1 Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech Park Pvt.Ltd Submitted to State Environment Expert Appraisal Committee III, Maharashtra Prepared by ULTRA-TECH (Environmental Consultancy & Laboratory) (An ISO Company, Accredited by NABET, Lab: Gazetted by MoEF, GoI) (NABET/EIA/1417/RA010) Saudamini Commercial Complex, Building C-3, 2nd Floor, Right Bhusari Colony, Paud Road, Kothrud, Pune Website: Phone: /109 1

2 1.0 INTRODUCTION & PROJECT DESCRIPTION: M/s.Balewadi Tech Park Pvt.Ltd has proposed Commercial development at Survey No 20, Balewadi, Taluka Haveli Pune The project site will be developed into Commercial development. This is a permissible activity under existing rules as the site is in the development zone. 1.1 PROJECT BACKGROUND: Details of proposed development are given as follows: Table 1: Location details Survey No 20, Balewadi, Taluka Haveli Pune Project details Total Plot Area m 2 Deductions m 2 Net Plot m 2 Commercial Development Ground coverage m 2 ( 28 %) R. G. area on ground m 2. Total Proposed Built-up area As per FSI m 2 Total Construction Built- up Area m 2 The total built-up area of the proposed project is more than 1,50,000 m 2 as per the Environment Impact Assessment (EIA) Notification dated 14 th September 2006 and subsequent amendments thereto, the project falls under 'Category B1' with project or activity type number '8', which require preparation of EIA Report. EIA Report shall address the environmental impacts of the project on surrounding 10 km radius and shall propose the mitigation measures for the same. The Report shall be prepared, based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by Ministry of Environment & Forests and Climate Change (MoEF & CC) in April Manual for Building, Construction, townships and area development projects prepared by Administrative Staff College of India, Hyderabad will be followed for preparation of EIA report. Any additional project specific ToR given by SEAC shall also be incorporated in the final EIA report. 2

3 This proposal will be studied for the proposed development: Description of the project site, geology, topography, climate, transport and connectivity, demographic aspects, socio-economic aspects shall be detailed out. Project details Site planning Water Requirement and its source, waste water generation, solid waste generation, debris and excavation soil management, power requirement, other utilities for amended proposal shall be detailed out. Status of environmental amenities Environmental liabilities like energy conservation, green belt development, waste water treatment and recycling, rain water harvesting, solid waste management, energy conservation measures, drainage pattern of the surrounding area shall be explained, runoff from the project site shall be calculated and capacities of the internal and external storm water drains shall be studied. Sewer line in the surrounding area of the project site shall be ascertained with respect to their capacities to take the load of excess treated sewage from the project. Essential Top sheets / Maps: A map of the study area 500 m from the boundary of the project area, delineating the major topographical features such as land use, drainage and locations of habitats, major constructions including roads, railways, Petroleum and Mineral pipelines, and industries if any in the area shall be reported in EIA. Land Use Land Cover maps of the study area covering 10 km radius around the project site are prepared using Remote Sensing and GIS which shall be a part of EIA. Contour map and drainage pattern of the project site and surrounding area shall be studied. Description of the project site, geology, topography, climate, transport and connectivity, demographic aspects, socio, cultural and economic aspects shall be detailed out. 3

4 Water Requirement for the project and its source, waste water generation, solid waste generation, power requirement, other utilities, type of building material to be used shall be detailed out. Detailed layout plan of project development, communication facilities, access/approach roads, landscape, sewage disposal facilities, and waste disposal etc. shall be studied. 2.0 DESCRIPTION OF THE ENVIRONMENT: In order to get an idea about the existing state of the environment, various environmental attributes such as meteorology, air quality, water quality, soil quality, noise level, ecology and socio - economic environment shall be studied /monitored. The methodology for conducting the baseline environmental survey considered shall be as per the guidelines given in the Environmental Impact Assessment Guidance Manual for building construction projects. Baseline data with respect to air quality, noise level, water quality and soil quality in the study area shall be collected by conducting primary sampling / field studies shall be studied and incorporated in EIA. Study Area: The study area is considered to be the area within 500 m radius of the site for Environmental monitoring while for studying the Environmental sensitivity radius of 10 km is considered. Primary Data Collection for study area within 500 m angular distance around project site Ambient air quality Noise Level Groundwater & Surface water quality Soil quality Ground survey Flora & Fauna Socio-Economic conditions Secondary Data Collection for area covering 10 km radius Flora & Fauna Socio-Economic conditions 4

5 Sensitive areas such as forests, Sanctuaries, places of historical, archaeological & tourist importance. Land use/ Land cover Map of the study area clearly delineating the location of various monitoring stations (air/water/soil and noise) superimposed with location of habitats shall be shown. Primary data shall be collected for one season except rainy season. Monitoring of the parameters shall be carried out within the study area. Study area of Proposed Project 10 Km radius around the plot boundary 5

6 Status of study area for environmental sensitive places within 15 km Locations of environmentally sensitive areas within 10 km radius around project site are marked and studies will be conducted accordingly to identify and mitigate the impact of proposed activity. Land Environment (Land-use, Solid Waste Generation and Management) Water Environment (Surface and Groundwater Quality) Air Environment [Meteorology (Secondary data from IMD), ambient air quality and noise levels] 6

7 Biological Environment (Flora& Fauna) Socio-economic environment (Demographic profile, Occupational structure, Educational facilities, Health care facilities, literacy status, etc.) 2.1 Land Environment It is the first feature which influences the development of a new project is the existing land use pattern of the neighborhood of the project. Study of land use pattern employing remote sensing techniques and ground truth and also through secondary data sources shall be studied. Soil analysis of the selected locations in the study area shall be carried out. Solid wastes generation & management shall be categorized into two phases i.e. during construction & during operation phases. Details for the following types of wastes shall be given: Excavation and Construction waste Municipal waste, i.e., biodegradable and non- biodegradable waste Hazardous waste (Mainly during construction phase) E-waste, if any STP sludge 2.2 Water Environment Baseline water quality shall be monitored. Water requirement during construction and operation phase shall be quantified and their source shall be identified. Scheme for rainwater harvesting shall be prepared as per the hydro-geological report of the project site. Water saving practices shall be suggested to reduce the water demand. Quantity of sewage shall be estimated management scheme for sewage shall be framed. 2.3 Air Environment Climatological data shall be obtained from India Meteorological Department (IMD) station for one year. Micro meteorological data consisting of wind speed, wind direction, temperature, humidity, rainfall (peak and average daily rainfall) and wind rose patterns shall be reported in EIA. Baseline data for ambient air parameters namely RSPM, Oxides of Sulphur, Oxides of Nitrogen and Carbon monoxide (CO) at project site and in an area extending 500 meters radius from the 7

8 boundary of project site has been carried out for the period February to April This may please be accepted in the ToR for our EIA studies. Baseline data of noise at the project site and the areas extending 500 meters radius from the boundary of project site shall be ascertained. Hourly reading for 24 hours at each location shall be monitored. Equivalent Noise levels in db (A) for day and night time shall be reported in EIA. 2.4 Biological Environment As per guidelines of MoEF for Environmental Impact Assessment, pertaining to construction projects, total study area shall be up to 9.5 km radius from the project site, of which primary data shall be collected from the area up to 500m radius and remaining area up to 9.5 km shall be represented by secondary data. The data up to 500 m radius will be generated with reference to topography, land use, vegetation pattern, flora, fauna etc. 2.5 Socio Economic Environment Demographic details as per Census shall be reported in the EIA. Following attributes for baseline socio-economic status of the study area shall be studied. Demographic Features and Infrastructure Decadal Growth Rate Settlement Pattern and Growth Population Literacy Education Facilities Historical, religious and tourist centers. 3.0 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES: The anticipated negative and positive impacts on the land, water, air, ecological and socioeconomic environment during the construction and operation phases shall be predicted. Impact identification for this project shall help to suggest mitigation measures to reduce adverse impacts due to the development. Best environmental practices, conservation of natural resources, environmental management plan, environmental monitoring programme including budgeting for the expenditure proposed, 8

9 corpus funding for long term maintenance of environmental management facilities in future shall be suggested. 4.0 ENVIRONMENTAL MONITORING PROGRAM: Environmental Monitoring Program shall include: Frequency, location, parameters of monitoring Summary matrix of environmental monitoring, during construction and operation stage Requirement of monitoring facilities Compilation and analysis of data and reporting system 5.0 ADDITIONAL STUDIES: Risk Assessment Studies for the construction and operation phase, the safety precautions to be taken during construction phase and the Disaster Management Plan and Emergency Preparedness Plan Onsite and Offsite shall be studied. Traffic Impact Study shall be studied. Hydrogeological & GIS based drainage pattern study to identify impact of development on river. 6.0 PROJECT BENEFITS: Details about the improvements in physical infrastructure, social infrastructure, employment potential and other benefits that are accrued shall be incorporated. Employment potential of this project during construction and operation phases shall be evaluated. 7.0 ENVIRONMENTAL MANAGEMENT PLAN: Adequate environmental management measures will be incorporated during the entire planning, construction and operating stages of the project to minimize any adverse environmental impact and assure sustainable development of the area. The EMP s shall include the following elements: Air Pollution Control and Management Noise Control and Management Water Conservation Wastewater Management Storm water management 9

10 Solid, Hazardous and E Waste Management Energy Conservation and use of Non conventional energy Traffic Management Plantation, Landscaping and Land Management Management of Social Issues Occupational, Safety and Health issues Environmental Monitoring Emergency Response Plans for emergency scenarios Environmental Management System For the effective and consistent functioning, an Environmental Management System (EMS) will be established at the site. The following components will be part of the EMS: Environmental Policy Objectives & Targets Structure and Responsibility Emergency Planning Environmental Monitoring Program Operation and Maintenance of Environmental Management Facilities like STP, rain water Harvesting, solar systems, landscape development, solid waste management system Non-conformance & Corrective and Preventive Action Short term and long term budgetary provisions for the EMP 8.0 DISCLOSURE OF CONSULTANTS ENGAGED: The consultants engaged and nature of consultancy rendered shall be listed in EIA. Enclosures: 1. Location plan 2. Google image 3. Master Layout Category 8(b): STANDARD TERMS OF REFERENCE FOR ONDUCTINGENVIRONMENT IMPACT ASSESSMENT STUDY FOR TOWNSHIP/AREA DEVELOPMENT PROJECTS AND INFORMATION TO BEINCLUDED IN EIA/EMP REPORT, APRIL

11 1) Examine details of land use as per Master Plan and land use around 10 km radius of the project site. Analysis should be made based on latest satellite imagery for land use with raw images. Check on flood plain of any river. 2) Submit details of environmentally sensitive places, land acquisition status, rehabilitation of communities/villages and present status of such activities. 3) Examine baseline environmental quality along with projected incremental load due to the project. 4) Environmental data to be considered in relation to the project development would be (a) land, (b) ground water, (c) surface water, (d) air, (e) bio-diversity, (f) noise and vibrations, (g) socio economic and health. 5) Submit a copy of the contour plan with slopes, drainage pattern of the site and surrounding area. Any obstruction of the same by the project 6) Submit the details of the trees to be felled for the project. 7) Submit the present land use and permission required for any conversion such as forest, agriculture etc. 8) Submit Roles and responsibility of the developer etc for compliance of environmental regulations under the provisions of EP Act. 9) Ground water classification as per the Central Ground Water Authority. 10) Examine the details of Source of water, water requirement, use of treated waste water and prepare a water balance chart. 11) Rain water harvesting proposals should be made with due safeguards for ground water quality. Maximize recycling of water and utilization of rain water. Examine details. 12) Examine soil characteristics and depth of ground water table for rainwater harvesting. 13) Examine details of solid waste generation treatment and its disposal. 11

12 14) Examine and submit details of use of solar energy and alternative source of energy to reduce the fossil energy consumption. Energy conservation and energy efficiency. 15) DG sets are likely to be used during construction and operational phase of the project. Emissions from DG sets must be taken into consideration while estimating the impacts on air environment. Examine and submit details. 16) Examine road/rail connectivity to the project site and impact on the traffic due to the proposed project. Present and future traffic and transport facilities for the region should be analyzed with measures for preventing traffic congestion and providing faster trouble free system to reach different destinations in the city. 17) A detailed traffic and transportation study should be made for existing and projected passenger and cargo traffic. 18) Examine the details of transport of materials for construction which should include source and availability. 19) Examine separately the details for construction and operation phases both for Environmental Management Plan and Environmental Monitoring Plan with cost and parameters. 20) Submit details of a comprehensive Disaster Management Plan including emergency evacuation during natural and man-made disaster. 21) Details of litigation pending against the project, if any, with direction /order passed by any Court of Law against the Project should be given. 22) The cost of the Project (capital cost and recurring cost) as well as the cost towards implementation of EMP should be clearly spelt out. 23) Any further clarification on carrying out the above studies including anticipated impacts due to the project and mitigative measure, project proponent can refer to the model ToR available on Ministry website " 12

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS APPENDIX II (See paragraph 6) FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT (Attach panoramic view of the project

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

GMR Holdings Private Limited

GMR Holdings Private Limited GMR Holdings Private Limited Development of LNG Facility at Kakinada Deep Water Port PROPOSED TERMS OF REFERENCE April 2016 Submitted By: L&T Infrastructure Engineering Limited (formerly known as L&T-Ramboll

More information

TERMS OF REFERENCE [TOR] FOR EIA REPORT FOR ACTIVITIES / PROJECTS REQUIRING ENVIRONMENTAL CLEARANCE

TERMS OF REFERENCE [TOR] FOR EIA REPORT FOR ACTIVITIES / PROJECTS REQUIRING ENVIRONMENTAL CLEARANCE ENVIRONMENTAL IMPACT ASSESSMENT TERMS OF REFERENCE Ministry of Environment & Forests GOVERNMENT OF INDIA, NEW DELHI TERMS OF REFERENCE [TOR] FOR EIA REPORT FOR ACTIVITIES / PROJECTS REQUIRING ENVIRONMENTAL

More information

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1 ANNEXURE I SITE LOCATION MAP Building Environment (India) Pvt. Ltd 1 ANNEXURE II LAYOUT PLAN Building Environment (India) Pvt. Ltd 2 ANNEXURE III LAND DETAILS Sr. No. LAND DETAILS (In Ha.) 1. LARGE SIZE

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT QUERY 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? Attach Maps

More information

SCOPE OF WORK TECHNICAL SPECIFICATIONS

SCOPE OF WORK TECHNICAL SPECIFICATIONS SCOPE OF WORK & TECHNICAL SPECIFICATIONS PROJECT DESCRIPTION/ SITE INFORMATION New storage depot is to be constructed at Bokaro in the state of Jharkhand. This tender envisages carrying out HAZOP Study,

More information

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29) 1 By: Speed-Post State Level Expert Appraisal Committee (Formed as per S.O. no. 1533 dated 14 th Sept 2006 of Government of India, Ministry of Environment & Forests) PARYAWARAN PARISAR, E-5, ARERA COLONY,

More information

CMPDI. 4.6 Mine Closure Plan

CMPDI. 4.6 Mine Closure Plan 4.6 Mine Closure Plan Post-mining Land Use Planning The mine closure planning with regard to for Lekhapani OCP will broadly involve the following aspects: 1. Technical Aspects 2 Environmental Aspects 2.

More information

Environmental Impact Assessment of Hydroelectric Power Plant LEEZA MALIK (2013CEP2080) TUSHAR SINGLA (2011MT50623)

Environmental Impact Assessment of Hydroelectric Power Plant LEEZA MALIK (2013CEP2080) TUSHAR SINGLA (2011MT50623) Environmental Impact Assessment of Hydroelectric Power Plant LEEZA MALIK (2013CEP2080) TUSHAR SINGLA (2011MT50623) 1 Contents Background Objective EIA of Hydroelectric plants Tools and Techniques used

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (BUILT UP AREA: 77420.15 SQ. M) BY AMC EWS HOUSING PROJECT RESIDENTIAL BUILDING & COMMERCIAL PROJECT F. P. NO. 174, T.P. NO. 32, GOTA,

More information

(1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options)

(1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options) Sub-sector Guideline: (1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options) Basic Concept A. General Concept Climate change will increase

More information

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC Prefeasibility Report For 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC of Alkyl Amines Chemicals Limited 401-407 Nirman Vyapar Kendra, Plot No. 10, Sector 17, Vashi,

More information

Telefax : 011: Dated 1 st March, 2013

Telefax : 011: Dated 1 st March, 2013 F. No. J-11011/263/2012- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 To, Shri Jigar Shah, Director M/s

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1. P. G. D. E. M. (Semester - I) Examination

Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1. P. G. D. E. M. (Semester - I) Examination Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1 P. G. D. E. M. (Semester - I) Examination - 2009 ENVIRONMENTAL MANAGEMENT TECHNIQUES - I (1) Answer any four questions. (3) Use of calculator

More information

Executive Summary 1. 1 Project Background 6

Executive Summary 1. 1 Project Background 6 Contents Executive Summary 1 1 Project Background 6 Page 1.1 Project Overview 6 1.2 Hotel Concept 6 1.3 Justification of the Project 8 1.3.1 Foreign Currency Earnings 8 1.3.2 Tourism Developments in Mauritius

More information

Canadian Technology Accreditation Criteria (CTAC) ENVIRONMENTAL ENGINEERING TECHNOLOGY - TECHNOLOGIST Technology Accreditation Canada (TAC)

Canadian Technology Accreditation Criteria (CTAC) ENVIRONMENTAL ENGINEERING TECHNOLOGY - TECHNOLOGIST Technology Accreditation Canada (TAC) Preamble Canadian Technology Accreditation Criteria (CTAC) ENVIRONMENTAL ENGINEERING TECHNOLOGY - TECHNOLOGIST Technology Accreditation Canada (TAC) These CTAC are applicable to programs having titles

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN Environment Protection Authority, ACT May 2009 ISBN-13: 978-0-642-60494-1 ISBN-10: 0-642-60494-0 Australian Capital Territory,

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway in association with Design 151.66 Km (Existing Road Apr. 180 km) 2 OBJECTIVE: The Government of Timor Lestewishes to Engage Consultant to carry out the Preliminary, Detailed Engineering Design and Environment

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity

More information

Draft - Smart City Proposal. Kalyan Dombivli Municipal Corporation

Draft - Smart City Proposal. Kalyan Dombivli Municipal Corporation Draft - Smart City Proposal Kalyan Dombivli Municipal Corporation 1 1. Kalyan-Dombivli Introduction 2 Kalyan Dombivli Kalyan Dombivli and Titwala cities form KDMC jurisdiction; Population increased from

More information

BASIC INFORMATION QUESTIONNAIRE

BASIC INFORMATION QUESTIONNAIRE Application No. Central Environmental Authority BASIC INFORMATION QUESTIONNAIRE Essential information to determine the environmental approval requirement of projects (Note Use separate sheets as and when

More information

6 Risk assessment methodology

6 Risk assessment methodology Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) Date: March 16, 2015 Environmental and Social onsiderations in Detailed Planning Survey (Technical ooperation for Development Planning) 1. Full title of the Project THE PROJET ON THE ORRIDOR DEVELOPMENT

More information

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives: ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not

More information

Measuring Disparities in Access to Sanitation in India: Findings from National Sample Survey. Aditya Bhol Centre for Policy Research, New Delhi

Measuring Disparities in Access to Sanitation in India: Findings from National Sample Survey. Aditya Bhol Centre for Policy Research, New Delhi Measuring Disparities in Access to Sanitation in India: Findings from National Sample Survey Aditya Bhol Centre for Policy Research, New Delhi Key Discussion Points Latest urban sanitation statistics in

More information

Environmental Management Plan (EMP)

Environmental Management Plan (EMP) SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit

More information

COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS CASE NOYALE SITE ENVIRONMENTAL IMPACT ASSESSMENT REPORT CONTENTS

COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS CASE NOYALE SITE ENVIRONMENTAL IMPACT ASSESSMENT REPORT CONTENTS COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS CASE NOYALE SITE ENVIRONMENTAL IMPACT ASSESSMENT REPORT CONTENTS Chapter Description Page EXECUTIVE SUMMARY 1 INTRODUCTION 1-1 1.1

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

APPENDIX 2. Nova Scotia Department of Environment and Labour Environmental Assessment Terms and Conditions for Environmental Assessment Approval

APPENDIX 2. Nova Scotia Department of Environment and Labour Environmental Assessment Terms and Conditions for Environmental Assessment Approval APPENDIX 2 Nova Scotia Department of Environment and Labour Terms and Conditions for Approval Approval Approval Date: March 14, 2007 Keltic Petrochemicals Inc. LNG and Petrochemical Plant Facilities Keltic

More information

Information Requirements Table for Liquid Waste

Information Requirements Table for Liquid Waste Applicant Summary Tracking # Authorization # Applicant / Facility Name Ministry of Environment Prepared by: Title Date The Information Requirements Table (IRT) for Liquid Waste is a tool used by Ministry

More information

Mambo Wastewater Treatment Plant Rehabilitation

Mambo Wastewater Treatment Plant Rehabilitation Public Disclosure Authorized SFG3031 Public Disclosure Authorized Water Utilities Corporation (WUC) Public Disclosure Authorized Public Disclosure Authorized Mambo Wastewater Treatment Plant Rehabilitation

More information

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

Summary of Environmental and Social Consideration in Development Study (Preparatory Study) Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 1. Full title of the Project The Study on Integrated Development Strategy for Danang City and Its Neighboring

More information

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India Review: Definition of EIA Environmental Impact Assessment

More information

Oweninny Wind Farm. Oweninny Power Ltd. Environmental Impact Statement. Chapter 20. Indirect and Interaction of Impacts

Oweninny Wind Farm. Oweninny Power Ltd. Environmental Impact Statement. Chapter 20. Indirect and Interaction of Impacts Oweninny Wind Farm Oweninny Power Ltd. Chapter 20 Indirect and Interaction of Impacts Copyright ESB International Limited, all rights reserved. TABLE OF CONTENTS 20. INDIRECT AND INTERACTION OF IMPACTS

More information

PREPARATORY STUDY FOR DEVELOPMENT STUDY. 1. Project Title The study on improvement of planning capability in sewerage sector in Malaysia

PREPARATORY STUDY FOR DEVELOPMENT STUDY. 1. Project Title The study on improvement of planning capability in sewerage sector in Malaysia PREPARATORY STUDY FOR DEVELOPMENT STUDY 1. Project Title The study on improvement of planning capability in sewerage sector in Malaysia 2. Type of the Study Study on improvement of planning capability

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

Struma Lot 3.2 EIA Development, Working Document

Struma Lot 3.2 EIA Development, Working Document Struma Lot 3.2 EIA Development, Working Document Revision 1, 03 February 2016 1 Introduction 1.1 Background Struma Motorway is one of the most challenging road projects in Bulgaria. The motorway is about

More information

RAPID ENVIRONMENTAL IMPACT ASSESSMENT

RAPID ENVIRONMENTAL IMPACT ASSESSMENT RAPID ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED AUGMENTATION & EXPANSION OF EXISTING THERMAL POWER PLANT BY M/s. ARS Metals Pvt. Ltd. Chennai, Tamil Nadu AT Sithurnatham, Sirupuzhalpettai & Eguvarapalayam

More information

We re going to look at why earlier consideration is better.

We re going to look at why earlier consideration is better. 1 2 3 4 We re going to look at why earlier consideration is better. Another way to think of this is exploiting the comparison of analysis and goals to find synergies, but nobody wants to think like that.

More information

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc. Project name:- Project Code :- Registration Category :- General Comments :- Drawings Feedback:- 1st feedback No Dwg Name Dwg Description Recommendation 1 Site survey plan Site plan showing following in

More information

Potable Water Supply, Wastewater & Reuse Element

Potable Water Supply, Wastewater & Reuse Element Potable Water Supply, Wastewater & Reuse Element GOAL ONE: HIGH QUALITY AND AFFORDABLE POTABLE WATER WILL BE AVAILABLE TO MEET THE EXISTING AND PROJECTED DEMANDS OF PINELLAS COUNTY UTILITY CUSTOMERS. 1.1.

More information

Design of Sewerage System for Jaffarpur area in Southwest New Delhi

Design of Sewerage System for Jaffarpur area in Southwest New Delhi International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 1 (2014), pp. 29-34 Research India Publications http://www.ripublication.com/ijcer.htm Design of Sewerage System for

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED

FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED Ford Motor Private Limited- Conceptual Plan 1 Contents 1 INTRODUCTION 3 1.1 BACKGROUND 3 1.2 PROJECT LOCATION 3 1.3 PROJECT FEATURES

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

(this cover page left intentionally blank)

(this cover page left intentionally blank) 4. Siting the Well (this cover page left intentionally blank) 4. Siting the Well Chapter Table of Contents Chapter Table of Contents Chapter Description... 4 Regulatory Requirements Well Siting... 4 Relevant

More information

Infrastructure Development and Environment

Infrastructure Development and Environment Infrastructure Development and Environment Few Stories Lift irrigation from Chambal River No Development Zone around Numaligarh Refinery NH - 31 C passing through Jaldapara, Mahananda and Buxa Nh-72 cutting

More information

ENVS 435: Watershed Management. 3 Credits INSTR.: Dr. R.M. Bajracharya

ENVS 435: Watershed Management. 3 Credits INSTR.: Dr. R.M. Bajracharya ENVS 435: Watershed Management 3 Credits INSTR.: Dr. R.M. Bajracharya Unit 1: Introduction - Watershed Concepts Definitions of watershed The elevated line separating the head streams which are tributaries

More information

LESEDI ENVIRONMENTAL MANAGEMENT FRAMEWORK (EMF) PUBLIC MEETING 25 JANUARY 2006

LESEDI ENVIRONMENTAL MANAGEMENT FRAMEWORK (EMF) PUBLIC MEETING 25 JANUARY 2006 LESEDI ENVIRONMENTAL MANAGEMENT FRAMEWORK (EMF) PUBLIC MEETING 25 JANUARY 2006 AGENDA Opening and Welcome Introduction of Consultants Profile of Izwelisha Consortium Explanation of the EMF process Environmental

More information

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 1 Ministry of Environmental Conservation and Forestry (MOECAF) Environmental

More information

Proposed Smart City at Trianon by Hermes Properties Ltd EXECUTIVE SUMMARY

Proposed Smart City at Trianon by Hermes Properties Ltd EXECUTIVE SUMMARY EXECUTIVE SUMMARY Hermes Properties Ltd (HPL), hereinafter referred to as the project promoter or proponent, is a private company incorporated in Mauritius involved in the property investment and development

More information

Outline for. Protected Areas Management Planning

Outline for. Protected Areas Management Planning Outline for Protected Areas Management Planning Level One: Community-based protected area management organizations and Level Two: Conservation organizations / Non-governmental organizations Outline for

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PETROCHEMICAL PLANTS C A G Citizen consumer and civic Action Group 1. What are the pollution problems associated with petrochemical plants? Petrochemical plants

More information

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR Overview of Presentation 1. Objectives of the Consultancy 2. Hydropower in Myanmar 3. Draft Table of Contents 4.

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

52 North Broadway DEIS Scoping Outline

52 North Broadway DEIS Scoping Outline Introduction WP Development NB, LLC (the Applicant ) proposes to redevelop the former Good Counsel site, of which it is the owner, in White Plains, NY with residential uses in a campus-like setting (the

More information

Municipal Stormwater Management Planning

Municipal Stormwater Management Planning Municipal Stormwater Management Planning Christopher C. Obropta, Ph.D., P.E. Water Resources Extension Specialist with Rutgers Cooperative Extension Assistant Professor with Department of Environmental

More information

The Lakes District and Schooner Cove Integrated Stormwater Management Plan Kerr Wood Leidal, Draft Report, July 2012 (revised October 2013)

The Lakes District and Schooner Cove Integrated Stormwater Management Plan Kerr Wood Leidal, Draft Report, July 2012 (revised October 2013) To: Jeremy Holm, Regional District of Nanaimo cc: Geoff Garbutt, Regional District of Nanaimo From: Dan Huang / Ehren Lee 1.0 INTRODUCTION Urban Systems has been asked to assist the Regional District of

More information

State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area

State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area Thaddeus L. Cohen, AIA Secretary November 2006 CONTENTS Part 1 - Summary

More information

Dredging for Climate Change and Transport in the Netherlands

Dredging for Climate Change and Transport in the Netherlands Dredging for Climate Change and Transport in the Netherlands Dredging to survive Polite Laboyrie (Chairman of CEC and Head of Hydr&Env Eng RWS) Organisation Ministry of Transport Dredging for Climate Change

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

SABI Code of Practice for On-farm Irrigation Design

SABI Code of Practice for On-farm Irrigation Design SABI Code of Practice for On-farm Irrigation Design This code was developed to provide guidelines for irrigators and those servicing irrigators on developing a new irrigation system or upgrading an existing

More information

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds- Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for Form -1 [Vide tification dated 1 st December 2009] FOR PROPOSED COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI

More information

IMS (Quality, Environment, Occupational Health & Safety) Awareness Training Course As per ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007

IMS (Quality, Environment, Occupational Health & Safety) Awareness Training Course As per ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007 IMS (Quality, Environment, Occupational Health & Safety) Awareness Training Course As per ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007 SESSION 1 ST HR INTRODUCTION COURSE OBJECTIVE This course is designed

More information

Mongolia s Green Development Policy Outcome-level Indicators. Yongsung Kim, GGGI Xin Zhou, IGES Mustafa Moinuddin, IGES

Mongolia s Green Development Policy Outcome-level Indicators. Yongsung Kim, GGGI Xin Zhou, IGES Mustafa Moinuddin, IGES Mongolia s Green Development Policy Outcome-level Indicators Yongsung Kim, GGGI Xin Zhou, IGES Mustafa Moinuddin, IGES Table of Contents Background and Objectives Review of Existing Indicators Methodological

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

Energy & Wetlands Research Group Centre for Ecological Sciences Indian Institute of Science Bangalore , India

Energy & Wetlands Research Group Centre for Ecological Sciences Indian Institute of Science Bangalore , India Energy & Wetlands Research Group Centre for Ecological Sciences Indian Institute of Science Bangalore 560 012, India E Mail: cestvr@ces.iisc.ernet.in mds@ces.iisc.ernet.in Tel: 91-080-22933099/23602075

More information

LEED-2009 Green Building Rating System. New Construction & Major Renovations

LEED-2009 Green Building Rating System. New Construction & Major Renovations LEED-2009 Green Building Rating System New Construction & Major Renovations 1 The following pages are designed to assist Engineers acquire LEED Credits in the design of Green Sustainable building utilizing

More information

Summary of Preparatory Study for Development Study

Summary of Preparatory Study for Development Study Summary of Preparatory Study for Development Study 1. Full Tile of the Project THE STUDY ON IMPROVEMENT OF WATER SUPPLY SYSTEM IN DELHI IN THE REPUBLIC OF INDIA (hereinafter referred to as the Study )

More information

Chapter 10 Natural Environment

Chapter 10 Natural Environment Chapter 10 Natural Environment Existing Conditions The Natural Environment Element addresses the protection, conservation, preservation, and restoration of the natural resources the Bayview Ridge Subarea,

More information

Rainwater Harvesting Structures - A Case Study

Rainwater Harvesting Structures - A Case Study Rainwater Harvesting Structures - A Case Study C.L.Jejurkar 1, N.S.Naik 2 1 Asso.Professor, SRES College of Engineering, Kopargaon, Dist. Ahmed Nagar, India 2 Asst. Professor, SRES College of Engineering,

More information

Executive Summary Sri Lanka Strategic Cities Development Project (SCDP)

Executive Summary Sri Lanka Strategic Cities Development Project (SCDP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Executive Summary Sri Lanka Strategic Cities Development Project (SCDP) Executive Summary

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

ToR Letter No. SEIAA/AP/ANT/ Dated Monitoring Period : October 2016 to December Applicant

ToR Letter No. SEIAA/AP/ANT/ Dated Monitoring Period : October 2016 to December Applicant EXECUTIVE SUMMARY of Proposed Quartz Mine (30.667 Ha.) with a Production of 91,125 TPA at Sy. No. 410, D.Cherlopalli Village, Bathalapalli Mandal, Anantapur District, Andhra Pradesh. ToR Letter No. SEIAA/AP/ANT/2015-3568

More information

Campus Photovoltaic Energy Project at California State University Channel Islands

Campus Photovoltaic Energy Project at California State University Channel Islands Negative Declaration and Initial Study Campus Photovoltaic Energy Project at California State University Channel Islands The Trustees of the California State University Project Proponent: California State

More information

Remote Sensing and GIS for Forestry Interventions for Ganga (ForGanga) Implementing Institute Forest Research Institute, Dehradun

Remote Sensing and GIS for Forestry Interventions for Ganga (ForGanga)  Implementing Institute Forest Research Institute, Dehradun Remote Sensing and GIS for Forestry Interventions for Ganga (ForGanga) www.forganga.in Implementing Institute Forest Research Institute, Dehradun Ganga: Glimpse of Few Issues Ganga: Glimpse of Few Issues

More information

Lesson Five: Best Management Practices for Nonpoint Source Pollution

Lesson Five: Best Management Practices for Nonpoint Source Pollution Lesson Five: Best Management Practices for Nonpoint Source Pollution Overview This lesson deals with agricultural and urban management practices designed to reduce nonpoint source pollution. Grade Level:

More information

SCHEME FOR ACCREDITATION OF EIA CONSULTANT ORGANIZATIONS - Version 3 Quality Management System: Explanatory Notes for the Guidelines

SCHEME FOR ACCREDITATION OF EIA CONSULTANT ORGANIZATIONS - Version 3 Quality Management System: Explanatory Notes for the Guidelines June, 2015 SCHEME FOR ACCREDITATION OF EIA CONSULTANT ORGANIZATIONS - Version 3 Quality Management System: Explanatory Notes for the Guidelines NATIONAL ACCREDITATION BOARD FOR EDUCATION AND TRAINING QUALITY

More information

: ENVIRONMENTAL SCIENCE AND DISASTER MANAGEMENT COURSE CODE : 3001 COURSE CATEGORY : P PERIODS/ WEEK : 3 PERIODS/ SEMESTER : 45 CREDIT : 3

: ENVIRONMENTAL SCIENCE AND DISASTER MANAGEMENT COURSE CODE : 3001 COURSE CATEGORY : P PERIODS/ WEEK : 3 PERIODS/ SEMESTER : 45 CREDIT : 3 COURSE TITLE : ENVIRONMENTAL SCIENCE AND DISASTER MANAGEMENT COURSE CODE : 3001 COURSE CATEGORY : P PERIODS/ WEEK : 3 PERIODS/ SEMESTER : 45 CREDIT : 3 TIME SCHEDULE MODULE TOPICS PERIODS 1 Renewable and

More information

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group Environmental Management System Integrated Pollution Control Document No. 5.2.1 Version no. 1 Origination Date 1 st February 2017 Area: The Group Approval: Group Services & Facilities Last Revision Date

More information

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator Florida Department of Environmental Protection Bureau of Mining and Minerals Regulation Regulation of Mines Howard J. Hayes, Program Administrator April 2011 What is a mine? Nonphosphate mine: Subsections

More information

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building... Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3

More information

STANDARD. Document information. Version: v4.8 Dec Date: Dec (c) 2012 European Water Partnership. All rights reserved.

STANDARD. Document information. Version: v4.8 Dec Date: Dec (c) 2012 European Water Partnership. All rights reserved. STANDARD Document information Version: v4.8 Dec 2012 Language: English Date: Dec 2012 (c) 2012 European Water Partnership. All rights reserved. PAGE LEFT BLANK ON PURPOSE European Water Stewardship (EWS)

More information

06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards

06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards 06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards THE APPLICATION Planning permission is sought for the construction of a noise attenuation

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information