1 Cogeneration & Carbon Management Key Issues in the Design of Carbon Management Policies and Regulations in Alberta Paula McGarrigle Managing Director Solas Energy Consulting Inc. Suite 119, Avenue S.W. Calgary Alberta T2T 1Z7 T: (403) E: January 28 th and 29 th, Calgary, Alberta, Canada
2 Overview History of Cogeneration in Alberta Drivers behind Cogeneration development in Alberta Economics of Cogeneration The future of Cogeneration in Alberta Solas Energy Consulting 2
3 Defining Cogeneration Integrated Standalone TransCanda Carseland Cogeneration produce electricity and steam Facilities often integrate waste energy into the production of power or steam. Facilities are built to either match steam or match power requirements. Solas Energy Consulting 3
4 Cogeneration In Alberta Alberta has experienced significant growth in Cogeneration 4,588 MW of installed capacity ~ 30% of total generation capacity Oil Sands development & Cogen Represents 67% of total installed Cogen capacity Other applications for Cogen in AB Chemical industry, conventional oil and gas, pulp and paper as well as hospitals, educational institutions Solas Energy Consulting 4
5 Ownership & Location of Cogen Suncor ATCO Syncrude TransCanada Dow Chemicals Nexen Medicine Hat CNRL MEG Imperial Oil Air Liquide Cenovus University of Alberta Shell AltaGas Southern Pacific Connacher Talisman University of Calgary Penn West SAIT Alberta s Cogen focused on Oil Sands in the North East Geographic Area 1000 Cogeneration Capacity (MW) by Owner NW 2% South 7% Central 12% Edmont on 1% owners NE 78% 0 REF: AESO REF: AESO Solas Energy Consulting 5
6 Drivers for Cogen Cogen driven by 3 main factors 1. Regulatory changes, 2. Improved economics, and 3. Demand growth requiring reliable power sources Solas Energy Consulting 6
7 Deregulation #1 Changing Regulatory Landscape Alberta Upgrading Capacity (MBPD) Alberta SAGD Production (MBPD) Electricity market deregulation, and industrial site designation were major drivers Alberta Cogeneration (MW) Class 43.2 Additions (MW) SGER
8 #2 Improved Economics Federal Tax Changes Accelerated capital cost depreciation; Class depreciation rate increased to 50% until High Heat Rates Alberta s market heat rates have been above cogeneration physical heat rate and therefore cogeneration facilities have generated positive cash flow. Industrial Site Designation Reduction in the ancillary service costs associated with power generation or load Alberta Specified Gas Emitters Regulation (SGER) Emissions Performance Credits SGER compares stand alone cogeneration to a reference technology. The use of the reference technology method has resulted in EPCs for cogeneration facilities. Combined Cycle electricity plant is compared to a target of tonnes CO 2 e/mwh. No reduction target is placed on the emissions associated with the electricity generated. The baseline for heat calculation assumes an 80% efficient boiler. ATCO - Muskeg River Plant Solas Energy Consulting 8
9 #3 Demand Growth & Reliability ATCO Scotford Cogeneration Facility Cogen concentrated in industries with high power demand Oil Sands upgrading, Steam Assisted Gravity Drainage (SAGD) and the chemical industry in Alberta have significant requirements for steam and power. SAGD has experienced exponential growth CAGR of 34.2% Oil Sands upgrading has more than doubled since 2001 Solas Energy Consulting 9
10 Economics of Cogeneration Levelized Cost ($/MWh) $200 $180 $160 Levelized Cost First Year Cost of Power LEVELIZED COST OF POWER $157 $163 $172 $140 $127 $132 $139 $120 $114 $100 $80 $84 $68 $92 $74 $92 $60 $40 $55 $44 $20 $0 Cogen Wind Coal CCGT SCGT Coal with CCS Hydro Solas Energy Consulting Wind Vision Technical Overview Report Cogeneration has the lowest levelized costs compared to alternatives in Alberta. (2016) Levelized cost of energy from a new cogeneration facility is higher than the Alberta forward power pool price. Solas Energy Consulting 10
11 Economics of Cogeneration Levelized Cost ($/MWh) Wind - CF =40% Simple C. Comb. C. - CF =20% - CF =50% Levelized Cost of Power (2016) LEVELIZED COST OF POWER - Components Cogen - CF =95% Solas Energy Consulting Wind Vision Technical Overview Report Coal - CF =93% Coal w CCS - CF =90% Hydro - CF =50% Taxes Repower Cost Capex CO2 Compliance Costs Generator Losses Fixed and Variable O&M Fuel Costs Offset Revenue Carbon revenue is positive (reducing levelized costs) however is not a significant factor. ISD s calculate their tariff using net generation and this creates savings compared to a standalone generation facility. Solas Energy Consulting 11
12 Future of Cogen in AB Oil Sands Growth Alberta s cogeneration development is indirectly dependent on Canada s climate change regulatory regime, because Oil sands growth is dependent on market access that is linked to climate policy. Transmission Availability/Reliability/Cost Northern AB could be susceptible to transmission contingencies. Delay in the Fort McMurray to Edmonton 500 kv Transmission line may increase the interest in self-generation, with cogen preferred. Transmission costs and therefore DTS charges are on the rise. This may stimulate additional cogeneration ISDs to reduce the cost of delivered power. Regulatory Treatment Potential changes in the treatment of cogeneration at the Provincial or Federal level may have profound impacts on size and continued investment in cogeneration. Air Quality Regional air shed limitations (Lower Athabasca) may impede extensive cogeneration development. Additional cogeneration in the region may tax the currently strained air shed. Solas Energy Consulting 12
13 Future of Cogeneration in AB AESO Long Term Outlook (2012) AESO Long Term Outlook (2012) Cogeneration capacity additions by 2022 are expected to total 6,200 MW or 29 per cent of supply mix. Same as current mix Addi ons (MW) Alberta Cogeneration (MW) The Oil Sands Developers Group 2011 Co- Gen Survey resulted in an estimate of 3,500 MW of additional cogeneration by (Estimate is higher than the AESO) 603 Solas Energy Consulting 13
14 Cogen & Carbon Compliance ALL FACILITIES COMPLIANCE Alberta s Carbon Compliance Cogeneration treatment under SGER is critical for Alberta compliance Cogeneration represents approximately 40 per cent (14,850 kt/39,930 kt) of the total avoided emissions since the SGER program was created. Solas Energy Consulting 14
15 Cogen & Carbon Compliance Future AB SGER Treatment Current treatment uses the following as baseline tonnes CO2e/MWh (Assumption for Electricity) 80% boiler efficiency Discussion on changing the assumptions tonnes CO2e/MWh 85% boiler efficiency Impact Reduced compliance or avoided emissions Reduction in economics of cogeneration. Solas Energy Consulting 15
16 Cogen & Carbon Compliance Nexen Balzac Power Station Federal Greenhouse Gas Emissions Regulations Cogeneration is considered a cross cutting issue since the technology is applied in multiple sectors. Treatment, or reduction required may vary by the type of industry that cogeneration is a part of. May result in cogeneration facilities also having an obligation to reduce emissions. Solas Energy Consulting 16
17 Key Questions to Consider Are EPC s critical for incenting cogeneration in the Oil Sands industry? Is cogeneration business as usual? If cogeneration is considered business as usual what are the implications for SGER and cascading ramifications such as oil sands economics and Alberta s greenhouse gas emission reduction plan? Does the new Lower Athabasca Regional Plan ( LARP ) and pending federal air quality regulations restrict CCGT facilities as viable alternatives for oil sands upgrading and SAGD? Should Alberta policy makers consider emphasizing higher efficiency heat and power generation technology? - Fuel cells? Should renewable energy integration in oil sands be incented through policies directed at further reducing air quality and GHG emissions? Solas Energy Consulting 17
18 Key Questions to Consider Recommendations Integrity of the system is paramount. Evaluate if cogeneration meets business as usual. If so, look to include cogeneration into the baseline. If not, ensure baseline used for cogen is representative. Solas Energy Consulting 18
ALBERTA POWER MARKET
ALBERTA POWER MARKET www.canaxenergy.com Generating Capacity Generating Capacity [MW] Coal 5,840 Gas 4,434 Hydro 900 Wind 522 Biomass 184 Fuel Oil 13 Subtotal 11,892 Interconnections British Columbia 750
More informationSupporting Co-Generation Through Alberta s Climate Leadership Plan
Supporting Co-Generation Through Alberta s Climate Leadership Plan Prepared for the Oil Sands Community Alliance (OSCA) A Division of the Canadian Association of Petroleum Producers (CAPP) August 3, 2017
More informationCalculation of the Grid Emission Intensity Factor for Alberta
Calculation of the Grid Emission Intensity Factor for Alberta Using the Wind Energy Working Group s Proposed Methodology Disclaimer The information and data provided in this report has been obtained or
More informationA Clean Electricity Standard (CES) for Alberta
A Clean Electricity Standard (CES) for Alberta May 21, 2013 Version 1.3 Paula McGarrigle Solas Energy ConsulBng Inc. Presented to the Pembina Thought Leaders Forum PresentaBon Purpose The case for a Clean
More informationAlberta s Climate Change Strategy and Regulations
Alberta s Climate Change Strategy and Regulations A review of the first six years of the Specified Gas Emitters Regulation Justin Wheler, P.Eng. Alberta Environment and Sustainable Resource Development
More informationDecision MEG Energy Corp. Amend Christina Lake Industrial System Designation. December 15, 2011
Decision 2011-496 December 15, 2011 The Alberta Utilities Commission Decision 2011-496: Application No. 1607774 Proceeding ID No. 1505 December 15, 2011 Published by The Alberta Utilities Commission Fifth
More informationVittoria Bellissimo IECA Annual Canadian Conference May 27, 2014 A CONSUMER S PERSPECTIVE ON ALBERTA S ELECTRICITY MARKET
Vittoria Bellissimo IECA Annual Canadian Conference May 27, 2014 A CONSUMER S PERSPECTIVE ON ALBERTA S ELECTRICITY MARKET PRESENTATION OVERVIEW About IPCAA Market supply and demand outlook Delivered costs
More informationThe Role of Oil Sands Cogeneration in the 2030 Alberta Generation Mixture. Ariane Ouellette, Dr. Andrew Rowe and Dr. Peter Wild April
The Role of Oil Sands Cogeneration in the 2030 Alberta Generation Mixture Ariane Ouellette, Dr. Andrew Rowe and Dr. Peter Wild April 13 2013 Motivation Province of Alberta targets a 2050 GHG emissions
More informationNexen Inc. and CNOOC Canada Inc.
Decision 2012-330 Long Lake Project December 6, 2012 The Alberta Utilities Commission Decision 2012-330: Long Lake Project Application No. 1608729 Proceeding ID No. 2074 December 6, 2012 Published by The
More informationPublic policy participation
1 of 5 10/10/2016 11:43 Public policy participation Home > Vision and strategy > Public policy participation On this page: Economic policy Social policy Environment policy Greenhouse gas emissions policy
More informationConnacher Oil and Gas Limited
Decision 2010-094 Cogeneration Plant and Industrial System Designation March 2, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-094: Cogeneration Plant and Industrial System Designation Application No.
More informationLong Term Adequacy Metrics February 2015
Long Term Adequacy Metrics February 2015 Introduction The following report provides information on the long term adequacy of the Alberta electric energy market. The report contains metrics that include
More informationPengrowth Energy Corporation
Decision 2013-308 Lindberg SAGD Industrial System Designation August 20, 2013 The Alberta Utilities Commission Decision 2013-308: Lindberg SAGD Industrial System Designation Application No. 1609200 Proceeding
More informationThe Integration of CO 2 Transportation and Sequestration Calgary, Alberta March 27, 2008
Calgary Chamber of Commerce The Integration of CO 2 Transportation and Sequestration Calgary, Alberta March 27, 2008 Chuck Szmurlo Vice President, Energy Technology & Power Generation Enbridge Inc. Enbridge
More informationAlberta s Climate Leadership Plan December 7, 2016
Alberta s Climate Leadership Plan December 7, 2016 Toso Bozic P.Ag Bioenergy Specialist Alberta Agriculture and Forestry Alberta s Climate Leadership Plan National Context Canada s approach www.climatechange.gc.ca
More informationAlberta's Renewable Electricity Program
Alberta's Renewable Electricity Program What is the Renewable Electricity Program? The volatility of electricity prices in a deregulated market like Alberta s make revenues from renewable energy too uncertain
More informationMeadow Creek West. Project overview:
Project overview: Meadow Creek West will be a steam assisted gravity drainage (SAGD) oil sands development in northeast Alberta. Meadow Creek West is an additional phase to our Meadow Creek project and
More informationInvesting in Alberta s Clean Energy Future A Framework. The Plan
The Plan What follows is an achievable plan to significantly reduce greenhouse gas (GHG) emissions from the electricity sector in Alberta. The plan enables a step change that will reduce emissions from
More informationCanada s Oil Sands. Energy Security. Environmental Sustainability. Economic Growth and Jobs. Shifting Supply and Demand
Canada s Oil Sands Canada s Oil Sands Energy Security Shifting Supply and Demand the world is counting on Canada s oil Access to existing and new markets Environmental Sustainability Greenhouse gas emissions
More informationRenewable and Alternative Energy - Alberta. National Renewable Energy Forum April Susan Carlisle Director, Alternative Energy
Renewable and Alternative Energy - Alberta National Renewable Energy Forum April 2 2013 Susan Carlisle Director, Alternative Energy What is Driving Alberta Today? Market Access Infrastructure Social License
More informationKearl. Project Description Update Kearl Mine Development
Project Description Update Mine Development May 2006 This document contains forward-looking information on future production, project start-ups and future capital spending. Actual results could differ
More information2011 Oil Sands Co-Generation Report
The Oil Sands Developers Group (OSDG) Co-Generation & Power Infrastructure Committee 211 Oil Sands Co-Generation Report Oil Sands Co Generation Potential Survey June 211 Prepared by Genalta Power for the
More informationAlberta Power Markets 101
Alberta Power Markets 101 BLG and its Electricity Markets Group National Law Firm: Over 700 lawyers Offices in Alberta, British Columbia, Ontario and Quebec BLG Electricity Markets Group: Over 40 lawyers
More informationNexen Inc. OPTI Canada Inc.
Decision 2010-006 Nexen Inc. OPTI Canada Inc. Long Lake South Phase 1 Cogeneration Power Plant January 15, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-006: Nexen Inc. and OPTI Canada Inc. Long Lake
More informationInvestor Presentation September 2016
Investor Presentation September 2016 1 LEGAL DISCLAIMER Statements made by representatives for ATCO Ltd. and information provided in this presentation may be considered forward-looking statements. By their
More informationTransCanada Power Market Update January 2018
Forward Prices Table TransCanada Flat 7x24 ($/MWh) AB - 6x16 On Peak ($/MWh) AB - Off-Peak ($/MWh) AECO Gas ($/GJ) Heat Rate BOM $42. $49.56 $32.76 $1.78 23.6 February $39.75 $46.51 $31.1 $1.69 23.5 218
More informationAlberta & Saskatchewan Renewable Energy Finance Summit Alberta and Saskatchewan Climate Policy Developments and Implications for Renewables
Alberta & Saskatchewan Renewable Energy Finance Summit 2018 Alberta and Saskatchewan Climate Policy Developments and Implications for Renewables Lisa (Elisabeth) DeMarco DeMarco Allan LLP lisa@demarcoallan.com
More informationEnergy Efficiency Advisory Panel Technical Session Community Energy Systems August 23, 2016
SESSION SUMMARY Community Energy System Technical Sessions Tuesday, August 23, 2016 8:00 am 12:00 noon Wales Room, Federal Building 9820-107 Street NW, Edmonton Intended Outcomes Participants understand
More informationElectricity Grid Displacement Factor Draft Discussion Paper
Electricity Grid Displacement Factor Draft Discussion Paper Draft for Comment December 01 Title: Electricity Grid Displacement Factor Draft Discussion Paper Number: 1.0 Program Name: Effective Date: This
More informationSong P. Sit 1 and David Layzell CESAR/University of Calgary Viola Birss, Kunal Karen and Jason Young CAESR-Tech/University of Calgary
Advanced Cogeneration Technologies to Reduce SAGD GHG Emissions Presented at New Technologies for In Situ Oil Sands Facilities 2017 May 30 th in Calgary Song P. Sit 1 and David Layzell CESAR/University
More informationStrathcona County. Living.Refined.
Strathcona County Living.Refined. Agenda What is Strathcona County? Strathcona County By The Numbers Alberta s Industrial Heartland Association Adding Value to Alberta Future Outlook Opportunities & Challenges
More informationOverview of Alberta s Greenhouse Gas Reduction Program
Overview of Alberta s Greenhouse Gas Reduction Program Kate Rich Executive Director, Air and Climate Change Policy Branch Alberta Environment and Parks World Bank Partnership for Market Readiness May 29,
More informationRenewable Energy and a Vision for a Prosperous and Clean Alberta. Presentation March 2015
Renewable Energy and a Vision for a Prosperous and Clean Alberta Presentation March 2015 Outline About Greengate Power Corporation Vision for Alberta Global Renewable Energy Leader The Age of Renewables
More informationSession III Major Investment Projects - Canada
BIREGIONAL WEC FORUM NORTH AMERICA, LATIN AMERICA & THE CARIBBEAN Session III Major Investment Projects - Canada John Ritchie Hatch Acres Inc. Niagara Falls, Canada Presentation Outline 1. Canada s Energy
More informationCOGENERATION: Opportunities in Today s Power Markets
COGENERATION: Opportunities in Today s Power Markets COGEN Europe Annual Conference 2005 10-11 March 2005 Paul Dillon Planning Executive: Europe, Middle East and Africa ExxonMobil Refining & Supply Taking
More informationALBERTA LINEAR PROPERTY ASSESSMENT MINISTER S GUIDELINES
2009 ALBERTA LINEAR PROPERTY ASSESSMENT MINISTER S GUIDELINES Copyright of the Statutes and Regulations, whether in print or electronic format, belongs to the Province of Alberta. No person may reproduce
More informationNatural Gas Use in Alberta s Oil Sands Industry. Outline
Natural Gas Use in Alberta s Oil Sands Industry CERI North American Natural Gas Conference March 1, 2004 1 Outline Oil Sands Industry Overview Bitumen and Synthetic Crude Oil Supply Projections Oil Sands
More informationPreliminary Report to Alberta Electric System Operator. Transmission Costs. April 19, 2006
Preliminary Report to Alberta Electric System Operator Transmission Costs April 19, 2006 PS Technologies Arnie Reimer, P. Eng. Table of Contents 1. Overview...2 2. Bulk System Coincidence...3 2.1 Alberta
More informationOntario s Climate Change Strategy The Move towards Cap & Trade. Karl Johannson Senior Vice President, Canadian Power TransCanada Corporation
Ontario s Climate Change Strategy The Move towards Cap & Trade Karl Johannson Senior Vice President, Canadian Power TransCanada Corporation Forward-Looking Information This presentation may contain certain
More informationAlberta s Contribution. Alberta Party Caucus Climate Change Plan
November 18, 2015 Contents INTRODUCTION... 1 THE ALBERTA PARTY CAUCUS CLIMATE CHANGE PLAN... 2 1. Clearly articulate support for continued growth of Alberta s energy sector, including the oil sands...
More informationALBERTA LINEAR PROPERTY ASSESSMENT MINISTER S GUIDELINES ALBERTA MUNICIPAL AFFAIRS AND HOUSING
2007 ALBERTA LINEAR PROPERTY ASSESSMENT MINISTER S GUIDELINES ALBERTA MUNICIPAL AFFAIRS AND HOUSING Copyright of the Statutes and Regulations, whether in print or electronic format, belongs to the
More informationApplications of Nuclear Energy to Oil Sands and Hydrogen Production
Applications of Nuclear Energy to Oil Sands and Hydrogen Production IAEA Conference on Opportunities and Challenges for WCR in the 21 st Century, Vienna, Austria R. Duffey, S. Kuran and A. Miller 27-30
More informationEnergy Storage Integration in Alberta s Energy Only Market. Kevin Dawson Director, Market Design Alberta Electric System Operator
Energy Storage Integration in Alberta s Energy Only Market Kevin Dawson Director, Market Design Alberta Electric System Operator Outline The AESO and Alberta s Wholesale Electricity Market About the AESO
More informationEnhancing a Business Case for Cogeneration Systems
Integrated Energy Solutions for Every Community Enhancing a Business Case for Cogeneration Systems Markham DES, Recip trigen Thermal Energy Issues Benefits of CHP Systems System Reliability Air Pollution
More informationAlberta s Climate Leadership Plan. Alberta Climate Change Office. May 17, 2017
Alberta s Climate Leadership Plan Alberta Climate Change Office May 17, 2017 Outline Context Setting Alberta s Climate Leadership Plan Measures of Success Context Setting Alberta Emissions Profile 267
More informationGlobe 2016 Outcome. What s in the Vancouver Declaration? Can we Influence? AREA presentation March 19, 2016 To Calgary Renewable Energy Meetup
Globe 2016 Outcome http://www.abrenewableenergy.ca What s in the Vancouver Declaration? Can we Influence? AREA presentation March 19, 2016 To Calgary Renewable Energy Meetup Vancouver Declaration on Clean
More informationThe Canadian Oil Sands in the Context of the Global Energy Demand
Extended Abstract for 17 th Convocation of the International Council of Academies of Engineering and Technological Sciences (CAETS), Tokyo, Japan, October 2007. The Canadian Oil Sands in the Context of
More informationMOPR and New Co-generation Capacity
MOPR and New Co-generation Capacity August 22, 2017 www.poweradvisoryllc.com CWG Submission to AESO Workgroups Summary and Key Points The MOPR proposal impedes competition with the sole benefit of higher
More informationImpacts of an 80% Clean Energy Standard on the Electricity Generation Sector: Technology and Policy Design Sensitivities
Impacts of an 80% Clean Energy Standard on the Electricity Generation Sector: Technology and Policy Design Sensitivities 27 July, 2011 Daniel C. Steinberg Andrew Martinez Matthew Mowers NREL is a national
More information2018 Market Share Offer Control Report
2018 Market Share Offer Control Report June 7, 2018 Taking action to promote effective competition and a culture of compliance and accountability in Albertaʹs electricity and retail natural gas markets
More informationAlberta Electric System Operator
Decision 22274-D01-2018 Provost to Edgerton and Nilrem to Vermilion Transmission System Reinforcement January 12, 2018 Alberta Utilities Commission Decision 22274-D01-2018 Provost to Edgerton and Nilrem
More information2017 Long-term Outlook. Information Session July 25, 2017
2017 Long-term Outlook Information Session July 25, 2017 0 Welcome Overview of 2017 Long-term Outlook (2017 LTO) Questions will be answered at the end of the presentation Please use microphone when asking
More informationOverview of Alberta Climate Change Policy
Overview of Alberta Climate Change Policy Solar West 2017 Alberta Climate Change Office May 10, 2017 1 Purpose/ Outline Context Alberta GHG emissions Climate Leadership Plan Carbon Levy Federal / Provincial
More informationCanada s oil sands the in situ producers perspective
Canada s oil sands the in situ producers perspective February 11, 2010 By: Chris Bloomer (Presented by: Gerald W. Bruce, IOSA member) IOSA Member Petrobank Who is IOSA? In situ Oil Sands Alliance Independent
More informationLevelized Cost of New Generation Resources in the Annual Energy Outlook 2012
July 2012 Levelized Cost of New Generation Resources in the Annual Energy Outlook 2012 This paper presents average levelized costs for generating technologies that are brought on line in 2017 1 as represented
More informationTri-Municipal Industrial Partnership
Tri-Municipal Industrial Partnership Industrial Area Structure Plan Public Open House October 24 & 25, 2018 Outline 1. Introduction 2. Review Project Aims & Objectives 3. Planning Context 4. Constraints
More informationCESAR SCENARIOS COGENERATION OPTIONS FOR A 33,000 BPD SAGD FACILITY: GREENHOUSE GAS AND ECONOMIC IMPLICATIONS
Volume 1 Issue 3 October 2016 COGENERATION OPTIONS FOR A 33,000 BPD SAGD FACILITY: GREENHOUSE GAS AND ECONOMIC IMPLICATIONS David B. Layzell, PhD, FRSC Eric Shewchuk, BSc, P.Eng. Song P. Sit, PhD, P.Eng.
More informationAlberta s Oil Sands Resources, Production Growth,Products and Markets
Alberta s Oil Sands Resources, Production Growth,Products and Markets Duke du Plessis. Senior Advisor Alberta Economic Development and Alberta Energy Research Institute Calgary, Alberta, Canada October
More informationDecision Cenovus FCCL Ltd.
Decision 2012-196 Construct and Operate a 95-MW Cogeneration Power Plant, Construct and Operate Sunday Creek 539S Substation, Industrial System Designation and Interconnection of the Christina Lake Industrial
More informationECONOMICS, BARRIERS, AND RISKS OF OIL SHALE DEVELOPMENT IN THE UNITED STATES
ECONOMICS, BARRIERS, AND RISKS OF OIL SHALE DEVELOPMENT IN THE UNITED STATES Khosrow Biglarbigi Hitesh Mohan Peter Crawford Marshall Carolus INTEK, Incorporated 28 th USAEE/IAEE North American Conference
More informationPolicy Direction for Alberta s Capacity Market Framework
Policy Direction for Alberta s Capacity Market Framework August 15, 2017 Alberta Department of Energy Table of Contents Executive Summary... 1 1 Introduction... 2 2 Policy Direction for Alberta s Capacity
More informationCenovus Energy Discussion Paper on Alberta Climate Leadership
Cenovus Energy Discussion Paper on Alberta Climate Leadership For official submission: September 30, 2015 Contents 1.0 Overview... 1 2.0 Carbon pricing architecture... 3 A. Cogeneration... 4 B. Offsets...
More informationRenewable Energy Development in Alberta
Renewable Energy Development in Alberta September 23, 2017 Kamaal Zaidi Barrister and Solicitor LLM, JD, BSc Interesting Facts about Alberta Calgary-based companies have built and operated wind farms since
More informationUpdate on GHG Regulation and Emissions Trading in Alberta and other Jurisdictions
Update on GHG Regulation and Emissions Trading in Alberta and other Jurisdictions The Canadian Institute s Forum on Environmental Law & Regulation in Alberta June 19, 2012 Presented by: John Goetz, Partner
More informationAshbridges Bay Treatment Plant Biogas Cogeneration Proposal from Toronto Hydro Energy Services
STAFF REPORT ACTION REQUIRED Ashbridges Bay Treatment Plant Biogas Cogeneration Proposal from Toronto Hydro Energy Services Date: May 20, 2009 To: From: Wards: Reference Number: Public Works and Infrastructure
More informationThe Nuclear Energy Option in Alberta. Alberta Research Council and Idaho National Laboratory
The Nuclear Energy Option in Alberta submitted by Alberta Research Council and Idaho National Laboratory to the Government of Alberta Nuclear Expert Panel on October 1, 2008 The Alberta Research Council
More informationWater and Energy Efficiency Challenges in Oil and Gas Development
Water and Energy Efficiency Challenges in Oil and Gas Development Presented to the 3RD CANADIAN GERMAN CONFERENCE ON ENERGY AND WATER EFFICIENCY IN INDUSTRIAL APPLICATIONS Calgary, Alberta March 3, 2015
More informationUnderstanding Bill 50
1 Understanding Bill 50 Major Players: Energy Utilities Board (EUB): Prior to 2008, the EUB was the governing body responsible for regulating the entire energy industry in Alberta, including transmission
More informationSection 1 - Introduction
Section 1 - Introduction Algar Lake SAGD Project Section 1 Project Introduction TABLE OF CONTENTS 1. PROJECT INTRODUCTION... 1 1.1 PROJECT BACKGROUND... 1 1.2 PROJECT PROPONENT... 1 1.3 PROJECT OVERVIEW...
More informationGovernment FISCAL PLAN CLIMATE LEADERSHIP PLAN
Government FISCAL PLAN CLIMATE LEADERSHIP PLAN 20 17 53 TABLE OF CONTENTS CLIMATE LEADERSHIP PLAN Climate Leadership Plan Overview.... 55 Climate Leadership Funding.... 55 Economic Analysis.... 58 Emissions
More informationCalculation of Demand Curve Parameters
Calculation of Demand Curve Parameters Rationale 4.1 Resource adequacy standard 4.1.1 The resource adequacy standard announced by the Government of Alberta prescribes a minimum level of reliability as
More informationDraft 2011 Long-term Transmission Plan. Stakeholder Session June 20, 2011
Draft 2011 Long-term Transmission Plan Stakeholder Session June 20, 2011 Agenda Highlights of draft 2011 Long-term Transmission Plan Discussion of project costs and rate impact Impact of transmission constraints
More informationCentral Washington Biomass Energy Workshop
Central Washington Biomass Energy Workshop April 29, 2015 Brent J. Sauder Director, Strategic Partnerships University of British Columbia Welcome to UBC s Point Grey Campus Targets Greenhouse Gas Emissions
More informationKearl Kearl Oil Sands Project Project Description November 2003
earl Kearl Oil Sands Project Project Description November 2003 PROPOSED DEVELOPMENT Imperial Oil Resources (Imperial) and ExxonMobil Canada Ltd. (ExxonMobil) are advancing public consultation and other
More informationCANADIAN RENEWABLE & CONSERVATION EXPENSE ("CRCE") "CLEAN" ENERGY TAX INCENTIVES MARCH 31, 2016
CANADIAN RENEWABLE & CONSERVATION EXPENSE ("CRCE") "CLEAN" ENERGY TAX INCENTIVES MARCH 31, 2016 This updated article is an overview of the Canadian income tax considerations relevant to Canadian renewable
More informationPotential Implications of the AUC TCM Decision ( ) on the Alberta Electricity Market s Economic Efficiency
Potential Implications of the AUC TCM Decision (2013-135) on the Alberta Electricity Market s Economic Efficiency May 2013 Judy Chang Johannes Pfeifenberger Michael DeLucia Prepared for Copyright 2013
More informationDocument title alberta.ca September
Document title alberta.ca September 2017 0 TABLE OF CONTENTS CLP Progress Report 2016-17... 2 What it is and what is included... 2 Alberta s Climate Leadership Plan... 3 What Alberta is doing and why it
More informationGrizzly Oil Sands ULC
Decision 2013-124 Algar Lake Project Distribution System Exemption March 28, 2013 The Alberta Utilities Commission Decision 2013-124: Algar Lake Project Distribution System Exemption Application No. 1609370
More informationAlberta Transmission System Transmission Cost Causation Update. September 15, Prepared for the. Alberta Electric System Operator (AESO)
Alberta Transmission System 2006 Transmission Cost Causation Update September 15, 2006 Prepared for the Alberta Electric System Operator (AESO) PS Technologies Inc. Arnie Reimer, P. Eng. Table of Contents
More informationMichael Thorpe Managing Director Infrastructure and Utilities
Michael Thorpe Managing Director Infrastructure and Utilities INTRODUCTION RENEWABLES IN THE UK RENEWABLES / GAS GENERATION IN THE US OPTIMISING THE OUTCOME Introduction Coming together is a beginning;
More informationWindRiver Power Corp.
AESO Stakeholder Consultation Key Transmission Initiatives Stakeholder Questions/Comments and AESO Responses June 9, 2008 Stakeholder Consultation Session The AESO would like to take this opportunity to
More informationAnalysis of Benefits of Clean Electricity Imports to Massachusetts Customers. Massachusetts Clean Electricity Partnership
Analysis of Benefits of Clean Electricity Imports to Massachusetts Customers Prepared for: Massachusetts Clean Electricity Partnership April 25, 2016 John Dalton poweradvisoryllc.com 978 369-2465 Contents
More informationAlberta s Climate Change Strategy Renewal Update October 9, 2013
Alberta s Climate Change Strategy Renewal Update October 9, 2013 Overview Where are we today? - Context and success to date Where do we need to go? - Emissions trends - Policy considerations How do we
More informationCOGENERATION Opportunities in Today s Power Markets
COGENERATION Opportunities in Today s Power Markets R. W. Meidel, Vice-President-Power Projects ExxonMobil Power and Gas Services Inc March 17, 2003 Presentation Outline Cogeneration at ExxonMobil Investment
More informationJAPAN CANADA OIL SANDS HANGINGSTONE SAGD PROJECT
Public Disclosure Document for the proposed JAPAN CANADA OIL SANDS HANGINGSTONE SAGD PROJECT May 7 th, 2008 I. INTRODUCTION Japan Canada Oil Sands Limited (JACOS) continues to evaluate the development
More informationUpdate on EPRI s Energy and Economy Modeling
Update on EPRI s Energy and Economy Modeling Francisco de la Chesnaye, Program Manager Energy & Environmental Analysis Group EPP and Center for Climate and Energy Decision Making, CMU Sponsored Seminar
More informationSummary of Integrated Capacity and Energy Revenue Modelling
Summary of Integrated Capacity and Energy Revenue Modelling Prepared by: Alberta Electric System Operator Date: January 26, 2018 Public Table of Contents 1. Summary of Integrated Capacity and Energy Revenue
More informationVerification Report for the TransAlta Corporation Wintering Hills Wind Farm Offset Project
KPMG Performance Registrar Inc. Box 10426, 777 Dunsmuir Street Vancouver BC V7Y 1K3 Canada Telephone (604) 691-3000 (604) 691-3401 Telefax (604) 691-3031 www.kpmg.ca Matthew Toohey TransAlta Corporation
More informationINDUSTRIAL FORT SASKATCHEWAN S. fortsask.ca/business LOCATION CONNECTIONS GROWTH
INDUSTRIAL FORT SASKATCHEWAN S L E A D I N Gedge LOCATION CONNECTIONS GROWTH fortsask.ca/business Fort Saskatchewan is a major industrial and commercial centre in northern Alberta. We are the largest urban
More informationA Strategy to Reduce the CO 2 Footprint of SAGD Oil Sands Recovery
A Strategy to Reduce the CO 2 Footprint of SAGD Oil Sands Recovery David B. Layzell, Manfred Klein, Song Sit Madhav Narendran & BasFaan Straatman CESAR Ini*a*ve, University of Calgary Presenta(on at the
More informationAlberta: A Renewable Energy Super Power?
Alberta: A Renewable Energy Super Power? Patrick Bateman, Policy & Market Development Director, CanSIA Evan Wilson, Prairies Regional Director, CanWEA Calgary & Edmonton SESA Seminars, September 26 & 27,
More informationAlberta Climate Change Advisory Panel 11th Floor, South Petroleum Plaza, Edmonton Alberta, T5K 2G8
DIRECTORS Greg Kiessling, Chair Lisa Asbreuk Beverley Hammond Bruce Lourie Greg Lyle Perry Miele John Ruffolo ADVISORS Bruce Croxon Gord Downie Gord Hicks Todd Hirsch Munir Sheikh September 28, 2015 Alberta
More informationTres Valles Cogeneration Project. Frederik Staun, UNEP Risoe Centre, Carbon finance Belize City August, 2010
Tres Valles Cogeneration Project Frederik Staun, fsta@risoe.dtu.dk UNEP Risoe Centre, Carbon finance Belize City 24 26 August, 2010 Description of the project Tres Valles Cogeneration Project consists
More informationThe Energy Policy Context for the Australian Energy Technology Assessment
The Energy Policy Context for the Australian Energy Technology Assessment Drew Clarke Secretary, Department of Resources, Energy and Tourism Australian National University 30 October 2012 Outline I Energy
More informationYOUR LOCAL DEVELOPER
YOUR LOCAL DEVELOPER ABOUT Alberta Wind Energy Corporation ( AWEC ) was formed in 2003 to develop independent wind farm projects. The Company is currently focused on developing several sites, taking a
More informationMEETING ENERGY NEEDS WITH CLEAN AND RENEWABLE POWER
MEETING ENERGY NEEDS WITH CLEAN AND RENEWABLE POWER Christian G. Brosseau President HQ Energy Services US November 2010 A Snapshot of Hydro-Québec Hydro-Québec is the largest power generator in North America
More information100% Fossil Free Electricity. June 27, 2018
100% Fossil Free Electricity June 27, 2018 Current Washington Emissions Levels 100 90 +7% 80 70 60 50-82% 40 30 20 10 0 1990 2013 2050 (goal) 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
More informationBIOENERGY IN ELECTRICITY GENERATION. Capital Power Perspectives & Initiatives
BIOENERGY IN ELECTRICITY GENERATION Capital Power Perspectives & Initiatives THE CHALLENGE: Transitioning Away From Coal Canada is working to significantly reduce coal emissions by 2030: Under the Climate
More informationAvailable online at Energy Procedia 4 (2011) Energy Procedia 00 (2010) GHGT-10
Available online at www.sciencedirect.com Energy Procedia 4 (2011) 2724 2731 Energy Procedia 00 (2010) 000 000 Energy Procedia www.elsevier.com/locate/procedia www.elsevier.com/locate/xxx GHGT-10 The techno-economics
More informationBC Hydro Renewable Generation Market Competitiveness Report
BUILDING A WORLD OF DIFFERENCE BC Hydro FINAL REPORT B&V Project Number: 172047 July 2011 Black & Veatch Corporation 11401 Lamar Avenue Overland Park, Kansas 66211 Tel: (913) 458 2000 www.bv.com Table
More information