India : Coal Fired Generation Rehabilitation Project Bandel Thermal Power Station

Size: px
Start display at page:

Download "India : Coal Fired Generation Rehabilitation Project Bandel Thermal Power Station"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized India : Coal Fired Generation Rehabilitation Project Bandel Thermal Power Station ENVIRONMENTAL MANAGEMENT ACTION PLAN (Prepared as outcome of Environmental Audit and Due Diligence Assessment of BTPS) E2021 VOL. 1 WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED NOVEMBER 2008

2 ENVIRONMENTAL MANAGEMENT ACTION PLAN India: Coal Fired Generation Rehabilitation Project Bandel Thermal Power Station West Bengal Power Development Corporation Limited (WBPDCL) has commissioned an independent Environmental Audt and Due Dihgence (EADD) Study for Bandel Thermal Power Station. The EADD has been prepared considering the project preparation requirements of the Coal Rehabilitation Project proposed to be funded by the World Bank. The project proposes Rehabihtation and Modernization (R&M) of 5[h Unit of Bandel TPS. The EADD, accepted by WBPDCL/BTPS during March-April 2008, recommends specific measures for improving environmental performance of 5th Unit (210 MW) as well as the plant level environmental performance including Unit 1-4 in the station. The Environmental Management Action Plan (EMAP) consolidates the recommendations of EADD including the agreed investment requirements for improving environmental performance. The EMAP comprises three levels of actions including: (a) mitigation measures to be implemented as part of R&M activities for the 5th measures proposed to be integrated as part of Institutional strengthening and capacity building; and (c) measures to be taken up by Bandel TPS for the power station as a whole. Each management measure included in the EMAP includes cost estimates and implementation schedule. The relevant portions of the EMAP has been integrated in to the technical specifications of the R&M bidding documents. The EMAP also provides necessary measures for environmental monitoring and compliance with West Bengal Pollution Control Board's (WBPCB) consent for operation. The analysis of environmental issues, supporting data and descriptive details of mitigation measures are covered in the EADD report. Thus, the EMAP need to be read in conjunction with the EADD report for Bandel TPS, March 2008.

3 Environmental Management Action Plan I Environmental Management Measures to be Integrated as Part of R&M Oesigns~Activiks for Unit - 5, Bandel Thermal Power Station Unit 5 complies with the stipulated air quality standards Particulate emissions from the Unit 5 of the plant are currently managed within permissible limit by using Ammonia dosing. The ESP performance efficiency need to be further improved as part of R&M activities. Dry fly ash evacuation system is to be augmented I Improvement of ESP performance by integration of pedormance enhancement measures in to R&M design specifications, including: (a) Replacement of faulty collecting electrodoes; (b) Replancement of faulty emitting electrodes; and (c) Replacement of rapping motors; (d) Automatic control system for Ammonia Injection; (e) detailed inspection of ESP's for alianment of fields for 100% availabilitv. Stack online monitoring system for PM, SOX, NOx, and CO > BTPS has established dry ash collection silo and conveyance 2.50 I Coterminous with implementati on of R&M activities I I for effective.functioning I system with relevant dry ash ejection mechanism. The I I I 3. Absence of boiler silencer causing noise pollution evacuation system need to be auimented with provision of vacuum pump in place of hydro ejector + one stand by, and one 100% compressor for dry ash evacuation.. > Installation of silencer for the boiler as part of tech specs for boiler renovation As Above -As Above - I Total Cost of Environmental Measures integrated in to R&M Activities I Rr Million I Measures to be lntegrated as Part of Institutional Strengthening and Capacity Building Strengthening of Environment Management Cell: Training of BTPS personnel who are associated with Environment, Health and Safety (EHS) for industrial health and safety management through certificate course on Industrial Health and Safety Management would further facilitate the worker health management aspects Management measures to include: (a) Documentation centre with office accessories; (b) Developing EMS for the plant and obtaining IS ; (c) preparing onsite emergency plan; and (d) IS0 audit certification for 2 professionals > Formal training of the BTPS EHS personnel (about 6 in number) for Industrial Health and Safety Management through short term (not more than 2 months) Certificate course, accredited by West Bengal State Government (lumpsum) Novemb November, I

4 Awareness amongst workers on importance of Occupation Health and Safety (OHS) measures including use of Personal Protective Equipment (PPE). This aspects also lacks integration of awareness for contract labour Sustained hazard exposure for section of workers in the plant. No existing policy on job rotation P BTPS to conduct regular (at least once in 6 months) awareness generation programs for imparting practical know how on OHS. Awareness to include cross section of workers from managers to floor level employees. P Mandatory compliance with OHS requirements for all the works contracts as well as temporary labour hiring P Job rotation Policy Plan to be developed by BTPS based on skill requirement and feasibility of manpower rotation P Awareness program for workers and their unions to sensitize on importance ofjob rotation Cost to be internalized in ongoing safety awareness programs Cost, if any to be estimated by Personnel Dept. of BTPS First awreness program to complete before March Policy Plan by June. lmplementati on Dec Currently there is no system established for Root Cause Analysis to analyse accident cases. Lack of such systems could lead to increased chance of recurrence of similar accidents (Ref. No. 6.2) i A comprehensive Root Cause Analysis (RCA) function with specific protocols to be internalized as part of the job responsibility of Safety Manager No Cost Implication RCA Formats and Protocols by June, I Plant Level Environmental Management Measures (including units 1-4, and overall BTPS Plant level) for Implementation by BTPS I ~ c o n s e n t Bengal Pollution Control Board (WBPCB) for Operation (CFO) of BTPS by West I P Current consent is valid up to j?t March, 2oog The I Included in Plant I Regular basis managementlmitigation measures included in the EMAP functioning includes the consent conditions given by WBPCB. P BTPS will furnish CFOs on regular basis to World Bank Compliance with A r pollution control requirements as per West Bengal Pollution Contol Board's (WBPCB) consent conditions for Units 1-4 Comply with Ar pollution standard stipulated under Air consent. Further, as part of annual maintenance and capital overhaul, BTPS wd: > (a) Replace faulty collecting Replancement of faulty emitting electrodes; and (c) Periodic inspection of ESP's for alignment of fields for 100% availability Periolc inspection of ESP's on continual basis for 100% availability of fields. Cost to be internalized as part of regular plant O&M costs Regular basis

5 Fugitive Dust Emissions from Coal Handling Plant Ambient Air Quality Monitoring complying with consent conditions of WBPCB Compliance with utilization with dry fly ash as per Fly Ash Utilization Notification is partially achieved > Installation of Dust Suppression system at Wagon Tiplers and Coal Handling area b Revamping dust extraction system at impact crusher of CHP > Use of dust suppressants/ chemicals as part of water sprinkling to retain moisture during summer season Currently BTPS complies with Ambient Air Quality Monitoring requirements. This arrangement will be continued > Dry ash collection system is in place for the plant. The utilization to be completely achieved by making necessary off-take arrangements with the consumers such as brick manufacturers, other uses for filling purposes, and cement manufacturers > Awareness generation in villages around Bandel TPS for utilization of fly ash for different purposes Current BTPS operation BTPS to prepare fly ash utilization plans and implement 100% utilization Works to be initiated by Feb for effective implementati on by June November 2010 Ash pond water recycling complying with WBPCB's consent conditions Water pollution due to storm water from coal yard. Oil spillages at oil unloading area leading to oil pollution in nearby drains. Wastewater from Canteen Ash pond restructuring for construction of a settling basin to further improve water quality (current water discharges from ash pond meets discharge standards) Piping and pumping of water from settling basin for reuse in plant. BTPS to conduct feasibility and design studies. Collection of strorm water from coal yard area of 45,000 sq.mt. by redirect the storm water drains (total construction of drain length of 265m with approx width and dept of l m each as well as renovation of existing drains) in to the existing oil pond to act as settling basin. Oil pond to be renovated with lining. BTPS will prepare necessary drain designs and procure contractor for implementation of the measure. > Channelizing the oil spillages and runoffs in to single area. - > Construct f il separator with relevant arrangement for oil collected from API separator Considering the above measures, BTPS will prepare relevant engineering designs and implement the proposed changes Installation of small package modular wastewater treatment plant of 20 m3/day capacity with provisions: (a) screen; (b) holdinq tank; (c) alum mixinq arranqement; (d) final settlinq; [block cost estimate) August June 2010 December, August 2010 January

6 n Plant level wastewater including boiler blow downs, surface drains from floor washings, and laboratory waste (quantity 22 m3 1 hr.) Access to Cooling Water discharge confluence at Hooahlv river formonitorina activities Currently water consumption is assessed based on pumps capacities. Thus, there is no precise mechanism to assess water balance and there by limited opportunity for efficiency improvements in water savings No designated place for storage and evacuation of scrap material in the plant Hazardous waste Occupation Health and Safety management at plant level and le) sludae removal svstem > Water to be collected in an equalization tank with holdinq capacity of 150 m3 size. pass through parallel plate interceptor and then led to Guard Pond > Guard Pond: Including DM plant discharge of 8 m3 1 hr and 22 m3 1 hr and intermittent flow from API oil separator, the guard pond will be designed for 48 hr. residence time with design margin of 1500 m3. Specific designs for implementation will be taken up by BTPS P Online ph monitoring at DM neutralization pit P Realignment of strom water drains in the plant Civil works to make pathwaylaccess to near by point to reviver confluence point BTPS will conduct regular (monthly basis) water balance assessment using non-contact (ultra sonic) and pitot tube mothod, and establishing wierlnotch in cooling water discharge channel. The measurement data shall necessarily consist of the following: > Three cooling water vertical mixed flow pums of 9500 M~/H~. each > 4 Nos Cooling Water pumps of 2400 M3/Hr.each > Two number service water pumps of loo M3/~r.each > Two number DM water service pumps of 60 M3/Hr.of capacity each > Cooling water discharge channel Scrap yard development including land area development clearing the existing scrap, construction of fencing and internal road Floor paving and construction of storage facility including shed. Facility to comply with West Bengal Pollution Control Boards stipulations Establishing Occupational Health Centre with the following facilities: > Developing an Occupational Health Centre with dedicated space, computers, printers, office accessories etc. > Purchasing personal safety gears (civil) 1 (cost of non-contact meters and wierlnotch for CW channel) May 2010 June - As Above - December June August

7 Environmental Monitoring Regular Monitoring and Annual Environmental Audit of compliance with EMAP 2. Purchasing equipment for medical facilities k Developing a documentation centre on occupational health and safety Establishing Laboratory and Equipment for Environmental Monitoring as specified under Tableg.1 of the EADD Report 2. BTPS will conduct regular monitoring: (a) online stack monitoring; (b) ambient air quality monitoring as per WBPCB consent condition; (c) effluent water quality monitoring covering STP outlet, ETP outlet, Ash Pond overlow; DM neutralization outlet, and cooling water discharge temperature at river confluence point; (d) water balance assessment covering all the intake, utilization, recycling, and discharge points; and (e) Occupational Health Assessment twice in a year. 2. Reporting: BTPS will prepare mothly monitoring reports covering the relevant parts of the above referred monitoring k BTPS will support WBPCBs independent monthly monitoring. k WBPDCL in close coordination with BTPS, will conduct third partylindependent Annual Environmental Audit to verity compliance with this agreed Environmental Management Forms part of BTPS operationa l costs 1 I Action Plan Total Cost of Station Level Environmental Management Measures to be Implemented by BTPS August On regular basis

8

JAYPEE NIGRIE SUPER THERMAL POWER PLANT

JAYPEE NIGRIE SUPER THERMAL POWER PLANT JAYPEE NIGRIE SUPER THERMAL POWER PLANT (A Division of M/s Jaiprakash Power Ventures Limited) Village: Nigrie, Tehsil: Sarai District: Singrauli 2015 2016 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

ENVIRONMENTAL MONITORING PROGRAMME

ENVIRONMENTAL MONITORING PROGRAMME Stage-I (2x800 MW) Page 1 5 CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAMME 6.0 OBJECTIVES Regular monitoring program the environmental parameters is essential to take into account the changes in the environment.

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2017 March 2018 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2017 - Sept 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

O&M CONFERENCE IPS 2013

O&M CONFERENCE IPS 2013 O&M CONFERENCE IPS 2013 NTPC Limited KAHALGAON SUPER THERMALPOWER PLANT Capacity :Stage I (4 X 210 MW) Stage- II (3 X 500 MW) Achieving Zero Water Discharge from Main Plant 1 NTPC Kahalgaon Overview Location

More information

INDUSTRIAL VISIT TATA THERMAL POWER PLANT PROJECT MANAGEMENT BATCH ( )

INDUSTRIAL VISIT TATA THERMAL POWER PLANT PROJECT MANAGEMENT BATCH ( ) INDUSTRIAL VISIT TATA THERMAL POWER PLANT PROJECT MANAGEMENT BATCH (2015-17) On the, the DEPARTMENT of Project Management, National Institute of Industrial Engineering organized an industrial visit in

More information

Mars Power & Steel Ltd.

Mars Power & Steel Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive

More information

Contd7. Theft of water by using pumps on water lines from dam to TPS. 8. Plant premise is not compact hence piping's are long.

Contd7. Theft of water by using pumps on water lines from dam to TPS. 8. Plant premise is not compact hence piping's are long. Contd7. Theft of water by using pumps on water lines from dam to TPS. 8. Plant premise is not compact hence piping's are long. 9. Most of the pipes are underground, Hence identification and attending leakage

More information

Environmental statement for the financial year ending the 31 st March 2014

Environmental statement for the financial year ending the 31 st March 2014 FORM V (See rule 14) Environmental statement for the ending the 31 st March 2014 1. Name and address of the Owner/Occupier of the Industry, operation of the process. PART A : BINANI CEMENT LIMITED, 2.

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Environmental statement for the financial year ending the 31 st March 2012

Environmental statement for the financial year ending the 31 st March 2012 FORM V (See rule 14) Environmental statement for the ending the 31 st March 2012 1. Name and address of the Owner/Occupier of the Industry, operation of the process. PART A : BINANI CEMENT LIMITED, VILLAGE:

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2016 Sept. 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the, operation and the

More information

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016)

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016) Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated 06.09.2012 (Period April 2016 to September 2016) Sr. No. Conditions Compliance status A. Specific Conditions A.1 Water 1. The fresh

More information

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

Environmental statement for the financial year ending the 31 st March 2012

Environmental statement for the financial year ending the 31 st March 2012 FORM V (See rule 14) Environmental statement for the financial ending the 31 st March 2012 1. Name and address of the Owner/Occupier of the Industry, operation of the process. PART A 2. Industry category

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

Application of Low and Non Waste Technology in the production process;

Application of Low and Non Waste Technology in the production process; 9.0 ENVIRONMENT MANAGEMENT PLAN (EMP) 9.1 INTRODUCTION Environment Management Plan is required for ensuring sustainable development. It should not affect the surrounding environment adversely. The management

More information

CCR Fugitive Dust Control Plan

CCR Fugitive Dust Control Plan CCR Fugitive Dust Control Plan Mill Creek Generating Station Louisville Gas & Electric Company Jefferson County, Kentucky October 2015 CCR Fugitive Dust Control Plan - Mill Creek Generating Station Page

More information

Checklist in respect of selection of Design Consultancy for EER&M of Parli TPS (U-3)

Checklist in respect of selection of Design Consultancy for EER&M of Parli TPS (U-3) Checklist in respect of selection of Design Consultancy for EER&M of Parli TPS (U-3) (a) Names of all consultants who submitted proposals; 1. M/s Tractable Engineers Pvt.Ltd New Delhi 2. M/s Evonik Energy

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

NATIONAL AWARD for EXCELLENCE IN WATER MANAGEMENT 2007

NATIONAL AWARD for EXCELLENCE IN WATER MANAGEMENT 2007 NATIONAL AWARD for EXCELLENCE IN WATER MANAGEMENT 2007 Presentation by: GMR ENERGY LTD. MANGALORE Humility Entrepreneurship Teamwork and Relationships GEL Profile: World s largest and India s first Barge

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to Sept. 2015 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,

More information

A Case Study: Problem Associated With Fly Ash Disposal

A Case Study: Problem Associated With Fly Ash Disposal A Case Study: Problem Associated With Fly Ash Disposal Ashish V Talati 1, Vaishakhi ATalati 2 Civil Engineering, Dr. Jivraj Mehta Institute of Technology Abstract: Coal based thermal power stations are

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,

More information

ENVIRONMENTAL GUIDELINES FOR PREVENTION AND CONTROL OF FUGITIVE EMISSIONS FROM CEMENT PLANTS

ENVIRONMENTAL GUIDELINES FOR PREVENTION AND CONTROL OF FUGITIVE EMISSIONS FROM CEMENT PLANTS ENVIRONMENTAL GUIDELINES FOR PREVENTION AND CONTROL OF FUGITIVE EMISSIONS FROM CEMENT PLANTS For achieving effective prevention and control of potential fugitive emission sources in cement manufacturing

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY & 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007-IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES Environmental / Social issue/ aspect/ activity Anticipated negative impact Management and mitigation

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell) ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation

More information

Environmental Control Plan

Environmental Control Plan Environmental Control Plan Environmental Control Plan In accordance with Watts & Hughes Construction Waikato Bay of Plenty Limited. corporate strategies the Company has an Environment Control Plan which

More information

2 x 300 MW (STAGE-I)

2 x 300 MW (STAGE-I) ENVIRONMENTAL STATEMENT OF Rosa Power Supply Company Ltd. Shahjahanpur (U.P.) 2 x 300 MW (STAGE-I) FINANCIAL YEAR ENDING THE 31 st MARCH, 2017 Prepared by: Rosa Power Supply Company Ltd. Shahjahanpur (U.P.)

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

Ⅰ. Introduction of Samcheok Green Power

Ⅰ. Introduction of Samcheok Green Power Ⅰ. Introduction of Samcheok Green Power Construction for the Samcheok Green Power Project Name : Samcheok Green Power Unit 1,2 Location : East Coast of Korea Before construction 호산항 작진항 Under construction

More information

Capacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB)

Capacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB) Brief Note Prakash Industries Limited (PIL) is existing Integrated Steel Plant located at Hathneora, Champa Villages, Janjgir-Champa District, Chhattisgarh. Existing plant has obtained Environment Clearance

More information

Jim Bridger Plant Document Type: PLANT POLICIES & PROCEDURES Document ID Number: ENV-CCR001

Jim Bridger Plant Document Type: PLANT POLICIES & PROCEDURES Document ID Number: ENV-CCR001 Jim Bridger Plant Document Type: PLANT POLICIES & PROCEDURES Document ID Number: ENV-CCR001 Department: Environmental Review Date: 09/01/2015 SUBJECT: CCR Fugitive Dust Control Plan Reviewed By: Dale Gillespie

More information

Calcom Cement India Limited

Calcom Cement India Limited Calcom Cement India Limited (Subsidiary of DALMIA BHARAT CEMENT LIMITED) 2 No. Pipalpukhuri, Lanka, Dist. Nagaon, Assam 782446 Ref: MOEF, New Delhi Environment Clearance F. No. J-1101/312/2006-IA.II (I)

More information

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017 A. SPECIFIC CONDITIONS Sl. No. i ii Condition Continuous stack monitoring facilities for all stacks and adequate air pollution control systems e.g. electrostatic precipitators (ESP) to clinker cooler and

More information

Dheeru Powergen Private Limited.

Dheeru Powergen Private Limited. Executive Summary Of The Proposed 2 x 300 MW Dhanras Thermal Power Station At Dhanras Village Katgora Taluk, Korba District, Chhattisgarh. Implemented By Dheeru Powergen Private Limited. Submitted to CHHATTISGARH

More information

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY S1014-0340-0008MPW NTS Rev1.doc Print Date 19 February 2009 ISSUE NUMBER 1 DATE 19/02/09 AUTHOR CHECKED MPW SMO Title Page

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

PERFORMANCE IMPROVEMENT OF ELECTROSTATIC PRECIPITATOR: SOME EXPERIMENTAL STUDIES

PERFORMANCE IMPROVEMENT OF ELECTROSTATIC PRECIPITATOR: SOME EXPERIMENTAL STUDIES ICESP X Australia 2006 Paper 8A1 PERFORMANCE IMPROVEMENT OF ELECTROSTATIC PRECIPITATOR: SOME EXPERIMENTAL STUDIES A. CHANDRA Centre for Energy Studies, Indian Institute of Technology Delhi, Hauz Khas,

More information

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~'" 'Its ~s 71 66

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~' 'Its ~s 71 66 CIN No. : L26943RJ1979PLC001935 Phone : 01462228101-6 Toll Free : 18001806003/6004 Fax: 01462228117/228119 E-Mail: shreebwr@shreecementltd.com (I." Website : www.shreecement.in SHREE CEMENT LTD..~..~..~

More information

Environmental Plans and Procedures

Environmental Plans and Procedures ACC RUCKERSVILLE Environmental Plans and Procedures OMM and SWPPP Permit # VAG110065 581 Luckstone Rd Ruckersville, Va. 22968 Contents OMM... 2 O&M practices for wastewater treatment... 2 Chemical and

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 0200-S3N-R2 AFIN: 32-00042 JANUARY 15, 2016 ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

(Period April 2017 ~ Sept. 2017)

(Period April 2017 ~ Sept. 2017) CHAMBAL FERTILIZERS AND CHEMICALS LIMITED, GADEPAN MOEF ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT [PHASE- I] (Period April 2017 ~ Sept. 2017) Letter No.J-11011 / 8 / 87-IA DT.15.11.88 01. The Project Proponent

More information

5. ENVIRONMENT MANAGEMENT PLAN

5. ENVIRONMENT MANAGEMENT PLAN 5. ENVIRONMENT MANAGEMENT PLAN The environmental management plan consist of the set of mitigation measures, management and, monitoring measures to be taken during construction and operation phase to eliminate

More information

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated 1 Status of Environmental Clearances received from MOEF vide MoEF No.J- 1101/572/2007-IA II(I) dated 27.12.2007- Cement Plant and CPP, April - 2017. i) Compliance report is enclosed herewith for all the

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

ZZH/CLAB-KSPCB/04/ Environmental Officer,

ZZH/CLAB-KSPCB/04/ Environmental Officer, ZZH/CLAB-KSPCB/04/ 21273 08-12-2014 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16 th Cross Near Hari Om Trust, Habbuwada

More information

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka) J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement

More information

Environmental Plans and Procedures

Environmental Plans and Procedures ACC CULPEPER Environmental Plans and Procedures OMM and SWPPP Permit # VAG110315 16273 Allied Way Culpeper, Va. 22701 Contents OMM... 2 O&M practices for wastewater treatment... 2 Chemical and material

More information

ENVIRONMENT MANAGEMENT PLAN. For Excavation of Brick Earth (Total Mining Area Ha.) (for Manufacturing of Bricks)

ENVIRONMENT MANAGEMENT PLAN. For Excavation of Brick Earth (Total Mining Area Ha.) (for Manufacturing of Bricks) ENVIRONMENT MANAGEMENT PLAN For Excavation of Brick Earth (Total Mining Area 2.121 Ha.) (for Manufacturing of Bricks) By M/s Bhagwati Eth (bzv) Udyog Village Shokanangla, Pargana & Tehsil Bazpur, District-

More information

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Reference: Environment clearance to CFG3 Project vides MOEF letter.no. J-11011/664/2008-IAII

More information

ANNEXURE-II CONSENT TO OPERATE AND ITS COMPLIANCE

ANNEXURE-II CONSENT TO OPERATE AND ITS COMPLIANCE AII-1 AII-2 AII-3 AII-4 FERRO MANGANESE PLANT, JODA CONSENT FOR EXISTING/NEW OPERATION OF THE PLANT (Under Sec.21 of the Air (Prevention and Control of Pollution) Act, 1981 Consent Details of the Consent

More information

Amendment required in the existing EC

Amendment required in the existing EC Amendment required in the existing EC Change/Addition in Phase I; 250 KLPD Grain based Distillery with 20 MW Co-gen Power Plant / Molasses 160 KLPD based distillery with 12 MW Co-gen Power Plant in Environmental

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

+VE. HIRA & AIR done for all activities & hazards. Docs Verified: HIRA & AIR - PR - Rev 00

+VE. HIRA & AIR done for all activities & hazards. Docs Verified: HIRA & AIR - PR - Rev 00 1. 4.2 SEMS policy Awareness @ SEMS policy & objectives. Verification: Mr. Dharap Shift In charge & Field officer Mr. Gaikwad is aware of SEMS policy & objectives. 2. 4.3 Planning All WI are reviewed &

More information

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities.

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities. Transit Systems NSW Environmental Management Plan GOAL 1: REDUCE THE GREENHOUSE IMPACT OF ENERGY USE To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems

More information

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION Page 1 of 8 Environmental Statement for Clinker Grinding Unit of M/s Bihar Cement Plant (A Unit of Shree Cement Ltd.), situated at Jasoia Mor, BIADA, Industrial Growth Centre, Aurangabad, Tehsil & Dist.

More information

INDUSTRIAL ACCESSORIES COMPANY

INDUSTRIAL ACCESSORIES COMPANY INDUSTRIAL ACCESSORIES COMPANY Biofuels Energy Centers Clean Alternative Power from Biomass PP020 10/2/09 1 IAC Products and Systems OEM Baghouse and Pneumatic Conveyor Supplier Technology for SOx, HCl

More information

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA OPERATING GUIDELINES FOR PROCESSING OF CONSENT TO ESTABLISH APPLICATION FOR ESTABLISHMENT OF COAL WASHERIES IN THE STATE OF ORISSA STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII,

More information

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) 1. PROJECT DESCRIPTION: Ambuja Cement Eastern Ltd. (ACEL) has the cement

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Environmental and Social Action Plan

Environmental and Social Action Plan APPENDIX 2 Environmental and Social Action Plan 1 6 P A G E S Phase 1 Environmental and Social Management System (ESMS) Equator Principle IFC PS1, EBRD PR1, EIB PS 1 Define and implement an Environmental,

More information

SUMMARY OF COMMENTS/RECOMMENDATIONS

SUMMARY OF COMMENTS/RECOMMENDATIONS SUMMARY OF COMMENTS/RECOMMENDATIONS PROPONENT: Boulet Brothers Concrete Ltd. PROPOSAL NAME: Ste. Agathe Concrete Batch Plant CLASS OF DEVELOPMENT: 1 TYPE OF DEVELOPMENT: Concrete Batch Plant CLIENT FILE

More information

12.0 Predicted Environmental - Impact & Mitigation measures

12.0 Predicted Environmental - Impact & Mitigation measures 12.0 Predicted Environmental - Impact & Mitigation measures 12.1 The Assessment of the Impact on Environment by The High Vacuum Atomic Molecular Distillation Process: There are Positive impacts of the

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

GEORGIA URBAN ENERGY LTD

GEORGIA URBAN ENERGY LTD GEORGIA URBAN ENERGY LTD PARAVANI HYDROPOWER PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT REPORT ENVIRONMENTAL AND SOCIAL ACTION PLAN Prepared by SRF Gamma Tbilisi, 2011 Paravani Hydropower Project

More information

ENVIRONMENTAL SUSTAINABILITY

ENVIRONMENTAL SUSTAINABILITY 114 SEMBCORP MARINE SEMBCORP MARINE RECOGNISES THE IMPACT IT HAS ON THE COMMUNITY, ENVIRONMENT AND RESOURCES. THE GROUP AIMS TO INTEGRATE ENVIRONMENTAL RISKS AND OPPORTUNITIES INTO STRATEGIC AND BUSINESS

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY& 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007- IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017 Georgia Power Plant Bowen NPDES Permit No. GA0001449 Revised December 2017 Purpose This (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures that Georgia Power

More information

Environmental and Social Monitoring Report. THA: Provincial Solar Power Project Phase 2B Bang Pa-hun, Phranakorn Sri Ayutthaya

Environmental and Social Monitoring Report. THA: Provincial Solar Power Project Phase 2B Bang Pa-hun, Phranakorn Sri Ayutthaya Environmental and Social Monitoring Report Annual Report Project Number: 45923-014 April 2014 to June 2015 THA: Provincial Solar Power Project Phase 2B Bang Pa-hun, Phranakorn Sri Ayutthaya This environmental

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

19th National Award for Excellence in Energy Management

19th National Award for Excellence in Energy Management 19th National Award for Excellence in Energy Management - 2018 Presented By: Indian Farmers Fertiliser Cooperative Ltd. Phulpur Unit-I 29th 31st August, 2018 1 IFFCO: At a Glance IFFCO was established

More information

A. SPECIFIC CONDITION COMPLIANCE

A. SPECIFIC CONDITION COMPLIANCE Six monthly compliance report of conditions laid down vide letter no. J-11011/438/2007-IA II (I), Dtd.02.02.2009 of Ministry of Environment & Forest, Government of India in respect of Integrated Steel

More information

Ottumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS

Ottumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENTS CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED

More information

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India SUMMARY: Coal will be transported to the power plant by belt conveyors in case of pit head power plants. In case of power plants located far away from the mines, coal will be transported by rail. In some

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information