Energy savings certificates in France Selection of calculation sheets. IEA-DSM Task XXI: Standardisation of Energy Savings Calculation

Size: px
Start display at page:

Download "Energy savings certificates in France Selection of calculation sheets. IEA-DSM Task XXI: Standardisation of Energy Savings Calculation"

Transcription

1 Energy savings certificates in France Selection of calculation sheets IEA-DSM Task XXI: Standardisation of Energy Savings Calculation March 2010

2 Household sector Insulation building envelope Internal wall insulation (BAR EN-02) Windows with insulating glazing (BAR EN-04) Heating appliances Water-water heat pump (BAR TH-03) Air -water heat pump ( BAR TH-04) Individual condensing boiler (BAR TH-06) Collective condensing boiler (BAR TH-07) Individual low temperature heating boiler (BAR TH-08) Collective low temperature boiler (BAR TH-09) Air -air heat pump (BAR TH-29) Lighting Compact fluorescent lamps (class A) (BAR EQ-01) Appliances Refrigeration appliances (Class A+) (BAR EQ-03) Buildings in tertiary sector Insulation building envelope Loft and roof insulation BAT EN-01) Internal wall insulation (BAT EN-02) Windows / glazing (BAT EN-04) Heating Low temperature boiler (BAT TH-01) Condensing boiler (BAT TH-02) Lighting Light fitting for T5 electronic fluorescent tube with or without control device (BAT EQ-01) Light fitting with electronic ballast and dimming system on lighting device (BAT EQ-04) Industry Sector Energy efficient industrial equipment Energy Efficient Motor Category EFF1 (IND-UT-01) Electronic regulation system on a motor (IND-UT-02) Steam Economiser on the gaseous effluent from a steam boiler (IND-UT-04)

3 Agriculture Tractor engine inspection (IND-UT-06) Public sector Public lighting Outside light fitting (RES-EC-04) Power sector Energy-efficient transformer for industrial low voltage supply (IND-UT-10)

4 Energy savings certificates Calculation sheet Internal wall insulation A- APPLICATION SECTOR Residential building: existing individual houses and apartments B- DESCRIPTION OF STANDARD OPERATION Installation of insulating lining (compound or on framework) with thermal resistance R 2.40 m²k/w on existing walls. Installation of insulating lining (complex or on framework) with thermal resistance R between 1.2 m²k/w and 2.40 m²k/w on existing walls. Special conditions for granting of certificates The insulation materials used must comply with CE marking and be certified by ACERMI or an equivalent certification scheme. They must be installed in accordance with DTU and or a Technical Evaluation. Installation carried out by a professional. PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS Criterion 1: Type of energy used for heating: Electricity Fuel Criterion 2: Climatic area BR93 - Page 1/4

5 D- BASELINE SITUATION Baseline hypothesis: Correction for climatic area (cf. RT 2000) Area Climatic coefficient H1 1.1 H2 0.9 H3 0.6 The average Upinit coefficient used for external walls is 3.3 W/m².K. E- NATURE OF OPERATION AND LIMITS OF VALUATION Depending on the technical constraints of the project, it is not always possible to install insulation with thermal resistance equal to or greater than 2.4 m²k/w. In order to take account of these difficulties, installing insulation with thermal resistance of between 1.2 and 2.4 m²k/w has been valued at 50%. However, so as to retain an incentive to move towards better performance, installing insulation greater than or equal to 2.4 m²k/w has been valued at 100%. F- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh per year and per m²) Actual energy gain in kwh/m²/year: Calculated energy gain Electric heating Fuel-based heating Unit Installation of insulating compound with thermal resistance R 2.40 m²k/w Installation of insulating compound with thermal resistance 1.2 m²k/w R < 2.40 m²k/w kwh/m² Value calculation based on information shown in appendix Energy gain used Electric heating Fuel-based heating Unit Installation of insulating compound with thermal resistance R 2.40 m²k/w Installation of insulating compound with thermal resistance 1.2 m²k/w R < 2.40 m²k/w G- LIFE SPAN OF PRODUCT OR SERVICE 35 years. In other words, a discount factor at 4% of kwh/m² BR93 - Page 2/4

6 H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the life span of the product. (Rounded values) Action: Installation of insulating compound with thermal resistance R 2.40 m²k/w: Climatic area Electric heating Fuel-based heating Unit H1 1,940 3,070 H2 1,580 2,510 H3 1,060 1,670 kwh cumac per m² of insulation Action: Installation of insulating compound with thermal resistance 1.2 m²k/w < 2.40 m²k/w: R Climatic area Electric heating Fuel-based heating Unit H ,380 H ,130 H kwh cumac per m² of insulation BR93 - Page 3/4

7 APPENDIX Additional information Baseline hypotheses: The average Upinit coefficient used for external walls is 3.3 W/m².K This coefficient corresponds to an uninsulated wall. There are between 9 and 11 million uninsulated homes. Average degree day (ADD): 2,450 K Intermittency coefficient and incidental gain = 0.5 Yield from electric heating system: 95% Yield from fuel-based heating system: 60% Up final = 1/(1/Upinit +R) Up = Up final Upinit Gain = Up x average ADD x 24h x 0.5 / BR93 - Page 4/4

8 Energy savings certificates Calculation sheet Installation of complete windows or French windows* A- APPLICATION SECTOR Residential building: existing individual houses and apartments B- DESCRIPTION OF STANDARD OPERATION Installation of a complete window or French window with air vents (if necessary) corresponding to a surface transmission coefficient Uw of 2 W/m²K. Installation of a complete window or French window with air vents (if necessary) corresponding to a surface transmission coefficient Uw between 2 and 2.5 W/m²K. Special conditions for granting of certificates Windows and French windows will have NF CSTBat certification and an ACOTHERM label or equivalent. Windows and French windows must comply with CE marking as soon as this is applicable. Where there is no certification, the systems used to manufacture the windows or French windows must be accredited or have been the subject of a Technical Evaluation. Windows and French windows must be double-glazed with increased insulation certified by CEKAL. Windows and French windows must be installed in accordance with the DTU and directions set out in the CSTB specifications in effect for each type of material (aluminium, wood and PVC). Installation carried out by a professional. * Complete replacement means the installation of a complete window (frame + casement). The old window frame may be retained and used as an external frame installed in accordance with the CTSB specification. PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS Criterion 1: Type of energy used for heating: Electricity Fuel Criterion 2: Climatic area BR81 - Page 1/4

9 D- BASELINE SITUATION Correction for climatic area (cf. RT 2000) Area Climatic coefficient H1 1.1 H2 0.9 H3 0.6 The aim of these works will be to replace old windows and French windows with poorly performing single or double-glazing. The average surface transmission coefficient Uw in each of these cases is: Old frames fitted with Single Glazing => Uw = 5 W/(m².K) Standard wooden frames fitted with 4/6/4 clear Double Glazing => Uw = 4W/(m².K) In order to simplify the process, and given the difficulty of verifying the initial position after the event, a single value has been used to value window and French window replacement activities, whatever the initial position. The baseline surface transmission coefficient for this activity is Uw = 4.5 W/m²K. This value is a penalising factor in view of the proportion of individual houses built before 1975 not covered by any regulations (62%) and the proportion of domestic households replacing single-glazed windows compared with all those replacing windows (95%; source: ADEME). E- NATURE OF OPERATION AND LIMITS OF VALUATION Installing windows or French windows with a surface transmission coefficient Uw of less than 2W/m²K is valued at 100%. However, so as to retain an incentive to move towards better performance, installing windows or French windows with a surface transmission coefficient Uw between 2.5 and 2 W/m²K has been valued at 50%. F- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh per year and per m²) Actual energy gain in kwh/m²/year: Calculated energy gain Electric heating Fuel-based heating Unit Replacement with windows with a surface transmission coefficient Uw 2 W/m²K Replacement with windows with a surface transmission coefficient 2 W/m²K < Uw 2.5W/m²K kwh/m² of window Value calculation based on information shown in appendix Energy gain used Electric heating Fuel-based heating Unit BR81 - Page 2/4

10 Replacement with windows with a surface transmission coefficient Uw 2 W/m²K Replacement with windows with a surface transmission coefficient 2 W/m²K < Uw 2.5W/m²K G- LIFE SPAN OF PRODUCT OR SERVICE 35 years. In other words, a discount factor at 4% of kwh/m² of window H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the life span of the product. (Rounded values) Action: Complete replacement of old windows with windows or French windows with a surface transmission coefficient Uw 2 W/m²K: Climatic area Electric heating Fuel-based heating Unit H1 1,650 2,620 H2 1,350 2,140 H ,430 kwh cumac per m² of window Action: Complete replacement of old windows with windows or French windows with a surface transmission coefficient 2 W/m²K < Uw 2.5 W/m²K: Climatic area Electric heating Fuel-based heating Unit H ,050 H H kwh cumac per m² of window BR81 - Page 3/4

11 APPENDIX Additional information Baseline hypotheses: - Uninsulated roof/loft: Transmission coefficient Up = 3 W/(m².K) - Poorly insulated roof/loft: Transmission coefficient Up = 1 W/(m².K) In order to simplify the process, and given the difficulty of verifying the initial position after the event, a single value has been used to value insulation activities, whatever the initial position. The baseline transmission coefficient for this activity is Upinit = 2 W/m²K Average degree day (ADD): 2,450 K Intermittency coefficient and incidental gain = 0.5 Yield from electric heating system: = 95% Yield from fuel-based heating system: = 60% Up final = 1/(1/Up initial +R) Up = Up final Upinit Gain = Up x average ADD x 24h x 0.5 / Number of individual houses = 13,537,577 (source: 1999 census) Of which built pre-1975 = 8,383,482 (62%) Number of domestic households having carried out insulation work in uninsulated lofts and roofs in 2002 = 223,500 (source: ADEME) Number of domestic households having carried out insulation work in poorly insulated lofts and roofs in 2002 = 76,800 (source: ADEME) Complete replacement means the installation of a complete window (frame + casement). The old window frame may be retained and used as an external frame installed in accordance with the CTSB specifications. The rules for installing windows in existing frames are set out in the CSTB technical specifications. There are no restrictions on the thermal performance of this technique compared with installation into masonry. Windows installed according to the so-called renovation technique can be ACOTHERM certified in the same way as newly installed windows. BR81 - Page 4/4

12 Energy savings certificates Calculation sheet Water/water type heat pump A- APPLICATION SECTOR Residential building: existing individual houses and apartments. B- DESCRIPTION OF STANDARD OPERATION Installation of a water/water type heat pump. Special conditions for granting of certificates Performance coefficient measured in accordance with standard EN equal to or greater than 3. Installation carried out by a professional Remarks: The only eligible systems are heat pumps, i.e. appliances designed to produce heat (primarily through their heat exchangers) and which may or may not produce cool air if reversible. The domestic hot water that may be produced by the heat pump from a renewable energy source is not considered here. This may be reviewed as the potential of heat pumps changes over time. In the absence of any particular requirement for the value of the performance coefficient being clearly defined in the programme, a value of 3 will be used as a baseline Groupe de travail Documents de référence Bâtiment résidentiel : équipement Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Bâtiment tertiaire : équipement N Rev date Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Collectivités locales et réseaux de chaleur Industrie Services d'efficacité énergétique Transport Fiche de calcul Correspondants Fiche de synthèse associée validation ATEE BR /03/ /09/ /01/2006 validation ADEME ATEE ADEME N Date N DIDEME D. Rys (EDF) J. Ransquin Ph. Laplaise BR112-S 31/01/2006 BR112 - Page 1/6

13 C- PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS Criterion 1: Year of construction: Before 1975 After 1975 Criterion 2: Type of housing: Apartment or individual house Criterion 3: Climatic area Correction for climatic area (cf. RT 2000) Climatic area Coefficient H1 1.1 H2 0.9 H3 0.6 Criterion 4: Size of dwelling based on number of main rooms: Given that this parameter is easier to establish in practice than the actual area heated in each dwelling, the correction will be based on the number of main rooms. Correction coefficients based on the number of main rooms (according to the Annuaire Statistique de la France - INSEE - Edition 2002) 6 and Number of rooms over Apartment Individual house D- AVERAGE CONSUMPTION STATISTICS Data: CEREN (2004): Electric heating Fuel-based heating Before 1975 After 1975 Individual house 14,568 kwh 12,162 kwh Apartment 4,894 kwh 3,472 kwh Individual house 22,930 kwh 20,700 kwh Apartment 10,847 kwh 9,247 kwh Heating requirements are calculated based on these statistics and the hypotheses in the appendix and no further distinction is made between electric and fuel-based energy (average figure, taking account of the breakdown of the housing stock by heating energy source). E- BASELINE SITUATION Market for individual central heating boilers (GFCC 2002): 745,000 boilers Market for electric heating appliances (MSI study 2004): Market for heat pumps (AFPAC 2004): 6,800 ground/ground and ground/water heat pumps per year 3,900 water/water heat pumps per year 5,600 air/water heat pumps per year 11,000 air/air heat pumps per year 550,877 dwellings 27,300 pumps BR112 - Page 2/5

14 Total market (new and existing) 1,317,000 dwellings Taking into account the construction of 340,000 homes every year, the existing market is estimated at 980,000 dwellings. The vast majority of heat pumps are currently installed in new homes (95%). The existing market for air/water pumps is of the order of a few hundred units. It appears to be larger in the air/air sector (as a replacement for electric heating). Although this is low, a symbolic coefficient of has been applied to take account of the current market in existing homes. This coefficient equates to around 5,000 appliances installed in existing homes, which is much higher than in reality. F- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh/year and per home treated) As heat pumps use renewable energy sources, the calculation has been based on taking into consideration the production of heat from a renewable source (from the ground in this example). Hypotheses: Appliance performance coefficient = 3 or 3.5 or 4 (the performance coefficient is that indicated by the manufacturer and measured in accordance with standard EN 14511). 100% of heating requirements covered by the heat pump. Unit: kwh/year and per average-sized dwelling (equivalent to the average number of main rooms shown in table 2). Energy gains are therefore as follows: Water/water heat pump appliance performance coefficient to 3 Before 1975 After 1975 Apartment 5,392 kwh 3,915 kwh Individual house 12,081 kwh 10,270 kwh Water/water heat pump appliance performance coefficient to 3.5 Before 1975 After 1975 Apartment 5,777 kwh 4,194 kwh Individual house 12,944 kwh 11,003 kwh Water/water heat pump appliance performance coefficient to 4 Before 1975 After 1975 Apartment 6,066 kwh 4,404 kwh Individual house 13,592 kwh 11,553 kwh G- LIFE SPAN OF PRODUCT OR SERVICE 16 years In other words, a discount factor at 4% of H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the life span of the product. BR112 - Page 3/5

15 (Rounded values) Operation: Replacement of a boiler-based central heating system or network of electric radiators with a water/water heat pump with an appliance performance coefficient 3: Apartment Individual house Area Before 1975 After 1975 Unit H1 71,000 52,000 H2 58,000 42,000 H3 39,000 28,000 H1 160, ,000 H2 131, ,000 H3 87,000 74,000 Lifetime cumulative discounted kwh (cumac) per average-sized dwelling (to be corrected in accordance with table 2) Operation: Replacement of a boiler-based central heating system or network of electric radiators with a water/water heat pump with an appliance performance coefficient 3.5: Apartment Individual house Area Before 1975 After 1975 Unit H1 77,000 56,000 H2 63,000 45,000 H3 42,000 30,000 H1 172, ,000 H2 140, ,000 H3 94,000 80,000 Lifetime cumulative discounted kwh (cumac) per average-sized dwelling (to be corrected in accordance with table 2) Action: Action: Replacement of a boiler-based central heating system or network of electric radiators with a water/water heat pump with an appliance performance coefficient 4: Apartment Individual house Area Before 1975 After 1975 Unit H1 80,000 58,000 H2 66,000 48,000 H3 44,000 32,000 H1 180, ,000 H2 147, ,000 H3 98,000 84,000 Lifetime cumulative discounted kwh (cumac) per average-sized dwelling (to be corrected in accordance with table 2) BR112 - Page 4/5

16 APPENDIX Calculation hypotheses Calculation principle: Average consumption (CEREN statistics given in methodology note) Distribution and production yield of equivalent systems in current building stock Heating require ment to be satisfied Heat pump distribution yield Quantity of heat produced as an output from the heat pump = Q2 Quantity of heat from renewable sources taken from the environment = Q1 Electrical energy consumed by the compressor + nonpermanent auxiliary sources = W The ESC represents solely the quantity of renewable energy taken from the environment. This therefore refers to the quantity Q1 in the preceding diagram. The value Q1 is obtained from the performance coefficient and quantity of energy produced as an output from the heat pump (Q2) to satisfy the heating requirement. Q2 1 COP and Q2 Q1 W Q1 Q2 1 W COP The quantity Q2 is initially calculated based on the heating requirement to be satisfied, taking into account the distribution yield hypotheses for the heat pump. The heating requirement to be satisfied is established on the basis of average consumption statistics and average yield hypotheses for the equipment installed. Yield hypotheses: The following yields have been used to convert consumption statistics into a heating requirement and then into the quantity of heat to be produced by the heat pump condenser: Production yield for electric heating: 1 Distribution yield for electric heating: 0.98 Production yield for an individual fuel-based boiler (current installed base): 0.8 Distribution yield for the network of radiators connected to the fuel-based boiler: 0.85 Distribution yield for the water/water heat pump (network of radiators or heated floor): 0.85 Breakdown of housing stock (in thousands) by heating energy (CEREN 2000): Before 1975 After 1975 Totals Apartment: electric 1,372 1,276 2,648 Apartment: heating oil or other 1, ,425 Apartment: gas (or LPG) shared 1, ,304 Apartment: gas (or LPG) individual 1, ,527 Total number of apartments 7,065 2,839 9,904 IH: electric 1,198 2,303 3,501 IH: heating oil or other 4,391 1,598 5,989 IH: gas (or LPG) 2,766 1,157 3,923 Total number of IH 8,355 5,058 13,413 Totals 15,420 7,897 23,317 BR112 - Page 5/5

17 Energy savings certificates Calculation sheet Air/water type heat pump A- APPLICATION SECTOR Residential building: existing individual houses and apartments. B- DESCRIPTION OF STANDARD OPERATION Installation of an air/water type heat pump. Special conditions for granting of certificates Performance coefficient measured in accordance with standard EN equal to or greater than 3. Installation carried out by a professional. Remarks: The only eligible systems are heat pumps, i.e. appliances designed to produce heat (primarily through their heat exchangers) and which may or may not produce cool air if reversible. The domestic hot water that may be produced by the heat pump from a renewable energy source is not considered here. This may be reviewed as the potential of heat pumps changes over time. In the absence of any particular requirement for the value of the performance coefficient being clearly defined in the programme, a value of 3 will be used as a baseline Groupe de travail Documents de référence Bâtiment résidentiel : équipement Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Bâtiment tertiaire : équipement N Rev date Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Collectivités locales et réseaux de chaleur Industrie Services d'efficacité énergétique Transport Fiche de calcul Correspondants Fiche de synthèse associée validation ATEE BR /12/ /09/ /01/2006 validation ADEME ATEE ADEME N Date N DIDEME D. Rys (EDF) J. Ransquin Ph. Laplaise BR113-S 06/03/2006 BR113 - Page 1/6

18 C- PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS Criterion 1: Year of construction: Before 1975 After 1975 Criterion 2: Type of housing: Apartment or individual house Criterion 3: Climatic area Correction for climatic area (cf. RT 2000) Climatic area Coefficient H1 1.1 H2 0.9 H3 0.6 Criterion 4: Size of dwelling based on number of main rooms: Given that this parameter is easier to establish in practice than the actual area heated in each dwelling, the correction will be based on the number of main rooms. Correction coefficients based on the number of main rooms (according to the Annuaire Statistique de la France - INSEE - Edition 2002) 6 and Number of rooms over Apartment Individual house D- AVERAGE CONSUMPTION STATISTICS Data: CEREN (2004): Electric heating Fuel-based heating Before 1975 After 1975 Individual house 14,568 kwh 12,162 kwh Apartment 4,894 kwh 3,472 kwh Individual house 22,930 kwh 20,700 kwh Apartment 10,847 kwh 9,247 kwh Heating requirements are calculated based on these statistics and the hypotheses in the appendix and no further distinction is made between electric and fuel-based energy (average figure, taking account of the breakdown of the housing stock by heating energy source). E- BASELINE SITUATION Market for individual central heating boilers (GFCC 2002): 745,000 boilers Market for electric heating appliances (MSI study 2004): Market for heat pumps (AFPAC 2004): 6,800 ground/ground and ground/water heat pumps per year 3,900 water/water heat pumps per year 5,600 air/water heat pumps per year 11,000 air/air heat pumps per year 550,877 dwellings 27,300 pumps BR113 - Page 2/6

19 Total market (new and existing) 1,317,000 dwellings Taking into account the construction of 340,000 homes every year, the existing market is estimated at 980,000 dwellings. The vast majority of heat pumps are currently installed in new homes (95%). The existing market for air/water pumps is of the order of a few hundred units. It appears to be larger in the air/air sector (as a replacement for electric heating). Although this is low, a symbolic coefficient of has been applied to take account of the current market in existing homes. This coefficient equates to around 5,000 appliances installed in existing homes, which is much higher than in reality. F- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh/year and per home treated) As heat pumps use renewable energy sources, the calculation has been based on taking into consideration the production of heat from a renewable source (from the ground in this example). Hypotheses: Appliance performance coefficient = 3 or 3.5 or 4 (the performance coefficient is that indicated by the manufacturer and measured in accordance with standard EN 14511). 95% of heating requirements covered by the heat pump. Unit: kwh/year and per average-sized dwelling (equivalent to the average number of main rooms shown in table 2). Energy gains are therefore as follows: Air/water heat pump appliance performance coefficient to 3 Before 1975 After 1975 Apartment 5,123 kwh 3,719 kwh Individual house 11,477 kwh 9,756 kwh Air/water heat pump appliance performance coefficient to 3.5 Before 1975 After 1975 Apartment 5,777 kwh 4,194 kwh Individual house 12,944 kwh 11,003 kwh Air/water heat pump appliance performance coefficient to 4 Before 1975 After 1975 Apartment 5,763 kwh 4,184 kwh Individual house 12,912 kwh 10,976 kwh G- LIFE SPAN OF PRODUCT OR SERVICE 16 years In other words, a discount factor at 4% of H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES BR113 - Page 3/6

20 Expressed in cumulative discounted (cumac) kwh over the life span of the product. (Rounded values) Operation: Replacement of a boiler-based central heating system or network of electric radiators with an air/water heat pump with an appliance performance coefficient 3: Area Before 1975 After 1975 Unit Apartment Individual house H1 68,000 49,000 H2 56,000 40,000 H3 37,000 27,000 H1 152, ,000 H2 124, ,000 H3 83,000 71,000 Lifetime cumulative discounted kwh (cumac) per average-sized dwelling (to be corrected in accordance with table 2) Operation: Replacement of a boiler-based central heating system or network of electric radiators with an air/water heat pump with an appliance performance coefficient 3.5: Area Before 1975 After 1975 Unit Apartment Individual house H1 73,000 53,000 H2 51,000 43,000 H3 40,000 29,000 H1 163, ,000 H2 133, ,000 H3 89,000 76,000 Lifetime cumulative discounted kwh (cumac) per average-sized dwelling (to be corrected in accordance with table 2) Operation: Replacement of a boiler-based central heating system or network of electric radiators with an air/water heat pump with an appliance performance coefficient 4: Area Before 1975 After 1975 Unit Apartment Individual house H1 76,000 55,000 H2 63,000 45,000 H3 42,000 30,000 H1 171, ,000 H2 140, ,000 H3 93,000 79,000 Lifetime cumulative discounted kwh (cumac) per average-sized dwelling (to be corrected in accordance with table 2) BR113 - Page 4/6

21 APPENDIX Calculation principle: Calculation hypotheses Average consumption (CEREN statistics given in methodology note) Distribution and production yield of equivalent systems in current building stock Heating require ment to be satisfied Heat pump distribution yield Quantity of heat produced as an output from the heat pump = Q2 Quantity of heat from renewable sources taken from the environment = Q1 Electrical energy consumed by the compressor + nonpermanent auxiliary sources = W The ESC represents solely the quantity of renewable energy taken from the environment. This therefore refers to the quantity Q1 in the preceding diagram. The value Q1 is obtained from the performance coefficient and quantity of energy produced as an output from the heat pump (Q2) to satisfy the heating requirement. COP Q2 and Q2 Q1 W Q1 Q2 1 1 W COP The quantity Q2 is initially calculated based on the heating requirement to be satisfied, taking into account the distribution yield hypotheses for the heat pump. The heating requirement to be satisfied is established on the basis of average consumption statistics and average yield hypotheses for the equipment installed. Yield hypotheses: The following yields have been used to convert consumption statistics into a heating requirement and then into the quantity of heat to be produced by the heat pump condenser: Production yield for electric heating: 1 Distribution yield for electric heating: 0.98 Production yield for an individual fuel-based boiler (current installed base): 0.8 Distribution yield for the network of radiators connected to the fuel-based boiler: 0.85 Distribution yield for the air/water heat pump (network of radiators or heated floor): 0.85 Breakdown of housing stock (in thousands) by heating energy (CEREN 2000): Before 1975 After 1975 Totals Apartment: electric 1,372 1,276 2,648 Apartment: heating oil or other 1, ,425 Apartment: gas (or LPG) shared 1, ,304 Apartment: gas (or LPG) individual 1, ,527 Total number of apartments 7,065 2,839 9,904 IH: electric 1,198 2,303 3,501 IH: heating oil or other 4,391 1,598 5,989 IH: gas (or LPG) 2,766 1,157 3,923 Total number of IH 8,355 5,058 13,413 Totals 15,420 7,897 23,317 BR113 - Page 5/6

22 Energy savings certificates Calculation sheet Individual condensing-type heating boiler A- APPLICATION SECTOR Residential building: existing individual houses or apartments. B- DESCRIPTION OF STANDARD OPERATION Installation of an individual condensing-type heating boiler. Special conditions for granting of certificates The boiler must be CE marked and defined by type based on a certified measurement of its characteristics so that it can be classed as one of the three types of boilers defined in Directive 92/42 EC. The operation includes the installation of an appropriate control system. This operation only applies to installations with heat exchangers that are large enough to allow the boiler to condense properly. Installation carried out by a professional Groupe de travail Documents de référence Bâtiment résidentiel : équipement Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Bâtiment tertiaire : équipement N Rev date Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Collectivités locales et réseaux de chaleur Industrie Services d'efficacité énergétique Transport Fiche de calcul Correspondants Fiche de synthèse associée validation ATEE BR /01/ /11/ /01/2006 validation ADEME ATEE ADEME N Date N DIDEME O. Servant (GDF) H. Despretz BR85-S 30/12/2005 BR85 - Page 1/3

23 C- PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS Criterion 1: Type of housing: Individual house Apartment, based on table 1 Criterion 2: Age of building: Before 1975 After 1975, based on table 1 Criterion 3: Size of dwelling, based on number of main rooms, table 2 Criterion 4: Geographical location, based on table 3 D- AVERAGE CONSUMPTION STATISTICS KWh/year 1975 > 1975 Individual house Apartment Cch Cecs Cch Cecs 22,932 KWh/year 20,698 KWh/year 4,800 KWh/year 10,847 KWh/year 3,687 KWh/year 4,800 KWh/year 9,247 KWh/year 3,687 KWh/year Table 1 Average consumption of typical dwellings (according to CEREN for heating and consumption cost display method for domestic hot water) Segment Average number of rooms 1 room 2 rooms 3 rooms 4 rooms 5 rooms 6 rooms and more Apartment Individual house Table 2 - Correction coefficient based on number of main rooms (according to the Annuaire Statistique de la France - INSEE - Edition 2002) Climate Area coefficient H1 1.1 H2 0.9 H3 0.6 Table 3: Correction for geographical area NB: the dwelling size coefficient is applied to the dwelling s overall consumption. The climate coefficient is applied only to heating consumption. E- BASELINE SITUATION Condensing boilers are the best available technology as a replacement for obsolete boilers or as a new installation in an existing building. Their value in terms of energy savings certificates is based on the standard gain obtained compared with a typical boiler from the old installed base, i.e. an energy saving of 40%. F- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh per year) BR85 - Page 2/3

24 Gain from condensing-type boiler: 40%. KWh/year 1975 > 1975 Individual house Heating gain 9,173 kwh/year 8,279 kwh/year Domestic hot water gain 1,920 kwh/year 1,920 kwh/year Heating gain 4,339 kwh/year 3,699 kwh/year Apartment Domestic hot water gain 1,475 kwh/year 1,475 kwh/year Table 4: Annual energy gain on consumption of heating and hot water G- LIFE SPAN OF PRODUCT OR SERVICE USED 16 years. In other words, a discount factor at 4% of H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the life span of the product. (Rounded values) Individual house Heating gain Apartment (individual heating) Heating gain Climatic area H1 H2 H3 H1 H2 H , ,000 67,000 58,000 47,000 32,000 > ,000 90,000 60,000 49,000 40,000 27,000 Gain on heating + domestic hot water Gain on heating + domestic hot water Climatic area H1 H2 H3 H1 H2 H , ,000 90,000 76,000 65,000 49,000 > , ,000 83,000 68,000 58,000 45,000 Table 5: Entitlement to ESC for basic operation, in cumulative discounted kwh over lifetime Entitlement to ESC operation = Entitlement to ESC average dwelling * coeff. no. main rooms BR85 - Page 3/3

25 Energy savings certificates Calculation sheet Individual low temperature-type heating boiler A- APPLICATION SECTOR Residential building: existing individual houses or apartments. B- DESCRIPTION OF STANDARD OPERATION Installation of an individual low temperature-type heating boiler. Special conditions for granting of certificates The boiler must be CE marked and defined by type based on a certified measurement of its characteristics so that it can be classed as one of the three types of boilers defined in Directive 92/42 EC. The operation includes the installation of an appropriate control system. Installation carried out by a professional Groupe de travail Documents de référence Bâtiment résidentiel : équipement Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Bâtiment tertiaire : équipement N Rev date Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Collectivités locales et réseaux de chaleur Industrie Services d'efficacité énergétique Transport Fiche de calcul Correspondants Fiche de synthèse associée validation ATEE BR /01/ /11/ /01/2006 validation ADEME ATEE ADEME N Date N DIDEME O. Servant (GDF) H. Despretz BR84-S 30/12/3005 BR84 - Page 1/3

26 C- PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS Criterion 1: Type of housing: Individual house Apartment, based on table 1 Criterion 2: Age of building: Before 1975 After 1975, based on table 1 Criterion 3: Size of dwelling, based on number of main rooms, table 2 Criterion 4: Geographical location, based on table 3 D- AVERAGE CONSUMPTION STATISTICS KWh/year 1975 > 1975 Individual house Apartment Cch Cecs Cch Cecs 22,932 KWh/year 20,698 KWh/year 4,800 KWh/year 10,847 KWh/year 3,687 KWh/year 4,800 KWh/year 9,247 KWh/year 3,687 KWh/year Table 1 Average consumption of typical dwellings (according to CEREN for heating and consumption cost display method for domestic hot water) Segment Average number of rooms 1 room 2 rooms 3 rooms 4 rooms 5 rooms 6 rooms and more Apartment Individual house Table 2 - Correction coefficient based on number of main rooms (according to the Annuaire Statistique de la France - INSEE - Edition 2002) Climate Area coefficient H1 1.1 H2 0.9 H3 0.6 Table 3: Correction for geographical area NB: the dwelling size coefficient is applied to the dwelling s overall consumption. The climate coefficient is applied only to heating consumption. E- BASELINE SITUATION Depending on the technical constraints of the project (evacuation of by-products of combustion, size of heat exchangers, etc.) it is not always possible to install the best available technology, i.e. a condensing boiler, as a replacement for an obsolete boiler or as a new installation in an existing building. In order to take account of the technical and economic realities in which projects are carried out, the installation of a low-temperature boiler that offers a significant gain in energy performance is valued in terms of energy savings certificates. BR84 - Page 2/3

27 So as to retain an incentive to move towards better performance, the standard gain of 35% obtained compared with a typical boiler from the old installed base is only valued at 50%, i.e. 17.5%. F- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh per year) Gain from low temperature-type boiler: 35%. KWh/year 1975 > 1975 Individual house Heating gain 4,013 kwh/year 3,622 kwh/year Domestic hot water gain 840 kwh/year 840 kwh/year Heating gain 1,898 kwh/year 1,618 kwh/year Apartment Domestic hot water gain 645 kwh/year 645 kwh/year Table 4: Annual energy gain on consumption of heating and domestic hot water G- LIFE SPAN OF PRODUCT OR SERVICE USED 16 years. In other words, a discount factor at 4% of H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the life span of the product. (Rounded values) Individual house Heating gain Apartment (individual heating) Heating gain Climatic area H1 H2 H3 H1 H2 H ,500 43,800 29,200 25,300 20,700 13,800 > ,300 39,500 26,300 21,600 17,700 11,800 Gain on heating + domestic hot water Gain on heating + domestic hot water Climatic area H1 H2 H3 H1 H2 H ,700 54,000 39,400 33,100 28,500 21,600 > ,500 49,700 36,500 29,400 25,500 19,600 Table 5: Entitlement to ESC for basic operation, in cumulative discounted kwh over lifetime Entitlement to ESC operation = Entitlement to ESC average dwelling * coeff. no. main rooms BR84 - Page 3/3

28 Energy savings certificates Calculation sheet Collective low temperature-type heating boiler A- APPLICATION SECTOR Residential buildings: existing apartment. B- DESCRIPTION OF STANDARD OPERATION Installation of a collective low temperature-type heating boiler. Special conditions for granting of certificates Business premises within a shared building are treated in the same way as an apartment. For appliances with a power rating less than or equal to 400kW, the boiler must be CE marked and defined by type based on a certified measurement of its characteristics so that it can be classed as one of the three types of boilers defined in Directive 92/42 EC. The operation includes the installation of an appropriate control system. Installation carried out by a professional Groupe de travail Documents de référence Bâtiment résidentiel : équipement Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Bâtiment tertiaire : équipement N Rev date Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Collectivités locales et réseaux de chaleur Industrie Services d'efficacité énergétique Transport Fiche de calcul Correspondants Fiche de synthèse associée validation ATEE BR /01/ /11/ /01/2006 validation ADEME ATEE ADEME N Date N DIDEME O. Servant (GDF) H. Despretz BR82-S 30/12/2005 BR82 - Page 1/3

29 C- PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS Criterion 1: Age of building: Before 1975 After 1975, based on table 1 Criterion 2: Size of dwelling, based on number of main rooms, table 2 Criterion 3: Geographical location, based on table 3 D- AVERAGE CONSUMPTION STATISTICS Type of use Age of building Cch Cecs ,404 kwh/year 4,260 kwh/year > ,615 kwh/year 4,260 kwh/year Table 1: Average consumption of typical apartments (according to CEREN for heating and consumption cost display method for domestic hot water) Segment Average number of rooms 1 room 2 rooms 3 rooms 4 rooms 5 rooms 6 rooms and more Coefficient Table 2 - Correction coefficient based on number of main rooms (according to the Annuaire Statistique de la France - INSEE - Edition 2002) Climate Area coefficient H1 1.1 H2 0.9 H3 0.6 Table 3: Correction for geographical area NB: the dwelling size coefficient is applied to overall consumption. The climate coefficient is applied only to heating consumption. E- BASELINE SITUATION Depending on the technical constraints of the project (evacuation of by-products of combustion, size of heat exchangers, etc.) it is not always possible to install the best available technology, i.e. a condensing boiler, as a replacement for an obsolete boiler or as a new installation in an existing building. In order to take account of the technical and economic realities in which projects are carried out, the installation of a low-temperature boiler that offers a significant gain in energy performance is valued in terms of energy savings certificates. However, so as to retain an incentive to move towards better performance, the standard gain of 35% obtained compared with a typical boiler from the old installed base is only valued at 50%, i.e. 17.5%. BR82 - Page 2/3

30 F- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh per year) Gain from low temperature-type boiler: 35%. Age of building Gain on domestic hot water on heating ,696 kwh/year 746 kwh/year > ,383 kwh/year 746 kwh/year Table 4: Annual energy gain for an apartment G- LIFE SPAN OF PRODUCT OR SERVICE USED 21 years. In other words, a discount factor at 4% of H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the life span of the product. (Rounded values) Use of boiler Heating Heating and domestic hot water Climatic area Length of service before 75 after 75 Number of rooms Correction factor H 1 43,300 38, H 2 35,400 31, H 3 23,600 20, H 1 54,100 49,100 X H 2 46,300 42, H 3 34,500 31, BR82 - Page 3/3

31 Energy savings certificates Calculation sheet Air/air type heat pump A- APPLICATION SECTOR Residential building: existing individual houses and apartments. B- DESCRIPTION OF STANDARD OPERATION Replacement of heating system with an air/air type heat pump. Special conditions for granting of certificates Performance coefficient measured in accordance with standard EN over 3.2 (efficiency class B or C according to Directive 2002/31/EC on energy labelling of domestic air-conditioners) over 3.6 (efficiency class A) System certified by Eurovent Certification Installation carried out by a professional. Remarks: The only eligible systems are heat pumps, i.e. appliances designed to produce heat and which may or may not produce cool air if reversible. In the absence of any particular requirement for the value of the performance coefficient being clearly defined in the programme, a value of 3.2 will be used as a baseline Groupe de travail Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Documents de référence Collectivités locales et réseaux de chaleur Bâtiment résidentiel : équipement Industrie Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Services d'efficacité énergétique Bâtiment tertiaire : équipement Transport Fiche de calcul Correspondants Fiche de synthèse associée N Rev date validation ATEE BR /09/06 16/10/06 validation ADEME ATEE ADEME N Date N DIDEME Pascal FOLEMPIN J.Ransquin BR 121-S 07/09/06 BR121 Air-air heat pump - Page 1/5

32 C- PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS Criterion 1: Year of construction: Before 1975 After 1975 Criterion 2: Type of housing: Apartment or individual house Criterion 3: Climatic area Correction for climatic area (cf. RT 2000) Climatic area Coefficient H1 1.1 H2 0.9 H3 0.6 Criterion 4: Size of dwelling based on number of main rooms or surface area Correction coefficients based on the number of main rooms (according to the Annuaire Statistique de la France - INSEE - Edition 2002) Size 1 room 2 rooms 3 rooms 4 rooms 5 rooms 6 rooms and more Surface area < 40 m² m² m² m² m² >131 m² Apartment Individual house D- AVERAGE CONSUMPTION STATISTICS Data: CEREN (2004): Electric heating Fuel-based heating Before 1975 After 1975 Individual house 14,568 kwh 12,162 kwh Apartment 4,894 kwh 3,472 kwh Individual house 22,930 kwh 20,700 kwh Apartment 10,847 kwh 9,247 kwh Heating requirements are calculated based on these statistics and the hypotheses in the appendix and no further distinction is made between electric and fuel-based energy (average figure, taking account of the breakdown of the housing stock by heating energy source). E- BASELINE SITUATION Market for individual central heating boilers (GFCC 2002): Market for electric heating appliances (MSI study 2004): Market for heat pumps (AFPAC 2005): 7,800 ground/ground and ground/water heat pumps per year 5,400 water/water heat pumps per year 12,000 air/water heat pumps per year Market for air/air heat pumps (Clim Info 2005): 39,500 multi-split air/air heat pumps of 2.7 to 7 kw per year 745,000 boilers 550,877 dwellings 25,200 pumps 56,500 pumps BR121 Air/air heat pump Page 2/5

33 17,000 multi-split air/air heat pumps of 7 to 17 kw per year Total market (new and existing) 1,317,000 dwellings Taking into account the construction of 340,000 homes every year, the existing market is estimated at 980,000 dwellings. The vast majority of heat pumps, all technologies combined, is currently installed in new homes (95%). In renovation projects, air/air heat pumps are usually installed to provide additional heating in one or more rooms. The aim of this standard operation is to provide 95% of heating throughout the period when heating is required. Although this is low, a coefficient of 0.95 has been applied to take account of the current market in existing homes. F- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh/year and per home treated) As heat pumps use renewable energy sources, the calculation has been based on taking into consideration the production of heat from a renewable source (from the air in this example). Hypotheses: Appliance performance coefficient = 3.2 or 3.6 (the performance coefficient is measured in accordance with standard EN and certified by Eurovent Certification). 95% of heating requirements are covered by the heat pump. Unit: kwh/year and per average-sized dwelling (equivalent to the average number of main rooms shown in table 2). Energy gains are therefore as follows: Appliance performance coefficient air/air heat pump > 3.2 (efficiency class B or C) Before 1975 After 1975 Apartment 4,194 kwh 2,899 kwh Individual house 10,036 kwh 8,448 kwh Appliance performance coefficient air/air heat pump > 3.6 (efficiency class A) Before 1975 After 1975 Apartment 4,433 kwh 3,072 kwh Individual house 10,571 kwh 8,903 kwh G- LIFE SPAN OF PRODUCT OR SERVICE 16 years In other words, a discount factor at 4% of BR121 Air/air heat pump Page 3/5

34 H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the life span of the product. (Rounded values) Operation: Replacement of a boiler-based central heating system or network of electric radiators with an air/air heat pump with an appliance performance coefficient > 3.2: Area Before 1975 After 1975 Unit H1 53,000 37,000 Apartment Individual house H2 44,000 30,000 H3 29,000 20,000 H1 128, ,000 H2 104,000 88,000 H3 70,000 57,000 Lifetime cumulative discounted kwh (cumac) per average-sized dwelling (to be corrected in accordance with table 2) Operation: Replacement of a boiler-based central heating system or network of electric radiators with an air/air heat pump with an appliance performance coefficient > 3.6: Area Before 1975 After 1975 Unit H1 57,000 39,000 Apartment Individual house H2 46,000 32,000 H3 31,000 21,000 H1 135, ,000 H2 110,000 93,000 H3 73,000 62,000 Lifetime cumulative discounted kwh (cumac) per average-sized dwelling (to be corrected in accordance with table 2) BR121 Air/air heat pump Page 4/5

35 Average consumption (CEREN statistics given in methodology note) Calculation principle: Distribution and production yield of equivalent systems in current building stock APPENDIX Calculation hypotheses The ESC values solely the quantity of renewable energy taken from the environment. This therefore refers to the quantity Q1 in the preceding diagram. The value Q1 is obtained from the performance coefficient and quantity of energy produced as an output from the heat pump (Q2) to satisfy the heating requirement. COP Heating requirem ent to be satisfied Heat pump distribution yield Quantity of heat produced as an output from the heat pump = Q2 Q2 and Q2 Q1 W Q1 Q2 1 1 W COP The quantity Q2 is initially calculated based on the heating requirement to be satisfied, taking into account the distribution yield hypotheses for the heat pump. The heating requirement to be satisfied is established on the basis of average consumption statistics and average yield hypotheses for the equipment installed. As these systems can be reversible, a summer consumption of 0.5kWh/m² has been deducted from the energy gains. Yield hypotheses: The following yields have been used to convert consumption statistics into a heating requirement and then into the quantity of heat to be produced by the heat pump condenser: Production yield for electric heating: 1 Distribution yield for electric heating: 0.98 Production yield for an individual fuel-based boiler (current installed base): 0.8 Distribution yield for the network of radiators connected to the fuel-based boiler: 0.85 Distribution yield for air/air heat pump: 0.95 Breakdown of housing stock (in thousands) by heating energy (CEREN 2000): Before 1975 After 1975 Totals Apartment: electric 1,372 1,276 2,648 Apartment: heating oil or other 1, ,425 Apartment: gas (or LPG) shared 1, ,304 Apartment: gas (or LPG) individual 1, ,527 Total number of apartments 7,065 2,839 9,904 IH: electric 1,198 2,303 3,501 IH: heating oil or other 4,391 1,598 5,989 IH: gas (or LPG) 2,766 1,157 3,923 Total number of IH 8,355 5,058 13,413 Totals 15,420 7,897 23,317 Quantity of heat from renewable sources taken from the environment = Q1 Electrical energy consumed by the compressor + non-permanent auxiliary sources = W BR121 Air/air heat pump Page 5/5

36 Energy savings certificates Calculation sheet Class A compact fluorescent lamp A- APPLICATION SECTOR Residential building: existing individual houses and apartments. B- DESCRIPTION OF STANDARD OPERATION Installation of a class A compact fluorescent lamp (also known as a low-energy light bulb) Groupe de travail Documents de référence Bâtiment résidentiel : équipement Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Bâtiment tertiaire : équipement N Rev date Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Collectivités locales et réseaux de chaleur Industrie Services d'efficacité énergétique Transport Fiche de calcul Correspondants Fiche de synthèse associée validation ATEE BR /01/ /09/ /01/2006 validation ADEME ATEE ADEME N Date N DIDEME P. Bramly (EDF) H. Lefebvre BR20-S 30/12/2005 BR20 - Page 1/3

37 C- PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS No specific differentiation criteria. General average value. D- AVERAGE CONSUMPTION STATISTICS On an operating basis of 800h/year: Incandescent bulb Compact fluorescent lamp Average power used (in W) Average consumption used (in kwh/year) E- BASELINE SITUATION Distribution of class A CFLs to replace existing incandescent bulbs. The baseline power will be taken as 80 W for incandescent bulbs and 18 W for CFLs based on a growing market. F- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh per year) General average value, based on a statistical calculation: On average, CFLs are fitted to replace: an incandescent bulb in 70% of cases, an existing CFL in 30% of cases. In other words, in kwh/year: Partial gain For each incandescent bulb replaced: 0.7*( ) = Total gain For each CFL replaced: 0 G- LIFE SPAN OF PRODUCT OR SERVICE USED 7.5 years In other words, a discount factor at 4% of H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the life span of the product. (Rounded value) Annual gain (kwh/year) Discount coefficient kwh cumac BR20 - Page 2/3

38 APPENDIX Additional information Market data Per domestic Total sector Trend household Number of light sources installed ,000,000 Slight increase in number Number of standard incandescents ,000,000 69% of installed base Decreasing Number of CFLs ,000,000 10% of installed base Increasing Others ,000,000 21% of installed base Growing strongly Annual sales of light 7 180,000,000 sources Sales of incandescent bulbs/year 6 152,000, % of total sales of light sources CFL sales/year 0.3 8,000, % of total sales of light sources Sales of other light sources / year ,000, % of total sales of light sources The energy gain is the gain obtained by substituting a so-called baseline bulb (the traditional incandescent bulb) with a CFL (compact fluorescent lamp). The gain is calculated over the life span of the CFL (6,000 hours) with an average annual use of 800 hours (i.e. 2 hours 10 minutes per day), to give a programme length of 7.5 years. Today, 70% of the 8 million CFLs sold annually are used as a substitute for an incandescent light source (75 W) whilst 30% are used to replace a CFL (18 W) that has reached the end of its life (source: SOFRES 2001). An 18 W CFL equates to a theoretical 80 W incandescent bulb. Potential yield from the operation: 80% of the annual sales of 8 million CFLs are made through mass-market retailers. We have calculated that the potential yield is therefore: 0.8 x 8,000,000 = 6,400,000 CFL/year i.e. 6,400,000 x 230 = TWh/year Average price of an incandescent bulb 0.80 Average price of a CFL 5 Additional cost: 4.20 Gain (cumac) per CFL 230 kwh Value of ESCs at 0.01/kWh 2.30 ESC coverage of additional cost 55% 1 Other bulbs include fluorescent tubes, low-voltage and pencil-style halogen bulbs, etc. BR20 - Page 3/3

39 Energy savings certificates Calculation sheet Class A+ domestic refrigeration appliances A- APPLICATION SECTOR Residential building: existing individual houses and apartments B- DESCRIPTION OF STANDARD OPERATION Installation of a class A+ domestic refrigeration appliance Groupe de travail Documents de référence Bâtiment résidentiel : équipement Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Bâtiment tertiaire : équipement N Rev date Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Collectivités locales et réseaux de chaleur Industrie Services d'efficacité énergétique Transport Fiche de calcul Correspondants Fiche de synthèse associée validation ATEE BR /01/ /09/ /01/2006 validation ADEME ATEE ADEME N Date N DIDEME P. Bramly (EDF) H. Lefebvre BR22-S 06/02/2006 BR22 - Page 1/3

40 C- PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS No specific differentiation criteria. General average value by type of appliance based on the segments defined in F. D- AVERAGE CONSUMPTION STATISTICS Type Average consumption used in kwh/year Refrigerator 221 Freezer 279 Combined fridge-freezer 346 Class A+ refrigerator 155 Class A+ refrigerator 229 Class A+ combined 279 fridge-freezer E- BASELINE SITUATION Replacement of refrigeration appliances in an averagely buoyant market by class A+ appliances. Each appliance is replaced by an appliance of the same type (for example, a refrigerator by a class A+ refrigerator). F- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh per year) Type Savings achieved in kwh/year refrigerator 66 freezer 50 combined 67 fridgefreezer G- LIFE SPAN OF PRODUCT OR SERVICE USED 10 years In other words, a discount factor at 4% of H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the life span of the product. (Rounded values) Type Annual gain in kwh/year Discount coefficient kwh cumac refrigerator freezer Combined fridge-freezer BR22 - Page 2/3

41 APPENDIX Additional information Annual consumption of installed base of domestic refrigeration equipment: 15.4 TWh in 2001 (Data: CEREN) Market data The installed base of refrigeration equipment is 39 million appliances (4 million of which are doubled up). Annual sales total 3 million appliances (source: GIFAM), 75% of which are to replace existing stock (SOFRES 1999). The baseline calculation for domestic refrigeration appliances is based on the range of products available in stores (information gathered from websites and catalogues), distinguishing between combined fridge-freezers, refrigerators and freezers. Information about upright and chest freezers is combined in the calculation of unit gains in order to avoid increasing the number of types of appliance. Potential yield from the operation: Cumac (in kwh) Annual sales A+ (100% of the market) Potential yield cumac (in TWh) Additional cost A+ compared with standard Value of ESC ( 0.01/kWh) ESC coverage of additional cost Category Installed base Annual sales (millions) (millions) Replacement rate Combined fridgefreezers (43% of the 75% market) Freezers (27% of the 56% market) Refrigerators (30% of the market) 84% Total % Combined fridgefreezers 565 1,300, Freezers , Refrigerators 557 1,000, Total 1.63 Combined fridgefreezers % Freezers % Refrigerators % BR22 - Page 3/3

42 Energy savings certificates Calculation sheet Loft and roof insulation A- APPLICATION SECTOR Tertiary buildings: existing premises in the tertiary sector reserved for business use, with a total surface area of less than 5,000 m². Accommodation buildings in the tertiary sector are comparable to residential buildings and are included in the sheet Loft and roof insulation Residential Buildings sector. B- DESCRIPTION OF STANDARD OPERATION Installation of thermal insulation with thermal resistance R 5 m²k/w in loft or roof. Installation of thermal insulation with thermal resistance 5 m²k/w > R 2.5 m²k/w in loft or roof. Special conditions for granting of certificates The insulation materials used must comply with CE marking and be certified by ACERMI or an equivalent certification scheme and be installed in accordance with the regulations in effect or the technical specification (CPT) for loft insulation Groupe de travail Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Document de référence Collectivités locales et réseaux de chaleur Bâtiment résidentiel : équipement Industrie Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Services d'efficacité énergétique Bâtiment tertiaire : équipement Transport Fiche de calcul Correspondants Fiche de synthèse associée N Rev date validation ATEE BT /12/05 24/11/05 validation ADEME ATEE ADEME N Date N DIDEME S. Charbonnier (SG Isover) H. Despretz BT217-S 30/12/05 BT217 - Page 1/5

43 C- PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS Criterion 1: Tertiary sector Table - Correction for tertiary sector function Education Offices Healthcare Hotels - Catering Shops Internal inputs Intermittence and indoor temperature Coefficient (inputs, T C and intermittence) Criterion 2: Type of energy used for heating: Electricity or Fuel Yield from electric heating: = 95% Yield from fuel-based heating: = 60% Criterion 3: Geographical location Table - Correction for climatic area Area Climate coefficient H1 1.1 H2 0.9 H3 0.6 Criterion 4: Thermal resistance of insulation D- AVERAGE CONSUMPTION STATISTICS Tableau A.1 - Baseline energy consumption indicator per sub-branch Offices Branch Sub-branch Heating + domestic hot water Heating (kwh/m²) Domestic hot water (kwh/m²) (kwh/m²) Natural gas Electricity Natural gas Electricity Natural gas Electricity Overall <1,000m² ,000m² Overall Education Primary Secondary Higher - Research Overall Healthcare Public hospitals Clinics BT217 - Page 2/5

44 Remainder Overall Shops Hypermarkets Small shops Large stores Overall Cafés, hotels and restaurants Restaurants Bars Hotels E- BASELINE SITUATION Work to install insulation in lofts and roofs will be carried out in buildings whose lofts or roofs are poorly insulated or not insulated at all. The average transmission coefficient (Up) in each of these cases is: No insulation in roof (Up = 3 W/m²K) Old, poor insulation in roof (Up = 1W/m²K) In order to simplify the process, and given the difficulty of verifying the initial position after the event, a single value has been used to value insulation activities, whatever the initial position. The baseline transmission coefficient for this activity is Up = 2 W/m²K Current breakdown of existing stock: 80% of the tertiary building stock predates 1990 (CEREN 2002) Nature of operation and limits of valuation: In order to take account of real situations, installing insulation with thermal resistance of between 2.5 and 5 m²k/w has been valued at 50%. So as to retain an incentive to move towards better performance, installing insulation with thermal resistance of 5 or above has been valued at 100%. F- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh per year) Calculated energy gain in kwh/year per m² of surface area insulated: Calculated energy gain Installation of insulation with thermal resistance R 5 m²k/w Installation of insulation with thermal resistance R 2.5 and< 5 m²k/w Electric heating Education Offices Healthcare Hotels - Catering Fuel-based heating Shops Education Offices Healthcare Hotels - Catering Shops BT217 - Page 3/5

45 Energy gain used in kwh/year per m² of surface area insulated (valuation calculation): Energy gain valued Installation of insulation with thermal resistance R 5 m²k/w Installation of insulation with thermal resistance R 2.5 and< 5 m²k/w Electric heating Fuel-based heating Education Offices Healthcare Hotels - Catering Shops Education Offices Healthcare Hotels - Catering Shops Gain calculated based on information given in appendix, to which regional correction coefficient to be applied. G- LIFE SPAN OF PRODUCT OR SERVICE 35 years In other words, a discount factor at 4% of H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the life span of the product. (Rounded values) Installation of insulation with thermal resistance R 5 m²k/w kwh cumac/ m² of surface area insulated Savings for ESCs Electric heating Education Offices Healthcare Hotels - Catering Fuel-based heating Hotels - Catering Shops H1 1,320 1,910 2,750 1,420 1,310 2,090 2,070 4,350 2,240 2,080 H2 1,080 1,070 2,250 1,160 1,080 1,710 1,700 3,560 1,830 1,700 H , ,140 1,130 2,370 1,220 1,130 Installation of insulation with thermal resistance 2.5 m²k/w R < 5 m²k/w kwh cumac/ m² of surface area insulated Savings for ESCs Electric heating Education Offices Shops Education Offices Healthcare Healthcare Hotels - Catering Fuel-based heating Shops Education Offices Healthcare Hotels - Catering H , ,990 1, Shops H , , H , BT217 - Page 4/5

46 APPENDIX Additional information A majority of the tertiary building stock is made up of buildings built before 1986* and which therefore have little or no insulation. Average degree day (ADD) 2,450 Regional correction coefficient area Climate coefficient H1 1.1 H2 0.9 H3 0.6 Calculation of energy savings per unit of surface area renovated: [ ΔU x ADD x 24 x Coeff / ] A reduction coefficient needs to be applied to this figure to factor in internal inputs, intermittence, the average indoor temperature and the yield from the heating system: Reduction coefficient for internal inputs Education Offices Healthcare Hotels - Catering Shops Internal inputs The use of CEREN degree days can be used to take account of intermittence (using a multiplication coefficient) where there is a programming device in existence in tertiary buildings that are not continuously occupied and an average indoor temperature regulation that is different from the baseline 18 C used for average degree days (ADDs). Intermittence and indoor temperature coefficient: Education Offices Health- Hotels - Shops care Catering CEREN degree day Intermittence and indoor temperature Overall inputs, intermittence and indoor temperature coefficient Education Offices Healthcare Hotels - Catering Shops Internal inputs Intermittence and indoor temperature Coefficient (inputs, T C and intermittence) Yield from electric heating: = 95% Yield from fuel-based heating: = 60% * According to CEREN (2002): 80% of the tertiary building stock predates 1990 BT217 - Page 5/5

47 Energy savings certificates Calculation sheet Internal wall insulation A- APPLICATION SECTOR Tertiary buildings: existing premises in the tertiary sector reserved for business use, with a total surface area of less than 5,000 m². Accommodation buildings in the tertiary sector are comparable to residential buildings and are included in the sheet Insulation of internal walls Residential buildings sector. B- DESCRIPTION OF STANDARD OPERATION Installation of insulating lining (compound or on framework) with thermal resistance R 2.4 m²k/w on existing walls. Installation of insulating lining (compound or on framework) with thermal resistance R 2.4 m²k/w > R 1.2 m²k/w on existing walls. Special conditions for granting of certificates The insulation materials used must comply with CE marking and be certified by ACERMI or an equivalent certification scheme. They must be installed in accordance with DTU 26.1 and 52.1 or as an underneath layer in accordance with established practices or a technical evaluation Groupe de travail Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Document de référence Collectivités locales et réseaux de chaleur Bâtiment résidentiel : équipement Industrie Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Services d'efficacité énergétique Bâtiment tertiaire : équipement Transport Fiche de calcul Correspondants Fiche de synthèse associée N Rev date validation ATEE BT /12/05 24/11/05 validation ADEME ATEE ADEME N Date N DIDEME S. Charbonnier (SG Isover) H. Despretz BT218-S 30/12/05 BT218 - Page 1/5

48 C- PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS Criterion 1: Tertiary sector Table - Correction for tertiary sector function Education Offices Health care Hotels - Catering Shops Internal inputs Intermittence and indoor temperature Coefficient (inputs, T C and intermittence) Criterion 2: Type of energy used for heating: Electricity or Fuel Yield from electric heating: = 95% Yield from fuel-based heating: = 60% Criterion 3: Geographical location Table - Correction for climatic area Area Climate coefficient H1 1.1 H2 0.9 H3 0.6 Criterion 4: Thermal resistance of insulation D- AVERAGE CONSUMPTION STATISTICS Tableau A.1 - Baseline energy consumption indicator per sub-branch Offices Branch Sub-branch Heating + domestic hot water Heating (kwh/m²) Domestic hot water (kwh/m²) (kwh/m²) Natural gas Electricity Natural gas Electricity Natural gas Electricity Overall <1,000m² ,000m² Overall Education Primary Secondary Higher - Research Overall Healthcare Public hospitals Clinics BT218 - Page 2/5

49 Remainder Overall Shops Hypermarkets Small shops Large stores Overall Cafés, hotels and restaurants Restaurants Bars Hotels E- BASELINE SITUATION Building constructed prior to 1990: Average U coefficient of uninsulated external wall: 3.3 W/m².K Current breakdown of existing stock: 80% of the tertiary building stock predates 1990 (CEREN 2002) Nature of operation and limits of valuation: In order to take account of the reality of this situation, installing insulation with thermal resistance of between 1.2 and 2.4 m²k/w has been valued at 50%. So as to retain an incentive to move towards better performance, installing insulation with thermal resistance of 2.4 or above has been valued at 100%. F- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh per year) Calculated energy gain in kwh/year per m² of surface area insulated: Electric heating Fuel-based heating Calculated energy Education Offices Healthcare Hotels - Shops Educatio Offices Health- Hotels - Shops gain Catering n care Catering Installation of insulation with thermal resistance R m²k/w Installation of insulation with thermal resistance R 1.2 and < 2.4 m²k/w Energy gain used in kwh/year per m² of surface area insulated (valuation calculation): Energy gain valued Electric heating Hotels - Catering Shops Educatio n Education Offices Healthcare Fuel-based heating Offices Healthcare Hotels - Catering Shops BT218 - Page 3/5

50 Installation of insulation with thermal resistance R 2.4 m²k/w Installation of insulation with thermal resistance R 1.2 and < 2.4 m²k/w Gain calculated based on information given in appendix, to which regional correction coefficient to be applied. G- LIFE SPAN OF PRODUCT OR SERVICE 35 years In other words, a discount factor at 4% of H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the life span of the product. (Rounded values) Installation of insulation with thermal resistance R kwh cumac/ m² of surface area insulated Electric heating Savings for ESCs Education Offices Healthcare Hotels - Catering 2.4 m²k/w Fuel-based heating Shops Education Offices Healthcare Hotels - Catering Shops H1 2,120 2,110 4,430 2,280 2,120 3,360 3,340 7,010 3,610 3,350 H2 1,740 1,730 3,620 1,870 1,730 2,750 2,730 5,730 2,960 2,740 H3 1,160 1,150 2,410 1,240 1,150 1,830 1,820 3,820 1,970 1,830 Installation of insulation with thermal resistance 1.2 m²k/w R < 2.4 m²k/w kwh cumac/ m² of surface area insulated Electric heating Fuel-based heating Education Offices Healthcare Hotels - Shops Education Offices Healthcare Catering Savings for ESCs Hotels - Catering Shops H ,990 1, ,510 1,500 3,150 1,620 1,510 H , ,240 1,230 2,580 1,330 1,230 H , , BT218 - Page 4/5

51 APPENDIX Additional information A majority of the tertiary building stock is made up of buildings built before 1986* and which therefore have little or no insulation. Average degree day (ADD) 2,450 Regional correction coefficient area Climate coefficient H1 1.1 H2 0.9 H3 0.6 Calculation of energy savings per unit of surface area renovated: [ ΔU x ADD x 24 x Coeff / ] A reduction coefficient needs to be applied to this figure to factor in internal inputs, intermittence, the average indoor temperature and the yield from the heating system: Reduction coefficient for internal inputs Education Offices Healthcare Hotels - Catering Shops Internal inputs The use of CEREN degree days can be used to take account of intermittence (using a multiplication coefficient) where there is a programming device in existence in tertiary buildings that are not continuously occupied and an average indoor temperature regulation that is different from the baseline 18 C used for average degree days (ADDs). Intermittence and indoor temperature coefficient: Education Offices Health- Hotels - Shops care Catering CEREN degree day Intermittence and indoor temperature Overall inputs, intermittence and indoor temperature coefficient Education Offices Healthc are Hotels - Catering Shops Internal inputs Intermittence and indoor temperature Coefficient (inputs, T C and intermittence) Yield from electric heating: = 95% Yield from fuel-based heating: = 60% * According to CEREN (2002): 80% of the tertiary building stock predates 1990 BT218 - Page 5/5

52 Energy savings certificates Calculation sheet Windows or French windows with insulating glazing A- APPLICATION SECTOR Tertiary buildings: existing premises in the tertiary sector with a total surface area of less than 5,000 m². B- DESCRIPTION OF STANDARD OPERATION Replacement of old windows with high-performance windows with air vents (if necessary) corresponding to a surface transmission coefficient Uw of 2 W/m²K. Replacement of old windows with high-performance windows with air vents (if necessary) corresponding to a surface transmission coefficient Uw of between 2.0 and 2.5 W/m²K. Special conditions for granting of certificates Windows and French windows are NF CSTBat certified and ACOTHERM labelled and have double glazing with increased insulation as certified by CEKAL or equivalent quality and performance characteristics established by a lawful method of proof in a European Union Member State or a State party to the agreement instituting the European Economic Area or in Turkey. Windows and French windows must comply with CE marking as soon as this is applicable. Windows and French windows must be installed in accordance with DTU 37.1 for pre-hung window units and aluminium joinery, DTU 36.1 for wooden windows and French windows and technical specification no for PVC windows. Installation carried out by a professional Groupe de travail Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Document de référence Collectivités locales et réseaux de chaleur Bâtiment résidentiel : équipement Industrie Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Services d'efficacité énergétique Bâtiment tertiaire : équipement Transport Fiche de calcul Correspondants Fiche de synthèse associée N Rev date validation ATEE BT /10/06 20/10/06 C- validation ADEME ATEE ADEME N Date N DIDEME S. Charbonnier (SG Isover) H. Despretz BT232 S 20/10/06 BT232 Replacement of windows and French windows Page 1/5

53 PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS Criterion 1: Tertiary sector Table - Correction for tertiary sector function Education Offices Health care Hotels - Catering Shops Internal inputs Intermittence and indoor temperature Coefficient (inputs, T C and intermittence) Criterion 2: Type of energy used for heating: Electricity or Fuel Yield from electric heating: = 95% Yield from fuel-based heating: = 60% Criterion 3: Geographical location Table - Correction for climatic area Area Climate coefficient H1 1.1 H2 0.9 H3 0.6 D- BASELINE SITUATION Window renovation in non-residential buildings (excluding curtain walls) represents just over 10% of total activity in renovating glazed walls, which itself represents 2/3 of the market for glazed walls. Aluminium frames are predominant in non-residential building renovations, with a market share estimated at over 55%, followed by PVC with 30% and wood at just over 10%. Given the predominance of aluminium frames in the renovations market for non-residential buildings and the absence of any regulatory requirements for renovation works, the performance of windows installed in this sector is currently significantly in excess of 3W/(m².K), although this figure should decrease with RT2005. The exemplary renovation works carried out on certain buildings, such as junior and senior secondary schools, under the influence of the HEQ scheme, are still very much in the minority. The aim of these works will be to replace old windows and French windows with poorly performing single or double glazing. The average surface transmission coefficient Uw in each of these cases is: Old aluminium frames fitted with Single Glazing => Uw = 6.15 W/(m².K) Aluminium frames with 4/6/4 clear Double Glazing => Uw = 4.5W/(m².K) BT232 Replacement of windows and French windows Page 2/5

54 The share of aluminium frames in the building stock to be renovated is of the order of 85%. Based on the minimum hypothesis that 1/3 of the old buildings to be renovated have single glazing in aluminium frames, the average Uw coefficient would be 5 W/(m².K). In order to simplify the process, and given the difficulty of verifying the initial position after the event, a single value has been used to value window and French window replacement activities, whatever the initial position. The baseline surface transmission coefficient for this activity is Uw = 5 W/m²K. E- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh per year) Calculated energy gain in kwh/year per m² of window: Calculated energy gain Replacement with windows with a surface transmission coefficient Uw 2 W/m².K Replacement with windows with a surface transmission coefficient 2 W/m²K < Uw 2.5W/m²K Electric heating Education Offices Healthcare Hotels - Catering Fuel-based heating Shops Education Offices Healthcare Hotels - Catering Shops Energy gain used in kwh/year per m² of window (valuation calculation): Energy gain valued Replacement with windows with a surface transmission coefficient Uw 2 W/m².K Replacement with windows with a surface transmission coefficient 2 W/m²K< Uw 2,5W/m²K Electric heating Fuel-based heating Education Offices Healthcare Hotels - Shops Educatio Offices Health- Hotels - Shops Catering n care Catering Gain calculated based on information given in appendix, to which regional correction coefficient to be applied. F- LIFE SPAN OF PRODUCT OR SERVICE 35 years In other words, a discount factor at 4% of BT232 Replacement of windows and French windows Page 3/5

55 G- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the life span of the product. (Rounded values) Complete replacement of old windows with windows or French windows with a surface transmission coefficient Uw 2 W/m²K kwh cumac/ m² of window Electric heating Education Offices Healthcare Savings for ESCs Hotels - Catering Fuel-based heating Shops Education Offices Healthcare Hotels - Catering Shops H1 2,170 2,160 4,530 2,340 2,170 3,440 3,420 7,180 3,700 3,430 H2 1,780 1,770 3,710 1,910 1,770 2,820 2,800 5,870 3,030 2,810 H3 1,190 1,180 2,470 1,270 1,180 1,880 1,870 3,910 2,020 1,870 Complete replacement of old windows with windows or French windows with a surface transmission coefficient: 2 W/m².K Uw 2.5 W/m².K kwh cumac/ m² of window Electric heating Education Offices Healthcare Savings for ESCs Hotels - Catering Fuel-based heating Shops Education Offices Healthcare Hotels - Catering Shops H , ,430 1,430 2,990 1,540 1,430 H , ,170 1,170 2,450 1,260 1,170 H , , BT232 Replacement of windows and French windows Page 4/5

56 APPENDIX Additional information Average degree day (ADD) 2,450 Regional correction coefficient area Climate coefficient H1 1.1 H2 0.9 H3 0.6 Calculation of energy savings per window unit renovated: [ ΔU x ADD x 24 x Coeff / ] A reduction coefficient needs to be applied to factor in internal inputs, intermittence, the average indoor temperature and the yield from the heating system: Reduction coefficient for internal inputs Education Offices Healthcare Hotels - Catering Shops Internal inputs The use of CEREN degree days can be used to take account of intermittence (using a multiplication coefficient) where there is a programming device in existence in tertiary buildings that are not continuously occupied and an average indoor temperature regulation that is different from the baseline 18 C used for average degree days (ADDs). Intermittence and indoor temperature coefficient: Education Offices Health- Hotels - Shops care Catering CEREN degree day Intermittence and indoor temperature Overall inputs, intermittence and indoor temperature coefficient Education Offices Healthcare Hotels - Catering Shops Internal inputs Intermittence and indoor temperature Coefficient (inputs, T C and intermittence) Yield from electric heating: = 95% Yield from fuel-based heating: = 60% * According to CEREN (2002): 80% of the tertiary building stock predates 1990 BT232 Replacement of windows and French windows Page 5/5

57 Energy savings certificates Calculation sheet Low temperature-type heating boiler A- APPLICATION SECTOR Tertiary buildings: existing premises in the tertiary sector reserved for business use, with a total surface area of less than 5,000 m² and heated by fuel-based central heating systems. B- DESCRIPTION OF STANDARD OPERATION Installation of a low temperature-type heating boiler. Special conditions for granting of certificates For appliances with a power rating less than or equal to 400kW, the boiler must be CE marked and defined by type based on a certified measurement of its characteristics so that it can be classed as one of the three types of boilers defined in Directive 92/42 EC. This operation includes the installation of an appropriate control system. Installation carried out by a professional Groupe de travail Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Documents de référence Collectivités locales et réseaux de chaleur Bâtiment résidentiel : équipement Industrie Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Services d'efficacité énergétique Bâtiment tertiaire : équipement Transport Fiche de calcul Correspondants Fiche de synthèse associée N Rev date validation ATEE validation ADEME ATEE ADEME N Date N DIDEME BT /02/06 24/11/05 O. Servant H. Despretz BT200-S 23/02/06 BT200 - Page 1/4

58 C- PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS Criterion 1: Type of activity Criterion 2: Surface area of premises Criterion 3: Geographical location, based on table 2 D- AVERAGE CONSUMPTION STATISTICS Tertiary C tertiary Heating + domestic hot Domestic hot water Heating (kwh/m²/year) water (kwh/m²/year) (kwh/m²/year) Fuel Electricity Fuel Electricity Fuel Electricity Table 1 - Average consumption of standard premises (according to CEREN) Consumption used is the average consumption in the tertiary sector for the segments shown in table 5. To calculate the number of kwh CUMAC/m² obtained for a given segment, multiply the results from table 4 by the ratio for the corresponding segment shown in table 5. Climate Area coefficient H1 1.1 H2 0.9 H3 0.6 Table 2 - Correction for geographical area NB: The climate coefficient is applied only to heating consumption. E- BASELINE SITUATION Depending on the technical constraints of the project (evacuation of by-products of combustion, size of heat exchangers, etc.) it is not always possible to install the best available technology, i.e. a condensing boiler, as a replacement for an obsolete boiler or as a new installation in an existing building. In order to take account of the technical and economic realities in which projects are carried out, the installation of a low-temperature boiler that offers a significant gain in energy performance is valued in terms of energy savings certificates. So as to retain an incentive to move towards better performance, however, the standard gain of 35% obtained compared with a typical boiler from the old installed base is only valued at 50%, i.e. 17.5%. F- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh per year) Gain from low temperature-type boiler: 35%. BT200 - Page 2/4

59 Per m²: Heating gain Domestic hot water gain Tertiary Table 3 - Annual energy gain on consumption of heating and domestic hot water G- LIFE SPAN OF PRODUCT OR SERVICE For a boiler with a power rating over or equal to 30kW: 21 years, i.e. a discount factor at 4% of For a boiler with a power rating of under 30 kw: 16 years, i.e. a discount factor at 4% of H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the life span of the product. (Rounded values) Unit amount in kwh cumac / m² Use of boiler Climatic area Power < 30kW 30kW H Heating H H H Heating and domestic H hot water H Table 4 - Entitlement to ESC for basic operation, in cumulative discounted kwh/m² over lifetime These average values must be multiplied by the surface area of the premises and the consumption ratio for the segment concerned. Entitlement to ESC operation = Entitlement to ESC Tertiary * Ratio segment / 100 * surface area) BT200 - Page 3/4

60 APPENDIX Additional information The consumption ratios shown in table 5 are calculated based on consumption in the segments used in the method for calculating energy savings per standard basic operation for heating and domestic hot water in the non-residential sector. Ratio segment = Consumption segment / Average branch consumption * 100 Table 5: Segment consumption ratios for tertiary sector: Branch Offices Education Healthcare Shops Cafés, hotels and restaurants Segment Heating + domestic hot water Heating Domestic hot water Fuel Electricity Fuel Electricity Fuel Electricity <1,000m² >=1,000m² Primary Secondary Higher - Research Public hospitals Clinics remainder Hypermarkets Small shops Large stores Restaurants Bars Hotels Branch averages: Base BT200 - Page 4/4

61 Energy savings certificates Calculation sheet Condensing-type heating boiler A- APPLICATION SECTOR Tertiary buildings: existing premises in the tertiary sector reserved for business use, with a total surface area of less than 5,000 m² and heated by fuel-based central heating systems. B- DESCRIPTION OF STANDARD OPERATION Installation of a condensing-type heating boiler. Special conditions for granting of certificates For appliances with a power rating less than or equal to 400kW, the boiler must be CE marked and defined by type based on a certified measurement of its characteristics so that it can be classed as one of the three types of boilers defined in Directive 92/42 EC. This operation includes the installation of an appropriate control system. This operation only applies to installations with heat exchangers that are large enough to operate in conditions that allow the boiler to condense properly. Installation carried out by a professional Groupe de travail Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Documents de référence Collectivités locales et réseaux de chaleur Bâtiment résidentiel : équipement Industrie Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Services d'efficacité énergétique Bâtiment tertiaire : équipement Transport Fiche de calcul Correspondants Fiche de synthèse associée N Rev date validation ATEE validation ADEME ATEE ADEME N Date N DIDEME BT /02/06 24/11/05 O. Servant H. Despretz BT201-S 23/02/06 BT201 - Page 1/4

62 C- PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS Criterion 1: Type of activity Criterion 2: Surface area of premises Criterion 3: Geographical location, based on table 2 D- AVERAGE CONSUMPTION STATISTICS Tertiary C tertiary Heating + domestic hot Domestic hot water Heating (kwh/m²/year) water (kwh/m²/year) (kwh/m²/year) Fuel Electricity Fuel Electricity Fuel Electricity Table 1 - Average consumption of standard premises (according to CEREN) Consumption used is the average consumption in the tertiary sector for the segments shown in table 5. To calculate the number of kwh CUMAC/m² obtained for a given segment, multiply the results from table 4 by the ratio for the corresponding segment shown in table 5. Climate Area coefficient H1 1.1 H2 0.9 H3 0.6 Table 2 - Correction for geographical area NB: The climate coefficient is applied only to heating consumption. E- BASELINE SITUATION Condensing boilers are the best available technology as a replacement for obsolete boilers or as a new installation in an existing building. Their value in terms of energy savings certificates is based on the standard gain obtained compared with a typical boiler from the old installed base, i.e. an energy saving of 40%. F- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh per year) Gain from condensing-type boiler: 40% Per m²: Heating gain Domestic hot water gain Tertiary Table 3 - Annual energy gain on consumption of heating and domestic hot water G- LIFE SPAN OF PRODUCT OR SERVICE BT201 - Page 2/4

63 For a boiler with a power rating over or equal to 30kW: 21 years, i.e. a discount factor at 4% of For a boiler with a power rating of under 30 kw: 16 years, i.e. a discount factor at 4% of H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the life span of the product. (Rounded values) Unit amount in kwh cumac / m² Use of boiler Climatic area Power < 30kW 30kW H Heating H H H Heating and domestic ,040 H hot water H Table 4 - Entitlement to ESC for basic operation, in cumulative discounted kwh/m² over lifetime These average values must be multiplied by the surface area of the premises and the consumption ratio for the segment concerned. Entitlement to ESC operation = (Entitlement to ESC Tertiary * Ratio segment / 100 * surface area) BT201 - Page 3/4

64 APPENDIX Additional information The consumption ratios shown in table 5 are calculated based on consumption in the segments used in the method for calculating energy savings per standard basic operation for heating and domestic hot water in the non-residential sector. Ratio segment = Consumption segment / Average branch consumption * 100 Table 5: Segment consumption ratios for tertiary sector: Branch Offices Education Healthcare Shops Cafés, hotels and restaurants Segment Heating + domestic hot water Heating Domestic hot water Fuel Electricity Fuel Electricity Fuel Electricity <1,000m² >=1,000m² Primary Secondary Higher - Research Public hospitals Clinics remainder Hypermarkets Small shops Large stores Restaurants Bars Hotels Branch averages: Base BT201 - Page 4/4

65 Energy savings certificates Calculation sheet Light fitting for T5 electronic fluorescent tube A- APPLICATION SECTOR Tertiary buildings: existing premises in the tertiary sector reserved for business use. B1- DESCRIPTION Installation of a light fitting equipped with a T5 fluorescent tube or tubes (16mm diameter) with electronic ballast(s). B2- SPECIAL CONDITIONS FOR GRANTING OF CERTIFICATES Not applicable Groupe de travail Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Méthodologie de calcul Collectivités locales et réseaux de chaleur Bâtiment résidentiel : équipement Industrie Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Services d'efficacité énergétique Bâtiment tertiaire : équipement Transport Fiche de calcul Correspondants Fiche de synthèse associée N Rev date validation ATEE BT /03/07 15/03/07 validation ADEME ATEE ADEME N Date N DIDEME D. Ouvrard (Syndicat de l éclairage) H. Lefebvre BT180-S 15/03/07 BT180 - Page 1/3

66 B- PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS No specific differentiation criteria. General average value based on sector of activity. C- AVERAGE CONSUMPTION STATISTICS Sector of activity Average light output (W) Annual period of operation (hours) Average consumption used (in kwh/year) Offices and administrative buildings 87 1, Educational establishments 87 1, Shops 74 2, Healthcare institutions 87 4, D- BASELINE SITUATION The market share of light fittings for T5 fluorescent bulbs is estimated at about 5% of the total market for light fittings for fluorescent bulbs. E- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh per year) Any installation of a fluorescent light fitting with T5 tubes provides an energy saving of: Sector of activity T5 average light output (W) Average consumption used (kwh/year) Energy gain generated per operation (kwh/year) Energy gain deduced from market position (kwh/year) Offices and administrative buildings Education Shops Healthcare institutions F- LIFE SPAN OF PRODUCT OR SERVICE For shops, the life span is 12 years, i.e. a discount factor at 4% of For offices, administrative buildings and educational and healthcare institutions, the life span is 15 years, i.e. a discount factor at 4% of BT180 - Page 2/3

67 G- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the life span of the product. (Rounded value) Sector of activity Discount factor Amount in kwh cumac Offices Education Shops Healthcare institutions ,640 If the light is controlled by a system that enables it to be switched on and off automatically based on whether there are people present in the building, the gain in kwh cumac is increased by 20%. If the light is controlled by a system that makes it possible to vary the intensity of the light, connected to a detection system that takes account of the level of natural light, the gain in kwh cumac is increased by 20%. If both systems are combined, the gain in kwh cumac is increased by 40%. Cumulative discounted (cumac) values with light management systems are therefore as follows: Sector of activity kwh cumac with presence detection kwh cumac with light variability kwh cumac with presence detection + light variability Offices ,050 Education Shops ,162 Healthcare institutions 1,968 1,968 2,296 BT180 - Page 3/3

68 Energy savings certificates Calculation sheet Light fitting with electronic ballast and dimming system on lighting device A- APPLICATION SECTOR Existing tertiary buildings. B- DESCRIPTION OF STANDARD OPERATION Installation of a light fitting with electronic ballast and a photoelectric cell dimming system on an indoor artificial lighting device. Special conditions for granting of certificates For buildings with a total surface area greater than 5,000 m², it is possible either to use either this sheet for a standard operation, or to calculate and optimise savings based on an energy assessment covering all of the equipment concerned. In this case, the operation will be treated as a non-standard operation Groupe de travail Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Méthodologie de calcul Collectivités locales et réseaux de chaleur Bâtiment résidentiel : équipement Industrie Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Services d'efficacité énergétique Bâtiment tertiaire : équipement Transport Fiche de calcul Correspondants Fiche de synthèse associée N Rev date validation ATEE BT /03/ /10/ /01/2006 validation ADEME ATEE ADEME N Date N DIDEME MH Foucard (EDF) H. Lefebvre BT184-S 07/03/2006 BT184 - Page 1/5

69 C- PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS Criterion 1: Area of activity Criterion 2: Number and unit power of light bulbs or power of lighting system concerned by the energy savings action D- AVERAGE CONSUMPTION STATISTICS Branch C lighting Area (TWh) (millions of m²) Offices Shops Chr Healthcare Education These values are based on a study by AICVF2 carried out in 1990, and by CLIP3 in 1995 on lighting. These data have been updated, taking into account an increase in surface areas and efficiency gains for light sources of 1% per year (value suggested by CEREN). E- BASELINE SITUATION Lighting installation based on standard fluorescent tubes (T8) and ferromagnetic ballast. Manual control. Periods of use: Power by type of source: Branch Annual period of use (hours) offices 1,945 shops 2,980 CHR 2,340 healthcare 4,280 education 1,413 Type of tube Power consumption (W) 18 W W W 70 Power consumption includes the power consumed by the tube plus the ballast. A 4 * 18 W light fitting has a total power of 88 W A 2 * 36 W light fitting has a total power of 90 W A 1 * 58 W light fitting has a total power of 70 W (Values taken from sheet T5 light fitting ) 1 CHR: Café Hotel Restaurant 2 (Association des Ingénieurs en Climatique, Ventilation et Froid) 3 (Club d Ingénierie Prospective et Environnement) BT184 - Page 2/5

70 Process installation rate: 2% Where light fittings are replaced (electronic ballasts and dimming), it is recommended that should also be fitted with high-performance tubes. F- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh per year) Gain coefficient: 45% Annual gain in kwh/year/tube: Unit power of tubes Branch 18 W 36 W 58 W offices shops CHR healthcare education Control-based gains are derived from RT For electronic ballasts, gains have been derived from manufacturers catalogues. The power and number of tubes relate to the area covered by the control system. G- LIFE SPAN OF PRODUCT OR SERVICE 15 years. In other words, a discount factor at 4% of H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the life span of the product. (Rounded value) Cumulative discounted gain in kwh cumac per tube: Unit power of tubes Branch 18 W 36 W 58 W offices shops ,060 CHR healthcare ,530 education BT184 - Page 3/5

71 APPENDIX Additional information This sheet is not intended to be used for installing lighting equipment in the field. It should not be seen as a substitute for the necessity of carrying out an analysis on a case-by-case basis of the technical solutions under consideration to ensure their pertinence and technical compatibility with the indoor lighting installation to be modified. Calculation sheets by area of activity: OFFICE SECTOR Annual period of lighting use (hours) = 1945 General characteristics of existing situation type of tube (W) power consumption per tube (W) life span hours years discount rate type of tube annual consumption with existing equipment annual consumption after operation Gain generated by operation current market share Energy gain from operation CUMAC energy gain Number of operations to achieve 3 GWh W kwh/year kwh/year kwh/year % kwh/year kwh % , % , % ,321 COMMERCE SECTOR Annual period of lighting use (hours) = 2980 General characteristics of existing situation type of tube (W) power consumption per tube (W) life span hours years discount rate type of tube annual consumption with existing equipment annual consumpti on after operation Gain generated by operation current market share Energy gain from operation CUMAC energy gain Number of operations to achieve 3 GWh W kwh/year kwh/year kwh/year % kwh/year kwh % , % , % ,820 BT184 - Page 4/5

72 CHR SECTOR Annual period of lighting use (hours) = 2340 General characteristics of existing situation type of tube (W) power consumption per tube (W) life span hours years discount rate type of tube annual consumption with existing equipment annual consumption after operation Gain generated by operation current market share Energy gain from operation CUMAC energy gain Number of operations to achieve 3 GWh W kwh/year kwh/year kwh/year % kwh/year kwh % , % , % ,592 HEALTHCARE SECTOR Annual period of lighting use (hours) = 4280 General characteristics of existing situation type of tube (W) power consumption per tube (W) life span hours years discount rate type of tube annual consumption with existing equipment annual consumptio n after operation Gain generated by operation current market share Energy gain from operation CUMAC energy gain Number of operations to achieve 3 GWh W kwh/year kwh/year kwh/year % kwh/year kwh % , % , % ,964 EDUCATION SECTOR Annual period of lighting use (hours) = 1415 General characteristics of existing situation type of tube (W) power consumption per tube (W) life span hours years discount rate type of tube annual consumption with existing equipment annual consumption after operation Gain generated by operation current market share Energy gain from operation CUMAC energy gain W kwh / an kwh / an kwh / an % kwh / an kwh Number of operations to achieve 3 GWh , % , % , % ,940 BT184 - Page 5/5

73 Energy saving certificates Calculation sheet Energy efficient motor A- APPLICATION SECTOR Industry. B- DESCRIPTION OF STANDARD OPERATION Purchase of an energy efficient motor. For any industrial use, including the purchase of equipment incorporating energy efficient motors such as compressors, motorised pumps, process machines or other types (Efficiency 1 category motor: EFF1 label defined by the European Committee of Manufacturers of Electrical Machines and Power Electronics (CEMEP)). EFF1 category motors are class IP55 or IP54 3-phase 400V 50 Hz AC 2 or 4 pole squirrel cage motors with a rating in the range 1.1kW to 90kW. Three efficiency classes are defined, from lowest to highest: EFF3, EFF2 and EFF1. The efficiency values are defined in accordance with standard EN or IEC 34 2: 1972 and its two amendments dated 1995 and 1996: Rotating electrical machines - Part 2: Methods for determining losses and efficiency of rotating electrical machinery from tests (excluding machines for traction vehicles) Groupe de travail Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Documents de référence Collectivités locales et réseaux de chaleur Bâtiment résidentiel : équipement Industrie Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Services d'efficacité énergétique Bâtiment tertiaire : équipement Transport Fiche de calcul Correspondants Fiche de synthèse associée N Rev date validation ATEE I /12/ /12/2004 validation ADEME ATEE ADEME N Date N DIDEME B. Escarnot (EDF) J.O. Budin I500-S 30/12/2005 I500 - Page 1/6

74 C- PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS Criterion 1: Power rating of existing motor (value shown on identification plate), suited to use. Criterion 2: Motor rotation speed (synchronism speed): 3000 rpm (2 poles) or 1500 rpm (4 poles). Criterion 3: Application type: pump, fan, compressor, conveyor or other D- AVERAGE CONSUMPTION STATISTICS According to the 1999 CEREN study on resources for energy management in industry: Electric motors represent on average 70% of electrical energy consumption in industry, or 89 TWh in 1997 Motors under 70 kw represent 44 TWh Motors over 70 kw represent 45 TWh. The other data sources for this sheet are as follows: The European study Improving the Penetration of Energy Efficient Motors and Drives carried out as part of the SAVE II 2000 programme is used to determine a weighted average load factor (see paragraph F below) CEMEP data on the breakdown of sales of different classes of motors in Europe (2003). E- BASELINE SITUATION The operation applies to asynchronous 3000 rpm or 1500 rpm motors with a power rating between 1.1 kw and 90 kw. The baseline situation of the motors market is as follows: Breakdown of motor sales by efficiency class in Europe (source CEMEP): EFF3 EFF2 EFF1 EFF3 EFF2 EFF1 Sales distribution 3000 rpm 3000 rpm 3000 rpm 1500 rpm 1500 rpm 1500 rpm (2 poles) (2 poles) (2 poles) (4 poles) (4 poles) (4 poles) % 83.2% 7.8% 11.0% 83.8% 5.2% F- AMOUNT OF ENERGY GAIN GENERATED PER STANDARD OPERATION (expressed in kwh per year) Annual energy saving E due to installation and operation of a high efficiency motor with rated power suited to use (only if the rotation speed is 3000 rpm or 1500 rpm): E = Saving(Pn) x Load factor With: E: Annual energy saving in kwh/year Saving (Pn): Power gain depending on Pn, motor power rating (kw) Load factor: o Pumps, fans, compressors, conveyors: 3,630 hrs o Other motors: 2,470 hrs I500 - Page 2/10

75 The load factor is calculated by taking the time of use multiplied by the average motor load. This load factor is taken from the European study Improving the Penetration of Energy Efficient Motors and Drives carried out as part of the SAVE II 2000 programme. This study is based on analysis of six industrial sectors representing 75% of the total consumption of motors in the European Union. This load factor assessment only includes sectors not subject to the National Allocation Plan (NAP). Gain ( Pn) Pn 1 ( référence ) ( EFF 1 1) With: η(reference): efficiency according to the structure of the motor market (CEMEP data). The baseline efficiency is calculated by weighting the average efficiency per efficiency class (see appendix) according to market share (see above) η(eff1): efficiency defined for high efficiency, EFF1 class (see Appendix table 1) Electrical power gain at Pn compared with the baseline situation of the motors market: Typical cases Power gain (kw) EFF1 motor / ref Pn (kw) 3000 rpm 1500 rpm Electrical power gain at Pn compared with the baseline situation of the motors market: Pn (kw) Application type Pumps, fan, compressor, conveyor Other 3000 rpm 1500 rpm 3000 rpm 1500 rpm I500 - Page 3/10

76 , G- PRODUCT OR SERVICE LIFE SPAN 15 years In other words, a discount factor at 4% of H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the product life span. (Rounded values) Eglobale E nbmoteur Discounted electrical power gain at Pn compared with the baseline situation of the motors market: Application type Pn (kw) Pumps, fan, compressor, conveyor Other 3000 rpm 1500 rpm 3000 rpm 1500 rpm 1.1 2,560 3,610 1,740 2, ,110 4,240 2,110 2, ,740 5,210 2,540 3, ,530 6,340 3,090 4, ,080 7,430 3,460 5, ,920 9,020 4,030 6, ,260 11,210 4,940 7, ,530 14,570 6,480 9, ,630 18,640 7,910 12, ,680 21,790 9,310 14, ,570 25,100 10,600 17, ,430 31,400 13,220 21,360 I500 - Page 4/10

77 37 21, ,910 24, ,310 41,680 17,220 28, ,040 47,770 19,080 32, ,780 62,540 25,710 42, ,260 74,550 32,160 50,720 I500 - Page 5/10

78 APPENDIX Additional information Operation context: - Improvement of existing system or replacement of a motor for final use - One-off purchase of an EFF1 energy efficient motor - Purchase of equipment fitted with EFF1 energy efficient motors How has the standard energy saving been estimated for the operation concerned? - Baseline: CEMEP classification of squirrel-cage motors (1.1 kw - 90 kw, 3000 rpm or 1500 rpm) - Baseline situation: motor corresponding to the motor market average in 2003 (CEMEP data) - Assessment of average motor efficiency for each of the efficiency classes 2 calculation sources: o Source 1: Estimated average efficiency per power class of motors available in France, produced by the two main manufacturers in the market: EFF2 class motor: the efficiency is assumed equal to the average observed for motors available on the French market (according to technical data provided by the two main suppliers) distinguishing between 2-pole 3000 rpm motors and 4-pole 1500 rpm motors. EFF1 class motor: the efficiency is assumed equal to the average observed for motors available on the French market (according to technical data provided by the two main suppliers) distinguishing between 2-pole 3000 rpm motors and 4-pole 1500 rpm motors). EFF3 class motor: the efficiency is assumed equal to the average observed for motors available on the French market according to data obtained from the EuroDEEM 2000 database, averaged between 2-pole 3000 rpm motors and 4-pole 1500 rpm motors. o Source 2: Efficiency limits for the different classes defined for the EFF1, EFF2 and EFF3 categories. In order to limit the potential effects arising from samples that are small and therefore distorted by the range of choices made by the motor manufacturers, the difference between the two sources is calculated for each motor power range, then averaged to give a single constant value for the entire power table, for each category. The efficiency values considered are shown in the table below (CEMEP limits and values used for typical cases). I500 - Page 6/10

79 Table 1: efficiency values at rated power used EFF3 estimated efficiency (market data) Source 1 limit EFF3- EFF2 (CEMEP) Source 2 Difference EFF3 value with EFF3-2 limit - average of differences EFF2 estimate d efficienc y (market data) 2 poles median EFF3- EFF2 (CEMEP ) Difference EFF2 value with medianaverage value EFF1 estimated efficiency (market data) Source 1 limit EFF2- EFF1 (CEMEP) Source 2 Difference η(eff1) EFF1 value with EFF2-1 limit - average of differences Source 1 Source % 76.20% 0.20% 74.71% 79.40% 79.20% -0.20% 79.05% 82.20% 82.20% 0.00% 82.53% % 78.50% 1.50% 77.01% 80.40% 81.30% 0.90% 81.15% 85.00% 84.10% 0.90% 84.43% % 81.00% 1.00% 79.51% 83.40% 83.30% -0.10% 83.15% 85.90% 85.60% 0.30% 85.93% % 82.60% 1.60% 81.11% 84.80% 84.65% -0.15% 84.50% 87.20% 86.70% 0.50% 87.03% % 84.20% 2.20% 82.71% 85.90% 85.90% 0.00% 85.75% 87.70% 87.60% 0.10% 87.93% % 85.70% 2.70% 84.21% 86.90% 87.10% 0.20% 86.95% 88.60% 88.50% 0.10% 88.83% % 87.00% 3.00% 85.51% 87.70% 88.25% 0.55% 88.10% 90.40% 89.50% 0.90% 89.83% % 88.40% 2.40% 86.91% 88.90% 89.50% 0.60% 89.35% 90.90% 90.60% 0.30% 90.93% % 89.40% 2.40% 87.91% 89.80% 90.35% 0.55% 90.20% 91.50% 91.30% 0.20% 91.63% % 90.00% 2.00% 88.51% 90.70% 90.90% 0.20% 90.75% 92.10% 91.80% 0.30% 92.13% % 90.50% 1.10% 89.01% 91.20% 91.35% 0.15% 91.20% 92.50% 92.20% 0.30% 92.53% % 91.40% 1.20% 89.91% 92.10% 92.15% 0.05% 92.00% 93.20% 92.90% 0.30% 93.23% % 92.00% 1.00% 90.51% 92.60% 92.65% 0.05% 92.50% 93.60% 93.30% 0.30% 93.63% % 92.50% 0.60% 91.01% 93.10% 93.10% 0.00% 92.95% 93.90% 93.70% 0.20% 94.03% % 93.00% 0.70% 91.51% 93.60% 93.50% -0.10% 93.35% 94.50% 94.00% 0.50% 94.33% % 93.60% 0.80% 92.11% 94.20% 94.10% -0.10% 93.95% 94.70% 94.60% 0.10% 94.93% % 93.90% 1.00% 92.41% 94.50% 94.45% -0.05% 94.30% 95.30% 95.00% 0.30% 95.33% average 1.49% 0.15% 0.33% EFF3 estimated efficiency (market data) Source 1 limit EFF3- EFF2 (CEMEP) Source 2 Difference EFF3 value with EFF3-2 limit - average of difference s EFF2 estimated efficiency (market data) Source 1 4 poles median EFF3- EFF2 (CEMEP ) Difference EFF2 value with medianaverage value EFF1 estimated efficiency (market data) Source 1 limit EFF2- EFF1 (CEMEP) Differenc e η(eff1) EFF1 value with EFF2-1 limit - average of differences Source Source % 76.20% 0.20% 74.71% 77.60% 80.00% 2.40% 79.16% 83.90% 83.80% 0.10% 84.12% % 78.50% 1.50% 77.01% 79.30% 81.75% 2.45% 80.91% 85.30% 85.00% 0.30% 85.32% % 81.00% 1.00% 79.51% 82.40% 83.70% 1.30% 82.86% 86.60% 86.40% 0.20% 86.72% % 82.60% 1.60% 81.11% 84.00% 85.00% 1.00% 84.16% 87.50% 87.40% 0.10% 87.72% % 84.20% 2.20% 82.71% 84.60% 86.25% 1.65% 85.41% 88.80% 88.30% 0.50% 88.62% % 85.70% 2.70% 84.21% 86.50% 87.45% 0.95% 86.61% 89.30% 89.20% 0.10% 89.52% % 87.00% 3.00% 85.51% 87.60% 88.55% 0.95% 87.71% 90.10% 90.10% 0.00% 90.42% % 88.40% 2.40% 86.91% 88.70% 89.70% 1.00% 88.86% 91.30% 91.00% 0.30% 91.32% % 89.40% 2.40% 87.91% 89.70% 90.60% 0.90% 89.76% 91.90% 91.80% 0.10% 92.12% % 90.00% 2.00% 88.51% 90.50% 91.10% 0.60% 90.26% 92.90% 92.20% 0.70% 92.52% % 90.50% 1.10% 89.01% 91.20% 91.55% 0.35% 90.71% 93.40% 92.60% 0.80% 92.92% % 91.40% 1.20% 89.91% 91.90% 92.30% 0.40% 91.46% 93.60% 93.20% 0.40% 93.52% % 92.00% 1.00% 90.51% 92.60% 92.80% 0.20% 91.96% 94.30% 93.60% 0.70% 93.92% % 92.50% 0.60% 91.01% 92.90% 93.20% 0.30% 92.36% 94.50% 93.90% 0.60% 94.22% % 93.00% 0.70% 91.51% 93.60% 93.60% 0.00% 92.76% 94.50% 94.20% 0.30% 94.52% % 93.60% 0.80% 92.11% 94.20% 94.15% -0.05% 93.31% 94.90% 94.70% 0.20% 95.02% % 93.90% 1.00% 92.41% 94.50% 94.45% -0.05% 93.61% 95.10% 95.00% 0.10% 95.32% average 1.49% 0.84% 0.32% I500 - Page 7/10

80 Baseline situation: The baseline motor is defined on the basis of a European motor market breakdown by different efficiency classes (source CEMEP): Table 2: European motor market 2003 (source CEMEP) Sales distribution EFF3 EFF2 EFF1 EFF3 EFF2 EFF1 2 poles 2 poles 2 poles 4 poles 4 poles 4 poles % 83.2% 7.8% 11.0% 83.8% 5.2% The efficiency of the baseline motor is calculated by weighting the average efficiency per efficiency class in Table 1 according to market share. The power gain is calculated using the following formula: Gain ( Pn) Pn 1 ( référence ) ( EFF 1 1) η(eff1): efficiency defined in table 1. Efficiency of EFF1 motors already on the market. Table 3: Efficiency of the baseline motor and power gain for an EFF1 motor compared with the baseline situation: Baseline efficiency Power gain (kw) Pn(kW) EFF1 motor / ref 3000 rpm 1500 rpm 3000 rpm 1500 rpm % 78.92% % 80.71% % 82.69% % 84.01% % 85.28% % 86.49% % 87.61% % 88.77% % 89.68% % 90.18% % 90.63% % 91.39% % 91.90% % 92.30% % 92.71% % 93.26% % 93.56% The load factor of an electric motor is calculated using the following parameters: - the European study Improving the Penetration of Energy Efficient Motors and Drives carried out as part of the SAVE II programme considering: o all motor applications o excluding the power ranges not covered in the agreement between the CEMEP and the European Commission (the ranges considered are therefore, in kw 0 4 ; 4 10 ; ; ; ) o excluding the 3 sectors subject to the NAP (minerals, paper-board, foundry and metal work) I500 - Page 8/10

81 o by weighting the different load factors according to each range processed: LF: Load Factor WLF: Load factor, weighted according to the level of energy consumption Table 4: Consumption of non-nap sectors in the European SAVE study and weighted load factors (all motors) IAA Basic chemistry Mechanica l Consumpt Consumpt Consumpt GWh % LF WLF GWh % LF WLF GWh % LF WLF 11, % , % 2, , % , % , % 3, , % , % , % 3, , % , % ,237 14, % 3,221 1,092 12, % , % , % 4,050 1, % ,890 3,560 43,717 3,516 53, % 17.22% 20.97% 35.73% 28.98% 35.29% WLF Total non-nap consumption According to the European study and distinguishing between motor types, the average load factor for non-nap sector motors is: - 3,630 hours for pumps, fans, compressors and conveyors, - 2,470 hours for other motors. Estimated life span: 15 years Economic profitability (optional) The profitability of the operation is considered with regard to the additional cost of investment in the purchase of an EFF1 motor compared with a standard EFF2 motor. Model 1: > 100% for under 3kW 50% around 7.5 kw 20 to 30% from 18.5 kw Potential yield from the operation (optional): Description of the current market or installed base: The segments concerned are from 1.1 to 90 kw: - In number of motors = 49% of the installed base concerned I500 - Page 9/10

82 - In installed capacity = 60% - In consumption = 46% - Breakdown of the installed base by rotation speed (estimate for kw according to manufacturing source 1985): o 3000 rpm motors: 14% o 1500 rpm motors: 55% o 1000 rpm motors: 20% (outside CEMEP classification) o 750 rpm motors: 5% (outside CEMEP classification) o 3000/1500 rpm motors: 5% (outside CEMEP classification) EFF1 motors market share: Breakdown of sales of EFF3, EFF2 and EFF1 motors between 1998 and 2003 (CEMEP, 2003): Sales distribution EFF3 2 poles EFF2 2 poles EFF1 2 poles EFF3 4 poles EFF2 4 poles EFF1 4 poles % 29.5% 2.1% % 51.4% 5.0% 57.4% 40.2% 2.4% % 58.2% 5.1% 46.7% 51.1% 2.3% % 78.2% 5.9% 16.1% 80.6% 3.3% % 83.0% 6.2% 12.0% 83.9% 4.1% % 83.2% 7.8% 11.0% 83.8% 5.2% 5/10 year market trend: All motors: approximately 1.5 % / year in volume for (Frost and Sullivan) I500 - Page 10/10

83 Energy savings certificates Calculation sheet Electronic variable speed drives for motors A- APPLICATION SECTOR Industry and infrastructures. B- DESCRIPTION OF STANDARD OPERATION Installation of an electronic variable speed drive (VSD) on a motor with a power rating between 0.37 kw and 630 kw Groupe de travail Bâtiment tertiaire : enveloppe et systèmes thermiques fixes Méthodologie de calcul Collectivités locales et réseaux de chaleur Bâtiment résidentiel : consommables et équipements mobiles Industrie Bâtiment résidentiel : enveloppe et systèmes thermiques fixes Services d'efficacité énergétique Bâtiment tertiaire : consommables et équipements mobiles Transports Fiche de calcul Correspondants Fiche de synthèse N Rev date validation ATEE I /01/ /12/ /01/2006 validation ADEME ATEE ADEME N Date N DIDEME B. Escarnot (EDF) J.O. Budin I502-S 30/12/2006 I502 - Page 1/7

84 C- PERFORMANCE DIFFERENTIATION CRITERIA FOR STANDARD OPERATION ACCORDING TO INSTALLATION CONDITIONS Criterion 1: Type of motor use: pump, fan, compressor Criterion 2: Power rating of motor D- AVERAGE CONSUMPTION STATISTICS According to the 1999 CEREN study on potential resources for energy management in industry: Electric motors represent on average 70% of electrical energy consumption in industry, or 89 TWh in 1997 Pumps, fans and compressors represent 43.5 TWh All industrial sectors combined, pumps, fans and compressors operating in load fluctuation represent 16.4 TWh, including 1.4 TWh corresponding to machines already equipped with variable speed drives (mechanical or electronic). E- BASELINE SITUATION The operation applies to all new or existing installations including motors (pumps, fans and compressors) with variable loads, regulated by a device giving rise to losses (bypass, throttling, etc.). The conventional system is replaced by an electronic variable speed drive, which is the most energy-efficient solution. IMPORTANT: Note that energy gains from individual operations can be highly variable. Before any installation, a specific analysis must systematically be performed to determine its technical and economic feasibility. Market condition and technical potential VSDs for electric Motor Systems, produced as part of the European SAVE II project: Basic data used to assess potential gains in the industrial sector: Application Application possibility (%) Existing application (%) Technical potential (%) Pumps fans Compressed air Incorporating the market baseline situation: Compressed air Ventilation Pumping 0.69% 3.86% 3.64% F- AMOUNT OF ENERGY SAVING GENERATED PER STANDARD OPERATION (expressed in kwh per year) There is no simple segmentation method for calculating the saving associated with the I502 - Page 2/7

85 installation of variable speed drive systems. The key parameters involved characterize variation ranges (flow levels and associated times). These parameters are highly variable: they depend on the installation design calculations, the process type, production organisation, etc. The simplest fixed rate approach therefore consists of establishing the following savings: Pumps and fans: 30% saving, Compressors: 15% saving. Energy saving taking the market structure into consideration: Application Average saving (%) Pumps 28.9 Fans 28.8 Compressed air 14.9 The number of operating hours can also be set at a fixed rate: Application Annual duration (hours) Pumping 5,091 Ventilation 6,148 Compressed air 4,709 Energy saving in kwh/year according to the application and motor rating: Energy saving per year Application and per kw of motor rating Pumping 1,472 Ventilation 1,773 Compressed air 701 NB: This assessment of the saving corresponds to the average of the cases considered. Under no circumstances may it be used to prove energy savings on a project to the customer the customer. It will be used solely for administrative purposes for MDE programme directives. In all cases, the detailed calculation of the saving must be performed as part of the preinstallation study carried out for the customer company, taking the economic and technical parameters into consideration. G- PRODUCT OR SERVICE LIFE SPAN 10 years i.e. a discount factor of (rate 4%) H- ENERGY SAVINGS PER STANDARD OPERATION FOR GRANTING OF ENERGY SAVINGS CERTIFICATES Expressed in cumulative discounted (cumac) kwh over the product life span. (Rounded values) I502 - Page 3/7

86 Application Amount of kwh cumac per kw of motor rating Pumping 12,400 Ventilation 15,000 X P motor (kw) Compressed air 5,900 I502 - Page 4/7

87 APPENDIX Additional information Operation context: Improvement of existing installations for pumps and fans or renewal in the case of air compressors Isolated or combined operation How has the standard energy saving been estimated for the operation concerned? Baseline situation: motor equipped with a load variation device giving rise to losses. Description of the new situation: replacement of the existing load variation device by a VSD The estimated fixed savings of 30% and 15% are based on in situ feedback. The number of operating hours has been set as follows: - for industry: source - SAVE study Improving the penetration of energy-efficient motors and drives see table 1 below, Estimated life span: 10 years. I502 - Page 5/7

88 Table 1: Determination of the equipment operating hours depending on the type of industrial application as described in the SAVE study Improving the penetration of energy efficient motors and drives. - The industrial sectors are those not subject to the NAP - the numbers of hours are weighted according to the consumption of each power range, then each sector. PUMPING NAF 15 NAF 24 NAF 28 motor ratings kw IAA Basic chemistry Mechanical consumption consumption consumption GWh % time GWh % time GWh % time total cons. % % % % % % % % % % % % % % % % % % % % % % % % no % hours total % % % VENTILATION NAF 15 NAF 24 NAF 28 motor ratings kw IAA Basic chemistry Mechanical consumption consumption consumption GWh % time GWh % time GWh % time total cons. % % % % % % % % % % % % % % % % % % % % % % % % no % hours total % % % AIR COMPRESSORS NAF 15 NAF 24 NAF 28 motor ratings kw IAA Basic chemistry Mechanical consumption consumption consumption GWh % time GWh % time GWh % time total cons. % % % % % % % % % % % % % % % % % % % % % % % % no % hours total % % % I502 - Page 6/7

89 Determination of the current VSD market: The market condition for each application (compressors, fans, pumps) is determined on the basis of: - the SAVE II study Improving the penetration of energy efficient motors and drives (1) - the SAVE II study VSDs for electric motor systems (2) Independent estimate of distribution of VSDs for asynchronous motors sold by type of application (European study (2) ) - Industry and tertiary - Power ranges (kw) Compressed air % Ventilation % Pumping % [0.75-4[ 2.00% 8.00% 6.00% [4-10[ 2.00% 11.00% 14.00% [10-30[ 5.00% 19.00% 16.00% [30-70[ 2.00% 22.00% 19.00% [70-130[ 3.00% 13.00% 12.00% [ [ 3.00% 20.00% 16.00% A % of VSDs for asynchronous motors sold in the EU in 1998 by power range (European study (2) ) - Industry and tertiary - Power ranges (kw) % [0.75-4[ 24.30% [4-10[ 9.60% [10-30[ 11.20% [30-70[ 10.60% [70-130[ 39.50% [ [ 43.10% B Estimate of the VSD market by type of application (European study (2) ) A x B Power ranges (kw) Compressed air % Ventilation % Pumping % [0.75-4[ 0.49% 1.94% 1.46% [4-10[ 0.19% 1.06% 1.34% [10-30[ 0.56% 2.13% 1.79% [30-70[ 0.21% 2.33% 2.01% [70-130[ 1.19% 5.14% 4.74% [ [ 1.29% 8.62% 6.90% VSD market average by type of application, weighted according to the consumption of each power range (combining data (1) and (2) Compressed air % Ventilation % Pumping % 0.69% 3.86% 3.64% Economic profitability (optional) Operation cost 170 to 210/ kw on average for standard variable speed drives (rating greater than 10 kw and less than 200 kw) without replacing the existing motor (add 100/ kw for motor replacement), excluding the decision-making study. Expected annual saving: variable from 5% to 50%. ROI time = Investment / Annual saving: variable. I502 - Page 7/7

The French Energy Savings Certificates Scheme

The French Energy Savings Certificates Scheme The French Energy Savings Certificates Scheme Agency for Environment and Energy Management Luc BODINEAU, March 2009 The Energy Savings Certificate (ESC) System: principles and operation : The 13st July

More information

Second European Working Meeting of the White Certificates Club

Second European Working Meeting of the White Certificates Club Second European Working Meeting of the White Certificates Club Study case comparison WCC Working Meeting 12 June 2013 1 The ATEE Association Created in 1978 after the oil crisis, by the big energy suppliers

More information

Role of daylight in the existent and future French building regulations

Role of daylight in the existent and future French building regulations Role of daylight in the existent and future French building regulations Christophe Martinsons Lighting Electromagnetism and Electricty Division christophe.martinsons@cstb.fr 13 May 2009 3rd VELUX Daylight

More information

Energy saving calculus The French system

Energy saving calculus The French system Energy saving calculus The French system 1 Identification of the energy saving potential and their costs 2 1 Theoretical potential for CEE (1) Sector Consumption Energy efficiency potential Equivalent

More information

White Certificates in Europe : practical implementation in France

White Certificates in Europe : practical implementation in France First international energy efficiency forum How to win on energy efficiency White Certificates in Europe : practical implementation in France Nicolas DYEVRE, European Countries Cooperation Manager French

More information

Partnership between energy companies and installers How White Certificates can finance energy efficiency for building renovation

Partnership between energy companies and installers How White Certificates can finance energy efficiency for building renovation Partnership between energy companies and installers How White Certificates can finance energy efficiency for building renovation Financing energy efficiency in private housing Opportunities from energy

More information

Energy savings obligation in the EU

Energy savings obligation in the EU Energy savings obligation in the EU Bruno Lapillonne, Vice president, Enerdata Workshop on Savings obligations, public buildings targets and the promotion of CHP-Best practices in MS and cost of implementation

More information

for refurbishing future?

for refurbishing future? High temperature residential heat pump for refurbishing What preferred refrigerant for the next future? Denis CLODIC IEA Workshop Paris, November 8, 2004 CENTRE D ENERGETIQUE 1 Contents Heat pump specifications

More information

Energy Savings Certificates (ESC) Scheme in France: initial results

Energy Savings Certificates (ESC) Scheme in France: initial results Energy Savings Certificates (ESC) Scheme in France: initial results Abstract In 2006, the French government decided to implement a new and innovative policy instrument (called energy savings certificates

More information

ZEMedS: Implementation

ZEMedS: Implementation ZEMedS: Implementation Implementation Case: El Calamot, Gavà, Catalonia (Spain) General data 3 Name of the School Type of school El Calamot High School High School Number of students Owner 1000 public

More information

Case Study 2: France. 2.1 Context

Case Study 2: France. 2.1 Context Case Study 2: France 2.1 Context The French White Certificates have been in place since July 2006 and arose out of the new French energy policy law passed in July 2005. It places an obligation on suppliers

More information

ZEMedS: Implementation

ZEMedS: Implementation ZEMedS: Implementation Implementation Case: Pere Borrell, Puigcerdà, Catalonia (Spain) General data 3 Name of the School Type of school Pere Borrell High School High School Number of students Owner 487

More information

Calculation of the yearly energy performance of heating systems based on the European Building Directive and related CEN Standards

Calculation of the yearly energy performance of heating systems based on the European Building Directive and related CEN Standards Downloaded from orbit.dtu.dk on: Oct 06, 2018 Calculation of the yearly energy performance of heating systems based on the European Building Directive and related CEN Standards Olesen, Bjarne W.; Langkilde,

More information

L 301/14 Official Journal of the European Union DECISIONS COMMISSION

L 301/14 Official Journal of the European Union DECISIONS COMMISSION L 301/14 Official Journal of the European Union 20.11.2007 II (Acts adopted under the EC Treaty/Euratom Treaty whose publication is not obligatory) DECISIONS COMMISSION COMMISSION DECISION of 9 November

More information

Energy efficiency building standards in Korea

Energy efficiency building standards in Korea www.asiabusinesscouncil.org Energy efficiency building standards in Korea Although government-affiliated research institutes, universities, and utility companies have investigated building energy efficiency

More information

INNOVATIVE METHODS TO ENCOURAGE BUILDING ENERGY EFFICIENCY IN FRANCE Francis Allard LaSIE, University of La Rochelle/CNRS

INNOVATIVE METHODS TO ENCOURAGE BUILDING ENERGY EFFICIENCY IN FRANCE Francis Allard LaSIE, University of La Rochelle/CNRS Rakennusten energiaseminaari Finlandia-talossa 8.10.2015 INNOVATIVE METHODS TO ENCOURAGE BUILDING ENERGY EFFICIENCY IN FRANCE Francis Allard LaSIE, University of La Rochelle/CNRS francis.allard@univ-lr.fr

More information

Project name SOLAR HOUSE 80/50 Project summary

Project name SOLAR HOUSE 80/50 Project summary http://lowenergybuildings.org.uk Project name SOLAR HOUSE 80/50 Project summary Project Description Projected build start date 01 Mar 2010 Projected date of occupation 19 Jul 2010 Project stage Under construction

More information

The challenges, dynamics and activities in the building sector and its energy demand in France

The challenges, dynamics and activities in the building sector and its energy demand in France The challenges, dynamics and activities in the building sector and its energy demand in France D2.1 of WP2 from Entranze Project Written by: Bruno Lapillonne, Carine Sebi and Nicolas Mairet Enerdata, with

More information

Overview. Best practices for effective program monitoring. Alessandro Federici ENEA - Energy Efficiency Technical Unit Research Fellow

Overview. Best practices for effective program monitoring. Alessandro Federici ENEA - Energy Efficiency Technical Unit Research Fellow Overview Best practices for effective program monitoring Alessandro Federici ENEA - Energy Efficiency Technical Unit Research Fellow IPEEC / WEACT Workshop on Energy Efficiency Policies in ASEAN Region

More information

Renewable Heat Incentive (RHI) Opportunities for Social Landlords in the RHI

Renewable Heat Incentive (RHI) Opportunities for Social Landlords in the RHI (RHI) Opportunities for Social Landlords in the RHI [Name] [Date] Three good reasons to choose renewable heat 1. Now every building will be able to get an incentive if it goes renewable the RHI is a reality

More information

FRANCE. Draft, approved for Phase I 14 September 2008

FRANCE. Draft, approved for Phase I 14 September 2008 Monitoring and evaluation of energy certification in practice with focus on central European states ANNEX I Country Reviews Draft, approved for Phase I 14 September 2008 Imprint Federal Ministry of Transport,

More information

Upgrading the energy performance of residential buildings in Cyprus

Upgrading the energy performance of residential buildings in Cyprus Upgrading the energy performance of residential buildings in Cyprus Energy Services, Barriers & Opportunities Gazzada Schianno, Varese, Italy 18-19 October 2017 Savvas Vlachos / Director Member of Cyprus

More information

Compatibility of the French white certificate program to fulfil the objective of energy savings claimed by the Energy Service Directive

Compatibility of the French white certificate program to fulfil the objective of energy savings claimed by the Energy Service Directive Compatibility of the French white certificate program to fulfil the objective of energy savings claimed by the Energy Service Directive Dominique Osso, Jean-Sébastien Broc, Luc Bodineau, Jérôme Adnot,

More information

EULF Workshop, September 2016 «Methodologies for energy performance assessment based on location data»

EULF Workshop, September 2016 «Methodologies for energy performance assessment based on location data» EULF Workshop, 12-14 September 2016 «Methodologies for energy performance assessment based on location data» Energy simulation of buildings and urban projects Spatial data input, use of measurements, «big

More information

Complying with the Minimum Energy Efficiency Standards (MEES)

Complying with the Minimum Energy Efficiency Standards (MEES) Complying with the Minimum Energy Efficiency Standards (MEES) Advantages of using DSM software to calculate the EPC Rating Introduction The Minimum Energy Efficiency Standards (MEES) for commercially rented

More information

SUMMER THERMAL COMFORT IN TYPICAL FRENCH RESIDENTIAL BUILDINGS: IMPACT ASSESSMENT OF BUILDING ENVELOPE INSULATION ENHANCEMENT

SUMMER THERMAL COMFORT IN TYPICAL FRENCH RESIDENTIAL BUILDINGS: IMPACT ASSESSMENT OF BUILDING ENVELOPE INSULATION ENHANCEMENT 13th Conference of International Building Simulation Association, Chambéry, France, August 26-28 SUMMER THERMAL COMFORT IN TYPICAL FRENCH RESIDENTIAL BUILDINGS: IMPACT ASSESSMENT OF BUILDING ENVELOPE INSULATION

More information

Energy Performance Certificate

Energy Performance Certificate 111, Greenham Road, NEWBURY, RG14 7JE Dwelling type: Semi-detached house Reference number: 0141-2891-7693-9593-5705 Date of assessment: 19 January 2017 Type of assessment: RdSAP, existing dwelling Date

More information

Energy Statement. Gainsford Road. For Pocket Living. XCO2 energy. May 2016

Energy Statement. Gainsford Road. For Pocket Living. XCO2 energy. May 2016 For Pocket Living May 2016 XCO2 energy w: www.xco2energy.com :: e: mail@xco2energy.com t: +44 (0) 20 7700 1000 :: f: +44 (0) 20 7183 6620 17-18 Hayward s Place :: Clerkenwell :: London :: EC1R 0EQ Contents

More information

Grant Table for ecoenergy Retrofit Homes. Save NOW with a home retrofit grant Save LATER on your energy bills

Grant Table for ecoenergy Retrofit Homes. Save NOW with a home retrofit grant Save LATER on your energy bills Effective July 1, 2009 Save NOW with a home retrofit grant Save LATER on your energy bills As part of the Government of Canada s Economic Action Plan, the ecoenergy Retrofit Homes program has been expanded

More information

Energy efficiency of buildings from Europe to Slovakia

Energy efficiency of buildings from Europe to Slovakia Energy efficiency of buildings from Europe to Slovakia Prof. Dušan Petráš, PhD. Slovak University of Technology Faculty of Civil Engineering Department of Building Services mail.: dusan.petras@stuba.sk

More information

Portuguese Thermal Building Legislation and Strategies for the Future

Portuguese Thermal Building Legislation and Strategies for the Future Chapter 2: Policies to Low Cost Sustainable Construction Portuguese Thermal Building Legislation and Strategies for the Future H. J. P. Gonçalves, M. J. N. Oliveira Panão & S.M.L. Camelo LNEG, Lisboa,

More information

GREEN AND ENERGY EFFICIENT BUILDINGS INTERNATIONAL BENCHMARK : THE THREE MODELS

GREEN AND ENERGY EFFICIENT BUILDINGS INTERNATIONAL BENCHMARK : THE THREE MODELS EUROPEAN HOUSING NETWORK REIMS 2008 OCTOBER 17 GREEN AND ENERGY EFFICIENT BUILDINGS INTERNATIONAL BENCHMARK : THE THREE MODELS Jean Carassus Director of the Economics and Human Sciences Department Professor

More information

conservation of fuel and power

conservation of fuel and power The conservation of fuel and power Approved document Conservation of fuel and power in new dwellings 2013 edition for use in England* main changes in the 2013 edition This approved document, Approved Document

More information

Title of the measure: General description. FRA16 Energy Efficiency Certificates

Title of the measure: General description. FRA16 Energy Efficiency Certificates Title of the measure: FRA16 Energy Efficiency Certificates General description The law n 2005-781 ( programme fixant les orientations de la politique énergétique ) adopted the 13th of July 2005 introduces

More information

Section 6 (Scotland) (2005) Methods (non-dwellings) <Virtual Environment> 5.9

Section 6 (Scotland) (2005) Methods (non-dwellings) <Virtual Environment> 5.9 Section 6 (Scotland) (2005) Methods (non-dwellings) 5.9 Page 1 of 21 Contents 1. Acknowledgements...3 2. Introduction...4 3. Basis for calculations...6 4. Section 6 Elemental and

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate 23, Temple Street BRIGHTON BN1 3BH Dwelling type: Mid-terrace house Date of assessment: 14 November 2007 Date of certificate: 15 November 2007 Reference number: 9848-0941-6259-4433-6060

More information

COUNTRY REPORT: FRANCE

COUNTRY REPORT: FRANCE COUNTRY REPORT: FRANCE Prepared by: CSTB Version 02 Date: 03/09/2010 Address: BP 209 F-06909 Sophia-Antipolis Cedex Tel. : 33 4 93 95 67 00 Fax : 33 4 93 95 64 31 E-mail: dominique.caccavelli@cstb.fr QAiST

More information

ZEMedS: Case studies

ZEMedS: Case studies ZEMedS: Case studies Case study: ANTONIO SALVETTI Primary School, Colle di Val d'elsa, Italy The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect

More information

Energy saving obligations schemes in the European Union

Energy saving obligations schemes in the European Union Brussels, 17 October 2011 1 1 Energy saving obligations schemes in the European Union Silvia Rezessy and Paolo Bertoldi European Commission, Directorate General JRC Workshop Savings obligations, public

More information

Planning for Zero Carbon Homes the policy context Neil Witney - DECC. 6 th May 2014

Planning for Zero Carbon Homes the policy context Neil Witney - DECC. 6 th May 2014 Planning for Zero Carbon Homes the policy context Neil Witney - DECC 6 th May 2014 Policy context for Zero Carbon Homes How is this to be achieved? regulation, planning, incentives How do we know if new

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate 15, Dan y Parc View, Dwelling type: Detached house Incline Top, Date of assessment: 19 September 2008 MERTHYR TYDFIL, CF47 0GF Date of certificate: 19 September 2008 Reference

More information

Building classification methodology in Albania Results of the residential building retrofitting methodology in Albania Zsuzsa Szalay PhD

Building classification methodology in Albania Results of the residential building retrofitting methodology in Albania Zsuzsa Szalay PhD Building classification methodology in Albania Results of the residential building retrofitting methodology in Albania Zsuzsa Szalay PhD Support for Low-Emission Development in South East Europe (SLED)

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate 4 The Oaks, Dwelling type: Semi-detached house The Street, Date of assessment: 05 September 2008 Colton, Date of certificate: 05 September 2008 NORWICH, NR9 5DB Reference

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate 11, Station Road Otford SEVENOAKS TN14 5QU Dwelling type: Detached house Date of assessment: 4 June 2008 Date of certificate: 5 June 2008 Reference number: 8298-6126-4690-7884-5002

More information

Results from the Application of the Maltese Energy Performance Rating of Dwellings in Malta EPRDM Software to a New Block of Apartments

Results from the Application of the Maltese Energy Performance Rating of Dwellings in Malta EPRDM Software to a New Block of Apartments Results from the Application of the Maltese Energy Performance Rating of Dwellings in Malta EPRDM Software to a New Block of Apartments Charles Yousif Institute for University of Malta with Celia Pérez

More information

Energy Audit of two Apartment Buildings in Cagliari using Energy Simulation

Energy Audit of two Apartment Buildings in Cagliari using Energy Simulation Energy Audit of two Apartment Buildings in Cagliari using Energy Simulation Graduation Thesis by Carla Vargiu and Luisa Zedda, Master in Green Building and Energy Efficiency This thesis focuses on the

More information

Project Description. Projected build start date Projected date of occupation. Dungannon, County Tyrone, Northern Ireland

Project Description. Projected build start date Projected date of occupation. Dungannon, County Tyrone, Northern Ireland http://lowenergybuildings.org.uk Project name Lisnahull Project summary The terrace of 5 two storey houses have been developed as the first certified social housing project in Ireland for Oaklee Homes

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate 51, Esh Wood View Ushaw Moor, Durham Durham DH7 7FD Dwelling Type: Detached house Date of Assessment: 05/1/007 Date of Certificate: 05/1/007 Reference Number: 9747-835-615-0803-8431

More information

Energy Performance Certificate (EPC)

Energy Performance Certificate (EPC) Energy Performance Certificate (EPC) You can use this document to: 17 WILLOWTREE WAY, BANCHORY, AB31 5JQ Dwelling type: Detached house Date of assessment: 03 November 2012 Date of certificate: 04 November

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate 15, Applecross Close, Dwelling type: Top-floor flat ROCHESTER, ME1 1SQ Date of assessment: February 008 Date of certificate: February 008 Reference number: 8838-61-430-95-50

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate Flat A 16 Pierrepont Street BATH BA1 1LA Dwelling type: Date of assessment: Date of certificate: Reference number: Total floor area: Top-floor flat 14 January 2009 14 January

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate Apartment 3 Porter House 36, Woodcutter Close WALSALL WS1 3QU Dwelling type: Date of assessment: Date of certificate: Reference number: Total floor area: Ground floor flat

More information

ZEMedS ds: Case studies

ZEMedS ds: Case studies ZEMedS: Case studies Case study: ITC EINSTEIN High School, Ancona, Italy The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect the opinion of

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate 15 Olympic Street MANCHESTER M11 3BH Dwelling type: Date of assessment: Date of certificate: Reference number: Total floor area: End-terrace house 07/08/08 7 August 2008

More information

Imp ementation Case:

Imp ementation Case: ZEMedS: Implementation Implementation Case: ITIS Merloni, Fabriano, Italy General data 3 Name of the School Type of school ITIS MERLONI High School High School Number of students Owner 398 public Location

More information

England Building Regulations Part L 2013

England Building Regulations Part L 2013 England Building Regulations Part L 2013 Domestic buildings Tom Lelyveld, David Ross 08 October 2013 Content Introduction Background Changes to meeting the five new-build compliance steps Existing dwellings

More information

Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles

Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles http://lowenergybuildings.org.uk Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles Project Description Projected build start date

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate Moreton Lough Church Road Longhope Glos GL17 0LA Dwelling type: Detached house Date of assessment: 28 June 2011 Date of certificate: 13 July 2011 Reference number: 2588-3095-6296-4779-9940

More information

Expired Report (92-100) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20)

Expired Report (92-100) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20) Energy Performance Certificate 21, Bingham Close, Dwelling type: End-terrace house VERWOOD, BH31 6TS Date of assessment: 05 August 2008 Date of certificate: Reference number: 05 August 2008 8602-1754-5920-5306-8883

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate Apartment 3, Dwelling type: Top-floor flat 187, Kentmere Road, Date of assessment: 29 July 2008 Timperley, Date of certificate: 29 July 2008 ALTRINCHAM, WA15 7NT Reference

More information

Top actions you can take to save money and make your home more efficient

Top actions you can take to save money and make your home more efficient You can use this document to: Energy Performance Certificate (EPC) Dwellings Scotland 29 HORDALAND, KIRKWALL, KW15 1UN Dwelling type: End-terrace bungalow Date of assessment: 10 January 2018 Date of certificate:

More information

(92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20)

(92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20) Energy Performance Certificate 56, Charnwood Avenue BEDFORD MK41 0BJ Dwelling type: Mid-terrace house Date of assessment: 12 September 2011 Date of certificate: 12 September 2011 Reference number: 8679-6021-9120-8082-3996

More information

(92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20)

(92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20) Energy Performance Certificate 8 Glan Yr Afon Cwmbach ABERDARE CF44 0DD Dwelling type: Detached house Date of assessment: 09 September 2011 Date of certificate: 09 September 2011 Reference number: 8599-6231-8640-5201-8902

More information

Dwelling type: Date of assessment: Date of certificate: Reference number: Total floor area:

Dwelling type: Date of assessment: Date of certificate: Reference number: Total floor area: Energy Performance Certificate 11C, Knights Walk CAERPHILLY CF83 2XN Dwelling type: Date of assessment: Date of certificate: Reference number: Total floor area: Ground floor flat 0744-2893-6486-0128-9561

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate 23, Kimbolton Close, Dwelling type: End-terrace house Freshbrook, Date of assessment: 03 June 2008 SWINDON, SN5 8RE Date of certificate: 04 June 2008 Reference number: 0045-2887-6762-0108-8285

More information

Energy Performance Certificate (EPC)

Energy Performance Certificate (EPC) Energy Performance Certificate (EPC) You can use this document to: 3F2, 23 BRUNTON PLACE, EDINBURGH, EH7 5EJ Dwelling type: Top-floor flat Date of assessment: 21 November 2012 Date of certificate: 22 November

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate 41 Trafalgar Square Poringland NORWICH NR14 7WP Dwelling type: Date of assessment: Date of certificate: Reference number: Total floor area: Top floor flat 4 November 2008

More information

Bifluid Geothermal System New Generation

Bifluid Geothermal System New Generation Bifluid Geothermal System New Generation The Geothermal Energy - from the Greek roots geo, meaning earth, and thermos, meaning heat - ie the thermal energy stored in the underground of our planet, and

More information

Microgeneration Installation Standard : MCS 024 SOLAR DOMESTIC HOT WATER ENERGY CALCULATION. to be used in conjunction with MIS 3001:

Microgeneration Installation Standard : MCS 024 SOLAR DOMESTIC HOT WATER ENERGY CALCULATION. to be used in conjunction with MIS 3001: Microgeneration Installation Standard : MCS 024 SOLAR DOMESTIC HOT WATER ENERGY CALCULATION to be used in conjunction with MIS 3001: REQUIREMENTS FOR CONTRACTORS UNDERTAKING THE SUPPLY, DESIGN, INSTALLATION,

More information

Expired Report. (92-plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20)

Expired Report. (92-plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20) Energy Performance Certificate 27, Studcross, Dwelling type: Detached house Epworth, Date of assessment: 26 July 2008 DONCASTER, DN9 1DS Date of certificate: 26 July 2008 Reference number: 8309-3564-5920-1726-6383

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate 73, Hornbeam Close Bradley Stoke BRISTOL BS32 8FE Dwelling type: Date of assessment: Date of certificate: Reference number: Total floor area: Top floor flat 9253-2858-6722-0898-1341

More information

Energy study of a habitation using a solar thermal and photovoltaic installation

Energy study of a habitation using a solar thermal and photovoltaic installation Energy study of a habitation using a solar thermal and photovoltaic installation Y Raffenel 1, E Blanco 1, J Virgone 2, G Thomas 1 1 Laboratoire AMPERE, Ecole Centrale de Lyon, 36 avenue Guy de Collongue,

More information

(92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20)

(92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20) Energy Performance Certificate Ty Perllan Tregynon NEWTOWN SY16 3EH Dwelling type: Detached house Date of assessment: 08 August 2011 Date of certificate: 10 August 2011 Reference number: 9708-7078-6388-8149-8990

More information

Energy Simulation And Optimized Retrofit Practices Applied To A Real Dwelling

Energy Simulation And Optimized Retrofit Practices Applied To A Real Dwelling Purdue University Purdue e-pubs International High Performance Buildings Conference School of Mechanical Engineering 2014 Energy Simulation And Optimized Retrofit Practices Applied To A Real Dwelling Giulia

More information

(92-100) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20)

(92-100) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20) Energy Performance Certificate 56 Ward Street Penistone SHEFFIELD S36 6EP Dwelling type: Mid-terrace House Date of assessment: 19 February 008 Date of certificate: 19 February 008 Reference number: 8178-60-4610-4571-5096

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate 10, Levett Avenue, Dwelling type: Semi-detached house POLEGATE, BN26 6LW Date of assessment: 23 March 2008 Date of certificate: Reference number: 25 March 2008 2078-1079-6217-4558-8040

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate Hi-View Old Park Road Ketley Bank TELFORD TF2 0DG Dwelling type: Detached bungalow Date of assessment: 12 August 2008 Date of certificate: 14 August 2008 Reference number:

More information

Homesol Passive House Design Process

Homesol Passive House Design Process Homesol Passive House Design Process Passive Houses are residential, commercial and institutional buildings in which a comfortable temperature can be achieved year round with a 75% 85% reduction in energy

More information

Energy Performance Certificate (EPC)

Energy Performance Certificate (EPC) Energy Performance Certificate (EPC) You can use this document to: FLAT 2/1, 12 DURWARD COURT, GLASGOW, G41 3RZ Dwelling type: Mid-floor flat Date of assessment: 20 May 2013 Date of certificate: 20 May

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate 13, Bowood Park, Dwelling type: Detached bungalow Lanteglos, Date of assessment: 19 February 008 CAMELFORD, PL3 9LA Date of certificate: 19 February 008 Reference number:

More information

Multifamily Net Zero Retrofit Market: Technical and Cost Benchmarks for San Francisco

Multifamily Net Zero Retrofit Market: Technical and Cost Benchmarks for San Francisco Multifamily Net Zero Retrofit Market: Technical and Cost Benchmarks for San Francisco 1 Table of Contents Acronym Key Analysis Process Retrofit Economics Technical Analysis Details 6 Unit Building Analysis

More information

Energy Performance Certificate

Energy Performance Certificate 1 Ashmere Grove LONDON SW2 5UH Dwelling type: Date of assessment: Date of certificate: Reference number: Total floor area: Mid-terrace house 12 June 2008 12 June 2008 8388-6326-4200-8802-9092 121 m² This

More information

(92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20)

(92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20) Energy Performance Certificate 1 Harts Court Hartshill Oakengates TELFORD TF2 6AL Dwelling type: Detached house Date of assessment: 30 August 2011 Date of certificate: 09 September 2011 Reference number:

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate 31, Tucker Drive WITHAM CM8 1FA Dwelling type: Ground floor flat Date of assessment: 23 May 2008 Date of certificate: 14 July 2008 Reference number: 0346-2877-6755-0728-1431

More information

Active solar heating system with concrete plate heating analysed with dynamical thermal simulations

Active solar heating system with concrete plate heating analysed with dynamical thermal simulations Active solar heating system with concrete plate heating analysed with dynamical thermal simulations Dr. D. Pahud SUPSI DCT Laboratory of Energy, Ecology and Economy, phone + 41 91 935 13 53, fax + 41 91

More information

Training Certification Categories

Training Certification Categories Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and

More information

P78. Implementation of the EPBD in Ireland: Status and planning August [Country review] > Legal context. Deirdre Flood.

P78. Implementation of the EPBD in Ireland: Status and planning August [Country review] > Legal context. Deirdre Flood. [Country review] P78 25-08-2008 Deirdre Flood Sustainable Energy Ireland Ireland More Information Papers on other European activities can be found at: www.buildingsplatform.eu Implementation of the EPBD

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 17065:2012 to provide product conformity certification Unit 4 Pioneer Way Pioneer Business Park Castleford WF10 5QU Contact: Mr Mark Rollins-Mann Tel: +44 (0)845 621111 Fax: +44 (0)845 621112 E-Mail: info@stroma.com

More information

1. The 2018 NCECC shall regulate the design and construction of buildings for the effective use of.

1. The 2018 NCECC shall regulate the design and construction of buildings for the effective use of. CHAPTER 1 [CE & RE] Scope & Administration WORKSHEET 1. The 2018 NCECC shall regulate the design and construction of buildings for the effective use of. a. energy b. natural resources c. manpower d. electric

More information

Economy Update Thailand: Compliance Activities on Energy Efficiency in Thailand

Economy Update Thailand: Compliance Activities on Energy Efficiency in Thailand 2011/SOM1/EWG/EGEEC/020 Agenda: D2 4 Economy Update Thailand: Compliance Activities on Energy Efficiency in Thailand Submitted by: Thailand 37 th Expert Group on Energy Efficiency and Conservation Meeting

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate 34, Sandygate Park Road, Dwelling type: Detached bungalow SHEFFIELD, S10 5TY Date of assessment: 03 July 2008 Date of certificate: Reference number: 05 July 2008 0678-4033-6283-4288-9074

More information

Top actions you can take to save money and make your home more efficient. Recommended measures Indicative cost Typical savings over 3 years

Top actions you can take to save money and make your home more efficient. Recommended measures Indicative cost Typical savings over 3 years You can use this document to: Energy Performance Certificate (EPC) Dwellings Scotland 5 Mountain Lodge, Wanlockhead, Biggar, ML12 6UT Dwelling type: Semi-detached bungalow Date of assessment: 16 February

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate Flat 35 Parkside Court Melbourne Avenue CHELMSFORD CM1 2DY Dwelling type: Date of assessment: Date of certificate: Reference number: Total floor area: Mid floor flat 22 January

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate The Grain House, Dwelling type: Detached house Linley Green, Date of assessment: 07 May 2008 Whitbourne, Date of certificate: 07 May 2008 WORCESTER, WR6 5RQ Reference number:

More information

Top actions you can take to save money and make your home more efficient

Top actions you can take to save money and make your home more efficient You can use this document to: Energy Performance Certificate (EPC) Dwellings Scotland FLAT 1/1, 11 MALTA TERRACE, GLASGOW, G5 0TN Dwelling type: Mid-floor flat Date of assessment: 05 February 2016 Date

More information

Top actions you can take to save money and make your home more efficient

Top actions you can take to save money and make your home more efficient You can use this document to: Energy Performance Certificate (EPC) Dwellings Scotland HUMBLECAIRN FARM, ARDALLIE, PETERHEAD, AB42 5AL Dwelling type: Detached bungalow Date of assessment: 22 August 2018

More information

(92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20)

(92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20) Energy Performance Certificate 15, Shottermill Park Hindhead Road HASLEMERE GU27 1RT Dwelling type: Top-floor flat Date of assessment: 13 July 2011 Date of certificate: 13 July 2011 Reference number: 8669-6423-8050-0807-3992

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate 2, Tree Bank Close, Dwelling type: Detached house RUNCORN, WA7 4TF Date of assessment: 30 August 2008 Date of certificate: Reference number: 31 August 2008 7708-6048-6288-5408-3000

More information

Part L Review New Domestic Buildings Tom Lelyveld, AECOM

Part L Review New Domestic Buildings Tom Lelyveld, AECOM Part L Review New Domestic Buildings 2014 Tom Lelyveld, AECOM 11 th -13 th February 2014 What I will be talking about Introduction Background Key changes to Part L1A 2014 meeting the five new-build compliance

More information

Microgeneration Certification Scheme: MCS 007

Microgeneration Certification Scheme: MCS 007 Microgeneration Certification Scheme: MCS 007 Product Certification Scheme Requirements: Heat Pumps Issue 2.2 This Microgeneration Installation Standard is the property of Department of Energy and Climate

More information