1 City of Sunrise Utilities Department By Giovanni Batista, P.E., C.G.C.

2 The City of Sunrise Utilities Department WHAT WE DO: Water, Wastewater and Gas Services The Utilities Department has 267 employees and provides water and wastewater services to approximately 217,000 people in Broward County. The service area encompasses an area of approximately 70 square miles. We serve the entire City of Sunrise, City of Weston, portions of the Town of Southwest Ranches, and Town of Davie, and some unincorporated areas of the County.

3 Finances Sunrise Utilities has assets of approximately $600M. The City s annual Utility Budget is approximately $101M. About 25% of this budget are labor costs (salaries, health insurance, pension and payroll taxes), 75% operating costs. The City of Sunrise Utility Department has initiated a $600 Million Capital Improvement Program since 2010 (through 2020 as proposed in the new budget year), including projects for water and wastewater treatment plant and system improvements, and will complete numerous contracts with local engineering consultants and contractors. The Government Finance Officers Association of the United States and Canada (GFOA) awarded a Certificate of Achievement for Excellence in Financial Reporting to the City of Sunrise in 2013.

4 Brief History City of Sunrise was incorporated The City purchased the Springtree W & WWT facilities from Central Broward Utilities Corporation Built Sawgrass WWTP Plants underwent major Rehab & Expansions The City purchased the Southwest W & WWT facilities from Central Broward Utilities Corporation Built Sawgrass WTP s

5

6

7 Summary of Existing System Water Sawgrass Springtree Southwest Total Plant Capacity 24 mgd 25.5 mgd 2 mgd 51.5 mgd Average Treated 10.8 mgd 10.9 mgd 0.95 mgd 22.7 mgd Length of Pipe Approximately 600 miles total Wells Wells Capacity 33 mgd 26 mgd 3 mgd 62 Wastewater Sawgrass Springtree Southwest Total Plant Capacity 20 mgd 10 mgd 0.99 mgd mgd Average Treated 12.6 mgd 8 mgd 0.3 mgd mgd Length of Pipe 461 Miles 211 Miles 18 Miles 690 Miles Manholes 5,225 2, ,800 Lift Stations

8 Springtree Plants Water Treatment Lime Softening (24 MGD) with Biscayne Aquifer water. New R.O. plant since 2014 (1.5 MGD) with Floridan Aquifer water drawn from what used to be an ASR well. Wastewater Treatment 10 MGD capacity Effluent is transferred to the Sawgrass WWTP for deep injection disposal.

9 Springtree Plants Projects Recently completed: R.O. Plant (1.5 MGD) in 2014 Consultant: Carollo Engineers Project Cost: $9.6 Million Biscayne Wells in 2015 Consultant: Arcadis Project Cost: $2.7 Million Lime plant Rehab Phase I in 2015 Consultant: Carollo Engineers Project Cost: $7.2 Million Projects Underway: Lime plant Rehab Phase II Deep Well Injection system Biosolids Rehab project including new anaerobic digestion. Headworks Rehabilitation

10 Sawgrass Plants Water Treatment Wastewater Treatment Nano-Filtration (24 MGD) with Biscayne Aquifer water. 20 MGD capacity Effluent is disposed through deep well injection system.

11 Sawgrass Plants Projects Recently completed: WTP Rerate in 2014 Consultant: Carollo Project Cost: $2.5 Million WTP Improvements in 2014 Consultant: CH2MHill Project Cost: $6 Million Headworks Improvements in 2015 Consultant: Brown and Caldwell Project Cost: $7.5 Million New Biosolids Dewatering in 2015 Consultant: Hazen and Sawyer Project Cost: $5 Million Projects Underway: High Level Disinfection and Reuse (4 MGD) Membranes Replacement at the WTP

12 Southwest Plants Water Treatment Wastewater Treatment Lime Softening (2 MGD) with Biscayne Aquifer water 0.99 MGD capacity Secondary treatment with Oxidation Ditches and effluent is disposed at 4 percolation ponds

13 Southwest Plants Projects Underway: WTP Rehabilitation Consultant: CH2MHill Project Cost: $8.5 Million WTP Ion Exchange Consultant: Carollo Project Cost: $5 Million WWTP Rehabilitation Consultant: Hazen and Sawyer Project Cost: $7.5 Million WWTP HLD Consultant: Hazen and Sawyer Project Cost: $3 Million

14 Challenges Three different treatment locations that were pieced together throughout the years; therefore the system lacks full records, uniformity and design coordination. The water distribution system is long and intricate. The systems have very old components which need rehabilitation, replacement or improvements. Aging workforce. More stringent regulations require more planning and better treatment systems. Sustainability awareness brings new factors to consider when selecting treatment and operational approaches. i.e. Biosolids Handling.

15 Questions?

Florida Ocean Outfall Legislation: What it Means for Utilities and What They Are Doing to Comply

Florida Ocean Outfall Legislation: What it Means for Utilities and What They Are Doing to Comply PD-Sw210 Florida Ocean Outfall Legislation: What it Means for Utilities and What They Are Doing to Comply May 1, 2015 Monique Durand, PE FIPA Spring Workshop 1 1 Outline Background Regulatory overview

More information

EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY

EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY Frank A. Brinson, P.E., DEE, CDM, Fort Lauderdale, FL

More information

Water Resource Task Force Meeting. Broward County Effluent Disposal and Reclaimed Water Conceptual Master Plan. January 28,

Water Resource Task Force Meeting. Broward County Effluent Disposal and Reclaimed Water Conceptual Master Plan. January 28, Water Resource Task Force Meeting Broward County Effluent Disposal and Reclaimed Water Conceptual Master Plan January 28, 2011 1 44228-703-07 Hydrology and environmental protection have driven effluent

More information

Closing the Gap Reaching for Energy Independence in Water Reclamation

Closing the Gap Reaching for Energy Independence in Water Reclamation Closing the Gap Reaching for Independence in Water Reclamation Graham Juby, P.E. July 27, 2012 Power use in POTWs is growing steadily... more than 25 billion kwh in 2015* * Electrical Power Research Institute

More information

Mark S. Drummond, P.E. President

Mark S. Drummond, P.E. President President Education B.S. Civil Engineering, Florida International University, 1996 (Minor in International Relations) Registration Professional Engineer: Florida (License No: 57428) Professional Engineer:

More information

Professional Engineering Services for Studies and Reports

Professional Engineering Services for Studies and Reports Broward County Board of County Commissioners Professional Engineering Services for Studies and Reports August 17, 2018 Overview 1. Introduction and Team 2. Our Past Performance with Broward County 3. Other

More information

Developing a Sustainable Water Supply Strategy for the City of Plantation, Florida

Developing a Sustainable Water Supply Strategy for the City of Plantation, Florida Developing a Sustainable Water Supply Strategy for the City of Plantation, Florida Water and Energy Sustainability Symposium Pittsburg, Pennsylvania September 29, 2010 Courtney S. Licata, Hazen and Sawyer

More information

Evaluating Green Energy Options At Water And Wastewater Treatment Facilities. Frederick Bloetscher, Ph.D., P.E. Florida Atlantic University

Evaluating Green Energy Options At Water And Wastewater Treatment Facilities. Frederick Bloetscher, Ph.D., P.E. Florida Atlantic University Evaluating Green Energy Options At Water And Wastewater Treatment Facilities Frederick Bloetscher, Ph.D., P.E. Florida Atlantic University Energy Costs for Water and Wastewater Treatment Plants are Significant

More information

Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015

Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015 Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015 Monthly Utility Bill in $ 100 Combined Average Utility Bill for 2015-2020 5/8 Meter with

More information

CRITICAL CRITERIA FOR EVALUATING MEMBRANES FOR WATER SOFTENING

CRITICAL CRITERIA FOR EVALUATING MEMBRANES FOR WATER SOFTENING CRITICAL CRITERIA FOR EVALUATING MEMBRANES FOR WATER SOFTENING Ohio AWWA 2016 Annual Conference Peter Kube, PE September 15, 2016 Outline Softening Water Discuss 4 Factors when Evaluating Membranes for

More information

Town of Davie. Broward County Water Advisory TAC Presentation. Water Treatment & Water Reclamation Facility Design-Build

Town of Davie. Broward County Water Advisory TAC Presentation. Water Treatment & Water Reclamation Facility Design-Build Town of Davie Water Treatment & Water Reclamation Facility Design-Build Broward County Water Advisory TAC Presentation Brian Stitt Senior Project Manager August 16, 2013 Project Driver: Growth Significant

More information

Miami-Dade Water and Sewer Department: Implementing a Resilient Water & Sewer Utility

Miami-Dade Water and Sewer Department: Implementing a Resilient Water & Sewer Utility By: Hardeep Anand (WASD) Josenrique Cueto (Hazen) Maricela J. Fuentes (AECOM) Miami-Dade Water and Sewer Department: Implementing a Resilient Water & Sewer Utility Introduction 01 02 03 04 System Overview

More information

Broward Regional Reuse Master Plan

Broward Regional Reuse Master Plan Broward Regional Reuse Master Plan June 14, 2013 Broward Water Resources Task Force 1 - Genesis of This Project Outgrowth from Broward Water Resources Task Force Report Key Items Identified Planning on

More information

Adopted Projects at Priority List Meeting August 9, 2017

Adopted Projects at Priority List Meeting August 9, 2017 Adopted Projects at Priority List Meeting August 9, 2017 Drinking Water State Revolving Fund Recipient Amount Project Big Bend Water $30,000 Planning for a water distribution system replacement project.

More information

Energy Reduction / Alternative Energy Strategies Palm Beach County Board of County Commissioners Water Utilities Department March 26, 2013 Bevin A. Beaudet, PE Utilities Director Utility Background Operations

More information

QUINCY 1WATER UTILITY TDS CONTROL. Lloyd Emil Voges Brown and Caldwell 701 Pike St. Suite 1200 Seattle, WA

QUINCY 1WATER UTILITY TDS CONTROL. Lloyd Emil Voges Brown and Caldwell 701 Pike St. Suite 1200 Seattle, WA QUINCY 1WATER UTILITY TDS CONTROL Lloyd Emil Voges Brown and Caldwell 701 Pike St. Suite 1200 Seattle, WA 98101 evoges@brwncald.com 206-749-2268 Abstract The city of Quincy, Washington has an industrial

More information

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1 APPENDIX A PRELIMINARY TECHNICAL SPECIFICATIONS FOR BIOSOLIDS MANAGEMENT SERVICES JEA Buckman Residuals Management Facility 1. Background JEA is seeking biosolids management services from experienced biosolids

More information

November 28, Dear Mr. Bechtold:

November 28, Dear Mr. Bechtold: 4000 Hollywood Boulevard Seventh Floor, North Tower Hollywood, Florida 33021 (954) 987-0066 Fax: (954) 987-2949 November 28, 2012 Wastewater Compliance and Enforcement Section FLORIDA DEPARTMENT OF ENVIRONMENTAL

More information

2015 BASELINE ASSESSMENT A REPORT CARD FOR ROADS, WATER, SEWER, AND STORMWATER APPENDIX

2015 BASELINE ASSESSMENT A REPORT CARD FOR ROADS, WATER, SEWER, AND STORMWATER APPENDIX 2015 BASELINE ASSESSMENT A REPORT CARD FOR ROADS, WATER, SEWER, AND STORMWATER APPENDIX FEBRUARY, 2015 GRADING SCALE Classification Description Value A Exceptional: Fit for the future The infrastructure

More information

Director of Public Utilities Recruitment Profile C I T Y O F M A N K A T O

Director of Public Utilities Recruitment Profile C I T Y O F M A N K A T O C I T Y Director of Public Utilities Recruitment Profile O F M A N K A T O The City of Mankato, Minnesota seeks an innovative and collaborative local government professional to lead the City of Mankato

More information

MAKING THE SWITCH FROM LIME TO MEMBRANE SOFTENING: WHEN IS IT THE RIGHT TIME? Introduction

MAKING THE SWITCH FROM LIME TO MEMBRANE SOFTENING: WHEN IS IT THE RIGHT TIME? Introduction MAKING THE SWITCH FROM LIME TO MEMBRANE SOFTENING: WHEN IS IT THE RIGHT TIME? Joseph R. Elarde CH2M HILL 5801 Pelican Bay Blvd., Suite 505 Naples, FL 34108 joe.elarde@ch2m.com 239-431-9225 Jeff Poteet,

More information

Manatee County Utilities. Water/Wastewater Rates Public Hearing February 7, 2017

Manatee County Utilities. Water/Wastewater Rates Public Hearing February 7, 2017 Water/Wastewater Rates Public Hearing February 7, 2017 1 What we do Responsible for water supply, treatment, distribution and metering to 117,000 retail accounts and 4 wholesale customers Wastewater treatment

More information

Cape Coral Integration of Irrigation Source Waters

Cape Coral Integration of Irrigation Source Waters Cape Coral Integration of Irrigation Source Waters Cape Coral Southwest Florida Coastal City 3rd Largest FL City in Land Area 11th Largest FL City in Population Peninsula Surrounded by Saltwater 2010 Population

More information

Capital Improvement Plan Update:

Capital Improvement Plan Update: Board of Supervisors Meeting Carson City Public Works Department Capital Improvement Plan Update: Wastewater Collection, Treatment and Reuse March 14, 2013 Topics of Discussion Regionalization Existing

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

Biennial Water and Sewer System Engineers Report

Biennial Water and Sewer System Engineers Report FINAL REPORT Biennial Water and Sewer System Engineers Report Prepared for City of Fort Lauderdale Based on Utility information up to September 30, 2016 Prepared by Contents Section Page 1 Introduction...

More information

Meridian s Class A Recycled Water Program

Meridian s Class A Recycled Water Program Meridian s Class A Recycled Water Program 2016 PNWS Conference - Boise May 5, 2016 Clint Dolsby, PE City of Meridian Assistant City Engineer Recycled Water Defined Highly treated wastewater effluent for

More information

Reclaimed Water Current Research and Emerging Contaminants

Reclaimed Water Current Research and Emerging Contaminants Reclaimed Water Current Research and Emerging Contaminants May 25, 2012 11:30 am -12:00 pm Tina Hanson, P.E. Enrique Vadiveloo, P.E. Hazen and Sawyer, P.C 1 1 Drivers for Advanced Technologies As water

More information

Just In Time Treatment Capacity

Just In Time Treatment Capacity Just In Time Treatment Capacity Developers and Utilities Can Partner June 2006 Pima County Wastewater Management Located in Southern Arizona Population Approaching 1 Million 3,300 Miles of Conveyance System

More information

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins

More information

Potential Public Private Partnership Projects. Miami-Dade Water and Sewer Department

Potential Public Private Partnership Projects. Miami-Dade Water and Sewer Department Potential Public Private Partnership Projects Miami-Dade Water and Sewer Department www.miamidade.gov/water Who We Are Number of People Served by Our Utility Each Day 2.3 Million Residential Monthly Rates

More information

Rehoboth Beach Commissioners Meeting Ocean Outfall & Treatment Plant Project Update July 26, Jeff Sturdevant Principal Kelvin George Principal

Rehoboth Beach Commissioners Meeting Ocean Outfall & Treatment Plant Project Update July 26, Jeff Sturdevant Principal Kelvin George Principal Rehoboth Beach Commissioners Meeting Ocean Outfall & Treatment Plant Project Update July 26, 2017 Jeff Sturdevant Principal Kelvin George Principal Rehoboth Beach Ocean Outfall/CIP Project(s) Update Agenda

More information

Partnership Funding for Water Reuse Revenue for Municipalities, Insurance for Industry

Partnership Funding for Water Reuse Revenue for Municipalities, Insurance for Industry Partnership Funding for Water Reuse Revenue for Municipalities, Insurance for Industry Jonathan Sandhu, P.E. Texas WateReuse 2016 Overview Industrial Water Demand and Economic Analysis Municipal Effluent

More information

SEACOAST UTILITY AUTHORITY ANNUAL ENGINEER S REPORT ON THE PHYSICAL CONDITION OF THE SYSTEM

SEACOAST UTILITY AUTHORITY ANNUAL ENGINEER S REPORT ON THE PHYSICAL CONDITION OF THE SYSTEM SEACOAST UTILITY AUTHORITY ANNUAL ENGINEER S REPORT ON THE PHYSICAL CONDITION OF THE SYSTEM Fiscal Year 2010 2011 Prepared By: SEACOAST UTILITY AUTHORITY ANNUAL ENGINEER S REPORT ON THE PHYSICAL CONDITION

More information

Pima County Regional Optimization Master Plan

Pima County Regional Optimization Master Plan Pima County Regional Optimization Master Plan Proposed extent of screen enclosure Existing and Expanded Ina Road WPCF Approximately 160 acres Sports Park Michael Gritzuk, P.E., Director Edward Curley,

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION : : : : : : : : : : : : : : : DIRECT TESTIMONY MICHAEL J. GUNTRUM, P.E.

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION : : : : : : : : : : : : : : : DIRECT TESTIMONY MICHAEL J. GUNTRUM, P.E. BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION Application of Pennsylvania-American Water Company for (1) approval of the transfer, by sale, of substantially all of the Borough of New Cumberland s assets,

More information

Orange County Utilities ANNUAL BIOSOLIDS REPORT

Orange County Utilities ANNUAL BIOSOLIDS REPORT Orange County Utilities 2011 ANNUAL BIOSOLIDS REPORT Introduction Orange County Utilities (OCU) provides water, wastewater, and solid waste services to the unincorporated areas of Orange County, Florida.

More information

Ocean Outfall Legislation Compliance

Ocean Outfall Legislation Compliance Ocean Outfall Legislation Compliance City of Hollywood Department of Public Utilities LARGE USER MEETING October 2, 2008 1 Agenda Regulatory Review Baseline Establishment Nutrient Reduction Options Reuse

More information

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION 1.1 Introduction The GWA provides wastewater services for Guam s general population and for Andersen Air Force Base. The wastewater system is made up of seven

More information

Riverside Water Quality Control Plant. Riverside, CA LOCATION: MBR MANUFACTURER: COMMENTS:

Riverside Water Quality Control Plant. Riverside, CA LOCATION: MBR MANUFACTURER: COMMENTS: FACILITY: Riverside Water Quality Control Plant LOCATION: Riverside, CA GEO. AREA: Southern California STATUS 07/14: Under Construction CONSTRUCTION: ENGINEERING: MBR MANUFACTURER: GE OPERATED BY: Self-Operated

More information

Recommendations for Changes to the Requirements of Section (9), Florida Statutes - Domestic Wastewater Ocean Outfalls

Recommendations for Changes to the Requirements of Section (9), Florida Statutes - Domestic Wastewater Ocean Outfalls Recommendations for Changes to the Requirements of Section 403.086(9), Florida Statutes - Domestic Wastewater Ocean Outfalls Division of Water Resource Management Department of Environmental Protection

More information

Presentation Outline

Presentation Outline Presentation Outline Nitrification/denitrification refresher Treatment technologies available for nitrification and BNR/ENR What is the problem? BNR/ENR VPDES permitting Causes of reduced BNR performance

More information

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration ROLE OF OTHERS For the design focus of the project, key partners included:»» Mortenson Construction, Contractor»» Jacobs, Contract Plant Operator»» Portland Engineering and Controls, I&C The City of The

More information

Membrane Thickening Aerobic Digestion Processes

Membrane Thickening Aerobic Digestion Processes Membrane Thickening Aerobic Digestion Processes 2013 NESOWEA Operator Seminar Bryen Woo, PE Membrane Thickening Digestion Aerobic digestion process using a Flat Sheet Membrane Unit Ideal for: Facilities

More information

Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013

Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013 Wastewater Treatment Plant Facility Plan Update City Project #11-013 City of Liberty, Missouri May 6, 2013 Background 2 HDR Begins Feasibility Study to Evaluate Construction of a New Wastewater Treatment

More information

Operation & Maintenance of the Delphos MBR WWTP. Presenters: Scott Ellsworth, P.E. Keith Radick Floyd Browne Group Kim Riddell City of Delphos WWTP

Operation & Maintenance of the Delphos MBR WWTP. Presenters: Scott Ellsworth, P.E. Keith Radick Floyd Browne Group Kim Riddell City of Delphos WWTP Operation & Maintenance of the Delphos MBR WWTP Presenters: Scott Ellsworth, P.E. Keith Radick Floyd Browne Group Kim Riddell City of Delphos WWTP Background Background Previous & Existing Facilities Trickling

More information

Florida Power & Light Reclaimed Water Opportunities. AIF Water Forum Orlando, FL October 5, 2018

Florida Power & Light Reclaimed Water Opportunities. AIF Water Forum Orlando, FL October 5, 2018 Florida Power & Light Reclaimed Water Opportunities AIF Water Forum Orlando, FL October 5, 2018 Agenda Water Use at FPL Facilities FPL Experience with Reclaimed Water Changing Water Landscape in Miami-Dade

More information

MEMORANDUM. DATE: December 12, Steve Joseph, P.E. J. Philip Cooke, P.E. Monique Durand, P.E. Wastewater Flow Projections

MEMORANDUM. DATE: December 12, Steve Joseph, P.E. J. Philip Cooke, P.E. Monique Durand, P.E. Wastewater Flow Projections 4000 Hollywood Boulevard Seventh Floor, North Tower Hollywood, Florida 33021 (954) 987-0066 Fax: (954) 987-2949 MEMORANDUM DATE: December 12, 2012 TO: FROM: PROJECT: Steve Joseph, P.E. J. Philip Cooke,

More information

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS: FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:

More information

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors:

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors: CHAPTER 5 Project Alternatives 5.1 Introduction The purpose of the alternatives analysis in an environmental impact report (EIR) is to describe a range of reasonable alternatives to the project that could

More information

Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties. September 13, 2018

Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties. September 13, 2018 Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties September 13, 2018 Agenda Opening remarks Eileen White, Director of Wastewater

More information

Peace River Manasota Regional Water Supply Authority

Peace River Manasota Regional Water Supply Authority Technical Memorandum Date: July 1, 2014 To: From: RE: Peace River Manasota Regional Water Supply Authority Atkins Team Task 4 - Existing Source Water Facilities Inventory 4.1 Introduction The Peace River

More information

Reverse-osmosis membranes were

Reverse-osmosis membranes were Benefits and Limitations of Utilizing A Raw-Water Blend Stream to Meet Production and Quality Goals at a Membrane Facility James E. Christopher Reverse-osmosis membranes were initially applied to the removal

More information

WRF Webcast Integrated Treatment Process Management for Drinking Water and Wastewater Treatment Operations

WRF Webcast Integrated Treatment Process Management for Drinking Water and Wastewater Treatment Operations No part of this presentation may be copied, reproduced, or otherwise utilized without permission. WRF Webcast Integrated Treatment Process Management for Drinking Water and Wastewater Treatment Operations

More information

Florida s Diverse Use of Class I injection Wells

Florida s Diverse Use of Class I injection Wells Florida s Diverse Use of Class I injection Wells Presented to: GWPC 2013 Underground Injection Control Conference Sarasota, Florida January 23, 2013 Presented by: Mark B. McNeal P.G. Tampa, Florida 1 Injection

More information

Historical Background

Historical Background Company Profile Historical Background Established in 1975 producing hydraulic power equipment for steel industry Steel industry requirements: High reliability level High quality products Long life products

More information

TO: Public Works Commission FROM: Robyn Mattison, Jim Pardy, and Shawn Wilson DATE: June 30, 2017 RE: Water Renewal Fund Capital Projects

TO: Public Works Commission FROM: Robyn Mattison, Jim Pardy, and Shawn Wilson DATE: June 30, 2017 RE: Water Renewal Fund Capital Projects TO: Public Works Commission FROM: Robyn Mattison, Jim Pardy, and Shawn Wilson DATE: June 30, 2017 RE: Water Renewal Fund Capital Projects MAJOR PROJECTS, INITIATIVES, CURENT ISSUES Clean Water: Major Projects

More information

Joint Water Purification ProjectColorado's First Planned Indirect. Potable Reuse

Joint Water Purification ProjectColorado's First Planned Indirect. Potable Reuse Joint Water Purification ProjectColorado's First Planned Indirect Potable Reuse April 25, 2013 California WATEREUSE Central Valley Sierra Foothills Project Overview Joint venture with two owners: Arapahoe

More information

Potable Reuse as an Alternative Water Supply. AWRA Conference Orlando, FL

Potable Reuse as an Alternative Water Supply. AWRA Conference Orlando, FL Potable Reuse as an Alternative Water Supply AWRA Conference Orlando, FL Who We Are New Port Richey Tampa St. Petersburg 100 percent groundwater pumped from 13 wellfields Tampa Bay Water History Integrated,

More information

DRAFT Master Water Reclamation Plan. City Council Meeting March 28, 2017

DRAFT Master Water Reclamation Plan. City Council Meeting March 28, 2017 DRAFT Master Water Reclamation Plan City Council Meeting March 28, 2017 Presentation Overview Tonight s Overall Goals Acknowledge Input City has Received Reminder: Where We are in the Process Present the

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

Learning Wastewater Treatment

Learning Wastewater Treatment Learning Wastewater Treatment The Northeast Ohio Regional Sewer District encourages all employees to learn about its core service, the collection, treatment and disposal of wastewater. Employees can increase

More information

INTEROFFICE MEMORANDUM

INTEROFFICE MEMORANDUM INTEROFFICE MEMORANDUM DATE: February 3, 2011 TO: Public Works Commission FROM: Heather Mink, Support Systems Manager SUBJECT: FY 2012 and 2013 CIP and Equipment Budget Recommendations ISSUE The attached

More information

Charlotte County Utilities 2007 Review/2008 Outlook

Charlotte County Utilities 2007 Review/2008 Outlook Charlotte County Utilities 2007 Review/2008 Outlook Presented to the Board of County Commissioners January 22, 2008 1 Utilities Mission Statement To provide products and services of uncompromising value

More information

CONCEPTUAL WASTEWATER TREATMENT ALTERNATIVES TECHNICAL MEMORANDUM. Cost Estimates... 3

CONCEPTUAL WASTEWATER TREATMENT ALTERNATIVES TECHNICAL MEMORANDUM. Cost Estimates... 3 Technical Memorandum Date: To: Prepared by: Reviewed by: Project: Subject: Rick Koon District Manager Phone: (805) 995-3290 Cayucos Sanitary District 200 Ash Avenue Cayucos, CA 93403 Dylan Wade, P.E.,

More information

Minnesota Pollution Control Agency

Minnesota Pollution Control Agency Minnesota Pollution Control Agency STATE OF MINNESOTA Minnesota Pollution Control Agency MUNICIPAL DIVISION PUBLIC NOTICE OF INTENT TO REISSUE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/ STATE

More information

A LEADING PROVIDER OF WATER RESOURCE CONSTRUCTION, MANAGEMENT, DRILLING, AND UTILITIES SOLUTIONS. FLDrilling.com

A LEADING PROVIDER OF WATER RESOURCE CONSTRUCTION, MANAGEMENT, DRILLING, AND UTILITIES SOLUTIONS. FLDrilling.com A LEADING PROVIDER OF WATER RESOURCE CONSTRUCTION, MANAGEMENT, DRILLING, AND UTILITIES SOLUTIONS FLDrilling.com 2019 A Growing Company Contents Company Highlights Company Overview Introduction to Management

More information

Miami-Dade Water & Sewer Department. Miami-Dade Water and Sewer Department 1

Miami-Dade Water & Sewer Department. Miami-Dade Water and Sewer Department  1 Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department www.miamidade.gov/water 1 Miami-Dade Water and Sewer Department (WASD) Largest Water & Sewer Utility in the Southeastern United

More information

GALVESTON COUNTY MUD 12 SUMMARY OF OPERATIONS - GENERAL FUND 31-Aug MONTHS YTD REVENUES: WATER AND SEWER AND LATE FEES 1,284,332

GALVESTON COUNTY MUD 12 SUMMARY OF OPERATIONS - GENERAL FUND 31-Aug MONTHS YTD REVENUES: WATER AND SEWER AND LATE FEES 1,284,332 31-Aug-18 11 MONTHS YTD WATER AND SEWER AND LATE FEES 1,284,332 M & O TAXES 468,968 OTHER REVENUES 24,575 INTEREST REVENUE 8,975 TOTAL REVENUES 1,786,850 WATER OPERATIONS 271,035 SEWER OPERATIONS 349,622

More information

Sewer Division of Public Works

Sewer Division of Public Works SEWER DIVISION OF PUBLIC WORKS The mission of the Sewer Division is to provide customers with high quality, cost effective, sanitary sewer services by collecting and treating all wastewater generated from

More information

Virginia Walsh, PhD, P.G. Ed Rectenwald, P.G. February 25, 2016

Virginia Walsh, PhD, P.G. Ed Rectenwald, P.G. February 25, 2016 Miami-Dade Water & Sewer Department Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida Virginia Walsh, PhD, P.G. Ed Rectenwald, P.G. February 25, 2016 Miami-Dade Water

More information

Integrating Design & Construction Ann Arbor Wastewater Treatment Plant Facilities Renovations Project

Integrating Design & Construction Ann Arbor Wastewater Treatment Plant Facilities Renovations Project Integrating Design & Construction Ann Arbor Wastewater Treatment Plant Facilities Renovations Project Presenters: Earl J. Kenzie, P.E. Ann Arbor Chris Englert, P.E. Englert Engin. Thomas Porter ARCADIS

More information

WASTEWATER TREATMENT MASTER PLAN SUPPLEMENT EXECUTIVE SUMMARY

WASTEWATER TREATMENT MASTER PLAN SUPPLEMENT EXECUTIVE SUMMARY City of Modesto Wastewater Treatment Master Plan Jennings Road Secondary Treatment Facility WASTEWATER TREATMENT MASTER PLAN SUPPLEMENT EXECUTIVE SUMMARY DRAFT June 2008 2700 YGNACIO VALLEY ROAD, SUITE

More information

Wastewater Treatment. Where does wastewater go when it leaves your house?

Wastewater Treatment. Where does wastewater go when it leaves your house? Wastewater Treatment Where does wastewater go when it leaves your house? Let s s take a look The process includes: Collection of wastewater Primary Treatment Secondary Treatment Solids Handling Influent

More information

Water Advisory Board. May 10, 2016

Water Advisory Board. May 10, 2016 Water Advisory Board May 10, 2016 Background on potable reuse implementation and technology Indirect potable reuse (IPR) Other Water Sources Environmental Buffer Water Treatment Drinking Water Wastewater

More information

Summary of Florida s Indirect Potable Reuse Regulations Part V

Summary of Florida s Indirect Potable Reuse Regulations Part V Summary of Florida s Indirect Potable Reuse Regulations 62-610 Part V David Ammerman, Carollo Engineers, Inc. Jeff Greenwell, Hillsborough County MARCH 16, 2018 Florida Administrative Code Chapters Chapter

More information

Massachusetts Water Resources Authority. Water and Wastewater System. Briefing to WSCAC and WAC

Massachusetts Water Resources Authority. Water and Wastewater System. Briefing to WSCAC and WAC Massachusetts Water Resources Authority 2013 MWRA Master Plan Water and Wastewater System Briefing to WSCAC and WAC November 19, 2013 Presentation Outline Introduction Water System Wastewater System 2

More information

Managing the Risk of Embracing Disruptive Technology

Managing the Risk of Embracing Disruptive Technology Managing the Risk of Embracing Disruptive Technology Julian Sandino PhD, PE, BCEE, IWA & WEF Fellow May 2016 Wastewater management evolution through time < 1900 1950 2000 Basic Sanitation Pollution Control

More information

TAHOE TRUCKEE SANITATION AGENCY WASTEWATER TREATMENT INQUIRY

TAHOE TRUCKEE SANITATION AGENCY WASTEWATER TREATMENT INQUIRY TAHOE TRUCKEE SANITATION AGENCY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year,

More information

MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT

MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT SUBMITTED BY: TREATMENT FACILITY: NPDES #: MUNICIPALITY: COUNTY: CONTACT PERSON: Responsible Official Title Telephone #: Fax #: Email Address:

More information

Polishing Ponds. Biosolids Storage. Ammonia Removal. Digesters. Thickeners. Pretreatment. Final Clarifiers. Primary Clarifiers.

Polishing Ponds. Biosolids Storage. Ammonia Removal. Digesters. Thickeners. Pretreatment. Final Clarifiers. Primary Clarifiers. Wastewater Treatment Facility (2012) Polishing Ponds Biosolids Storage Ammonia Removal Digesters Thickeners Pretreatment Primary Clarifiers Activated Sludge Final Clarifiers OVERVIEW Whenever a home, business,

More information

CERTIFICATION PROPOSAL

CERTIFICATION PROPOSAL WASTEWATER TREATMENT PLANT IMPROVEMENTS Revised: May 11, 2015 WASTEWATER TREATMENT PLANT IMPROVEMENTS INDEX EXECUTIVE SUMMARY 2 1. ELIGIBILITY 4 2. CERTIFICATION CRITERIA 2.1 Technical Criteria 2.1.1.

More information

Teamwork-Engineering and Operations Working Together for Reliable Treatment Facilities. November 13, 2017

Teamwork-Engineering and Operations Working Together for Reliable Treatment Facilities. November 13, 2017 Teamwork-Engineering and Operations Working Together for Reliable Treatment Facilities November 13, 2017 Agenda Charlotte Water Overview Focus on Rehabilitation/O&M Getting Started ROSG Benefits Successes

More information

Chapter 4 TMACOG Areawide Water Quality Management 208 Plan 4-116

Chapter 4 TMACOG Areawide Water Quality Management 208 Plan 4-116 Fremont Facility Planning Area Designated Management Agency Responsibilities: Fremont: Owns and operates the wastewater treatment plant, and sanitary sewers within its corporate limits. Sandusky Township

More information

Ocean Outfall Rule Compliance. Piloting Alternative Technologies for Recharge of the Floridan Aquifer. July 8, PD-Sw202w

Ocean Outfall Rule Compliance. Piloting Alternative Technologies for Recharge of the Floridan Aquifer. July 8, PD-Sw202w Ocean Outfall Rule Compliance Piloting Alternative Technologies for Recharge of the Floridan Aquifer July 8, 2014 1 Outfall rule mandates are significant Reduce outfall nutrients by December 31, 2018 Eliminate

More information

Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant

Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant Massachusetts Water Resources Authority Presentation to MWRA Board of Directors Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant March 12, 2014 On-Site Thermal/Power Plant Built in

More information

Watertown Wastewater Facility Plan. August 11, 2015

Watertown Wastewater Facility Plan. August 11, 2015 Watertown Wastewater Facility Plan August 11, 2015 Watertown Wastewater Wastewater Treatment Facility History Comprehensive Planning Wastewater Concerns Capacity Condition Permitting Requirements Watertown

More information

RENNIA ENGINEERING DESIGN, PLLC CIVIL ENVIRONMENTAL STRUCTURAL. Report. Conceptual Wastewater Facility Plan. Olivet Center.

RENNIA ENGINEERING DESIGN, PLLC CIVIL ENVIRONMENTAL STRUCTURAL. Report. Conceptual Wastewater Facility Plan. Olivet Center. Report Conceptual Wastewater Facility Plan Olivet Center Town of Dover, NY APPLICANT: Olivet Management LLC 73 Wheeler Road Wingdale, NY 12594 LOCATION: NYS Route 22 and Wheeler Road Wingdale, NY 12594

More information

Zero Liquid Discharge for Water Remediation. Bill Berzins, M.A.Sc. P.Eng.

Zero Liquid Discharge for Water Remediation. Bill Berzins, M.A.Sc. P.Eng. Zero Liquid Discharge for Water Remediation Bill Berzins, M.A.Sc. P.Eng. Zero Liquid Discharge Strategy Technology Selection Case Studies Recommendations Project Portfolio: Design-Build-Operate-Transfer

More information

Eco-efficient Solids Separation Using Salsnes Filter Technology. Jonathan Leech Trojan Technologies Nov 2013

Eco-efficient Solids Separation Using Salsnes Filter Technology. Jonathan Leech Trojan Technologies Nov 2013 Eco-efficient Solids Separation Using Salsnes Filter Technology Jonathan Leech Trojan Technologies Nov 2013 Outline Process Description Technology Overview Primary Filtration Applications Full-scale application:

More information

2013 WASTEWATER PROJECTS

2013 WASTEWATER PROJECTS WASTEWATER PROJECTS 1 PROJECT NAME TABLE 1b - Wastewater Projects PROJECT STATUS SUMMARY UP PROJECT NUMBER PROJECT PHASE April 2013 PERCENT COMPLETION Ocean Outfall Rule Change (Pilot) 10-9086 Design 50%

More information

The Unexpected Consequences of Water Conservation on Water Reuse Facilities

The Unexpected Consequences of Water Conservation on Water Reuse Facilities The Unexpected Consequences of Water Conservation on Water Reuse Facilities Linda Sawyer Linda Sawyer 925.210.2536 LSawyer@brwncald.com WateReuse Northern California December 8, 2017 Water Conservation

More information

INTEROFFICE MEMORANDUM

INTEROFFICE MEMORANDUM INTEROFFICE MEMORANDUM Date: Dec 3, 2015 To: Boise Public Works Commission From: Paul Zimmerman, Matt Hightree, and Jim Pardy Subject: Directors Report - Sewer Goal: Develop and implement a long-term wastewater

More information

West Hernando County Sewer Master Plan SECTION 7.0 RECLAIMED WATER

West Hernando County Sewer Master Plan SECTION 7.0 RECLAIMED WATER SECTION 7.0 RECLAIMED WATER 7.1 Introduction The use of highly treated wastewater effluent, or reclaimed water, has expanded greatly in Florida over the past several decades. In particular, the use of

More information

Recovery & Concentrate Management

Recovery & Concentrate Management WRRC 2011 Annual Conference, Yuma AZ April 26 th & 27th Recovery & Concentrate Management A Quick Look at Three Local Projects Guy W. Carpenter, PE Vice President, Water Supply & Reuse How do we make use

More information

Water Recycling Facility Project

Water Recycling Facility Project Water Recycling Facility May 15, 2006 How did we get here? December 2002 City facing $8,000,000 fines from the Regional Water Quality Control Board (RWQCB) for Wastewater Discharge Violations. Existing

More information

Stormwater Infrastructure Rehabilitation Program (SWIRP) Florida Stormwater Association. Excellence Awards for Stormwater Programs and Projects

Stormwater Infrastructure Rehabilitation Program (SWIRP) Florida Stormwater Association. Excellence Awards for Stormwater Programs and Projects Stormwater Infrastructure Rehabilitation Program (SWIRP) Florida Stormwater Association Excellence Awards for Stormwater Programs and Projects February 2013 Part I NOMINATION FORM See attached. Part II

More information

Abstract. Creative Contracting Strategy Delivers Utah's Newest Biosolids Cogen Facility Using Progressive Design-Build

Abstract. Creative Contracting Strategy Delivers Utah's Newest Biosolids Cogen Facility Using Progressive Design-Build Conference: Design-Build for Water/Wastewater Conference 2016 Paper/Presentation Title: Creative Contracting Strategy Delivers Utah's Newest Biosolids Cogen Facility Using Progressive Design-Build Authors:

More information

Lombardo Associates, Inc. Representative Project Descriptions

Lombardo Associates, Inc. Representative Project Descriptions Lombardo Associates, Inc. Representative Project Descriptions Municipal & Private Wastewater Applications Mayo, MD Town of Woodstock, NY Town of Mashpee, MA Los Osos, San Luis Obispo, CA Little Neck- Ipswich,

More information

Built to Last Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA September 30, 2014

Built to Last Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA September 30, 2014 87 th Annual WEFTEC Conference Built to Last Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA September 30, 2014 Dan Bunce, P.E., PMP and Victoria Pilko, PMP Orange County Sanitation District

More information