contractors ENGINEERED SOLUTIONS
|
|
- Lambert Harrison
- 5 years ago
- Views:
Transcription
1 contractors ENGINEERED SOLUTIONS
2 Custom Engineered Floor System for Mid- and High-Rise Structures Engineered Solutions From 2» Long-Span Metal Dek and structural steel floor assembly» Prefabricated panels One panel can cover up to 1,200 sq. ft. Panels can clear span up to 35 ft.» Performance tested Fire Sound and Impact Vibration Structural» Built-in lineal chase way» Unique assembly using traditional constuction techniques and materials Design assistance provided for Versa-Floor [HR]* projects *patents pending
3 Custom Engineered Composite Floor System SPEED + SAFETY = MONEY» Reduce project schedule by up to 50%*» Double or triple floor installation speed* (15,000 sq. ft. per crane per day)*» Enhance jobsite safety*» Reduce workforce *Compared to CIP construction Floor system Benefits Mid- & High-Rise Structures» Decreases weight of structure Reduces foundation requirements Lessens seismic impact» Reduces column footprint Facilitates space planning Produces 2% more useable floor space» Provides flexibility Allows for core drilling where needed Offers options for suspending components Finishes with painted Dek or gypsum ceilings Panelization» Creates vertically aligned lineal chase way for M/E/P» Creates flush spandrel beam condition (Allows floor-to-ceiling glass curtain wall) Jobsite Benefits Safety with Panelization» Assembles at grade level» Carries welded wire fabric and rebar bundles when lifted» Includes fall protection before lifting Vertical Transportation of Panels» Needs fewer crane picks» Carries additional materials when lifted» Reduces burden on man lifts Production» Provides for controlled output» Facilitates quality control» Allows for panel inspection before lifting» Installs with limited to no shoring» Allows timely access to trades Engineering Performance» Gravity and shear load tested» UL 2-hour unprotected fire rating» Sound Transmission Class up to 57 db» Impact Insulation Class up to 57 db» Vibration conforms to AISC Design Guide 11 3
4 Custom Engineered Composite Floor System M/E/P Riser Block-Out Negative Reinforcement as Required M/E/P Chaseway Created by Versa-Floor [HR] Panels (See detail page 6) Normal or Light Weight Concrete Reinforced Spandrel Beam (See detail page 6) Welded Wire Fabric Versa-Floor [HR] Prefabricated Panel Multi-Story Structural Steel Column Deep-Dek Composite Floor Dek with Factory Closed Ends Spandrel Beam Assembly Seat Angle for Versa-Floor [HR] Panel Installation PrOCESS 1. Set multi-story structural steel columns 2. Install Versa-Floor [HR] panelized sections 3. Install temporary shoring beams, if required 4. Install Versa-Dek at corridors and balconies 5. Block out chaseways where openings are required 6. Install welded wire fabric 7. Install negative reinforcement, if required 8. Install spandrel beam system at perimeter 9. Pour normal or light weight concrete Versa-Floor [HR] Panel to Column Connection (See detail page 6) M/E/P Riser Block-Out in Floors Below Versa-Dek Composite at Corridors 4 5
5 Versa-Floor [HR] panel cut section at reinforced spandrel beam Versa-Floor [HR] panels forming M/E/P chase way Versa-Floor [HR] panel-to-column connection (Deep-Dek Composite section partially removed & opposite channel shown for clarity) 6
6 Custom Engineered Composite Floor System Design Flexibility Flush spandrel beam condition allows floor-to-ceiling glass curtain wall. Versa-Floor [HR] creates unobstructed ceilings without filler beams. Versa-Floor [HR] panels create aligned lineal chase ways, which simplify M/E/P installation. Versa-Floor [HR] has no post-tension strands to hinder M/E/P installation. 7
7 versafloor.com Contact the Versa-Floor [HR] Design Team for design and technical assistance. Main Office: 650 Rosewood Drive» Columbia, SC phone (888) » Main Office: 1730 West Reno» Oklahoma City, OK phone (405) » Metal Dek Group v07.09
ENGINEERS ENGINEERED SOLUTIONS DEEP-DEK COMPOSITE COMPOSITE LONG SPAN FLOOR DECK.
ENGINEERS ENGINEERED SOLUTIONS DEEP-DEK COMPOSITE COMPOSITE LONG SPAN FLOOR DECK www.metaldek.com DEEP-DEK 4.5 COMPOSITE DEEP-DEK 6 COMPOSITE DEEP-DEK COMPOSITE Deep-Dek Composite* is a long-span composite
More informationDEEP-DEK COMPOSITE A VERSA-FLOOR SYSTEM
ENGINEERS ENGINEERED SOLUTIONS DEEP-DEK COMPOSITE A VERSA-FLOOR SYSTEM LONG SPAN COMPOSITE FLOOR SYSTEM DEEP-DEK COMPOSITE A VERSA-FLOOR SYSTEM Deep-Dek Composite A Versa-Floor System Deep-Dek Composite*
More informationENGINEERED SOLUTIONS VERSA-DEK COMPOSITE 3.5LS COMPOSITE LONG SPAN FLOOR DECK.
E N G I N E E R S ENGINEERED SOUTIONS VERSA-DEK COMPOSITE 3.5S COMPOSITE ONG SPAN FOOR DECK www.metaldek.com VERSA-DEK COMPOSITE 3.5S VERSA-DEK COMPOSITE 3.5S Dovetail-shaped structural composite Dek engineered
More informationCaitlin Ferrell Structural Option Dr. Boothby, AE Faculty Consultant. Erie Convention Center and Sheraton Hotel
Caitlin Ferrell Structural Option Dr. Boothby, AE Faculty Consultant Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Technical Report #2: Pro-Con Structural Study of Alternate Floor Systems
More informationStructural Steel Building Systems NATIONWIDE DESIGN, MANUFACTURE AND DELIVERY
Structural Steel Building Systems NATIONWIDE DESIGN, MANUFACTURE AND DELIVERY Table of Contents Applications Overview... 4-5 Roofing and Flooring Systems... 6-7 Ceiling and Cladding Systems... 8-9 Long-Span
More informationPRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION
PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION An overview of costing strategies for wood framed construction elements CREATING A PROJECT ENDLESS POSSIBILITIES COMPATORS LIST A FLOOR Cast in Place
More informationInstalling DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site
Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan
More informationHAMBRO COMPOSITE FLOOR SYSTEM
HAMBRO COMPOSITE FLOOR SYSTEM OUR EXPERTISE AT YOUR SERVICE Canam has been offering owners, real estate developers, architects, engineers and contractors an array of construction solutions since 1970.
More informationTECHNICAL REPORT II STRUCTURAL STUDY OF ALTERNATE FLOOR SYSTEMS
TECHNICAL REPORT II STRUCTURAL STUDY OF ALTERNATE FLOOR SYSTEMS Chris Vanaskie Structural Peninsula Regional Medical Center Salisbury, MD December 22, 2008 TABLE OF CONTENTS Executive Summary... 3 Introduction...
More informationModular Wood Framing Goes Vertical
Modular Wood Framing Goes Vertical By: Troy Bean, P.E., S.E. DCI Engineers January 2013 The Wood Products Council is a Registered Provider with. Credit(s) earned on completion of this program will be reported
More informationAISC Steel & Timber Research for High-Rise Residential Buildings
AISC Steel & Timber Research for High-Rise Residential Buildings Final Report December 4 th, 2017 SOM Designed Benchmark Concrete Building Skidmore, Owings, and Merrill, LLP 2017 224s Michigan Avenue Suite
More informationSTEEL STRUCTURAL SYSTEMS
STEEL STRUCTURAL SYSTEMS Steel elements are of two basic types: Structural steel shapes are formed into their final shapes by hot-rolling. This method produces such common elements as wide flange sections,
More informationTECHNICAL REPORT 1. Structural Concepts / Structural Existing Conditions. Penn State Hershey Medical Center Children s Hospital. Hershey, Pennsylvania
TECHNICAL REPORT 1 Structural Concepts / Structural Existing Conditions Penn State Hershey Medical Center Children s Hospital Matthew V Vandersall The Pennsylvania State University Architectural Engineering
More informationHAMBRO COMPOSITE FLOOR SYSTEM
HAMBRO COMPOSITE FLOOR SYSTEM OUR EXPERTISE AT YOUR SERVICE Canam has been offering owners, real estate developers, architects, engineers and contractors an array of construction solutions since 1970.
More informationInstalling metal decking, curtain walls, window walls, siding systems, miscellaneous metals, ornamental iron, and similar materials; and
Steel Erection Plan for Construction Purpose Company Name must meet the requirements of OSHA's Steel Erection standard (29 CFR 1926, Subpart R). This Steel Erection Plan for Construction is our company's
More informationStatement of Special Inspections Michigan Building Code 2012 (MBC 2012)
Gaines Charter Township 8555 Kalamazoo Ave SE Caledonia MI 49316 PH: 616 698-6640 Fax: 616 698-2490 www.gainestownship.org Building Department Statement of Special Inspections Michigan Building Code 2012
More informationStructural Technical Report #2 By Robert Whitaker
Structural Technical Report #2 By Robert Whitaker Robert Whitaker Structural ~ Parfitt Parkview at Bloomfield Station Bloomfield, NJ 10-31-05 Executive Summary This report covers the comparative redesign
More informationLIGHT-GAUGE PANELIZED WALL SYSTEMS. Michael Waggoner Mark Schroeder
LIGHT-GAUGE PANELIZED WALL SYSTEMS Michael Waggoner Mark Schroeder INTRODUCTION Development of Light-Gauge Panelized Wall Systems Selecting the Right Framing Systems Building Code Design Considerations
More informationLibrary In Metropolitan Washington, D.C.
1 Library In Metropolitan Washington, D.C. Penn State Architectural Engineering Senior Capstone Project Rob Leicht Picture Provided by Multivista 2 Picture Provided by Multivista 3 Building Name: Library
More informationPrefabricated Light Weight Steel Structures. Systems Guide WALLS, FLOORS, TRUSSES
Prefabricated Light Weight Steel Structures WALLS, FLOORS, TRUSSES www.psiincusa.com 14869 Persistence Drive Woodbridge, Virginia 22191 Phone: 703.550.1466 Fax: 703-550-0486 Systems Guide Introduction
More informationTemecula Medical Center Temecula, CA
Temecula Medical Center Temecula, CA Technical Assignment #2 Sean F. Beville The Pennsylvania State University Architectural Engineering Structural Option Senior Thesis Project Student Advisor: Thomas
More informationWilliam W. Wilkins Professional Building Columbus, Ohio
William W. Wilkins Professional Building Columbus, Ohio Technical Assignment 1 October 5, 2006 Michelle Structural Option AE 481W Senior Thesis Faculty Advisor: Dr. Boothby Table of Contents Executive
More informationThe Perfect Choice for Mezzanines in Custom Metal Buildings
The Perfect Choice for Mezzanines in Custom Metal Buildings Ecospan composite floor system. The Ecospan Composite Floor System is an innovative, simple, effective and economical method of providing all
More informationStructural Inspection
General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized
More informationStructural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report
1 THE ODYSSEY ARLINGTON, VA Aaron Snyder Structural Option Advisor: M. Kevin Parfitt, PE Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report Executive
More informationSTATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014
STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural
More informationMOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS
MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS PARKERSBURG, WEST VIRGINIA DOMINIC MANNO STRUCTURAL OPTION FACULTY CONSULTANT: DR. ANDRES LEPAGE Technical Report 3 11-21-08 TABLE OF CONTENTS TABLE OF
More informationSPECIAL INSPECTION AGREEMENT
PART 1 STATEMENT OF SPECIAL INSPECTIONS When special inspection is required to be performed in accordance with International Building Code Chapter 17, a building permit cannot be issued until a statement
More informationProject Address: Name of Person Completing Form:
Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties
More information181 Fremont San Francisco, CA. Tech Report 3 10/17/2014. PSUAE Structural Option Advisor: Dr. Thomas Boothby
181 Fremont San Francisco, CA Tech Report 3 10/17/2014 PSUAE Structural Option Advisor: Dr. Thomas Boothby Caroline Klatman cjk5258@psu.edu October 17, 2014 Dr. Thomas Boothby The Pennsylvania State University
More informationStructural Redesign Gravity System
Redesign Gravity System Design Considerations A composite floor system was used for this design to maximize the efficiency of the material being used. This type of system requires less material and provides
More informationA Composite Structural Steel and Prestressed Concrete Beam for Building Floor Systems
University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Architectural Engineering -- Dissertations and Student Research Architectural Engineering Spring 4-20-2012 A Composite Structural
More informationMatthew Kutzler. Structural Option Spring Buildings C and D Campus Square, Lehigh University Bethlehem, PA
Matthew Kutzler Structural Option Spring 2004 Buildings C and D Campus Square, Lehigh University Bethlehem, PA Located at Lehigh University in Bethlehem, PA Complex consists of four dormitories and a parking
More information151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University
November 16 th, 2007 William J. Buchko AE 481w Senior Thesis The Pennsylvania State University Thesis Advisor: Kevin Parfitt Table of Contents Executive Summary... 3 Structural System Overview Foundation...
More informationExecutive Summary. Non-Composite Steel system 2- Way Flat Concrete Slab Wood Beam with Form Deck Pre-Cast Hollow Core Plank
Executive Summary This report is a description, analysis and comparison of the existing floor system and four alternatives. The proposed floor system for the Kenneth Langone Athletic and Recreation Center
More informationHouse of Sweden. Structural Study of Alternative Floor Systems K St. NW Washington, DC 20007
Structural Study of Alternative Floor Systems 2900 K St. NW 20007 The Pennsylvania State University Department of Architectural Engineering Senior Thesis 2008-2009 October 24, 20008 Prepared by: Prepared
More informationTable of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8
WISCONSIN PLACE RESIDENTIAL TECHNICAL ASSIGNMENT 2 OCTOBER 29, 2007 KURT KRASAVAGE THE PENNSYLVANIA STATE UNIVERSITY STRUCTURAL OPTION FACULTY ADVISOR: DR. ALI MEMARI 1 Table of Contents Table of Contents.2
More informationSouthwest Housing, Arizona State University
Prepared by KSENIA TRETIAKOVA Structural Option 01.09.2012 Architectural Engineering Pennsylvania State University 2012 Southwest Housing, Arizona State University Technical Report #3 Lateral System 01.09.2012
More informationJAMES DEAN BAKER ALCOA CORPORATE CENTER STRUCTURAL OPTION 201 ISABELLA STEET
JAMES DEAN BAKER STRUCTURAL OPTION ALCOA CORPORATE CENTER 201 ISABELLA STEET PRESENTATION OUTLINE Introduction Existing Conditions Structural Existing Conditions Design Goals and Criteria Suspension Design
More informationStructural Design Engineers 120 Montgomery Street, Suite 1410 San Francisco, California / Fax 415/
120 Montgomery Street, Suite 1410 San Francisco, California 94104 415/781-1505 Fax 415/781-2718 sde@sdesf.com Rajendra Sahai, SE Principal John W. Laws, SE Principal Steven Lepisto, SE Principal STRUCTURAL
More informationSECTION COMPOSITE METAL DECKING
PART 1 GENERAL 1.1 DESCRIPTION SECTION 05 36 00 1. Use this section only for NCA projects. 2. Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable
More informationSECTION NON-LOAD BEARING WALL FRAMING. B. Section Furring and Lathing: Lath and furring for interior plaster applications.
SECTION 09.22.16 NON-LOAD BEARING WALL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Non-load bearing metal studs for wall assemblies. B. Area Separation and shaft wall framing products. 1.2 RELATED SECTIONS
More informationHershey Research Park Building One. Technical Report 2. Jonathan Krepps Structural Option Advisor: Dr. Hanagan 10/12/12
Hershey Research Park Building One Technical Report 2 Advisor: Dr. Hanagan 10/12/12 Table of Contents Executive Summary..3 Building Introduction 4 Structural Overview..5 Materials 9 Design Codes 10 Design
More informationBest Buy Corporate Building D (4) Richfield, MN
Best Buy Corporate Building D (4) Thesis Proposal Professor Boothby December 12 th, 2008 Executive Summary: The Best Buy Corporate Building D is a 6 story building with a total area of 304,610 square feet.
More informationFOUR. at the Fore BY RICHARD B. GARLOCK, P.E.
The first tower to open at the original World Trade Center site, 4WTC maximizes its space and views with creative column construction. FOUR at the Fore BY RICHARD B. GARLOCK, P.E. Joe Woolhead APRIL 2015
More informationStructural Technical Report 1 Structural Concepts / Structural Existing Conditions Report
Michael A. Troxell Structural Option Advisor: Professor Parfitt College of Business Administration Oct. 5, 2005 Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report
More information1000 CONNECTICUT AVENUE
1000 CONNECTICUT AVENUE Gea Johnson Structural Option Faculty Advisor: Dr. Hanagan September 23, 2011 Revised: December 16, 2011 Washington DC Technical : Existing Conditions Table of Contents Executive
More informationTechnical Report 3. Alyssa Stangl Structural Option Advisor Dr. Linda Hanagan L A J O L L A C O M M O N S P H A S E I I O F F I C E T O W E R
Technical Report 3 Alyssa Stangl Structural Option Advisor Dr. Linda Hanagan L A J O L L A C O M M O N S P H A S E I I O F F I C E T O W E R Site and Location La Jolla Commons, San Diego, California General
More informationLa Jolla Commons Office Tower. Appendix Slides. Architecture Breadth. Dual Systems Check. Lateral System. Shear Wall Modeling. Verification.
Appendix Slides Architecture Breadth Dual Systems Check Shear Wall Modeling Lateral System Verification Model Verification Vibrations Analysis Architecture Breadth 198 8 La Jolla Commons Office Tower Floor-to-Ceiling
More informationThe ACR : Advanced Design Features for a Short Construction Schedule
Transactions of the 17 th International Conference on Structural Mechanics in Reactor Technology (SMiRT 17) Prague, Czech Republic, August 17 22, 2003 Paper # S01-3 The ACR : Advanced Design Features for
More informationIndustry Standard Terms & Definitions Of The Steel Deck Institute
Industry Standard Terms & Definitions Of The Steel Deck Institute A specialized set of jargon to describe common terms used by manufacturers and other professionals associated with the usage of Steel Deck
More informationNorth Mountain IMS Medical Office Building
North Mountain IMS Medical Office Building Phoenix, Arizona Michael Hopple Technical Assignment 2 October 29 th, 2007 AE 481W-Senior Thesis The Pennsylvania State University Faculty Adviser: Dr. Ali Memari,
More informationStructural Breadth Study
Structural Breadth Study Connection Redesign Structural Breadth Study Connection Redesign Existing EIFS Connection The expansion project is a steel frame structure with concrete slab on deck. There is
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,
More informationEarth and Engineering Sciences Building University Park, Pennsylvania
Executive Summary The Earth and Engineering Sciences building is a 4 story educational and laboratory facility. An additional basement level is located below grade and provides the foundation for the East
More informationSJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series
SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series SUMMARY David Samuelson Steel joists are growing in recognition as being a very economical
More informationDIVISION 5 - STRUCTURAL STEEL AND IRON WORK
DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete
More informationPASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017
SECTION 053100 STEEL DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationPOINT. Making the. The highlights of High Point University s newest academic building are comprised of open volumes, and steel makes them happen.
The highlights of High Point University s newest academic building are comprised of open volumes, and steel makes them happen. Making the POINT BY CHARLES BOWMAN, PE THE NEW COTTRELL HALL, home of the
More informationMechanical Engineer of Record: (Smoke Control Systems Only) Name & License Company. Others: Responsible Party Name & License Company
PRINCE WILLIAM COUNTY Department Development Services Building Development Division STATEMENT OF SPECIAL INSPECTIONS (Building/Other Structures other than Retaining Walls) Version 2015-12-31 Building Permit
More informationTable of Contents 2. Structural Systems.4 Foundations.4 Floor System...4 Columns..5 Lateral System...5
WISCONSIN PLACE RESIDENTIAL TECHNICAL ASSIGNMENT 1 OCTOBER 5, 2007 KURT KRASAVAGE THE PENNSYLVANIA STATE UNIVERSITY STRUCTURAL OPTION FACULTY ADVISOR: DR. ALI MEMARI Table of Contents Table of Contents
More informationSimplified Building Schematic for Typical Floor (Levels 9 through 22):
Introduction to Structural System Simplified Building Schematic for Typical Floor (Levels 9 through 22): Key: - Tower Columns - Tower Shear Walls - Parking Garage Columns - Parking Garage Shear Walls Solid
More informationDanielle Shetler - Structural option Courtyard by Marriott Lancaster, PA
Structural Analysis Overview: During the structural analysis of the in Lancaster, Pa, a redesign of the lateral and gravity system from masonry bearing and shear walls to a staggered truss system was performed.
More informationS p a c e e l e v a t o r. Structure selection and design Prof Schierle 1
S p a c e e l e v a t o r Structure selection and design Prof Schierle 1 Selection criteria: 1 Morphology 2 Capacity Limits 3 Code Requirements 4 Cost 5 Load Conditions 6 Resources and Technology 7 Sustainability
More informationSECTION STEEL DECKING
SECTION 05 31 00 STEEL DECKING SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Refer to Section 05 36 00, COMPOSITE METAL DECKING for floor
More informationDesign Guidev1.2 A REVOLUTIONARY STRUCTURAL SYSTEM FOR MID AND HIGH-RISE RESIDENTIAL CONSTRUCTION.
Design Guidev1.2 A REVOLUTIONARY STRUCTURAL SYSTEM FOR MID AND HIGH-RISE RESIDENTIAL CONSTRUCTION. www.girder-slab.com COMPOSITE STEEL AND PRECAST SYSTEM A revolutionary steel-based framing system that
More information2016 CDM Smith All Rights Reserved July 2016 SECTION COMPOSITE STEEL FLOOR DECK
PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 05 36 00 COMPOSITE STEEL FLOOR DECK A. Furnish all labor, materials, equipment and incidentals required and install composite steel floor deck complete as shown
More informationDIVISION 5 METALS SECTION METAL DECKING
DIVISION 5 METALS SECTION 05 30 00 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: All labor and materials required to furnish and install metal decking and accessories including shear connectors, closures,
More informationStructural Option October 24, Technical Report 2. Evaluation of Floor System Alternatives. Residence Inn By Marriott.
Katie Ritter Advisor: Dr. Ali Memari Structural Option October 24, 2008 Technical Report 2 Evaluation of Floor System Alternatives Residence Inn By Marriott Norfolk, Virginia TABLE OF CONTENTS Executive
More informationLintel Tables Design Notes and Limitations
LINTEL TABLES Lintel Tables Design Notes and Limitations 1. These tables apply to one and two family residential structures only that conform to the requirements of the 2006, 2009 or 2012 International
More informationSEISMIC RESTRAINT SYSTEM
1. GENERAL 1.1. Description: SECTION 16012 SEISMIC RESTRAINT SYSTEM 1.1.1. This specification covers design and installation of seismic bracing and anchorage required for conduit, cable tray, bus duct,
More informationThesis Proposal Executive Summary Depth and Breadth Analysis
Mathew Nirenberg Structural Option Metropolis at Dadeland Adviser: Schneider Proposal Executive Summary 12/12/05 Thesis Proposal Executive Summary Depth and Breadth Analysis The Metropolis at Dadeland
More informationStatement of Special Inspections 2013 CBC
BUILDIG & SAFET DIVISIO 2729 Prospect Park Drive Rancho Cordova, CA 95670 Phone: (916) 851-8760 Fax: (916) 851-8762 Statement of Special Inspections 2013 CBC PERMIT #: PROJECT ADDRESS: This Statement of
More informationDAVID GEIGER BAE STRUCTURAL OPTION
DAVID GEIGER BAE STRUCTURAL OPTION SENIOR THESIS PRESENTATION 14 APRIL 2009 INTRODUCTION Building Overview Proposal Summary Goals Depth Study Structural System Redesign Breadth Study Cost Comparison Schedule
More informationTable 3. Detailed Comparison of Structural Provisions of IRC 2000 and 1997 NEHRP (Continued)
2000 IRC 1997 NEHRP Section Provision Section Provision Comments CHAPTER 3 BUILDING PLANNING R301 DESIGN CRITERIA R301.2.2 Seismic Provisions R301.2.2.1 Determination of Seismic Design Category R301.2.2.1.1
More informationAlexis Pacella Structural Option Dr. Schneider Lexington II, Washington D.C. Technical Report #2 October 31,
1 Executive Summary: Pro-Con Structural Study of Alternate Floor Systems is an investigation into possible alternative structural systems for Lexington II in Washington, D.C. For this report, several structural
More informationPoint Pleasant Apartments Point Pleasant, NJ Ryan P. Flynn Structural Option Faculty Consultant: Dr. Hanagan
Point Pleasant Apartments Point Pleasant, NJ Ryan P. Flynn Structural Option Faculty Technical Report #3: Lateral System Analysis and Confirmation Design Table of Contents Introduction... 3 Executive Summary...
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING
SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationTechnical Report #2. Matthew R Peyton
Technical Report #2 This Document is Technical Report #2 for 5th year senior thesis in the Architectural Engineering Departments at The Pennsylvania State University. This Report is to prepare a study
More informationSTEEL DECK INSTITUTE Industry Standard Terms & Definitions
s Industry Standard Terms & Definitions November 2016 Industry Standard Terms & Definitions A specialized set of jargon to describe common terms used by manufacturers and other professionals associated
More informationRutgers University Law School Building Addition and Renovation Camden, NJ
Building Addition and Renovation Camden, NJ Technical Assignment 1 October 5, 2007 Nathan E. Reynolds Structural Option Senior Thesis The Pennsylvania State University Faculty Consultant: Professor M.
More informationFAIRFIELD INN & SUITES, MARRIOT PITTSBURGH, PA
10/28/2009 TECHNICAL REPORT II FAIRFIELD INN & SUITES, MARRIOT PITTSBURGH, PA Advisor: Dr. Ali Memari Structural Option TABLE OF CONTENTS Table of Contents 2 Executive Summary...3 Introduction: Fairfield
More informationOVERALL STRUCTURAL SYSTEM
EXECUTIVE SUMMARY The at the Pittsburgh International Airport, PA, is a 275,000 square foot multi-use building located directly adjacent to the airport s landside terminal. The building consists of an
More informationNortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1
16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More informationTechnical Report #1. Matthew R Peyton
Technical Report #1 This Document is Technical Report #1 for 5th year senior thesis in the Architectural Engineering Departments at The Pennsylvania State University. This Report will include structural
More informationEarth and Engineering Sciences Building
Executive Summary The purpose of this report is to provide an analysis of the existing floor system of the Earth and Engineering Sciences Building at University Park, Pennsylvania, as well as investigating
More informationCORPORATE HEADQUARTERS
TECHNICAL REPORT 1 `` CORPORATE HEADQUARTERS Great Lakes Region, U.S.A. M. JULIA HAVERTY STRUCTURAL OPTION ADVISOR: H. SUSTERSIC 12 SEPTEMBER 2014 Contents Executive Summary... 2 Purpose and Scope... 3
More informationENTRY FORM. DVASE 2014 Excellence in Structural Engineering Awards Program
ENTRY FORM DVASE 2014 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $2M Buildings Over $100M Buildings $2M-$10M Other Structures Under $5M Buildings
More information5/6/2008. Presentation Outline. Project Overview. Project Overview. Structural System Analysis. Project Overview. Granby Tower
Presentation Outline Justin Pennycoff AE Senior Thesis 2008 Construction Management Structural Breadth CM Depth Mechanical Breadth Mechanical System Analysis s Q& A Location Total Cost $180 million Building
More informationMaximize Your Space. Mezzanines are ideal for:
www.vertispace.ws Maximize Your Space Worker productivity and manufacturing efficiencies are under constant scrutiny in today s business world. Whether you re an operations manager charged with expanding
More informationSECTION COLD-FORMED METAL FRAMING
SECTION 05.40.00 COLD-FORMED METAL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Cold-formed metal framing for: B. Exterior load-bearing steel stud walls. 1. Interior load-bearing steel stud walls. 2.
More informationThesis Proposal 12/13/06
Photo courtesy of OTO Development, http://www.otodevelopment.com/ Dr. Memari Thesis Advisor Thesis Proposal 12/13/06 Executive Summary Structural System The in, is an eleven story hotel complex which reaches
More informationHYBRID DESIGN REDUCES COSTS WHEN DESIGN FIRST BEGAN. Switching from a concrete frame to steel beams and concrete columns proved advantageous
Switching from a concrete frame to steel beams and concrete columns proved advantageous HYBRID DESIGN REDUCES COSTS WHEN DESIGN FIRST BEGAN ON THE 30-STORY IJL FINANCIAL CENTER IN DOWNTOWN CHARLOTTE, the
More informationJonathan R. Torch Technical Report 2 Columbia University. Technical Report 2. Pro-Con Structural Study of Alternate Floor Systems
Technical Report 2 Pro-Con Structural Study of Alternate Floor Systems Columbia University Broadway & 120 th Street, New York, NY Jonathan R. Torch Pennsylvania State University Architectural Engineering
More information15/06/ Clippers Quay. Salford Manchester.
Salford Manchester 1 CCL Introduction to CCL Founded in 1935 Specialised engineered solutions for structures Independently owned private company 700+ employees 30 group companies Global presence Advanced
More informationBrent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan
Structural Design: Goals: The original design of 200 Minuteman Drive was dictated largely by Brickstone Properties, the building s owner. The new design of 200 Minuteman Drive, with additional floors,
More informationK. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.
DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:
More informationConstruction Management Study
Construction Management Study CONSTRUCTION MANAGEMENT STUDY A construction management study of the alternate concrete system was done to examine the impact that changing the building s superstructure material
More informationDIVISION 13 - SPECIAL CONSTRUCTION SECTION ACOUSTICAL PANEL ENCLOSURE
DIVISION 13 - SPECIAL CONSTRUCTION SECTION 13080 - ACOUSTICAL PANEL ENCLOSURE 1 GENERAL 1.01 SUMMARY A. ACOUSTIC ENCLOSURE CONSISTING OF WALLS, CEILING, STRUCTURAL FRAMING, CONNECTING MEMBERS, DOORS, WINDOWS,
More information