1 ALBERTA POWER MARKET

2 Generating Capacity Generating Capacity [MW] Coal 5,840 Gas 4,434 Hydro 900 Wind 522 Biomass 184 Fuel Oil 13 Subtotal 11,892 Interconnections British Columbia 750 Saskatchewan 150 MARKET 900 Grand Total 12,792 Source: Alberta Government, Energy and Utilities Board (EUB), Alberta Electric System Operator (AESO) and industry information

3 Alberta Generation and Transmission System ALBERTA POWER MARKET Source: Alberta Energy Overview, Alberta Government

4 Electric Utility Service Areas ALBERTA POWER MARKET Source: Alberta Energy and Utilities Board

5 Fundamental Facts Q Peak demand 85,707 8,967 9,236 9,580 9,961* 9,478 (MW) 6 Max. (peak) Pool price ($/MWh) Average Pool Price ($/MWh) Min. (nonpeak) Pool price ($/MWh) Total energy traded 118,845, ,425, ,520, ,533, ,742,950 35,552,228 (MWh) Number of Power Pool participant s *November 28,2006 Source: Alberta Government ALBERTA POWER MARKET

6 Electricity Imports & Exports Exports volume (MWh) Exports value ($ million) Imports volume (MWh) Imports value ($ million) Q ,769 1,227,698 1,061,083 1,038, , ,374 $9.8 M $50.9 M $36.3 M $37.9 M $19.4 M $15.4 M 1,160,675 1,332,193 1,491,661 1,534,574 1,517, ,523 $78.7 M $120.4 M $111.2 M $164.5 M $193.3 M $22.2 M Source: AESO data ALBERTA POWER MARKET

7 Customer Usage Estimates 2006 Number of Customers 2002 Usage(GWh) 2003 Usage(GWh) 2004 Usage(GWh) 2005 Usage(GWh) 2006 Usage(GWh) Residential 1,191,538 7, , , , , Farm 78,754 1, , , , , Commercial 141,687 11, , , , , Industrial 35,532 28, , , , , Total 1,447,511 48, , , , , Source: EUB ALBERTA POWER MARKET

8 Generation Additions Developer CNRL & ATCO Power Alberta Pacific Forest Ind. Altec Power BC Hydro BP Canada Energy Dow / TransAlta Drayton Valley Power ALBERTA POWER Air Liquide ATCO / NOVA / EPCOR Devon Canada Mercury Electric TransCanada (TransAlta) (TransAlta) Location Installed Capacity (MW) Type Year On-line Primrose 85 Cogeneration 1998 Boyle 82 Biomass 1999 Willesden Green 1 Flare Gas 1999 Poplar Hill 47 Gas Turbine 1999 Rainbow Lake 4 45 Cogeneration 1999 Fort Nelson 45 Gas Turbine 1999 Various 10 Natural Gas 1999 Fort Saskatchewan 120 Cogeneration 1999 Dapp 17 Biomass 1999 Gold Creek 7 Waste Heat 1999 Fort McMurray 80 Cogeneration 1999 Scotford 80 Cogeneration 2000 Joffre 416 Cogeneration 2000 Cowley Ridge Exp. 2 Wind 2000 Drywood 6 Natural Gas 2000 Taylor Chute Hydro 14 Hydro 2000 Devon 12 Natural Gas 2000 Alberta 3 Natural Gas 2000 Medicine Hat 27 Cogeneration 2000 Castle River Exp. 39 Wind 2000 Waterton area 3 Wind 2000 Rainbow Lake 5 45 Cogeneration 2001 Cowley North 20 Wind 2001

9 EnCana EnCana/Nexen EPCOR/ Peigan First Nation Lundbreck Developments Penn West TransAlta TransCanada TransCanada TransCanada Imperial Oil Northstone Power Permolex Sinnott 7 Wind 2001 Cavalier 120 Cogeneration 2001 Balzac 106 Cogeneration 2001 Pincher Creek 1 Wind 2001 Lundbreck 1 Wind 2001 APP-Burdette 7 Natural Gas 2001 APP-Coaldale 6 Natural Gas 2001 APP-Fort MacLeod 4 Natural Gas 2001 APP-Taber 8 Natural Gas 2001 Gift Lake 1 Waste Heat 2001 Buck Lake 6 Cogeneration 2001 Poplar Creek 360 Cogeneration 2001 Carseland 80 Cogeneration 2001 Medicine Hat/Cancarb 11 Cogeneration 2001 Redwater 40 Cogeneration 2001 Albian Muskeg River 170 Cogeneration 2002 Valleyview 45 Natural Gas 2002 Cold Lake 169 Cogeneration 2002 EVI 3 Natural Gas 2002 Elmworth Area 12 Natural Gas 2002 Red Deer 4 Cogeneration 2002 TransAlta Sundance #6 exp. 35 Coal 2002 TransCanada Co-gen & Bear Creek 80 Biomass 2002 Albian Muskeg River (ph. 2) 30 Cogeneration 2003 McBride Lake (TransAlta) East 1 Wind 2003 Oldman River 1, 2 32 Hydro 2003 Scotford 179 Cogeneration 2003 Calpine EnCana Calgary 300 Natural Gas 2003 Foster Creek 80 Cogeneration 2003

10 SAIT TransCanada (TransAlta) Irrican Suncor / Enbridge / EHN (TransAlta) EnCana / Nexen EPCOR EPCOR Talisman Highmark Renewables GW Power/ Nexen Kettle Hills Wind Energy Syncrude Canada Suncor City of Medicine Hat Suncor Enmax Purple Springs Kettle Hills Wind Energy Syncrude Mildred Lake Total New Generation On line ( ) Calgary 3 Cogeneration 2003 McKay River 165 Cogeneration 2003 McBride Lake 75 Wind 2003 Scotford 2 Cogeneration 2004 St. Mary River 7 Hydro 2004 Magrath 30 Wind 2004 Summerview 68 Wind 2004 Grande Prairie 25 Biomass 2005 Balzac 9 Cogeneration 2005 Genesee Coal 2005 Clover Bar 5 Biogas 2005 Edson 12 Cogeneration 2005 Vegreville 1 Biogas 2005 Taylor 3 Wind 2006 Soderglen 68 Wind 2006 Pincher Creek 9 Wind 2005 Aurora 80 Cogeneration 2006 Chin Chute 30 Wind 2006 Medicine Hat 10 Gas 2007 Fire Bag 80 Cogeneration 2007 Taber 81 Wind 2007 Pincher Creek 54 Wind 2007 Aurora 80 Cogeneration ,451 Source: Alberta Government Energy Department, Estimate based on EUB and AESO and industry information, 2007.

11 Proposed Generations Developer AltaGas Alberta Wind Energy Prairie Home Wind Energy Blue Trail Shell Canada TransAlta EPCOR ALBERTA POWER CNRL ECB Enviro North America EnCana Montant Alberta Tie Line OPTI/Nexen Sundance Forest Industries TransAlta TransAlta Wind Power Castle Rock Wind Power Prairie Greenwind Power Yagos Enviro N. America Location Proposed Capacity (MW) Type Status Southern Alberta 14 Gas 2007 Pincher Creek 50 Wind 2007 County of Warner 12 Wind 2007 Macleod Flats 66 Wind 3Q Caroline 20 Cogeneration 4Q 2007 SD 4 Upgrades 45 Coal 4Q 2007 Clover Bar 45 Gas 2007 Cyr's Ridge 18 Wind Sennet 35 Wind St Henry 72 Wind Fort McMurray 101 Cogeneration Primrose East 85 Cogeneration Lethbridge 3 Biomass Medicine Hat 85 Cogeneration Lethbridge 300 Interconnection Fort McMurray 170 Bitumen Edson 10 Biomass Keephills Upgrades Sundance Upgrades 30 Coal Coal Pincher Creek 112 Wind Pincher Creek 115 Wind Pincher Creek 100 Wind Lethbridge 3.2 Bio-Mass (cogen) 2008

12 EPCOR Greenwind Power Riverside Greenwind Power Hucik Greenwind Power Zoratti Kettles Hill Heritage TransAlta Seven Persons CNRL West WindEau MEG Energy Shell Canada Suncor Stage 3 West WindEau Wind Power Castle Rock #2 Windrise Power Deer Creek Energy EPCOR ENMAX ENMAX Imperial Kearl Phase 1 Luscar CNRL Shell Canada Petro- Canada/UTS TransAlta/ EPCOR Petro-Canada Clover Bar 100 Gas 2008 Pincher Creek 100 Wind 2008 Pincher Creek 140 Wind Pincher Creek 100 Wind Pincher Creek 70 Wind Medicine Hat 120 Wind Summerview 63 Wind Fort McMurray 85 Cogeneration Cypress Hills 200 Wind Christina Lake 85 Cogeneration Carmon Creek 185 Cogeneration Fort McMurray 170 Cogeneration Waterton 150 Wind Cypress Hills 200 Wind Pincher Creek 350 Wind Soderglen 99 Wind Fort McMurray 85 Cogeneration Clover Bar 100 Gas Calgary 50 Cogeneration Southern Alberta 1200 Gas Fort McMurray 85 Cogeneration Brooks area 450 Coal Primrose East 85 Cogeneraton Jackpine 170 Cogeneration Waterton 150 Wind Dunvegan 100 Hydro Fort McMurray 85 Cogeneration Keephills #3 450 Coal MacKay River 190 Cogeneration 2013+

13 TransAlta/ SD3 Upgrades CNRL Horizon Phase 3 Deer Cr. Joslyn Plant N. Imperial Oil Kearl Phase 2 Petro-Canada Total Proposed Generation Wabamun 40 Coal Fort McMurray 85 Gas Fort McMurray 85 Gas Fort McMurray 85 Gas Meadow Creek 170 Cogeneration ,189 *U/C denotes "Under Construction" Source: Alberta Government, EUB Information

Calculation of the Grid Emission Intensity Factor for Alberta

Calculation of the Grid Emission Intensity Factor for Alberta Calculation of the Grid Emission Intensity Factor for Alberta Using the Wind Energy Working Group s Proposed Methodology Disclaimer The information and data provided in this report has been obtained or

More information

ALBERTA LINEAR PROPERTY ASSESSMENT MINISTER S GUIDELINES

ALBERTA LINEAR PROPERTY ASSESSMENT MINISTER S GUIDELINES 2009 ALBERTA LINEAR PROPERTY ASSESSMENT MINISTER S GUIDELINES Copyright of the Statutes and Regulations, whether in print or electronic format, belongs to the Province of Alberta. No person may reproduce

More information

ALBERTA LINEAR PROPERTY ASSESSMENT MINISTER S GUIDELINES ALBERTA MUNICIPAL AFFAIRS AND HOUSING

ALBERTA LINEAR PROPERTY ASSESSMENT MINISTER S GUIDELINES ALBERTA MUNICIPAL AFFAIRS AND HOUSING 2007 ALBERTA LINEAR PROPERTY ASSESSMENT MINISTER S GUIDELINES ALBERTA MUNICIPAL AFFAIRS AND HOUSING Copyright of the Statutes and Regulations, whether in print or electronic format, belongs to the

More information

2018 Market Share Offer Control Report

2018 Market Share Offer Control Report 2018 Market Share Offer Control Report June 7, 2018 Taking action to promote effective competition and a culture of compliance and accountability in Albertaʹs electricity and retail natural gas markets

More information

Long Term Adequacy Metrics February 2015

Long Term Adequacy Metrics February 2015 Long Term Adequacy Metrics February 2015 Introduction The following report provides information on the long term adequacy of the Alberta electric energy market. The report contains metrics that include

More information

Cogeneration & Carbon Management Key Issues in the Design of Carbon Management Policies and Regulations in Alberta

Cogeneration & Carbon Management Key Issues in the Design of Carbon Management Policies and Regulations in Alberta Cogeneration & Carbon Management Key Issues in the Design of Carbon Management Policies and Regulations in Alberta Paula McGarrigle Managing Director Solas Energy Consulting Inc. Suite 119, 2137 33 Avenue

More information

2017 Assessment Year Request for Information. Reference Guide. Operators of Electric Power Systems. (Generation)

2017 Assessment Year Request for Information. Reference Guide. Operators of Electric Power Systems. (Generation) 2017 Assessment Year Request for Information Reference Guide Operators of Electric Power Systems (Generation) Municipal Affairs Contents The Linear Property Operator s Responsibility/ Purpose of the 2017

More information

The Integration of CO 2 Transportation and Sequestration Calgary, Alberta March 27, 2008

The Integration of CO 2 Transportation and Sequestration Calgary, Alberta March 27, 2008 Calgary Chamber of Commerce The Integration of CO 2 Transportation and Sequestration Calgary, Alberta March 27, 2008 Chuck Szmurlo Vice President, Energy Technology & Power Generation Enbridge Inc. Enbridge

More information

AESO Considerations and Experiences with Development of Wind Facility Interconnection

AESO Considerations and Experiences with Development of Wind Facility Interconnection AESO Considerations and Experiences with Development of Wind Facility Interconnection John H. Kehler, Senior Technical Specialist BC Focused Wind Workshop January 25-26, 2005 Topics Background on Alberta

More information

Your guide to the. SOUTHERN ALBERTA Transmission Reinforcement

Your guide to the. SOUTHERN ALBERTA Transmission Reinforcement Your guide to the SOUTHERN ALBERTA Transmission Reinforcement OUR TRANSMISSION LINES TRANSPORT THE POWER YOU USE EVERY DAY. Edmonton Red Deer Calgary Lethbridge 85% AltaLink s transmission system efficiently

More information

Session III Major Investment Projects - Canada

Session III Major Investment Projects - Canada BIREGIONAL WEC FORUM NORTH AMERICA, LATIN AMERICA & THE CARIBBEAN Session III Major Investment Projects - Canada John Ritchie Hatch Acres Inc. Niagara Falls, Canada Presentation Outline 1. Canada s Energy

More information

Supporting Co-Generation Through Alberta s Climate Leadership Plan

Supporting Co-Generation Through Alberta s Climate Leadership Plan Supporting Co-Generation Through Alberta s Climate Leadership Plan Prepared for the Oil Sands Community Alliance (OSCA) A Division of the Canadian Association of Petroleum Producers (CAPP) August 3, 2017

More information

Understanding Bill 50

Understanding Bill 50 1 Understanding Bill 50 Major Players: Energy Utilities Board (EUB): Prior to 2008, the EUB was the governing body responsible for regulating the entire energy industry in Alberta, including transmission

More information

PARTICULATE MATTER AND OZONE MANAGEMENT FACT SHEET ( )

PARTICULATE MATTER AND OZONE MANAGEMENT FACT SHEET ( ) PARTICULATE MATTER AND OZONE MANAGEMENT FACT SHEET (2010 2012) April 2014 What is PM 2.5? Particulate matter can be emitted by any combustion source. PM 2.5 is fine particulate matter less than 2.5 micrometres

More information

Tri-Municipal Industrial Partnership

Tri-Municipal Industrial Partnership Tri-Municipal Industrial Partnership Industrial Area Structure Plan Public Open House October 24 & 25, 2018 Outline 1. Introduction 2. Review Project Aims & Objectives 3. Planning Context 4. Constraints

More information

WindRiver Power Corp.

WindRiver Power Corp. AESO Stakeholder Consultation Key Transmission Initiatives Stakeholder Questions/Comments and AESO Responses June 9, 2008 Stakeholder Consultation Session The AESO would like to take this opportunity to

More information

TransCanada Power Market Update January 2018

TransCanada Power Market Update January 2018 Forward Prices Table TransCanada Flat 7x24 ($/MWh) AB - 6x16 On Peak ($/MWh) AB - Off-Peak ($/MWh) AECO Gas ($/GJ) Heat Rate BOM $42. $49.56 $32.76 $1.78 23.6 February $39.75 $46.51 $31.1 $1.69 23.5 218

More information

Preliminary Report to Alberta Electric System Operator. Transmission Costs. April 19, 2006

Preliminary Report to Alberta Electric System Operator. Transmission Costs. April 19, 2006 Preliminary Report to Alberta Electric System Operator Transmission Costs April 19, 2006 PS Technologies Arnie Reimer, P. Eng. Table of Contents 1. Overview...2 2. Bulk System Coincidence...3 2.1 Alberta

More information

Water Conservation, Efficiency, and Productivity Plan Electric Power Generation

Water Conservation, Efficiency, and Productivity Plan Electric Power Generation GUIDE Water Conservation, Efficiency, and Productivity Plan Electric Power Generation August 2012 Acknowledgements Industry members associated with this document support the important principles of the

More information

Net energy returns from unconventional oil: Implications for the environment

Net energy returns from unconventional oil: Implications for the environment Net energy returns from unconventional oil: Implications for the environment Full pathway (point of use) net energy returns for pathways and industry [GJ/GJ] 6 5 4 3 2 1 0 Jan70 National Geographic NER

More information

Alberta's Water Resource Allocation and Management System:

Alberta's Water Resource Allocation and Management System: Alberta's Water Resource Allocation and Management System: A Review of the Current Water Resource Allocation System in Alberta W.L. (Vic) Adamowicz University of Alberta June 2010 David Percy University

More information

The Canadian Oil Sands in the Context of the Global Energy Demand

The Canadian Oil Sands in the Context of the Global Energy Demand Extended Abstract for 17 th Convocation of the International Council of Academies of Engineering and Technological Sciences (CAETS), Tokyo, Japan, October 2007. The Canadian Oil Sands in the Context of

More information

Environmental. Performance

Environmental. Performance Letter Environmental to Shareholders Performance TransAlta is transitioning our generation mix and putting our focus onto less carbon intensive fuels. By 2025, we anticipate that coal will account for

More information

Green Building Offsets in Alberta Challenges and Opportunities. Chelsea Thomson Capital Power Corporation October 25, 2012

Green Building Offsets in Alberta Challenges and Opportunities. Chelsea Thomson Capital Power Corporation October 25, 2012 Green Building Offsets in Alberta Challenges and Opportunities Chelsea Thomson Capital Power Corporation cthomson@capitalpower.com October 25, 2012 1 Capital Power Capital Power (CPX:TSX) is a growth-oriented

More information

Company Introduction

Company Introduction Company Introduction Zachry Canada Ltd. (Zachry) is a Canadian owned multi-disciplined consulting engineering firm. Zachry has been providing professional engineering services since 1988 to industrial

More information

Alberta Transmission System Transmission Cost Causation Update. September 15, Prepared for the. Alberta Electric System Operator (AESO)

Alberta Transmission System Transmission Cost Causation Update. September 15, Prepared for the. Alberta Electric System Operator (AESO) Alberta Transmission System 2006 Transmission Cost Causation Update September 15, 2006 Prepared for the Alberta Electric System Operator (AESO) PS Technologies Inc. Arnie Reimer, P. Eng. Table of Contents

More information

Alberta Power Markets 101

Alberta Power Markets 101 Alberta Power Markets 101 BLG and its Electricity Markets Group National Law Firm: Over 700 lawyers Offices in Alberta, British Columbia, Ontario and Quebec BLG Electricity Markets Group: Over 40 lawyers

More information

Environmental Baseline Study: Noise. Total E&P Canada Ltd. Calgary, Alberta

Environmental Baseline Study: Noise. Total E&P Canada Ltd. Calgary, Alberta Environmental Baseline Study: Noise Total E&P Canada Ltd. Calgary, Alberta Table of Contents Table of Contents 1 Introduction... 1-1 1.1 Background... 1-1 1.2 Focus of Baseline Investigations... 1-1 1.3

More information

Kearl Kearl Oil Sands Project Project Description November 2003

Kearl Kearl Oil Sands Project Project Description November 2003 earl Kearl Oil Sands Project Project Description November 2003 PROPOSED DEVELOPMENT Imperial Oil Resources (Imperial) and ExxonMobil Canada Ltd. (ExxonMobil) are advancing public consultation and other

More information

2016 YEAR IN REVIEW PROJECT HIGHLIGHTS ENVIRONMENT PEOPLE CUSTOMERS COMMUNITY

2016 YEAR IN REVIEW PROJECT HIGHLIGHTS ENVIRONMENT PEOPLE CUSTOMERS COMMUNITY 2016 ANNUAL REPORT At ENMAX, our mission is clear we power the potential of people, businesses and communities by safely and responsibly providing electricity and energy services. In 2016, we delivered

More information

The Nuclear Energy Option in Alberta. Alberta Research Council and Idaho National Laboratory

The Nuclear Energy Option in Alberta. Alberta Research Council and Idaho National Laboratory The Nuclear Energy Option in Alberta submitted by Alberta Research Council and Idaho National Laboratory to the Government of Alberta Nuclear Expert Panel on October 1, 2008 The Alberta Research Council

More information

Strathcona County. Living.Refined.

Strathcona County. Living.Refined. Strathcona County Living.Refined. Agenda What is Strathcona County? Strathcona County By The Numbers Alberta s Industrial Heartland Association Adding Value to Alberta Future Outlook Opportunities & Challenges

More information

Decision MEG Energy Corp. Amend Christina Lake Industrial System Designation. December 15, 2011

Decision MEG Energy Corp. Amend Christina Lake Industrial System Designation. December 15, 2011 Decision 2011-496 December 15, 2011 The Alberta Utilities Commission Decision 2011-496: Application No. 1607774 Proceeding ID No. 1505 December 15, 2011 Published by The Alberta Utilities Commission Fifth

More information

TransAlta Corporation. Investor Presentation January 2018

TransAlta Corporation. Investor Presentation January 2018 TransAlta Corporation Investor Presentation January 2018 1 Forward Looking Statements This presentation includes forward-looking statements or information (collectively referred to herein as forward-looking

More information

TransAlta Corporation. Investor Presentation March 2018

TransAlta Corporation. Investor Presentation March 2018 TransAlta Corporation Investor Presentation March 2018 1 Forward Looking Statements This presentation includes forward-looking statements or information (collectively referred to herein as forward-looking

More information

Renewable and Alternative Energy - Alberta. National Renewable Energy Forum April Susan Carlisle Director, Alternative Energy

Renewable and Alternative Energy - Alberta. National Renewable Energy Forum April Susan Carlisle Director, Alternative Energy Renewable and Alternative Energy - Alberta National Renewable Energy Forum April 2 2013 Susan Carlisle Director, Alternative Energy What is Driving Alberta Today? Market Access Infrastructure Social License

More information

Alberta s Irrigation Water Management Challenges

Alberta s Irrigation Water Management Challenges Alberta s Irrigation Water Management Challenges - The Need For Water Measurement - 2010 Water Measurement Workshop July 14-15, 2010 Lethbridge, Alberta Alberta s Water Challenges Increasing public pressure

More information

Parsons Creek Aggregates Project. Part D: Environmental Impact Assessment (EIA) Methodology

Parsons Creek Aggregates Project. Part D: Environmental Impact Assessment (EIA) Methodology Part D: Environmental Impact Assessment (EIA) Methodology Table of Contents D. ENVIRONMENTAL IMPACT ASSESSMENT METHODOLOGY... 1 D.1 EIA TERMS OF REFERENCE... 1 D.2 SCOPE OF THE ASSESSMENT... 2 D.2.1 Scope

More information

Pressure Communication

Pressure Communication Pressure Communication Industry, government collaborate on gas over bitumen R&D BY DEBORAH JAREMKO Slant drilling has helped push bitumen development, but more advances are needed 44 Oilweek February 2006

More information

Investor Presentation September 2016

Investor Presentation September 2016 Investor Presentation September 2016 1 LEGAL DISCLAIMER Statements made by representatives for ATCO Ltd. and information provided in this presentation may be considered forward-looking statements. By their

More information

Canadian Wind Market Case Study. Wind Power Development Workshop Denver, July 19, 2007 Uwe Roeper - ORTECH

Canadian Wind Market Case Study. Wind Power Development Workshop Denver, July 19, 2007 Uwe Roeper - ORTECH Canadian Wind Market Case Study Wind Power Development Workshop Denver, July 19, 2007 Uwe Roeper - ORTECH ORTECH Consultants Energy & Environment 35 Staff Financial Side (ORTECH Power) Sector research

More information

Fort McKay Specific Assessment

Fort McKay Specific Assessment SURFACE WATER HYDROLOGY Fort McKay Specific Assessment Fort McKay Industry Relations Corporation March 2010 Contents 4.0... 1 4.1 Fort McKay s Key Concerns Related to Surface Water... 1 4.2 Fort McKay

More information

APPENDIX B. Provost to Edgerton and Nilrem to Vermilion Transmission Reinforcement Long-term Outlook Load and Generation Forecasts

APPENDIX B. Provost to Edgerton and Nilrem to Vermilion Transmission Reinforcement Long-term Outlook Load and Generation Forecasts APPENDIX B Provost to Edgerton and Nilrem to Vermilion Transmission Reinforcement 2016 Long-term Outlook Load and Generation 1 Introduction 1.1 Load and generation forecasts are an essential input to the

More information

Natural Gas Use in Alberta s Oil Sands Industry. Outline

Natural Gas Use in Alberta s Oil Sands Industry. Outline Natural Gas Use in Alberta s Oil Sands Industry CERI North American Natural Gas Conference March 1, 2004 1 Outline Oil Sands Industry Overview Bitumen and Synthetic Crude Oil Supply Projections Oil Sands

More information

Corey J. De La Mare. Education B.Sc., (Zoology) University of Alberta, 1995 M.Sc. (Wildlife Biology), University of Alberta, In Progress

Corey J. De La Mare. Education B.Sc., (Zoology) University of Alberta, 1995 M.Sc. (Wildlife Biology), University of Alberta, In Progress Education B.Sc., (Zoology) University of Alberta, 1995 M.Sc. (Wildlife Biology), University of Alberta, In Progress Affiliations Alberta Society of Professional Biologists (Director 2005-Current)) Alberta

More information

Q2/2016 Quarterly Report

Q2/2016 Quarterly Report April June 2016 July 29, 2016 Taking action to promote effective competition and a culture of compliance and accountability in Albertaʹs electricity and retail natural gas markets www.albertamsa.ca Table

More information

Kearl. Project Description Update Kearl Mine Development

Kearl. Project Description Update Kearl Mine Development Project Description Update Mine Development May 2006 This document contains forward-looking information on future production, project start-ups and future capital spending. Actual results could differ

More information

NWGA Members: 1914 Willamette Falls Dr., #255 West Linn, OR (503) Avista Corporation. Cascade Natural Gas Co.

NWGA Members: 1914 Willamette Falls Dr., #255 West Linn, OR (503) Avista Corporation. Cascade Natural Gas Co. 1914 Willamette Falls Dr., #255 West Linn, OR 97068 (503) 344-6637 www.nwga.org NWGA Members: Avista Corporation Cascade Natural Gas Co. FortisBC Energy Intermountain Gas Co. NW Natural Puget Sound Energy

More information

SUNDANCE 7 January 2014

SUNDANCE 7 January 2014 Artist rendering of a combined-cycle natural gas power plant. SUNDANCE 7 January 2014 Project Information Booklet Table of Contents Introduction to Sundance 7 1 TransAlta and MidAmerican 1 Project location

More information

Alberta Electric System Operator

Alberta Electric System Operator Decision 2014-004 Goose Lake to Chapel Rock Southern Alberta Transmission Reinforcement Needs Identification Document Amendment January 27, 2014 The Alberta Utilities Commission Decision 2014-004: Goose

More information

Status of Social Economy Provision of Wind Electric Energy in Alberta. Photo: Wind turbines at Pincher Creek, AB

Status of Social Economy Provision of Wind Electric Energy in Alberta. Photo: Wind turbines at Pincher Creek, AB Status of Social Economy Provision of Wind Electric Energy in Alberta Photo: Wind turbines at Pincher Creek, AB Julie MacArthur BALTA B6 Researcher January 4, 2010 Wind electricity in Canada and Alberta

More information

Biomass supply and diesel requirements for cofeeding a bitumen upgrader in Alberta

Biomass supply and diesel requirements for cofeeding a bitumen upgrader in Alberta Engineering Conferences International ECI Digital Archives BioEnergy IV: Innovations in Biomass Conversion for Heat, Power, Fuels and Chemicals Proceedings Spring 6-12-2013 Biomass supply and diesel requirements

More information

Sustainable Forests, Sustainable Communities

Sustainable Forests, Sustainable Communities Sustainable Forests, Sustainable Communities The Future of Alberta s Southwestern Forests Citizens and associations from communities throughout southwestern Alberta have joined together to document serious

More information

Best Practices Awards

Best Practices Awards 2018 Workforce Development Award Information Booklet for Nominators & Nominees The Construction Owners Association of Alberta (COAA) provides leadership to enable the Alberta heavy industrial construction

More information

Alberta s Irrigation A Strategy for the Future

Alberta s Irrigation A Strategy for the Future Government Alberta s Irrigation A Strategy for the Future 2016/17 Strategy Measures Alberta's Irrigation Strategy for the Future Alberta's Irrigation - a Strategy for the Future 2016/17 Strategy Measures

More information

Alberta s Irrigation Infrastructure

Alberta s Irrigation Infrastructure Alberta s Irrigation Infrastructure Reservoir Diversion structure Dam Spillway River Reservoirs store and control primary water supplies for irrigation. In Alberta, most of the stored water is from spring

More information

Alberta s Oil Sands Resources, Production Growth,Products and Markets

Alberta s Oil Sands Resources, Production Growth,Products and Markets Alberta s Oil Sands Resources, Production Growth,Products and Markets Duke du Plessis. Senior Advisor Alberta Economic Development and Alberta Energy Research Institute Calgary, Alberta, Canada October

More information

WATER, AGRICULTURE & FOOD Alberta s Opportunities and Challenges

WATER, AGRICULTURE & FOOD Alberta s Opportunities and Challenges SUPPLY MANAGEMENT QUALITY WATER, AGRICULTURE & FOOD Alberta s Opportunities and Challenges Brent Paterson, P.Ag. Alberta Agriculture and Rural Development McGill Conference on Global Food Security October

More information

Part C. Environmental Impact Assessment Methodology

Part C. Environmental Impact Assessment Methodology Part C Environmental Impact Assessment Methodology TABLE OF CONTENTS Page C. ENVIRONMENTAL IMPACT ASSESSMENT METHODOLOGY... 1 C.1 INTRODUCTION... 1 C.2 ENVIRONMENTAL IMPACT ASSESSMENT CONSIDERATIONS...

More information

Section 1 - Introduction

Section 1 - Introduction Section 1 - Introduction Algar Lake SAGD Project Section 1 Project Introduction TABLE OF CONTENTS 1. PROJECT INTRODUCTION... 1 1.1 PROJECT BACKGROUND... 1 1.2 PROJECT PROPONENT... 1 1.3 PROJECT OVERVIEW...

More information

ECONOMICS, BARRIERS, AND RISKS OF OIL SHALE DEVELOPMENT IN THE UNITED STATES

ECONOMICS, BARRIERS, AND RISKS OF OIL SHALE DEVELOPMENT IN THE UNITED STATES ECONOMICS, BARRIERS, AND RISKS OF OIL SHALE DEVELOPMENT IN THE UNITED STATES Khosrow Biglarbigi Hitesh Mohan Peter Crawford Marshall Carolus INTEK, Incorporated 28 th USAEE/IAEE North American Conference

More information

New Opportunities in the Alberta Electricity Market. A BLG Overview

New Opportunities in the Alberta Electricity Market. A BLG Overview New Opportunities in the Alberta Electricity Market A BLG Overview April 2017 THE NEW ALBERTA ELECTRICITY OPPORTUNITY Renewable power will account for 30% of Alberta s generation by 2030 likely over 7,000

More information

ISA Calgary. September 26, 2013

ISA Calgary. September 26, 2013 ISA Calgary September 26, 2013 Canada s leading integrated energy company Focused on profitable growth and returning cash to shareholders The Suncor Advantage Largest reserves in the oil sands (1) Integrated

More information

1.0 DESIGN FORECAST...

1.0 DESIGN FORECAST... Table of Contents TABLE OF CONTENTS EXECUTIVE SUMMARY 1.0 DESIGN FORECAST... 1-1 1.1 INTRODUCTION... 1-1 1.2 ECONOMIC ASSUMPTIONS... 1-1 1.2.1 General Assumptions... 1-1 1.2.2 Average Field Price... 1-2

More information

Renewable Energy in Rural Alberta. Opportunities & Obstacles

Renewable Energy in Rural Alberta. Opportunities & Obstacles Renewable Energy in Rural Alberta Opportunities & Obstacles About Pembina 2010 marked the 25th anniversary of the Pembina Institute born in the wake of the Lodgepole Sour Gas blowout. Publications Sundance

More information

Analyzing New Opportunities for Large-Scale Wind in Alberta and Saskatchewan. David Hickey Vice President, Wind Power & Renewables Siemens Canada

Analyzing New Opportunities for Large-Scale Wind in Alberta and Saskatchewan. David Hickey Vice President, Wind Power & Renewables Siemens Canada Analyzing New Opportunities for Large-Scale Wind in Alberta and Saskatchewan David Hickey Vice President, Wind Power & Renewables Siemens Canada Calgary, Alberta June 2nd & 3rd, 2016 We make real what

More information

Oldman 2 Wind Farm Limited

Oldman 2 Wind Farm Limited Decision 2010-461 Oldman 2 Wind Farm Project September 24, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-461: Oldman 2 Wind Farm Project Application No. 1605398 Proceeding ID. 293 September 24, 2010

More information

Self Lubricated Transport of Bitumen Froth from Concept to Commercial Demonstration

Self Lubricated Transport of Bitumen Froth from Concept to Commercial Demonstration Self Lubricated Transport of Bitumen Froth from Concept to Commercial Demonstration Outline Background Technology Development Program Economic and Technical Screening of Bitumen Transfer Options Pilot

More information

Potential Implications of the AUC TCM Decision ( ) on the Alberta Electricity Market s Economic Efficiency

Potential Implications of the AUC TCM Decision ( ) on the Alberta Electricity Market s Economic Efficiency Potential Implications of the AUC TCM Decision (2013-135) on the Alberta Electricity Market s Economic Efficiency May 2013 Judy Chang Johannes Pfeifenberger Michael DeLucia Prepared for Copyright 2013

More information

TransCanada As at December 31, 2017

TransCanada As at December 31, 2017 TransCanada As at December 31, 2017 Natural Gas Pipeline In Development/Construction Regulated Natural Gas Storage Unregulated Natural Gas Storage Liquids Pipeline In Development/Construction Liquids Tank

More information

Canadian Clean Power Coalition: Clean Coal-Fired Power Plant Technology To Address Climate Change Concerns

Canadian Clean Power Coalition: Clean Coal-Fired Power Plant Technology To Address Climate Change Concerns Canadian Clean Power Coalition: Clean Coal-Fired Power Plant Technology To Address Climate Change Concerns Presented to Gasification Technologies 2002 San Francisco, CA October 27-30, 2002 Bob Stobbs,

More information

Renewable Energy Development in Alberta

Renewable Energy Development in Alberta Renewable Energy Development in Alberta September 23, 2017 Kamaal Zaidi Barrister and Solicitor LLM, JD, BSc Interesting Facts about Alberta Calgary-based companies have built and operated wind farms since

More information

MONTANA S ENERGY ECONOMY

MONTANA S ENERGY ECONOMY MONTANA S ENERGY ECONOMY EPDD Mission Foster creation of high quality jobs Increase tax base Increase Montana energy production The Schweitzer Energy Policy Long term, sustainable, reliable, and affordable

More information

2017 Long-term Outlook. Information Session July 25, 2017

2017 Long-term Outlook. Information Session July 25, 2017 2017 Long-term Outlook Information Session July 25, 2017 0 Welcome Overview of 2017 Long-term Outlook (2017 LTO) Questions will be answered at the end of the presentation Please use microphone when asking

More information

Meadow Creek West. Project overview:

Meadow Creek West. Project overview: Project overview: Meadow Creek West will be a steam assisted gravity drainage (SAGD) oil sands development in northeast Alberta. Meadow Creek West is an additional phase to our Meadow Creek project and

More information

Energy Storage Integration in Alberta s Energy Only Market. Kevin Dawson Director, Market Design Alberta Electric System Operator

Energy Storage Integration in Alberta s Energy Only Market. Kevin Dawson Director, Market Design Alberta Electric System Operator Energy Storage Integration in Alberta s Energy Only Market Kevin Dawson Director, Market Design Alberta Electric System Operator Outline The AESO and Alberta s Wholesale Electricity Market About the AESO

More information

Benthic Invertebrates

Benthic Invertebrates Climate and Hydrology Water Quality Sediment Quality Benthic Invertebrates Fish Populations Acid-Sensitive Lakes Technical Design and Rationale December 2009 RAMP: TECHNICAL DESIGN AND RATIONALE Prepared

More information

Ontario Power Generation s Executive Compensation Program. January 1, 2017

Ontario Power Generation s Executive Compensation Program. January 1, 2017 Ontario Power Generation s Executive Compensation Program January 1, 2017 1 A. Context: Ontario Power Generation () provides about half of the electricity used in Ontario, and does so at a cost that s

More information

Golder Associates Ltd. Edmonton. Employment History

Golder Associates Ltd. Edmonton. Employment History LASHA YOUNG Education B.Sc. Environmental and Conservation Sciences Major: Conservation Biology and Wildlife Management, University of Alberta, Edmonton, Alberta M.Sc.F., University of New Brunswick, Fredericton

More information

Canada-China Clean Energy Initiative & Annual Workshop

Canada-China Clean Energy Initiative & Annual Workshop The 2060 Project: Energy Pathways for BC and Canada Estimating an Idealized Carbon Tax Via Dispatch Protocols Amy Sopinka Ariane Ouellette Lawrence Pitt June 18 th, 2014 Canada-China Clean Energy Initiative

More information

Macquarie Power & Infrastructure Income Fund. Rob Roberti Analyst Day pqof`qiv=`lkcfabkqf^i

Macquarie Power & Infrastructure Income Fund. Rob Roberti Analyst Day pqof`qiv=`lkcfabkqf^i Macquarie Power & Infrastructure Income Fund Rob Roberti Analyst Day 2007 pqof`qiv=`lkcfabkqf^i High Quality Assets High quality wind, hydro & biomass assets Low-cost power sources Predictable annual production,

More information

SOUTH SASKATCHEWAN RIVER BASIN WATER ALLOCATION. May 2003 (Revised January 2005) Regional Services Southern Region

SOUTH SASKATCHEWAN RIVER BASIN WATER ALLOCATION. May 2003 (Revised January 2005) Regional Services Southern Region May 2003 (Revised January 2005) Regional Services Southern Region Executive Summary The Water Act governs the allocation of water via licences within the South Saskatchewan River basin. Licencing of 20,000

More information

Alberta s Climate Leadership Plan December 7, 2016

Alberta s Climate Leadership Plan December 7, 2016 Alberta s Climate Leadership Plan December 7, 2016 Toso Bozic P.Ag Bioenergy Specialist Alberta Agriculture and Forestry Alberta s Climate Leadership Plan National Context Canada s approach www.climatechange.gc.ca

More information

Supplying the entrepreneurial spirited reader with inspiration and practical information that will ensure success in agriculture.

Supplying the entrepreneurial spirited reader with inspiration and practical information that will ensure success in agriculture. CPM READERSHIP CIRCULATION DIGITAL EDITORIAL DATES & SPECIFICATIONS ENTREPRENEURS IN AGRICULTURE Supplying the entrepreneurial spirited reader with inspiration and practical information that will ensure

More information

Alberta Reliability Committee (ARC) Terms of Reference

Alberta Reliability Committee (ARC) Terms of Reference Alberta Reliability Committee (ARC) Terms of Reference Version: 1 Date: December 2014 Prepared by: Miranda Keating Erickson, Vice President Operations Jerry Mossing, Vice President Transmission Planning

More information

DEER CREEK ENERGY LIMITED JOSLYN NORTH MINE PROJECT

DEER CREEK ENERGY LIMITED JOSLYN NORTH MINE PROJECT DEER CREEK ENERGY LIMITED JOSLYN NORTH MINE PROJECT Section C ENVIRONMENTAL IMPACT ASSESSMENT (EIA) METHODOLOGY TABLE OF CONTENTS C. ENVIRONMENTAL IMPACT ASSESSMENT METHODOLOGY...C-1 C.1 (EIA) METHODOLOGY...C-1

More information

YOUR LOCAL DEVELOPER

YOUR LOCAL DEVELOPER YOUR LOCAL DEVELOPER ABOUT Alberta Wind Energy Corporation ( AWEC ) was formed in 2003 to develop independent wind farm projects. The Company is currently focused on developing several sites, taking a

More information

LEED. What does it mean for my facility and the Earth. Mike Bryson LEED AP

LEED. What does it mean for my facility and the Earth. Mike Bryson LEED AP LEED What does it mean for my facility and the Earth. Mike Bryson LEED AP What does it all mean?? LEED which stands for Leadership in Energy and Environmental Design, is a certification program focused

More information

FINAL REPORT. CO 2 Supply from the Fort McMurray Area Prepared By:

FINAL REPORT. CO 2 Supply from the Fort McMurray Area Prepared By: FINAL REPORT CO 2 Supply from the Fort McMurray Area 2005-2020 Prepared By: Guillermo Ordorica-Garcia, Ph.D., Sam Wong, M. Sc., and John Faltinson, MBA, P.Eng. ALBERTA RESEARCH COUNCIL INC. 250 Karl Clark

More information

The Evaluation of Options for CO 2

The Evaluation of Options for CO 2 The Evaluation of Options for CO 2 Extraction from Existing & New Coal-fired Power Plants Presented at the Gasification Technologies 2001 San Francisco, CA, October 7 10, 2001 M. McDonald, Director, Research

More information

MON TANA M EAN S BU SINE SS MONTANA TRANSMISSION FOR AMERICA CLEAN ENERGY AND TRANSMISSION DEVELOPMENT IN MONTANA AND THE WEST

MON TANA M EAN S BU SINE SS MONTANA TRANSMISSION FOR AMERICA CLEAN ENERGY AND TRANSMISSION DEVELOPMENT IN MONTANA AND THE WEST MON TANA M EAN S BU SINE SS MONTANA TRANSMISSION FOR AMERICA CLEAN ENERGY AND TRANSMISSION DEVELOPMENT IN MONTANA AND THE WEST MONTANA CLEAN ENERGY AND TRANSMISSION DEVELOPMENT Montana is energy country.

More information

electricity future REPORT TO COMMUNITIES

electricity future REPORT TO COMMUNITIES renewing our electricity future REPORT TO COMMUNITIES ReNEWing OUR RESPONSIBILITY As I listen to customers across Alberta, your expectations of our province s electricity system are clear. You want to

More information

Geothermal Energy Southern Alberta

Geothermal Energy Southern Alberta Geothermal Energy Southern Alberta Alberta s Energy Vision A global energy leader, recognized as a responsible world class energy supplier, an energy technology champion, a sophisticated energy consumer,

More information

Canadian Clean Power Coalition: Clean Coal Technologies & Future Projects Presented to. David Butler Executive Director

Canadian Clean Power Coalition: Clean Coal Technologies & Future Projects Presented to. David Butler Executive Director Canadian Clean Power Coalition: Clean Coal Technologies & Future Projects Presented to David Butler Executive Director Presentation Outline Canadian Clean Power Coalition (CCPC) Overview Technology Overview

More information

INVESTOR MEETING. Fort McKay

INVESTOR MEETING. Fort McKay INVESTOR MEETING Fort McKay December 15, 2015 2 Forward Looking Information This report contains statements about the Company s business outlook, objectives, plans, strategic priorities and other statements

More information

Alberta s Energy Markets: Opportunities and Challenges. Paul Tsounis Alberta Department of Energy Economics and Markets Branch June 2012

Alberta s Energy Markets: Opportunities and Challenges. Paul Tsounis Alberta Department of Energy Economics and Markets Branch June 2012 1 Alberta s Energy Markets: Opportunities and Challenges Paul Tsounis Alberta Department of Energy Economics and Markets Branch June 2012 Key Issues of the Day Uncertainties in Europe Greek elections GDP

More information

Pacific Gas and Electric Company. Cogeneration and Small Power Production Semi Annual Report

Pacific Gas and Electric Company. Cogeneration and Small Power Production Semi Annual Report Pacific Gas and Electric Company Cogeneration and Small Power Production Semi Annual Report Page 2 PACIFIC GAS AND ELECTRIC COMPANY SUMMARY OF PROJECTS s Currently Delivering* Project Type Number of Projects

More information

ALBERTA S ENERGY STORY

ALBERTA S ENERGY STORY ALBERTA S ENERGY STORY TABLE OF CONTENTS INTRODUCING ENERGY IQ 2 OVERVIEW OF ALBERTA 3 OIL SANDS 4 NATURAL GAS 8 COAL 12 RENEWABLE ENERGY 16 QUESTION & ANSWER Joe Dion on First Nations in the energy sector

More information

Jackpine Mine Expansion Project

Jackpine Mine Expansion Project Shell Canada Limited Application for the Approval of the Jackpine Mine Expansion Project Volume 1: Project Description December 2007 PREFACE Section P.1 APPLICATION FOR APPROVAL OF THE JACKPINE MINE EXPANSION

More information

The Public Interest: What Could It Mean For The ERCB and NRCB?

The Public Interest: What Could It Mean For The ERCB and NRCB? Vol. 23 No. 1, 2008 Pages 1-7 The Public Interest: What Could It Mean For The ERCB and NRCB? By Jodie Hierlmeier Staff Counsel Environmental Law Centre Introduction The Environmental Law Centre (ELC) recently

More information