Botany Bay Cable Project
|
|
- Donna Rich
- 6 years ago
- Views:
Transcription
1 Botany Bay Cable Project SUBMISSIONS REPORT including PREFERRED PROJECT REPORT SEPTEMBER 2007 DON T DELETE THE THREE LINES BELOW (they control the headers and footers Botany Bay Cable Project Submissions Report EnergyAustralia
2 Endorsed by: Peter Stewart Title: Principal (Molino Stewart Pty Limited) Signed: Date: 19/9/2007 Endorsed by: Craig Moody Title: Executive Manager Major Projects & Engineering (EnergyAustralia) Signed: Date: 19/9/2007
3 Contents 1 Introduction Purpose of this report Background Overview of the Project The Proponent The Project The approval process Stakeholder consultation Structure of the Submissions Report 4 2 Consideration of the Environmental Assessment Statutory compliance Application of Part 3A of the Environmental Planning and Assessment Act (1979) Commonwealth environmental legislation State legislation Local, regional and state planning instruments Description of the Project Project requirements Cable laying (land based) Cable laying (sea based) Substation works Options considered Overview of environmental issues Traffic impacts Noise Aquatic ecology Sediment plumes Terrestrial flora and fauna Heritage Spoil management Potential Acid Sulphate Soils Surface and groundwater disposal/treatment Erosion control / sedimentation Safety and risks Marine movements Electric and magnetic fields Visual impacts 21 Botany Bay Cable Project Submissions Report i
4 Contents 3 Consideration of Submissions Overview Analysis of issues raised in submissions Responses to key issues raised in submissions Potential damage to the bed of Posidonia australis near Kurnell Benefits and disadvantages analysis Cumulative impacts EMF impacts Managing electricity demand Responses to individual submissions 46 4 Preferred Project Report Modifications to the Project Refinements and changes to the Project since exhibition of the Environmental Assessment Refinement 1 vertical route alignment under the shipping channel Refinement 2 - Horizontal route alignment through the seagrass bed at Silver, Beach, Kurnell Refinement 3 - Use of HDD as an option to avoid trenching through the seagrass bed at Silver Beach, Kurnell Refinement 4 - Oil retention tank at Kurnell STS site Refinement 5 - Removal of vegetation fronting Kurnell STS and swale relocated Environmental assessment of proposed refinements Refinement 1 Vertical route alignment under the shipping channel (deeper burial) Refinement 2 Horizontal route alignment through the seagrass bed at Silver, Beach, Kurnell (trenching though the SE corner of the Posidonia bed) Refinement 3 Use of HDD to avoid trenching through the seagrass bed at Silver Beach, Kurnell Refinement 4 Oil retention tank at Kurnell STS site (above ground oil containment system) Refinement 5 Removal of vegetation fronting Kurnell STS and swale relocated 75 5 Revised Statement of Commitments Mitigation measures Environmental management plan Stakeholder relations 85 6 Conclusion 86 ii EnergyAustralia
5 Appendices Appendix A - Director General s Requirements Appendix B - Copies of submissions from government agencies Number 6 Sydney Water Number 7 Department of Primary Industries Number 12 TransGrid Number 14 Randwick City Council Number 17 Sutherland Shire Council Number 21 NSW Health Number 22 Department of Environment and Climate Change Number 24 Sydney Ports Corporation Number 26 Rockdale City Council List of tables Table 1: Information requested by the Commonwealth Department of Environment and Water Resources 6 Table 2: Summary of construction noise findings 16 Table 3: Issues summary (from a total of 26 submissions) 23 Table 4: Analysis of submissions and issues raised 24 Table 5: Possible targets for the sea grass management plan 35 Table 6: Trenching through the seagrasses at Kurnell analysis 38 Table 7: Use of HDD to manage seagrasses at Kurnell analysis 38 Table 8: Summary of refinements outlines in the Preferred Project Report 70 Table 9: Construction noise criteria at residences opposite Kurnell HDD site 74 List of figures Figure 1: Indicative cable route and location of Bunnerong and Kurnell STSs 9 Figure 2: Examples of land based trenching cable configuration 10 Figure 3: Cross section of the proposed cable route between Bunnerong STS and Kurnell STS (Refer to revised profile at shipping channel Section 4.1.2) 12 Figure 4: Artist s impression of proposed construction at Kurnell STS 13 Figure 5: Latest aerial showing changes to seagrass bed and proposed cable route 34 Figure 6: Examples of silt screens 35 Figure 7: Previous land based cable route from Bunnerong STS to Botany Bay 51 Figure 8: Proposed cable burial under shipping channel 71 Figure 9: Proposed HDD site 73 Botany Bay Cable Project Submissions Report iii
Conversion of Kurnell refinery to a fuel import terminal
Conversion of Kurnell refinery to a fuel import terminal Dr Jos Kusters 1 May 2014 AGENDA Background Kurnell site conversion Management of environmental and community impacts Operation as a terminal 2
More informationKurnell Wharf Infrastructure Upgrade
Kurnell Wharf Infrastructure Upgrade Sediment and Water Quality Monitoring Program CALTEX REFINERIES (NSW) PTY LTD September 2013 Page 1 1 INTRODUCTION Caltex Refineries (NSW) Pty Ltd (Caltex) proposes
More informationPreferred Project Report for. Sydney s Desalination Project
Preferred Project Report for Sydney s Desalination Project August 2006 Appendix A The Concept Plan for the Desalination project as exhibited Appendix B Issues Database Summary Appendix C Matters relating
More informationenvironmental issues Figure 15 and Figure 16 show the road network in and around the Project area. A description follows.
7 assessment of key environmental issues 7 Assessment of key environmental issues 7.1 Traffic and transport Traffic and transport issues associated with the Project relate almost entirely to the construction
More informationBOTANY BAY CABLE PROJECT
BOTANY BAY CABLE PROJECT CONSTRUCTION & OPERATIONAL NOISE ASSESSMENT REPORT NO. 06096 VERSION A BOTANY BAY CABLE PROJECT CONSTRUCTION & OPERATIONAL NOISE ASSESSMENT REPORT NO. 06096 VERSION A SEPTEMBER
More informationQuintillion Subsea Project Applicant Proposed Mitigation Statement
1. Avoidance of impacts to waters of the U.S., including wetlands: Please describe how, in your project planning process, you avoided impacts to waters of the U.S., including wetlands, to the maximum extent
More informationTABLE OF CONTENTS. Page
TABLE OF CONTENTS Page 1 PROJECT INTRODUCTION... 1-1 1.1 PROJECT BACKGROUND... 1-2 1.2 PROJECT PROPONENT... 1-2 1.3 PROJECT OVERVIEW... 1-3 1.4 PROJECT REGULATORY APPROVAL PROCESS... 1-4 1.4.1 Existing
More informationA. TABLE OF CONTENTS ENVIRONMENTAL IMPACT STATEMENT
A. TABLE OF CONTENTS TABLE OF CONTENTS PAGE ii TABLE OF CONTENTS FOLDER 1 OF 14 List of Abbreviations... Tab B Glossary of Terms... Tab C Summary of changes to Queensland Government Departments... Tab
More informationECOSYSTEM MONITORING PROGRAM BOTANY BAY SECTOR TABLE OF CONTENTS 1 INTRODUCTION Purpose SCOPE DEFINITIONS...
TABLE OF CONTENTS 1 INTRODUCTION... 4 1.1 Purpose...4 2 SCOPE... 5 3 DEFINITIONS... 6 4 ISSUE INFORMATION... 7 4.1 Document Control and Records Management...7 4.2 Compliance...7 4.3 Plan Quality and Control...7
More informationBelize Cable Feasibility Study Stakeholder Briefing Note
Project brief background. Belize Cable Feasibility Study project was firstly conceived to provide a reliable service to the current and future electricity supplies for Caye Caulker. Current supply is from
More informationVictorian Desalination Project
Victorian Desalination Project D&C Utilities Environmental Management Plan Attachment D List of Technical Reports and Documents (Environmental) DOCUMENT NUMBER TDV 0 EV AT 0012.D 03 ATTACHMENT D LIST OF
More informationGovernment Consultation
7 Government Consultation Government Consultation CHAPTER 7 7.1 Introduction This chapter outlines the consultation undertaken with Government and other authorities as part of the development of the BGC
More informationELECTRICAL TRANSMISSION LINES & SUBSTATIONS
TERMS OF REFERENCE ELECTRICAL TRANSMISSION LINES & SUBSTATIONS Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to development projects involving the construction
More informationKurnell Wharf Infrastructure Upgrade
Kurnell Wharf Infrastructure Upgrade Sediment and Water Quality Management Plan 301015-03067 301015-03067-EN-REP-011 1 October 2013 Infrastructure & Environment Level 12, 141 Walker Street, North Sydney
More informationTABLE OF CONTENTS. Atlas-Campaspe Mineral Sands Project Environmental Impact Statement
TABLE OF CONTENTS 1 INTRODUCTION 1-1 1.1 PROJECT OVERVIEW 1-1 1.1.1 Purpose of this Report 1-1 1.1.2 Project Summary 1-1 1.1.3 Land Tenure, Development Application Area, Tenements and Zoning 1-7 1.1.4
More informationSubmission on the draft terms of reference for Balaclava Island Coal Export Terminal project
Submission on the draft terms of reference for Balaclava Island Coal Export Terminal project Name: Chantelle James Email: ccc@cqnet.com.au Michael Mc Cabe Organisation (if applicable): Capricorn Conservation
More informationVictorian Desalination Project
Victorian Desalination Project D&C Area Environmental Management Plan Attachment D List of Technical Reports and Documents (Environmental) DOCUMENT NUMBER TDV 0 EV RG 0013.D 03 D&C Area EMP Attachment
More informationCOASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS BAIE DU TOMBEAU SITE CONTENTS
COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS BAIE DU TOMBEAU SITE CONTENTS Chapter Description Page EXECUTIVE SUMMARY 1 INTRODUCTION 1-1 1.1 General 1-1 1.1.1 Need for EIA 1-1
More informationEnvironmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores
Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores October 2015 Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores WaterNSW on behalf of the NSW Government
More informationKurnell Refinery Conversion Project
Kurnell Refinery Conversion Project Contamination Management Plan CALTEX REFINERIES (NSW) PTY LTD January 2014 Page 1 1 INTRODUCTION Caltex propose to convert the petroleum refinery in Kurnell (the Site
More informationtel fax ABN
AECOM Australia Pty Ltd Level 21, 420 George Street Sydney NSW 2000 PO Box Q410 QVB Post Office NSW 1230 Australia www.aecom.com +61 2 8934 0000 tel +61 2 8934 0001 fax ABN 20 093 846 925 15 June 2018
More informationKurnell Terminal Demolition Project
Kurnell Terminal Demolition Project Biodiversity and Weed Management Plan CALTEX REFINERIES (NSW) PTY LTD September 2015 Page 1 Page 2 1 INTRODUCTION... 5 1.1 Legislative and Other Requirements... 6 2
More informationGREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT
GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY DECEMBER 2013 EXECUTIVE SUMMARY 1. PROJECT BACKGROUND
More informationWestern Rail Coal Unloader
ENVIRONMENTAL ASSESSMENT CHAPTER 1 - INTRODUCTION April 2007 Chapter 1 - Introduction Contents 1. Introduction 1-1 1.1 Overview 1-1 1.2 Project Objectives 1-1 1.3 The Proponent 1-3 1.4 Statutory Planning
More informationEnvironmental Impact Statement. Avoca Tank Project
ABN 88 100 095 494 Environmental Impact Statement for the Avoca Tank Project Prepared by: R.W. CORKERY & CO. PTY. LIMITED July 2014 This page has intentionally been left blank ABN 88 100 095 494 Environmental
More informationEIS TABLE OF CONTENTS
EIS TABLE OF CONTENTS GLOSSARY OF TERMS... GL-1 Glossary and Abbreviations... GL-1 Units... GL-14 EXECUTIVE SUMMARY... ES-1 INTRODUCTION... ES-1 PROJECT PROPONENTS... ES-1 LOCATION... ES-1 PROJECT DESCRIPTION...
More informationIntermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 1 INTRODUCTION
Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 1 INTRODUCTION October 2005 Contents 1. 1-1 1.1 Background 1-1 1.1.1 The Applicant 1-1 1.1.2 Growth in Container Trade 1-1 1.1.3
More informationENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR Overview of Presentation 1. Objectives of the Consultancy 2. Hydropower in Myanmar 3. Draft Table of Contents 4.
More informationBulk Liquids Berth No. 2 - Port Botany
Bulk Liquids Berth No. 2 - Port Botany ENVIRONMENTAL ASSESSMENT Final 9 November 2007 The SKM logo is a trade mark of Sinclair Knight Merz Pty Ltd. Sinclair Knight Merz Pty Ltd, 2006 Bulk Liquids Berth
More informationAustralia Pacific LNG Project. Volume 1: Overview Chapter 6: APLNG Commitments
Australia Pacific LNG Project Contents 6. Australia Pacific LNG commitments... 1 6.1 Commitments gas fields... 1 6.1.1 Stakeholder engagement... 1 6.1.2 Climate... 1 6.1.3 Geology and soils... 1 6.1.4
More informationSydney, 13 October 2005 File No. S01/02520
DETERMINATION OF A DEVELOPMENT APPLICATION FOR STATE SIGNIFICANT AND DESIGNATED DEVELOPMENT UNDER SECTION 80 OF THE ENVIRONMENTAL PLANNING AND ASSESSMENT ACT, 1979 I, the Minister for Planning, pursuant
More informationNotes for NEPA for Generic Terms of Reference
TERMS OF REFERENCE IIRRIIGATIION AND WATER MANAGEMENT Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to the construction and/or the development of Irrigation
More informationCommunity and Stakeholder Consultation Report. Powering Sydney s Future
Community and Stakeholder Consultation Report Powering Sydney s Future Early Engagement July 2017 1. Executive Summary Powering Sydney s Future (the Project) aims to secure a reliable, safe and economical
More informationT a b l e o f C o n t e n t s
T a b l e o f C o n t e n t s Executive Summary English Executive Summary French page 1. Introduction and Background... 1-1 1.1 Introduction...1-1 1.2 The Proponent Waste Management of Canada Corporation...1-2
More informationSome Sydney councils require 27 reports for a single house development application
Some Sydney councils require 27 reports for a single house development application Monday, 23 April 2018 Sydney councils are requiring an excessive number of specialist reports to submit a Development
More information1 Introduction 1-1. Project Need and Objectives
Introduction 1 CONTENTS 1 Introduction 1-1 1.1 1.1 Introduction Introduction 1-1 1-1 1.2 1.2 Project Overview Project Overview 1-1 1-1 1.3 1.3 Project Site Project Site 1-1 1-1 1.4 1.4 The Proponent The
More informationOur project commitments
Australia Pacific LNG has made a range of social and environmental commitments across each component of the project comprising gas fields, gas pipeline and LNG facility. Our commitments are summarised
More informationPlanning Approval Consistency Assessment Form
Integrated Management System Planning Approval Consistency Assessment Form SM ES-FT-414 Sydney Metro Integrated Management System (IMS) Assessment Name: Prepared by: Prepared for: Assessment number: Status:
More informationEnvironmental impact assessment of council roadside activities
Environmental impact assessment of council roadside activities Developed on behalf of LGNSW for the Council Roadside Reserve Project 2016-2019 Introduction These slides cover legislative obligations in
More informationtransfer of treated water via pipelines to users on the BIP or to Bunnerong Canal, and of waste water to sewer; and
6 6.1 Scope A number of statutory planning controls need to be addressed for the Activity (which is defined below) and other components of the BGC Project. This chapter reviews the Commonwealth and State
More informationKurnell Refinery Conversion Project
Kurnell Refinery Conversion Project Waste Management Plan CALTEX REFINERIES (NSW) PTY LTD January 2014 Page 1 1 INTRODUCTION Caltex propose to convert the petroleum refinery in Kurnell (the Site ) to a
More informationKurnell Terminal Demolition Project
Kurnell Terminal Demolition Project Traffic Management Plan CALTEX REFINERIES (NSW) PTY LTD September 2015 Page 1 Page 2 1 Introduction... 5 1.1 Legislative and Other Requirements... 6 2 Objectives...
More informationThe aim of the public participation process undertaken as part of this Scoping phase is to:
SECTION 5: PUBLIC PARTICIPATION PROCESS 5.1 PUBLIC PARTICIPATION PROCESS Public participation is an integral aspect of any EIA process and should aim to meaningfully engage stakeholders at all levels throughout
More informationCOASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS CASE NOYALE SITE ENVIRONMENTAL IMPACT ASSESSMENT REPORT CONTENTS
COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS CASE NOYALE SITE ENVIRONMENTAL IMPACT ASSESSMENT REPORT CONTENTS Chapter Description Page EXECUTIVE SUMMARY 1 INTRODUCTION 1-1 1.1
More information7. Value Management Workshop
7. Value Management Workshop 7.1 Introduction A two day Value Management Workshop (VMW) was held on 12 and 13 December 2005. The value management workshop was used to review and assess the four route options
More informationAT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017.
Cairns Shipping Development Project Revised Draft Environmental Impact Statement Fact Sheet July 2017 AT A GLANCE > An additional 70 cruise ships into Port of Cairns each year by 2031 > Project design
More informationAdani Appendix F1 Guidelines Cross Reference Table
Adani Appendix F1 Guidelines Cross Reference Table Terminal 0 Environmental Impact Statement Abbot Point Coal Terminal 0 EIS Adani 5.1 EXECUTIVE SUMMARY An executive summary that outlines the key findings
More informationFrank Sartor MP Minister for Planning. Sydney, 13 October 2005 File No. S01/02520
DETERMINATION OF A DEVELOPMENT APPLICATION FOR STATE SIGNIFICANT AND DESIGNATED DEVELOPMENT UNDER SECTION 80 OF THE ENVIRONMENTAL PLANNING AND ASSESSMENT ACT, 1979 I, the Minister for Planning, pursuant
More informationSection 75J of the Environmental Planning and Assessment Act 1979
Project Approval Section 75J of the Environmental Planning and Assessment Act 1979 I approve the project application referred to in Schedule 1, subject to the conditions in Schedules 2 to 4. These conditions
More informationTable of Contents. List of Tables. 11. Advantages and Disadvantages
Table of Contents 11. Advantages and Disadvantages... 11-1 page List of Tables... 11-1 11. Advantages and Disadvantages The overall advantages and disadvantages of the DMNP are articulated, summarized
More informationKurnell Refinery Conversion Project
Kurnell Refinery Conversion Project Air Quality Management Plan CALTEX REFINERIES (NSW) PTY LTD January 2014 Page 1 1 INTRODUCTION Caltex propose to convert the petroleum refinery in Kurnell (the Site
More informationEnvironmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project
May 2018 Third Draft GEO: East West Highway (Khevi Ubisa Section) Improvement Project Section F2 of the Khevi Ubisa Shorapani Argveta Road (E60 Highway) Part 6 Appendices A D Prepared by JV IRD Engineering
More informationTERMS OF REFERENCE. Notes for NEPA for Generic Terms of Reference
TERMS OF REFERENCE INDUSTRIAL PROJECTS: MANUFACTURING & PROCESSING PAINT, TEXTILES, CEMENT & LIME, DETERGENTS, PESTICIDES & HAZARDOUS SUBSTANCES, PULP, PAPER & WOOD, BOTTLES, AND CANS. DRY CLEANING AND
More informationIntermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 5 COMMUNITY CONSULTATION
Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 5 COMMUNITY CONSULTATION October 2005 Contents 5. 5-1 5.1 Introduction 5-1 5.2 Consultation for the Environmental Assessment 5-2
More informationSection 75J of the Environmental Planning & Assessment Act 1979
Project Approval Section 75J of the Environmental Planning & Assessment Act 1979 I approve the project application referred to in schedule 1, subject to the conditions in schedule 2. These conditions are
More informationLiverpool Range. Preliminary Environmental Assessment February 2011
Liverpool Range Wind Farm Preliminary Environmental Assessment February 2011 2 Preliminary Environmental Assessment Table of Contents TABLE OF CONTENTS 2 1 INTRODUCTION 3 1.1 Site description and location
More informationConstruction Environmental Management Plan
Construction Environmental Management Plan Newcastle Gas Storage Facility - Low Pressure Gas Pipeline March 2014 Construction Environmental Management Plan Newcastle Gas Storage Facility - Low Pressure
More informationIssues in measuring and managing changes to the ecological character of the Western Port Ramsar Site as a result of climate change
presenter: Shelley Heron Issues in measuring and managing changes to the ecological character of the Western Port Ramsar Site as a result of climate change Western Port Bay Where is it? Ecological character
More information1. Summary of Local Government Boundaries Commission comments
1. Summary of Local Government Boundaries Commission comments The Boundaries Commission has reviewed the Delegate s Report on the proposed merger of the City of Botany Bay Council and parts of Marrickville,
More informationPlanning Approval Consistency Assessment Form
Integrated Management System Planning Approval Consistency Assessment Form SM ES-FT-414 Sydney Metro Integrated Management System (IMS) Assessment Name: Prepared by: Prepared for: Assessment number: Status:
More informationIntegrated Water Management Developer Guidance
WESTERN WATER Western Water Whole-of-water-cycle Strategy Integrated Water Management Developer Guidance Edition 1, 2018 For more information call 1300 650 422 or visit us at WesternWater.com.au Development
More informationAppendix M. Criteria, Measures and Indicators for Effects Assessment
Appendix M Criteria, Measures and Indicators for Effects Assessment Appendix M. Criteria, Measures and Indicators for Effects Assessment Objective 1: Naturalization Changes to Aquatic Habitat Disruption,
More informationSubmission on the environmental impact statement (EIS) Townsville Port Expansion Project
Submission on the environmental impact statement (EIS) Townsville Port Expansion Project Name: Peter Jones Email: peter.jones1@jcu.edu.au Organisation (if applicable): Magnetic Island Nature Care Association
More information21 July Anthony Yeates RATCH-Australia Corporation Limited Level 7, 111 Pacific Highway North Sydney NSW 2060
AECOM Australia Pty Ltd Level 21, 420 George Street Sydney NSW 2000 PO Box Q410 QVB Post Office NSW 1230 Australia www.aecom.com +61 2 8934 0000 tel +61 2 8934 0001 fax ABN 20 093 846 925 21 July 2015
More informationSEARs project justification and conclusion
31 Project justification and conclusion This chapter presents a justification for the project and a conclusion to the environmental impact statement (EIS). The justification is based on the strategic need
More informationDocument ID: ABU Revision ID: 1.0 Revision Date: 10 October 2018 Next Revision Due: N/A Information Sensitivity: Public
Gorgon Gas Development Jansz Feed Gas Pipeline erence: 2003/1294 (as amended) Reference: 2008/4178 Compliance Assessment 2018 Revision ID: 1.0 Revision Date: 10 October 2018 Next Revision Due: N/A 2018
More informationThe Energy Supply and Purchase Agreement (ESPA) was signed between Solar Energy Ltd and the Central Electricity Board on 28 November 2014.
EXECUTIVE SUMMARY E1 Introduction The proponent is SOLAR FIELD LTD, a consortium between 1. Dhamma Energy, a company based in Spain, specialised in photovoltaic projects 2. Harel Mallac & Co. Ltd, a company
More information6 Risk assessment methodology
Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management
More informationCrudine Ridge Wind Farm Preliminary Environmental Assessment February 2011
Crudine Ridge Wind Farm Preliminary Environmental Assessment February 2011 Document Control Revision Date Description Author Reviewed Approved A Feb 2011 Final EM AM EM Prepared by Wind Prospect CWP Pty
More informationSECTION 28 Environment Management Strategies
SECTION 28 Environment Management Strategies 28.0 Environmental Management Strategies 325 28.1 Introduction 325 28.2 Response to Submissions 325 28.2.1 28.2.2 28.2.3 28.2.4 28.2.5 28.2.6 28.2.7 28.2.8
More informationA British perspective on the design of an offshore wind farm: balancing constraint Pre- and post- monitoring at an of offshore wind farm
A British perspective on the design of an offshore wind farm: balancing constraint Pre- and post- monitoring at an of offshore wind farm Dr Marcus Cross 8 th November 2017 Contents Introduction Full Scope
More informationUnderstanding the State Planning Policy July 2017 Changes to state interest statements, policies and assessment benchmarks
Understanding the State Planning Policy July 2017 Changes to state statements, policies and assessment benchmarks This fact sheet outlines the key policy changes to the state statements, policies and assessment
More informationEstudios Ambientales del Programa de Ampliación
Western Dredging Association 2016 Chapter Meeting Environmental Management - Lessons Leaarned Panama Canal Expansion Daniel M. Muschett Ibarra Water Capacity Project Office of the Deputy Administrator
More informationNoise & Vibration Impact Assessment
Appendix Noise & Vibration Impact Assessment APPENDIX F KURNELL REFINERY CONVERSION INTO A FINISHED PRODUCT TERMINAL REPORT NO. 12315 VERSION F MAY 2013 PREPARED FOR URS AUSTRALIA PTY LTD 407 PACIFIC HIGHWAY
More informationAppendix A: Project Characteristics
Gorgon Fourth Train Expansion Proposal Appendix A: Project Characteristics Appendices Project Characteristics A Key Characteristics table has been prepared to describe the elements of the Foundation Project
More informationExecutive Summary 1. 1 Project Background 6
Contents Executive Summary 1 1 Project Background 6 Page 1.1 Project Overview 6 1.2 Hotel Concept 6 1.3 Justification of the Project 8 1.3.1 Foreign Currency Earnings 8 1.3.2 Tourism Developments in Mauritius
More informationKurnell Wharf Infrastructure Upgrade
Kurnell Wharf Infrastructure Upgrade Dredge and Spoil Disposal Management Plan 301015-03067 301015-03067-EN-REP-010 1 October 2013 Infrastructure & Environment Level 12, 141 Walker Street, North Sydney
More informationConstruction Environmental Management Plan. Newcastle Gas Storage Facility Main Power Supply Document Number: NGSF-PSV-NAS-EN-PLN-0001
Construction Environmental Management Plan Document Number: NGSF-PSV-NAS-EN-PLN-0001 Construction Environmental Management Plan Document Number: Version: 2.0 NGSF-PSV-NAS-EN-PLN-0001 Date: 11 November
More informationFactor Potential Effects Mitigation Measures
Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table
More informationPreliminary Environmental Assessment. Powering Sydney s Future Rookwood Road to Beaconsfield West Transmission Cable Project
Preliminary Environmental Assessment Powering Sydney s Future Rookwood Road to Beaconsfield West Transmission Cable Project JUNE 2017 Powering Sydney's Future - Rookwood Road to Beaconsfield West Transmission
More informationFRINGE COMMERCIAL ZONE RULES
Chapter 17 FRINGE COMMERCIAL ZONE RULES INTRODUCTION This chapter contains rules managing land uses in the. This zone surrounds the CBD area of the City and contains much of the commercial service activity
More informationAbbot Point Stormwater Return Dam (EPBC 2010/5561) Operation Annual Compliance Report, January 2016
Abbot Point Stormwater Return Dam (EPBC 2010/5561) Operation Annual Compliance Report, 2015 22 January 2016 Table of Contents 1. Introduction... 4 1.1. The purpose of this Document... 4 1.2. Project Background...
More informationSection 4 Environmental Impact Assessment Framework
Section 4 Environmental Impact Assessment Framework 4. ENVIRONMENTAL IMPACT ASSESSMENT FRAMEWORK 4.1 Environmental Impact Assessment in Western Australia The overall framework for EIA in WA is described
More informationSLAUGHTERHOUSES AND ABATTOIRS
TERMS OF REFERENCE SLAUGHTERHOUSES AND ABATTOIRS Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to Slaughterhouses and Abattoirs. The TOR outlines the
More informationQUEENSLAND ENVIRONMENTAL OFFSETS FRAMEWORK 20 August Nelson Wills
QUEENSLAND ENVIRONMENTAL OFFSETS FRAMEWORK 20 August 2014 Nelson Wills nwills@newground.com.au Disclaimer Important Notice The material in this presentation has been prepared by New Ground Environmental
More informationSection 7 Commitments Table
Section 7 Table Terminal 0 Environmental Impact Statement Abbot Point Coal Terminal 0 EIS Adani Section 7 Table Legislation Climate, Natural Hazards and Climate Change Landscape and Visual Amenity Adani
More informationGold Coast Airport Tenant Environment Management Guideline
Gold Coast Airport Tenant Environment Management Guideline July 2012 Introduction Implementation of sound environment management practices is critical in meeting legislative requirements and business objectives.
More informationGreen Square Stormwater Drain Decision Report
Green Square Stormwater Drain Decision Report July 2014 Sydney Water Green Square Stormwater Drain Decision report Page 1 Sydney Water Corporation (2014). Commercial in Confidence. All rights reserved.
More informationIndirect and Cumulative Effects
Chapter 21: Indirect and Cumulative Effects 21-1 INTRODUCTION The federal Council on Environmental Quality s (CEQ) regulations implementing the procedural provisions of the National Environmental Policy
More informationDraft Environmental Impact Statement Guidelines for the Environmental Assessment of the Sydney Tar Ponds and Coke Ovens Sites Remediation Project
Draft Environmental Impact Statement Guidelines for the Environmental Assessment of the Sydney Tar Ponds and Coke Ovens Sites Remediation Project Table of Contents 1. BACKGROUND...5 1.1 CONTEXT...5 2.
More informationFINAL REPORT GREEN SQUARE ZONE ADDITIONAL TRANSFORMER
FINAL REPORT GREEN SQUARE ZONE ADDITIONAL TRANSFORMER 31 st May 2010 Disclaimer This document has been prepared and made available solely for information purposes and consultation under the National Electricity
More informationEXECUTIVE SUMMARY. Impact Analyses: EMF; Temperature Impacts; Safety Issues and Impacts; and Installation and Maintenance Impacts.
STUDY OBJECTIVES The Connecticut Academy of Science and Engineering (CASE) convened the Long Island Sound Symposium: A Study of Benthic Habitats on July 28-29, 2004 on behalf of the Connecticut Energy
More informationCONSTRUCTION ENVIRONMENTAL MANAGEMENT FRAMEWORK
CONSTRUCTION ENVIRONMENTAL MANAGEMENT FRAMEWORK APPENDIX D Contents 1 Introduction... 1 1.1 Purpose and Scope... 1 1.2 Status... 1 1.3 Environment and Sustainability Policy... 1 1.4 Project Description...
More informationSince the Game Lands are publicly owned, reclamation can be done with Project 500 bond issue funds. E. D'Appolonia Consulting Engineers, Inc.
FINAL REPORT ENGINEERING SURVEY AND FEASIBILITY STUDY MINE DRAINAGE POLLUTION ABATEMENT STATE GAME LANDS NO. 117 WASHINGTON COUNTY, PENNSYLVANIA PROJECT NO. SL-130-1 1.0 INTRODUCTION Raccoon Creek is one
More informationWater Quality and Pollution
Chapter 6 Water Quality and Pollution Guiding Principles: Chapter 4 details all the guiding principles relevant to the overall management of the Harbour. Whilst all should be given some consideration the
More informationDraft Structure of the Environmental Report for the Spatial Offshore Grid Plan of the German Exclusive Economic Zone (EEZ) in the Baltic Sea 2013
Draft Structure of the Environmental Report for the Spatial Offshore Grid Plan of the German Exclusive Economic Zone (EEZ) in the Baltic Sea 2013 1 Introduction 1.1 Legal Basis and Function of Environmental
More informationBACKGROUND INFORMATION
BACKGROUND INFORMATION Preliminary Design & Class Environmental Assessment Study G.W.P. 30-95-00 The following information was included in the Transportation Environmental Study Report (TESR) that was
More informationMONTHLY ENVIRONMENTAL MONITORING REPORT PORT BOTANY REDEVELOPMENT PATRICK STEVEDORES
MONTHLY ENVIRONMENTAL MONITORING REPORT PORT BOTANY REDEVELOPMENT PATRICK STEVEDORES JANUARY 2014 www.mcconnelldowell.com MCCONNELL DOWELL CORPORATION PAGE 1 OF 13 McConnell Dowell Constructors (Aust.)
More informationFINAL. WREP Sectional Replacement Project Environmental and Social Impact Assessment. Georgian Pipeline Company
FINAL WREP Sectional Replacement Project Georgian Pipeline Company AUGUST 2016 TABLE OF CONTENTS NON-TECHNICAL SUMMARY 1 INTRODUCTION 1-1 1.1 General 1-1 1.2 Background to the WREP 1-1 1.3 Rationale for
More informationTraffic Management Plan. Environmental Management and Monitoring Program. Appendix VI
Traffic Management Plan Environmental Management and Monitoring Program Appendix VI Gunlake Quarries December 2009 Olsen Consulting Group Pty Ltd 6/25 Victoria Street WOLLONGONG 2500 PO Box 353 FIGTREE
More information