1 EVALUATING THE ENVIRONMENTAL BENEFITS OF NEW WASTEWATER SCHEMES ON SYDNEY S OUTSKIRTS Shafiqul Hassan and Cathy O Rourke Sydney Water, Sydney, NSW, Australia ABSTRACT Since 2003, Sydney Water has constructed 17 new wastewater schemes in villages previously reliant on on-site sewage management systems. The environmental benefits of the new schemes were assessed by collecting water quality data from potentially impacted watercourses before and after commissioning. Pre-commissioning data demonstrated some evidence of pollution from on-site systems. Extremely high levels of ammonia nitrogen and bacteria and sewage odours were the key indicators of sewage contamination. There were a number of challenges encountered, including inconsistencies in monitoring program design and low or no flow at some monitoring sites. Despite this, the post-commissioning data for most of the completed schemes provides sufficient evidence of water quality improvement in the immediate vicinity of the villages. Monitoring methods improved over the years to identify the benefits of new schemes more effectively. INTRODUCTION Traditional on-site sewage management systems are common at the outskirts of greater Sydney and in regional New South Wales (NSW). The NSW Government s Priority Sewerage Program (PSP) commenced in 1997 as an initiative to provide improved wastewater services to unsewered urban areas on a priority basis. Priority areas were originally selected based on an assessment by the NSW Environment Protection Authority (EPA) and Department of Health (Sydney Water 2001). Provision of a reticulated system to areas with a high environmental ranking was considered to provide an opportunity for significant environmental improvement and reduction in human health risks (NSW Government 1996). Highly ranked areas typically consisted of areas within a drinking water catchment, recreational areas (including primary contact) or areas surrounded by sensitive environments (NSW Government 1996). Since 2003, Sydney Water has completed 17 new wastewater schemes as part of the PSP (Figure 1) and connected 33 villages and over 11,000 properties to its wastewater network. The next scheme to connect two more villages is due to be delivered by mid-2015, bringing the total to 18 schemes. The key environmental objectives of the PSP are to provide an improved wastewater service that provides for environmental improvement, reduces risks to public health and improves public amenity. The overall objective of this paper is to evaluate the achievement of these objectives by analysing the water quality data before and after commissioning of the schemes. A case study of the Glossodia, Freemans Reach and Wilberforce Scheme is included to provide more detail on a typical water quality monitoring program and monitoring outcomes. Details about the monitoring challenges encountered and improvements made over the years are also provided. METHODOLOGY Monitoring programs Water quality monitoring programs have been implemented for 16 out of the 18 planned and completed PSP schemes. The monitoring programs have complemented the environmental impact assessments prepared for each scheme. The monitoring results have been used to inform Sydney Water s benefit realisation reviews. The water quality monitoring programs focused on assessing the conditions before and after commissioning of each wastewater scheme. Sydney Water targeted locations where the on-site sewage management systems might be impacting the local stormwater drainage lines, creeks or rivers. Where possible, reference sites upstream of the villages were also chosen for comparison with impact sites. Pre-commissioning data was collected for 16 schemes. Post-commissioning monitoring commences when at least 80% of properties within the scheme service area have connected. At January 2015, this has been completed for 10 schemes (Figure 1).

2 Figure 1: Location of PSP villages delivered by Sydney Water Monitoring generally included field measurements of common physico-chemical variables such as temperature, dissolved oxygen, ph, conductivity and turbidity along with field observations on sewage odours and the visual and aesthetic conditions. Samples were also collected for laboratory analysis of ammonia nitrogen, oxidised nitrogen, total nitrogen, total phosphorus, faecal coliforms and Enterococci. Only dry weather samples were taken for three of the earlier schemes. It was expected that the impact from on-site systems would be more clear in dry weather conditions when rainfall and the resultant stormwater run-off are minimal. For later schemes, both wet and dry weather samples were taken. Not all water quality variables listed above were monitored for all schemes. Ammonia nitrogen (a key indicator of sewage pollution) was not monitored for three earlier schemes: Bundeena and Maianbar, Jamberoo and Coalcliff, Stanwell Tops, Stanwell Parks and Otford. Enterococci was not monitored for the Mulgoa, Wallacia and Silverdale Scheme. Some schemes had insufficient number of impact or reference sites due to local access constraints or the topographic conditions. Some impact sites or upstream reference sites (creek/river) were also impacted by other local factors such as upstream unsewered villages, intensive agricultural practices or other unknown pollution sources. The design of the monitoring programs, especially for the early schemes, has varied resulting in some difficulties in evaluating and comparing the water quality results. Key variations across the monitoring programs include: The duration and frequency of sampling was different for each scheme and was governed by scheme planning and construction deadlines. Monitoring periods ranged from one week pre and two weeks post-commissioning for the Jamberoo Scheme, to three years postcommissioning for the Bundeena and Maianbar Scheme. The monitoring season varied for each scheme and also between pre and postcommissioning periods.

3 Data selection As a result of the variations across the monitoring programs, not all data collected could be used for the analysis. Wet weather samples were not collected for all schemes and therefore only dry weather data is analysed in this paper. Due to insufficient flow or stagnant water conditions, limited or no monitoring data was collected from some sites. As a result, the analysis is restricted to: pre-commissioning water quality data from 106 of 132 planned sites, including 82 impact and 24 reference sites post-commissioning data from 65 of 84 planned sites, including 48 impact and 17 reference sites. Data analysis Five water quality variables which are expected to be more directly related to pollution from on-site sewage management system are analysed in this paper. These are ammonia nitrogen, total nitrogen, total phosphorus, faecal coliforms and Enterococci. Statistical analysis was carried out for each site by the paired t-test (SAS 9.4) to determine any significant change (p<0.05) in water quality after commissioning. Monitoring results were compared with the sitespecific and national guidelines. Firstly, the sites were grouped into impact and reference sites, and then into drainage line, creek and river sites. Conclusions were drawn for each of these across all schemes. The ANZECC (2000) guideline for the protection of aquatic ecosystems was used for ammonia nitrogen. For bacteria (faecal coliforms and Enterococci), the primary and secondary contact recreation guidelines (ANZECC 2000) were used for river and creek/drainage line sites, respectively. For nutrients (total nitrogen and total phosphorus), guideline values were based on land use or catchment type (HRC 1998). For example, urban stream guidelines were used for drainage line and creek sites and estuarine guidelines were used for saline or semi-saline sites. Because of the large number of monitoring sites and therefore results, an integrated water quality status was developed for each site and monitoring period. The integrated water quality status provides a basis for analysing the results and determining the overall trends in water quality from before and after commissioning. This was firstly based on percent samples within the guideline for each variable and site. Then the average percentage of all variables was regarded as the integrated water quality status of that site, which is expressed in percent. RESULTS AND DISCUSSION Pre-commissioning results The pre-commissioning monitoring data demonstrated some evidence of pollution from onsite sewage management systems. Very high levels of ammonia nitrogen and bacteria along with sewage odour were the key indicators of sewage contamination from on-site systems. The maximum levels recorded for ammonia nitrogen and faecal coliforms at each impact site is shown in Figure 2 and Figure 3, respectively. Ammonia nitrogen reached above 1 mg/l (an initial level of concern for sewage contamination) at one or more sites in 10 out of the 13 schemes where it was monitored (Figure 2). It reached above 10 mg/l and 50 mg/l at one or more sites at seven and two schemes, respectively. The maximum densities of faecal coliforms reached above 1,000 organisms/100ml, (secondary contact guideline for recreational use of waterways) at one or more sites in 15 out of 16 schemes monitored (Figure 3). It reached above 100,000 (organisms/100ml) at one or more sites in 11 out of 16 schemes monitored. Among the 82 impact monitoring sites, about one third (27 sites) indicated sewage related pollution based on a gross comparison of odours, ammonia nitrogen and bacteria data. Eighty nine percent (24 sites) of these sites were drainage line sites and the remaining 11% (3 sites) were creek sites. At a scheme level, the pre-commissioning data for 11 out of 16 schemes (about two thirds) had one or more sites with some evidence of contamination from on-site systems. Among the five schemes where no sewage related pollution was detected, three had some constraints in monitoring program design or topographic conditions. There was only one impact site (creek) monitored for the Oaks, Oakdale and Belimbla Park Scheme. There were no drainage line sites monitored for the Jamberoo scheme and the monitoring period was too short, only two sampling events within a week. The mountainous topography of Hawkesbury Heights and Yellow Rock areas allows rapid movement of water through their drainage systems, making detection of pollution more difficult. The pre-commissioning monitoring program for two of the more recent schemes (West Hoxton and Galston and Glenorie) was more successful in identifying sewage contamination from on-site systems. This is because of better designed monitoring programs and methods. Field based ammonia tests and field notes on sewage odours corresponded well with the high ammonia nitrogen and bacteria results for multiple sites of these schemes. Three sewage contaminated sites were identified at Galston and Glenorie with extreme

4 levels of ammonia nitrogen, bacteria and also sewage odour on many sampling occasions. At two other sites, there were also evidences of possible sewage contamination. At West Hoxton, there was strong indication of sewage pollution at two drainage line sites which were located at downstream drainage points of this small urban village. Two other upstream drainage line sites also suggested some level of sewage contamination. (Figure 1) across the Hawkesbury River. The scheme was delivered in 2012 and connected more than 1600 properties to Sydney Water s existing wastewater network. The stormwater drainage systems of these villages are connected to Howes Creek, Currency Creek and a couple of other minor tributaries before joining with the Hawkesbury River (Figure 4). The Howes and Currency Creeks catchments are predominantly rural, with some urban and residential development. The water quality within these creeks is also governed by other upstream peri-urban areas and intensive agricultural activities such as poultry farms, livestock grazing and horse studs, market gardens, orchards and turf farms. Eight monitoring sites were selected in total, including five drainage line sites, two creek sites and one upstream reference site on Currency Creek (N392) (Figure 4). No monitoring site was selected in the Hawkesbury River. It was expected that it would be difficult to separate many other upstream or local catchment factors contributing to the overall water quality of the river. Figure 2: Pre-commissioning maximum ammonia nitrogen at all impact monitoring sites (13 schemes) Figure 4: Monitoring sites and servicing areas of Glossodia, Freemans Reach and Wilberforce Figure 3: Pre-commissioning maximum faecal coliforms at all impact monitoring sites (16 schemes) Case study: Glossodia, Freemans Reach and Wilberforce A case study of the Glossodia, Freemans Reach and Wilberforce Wastewater Scheme is included in this paper to provide more detail on a typical monitoring program and monitoring outcomes. This scheme provides a good representative example, in that many of the difficulties encountered and mixture of results were also encountered during other monitoring programs. Glossodia, Freemans Reach and Wilberforce is located about 60 km north west of Sydney The pre-commissioning monitoring collected and analysed weekly water quality samples for 13 weeks between June and September The post-commissioning monitoring was conducted at a fortnightly interval between September 2013 and March 2014, with a total of 13 sampling trips. The drainage line site at Freemans Reach (N3901) could not be monitored because of dry conditions during both pre and post-commissioning periods. Pre-commissioning data for two of the three drainage line sites in Wilberforce showed some evidence of sewage contamination from the on-site systems. There were strong sewage odours at Kings Road (N3401), Wilberforce on multiple occasions during sampling. These events were also accompanied by high ammonia nitrogen and

5 bacteria levels. The drainage line site at Duke Street, Wilberforce (N3402) also had sewage odours and elevated levels of ammonia nitrogen, nutrients and bacteria. The post-commissioning results and statistical analysis confirmed an environmental improvement at both these sites with no sewage odours and reduced levels of all pollutants including ammonia nitrogen (Figure 5). other schemes, in that greater improvements were observed at local drainage sites closer to the source of pollution. Two of the monitoring sites, at Spinks Road, Glossodia (N4001) and at the corner of Clergy Road and Poidevin Lane, Wilberforce (N3403) were always dry during post-commissioning. For this reason, no samples could be collected during postcommissioning monitoring, even though samples were consistently collected and analysed in the precommissioning period. Recorded qualitative observations show that these sites had low flow and occasionally moderate flow during the precommissioning period. The fact that no samples could be taken during post-commissioning monitoring makes it difficult to draw conclusions about the benefits of changing the wastewater management practices based on specific water quality results. However, the fact that these sites were always dry upon sampling may indicate an improvement in itself. It suggests that there may be less leakages or spilling of unauthorised sewage to stormwater during dry conditions, particularly given that rainfall was similar in the two periods. Without continuous quantitative data on flow rates in these stormwater lines the assumption of an improvement is hard to verify (Sydney Water 2014). The trends in dry weather ammonia nitrogen, total nitrogen, total phosphorus, faecal coliforms and Enterococci levels are shown in Figure 5. Statistical analysis confirmed that at one drainage line site of Wilberforce (N3401) all five variables improved significantly (p<0.05) after the commissioning of the scheme. At drainage site N3402, four out of five variables improved significantly (p<0.05). The pre-commissioning water quality at the three creek sites (N391, N392 and N321) was much better in comparison to drainage line sites as expected. The trends were mixed as determined by statistical test (p<0.05) with some further improvements in ammonia nitrogen and nutrient variables and a significant deterioration in faecal coliform and Enterococci at one site (N391). Overall, the results showed evidence of significant water quality improvements at two drainage sites in Wilberforce. This indicated that the wastewater scheme has resulted in environmental benefits in the immediate vicinity of the Wilberforce village. Insufficient data at some sites, including Freemans Reach, meant that an assessment of impacts could not be undertaken. Results at the creek sites (including the reference site) were mixed, which likely reflects other catchment influences. The results of this monitoring program was similar to Blue site code=reference site; Filled box= pre-commissioning, empty box=post-commissioning, The boxes graph the 25 th percentile values, mean (dot), median (line), and 75 th percentile values. The whiskers pointed to 10 th (bottom line) and 90 th percentile values (top line). The number of observations at the bottom of each box. Figure 5: Spatial and temporal trends in water quality at Glossodia, Freemans Reach and Wilberforce

6 Summary of outcomes: all schemes The water quality was generally poor at all monitoring sites and it frequently exceeded the guideline limits. The integrated water quality status improved at many impact sites after commissioning (Figure 6). Greater improvements were seen more locally, at drainage line sites closer to the source of pollution from on-site systems. The water quality status was relatively better at reference sites compared to impact sites as expected but postcommissioning results varied due to other factors related with those sites. showing no evidence of sewage contamination before or after commissioning. It is therefore more likely that the deterioration was due to other factors (for example upstream pollution sources). Of the sites monitored, most improved were sites at Bundeena, Maianbar, Stanwell Tops, Silverdale, Brooklyn, Wilberforce and Appin. There were one or more local drainage sites at these villages with extremely high levels of ammonia nitrogen and bacteria before commissioning. These contaminant levels decreased markedly following the commissioning of schemes. There were also some sites and villages where pre-commissioning water quality was relatively better and little or no further improvement was detected during postcommissioning (Coalcliff and Hawkesbury Heights). Figure 6: Average integrated water quality status based on percent samples and water quality variables within the guidelines (top=impact sites, bottom=reference sites) There was a generalised improvement across the board in key water quality variables related to sewage pollution. The maximum ammonia nitrogen concentration and faecal coliform densities decreased at many sites after commissioning especially where the pre-commissioning levels were extremely high (Figure 7). The monitoring results indicated improved water quality at many impact sites after commissioning of new wastewater schemes. Statistical analysis confirmed that the level of ammonia nitrogen, total nitrogen, total phosphorus, faecal coliform and Enteroccocci was significantly lower (p<0.05) at many sites following commissioning. Significant improvements in water quality were observed at more than 60% of impact monitoring sites (30 out of 48). The water quality was steady or somewhat deteriorated at the remaining sites (Figure 8). The water quality also deteriorated significantly at some impact and reference sites (13 sites) across most of the schemes. One common characteristic of these sites was that pollutant levels were generally low Figure 7: Comparison on pre and postcommissioning level of maximum ammonia nitrogen and faecal coliforms

7 100% 80% Oaks, Oakdale & Belimbla Park (2003) Hawkesbury Heights & Yellow Rock (2010) Glossodia, Freemans Reach & Wilberforce (2012) Percent variables improved 60% 40% 20% 0% -20% -40% -60% -80% -100% Bundeena & Maianbar (2003) Jamberoo (2005) Mulgoa, Coalcliff, Stanwell Wallacia Tops, Stanwell Park &Silverdale & Oatford (2005) (2006) Schemes and sites Brooklyn & Dangar Island (2008) Agnes Banks & Londonderry (2010) Appin (2012) (100% means all key variables improved, -25% means 25% variables deteriorated, 0% means all variables stable or 50% improved and 50% deteriorated and so on) Figure 8: Significant trends (p<0.05) in water quality variables at all 65 monitoring sites; impact sites in bright blue and reference sites in dark blue. Improvements in monitoring program design Sydney Water has progressively improved monitoring strategies and sampling techniques to better detect the underlying environmental impact from on-site sewage management systems (if any). For example, in later schemes monitoring data was also collected during wet weather, when there is potential for overflows and contaminated runoff from poorly performing on-site systems. As a result of the progressive improvements, the best sampling design and monitoring data was captured for the most recent program implemented for the Galston and Glenorie Wastewater Scheme. Extensive desktop research and field inspections were carried out before selecting monitoring sites for this scheme to capture the probable hot spots with sewage pollution. Two types of sites were selected initially: (i) routine sites: sample collection would occur under all conditions, these were at strategic locations within the drainage system or creeks; (ii) drive by sites: where monitoring was conducted only when sewage odour was detected and/or high ammonia nitrogen was detected by the field test kit. In addition, more importance was given to qualitative field data collection such as sewage odours, stream flows, weeds or presence of any other visual pollutants to support the data analysis. CONCLUSION Sewage odours, high levels of ammonia nitrogen and bacteria were commonly observed at water quality monitoring sites where on-site systems were used during pre-commissioning monitoring. The post-commissioning monitoring results showed improvements in key nutrients, ammonia nitrogen and bacteria levels at many drainage line sites and also at some creek sites located close to the source of pollution from onsite systems. Improvements were greater at villages where higher levels of pollution from onsite systems were detected during precommissioning. Despite some limitations associated with consistency in monitoring program design and low or no flow at some sites, the data for most of the completed schemes provided sufficient evidence of local improvement in the immediate vicinity of the villages serviced under the PSP. The monitoring programs have provided useful learnings since The design of the programs has improved to more effectively evaluate the environmental benefits of the new wastewater schemes. ACKNOWLEDGMENT We acknowledge the personnel involved in designing and implementing some of these earlier monitoring programs. We are grateful to many field staff for their extensive efforts to collect samples over many years and laboratory staff for analysing these samples.

8 REFERENCES ANZECC Australian and New Zealand Water Quality Guidelines for Fresh and Marine Waters, Australian and New Zealand Environment and Conservation Council. HRC Independent Inquiry into the Hawkesbury-Nepean River System. Final Report. Healthy Rivers Commission of NSW, Australia. NSW Government Village Wastewater Management Program, NSW Government, NSW. New South Wales Parliament Legislative Assembly - Committee on Environment and Regulation 2012 Inquiry into the regulation of domestic wastewater, NSW Government, Sydney. Sydney Water Memorandum Extension of the Priority Sewerage Program, Sydney Water, Sydney. Sydney Water Glossodia, Freemans Reach and Wilberforce Wastewater Scheme, Water Quality Report. Sydney Water, May 2014.

6.5 The Present Situation Water Quality Stormwater quality is currently being improved by:

6.5 The Present Situation Water Quality Stormwater quality is currently being improved by: 6.5 The Present Situation 6.5.1 Water Quality Stormwater quality is currently being improved by: o o o o The SPE project. The project is driven by the 11 resource consents for the discharge of wastewater-contaminated

More information

Ambient Water Quality Objectives For The Tributaries To Okanagan Lake Near Kelowna

Ambient Water Quality Objectives For The Tributaries To Okanagan Lake Near Kelowna Water Quality Ambient Water Quality Objectives For The Tributaries To Okanagan Lake Near Kelowna Overview Report Water Management Branch Environment And Resource Division Ministry Of Environment, Lands

More information

Galston and Glenorie Wastewater Scheme Community update August 2014

Galston and Glenorie Wastewater Scheme Community update August 2014 Galston and Glenorie Wastewater Scheme Community update - August 2014 Sydney Water will provide a new wastewater service to Galston and Glenorie by 30 June 2015. About the scheme The Galston and Glenorie

More information

Pressure Sewerage Systems Connections and extensions Urban Growth and Water Servicing Coordinator roles

Pressure Sewerage Systems Connections and extensions Urban Growth and Water Servicing Coordinator roles Procedure Pressure Sewerage Systems Connections and extensions Urban Growth and Water Servicing Coordinator roles 1 Overview 1.1 At a glance What Pressure Sewerage Systems (PSS) are located in areas where

More information

REPORT. Report No: 2013/0958 Prepared For: Natural Resources Committee Prepared By: Dean Olsen, Environmental Resource Scientist Date: 11 July 2013

REPORT. Report No: 2013/0958 Prepared For: Natural Resources Committee Prepared By: Dean Olsen, Environmental Resource Scientist Date: 11 July 2013 REPORT Document Id: A544088 Report No: 2013/0958 Prepared For: Natural Resources Committee Prepared By: Dean Olsen, Environmental Resource Scientist Date: 11 July 2013 Subject: Waianakarua River Water

More information

TAMAR ESTUARY 2011 REPORT CARD ECOSYSTEM HEALTH ASSESSMENT PROGRAM. Working together for healthy waterways

TAMAR ESTUARY 2011 REPORT CARD ECOSYSTEM HEALTH ASSESSMENT PROGRAM. Working together for healthy waterways TAMAR ESTUARY 2011 REPORT CARD ECOSYSTEM HEALTH ASSESSMENT PROGRAM Working together for healthy waterways TAMAR ESTUARY 2011 REPORT CARD RESULTS EHAP study area Tamar Estuary Tasmania This 2011 report

More information

Te Puna Environmental Monitoring Results (Update January 2015)

Te Puna Environmental Monitoring Results (Update January 2015) Te Puna Environmental Monitoring Results (Update January ) Introduction Many of the Bay of Plenty s coastal communities are served by on-site wastewater treatment systems. In areas of more concentrated

More information

Irrigation. Branch. Crowfoot Creek Watershed Study. Why was this study conducted? How was this study conducted?

Irrigation. Branch. Crowfoot Creek Watershed Study. Why was this study conducted? How was this study conducted? AGRICULTURE, FOOD AND RURAL DEVELOPMENT Irrigation Branch Crowfoot Creek Watershed Study The Crowfoot Creek Study was conducted to determine whether agricultural practices are contributing to the deterioration

More information

Water Quality in the Waihopai Catchment

Water Quality in the Waihopai Catchment Water Quality in the Waihopai Catchment 2005 2006 Kirsten Meijer Environment Southland SRC Publication No 2007-04 May 2007 Executive Summary This report summarises the results of water quality monitoring

More information

To understand how runoff water can be polluted if land uses are not properly managed

To understand how runoff water can be polluted if land uses are not properly managed Lesson plan - catchment land use impacts Objective To understand how runoff water can be polluted if land uses are not properly managed Materials Catchment land use impacts map (printed colour or black

More information

Acidity and Alkalinity:

Acidity and Alkalinity: Evaluation of Pollution Sources to Lake Glenville Quarterly Report December 2018 Kimberlee K Hall, PhD Environmental Health Program, Western Carolina University Summary Chemical and microbial analysis

More information

Volume I Sewage Treatment System Impact Monitoring Program Executive Summary

Volume I Sewage Treatment System Impact Monitoring Program Executive Summary Volume I Sewage Treatment System Impact Monitoring Program Executive Summary 2010-11 Sydney Water - Commercial in Confidence Page 1 Commercial-in-Confidence Sydney Water 1 Smith Street, Parramatta, NSW

More information

E1. Water quality and integrated management

E1. Water quality and integrated management E1. Water quality and integrated management E1.1. Introduction The National Policy Statement for Freshwater Management, the New Zealand Coastal Policy Statement and this Plan seek to improve the integrated

More information

Water sensitive urban design. Developing design objectives for urban development in South East Queensland

Water sensitive urban design. Developing design objectives for urban development in South East Queensland Water sensitive urban design Developing design objectives for urban development in South East Queensland Version 2-8 November 2007 Contents Contents......... ii Executive Summary............1 1 Introduction.........1

More information

COOKS RIVER VALLEY ASSOCIATION [CRVA] ANNUAL WATER QUALITY REPORT 2010/11

COOKS RIVER VALLEY ASSOCIATION [CRVA] ANNUAL WATER QUALITY REPORT 2010/11 COOKS RIVER VALLEY ASSOCIATION [CRVA] ANNUAL WATER QUALITY REPORT 2010/11 Introduction CRVA started testing water quality at several sites on the Cooks River in December 2007. This is the fourth annual

More information

Interim Global Stormwater Consent. Wet Weather Monitoring Report for the period May 2013 April 2014

Interim Global Stormwater Consent. Wet Weather Monitoring Report for the period May 2013 April 2014 Interim Global Stormwater Consent Wet Weather Monitoring Report for the period May 2013 April 2014 Dr Belinda Margetts Asset and Network Planning Unit 16 th July 2014 Interim Global Stormwater Consent

More information

Nutrient Management in the Hawkesbury-Nepean River System

Nutrient Management in the Hawkesbury-Nepean River System Iain Environmental Regulatory Manager, Sydney Water, Sydney, Australia E-mail: iain.fairbairn@sydneywater.com.au Abstract Sydney Water is exploring innovative ways to manage the load of nutrients (nitrogen

More information

Holcim (Australia) Pty Limited. Lynwood Quarry Groundwater Monitoring Program Revision 2

Holcim (Australia) Pty Limited. Lynwood Quarry Groundwater Monitoring Program Revision 2 Holcim (Australia) Pty Limited Lynwood Quarry Groundwater Monitoring Program Revision 2 June 2011 Lynwood Quarry Groundwater Monitoring Program Revision 2 Prepared by on behalf of Holcim (Australia) Pty

More information

DRY WEATHER SEWAGE SPILLS IMPACTS ON RIVER HEALTH

DRY WEATHER SEWAGE SPILLS IMPACTS ON RIVER HEALTH 1 DRY WEATHER SEWAGE SPILLS IMPACTS ON RIVER HEALTH T. Swaminathan Chemical Engineering Department,Indian Institute of Technology,Madras,India E-mail: tswami@iitm.ac.in T.V. Binu Chemical Engineering Department,Indian

More information

Little Cypress Bayou Special Study - Subwatershed 1.10

Little Cypress Bayou Special Study - Subwatershed 1.10 - Subwatershed 1.1 Sabine River Authority of Texas August 31, 21 Prepared in Cooperation with the Texas Natural Resource Conservation Commission Under the Authorization of the Texas Clean Rivers Act Table

More information

(No. of pages excluding this page = 10)

(No. of pages excluding this page = 10) SPECIALIST CONSULTANT STUDIES 3-65 BIG ISLAND MINING PTY LTD (No. of pages excluding this page = 10) Ltd BIG ISLAND MINING PTY LTD 3-66 SPECIALIST CONSULTANT STUDIES This page has intentionally been left

More information

Water for life and livelihoods

Water for life and livelihoods Water for life and livelihoods Dee River Basin District: Challenges and choices Facts and statistics Background information On 1 April Natural Resources Wales brought together the work of the Countryside

More information

Singapore s experience in Stormwater Harvesting: The Lower Seletar / Bedok Water Scheme

Singapore s experience in Stormwater Harvesting: The Lower Seletar / Bedok Water Scheme Singapore s experience in Stormwater Harvesting: The Lower Seletar / Bedok Water Scheme Mong Hoo Lim Deputy Director, PUB, Singapore 1 5 July 2012 Outline 1. Catchment Characteristics 2. Collection Systems

More information

GROUND WATER. Practice Note # water. sensitive. urban. design \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \

GROUND WATER. Practice Note # water. sensitive. urban. design \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 2013 water. sensitive. urban. design \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ Practice Note #8 GROUND Water Smart design is the effective planning, design and building of homes, subdivisions,

More information

Henderson Watershed WRIA 13. Chapter Includes: Tanglewilde Stormwater Outfall Woodard Creek Woodland Creek

Henderson Watershed WRIA 13. Chapter Includes: Tanglewilde Stormwater Outfall Woodard Creek Woodland Creek Henderson Watershed WRIA 13 Chapter Includes: Tanglewilde Stormwater Outfall Woodard Creek Woodland Creek 146 Tanglewilde Stormwater Outfall PART OF HENDERSON WATERSHED PRIMARY LAND USES: Urban residential

More information

IDENTIFYING FLOOD CONTROL LOTS IN THE HORNSBY LGA

IDENTIFYING FLOOD CONTROL LOTS IN THE HORNSBY LGA IDENTIFYING FLOOD CONTROL LOTS IN THE HORNSBY LGA B.C. Phillips 1, R.S. Thomson 1, T. Fang 1, S. Yu 1, A. Boyd 2 1 Cardno (NSW/ACT) Pty Ltd, Sydney, NSW 2 Hornsby Shire Council, Hornsby, NSW Introduction

More information

6. Pollutant Sources in

6. Pollutant Sources in 6. Pollutant Sources in 45 6. Pollutant Sources in the Plum Creek Watershed The LDC analysis for Plum Creek indicates that both point and nonpoint sources contribute pollutants in the watershed. Identifying

More information

11 Coastal Water Quality

11 Coastal Water Quality 11 Coastal Water Quality 11 COASTAL WATER QUALITY...178 11.1 COASTAL WATER QUALITY: MAIN POINTS...179 11.2 INTRODUCTION TO COASTAL WATER QUALITY IN NORTHLAND...180 11.3 REGIONAL POLICY STATEMENT OBJECTIVES...180

More information

Buxton Wastewater Scheme. February 2013

Buxton Wastewater Scheme. February 2013 Buxton Wastewater Scheme February 2013 1 At a glance a Introduction............................. 3 Scheme objectives..................... 4 Location and setting................... 4 Benefits of the scheme................

More information

MARK CREEK DEMONSTRATION PROJECT

MARK CREEK DEMONSTRATION PROJECT MARK CREEK DEMONSTRATION PROJECT OCC Tasks 20 and 21 FY 1990 319(h) Task 210 EPA Grant # C9-006704-90-0 Submitted by: Oklahoma Conservation Commission Water Quality Division 413 NW 12 th Oklahoma City,

More information

Environmental Management System

Environmental Management System Environmental Management System Moreton Bay Research Station (MBRS) Water Management Program 1. Program Scope The Water Management Program incorporates all the water used throughout the Moreton Bay Research

More information

Presenter: Kylie Evans 9 October 2014

Presenter: Kylie Evans 9 October 2014 Presenter: Kylie Evans 9 October 2014 Tamworth Sewerage Augmentation Scheme The Tamworth Sewerage Augmentation Scheme has two major components: Westdale Wastewater Treatment Plant Tamworth Effluent Reuse

More information

Redwood Shores Lagoon November 2016 Monthly Water Quality Monitoring Report

Redwood Shores Lagoon November 2016 Monthly Water Quality Monitoring Report Redwood Shores Lagoon November 2016 Monthly Water Quality Monitoring Report Prepared for Redwood City Public Works Services Department 1400 Broadway Redwood City, CA 94063-2594 Prepared by Clean Lakes,

More information

Sediment and nutrient generation rates for Queensland rural catchments an event monitoring program to improve water quality modelling

Sediment and nutrient generation rates for Queensland rural catchments an event monitoring program to improve water quality modelling Sediment and nutrient generation rates for Queensland rural catchments an event monitoring program to improve water quality modelling Dave Waters¹ and Robert Packett² 1 Queensland Department of Natural

More information

Redwood Shores Lagoon February 2019 Monthly Water Quality Monitoring Report

Redwood Shores Lagoon February 2019 Monthly Water Quality Monitoring Report Redwood Shores Lagoon February 2019 Monthly Water Quality Monitoring Report Prepared for Redwood City Public Works Services Department 1400 Broadway Redwood City, CA 94063-2594 Prepared by Clean Lakes,

More information

Fact Sheet. Chesapeake Bay Water Quality

Fact Sheet. Chesapeake Bay Water Quality Fact Sheet Chesapeake Bay Water Quality Water quality is a critical measure of the Chesapeake Bay s health. For the Bay to be healthy and productive, the water must be safe for people and must support

More information

Overview and key environmental issues

Overview and key environmental issues Blue Mountains Draft Local Environmental Plan 2013 1 Information Sheet 4 Overview and key environmental issues Use this document in conjunction with Information Sheet 5: SUBMISSION WRITING GUIDE AND SUMMARY

More information

Redwood Shores Lagoon May 2017 Monthly Water Quality Monitoring Report

Redwood Shores Lagoon May 2017 Monthly Water Quality Monitoring Report Redwood Shores Lagoon May 2017 Monthly Water Quality Monitoring Report Prepared for Redwood City Public Works Services Department 1400 Broadway Redwood City, CA 94063-2594 Prepared by Clean Lakes, Inc.

More information

Project Report Global Potable Reuse Case Study 2: Upper Occoquan Service Authority

Project Report Global Potable Reuse Case Study 2: Upper Occoquan Service Authority Project Report Global Potable Reuse Case Study 2: Upper Occoquan Service Authority A report of a study funded by the Australian Water Recycling Centre of Excellence University of New South Wales, November,

More information

Integrated Water Management Developer Guidance

Integrated Water Management Developer Guidance WESTERN WATER Western Water Whole-of-water-cycle Strategy Integrated Water Management Developer Guidance Edition 1, 2018 For more information call 1300 650 422 or visit us at WesternWater.com.au Development

More information

Bronx River Pollutant Loading Model Summary

Bronx River Pollutant Loading Model Summary Bronx River Pollutant Loading Model Summary Section of River Located in Bronx County Table of Contents Drainage Areas...2 Data Sets Used for Analysis...2 Land Use Statistics...3 Model Calculations...3

More information

Waterways Local Update

Waterways Local Update Waterways Local Update 2015-16 Melbourne Water s work to improve waterways and provide flood protection in the City of Greater Dandenong. 300 m STABILISATION OF MILE CREEK 358 FLOOD INFORMATION REQUESTS

More information

Sustainable management of Christchurch's waterways and wetlands using stormwater soakage disposal

Sustainable management of Christchurch's waterways and wetlands using stormwater soakage disposal Impacts of Urban Growth on Surface Water and Groundwater Quality (Proceedings of IUGG 99 Symposium HS5, Birmingham, July 1999). IAHS Publ. no. 259, 1999. 365 Sustainable management of Christchurch's waterways

More information

Water Quality Assessment for the Town of Caswell Beach, 2008

Water Quality Assessment for the Town of Caswell Beach, 2008 Water Quality Assessment for the Town of Caswell Beach, 2008 UNCW-CMS Report 08-02 Report to: Town of Caswell Beach 1100 Caswell Beach Rd. c/o Mr. Jim Carter, Town Administrator Caswell Beach, N.C. 28465

More information

final report Water quality improvement strategy for a processing site

final report Water quality improvement strategy for a processing site final report Project title: Water Quality Improvement Strategy Project code: P.PSH.0449 Prepared by: GHD Date published: July 2010 PUBLISHED BY Meat & Livestock Australia Limited Locked Bag 991 NORTH SYDNEY

More information

Hazardous Substances Hazardous Substances Explanatory Statement Significant Issues Objective and Policies...

Hazardous Substances Hazardous Substances Explanatory Statement Significant Issues Objective and Policies... Section Contents Hazardous Substances... 2 9. Hazardous Substances... 2 Explanatory Statement... 2 9.1 Significant Issues... 3 9.2 Objective and Policies... 3 9.3 Activity Lists... 4 9.4 Quantity thresholds

More information

Appendix 2 Screening of Keewatinoow Construction Camp Waste Water Effluent Discharge to Creek Fourteen

Appendix 2 Screening of Keewatinoow Construction Camp Waste Water Effluent Discharge to Creek Fourteen Appendix 2 Screening of Keewatinoow Construction Camp Waste Water Effluent Discharge to Creek Fourteen Prepared by: North/South Consultants Inc. July 19, 2011 Introduction The following provides a screening

More information

Points. To encourage and recognise the minimisation of peak stormwater flows and the protection of receiving waters from pollutants.

Points. To encourage and recognise the minimisation of peak stormwater flows and the protection of receiving waters from pollutants. Points Available 3 Aim of Credit To encourage and recognise the minimisation of peak stormwater flows and the protection of receiving waters from pollutants. Credit Criteria Up to three points are available.

More information

Report to COUNCIL for information

Report to COUNCIL for information 18 149 Title: Section: Prepared by: Draft Regional Target for Swimmable Lakes and Rivers Transformation & Relationships Janic Slupski (Senior Policy Advisor) Meeting Date: 5 April 2018 Legal Financial

More information

Grants Pass Water Quality Monitoring

Grants Pass Water Quality Monitoring Grants Pass Water Quality Monitoring 2003-2005 Rogue Valley Council of Governments April 2005 Rogue Valley Council of Governments Natural Resources Department 155 North First Street Central Point, Oregon

More information

Salem River Water Quality

Salem River Water Quality Slide 1 Salem River Water Quality Salvatore Mangiafico County Environmental and Resource Management Agent Cooperative Extension of Salem and Cumberland Counties This presentation will review some information

More information

Faculty of Engineering and Surveying

Faculty of Engineering and Surveying Suspended Solids In Stormwater Runoff From Various Urban Surfaces Introduction Stormwater runoff from urban areas has long been identified as being a significant cause of poor water quality in creeks and

More information

Waterways Local Update

Waterways Local Update Waterways Local Update 2016-17 Melbourne Water s work to improve waterways and provide flood protection in the City of Moonee Valley. 7.9 km REVEGETATION ALONG WATERWAYS SUPPORTED WATER SENSITIVE URBAN

More information

Wetland Design Manual. Supporting document: Planning, funding and. management

Wetland Design Manual. Supporting document: Planning, funding and. management Wetland Design Manual Supporting document: Planning, funding and management Contents Introduction... 2 Water Industry Act (1994)... 2 Water Act (1989)... 3 Planning and Environment Act (1987)... 3 Subdivisions

More information

Hazardous Substances. 9. Hazardous Substances. Explanatory Statement

Hazardous Substances. 9. Hazardous Substances. Explanatory Statement Hazardous Substances 9. Hazardous Substances Explanatory Statement The Western Bay of Plenty District is predominantly rural land in farming and horticulture and has a number of small urban centres containing

More information

CAFO Permits & Nutrient TMDLs

CAFO Permits & Nutrient TMDLs www.deq.virginia.gov CAFO Permits & Nutrient TMDLs 2018 ACWA Nutrients Permitting Workshop Gulfport, Mississippi November 6, 2018 Neil Zahradka Manager, Office of Land Application Programs Virginia Department

More information

Urban Geology Spring 2011

Urban Geology Spring 2011 Urban Geology Spring 2011 Gowanus Canal Historical use New York City Water pollution Sewage treatment plants Eutrophication Combined sewage outflows (CSO) Remediation Sustainability Gowanus Canal today

More information

The Neutral or Beneficial Effect on Water Quality Assessment Tool

The Neutral or Beneficial Effect on Water Quality Assessment Tool The Neutral or Beneficial Effect on Water Quality Assessment Tool Author(s): Alison Kniha, Greg Greene Organisation: WaterNSW Country: Australia Email: alison.kniha@waternsw.com.au Paper: INTRODUCTION

More information

Water Quality Objectives for Sooke Inlet, Harbour, Basin, and Tributary Streams

Water Quality Objectives for Sooke Inlet, Harbour, Basin, and Tributary Streams W A T E R Q U A L I T Y O B J E C T I V E S E R I E S Water Quality Objectives for Sooke Inlet, Harbour, Basin, and Tributary Streams British Columbia Ministry of Environment & Climate Change Strategy

More information

PINEY RUN WATERSHED 2005 PROFILE

PINEY RUN WATERSHED 2005 PROFILE PINEY RUN WATERSHED 25 PROFILE Table of Contents Page Watershed Description Water Quality Studies Stream Monitoring Water Chemistry Conditions Water Bacteria Conditions Stream Habitat Conditions Aquatic

More information

Report Date: September 15, 2009 Technical Report #

Report Date: September 15, 2009 Technical Report # Bacterial Assessment: Arlington Manholes, Alewife Brook & Spy Pond March 25, 2009 Report Date: September 15, 2009 Technical Report # 0909-002 Summary: This report documents the results of a monitoring

More information

ACAPMA Best Practice Guidelines

ACAPMA Best Practice Guidelines ADVOCACY EMPLOYMENT EVENTS NEWS TRAINING ACAPMA Best Practice Guidelines Management of Hydrocarbons in Stormwater at Retail Fuel Outlets 2017 Version ACAPMA The Voice of Downstream Petroleum ABOUT THIS

More information

SUSQUEHANNA RIVER MONITORING:

SUSQUEHANNA RIVER MONITORING: SUSQUEHANNA RIVER MONITORING: Monitoring the fecal coliform bacteria and water quality in the Upper Susquehanna River, summer 2002 Selinda Schlierman 1 ABSTRACT As part of a long-term, ongoing study by

More information

Manitoba Water Quality Standards, Objectives, and Guidelines Dwight Williamson, Manager Water Quality Management Section Manitoba Conservation

Manitoba Water Quality Standards, Objectives, and Guidelines Dwight Williamson, Manager Water Quality Management Section Manitoba Conservation Manitoba Water Quality Standards, Objectives, and Guidelines 2002 Dwight Williamson, Manager Water Quality Management Section Manitoba Conservation 1 Outline Brief history Review process Overview of proposed

More information

The Snapshot CONODOGUINET CREEK WATERSHED SNAPSHOT

The Snapshot CONODOGUINET CREEK WATERSHED SNAPSHOT CONODOGUINET CREEK WATERSHED SNAPSHOT ABOVE: CONODOGUINET CREEK AT RT 74 BRIDGE FACING DOWNSTREAM The Snapshot The Conodoguinet Watershed Snapshot was a collaborative effort to engage local citizens in

More information

Factsheet: Town of Deep River Water Quality and Stormwater Summary

Factsheet: Town of Deep River Water Quality and Stormwater Summary 79 Elm Street Hartford, CT 06106-5127 www.ct.gov/deep Affirmative Action/Equal Opportunity Employer Factsheet: Town of Deep River Water Quality and Stormwater Summary This document was created for each

More information

UPPER HOOD CANAL WATERSHED

UPPER HOOD CANAL WATERSHED UPPER HOOD CANAL WATERSHED 2014 Water Quality Monitoring Report Kitsap Public Health District 1 2 UPPER HOOD CANAL WATERSHED The Upper Hood Canal (UHC) watershed, most of which is designated as Extraordinary

More information

South Venice Water Quality

South Venice Water Quality SARASOTA COUNTY South Venice Water Quality Summary of Data Collected in Support of the South Venice Civic Association Water Quality Task Force Sarasota County Water Resources 8//24 Introduction The South

More information

Hydrology and Water Quality. Water. Water 9/13/2016. Molecular Water a great solvent. Molecular Water

Hydrology and Water Quality. Water. Water 9/13/2016. Molecular Water a great solvent. Molecular Water Hydrology and Water Quality Water Molecular Water Exists as an equilibrium But equilibrium altered by what is dissolved in it Water Molecular Water a great solvent In reality, water in the environment

More information

Factsheet: City of West Haven Water Quality and Stormwater Summary

Factsheet: City of West Haven Water Quality and Stormwater Summary 79 Elm Street Hartford, CT 06106-5127 www.ct.gov/deep Affirmative Action/Equal Opportunity Employer Factsheet: City of West Haven Water Quality and Stormwater Summary This document was created for each

More information

Vancouver Watershed Health Assessment. Burnt Bridge Creek Watershed

Vancouver Watershed Health Assessment. Burnt Bridge Creek Watershed Vancouver Watershed Health Assessment Burnt Bridge Creek Watershed Presentation Overview 1. Introduction 2. Study Context 3. Burnt Bridge Creek Monitoring Program and Trend Analysis 4. Watershed Health

More information

Schedule 9 Water Quality Classification Standards and Criteria

Schedule 9 Water Quality Classification Standards and Criteria Schedule 9 Water Quality Classification Standards and Criteria The Water Quality Classification Standards and Criteria in Schedule 9 will be used to assess discharges to water that are discretionary activities

More information

Combined Sewer Overflows (CSO) Master Plan. Public Meetings, September 14-15, 2015

Combined Sewer Overflows (CSO) Master Plan. Public Meetings, September 14-15, 2015 Combined Sewer Overflows (CSO) Master Plan Public Meetings, September 14-15, 2015 Outline What are Combined Sewer Overflows (CSOs) Why Manage CSOs? CSO History and Regulations CSO Master Plan CSO Evaluation

More information

Environment Plan Sydney Water s objectives, targets and actions to protect the environment and enhance the liveability of our communities.

Environment Plan Sydney Water s objectives, targets and actions to protect the environment and enhance the liveability of our communities. Environment Plan 18 Sydney Water s objectives, targets and actions to protect the environment and enhance the liveability of our communities. Environment Plan 18 Introduction Sydney Water s vision is to

More information

GULF OF MEXICO - SEGMENT 2501

GULF OF MEXICO - SEGMENT 2501 GULF OF MEXICO - SEGMENT 2501 GULF OF MEXICO - SEGMENT 2501 LAND COVER BACTERIA CHLOROPHYLL A Impairment Concern No Impairments or Concerns GULF OF MEXICO - SEGMENT 2501 OTHER IMPAIRMENTS Bays & Estuaries

More information

How to set up a sewer mining scheme

How to set up a sewer mining scheme Sewer Mining How to set up a sewer mining scheme With a growing population and highly variable rainfall over the catchments, water recycling is making an increasingly important contribution to our water

More information

Factsheet: Town of East Lyme Water Quality and Stormwater Summary

Factsheet: Town of East Lyme Water Quality and Stormwater Summary 79 Elm Street Hartford, CT 06106-5127 www.ct.gov/deep Affirmative Action/Equal Opportunity Employer Factsheet: Town of East Lyme Water Quality and Stormwater Summary This document was created for each

More information

Evaluation methods for total water cycle management plans

Evaluation methods for total water cycle management plans Fact Sheet December 2011 Evaluation methods for total water cycle management plans Total water cycle management (TWCM) is seen to be an important part of water policy in South East Queensland (SEQ). Research

More information

Grovelands Park Wetlands, Enfield

Grovelands Park Wetlands, Enfield Grovelands Park Wetlands, Enfield Description This project was undertaken as part of the Salmons Brook Healthy River Challenge, an initiative designed to improve water quality in the Salmons Brook and

More information

MARINE WATER MONITORING PLAN

MARINE WATER MONITORING PLAN MARINE WATER MONITORING PLAN POT 1569 REVISION 3 CONTENTS 1 Introduction... 1 2 Composition of Marine Waters... 2 3 Objective... 4 4 Scope... 4 4.1 Monitoring Locations... 5 4.2 Frequency and Timing of

More information

Water NSW Reporting Manual

Water NSW Reporting Manual Water NSW Reporting Manual Operating Licence 2017-2022 Reporting Manual Water July 2017 Independent Pricing and Regulatory Tribunal of New South Wales 2017 This work is copyright. The Copyright Act 1968

More information

Redwood Shores Lagoon August Monthly Water Quality Monitoring Report

Redwood Shores Lagoon August Monthly Water Quality Monitoring Report Redwood Shores Lagoon August Monthly Water Quality Monitoring Report Prepared for Redwood City Public Works Services Department 1400 Broadway Redwood City, CA 94063-2594 Prepared by Clean Lakes, Inc. P.

More information

Water Quality Study In the Streams of Flint Creek and Flint River Watersheds For TMDL Development

Water Quality Study In the Streams of Flint Creek and Flint River Watersheds For TMDL Development Water Quality Study In the Streams of Flint Creek and Flint River Watersheds For TMDL Development Idris Abdi Doctoral Dissertation Presentation Major Advisor: Dr. Teferi Tsegaye April 18, 2005 Alabama

More information

An Approach To Water Quality Classification

An Approach To Water Quality Classification Environmental Challenges For The Water and Wastewater Sector An Approach To Water Quality Classification Caribbean Water and Wastewater Association 12th Annual Conference and Exhibition September 2003

More information

Appendix C. Water balance report. Googong Township water cycle project. Environmental Assesment

Appendix C. Water balance report. Googong Township water cycle project. Environmental Assesment Appendix C Water balance report Googong Township water cycle project Environmental Assesment November 2010 A1081402 Rev 7 FEBRUARY 2010 This document has been prepared specifically for Canberra Investment

More information

3.5 Hydrology & Hydraulics

3.5 Hydrology & Hydraulics 3.5 Hydrology & Hydraulics 3.5.1 Purpose The purpose of this section is to provide results from the analysis and assessment of the impact of the proposed Carmichael Rail Alignment (Option 11 Revision 1)

More information

Programs to Resolve Agricultural Water Quality Issues the Kiwi Perspective. Tom Cochrane University of Canterbury, New Zealand

Programs to Resolve Agricultural Water Quality Issues the Kiwi Perspective. Tom Cochrane University of Canterbury, New Zealand Programs to Resolve Agricultural Water Quality Issues the Kiwi Perspective Tom Cochrane University of Canterbury, New Zealand Outline Background on New Zealand (NZ) Water quality issues in NZ Monitoring

More information

Water Quality Assessment and Objectives for Windermere Lake

Water Quality Assessment and Objectives for Windermere Lake ENVIRONMENTAL PROTECTION DIVISION ENVIRONMENTAL SUSTAINABILITY DIVISION MINISTRY OF ENVIRONMENT Water Quality Assessment and Objectives for Windermere Lake OVERVIEW REPORT FIRST UPDATE November 2010 Prepared

More information

Water Quality indicators and How Human Activities Affect Water Quality

Water Quality indicators and How Human Activities Affect Water Quality Water Quality indicators and How Human Activities Affect Water Quality Name: Online Assignment: Period: Date: Purpose: to learn how to evaluate water quality and how pollution can make water unavailable

More information

EXECUTIVE SUMMARY. Project Summary. Background

EXECUTIVE SUMMARY. Project Summary. Background EXECUTIVE SUMMARY Project Summary In 1998 one reach of Crow Creek was listed as impaired by the Wyoming Department of Environmental Quality (DEQ) and placed on the Clean Water Act (CWA), Section 303(d)

More information

Water quality sampling at Tomahawk Creek

Water quality sampling at Tomahawk Creek Water quality sampling at Tomahawk Water samples for parasite analysis were collected by pumping about 1 L of creek water through a cartridge filter. Raw and treated drinking water samples were also put

More information

Horticultural Development within the Peel-Harvey Coastal Plain Catchment

Horticultural Development within the Peel-Harvey Coastal Plain Catchment Local Planning Policy Horticultural Development within the Peel-Harvey Coastal Plain Catchment Introduction The expansion of in-ground horticulture in Peel-Harvey Coastal Catchment Area (Coastal Catchment

More information

Chapter 9: Stormwater Pollution in the Fairy Creek Catchment

Chapter 9: Stormwater Pollution in the Fairy Creek Catchment Chapter 9: Stormwater Pollution in the Fairy Creek Catchment Kelly Peden Australia s beaches are a key component of its cultural identity, but this symbol is not as clean as could be. Beach pollution is

More information

Hydrology and Water Quality. Water. Water 9/11/2018. Molecular Water a great solvent. Molecular Water

Hydrology and Water Quality. Water. Water 9/11/2018. Molecular Water a great solvent. Molecular Water Hydrology and Water Quality Water Molecular Water Exists as an equilibrium But equilibrium altered by what is dissolved in it Water Molecular Water a great solvent In reality, water in the environment

More information

Water Quality in the Upper Cohansey Watershed

Water Quality in the Upper Cohansey Watershed Slide 1 Water Quality in the Upper Cohansey Watershed Salvatore Mangiafico County Environmental and Resource Management Agent Cooperative Extension of Salem and Cumberland Counties This talk will present

More information

Sewage Pollution Risk Assessment for Environmental Health

Sewage Pollution Risk Assessment for Environmental Health Sewage Pollution Risk Assessment for Environmental Health Steven Kenway 1 and Robert Irvine 2 1 Senior Environmental Scientist, Brown & Root Services Asia Pacific Pty Ltd (Brisbane) 2 Principal Policy

More information

SECTION 10 WATER QUALITY

SECTION 10 WATER QUALITY SECTION 10 WATER QUALITY 10.1 General Local ordinances in the Caldwell County political subdivisions regarding water quality and quantity issues are minimal. The county does not have authority to create,

More information

SEWAGE TREATMENT PLANT PERFORMANCE REPORT

SEWAGE TREATMENT PLANT PERFORMANCE REPORT SEWAGE TREATMENT PLANT PERFORMANCE REPORT 2015-16 Report Details i Contents 1. Introduction... 1 1.1. Quick Statistics July 2015 - June 2016... 1 2. Effluent Quality Summary... 2 3. Performance in Detail

More information

Narragansett Environmental Action Team (N.E.A.T.) Presented by: Elizabeth Omenitsch, Andrea Miller, Maeve Crimmins, Jessica Anton Timothy Lyons

Narragansett Environmental Action Team (N.E.A.T.) Presented by: Elizabeth Omenitsch, Andrea Miller, Maeve Crimmins, Jessica Anton Timothy Lyons Narragansett Environmental Action Team (N.E.A.T.) Presented by: Elizabeth Omenitsch, Andrea Miller, Maeve Crimmins, Jessica Anton Timothy Lyons Overview: Mission Statement History and Characteristics Population

More information

Amy M. Schofield Project Manager Boston Water and Sewer Commission November 2, 2017

Amy M. Schofield Project Manager Boston Water and Sewer Commission November 2, 2017 Amy M. Schofield Project Manager Boston Water and Sewer Commission November 2, 2017 Boston Water and Sewer Commission s Collection Systems 206 Storm Drain Outfalls/Subcatchments 18 Interconnections 30

More information