1 1 Ambassador Bridge Enhancement Project Presented by Canadian Transit Company Detroit International Bridge Company 2 Existing CTC Corridor Begin Project End Project U.S. Modifications to both plazas have been implemented over the years to optimize the operation and minimize travel delays Canada 1

2 3 CTC Corridor Initiatives Gateway FONSI approved in 1997 and reevaluated in 1999, 2004 and 2007 Canadian expansion approved east and west phases in 2005 with construction completed in 2007 Main Span Deck Rehabilitation Currently Underway ABEP EIS Initial submitted in December CTC Corridor Initiatives 2007 Canadian Plaza Project FAST Truck processing capability introduced in 2006 and 2007 Construct bridge plaza expansion, including expansion of structure, retaining wall and customs booths as per committee of adjustment A-006/05, site plan control SPC 063/04 and approved plans. 2

3 5 CTC Corridor Initiatives 2007 CTC Plaza Improvements 2007 Improvements to the Canadian plaza provided additional border crossing capacity 6 CTC Corridor Initiatives Canadian Plaza Final 2007 Configuration Phase 1 January 2006 Buffer Zone (Security Upgrade) Phase 2 July 2007 Expanded capacity by adding nine additional custom booths Buffer area proposed along west side No modification to circulation patterns on local streets was required 3

4 7 Other Corridor Initiatives Capacity expansion study completed by the bi-national Detroit River International Crossing Study or DRIC Study All DRIC Build Alternatives assumed the Ambassador Bridge crossing is maintained At some time in the future an Ambassador Bridge replacement structure will be required to maintain safe operation 8 Project Need The existing bridge is over 80 years old The existing bridge has a tower in the river The existing bridge has substandard lanes and shoulders without capability for dedicated FAST lanes to serve the FAST booths now present in the plazas This structure is the vital link in the most important border crossing between the United States and Canada This corridor served 7.2 million vehicles in 2010 including 2.7 million trucks and buses Any disruption in traffic flow across the structure results in significant delays and causes economic losses in both countries Environmental impacts associated with the DRIC project assume an operational Ambassador Bridge for many decades to come 4

5 9 Project Purpose Upgrade the crossing to: Meet current standards Accommodate FAST lane operations with dedicated lanes on the new bridge Connect to and improve plaza operations Avoid navigational conflicts in the river Maintain current operations during construction 10 Replacement Bridge Alignment Alternatives Construct 3 new lanes east of the current facility and use existing structure for 3 lanes Construct 3 new lanes west of the current facility and use existing structure for 3 lanes Construct 6 new lanes east of the existing facility Construct 6 new lanes west of the existing facility Existing Structure 5

6 11 Bridge Replacement Tunnel Alternatives Construct new 3 lane tunnel east of the current facility and use existing structure for 3 lanes Existing Structure 12 Bridge Replacement Tunnel Alternatives Construct new 3 lane tunnel west of the current facility and use existing structure for 3 lanes Existing Structure 6

7 13 Bridge Replacement Tunnel Alternatives X Construct dual 3 lane tunnels east and west of the current facility and abandon the existing structure Existing Structure 14 Summary of Build Alternatives Evaluated Construct a Twin Suspension Bridge 3 new SB lanes (west) provide 3 NB lanes on existing structure Construct a Suspension Bridge 3 new NB lanes (east) provide 3 SB lanes on existing structure 3 new SB lanes (west) provide 3 NB lanes on existing structure 6 new lanes west of existing facility 6 new lanes east of existing facility Construct a Cable Stay Bridge 3 new NB lanes (east) provide 3 SB lanes on existing structure 3 new SB lanes (west) provide 3 NB lanes on existing structure 6 new lanes west of existing facility 6 new lanes east of existing facility Construct a Tunnel 3 new NB lanes (east) provide 3 SB lanes on existing structure 3 new SB lanes (west) provide 3 NB lanes on existing structure 3 new NB lanes (east) and 3 new SB lanes (west) 7

8 15 Alternatives Analysis No Build Twin Suspension 3 new lanes west Suspension 3 new lanes west 6 new lanes west 3 new lanes east 6 new lanes east Cable Stay 3 new lanes west 6 new lanes west 3 new lanes east 6 new lanes east Tunnel 3 new lanes west 3 new lanes east 6 new lanes e-w Nav Impacts Relocation Impacts Enviro Impacts Economic Impacts Function Constr Impacts ` Security Preferred Alternative Life Cycle Costs Poor Excellent 16 CTC Plaza Expansion CBSA Option A 8

9 17 CTC Plaza Expansion CBSA Option B 18 Preferred Alternative Begin Project End Project Phase 1 Construction of a 6 lane cable stayed structure adjacent to and west of the existing bridge Current plaza configurations adequate for normalized traffic projections Phase 2 Build Ultimate Plaza Configuration when necessary All mitigation required for the construction of both phases included in Phase 1 construction 9

10 19 Regional Traffic 2025 without DRIC Impacts in the EIS are based on traffic projections that assume the DRIC is not in operation The revised traffic projections increased by 70 percent for car volumes and by 378 percent for truck volumes 5,550,000 Cars 3,360,000 Trucks 8,910,000 Total 33,110,000 Ambassador 8,820,000 Cars 6,400,000 Trucks 15,220,000 Total 8,750,000 Cars 230,000 Trucks 8,980,000 Total Source: DRIC Travel Demand Forecasts Sep Project Profile Assessed in EIS The Ambassador Bridge Enhancement Project begins just south of the US Plaza and end just south of Canadian Plaza The new 6 lane replacement bridge will be constructed west of the existing bridge and will consist of 4 general purpose lanes and 2 FAST lanes The ultimate Canadian Plaza Configuration is included in analysis of impacts The 2025 Traffic Demand Based Projections assume the DRIC is not operational The bridge and plaza will continue to connect directly to Huron Church Rd south of plaza The analysis limits for the EIS extend from the Canadian border 4.5 km south to Industrial Drive along Huron Church Rd 10

11 21 Studies Completed Spills Air Quality Surface Water Ground Water Geology and Soils Erosion and Sediment Control Fish and Fish Habitat Wildlife and Wildlife Habitat Vegetation and Vegetation Communities Contamination and Waste Management Noise and Vibration Socioeconomics Visual and Aesthetics Windsor Plan and Zoning Archaeology Heritage Navigation Consultations 22 Spill Contingency Plan Addresses spills resulting in a release to the environment Possibility of a large spill is very remote Limited quantities of hazardous material on site Nature of construction and operation phases It is the policy of CTC to initiate clean up activities if associated with the spill Standard procedure Identification of spill Response Documentation Government notification as early as possible Communication Spill response training will be provided for site personnel 11

12 23 Air Quality Based on federal EA Guidelines & Air Quality Work Plan (reviewed by Env. Can.) Site Study Area: Existing bridge and Enhancement Project (ABEP) where construction would take place Local Study: Areas within 300 m of Huron Church Road extending 2 kilometers from the Site Study Area to the intersection of Huron Church Road and Industrial Drive. Regional Study Area: Area in which cumulative impacts may occur 24 Air Quality Emission factors used as input into state-of-science software to model impacts: CALQ3HCR; AERMOD; MOBILE6.2C 16+ pollutants and precursors of interest Detailed analysis of 6 emission scenarios: Present (Baseline) Construction Operation Future (Do Nothing) Future (6 Lanes) Future (10 Lanes) operation of existing bridge only construction of ABEP and operation of existing bridge (2015) operation of ABEP only (2015) operation of existing bridge only (2025) operation of ABEP only (2025) Operation of both ABEP and existing bridge (2025) Analysis includes the assessment of cumulative effects: 90th percentile concentrations were used for background ambient air concentrations Other projects (existing bridge, US side of ABEP, DRIC) 12

13 25 Air Quality Baseline Greatest air quality impacts occur around key intersection locations along Huron Church Road (within ~ <150 m of Huron Church Road) Aside from Huron Church Road, greatest impacts occur at the customs plaza Air quality modeling indicates that concentrations above the air quality criteria may occur at these locations for certain pollutants of interest (NOx, PM 10 and PM 2.5 ) For both PM 10 and PM 2.5, the selected background is a significant fraction of the maximum air quality concentration Idling and acceleration of vehicles related to traffic control lights appear to be a significant contributor to the air quality impacts Pollutant Relevant Air Units Baseline of Interest Averaging Quality Maximum Background Maximum Period Criteria Modelling Concentration Air Quality Concentration Concentration Pollutants and Precursors (1) CO 1 hr 36,200 µg/m NOx 1 hr 400 µg/m NOx 24 hr 200 µg/m SO2 1 hr 690 µg/m SO2 24 hr 275 µg/m PM10 24 hr 50 µg/m PM hr 30 µg/m VOC 1 hr NA ppm Air Quality Construction in 2015 All air toxics, greenhouse gases, ozone and most pollutants below air quality criteria Potential for PM10 and PM2.5 to be above the air quality criteria Mitigation Implementing BMPs and heavy equipment must meet design specifications Idling of equipment will be monitored Heavy equipment will be limited during smog advisories Number and size of equipment will be monitored when operating simultaneously with barges Construction activities will largely occur during daytime periods Pollutant Relevant Air Units 2015 (Construction) 2015 (Operation) of Interest Averaging Quality Maximum Background Maximum Maximum Background Maximum Period Criteria Modelling Concentration Air Quality Modelling Concentration Air Quality Concentration Concentration Concentration Concentration Pollutants and Precursors (1) CO 1 hr 36,200 µg/m NOx 1 hr 400 µg/m NOx 24 hr 200 µg/m SO2 1 hr 690 µg/m SO2 24 hr 275 µg/m PM10 24 hr 50 µg/m PM hr 30 µg/m VOC 1 hr NA ppm

14 27 Air Quality Operation in 2025 Impacts are small compared to background concentrations Improvement of air quality with Project over future no build All air toxics, greenhouse gases, ozone and most pollutants below air quality criteria Potential for PM10 to be above the air quality criteria Most impacts of PM along Huron Church Road Pollutant Relevant Air Units 2025 (FDN) 2025 (A) of Interest Averaging Quality Maximum Background Maximum Maximum Background Maximum Period Criteria Modelling Concentration Air Quality Modelling Concentration Air Quality Concentration Concentration Concentration Concentration Pollutants and Precursors (1) CO 1 hr 36,200 µg/m NOx 1 hr 400 µg/m NOx 24 hr 200 µg/m SO2 1 hr 690 µg/m SO2 24 hr 275 µg/m PM10 24 hr 50 µg/m PM hr 30 µg/m Air Quality 14

15 29 Air Quality 30 Surface Water No piers placed in, or immediately adjacent to, the Detroit River No dredging, in-water blasting, in-water pile driving, pier construction or in or along the Detroit River Use of barges for materials has no significant effect on water quality, levels or use No need to dredge channels for the barges Stormwater management facility proposed The Heritage River status of the Detroit River will be respected Erosion and Sediment control will occur during all project phases to manage stormwater from construction areas The Project does not inhibit floodplain or the ability of the Detroit River to accommodate a 100-year storm event The environmental effects of the Project on surface water within the assessment area, for all project phases, are not significant 15

16 31 Ground Water No significant impact on groundwater resulting from the Enhancement Project Groundwater in not used as a source of drinking water for the urban area Not a recharge area for underlying aquifers Construction materials consist of concrete, steel, plastic and wood and are non-reactive with water There will be minimal impacts to groundwater flows in the deep aquifers from the Enhancement Project 32 Geology and Soils Boreholes confirmed geological and soil conditions in the Site Study area as calcerous limestone Study areas: Site Study area project footprint Local Study area - area within a 100 metre (328 foot) radius of the Site Study Area Regional Study area City of Windsor Surface soils are fill and disturbed native soils Sub-surface soils consists of metres of unconsolidated deposits mainly of lacustrine clay with interspersed gravel and sand deposits Underlying bedrock part of Michigan Basin and Dundee formation underlies Local Study area No salt beds located in the Site Study area Except for the permanent removal of the geologic materials from the excavation during foundation construction and localized rock fracturing, no other permanent environmental changes to the site geology will occur 16

17 33 Erosion and Sediment Control An Erosion and Sediment Control Plan will be developed Construction Stabilize unprotected surfaces through seeding, mulching and dust suppression Sediment barriers and flow check dams (silt fence, straw bales) Inlet protection Stormwater management facilities Operation The Ambassador Bridge currently collects stormwater runoff and directs it to the City of Windsor storm sewer system A stormwater treatment system will be developed and implemented to treat stormwater runoff for both the second span and additional property for the plaza improvements 34 Fish and Fish Habitat No adverse effects to fish and fish and habitat expected from construction or operation of Project No construction activities within Detroit River No piers within Detroit River All towers and piers situated a minimum of 30 metres (approximately 100 feet) from the riverbank No impacts on any Species at Risk Erosion and sediment control systems will be implemented Dust suppression measures, silt fences, diversions, temporary ground cover Stormwater management facilities to collect, convey, and treat stormwater Project results in No net loss of fish habitat 17

18 35 Wildlife and Wildlife Habitat Field review conducted to assess and identify existing wildlife in Local and Site Study areas Study areas: Site Study area Project footprint where construction will occur Local Study area Area within 300 m radius of site study area Regional Study area City of Windsor and surrounding communities including Towns of LaSalle, Tecumseh and Amherstburg Common Name Indian Road McKee Park Riverside Adjacent to Bridge American Goldfinch X X Wildlife Species Observed in the Local Study Area American Robin Bank Swallow X X X X Canada Goose* X Eastern Gray Squirrel X European Starling X House Sparrow X Ring-billed Seagull X Rock Dove X X X * Evidence (scat) of Canada goose was observed only. 36 Wildlife and Wildlife Habitat Wildlife reflects urban environment and tolerant of humans (mice, squirrels, skunks, opossum, raccoons, birds) No threatened or endangered wildlife or species at risk or suitable habitat found within project Impacts limited to species highly tolerant of human activities Areas within Project previously disturbed Migratory Birds Project crosses Atlantic and Mississippi flyway Birds tend to fly over or under bridges to avoid collisions The cable stays for the Enhancement Project will be 4 inches in diameter or greater which is very visible and greatly reduces the potential for avian collisions Non-reflective surfaces will be used to eliminate the possibility of avian collisions resulting from deception Downward lighting, low intensity, white strobe lighting will be used to prevent avian confusion caused by light refracted or reflected by mist No regional linkages or corridors in local or site study areas A tree planting/preservation plan will be undertaken to restore wildlife habitats 18

19 37 Vegetation and Vegetation Communities Field review conducted to assess and identify existing vegetation in Local and Site Study areas Study areas: Site Study area Project footprint where construction will occur Local Study area Area within 300 m radius of site study area Regional Study area City of Windsor and surrounding communities including Towns of LaSalle, Tecumseh and Amherstburg Existing vegetation limited to street trees, shrubs and manicured grass Impacts limited to small areas Support towers and piers for the bridge Areas required for the plaza All areas already heavily disturbed 38 Vegetation and Vegetation Communities Few Natural Heritage features No wetlands within Project area Existing vegetation limited to street trees Two Carolina Trees within project limits White Oak (less than 5 individuals) Tulip Tree (less than 5 individuals) No unique, endangered or threatened tree species or Species at Risk No Provincial Parks, Areas of Natural and Scientific Interest, Environmentally Significant Areas, and Candidate Natural Heritage Sites Tree Preservation Plan has been developed 19

20 39 Contaminated Sites Radius search of 0.25 km from Project Footprint (Study Area) No known contaminated sites within Study Area Several spills adjacent to Project property Spill in 1995 below Ambassador Bridge with environmental impact Spill in 1999 at intersection of College Avenue and Huron Church Road that was cleaned up Eight spills between 1988 and 2008 within the customs plaza or Ambassador Bridge with no environmental impacts Two additional spills on the Ambassador Bridge in 2006 and 2007 that were cleaned up Wastes will be treated and disposed of in accordance with regulatory requirements Excess construction materials will be properly managed and disposed Spills Prevention and Contingency Plan implemented Emergency Spills Response Plan implemented 40 Noise and Vibration Followed Ontario Ministry of Transportation (MTO) guidelines for Highway Improvements Study Area Schools, Residences and Heritage Sites within 300m of the project footprint Predicted Sound Levels at 23 representative NSRs for: Present Day Scenario (2010 traffic volumes) Future No-Build Scenario (2025 traffic volumes) Future Build Scenario (2025 traffic volumes ) 20

21 41 Noise and Vibration Noise Criteria MTO Guidelines, Environmental Office Manual, Technical Areas Noise (May 15, 1992), states that if future sound levels will be greater than 55 dba and will increase by more than 5 dba (Build vs. No- Build), mitigation should be investigated on the Right of Way Health Canada suggested that mitigation be considered for all noise receptors that are predicted to increase by 1 dba or more for the ABEP 42 Noise and Vibration Construction Related to construction of tower and support piers Construction time restrictions in Municipal noise by-laws will be adhered to Sound level limits for construction equipment based on MOE guildelines (NPC 115) will be complied with Sound and vibration levels will be monitored during pile driving within 100 metres of sensitive receptors Operation Most receptors experience a decrease in sound level or no change in sound level between the build and no-build scenario Without mitigation, noise levels could increase up to 3 dba higher than no-build levels 21

22 43 Noise and Vibration Mitigation Noise Noise barrier 3.0 metres in height along part of the west edge of the bridge Noise barrier 5.5 metres in height along the western extent of the proposed customs plaza Noise barriers will reduce levels of all receptors so that no receptor experiences any increase in noise between the build and no build scenario Sound levels above 65 dba would remain at 4 receptors Sound levels at these location are the same or less than the no build condition with the noise barriers Vibration Vibration levels expected to be lower than existing conditions due to new foundation and smooth road surface 44 Socioeconomics Enhancement Project is compatible with surrounding land use Project constructed entirely on land owned by Proponent No displacement or loss of any homes, businesses, industrial sites or institutional land uses Project results in increased employment opportunities during construction and operation supporting the local economy No increase in community fragmentation Within an established international transportation corridor More efficient and safer crossing reducing congestion which improves cross-border movement of goods 22

23 45 Visual and Aesthetics The Ambassador Bridge is recognized as an international gateway between Canada and the US The Enhancement Project compliments the aesthetics of this transportation corridor Allows for an integration of the state-of-the-art technology of the 20th century with the state-of-the-art technology of the 21st century The Project will be visible from several heritage sites and no significant visual impacts are anticipated. The Ambassador Bridge has been a landmark of the urban skyline for over 80 years 46 Archaeology Stage 1 investigation results indicated a thorough Stage 2 investigation of entire area was necessary Stage 2 investigation led to discovery of artifacts at 7 locations (AbHs -28, -29, -30, -31, -32, -33, -34) AbHs-29, -32, -33 will not be impacted by the project so not require Stage 3 investigations. Stage 3 was required at 4 locations (AbHs -28, -30, -31, -34) which identified one property requiring stage 4 investigation Stage 4 investigation will be required at one location (AbHs-34) AbHs-34 AbHs-33 AbHs-32 AbHs-31 AbHs-30 AbHs-28 AbHs-29 23

24 47 Archaeology Stage 4 investigation for site AbHs-34 will be provided during the excavation of the tower pier foundation AbHs-34 Tower Pier Foundation 48 Heritage Structure and Sites of Significance Study Area Pie shaped area bounded by the Detroit River, Huron Church Road, and Prince Road There are numerous heritage sites designated by the Ontario Ministry of Culture situated within the Regional and Local Study Area Site Study Area - Row of houses east of Indian Road from Wyandotte Street to Mill Street None of the houses in the Site Study Area merit heritage designation Landscape buffer proposed in this location would act as a buffer to the neighborhood for noise and air pollution No heritage sites will be demolished or moved as part of the Project The integration of design elements that reflect the characteristics of the existing Ambassador Bridge will mitigate the visual impacts of the replacement span on heritage sites 24

25 49 Navigation Statutory requirements: Canada Shipping Act, 2001 Collision Regulations (CRC, VOl. XV, c. 1416) The St. Clair & Detroit River Navigation Safety Regulations (SOR/84-335) Competency of Operators of Pleasure Craft Regulations (SOR/99-53) Barges used during construction to transport materials Barge activities will be coordinated so no impediment to other vessels Licensed operators No piers will be placed in the waters of the Detroit River, resulting in no environmental effects 50 Public Consultation Public Outreach ongoing since 2005 Series of public information sessions held between April 16-19, 2007 at four locations Open houses held June 25 and 26, 2007 to discuss preliminary results of studies Two additional open houses held October 1 and 2, 2007 to discuss final results of studies Numerous meetings with municipalities, local chambers of commerce, unions, business improvement areas, community groups and other interested groups Mailings were sent out requesting comments First Nations Consultation through letters Meeting with Walpole Island Heritage Committee on June 28,

26 51 Summary of ABEP Entire estimated $600M funds required for construction of the project will be provided by CTC No significant impacts have been discovered Air quality is improved over no build alternative All minimal impacts will be mitigated in phase 1 Zero increase in noise levels with wall along west edge of plaza and part of west side of the new bridge Stage 4 Archeology when constructing tower foundation The environmental impacts from the DRIC project are assessed assuming that the Ambassador Bridge is in operation The environmental impacts from the ABEP project are assessed assuming that the DRIC project is NOT in operation Therefore, the ABEP is a stand alone project while the DRIC project requires that the ABEP project be constructed 52 Ambassador Bridge Enhancement Project 26

27 1 Environmental Impacts Comparison DRIC and ABEP The following slides present a comparison of the environmental impacts reported in the environmental documents prepared for the Detroit River International Crossing (DRIC) study and the Ambassador Bridge Enhancement Project (ABEP) study 2 ABEP vs DRIC Air Quality ABEP Impacts from the Project are small compared to the background concentrations Results show a positive environmental change as the future air quality is predicted to improve with the replacement span A comparison of the future 2025 do nothing and replacement span only scenarios indicate that the replacement span and customs plaza will result in an improvement in air quality, notably in the area close to the bridge and the customs plaza Under the future scenario, in 2015, that considers impacts from construction, the potential exists for concentrations of PM 10 and PM 2.5 to be above the air quality criteria. Under the future scenario, in 2025, the increased concentration of higher emitting heavy duty vehicles along the replacement span is predicted to result in concentrations of PM 10 above the air quality criteria due to road dust, in the vicinity of the customs plaza DRIC During the operation scenario, there are exceedances of PM 10 and PM 2.5 Both PM 10 and PM 2.5 are higher in the build scenario over the future no-build scenario Other contaminants in the TEPA report exceed criteria, but the background concentrations are the main contributors as the cause for the exceedances Impacts from The Windsor- Essex Parkway would be small relative to background concentrations From DRIC Air Quality Impact Assessment Technical Memo, December

28 3 ABEP vs DRIC Vegetation ABEP Only species present are those associated with roadsides Two species of Carolina trees found within the study area including white oak and tulip trees (both had less than 5 individuals within the study area) No endangered or threatened species or Species at Risk Proposed tree Preservation/Planting Plan to offset the minimal impacts DRIC Total of 134 vegetation communities ( ha) will be partially or fully displaced including eight high quality communities (3.62 ha), 45 moderate quality communities (40.72 ha) and 81 low quality communities (87.37 ha) 4 ABEP vs DRIC Wildlife ABEP Site preparation and construction activities may result in displacement and potential mortality to wildlife Only species present are those adapted to urban environments No endangered or threatened species or Species at Risk Proposed tree Preservation/Planting Plan to provide wildlife habitat DRIC Site preparation activities will result in the displacement of wildlife and wildlife habitat and potential mortality to Species at Risk Portions of provincially significant wildlife habitat will be lost Portions of the habitat of the Butler s gartersnake and eastern foxsnake may be displaced by construction 2

29 5 ABEP vs DRIC Species at Risk ABEP No Species at Risk or habitat within study areas DRIC A total of 5.47 ha of designated natural area will be displaced including the Black Oak Woods (1.68 ha of a total area of 46 ha), Ojibway Park (0.51 ha of a total area of 64 ha) and TC2 (3.28 ha of a total area of 9.0 ha) No encroachment will occur at the St. Clair College Prairie A total of ha of designated natural area may be disturbed on adjacent lands located within 120 m of the footprint of the Recommended Plan. 6 ABEP vs DRIC Noise and Vibration ABEP No receptors experienced an increase in noise of 5 dba or greater 10 years after completion Health Canada required mitigation measures to be undertaken for all noise sensitive receptors at which sound levels may increase by more than 1 decibel between the build and no-build scenarios (typical requirements are 5 dba) Nine of the receptors modeled, representing many more sites, were predicted to experience an increase in traffic noise levels of 1 dba or more Nine receptors were predicted to experience no change in sound levels between the build and no-build scenario Thirteen receptors were predicted to experience a reduction in noise levels between the build and no-build scenario Construction of a noise wall 3.0 metres in height along the west edge of the bridge and a second noise wall 5.5 metres in height along the western extent of the proposed plaza provides sufficient mitigation such that there would be no increase in sound level between the build and no-build scenarios at any receptor DRIC DRIC only required to look at mitigation if sound levels increased by 5 or more dba Noise exceedances of greater than 5 dba were observed at many receptors (10 modeled receptors) and in several cases (6 modeled receptors), an exceedance of greater than 10 dba was predicted With a barrier 5 metres in height in place, the proposed project is predicted to result in no to marginal noise impact for The Windsor-Essex Parkway, except for one receptor 3

30 7 ABEP vs DRIC Land Use ABEP No displacement or loss of any homes, businesses, industrial sites or institutional land uses Some disruption due to noise and dust during construction can be expected Two noise walls are proposed to mitigate for noise disturbances DRIC Displacement of 360 homes Changes to cohesion and character in some neighbourhood communities Loss of 48 businesses and overall disruption and nuisance effects to both residents and the public during construction 8 ABEP vs DRIC Heritage Sites ABEP No direct impacts to Heritage Sites The integration of design elements that reflect the characteristics of the existing Ambassador Bridge will mitigate the visual impacts of the replacement span on heritage sites There are no significant adverse visual effects of the Project on heritage sites DRIC Six Built Heritage Resources will be removed Mitigation will include either relocation of structures or salvage of significant architectural elements followed by demolition 4

31 9 ABEP vs DRIC Archaeology ABEP Four sites were recommended for a Stage 3 archaeological investigation Based on the Stage 3 archaeological investigation, three of the four sites were not considered significant Fourth site, AbHs-34 is a significant heritage resource which will require avoidance or Stage 4 mitigation DRIC Twenty-four sites located within the TEPA were recommended for a Stage 3 archaeological assessment This assessment has not been completed 10 ABEP vs DRIC Contaminated Sites ABEP No known contaminated sites within the Study Area The Ontario Occurrence Reporting Information System listed several spills immediately adjacent to the proposed Project property DRIC Thirty-six properties with high potential for contamination Phase II screening of these sites is underway 5

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM Date: To: Cc: From: Subject: TECHNICAL MEMORANDUM Transport Canada - Sarah O Keefe, Laureen Chung, Ronald Hall Dan Stamper (CTC) Scott Korpi (ACP) Ambassador Bridge Enhancement Project EIS Clarification

More information

EA Report Canadian Transit Company Comments and Study Team Responses

EA Report Canadian Transit Company Comments and Study Team Responses EA Report Canadian Transit Company Comments and Study Team s 1) CTC/DIBC respectfully requests that the Partnership, specifically the Ontario Ministry of Transportation ( MTO ) launch a fair, more meaningful

More information

Detroit River International Crossing Study Canadian Frequently Asked Questions. Q. Why have you decided to focus on this area of analysis?

Detroit River International Crossing Study Canadian Frequently Asked Questions. Q. Why have you decided to focus on this area of analysis? Q. Why have you decided to focus on this area of analysis? After appropriate study and analysis, the Border Transportation Partnership has reviewed the possible alternatives and identified this particular

More information

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E Ambassador Bridge Enhancement Project CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX E DRAFT EROSION AND SEDIMENT

More information

DETROIT RIVER INTERNATIONAL CROSSING STUDY MAG

DETROIT RIVER INTERNATIONAL CROSSING STUDY MAG DETROIT RIVER INTERNATIONAL CROSSING STUDY MAG Meeting September 5 th, 2006 1 Agenda 1. Study Update 2. Construction Staging for Tunneling 3. Other Business 2 Deep Borehole Program 3 Status Update - Engineering

More information

Presentation Date: September 13, 2017 Location: Fogolar Furlan

Presentation Date: September 13, 2017 Location: Fogolar Furlan Presentation Date: September 13, 2017 Location: Fogolar Furlan www.brianmasse.ca Windsor-Detroit is already a multi-modal border crossing region. ACTUAL Detroit-Windsor Truck Ferry The Ambassador Bridge

More information

Changes to Air Quality

Changes to Air Quality Changes to Air Quality Identifying how the Detroit River International Crossing (DRIC) study alternatives may change air quality is an important consideration in the DRIC Environmental Assessment. Air

More information

Public Information Centre

Public Information Centre Vineland West Private Water System Municipal Class Environmental Assessment Public Information Centre Tuesday, July 12, 2016, 6 to 8 p.m. Vineland Research and Innovation Centre, Rittenhouse Hall Welcome!

More information

DETROIT RIVER INTERNATIONAL CROSSING ENVIRONMENTAL ASSESSMENT. Armanda Street Residents Meeting. May 10 th, Meeting Outline

DETROIT RIVER INTERNATIONAL CROSSING ENVIRONMENTAL ASSESSMENT. Armanda Street Residents Meeting. May 10 th, Meeting Outline DETROIT RIVER INTERNATIONAL CROSSING ENVIRONMENTAL ASSESSMENT Armanda Street Residents Meeting May 10 th, 2006 1 Meeting Outline 1. Project Status 2. Generation and Assessment of Practical Alternatives

More information

Alteration of the Canadian Border Services Facilities

Alteration of the Canadian Border Services Facilities SCHEDULE Definitions 1 The following definitions apply in this Schedule. Ambassador Bridge means the existing four-lane international bridge that spans the Detroit River between Windsor, Ontario, and Detroit,

More information

Gordie Howe International Bridge Public Information Meeting. Detroit, Michigan July 19, 2017

Gordie Howe International Bridge Public Information Meeting. Detroit, Michigan July 19, 2017 Gordie Howe International Bridge Public Information Meeting Detroit, Michigan July 19, 2017 Introduction 1. WDBA and Partners 2. Components of the Project 3. Activities in the US 4. Activities in Canada

More information

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017 WELCOME QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street Public Information Centre Round #1 October 2017 Please Sign In PURPOSE OF THIS MEETING The Ontario Ministry

More information

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables Highway 400 Improvements from 1 km South of Highway 89 to the Junction of Highway 11 Appendix C - Highway 400 Widening and Interchange Tables Prepared for: Ontario Ministry of Transportation Four General

More information

Appendix M. Criteria, Measures and Indicators for Effects Assessment

Appendix M. Criteria, Measures and Indicators for Effects Assessment Appendix M Criteria, Measures and Indicators for Effects Assessment Appendix M. Criteria, Measures and Indicators for Effects Assessment Objective 1: Naturalization Changes to Aquatic Habitat Disruption,

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

5.0 LONG-TERM CEQA CONSIDERATIONS

5.0 LONG-TERM CEQA CONSIDERATIONS 5.0 LONG-TERM CEQA CONSIDERATIONS Section 15126 of the CEQA Guidelines requires that all phases of a project must be considered when evaluating its impact on the environment, including planning, acquisition,

More information

MOSLEY STREET URBANIZATION TH

MOSLEY STREET URBANIZATION TH Public Information Centre 1 (PIC 1) MOSLEY STREET URBANIZATION TH 45 BEACHWOOD ROAD TO STREET Class Environmental Assessment November 29, 2016 Welcome 2 This Public Information Centre will: establish channels

More information

Appendix Q Canadian Air Quality Study

Appendix Q Canadian Air Quality Study Appendix Q Canadian Air Quality Study NOTICE The information contained in this Appendix was developed strictly for the purpose of evaluating the environmental impacts associated with the Ambassador Bridge

More information

City of Bishop. Environmental Checklist Form

City of Bishop. Environmental Checklist Form City of Bishop Environmental Checklist Form 1. Project title: Environmental Review / 2007 California Building Codes 2. Lead agency name and address: City of Bishop 377 W. Line Street Bishop, Ca 93514 3.

More information

407 TRANSITWAY. Planning & Preliminary Design

407 TRANSITWAY. Planning & Preliminary Design FROM EAST OF HIGHWAY 400 TO KENNEDY ROAD GWP #252-96-00 Public Information Centre #2 June 24 th and 29 th, 2010 Purpose of Public Information Centre #2 The first Public Information Centre (PIC #1) was

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

Torbram Road Improvements From Queen Street East to Bovaird Drive

Torbram Road Improvements From Queen Street East to Bovaird Drive Torbram Road Improvements From Queen Street East to Bovaird Drive Municipal Class EA Study Public Information Centre No. 1 November 16 2017 6:30 pm 8:30 pm Please sign in so we can keep you updated on

More information

Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1

Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1 Municipal Class Environmental Assessment Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1 Date: Thursday, June 20, 2013 Time: 6:30 p.m. 8:30 p.m.

More information

EA Report External Agency Comments and Study Team Responses

EA Report External Agency Comments and Study Team Responses 1 9-Feb-09 Karla Barboza, Ontario Ministry of Culture 1) MCL is interested in remaining on the circulation list and being informed of the project as it proceeds through the EA process. 2) The Glossary

More information

IMPACT ON LAND. 1. Will there be an effect as a result of a physical change to project site? Yes No

IMPACT ON LAND. 1. Will there be an effect as a result of a physical change to project site? Yes No Part 2 Project s Can Be IMPACT ON LAND 1. Will there be an effect as a result of a physical change to project site? Any construction on slopes of 15% or greater (15-foot rise per 100 feet of length) or

More information

Welcome to the Noise Barrier Workshop

Welcome to the Noise Barrier Workshop Welcome to the Noise Barrier Workshop DETROIT RIVER INTERNATIONAL CROSSING STUDY Initial Construction of The Windsor-Essex Parkway: Bridge No. 13, Bridge No. 14 & Noise Mitigation Adjacent to Southwood

More information

South Landfill Annual Cover Rate Screening Criteria Checklist

South Landfill Annual Cover Rate Screening Criteria Checklist South Landfill Annual Cover Rate Screening Criteria Checklist The following checklist is taken from the Guide to Environmental Assessments for Waste Management Projects, Part B Environmental Screening

More information

APPENDIX M CEQA Initial Study Checklist

APPENDIX M CEQA Initial Study Checklist APPENDIX M CEQA Initial Study Checklist Appendix G ENVIRONMENTAL CHECKLIST FORM (To be Completed by Applicant) 1. Project title: 2. Lead agency name and address: 3. Contact person and phone number: 4.

More information

Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description

Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description Introduction The analysis of the Warren Wagon Road Improvement Project is tiered to the 2003 Environmental

More information

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture Assessment of Landfill Footprint Alternatives Figure 422 99 Option #4 Impact on Agriculture The net effects with respect to continued service to customers, the optimized site life/ capacity is 65 million

More information

Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction

Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction Date: Wednesday, April 26, 2017 Time: 3:00 pm to 5:00 pm and 7:00 pm to 8:00 pm 1 Your input is appreciated. You are encouraged to review

More information

5. OTHER CEQA CONSIDERATIONS

5. OTHER CEQA CONSIDERATIONS 5. OTHER CEQA CONSIDERATIONS Cumulative Impacts CEQA requires the analysis of impacts due to cumulative development that would occur independent of, but during the same timeframe as, the project under

More information

Washington Dulles International Airport EXECUTIVE SUMMARY

Washington Dulles International Airport EXECUTIVE SUMMARY EXECUTIVE SUMMARY The events of September 11, 2001 and the economic uncertainties facing commercial aviation have affected the timing of the Proposed Action. The Metropolitan Washington Airports Authority

More information

Public Information Meeting - 14 September 2015 New Champlain Bridge Corridor Project

Public Information Meeting - 14 September 2015 New Champlain Bridge Corridor Project Public Information Meeting - 14 September 2015 Meeting Objective To provide information on the Highway 15 works of the in the Verdun and Sud-Ouest boroughs up to March 2016 ------------ including anticipated

More information

404(b)(1) EVALUATION

404(b)(1) EVALUATION 404(b)(1) EVALUATION SECTION 404(b)(1) EVALUATION DETAILED PROJECT REPORT AND ENVIRONMENTAL ASSESSMENT POMEROY SECTION 14 EMERGENCY STREAMBANK PROTECTION PROJECT POMEROY, OH I. INTRODUCTION As required

More information

U. S. COAST GUARD DRAFT FINDING OF NO SIGNIFICANT IMPACT FOR AMBASSADOR BRIDGE ENHANCEMENT PROJECT

U. S. COAST GUARD DRAFT FINDING OF NO SIGNIFICANT IMPACT FOR AMBASSADOR BRIDGE ENHANCEMENT PROJECT U. S. COAST GUARD DRAFT FINDING OF NO SIGNIFICANT IMPACT FOR AMBASSADOR BRIDGE ENHANCEMENT PROJECT Proposed construction of a companion bridge adjacent to the existing Ambassador Bridge across the Detroit

More information

Table of Contents. List of Tables. 11. Advantages and Disadvantages

Table of Contents. List of Tables. 11. Advantages and Disadvantages Table of Contents 11. Advantages and Disadvantages... 11-1 page List of Tables... 11-1 11. Advantages and Disadvantages The overall advantages and disadvantages of the DMNP are articulated, summarized

More information

APPENDIX H: SFEIS FLOODPLAIN IMPACT ANALYSIS SECTION

APPENDIX H: SFEIS FLOODPLAIN IMPACT ANALYSIS SECTION TH 36/STH 64 St. Croix River Crossing 2005 Water Resources Preliminary Design Report APPENDIX H: SFEIS FLOODPLAIN IMPACT ANALYSIS SECTION within the project area. Other methods of attaining this reduction

More information

MINISTRY OF TRANSPORTATION ONTARIO MANAGING OUR ASSETS

MINISTRY OF TRANSPORTATION ONTARIO MANAGING OUR ASSETS MINISTRY OF TRANSPORTATION ONTARIO MANAGING OUR ASSETS Financial Management Institute of Canada November 19, 2008 Ministry s Assets Mature network - large inventory Over 16,500 km Over 2,800 bridges 8

More information

ENVIRONMENTAL CHECKLIST (WAC )

ENVIRONMENTAL CHECKLIST (WAC ) Fee: $400.00 Date Fee Paid: Received by: 186 Iron Horse Court, Suite 101, Yakima WA 98901 Phone: (509) 834-2050 Fax: (509) 834-2060 Website: http://www.yakimacleanair.org ENVIRONMENTAL CHECKLIST (WAC 197-11-960)

More information

DRAFT FINDING OF NO SIGNIFICANT IMPACT. for. Tioga Sports Park

DRAFT FINDING OF NO SIGNIFICANT IMPACT. for. Tioga Sports Park DRAFT FINDING OF NO SIGNIFICANT IMPACT for Tioga Sports Park The U.S. Fish and Wildlife Service (USFWS) prepared an Environmental Assessment (EA) to analyze the potential effects of the proposal by the

More information

Municipal Class EA Process

Municipal Class EA Process Purpose of Tonight s Meeting INTRODUCTION This is the first Public Information Centre (PIC) to present information on the Class Environmental Assessment (EA) Study for a new operations centre. The following

More information

Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In

Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In WELCOME Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In PURPOSE OF THIS MEETING Rankin Construction Inc. (RCI) and their design consultant

More information

SEPA Environmental Checklist

SEPA Environmental Checklist Purpose of the Checklist: The State Environmental Policy Act (SEPA), chapter 43.21 RCW, requires all governmental agencies, including the City of Ferndale to consider the environmental impacts of a proposal

More information

Indirect and Cumulative Effects

Indirect and Cumulative Effects Chapter 21: Indirect and Cumulative Effects 21-1 INTRODUCTION The federal Council on Environmental Quality s (CEQ) regulations implementing the procedural provisions of the National Environmental Policy

More information

Single Family Residential Construction Erosion/Sediment Control Standards

Single Family Residential Construction Erosion/Sediment Control Standards Single Family Residential Construction Erosion/Sediment Control Standards Introduction: This booklet contains standard plans and procedures sufficient for typical building construction. It is not intended

More information

Environmental Check List Georgia Environmental Policy Act

Environmental Check List Georgia Environmental Policy Act Environmental Check List Georgia Environmental Policy Act Project No. : Project Name: GEORGIA IS AREA AFFECTED? IF AFFECTED, HOW SEVERELY? AREA/CATEGORY NO YES UNKNOWN MINOR MEDIAN MAJOR UNKNOWN 1. Wetlands

More information

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District Notice of Intent to Prepare a Draft Environmental Impact Statement for the Proposed Jasper Ocean Terminal in Jasper County,

More information

Key Milestones DETROIT RIVER INTERNATIONAL CROSSING. Initial Public Outreach. Study Area Features, Opportunities & Constraints.

Key Milestones DETROIT RIVER INTERNATIONAL CROSSING. Initial Public Outreach. Study Area Features, Opportunities & Constraints. DETROIT RIVER INTERNATIONAL CROSSING E N V I R O N M E N T A L A S S E S S M E N T Advisory Group Meetings - Illustrative Alternatives June 2005 1 Key Milestones Study Area Features, Opportunities & Constraints

More information

CATEGORY a protection of the natural environment, its ecosystems and biodiversity.

CATEGORY a protection of the natural environment, its ecosystems and biodiversity. 29. ENVIRONMENTAL DEVELOPMENT PERMIT AREA CATEGORY a protection of the natural environment, its ecosystems and biodiversity. The requirement to obtain an environmental development permit is cited in Section

More information

PERMIT APPLICATION FEES Fees must be paid at time of application

PERMIT APPLICATION FEES Fees must be paid at time of application Permits SEPA Checklist Permit # Staff use Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful

More information

FINDINGS OF FACT And CONCLUSIONS

FINDINGS OF FACT And CONCLUSIONS FINDINGS OF FACT And CONCLUSIONS SOUTHWEST RECONNECTION PROJECT Highway 61/101 Flood Mitigation State Project No. 1009-24 and State Aid Project No. 010-661-002 Prepared for: Carver County September 2013

More information

6/8/2016. Development Factors. Part 58 Review. Environmental Assessment Development Factors

6/8/2016. Development Factors. Part 58 Review. Environmental Assessment Development Factors Development Factors Part 58 Review Environmental Assessment Development Factors 1 Environmental Assessment Development Factors Impact Codes Make a Determination of Impact for each factor by choosing the

More information

Waste Management of Canada Corporation (WM) is pleased to welcome you to Public Open House #2 for the. Twin Creeks Landfill Environmental Screening

Waste Management of Canada Corporation (WM) is pleased to welcome you to Public Open House #2 for the. Twin Creeks Landfill Environmental Screening Welcome Waste Management of Canada Corporation (WM) is pleased to welcome you to Public Open House #2 for the Please take a few moments to browse the display material and talk to our staff and consultants.

More information

KALIA-FORT DERUSSY WASTEWATER SYSTEM IMPROVEMENTS FINAL ENVIRONMENTAL ASSESSMENT EXECUTIVE SUMMARY

KALIA-FORT DERUSSY WASTEWATER SYSTEM IMPROVEMENTS FINAL ENVIRONMENTAL ASSESSMENT EXECUTIVE SUMMARY EXECUTIVE SUMMARY This Environmental Assessment (EA) addresses the environmental impacts of the Proposed Action to construct certain improvements to the City and County of Honolulu (City) wastewater collection

More information

Welcome. About the Proponent. About the Proposed Project. The Proposed Project is now in the Regulatory Review period of the schedule.

Welcome. About the Proponent. About the Proposed Project. The Proposed Project is now in the Regulatory Review period of the schedule. Welcome Thank you for attending this Open House for the British Columbia Environmental Assessment Office (EAO) Pre-Application Public Comment Period. The B.C. Ministry of Transportation and Infrastructure

More information

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017 Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach October 2017 (Simulated FPF) INTRODUCTION Noront is proposing to develop a Ferrochrome Production Facility (FPF) in Northern

More information

Oklahoma Department of Transportation Environmental Programs Division Office Fax

Oklahoma Department of Transportation Environmental Programs Division Office Fax Oklahoma Department of Transportation Environmental Programs Division Office 521-3050 Fax 522-5193 Documented Categorical Exclusion (DCE) for I-40: Pavement Reconstruction and Added Lanes from the Douglas

More information

ENVIRONMENTAL CHECKLIST

ENVIRONMENTAL CHECKLIST City of Hoquiam Planning and Building Division 609 8 th St. Hoquiam, WA 98550-3522 Tel: 360-532-5700 ext. 211, Fax: 360-538-0938 Website: www.cityofhoquiam.com ENVIRONMENTAL CHECKLIST Purpose of checklist:

More information

The Halifax Harbour Solutions Project Provision of Sewage Treatment

The Halifax Harbour Solutions Project Provision of Sewage Treatment The Halifax Harbour Solutions Project Provision of Sewage Treatment ENVIRONMENTAL SCREENING PURSUANT TO THE CANADIAN ENVIRONMENTAL ASSESSMENT ACT Prepared by Halifax Regional Municipality June, 2000 Revised

More information

Lynnwood Link Extension 2013 Draft EIS Comments and Responses

Lynnwood Link Extension 2013 Draft EIS Comments and Responses Page 157 C-001-001 Sound Transit acknowledges your opposition to Alternative C1 due to its residential impacts and impacts to Scriber Creek Park and wetlands. Page 158 C-002-001 Following the Draft EIS,

More information

New. Stations. Public Information Centre

New. Stations. Public Information Centre New I Stations Public Information Centre King-Liberty SmartTrack Station St. Clair-Old Weston SmartTrack Station Spadina-Front GO Station Bloor-Lansdowne GO Station March 1, 2018 Today s Meeting Agenda

More information

Detroit River International Crossing Study. Draft Environmental Impact Statement (DEIS)/ Section 4(f) Evaluation

Detroit River International Crossing Study. Draft Environmental Impact Statement (DEIS)/ Section 4(f) Evaluation Detroit River International Crossing Study Draft Environmental Impact Statement (DEIS)/ Section 4(f) Evaluation DEIS and Technical Reports Available at: MDOT Lansing Office MDOT Metro Region Office MDOT

More information

WELCOME. Please sign in Representatives are available to answer questions Please complete a comment sheet

WELCOME. Please sign in Representatives are available to answer questions Please complete a comment sheet WELCOME Please sign in Representatives are available to answer questions Please complete a comment sheet Place it in the box or send it to the Consultant undertaking the study or to the Town of Wasaga

More information

Public Disclosure Authorized EXECUTIVE SUMMARY

Public Disclosure Authorized EXECUTIVE SUMMARY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized EXECUTIVE SUMMARY Introduction Georgia is an important transport corridor connecting

More information

Town of Perth Landfill Expansion Environmental Screening

Town of Perth Landfill Expansion Environmental Screening Town of Perth Landfill Expansion Environmental Screening Public Information Centre Thursday September 29, 2016 4:00 to 6:00 p.m. and 7:00 to 9:00 p.m. Perth Town Hall Main Floor Welcome to the Public Information

More information

APPENDIX A. CEAA Scoping Document

APPENDIX A. CEAA Scoping Document APPENDIX A CEAA Scoping Document Transport Canada - Surface Programs Scoping Document for the Mississauga BRT project, Mississauga Ontario. Introduction Transport Canada and Infrastructure Canada propose

More information

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and Introduction There are many tools that a reviewer of environmental impact assessment documents can use to help determine whether such documents are complete and adequate. Among the powerful tools that

More information

Site Plan and Subdivision Review

Site Plan and Subdivision Review Site Plan and Subdivision Review Municipal Land Use Framework Environmental Resource Inventory Master Plan Zoning Land Use Regulation Ordinance requirements for each zone Lot size, setbacks parking, cluster

More information

Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT

Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT I. BACKGROUND FOR MANURE STORAGE AND HANDLING SYSTEMS Supplementary Information Form on sizing and safety

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s T a b l e o f C o n t e n t s Executive Summary English Executive Summary French page 1. Introduction and Background... 1-1 1.1 Introduction...1-1 1.2 The Proponent Waste Management of Canada Corporation...1-2

More information

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199)) 11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363-4210 Fax: (916) 363-4230 M e m o r a n d u m To: Reena Gohil, Environmental Planner Date: May 30, 2017 California Department of

More information

5. Other Environmental Consequences

5. Other Environmental Consequences 5. Other Environmental Consequences 5.1 Unavoidable Adverse Impacts Impacts to the following environmental resources were evaluated for Alternative D, the preferred alternative, to determine if they would

More information

Appendix F: Noise Report

Appendix F: Noise Report Appendix F: Noise Report HIGHWAY 404 HIGHWAY 407 TO GREEN LANE (W.O. 03-20024) REGIONAL MUNICIPALITY OF YORK NOISE REPORT Preliminary Design and Class Environmental Assessment Study Class Environmental

More information

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-3

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-3 Texas Department of Transportation Book 2 - Technical Provisions IH 35E Managed Lanes Project Attachment 4-3 Form 2448 IH 35E Managed Lanes Project Book 2 - Technical Provisions Attachment 4-3 Show Form

More information

Draft Air Quality Work Plan

Draft Air Quality Work Plan Canada-United States-Ontario-Michigan Border Transportation Partnership Draft Air Quality Work Plan March 2006 Version 2 PREFACE The Canada - U.S. Ontario - Michigan Border Transportation Partnership (The

More information

Tall Trees HOA Update

Tall Trees HOA Update A Regional Transportation Solution Tall Trees HOA Update June 9, 2016 Meeting Agenda I. Brief Section Update II. List of Community Concerns Received III. Responses to Each Concern IV. Recap Action Items

More information

ATTACHMENT 1 GEPA CHECKLIST & Historical Archeological & Natural Heritage Preservation Documents

ATTACHMENT 1 GEPA CHECKLIST & Historical Archeological & Natural Heritage Preservation Documents ATTACHMENT 1 GEPA CHECKLIST & Historical Archeological & Natural Heritage Preservation Documents INTRODUCTION The 1991 Session of the Georgia General Assembly passed Senate Bill 97, as amended, and it

More information

Modeling the impacts of new border crossing corridor in Windsor, Ontario (Congestion, Accessibility and Emissions)

Modeling the impacts of new border crossing corridor in Windsor, Ontario (Congestion, Accessibility and Emissions) Modeling the impacts of new border crossing corridor in Windsor, Ontario (Congestion, Accessibility and Emissions) Presenter: Shakil Khan Co-authors: Hanna Maoh and William Anderson, Cross-Border Institute,

More information

Silverdale Water District 2018 Environmental Checklist

Silverdale Water District 2018 Environmental Checklist PURPOSE OF THE CHECKLIST: Project Name: Construction Agreement No.: Applicant: Abbreviated Legal Description: Assessor s Tax Parcel ID No.: Please read the following carefully before filling out the checklist.

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED METROPOLITAN COUNCIL ENVIRONMENTAL SERVICES ST. LOUIS

More information

Ottawa-Trussler Area Sewage Facility Class Environmental Assessment

Ottawa-Trussler Area Sewage Facility Class Environmental Assessment Welcome to the Ottawa-Trussler Area Sewage Facility Class Environmental Assessment Public Open House May 7, 2013 September 25, 2013 Welcome The purpose of this second Public Open House is to: Present the

More information

Chapter 5 Regulatory Coordination and Compliance

Chapter 5 Regulatory Coordination and Compliance Chapter 5 Regulatory Coordination and Compliance This chapter provides an update on the federal, state, and local laws and regulations that required the City to coordinate with regulatory agencies to obtain

More information

MITIGATION MONITORING AND REPORTING PROGRAM Valero Benicia Crude By Rail Project

MITIGATION MONITORING AND REPORTING PROGRAM Valero Benicia Crude By Rail Project MITIGATION MONITORING AND REPORTING PROGRAM Valero Benicia Crude By Rail Project Introduction This document describes the mitigation monitoring and reporting program (MMRP) for ensuring the effective implementation

More information

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX B

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX B CANADIAN TRANSIT COMPANY Ambassador Bridge Enhancement Project CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX B PLAZA

More information

LNG Canada Development Inc.

LNG Canada Development Inc. LNG Canada Development Inc. Shell Centre 32 nd Floor 400 4 th Avenue SW PO Box 100, Station M Calgary AB T2P 2H5 Canada Submitted electronically to: compliance.conformite@ceaa-acee.gc.ca April 20, 2016

More information

The Norwich Street Bridge

The Norwich Street Bridge The Norwich Street Bridge Class Environmental Assessment Open House May 17, 2017 6:30-8 p.m. Guelph City Hall Phase 1 Phase 2 Project File Our Study Process: This study is being undertaken as a Schedule

More information

Draft. Environmental Assessment Guidelines (including the Scope of the Environmental Assessment)

Draft. Environmental Assessment Guidelines (including the Scope of the Environmental Assessment) Draft the Scope of the Environmental Assessment) March 2012 Page left intentionally blank I II Page left intentionally blank III TABLE OF CONTENTS 1 INTRODUCTION... 1 1.1 PROJECT BACKGROUND... 1 1.2 APPLICATION

More information

Public Information Centre September 19 th, 2017

Public Information Centre September 19 th, 2017 Public Information Centre September 19 th, 2017 WELCOME! Public Information Centre for the Maple Hill Creek Rehabilitation Class Environmental Assessment Please take the time to sign our sign in sheet

More information

Chapter 4 ALTERNATIVES COMPARISON

Chapter 4 ALTERNATIVES COMPARISON Chapter 4 ALTERNATES COMPARSON 4.1 NTRODUCTON This chapter presents a comparison of the alternatives that were considered during preparation of this Draft ES/ER. Section 1.6 of this Draft ES/ER presents

More information

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below.

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below. CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE EAST CAMPUS STUDENT HOUSING PHASE III DEVELOPMENT PROJECT UNIVERSITY OF CALIFORNIA, IRVINE I. ADOPTION OF THE MITIGATED

More information

Detroit River International Crossing Environmental Assessment Study

Detroit River International Crossing Environmental Assessment Study Canada-United States-Ontario-Michigan Border Transportation Partnership Detroit River International Crossing Environmental Assessment Study Practical Alternatives Evaluation Constructability Report for

More information

Georgetown Water Storage Class Environmental Assessment Study

Georgetown Water Storage Class Environmental Assessment Study Georgetown Water Storage Class Environmental Assessment Study Public Information Centre Cedarvale Community Centre 181-185 Main Street South Thursday, September 4th, 2008 6:30 p.m. 8:30 p.m. Why are we

More information

Public Information Open House

Public Information Open House Frequently sked Questions Detroit River International Crossing (DRIC) Public Information Open Houses #5 Public Information Open House Quick Reference 1. PIOH, pg 1 2. ccess Rd lternatives, pg 2 3. Property

More information

Wyandanch Intermodal Transit Facility

Wyandanch Intermodal Transit Facility Wyandanch Intermodal Transit Facility Environmental Assessment July 2010 Prepared by: The United States Department of Transportation Federal Transit Administration in cooperation with The Town of Babylon

More information

CITY OF MERCER ISLAND

CITY OF MERCER ISLAND Exhibit B CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36TH STREET MERCER ISLAND, WA 98040 PHONE: 206.275.7605 www.mercergov.org Inspection Requests: Online: www.mybuildingpermits.com VM: 206.275.7730

More information

ENVIRONMENTAL CHECKLIST

ENVIRONMENTAL CHECKLIST ENVIRONMENTAL CHECKLIST CITY OF UNIVERSITY PLACE 3715 Bridgeport Way West University Place, WA 98466 Phone (253) 566-5656 FAX (253) 460-2541 Purpose of Checklist: PLEASE READ CAREFULLY BEFORE COMPLETING

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

Comparative Evaluation Option #1 & Option #2

Comparative Evaluation Option #1 & Option #2 Comparative Evaluation Option #1 & Option #2 Option #1 Existing Landfill Approx. 47 metres/14 stories Proposed Layout Approx. 31 metres/9.5 stories Option #2 Existing Landfill Approx. 47 metres/14 stories

More information

SECTION 6.0 Alternatives to the Proposed Project

SECTION 6.0 Alternatives to the Proposed Project SECTION 6.0 Alternatives to the Proposed Project 6.0 ALTERNATIVES TO THE PROPOSED PROJECT CEQA requires that an EIR include an analysis of a range of project alternatives that could feasibly attain most

More information