish and install the equipment as specified herein and as shown on the contract drawings. The medium

More information

Arc Resistant Switchgear & Integrated Factory Assembled Buildings

Arc Resistant Switchgear & Integrated Factory Assembled Buildings Arc Resistant Switchgear & Integrated Factory Assembled Buildings Factory Assembled Factory Pre-commissioned Fully Tested Arc Resistant Designs Proven Long Distance Transport Capability Five Days for Site

More information

Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008

Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008 Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008 (Above 1000V and up to 38kV for Surface Mining) Key Components of Specification:

More information

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE PART 1 GENERAL 1.01 SCOPE A. The Contractor shall furnish and install the primary unit substation(s) complete from the incoming line terminals to the

More information

Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R

Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R Product Brochure www.apt-power.com 433 N. 36 th Street PROVIDING A COMPREHENSIVE Lafayette, IN 47905 www.apt-power.com 433

More information

SECTION MOTOR CONTROL CENTER

SECTION MOTOR CONTROL CENTER SECTION 16445 MOTOR CONTROL CENTER PART 1 GENERAL 1.01 DESCRIPTION A. This section covers the contract item Motor Control Center (MCC). The contract item includes demolition and removal of existing MCC;

More information

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the secondary unit substation(s) complete from the incoming line terminals

More information

N-SERIES: NTH2700 SPECIFICATIONS Tubular Composite Top Hung Sliding Door System

N-SERIES: NTH2700 SPECIFICATIONS Tubular Composite Top Hung Sliding Door System Version 5.22.13 N-SERIES: NTH2700 SPECIFICATIONS Tubular Composite Top Hung Sliding Door System OPTIONS ARE LISTED IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT CONSULT MANUFACTURER

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS SECTION 26 12 16 SECONDARY UNIT SUBSTATIONS PART 1 GENERAL 1.1 SUMMARY This section describes metal-clad, indoor or outdoor, secondary unit substations with integral primary fused disconnect switches,

More information

SECTION PARK NON-SEGREGATED BUS SPECIFICATION

SECTION PARK NON-SEGREGATED BUS SPECIFICATION Page 1 of 5 SECTION ------- PARK NON-SEGREGATED BUS SPECIFICATION 1.0 SCOPE 1.1. This specification describes assemblies of 600V, 5Kv and 15Kv non-segregated bus duct, which will be installed indoors and

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 16060 Grounding and Bonding This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or

More information

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard PART 1 GENERAL 1.1 Scope A. The intent of this specification is to provide power control for the parallel operation of generator

More information

L-SERIES: LTH3900 SPECIFICATIONS Stainless Steel Hollow Metal Sliding Fire Door System

L-SERIES: LTH3900 SPECIFICATIONS Stainless Steel Hollow Metal Sliding Fire Door System Version 5.22.13 L-SERIES: LTH3900 SPECIFICATIONS Stainless Steel Hollow Metal Sliding Fire Door System OPTIONS ARE LISTED IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT CONSULT MANUFACTURER

More information

N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System

N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System Version 5.22.13 N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System OPTIONS ARE LISTED IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT CONSULT MANUFACTURER FOR ADDITONAL

More information

A. Section includes busway and fittings including plug-in units.

A. Section includes busway and fittings including plug-in units. SECTION 26 25 00 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes busway and fittings including plug-in units. 1.2 REFERENCES A. Institute of Electrical and Electronics Engineers:

More information

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 5138 SECURITY GUARDHOUSE INSTALLATION

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 5138 SECURITY GUARDHOUSE INSTALLATION 1993 SPECIFICATIONS CSJ 0500-03-438 SPECIAL SPECIFICATION ITEM 5138 SECURITY GUARDHOUSE INSTALLATION 1. DESCRIPTION. THIS ITEM SHALL GOVERN THE SECURITY GUARDHOUSE PROVISION AND INSTALLATION AT THE FUQUA

More information

Point Eight Power, Inc. Switchgear Specification Low Voltage UL 1558 Metal-Enclosed Switchgear

Point Eight Power, Inc. Switchgear Specification Low Voltage UL 1558 Metal-Enclosed Switchgear Table of Content 1.0 General... 2 2.0 Scope... 2 3.0 Applicable Codes, Standards and Qualifications... 2 4.0 Service and Environmental Conditions... 3 5.0 Construction... 3 6.0 Front Breaker Compartment

More information

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows

More information

SECTION MISCELLANEOUS METALS

SECTION MISCELLANEOUS METALS PART 1 GENERAL 1.1 WORK OF THIS SECTION A. Contractor shall provide all labor, materials, equipment and incidentals as shown, specified and required to furnish and install all miscellaneous metal fabrications

More information

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Low-Voltage Plug-in Busway - 225 to 5000 ampere, 600 VAC 1.02 RELATED

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

SECTION BUSWAYS

SECTION BUSWAYS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 25 11 BUSWAYS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable to the section and

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information

LTH3700, HOLLOW METAL SLIDING FIRE DOOR

LTH3700, HOLLOW METAL SLIDING FIRE DOOR LTH3700, HOLLOW METAL SLIDING FIRE DOOR Consult Manufacturer for additional options or modifications PART 1-GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

SPECIFICATION FOR SIMPLEX SWITCHBOARDS

SPECIFICATION FOR SIMPLEX SWITCHBOARDS SPECIFICATION FOR SIMPLEX SWITCHBOARDS 1.0 SCOPE This specification presents general guidelines, design criteria, and construction requirements for AZZ ENCLOSURE SYSTEMS SIMPLEX PANELS for providing control

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

a) Line and load compartments must be separated by a stable barrier.

a) Line and load compartments must be separated by a stable barrier. 1.00 GENERAL 1.01 The electric utility shall furnish and connect all meters, instrument transformers, test switches, and meter control wiring necessary to complete the meter installation. 1.02 The customer

More information

A. Access doors and frames are part of an access door and frame allowance.

A. Access doors and frames are part of an access door and frame allowance. SECTION 08 31 13 ACCESS DOORS AND FRAMES PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION

SECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION SECTION 16-372 SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION 1. GENERAL SPECIFICATIONS The work of this Section includes furnishing all labor, equipment, materials (unless specifically identified as Owner-furnished)

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section

More information

SECTION DETAILS (MECHANICALLY ASSEMBLY)

SECTION DETAILS (MECHANICALLY ASSEMBLY) COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (DOOR ASSEMBLY)

More information

Houston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER

Houston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER PART 1 - GENERAL 1.1 SUMMARY SECTION 26 13 16 MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER A. The scope of this section includes providing and assembling materials and equipment for the dead-front, medium voltage

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system.

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. SECTION 08625 METAL FRAMED SKYLIGHT PART 1 GENERAL 1.01 SECTION INCLUDES: A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. B. Fabrication

More information

SECTION WIRE, CABLE AND BUSWAYS. A. This section specifies providing wire, cable and busways.

SECTION WIRE, CABLE AND BUSWAYS. A. This section specifies providing wire, cable and busways. SECTION 16120 WIRE, CABLE AND BUSWAYS PART 1 - GENERAL 1.01 DESCRIPTION: A. This section specifies providing wire, cable and busways. B. Definitions: 1. Cable: Cable having low smoke generating characteristics.

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification. SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,

More information

COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY)

COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (DOOR ASSEMBLY)

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES SECTION 262500 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION ELECTRIC FOUR FOLD DOORS MODEL 46 FLAT SHEETED

SECTION ELECTRIC FOUR FOLD DOORS MODEL 46 FLAT SHEETED SECTION 08350 ELECTRIC FOUR FOLD DOORS MODEL 46 FLAT SHEETED PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Equipment Specifications Low Voltage. Active Harmonic Filter

Equipment Specifications Low Voltage. Active Harmonic Filter Equipment Specifications Low Voltage Active Harmonic Filter 1.0 General Description This section contains the design standards, general equipment type and configuration, components, product description,

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

GRDA 69kV Pryor City 3 Substation. Technical Specifications For Control Building

GRDA 69kV Pryor City 3 Substation. Technical Specifications For Control Building GRDA 69kV Pryor City 3 Substation Technical Specifications For Control Building May 2015 TABLE OF CONTENTS Section Subject Page 2.0 APPLICABLE STANDARDS... 3 3.0 GENERAL DESCRIPTION... 3 4.0 DESIGN, CONSTRUCTION

More information

SECTION The specification section is organized by placing information in three standard parts:

SECTION The specification section is organized by placing information in three standard parts: SECTION 14244 LIMITED USE HYDRAULIC ELEVATOR ***** Since 1982 Liftavator, Inc. has provided limited use/limited application (LU/LA) elevators, residential elevators, hydraulic vertical platform wheelchair

More information

603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336)

603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336) Ricky L. Loman, AIA Architect 603 Summit Avenue, Suite 102 Greensboro, N.C. 27405-7700 Voice/FAX (336) 273-7999 ADDENDUM: Number 1 ISSUED: March 14, 2017 SUBJECT: New Agriculture & Equipment Storage Barn

More information

Section BUILDINGS, SHELTERS, ENCLOSURES

Section BUILDINGS, SHELTERS, ENCLOSURES Section 13121 BUILDINGS, SHELTERS, ENCLOSURES Part 1 GENERAL 1.1 SECTION INCLUDES 1.2 A. Pre-engineered buildings. B. Pre-engineered shelters. C. Pre-engineered enclosures. D. Electrical wiring and devices

More information

F-SERIES: F SPECIFICATIONS Four-Fold Door Systems

F-SERIES: F SPECIFICATIONS Four-Fold Door Systems Version 5.22.13 F-SERIES: F100-600 SPECIFICATIONS Four-Fold Door Systems OPTIONS ARE IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT. CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS.

More information

SECTION OVERHEAD COILING FIRE DOORS MODEL 662 OVERHEAD COILING COUNTER FIRE DOORS WITH INTEGRAL FRAME

SECTION OVERHEAD COILING FIRE DOORS MODEL 662 OVERHEAD COILING COUNTER FIRE DOORS WITH INTEGRAL FRAME SECTION 08331 OVERHEAD COILING FIRE DOORS MODEL 662 OVERHEAD COILING COUNTER FIRE DOORS WITH INTEGRAL FRAME Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES

More information

RAOUL WALLENBERG HIGH SCHOOL SECURITY COILING GRILLE SFUSD PROJECT NO SAN FRANCISCO UNIFIED SCHOOL DISTRICT SECTION 08330

RAOUL WALLENBERG HIGH SCHOOL SECURITY COILING GRILLE SFUSD PROJECT NO SAN FRANCISCO UNIFIED SCHOOL DISTRICT SECTION 08330 SECTION 08330 PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Provide all labor, materials, necessary equipment, services and included but limited to all related work to complete security coiling grille

More information

FF200, FOUR-FOLD DOORS CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS.

FF200, FOUR-FOLD DOORS CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS. FF200, FOUR-FOLD DOORS CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 [08 33 13] COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Metal Counter

More information

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein. 16470 PANELBOARDS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 16 An optional keynote to

More information

Specifications for RM Products Ltd. Pre-Assembled & Unassembled Fiberglass Buildings

Specifications for RM Products Ltd. Pre-Assembled & Unassembled Fiberglass Buildings Phone (705) 326-5580 Fax (705) 326-3646 www.rmfiberglass.com sales@rmfiberglass.com Specifications for RM Products Ltd Pre-Assembled & Unassembled Fiberglass Buildings GENERAL SCOPE: This specification

More information

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and

More information

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 11 16 SECONDARY UNIT SUBSTATIONS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR PAN SYSTEM PART 1 GENERAL 1.1

More information

Guide Specifications ADP Series SECTION SHEET METAL ROOFING

Guide Specifications ADP Series SECTION SHEET METAL ROOFING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Sheet metal roofing panels, metal trim, accessories, fasteners, closures, and sealants. [Specifier Note: Edit paragraph below to suit project requirements.]

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 GROUNDING AND BONDING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

F-SERIES: FF XT SPECIFICATIONS Exterior Swinging Four-Fold Door Systems

F-SERIES: FF XT SPECIFICATIONS Exterior Swinging Four-Fold Door Systems Version 5.22.13 F-SERIES: FF100-600XT SPECIFICATIONS Exterior Swinging Four-Fold Door Systems OPTIONS ARE LISTED IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT. CONSULT MANUFACTURER

More information

SPECIAL SPECIFICATION 6499 Environmentally controlled Communications Building

SPECIAL SPECIFICATION 6499 Environmentally controlled Communications Building 2004 Specifications CSJ 0720-03-095 SPECIAL SPECIFICATION 6499 Environmentally controlled Communications Building 1. Description. Furnish and install Environmentally Controlled Communications Building

More information

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 Part 1 General 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified,

More information

SECTION ORNAMENTAL WELDED STEEL FENCING

SECTION ORNAMENTAL WELDED STEEL FENCING SECTION 032300 ORNAMENTAL WELDED STEEL FENCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

Whitley Shower Locker Toilet Facilities

Whitley Shower Locker Toilet Facilities Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.com Building Type Building Code Whitley Shower Locker Toilet Facilities

More information

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 INDEX Page SECTION 1.0: SCOPE 1 1.1 Toronto Hydro Requirements 1 1.2 Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 SECTION 3.0: DEFINITIONS AND THE INTERNATIONAL SYSTEM OF UNITS 1 3.1 Definitions

More information

1. Hangers and supports for electrical equipment and systems.

1. Hangers and supports for electrical equipment and systems. PART 1 - GENERAL... 1 1.1 RELATED DOCUMENTS... 1 1.2 SUMMARY... 1 1.3 DEFINITIONS... 1 1.4 PERFORMANCE REQUIREMENTS... 1 1.5 SUBMITTALS... 2 1.6 QUALITY ASSURANCE... 2 1.7 COORDINATION... 2 PART 2 - PRODUCTS...

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF WELDED SYSTEM PART 1 GENERAL 1.1 SECTION

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections

More information

HOTEL SPECIFICATION SECTION 08100

HOTEL SPECIFICATION SECTION 08100 Part 1 General HOTEL SPECIFICATION SECTION 08100 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified including, but not limited

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION LOW-VOLTAGE SWITCHGEAR

SECTION LOW-VOLTAGE SWITCHGEAR PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 00 LOW-VOLTAGE SWITCHGEAR SPEC WRITER NOTE: This specification is not for general use. Use Section 26 24 13, DISTRIBUTION SWITCHBOARDS for most applications.

More information

A. Submit the following in addition to the standard requirements.

A. Submit the following in addition to the standard requirements. SECTION [13120] OMNIFLEX 300 MODULAR WALL SYSTEM SECTION 1 GENERAL 1.01 SECTION INCLUDES A. This Section specifies all requirements necessary to furnish and install a complete modular wall system including,

More information

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2

More information

SECTION (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS SECTION 26 05 48 (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. This Section includes seismic restraints and other earthquake-damage-reduction measures for

More information

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07 4243 - PART 1 GENERAL 1.01 SECTION INCLUDES A. Composite wall panel system consisting of aluminum-faced composite panels in a rainscreen application as part of the assembly described below.

More information

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

B. Provide liquid-filled secondary substation transformers as indicated on drawings. SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION METAL FLOOR PLATE STAIRS

SECTION METAL FLOOR PLATE STAIRS SECTION 05513 - METAL FLOOR PLATE STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION INDUSTRIAL ACCESS / INSPECTION HATCH. A. Industrial Access / Inspection Hatch: Model AH-710

SECTION INDUSTRIAL ACCESS / INSPECTION HATCH. A. Industrial Access / Inspection Hatch: Model AH-710 Page 1 of 6 PART 1 - GENERAL SECTION 08370 INDUSTRIAL ACCESS / INSPECTION HATCH 1.1 SECTION INCLUDES A. Industrial Access / Inspection Hatch: Model AH-710 1.2 RELATED SECTIONS A. Section 04810 - Unit Masonry

More information

A. Basket Cable Tray: A fabricated structure consisting of wire mesh bottom and side rails.

A. Basket Cable Tray: A fabricated structure consisting of wire mesh bottom and side rails. SECTION 27 11 00 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION METAL ATHLETIC LOCKERS

SECTION METAL ATHLETIC LOCKERS SECTION 10 51 13 - METAL ATHLETIC LOCKERS PART 1 GENERAL 1.1 SECTION INCLUDES A. DESCRIPTION: Furnish and install factory-assembled Heavy-Duty MIG-Welded Metal Lockers, complete, as shown and specified

More information

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 [08 33 13] COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) ** NOTE TO SPECIFIER ** Wayne Dalton; Coiling counter door products.. This section is based

More information

SECTION BASIC ELECTRICAL REQUIREMENTS

SECTION BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies

More information

SECTION ALUMINUM HANDRAIL SYSTEMS

SECTION ALUMINUM HANDRAIL SYSTEMS SECTION 05520 ALUMINUM HANDRAIL SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes aluminum handrails and railings. B. Related Work: 1. Section 03300 - Cast-in-Place Concrete C. References: 1. American

More information

ELECTRICAL SECTION 2

ELECTRICAL SECTION 2 ELECTRICAL SECTION 2 COMMON WORK RESULTS FOR ELECTRICAL PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. This Section includes raceways, conductors and cables, grounding materials, boxes, electrical identification

More information

PRODUCT SPECIFICATIONS PULTRUDED GRATING AND TREADS SECTION PART 1 GENERAL

PRODUCT SPECIFICATIONS PULTRUDED GRATING AND TREADS SECTION PART 1 GENERAL PRODUCT SPECIFICATIONS PULTRUDED GRATING AND TREADS SECTION 06600 PART 1 GENERAL 1.1 Related Documents A. Drawings and general provisions of Contract, including General and Supplementary Conditions and

More information

SECTION ROOF ACCESSORIES

SECTION ROOF ACCESSORIES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 72 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

Kaf-Tech Product Specification

Kaf-Tech Product Specification Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-LUMINARY CABLE

More information