1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR JATILUHUR IRRIGATION MANAGEMENT AND IMPROVEMENT (JIMI) FOR THE REHABILITATION OF SUB- SYSTEMS OF BARUGBUG Cs, PAWELUTAN Cs AND SALAMDARMA KIRI Cs. - Content - 1. Background Location Scope of Works for 3 Sub-Systems in the 1st year Program Construction Equipment Assessment Condition Summary Climate Air Quality and Noise Topographic Characteristics and Regional Geology Hydrology and Water Quality Flora and Fauna Spatial Plan Socio Economic and Culture, Public Health Potential Impacts Pre-construction Stage Construction Stage Recruitment and Mobilization of Labor Equipment Mobilization Excavation of Sediment Disposal Area Chance Find Procedures After Construction Stage (O&M Stage) Plan Monitoring Plan Reporting and Capacity Building Integration of EMP into the project Public Consultation Meeting (PCM) i

2 ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR JATILUHUR IRRIGATION MANAGEMENT AND IMPROVEMENT (JIMI) FOR THE REHABILITATION OF SUB- SYSTEMS OF BARUGBUG Cs, PAWELUTAN Cs AND SALAMDARMA KIRI Cs. 1. Background. Development of Jatiluhur Irrigation Project started in year 1925 by construction of Walahar weir including the irrigation system called North Tarum Canal (NTC) with km length of canals and irrigated 85,945 ha paddy field. In year 1965 it was followed by construction Curug weir located 8 km just upstream of Walahar weir, completed with irrigation system. The irrigation system from Curug weir divided into 2 (two) parts, for the left side called West Tarum Canal (WTC) with km of canal length to irrigate 56,628 ha of paddy field and for the right side called East Tarum Canal (ETC) with km of canal length to irrigate 90,230 ha paddy field. The total irrigation area of Jatiluhur is 232,803 ha. This area spread over 4 (four) districts in West Java Province; they are Purwakarta District, Karawang District, Subang District and Indramayu District. Beside for irrigation purpose, the Jatiluhur System also functions as water supply for Domestic, Municipal and Industrial (DMI) for the people and company along or around the canal and for Jakarta drinking water. Citarum river is the longest river in West Java Province with 270 km of length with abundant water. At the upstream portion of river, the Government constructed 3 (three) dams. The first dam located at the upstream of Curug weir is called Juanda Dam as a multi-purpose dam for hydro-electric plant (PLTA) and regulator water for Jatiluhur Irrigation System. The capacity of Juanda dam is 3 billion m³. More upstream there are Cirata dam and Saguling dam having functions as a hydro-electric plant (PLTA). Water supply for Jatiluhur Irrigation system is controlled and regulated by Juanda dam, firstly water use for electric power station, and then water flowing to downstream through Citarum river. At the Curug weir, the water pumped by hydraulic pump to the left irrigation canal WTC with capacity of 85 m³/sec, and by electric pump to the right irrigation canal ETC with capacity of 84 m³/sec. The excessive water flows to the downstream of Citarum River and at the Walahar weir is diverted to irrigation canal of NTC with capacity of 102 m³/sec. In line with the rapid development in various sector, the water requirement for domestic, municipal and industrial sectors also increase. The existence of Jatiluhur Irrigation Canals becomes more important. But on the behind, after operated more than 45 years, the capacity of canals has been reduced continuously. The main factor reducing the conveyance capacity of the canals is the sediment flowing with irrigation water and settled in the canals. For example, the capacity of ETC is now only 62.5 m³/sec, this is 1

3 only 75% of designed capacity of 84 m³/sec. Due to reducing capacity, the conflict of using water becomes more serious. In order to solve the problem of water supply at the Jatiluhur Irrigation System, the Government of Republic Indonesia, through Department of Public Works, Balai Besar Wilayah Sungai Citarum (BBWSC) plans to improve the irrigation system by implementing Water Resources and Irrigation Sector Program (WISMP-2) Stage 2, especially in West Java Province named Jatiluhur Irrigation Improvement (JIMI) Loan 4711-IND. According to Loan Agreement, the improvement work should be executed in accordance with environmental requirement. 2. Location. The Assessment was carried out for the 3 (three) Sub-Systems of Jatiluhur irrigation system, such as Barugbug Cs, Pawelutan Cs, and Salamdarma Kiri Cs, which administratively locate at Subang district, West Java Province. SS Pawelutan Cs and SS Salamdarma Kiri locate at the Binong Sub-District and SS Barugbug Cs locate at Jatisari Sub-District. Location of sub-systems can be seen in Figure 1 attached. 3. Scope of Works for 3 Sub-Systems in the 1 st year Program Scope of work for Improvement of Jatiluhur Irrigation System are divided into several packages. For the first stage planned in year , the rehab works for the 3 Sub- Systems in East Tarum Canal (ETC) will be implemented with the details as below: 1. SS. Pawelutan Cs for area of 3,592 ha, consists of 30,876 m canal long with the excavation work of 183,578 m3, improvement of embankment for 136,718 m3, canal lining for km with 9,988 m³ of stone masonry and rehabilitation of 81 nos of structures. 2. SS. Barugbug Cs for area of 2,901 ha, with the irrigation canal of 15,791 m long, the excavation work of 18,484 m3 and improvement of embankment for 32,487 m3, canal lining for km with 12,176 m³ of stone masonry and rehabilitation of 27 nos of structures. 3. SS. Salamdarma Kiri Cs for area of 2,922 ha, with the irrigation canal of 16,437 m long, the excavation work of 39,366 m3 and improvement of embankment for 29,782 m3, canal lining for km with 21,733 m³ of stone masonry and rehabilitation of 22 nos of structures. For more clear, the scope and quantity of the work can be seen in Table 1 attached. 4. Construction Equipment. The Construction Period is planned for 18 months. For the execution of rehabilitation works as above will be used several kinds of the equipment consisting of bulldozer, excavator, vibrator roller, watertank truck, dump truck, concrete mixer and concrete vibrator. The required number of such equipment can be seen in Table 2 attached. 2

4 5. Assessment. For the environmental assessment for Improvement of Jatiluhur Irrigation system, various surveys were executed at the field covering area within East Tarum and North Tarum Irrigation System. The surveys consist of: 1) Physical-chemical survey - Air Quality and Noise - Water Quality - Sediment Content. 2) Biological Survey - Flora and Fauna - Biota Aquatic 3) Social, Economic and Culture - Demography - Social Economy - Cultural - Community Health - Community Response and Involvement 6. Condition Summary 6.1. Climate A. Meteorological Station There are many meteorological stations in the Jatiluhur irrigation area. About 100 rainfall stations operated by PJT-II and one meteorological station by Balai Besar Penelitian Tanaman Padi Sukamandi (BBPTP Sukamandi) are located in the Jatiluhur irrigation area. The location of the main stations is shown in the below Figure. The BBPTP Sukamandi has been measuring several climate data such as rainfall, evaporation, relative humidity, sunshine hours and wind velocity. The period of BBPTP Sukamandi data is from 1991~2009 (19 years) and the period of rainfall data of PJT-II is from 1988~2009 (21 years). <Location map of meteorological stations> 3

5 Rainfall (mm/semimonth) B. Climate Table below demonstrates several climatic features in the Jatiluhur irrigation area. The Jatiluhur irrigation area is characterized with high temperature and longer sunshine length with lower rainfall depth. The climate of the area is affected by the sea more over the mountain. <Climatic features in the project area> Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Avg Temperature ( ) Relative Humid (%) Sunshine (hr/day) Wind Speed (m/s) C. Rainfall The climate of the Jatiluhur irrigation area is characterized by two distinct seasons: rainy season and dry season. The rainy season occurs during the months of November to April, while the dry season occurs during the remaining months. February is the wettest month, while August is the driest month. The semi-monthly distribution of rainfall in the Jatiluhur irrigation area is shown in the following figure. The average annual rainfall is 1,453 mm. Almost 83% of annual rainfall occurs during the rainy season May Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec <Semi-monthly Rainfall> 6.2. Air Quality and Noise A. Ambient Air Quality Ambient air quality sampling was taken in 4 locations where population density is high enough and near to the project site as well. The locations are Walahar village (Karawang), Tanah Timbul village SS. Lamaya Timur (Karawang), Lampeni village SS. Kamurang (Subang), dan Karang Baru village SS. Sukra, Indramayu. 4

6 Measurement of air pollutant was made to the gas nitrogen dioxide (NO2), sulfur dioxide (SO2), carbon monoxide (CO), hydrogen sulfide (H2S), total suspended particular (TSP), and Plumbum (Pb). The results of the measurements show that in general all the parameters meet the required quality standard. <Ambient Air Quality Analyses> Result No Parameter Unit Method Nitrogen Dioxide (NO2) Sulphur (SO2) Dioxide Carbon Monoxide (CO) Hydrogen Sulfide (H2S) Total Suspended Solid 6 Plumbum (Pb) μg/nm3 per 1 Jam μg/nm3 per 1 Jam μg/nm3 per 1 Jam μg/nm3 per 1 Jam μg/nm3 per 24 Jam μg/nm3 per 24 Jam Grietz Saltzman(SNI ) Grietz Saltzman(SNI ) Standard 19,74 18,89 15,45 30, ,93 tt tt tt 900 Iodine Pentoxide(WHO) Methylene Blue(WHO) tt tt tt tt 0,02**) Gravimetry(SNI ) Gravimetry(SNI ) 7 Noise db(a) SNI ,5 121,5 230 tt tt tt 0, Remark : * ) Law of Government No. 41 Year 1999, Concerning Air Pollution Operation ** ) Ministry Decree No. Kep 50/MENLH/11/1996, concerning Odor Level Standard *** ) Ministry Decree No. Kep 48/MENLH/11/1996, concerning Noise Level Standard for Settlement Area tt = Not detected ***) B. Noise Noise level at 4 sampling locations ranged from 48 dba to 80 dba as shown in the table above. The highest noise level is at SS. Sukra, Karang Baru Village, Indramayu District ranging between dba and lowest noise is at SS. Kamurang, Lampeni Village, Subang District ranging between dba. The highest level of noise at SS. Sukra, Karang Baru Village, Indramayu District is because of heavy transportation there. When compared with the noise level standard based on Ministry Decree No. Kep 48/MENLH/11/1996, the allowed noise level standard for a settlement is 55 dba. Results of measurement at 4 locations in the study area indicates that noise exceeds the noise level standard Topographic Characteristics and Regional Geology A. Topographic Characteristics The principal features of the Citarum River basin with the Jatiluhur irrigation area are some hilly areas which almost cover the entire lowland and plain area. The Jatiluhur Irrigation area can be geomorphologic divided into two types of landforms: a) Hilly areas mainly located along the upstream area from Jatiluhur weir and partially scattered on the lowlands, consist of gentle slopes and plateaus and have an altitude of 10 to 150 meters, mostly below 100 meters. The plain area is 5

7 Discharge (m 3 /s) Discharge Volume (MCM) between 0 and 10 meters in height and mostly below 1.5 meters. In addition, hills are covered scarcely with plantation and agriculture production area. b) Lowland and plain, below 10 meters in altitude, comprise the main fish-pounding and paddies area. The length of North Tarum Canal (NTC) and East Tarum Canal (ETC) are approximately km. The canal originates from the Curug Diversion Weir and Walahar Diversion Weir. B. Regional Geology The bedrock area of investigation was distributed on the ETC, NTC and upstream of curug weir consists of Tertiary sedimentary (mainly conglomeratic and tuffaceous sandstone) and Subang formation. The bedrock is exposed mainly on hilly and covered locally by Pliocene Beach ridge deposits. Quaternary alluvial deposits widely overlie the bedrock, especially on the lowlands Hydrology and Water Quality A. Jatiluhur Dam The Jatiluhur dam is the first multi-purpose dam in Indonesia and the primary water source of Jatiluhur irrigation system. The total catchment area of Jatiluhur dam is 4,550km 2 and inflow from the Citarum River is regulated by two dams located on the upstream of Jatiluhur. According to the previous studies, average annual discharge from Jatiluhur was 5,806MCM during the period of (BCEOM, 1990) and 5,787MCM during the period of (ICWRMP, Nippon Koei, 2005). Based on the recent discharge data from PJT II, annual discharge from Jatiluhur during is 5,344MCM or 169.4m 3 /s. Maximum and minimum discharges are 7,314MCM in 1993 and 3,945MCM in Monthly Discharge Distribution ( ) Average 169.4m 3 /s 8,000 7,000 6,000 Annual Discharge at Jatiluhur ( ) 150 5,000 4, ,000 2,000 1,000 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 <Discharge from Jatiluhur> Water availabilities of the Jatiluhur estimated in previous study are 186.6m 3 /s or 5,885MCM with 80% dependability (JWRMP, NEDECO, 1998) and 152.2m 3 /s or 4,871MCM with 90% dependability (ICWRMP, Nippon Koei, 2006). The recent annual discharge is median value of these two estimations. When estimating dependable discharge using the recent 16-year discharge data, 80% dependable discharge is 4,448MCM and 90% dependable discharge is 4,048MCM. If the data 6

8 series in the past were included, the dependable discharge would be increased. This implies the reduction of water availability in Jatiluhur. Jatiluhur is operated as a cascade system with Saguling and Cirata based on the equal sharing concept which balances on the percentage of each dam s effective storage against total effective storage of three dams. This operational system regulates the most part of inflow and outflow of Jatiluhur dam and makes better of water resources in upper Citarum river basin. Stored excess water along one year at upper two dams can be released to the downstream in the following year for interannual regulation. Regarding water supply capacity of Jatiluhur, 5,344MCM of annual discharge during the period was accepted as water availability in normal year. B. Intercepted Rivers Within the Jatiluhur system, there are 9 weirs interacting with Tarum canals, namely Curug, Bekasi, Cikarang, Cibeet, Barugbug, Jengkol, Macan, Gadung and Salamdarma. Water captured at these weirs is irrigated to about 240,000ha of farmland and supplied to nearby area for DMI water. Weirs in western part (Bekasi, Cikarang and Cibeet) are directly connected to WTC and provide supplementary water. Weirs in eastern part (Barugbug, Jengkol, Macan, Gadung and Salamdarma) are intersected with ETC and receive supplementary water from ETC during the dry period. NTC has no intersected rivers. In Jatiluhur area, runoff records at each weir site have been measured since 1971 by PJT II. 39 years of semimonthly runoff data is available except Macan (37years) and Gadung (38years). However, the total runoff volume in rivers cannot be utilized for Jatiluhur area because of seasonal variations of runoff and water demand, location of intake weirs and capacity of intake facilities. Annual Discharge Volumes (in MCM) WTC Region River Weir Avg. 5-year (80%) Bekasi Bekasi ETC Region River Weir Avg. Cilamaya + Ciherang 5-year (80%) Barugbug Cikarang Karang Cijengkol Jengkol Cibeet Beet Ciasem Macan Cigadung Gadung Cipunegara Salamdarma ,031 Total 2,219 1,212 Total 3,440 1,946 C. Water Quality Result of water quality at 2 (two) locations, one is in Cilamaya River which supply water to Barugbug weir and the other is in Ciasem River which supply to Macan Weir and Pawelutan weir can be seen in Table 5 below : 7

9 Table 5: Water Quality at Cilamaya and Ciasem Rivers. Location No Parameter Unit S. S. Cilamaya Ciasem Standard 1 Dissolved Solid mg/l Suspended Solid mg/l ph mg/l BOD mg/l COD mg/l DO mg/l Nitrite mg/l 0.47 < Nitrate mg/l Oil and greese ug/l Detergent ug/l Note: Standard base on Indonesian Regulation No. 82 Year 2001 concerning and Pollution of Water Quality for Class IV The result of water quality regarding parameter of suspended solid at Cilamaya River is 498 mg /L and BOD is 22 mg / L. This high parameter are likely because of the heavy rainfall at the upstream of Cilamaya river. Generally, the parameters which have been measured at the Cilamaya River and Ciasem River have fulfilled the requirements based on Indonesian Regulation No. 82 Year Flora and Fauna Typology of land in JIMI study area can be divided into 4 (four) typologies; there are paddy field, yards, agroforrestry and shrub typologies. The 3 sub sytems are not located in any protected areas such as protection forest, tourism forest and preserve forest areas as regulated by the Indonesian law and regulations regarding protection areas. However, the Presidential Decree. No 32/1990 states that the belt of the river is the area along both sides of the river, including the artificial river / canal / primary irrigation canal has important benefits to maintain the sustainability of river function, are protection areas and needs to be protected. Flora and fauna found in the study area for every typology can be explained as follows: A. Flora. a. Paddy field Typology Most of JIMI area has a typology of Paddy field. The paddy fields consists of irrigated paddy field, rainfed, and swamp. Irrigated paddy field is subdivided into technical irrigation, semi-technical and simple irrigation paddy field. In some areas, such as Pawelutan, Subang district, on the small dike in rice field, the farmers cultivate several kinds of cash crops but small amounts. b. Yards Typology Yards typology is found around the houses in the residential areas. Based on field survey and inventory there are 30 kinds of flora found in the project area. Mostly 8

10 are fruit trees, like Breadfruit (Artocarpus communis), Jackfruit (Artocarpus Integra), Mango (Mangifera indica) and Guava (Psidium guajava). c. Agroforrestry Typology Agroforrestry typology is the area cultivated with mixed vegetation consisting of trees as a perenial crops (annual) and vegetable or plants that live only one year or one season. There are 50 kinds of flora in the study area with majority of woodproducing plants dominated by Jengjen (Albizzia falcataria) and Formis (Acacia auriculiformis). d. Shrub Shrub typology in study area consists 32 kinds of flora, majority of shrub species like kirinyuh (Eupathorium odoratum), kaliandra (Calliandra sp.), and Cucuk garut (Mimosa invisa). The various kinds of flora found in the study area, more specifically, found along the irrigation canals, are not categorized as protected flora. B. Fauna. The collected fauna data is an inventory of terrestrial fauna species in each typology of land as above. Observed terrestrial fauna consists of four classes of animals, namely mammals, reptiles, amphibians, and birds. Based on primary survey and interviews with local people, the type of land mammals found in the study area are only two kinds, namely rice field rats (Rattus argentiventer) and brown rat (Rattus rattus). Class of reptiles found in the study area are Lacertilia (Lizards), Ophidia (Snakes), and Testudinata. Species of reptiles in the river banks or canals is a type of lizard (Varanus salvator). This species is a top predator from the class of reptiles that usually prey fish and other aquatic biota. Class Amphibians found in the study area is Anura (frog). Out of amphibians most abundant types in the study area is paddy field frog species (Fejervarya cancrivora). The diversity of birds was invetorized for every typologies of land as follow: a. Paddy field typology There are 25 kinds of fauna found in the project area. The most dominant species is the type of Java Scaly-breasted (Lonchura leucogastroides) and rabbit Swiftlet (Collocalia linchi). Both bird species are commonly found in the typology of paddy fields due to the paddy land provides an abundant food source. Seeds of rice became the main food source of the Scaly-breasted birds of Java and Peking Scaly-breasted (Lonchura punctulata). While various types of soil insects, and air insects, as a source of feed for birds Insectivora (insect eaters) such as rabbit Swiftlet (Collocalia linchi), Asian Kites (Hirundo rustica), and type of Zitting Cisticola (Cisticola juncidis). 9

11 b. Yard There are 8 kinds of fauna found in the project area. The most dominant species is the type of rabbit Swiftlet (Collocalia linchi), whereas the others are Burunggereja Erasia (Passer montananus), Scaly-breasted Java (Lonchura leucogastroides), Chili Java (Diaceum trochileum), and Burungmadu Sriganti (Nectarinia jugularis). Burunggereja Erasia (Passer montananus) is an adaptive type of settlement, because its source of food is human food scraps, and usually nest at the houses roof. c. Agroforrestry Agroforestry is the typical land for the most bird species, because it has a stratification of vegetation composition and complex compared with other land typology. There are 38 kinds of fauna found in the project area. The most dominant species is the type of rabbit Swiftlet (Collocalia linchi), where the dominating species is similar to the yards typology. The other dominant species are Scalybreasted Java (Lonchura leucogastroides), Burunggereja Erasia (Passer montananus), and Cucak Kutilang (Pycnonotus aurigaster). d. Shrub The Shrub has its own characteristics on the type of bird, although the dominant kind is similar to yards and agroforestry typology. There are 28 kinds of fauna found in the project area. Shrub typology has a special characteristic, which can not found in other typologies, such as reeds Coucal (Centropus bengalensis), Long-tailed Shrike (Lanius schach), and striped Gemak (Turnix suscitator). Fauna recorded in this survey, generally, live in the paddy field, yard, agroforrestry and shrub, and not in the irrigation canals. No protected fauna based on international and Indonesian wildlife protection regulations were found in the study area. C. Aquatic Biota Aquatic biota in the study area is divided into three groups as follows: plankton, benthos, dan nekton. a. Plankton Plankton can be divided into two groups, namely phytoplankton which is the plant microorganisms and zooplankton which is the animal microorganisms. In aquatic ecosystems, phytoplankton determines the productivity of aquatic plants. In addition, phytoplankton can also be used as indicators of aquatic environmental conditions change, for example, the entry of polluting substances into waters will have an impact on the quantities of phytoplankton as well as zooplankton. Based on the survey, in the study area was found as many as 19 species phytoplankton and 8 species of zooplankton. The most of phytoplankton population is Fragilaria sp. and Rhabdholaimus sp. for zooplankton. b. Benthos Benthos consists of stick biota, crawling or making a hole in the bottom of waters. Benthos is an important animal group which connects the energy transport and 10

12 benthic aquatic ecosystems. Composition and density of macrobenthos in the river is usually stable from year to year. Some communities respond to changes in habitat quality by adjusting the structure of their community. There are three conditions that cause changes in community structure, namely organic matter, changes in the substrate, and contamination by toxic chemicals. There are 6 species of benthos found in the project area. The most population of benthos are Macrobrachium sp. and Melanoides sp. c. Nekton In irrigation canals was identified 8 nekton or fish species. Fish which is often found is the kind of Snakeskin Gourami (Trichogaster pectoralis), betok (Anabas Testudineus) and keting (Arius caelatus). Species of fish in the irrigation canal is a type that is carried from the river or from the fish ponds, because some species of fish found similar to those found in stream headwaters Spatial Plan Inside JIMI land, most (over 80%) is agricultural area of paddy fields and only a small portion was developed as an aquaculture area. Yet in some areas of JIMI study area there are local protection area, in accordance with Presidential Decree. No 32/1990 which states that the belt of the river is the area along both sides of the river, including the artificial river / canal / primary irrigation canal, which has important benefits to maintain the sustainability of river function. Riverine criteria is as below: At least 100 meters on either side of major rivers and 50 meters on either side of the creek is outside the settlement. For the river in the form of riverine settlement area it is expected to build enough inspection road between meters. In addition to riverine areas, Cilamaya Wetan sub district is a forested coastal mangroves and tidal waves and flood-prone area, thus it is included in local conservation area boundary Socio Economic and Culture, Public Health A. Population Population by sex and sex ratio Based on data from the Central Statistics Agency the study area where the 3 sub systems exist is located into 2 (two) sub-districts, there are Jatisari and Binong Sub- District. Total population is 117,652 of people consisting of 59,084 male and 58,568 female, with 33,447 households. The Sex ratio is 101%. Population by Age Group 11

13 From the total population, the age with 40 years and over is the greatest number in the study area that is equal to 44,910 inhabitants or 38.17%. The age group from years has least in the study area that is equal to 6,458 inhabitants or 6.49%. Based on the results of interviews with respondents in the study area, who are the head of the family, the majority of respondents have aged between 41 and 50 years old, which were 31.48% of respondents. While respondents years age group is the least number with 1 respondent or 0.37% of the total 270 respondents. Population Density Population density in project area in the Jatisari Sub-District is people/ha, while in Binong Sub-district it is 9.04 people/ha. B. Social Economy Livelihood Livelihoods of the study area consists of agriculture, industry, trade, and other services. Total population by type of livelihoods in the study area is dominated by agriculture and trade. Based on survey data of 270 respondents from ten Sub districts, the majority of its population is living as farmworker (26.67%), entrepreneur (18.15%), construction workers (15.19%) and traders (12.96%), Farm owners (9.26%), farmers (7.04%), private employees (4.07%) PNS / TNI / Police (1.11%), Retired (1.11%), sugar cane plantation workers ( 0.74%) and others (3.70%). It can be seen in graphic below. Source : Primary Survey, 2010 Vulnerable population within the three sub-systems which are likely to be influenced by irrigation project is 50,556 peoples (42.97%) consists of owner farmer 9.26% (10,895 peoples), tenant farmer 7.04% (8,283 peoples) and farmworker 26.67%(31,378 peoples). Women group is 25,106 peoples. As for expectations and hopes of respondents it found that the majority of respondents, when the project start, they wish to participate in the project. It was 12

14 revealed that as many as 37.04% of the respondents (n = 270) want to work for the project while 29.63% of respondents suggest to use local labour. Population Economic Level Based on the results of interviews with residents in the study area of 270 respondents carried out in February 2010, income of respondents varies greatly, the majority of respondents (25.93%) has an average income of between Rp. 500,000 - Rp. 750,000 per month, while respondents with incomes of less than Rp. 250,000 per month equal to 25.19%. Most respondents had an average expenditure of between Rp. 500,000 - Rp. 750,000 per month that is counted 33.33% of the total respondents. Regional Economic Growth Regarding economic contribution by each sector in the districts of Purwakarta, Kawarang, Bekasi, Subang and Indramayu, the greatest contribution is from the agriculture sector and manufacturing sector and trade sector. The agricultural sector is supported by sub-sector of food crops and plantations. The industrial sector is supported by the sub-sectors of food, beverages and printing matter. Trade sub-sector is supported by the wholesale and retail trade. C. Cultural Based on data from the Central Statistic Agency, out of people living in the study area, majority have a religion of Islam (98.79%, 116,217 peoples), followed by Christian Protestant (0.52%, 612 peoples), Budhist (0.41%, 482 peoples), Catholic (0.28%, 329 peoples) and Hindu (0.01%, 12 peoples). Religious service buildings recorded are 99 mosques and 319 musolas while church, temple and vihara were not available in the study area. Mosque and musola are located in the residential areas and not found along the irrigation canals. No physical cultural resources such as archeological site were found in the study area. Cemeteries are located near to residential areas, relatively far from irrigation canals. D. Community Health Morbidity Based on data from sub district health centers Jatisarii, type of disease that is often suffered by residents is acute respiratory infection as much as 16,542 cases, followed by fever with 2,778 cases. Based on the interview and distributing questionnaires to the respondents, the disease often suffered by family members of respondents is Flu / Cough / Colds as many as 173 people infected (64.07%). Itching disease ranks number two of 34 patients (12.59%). Fever and Demam Bedarah ranks third with 31 people (11.48%) with most types of disease that are often suffered by family members of respondents. Health facilities and Infrastructure Basically the development in the health sector aims to provide health services easily, evenly, and cheap. One of the government's efforts in order to provide health services to the community is to provide health facilities especially health centers, because the facilities were able to reach all layers of society down to the 13

15 more remote areas. In the year 2008 in the Jatisari sub-district there are 2 health centers and 2 sub-health centers, since for Binong Sub-district there are also 2 health and 2 sub-health centers. Based on questionnaires and interviews with residents in the study area, most health facilities by the respondents were clinic as much as 89.26% of the total 270 respondents. The majority of respondents used Public Health Center facilities because of the distance to a location close enough and also the cost of treatment is cheap so affordable by all levels of society. Health Facilities Frequently Used by Respondents General Hospital 0.74% Policlinic 4.07% Others 0.37% Doctor 5.56% Puskesmas 89.26% Sanitation sanitation is one indicator that can be measured to determine the degree of public health. When sanitation conditions in one community is adequate, then the relative degree of public health will be better, and vice versa. From interviews with 270 respondents in the study area, data showed that the majority of respondents use dug wells / pumps as a source of clean water that is used for daily life as much as 61.48% of the total respondents, and the user of taps as a source of clean water as much as 18, 89% in the second. The respondents who have dumped waste into the trench toilets directly into the river reach as much as 57.41%, dumped into septic tengki as much as 31.11%, and others as much as 11.48%. For disposal of waste generated by households the majority of respondents burn household waste (65.93%) and dump directly into rivers (22.59%). Average waste generated per family is less than 2 kg of waste per day. It ranked first with 71.11%. E. Community Response and Involvement From interviews with respondents in the study area, it is noted that all respondents agreed with the plan of activities Jatiluhur Irrigation and Improvement (JIMI), with a reason to increase agricultural productivity and to overcome the problem of canal and sluice structures damaged. The sampling locations into the study area has a strong culture of Sundanese culture, and in some sub districts in the Karawang and Indramayu districts some residents 14

16 have mixed cultures of Sundanese and Javanese with the domination by the Javanese culture, because the area is bounded by the Central Java area mixing culturals that occur between the Javanese culture and Sundanese culture. Also, people in the study area is very dynamic, hardworking and friendly, and it can be seen at the time of the survey. The community welcomed with open every new person who comes into their area, especially when there are guests from the big city. Community Attitudes and perceptions of JIMI activity plan Based on the results of questionnaires and interviews with people in the study area, generally they are not aware of any planned activity. Only some people who knew about JIMI activity plan. The aspirations and expectations of respondents are as follows: Planned JIMI Benefits Based on the interview and distributed questionnaires to the respondents (n = 270) about JIMI activitiy plan in February 2010, approximately 66.30% of the respondents did not know the benefits and advantages of JIMI. While 74.81% of respondents gave their opinions that they agree with JIMI activity plan. The reason they agree is that JIMI activities can increase agricultural productivity and overcome problems that arise around the location of irrigation. And they hope to participate and to be employed in JIMI activity. Respondent opinions on JIMI Activity Plan Respondent expressly agrees to JIMI activity plan (74.81%); the community hopes to participate in project work (37.04%), and hope to give priority to local residents who can work on this project (29.63%); the project should be completed quickly and environmentally friendly (27.78%) and the rest of respondents expect to be trained as employees of the project (2.59%) and others (2.96%). Some community leaders and local officials expect the holding of socialization expecting any JIMI or media forum of communication between and the peoples of the community so that every complain or information to be conveyed to the implementators in order to be resolved. In addition, the majority of residents expect to be given priority to local residents in the recruitment of labor. Community Participation in Project Planning and Design Government policy calls for participatory irrigation management, whereby beneficiary participation is channeled and strengthened through organization of water user associations (WUAs, generally covering about ha and farmers), and the WUAs then are amalgamated into WUA federations (WUAFs). These organizations participate in all stages of management: planning, design, construction supervision, and operation and maintenance of completed works and sub-works. Based on the surveys carried out in early 2010 and participatory irrigation approach, community aspirations and concerns are channeled through WUAs located in the 3 subsystems during project planning and design. During walk 15

17 throughs of sub systems planning, communities located near the irrigation canals were consulted for their inputs including decision of subsystem technical designs. Formal consultations was carried out in December 16 and 17, 2010 to share results of project design for each sub systems (Pawelutan, Barugbug, and Salamdharma SSs) and Environment Plan (EMP). Results of such consultations was recorded and updated in this EMP. 7. Potential Impacts For the study and evaluation of potential environmental impact by the improvement of Jatiluhur Irrigation System, the Consultant assessed environmental and social impacts by dividing project implementation into 3 (three) stages, there are: 1. Pre- Construction Stage 2. Construction Stage, and 3. After Construction Stage (O&M) Pre-construction Stage During pre-construction period, the activities which will give impact on environment are: a. Survey, Investigation and Design (SID). It is very important to communicate the development plan with the peoples in the project area. Implementation of the project, starting from SID should be following the bottom-up process. Information and input from the farmers is very important especially in the rehabilitation project. Socialization of the project to the farmers will give a good feedback for successful development. From the survey with 270 respondents in the project area, majority (74.81%) of the respondents fully understand that improvement of Jatiluhur project will improve the quality of life of the farmers and they will give a support to the project. Using the participatory irrigation approach, communities within the proposed 3 sub systems were consulted to accommodate inputs during planning and design. b. Land Acquisition. Availability of land (space) for development of a project is a very important in the project activities. Since the scope of work for JIMI is rehabilitation or normalization of irrigation system, and the first priority is to re-function all the irrigation facility to meet the current requirement, there is no special land acquisitions required for irrigation purposes. The majority of work is removal of the sediment material deposited in canals from long time ago, and excavation to fit the original design dimension. Excavated material will be re-used to improve the canal embankment and inspection road as much as possible. The excessive excavated sediment material will be placed at the outside of canals. These areas belong to Perum Jasa Tirta II and no need of land acquisition. 16

18 7.2. Construction Stage. During construction stage, the activities which will have an impact on environment are as follows: Recruitment and Mobilization of Labor. a. Population Density. During the construction stage, there will be required labor or worker. The number of labor or worker are estimated at 665 peoples consisting of 364 un-skill labors and 301 peoples of skill labor. Un-skilled labor can be supplied from people which stay in the project area, meanwhile the skill labor will be supplied from outside and will be mobilized to project area. Mobilization of the skill labor predicts that there will be additional population in the project area and increase of population density. Compared to the numbers of population in the project area, considering the big sizes of area, the impact of population increase on the society is relatively very small. The skill labor of 301 peoples will stay in the base camp provided by the project located near to the working sites, so they will not give important impact to the residence area of local peoples. The labor required can be seen in Table 3 attached. b. Income Level. With the additional labor in the project area, it will increase additional income. By assuming the wage of un-skilled labor of Rp. 40,000/day, the increase of money circulation for one month with 364 labor will amount to be Rp. 364,000,000 ( Rp. 40,000.- x 25 day x 364 peoples). For 301 skilled labor, by assuming the wage of Rp. 2,000,000.-per month, the increase of money will amount to Rp. 602,000,000.- (Rp. 2,000,000.- x 301 people). The money will be used for daily life of labor and will give a positive impact. c. Job Opportunities. During construction, implementation of irrigation system in the study area, the impact will appear to the people such as tenant farmer and farm workers who have a direct influence due to decrease of farming works. The impact is the lost of source of income. To minimize or reduce the negative impact of the lost farming work opportunity can be done the followings. - Main construction activities to be scheduled during uncultivated period - Carry out construction of irrigation facilities without totally stoping delivery of water to the field. The required water at the field can be supplied even with intermitten ways. - Suggestion to the farmer to plant the crop with low requirement of water like palawija. With the project, there is a chance for the people in the project area to get the job out of agriculture work. Job opportunity in construction activities will increase and have a positive impact on the community, direct or in-direct way. With the availability of job, it will reduce the un-working people in the project area. 17

19 d. Business Opportunities. Labor mobilization activities will encourage for the creation of business opportunity in the project area. With arrival of 301 people outsite labor, it will bring opportunity for people in the project area to create some business to fulfill the requirement of the influxed labors, i.e.: transportation sector, lodging sector, food sector and etc. Women groups can utilize business oportunity in the food sector. e. Attitudes and perceptions of Community. Recruitment of labor for the project implementation will give some impacts on social environment. If majority of the labor working in the project area are supplied by local people, the impact will be small, otherwise it will give a relative high impact. Emphasis should be on socialization and information to the peoples in the project area about the quality and criteria of the labor for the project requirement. Even though the people in the project area agree and support the project implementation for the Jatiluhur Irrigation Project, continuous socialization and information should be carried out through out the construction stage Equipment Mobilization. There will be increase in mobilization of equipment due to execution of the project. Equipment required for project implementation as shown in Table 2. The type of equipments to be used are bulldozer, excavator, vibrator roller, watertank truck, dump truck, concrete mixer and concrete vibrator, and etc. a. Air and Noise Quality. As known from the results of ambient air quality measurements in the project area and its surroundings regarding the parameters of SO2, NO2, CO, H2S, TSP and pb, in general the concentration is still below the quality standard according to Government Regulation Number 41 Year 1999 on Ambient Air Pollution Control. There are 8 (eight) locations for this survey in the study area. In a total of 5 samplings cannot be identified H2S parameters, except for location no. 1 at Walahar Village 2.19 μg/nm3 per 1 hour, and 4 locations in SS Rawa Baru respectively 0, 58 μg/nm3 per 1 Hour. Based on the Decree of the Minister of Environment No. Kep 50/MENLH/11/1996, about Standard Level odor, H2S parameters of the three locations do not exceed the required quality standard (28 μg/nm3 per 1 hour). The parameter of pb, cannot be detected at 5 (five) locations, and at the others 3 (three) locations was detected very low and still below the standard level (detected 0.1 µg/nm³ per 24 hours in SS. Rawa Sentul, 0.15 µg/nm³ in SS. Rawa Baru and 0.13 µg/nm³ in SS. Kamurang, while the Standard Level according to Indonesian Government Regulation No. 41 year 1999 regarding the Controlling Air Pollution is 2 µg/nm³ per 24 hours). Meanwhile, the noise level in the project area and the surrounding was measured at 8 points of measurement location. From 8 point measurement location, the measured noise levels range from 48 dba to 80 dba, where the Standard Level maximum is 70 dba. The measured noise exceed the Standard Level located at SS. Rawa Sentul with value dba, at SS. Rawa Baru the value dba and at SS. Kamurang the value is dba. However these areas locate outside of the proposed sub-systems area. 18

20 Result of noise level at the Kampung Lampeni near the project area is 62.5 dba, which is below the standard level. The prediction noise level of equipments operated at the project site can be seen in table 4 below. No Table 4 : Noise Level Prediction on the Distance of Source. Equipment Type Noise (dba) Noise Prediction (meter) Bulldozer Excavator Compactor Dump truck Concrete mixer Vibrator Noise Level Standard for Resettlement based on Decree of No. Kep- 50/MENLH/XI/1996 is 55 dba b. Traffic. During the construction there will likely be 23 dump truck operating for sediment movement from work sites to disposal area which is proposed to be located outside of the canal along the canal. Based on observation in the field, the traffic density along the canal inspection road is low, and increasing dump truck mobilization will give a small impact. c. Attitudes and perceptions of Community. Mobilization of heavy equipment such as dump truck at the site will increase the risk of accident and give a negative impact. Even though, the people in the project area agree and support the project implementation of Jatiluhur Irrigation Project, special attention should be taken during operation of heavy equipment Excavation of Sediment. Dredging spoils transportation without proper care (not dewatered) can cause excessive spilling on roads. Odor from dredged anaerobic sediment is to be expected. Although the smell subsides within a few days of exposure to air, residents in the immediate vicinity of the dredging should be informed and assured that the foul smell is temporary. Disruptions to community daily activities to be expected. Contractor should be required to prepare spoil disposal and nuisance minimization plans and inform affected communities including duration of works. Contractor should also plan the works without need for cutting-off the downstream flow. Alternative source of water supply will be provided to communities along the canal that tap water from the stream or use it for washing /bathing purposes. 19

21 Sediment Contents Concentration in the sediment of a range of organic and heavy metal contaminants must be measured before dredging is started. The selection of the sediment contaminants to be checked should be based on an assessment of the surrounding land use and potential sources of contamination. There are no samples truly representing the three sub-systems, available sediment testing results were taken from ETC and NTC main canals. However, from long experiences it is known that the sediments from the canals of subsystems are not easy exploded, not easy burn, un-reactive, and do not cause infection and un-corrosive material. Excavated material can be directly placed at the disposal areas along the canal and will not give a negative impact Disposal Area. As explained in Point 6.1 above, all the excavated sediment will be placed at the outside of canals along the canals, where the space available from m wide, belongs to Perum Jasa Tirta II. Calculated from excavation quantity and the length of canal, the amount of excavated sediment is estimated at only 0,67 m³/m ((241, ,987)/63,105=0.67) along the canal. It is very small amount compared to the space available at the field. Disposal areas for the sediments removed from the canal will be properly sited so that these are not susceptible to washout or slumping. Possible beneficial uses of the material should be maximized, including use for topping of service road embankments. The area allocated for sediment disposal will be surrounded by protective embankment/bunds to prevent silt runoff into the surrounding areas. A security fence will be installed to prevent contact between farmers /residents and fresh sediments a. Landscape Disposal of excavated sediment is predicted to have an impact on the landscape along the canal alignments. Landscape will be changed after disposed of soils. To reduce the impact, the material should be placed with good treatment and shape, even the change of landscape is relatively neglectable. b. Terrestrial Flora Inspection Road Excavate Canal Free area m Along the disposal area proposed at the outside of canals, there are no trees at the site. Placing the excavated material can be done directly without any special preparation, and will have no impact. 20

22 c. Terrestrial Fauna There are not found protected fauna at disposal area along the canal. Placing the excavated material can be done directly without special preparation, and will have no impact. d. Diversity on Aquatic Biota Excavation sediment activity predicts decrease in the diversity of aquatic biota inside the canals as a result of taking large amounts of sediment. Population of aquatic biota may be disturbed especially the benthos. Sediment excavation activity will change the sediment substances, which may affect the overall aquatic biota community structure, species of benthos, nekton, and plankton. However, the impact can be neglected because the working area is inside of the canal where the aquatic biota is not so various. e. Attitudes and perceptions of community Based on the results of interviews with people in the study area (n = 270) regarding the implementation of improved management of irrigation systems, as much as 77.81% stated that they agree and strongly agree, while 1.48% stated not agree and the remaining stated they do not know. As much as 66.30% stated that they know the benefits of this project. f. Sanitation Since disposing activity along the canal is relatively far from the residential area (more than 100 m), it is predicted that there will not be the important impact from environmental sanitation point of view Chance Find Procedures If any person discovers a physical cultural resource during construction, such as (not limited to) archeological sites, hystorical sites, remains and objects, or a cemetery and/or individual graves during excavation or construction, the contractor shall follow the Chance Find procedures as follows: 1. Stop the construction activities in the area of the chance find; 2. Delineate the discovered site or area; 3. Secure the site to prevent any damage or loss of removable objects. In case of removable antiquities or sensitive remains, a night quard shall be arranged until the responsible local authorities take over; 4. Notify the Supervising Engineer who in turn will notify BBWSC and the responsible local authorities immediately (within 24 hours or less); 5. Responsible local authorities are in charge of protecting and preserving the site before deciding on subsequent appropriate procedures. This would require a preliminary evaluation of the findings to be performed by archeologists. The significance and importance of the findings should be assessed according to the various criteria relevant to cultural heritage; those include the aesthetic, historic, scientific or research, social and economic values; 6. Decisions on how to handle the finding shall be taken by the responsible authorities. This could include changes in the layout (such as when finding an irremovable remain of cultural or archeological importance) conservation, preservation, restoration and salvage; 21

23 7. Implementation for the authority decision concerning the management of the finding shall be communicated in writing by relevant local authorities; and 8. Construction works could resume only after permission is granted from the responsible local authorities concerning safeguard of the physical cultural resource After Construction Stage (O&M Stage). a. Irrigation Operation - Income Level Operations of irrigation system predict to generate a positive impact on community income levels around the location of the canals. The effects of improvement of irrigation canals will increase the water discharge in the canal; the farmer can cultivate their land according to proposed cropping pattern of two times rice cultivation a year. Another positive impact comes from improving infrastructure such as roads around the irrigation canals, so that the mobility of the population in and around the project area can utilize inspection road to travel to the work place or for other activities. Impacts cause to accelerate more active flow of agricultural commodities in the project area. - Attitudes and perceptions of community Operation of irrigation system has a positive impact on attitudes and perceptions of the community because of the availability of water for irrigation which in turn would spur economic development of the territory and increase of population. Improvement of the existing road infrastructure will also enhance the accommodative attitude of society towards the rehabilitation of irrigation canals. b. Irrigation Maintenance - Job Opportunities Irrigation maintenance will need labor. The existence of such maintenance can cause a positive impact on employment of people around the irrigation area. - Attitudes and perceptions of community Irrigation maintenance activities would require worker. Impact of these employment opportunities is development of positive attitudes and perceptions of residents who are involved, and social interaction in the form of cooperation. 8. Plan Potential Plan (EMP) for the rehabilitation of the Jatiluhur irrigation system can be seen in table Monitoring Plan Potential Monitoring Plan for the rehabilitation of the Jatiluhur irrigation system can be seen in table 7. 22

24 10. Reporting and Capacity Building To ensure that the environmental and social management and monitoring is effectively undertaken it will need resources which understand the requirements and are skilled in meeting techniques and procedure for the project. This will include: Environment management implementer. Environment Monitoring Implementer. Report Writing Technique for environment management and monitoring Understanding organizational management. <Flow Chart of Implementation Coordination for and Monitoring> BALAI BESAR WILAYAH SUNGAI CITARUM PERUM JASA TIRTA JIMI PROJECT BPLHD West Java Province CONTRACTOR IMPLEMENTER PROJECT IMPLEMENTER Board (BPLH) of Districts Impacts - on environmental: - Impacts on air and noise quality - Impacts on water qulity and aquatic biota - Impacts on slope stability - Impacts on flora dan fauna - Impacts on social-economic and cultural - Impacts on public health MONITORING AND RECOMENDATION IMPLEMENTATION of EMP REPORTING 23

25 INSTANCE OF IMPLEMENTER INSTANCE OF CONTOLLER INSTANCE OF REPORT RECEIVER <Flow Chart of Work System with Implementation Reporting of and Monitoring> BPLHD West Java Province 1. BPLH Karawang District 1. BPLH Subang District 2. Balai Besar Wilayah Sungai Citarum 3. Perum Jasa Tirta 4. KRC Asosiasi Implementer Contractor Note : Flow Report Flow control Notes : Implementer contractor managed in construction stage activity of Jatiluhur irrigation canal rehabilitation while operational stage management by Perum Jasa Tirta (PJT). To provide these resources, capacity building through training is needed. Materials for this capacity building are: Understanding environmental management policies Understanding activity criteria as an impact source Understanding management techniques from impact sources Understanding key indicators with simple nature as standard of monitoring Understanding the monitoring methods, and determination of monitoring period and measurement in relation to decreases in environmental quality Data analyze techniques and interpretation Coordination or institutional cohesiveness between stakeholders Writing technique and report management of UKL/UPL The estimated cost for this training and capacity building is as follows: 1. Provincial Level: Rp 120,000,000 (one time) 2. District and subdistrict level: Rp. 300,000,000.- (2 districts x 2 times x Rp 75,000,000) 24

26 11. Integration of EMP into the project Compilation of UKL-UPL/EMP is one of the permit requirements to be undertaken for an activity as the basis of environmental feasibility. feasibility means that the work plan and planned activity will consider their impacts to the environment. Negative impact will be minimized or eliminated while positive impact will be optimized. The purpose of environmental management and monitoring is technically not just assuring the environmental components but also protecting project interest because it could minimize negative impact to the environment from the project whether biophysical or social. As an example, unmanaged project management could have an impact on dam preservation, as well as the community around the activity location if the aspects and impacts associated with the project are not identified and mitigated against. This EMP will be treated as one of the mandatory requirements for bidding and contractor documents. From the legal policy aspect, the implementation of UKL-UPL/EMP shows conformance with the environmental management policy stipulated by the laws and also project protection if any environmental issues occur in the future. From the integration aspect, management policy has an extremely interactional correlation on project management. 12. Public Consultation Meeting (PCM) Public Consultation Meeting (PCM) was carried out December 16, 2010 in Jatimulya village office for SS Salam Darma Kiri Cs and SS Pawelutan Cs, and December 17, 2010 in Seksi Sukamandi Office of PJT II for SS Barugbug Cs. (Details: attachment 1,2 & 3) Material presented and discussed in PCM are as follows: a. Rehabilitation Design for three sub systems,m b. Operation and Maintenance for ETC and NTC of Jatiluhur, and c. Plan (EMP). Result of PCM are as floows: 1. Rehabilitation Design by JIMI Consultant already confirmed with farmer proposal and input during walk-through and could be well accepted. 2. Farmer through WUA/WUAF will participate in operation and maintenance of the irrigation system according to regulation available. 3. Prior to main construction works implementation, construction activities should be started with a pra-construction Public Consultation Meeting in order to reach the real target of development according to plan. 4. WUA/WUAFs are proposed to be involved in supervision for the construction work for good quality of work according to technical specipication. 5. From the environment point of view, the farmers agree to and understand about: 25

27 a. Using heavy equipment during construction. b. Disposal the material excavated along the outer side of canal. c. Farmer full understands that during construction of irrigation system, the impact will appear to the peoples/farmers due to decrease of farming works, distributing of water to the field will be disturbed. d. Farmer wants to minimize or reduce the negative impacts with; i) Main construction activities to be scheduled during uncultivated period (during maintenance period); ii) Delivering the irrigation water to the field with intermittent ways; iii) Using cofferdam to protect the special work. 26

28 27

29 Table 1 : Scope and Quantity of Works Description Area ( Ha ) Length (m) Canal Normalization Excavation (m³) Embankment (m³) Canal Lining (stone masonry) Length (m) Volume (m³) Total Structures Rehabilition of Gates SS. Pawelutan Cs 3,592 30, , ,718 8,803 9, SS. Barugbug Cs 2,901 15,791 18,484 32,487 6,087 12, SS. Salam Darma Kiri Cs 2,922 16,437 39,366 29,782 9,418 21, Total 9,415 63, , ,987 24,308 43,

30 Buldozer type HP Excavator HP Vibrator Roller 5-8 ton Water tank 5000 lt Dump truck Concrete Mixer Concerte Vibrator Table 2 : LIST OF EQUIPMENT Quantity equipment to be used ( set ) NO Discription of Work Volume Estimate time (month) Remark 1 SS. Pawelutan Cs a.stripping 27, b.common Soil 183, c.earthfill 136, d.concrete e.stone Masonry 9, f.inpection Road 28, Sub Total SS. Barugbug Cs a.stripping 7, b.common Soil 18, c.earthfill 32, d.concrete e.stone Masonry 12, f.inpection Road 20, Sub Total

31 3 Package 5 : SS. Salam Darma Kiri Cs a.stripping 7, b.common Soil 39, c.earthfill 29, d.concrete e.stone Masonry 21, f.inpection Road 6, Sub Total TOTAL

32 Operator Ass. Operator Foreman Skill Labour Sub Total Table 3 : LIST OF LABOR Man Power/ day Skill Labor NO Discription of Work Volume ( cu.m ) Un- Skilled labor TOTAL Remark 1 SS. Pawelutan Cs a.stripping 27, b.common Soil excavation 183, c.earthfill 136, d.concrete e.stone Masonry 9, f.inpection Road 28, Sub-Total SS. Barugbug Cs a.stripping 7, b.common Soil excavation 18, c.earthfill 32, d.concrete e.stone Masonry 12, f.inpection Road 20, Sub-Total

33 3 SS. Salam Darma Kiri Cs a.stripping 7, b.common Soil excavation 39, c.earthfill 29, d.concrete e.stone Masonry 21, f.inpection Road 6, Sub-Total TOTAL

34 No Impact Source Important Impact Type I. CONSTRUCTION STAGE 1. Recruitment and Mobilisation of Labor Income level Job and Business opportunities Attitudes and Perceptions of community Table 6. Matrix of Plan, Implementation Schedule and Cost Estimation Impact Measuring Income rate of residents in study area before activity and minimum wage of Karawang, Subang, and Purwakarta districts Number of unemployed in study areas Attitudes and perceptions of community before activity Purpose of Plan To maximize the using level of local labor to work on projects, so it can reduce the number of unemployed. Plan Guidelines Socialization in Labor reception involve participative Society figure, Village and sub district government. In labor recruitment cooperate with related agencies which employ the appropriate local labor with expertise and competent as many as possible. Provide opportunities for the people trying to live around the project Location of SS Barugbug, SS Pawelutan, SS Salam Darma Kiri Period Period of procurement and mobilization of labor Cost of environmental management Announcement on village and 2 districts = Rp. 2,000,000,- (2 times x 2 village x Rp ,-) Institution Implementer Controller Reporting Assigned Contractor by BBWS Citarum Balai Besar Wilayah Sungai Citarum (BBWS) Perum Jasa Tirta -2 - Board of Karawang, Subang Districts - Regional Board of west Java Province 2. Equipment Mobilization Air and Noise Quality Increasement of traffic volume and damage of road facilities PP RI No 41,1999 about air pollution control Kep Men LH No. KEP- 48/MENLH/XI/1996 about noise level The road condition before equipment and construction materials mobilization To reduce the air pollution noise To prevents damages to rural roads that are used for mobilization Using equipment that still meets the requirements by Department of Transportation. Operate sprinkler car Using a closed truck. Set the frequency of traffic. Conducting socialization to the nearby community about the route, duration and impact of activities. Improving the roads condition after mobilizing equipment as soon as possible. Coordinating with local governments on the route Speed control of vehicles, with max speed 30 Km/hour. Along the road used by materials vehicles to project site especially in around the resident area. Period of mobilizing equipments and materials Traffic Controller = Rp ,- (2 person x 7 days x Rp ,-) Cost for Maintenance of existing rural roads included in contract price. Assigned Contractor by BBWS Citarum Balai Besar Wilayah Sungai Citarum (BBWS) Perum Jasa Tirta=2 - Board of Karawang, subang Districts - Regional Board of west Java Province 3. Sediment Excavation /Dredging Content of sediment Water quality Odor Community perception and disturbance Decree BAPEDAL No 04/BAPEDAL/09/ 1995 about Requirements on Procedures, Results Processing, Processing and Terms Location of Former Landfill Site Waste Used B3. To know the content of the sediment from the dredging. To reduce the possibility of decrease of conveyance Dredging spoils must be dewatered before moving to allow the foul smell to subside and so that these are dry enough to be transported to the spoil banks without excessive spilling on roads. SS Barugbug, SS Pawelutan, SS Salam Darma Kiri Period of sediment excavation Sediment Analyses Rp. 27,000,000,- ( 3 samples x 3 points x Rp. 3,000,000,- ) Water Analyses Assigned Contractor by BBWS Citarum Balai Besar Wilayah Sungai Citarum (BBWS) Perum Jasa Tirta-2 - Board of Karawang, Subang Districts - 33

35 No Impact Source Important Impact Type Impact Measuring Purpose of Plan Plan Guidelines Location of Period Cost of environmental management Institution Implementer Controller Reporting Regional Board of west Java Province PP RI No. 82, 2001 about and Water Pollution Control capacity of canals. Use dredging spoils as resource. Coarse sediments could be used as base material for improving inspection roads in the irrigation service areas. Odor from dredged anaerobic sediment is to be expected. Although the smell subsides within a few days of exposure to air, residents in the immediate vicinity of the dredging should be informed and assured that the foul smell is temporary. Contractor plan shall include measures to minimize nuisance to nearby communities. Contractor will also be responsible for notifying communities of temporary nuisance to be expected, and for providing adequate signs and detours in the work areas. Affected communities should be informed of the disruptions to be expected and their duration, and contractor should be required to prepare spoil disposal and nuisance minimization plans. Contractor should also plan the works without need for cuttingoff the downstream flow. Alternative source of water supply should be provided to communities along the canal that tap water from the stream or use it for washing /bathing purposes Rp.22,500,000,- (3 samples x 3 points x Rp. 2,500,000,-) TCLP test Rp.31,500,000,- (3 samples x 3 points x Rp. 3,500,000,-) Provide sediment screen: Rp. 450,000,000.- (3 SS each Rp. 150,000,000.-) 34

36 No Impact Source Important Impact Type Impact Measuring Purpose of Plan Plan Guidelines Concentration in the sediment of a range of organic and heavy metal contaminants must be measured before dredging is started. The selection of the sediment contaminants to be checked should be based on an assessment of the surrounding land use and potential sources of contamination. Performing solidification test, when these sediments contain heavy metals and exceed quality standards Performing interim storage and final disposal in accordance with the Minister of State for Environment Office and BPLHD West Java Province recommendations Building a pool for effluent water until there is no effluent water from sediment. Installation of a screen in the site to reduce sedimentation and turbidity in the river Implement measures to minimize effect of disruption due to dredging and road construction works and impact on any communities affected by restricting the current open access to the canal. Require contractor to prepare spoil and other debris disposal plan and to post bond to ensure compliance. Location of Period Cost of environmental management Institution Implementer Controller Reporting 35

37 No Impact Source Important Impact Type Impact Measuring Purpose of Plan Plan Guidelines Require also to include in plan various measures to minimize nuisance to nearby communities. The contractor should plan works without need for cutting-off the downstream flow. Location of Period Cost of environmental management Institution Implementer Controller Reporting 4. Disposal Area Flora terrestrial Fauna terrestrial Biota aquatic Attitudes and perceptions of community about environmental sanitation Decrease in diversity of vegetation and land area before the project. Biota abundance level of water before construction Frequency of public complaints due to turbid waters To prevent the decrease of biodiversity in the study area. To reduce the decrease in the diversity of biota and the aquatic ecosystem stability. To increase accommodative attitude of society to plan the project activities. To prevent the unconvinience that could create social conflict. Disposal areas for the sediments removed from the canal should be properly sited so that these are not susceptible to washout or slumping. Possible beneficial uses of the material should be maximized, including use for topping of service road embankments. The area allocated for sediment disposal should be surrounded by protective embankment/bunds to prevent silt runoff into the surrounding areas. To reduce the impact, the excavated material should be placed with good treatment and shape, even the change of landscape is relatively neglectable. Planned disposal area Period of construction Social surveys Rp. 6,000,000,- ( 2 district x Rp. 3,000,000,-) Treatment cost of disposal material in outside canals included in contract cost Assigned Contractor by BBWS Citarum Balai Besar Wilayah Sungai Citarum (BBWS) Perum Jasa Tiirta - Board of Karawang District - Board of Subang District - Regional Board of west Java Province II OPERATIONAL STAGE 5. Irrigation Operation Income level Attitudes and perceptions of community Level of population income before operating canal Attitudes and perceptions of the public before the project Accommodative attitude of community to the canal operation To increase public participative attitude about preservation of canal Keep the fluency of operational activities To increase the economic growth Preventing throw of garbage into the irrigation canal Maintaining side of canal to reduce contamination Cordinating with relevant agencies and communities around the canal to maintain the canal Obeying the regulations relating to areas Along the canal Period of operating irrigation system Social surveys Rp. 6,000,000,- ( 2 district x Rp. 3,000,000,-) Perum Jasa Tirta-II (PJT-II) Balai Besar Wilayah Sungai Citarum (BBWS) - Board of Karawang, Subang Districts - Regional Board of west Java Province 36

38 No components Impact Source Table 7. Matrix of Monitoring Plan, Implementation Schedule, and Cost Estimation Parameter Purpose of Monitoring Collecting Method and Data Analysis Location of environmental Monitoring Time and Monitoring Frequency Cost of Monitoring Monitoring Institution Implementer Controller Reporting I. - CONSTRUCTIONS STAGE 1. Income Level Procurement and Labor mobilization 2. Job and Business opportunities Procurement and labor mobilization - Income level of residents in study area. - Type of livelihood in study area. - Total new business that resident make - Total local labor recruitment - To detect income level and economic growth in study area - To know total labor recruitment, - To make new business, - To manage effectively - Interview and secondary data. - Economic analysis comparing incomes before and after construction. - Interview and secondary data collection. - Descriptive data analysis and trend analysis. SS Barugbug, SS Pawelutan, SS Salam Darma Kiri SS Barugbug, SS Pawelutan, SS Salam Darma Kiri 1 (one) time before and after mobilization and procurement of labor. 1 (one) time before and after mobilization and procurement of labor. Social surveys Rp. 6,000,000,- ( 2 district x Rp. 3,000,000,-) Social surveys together with point 1 above,- Assigned Contractor by BBWS Citarum Assigned Contractor by BBWS Citarum - BBWS Citarum - Perum Jasa Tirta (PJT ) - Sub district and village institution in study area. - BBWS Citarum - Perum Jasa Tirta (PJT ) - Sub district and village institution in study area. - Board of Karawang, Subang Districts - Regional Board of west Java Province - Board of Karawang, Subang Districts - Regional Board of west Java Province 3. Attitudes and perceptions of community - Procurement and labour mobilization - Sediment dredging and disposal areas - Total local labor recruitment by project - Turbidity level of location in downstream caused by sediment dredging - Communities affected by rehabilitation works, including impact on households affected by limiting the open access to the canal (e.g., provision of alternate water source, toilet facilities) - Nuisance caused by rehabilitation works including noise, - To know income level of local resident working in project and turbidity level caused by dredging - To manage effectively - Collecting primary and secondary data. Primary data to be collected by interview with respondents. While secondary data to be collected from institutions such as village and sub district government. - Sampling water and analysis in laboratory, comparing the results with PP RI No. 82/2001 SS Barugbug, SS Pawelutan, SS Salam Darma Kiri 1 (one) time before and after activities. Social surveys together with point 1 above,- Assigned Contractor by BBWS Citarum - BBWS Citarum - Perum Jasa Tirta (PJT ) - Sub district and village institution in study area. - Board of Karawang, Subang Districts - Regional Board of west Java Province 37

39 No components Impact Source Parameter Purpose of Monitoring Collecting Method and Data Analysis Location of environmental Monitoring Time and Monitoring Frequency Cost of Monitoring Monitoring Institution Implementer Controller Reporting dust, traffic congestion on service roads 4. Air quality, noise and traffic Heavy equipment mobilization and construction materials - monitoring parameter; NO 2, CO, H 2S, SO 2, Pb and TSP - Damaged level of road caused by project especially transport route of construction materials and traffic volume. - To know increased gas pollutant and particular - To know damaged level of roads caused by mobilization of heavy equipment and construction material - To manage effectively - Collecting data by direct sampling air in field with chemistry reaction (absorbent) for analysis in laboratory, comparing the results with standard of PP RI No. 41/ Monitoring road condition by observation and interview with residents during mobilizing route of heavy equipment and construction material SS Barugbug, SS Pawelutan, SS Salam Darma Kiri monitoring to be conducted in construction stage every 6 (six) months Air and Noise Quality Rp. 22,500,000,- (3 points x 3 samples x Rp. 2,500,000,-) Assigned Contractor by BBWS Citarum - BBWS Citarum - Perum Jasa Tirta (PJT ) - Sub district and village institution in study area. - Board of Karawang, Subang Districts - Regional Board of west Java Province 5. Sediment Contents Sediment dredging and disposal area - Handling and disposal of sediment and vegetation debris removed from the canal, including safeguard provisions in bidding documents, contractor plans and compliance reports (SEE ESSF WISMP2) - To know heavy metal content in sediment - To manage effectively Sampling sediment ± ½ kg and analysis in laboratory, comparing the results with Kep 04/Bapedal/09/ 1995 SS Barugbug, SS Pawelutan, SS Salam Darma Kiri and monitoring to be conducted in construction stage every 6 (six) months Sediment Analyses = Rp. 27,000,000,- ( 3 samples x 3 points x Rp. 3,000,000,- ) Assigned Contractor by BBWS Citarum - BBWS Citarum - Perum Jasa Tirta (PJT ) - - Board of Karawang, Subang Districts - Regional Board of west Java Province - Presence of toxic contaminants in the dredged sediment 6. Water quality and Biota aquatic Sediment dredging and disposal area - Provision of adequate silt traps to prevent sediment dispersion downstream - - Water quality parameters monitored, physical and chemical - Type and population of plankton and benthos - To know changed level of water quality and to conduct effectiveness management - To know changed level of biota - Sampling of water and analysis in laboratory, comparing the results with PP RI No 82 Year Plankton: extraction of water sample by SS Barugbug, SS Pawelutan, SS Salam Darma Kiri monitoring to be conducted in construction stage every 6 (six) months Analyses Biota Aquatic (3 points x 3 Sample x Rp 1,500,000,-) = Rp.13,500,000, - Assigned Contractor by BBWS Citarum - BBWS Citarum - Perum Jasa Tirta (PJT ) - Board of Karawang, Subang Districts - 38

40 No components Impact Source Parameter Purpose of Monitoring Collecting Method and Data Analysis Location of environmental Monitoring Time and Monitoring Frequency Cost of Monitoring Monitoring Institution Implementer Controller Reporting Water turbidity - Canal discharge to monitor reduction of water flow caused by rehabilitation works - Adequacy of drainage for access/service road improvement works diversity - To manage effectively plankton-net, then analysis by diversity, abundance and domination index. - Benthos: extraction of sample by Eyckman dredge then analysis in laboratory - Nekton: interview with peoples around site and collect secondary data from institutions Regional Board of west Java Province 7. Flora and Fauna Terrestrial 8. Sanitation Sediment dredging and disposal area Sediment hoarding in disposal area II. OPERATIONAL STAGE 1. - Income level - Attitudes and perceptions of community Canal operation Type of vegetation around disposal site Complaining level of society caused by odor - Income level of residents in study area. - Type of livelihood of residents in study area. - To press decreasing of vegetation diversity - To prevent contamination caused by odor To know income level and economic growth in study area Monitoring by direct observation along the canal alignments Collect the data by sampling air in field with chemistry reaction (absorbent) for analysis in laboratory, comparing the results with standard of KepMen LH No KEP- 50/MENLH/11/ 1996 About smell level - Interview and secondary data collection. - Economic analysis comparing incomes before and after construction. SS Barugbug, SS Pawelutan, SS Salam Darma Kiri Planned disposal area SS Barugbug, SS Pawelutan, SS Salam Darma Kiri monitoring to be conducted in construction stage every 6 (six) months monitoring to be conducted in construction stage every 6 (six) months monitoring to be conducted in construction stage every 6 (six) months No special cost No special cost No special cost Assigned Contractor by BBWS Citarum Assigned Contractor by BBWS Citarum Perum Jasa Tirta II (PJT-II) - BBWS Citarum - Perum Jasa Tirta (PJT ) - BBWS Citarum - Perum Jasa Tirta (PJT ) - BBWS Citarum - Perum Jasa Tirta (PJT ) - Board of Karawang, Subang Districts - Regional Board of west Java Province - Board of Karawang, Subang Districts - Regional Board of west Java Province - Board of Karawang, Subang Districts - Regional Board of west Java Province 39

41 Attachment No. 1 NOTICE OF PCM (PUBLIC CONSULTATION MEETING) JATILUHUR IRRIGATION MANAGEMENT IMPROVEMENT (JIMI) IMPROVEMENT OF SS BARUGBUG Cs, SS. PAWELUTAN CS DAN SALAM DARMA KIRI CS Day : Thursday and Friday Date : 16 and 17 December 2010 Place : 1. Jatimulya village Office for SS Pawelutan Cs and SS Salam Darma Kiri Cs, Jl. Raya Pertamina Wates Compreng, Kec. Compreng, Kab. Subang 2. Office of Seksi Sukamandi PJT II for SS Barugbug Cs Jl. Purwadadi No. 21 Sukamandi, Kabupaten Subang Subject : Presentation and discussing Rehabilitation of SS Barugbug Cs, SS Pawelutan Cs dan SS Salam Darma Kiri Cs. I. IINTRUDUCTION The PCM was opened by Ir. Winskayati Sp.1 from BBWS Citarum as a meeting leader by explaining the purpose of this PCM. PCM (Public Consultation Meeting) is a part of JIMI (Jatiluhur Irrigation Improvement) consulting services by KRC (Korea Rural Community Corporation) Consultant. Speech was followed by Head of District Compreng Drs. H. Oong Saropi, and by Abu Syukur ST, Head of Technical Planning of PJT II. In PCM attends 74 participants for SS Pawelutan Cs, SS Salam Darma Kiri Cs and 66 participants for SS Barugbug Cs (see attendant list in attachment no 2 and photo documentation in attachment no. 3) from BBWS Citarum, PJT II, Local Government (consists of: District Police Department, Head of District, Head of villages, staff of Districts and villages), WUA/WUAF with farmers, and local NGO in area of SS Barugbug Cs, SS. Pawelutan Cs and SS. Salam Darma Kiri Cs. Purpose of PCM is to consult the result of rehabilitation design of SS Barugbug Cs, SS Pawelutan Cs and SS Salam Darma Kiri Cs and Environment Plan (EMP). II. PRESENTATION Presentation consists of 3 (three) sessions, they are: 1. Presentation of the result of Rehabilitation Design for SS. Pawelutan Cs and SS. Salam Darma Kiri Cs. by Ir. Chrisnen Purba M. Eng as a Co-Team Leader from KRC Consultant JIMI (Jatiluhur Irrigation Improvement). 2. Presentation of EMP ( Plan) by PT Inasa Sakha Kirana consultant. 3. Ppresentation of Operation and Maintenance for ETC and NTC Jatiluhur by Ir. Abdullah Syarif M.Eng as a O&M Specialist from KRC Consultant JIMI. III. COMMENT AND PROPOSED FROM MEETING In the meeting gets the agreement as follows: 1. Design Agreement 40

42 a. The structures broken should be rehabilitated and the broken gate should be replaced/repaired. b. In some place the embankment become small, it should be resized according to original condition with coordinating with PJT II. c. The canal lining are vproposed to the location of widening canal and in the residence area. d. Normalizations of canal should follow the proposed design. e. The broken measuring device should be rehabilitated according to previous condition. f. Proposal on Meeting building (saung meeting) in the field, by using PJT II land. g. Before construction started, a coordination meeting should be held with local government. h. Required the re-check of works (especially aqueduct) in order to confirm the actual condition before construction. All the propose and input from the farmers already are accommodated in rehabilitation design by JIMI Consultant, and farmers agreed for all proposes of design since the participative process of design were executed by walk-through and field discussions. 2. Environments Agreement a. Farmer agree and no objection in use of heavy equipment for construction of works. b. Disposing the excavation material along the outer side of canals. c. During construction there will be a disturbance of water delivery to the field, farmer fully understand and no objection. The negative impact should be minimized or reduced by scheduling the main work during maintenance period, or delivery of irrigation water with intermittent ways, or use cofferdam to protect the work activities. 3. O&M Agreement Municipals or farmers through WUA/WUAF agreed to involve in maintenance of irrigation facilities. IV. CLOSING After presentation and discussion in the meeting, all the participants got agreement and fully understood about improvement of SS Barugbug Cs, SS Pawelutan and SS. Salam Darma Kiri Cs, then the meeting was closed. Notice of PCM was prepared for improvement of design and also for implementation of guidance during construction stage for the success of works and signed by participant below. 41

43 42

44 43

45 Attachment No. 2 44

46 45

47 46

48 47

49 48

50 49

51 Attachment No. 3 Foto 1 : Lokasi PCM SS Salam Darma Kiri Cs dan SS Pawelutan Cs di Desa Jatimulya Kabupaten Subang tgl 16 Desember 2010 Foto 2 : Pelaksanaan PCM SS Salam Darma Kiri Cs dan SS Pawelutan Cs, Pembukaan oleh BBWSC Foto 3 : Team Penyaji Co-Team Leader dan O&M Engineer dari KRC, PT. Inasa Sakha Kirana konsultan EMP Foto 4 : Penyajian Materi Desain Rehabilitasi oleh Co-Team Leader KRC Foto 5 : Penyajian Materi O&P oleh O&P Specialist KRC Foto 6 : Penyajian Materi Remcana Pengelolaan Lingkungan oleh PT. Inasa Sakha Kirana Bandung 50

52 Foto 7 : Peserta PCM menyimak presesentasi dari para penyaji Foto 8 : Peserta PCM menyimak presesentasi dari para penyaji Foto 9 : Peserta PCM menyimak presesentasi dari para penyaji Foto 10 : Peserta PCM menyimak presesentasi dari para penyaji Foto 11 : Peserta PCM menyimak presesentasi dari para penyaji Foto 12 : Peserta PCM menyimak presesentasi dari para penyaji 51

53 Foto 13 : Peserta PCM menyimak presesentasi dari para penyaji Foto 14 : Pertanyaan dan Usulan dari Peserta PCM Foto 15 : Pertanyaan dan Usulan dari Peserta PCM Foto 16 : Pertanyaan dan Usulan dari Peserta PCM Foto 17 : Diskusi teknis detail pada gambar Peta Layout Jaringan Irigasi Foto 18 : Pertanyaan dan Usulan dari Peserta PCM 52

54 Foto 19 : Pertanyaan dan Usulan dari Peserta PCM Foto 20 : Pengarahan dari BBWSC Foto 21 : Penyaji memberikan jawaban atas pertanyaan peserta PCM Foto 22 : Penyaji memberikan jawaban atas pertanyaan peserta PCM 53

55 Foto 23 : Lokasi Pelaksanaan PCM SS Barugbug Cs di Kantor Seksi Sukamandi PJT II tanggal 17 Desember 2010 Foto 24 : Lokasi Pelaksanaan PCM SS Barugbug Cs di Kantor Seksi Sukamandi PJT II tanggal 17 Desember 2010 Foto 25 : Pelaksanaan PCM SS Barugbug Cs Foto 26 : Peserta mendengarkan dan menyimak presentasi PCM SS Barugbug Cs Foto 27 : Pelaksanaan PCM SS Barugbug Cs, Pembukaan oleh BBWSC Foto 28 : Pelaksanaan PCM SS Barugbug Cs, Pengarahan oleh BBWSC 54

56 Foto 29 : Penyajian materi Desain Rehabilitasi SS Barugbug Cs, oleh Co-Team Leader KRC Foto 30 : Penyajian materi masalah O&P yang disampaikan oleh Specialist O&P KRC Foto 31 : Penyajian materi Rencana Pengelolaan Lingkungan (EMP) SS Barugbug Cs, oleh PT. Inasa Sakha Kirana Bandung Foto 32 : Peserta PCM mendengarkan dan menyimak presentasi Foto 33 : Peserta PCM mendengarkan dan menyimak presentasi Foto 34 : Peserta PCM mendengarkan dan menyimak presentasi 55

57 Foto 35 : Peserta PCM mendengarkan dan menyimak presentasi Foto 36 : Peserta PCM mendengarkan dan menyimak presentasi dan diskusi Foto 37 : Peserta PCM mendengarkan dan menyimak presentasi Foto 38 : Pertanyaan dan usulan dari Peserta PCM Foto 39 : Peserta PCM mendengarkan dan menyimak presentasi Foto 40 : Peserta PCM mendengarkan dan menyimak presentasi 56

58 Foto 41 : Peserta PCM mendengarkan dan menyimak presentasi Foto 42 : Peserta PCM menyampaikan pertanyaan dan usulan Foto 43 : Peserta PCM menyampaikan pertanyaan dan usulan Foto 44 : Peserta PCM menyampaikan pertanyaan dan usulan Foto 45 : Peserta PCM menyampaikan pertanyaan dan usulan Foto 46 : Peserta PCM menyampaikan pertanyaan dan usulan 57

59 Foto 47 : Peserta menyimak penyampaikan materi PCM Foto 48 : Peserta PCM menyampaikan pertanyaan dan usulan Foto 49 : Peserta PCM menyampaikan pertanyaan dan usulan Foto 50 : Peserta PCM menyampaikan pertanyaan dan usulan Foto 51 : Peserta PCM menyampaikan pertanyaan dan usulan Foto 52 : Peserta PCM menyampaikan pertanyaan dan usulan 58

60 Foto 53 : Peserta PCM menyampaikan pertanyaan dan usulan Foto 54 : Wakil Peserta PCM menyetujui Berita Acara/Notulen Rapat dengan penandatanganan. Foto 55 : Wakil Peserta PCM menyetujui Berita Acara/Notulen Rapat dengan penandatanganan. Foto 56 : Wakil Peserta PCM menyetujui Berita Acara/Notulen Rapat dengan penandatanganan. Foto 57 : Wakil Peserta PCM menyetujui Berita Acara/Notulen Rapat dengan penandatanganan. Foto 58 : Wakil Peserta PCM menyetujui Berita Acara/Notulen Rapat dengan penandatanganan. 59

61 Foto 59 : Wakil Peserta PCM menyetujui Berita Acara/Notulen Rapat dengan penandatanganan. Foto 60 : Wakil Peserta PCM menyetujui Berita Acara/Notulen Rapat dengan penandatanganan. Foto 61 : Pemrakarsa BBWSC menyetujui Berita Acara/Notulen Rapat dengan penandatanganan. Foto 62 : Pemrakarsa BBWSC menyetujui Berita Acara/Notulen Rapat dengan penandatanganan. 60

INTEGRATED WATER RESOURCES MANAGEMENT IN CITARUM RIVER BASIN - INDONESIA

INTEGRATED WATER RESOURCES MANAGEMENT IN CITARUM RIVER BASIN - INDONESIA INTEGRATED WATER RESOURCES MANAGEMENT IN CITARUM RIVER BASIN - INDONESIA Presented by Reni Mayasari Jasa Tirta II Public Corporation - Indonesia 1. Introduction Water resources management for the Citarum

More information

EXPERIENCE IN MANAGING CITARUM RIVER BASIN

EXPERIENCE IN MANAGING CITARUM RIVER BASIN JASA TIRTA II PUBLIC CORPORATION EXPERIENCE IN MANAGING CITARUM RIVER BASIN Bangkok Chiang Mai, Thailand July 26 th August 6 th 2004 Integrated Waetr Resources Management (IWRM) Training Course ORIENTATION

More information

Member s Annual Report 2005

Member s Annual Report 2005 Member s Annual Report 2005 Date of preparation: 31 /July/2006 Name of the editor: Herman Idrus, Reni Mayasari, Tenti Utami, Ary Ramayansyah 1. About the organization (1) Name of the organization JASA

More information

Foreword. Jatiluhur, February 26 th, JASA TIRTA II PUBLIC CORPORATION President Director, Ir. Djendam Gurusinga, Dipl. HE NIK.

Foreword. Jatiluhur, February 26 th, JASA TIRTA II PUBLIC CORPORATION President Director, Ir. Djendam Gurusinga, Dipl. HE NIK. Foreword This report is the annual report of the Jasa Tirta Public Corporation of the year 2006, a part of the activities of the Company as member of the Network of Asian River Basin Organization (NARBO).

More information

THE THEMATIC WORKSHOPs of NARBO ACTIVITIES.

THE THEMATIC WORKSHOPs of NARBO ACTIVITIES. PERUSAHAAN UMUM (PERUM) J A S A T I R T A I I Final Report On THE THEMATIC WORKSHOPs of NARBO ACTIVITIES. Prepared By Herman Idrus, CES Perum Jasa Tirta II (Citarum River Basin Organization) INDONESIA

More information

Keywords - Integrated water resources management, decision support system, capacity development

Keywords - Integrated water resources management, decision support system, capacity development Abstract - The water resources of the rivers systems (CRB) are critical to social and economic development of the country. They are essential for urban and industrial development particularly in Jakarta

More information

Krueng Aceh Irrigation Project

Krueng Aceh Irrigation Project Indonesia 1. Project Profile and Japan s ODA Loan Krueng Aceh Irrigation Project Report Date: March 2001 Field Survey: August 2000 Location Map of Project Area Headwork Constructed by this Project (1)

More information

Member s Annual Report 2007

Member s Annual Report 2007 Member s Annual Report 2007 Date of preparation: 4/15/2008 Name of the editor: Herman Idrus, CES 1. About the organization (1) Name of the organization and postal address of the office Jasa Tirta II Public

More information

인도네시아찌다룸강유역거주자의수질관리인식도조사

인도네시아찌다룸강유역거주자의수질관리인식도조사 KCID Vol. 22 No. 2 ISSN 1225-8253 (Print) ISSN 2383-5044 (Online) 인도네시아찌다룸강유역거주자의수질관리인식도조사 장정렬 * Survey on the Attitude of the Residents for Water Quality Management in the Citarum River Watershed, Indonesia

More information

LAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES

LAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES LAW OF NUMBER 7 OF 2004 REGARDING WATER RESOURCES BY THE GRACE OF THE ALMIGHTY GOD, THE PRESIDENT OF Considering : a. that water resources is the gift of the Almighty God which gives benefits for the realization

More information

Indonesia: Integrated Water Resources Management Program

Indonesia: Integrated Water Resources Management Program Environmental Assessment Report Summary Initial Environmental Examination Project Number: 37049 December 2006 Indonesia: Integrated Water Resources Management Program Prepared by [Author(s)] [Firm] [City,

More information

Member s Annual Report 2009

Member s Annual Report 2009 Member s Annual Report 2009 Date of preparation: 30/06/2010 Name of the editor: Herman Idrus, CES 1. About the organization (1) Name of the organization and postal address of the office Jasa Tirta II Public

More information

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full title of the Project Project for Updating Dakar Urbanization Master Plan by

More information

Xayaburi Hydroelectric Power Project

Xayaburi Hydroelectric Power Project The MRC Regional Workshop on Discharge and Sediment Monitoring and Geomorphological Tool for the Lower- Mekong Basin, 21-22 22 October 2008 Xayaburi Hydroelectric Power Project TEAM Consulting Engineering

More information

SEDIMENTATION PROBLEM IN WEST TARUM CANAL WEST JAWA, INDONESIA. Endah Kurniyaningrum and Trihono Kadri

SEDIMENTATION PROBLEM IN WEST TARUM CANAL WEST JAWA, INDONESIA. Endah Kurniyaningrum and Trihono Kadri SEDIMENTATION PROBLEM IN WEST TARUM CANAL WEST JAWA, INDONESIA Endah Kurniyaningrum and Trihono Kadri INTRODUCTION There are several purposes which take water from WTC and they are: agriculture, domestis,

More information

DOORNVALLEI EXT 5 & 6

DOORNVALLEI EXT 5 & 6 DOORNVALLEI EXT 5 & 6 Proposed township establishment on portion 107 the farm Doornkloof 391 JR Sewer Pipe Crossings - Sesmylspruit Construction Method Statement April 2016 Revision 3 PREPARED FOR: PREPARED

More information

COMMUNITY-BASED ACTION PLAN TO ADAPT WITH CLIMATE CHANGE CONDITION IN BINH GIANG COMMUNE, HON DAT DISTRICT, KIEN GIANG PROVINCE

COMMUNITY-BASED ACTION PLAN TO ADAPT WITH CLIMATE CHANGE CONDITION IN BINH GIANG COMMUNE, HON DAT DISTRICT, KIEN GIANG PROVINCE Climate Change risk and vulnerability assessments in Kien Giang Province, Mekong Delta, Viet Nam COMMUNITY-BASED ACTION PLAN TO ADAPT WITH CLIMATE CHANGE CONDITION IN BINH GIANG COMMUNE, HON DAT DISTRICT,

More information

Summary of Preliminary Study Result for Technical Cooperation Project

Summary of Preliminary Study Result for Technical Cooperation Project Summary of Preliminary Study Result for Technical Cooperation Project 1. Title of the Cooperation Project, Relevant Project Report The Project for Bridge Construction in Southeast Sulawesi Province Project

More information

4. Agency (or Institution) Responsible for Implementing the Project

4. Agency (or Institution) Responsible for Implementing the Project Summary of Preparatory Study 1. Full Title of the Project Urban Transport Policy and System Development Master Plan for the ity of Dar es Salaam 2. Type of Study Master Plan 3. ategorisation and Its Reason

More information

K water s s Collaboration Activity in the Citarum River Basin

K water s s Collaboration Activity in the Citarum River Basin NARBO 3 rd General Meeting, 22 February 2008, Solo Indonesia K water s s Collaboration Activity in the Citarum River Basin Dr. Ick Hwan Ko Director K water Research Center Water Issues in the Citarum Basin

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

Climate Change Impacts, Adaptation and Mitigation (CCIAM) Programme in Tanzania FACT SHEET

Climate Change Impacts, Adaptation and Mitigation (CCIAM) Programme in Tanzania FACT SHEET Climate Change Impacts, Adaptation and Mitigation (CCIAM) Programme in Tanzania FACT SHEET Project: Development of Climate Change Adaptation Strategy for Sustainable Water Resources Management in Great

More information

REGIONAL EXPERT ADVISORY WORKSHOP REPORT 01 MAR 2011 VIENTIANE, LAO PDR WETLANDS ECOSYSTEM SERVICES AND BIODIVERSITY AND CC

REGIONAL EXPERT ADVISORY WORKSHOP REPORT 01 MAR 2011 VIENTIANE, LAO PDR WETLANDS ECOSYSTEM SERVICES AND BIODIVERSITY AND CC Mekong Wetlands ecosystem services and biodiversity and Climate Change Peter-John Meynell, based on paper by Mark Bezuijen Outline Wetland Ecosystem services a means of valuing the importance of wetlands

More information

IN THE KYRGYZ REPUBLIC

IN THE KYRGYZ REPUBLIC Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL ROAD REHABILITATION (OSH-ISFANA) PROJECT (NRRP)- WORLD BANK PPA Q 6240 CONSULTANCY

More information

Wood Canyon Emergent Wetland Project. City of Aliso Viejo 12 Journey, Suite 100 Aliso Viejo, CA 92656

Wood Canyon Emergent Wetland Project. City of Aliso Viejo 12 Journey, Suite 100 Aliso Viejo, CA 92656 Wood Canyon Emergent Wetland Project City of Aliso Viejo 12 Journey, Suite 100 Aliso Viejo, CA 92656 Introduction Wood Canyon is located within Aliso and Wood Canyon Regional Park in southwest Orange County,

More information

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d) Checklist:. 10.Ports and Harbors (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders (3) Examination of Alternatives (1) Air Quality (2) Water

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

Comparative Evaluation Option #1 & Option #2

Comparative Evaluation Option #1 & Option #2 Comparative Evaluation Option #1 & Option #2 Option #1 Existing Landfill Approx. 47 metres/14 stories Proposed Layout Approx. 31 metres/9.5 stories Option #2 Existing Landfill Approx. 47 metres/14 stories

More information

Summary of Preliminary Study Result for Technical Cooperation Project. Date: 2008/10/8

Summary of Preliminary Study Result for Technical Cooperation Project. Date: 2008/10/8 Summary of Preliminary Study Result for Technical Cooperation Project Date: 2008/10/8 1. Full title of the Project The Project on Integrated UMRT and Urban Development for Hanoi 2. Type of the study Feasibility

More information

Science and Technology Adaptation for Community Water Resource Management Jittiporn Chantarojsiri

Science and Technology Adaptation for Community Water Resource Management Jittiporn Chantarojsiri Science and Technology Adaptation for Community Water Resource Management Jittiporn Chantarojsiri Hydro and Agro Informatics Institute (HAII), Ministry of Science and Technology, Thailand HAII s Mission

More information

Proposal for application of FHM in Lao PDR: Case of Nam Ngum River Basin

Proposal for application of FHM in Lao PDR: Case of Nam Ngum River Basin Proposal for application of FHM in Lao PDR: Case of Nam Ngum River Basin I. Nam Ngum River and Its Basin Nam Ngum River Basin is of vital importance to the Lao PDR, it is considered as the food house of

More information

ELECTRICAL TRANSMISSION LINES & SUBSTATIONS

ELECTRICAL TRANSMISSION LINES & SUBSTATIONS TERMS OF REFERENCE ELECTRICAL TRANSMISSION LINES & SUBSTATIONS Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to development projects involving the construction

More information

5.4 Initial Environmental Examination

5.4 Initial Environmental Examination 5.4 Initial Environmental Examination The objectives of Initial Environmental Examination (IEE) are to examine and identify the necessity of Environmental Impact Assessment (EIA), and to identify potentially

More information

What is Run-of-river hydro?

What is Run-of-river hydro? The Project: The Corporation of the Village of Slocan submitted a waterpower project application on Springer Creek in May 2010 Engineering & Environmental studies were performed on the project site to

More information

IN JASA TIRTA II PUBLIC CORPORATION

IN JASA TIRTA II PUBLIC CORPORATION INTEGRATED WATER RESOURCES MANAGEMENT AND ITS DEVELOPING CAPACITY IN JASA TIRTA II PUBLIC CORPORATION Presented by Djendam Gurusinga The 2 nd Southeast Asia Water Forum August 29 th September 3 rd, 2005

More information

Subject: - Development of Fisheries Floating Nets for Resettlement Program of Hydropower Project Cirata Dam

Subject: - Development of Fisheries Floating Nets for Resettlement Program of Hydropower Project Cirata Dam IEA Hydropower Implementing Agreement Annex VIII - Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 14-05: Development of Regional Industries Cirata Hydro Electric Power

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

Pamarayan Ciujung Irrigation System Rehabilitation Project

Pamarayan Ciujung Irrigation System Rehabilitation Project Indonesia Pamarayan Ciujung Irrigation System Rehabilitation Project 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: August 2000 Location Map of Project Area Overall View

More information

Preparatory Study for Development Study (M/P or F/S)

Preparatory Study for Development Study (M/P or F/S) Preparatory Study for Development Study (M/P or F/S) 1. Title of the Cooperation Project and Name of the Project Proponent (1) Title of the Cooperation Project The Study for Groundwater Development in

More information

Potential Impact of Biomass Burning on Urban Air Quality: Case-study of Chiang Mai

Potential Impact of Biomass Burning on Urban Air Quality: Case-study of Chiang Mai Potential Impact of Biomass Burning on Urban Air Quality: Case-study of Chiang Mai Sébastien Bonnet, Narongchai Suwanprik and Savitri Garivait The Joint Graduate School of Energy and Environment Chiang

More information

Agency (or Institution) Responsible for Implementing the Project

Agency (or Institution) Responsible for Implementing the Project Summary of Preparatory Study Full Title of the Project The Study on Integrated Flood Management for Nyando River asin in the Republic of Kenya Type of Study Master Plan ategorisation and Its Reason 3.1

More information

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item.

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item. Checklist: 26. Forestry Projects(1) 1. Permits and Approvals, Explanations 2. Antipollution Measures (1) ESIA and Permits (2) Explanations to the Public (1) Air Quality (2) Water Quality (3) Waste (4)

More information

Climate Change Risk Assessment: Concept & approaches

Climate Change Risk Assessment: Concept & approaches Climate Change Risk Assessment: Concept & approaches Suppakorn Chinvanno Southeast Asia START Regional Center Topics Introduction to Climate and change Common misconception in climate change risk assessment

More information

Trenches combined with living hedges or grass lines Rwanda - Imiringoti

Trenches combined with living hedges or grass lines Rwanda - Imiringoti Trenches combined with living hedges or grass lines Rwanda - Imiringoti Trenches combined with living hedges or grass lines are slow-forming terraces to control soil erosion by changing the length of the

More information

ICELANDIC RIVER / WASHOW BAY CREEK INTEGRATED WATERSHED MANAGEMENT PLAN STATE OF THE WATERSHED REPORT CONTRIBUTION SURFACE WATER HYDROLOGY REPORT

ICELANDIC RIVER / WASHOW BAY CREEK INTEGRATED WATERSHED MANAGEMENT PLAN STATE OF THE WATERSHED REPORT CONTRIBUTION SURFACE WATER HYDROLOGY REPORT ICELANDIC RIVER / WASHOW BAY CREEK INTEGRATED WATERSHED MANAGEMENT PLAN STATE OF THE WATERSHED REPORT CONTRIBUTION SURFACE WATER HYDROLOGY REPORT Disclaimer: The hydrologic conditions presented in this

More information

E1184 v1. 6. Environmental Management Plan (EMP)

E1184 v1. 6. Environmental Management Plan (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 6. Environmental Management Plan (EMP) This EMP reviews the potential negative impacts

More information

Japanese ODA Loan. Ex-Ante Evaluation

Japanese ODA Loan. Ex-Ante Evaluation Japanese ODA Loan Ex-Ante Evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Haor Flood Management and Livelihood Improvement Project Loan Agreement: June 16, 2014 Loan

More information

SEAFDEC/AQD Institutional Repository (SAIR)

SEAFDEC/AQD Institutional Repository (SAIR) SEAFDEC/AQD Institutional Repository (SAIR) Title The use of mangroves for aquaculture: Indonesia. Author(s) Citation Sunaryanto, Anto Sunaryanto, A. (2004). The use of mangroves for aquaculture: Indonesia.

More information

EVALUATION - SECTION 404 OF THE CLEAN WATER ACT DISCHARGE OF SEDIMENTS FROM OR THROUGH A DAM

EVALUATION - SECTION 404 OF THE CLEAN WATER ACT DISCHARGE OF SEDIMENTS FROM OR THROUGH A DAM EVALUATION - SECTION 404 OF THE CLEAN WATER ACT DISCHARGE OF SEDIMENTS FROM OR THROUGH A DAM U.S. ARMY CORPS OF ENGINEERS, NEW ENGLAND DISTRICT CONCORD, MA PROJECT: Northfield Brook Dam, Naugatuck River

More information

Contractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector

Contractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector Contractors, Illicit Discharges, & Best Management Practices Chris Allen Stormwater Inspector What is an Illicit Discharge? Georgetown County Stormwater Ordinance defines an Illicit Discharge as: Any activity

More information

ENGAGING LOCAL STAKEHOLDERS IN FLOOD MANAGEMENT TOWARDS LIVING WITH FLOOD IN THE MEKONG DELTA, VIETNAM

ENGAGING LOCAL STAKEHOLDERS IN FLOOD MANAGEMENT TOWARDS LIVING WITH FLOOD IN THE MEKONG DELTA, VIETNAM ENGAGING LOCAL STAKEHOLDERS IN FLOOD MANAGEMENT TOWARDS LIVING WITH FLOOD IN THE MEKONG DELTA, VIETNAM Joint Actions on Climate Change, 8-10 Junel 2009, Aalborg Congress and Culture Centre, Denmark Bach

More information

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure

More information

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10.1 Objective The main objective is to confirm the implementation of mitigation measures recommended in

More information

Little Cypress Bayou Special Study - Subwatershed 1.10

Little Cypress Bayou Special Study - Subwatershed 1.10 - Subwatershed 1.1 Sabine River Authority of Texas August 31, 21 Prepared in Cooperation with the Texas Natural Resource Conservation Commission Under the Authorization of the Texas Clean Rivers Act Table

More information

NATIONAL FRAMEWORK FOR ACCELERATING THE UPTAKE OF NATURED-BASED SOLUTIONS

NATIONAL FRAMEWORK FOR ACCELERATING THE UPTAKE OF NATURED-BASED SOLUTIONS NATIONAL FRAMEWORK FOR ACCELERATING THE UPTAKE OF NATURED-BASED SOLUTIONS Abdul Malik Sadat Idris Director of Water Resources and Irrigation Indonesia Ministry of National Development Planning Jakarta,

More information

Summary of Preliminary Study

Summary of Preliminary Study Summary of Preliminary Study 1. Title of the Cooperation Project ridge Construction Project for Expanded Agrarian Reform Communities Development in the Republic of the Philippines 2. Categorization and

More information

1.6 Experience and challenges of spate irrigation projects in Tigray. (By Demisew Abate)

1.6 Experience and challenges of spate irrigation projects in Tigray. (By Demisew Abate) 1.6 Experience and challenges of spate irrigation projects in Tigray (By Demisew Abate) Part I : Introduction What is spate irrigation? o Spate irrigation is a flood harvesting and management system, involving

More information

Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM)

Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM) TAILINGS DISPOSAL Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM) Tailings must be disposed of in a manner that optimizes protection of human

More information

South Landfill Annual Cover Rate Screening Criteria Checklist

South Landfill Annual Cover Rate Screening Criteria Checklist South Landfill Annual Cover Rate Screening Criteria Checklist The following checklist is taken from the Guide to Environmental Assessments for Waste Management Projects, Part B Environmental Screening

More information

Lecture 1 Integrated water resources management and wetlands

Lecture 1 Integrated water resources management and wetlands Wetlands and Poverty Reduction Project (WPRP) Training module on Wetlands and Water Resources Management Lecture 1 Integrated water resources management and wetlands 1 Water resources and use The hydrological

More information

ENVIRONMENTAL MANAGEMENT PLAN SAN CARLOS HYDROELECTRIC POWER PLANT

ENVIRONMENTAL MANAGEMENT PLAN SAN CARLOS HYDROELECTRIC POWER PLANT ENVIRONMENTAL MANAGEMENT PLAN SAN CARLOS HYDROELECTRIC POWER PLANT SAN CARLOS HYDROELECTRIC POWER PLANT It is located near the district of El Jordán in the municipality of San Carlos, department of Antioquia,

More information

ENVIRONMENTAL MANAGEMENT PLAN JAGUAS HYDROELECTRIC POWER PLAN

ENVIRONMENTAL MANAGEMENT PLAN JAGUAS HYDROELECTRIC POWER PLAN ENVIRONMENTAL MANAGEMENT PLAN JAGUAS HYDROELECTRIC POWER PLAN JAGUAS HYDROELECTRIC POWER PLANT It is located in the department of Antioquia on the basins of the Nare and Guatapé rivers, within the jurisdiction

More information

olumbia River Treaty The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct

olumbia River Treaty The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct 2006 1 Presentation Outline Geography of the Pacific Northwest Bonneville Power Administration

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

Special Seminar on Food Security: Focusing on Water management and Sustainable Agriculture

Special Seminar on Food Security: Focusing on Water management and Sustainable Agriculture Special Seminar on Food Security: Focusing on Water management and Sustainable Agriculture Kyi Myint Ministry of Agriculture and Irrigation Location Latitude 9 58-28 31 N Longitude 92 9-100 10 E Country

More information

Watershed Management Area Recommendations for NJ Water Policy

Watershed Management Area Recommendations for NJ Water Policy Watershed Management Area Recommendations for NJ Water Policy Presenters: William Kibler, Director of Policy, Raritan Headwaters Association Bob Kecskes, Freelance Environmental Consultant, retired NJDEP

More information

Vulnerability and Adaptation of Rainfed-Rice Farmers to Impact of Climate Variability in Songkhone District, Savanakhet Province, Lao PDR

Vulnerability and Adaptation of Rainfed-Rice Farmers to Impact of Climate Variability in Songkhone District, Savanakhet Province, Lao PDR Vulnerability and Adaptation of Rainfed-Rice Farmers to Impact of Climate Variability in Songkhone District, Savanakhet Province, Lao PDR By Somkhit BOULIDAM Main Advisor: Prof. Sansanee Choowaew, Ph.D

More information

WASA Quiz Review. Chapter 2

WASA Quiz Review. Chapter 2 WASA Quiz Review Chapter 2 Question#1 What is surface runoff? part of the water cycle that flows over land as surface water instead of being absorbed into groundwater or evaporating Question #2 What are

More information

The Project will be undertaken in line with a number of national laws and standards. Key local laws relating to ESIA include:

The Project will be undertaken in line with a number of national laws and standards. Key local laws relating to ESIA include: 1 EXECUTIVE SUMMARY 1.1 CONTEXT OF THE PROJECT Myanmar UPA Company Limited ( MUPA or the Project Sponsor or the Project Proponent ) intends to develop a 200MW Combined Cycle Power Plant (CCPP) to supply

More information

Yoshinaga Ikuo *, Y. W. Feng**, H. Hasebe*** and E. Shiratani****

Yoshinaga Ikuo *, Y. W. Feng**, H. Hasebe*** and E. Shiratani**** NITROGEN REMOVAL FUNCTION OF PADDY FIELD IN A CIRCULAR IRRIGATION SYSTEM Yoshinaga Ikuo *, Y. W. Feng**, H. Hasebe*** and E. Shiratani**** * National Institute for Rural Engineering, Tsukuba Science City

More information

WATER ALLOCATION IN THE BRANTAS RIVER BASIN CONFLICTS AND ITS RESOLUTIONS

WATER ALLOCATION IN THE BRANTAS RIVER BASIN CONFLICTS AND ITS RESOLUTIONS WATER ALLOCATION IN THE BRANTAS RIVER BASIN CONFLICTS AND ITS RESOLUTIONS ARIS HARNANTO Head of Research and Development Bureau of Jasa Tirta I Public Corporation, Jl. Surabaya No. 2A Malang 65115 Indonesia

More information

Multi-Storey Cropping Philippines - Maramihang Pagtatanim or Planting in Great Numbers

Multi-Storey Cropping Philippines - Maramihang Pagtatanim or Planting in Great Numbers Multi-Storey Cropping Philippines - Maramihang Pagtatanim or Planting in Great Numbers Cultivating a mixture of crops with different heights (multi-storey) and growth characteristics which together optimise

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan 1.Name of the Project Country: The Republic of Indonesia Project: Upper Citarum Basin Flood Management Sector Loan Loan Agreement: March 28,

More information

Mekong Climate Change and Adaptation Initiative and the Mekong River Commission

Mekong Climate Change and Adaptation Initiative and the Mekong River Commission The real threat: climate change impacts in Lower Mekong Basin Mekong Climate Change and Adaptation Initiative and the Mekong River Commission By Jeremy Bird Chief Executive Officer Mekong River Commission

More information

WATER SUPPLY OF JAKARTA

WATER SUPPLY OF JAKARTA WATER SUPPLY OF JAKARTA Prof.Dr. Djoko M. Hartono Environmental Engineering Study Program. Civil Engineering Department, Faculty of Engineering University of Indonesia SMART ENGINEERING TOKYO 2018 UNITED

More information

Fig: Alignment of a ridge or watershed canal (Head reach of a main canal in plains)

Fig: Alignment of a ridge or watershed canal (Head reach of a main canal in plains) SYSTEM OF IRRIGATION CANAL CHAPTER 6 Alluvial Soil and Non-Alluvial Soil The soil which is formed by transportation and deposition of silt through the agency of water, over a course of time, is called

More information

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture Assessment of Landfill Footprint Alternatives Figure 422 99 Option #4 Impact on Agriculture The net effects with respect to continued service to customers, the optimized site life/ capacity is 65 million

More information

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT The health of the world s oceans and marine life is degrading rapidly as a result of excess human activities.

More information

Sustaining Colorado s Watersheds: Making the Water Quality Connections October 2-4, 2007

Sustaining Colorado s Watersheds: Making the Water Quality Connections October 2-4, 2007 Sustaining Colorado s Watersheds: Making the Water Quality Connections October 2-4, 2007 Barr Lake and Milton Reservoir Watershed Management Plan ~ Brief History of the Reservoirs ~ Overview of the BMW

More information

Freshwater Ecosystems

Freshwater Ecosystems Freshwater Ecosystems The types of organisms in an aquatic ecosystem are mainly determined by the water s salinity. As a result, aquatic ecosystems are divided into freshwater and marine ecosystems. Freshwater

More information

STUDY ON FINAL REPORT SUMMARY. February 2013

STUDY ON FINAL REPORT SUMMARY. February 2013 STUDY ON ECONOMIC PARTNERSHIP PROJECTS IN DEVELOPING COUNTRIES IN FY2012 STUDY ON THE SECOND JAKARTA-CIKAMPEK TOLL-ROAD PROJECT IN THE REPUBLIC OF INDONESIA FINAL REPORT SUMMARY February 2013 Prepared

More information

New Network of IWRM for Asia Network of Asian River Basin Organizations 1

New Network of IWRM for Asia Network of Asian River Basin Organizations 1 New Network of IWRM for Asia Network of Asian River Basin Organizations 1 Presented by Sukrasno Sastro Hardjono 2 and Tjoek Walujo Subijanto 3 [How IWRM Ought to Be] Water plays various roles. Water is

More information

Introducing the WBG Guidelines for selecting EFlow assessment methods. Cate Brown

Introducing the WBG Guidelines for selecting EFlow assessment methods. Cate Brown Introducing the WBG Guidelines for selecting EFlow assessment methods Cate Brown This presentation Factors affected potential impacts Level of detail in EFlows assessments: Magnitude and complexity of

More information

FACTSHEET INTRODUCTION. help rebalance the water cycle, mitigate the effects of climate change and improve human health and livelihoods.

FACTSHEET INTRODUCTION. help rebalance the water cycle, mitigate the effects of climate change and improve human health and livelihoods. 1 FACTSHEET INTRODUCTION World Water Day, on 22 March every year, is about focusing attention on the importance of water. This year s theme, Nature for Water, explores nature-based solutions (NBS) to the

More information

E2. Water quantity, allocation and use

E2. Water quantity, allocation and use E2. Water quantity, allocation and use E2.1. Introduction E2 Water quantity, allocation and use Demand for water already equals or exceeds availability in some surface waterbodies and aquifers. Future

More information

Budhi Gunawan. Padjadjaran University. International Conference on Sustainability Science in Asia March 2011

Budhi Gunawan. Padjadjaran University. International Conference on Sustainability Science in Asia March 2011 Socio-ecological Dimension of Human-Nature Relation and Potential for Developing a Community-based Natural Resource Management System: a Case in a Degraded Watershed of West Java, Indonesia Budhi Gunawan

More information

IX: HAZARDOUS WASTE MANAGEMENT

IX: HAZARDOUS WASTE MANAGEMENT IX: HAZARDOUS WASTE MANAGEMENT 9.0 INTRODUCTION The Government of India has promulgated the Hazardous Waste (Management and Handling) Rules, 1989 and the aegis of Environment (Protection) Act, 1886 through

More information

groundwater. Because watersheds are complex systems, each tends to respond differently to natural or human activities.

groundwater. Because watersheds are complex systems, each tends to respond differently to natural or human activities. The private development of Altos del María is located at an altitude between 550 and 1,000 meters above sea level in the environmentally sensitive Cordillera Central of Panama that separates the Pacific

More information

Base Metal and Iron Ore Mining

Base Metal and Iron Ore Mining Multilateral Investment Guarantee Agency Environmental Guidelines for Base Metal and Iron Ore Mining Industry Description and Practices This document addresses the mining of base metal ores (copper, lead

More information

MATERIALS AND METHODS:

MATERIALS AND METHODS: MATERIALS AND METHODS: To study the conservation and management of wildlife at Chandoli National Park (old Chandoli Wildlife Sanctuary), the study area was frequently visited and observed conservation

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

ArcelorMittal Liberia: Meeting International Environmental Standards

ArcelorMittal Liberia: Meeting International Environmental Standards ArcelorMittal Liberia: Meeting International Environmental Standards 1 Social and environmental safeguards for Project Phase 2 Detailed Environmental and Social Impact Assessment prepared over 2 years,

More information

404(b)(1) EVALUATION

404(b)(1) EVALUATION 404(b)(1) EVALUATION SECTION 404(b)(1) EVALUATION DETAILED PROJECT REPORT AND ENVIRONMENTAL ASSESSMENT POMEROY SECTION 14 EMERGENCY STREAMBANK PROTECTION PROJECT POMEROY, OH I. INTRODUCTION As required

More information

CLIMATE CHANGE ASSESSMENT (SUMMARY)

CLIMATE CHANGE ASSESSMENT (SUMMARY) Chongqing Longxi River Basin Integrated Flood and Environmental Risk Management Project (RRP PRC 51005) CLIMATE CHANGE ASSESSMENT (SUMMARY) I. Basic Project Information Project Title: Chongqing Longxi

More information

Thematic WS 3: Water-Food-Energy Nexus

Thematic WS 3: Water-Food-Energy Nexus Thematic WS 3: Water-Food-Energy Nexus The Role of PJT II to Ascertain the National Food & Energy Resilience Through the Adoption of IWRM Delivered by: Djoko Saputro President Director Jakarta, February

More information

Ex-Post Monitoring for Completed ODA Loan Projects

Ex-Post Monitoring for Completed ODA Loan Projects (Onsite evaluation: July 2006) ExPost Monitoring for Completed ODA Loan Projects Evaluator: Kenji Momota (IC Net, Ltd.) Project Name: Indonesia: Bila Irrigation Project Phases (I) (II) (L/A No. IP364,

More information

Stone lines Uganda - Ennyiriri z'amayinja eziziyiza ettaka okutwalibwa enkuba (Luganda)

Stone lines Uganda - Ennyiriri z'amayinja eziziyiza ettaka okutwalibwa enkuba (Luganda) Stone lines Uganda - Ennyiriri z'amayinja eziziyiza ettaka okutwalibwa enkuba (Luganda) Stone lines are built along a contour to control soil erosion on a degraded steep slope. left: Stone lines established

More information

Category Environmental Item Main Check Items Confirmation of Environmental Considerations

Category Environmental Item Main Check Items Confirmation of Environmental Considerations al Checklist: 2. Oil and Natural Gas Development 1 1 Permits and Explanation 2 Mitigation (1) EIA and al Permits (2) Explanation to the Public (1) Air Quality (2) Water Quality (3) Wastes Have EIA reports

More information

The Environmental and Economic Impacts of the Nam Theun 2 Hydroelectric Project on Communities Living in the Xe Bang Fai River Basin 16 March 2004

The Environmental and Economic Impacts of the Nam Theun 2 Hydroelectric Project on Communities Living in the Xe Bang Fai River Basin 16 March 2004 TERRA 409 Soi Rohitsuk, Pracharajbampen Road Huay Kwang, Bangkok 10320 Thailand Tel: (66) 02 691 0718/19/20; Fax: (66) 02 691 0714; e-mail terraper@ksc.net.th The Environmental and Economic Impacts of

More information