1 ENERGY AUDIT FINAL REPORT Houston High School West Hawk Lane Houston, AK p (907) AkWarm ID No. CIRI-WOW-CAEC F Street Anchorage, AK p (907) f (907) Contact: Walter Heins, PE, CCP, CxA, CEA Lakefront Dr. Soldotna, Alaska p (907) Contact: Jerry P. Herring, PE, CEA

2 Contents I. Executive Summary... 1 II. Introduction... 4 III. Energy Audit Process... 5 IV. Method of Analysis... 6 V. Building Description... 7 V.I ARCHITECTURAL DESCRIPTION... 8 V.II MECHANICAL DESCRIPTION... 8 V.III ELECTRICAL DESCRIPTION... 9 VI. Historic Energy Consumption and Cost VI.I ELECTRICAL CONSUMPTION DATA VI.II NATURAL GAS CONSUMPTION DATA VI.III OVERALL ENERGY CONSUMPTION DATA VII. Equipment Inventory and Photo Survey VIII. Energy Conservation Measures VIII.I ENERGY CONSERVATION MEASURES VIII.II ADMINISTRATIVE CONTROLS FOR ENERGY CONSERVATION AND OPTIMIZATION Appendices Appendix A Energy Benchmark Data Appendix B AkWarm Commercial Reports Appendix C Major Equipment List Appendix D Energy Conservation Measures Houston High School Appendix E Site Survey Photos Appendix F Thermographic Photos Coffman Engineers, Inc. 6/12/2012 i AkWarm No. CIRI-WOW-CAEC-02

3 Abbreviations AHFC ARRA ASHRAE BTU CCF CFM DDC ECI ECM EUI F HP HPS HVAC in IPLC kwh LED O&M sf SIR V W Alaska Housing & Finance Corporation American Recovery & Reinvestment Act American Society of Heating, Refrigeration, and Air-Conditioning Engineers British Thermal Unit One Hundred Cubic Feet Cubic Feet per Minute Direct Digital Control Energy Cost Index Energy Conservation Measure Energy Utilization Index Fahrenheit horsepower High Pressure Sodium Heating, Ventilating, and Air-Conditioning inch(es) Integrated Power & Load Circuit kilowatt-hour Light-Emitting Diode Operations & Maintenance square feet Savings-to-Investment Ratio Volts Watts Coffman Engineers, Inc. 6/12/2012 ii AkWarm No. CIRI-WOW-CAEC-02

4 List of Figures Fig. 1 Energy Audit Clients... 1 Fig. 2 Energy Benchmark Data... 1 Fig. 3 Houston High School, Houston, Alaska Google Maps... 4 Fig. 4 Houston High School Google Maps... 4 Fig. 5 Houston High School First Floor Plan... 7 Fig. 6 Houston High School Second Floor Plan... 7 List of Tables Table 1 Recommended Energy Conservation Measures, Houston High School... 2 Table 2 Energy Cost and Consumption Data Coffman Engineers, Inc. 6/12/2012 iii AkWarm No. CIRI-WOW-CAEC-02

5 REPORT DISCLAIMER Privacy The information contained within this report, including any attachment(s), was produced under contract to Alaska Housing Finance Corporation (AHFC). IGAs are the property of the State of Alaska, and may be incorporated into AkWarm-C, the Alaska Retrofit Information System (ARIS), or other state and/or public information systems. AkWarm-C is a building energy modeling software developed under contract by AHFC. Limitations of Study This energy audit is intended to identify and recommend potential areas of energy savings, estimate the value of the savings, and provide an opinion of the costs to implement the recommendations. This audit meets the criteria of a Level 2 Investment Grade Audit (IGA) per the American Society of Heating, Refrigeration, Air-conditioning Engineers (ASHRAE) and the Association of Energy Engineers (AEE), and is valid for one year. The life of the IGA may be extended on a case-by-case basis, at the discretion of AHFC. In preparing this report, the preparers acted with the standard of care prevalent in this region for this type of work. All results are dependent on the quality of input data provided. Not all data could be verified and no destructive testing or investigations were undertaken. Some data may have been incomplete. This report is not intended to be a final design document. Any modifications or changes made to a building to realize the savings must be designed and implemented by licensed, experienced professionals in their fields. Lighting upgrades should undergo a thorough lighting analysis to assure that the upgrades will comply with State of Alaska Statutes as well as Illuminating Engineering Society (IES) recommendations. All liabilities for upgrades, including but not limited to safety, design, and performance are incumbent upon the professional(s) who prepare the design. Coffman Engineers, Inc (CEI) and Central Alaska Engineering Company (CAEC) bear no responsibility for work performed as a result of this report. Financial ratios may vary from those forecasted due to the uncertainty of the final installed design, configuration, equipment selected, installation costs, related additional work, or the operating schedules and maintenance provided by the owner. Furthermore, many ECMs are interactive, so implementation of one ECM may impact the performance of another ECM. CEI and CAEC accept no liability for financial loss due to ECMs that fail to meet the forecasted financial ratios. The economic analyses for the ECMs relating to lighting improvements are based solely on energy savings. Additional benefits may be realized in reduced maintenance cost, deferred maintenance, and improved lighting quality. The new generation lighting systems have significantly longer life leading to long term labor savings, especially in high areas like Gyms and exterior parking lots. Lighting upgrades displace re-lamping costs for any fixtures whose lamps would otherwise be nearing the end of their lifecycle. This reduces maintenance costs for 3-7 years after the upgrade. An overall improvement in lighting quality, quantified by numerous studies, improves the performance of students and workers in the built environment. New lighting systems can be designed to address all of the above benefits. US Government Disclaimer: This material is based upon work supported by the Department of Energy under Award Number DE-EE This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. Coffman Engineers, Inc. 6/12/2012 iv AkWarm No. CIRI-WOW-CAEC-02

6 I. Executive Summary This report presents the findings of an energy audit conducted at Houston High School as part of a contract for: Alaska Housing Finance Corporation Contact: Rebekah Luhrs 4300 Boniface Parkway Anchorage, AK rluhrs@ahfc.us Matanuska-Susitna Borough School District Contact: Rick Jensen 501 N Gulkana Street Palmer, AK ricky.jensen@matsuk12.us Fig. 1 Energy Audit Clients This audit was performed using American Recovery and Reinvestment Act (ARRA) funds to promote the use of innovation and technology to solve energy and environmental problems in a way that improves the State of Alaska s economy. This can be achieved through the wiser and more efficient use of energy. The average January 2009 December 2010 documented annual utility costs at this facility are as follows: Electricity $ 99,198 Natural Gas $ 58,811 Total $158,009 January 2009-December 2010 Energy Utilization Index (EUI) = 99.9 kbtu/sf January 2009-December 2010 Energy Cost Index = 1.75 $/sf Fig. 2 Energy Benchmark Data Energy Conservation Measures (ECMs) calculated to be cost effective are shown below in the Executive Summary Table with the energy analyst s best opinion of probable cost, savings, and investment returns. Be aware that the measures are not additive because of the interrelation of several of the measures. The cost of each measure for this level of auditing is ± 30% until detailed engineering, specifications, and hard proposals are obtained. See section VIII for detailed descriptions of all cost effective ECMs. Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

7 Table 1 Recommended Energy Conservation Measures, Houston High School Houston High School (HHS) Rank Feature Recommendation Annual Energy Savings HHS-1 a Refrigerators Replace residential & light commercial refrigerators/freezers older than 5 years old Installed Cost SIR Payback (Years) <10 HHS-2 Ventilation Add 4 CO2 s to Return Air ductwork in AHU-1, -2, -3, -5 & CO2 Control to DDC System $7,170 $15, HHS-3 Lighting: Staff Rooms Add new occupancy sensors $193 $ HHS-4 Lighting: Library Add new occupancy sensors $371 $1, HHS-5 Lighting: Corridors and Lobby Replace the 400W Metal Halide light fixtures with four-lamp T5HO fluorescent light fixtures, revise wiring to remove night-lights, and add a new occupancy sensor $5,252 $24, HHS-6 Lighting: Offices Add new occupancy sensors and revise wiring to remove night lights $167 $ HHS-7 Lighting: Gym Replace the 400W Metal Halide light fixtures with T5HO fluorescent light fixtures, remove nightlights, retrofit lighting controls, and add new occupancy sensors $2,700 $27, HHS-8 Lighting: Cafeteria Replace the 400W Metal Halide light fixtures with four-lamp T5HO fluorescent light fixtures $1,824 $19, HHS-9 Lighting: Exterior Replace the building and pole mounted High Pressure Sodium light fixtures with LED fixtures $8,676 $110, Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

8 Houston High School (HHS) Rank Feature Recommendation Annual Energy Savings HHS-10 Lighting: Storage Rooms Add new occupancy sensors Installed SIR Payback Cost (Years) $35 $ HHS-11 Air Tightening Perform air sealing to reduce air leakage by 20%. $1,479 $13, HHS-12 Lighting: Classrooms Replace the three and fourlamp fluorescent classroom fixtures with two lamp fixtures and add new occupancy sensors $5,441 $79, Notes: a Due to advances in refrigerators in the previous 5 years, new Energy Star refrigerators are much more efficient and result in viable energy savings. Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

9 II. Introduction This energy audit was conducted at Houston High School (HHS) for AHFC and Matanuska-Susitna Borough School District (MSBSD). The school is an approximately 90,264 square foot (sf) campus that includes classrooms, locker rooms, restrooms, administrative offices, a library, a gymnasium, and a multipurpose room. The location of the school is shown in the following regional and overhead images. The energy audit was conducted in order to evaluate areas and equipment where energy savings can be realized. The savings are then compared to a baseline and evaluated for reasonable project financial ratios and payback. Fig. 3 Houston High School, Houston, Alaska Google Maps Fig. 4 Houston High School Google Maps Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

10 III. Energy Audit Process Prior to visiting the school, the first task was to collect and review two years of utility data for electricity and natural gas usage. This information was used to analyze operational characteristics, calculate energy benchmarks for comparison to industry averages, estimate savings potential and establish a baseline to monitor the effectiveness of implemented energy conservation measures. A spreadsheet was used to enter, sum, and calculate benchmarks and to graph energy use information (see Appendix A). The primary benchmark calculation used for comparison and baseline data is the Energy Utilization Index, or EUI (see Section VI). After gathering the utility data and calculating the EUI, the next step in the audit process was to review the architectural and engineering drawings to develop a building profile which documented building age, type, usage, and major energy consuming equipment or systems such as lighting, Heating, Ventilating, and Air Conditioning (HVAC), water heating, refrigeration, and etc. The building profile is utilized to generate, and answer, all possible questions regarding the facility s energy usage. These questions were then compared to the energy usage profiles developed during the utility data gathering step. After this information was gathered, the next step in the process was to conduct a site survey. A site survey was completed on February 20, The audit included inspecting the building systems that impact energy consumption and answering questions from the preliminary review of the school. The on-site contact during the investigation was Mr. Rick Jensen of the MSBSD Maintenance Department 1. The following information was also collected while on site: occupancy schedules, O&M practices, building energy management program, and other information that has an impact on energy consumption. The following energy audit includes an evaluation of the information gathered, the researching of possible conservation opportunities, organizing the energy audit into a comprehensive report, and making ECM recommendations for mechanical, electrical, and building envelope improvements. 1 Mr. Rick Jensen, (907) (mobile), (907) (office) Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

11 IV. Method of Analysis Having completed the preliminary energy audit tasks, Coffman Engineers, Inc., (CEI) conducted a site survey. The site survey provides critical input in deciphering where energy savings opportunities exist within a facility. The audit team from CEI walked the entire site to inventory and investigate the building envelope and major equipment, including: HVAC, water heating, lighting, and equipment located in shops, kitchens, offices, gyms, multipurpose rooms, and classrooms. An understanding of how the equipment is used is determined during the site survey. The collected data was entered into AkWarm Commercial software, an energy calculating program for buildings. The data was processed by AkWarm to model a baseline from which ECMs could be considered. The model was compared to actual utility costs to ensure the quality of the baseline and proposed energy modeling performed by AkWarm. The recommended ECMs focus on the building envelope, HVAC, lighting, water heating, and other electrical measures that will reduce annual energy consumption. ECMs are evaluated based on building use and processes, local climate conditions, building construction type, function, operational schedule, existing conditions, and foreseen future plans. When new equipment is proposed, energy consumption is calculated based on the manufacturer s cataloged information. Energy savings are calculated by AkWarm. Implementation of more than one ECM often affects the savings of other ECMs. The savings may in some cases be relatively higher for an ECM implemented individually than when that ECM is just one of multiple recommended ECMs. For example, implementing reduced operating schedules of inefficient lighting systems may result in a given savings. Also implementing a more efficient lighting system will add to the savings, but less than the efficient lighting would alone because there is less energy to be saved when the lights are on a reduced operating schedule. Thus, if multiple ECM s are recommended, the combined savings are calculated and identified appropriately in groups. In Appendix D, Energy Conservation Measures, the simple lifetime calculation is shown for each ECM, which is based on the typical life of the equipment being replaced or altered. The energy savings are extrapolated throughout the simple lifetime of the ECM. The total energy savings is calculated as the total lifetime multiplied by the yearly energy savings. The cost savings and installation costs are used to calculate simple payback 2 and the Savings to Investment Ratio 3 (SIR). These are listed in Appendix D and summarized in the Executive Summary Table of this report. The SIR is calculated as a ratio by dividing the break even cost by the initial installed cost. Cost savings is calculated based on the historical energy costs for the building. Installation costs include labor and equipment to evaluate the initial investment required to implement an ECM. These are applied to each recommendation with simple paybacks calculated. The energy analyst s opinions of probable cost are garnered from RS Means Cost Data, other industry publications, and local contractors and suppliers. In addition, where applicable, maintenance cost savings are estimated and applied to the net savings. 2 The simple payback is based on the years that it takes for the net savings to payback the net installation cost (Cost divided by Savings). 3 Savings to Investment Ratio (SIR): Break Even Cost divided by initial installed cost, where Break-Even Cost is how much can be spent and still have the measure be cost effective; it equals the Present Value (PV) of Savings over the life of the measure minus PV of maintenance costs. Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

12 V. Building Description Houston High School is a two story building with a variety of space usages and schedules. The exterior structure is an insulated finish system over a studwall. The school was built in The only renovation since construction has been a moderate change to the heating system. The facility is operated from 6am to 11pm, five days a week during the school year, and is open on weekends for school sports and community activities. The school is shut down to the greatest extent possible during summer months. The school year runs from mid-august until late May. Fig. 5 Houston High School First Floor Plan Fig. 6 Houston High School Second Floor Plan Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

13 V.I Architectural Description Most of the school s exterior walls consist of an exterior insulated finish system, gypsum board sheathing, 6 studs with batt infill, and the interior gypsum board. This typical wall construction provides for an overall insulating value of R The gymnasium walls are nearly identical; however, a 4 precast concrete panel is added to the construction on the interior face, providing an insulating value of R Most walls are approximately 27 high. There is approximately 7,950 sf of gym wall face area, and 33,000 sf of face area for the typical wall construction. Floor construction for the school consists of slab-on grade. Foundation walls are insulated with 2 of rigid insulation covering the floor slab edge and extending approximately 4 below grade. The building has a 65,234 sf footprint with approximately 25,030 sf of second floor and utility space, for a total of 90,264 sf of usable floor area. Roof construction consists of metal decking, gypsum wallboard, a waterproof membrane, rigid insulation, and ballast-supported pavers which provide a slope for drainage. This construction provides an insulating value of approximately R-33. There is approximately 65,234 sf of roof area. Typical window construction consists of double-paned low emissivity windows with vinyl frames. An estimated insulating value of R-2.4 was used for modeling purposes. There is a total of approximately 3,628 sf of window area for the school. There are two main door types for the school. There are 20 windowless, insulated hollow metal doors with an insulating value of R-2.7. Eleven doors are half-lite, insulated hollow metal with an insulating value of R-1.7. Each of the half-lite windows feature double panes with 1/2 air space. There are two overhead doors; one for the shops and one for the loading bay. These doors appear to be insulated metal doors with a thermal break. There is a total of 180 sf of overhead door area, with an estimated insulating value of R-3.4. V.II Mechanical Description The school's heat is provided by two Weil-McLain model 88 cast iron sectional boilers, each rated for 5,124 MBH natural gas input. Both are equipped with Gordon-Piatt burners and the heating system medium is water. Conduction and infiltration heating loads are accomplished with perimeter baseboard heating and terminal unit heaters. Ventilation heating is provided by heating coils using glycol, heated by the central heating system via water-to-glycol heat exchangers located in each fan room. No mechanical cooling is provided for any systems in the facility. There are five air handling units (AHUs) serving Houston High School. All of the AHUs are original construction Scott Springfield series appropriately sized for their individual applications. AHU-1, 2, and 5 are variable air volume (VAV) units with variable frequency drive (VFD) equipped motors. AHU-1 is equipped with a 40 horsepower (HP) motor and serves up to 38,000 cubic feet per minute (CFM) of air to the school's classrooms. AHU-2 serves 26,000 CFM of air via a 30 HP motor to the Art, Music, and Library areas. AHU-5 provides 6,600 CFM of air to the school offices with a 7.5 HP motor. AHU-3 is a two-speed, constant volume unit that serves the commons, multipurpose room, kitchen, and stage areas with 24,000 CFM of air using a 25 HP motor. AHU-4 is a two-speed, constant volume unit supply the gym, technical education, and locker room areas with 33,000 CFM of air using a 30 HP motor. Two gas-fired water heaters, both PVI model MAXIM 72P-250A, provide domestic hot water for the school. Each heater is rated for 720 MBH natural gas input and has a storage capacity of 250 gallons. The system is engineered for constant hot water recirculation, using a Grundfos type UP inline circulator pump. Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

14 The building's domestic cold water is provided by a local well system, which primarily fills a 24,500 gallon storage tank. The tank is located below grade, approximately 250 ft northwest of the building. Water is delivered to the building through a 5-inch domestic water line and 10-inch fire water line. A Tigerflow triplex pump system distributes the domestic water throughout the building. The school's building energy management and control system is controlled using a direct digital control (DDC) system. The system has been adequately maintained and appeared to be in good working order during the site visit. The energy management and control system controls the boilers, water pumps, glycol pumps, and supply fans. V.III Electrical Description The School is served by a 2000 Amp (A), 277/480 Volt (V), three-phase, four-wire, underground electrical service connected to a pad-mounted utility transformer. The school has a 200kW standby diesel generator used to power selected loads in the event of a power outage. Inside the school, 277/480V power is used to serve large mechanical loads and lighting. A dry type transformer is used to step the voltage to 120/208V, three phase for receptacle loads, computers, and kitchen equipment. Since the passage of the Energy Policy Act of 2005, all general purpose transformers have been required to meet the efficiency requirements listed in the National Electrical Manufacturer's Association publication NEMA TP There are energy savings available by replacing these transformers with new models that meet or exceed the standard, however caution must be exercised as replacing transformers impacts available fault current and over-current protection device selective coordination. The replacement of the school s existing transformers to meet NEMA requirements can only be recommended after performing a power system analysis. That level of study is outside the scope of this project. The school is primarily illuminated by fluorescent T8 light fixtures with rapid start electronic ballasts. Rapid start electronic ballasts are beneficial since they are compatible with the use of occupancy sensors. Approximately 95% of the fixtures used to illuminate the classrooms are 2'x4' troffer fixtures that are controlled by wall switches and feature inboard/outboard bi-level switching. The remaining fixtures used to illuminate the classroom areas consist of 32W compact fluorescent lamp (CFL) down lights, and twolamp 2'x4' troffers, while the shop and art classes are illuminated by four-lamp 2'x4' troffers. The lighting throughout the classroom spaces was observed to be in excess of the values recommended by the Illuminating Engineering Society of North America (IESNA). The corridors, vestibules, and main lobby area are illuminated by a mix of CFL, T8 fluorescent and 400W metal halide (MH) light fixtures controlled by occupancy sensors that reduce the T8 fixtures to 50% of normal when the corridors are unoccupied. Approximately 30% of the fluorescent fixtures are used as night lights and are never switched off. The gym and cafeteria are illuminated with 400W MH light fixtures. Occupancy sensors are used in the gym to reduce the lighting levels to 50% when the space is unoccupied, but due to the long strike times associated with MH fixtures, these fixtures typically remain on even if the space is unoccupied for extended periods of time. The building mounted exterior lighting consists of 100W canopy, and wallpack light fixtures. Area lighting is provided by 150W and 400W pole-mounted fixtures. Pole mounted fixtures are present in single, double, and triple-headed configurations. All of the lighting is high pressure sodium (HPS) with the exception of seven LED single head pole mounted area lights. These lights are controlled by an on/off photo switch that turns the lights off during the day. Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

15 Other electricity-using equipment not previously described in the mechanical or electrical sections include a shop tools, microwaves, a walk in freezer, various other kitchen equipment, and various user equipment such as projectors, computers, and printers. VI. Historic Energy Consumption and Cost Tables provided in Appendix A, Energy Benchmark Data Report, represent the electric and natural gas energy usage for the surveyed facility from January 2009 to December Matanuska Electric Association provides the electricity and Enstar Natural Gas provides the gas to the building. Both utility companies bill the facility using a commercial rate schedule. The actual utility bills were not provided to be able to verify the data received to assure 100 percent accuracy of the data. The AkWarm model of the facility was built to match the facility s average annual electric and natural gas consumption, so that a realistic model could be created. The monthly energy consumption of the AkWarm model matches the actual average monthly consumption of the facility within 25%, which is adequate for this level of modeling. Overall, the energy consumption trends of the AkWarm model and the actual facility match appropriately. Graphical representations of the monthly energy consumption are included in Appendix A. VI.I Electrical Consumption Data The electric utility costs consist of several components: a fixed monthly customer charge, an energy usage charge, fuel surcharge, taxes, and a demand charge. The energy usage and fuel surcharge are based on the customer's usage as measured in kilowatt-hours (kwh). The usage (kwh) is determined by load wattage divided by 1,000, times hours running. For example, a 1,000 watt space heater operating for one hour will use 1 kwh of electricity as would ten, 100 watt lamps operating for one hour or one, 100W lamp operating for 10 hours. One kwh is equivalent to 3,413 BTU. Utility data used in this report reflects the historical data provided for the building in a summarized format. VI.II Natural Gas Consumption Data The natural gas supplier bills for consumption in units of 100 cubic feet (CCF) of natural gas. Natural gas is delivered as needed through a utility service connection. The average heating value of natural gas is 100,000 BTUs per CCF, which is equal to 1 Therm of energy. VI.III Overall Energy Consumption Data The overall cost for energy use is calculated by dividing the total cost by the total usage. Based on the electric and natural gas utility data provided, the average cost for the energy and consumption calculations at the surveyed facility are summarized in the table below. Table 2 Energy Cost and Consumption Data Energy Cost and Consumption Data Average Electric 0.14 $/kwh 0.11 $/kwh 0.13 $/kwh Natural Gas 0.99 $/CCF 0.86 $/CCF 0.93 $/CCF Total Cost $171,898 $144,120 $158,009 ECI 1.90 $/sf 1.60 $/sf 1.75 $/sf Electric EUI 29.1 kbtu/sf 29.9 kbtu/sf 29.5 kbtu/sf Natural Gas EUI 70.5 kbtu/sf 70.3 kbtu/sf 70.4 kbtu/sf Building EUI 99.6 kbtu/sf kbtu/sf 99.9 kbtu/sf Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

16 The Energy Cost Index (ECI) is derived by dividing the annual cost by the building square footage. The building square footage was calculated to be approximately 90,264 square feet. The annual EUI is expressed in Thousands of British Thermal Units per Square Foot (kbtu/sf) and can be used to compare energy consumption of similar building types or to track consumption from year to year in the same building. The EUI is calculated by converting annual consumption of all fuels used to Btu s and then dividing by the area (gross conditioned square footage) of the building. EUI is a good indicator of the relative potential for energy savings. A comparatively low EUI indicates less potential for large energy savings. Building architectural, mechanical, and electrical drawings were obtained and utilized to calculate and verify the gross area of the facility. The gross area was confirmed on the physical site investigation. Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

17 VII. Equipment Inventory and Photo Survey Following the completion of the field survey a detailed equipment list was created and is attached as Appendix C. The major equipment listed are considered to be the major energy consuming equipment in the building whose replacement could yield substantial energy savings. An approximate age was assigned to the equipment if a manufactured date was not shown on the equipment s nameplate. As listed in the 2011 ASHRAE Handbook for HVAC Applications, Chapter 37, Table 4, the service life for the equipment along with the remaining useful life in accordance to the ASHRAE standard are also noted in the equipment list. Where there are zero (0) years remaining in the estimated useful life of a piece of equipment, this is an indication that maintenance costs are likely on the rise and more efficient replacement equipment is available which will lower the operating costs of the unit. Maintenance costs should also fall with the replacement. Additionally, photos of various equipment and the building construction were taken during the site visit. Several photos are included in Appendix E. CEI made miscellaneous thermographic images of the building using a FLIR T300 Infrared Camera. This is not a thermographic study, but rather just a few snapshots to illustrate easy-to-identify heat losses. These thermographic photos are included in Appendix F. Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

18 VIII. Energy Conservation Measures The following ECMs described here have been calculated by AkWarm Commercial and considered by the energy audit team as viable projects. ECMs provided below are considered to have viable financial ratios (SIR>1) or to add value to the building or building operational profiles. For a full list of ECMs considered and calculated by the energy audit team, including ECMs not recommended at this time, please see Appendix D. Several HVAC upgrades were considered. Since the school is relatively new and in good condition, few proved financially viable. One upgrade considered stack economizers to both boilers (both boilers are too large to be piped to a common stack economizer). Another upgrade was to remove and replace one existing boiler with a high-efficiency condensing boiler, such as an Aerco Benchmark. Such an upgrade would use the new high efficiency boiler as the primary, and use the remaining existing boiler as backup. Pumping efficiency improvements had already been incorporated when the facility was built, so no alternatives were modeled. The demand ventilation control (CO2 sensors) did prove viable, and is recommended. It is nonetheless important for the school operations and maintenance department to maintain strict adherence to efficient operating procedures, control sequences, and maintenance in order to achieve the HVAC efficiency potential of this facility. VIII.I Energy Conservation Measures ECM# HHS-1 Replace residential & light commercial refrigerators/freezers older than 5 years old Annual Energy Savings Installed Cost SIR Payback (years) <10 years Due to advances in refrigerators in the previous five years, new Energy Star residential-type and light commercial-type refrigerators and freezers are much more efficient and result in viable energy savings. Built-in refrigerators and freezers should be evaluated independently. Replacing existing refrigerators, which are older than five years old, with new energy star models will typically have paybacks of less than 10 years. ECM# HHS-2 Add 4 CO2 s to Return Air ductwork in AHU-1, -2, -3, -5 & CO2 Control to DDC System Annual Energy Savings Installed Cost SIR Payback (years) $7,170 $15, Currently, there is only one AHU at HHS with CO2 outside air control. By adding DDC control points, including CO2 sensors in return air ductwork of AHU-1, -2, -3, and -5, and more damper actuators to fine-tune the amount of outside air drawn into the building, heating loads can be reduced while still meeting ventilation code requirements. See item 33 in Appendix D for more information. ECM# HHS-3 - Upgrade the Staff Room Lighting Control Annual Energy Savings Installed Cost SIR Payback (years) $193 $ There are four staff work rooms in the school. The lighting in one of these rooms is controlled by a occupancy sensor that shuts the lights off while the room is unoccupied. This ECM consists of installing Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

19 four new ceiling mounted occupancy sensors in the remaining three rooms, to control the existing light fixtures. Please note that room 103 will require two occupancy sensors. See items 7 and 21 in Appendix D for more information. ECM# HHS-4 - Upgrade the Library Lighting Control Annual Energy Savings Installed Cost SIR Payback (years) $371 $1, This ECM consists of installing new occupancy sensors to control the light fixtures in the library and the adjacent student government room. Approximately five ceiling mounted occupancy sensors should be used to control the lighting in the library, while only one ceiling mounted occupancy sensor will be required in the student government room. See items 4, 8, 12, and 20 in Appendix D for more information. ECM# HHS-5 - Upgrade the Corridor and Lobby Lighting Annual Energy Savings Installed Cost SIR Payback (years) $5,252 $24, The main lobby is illuminated by approximately (29) recessed 2'x2' 400W MH down lights, and two decorative 400W MH pendant fixtures. The lighting in the corridors consists of two-lamp 13W, 18W, and 32W compact fluorescent lamp (CFL) fixtures, and two and three-lamp 4' fluorescent T8 light fixtures. With the exception of the corridor from the cafeteria to the loading dock, the corridors feature occupancy sensor control that reduces the lighting levels when the spaces are unoccupied. The corridor that leads to the loading dock is illuminated by three two-lamp T8 fixtures that are controlled by a wall switch and one two-lamp T8 night light that is never switched off. Based on the construction documents five 32W CFL and (53) two-lamp T8 fixtures are used as night lights and never switched off in the remaining corridor areas. It is recommended that a new ceiling mounted occupancy sensor is installed in the corridor leading to the loading dock, and that the night lights be re-wired to switch with their local lighting circuits. This ECM also recommends replacing the 400W MH light fixtures by replaced with four-lamp T5HO fluorescent light fixtures. See items 2, 5, 10, 18, 19, and 37 in Appendix D. ECM# HHS-6 - Upgrade the Office Lighting and Control Annual Energy Savings Installed Cost SIR Payback (years) $167 $ Four private offices were observed to use wall mounted rocker switches for lighting control, while the remaining 18 use occupancy sensors that switch the lights off while the spaces are unoccupied. It is recommended that the four offices with wall switch control be provided new ceiling mounted occupancy sensors to switch the lights off while the rooms are vacant. Additionally there is a single three-lamp fluorescent T8 un-switched night light present in the main office that should be re-wired to the existing switch. Please note that due to the use of the main office it is not recommended that new occupancy sensors be installed. See items 1, 13, 22, and 29 in Appendix D for more information. ECM# HHS-7 - Upgrade the Gym Lighting and Controls Annual Energy Savings Installed Cost SIR Payback (years) $2,700 $27, The gymnasium is illuminated by (34) 400W MH high bay light fixtures with bi-level occupancy sensor control. Because of the long strike time associated with MH lamps the occupancy sensors reduce the lighting in the gymnasium to 50% rather than shutting them completely off. Additional lighting is Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

20 provided by (8) four-lamp fluorescent T8 night lights powered by the standby power system. The adjacent locker rooms are illuminated by approximately (60) two-lamp light fixtures that are controlled by wall switches. The three gym storage spaces are illuminated by (3) two-lamp, and (17) four-lamp T8 light fixtures and are all controlled by wall switches. Lighting in the mat and weight rooms consists of (50) three-lamp inboard/outboard switched T8 fixtures that are controlled by wall switches. This ECM includes replacing the 400W MH fixtures one-for-one with 6-lamp T5HO fixtures with bilevel switching, demolishing the night lights, and installing occupancy sensors in the remaining spaces adjacent to the gymnasium. The existing gymnasium lighting controls will likely need to be revised to integrate with the new light fixtures. Approximately six ceiling mounted occupancy sensors will be required in the each of the two locker rooms, while only one occupancy sensor will be required in each of the three storage areas. The mat and weight rooms were modeled with three ceiling mounted occupancy sensors each that only control the inboard ballasts to eliminate any safety concerns over nuisance switching. See items 11, 14, 15, 17, 25, 28, and 38 in Appendix D for additional information. ECM# HHS-8 - Upgrade the Cafeteria Lighting Annual Energy Savings Installed Cost SIR Payback (years) $1,824 $19, The cafeteria is illuminated by (21) 400W MH decorative pendant, and (12) 400W MH recessed 2'x2' light fixtures. It is recommended that these fixtures be replaces one-for-one with four-lamp T5HO light fixtures. See item 23 in Appendix D for more information. ECM# HHS-9 - Upgrade the Exterior Lighting Annual Energy Savings Installed Cost SIR Payback (years) $8,676 $110, The building mounted exterior lighting at the school consists of (6) 100W pendant and (15) 100W wall pack light fixtures. Site lighting consists of (7) 150W LED, (7) 400W HPS, and (21) twin head 400W pole mounted area lighters. It is recommended that the 100W and 400W fixtures be replaced one-for-one with 50W and 150W LED light fixtures. Installation costs assume the re-use of existing wiring. Upgrading the hockey rink light fixtures with LED fixtures was evaluated. However, the measure did not result in an SIR>1 due to the usage schedule of these lights. This description compiles measures 26, 27, 31, and 32 which were individually modeled in AkWarm. See Appendix D for details of individual measures. ECM# HHS-10 - Upgrade the Storage Room Lighting Controls Annual Energy Savings Installed Cost SIR Payback (years) $35 $ The lighting controls in a majority of the storage areas in the school consists of wall mounted occupancy sensors, however three of the general use storage areas use wall mounted rocker switches for control. It is recommended that the wall mounted rocker switched be replaced with wall mounted occupancy sensors. See items 24, and 35 in Appendix D for more information. Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

21 ECM # HHS-11 Perform Air Sealing to Reduce Air Leakage by 20% Annual Energy Savings Installed Cost SIR Payback (years) $1,479 $13, Unconditioned infiltration air, leaking through doors, windows, and other building envelope penetrations contributes to the heating load of the building. Methods to decrease the infiltration into the building include: sealing around roof and wall penetrations with caulking and insulation, gasketing mechanical louvers or hoods, providing gaskets to all exterior cover plates, and adding or repairing weather stripping around exterior doors. To achieve a viable economic benefit, up to $13,000 can be invested and still achieve an SIR > 1 by reducing air leakage by 20%. Details of the ECM are shown in item 30 in Appendix D. ECM# HHS-12 - Upgrade the Classroom Lighting and Controls Annual Energy Savings Installed Cost SIR Payback (years) $5,441 $79, With the exception of the art room, the classrooms are all predominantly illuminated by (462) three-lamp fluorescent T8 flat lensed troffer fixtures with inboard/outboard multi-level control. The art room is illuminated by (24) four-lamp T8 flat lensed troffer fixtures with bi-level control. Five 32W CFL down lights and four two-lamp T8 fixtures are also present in the classrooms. All of the classrooms exceed the suggested illumination levels by the IESNA and may be reduced. This ECM consists of retrofitting all of the existing three and four lamp fixtures with two lamp volumetric troffer retrofit kits with bi-level switching. Additionally a ceiling mounted occupancy sensor should be installed in each of the 30 classrooms. A new occupancy sensor should also be installed in the storage area off of classroom 203. See items 3, 6, 9, 16, 34, 36, and 40 in Appendix D for more information. Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

22 VIII.II Administrative Controls for Energy Conservation and Optimization While the intent of many energy conservation measures is to increase the efficiency of fuel-burning and electrical equipment, an important factor of energy consumption lies in the operational profiles which control the equipment usage. Such profiles can be managed by administrative controls and departmental leadership. They determine how and when fuel-burning and electrical equipment are used, and therefore have a greater impact on energy savings potential than simply equipment upgrades alone. Significant energy cost savings can be realized when ECMs are combined with efficient-minded operational profiles. Operational profiles may be outlined by organization policy or developed naturally or historically. These profiles include, but are not limited to: operating schedules, equipment setpoints and control strategies, maintenance schedules, and site and equipment selection. Optimization of operational profiles can be accomplished by numerous methods so long as the intent is reduction in energy-using equipment runtime. Due to the numerous methods of optimization, energy cost savings solely as a result of operational optimization are difficult to predict. Quantification, however, is easy to accomplish by metering energy usage during and/or after implementation of energy-saving operational profiles and ECMs. Shown below are some examples which have proven successful for other organizations. Optimization of site selection includes scheduling and location of events. If several buildings in a given neighborhood are all lightly used after regularly occupied hours, energy savings can be found when afterhours events are consolidated and held within the most energy efficient buildings available for use. As a result, unoccupied buildings could be shut down to the greatest extent possible to reduce energy consumption. Two operational behaviors which can be combined with equipment upgrades are operating schedules and equipment control strategies including setpoints. Occupancy and daylight sensors can be programmed to automatically shut off or dim lighting when rooms are unoccupied or sufficiently lit from the sun. Operating schedules can be optimized to run equipment only during regular or high-occupancy periods. Also, through a central control system, or with digital programmable thermostats, temperature setpoints can be reduced during low-occupancy hours to maximize savings. In addition, sporadically used equipment can be shut down during unoccupied hours to further save energy. In general, having equipment operating in areas where no occupants are present is inefficient, and presents an opportunity for energy savings. Operational profiles can also be implemented to take advantage of no- or low-cost ECMs. Examples include heating plant optimizations (boiler section cleaning, boiler flush-through cleaning) and tighter controls of equipment setbacks and shutdowns (unoccupied zones equipment shutdown, easier access to and finer control of equipment for after-hours control). In a large facility management program, implementation of these measures across many or all sites will realize dramatic savings due to the quantity of equipment involved. Changes to building operational profiles can only be realized while simultaneously addressing health, safety, user comfort, and user requirements first. It is impractical to expect users to occupy a building or implement operational behaviors which do not meet such considerations. That said, it is quite practical for management groups to implement administrative controls which reduce losses brought about by excess and sub-optimum usage. Coffman Engineers, Inc. 6/12/ AkWarm No. CIRI-WOW-CAEC-02

23 Appendix A Energy Benchmark Data Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

24 Final Draft Energy Audit Report Facility Owner Mat-Su School District REAL Preliminary Benchmark Data Form PART I FACILITY INFORMATION Facility Owned By Date Municipal Government/Subdivision 03/09/11 Building Name/ Identifier Building Usage Building Square Footage Houston High Education 90,264 Building Type School Community Population 88,379 Facility Address Facility City Facility Zip Mi. 53 Parks Hwy Houston Contact Person First Name Last Name Middle Name Phone Rick Jensen ricky.jensen@matsuk12.us Mailing Address 501 N Gulkana St City Palmer Year Built 2003 State Zip AK Primary Operating Hours Average # of Occupants During Monday- Friday Saturday Sunday Holidays 7 am - 8 pm Renovations / Notes Date Details None Notes Any available drawings are kept at district office for maintenance. PART II ENERGY SOURCES 1. Please check every energy source you use in the table below. If known, please enter the base rate you pay for the energy source. 2. Provide utilities bills for the most recent two-year period for each energy source you use. Heating Oil Electricity Natural Gas Propane Wood Coal $ /gallon $ / kwh $ / CCF $ / gal $ / cord $ / ton Other energy sources? Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02 CIRI)WOW)CAEC)02

25 Draft Energy Audit Report Houston High Buiding Size Input (sf) = 90, Natural Gas Consumption (Therms) 63, Natural Gas Cost ($) 63, Electric Consumption (kwh) 769, Electric Cost ($) 108, Total Energy Use (kbtu) 8,991, Total Energy Cost ($) 171,898 Annual Energy Use Intensity (EUI) 2009 Natural Gas (kbtu/sf) Electricity (kbtu/sf) Energy Utilization Index (kbtu/sf) 99.6 Annual Energy Cost Index (ECI) 2009 Natural Gas Cost Index ($/sf) Electric Cost Index ($/sf) Energy Cost Index ($/sf) Natural Gas Consumption (Therms) 63, Natural Gas Cost ($) 54, Electric Consumption (kwh) 790, Electric Cost ($) 89, Total Energy Use (kbtu) 9,041, Total Energy Cost ($) 144,120 Annual Energy Use Intensity (EUI) 2010 Natural Gas (kbtu/sf) Electricity (kbtu/sf) Energy Utilization Index (kbtu/sf) Annual Energy Cost Index (ECI) 2010 Natural Gas Cost Index ($/sf) Electric Cost Index ($/sf) Energy Cost Index ($/sf) 1.60 Note: 1 kwh = 3,413 Btu's 1 Therm = 100,000 Btu's 1 CF 1,000 Btu's Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02 CIRI)WOW)CAEC)02

26 Houston High Natural Gas Btus/CCF = 100,000 Provider Customer # Month Start Date End Date Billing Days Consumption (CCF) Consumption (Therms) Demand Use Natural Gas Cost ($) Unit Cost ($/Therm) Demand Cost ($) ENSTAR G Jan-09 1/8/2009 2/9/ ,621 12,621 $12,714 $1.01 ENSTAR G Feb-09 2/9/2009 3/10/ ,441 8,441 $8,525 $1.01 ENSTAR G Mar-09 3/10/2009 4/8/ ,180 7,180 $7,260 $1.01 ENSTAR G Apr-09 4/8/2009 5/11/ ,522 4,522 $4,595 $1.02 ENSTAR G May-09 5/11/2009 6/10/ ,695 1,695 $1,762 $1.04 ENSTAR G Jun-09 6/10/2009 7/9/ $231 $1.39 ENSTAR G Jul-09 7/9/2009 8/7/ $716 $1.10 ENSTAR G Aug-09 8/7/2009 9/10/ ,231 2,231 $2,302 $1.03 ENSTAR G Sep-09 9/10/ /8/ ,893 3,893 $3,970 $1.02 ENSTAR G Oct-09 10/8/ /9/ ,795 5,795 $5,877 $1.01 ENSTAR G Nov-09 11/9/ /9/ ,930 8,930 $9,021 $1.01 ENSTAR G Dec-09 12/9/2009 1/8/ ,531 7,531 $6,295 $0.84 ENSTAR G Jan-10 1/8/2010 2/8/ ,133 9,133 $7,620 $0.83 ENSTAR G Feb-10 2/8/2010 3/8/ ,512 6,512 $5,451 $0.84 ENSTAR G Mar-10 3/8/2010 4/7/ ,581 6,581 $5,562 $0.85 ENSTAR G Apr-10 4/7/2010 5/5/ ,713 4,713 $4,002 $0.85 ENSTAR G May-10 5/5/2010 6/7/ ,698 1,698 $1,485 $0.87 ENSTAR G Jun-10 6/7/2010 7/6/ $454 $0.98 ENSTAR G Jul-10 7/6/2010 8/4/ $562 $2.24 ENSTAR G Aug-10 8/4/2010 9/2/ ,664 1,664 $1,692 $1.02 ENSTAR G Sep-10 9/2/ /5/ ,106 4,106 $3,646 $0.89 ENSTAR G Oct-10 10/5/ /3/ ,473 6,473 $5,539 $0.86 ENSTAR G Nov-10 11/3/ /7/ ,289 10,289 $8,592 $0.84 ENSTAR G Dec-10 12/7/2010 1/12/ ,556 11,556 $9,750 $0.84 Jan - 09 to Dec - 09 total: 63,654 63,654 0 $63,267 $0 Jan - 10 to Dec - 10 total: 63,437 63,437 0 $54,356 $0 Jan - 09 to Dec - 09 avg: Jan - 10 to Dec - 10 avg: $0.99 $0.86 Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

27 Houston High - Natural Gas Consumption (Therms) vs. Natural Gas Cost ($) 14,000 $14,000 12,000 $12,000 10,000 $10,000 Natural Gas Consumption (Therms) 8,000 6,000 $8,000 $6,000 Natural Gas Cost ($) Natural Gas Consumption (Therms) Natural Gas Cost ($) 4,000 $4,000 2,000 $2,000 0 $0 Date (Mon -Yr) Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

28 Houston High Electricity Btus/kWh = 3,413 Provider Customer # Month Start Date End Date Billing Days Consumption (kwh) Consumption (Therms) Demand Use Electric Cost ($) Unit Cost ($/kwh) Demand Cost ($) MEA E13002 Jan-09 12/28/2008 1/27/ ,040 2, $13,226 $0.15 MEA E13002 Feb-09 1/27/2009 2/26/ ,120 2, $12,141 $0.15 MEA E13002 Mar-09 2/26/2009 3/25/ ,600 2, $10,125 $0.16 MEA E13002 Apr-09 3/25/2009 4/27/ ,760 2, $10,546 $0.14 MEA E13002 May-09 4/27/2009 5/27/ ,400 2, $8,900 $0.14 MEA E13002 Jun-09 5/27/2009 6/28/ , $3,767 $0.15 MEA E13002 Jul-09 6/28/2009 7/28/ , $3,135 $0.14 MEA E13002 Aug-09 7/28/2009 8/26/ ,440 1, $7,237 $0.14 MEA E13002 Sep-09 8/26/2009 9/27/ ,240 2, $9,968 $0.13 MEA E13002 Oct-09 9/27/ /27/ ,320 2, $9,445 $0.13 MEA E13002 Nov-09 10/27/ /28/ ,000 2, $10,572 $0.13 MEA E13002 Dec-09 11/28/ /26/ ,360 2, $9,569 $0.13 MEA E13002 Jan-10 12/26/2009 1/26/ ,960 2, $8,383 $0.12 MEA E13002 Feb-10 1/26/2010 2/22/ ,520 2, $8,056 $0.12 MEA E13002 Mar-10 2/22/2010 3/28/ ,040 2, $10,209 $0.12 MEA E13002 Apr-10 3/28/2010 4/27/ ,320 2, $8,230 $0.11 MEA E13002 May-10 4/27/2010 5/25/ ,960 2, $6,982 $0.11 MEA E13002 Jun-10 5/25/2010 6/27/ ,080 1, $3,670 $0.11 MEA E13002 Jul-10 6/27/2010 7/27/ , $2,834 $0.11 MEA E13002 Aug-10 7/27/2010 8/28/ ,320 2, $6,775 $0.11 MEA E13002 Sep-10 8/28/2010 9/27/ ,840 2, $8,222 $0.11 MEA E13002 Oct-10 9/27/ /26/ ,720 2, $9,080 $0.11 MEA E13002 Nov-10 10/26/ /28/ ,680 2, $9,001 $0.11 MEA E13002 Dec-10 11/28/ /28/ ,400 2, $8,322 $0.11 Jan - 09 to Dec - 09 total: 769,520 26,264 2,991 $108,631 $0 Jan - 10 to Dec - 10 total: 790,320 26,974 2,714 $89,764 $0 Jan - 09 to Dec - 09 avg: Jan - 10 to Dec - 10 avg: $0.14 $0.11 Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

29 Houston High - Electric Consumption (kwh) vs. Electric Cost ($) 100,000 $14,000 90,000 $12,000 80,000 70,000 $10,000 Electric Consumption (kwh) 60,000 50,000 40,000 $8,000 $6,000 Electric Cost ($) Electric Consumption (kwh) Electric Cost ($) 30,000 $4,000 20,000 $2,000 10,000 0 $0 Date (Mon -Yr) Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

30 Appendix B AkWarm Commercial Reports Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

31 ENERGY AUDIT REPORT PROJECT SUMMARY Created 3/15/2012 4:54 PM General Project Information PROJECT INFORMATION Building: Houston High School Address: West Hawk Lane City: Houston Client Name: Rick Jensen Client Address: 501 North Gulkana Street Palmer, AK Client Phone: (907) AUDITOR INFORMATION Auditor Company: Coffman Engineers Auditor Name: Walter Heins, PE, CCP, CxA, CEA Auditor Address: 800 F Street Anchorage, AK Auditor Phone: (907) Auditor FAX: (907) Auditor Comment: Client FAX: Design Data Building Area: 90,264 square feet Design Heating Load: Design Loss at Space: 8,629,305 Btu/hour with Distribution Losses: 8,896,190 Btu/hour Plant Input Rating assuming 82.0% Plant Efficiency and 25% Safety Margin: 13,561,270 Btu/hour Note: Additional Capacity should be added for DHW load, if served. Typical Occupancy: 500 people Actual City: Houston Weather/Fuel City: Houston Design Indoor Temperature: 68 deg F (building average) Design Outdoor Temperature: -18 deg F Heating Degree Days: 10,810 deg F-days Utility Information Electric Utility: Matanuska Electric Assn. - Commercial - Lg Average Annual Cost/kWh: $0.130/kWh Natural Gas Provider: Enstar Natural Gas - Commercial - Lg Average Annual Cost/ccf: $0.930/ccf Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

32 Annual Energy Cost Estimate Description Space Heating Space Cooling Water Heating Lighting Refrigeration Other Electrical Cooking Clothes Drying Ventilation Fans Service Fees Total Cost Existing Building With Proposed Retrofits $62,431 $0 $5,329 $59,178 $0 $5,698 $0 $0 $28,041 $0 $160,677 $58,917 $0 $5,329 $33,990 $0 $5,698 $0 $0 $28,374 $0 $132,307 SAVINGS $3,514 $0 $0 $25,188 $0 $0 $0 $0 -$333 $0 $28,370 Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

33 Annual Energy Costs by End Use $200,000 $150,000 Ventilation and Fans Space Heating Other Electrical Lighting Domestic Hot Water $100,000 $50,000 $0 Existing Retrofit Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

34 Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

35 Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

36 High School Annual Modeled Consumption (Blue) compared to Actual Electric (Left) and Natural Gas (Right) Consumption (Orange). Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

37 High School Monthly Modeled Consumption (Blue) compared to Actual Electric Consumption (Orange). Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

38 High School Monthly Modeled Consumption (Blue) compared to Actual Natural Gas Consumption (Orange) Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

39 Appendix C Major Equipment List Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

40 MAJOR EQUIPMENT INVENTORY TAG LOCATION FUNCTION MAKE MODEL TYPE CAPACITY EFFICIENCY MOTOR SIZE ASHRAE SERVICE LIFE (YEARS) ESTIMATED REMAINING USEFUL LIFE (YEARS) BLR-1 BLR-2 BOILER RM A111 BOILER RM A111 BUILDING HEATING BUILDING HEATING WEIL MCLAIN WEIL MCLAIN BG-1688R BG-1688R CAST IRON GAS FIRED CAST IRON GAS FIRED 3980 MBH 83% MBH 83% WH-1 WH-2 BOILER RM A111 BOILER RM A111 DOMESTIC WATER HEATING DOMESTIC WATER HEATING PVI PVI MAXIM 72 P 250A MAXIM 72 P 250A GAS FIRED WATER HEATER GAS FIRED WATER HEATER 720 MBH 85% 1/3 HP MBH 85% 1/3 HP AHU-1 AHU-2 AHU-3 FAN RM C300 FAN RM C300 FAN RM B200 CLASSROOMS ARTS, MUSIC, & LIBRARY COMMONS, CAFETERIA, KITCHEN, & STAGE SCOTT SPRING- FIELD SCOTT SPRING- FIELD SCOTT SPRING- FIELD HQ-400 HQ-280 HQ-280 VARIABLE AIR VOLUME VARIABLE AIR VOLUME TWO SPEED CONSTANT AIR VOLUME CFM 54" CFM 44" CFM 44" 90% 40 HP % 30 HP % 25 HP AHU-4 FAN RM B200 GYM, TECH ED, LOCKERS SCOTT SPRING- FIELD HQ-330 TWO SPEED CONSTANT AIR VOLUME CFM 54" 90% 30 HP Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

41 MAJOR EQUIPMENT INVENTORY TAG LOCATION FUNCTION MAKE MODEL TYPE CAPACITY EFFICIENCY AHU-5 MUA-1 MUA-2 FAN RM B200 ROOF ROOF TECH EDUCATION OFFICES KITCHEN HOOD PAINT BOOTH SUPPLY SCOTT SPRING- FIELD GREENHECK ICE HQ-80 DGX-112- H220-DBC BMA-115 VARIABLE AIR VOLUME GAS FIRED MAKE UP / EXHAUST AIR UNIT GAS FIRED HEATER MAKE UP AIR HANDLER 6600 CFM 22" 550 MBH 4000 CFM 636 MBH 5250 CFM MOTOR SIZE ASHRAE SERVICE LIFE (YEARS) ESTIMATED REMAINING USEFUL LIFE (YEARS) 85% 7.5 HP % 3 HP % 5 HP PMP- 1/1A PMP- 2/2A PMP-3 PMP-4 PMP-5 PMP-6 PMP-7 PMP-8 BOILER RM A111 BOILER RM A111 BOILER RM A111 FAN ROOM C300 FAN ROOM C300 BOILER CIRC BUILDING CIRC BUILDING CIRC AHU-1 HEATING COIL RECIRC AHU-2 PREHEAT COIL RECIRC GRUNDFOS GRUNDFOS GRUNDFOS UPS F 4.0LP5/ LP5/4.3 VERTICAL INLINE (REDUNDANT) VERTICAL INLINE VERTICAL INLINE GRUNDFOS UPS INLINE GRUNDFOS UPS INLINE 300 GPM 25' 369 GPM 54' 369 GPM 54' 40 GPM 40' 20 GPM 10' NEMA STANDARD 2050 W % 7.5 HP % 7.5 HP 10 1 NEMA STANDARD NEMA STANDARD 280 W W 10 1 Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

42 MAJOR EQUIPMENT INVENTORY TAG LOCATION FUNCTION MAKE MODEL TYPE CAPACITY EFFICIENCY MOTOR SIZE ASHRAE SERVICE LIFE (YEARS) ESTIMATED REMAINING USEFUL LIFE (YEARS) PMP-9 FAN ROOM C300 AHU-2 HEATING COIL RECIRC GRUNDFOS UPS INLINE 30 GPM 10' NEMA STANDARD 280 W 10 1 PMP- 10 FAN ROOM B200 AHU-3 HEATING COIL RECIRC GRUNDFOS UPS INLINE 20 GPM 10' NEMA STANDARD 115 W 10 1 PMP- 11 FAN ROOM B200 AHU-4 HEATING COIL RECIRC GRUNDFOS UPS INLINE 40 GPM 10' NEMA STANDARD 280 W 10 1 PMP- 13 BOILER RM A111 DOMESTIC HOT WATER CIRC GRUNDFOS UP B7 INLINE 6 GPM 6' NEMA STANDARD 85 W 10 1 PMP- 14 BOILER RM A111 DOMESTIC WATER BOOSTER SYSTEM TIGERFLOW VMS-4000 TRIPLEX, VERTICAL INLINE 180 GPM 160' 87.5% 5 HP 10 1 PMP- 14A/14 B/14C BOILER RM A111 DOMESTIC WATER DISTRIBUTION GRUNDFOS CR8-50 INTEGRATED IN PMP-14 TRIPLEX 42 GPM 224' 87.5% 5 HP 10 1 PMP- 15 BOILER RM A111 FIRE PUMP FAIRBANKS MORSE VERTICAL INLINE 500 GPM 150' 89.5% 30 HP 10 1 PMP- 16 BOILER RM A111 JOCKEY PUMP FAIRBANKS MORSE - 5 GPM 173' NEMA STANDARD 1 HP 10 1 PMP- 17 ELEVATOR SUMP SUMP PUMP GRUNDFOS KP150 SUBMERSIBLE PUMP 32 GPM 6' NEMA STANDARD 1/4 HP 10 1 Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

43 MAJOR EQUIPMENT INVENTORY TAG LOCATION FUNCTION MAKE MODEL TYPE CAPACITY EFFICIENCY PMP-1 (2006) PMP-2 (2006) PMP-3 (2006) PMP-4 (2006) FAN ROOM B200 FAN ROOM C300 GLYCOL CIRC GRUNDFOS 2.5LM8 GLYCOL CIRC GRUNDFOS 2.5LM9 VERTICAL INLINE (REDUNDANT) VERTICAL INLINE (REDUNDANT) 157 GPM 59' 157 GPM 59' MOTOR SIZE ASHRAE SERVICE LIFE (YEARS) ESTIMATED REMAINING USEFUL LIFE (YEARS) 85.5% 5 HP % 5 HP 10 6 HX-1 HX-2 FAN RM C300 FAN RM B200 WATER / GLYCOL HEAT EXCHANGER WATER / GLYCOL HEAT EXCHANGER TRANTER TRANTER GXD-042- L-5-KP-69 GXD-042- L-5-KP-51 PLATE-AND- FRAME PLATE-AND- FRAME SURFACE AREA: ft 2 SURFACE AREA: ft 3 EF-1 ROOF RESTROOM / GENERAL EXHAUST GREENHECK - CENTRIFUGAL BELT DRIVE 1125 CFM NEMA STANDARD 1/4 HP EF-2 ROOF RESTROOM / GENERAL EXHAUST GREENHECK - CENTRIFUGAL BELT DRIVE 1250 CFM NEMA STANDARD 1/4 HP EF-3 ROOF RESTROOM / GENERAL EXHAUST GREENHECK - CENTRIFUGAL BELT DRIVE 320 CFM NEMA STANDARD 1/4 HP EF-4 ROOF LAB EXHAUST STROBIC AIR - CONST. VOL. DIRECT DRIVE 4500 CFM NEMA STANDARD 5 HP Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

44 MAJOR EQUIPMENT INVENTORY TAG LOCATION FUNCTION MAKE MODEL TYPE CAPACITY EFFICIENCY MOTOR SIZE ASHRAE SERVICE LIFE (YEARS) ESTIMATED REMAINING USEFUL LIFE (YEARS) EF-5 ROOF LAB EXHAUST STROBIC AIR - CONST. VOL. DIRECT DRIVE 2500 CFM NEMA STANDARD 3 HP EF-6 ROOF ART ROOM EXHAUST GREENHECK - CENTRIFUGAL BELT DRIVE 3200 CFM NEMA STANDARD 3/4 HP EF-8A ROOF HOME EC RES HOOD EXHAUST GREENHECK - CENTRIFUGAL BELT DRIVE 450 CFM NEMA STANDARD 1/4 HP EF-8B ROOF HOME EC RES HOOD EXHAUST GREENHECK - CENTRIFUGAL BELT DRIVE 600 CFM NEMA STANDARD 1/4 HP EF-9 ROOF RESTROOM A107D EXHAUST GREENHECK - CENTRIFUGAL BELT DRIVE 200 CFM NEMA STANDARD 1/6 HP EF-10 ROOF EXHAUSTA105 FA106G GREENHECK - CENTRIFUGAL BELT DRIVE 160 CFM NEMA STANDARD 1/6 HP EF-11 ROOF GENERAL RESTROOM EXHAUST GREENHECK - CENTRIFUGAL BELT DRIVE 140 CFM NEMA STANDARD 1/6 HP EF-12 KITCHEN HOOD KITCHEN HOOD (PACKAGED WITH MUA-1) GREENHECK - MAKE UP / EXHAUST AIR 5000 CFM NEMA STANDARD 3 HP EF-13 ROOF TYPE II KITCHEN EXHAUST HOOD GREENHECK - CENTRIFUGAL BELT DRIVE 700 CFM NEMA STANDARD 1/4 HP Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

45 MAJOR EQUIPMENT INVENTORY TAG LOCATION FUNCTION MAKE MODEL TYPE CAPACITY EFFICIENCY MOTOR SIZE ASHRAE SERVICE LIFE (YEARS) ESTIMATED REMAINING USEFUL LIFE (YEARS) EF-14 FAN ROOM B200 MENS LOCKER ROOM EXHAUST GREENHECK - CENTRIFUGAL BELT DRIVE 3050 CFM FAST 2020 CFM SLOW NEMA STANDARD 1 HP EF-15 FAN ROOM B200 WOMENS LOCKER ROOM EXHAUST GREENHECK - CENTRIFUGAL BELT DRIVE 3050 CFM FAST 2020 CFM SLOW NEMA STANDARD 1 HP EF-16 ROOF SKI B105 EXHAUST GREENHECK - CENTRIFUGAL BELT DRIVE 150 CFM NEMA STANDARD 1/6 HP EF-17 ROOF PAINT BOOTH EXHAUST GREENHECK - TUBE AXIAL FAN BELT DRIVE 5250 CFM NEMA STANDARD 3/4 HP EF-18 ROOF TECH ROOM GEN EXHAUST GREENHECK - CENTRIFUGAL BELT DRIVE 5300 CFM FAST 3500 CFM SLOW NEMA STANDARD 1.5 HP EF-19 ROOF RESTROOM KITCHEN EXHAUST GREENHECK - CENTRIFUGAL BELT DRIVE 80 CFM NEMA STANDARD 1/6 HP EF-20 ROOF COOLING GREENHECK - CENTRIFUGAL BELT DRIVE 1500 CFM NEMA STANDARD 1/4 HP EF-21 ROOF LAB CABINET EXHAUST GREENHECK - CENTRIFUGAL BELT DRIVE 100 CFM NEMA STANDARD 1/4 HP Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

46 MAJOR EQUIPMENT INVENTORY TAG LOCATION FUNCTION MAKE MODEL TYPE CAPACITY EFFICIENCY MOTOR SIZE ASHRAE SERVICE LIFE (YEARS) ESTIMATED REMAINING USEFUL LIFE (YEARS) EF-22 ROOF LIFE SKILLS RANGE HOOD EXHAUST GREENHECK - CENTRIFUGAL BELT DRIVE 150 CFM NEMA STANDARD 1/30 HP EF-23 ROOF RESTROOM EXHAUST GREENHECK - CENTRIFUGAL BELT DRIVE 125 CFM NEMA STANDARD 1/6 HP Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

47 Appendix D Energy Conservation Measures Houston High School Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

48 The following tables consist of raw output data from the AkWarm Commercial program used to model energy costs and calculate energy savings and financial ratios. These tables represent all of the energy conservation measures calculated and considered by the energy audit team. However, ECMs included in the Executive Summary and Section VIII are recommended by the energy audit team due to their viable financial ratios (SIR>1) or due to their value added. PRIORITY LIST RECOMMENDED ENERGY EFFICIENCY MEASURES Rank Feature Recommendation Annual Energy Savings 1 Lighting: Main Office Installed SIR Cost Improve Manual Switching $81 $ Payback (Years) 2 Lighting: Corridor Custodian and Improve Manual Switching $62 $ Lighting: Classroom and Improve Multi- Level Switch 4 Lighting: Library 5 Lighting: Corridor and Improve Manual Switching 6 Lighting: Classroom 7 Lighting: Staff Room 8 Lighting: Library 9 Lighting: Classroom $3,383 $5, $197 $ $2,497 $5, $125 $ $178 $ $74 $ $15 $ Lighting: Corridor Improve Manual Switching $119 $ Lighting: Gym Improve Manual Switching $334 $1, Lighting: Library 13 Lighting: Office $79 $ $37 $ Lighting: Gym Low Use $74 $ Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

49 PRIORITY LIST RECOMMENDED ENERGY EFFICIENCY MEASURES Rank Feature Recommendation Annual Energy Savings 15 Lighting: Gym Moderate Use Installed SIR Cost $74 $ Payback (Years) 16 Lighting: Classroom $10 $ Lighting: Locker Room $334 $2, Lighting: Corridor Replace with 2 FLUOR (4) T5 45.2" F54W/T5 HO Standard StdElectronic 19 Lighting: Corridor Replace with 29 FLUOR (4) T5 45.2" F54W/T5 HO Standard StdElectronic $166 $1, $2,401 $17, Lighting: Library Student Government $21 $ Lighting: Staff Room 22 Lighting: Office 23 Lighting: Cafeteria Replace with 33 FLUOR (4) T5 45.2" F54W/T5 HO Standard (2) StdElectronic 24 Lighting: Storage 25 Lighting: Gym Replace with 34 FLUOR (6) T5 45.2" F54W/T5 HO Standard (2) StdElectronic and Improve Occupancy $15 $ $38 $ $1,824 $19, $28 $ $1,791 $21, Lighting: Exterior Parking 27 Lighting: Exterior Parking 28 Lighting: Gym Moderate Use Replace with 7 LED 150W Module StdElectronic Replace with 21 LED (2) 150W Module (2) StdElectronic $1,125 $14, $6,752 $84, $86 $1, Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

50 PRIORITY LIST RECOMMENDED ENERGY EFFICIENCY MEASURES Rank Feature Recommendation Annual Energy Savings 29 Lighting: Custodian Office Installed SIR Cost $11 $ Payback (Years) 30 Air Tightening Perform air sealing to reduce air leakage by 20%. $1,479 $13, Lighting: Exterior Lighting 32 Lighting: Exterior Lighting Replace with 15 LED 50W Module StdElectronic Replace with 6 LED 50W Module StdElectronic $571 $9, $228 $3, Ventilation Add 1 CO2 and associated programming to AHU-1 to reduce OSA and OSA schedule. Add/alter existing OSA dampers to provide finer OSA control. 34 Lighting: Classroom Replace with 24 FLUOR (2) T8 4' F32T8 32W Standard (2) Program StdElectronic 35 Lighting: Storage $582 $10, $179 $3, $7 $ Lighting: Class Storage 37 Lighting: Corridor Custodian 38 Lighting: Gym Low Use $5 $ $7 $ $7 $ HVAC And DHW Provide 2 Exhaust stack economizers, 1 for each boiler. Boilers are too large to combine into 1 economizer. 40 Lighting: Classroom Replace with 462 FLUOR (2) T8 4' F32T8 32W Standard (2) Program StdElectronic $1,120 $42, $1,724 $69, Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

51 PRIORITY LIST RECOMMENDED ENERGY EFFICIENCY MEASURES Rank Feature Recommendation Annual Energy Savings 41 Lighting: Exterior Hockey Replace with 2 LED (2) 150W Module (2) StdElectronic Installed SIR Cost $132 $8, Payback (Years) 42 Lighting: Exterior Hockey 43 Lighting: Staff Restrooms Replace with 4 LED (3) 150W Module (3) StdElectronic $396 $24, $2 $ TOTAL $28,370 $362, Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

52 ENERGY AUDIT REPORT ENERGY EFFICIENT RECOMMENDATIONS 1. Building Envelope Air Leakage Rank Location Estimated Air Leakage Recommended Air Leakage Target Installed Cost Annual Energy Savings 30 Air Tightness estimated as: 0.67 cfm/ft2 of above-grade shell area at 75 Pascals Perform air sealing to reduce air leakage by 20%. $13,000 $1, Mechanical Equipment Mechanical Rank Recommendation Installed Cost Annual Energy Savings 39 Provide 2 Exhaust stack economizers, 1 for each boiler. Boilers are too large to combine into 1 economizer. $42,000 $1,120 Ventilation Rank Recommendation Cost Annual Energy Savings 33 Add 1 CO2 and associated programming to AHU-1 to reduce OSA and OSA schedule. Add/alter existing OSA dampers to provide finer OSA control. $10,000 $ Appliances and Lighting Lighting Fixtures and Controls Rank Location Existing Recommended Installed Cost Annual Energy Savings 1 Main Office FLUOR (3) T8 4' F32T8 32W Standard (2) Program StdElectronic with Manual Switching Improve Manual Switching $100 $81 Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

53 Lighting Fixtures and Controls Rank Location Existing Recommended Installed Cost Annual Energy Savings 2 Corridor Custodian FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching 3 Classroom 462 FLUOR (3) T8 4' F32T8 32W Standard (2) Program StdElectronic with Manual Switching, Multi-Level Switch 4 Library 35 FLUOR (3) T8 4' F32T8 32W Standard (2) Program StdElectronic with Manual Switching 5 Corridor 53 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching 6 Classroom 24 FLUOR (4) T8 4' F32T8 32W Standard (2) Program StdElectronic with Manual Switching, Multi-Level Switch 7 Staff Room 24 FLUOR (4) T8 4' F32T8 32W Standard (2) Program StdElectronic with Manual Switching 8 Library 20 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching 9 Classroom 4 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching and Improve Manual Switching and Improve Multi- Level Switch and Improve Manual Switching $100 $62 $5,600 $3,383 $400 $197 $5,300 $2,497 $290 $125 $450 $178 $200 $74 $50 $15 10 Corridor 5 FLUOR [Unknown Lamp] with Manual Switching 11 Gym 8 FLUOR (4) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching, Occupancy Improve Manual Switching $500 $119 Improve Manual Switching $1,600 $334 Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

54 Lighting Fixtures and Controls Rank Location Existing Recommended Installed Cost Annual Energy Savings 12 Library 40 FLUOR T8 4' F32T8 32W Standard with Manual Switching 13 Office 5 FLUOR (4) T8 4' F32T8 32W Standard (2) Program StdElectronic with Manual Switching 14 Gym Low Use 17 FLUOR (4) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching 15 Gym Moderate Use 17 FLUOR (4) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching 16 Classroom 5 FLUOR T8 4' F32T8 32W Standard with Manual Switching 17 Locker Room 60 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching 18 Corridor 2 MH 400 Watt Magnetic with Manual Switching 19 Corridor 29 MH 400 Watt Magnetic with Manual Switching Replace with 2 FLUOR (4) T5 45.2" F54W/T5 HO Standard StdElectronic Replace with 29 FLUOR (4) T5 45.2" F54W/T5 HO Standard StdElectronic $400 $79 $200 $37 $400 $74 $400 $74 $60 $10 $2,400 $334 $1,200 $166 $17,400 $2, Library Student Government 4 FLUOR (4) T8 4' F32T8 32W Standard (2) Program StdElectronic with Manual Switching, Manual Dimmer $200 $21 21 Staff Room 4 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching $150 $15 Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

55 Lighting Fixtures and Controls Rank Location Existing Recommended Installed Cost Annual Energy Savings 22 Office 7 FLUOR (3) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching 23 Cafeteria 33 MH 400 Watt Magnetic with Manual Switching 24 Storage 4 FLUOR (4) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching 25 Gym 34 MH 400 Watt Magnetic with Manual Switching, Occupancy 26 Exterior Parking 7 HPS 400 Watt Magnetic with Manual Switching 27 Exterior Parking 21 HPS (2) 400 Watt (2) Magnetic with Manual Switching 28 Gym Moderate Use 50 FLUOR (3) T8 4' F32T8 32W Standard (2) Program StdElectronic with Manual Switching, Multi-Level Switch 29 Custodian Office 2 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching 31 Exterior Lighting 15 HPS 100 Watt Magnetic with Manual Switching 32 Exterior Lighting 6 HPS 100 Watt Magnetic with Manual Switching 34 Classroom 24 FLUOR (4) T8 4' F32T8 32W Standard (2) Program StdElectronic with Manual Switching, Multi-Level Switch Replace with 33 FLUOR (4) T5 45.2" F54W/T5 HO Standard (2) StdElectronic Replace with 34 FLUOR (6) T5 45.2" F54W/T5 HO Standard (2) StdElectronic and Improve Occupancy Replace with 7 LED 150W Module StdElectronic Replace with 21 LED (2) 150W Module (2) StdElectronic Replace with 15 LED 50W Module StdElectronic Replace with 6 LED 50W Module StdElectronic Replace with 24 FLUOR (2) T8 4' F32T8 32W Standard (2) Program StdElectronic $400 $38 $19,800 $1,824 $300 $28 $21,400 $1,791 $14,000 $1,125 $84,000 $6,752 $1,200 $86 $150 $11 $9,000 $571 $3,600 $228 $3,600 $179 Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

56 Lighting Fixtures and Controls Rank Location Existing Recommended Installed Cost Annual Energy Savings 35 Storage 2 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching 36 Class Storage 3 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching 37 Corridor Custodian 3 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching 38 Gym Low Use 3 FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching 40 Classroom 462 FLUOR (3) T8 4' F32T8 32W Standard (2) Program StdElectronic with Manual Switching, Multi-Level Switch 41 Exterior Hockey 2 HPS (2) 400 Watt (2) Magnetic with Manual Switching 42 Exterior Hockey 4 HPS (3) 400 Watt (3) Magnetic with Manual Switching 43 Staff Restrooms FLUOR (2) T8 4' F32T8 32W Standard Program StdElectronic with Manual Switching Replace with 462 FLUOR (2) T8 4' F32T8 32W Standard (2) Program StdElectronic Replace with 2 LED (2) 150W Module (2) StdElectronic Replace with 4 LED (3) 150W Module (3) StdElectronic $150 $7 $150 $5 $200 $7 $200 $7 $69,300 $1,724 $8,000 $132 $24,000 $396 $150 $ AkWarmCalc Ver , Energy Lib 3/1/2012 Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

57 Appendix E Site Visit Photos Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

58 1. Main Entrance (South Face) 2. North Face and Loading Dock 3. North Entrance and Gym 4. Domestic Water Heaters WH-1 and WH-2 5. Boilers BLR-1 and BLR-2 6. Boiler Circulation Pumps Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

59 7. Heating Water Circulation Pumps 8. Domestic Cold Water System Pumps 9. Circulation Pump VFDs (Boiler Room) 10. AHU-3 Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

60 11. AHU AHU AHU AHU-2 Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

61 15. AHU-2 VFD 16. AHU-5 VFD 17. West Fan Rm HX-2 System 18. East Fan Rm HX-1 System Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

62 Appendix F Thermographic Photos Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

63 Coffman Engineers made miscellaneous thermographic images of East High School using a FLIR T300 Infrared Camera. This is not a thermographic study, rather photographs to illustrate easy-to-identify heat losses. 1. Main Entrance, optical image. The shadow in the upper left is part of the infrared camera and is typical to all optical images in this section. 2. Main Entrance, infrared image. Heat loss through windows and doors is typical. 3. South Face, optical image. 4. South Face, infrared image. Heat loss through windows and doors is typical. 5. East Entrance, optical image. 6. East Entrance, infrared image. Heat loss through windows and doors is typical. Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

64 7. East Face, optical image. 8. East Face, infrared image. Window losses are typical. Well insulated wall. 9. North face, optical image. 10. North face, infrared image. Heat losses through windows are typical. 11. Loading Dock, optical image. 12. Loading Dock, infrared images. Man doors show possible excessive air leakage. Windows and Overhead doors are showing typical heat losses. End of Report Coffman Engineers, Inc. 6/12/2012 AkWarm No. CIRI-WOW-CAEC-02

ENERGY AUDIT FINAL REPORT

ENERGY AUDIT FINAL REPORT ENERGY AUDIT FINAL REPORT Mountain View Elementary School 4005 McPhee Avenue Anchorage, AK 99517 p (907) 742-3900 AkWarm ID No. CIRI-ANC-CAEC-16 800 F Street Anchorage, AK 99501 p (907) 276-6664 f (907)

More information

ENERGY AUDIT FINAL REPORT

ENERGY AUDIT FINAL REPORT ENERGY AUDIT FINAL REPORT Manokotak School Manokotak, AK 99628 p (907) 842 5280 AkWarm ID No. BBNC MBA CAEC 01 800 F Street Anchorage, AK 99501 p (907) 276 6664 f (907) 276 5042 Contact: Walter K. Heins,

More information

ENERGY AUDIT FINAL REPORT

ENERGY AUDIT FINAL REPORT ENERGY AUDIT FINAL REPORT Anchorage School District Facilities/Maintenance Building 1301 Labar Street Anchorage, AK 99515 p (907) 348 5132 AkWarm ID no. CIRI ANC CAEC 03 800 F Street Anchorage, AK 99501

More information

ENERGY AUDIT FINAL REPORT

ENERGY AUDIT FINAL REPORT ENERGY AUDIT FINAL REPORT 4025 East Northern Lights Boulevard Anchorage, AK 99508 p (907) 742-2100 AkWarm ID No. CIRI-ANC-CAEC-15 800 F Street Anchorage, AK 99501 p (907) 276-6664 f (907) 276-5042 Contact:

More information

Willard Bowman Elementary School

Willard Bowman Elementary School Willard Bowman Elementary School 11700 Gregory Rd Anchorage, Alaska 99517 AkWarm ID No. CIRI-ANC-CAEC-26 Submitted by: Central Alaska Engineering Company Contact: Jerry P. Herring, P.E., C.E.A. 32215 Lakefront

More information

ENERGY AUDIT FINAL REPORT

ENERGY AUDIT FINAL REPORT ENERGY AUDIT FINAL REPORT Kasuun Elementary School 4000 E. 68 th Avenue Anchorage, AK 99507 p (907) 349)9444 AkWarm ID No. CIRI)ANC)CAEC)12 800 F Street Anchorage, AK 99501 p (907) 276)6664 f (907) 276)5042

More information

Slana School. Mile 4 Nabesna Road. Slana, Alaska AkWarm ID No. AHTNA-Z93-CAEC-02. Submitted by:

Slana School. Mile 4 Nabesna Road. Slana, Alaska AkWarm ID No. AHTNA-Z93-CAEC-02. Submitted by: Slana School Mile 4 Nabesna Road Slana, Alaska 99586 AkWarm ID No. AHTNA-Z93-CAEC-02 Submitted by: Central Alaska Engineering Company Contact: Jerry P. Herring, P.E., C.E.A. 32215 Lakefront Drive Soldotna,

More information

Klatt Elementary School

Klatt Elementary School Klatt Elementary School 1190 Juniper Drive Anchorage, Alaska 99517 AkWarm-C ID No. CIRI-ANC-CAEC-28 Submitted by: Central Alaska Engineering Company Contact: Jerry P. Herring, P.E., C.E.A. 32215 Lakefront

More information

ENERGY AUDIT REPORT. Women s Bay Volunteer Fire Department 538 Sargent Creek Road Kodiak, Alaska AkWarm ID No. KONI-ADQ-CAEC-04.

ENERGY AUDIT REPORT. Women s Bay Volunteer Fire Department 538 Sargent Creek Road Kodiak, Alaska AkWarm ID No. KONI-ADQ-CAEC-04. ENERGY AUDIT REPORT Women s Bay Volunteer Fire Department 538 Sargent Creek Road Kodiak, Alaska 99615 AkWarm ID No. KONI-ADQ-CAEC-04 Submitted by: Central Alaska Engineering Company Contact: Jerry P. Herring,

More information

ENERGY AUDIT REPORT. (Photo From Google Maps) City of Kenai Airport 305 North Willow Kenai, Alaska CAEC Project No. CIRI-ENA-CAEC-04 May 2012

ENERGY AUDIT REPORT. (Photo From Google Maps) City of Kenai Airport 305 North Willow Kenai, Alaska CAEC Project No. CIRI-ENA-CAEC-04 May 2012 ENERGY AUDIT REPORT (Photo From Google Maps) City of Kenai Airport 305 North Willow Kenai, Alaska 99611 CAEC Project No. CIRI-ENA-CAEC-04 May 2012 SUBMITTED BY: PRIMARY CONTACT: 220 SE 51 st Street 32266

More information

ENERGY AUDIT REPORT. City of Kenai Public Safety 105 & 107 South Willow Kenai, Alaska CAEC Project No. CIRI-ENA-CAEC-05 May 2012

ENERGY AUDIT REPORT. City of Kenai Public Safety 105 & 107 South Willow Kenai, Alaska CAEC Project No. CIRI-ENA-CAEC-05 May 2012 ENERGY AUDIT REPORT City of Kenai Public Safety 5 & 7 South Willow Kenai, Alaska 99611 CAEC Project No. CIRI-ENA-CAEC-05 May 2012 SUBMITTED BY: PRIMARY CONTACT: 220 SE 51 st Street 32266 Lakefront Drive

More information

Energy Assessment Report Clayville Elementary School DRAFT October George Washington Highway, Clayville, RI DRAFT

Energy Assessment Report Clayville Elementary School DRAFT October George Washington Highway, Clayville, RI DRAFT Report Clayville Elementary School October 2016 3 George Washington Highway, Clayville, RI 02815 Clayville Elementary School Summary of Findings On behalf of the School Building Authority at Rhode Island

More information

Comprehensive Energy Audit For Sleetmute Water Treatment Plant

Comprehensive Energy Audit For Sleetmute Water Treatment Plant Comprehensive Energy Audit For Sleetmute Water Treatment Plant Prepared For Sleetmute Traditional Council August 1, 2011 Prepared By: ANTHC-DEHE Energy Projects Group 1901 Bragaw, Suite 200 Anchorage,

More information

Comprehensive Energy Audit For Kongiganak Health Clinic

Comprehensive Energy Audit For Kongiganak Health Clinic Comprehensive Energy Audit For Kongiganak Health Clinic Prepared For Native Village of Kongiganak September 15, 2011 Prepared By: ANTHC DEHE Energy Projects Group Anchorage, Alaska 99508 1 Table of Contents

More information

ENERGY ANALYSIS AND ENERGY CONSERVATION OPTION FOR THE WAREHOUSE FACILITY AT THE HUMAN SERVICES CENTER COMPLEX DRAFT REPORT.

ENERGY ANALYSIS AND ENERGY CONSERVATION OPTION FOR THE WAREHOUSE FACILITY AT THE HUMAN SERVICES CENTER COMPLEX DRAFT REPORT. ESL-TR-86/09-03 ENERGY ANALYSIS AND ENERGY CONSERVATION OPTION FOR THE WAREHOUSE FACILITY AT THE HUMAN SERVICES CENTER COMPLEX DRAFT REPORT Submitted by Mohsen Farzad Dennis O'Neal Prepared For Energy

More information

BB&E GREENHOUSE GAS EMISSIONS INVENTORY. Prepared For: General Services Administration (GSA) Joint Base Andrews, Maryland.

BB&E GREENHOUSE GAS EMISSIONS INVENTORY. Prepared For: General Services Administration (GSA) Joint Base Andrews, Maryland. BB&E GREENHOUSE GAS EMISSIONS INVENTORY Prepared For: General Services Administration (GSA) Joint Base Andrews, Maryland Prepared By: BB&E, Inc. July 2014 This Greenhouse Gas (GHG) Emissions Inventory

More information

Results and Recommendations from Energy Audit of Kipnuk. For VEEP Grants. City of Kipnuk, Alaska

Results and Recommendations from Energy Audit of Kipnuk. For VEEP Grants. City of Kipnuk, Alaska ENERGY AUDIT POST INSTALLATION REPORT Results and Recommendations from Energy Audit of Kipnuk For VEEP Grants City of Kipnuk, Alaska June 20, 2012 Prepared By:, Inc. 6643 Brayton Drive Anchorage, AK 99507

More information

ENERGY AUDIT REPORT. Skyview High School Sterling Hwy. Soldotna, AK 99669

ENERGY AUDIT REPORT. Skyview High School Sterling Hwy. Soldotna, AK 99669 ENERGY AUDIT REPORT Skyview High School 46188 Sterling Hwy. Soldotna, AK 99669 CAEC Project No. CIRI SXQ CAEC 10 May 2012 SUBMITTED BY: PRIMARY CONTACT: 22010 SE 51 st Street 32266 Lakefront Drive Issaquah,

More information

For Point. Prepared For City of Nunapitchuk. June 14, 2012 ANTHC DEHE

For Point. Prepared For City of Nunapitchuk. June 14, 2012 ANTHC DEHE Comprehensive Energy Audit For West Watering Point Prepared For City of Nunapitchuk June 14, 2012 Prepared By: ANTHC DEHE 1901 Bragaw Street, Suite 200 Anchorage, AK 99508 1 Table of Contents 1. EXECUTIVE

More information

Comprehensive Energy Audit For Sleetmute Community Center

Comprehensive Energy Audit For Sleetmute Community Center Comprehensive Energy Audit For Sleetmute Community Center Prepared For The Traditional Council of Sleetmute, and the Alaska Rural Utility Collaborative Apr 26, 2011 Prepared By: ANTHC 1901 Bragaw St. Suite

More information

Results and Recommendations from Energy Audit of Nikolai. For VEEP Grants. City of Nikolai, Alaska

Results and Recommendations from Energy Audit of Nikolai. For VEEP Grants. City of Nikolai, Alaska ENERGY AUDIT POST INSTALLATION REPORT Results and Recommendations from Energy Audit of Nikolai For VEEP Grants City of Nikolai, Alaska June 20, 2012 Prepared By:, Inc. 6643 Brayton Drive Anchorage, AK

More information

ENERGY AUDIT REPORT. Kenai Middle School 201 N. Tinker Lane Kenai, AK 99611

ENERGY AUDIT REPORT. Kenai Middle School 201 N. Tinker Lane Kenai, AK 99611 ENERGY AUDIT REPORT Kenai Middle School 201 N. Tinker Lane Kenai, AK 99611 CAEC Project No. CIRI ENA CAEC 11 May 2012 SUBMITTED BY: PRIMARY CONTACT: 22010 SE 51 st Street 32266 Lakefront Drive Issaquah,

More information

Whitemarsh Township Municipal Building

Whitemarsh Township Municipal Building Whitemarsh Township Municipal Building 616 Germantown Pike, Lafayette Hill, PA 19444 Prepared For: Whitemarsh Township practical energy solutions 101 e. evans street, suite 2, west chester, pa 19380 t.610.430.1382

More information

ENERGY AUDIT REPORT. Soldotna High School 425 W. Marydale Ave. Soldotna, AK 99669

ENERGY AUDIT REPORT. Soldotna High School 425 W. Marydale Ave. Soldotna, AK 99669 ENERGY AUDIT REPORT Soldotna High School 425 W. Marydale Ave. Soldotna, AK 99669 CAEC Project No. CIRI SXQ CAEC 11 May 2012 SUBMITTED BY: PRIMARY CONTACT: 22010 SE 51 st Street 32266 Lakefront Drive Issaquah,

More information

2/17/2017. Energy Accounting & Education. Topics (Electricity) Creating Electricity

2/17/2017. Energy Accounting & Education. Topics (Electricity) Creating Electricity Energy Accounting & Education Energy Managers Kermit King School District of La Crosse John Daily School District of Holmen 1 Topics (Electricity) Creating electricity Defining degree days Customer charges

More information

Comprehensive Energy Audit For Sleetmute Tribal Office

Comprehensive Energy Audit For Sleetmute Tribal Office Comprehensive Energy Audit For Sleetmute Tribal Office Prepared For Traditional Council of Sleetmute August 17, 2011 Prepared By: ANTHC Energy Projects Group 1901 Bragaw St. Suite 200 Anchorage, AK 99508

More information

Comprehensive Energy Audit For Akiak Health Clinic

Comprehensive Energy Audit For Akiak Health Clinic Comprehensive Energy Audit For Akiak Health Clinic Prepared For Akiak Native Community October 19, 2011 Prepared By: ANTHC-DEHE Energy Projects Group Anchorage, Alaska 99508 1 Table of Contents 1. EXECUTIVE

More information

Comprehensive Energy Audit For Eek Tribal Office/City Office

Comprehensive Energy Audit For Eek Tribal Office/City Office Comprehensive Energy Audit For Eek Tribal Office/City Office Prepared For: Native Village of Eek And City of Eek August 5, 2011 Prepared By: ANTHC-DEHE Energy Projects Group 1901 Bragaw St. Suite 200 Anchorage,

More information

LOGO. Trivium Level II Energy Audit

LOGO. Trivium Level II Energy Audit LOGO Trivium Level II Energy Audit Submission Date: 9/16/2016 Table of Contents 1.0 EXECUTIVE SUMMARY 3 2.0 SITE ENERGY CONSUMPTION 5 3.0 BACKGROUND INFORMATION 6 3.1 Description of the Client 6 3.2 Description

More information

Compr For. Prepared For City of Teller. Prepared By: ANTHC DEHE Energy

Compr For. Prepared For City of Teller. Prepared By: ANTHC DEHE Energy Compr rehensive Energy Audit For Teller Water Plant and Washeteria Prepared For City of Teller September 14, 2011 Prepared By: ANTHC DEHE Energy Projects Group 1901 Bragaw St. Suite 200. Anchorage, AK

More information

Comprehensive Energy Audit For Pitkas Point Tribal Office

Comprehensive Energy Audit For Pitkas Point Tribal Office Comprehensive Energy Audit For Pitkas Point Tribal Office Prepared For Native Village of Pitkas Point March 7, 2013 Prepared By: ANTHC DEHE 3900 Ambassador Drive, Suite 301 Anchorage, AK 99508 1 Table

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: i Energy Audit Report Lift Station #1, 3, 5, 6, 7, 8, and 9 Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part

More information

Comprehensive Energy Audit For. Savoonga Water Treatment Plant

Comprehensive Energy Audit For. Savoonga Water Treatment Plant Comprehensive Energy Audit For Savoonga Water Treatment Plant Prepared For: City of Savoonga August 30, 2010 Prepared By: ANTHC-DEHE Energy Projects Group 1901 Bragaw St. Suite 200 Anchorage, AK 99508

More information

Comprehensive Energy Audit For Chevak Vacuum Plant

Comprehensive Energy Audit For Chevak Vacuum Plant Comprehensive Energy Audit For Chevak Vacuum Plant Prepared For City of Chevak March 30, 2013 Prepared By: ANTHC-DEHE 3900 Ambassador Drive, Suite 301 Anchorage, AK 99508 1 Table of Contents 1. EXECUTIVE

More information

Results and Recommendations from Energy Audit of Shageluk. For VEEP Grants Village of Shageluk, Alaska

Results and Recommendations from Energy Audit of Shageluk. For VEEP Grants Village of Shageluk, Alaska ENERGY AUDIT POST INSTALLATION REPORT Results and Recommendations from Energy Audit of Shageluk For VEEP Grants Village of Shageluk, Alaska June 21, 2012 Prepared By:, Inc. 6643 Brayton Drive Anchorage,

More information

Compr For & Washeteria

Compr For & Washeteria Compr rehensive Energy Audit For Water Treatment Plant & Washeteria Prepared For Pitkas Point Village Council March 6, 2013 Prepared By: ANTHC DEHE 3900 Ambassador Drive, Suite 301 Anchorage, AK 99508

More information

Energy Audit. Town of Charlemont. Town Hall. 157 Main Street Charlemont, MA August 31, 2018

Energy Audit. Town of Charlemont. Town Hall. 157 Main Street Charlemont, MA August 31, 2018 Energy Audit Town of Charlemont Town Hall 157 Main Street Charlemont, MA 01339 August 31, 2018 Prepared by: Bowman Engineering, Inc. PO Box 410 Greenfield, MA 01302 (413) 303-0238 Preparer: Thomas Bowman,

More information

Results and Recommendations from Energy Audit of Koyukuk. For VEEP Grants. City of Koyukuk, Alaska

Results and Recommendations from Energy Audit of Koyukuk. For VEEP Grants. City of Koyukuk, Alaska ENERGY AUDIT POST INSTALLATION REPORT Results and Recommendations from Energy Audit of Koyukuk For VEEP Grants City of Koyukuk, Alaska June 20, 2012 Prepared By:, Inc. 6643 Brayton Drive Anchorage, AK

More information

LIBRARY ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC

LIBRARY ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC LIBRARY ENERGY WALK- THROUGH Andy Robinson, Training and Education, SEDAC ILLINOIS ENERGY NOW University of Illinois 360 Energy Group 2 WHAT WE DO SEDAC Free Services Outreach and Training Energy Assistance

More information

Establishing a Baseline, Energy Audits and Energy Star s Portfolio Manager

Establishing a Baseline, Energy Audits and Energy Star s Portfolio Manager Establishing a Baseline, Energy Audits and Energy Star s Portfolio Manager Glenn Barnes Environmental Finance Center University of North Carolina at Chapel Hill 919-962-2789 glennbarnes@sog.unc.edu Energy

More information

ENERGY AUDIT REPORT. Soldotna Sports Center 538 Arena Avenue Soldotna, AK 99669

ENERGY AUDIT REPORT. Soldotna Sports Center 538 Arena Avenue Soldotna, AK 99669 ENERGY AUDIT REPORT Soldotna Sports Center 538 Arena Avenue Soldotna, AK 99669 CAEC Project No. CIRI SXQ CAEC 06 May 2012 SUBMITTED BY: PRIMARY CONTACT: 22010 SE 51 st Street 32266 Lakefront Drive Issaquah,

More information

Results and Recommendations from Energy Audit of Beaver. For VEEP Grants City of Beaver, Alaska

Results and Recommendations from Energy Audit of Beaver. For VEEP Grants City of Beaver, Alaska ENERGY AUDIT POST INSTALLATION REPORT Results and Recommendations from Energy Audit of Beaver For VEEP Grants City of Beaver, Alaska June 20, 2012 Prepared By:, Inc. 6643 Brayton Drive Anchorage, AK 99507

More information

For. Prepared For ANTHC DEHE

For. Prepared For ANTHC DEHE Comprehensive Energy Audit For Tuluksakk Health Clinic Prepared For Tuluksak Native Community February 7, 20122 Prepared By: ANTHC DEHE 1901 Bragaw, Suite 200 Anchorage, AK 99508 1 Table of Contents 1.

More information

ENERGY AUDIT. 123 Main Street Mississauga, Ontario. January 1, Report To: Mr. John Smith Smith Printing Company.

ENERGY AUDIT. 123 Main Street Mississauga, Ontario. January 1, Report To: Mr. John Smith Smith Printing Company. Report To: Mr. John Smith Smith Printing Company ENERGY AUDIT 123 Main Street Mississauga, Ontario January 1, 2009 120 Carlton Street, Suite 212 Toronto, Ontario M5A 4K2 Tel 416-964-3246 Toll Free 1-866-964-3246

More information

WAKE TECHNICAL COMMUNITY COLLEGE SUSTAINABLE ENERGY PLAN. Energy Plan

WAKE TECHNICAL COMMUNITY COLLEGE SUSTAINABLE ENERGY PLAN. Energy Plan Energy Plan 1 EXECUTIVE SUMMARY SCORECARD RESULTS An assessment of current energy management efforts was performed; current performance falls into all categories on the SEP-Performance Scorecard (Appendix

More information

Compr For. Prepared For. August 15, Prepared By: ANTHC DEHE Energy

Compr For. Prepared For. August 15, Prepared By: ANTHC DEHE Energy Compr rehensive Energy Audit For Toksook Bay Water Treatment Plant Prepared For City of Toksook Bay August 15, 2011 Prepared By: ANTHC DEHE Energy Projects Group 1901 Bragaw, Suite 200 Anchorage, Alaska

More information

For Newtok. Prepared For. March 16, 2012 ANTHC DEHE

For Newtok. Prepared For. March 16, 2012 ANTHC DEHE Comprehensive Energy Audit For Newtok Triball Court Prepared For Newtok Village March 16, 2012 Prepared By: ANTHC DEHE 1901 Bragaw Suite 200 Anchorage, Alaska 99508 1 Table of Contents 1. EXECUTIVE SUMMARY...

More information

EAST ORANGE SCHOOL DISTRICT DIONNE WARWICK INSTITUTE FACILITY ENERGY REPORT 120 CENTRAL AVENUE EAST ORANGE, NEW JERSEY 07017

EAST ORANGE SCHOOL DISTRICT DIONNE WARWICK INSTITUTE FACILITY ENERGY REPORT 120 CENTRAL AVENUE EAST ORANGE, NEW JERSEY 07017 EAST ORANGE SCHOOL DISTRICT DIONNE WARWICK INSTITUTE 120 CENTRAL AVENUE EAST ORANGE, NEW JERSEY 07017 FACILITY ENERGY REPORT East Orange School District Dionne Warwick Institute TABLE OF CONTENTS I. HISTORIC

More information

Energy Audit. Town of Charlemont. Highway Garage. 12 Factory Rd. Charlemont, MA August 31, 2018

Energy Audit. Town of Charlemont. Highway Garage. 12 Factory Rd. Charlemont, MA August 31, 2018 Energy Audit Town of Charlemont Highway Garage 12 Factory Rd. Charlemont, MA 01339 August 31, 2018 Prepared by: Bowman Engineering, Inc. PO Box 410 Greenfield, MA 01302 (413) 303-0238 Preparer: Thomas

More information

ENERGY AUDIT FINAL REPORT

ENERGY AUDIT FINAL REPORT ENERGY AUDIT FINAL REPORT Saint Paul 1032 Diamond Hill Road Prepared for: Ms. Wanda Melovidov 950 Girbash Street Prepared by: David C. Lanning PE, CEA Jeremy Spargur CEAIT July 13, 2012 Acknowledgment:

More information

Fifteen Year Plan for Energy Efficiency and Conservation Projects

Fifteen Year Plan for Energy Efficiency and Conservation Projects Fifteen Year Plan for Energy Efficiency and Conservation Projects Presented to the Board of Trustees of the Northeastern Ohio Universities Colleges of Medicine and Pharmacy, December, 2008, in accordance

More information

Do-It-Yourself Energy Audit. Bob Furgeson, PE CEM CBCP GBE CEA Shive-Hattery Architects+Engineering

Do-It-Yourself Energy Audit. Bob Furgeson, PE CEM CBCP GBE CEA Shive-Hattery Architects+Engineering Do-It-Yourself Energy Audit Bob Furgeson, PE CEM CBCP GBE CEA Shive-Hattery Architects+Engineering Agenda» Basic Terminology» Background» Benchmarking» Audit Types/ASHRAE Standard» Building Audit Systems

More information

ENERGY AUDIT FINAL REPORT

ENERGY AUDIT FINAL REPORT ENERGY AUDIT FINAL REPORT FALSE PASS SCHOOL PO Box 52 Prepared for: Mr. Jim Brown PO Box 349 Sand Point, Alaska Prepared by: David Lanning PE, CEA Jeremy Spargur EIT, CEAIT July 9, 2012 Acknowledgment:

More information

Holistic Design Approach For Energy Efficiency ASHRAE TECHNOLOGY AWARD CASE STUDIES

Holistic Design Approach For Energy Efficiency ASHRAE TECHNOLOGY AWARD CASE STUDIES ASHRAE TECHNOLOGY AWARD CASE STUDIES This article was published in ASHRAE Journal, June 2018. Copyright 2018 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically

More information

Existing Building Upgrades

Existing Building Upgrades Existing Building Upgrades Shawn Maurer SEDAC Building Energy Specialist Smart Energy Design Assistance Center (SEDAC), University of Illinois at Urbana Champaign SEDAC ILLINOIS K-12 SCHOOL ENERGY USE

More information

New Construction Procurement Guidelines for the Pacific Northwest

New Construction Procurement Guidelines for the Pacific Northwest Northwest Portable Classroom Project New Construction Procurement Guidelines for the Pacific Northwest March 31, 2003 WSUCEEP03_063 Washington State University Extension Energy Program 925 Plum Street

More information

Comprehensive Energy Audit For. Akiachak Water Treatment Plant

Comprehensive Energy Audit For. Akiachak Water Treatment Plant Comprehensive Energy Audit For Akiachak Water Treatment Plant Prepared For Native Village of Akiachak December 14, 2015 Prepared By: ANTHC-DEHE 3900 Ambassador Drive Anchorage, AK 99508 1 Table of Contents

More information

For. Prepared For. June 11, 2012 ANTHC DEHE

For. Prepared For. June 11, 2012 ANTHC DEHE Comprehensive Energy Audit For Tununak Tribal Police Office Prepared For Native Village of Tununak June 11, 2012 Prepared By: ANTHC DEHE 1901 Bragaw Suite, Suite 200 Anchorage, AK 99508 1 Table of Contents

More information

Richard S. Armstrong, PE, LLC

Richard S. Armstrong, PE, LLC Richard S. Armstrong, PE, LLC Mechanical/Electrical Engineer Comprehensive Energy Audit of Barrow Search and Rescue Hangar Building 1797 and 1799 Ahkovak Project # ASRC-BRW-RSA-06 Prepared for: The North

More information

Xavier University of Louisiana

Xavier University of Louisiana Annual Savings Report Year 2 May 1, 2012 to April 30, 2013 July 2013 For Marion Bracy Vice President Xavier University Facilities Planning 1 Drexel Drive New Orleans LA 70125 (504) 520 1056 Submitted By

More information

Comprehensive Energy Audit For. Shungnak Water Treatment Plant

Comprehensive Energy Audit For. Shungnak Water Treatment Plant Comprehensive Energy Audit For Shungnak Water Treatment Plant Prepared For City of Shungnak November 9, 2018 Prepared By: Kevin Ulrich, CEM ANTHC-DEHE 4500 Diplomacy Dr., Anchorage, AK 99508 1 Table of

More information

EAST ORANGE SCHOOL DISTRICT GORDON PARKS ACADEMY FACILITY ENERGY REPORT 99 GREENWOOD AVENUE EAST ORANGE, NEW JERSEY 07017

EAST ORANGE SCHOOL DISTRICT GORDON PARKS ACADEMY FACILITY ENERGY REPORT 99 GREENWOOD AVENUE EAST ORANGE, NEW JERSEY 07017 EAST ORANGE SCHOOL DISTRICT GORDON PARKS ACADEMY 99 GREENWOOD AVENUE EAST ORANGE, NEW JERSEY 07017 FACILITY ENERGY REPORT East Orange School District Gordon Parks Academy TABLE OF CONTENTS I. HISTORIC

More information

Investigative Energy Audit For. Koliganek IGAP Office Building. Prepared For Koliganek Village Council. Prepared By Curtis Boudreau, PE, CEM

Investigative Energy Audit For. Koliganek IGAP Office Building. Prepared For Koliganek Village Council. Prepared By Curtis Boudreau, PE, CEM Investigative Energy Audit For Koliganek IGAP Office Building Prepared For Koliganek Village Council Prepared By Curtis Boudreau, PE, CEM February 22, 2017 ANTHC DEHE 4500 Diplomacy Dr. Anchorage, AK 99508

More information

Comprehensive Energy Audit For. Unalakleet Pump House

Comprehensive Energy Audit For. Unalakleet Pump House Comprehensive Energy Audit For Unalakleet Pump House Prepared For City of Unalakleet March 9, 2017 Prepared By: Kevin Ulrich and Martin Wortman ANTHC-DEHE 4500 Diplomacy Dr. Anchorage, AK 99508 1 Table

More information

Farm Energy IQ. Farms Today Securing Our Energy Future. Farm Energy Efficiency Principles Tom Manning, New Jersey Agricultural Experiment Station

Farm Energy IQ. Farms Today Securing Our Energy Future. Farm Energy Efficiency Principles Tom Manning, New Jersey Agricultural Experiment Station Farm Energy IQ Farms Today Securing Our Energy Future Farm Energy Efficiency Principles Tom Manning, New Jersey Agricultural Experiment Station Farm Energy IQ Farm Energy Efficiency Principles Tom Manning,

More information

BRICK TOWNSHIP BOARD OF EDUCATION EMMA HAVENS YOUNG ELEMENTARY SCHOOL 43 DRUM POINT ROAD BRICK, NJ FACILITY ENERGY REPORT

BRICK TOWNSHIP BOARD OF EDUCATION EMMA HAVENS YOUNG ELEMENTARY SCHOOL 43 DRUM POINT ROAD BRICK, NJ FACILITY ENERGY REPORT BRICK TOWNSHIP BOARD OF EDUCATION EMMA HAVENS YOUNG ELEMENTARY SCHOOL 43 DRUM POINT ROAD BRICK, NJ 08723 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION...

More information

The energy benefits of View Dynamic Glass

The energy benefits of View Dynamic Glass Workplace demonstration Energy monitoring over a period of 12 months resulted in the commercial office room installed with View Dynamic Glass saving 39 percent of the total energy consumed compared to

More information

Greening Your Business Energy Efficiency in Buildings

Greening Your Business Energy Efficiency in Buildings Greening Your Business Energy Efficiency in Buildings Ben J. Sliwinski Building Research Council School of Architecture University of Illinois at Urbana-Champaign Overview Introduction Where is the Money?

More information

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal The following documentation provides an example submittal for the LEED-NC v2.1 Energy & Atmosphere Credit 1 (EAc1). This sample EAc1 submittal

More information

ENERGY AUDIT FINAL REPORT

ENERGY AUDIT FINAL REPORT ENERGY AUDIT FINAL REPORT ANDREW K. DEMOSKI SCHOOL Prepared for: Ms. Kerry Boyd 4762 Old Airport Way Fairbanks, Alaska Prepared by: David C. Lanning PE, CEA Steven Billa EIT, CEAIT July 10, 2012 Acknowledgment:

More information

Energy Benchmarking Report for Mt. Pleasant Elementary School. Millville, NJ

Energy Benchmarking Report for Mt. Pleasant Elementary School. Millville, NJ Energy Benchmarking Report for Mt. Pleasant Elementary School Millville, NJ (for the period: June 1, 2008 through May 31, 2009) Prepared by: Background & Findings: The New Jersey Clean Energy Program (NJCEP)

More information

Turning Data Into Action

Turning Data Into Action tearsheets Building Segment-Specific Packages of s Report Partners: sustainable energy partnerships Introduction These tearsheets have been created to make New York City building energy audit data actionable.

More information

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST ENVELOPE REQUIREMENTS Project: Date: Instructions RECOMMENDED: List performance values, note exceptions that were applied, or provide other

More information

SUMMARY OF SERVICES & INCENTIVES

SUMMARY OF SERVICES & INCENTIVES SMALL BUSINESS PROGRAM 2017 SUMMARY OF SERVICES & INCENTIVES Effective through December 31, 2017 Last updated February 1, 2017 EFFICIENCY INCENTIVES SUMMARY The Focus on Energy Small Business Program offers

More information

Comprehensive Energy Audit For. Mountain Village Boys & Girls Club

Comprehensive Energy Audit For. Mountain Village Boys & Girls Club Comprehensive Energy Audit For Mountain Village Boys & Girls Club Prepared For City of Mountain Village August 11, 2017 Prepared By: Kevin Ulrich ANTHC-DEHE 4500 Diplomacy Dr. Anchorage, AK 99508 1 Table

More information

Comprehensive Energy Audit For. Elim Water Treatment Plant

Comprehensive Energy Audit For. Elim Water Treatment Plant Comprehensive Energy Audit For Elim Water Treatment Plant Prepared For City of Elim July 8, 2014 Prepared By: ANTHC-DEHE 3900 Ambassador Drive, Suite 301 Anchorage, AK 99508 1 Table of Contents PREFACE...

More information

Retro-Commissioning in Hospitals

Retro-Commissioning in Hospitals Retro-Commissioning in Hospitals American Society of Healthcare Engineering () Introduction Elements of the Health Facility Retro-Cx Process Retro-Cx Case Studies Hospital Hospital Oklahoma Heart Hospital

More information

Energy Savings Audit

Energy Savings Audit Energy Savings Audit PREPARED FOR Steve Bennett Eileen Horn City of Lawrence ASSESSMENT SITE City of Lawrence Arts Center 940 new Hampshire St. Lawrence, KS 66044 ASSESSMENT PERFORMED BY P1 Group Inc 16210

More information

Farm Energy IQ. Farm Energy Efficiency Principles 2/16/2015. Farm Energy Efficiency. Basic Energy Principles

Farm Energy IQ. Farm Energy Efficiency Principles 2/16/2015. Farm Energy Efficiency. Basic Energy Principles Farm Energy IQ Farm Energy IQ Farms Today Securing Our Energy Future Farm Energy Efficiency Principles Tom Manning, New Jersey Agricultural Experiment Station Farm Energy Efficiency Principles Tom Manning,

More information

Comprehensive Energy Audit For Kiana Water Treatment Plant

Comprehensive Energy Audit For Kiana Water Treatment Plant Comprehensive Energy Audit For Kiana Water Treatment Plant Prepared For City of Kiana July 12, 2016 Prepared By: Bailey Gamble ANTHC-DEHE 4500 Diplomacy Dr., Suite 545 Anchorage, AK 99508 1 Table of Contents

More information

Commercial Energy Savings Guide

Commercial Energy Savings Guide Commercial Energy Savings Guide www.touchstoneenergy.coop Commercial Energy Saving Tips This guide provides basic hints on ways to reduce energy costs for business customers. All Touchstone Energy cooperatives

More information

Comprehensive Energy Audit For Community Building

Comprehensive Energy Audit For Community Building Comprehensive Energy Audit For Community Building Prepared For Hooper Bay Tribal Council June 29, 2012 Prepared By: ANTHC 1901 Bragaw St. Suite 200 Anchorage, AK 99508 1 Table of Contents 1. EXECUTIVE

More information

Comprehensive Energy Audit For. Kiana Lift Station

Comprehensive Energy Audit For. Kiana Lift Station Comprehensive Energy Audit For Kiana Lift Station Prepared For City of Kiana July 27, 2016 Prepared By: Bailey Gamble ANTHC 4500 Diplomacy Dr., Suite 545 Anchorage, AK 99508 1 Table of Contents PREFACE...

More information

Comprehensive Energy Audit For. Quinhagak Utility Building

Comprehensive Energy Audit For. Quinhagak Utility Building Comprehensive Energy Audit For Quinhagak Utility Building Prepared For City of Quinhagak May 11, 2016 Prepared By: ANTHC-DEHE 4500 Diplomacy Dr., Anchorage, AK 99508 1 Table of Contents PREFACE... 3 ACKNOWLEDGMENTS...

More information

Low-Hanging Fruit Simple Steps Toward Energy Effective Building Operations

Low-Hanging Fruit Simple Steps Toward Energy Effective Building Operations Low-Hanging Fruit Simple Steps Toward Energy Effective Building Operations Roger Ebbage Northwest Water / Energy Education Institute Lane Community College May 7-9 Enzian Inn - Leavenworth, Washington

More information

Holistic Design Approach For Energy Efficiency ASHRAE TECHNOLOGY AWARD CASE STUDIES

Holistic Design Approach For Energy Efficiency ASHRAE TECHNOLOGY AWARD CASE STUDIES 2018 ASHRAE TECHNOLOGY AWARD CASE STUDIES Holistic Design Approach For Energy Efficiency Using LED and fluorescent lighting, the lighting design was modeled to maximize lighting effect while reducing energy

More information

Comprehensive Energy Audit For CMTRS Building

Comprehensive Energy Audit For CMTRS Building Comprehensive Energy Audit For CMTRS Building Prepared For Chevak Native Village December 21, 2011 Prepared By: ANTHC-DEHE 1901 Bragaw Street, Suite 200 Anchorage, AK 99508 1 Table of Contents 1. EXECUTIVE

More information

Building Operator Certification Level I

Building Operator Certification Level I Building Operator Certification Level I A Partnership of the CUNY Institute for Urban Systems Building Performance Lab, the CUNY School of Professional Studies, and the New York State Energy Research &

More information

MAYWOOD BOARD OF EDUCATION MEMORIAL ELEMENTARY SCHOOL ENERGY ASSESSMENT. For NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO.

MAYWOOD BOARD OF EDUCATION MEMORIAL ELEMENTARY SCHOOL ENERGY ASSESSMENT. For NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. MAYWOOD BOARD OF EDUCATION MEMORIAL ELEMENTARY SCHOOL ENERGY ASSESSMENT For NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 24473 September 2012 Prepared by: 6 Campus Drive Parsippany, NJ 07054 (973)

More information

Comprehensive Energy Audit For. Nondalton WTP

Comprehensive Energy Audit For. Nondalton WTP Comprehensive Energy Audit For Nondalton WTP Prepared For City of Nondalton January 2, 2015 Prepared By: ANTHC-DEHE 3900 Ambassador Drive, Suite 201 Anchorage, AK 99508 1 Table of Contents PREFACE... 2

More information

Comprehensive Energy Audit For. Kobuk Water and Sanitiation

Comprehensive Energy Audit For. Kobuk Water and Sanitiation Comprehensive Energy Audit For Kobuk Water and Sanitiation Prepared For City of Kobuk March 23, 2015 Prepared By: ANTHC-DEHE 3900 Ambassador Drive, Suite 301 Anchorage, AK 99508 1 Table of Contents PREFACE...

More information

The baseline building system for compliance with Senate Bill 668 is defined by Appendix G,

The baseline building system for compliance with Senate Bill 668 is defined by Appendix G, Project: North Carolina A&T State University New Student Health Center SCO #: 08-08109-01A 1.0 Heating, Ventilating and Air Conditioning (HVAC) Baseline Building Systems Senate Bill 668 Compliance The

More information

Technical Report Two: Building and Plant Energy Analysis Report

Technical Report Two: Building and Plant Energy Analysis Report The American Swedish Institute Minneapolis, MN Technical Report Two: Building and Plant Energy Analysis Report Name: Option: Mechanical Advisor: Stephen Treado Date: 10.19.11 Table of Contents Executive

More information

Michigan Energy Code Training and Implementation Program

Michigan Energy Code Training and Implementation Program Michigan Energy Code Training and Implementation Program 1.0 Hour Advanced Program Course Number 16202 Residential Energy Plan Review School of Planning, Design & Construction Michigan State University

More information

ENERGY MANAGEMENT PLAN - HEADQUARTERS. ABC Winery 123 1st Street Franklin, NJ 12345

ENERGY MANAGEMENT PLAN - HEADQUARTERS. ABC Winery 123 1st Street Franklin, NJ 12345 ENERGY MANAGEMENT PLAN - HEADQUARTERS ABC Winery 123 1st Street Franklin, NJ 12345 TABLE OF CONTENTS Executive Summary 3 Background and Site Information 3 Summary 3 Energy Conservation Opportunities 4

More information

Cheldelin Middle School

Cheldelin Middle School Facility Information Address: 987 NE Conifer Blvd Corvallis Site Size: Building Area: Construction Date: Improved Parking: Grade Levels Served: Regular Classrooms: Portable Classrooms: Sept. 2007 Enrollment:

More information

Energy Provisions of the Residential Building Code IECC: Guide for Homeowners

Energy Provisions of the Residential Building Code IECC: Guide for Homeowners Energy Provisions of the Residential Building Code 2009 IECC: Guide for Homeowners Missouri Energy Code Guide If you are interested in buying a home or want to learn about the energy code and how to make

More information

Comprehensive Energy Audit For Buckland Washeteria

Comprehensive Energy Audit For Buckland Washeteria Comprehensive Energy Audit For Buckland Washeteria Prepared For City of Buckland May 12, 2017 Prepared By: Bailey Gamble Alaska Native Tribal Health Consortium 4500 Diplomacy Dr., Suite 454 Anchorage,

More information

Italcementi Center for Research and Innovation

Italcementi Center for Research and Innovation Italcementi Center for Research and Innovation Bergamo, Italy LEED-NC v2.1 EAc1 A. Project Narrative (Viridian) analyzed the energy use of the proposed Italcementi Center for Research and Innovation located

More information

Implementing Low-Cost Energy Savings Projects & Conducting Energy Audits

Implementing Low-Cost Energy Savings Projects & Conducting Energy Audits AEP Ohio Customer Seminar Implementing Low-Cost Energy Savings Projects & Conducting Energy Audits Presented by: Julie Birchfield Customer Manager Energy Optimizers, USA May, 2018 Test your Energy IQ 11

More information