1 ENGLEWOOD CLIFFS PUBLIC SCHOOLS NORTH CLIFF ELEMENTARY SCHOOL ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO November 2012 Prepared by: 6 Campus Drive Parsippany, NJ (973) New Jersey BPU - Energy Audits

2 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND EXISTING CONDITIONS Building - General Utility Usage HVAC Systems Control Systems Lighting/Electrical Systems Plumbing Systems ENERGY CONSERVATION MEASURES ECM-1 Install HVAC Occupancy Sensors ECM-2 HVAC Condensing Boiler Addition ECM-3 Install Hot Water Reset Controller on Condensing Boiler ECM-4 Install High Efficiency Domestic Hot Water Heater ECM-5 Install Insulation in Ceiling ECM-6 Install Low Flow Plumbing Fixtures ECM-7 Install High Efficiency Condensing Units ECM-8 Lighting Replacement / Upgrades ECM-9 Lighting Controls Installation ECM-10 Lighting Replacements with Lighting Controls System Improvement Opportunities PROJECT INCENTIVES Incentives Overview New Jersey Pay For Performance Program New Jersey Smart Start Program Direct Install Program Energy Savings Improvement Plans (ESIP) ALTERNATIVE ENERGY SCREENING EVALUATION New Jersey BPU - Energy Audits i

3 6.1 Solar Photovoltaic Rooftop Solar Power Generation Solar Thermal Hot Water Plant Demand Response Curtailment EPA PORTFOLIO MANAGER CONCLUSIONS & RECOMMENDATIONS APPENDICES A Utility Usage Analysis, Energy Suppliers List B Equipment Inventory C ECM Calculations D New Jersey Pay For Performance Incentive Program E ESIP Information F Alternative Energy Screening G EPA Portfolio Manager New Jersey BPU - Energy Audits ii

4 REPORT DISCLAIMER This audit was conducted in accordance with the standards developed by the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) for a Level II audit. C ost and savings calculations for a given measure were estimated to within ±20%, and are based on data obtained from the owner, data obtained during site observations, professional experience, historical data, a nd standard engineering practice. Cost data does not include soft costs such as engineering fees, legal fees, project management fees, financing, etc. A thorough walkthrough of the facility was performed, which included gathering nameplate information and operating parameters for all accessible equipment and lighting systems. Unless otherwise stated, model, efficiency, and capacity information included in this report were collected directly from equipment nameplates and /or from documentation provided by the owner during the site visit. Typical operation and scheduling information was obtained from interviewing facility staff and spot measurements taken in the field. New Jersey BPU - Energy Audits iii

5 1.0 EXECUTIVE SUMMARY The Englewood Cliffs Public Schools engaged CHA to perform an energy audit in connection with the New Jersey Board of Public Utilities Local Government Energy Audit Program. This report details the results of the energy audit conducted for: Building Name Englewood Cliffs Public Schools North Cliff Elementary School Address 700 Floyd Street Englewood Cliffs, NJ Square Feet Construction Date 24,971 Original: 1963 The Energy Conservation Measures (ECMs) identified in this report will allow for a more efficient use of energy and if pursued have the opportunity to qualify for New Jersey Clean Energy Program (NJCEP) incentives. Potential annual savings of $17,100 for the recommended ECMs may be realized with an average payback of 6.0 years. A summary of the costs, savings, and paybacks for the recommended ECMs follows: ECM-1 ECM-2 ECM-3 ECM-4 Energy Conservation Measure Summary of Energy Conservation Measures Approx. Costs ($) Approx. Savings ($/year) Payback (Years) w/o Incentive Potential Incentive ($)* Payback (Years) w/ Incentive Recommended for Implementation (X) Install HVAC Occupancy Sensors 18,000 2, X Install Condensing Boiler for Shoulder Months 39, >20 2,900 >20 Install a Hot Water Reset Controller on Condensing Boiler 1, Install High Efficiency Domestic Hot Water Heater 4, X ECM-5 ECM-6 ECM-7 ECM-8 Install Insulation in Ceiling 20,000 5, X Install Low Flow Fixtures in Bathrooms 29, >20 0 >20 Install High Efficiency Condensing Units 41, >20 0 >20 Upgrade Current Lighting Fixtures 54,000 4, , ECM-9 Install Occupancy Sensors 6,000 5, , Replace Lighting and Install ECM-10 Occupancy Sensors 60,000 8, , X * Incentives shown are per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. New Jersey BPU - Energy Audits Page 4 of 33

6 2.0 INTRODUCTION AND BACKGROUND New Jersey s Clean Energy Program, funded by the New Jersey Board of Public Utilities, supports energy efficiency and sustainability for Municipal and Local Government Energy Audits. Through the support of a utility trust fund, New Jersey is able to assist state and local authorities in reducing energy consumption while increasing comfort. The elementary school located in Englewood Cliffs, NJ, is a 24,971 square foot single story block structure with a high bay gym and multipurpose room. H VAC equipment is located on the ground outside the gym, on t he roof, and in the mechanical room. The high bay gym and all purpose room condensers are located on the ground adjacent to the gym. The building was constructed in Occupancy includes approximately 215 students and 30 full time staff. The school operates Monday through Friday from 8:00 AM to approximately 3:00 PM, with some afterschool use. New Jersey BPU - Energy Audits Page 5 of 33

7 3.0 EXISTING CONDITIONS 3.1 Building - General Built in 1963, the 24,971 square foot, one-story facility has high bay areas for the multipurpose room (gym, auditorium, and cafeteria). The spaces include classrooms, administrative offices, small kitchen, and support spaces. The following block diagram/drawing (not to scale) shows the general school layout. NORTH The school has approximately 215 students and 30 full time staff, and appeared fully utilized during the field survey. The building can be assumed to be fully occupied by about 245 people from 8:00 AM until 3:00 PM during the week, and on Saturday and Sunday for the gym. Custodial staff is in the building for approximately three hours after 3:00 PM during the week. The building is constructed of masonry walls having a brick veneer and a structural steel roof framing system. With the exception of the multipurpose room, the roof is flat and has an asphalt sheet roof covering. The multipurpose room has a cathedral ceiling with wood rafters and tongue and groove interior wood finish, and residential type asphalt shingles at the exterior. The windows and doors were replaced in 2007 during a major capital improvement project. The windows are double glazed aluminum framed and have insulated fiberglass reinforced plastic (FRP) panels. The doors are also insulated FRP. 3.2 Utility Usage Utilities include electricity, natural gas, and potable water. Electricity is delivered by PSE&G and supplied by SJEC. Natural gas is delivered by PSE&G and supplied by Hess. Potable water is provided New Jersey BPU - Energy Audits Page 6 of 33

8 by the municipally owned water department at a charge. See Appendix A for a detailed elementary school utility analysis. The school has one electric meter. Electrical usage for October 2010 through September 2011 was approximately 240,810 kwh at a cost of about $25,200. Review of electricity bills during this period showed that electricity was charged at the following rates: supply unit consumption cost of $0.136 per kwh; demand unit cost of $7.51 per kw; and blended unit cost of $0.154 per kwh. From October 2010 through September 2011, the elementary school had a m aximum electrical demand of kw and minimum of kw. The monthly average over the observed 12 m onth period was kw. Electrical usage was generally higher in the summer months when air conditioning equipment was operational. The school has one natural gas meter. From October 2010 through September 2011, gas-fired equipment consumed about 16,690 therms of natural gas. Based on the annual cost of $16,400, the blended price for natural gas was $0.98 per therm. Natural gas consumption was highest in winter months for heating. Potable water billing data was not received from the client. Rather, an average water usage rate was obtained from the Englewood Cliffs public utility as $3.29 per 1000gallons. The delivery component of the electric and natural gas bills will always be the responsibility of the utility that connects the facility to the power grid or gas line; however, the supply can be purchased from a third party; as is currently the case with electricity and natural gas. The electricity or natural gas commodity supply entity will require submission of one to three years of past energy bills. Contract terms can vary among suppliers. According to the U.S. Energy Information Administration, the average commercial unit costs of electricity and natural gas in New Jersey during the same periods as those noted above was $ per kwh and $0.954 per therm. The electrical supply rate charged by SJEC for the 12 month period from October 2010 through September 2011 resulted in a lower cost to the school district than having PSE&G provide both supply and delivery (see table below). When compared to the average state values, it is recommended that the present natural gas be maintained and the present electricity supply rate charge be monitored and checked monthly. Elementary School Electric Supply Costs SJEC vs. PSE&G Electricity Consumption (kwh) SJEC Supply Costs (Actual) PSE&G Supply Costs (For Comparison) Month October ,460 $10, $9, November-10 22,680 $2, $2, December-10 12,540 $1, $1, January-11 12,660 $1, $1, February-11 11,250 $1, $1, March-11 12,150 $1, $1, April-11 10,530 $1, $1, May-11 11,160 $1, $1, June-11 12,450 $1, $1, July-11 9,240 $ $1, August-11 5,130 $ $ September-11 19,560 $1, $2, Total 240,810 $25, $25, Savings by using SJEC for electric supply $ New Jersey BPU - Energy Audits Page 7 of 33

9 A list of approved electrical and natural gas energy commodity suppliers can be found in Appendix A. 3.3 HVAC Systems The systems and equipment described below serve the building. Specifics on the mechanical equipment can be found within the equipment inventory located in Appendix B Heating Hot Water Systems The heating system consists of two Eastco fire tube boilers having Power Flame full modulation gas burners. The boilers have an input capacity of 3,344 MBH. The heating system uses two 2 HP pumps that distribute the heating hot water to all terminal units. The pumps and boilers operate in a lead/lag manner. A Heat Timer Multi-Mod Platinum boiler controller provides the boiler and pump enable/disable, lead/lag, and hot water reset control sequences. A digital three-way mixing valve enables the boiler water to mix with the heating loop water to provide loop water temperature reset. The heating hot water is pumped to heating only classroom unit ventilators, perimeter fintube radiators, and small cabinet heaters in corridors and vestibules. There are exterior wall exposures that are heated by perimeter hot water fintube radiators with wall mounted thermostats. Corridors, entrance vestibules, and some rooms are heated by ceiling mounted hot water cabinet unit heaters controlled by space thermostats. There is no central air handling system in this building Ductless Split System Air Conditioning Systems Cooling is provided in the library and multipurpose room by individual ductless split system air conditioning systems. The library has a 36,000 Btuh system and the multipurpose room has four 60,000 Btuh systems. The faculty lounge also has a small 9,000 Btu/h Fujitsu ductless split system air conditioning unit Window Air Conditioning Units Some rooms and spaces have window air conditioning units installed to provide additional cooling. The main office, nurse s office, and resource rooms each have residential window air conditioners ranging in size from 5,000 12,000 Btuh Exhaust Systems Exhaust fans are used for restrooms and custodial closets throughout the building. There are small restrooms in most of the classrooms for the students and separate adult and faculty restrooms with standard exhausts. 3.4 Control Systems The building has an Automated Logic direct digital controls (DDC) system that only manages the classroom unit ventilators. The perimeter fintube radiators have self-contained control valves that are manually adjusted by the teachers. All cooling systems are also manually controlled by the staff. Occupied space temperatures are maintained at F heating and F cooling, 5:00 AM to 8:00 PM during the school year. Unoccupied heating temperatures are maintained the same as occupied, and cooling is manually turned on by t he teachers in the morning and turned off by the maintenance staff at 8:00 PM during summer months. New Jersey BPU - Energy Audits Page 8 of 33

10 The boilers and pumps are independently controlled by the Heat Timer controls. 3.5 Lighting/Electrical Systems Since building construction, the facility has reballasted and relamped all fixtures. The facility primarily utilizes fixtures with T-8 32 watt bulbs, compact fluorescent spiral bulbs; older style incandescent bulbs are also used in select areas. Four feet, 4 lamp T-8 light fixtures are used in the high bay gym. The primary source of control for the lights is switches manually turned off at the end of the school day. Exterior lights consist mainly of wall mounted shoebox type metal halides on Tork timers, incandescent lightbulbs, and some LED spotlights. The wall mounted metal halide lights, incandescent lightbulbs, and LED lights are powered by the building s electrical system and are part of the lighting systems analysis. 3.6 Plumbing Systems Domestic Hot Water System The building has an independent domestic hot water heating system. The system consists of an RBI gas fired boiler that has a gross input capacity of 530,000 BTU/h. The boiler produces 150 F hot water that is stored in a 119 gallon glass-lined storage tank at approximately 130 F. A small 1/6 HP pump circulates the water between the boiler and storage tank. The 130 F hot water is then mixed with cold water at a master mixing valve and distributed to the plumbing fixtures at 105 F. A separate 1/4 HP pump circulates the 105 F domestic hot water to the fixtures. This pump is controlled by water temperature Plumbing Fixtures The building has several student and staff restrooms. There are also small restrooms within some classrooms. Cooking or dishwashing is not performed. The majority of the plumbing fixtures are the same vintage as the building construction. The water closets and urinals use older manual flush valves that are assumed to be 3.5 gallons per flush or greater. All lavatories use older metered faucets that flow at least 3 gallons per minute and operate for seconds. Janitor closets are provided with mop sinks and faucets. The small warming kitchen and classrooms have residential type stainless steel sinks and faucets. New Jersey BPU - Energy Audits Page 9 of 33

11 4.0 ENERGY CONSERVATION MEASURES 4.1 ECM-1 Install HVAC Occupancy Sensors The HVAC system is controlled by a DDC system that only controls the unit ventilators in the classrooms. O ccupied space temperatures are maintained at F heating and F cooling. Occupied temperatures are maintained the same as u noccupied. T his measure assessed installing occupancy sensors that would automatically dial back the heating of spaces when they are unoccupied. This will reduce natural gas consumption during the heating months and electrical consumption during the cooling months. These sensors would not be used to control the ventilation quantity for each classroom. The implementation cost and savings related to this ECM are presented in Appendix C and summarized below: ECM-1 Install HVAC Occupancy Sensors Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 18,000 7, $ 2, , Expected Life: 25 years Lifetime Savings: 188,200 kwh 20,800 therms $ 52,500 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. This measure is recommended. 4.2 ECM-2 HVAC Condensing Boiler Addition The school is heated by two Eastco fire tube boilers having Power Flame full modulation gas burners. The boilers have an input capacity of 3,344 M BH. The heating system contains two 2 H P pumps that distribute the heating hot water to all of the terminal units. The boilers each have efficiencies of 80%. Due to the relatively low efficiency of the two existing boilers, an evaluation was performed for adding one high efficiency condensing boiler to operate as the primary boiler during the shoulder months (March-May and September-November) with the existing two boilers operating as secondary. The majority of the savings will be achieved during these months when the lower return water temperature enables the condensing boiler to achieve the highest efficiencies. The boiler fuel consumption was calculated from the natural gas used annually for the shoulder months per utility bills and boiler efficiency. The results were compared to the improved operating efficiency of a new condensing boiler. The difference in fuel usage was the savings. The implementation cost and savings related to this ECM are presented in Appendix C and summarized below: New Jersey BPU - Energy Audits Page 10 of 33

12 ECM-2 Budgetary Install Condensing Boiler for Shoulder Months Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 39, $ (0.9) 2,900 >20 >20 Expected Life: 25 years Lifetime Savings: 0 kwh 4,000 therms $ 5,000 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. This measure is not recommended. 4.3 ECM-3 Install Hot Water Reset Controller on Condensing Boiler This ECM evaluated installation of hot water reset in conjunction with the addition of condensing boilers to the system (ECM-2). The purpose of hot water reset is to modulate the heating hot water temperature depending on the outdoor air temperature; on a warmer day, the boiler can produce lower temperature heating hot water to meet heating demands. Savings were determined through improved boiler efficiency as the heating hot water temperature decreased. The implementation cost and savings related to this ECM are presented in Appendix C and summarized below: ECM-3 Install a Hot Water Reset Controller on Condensing Boiler Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Nat Electric Electric Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 1, $ (0.1) Expected Life: 15 years Lifetime Savings: 0 kwh 900 therms $ 1,500 * Does not qualify for an Incentive per the New Jersey SmartStart Program. See section 5.0 for other incentive opportunities. This measure is not recommended because of interaction with ECM ECM-4 Install High Efficiency Domestic Hot Water Heater The school has one domestic hot water heater that provides hot water to the facility. The RBI unit is tank type, natural gas standard efficiency, with an input of 530 MBH. During periods of little or no domestic hot water use, the unit must still heat the water within the storage tank. Energy required maintaining the 119 gallons of hot water temperature setpoint during times of zero demand is known as standby losses; replacing this unit with a higher efficiency condensing natural gas unit was evaluated. According to the U.S. Department of Energy, 2.5% of stored capacity is lost every hour during hot water heater standby. This value was applied to the total volume of the existing DHW heater storage tank to determine the annual standby losses. Proposed efficiency was based on a typical tank type, high New Jersey BPU - Energy Audits Page 11 of 33

13 efficiency, condensing hot water heater; it was calculated that 650 therms of natural gas would be saved per year. The new water heater will require gas and water piping modifications, venting, and electrical connections. The implementation cost and savings related to this ECM are presented in Appendix C and summarized as follows: ECM-4 Install High Efficiency Domestic Hot Water Heater Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 4, $ Expected Life: 12 years Lifetime Savings: 0 kwh 7,900 therms $ 8,400 * Incentive shown is per the New Jersey SmartStart Program. See section 5.0 for other incentive opportunities. This measure is recommended. 4.5 ECM-5 Install Insulation in Ceiling The roof is constructed of flat asphalt sheets with minimal insulating board, and concrete decking. This ECM addressed installing 6 thick fiberglass insulation (R-19) between the joists of the ceiling to minimize heating losses. To calculate the savings, the heat losses through the roof assembly of the facility was found using an estimated roof R-value of 5 and bin weather data for nearby Newark, NJ. The values were totaled to determine the existing annual energy losses. Heating energy loss values were then determined with a thermal resistance which included the additional R-19 fiberglass insulation. The annual energy savings of installing insulation in between the ceiling joists is expected to be about 5,500 therms. The implementation cost and savings related to this ECM are presented in Appendix C and summarized as follows: ECM-5 Install Insulation in Ceiling Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 20, ,550 $ 5, , Expected Life: 35 years Lifetime Savings: 0 kwh 194,300 therms $ 192,500 * Does not qualify for an Incentive per the New Jersey SmartStart Program. See section 5.0 for other incentive opportunities. This measure is recommended. New Jersey BPU - Energy Audits Page 12 of 33

14 4.6 ECM-6 Install Low Flow Plumbing Fixtures The facility has vintage 1963 plumbing fixtures in the restrooms. Older fixtures consume more water than modern units. It was determined that there is a combination of 32 toilets and urinals with an average water use of 3.25 gal/flush and 14 faucets with a water discharge rate of 3 gal/min. Per the number of occupants, it was estimated that each toilet and faucet is utilized approximately 2 times per day. The water savings associated from replacing these fixtures with low-flow fixtures was calculated by taking the difference of the annual water usage for the proposed and base cases. The basis of this calculation is the number of times each fixture is used, gallons per use, and number of fixtures. Replacing the existing fixtures in the restrooms with 1.6 gals/flush toilets, 1.0 gal/flush urinals, and 1.5 g al/min faucets would save 33 KGal annually. The implementation cost and savings related to this ECM are presented in Appendix C and summarized as follows: ECM-6 Install Low Flow Fixtures in Bathrooms Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Water Total Savings incentive) incentive) $ kwh kw kgal $ $ $ $ Years Years 29, $ (0.9) 0 >20 >20 Expected Life: 15 years Lifetime Savings: 0 kwh 500 kgal $ 1,500 * Incentive shown is per the New Jersey SmartStart Program. See section 5.0 for other incentive opportunities. This measure is not recommended. 4.7 ECM-7 Install High Efficiency Condensing Units The facility uses split system direct expansion (DX) air conditioning equipment in the library and in the multipurpose room. T hese systems are rated at 11.0 EER and use more energy than higher SEER condensing units available today. It was determined that there are six DX units in place totaling 285 MBH of electric cooling. The electrical savings associated with replacing these units with higher EER condensing units was calculated by taking the difference in electrical usage for the proposed and base case. The calculation uses bin temperature data adjusted for the months when school is in session to account for only the hours when the cooling system is in regular use. U pgrading the existing EER 11 units with EER 17.6 condensing units would result in an electricity savings of 1,630 kwh annually. New Jersey BPU - Energy Audits Page 13 of 33

15 The implementation cost and savings related to this ECM are presented in Appendix C and summarized below: ECM-7 Install High Efficiency Condensing Units Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 41,000 1, $ (0.8) 0 >20 >20 Expected Life: 25 years Lifetime Savings: 40,800 kwh 0 therms $ 7,500 * Does not qualify for an Incentive per the New Jersey SmartStart Program. See section 5.0 for other incentive opportunities. This measure is not recommended. 4.8 ECM-8 Lighting Replacement / Upgrades The classrooms and other occupied spaces have upgraded to electronic ballasts and utilize mainly 4 foot 2 lamp 32W T-8 fluorescent bulbs, U-tube T-8s, and 2 foot T-8s are also used in some fixtures. Biaxial compact fluorescent lights (CFLs) are utilized in can lights and surface mounted standard bulb fixtures to replace original incandescent bulbs. A fluorescent lamp converts electrical power into useful light more efficiently than an incandescent lamp or T-12 bulbs. A comprehensive fixture survey was conducted of the entire building. E ach switch and circuit was identified, and the number of fixtures, locations, and existing wattage established (Appendix C). There is an opportunity to continue to reduce consumption by upgrading the classrooms to super T-8 fixtures, and the exterior metal halides to LED fixtures. Energy savings for this measure were calculated by applying the existing and proposed fixture wattages to estimated times of operation. T he difference between energy requirements resulted in a t otal annual savings of 26,070 kwh with an electrical demand reduction of about 8.7 kw. Supporting calculations, including assumptions for lighting hours and annual energy usage for each fixture, are provided in Appendix C. The implementation cost and savings related to this ECM are presented in Appendix C and summarized below: ECM-8 Upgrade Current Lighting Fixtures Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 54,000 26, $ 4, , , Expected Life: 15 years Lifetime Savings: 391,100 kwh 0 therms $ 64,500 *Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. This measure is not recommended in lieu of ECM-10. New Jersey BPU - Energy Audits Page 14 of 33

16 4.9 ECM-9 Lighting Controls Installation The current lighting is controlled by manual switches. Lights are generally turned on in the morning and shut off at night. During school hours, there are rooms that are not occupied; however, the lights sometimes remain on. A dding occupancy controls to individual rooms will control the lights based on occupancy. The occupancy sensor can be wall mounted near the switch or placed at the ceiling for larger room coverage. All occupancy sensors are equipped with a manual override feature. These sensors are generally not recommended in public restrooms. The implementation cost and savings related to this ECM are presented in Appendix C and summarized below: ECM-9 Install Occupancy Sensors Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 6,000 42, , , , Expected Life: 15 years Lifetime Savings: 641,300 kwh 0 therms $ 87,000 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. This measure is not recommended in lieu of ECM ECM-10 Lighting Replacements with Lighting Controls Due to interactive effects, the energy and cost savings for occupancy sensors and lighting upgrades are not cumulative. This measure is a combination of ECM-1 and ECM-9 to reflect actual expected energy and demand reduction. The implementation cost and savings related to this ECM are presented in Appendix C and summarized below: ECM-10 Replace Lighting and Install Occupancy Sensors Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 60,000 59, , , , Expected Life: 15 years Lifetime Savings: 890,400 kwh 0 therms $ 132,000 *Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. This measure is recommended. New Jersey BPU - Energy Audits Page 15 of 33

17 4.11 System Improvement Opportunities The following item can be implemented by the owner to provide additional energy savings: It is recommended that vending misers be added to all district owned vending machines. It is also recommended the school requests that vendor owned machines be upgraded or removed if they are not high efficiency equipment. New Jersey BPU - Energy Audits Page 16 of 33

18 5.0 PROJECT INCENTIVES 5.1 Incentives Overview New Jersey Pay For Performance Program The facility will be eligible for incentives from the New Jersey Office of Clean Energy. T he most significant incentives are available from the New Jersey Pay for Performance (P4P) Program. The P4P program is designed for qualified energy conservation projects applied to facilities whose demand in any of the preceding 12 m onths exceeds 100 kw. T his average minimum has been waived for buildings owned by local governments or municipalities and non-profit organizations, however. Facilities that meet this criterion must also achieve a minimum performance target of 15% energy reduction by using the EPA Portfolio Manager benchmarking tool before and after implementation of the measure(s). If the participant is a municipal electric company customer, and a customer of a regulated gas New Jersey Utility, only gas measures will be eligible under the Program. Available incentives are as follows: Incentive #1: Energy Reduction Plan This incentive is designed to offset the cost of services associated with the development of the Energy Reduction Plan (ERP). Incentive Amount: $0.10/SF Minimum incentive: $5,000 Maximum Incentive: $50,000 or 50% of Facility annual energy cost The standard incentive pays $0.10 per square foot, up to a maximum of $50,000, not to exceed 50% of facility annual energy cost, paid after approval of application. For building audits funded by the New Jersey Board of Public Utilities, which receive an incentive toward performance of the energy audit, facilities are only eligible for an additional $0.05 per square foot, up to a maximum of $25,000, rather than the standard incentive noted above. Incentive #2: Installation of Recommended Measures This incentive is based on projected energy savings as d etermined in Incentive #1 ( Minimum 15% savings must be achieved), and is paid upon successful installation of recommended measures. Electric Base incentive based on 15% savings: $0.09/ per projected kwh saved. For each % over 15% add: $0.005 per projected kwh saved. Maximum incentive: $0.11/ kwh per projected kwh saved Gas Base incentive based on 15% savings: $0.90/ per projected Therm saved. For each % over 15% add: $0.05 per projected Therm saved. Maximum incentive: $1.25 per projected Therm saved Incentive cap: 25% of total project cost Incentive #3: Post-Construction Benchmarking Report This incentive is paid after acceptance of a report proving energy savings over one year utilizing the Environmental Protection Agency (EPA) Portfolio Manager benchmarking tool. Electric Base incentive based on 15% savings: $0.09/ per projected kwh saved. For each % over 15% add: $0.005 per projected kwh saved. Maximum incentive: $0.11/ kwh per projected kwh saved New Jersey BPU - Energy Audits Page 17 of 33

19 Gas Base incentive based on 15% savings: $0.90/ per projected Therm saved. For each % over 15% add: $0.05 per projected Therm saved. Maximum incentive: $1.25 per projected Therm saved Incentives #2 and #3 can be combined to yield additive savings. Total P4P incentives are summarized below: Incentives $ Electric Gas Total Incentive #1 $0 $0 $5,000 Incentive #2 $7,357 $8,806 $16,163 Incentive #3 $7,357 $8,806 $16,163 Total $14,714 $17,612 $37,326 The current ECM s meet the minimum savings of 15% and therefore the building would be eligible for incentives #2 and #3. See Appendix D for additional details New Jersey Smart Start Program For this program, specific incentives for energy conservation measures are calculated on an individual basis utilizing the 2012 New Jersey Smart Start incentive program. T his program provides incentives dependent upon mechanical and electrical equipment. I f applicable, incentives from this program are reflected in the ECM summaries and attached appendices. If the complex qualifies and enters into the New Jersey Pay for Performance Program, all energy savings will be included in the total site energy reduction, and savings will be applied towards the Pay for Performance incentive. A project is not applicable for both New Jersey incentive programs Direct Install Program The Direct Install Program targets small and medium sized facilities where the peak electrical demand does not exceed 150 kw in any of the previous 12 months. Buildings must be located in New Jersey and served by one of the state s public, regulated electric or natural gas utility companies. On a case-by-case basis, the program manager may accept a project for a customer that is within 10% of the 150 kw peak demand threshold. Direct Install is funded through New Jersey s Clean Energy Program and is designed to provide capital for building energy upgrade projects to fast track implementation. The program will pay up to 70% of the costs for lighting, HVAC, motors, natural gas, refrigeration, and other equipment upgrades with higher efficiency alternatives. I f a building is eligible for this funding, the Direct Install Program can significantly reduce the implementation cost of energy conservation projects. The program pays 70% of each project cost up to $75,000 per electrical utility account; total funding for each year is capped at $250,000 per customer. I nstallations must be completed by a Direct Install participating contractor, a list of which can be found on t he New Jersey Clean Energy Website at Contractors will coordinate with the applicant to arrange installation of recommended measures identified in a previous energy assessment, such as this document. New Jersey BPU - Energy Audits Page 18 of 33

20 The facility is eligible to receive funding from the Direct Install Program due to its low peak electric demand Energy Savings Improvement Plans (ESIP) The Energy Savings Improvement Program (ESIP) allows government agencies to make energy related improvements to their facilities and pay for the costs using the value of energy savings that result from the improvements. Under the recently enacted Chapter 4 of the Laws of 2009 (the law), the ESIP provides all government agencies in New Jersey with a flexible tool to improve and reduce energy usage with minimal expenditure of new financial resources. ESIP allows local units to use energy savings obligations to pay for the capital costs of energy improvements to their facilities. This can be done over a maximum term of 15 years. Energy savings obligations are not considered new general obligation debt of a local unit and do not count against debt limits or require voter approval. They may be issued as refunding bonds or leases. Savings generated from the installation of energy conservation measures pay the principal of and interest on the bonds; for that reason, the debt service created by the ESOs is not paid from the debt service fund, but is paid from the general fund. For local governments interested in pursuing an ESIP, the first step is to perform an energy audit. Pursuing a Local Government Energy Audit through New Jersey's Clean Energy Program is a valuable first step to the ESIP approach. The Local Finance Notice outlines how local governments can develop and implement an ESIP for their facilities (see Appendix E). The ESIP can be prepared internally if the entity has qualified staff. If not, the ESIP must be implemented by an independent contractor and not by the energy savings company producing the Energy Reduction Plan. The ESIP approach may not be appropriate for all energy conservation and energy efficiency improvements. L ocal units should carefully consider all alternatives to develop an approach that best meets their needs. New Jersey BPU - Energy Audits Page 19 of 33

21 6.0 ALTERNATIVE ENERGY SCREENING EVALUATION 6.1 Solar Photovoltaic Rooftop Solar Power Generation The facility was evaluated for the potential to install rooftop photovoltaic (PV) solar panels for power generation. Present technology incorporates the use of solar cell arrays that produce direct current (DC) electricity. This DC current is converted to alternating current (AC) with the use of an electrical device known as an inverter. T he building s roof has sufficient room to install a l arge solar cell array. A ll rooftop areas have been replaced, and are in good condition. The PVWATTS solar power generation model was utilized to calculate PV power generation. The closest city available in the model is Newark, New Jersey and a fixed tilt array type was utilized to calculate energy production. The PVWATT solar power generation model is provided in Appendix F. Federal tax credits are also available for renewable energy projects up to 30% of installation cost. Since the facility is a non-profit organization, federal taxes are paid and this project is eligible for this incentive. Installation of (PV) arrays in the state New Jersey will allow the owner to participate in the New Jersey solar renewable energy certificates program (SREC). T his is a program that has been set up to allow entities with large amounts of environmentally unfriendly emissions to purchase credits from zero emission (PV) solar-producers. One SREC credit is equivalent to 1,000 kilowatt hours of PV electrical production; these credits can be traded for period of 15 years from the date of installation. The average SREC value per credit is estimated to be about $80/ SREC per year based on current market data, and this number was utilized in the cash flow for this report. The existing load justifies the use of 100 kw PV solar array. The system costs for PV installations were derived from contractor budgetary pricing in the state of New Jersey for estimates of total cost of system installation. It should be noted that the cost of installation is currently about $4.00 per watt or $4,000 per kw of installed system, for a 100 kw system. Other cost considerations will also need to be considered. PV panels have an approximate 20 year life span; however, the inverter device that converts DC electricity to AC has a life span of 10 to 12 years and will need to be replaced multiple times during the useful life of the PV system. The implementation cost and savings related to this ECM are presented in Appendix F and summarized as follows: Photovoltaic (PV) Rooftop Solar Power Generation 100 kw System New Jersey Budgetary Annual Utility Savings Total Federal Renewable Payback Payback Cost Savings Tax Credit * SREC** (without incentive) (with incentives) Natural Electricity Gas Total $ kw kwh Therms $ $ $ $ Years Years $400, ,897 0 $20,382 $20,382 $0 $9, * 30% federal tax credit-not available for schools ** Solar Renewable Energy Certificate Program (SREC) for 2012 is $80/1000kwh New Jersey BPU - Energy Audits Page 20 of 33

22 The existing roof would need a structural analysis to ensure that it can support the additional weight of the panels. Installing a photovoltaic system is recommended if SREC credits can be secured to offset the high installation cost of the system. At the current SREC rate, this measure is not recommended Solar Thermal Hot Water Plant Active solar thermal systems use solar collectors to gather the sun s energy to heat water, another fluid, or air. An absorber in the collector converts the sun s energy into heat. The heat is then transferred by circulating water, antifreeze, or sometimes air to another location for immediate use or storage for later utilization. Applications for active solar thermal energy include providing hot water, heating swimming pools, space heating, and preheating air in residential and commercial buildings. A standard solar hot water system is typically composed of solar collectors, heat storage vessel, piping, circulators, and controls. Systems are typically integrated to work alongside a conventional heating system that provides heat when solar resources are not sufficient. The solar collectors are usually placed on the roof of the building, oriented south, and tilted around the site s latitude, to maximize the amount of radiation collected on a yearly basis. Several options exist for using active solar thermal systems for space heating. The most common method involves using glazed collectors to heat a liquid held in a storage tank (similar to an active solar hot water system). The most practical system would transfer the heat from the panels to thermal storage tanks and transfer solar produced thermal energy to use for domestic hot water production. D HW is presently produced by gas-fired water heaters and, therefore, this measure would offer natural gas utility savings. Currently, an incentive is not available for installation of thermal solar systems; a Federal tax credit of 30% of installation cost for the thermal applications is available. This is not recommended since the facility currently uses natural gas, the building is not occupied year-round, and domestic hot water demand is not excessive. The implementation cost and savings related to this ECM are presented in Appendix F and summarized as follows: Budgetary Annual Utility Savings Total Federal Tax Credit Cost Savings * Electricity Natural Gas Total Payback (without incentive) Payback (with incentives) $ kw kwh Therms $ $ $ Years Years $5, ,220 $130 $130 1,500 >25 >25 This measure is not recommended. 6.2 Demand Response Curtailment Presently, electricity is delivered by South Jersey Energy Company, which receives the electricity from PSE&G. South Jersey Energy Company is a regional transmission organization (RTO) that coordinates the movement of wholesale electricity in all or parts of 13 states and the District of Columbia including the State of New Jersey. New Jersey BPU - Energy Audits Page 21 of 33

23 Utility Curtailment is an agreement with the utility provider s regional transmission organization and an approved Curtailment Service Provider (CSP) to shed electrical load by either turning major equipment off or energizing all or part of a facility utilizing an emergency generator; therefore, reducing the electrical demand on the utility grid. This program is to benefit the utility company during high demand periods and utility provider offers incentives to the CSP to participate in this program. Enrolling in the program will require program participants to drop electrical load or turn on emergency generators during high electrical demand conditions or during emergencies. P art of the program also will require that program participants reduce their required load or run emergency generators with notice to test the system. A pre-approved CSP will require a minimum of 100 kw of load reduction to participate in any curtailment program. From October 2010 through September 2011, the Englewood Cliffs North Cliffs Elementary School had a maximum electricity demand of 90.6 kw and a minimum of 16.8 kw. The monthly average over the observed 12 month period was 45.1 kw. This measure is not recommended because the facility does not meet the minimum required load, is not operating year round, and does not have back up/emergency generator power. New Jersey BPU - Energy Audits Page 22 of 33

24 7.0 EPA PORTFOLIO MANAGER The EPA Portfolio Manager benchmarking tool was used to assess the building s energy performance. Portfolio Manager provides a S ite and Source Energy Use Intensity (EUI), as well as an Energy Star performance rating for qualifying building types. The EUIs are provided in kbtu/ft 2 /year, and the performance rating represents how energy efficient a building is on a scale of 1 to 100, with 100 being the most efficient. In order for a building to receive and Energy Star label, the energy benchmark rating must be at least 75. As energy use decreases from implementation of the proposed ECMs, the Energy Star rating will increase. The Site EUI is the amount of heat and electricity consumed by a building as reflected in utility bills. Site energy may be delivered to a facility in the form of primary energy, which is raw fuel burned to create heat or electricity (such as natural gas or oil), or as secondary energy, which is the product created from a raw fuel (such as electricity or district steam). S ite EUI is a m easure of a building s annual energy utilization per square foot. Site EUI is a good measure of a building s energy use and is utilized regularly for comparison of energy performance for similar building types. Site Energy Intensity = (Electric Usage in kbtu + Natural Gas in kbtu) Building Square Footage To provide an equitable comparison for different buildings with varying proportions of primary and secondary energy consumption, the Portfolio Manager uses the convention of Source EUIs. The source energy also accounts for all losses incurred in production, storage, transmission, and delivery of energy to the site; which provides an equivalent measure for various types of buildings with different energy sources. Source Energy Intensity = (Electric Usage in kbtu X Site/Source Ratio + Natural Gas in kbtu X Site/Source Ratio) Building Square Footage The EPA Score, Site EUI, and Source EUI for Englewood Cliffs North Cliffs Elementary School are as follows: Energy Intensity Englewood Cliffs North Cliffs Elementary School National Average EPA Score Site (kbtu/sf/year) Source (kbtu/sf/year) The North Cliffs Elementary School is considered a lower than average energy consumer by the EPA Portfolio Manager which gives it a higher than average EPA score. F or the North Cliffs Elementary School to qualify for the Energy Star label the EPA score is required to be above 75. There are several energy conservation measures recommended in this report, that if implemented will further reduce the energy use intensity and increase the EPA score of the school. The Portfolio Manager account can be accessed by entering the username and password shown below at the login screen of the Portfolio Manager website ( A full EPA Energy Star Portfolio Manager Report is located in Appendix G. New Jersey BPU - Energy Audits Page 23 of 33

25 The user name ( ##### ) and password ( ##### ) for the building s EPA Portfolio Manager Account has been provided to Mary Welfel, Business Administrator for the Englewood Cliffs School District. New Jersey BPU - Energy Audits Page 24 of 33

26 8.0 CONCLUSIONS & RECOMMENDATIONS The energy audit conducted by CHA at the North Cliff Elementary School identified potential ECMs for lighting and control replacement/upgrades, HVAC occupancy sensors, insulating upgrades, and domestic hot water heater replacement. Potential annual savings of $17,100 may be realized for the recommended ECMs, with a summary of the costs, savings, and paybacks as follows: ECM-1 Budgetary Install HVAC Occupancy Sensors Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 18,000 7, $ 2, , Expected Life: 25 years Lifetime Savings: 188,200 kwh 20,800 therms $ 52,500 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. ECM-4 Budgetary Install High Efficiency Domestic Hot Water Heater Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 4, $ Expected Life: 12 years Lifetime Savings: 0 kwh 7,900 therms $ 8,400 * Incentive shown is per the New Jersey SmartStart Program. See section 5.0 for other incentive opportunities. ECM-5 Budgetary Install Insulation in Ceiling Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 20, ,550 $ 5, , Expected Life: 35 years Lifetime Savings: 0 kwh 194,300 therms $ 192,500 * Does not qualify for an Incentive per the New Jersey SmartStart Program. See section 5.0 for other incentive opportunities. ECM-10 Budgetary Replace Lighting and Install Occupancy Sensors Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 60,000 59, , , , Expected Life: 15 years Lifetime Savings: 890,400 kwh 0 therms $ 132,000 *Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. New Jersey BPU - Energy Audits Page 25 of 33

27 APPENDIX B Equipment Inventory New Jersey BPU - Energy Audits Page 27 of 33

28 New Jersey BPU Energy Audit Program CHA #24385 Englewood Cliffs Elementary School North Cliffs Original Construction Date: 1964 Renovation/Addtion Date: Note: all equipment assements are based on visual observations of the exterior of the units an employee interviews. No testing or internal evaluation was performed Description Burner-01 Burner-02 Boiler-01 Boiler-02 QTY Manufacturer Name Model No. Serial No. 2 Power Flame Inc C3-G A.L. Eastmond & Sonds Inc. Primary HW Pumps 2 Marathon Electric SM4-80-W030 DVN 145TTDR5350AD NOT AVAILABLE DHW-1 1 RBI Gas Boiler HW HW Tank John Wood CST-119 NOT AVAILABLE AC-1 1 Fujitsu A0U9C AC-2 1 Amana HAC VCA36B3E AC-3 AC-4 AC-5 AC-6 4 Amana HAC VCA60B3D Equipment Type / Utility Hot Water Heating Burner / Electric Hot Water Heating Boiler / Natural Gas Hot Water Heating Pump Electric Domestic Hot Water Heating Natural Gas Hot WaterStorage / Natural Gas HVAC Electric Window Unit Ductless S/S HVAC / Chilled Water Cooling / Electric Ductless S/S HVAC / Chilled Water Cooling / Electric Capacity/Size/ Efficiency 900 MBH (Min) / 3348 MBH (Max) / 1.5 HP / 208V 3 Phase Electric 3344 MBH Input/ 2678 MBHOutput/ 80% Efficiency 2 HP / (1740/ 1430) RPM Standard Efficiency 81.5% 530 MBH Input / 429 MBH Output / 81% Efficiency F Fractional HP motors Location Areas/Equipment Served Date Installed Remaining Useful Life (years) Other Info. Boiler Room North Cliffs Good Condition Boiler Room North Cliffs Good Condition Boiler Room North Cliffs Good Condition Boiler Room North Cliffs N/A N/A Good Condition Boiler Room North Cliffs Good Condition 9,400 Btu (~1 Ton) Faculty Room Faculty Room N/A N/A Good Condition Btu (3 Ton) 60,000 Btu (5 Ton) Condenser on oof / unit ventilator (UV) in room Condenser on ground outside gym / UV in room Library N/A N/A Good Condition Gym N/A N/A Good Condition Englewood - North Cliffs - Equip Inventory - Rev 0.xls North Cliffs

29 APPENDIX C ECM Calculations New Jersey BPU - Energy Audits Page 28 of 33

30 Englewood Cliff - NJBPU CHA Project #24385 North Cliffs Elementary School ECM Summary Sheet ECM-1 Install HVAC Occupancy Sensors Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 18,000 7, $ 2, , Expected Life: 25 years Lifetime Savings: 188,200 kwh 20,800 therms $ 52,500 ECM-2 Install Condensing Boiler for Shoulder Months Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 39, $ (0.9) 2,900 >20 >20 Expected Life: 25 years Lifetime Savings: 0 kwh 4,000 therms $ 5,000 ECM-3 Install a Hot Water Reset Controller on Condensing Boiler Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 1, $ (0.1) Expected Life: 15 years Lifetime Savings: 0 kwh 900 therms $ 1,500 ECM-4 Install High Efficiency Domestic Hot Water Heater Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 4, $ Expected Life: 12 years Lifetime Savings: 0 kwh 7,900 therms $ 8,400 ECM-5 Install Insulation in Ceiling Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 20, ,550 $ 5, , Expected Life: 35 years Lifetime Savings: 0 kwh 194,300 therms $ 192,500

31 ECM-6 ECM-7 Install Low Flow Fixtures in Bathrooms Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Water Total Savings incentive) incentive) $ kwh kw kgal $ $ $ $ Years Years 29, $ (0.9) 0 >20 >20 Expected Life: 15 years Lifetime Savings: 0 kwh 500 kgal $ 1,500 Install High Efficiency Condensing Units Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 41,000 1, $ (0.8) 0 >20 >20 Expected Life: 25 years Lifetime Savings: 40,800 kwh 0 therms $ 7,500 ECM-8 ECM-9 Upgrade Current Lighting Fixtures Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 54,000 26, $ 4, , , Expected Life: 15 years Lifetime Savings: 391,100 kwh 0 therms $ 64,500 Install Occupancy Sensors Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 6,000 42, , , , Expected Life: 15 years Lifetime Savings: 641,300 kwh 0 therms $ 87,000 ECM-10 Replace Lighting and Install Occupancy Sensors Budgetary Estimated Total Payback Payback Cost Annual Utility Savings Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive) $ kwh kw Therms $ $ $ $ Years Years 60,000 59, , , , Expected Life: 15 years Lifetime Savings: 890,400 kwh 0 therms $ 132,000

32 Englewood Cliff - NJBPU CHA Project #24385 North Cliffs Elementary School Utility Costs $ $/kwh blended $ $/kwh supply $ 7.79 $/kw $ 1.00 $/Therm $ 3.29 $/kgals Item Savings Cost Simple kw kwh therms cooling kwh kgal/yr $ Payback ECM-1 Install HVAC Occupancy Sensors 0.0 7, $ 2,100 $ 18, ECM-2 Install Condensing Boiler for Shoulder Months $ 200 $ 39, ECM-3 Install a Hot Water Reset Controller on Condensing $ 100 $ 1, ECM-4 Install High Efficiency Domestic Hot Water Heater $ 700 $ 4, ECM-5 Install Insulation in Ceiling , $ 5,500 $ 20, ECM-6 Install Low Flow Fixtures in Bathrooms $ 100 $ 29, ECM-7 Install High Efficiency Condensing Units 0.0 1, $ 300 $ 41, ECM-8 Upgrade Current Lighting Fixtures , $ 4,300 $ 53, ECM-9 Install Occupancy Sensors , $ 5,800 $ 6, ECM-10 Replace Lighting and Install Occupancy Sensors , $ 8,800 $ 60,

33 Englewood Cliff - NJBPU CHA Project #24385 North Cliffs Elementary School ECM-1 Install HVAC Occupancy Sensors Add VSD s to the HV unit fans ECM Description According to facility personnel, the HVAC system is enabled at 5am and disabled at 8pm Monday-Saturday. However some areas are conditioned, yet not occupied during some hours. The temperatures are set between 68-72F during the heating season and 66-70F during the cooling season. This ECM recommends that HVAC occupancy sensors be installed that will automatically setback the temperature setpoints during unoccupied times. E X I S T I N G C O N D I T I O N S Existing Facility Total Electric usage Existing Facility Natural Gas Usage Cost of Electricty Cost of Natural Gas S A V I N G S TOD Electric savings TOD Natural Gas savings Total Cost Savings Estimated Total Project Cost Simple Payback 150,540 kwh 16,691 Therms $ $/kwh $ 0.98 $/Therm $ $ 7,527 kwh 835 Therms 1, , years Assumptions 1 5% Approximate electric savings due to setback 2 5% Approximate natural gas savings due to setback 3 Project cost is an estimate, includes cost of replacing non- programmbale thermostats with programmbale thermostats 4 $1,000 control work cost ($1000/Unit Ventilator )

34 Englewood Cliff - NJBPU CHA Project #24385 North Cliffs Elementary School ECM-2: Boiler Replacement ECM Description The current heating system employs two boilers which service the original and new portions of the building. These boilers have an efficiency of roughly 80% and only run partially loaded during the shoulder months. This ECM suggests installing a condensing boiler to operate during the shoulder months. Condensing boilers, besides having a higher efficiency can modulate loads better than standard non-condensing boilers. Existing Fuel Proposed Fuel Item Value Units Baseline Fuel Cost $ 1.00 / Therm Proposed Fuel Cost $ 0.95 / Therm HW BOILERS Formula/Comments Baseline Fuel Use 1,217 Therms Existing Boiler Efficiency 80% Baseline Boiler Load 97,372 Mbtu/yr Baseline Fuel Cost $ 1,217 Proposed Condensing Boiler Efficiency 92% Proposed Fuel Use 1,058 Therms Proposed Fuel Cost $ 1,005 Based on historical utility data for shoulder months, see Fuel usage breakdown below. HHW Only Combustion eff measured peak near 80% at high fire, with excessive boiler cycling Baseline Fuel Use x Existing Efficiency x 100 Mbtu/Therms New Boiler Efficiency Baseline Boiler Load / Proposed Efficiency / 100 Mbtu/Therms BOILER REPLACEMENT SAVINGS SUMMARY Electric Demand Electric Usage Nat Gas Usage Maint. Total Cost ( kw ) ( kwh ) ( Therms ) ( $ ) ( $) Savings $151 Rule of Thumb Boiler Sizing Fuel Usage Analysis (1 year average): sq. ft Total Metered Gas Usage - Therms btu/sq. ft 35 Baseline HW Usage 1,217 Therms btu 873,985 Baseline DHW Usage (1,217) Therms ~Size Boiler Size BTUH 440 MBTUH

35 Englewood Cliff - NJBPU CHA Project #24385 Multipliers North Cliffs Elementary School Material: 0.99 Labor: 1.25 ECM-M3A: Boiler Replacement - Cost Equipment: 1.11 Description QTY UNIT UNIT COSTS SUBTOTAL COSTS MAT. LABOR EQUIP. MAT. LABOR EQUIP. TOTAL COST REMARKS 600 MBH Capacity Condensing Boiler 1 1 $ 16,500 $ 16,500 $ 33,000 Vendor Quote Miscellaneous Electrical 1 LS $ 150 $ 149 $ - $ - $ 100 Venting Kit 1 EA $ 450 $ 650 $ 447 $ 809 $ - $ 1,300 Boiler Control Kit 1 EA $ 3,000 $ - Vendor Quote Miscellaneous Piping and Valves 1 LS $ 1,200 $ 1,193 $ - $ - $ 1,200 $ 33,000 Subtotal $ 3, % Contingency $ 3, % Contractor O&P $ - Engineering $ 39,900 Total

36 Englewood Cliff - NJBPU CHA Project #24385 North Cliffs Elementary School ECM-2: Install HW Reset Hot Water Boiler Reset Control Notes: 1. Building heat is proposed to be provided by one condensing gas-fired hot water boiler. 2. Recommend installation of condensing boiler and controls to allow for automatic boiler water reset based on OA temperature. 3. This measure has been interracted with the 'Boiler Replacement' measure. BOILER WATER TEMPERATURE RESET: 92.0% BOILER COMBUSTION EFFICIENCY (OLDEFF) 5.0% BOILER/PIPING RADIANT& MISC. HEAT LOSSES (OLDLOSS) 80 AMBIENT ROOM TEMPERATURE (AMBTEMP) CURRENT BOILER TEMPERATURE (OLDTEMP) NEW BOILER TEMPERATURE (NEWTEMP) 60...AVERAGE REDUCTION IN BOILER TEMP (AVGRED) = (OLDTEMP-NEWTEMP) 1.50%...REDUCTION IN COMBUSTION LOSSES BY RESET (COMBRED) = AVGRED/40/ %...REDUCTION IN RADIANT LOSSES (RADRED)=(OLDLOSS-(OLDLOSS*(NEWTEMP-AMBTEMP)/(OLDTEMP-AMBTEMP))) 4.50%...NET IMPROVEMENT IN BOILER FUEL-TO-HEAT EFFICIENCY (NETEFF) = COMBRED+RADRED THERMS...TYPE OF FUEL (GAS MCF, OIL GAL, COAL TONS) $ COST / UNIT OF FUEL 100,000...BTUs / UNIT (BTUs/UNIT) 1,217...ANNUAL TOTAL FUEL CONSUMPTION FROM BILLS (TOTFUEL) 0.00 ESTIMATED NON-BOILER FUEL CONSUMPTION (OTHFUEL) ANNUAL BOILER FUEL CONSUMPTION (HEATFUEL) = TOTFUEL-OTHFUEL 87.0% CURRENT BOILER FUEL-TO-HEAT EFFICIENCY (CEFF) = OLDEFF-OLDLOSS 91.5% RETROFIT BOILER FUEL-TO-HEAT EFFICIENCY (REFF) = CEFF+NETEFF CALCULATED ANNUAL FUEL SAVINGS (FUELSAVE) = ANNFUEL - (ANNFUEL*CEFF/REFF) FUELSAVE * COST/UNIT OF FUEL ==================== THERMS SAVINGS $58.66 COST SAVINGS

37 Englewood Cliff - NJBPU CHA Project #24385 North Cliffs Elementary School ECM-4 Install High Efficiency Domestic Hot Water Heater ECM Description Standard domestic hot water heaters employ an insulated tank to keep water hot for use. These systems are inefficient due to losses incurred by heatloss from water sitting in the tanks. The U.S. Department of Energy estimates standby losses to be about 2.5% stored energy/hour. This ECM recommends a tankless high efficiency water heater be installed which will heat water only when there is a demand for it. Item Value Units Avg. Monthly Utility Demand by Water Heater 209 Therms/month Total Annual Utility Demand by Water Heater 250,926 MBTU/yr Existing DHW Heater Efficiency 81% Total Annual Hot Water Demand (w/ standby losses) 203,250 MBTU/yr Existing Tank Size 119 Gallons Hot Water Piping System Capacity 179 Gallons Hot Water Temperature 130 F Room Temperature 70 F Standby Losses (% by Volume) 2.5% Standby Losses (Heat Loss) 3.7 MBH Annual Standby Hot Water Load 32,576 MBTU/yr New Tank Size 0 Gallons Hot Water Piping System Capacity 60 Gallons Hot Water Temperature 130 F Room Temperature 70 F Standby Losses (% by Volume) 2.5% Standby Losses (Heat Loss) 0.7 MBH Annual Standby Hot Water Load 6,515 MBTU/yr Formula/Comments Calculated from utility bill 1therm = 100 MBTU Per manufacturer nameplate Per manufacturer nameplate Estimated Per existing system (includes HWR piping) Per building personnel ( 2.5% of stored capacity per hour, per U.S. Department of Energy ) Based on Takagi Flash T-H1 instantaneous, condensing DHW Heater Estimated Per existing system (includes HWR piping) ( 2.5% of stored capacity per hour, per U.S. Department of Energy ) Total Annual Hot Water Demand 177,189 MBTU/yr Proposed Avg. Hot water heater efficiency 96% Proposed Fuel Use 1,846 MBTU/yr Based on Takagi Flash T-H1 instantaneous, condensing DHW Heater Standby Losses and inefficient DHW heater eliminated Utility Cost $1.00 $/Therm Existing Operating Cost of DHW $2,508 $/yr Proposed Operating Cost of DHW $1,845 $/yr Savings Summary: Utility Energy Cost Savings Savings Therms/yr 664 $663

38 Englewood Cliff - NJBPU CHA Project #24385 Multipliers North Cliffs Elementary School Material: 1.10 Labor: 1.35 ECM-4 Install High Efficiency Domestic Hot Water Heater Cost Equipment: 1.10 Description QTY UNIT UNIT COSTS SUBTOTAL COSTS MAT. LABOR EQUIP. MAT. LABOR EQUIP. TOTAL COST REMARKS High Efficiency DHW 440 MBH Output 1 1 $ - $ - $ - $ 4,000 Miscellaneous Electrical 1 LS $ 150 $ 165 $ - $ - $ 200 Venting Kit 1 EA $ 450 $ 650 $ 495 $ 878 $ - $ 1,400 Miscellaneous Piping and Valves 1 LS $ 200 $ 220 $ - $ - $ 200 $ 4,000 Subtotal $ % Contingency $ % Contractor O&P $ - Engineering $ 4,800 Total

39 Englewood Cliff - NJBPU CHA Project #24385 North Cliffs Elementary School ECM-5 Install Ceiling Insulation Existing: Ceiling can lead to increased energy consumption due to infiltration/exfiltration and heat gain/loss Proposed: Install 6" fiberglass blanket insulation in ceiling cavity to reduce heat transfe Area of ceiling 20,688 SF Cooling System Efficiency 1.2 kw/ton Heating System Efficiency 80% Existing Infiltration Factor 0.00 cfm/sf Ex Occupied Clng Temp. 66 *F Heating On Point 60 *F Proposed Infiltration Factor 0.00 cfm/sf Ex Unoccupied Clng Temp. 70 *F Ex Occupied Htg Temp. 72 *F Existing U Value Btuh/SF/ F Cooling Occ Enthalpy Setpoint 27.5 Btu/lb Ex Unoccupied Htg Temp. 68 *F Proposed U Value Btuh/SF/ F Cooling Unocc Enthalpy Setpoint 27.5 Btu/lb Electricity $ $/kwh (Loose-Fill R-2.7/inch) Natural Gas $ 1.00 $/Therm EXISTING LOADS PROPOSED LOADS COOLING ENERGY HEATING ENERGY Occupied Unoccupied Occupied Unoccupied Avg Outdoor Existing Occupied Unoccupied Wall Infiltration & Wall Infiltration Wall Infiltration & Wall Infiltration Existing Cooling Proposed Cooling Existing Heating Proposed Heating Air Temp. Bins Avg Outdoor Equipment Bin Equipment Bin Equipment Bin Heat Load & Heat Load Heat Load & Heat Load Energy Energy Energy Energy F Air Enthalpy Hours Hours Hours BTUH BTUH BTUH BTUH kwh kwh Therms Therms A B C D E F G H I J K L , ,472-39,743-35, , ,784-34,299-29, ,646-93,096-28,854-24, ,958-72,408-23,410-19, ,270-51,720-17,966-13, ,582-31,032-12,522-8, ,894-10,344-7,077-2, , , ,995 43,445 15,788 11, ,683 64,133 21,232 16, ,371 84,821 26,677 22, , ,509 32,121 27, , , ,197 37,565 33, , , ,885 43,009 38, , , ,573 48,453 44, , ,261 53,898 49, , ,949 59,342 54, , ,637 64,786 60, , ,325 70,230 65, , ,013 75,675 71, , ,701 81,119 76, , ,389 86,563 82, TOTALS 7,272 2,597 4, ,528 1,981 Existing Ceiling Infiltration 0 cfm Savings 5,547 Therms $ 5,544 Existing Ceiling Heat Transfer 4,138 Btuh/ F Proposed Ceiling Infiltration 0 cfm Proposed Ceiling Heat Transfer 1,089 Btuh/ F

40 Englewood Cliff - NJBPU CHA Project #24385 Multipliers North Cliffs Elementary School Material: Labor: ECM-5 Install Ceiling Insulation Cost Equipment: UNIT COSTS SUBTOTAL COSTS Description QTY UNIT TOTAL COST REMARKS MAT. LABOR EQUIP. MAT. LABOR EQUIP. Fiberglass Blanket Insulation (6" thick, 23" wi 20,688 SF $ 0.47 $ 0.20 $ 9,727 $ 5,100 $ - $ 14,800 6" Thick Extended Effort 1 LS $ $ - $ 623 $ - $ 600 Pulling up floor boards $ 15,400 Subtotal $ 1, % Contingency $ 3, Contractor 20% O&P $ - Engineering $ 20,300 Total

41 Englewood Cliff - NJBPU CHA Project #24385 North Cliffs Elementary School ECM-6W1: Replace urinals and flush valves with low flow E X I S T I N G Cost of Water / 1000 Gallons Urinals in Building Average Flushes / Urinal (per Day) Average Gallons / Flush C O N D I T I O N S $3.29 $ / kgal Gal P R O P O S E D Proposed Urinals to be Replaced Proposed Gallons / Flush Proposed Material Cost Proposed Installation Cost Total cost of new urinals & valves C O N D I T I O N S Gal $1,000 $228 $4,900 Current Urinal Water Use Proposed Urinal Water Use Water Savings Cost Savings Simple Payback S A V I N G S 9 kgal / year 3 kgal / year 6 kgal / year $20 / year years

42 Englewood Cliff - NJBPU CHA Project #24385 North Cliffs Elementary School ECM-6W3: Replace urinals and flush valves with low flow E X I S T I N G Cost of Water / 1000 Gallons Toilets in Building Average Flushes / Toilet (per Day) Average Gallons / Flush P R O P O S E D Proposed Toilets to be Replaced Proposed Gallons / Flush Proposed Material Cost of new toilet Proposed Installation cost of new toilet Total cost of new toilets & valves C O N D I T I O N S $3.29 $ / kgal Gal C O N D I T I O N S Gal $1,000 $252 $17,500 Current Toilet Water Use Proposed Toilet Water Use Water Savings Cost Savings Simple Payback S A V I N G S 36 kgal / year 16 kgal / year 19 kgal / year $60 / year years

43 Englewood Cliff - NJBPU CHA Project #24385 North Cliffs Elementary School ECM-6W5: Replace urinals and flush valves with low flow E X I S T I N G Cost of Water / 1000 Gallons Faucets in Building Average Uses / Faucet (per day) Average Time of Use Average Flowrate C O N D I T I O N S $3.29 $ / kgal min 3.0 gpm P R O P O S E D Proposed Faucets to be Replaced Proposed Flowrate Proposed Material Cost of new Faucets Proposed Installation cost of new Faucets Total cost of new faucets C O N D I T I O N S gpm $250 $250 $7,000 Current Faucet Water Use Proposed Faucet Water Use Water Savings Cost Savings Simple Payback S A V I N G S 15 kgal / year 8 kgal / year 8 kgal / year $30 / year years

44 Englewood Cliff - NJBPU CHA Project #24385 North Cliffs Elementary School COOLING CAPACITY EQUIPMENT AREA/EQUIPMENT SERVED (MBH) AC-1 Faculty Room 9 AC-2 Library 36 AC-3 Gym I 60 AC-4 Gym II 60 AC-5 Gym III 60 AC-6 Gym IV 60 ECM-7: DX Split Systems Replaced Total Electric DX Cooling: 285 MBH ECM Description Summary By replacing older split system DX equipment with higher SEER/EER DX condensing units, significant electrical energy can be saved. Control schemes can be incorporated that were not possible with the older equiopment as well, but the equipment can also operate in same manner as existing (i.e., stand alone, or monitored/sequenced by a BAS). It is recommended these units be replaced by more modern DX split system equipment with high efficiecny fans and compressors ASSUMPTIONS Comments Electric Cost $ / kwh Average run hours per Week 75 Hours 5am - 8pm, 5 days /wk Space Balance Point 55 F Space Temperature Setpoint 68 deg F Setpoint BTU/Hr Rating of existing DX equipment 285,400 Btu / Hr Total BTU/hr of DX cooling equipment to be replaced. Average EER 11.0 Units 10 SEER family converted using EER = -.02*SEER+1.12*SEER Existing Annual Electric Usage 4,344 kwh Item Value Units Proposed EER 17.6 Proposed Annual Electric Usage 2,715 kwh Comments New ductless mini-splits (per manufacturer) Unit will cycle on w/ temp of room. Possible operating time shown below ANNUAL SAVINGS Annual Electrical Usage Savings 1,629 kwh Annual Cost Savings $366,422 Total Project Cost $41,100 Simple Payback 0 years OAT - DB Cooling Hrs Assumed Bin Annual at Temp Above Assumed % of hrs of Temp F Hours balance point time of operation Operation % % % % % % % % % % % % % % % % % % % % % % % 0 Total 7, % 167

45 Englewood Cliff - NJBPU CHA Project #24385 Multipliers North Cliffs Elementary School Material: 0.99 Labor: 1.25 ECM-7: DX Split Systems Replaced Cost Equipment: 1.11 Description QTY UNIT UNIT COSTS SUBTOTAL COSTS TOTAL MAT. LABOR EQUIP. MAT. LABOR EQUIP. COST $ - $ - $ - $ - Existing (4) Acs & CUs demolition 6 EA $ 100 $ 250 $ 596 $ 1,868 $ - $ 2,500 (4) ACs, 5.0 ton air conditioner condensing units 4 EA $ 2,250 $ 1,325 $ 8,946 $ 6,599 $ - $ 15,500 (1) ACs, 3.0 ton air conditioner condensing units 1 EA $ 1,425 $ 615 $ 1,416 $ 766 $ - $ 2,200 (1) AC, 1.5 ton air conditioner condensing unit 1 EA $ 1,125 $ 320 $ 1,118 $ 398 $ - $ 1,500 - Reprogram DDC system for (6) CUs 6 EA $ 75 $ 300 $ 447 $ 2,241 $ - $ 2,700 Electrical - misc. 1 LS $ 1,000 $ 5,000 $ 994 $ 6,225 $ - $ 7,200 $ - $ - $ - $ - REMARKS $ 31,600 Subtotal $ 3,200 10% Contingency $ 6,300 20% Contractor O&P $ - 0% Engineering $ 41,100 Total

46 Energy Audit of Englewood Cliffs North Cliffs School CHA Project No Cost of Electricity: $0.135 $/kwh Existing Lighting $7.79 $/kw EXISTING CONDITIONS Field Code Area Description Unique description of the location - Room number/room name: Floor number (if applicable) No. of Fixtures Standard Fixture Code NYSERDA Fixture Code No. of fixtures before the retrofit "Lighting Fixture Code" Example 2T 40 R F(U) = 2'x2' Troff 40 w Recess. Floor 2 lamps U shape Code from Table of Standard Fixture Wattages Watts per Fixture kw/space Exist Control Value from Table of Standard Fixture Wattages (Watts/Fixt) * (Fixt No.) Pre-inst. control device Annual Hours Estimated annual hours for the usage group Retrofit Control Retrofit control device Annual kwh (kw/space) * (Annual Hours) 175A Kitchen 6 4' 2-LAMP T-8 (32W) F42ILL SW 2912 OCC 1, All Purpose/Gym 52 4' 4-Lamp T-8 (32W) F44ILL SW 2080 OCC 12, A General Office Copy Room 1 4' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC A Room ' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC 3, A Room ' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC 3, A Nurses Office 1 2 SP 72 I I72/ SW 3000 OCC A Nurses Office 2 5 4' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC A Room ' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC 4, A Room ' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC 4, A Room ' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC 4, A Room ' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC 4, A Room ' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC 4, A Room ' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC 4, A Room ' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC 4, A Room 19 Bathroom 2 SP 72 I I72/ SW 2250 OCC A Room ' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC 4, A Room 20 Bathroom 2 SP 72 I I72/ SW 2250 OCC A Room ' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC 4, A Room 21 Bathroom 2 SP 72 I I72/ SW 2250 OCC A Room ' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC 4, A Room 22 Bathroom 2 SP 72 I I72/ SW 2250 OCC A Room ' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC 4, A Room 23 Bathroom 2 SP 72 I I72/ SW 2250 OCC A Rioom ' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC 4, A Room 24 Bathroom 2 SP 72 I I72/ SW 2250 OCC 324 4A Exit 3 Bathroom 1 2-LAMP U-TUBE T-12 FU2SS SW 2250 OCC A Custodian Office 1 5 SP 72 I I72/ SW 3000 OCC 1,080 X0 Custodian Office 2 2 CF42/1-L CF42/1-L SW 3000 OCC 288 X0 Boiler Room 4 CF42/1-L CF42/1-L SW 2000 OCC 384 4A Room LAMP U-TUBE T-12 FU2SS SW 3000 OCC 2,592 X0 Room 12 Bathroom 1 CF42/1-L CF42/1-L SW 2250 OCC 108 4A Zone 4 Girl's Bathroom LAMP U-TUBE T-12 FU2SS SW 2250 OCC A Zone 4 Girl's Bathroom 2 1 4' 2-LAMP T-8 (32W) F42ILL SW 2250 OCC A Zone 4 Storage 1 3 SP 72 I I72/ SW 500 OCC 108 X0 Zone 4 Storage 2 1 CF42/1-L CF42/1-L SW 500 OCC 24 4A Zone 1 Men's Bathroom LAMP U-TUBE T-12 FU2SS SW 2250 OCC A Zone 1 Men's Bathroom 2 1 4' 2-LAMP T-8 (32W) F42ILL SW 2250 OCC 133 4A Zone 1 Women's Bathroom LAMP U-TUBE T-12 FU2SS SW 2250 OCC A Zone 1 Women's Bathroom 2 1 4' 2-LAMP T-8 (32W) F42ILL SW 2250 OCC 133 4A Zone 1 Boy's Bathroom LAMP U-TUBE T-12 FU2SS SW 2250 OCC A Zone 1 Boy's Bathroom 2 1 4' 2-LAMP T-8 (32W) F42ILL SW 2250 OCC Principle's Office Conference 1 4' 8-Lamp T-8 (32W) F48ILL SW 3000 OCC Principle's Office 4 4' 8-Lamp T-8 (32W) F48ILL SW 3000 OCC 2,688 4A Nurses Office Bathroom LAMP U-TUBE T-12 FU2SS SW 2250 OCC Nurses Office Bathroom 2 1 2' 20 W F 1 (MAG) F21SS SW 2250 OCC 63 Notes 9/17/2012 Page 1, Existing

47 Energy Audit of Englewood Cliffs North Cliffs School CHA Project No Cost of Electricity: $0.135 $/kwh Existing Lighting $7.79 $/kw EXISTING CONDITIONS Field Code Area Description Unique description of the location - Room number/room name: Floor number (if applicable) No. of Fixtures Standard Fixture Code NYSERDA Fixture Code No. of fixtures before the retrofit "Lighting Fixture Code" Example 2T 40 R F(U) = 2'x2' Troff 40 w Recess. Floor 2 lamps U shape Code from Table of Standard Fixture Wattages Watts per Fixture kw/space Exist Control Value from Table of Standard Fixture Wattages (Watts/Fixt) * (Fixt No.) Pre-inst. control device Annual Hours Estimated annual hours for the usage group Retrofit Control Retrofit control device Annual kwh (kw/space) * (Annual Hours) 249 Speech Room 2 4' 4-Lamp T-8 (32W) F44ILL SW 3000 OCC A Room 3 5 4' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC A Room ' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC Room ' 4-Lamp T-8 (32W) F44ILL SW 3000 OCC A Room ' 2-LAMP T-8 (32W) F42ILL SW 3000 OCC 1, A Gym Closet 2 4' 2-LAMP T-8 (32W) F42ILL SW 500 OCC A Display Case 1 1 SP 72 I I72/ SW 500 OCC 36 X0 Display Case 2 1 CF42/1-L CF42/1-L SW 500 OCC A Exterior 1 7 SP 72 I I72/ SW , Exterior 2 1 FXLED78 FXLED78/ SW Exterior 3 14 MH 100 MH100/ SW ,827 Total ,750 Notes 9/17/2012 Page 2, Existing

48 Energy Audit of Englewood Cliffs North Cliffs School CHA Project No Cost of Electricity: $0.135 $/kwh ECM-8 Lighting Replacements $7.79 $/kw Field Code Area Description Unique description of the location - Room number/room No. of fixtures name: Floor number (if applicable) before the retrofit No. of Watts per Fixtures Standard Fixture Code NYSERDA Fixture Code Fixture "Lighting Fixture Code" Example 2T 40 R F(U) = 2'x2' Troff 40 w Recess. Floor 2 lamps U shape EXISTING CONDITIONS Code from Table of Standard Fixture Wattages Value from Table of Standard Fixture Wattages kw/space (Watts/Fixt) * (Fixt No.) Exist Control Pre-inst. control device Annual Hours Annual kwh Estimated daily (kw/space) * hours for the (Annual Hours) usage group Number of Fixtures Standard Fixture Code Fixture Code No. of fixtures after the retrofit "Lighting Fixture Code" Example 2T 40 R F(U) = 2'x2' Troff 40 w Recess. Floor 2 lamps U shape RETROFIT CONDITIONS Code from Table of Standard Fixture Wattages Watts per Fixture Value from Table of Standard Fixture Wattages kw/space (Watts/Fixt) * (Number of Fixtures) Retrofit Control Retrofit control device Annual Hours Estimated annual hours for the usage group Annual kwh (kw/space) * (Annual Hours) Annual kwh Saved (Original Annual kwh) - (Retrofit Annual kwh) Annual kw Saved COST & SAVINGS ANALYSIS Annual $ Saved (kwh Saved) * (Original Annual kw) - (Retrofit ($/kwh) Annual kw) Retrofit Cost Cost for renovations to lighting system NJ Smart Start Lighting Incentive Prescriptive Lighting Measures Simple Payback With Out Incentive Length of time for renovations cost to be recovered Simple Payback Length of time for renovations cost to be recovered 175A Kitchen 6 4' 2-LAMP T-8 (32W) F42ILL SW ,031 6 F30T8 F42SSILL SW 2, $ $ $ All Purpose/Gym 52 4' 4-Lamp T-8 (32W) F44ILL SW , F30T8 F44SSILL SW 2,080 10,383 1, $ $ 7, $ A General Office Copy Room 1 4' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL SW 3, $ 5.48 $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL SW 3,000 3, $ $ 2, $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL SW 3,000 3, $ $ 2, $ A Nurses Office 1 2 SP 72 I I72/ SW CFD28W CF28/2D SW 3, $ $ $ A Nurses Office 2 5 4' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL SW 3, $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL SW 3,000 3, $ $ 2, $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL SW 3,000 3, $ $ 2, $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL SW 3,000 3, $ $ 2, $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL SW 3,000 3, $ $ 2, $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL SW 3,000 3, $ $ 2, $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL SW 3,000 3, $ $ 2, $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL SW 3,000 3, $ $ 2, $ A Room 19 Bathroom 2 SP 72 I I72/ SW CFD28W CF28/2D SW 2, $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL SW 3,000 3, $ $ 2, $ A Room 20 Bathroom 2 SP 72 I I72/ SW CFD28W CF28/2D SW 2, $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL SW 3,000 3, $ $ 2, $ A Room 21 Bathroom 2 SP 72 I I72/ SW CFD28W CF28/2D SW 2, $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL SW 3,000 3, $ $ 2, $ A Room 22 Bathroom 2 SP 72 I I72/ SW CFD28W CF28/2D SW 2, $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL SW 3,000 3, $ $ 2, $ A Room 23 Bathroom 2 SP 72 I I72/ SW CFD28W CF28/2D SW 2, $ $ $ A Rioom ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL SW 3,000 3, $ $ 2, $ A Room 24 Bathroom 2 SP 72 I I72/ SW CFD28W CF28/2D SW 2, $ $ $ A Exit 3 Bathroom 1 2-LAMP U-TUBE T-12 FU2SS SW F17T8 F22ILL SW 2, $ $ $ A Custodian Office 1 5 SP 72 I I72/ SW ,080 5 CFD28W CF28/2D SW 3, $ $ $ X0 Custodian Office 2 2 CF42/1-L CF42/1-L SW CF42/1-L CF42/1-L SW 3, $ - $ - $0 X0 Boiler Room 4 CF42/1-L CF42/1-L SW CF42/1-L CF42/1-L SW 2, $ - $ - $0 4A Room LAMP U-TUBE T-12 FU2SS SW ,592 9 F17T8 F22ILL SW 3, , $ $ $ X0 Room 12 Bathroom 1 CF42/1-L CF42/1-L SW CF42/1-L CF42/1-L SW 2, $ - $ - $0 4A Zone 4 Girl's Bathroom LAMP U-TUBE T-12 FU2SS SW F17T8 F22ILL SW 2, $ $ $ A Zone 4 Girl's Bathroom 2 1 4' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL SW 2, $ 4.36 $ $ A Zone 4 Storage 1 3 SP 72 I I72/ SW CFD28W CF28/2D SW $ $ $ X0 Zone 4 Storage 2 1 CF42/1-L CF42/1-L SW CF42/1-L CF42/1-L SW $ - $ - $0 4A Zone 1 Men's Bathroom LAMP U-TUBE T-12 FU2SS SW F17T8 F22ILL SW 2, $ $ $ A Zone 1 Men's Bathroom 2 1 4' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL SW 2, $ 4.36 $ $ A Zone 1 Women's Bathroom LAMP U-TUBE T-12 FU2SS SW F17T8 F22ILL SW 2, $ $ $ A Zone 1 Women's Bathroom 2 1 4' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL SW 2, $ 4.36 $ $ A Zone 1 Boy's Bathroom LAMP U-TUBE T-12 FU2SS SW F17T8 F22ILL SW 2, $ $ $ A Zone 1 Boy's Bathroom 2 1 4' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL SW 2, $ 4.36 $ $ Principle's Office Conference 1 4' 8-Lamp T-8 (32W) F48ILL SW ' 8-Lamp T-8 (32W) F48ILL SW 3, $ - $ - $0 250 Principle's Office 4 4' 8-Lamp T-8 (32W) F48ILL SW , ' 8-Lamp T-8 (32W) F48ILL SW 3,000 2, $ - $ - $0 4A Nurses Office Bathroom LAMP U-TUBE T-12 FU2SS SW F17T8 F22ILL SW 2, $ $ $ Nurses Office Bathroom 2 1 2' 20 W F 1 (MAG) F21SS SW ' 17 W F 1 F21ILL SW 2, $ 3.17 $ $ Speech Room 2 4' 4-Lamp T-8 (32W) F44ILL SW F30T8 F44SSILL SW 3, $ $ $ A Room 3 5 4' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL SW 3, $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL SW 3, $ $ $ Room ' 4-Lamp T-8 (32W) F44ILL SW F30T8 F44SSILL SW 3, $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL SW 3,000 1, $ $ 1, $ A Gym Closet 2 4' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL SW $ 3.54 $ $ A Display Case 1 1 SP 72 I I72/ SW CFD28W CF28/2D SW $ 5.95 $ $ X0 Display Case 2 1 CF42/1-L CF42/1-L SW CF42/1-L CF42/1-L SW $ - $ - $0 129A Exterior 1 7 SP 72 I I72/ SW ,201 7 CFD28W CF28/2D SW 4,368 1,070 1, $ $ $ Exterior 2 1 FXLED78 FXLED78/ SW FXLED78 FXLED78/ SW 4, $ - $ - $0 142 Exterior 3 14 MH 100 MH100/ SW , FXLED39 FXLED39/ SW 4,368 2,385 5, $ $ - $1, Total , , ,683 26, $4,332 $53,696 $6,170 Demand Savings kwh Savings Total savings 8.7 $817 26,067 $3,515 $4, /17/2012 Page 3, ECM-8

49 Energy Audit of Englewood Cliffs North Cliffs School CHA Project No Cost of Electricity: $0.135 $/kwh ECM-9 Install Occupancy Sensors $7.79 $/kw Field Code Area Description Unique description of the location - Room number/room name: Floor number (if applicable) No. of Watts per Fixtures Standard Fixture Code NYSERDA Fixture Code Fixture No. of fixtures before the retrofit "Lighting Fixture Code" Example 2T 40 R F(U) = 2'x2' Troff 40 w Recess. Floor 2 lamps U shape EXISTING CONDITIONS Code from Table of Standard Fixture Wattages Value from Table of Standard Fixture Wattages kw/space (Watts/Fixt) * (Fixt No.) Exist Control Pre-inst. control device Annual Hours Estimated annual hours for the usage group Annual kwh (kw/space) * (Annual Hours) Number of Fixtures Standard Fixture Code Fixture Code No. of fixtures after the retrofit "Lighting Fixture Code" Example 2T 40 R F(U) = 2'x2' Troff 40 w Recess. Floor 2 lamps U shape RETROFIT CONDITIONS Code from Table of Standard Fixture Wattages Watts per Fixture Value from Table of Standard Fixture Wattages kw/space (Watts/Fixt) * (Number of Fixtures) Retrofit Control Retrofit control device Annual Hours Estimated annual hours for the usage group Annual kwh (kw/space) * (Annual Hours) Annual kwh Saved (Original Annual kwh) - (Retrofit Annual kwh) Annual kw Saved (Original Annual kw) - (Retrofit Annual kw) COST & SAVINGS ANALYSIS Annual $ Saved (kw Saved) * ($/kwh) Retrofit Cost Cost for renovations to lighting system NJ Smart Start Lighting Incentive Simple Payback With Out Incentive Length of time for renovations cost to be recovered Simple Payback Length of time for renovations cost to be recovered 175A Kitchen 6 4' 2-LAMP T-8 (32W) F42ILL SW , ' 2-LAMP T-8 (32W) F42ILL OCC $69.49 $ $ All Purpose/Gym 52 4' 4-Lamp T-8 (32W) F44ILL SW , ' 4-Lamp T-8 (32W) F44ILL OCC , , $ $ $ A General Office Copy Room 1 4' 2-LAMP T-8 (32W) F42ILL SW ' 2-LAMP T-8 (32W) F42ILL OCC $11.93 $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , ' 2-LAMP T-8 (32W) F42ILL OCC , , $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , ' 2-LAMP T-8 (32W) F42ILL OCC , , $ $ $ A Nurses Office 1 2 SP 72 I I72/ SW SP 72 I I72/ OCC $29.12 $ $ A Nurses Office 2 5 4' 2-LAMP T-8 (32W) F42ILL SW ' 2-LAMP T-8 (32W) F42ILL OCC $59.66 $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , ' 2-LAMP T-8 (32W) F42ILL OCC , , $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , ' 2-LAMP T-8 (32W) F42ILL OCC , , $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , ' 2-LAMP T-8 (32W) F42ILL OCC , , $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , ' 2-LAMP T-8 (32W) F42ILL OCC , , $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , ' 2-LAMP T-8 (32W) F42ILL OCC , , $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , ' 2-LAMP T-8 (32W) F42ILL OCC , , $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , ' 2-LAMP T-8 (32W) F42ILL OCC , , $ $ $ A Room 19 Bathroom 2 SP 72 I I72/ SW SP 72 I I72/ OCC $24.27 $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , ' 2-LAMP T-8 (32W) F42ILL OCC , , $ $ $ A Room 20 Bathroom 2 SP 72 I I72/ SW SP 72 I I72/ OCC $24.27 $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , ' 2-LAMP T-8 (32W) F42ILL OCC , , $ $ $ A Room 21 Bathroom 2 SP 72 I I72/ SW SP 72 I I72/ OCC $24.27 $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , ' 2-LAMP T-8 (32W) F42ILL OCC , , $ $ $ A Room 22 Bathroom 2 SP 72 I I72/ SW SP 72 I I72/ OCC $24.27 $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , ' 2-LAMP T-8 (32W) F42ILL OCC , , $ $ $ A Room 23 Bathroom 2 SP 72 I I72/ SW SP 72 I I72/ OCC $24.27 $ $ A Rioom ' 2-LAMP T-8 (32W) F42ILL SW , ' 2-LAMP T-8 (32W) F42ILL OCC , , $ $ $ A Room 24 Bathroom 2 SP 72 I I72/ SW SP 72 I I72/ OCC $24.27 $ $ A Exit 3 Bathroom 1 2-LAMP U-TUBE T-12 FU2SS SW LAMP U-TUBE T-12 FU2SS OCC $16.18 $ $ A Custodian Office 1 5 SP 72 I I72/ SW , SP 72 I I72/ OCC $72.81 $ $ X0 Custodian Office 2 2 CF42/1-L CF42/1-L SW CF42/1-L CF42/1-L OCC $19.41 $ $ X0 Boiler Room 4 CF42/1-L CF42/1-L SW CF42/1-L CF42/1-L OCC $0.00 $ $ A Room LAMP U-TUBE T-12 FU2SS SW , LAMP U-TUBE T-12 FU2SS OCC , , $ $ $ X0 Room 12 Bathroom 1 CF42/1-L CF42/1-L SW CF42/1-L CF42/1-L OCC $8.09 $ $ A Zone 4 Girl's Bathroom LAMP U-TUBE T-12 FU2SS SW LAMP U-TUBE T-12 FU2SS OCC $48.54 $ $ A Zone 4 Girl's Bathroom 2 1 4' 2-LAMP T-8 (32W) F42ILL SW ' 2-LAMP T-8 (32W) F42ILL OCC $9.94 $ $ A Zone 4 Storage 1 3 SP 72 I I72/ SW SP 72 I I72/ OCC $0.00 $ $20.00 X0 Zone 4 Storage 2 1 CF42/1-L CF42/1-L SW CF42/1-L CF42/1-L OCC $0.00 $ $ A Zone 1 Men's Bathroom LAMP U-TUBE T-12 FU2SS SW LAMP U-TUBE T-12 FU2SS OCC $48.54 $ $ A Zone 1 Men's Bathroom 2 1 4' 2-LAMP T-8 (32W) F42ILL SW ' 2-LAMP T-8 (32W) F42ILL OCC $9.94 $ $ A Zone 1 Women's Bathroom LAMP U-TUBE T-12 FU2SS SW LAMP U-TUBE T-12 FU2SS OCC $48.54 $ $ A Zone 1 Women's Bathroom 2 1 4' 2-LAMP T-8 (32W) F42ILL SW ' 2-LAMP T-8 (32W) F42ILL OCC $9.94 $ $ A Zone 1 Boy's Bathroom LAMP U-TUBE T-12 FU2SS SW LAMP U-TUBE T-12 FU2SS OCC $48.54 $ $ A Zone 1 Boy's Bathroom 2 1 4' 2-LAMP T-8 (32W) F42ILL SW ' 2-LAMP T-8 (32W) F42ILL OCC $9.94 $ $ Principle's Office Conference 1 4' 8-Lamp T-8 (32W) F48ILL SW ' 8-Lamp T-8 (32W) F48ILL OCC $45.30 $ $ Principle's Office 4 4' 8-Lamp T-8 (32W) F48ILL SW , ' 8-Lamp T-8 (32W) F48ILL OCC , , $ $ $ A Nurses Office Bathroom LAMP U-TUBE T-12 FU2SS SW LAMP U-TUBE T-12 FU2SS OCC $16.18 $ $ Nurses Office Bathroom 2 1 2' 20 W F 1 (MAG) F21SS SW ' 20 W F 1 (MAG) F21SS OCC $4.72 $ $ Speech Room 2 4' 4-Lamp T-8 (32W) F44ILL SW ' 4-Lamp T-8 (32W) F44ILL OCC $45.30 $ $ A Room 3 5 4' 2-LAMP T-8 (32W) F42ILL SW ' 2-LAMP T-8 (32W) F42ILL OCC $59.66 $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW ' 2-LAMP T-8 (32W) F42ILL OCC $23.86 $ $ Room ' 4-Lamp T-8 (32W) F44ILL SW ' 4-Lamp T-8 (32W) F44ILL OCC $45.30 $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , ' 2-LAMP T-8 (32W) F42ILL OCC $ $ $ A Gym Closet 2 4' 2-LAMP T-8 (32W) F42ILL SW ' 2-LAMP T-8 (32W) F42ILL OCC $0.00 $ $ A Display Case 1 1 SP 72 I I72/ SW SP 72 I I72/ OCC $0.00 $ $20.00 X0 Display Case 2 1 CF42/1-L CF42/1-L SW CF42/1-L CF42/1-L OCC $0.00 $ $ A Exterior 1 7 SP 72 I I72/ SW , SP 72 I I72/ , $0.00 $0.00 $ Exterior 2 1 FXLED78 FXLED78/ SW FXLED78 FXLED78/ $0.00 $0.00 $ Exterior 3 14 MH 100 MH100/ SW , MH 100 MH100/ , $0.00 $0.00 $0.00 Total , ,091 42, ,752 $6,294 1,060 Demand Savings 0.0 $0 kwh Savings 42,659 $5,752 Total Savings $5, /17/2012 Page 4, ECM-9

50 Energy Audit of Englewood Cliffs North Cliffs School CHA Project No Cost of Electricity: $0.135 $/kwh ECM-10 Lighting Replacements with Occupancy Sensors $7.79 $/kw Field Code Area Description Unique description of the location - Room number/roomno. of fixtures name: Floor number (if applicable) before the retrofit No. of Watts per Fixtures Standard Fixture Code NYSERDA Fixture Code Fixture "Lighting Fixture Code" Example 2T 40 R F(U) = 2'x2' Troff 40 w Recess. Floor 2 lamps U shape EXISTING CONDITIONS Code from Table of Standard Fixture Wattages Value from Table of Standard Fixture Wattages kw/space (Watts/Fixt) * (Fixt No.) Exist Control Pre-inst. control device Annual Hours Annual kwh Estimated daily (kw/space) * hours for the (Annual Hours) usage group Number of Fixtures Standard Fixture Code Fixture Code No. of fixtures after the retrofit "Lighting Fixture Code" Example 2T 40 R F(U) = 2'x2' Troff 40 w Recess. Floor 2 lamps U shape RETROFIT CONDITIONS Code from Table of Standard Fixture Wattages Watts per Fixture Value from Table of Standard Fixture Wattages kw/space (Watts/Fixt) * (Number of Fixtures) Retrofit Control Retrofit control device Annual Hours Estimated annual hours for the usage group Annual kwh (kw/space) * (Annual Hours) Annual kwh Saved (Original Annual kwh) - (Retrofit Annual kwh) Annual kw Saved (Original Annual kw) - (Retrofit Annual kw) COST & SAVINGS ANALYSIS Annual $ Saved Retrofit Cost (kwh Saved) * Cost for ($/kwh) renovations to lighting system NJ Smart Start Lighting Incentive Prescriptive Lighting Measures Simple Payback With Out Incentive Length of time for renovations cost to be recovered Simple Payback Length of time for renovations cost to be recovered 175A Kitchen 6 4' 2-LAMP T-8 (32W) F42ILL SW ,031 6 F30T8 F42SSILL OCC 1, $ $ $ All Purpose/Gym 52 4' 4-Lamp T-8 (32W) F44ILL SW , F30T8 F44SSILL OCC 1,560 7,788 4, $ $ 7, $ A General Office Copy Room 1 4' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL OCC 1, $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL OCC 1,500 1,584 2, $ $ 2, $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL OCC 1,500 1,584 2, $ $ 2, $ A Nurses Office 1 2 SP 72 I I72/ SW CFD28W CF28/2D OCC 1, $ $ $ A Nurses Office 2 5 4' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL OCC 1, $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL OCC 1,500 1,728 2, $ $ 2, $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL OCC 1,500 1,728 2, $ $ 2, $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL OCC 1,500 1,728 2, $ $ 2, $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL OCC 1,500 1,728 2, $ $ 2, $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL OCC 1,500 1,728 2, $ $ 2, $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL OCC 1,500 1,728 2, $ $ 2, $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL OCC 1,500 1,728 2, $ $ 2, $ A Room 19 Bathroom 2 SP 72 I I72/ SW CFD28W CF28/2D OCC 1, $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL OCC 1,500 1,728 2, $ $ 2, $ A Room 20 Bathroom 2 SP 72 I I72/ SW CFD28W CF28/2D OCC 1, $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL OCC 1,500 1,728 2, $ $ 2, $ A Room 21 Bathroom 2 SP 72 I I72/ SW CFD28W CF28/2D OCC 1, $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL OCC 1,500 1,728 2, $ $ 2, $ A Room 22 Bathroom 2 SP 72 I I72/ SW CFD28W CF28/2D OCC 1, $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL OCC 1,500 1,728 2, $ $ 2, $ A Room 23 Bathroom 2 SP 72 I I72/ SW CFD28W CF28/2D OCC 1, $ $ $ A Rioom ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL OCC 1,500 1,728 2, $ $ 2, $ A Room 24 Bathroom 2 SP 72 I I72/ SW CFD28W CF28/2D OCC 1, $ $ $ A Exit 3 Bathroom 1 2-LAMP U-TUBE T-12 FU2SS SW F17T8 F22ILL OCC 1, $ $ $ A Custodian Office 1 5 SP 72 I I72/ SW ,080 5 CFD28W CF28/2D OCC 1, $ $ $ X0 Custodian Office 2 2 CF42/1-L CF42/1-L SW CF42/1-L CF42/1-L OCC 1, $ $ $ X0 Boiler Room 4 CF42/1-L CF42/1-L SW CF42/1-L CF42/1-L OCC 2, $ - $ $ 20 4A Room LAMP U-TUBE T-12 FU2SS SW ,592 9 F17T8 F22ILL OCC 1, , $ $ 1, $ X0 Room 12 Bathroom 1 CF42/1-L CF42/1-L SW CF42/1-L CF42/1-L OCC 1, $ 8.09 $ $ A Zone 4 Girl's Bathroom LAMP U-TUBE T-12 FU2SS SW F17T8 F22ILL OCC 1, $ $ $ A Zone 4 Girl's Bathroom 2 1 4' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL OCC 1, $ $ $ A Zone 4 Storage 1 3 SP 72 I I72/ SW CFD28W CF28/2D OCC $ $ $ X0 Zone 4 Storage 2 1 CF42/1-L CF42/1-L SW CF42/1-L CF42/1-L OCC $ - $ $ 20 4A Zone 1 Men's Bathroom LAMP U-TUBE T-12 FU2SS SW F17T8 F22ILL OCC 1, $ $ $ A Zone 1 Men's Bathroom 2 1 4' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL OCC 1, $ $ $ A Zone 1 Women's Bathroom LAMP U-TUBE T-12 FU2SS SW F17T8 F22ILL OCC 1, $ $ $ A Zone 1 Women's Bathroom 2 1 4' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL OCC 1, $ $ $ A Zone 1 Boy's Bathroom LAMP U-TUBE T-12 FU2SS SW F17T8 F22ILL OCC 1, $ $ $ A Zone 1 Boy's Bathroom 2 1 4' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL OCC 1, $ $ $ Principle's Office Conference 1 4' 8-Lamp T-8 (32W) F48ILL SW ' 8-Lamp T-8 (32W) F48ILL OCC 1, $ $ $ Principle's Office 4 4' 8-Lamp T-8 (32W) F48ILL SW , ' 8-Lamp T-8 (32W) F48ILL OCC 1,500 1,344 1, $ $ $ A Nurses Office Bathroom LAMP U-TUBE T-12 FU2SS SW F17T8 F22ILL OCC 1, $ $ $ Nurses Office Bathroom 2 1 2' 20 W F 1 (MAG) F21SS SW ' 17 W F 1 F21ILL OCC 1, $ 6.54 $ $ Speech Room 2 4' 4-Lamp T-8 (32W) F44ILL SW F30T8 F44SSILL OCC 1, $ $ $ A Room 3 5 4' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL OCC 1, $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL OCC 1, $ $ $ Room ' 4-Lamp T-8 (32W) F44ILL SW F30T8 F44SSILL OCC 1, $ $ $ A Room ' 2-LAMP T-8 (32W) F42ILL SW , F30T8 F42SSILL OCC 1, , $ $ 1, $ A Gym Closet 2 4' 2-LAMP T-8 (32W) F42ILL SW F30T8 F42SSILL OCC $ 3.54 $ $ A Display Case 1 1 SP 72 I I72/ SW CFD28W CF28/2D OCC $ 5.95 $ $ X0 Display Case 2 1 CF42/1-L CF42/1-L SW CF42/1-L CF42/1-L OCC $ - $ $ A Exterior 1 7 SP 72 I I72/ SW ,201 7 CFD28W CF28/2D ,368 1,070 1, $ $ $ Exterior 2 1 FXLED78 FXLED78/ SW FXLED78 FXLED78/ , $ - $ - $ Exterior 3 14 MH 100 MH100/ SW , FXLED39 FXLED39/ ,368 2,385 5, $ $ - $ 1, Total , , ,810 59,990 7,230 Demand Savings 8.7 $817 kwh Savings 59,283 $7,993 Total Savings $8, /17/2012 Page 5, ECM-10

51 Notes Field Code Energy Audit of Englewood Cliffs North Cliffs School CHA Project No Fixture and Control Replacement Cost Lighting Analysis COST TABLE Standard Code NYSERDA Code Watts per fixture Retrofit Standard Code NYSERDA Code Watts per fixture Fixture Replacement Ballast Replacement Material Labor Disposal Material Labor Disposal Material Labor Disposal B,L X0 CF42/1-L CF42/1-L 48 None $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 AS 4A 2-LAMP U-TUBE T-12 FU2SS 96 Replace F17T8 F22ILL $20.00 $45.00 INC $5.00 $5.00 INC $26.25 $10.00 $ A,AL 5A 2' 2-LAMP T-8 F22ILL 33 NONE 2 AN 17 2' 20 W F 1 (MAG) F21SS 28 RL/RB 2' 17 W F 1 F21ILL 20 2 $20.00 $45.00 INC $5.00 $5.00 INC $26.25 $10.00 $ E 35A 4' 3-LAMP T-8 (32W) F43ILL 89 Replace F30T8 F43SSILL $20.00 $45.00 INC $15.00 $15.00 INC $33.25 $10.00 $ F 41A 4' 1-LAMP T-8 (32W) F41ILL 31 Replace F30T8 F41SSILL 26 1 $20.00 $45.00 INC $20.00 $20.00 INC $36.75 $10.00 $ M Y I 100 I100/1 100 Replace CFD28W CF28/2D 35 1 $15.00 $15.00 INC $10.50 $10.00 $40.50 J 129A SP 72 I I72/1 72 Replace CFD28W CF28/2D 35 1 $15.00 $15.00 INC $10.50 $10.00 $40.50 Z 142 MH 100 MH100/1 128 Replace FXLED39 FXLED39/ INC $0.00 $ $ HPS 100 POLE HPS100/1 138 Replace FXLED39 FXLED39/ INC $0.00 $ $0.00 Q 169 SP 250 MH ROOF MH250/1 295 Replace FXLED78 FXLED78/ INC $0.00 $ $0.00 C 175A 4' 2-LAMP T-8 (32W) F42ILL 59 Replace F30T8 F42SSILL 48 2 $20.00 $45.00 INC $10.00 $10.00 INC $29.75 $10.00 $ P 249 4' 4-Lamp T-8 (32W) F44ILL 112 Replace F30T8 F44SSILL 96 4 $20.00 $45.00 INC $20.00 $20.00 INC $36.75 $10.00 $ AT 250 4' 8-Lamp T-8 (32W) F48ILL 224 NONE 8 $20.00 $45.00 INC $40.00 $ FXLED78 FXLED78/1 78 None FXLED78 FXLED78/ OCC OCCUPANCY SENSOR SWITCH $50 $45 INC $23.75 $20.00 $ Lamps/Fix Ball/Fix Lamp Replacement O.P.& D NJ Incentive Retrofit Cost (inc. O&P) 9/17/2012 Page 6, Cost Table

52 Energy Audit of Englewood Cliffs North Cliffs School CHA Project No Fixture and Control Replacement Cost Lighting Analysis Hours of Operation Area Hallways Offices Multi Purpose/Court Outdoor Lighting Stairway Storage Areas Boiler Room Bath Room Cafeteria/Kitchen/Service Office Linen/Utility/Wet/Janitor/Electrical Cafeteria/Kitchen/Service Locker Storage/Janitor Conference Shower Staff Lounge Hours/Day Hours/Year Proposed Utilized Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y 9/17/2012 Page 7, Operating Hours

53 APPENDIX D New Jersey Pay For Performance Incentive Program New Jersey BPU - Energy Audits Page 29 of 33

54 2012 PAY FOR PERFORMANCE PROGRAM Existing Buildings Incentive Structure Incentive #1: Energy Reduction Plan Incentive Amount:... $0.10 per sq ft Minimum Incentive:... $5,000 Maximum Incentive::... $50,000 or 50% of facility annual energy cost (whichever is less) This incentive is designed to offset the cost of services associated with the development of the Energy Reduction Plan (ERP) and is paid upon ERP approval. Incentive is contingent on implementation of recommended measures outlined in the ERP. Incentive #2: Installation of Recommended Measures Minimum Performance Target:...15% Electric Incentives Base Incentive based on 15% savings:...$0.09 per projected kwh saved For each % over 15% add:...$0.005 per projected kwh saved Maximum Incentive:...$0.11 per projected kwh saved Incentive Cap:... 25% of total project cost Gas Incentives Base Incentive based on 15% savings:...$0.90 per projected Therm saved For each % over 15% add:...$0.05 per projected Therm saved Maximum Incentive:...$1.25 per projected Therm saved This incentive is based on projected energy savings outlined in the ERP. Incentive is paid upon successful installation of recommended measures. Incentive #3: Post-Construction Benchmarking Report Minimum Performance Target:...15% Electric Incentives Base Incentive based on 15% savings:...$0.09 per actual kwh saved For each % over 15% add:...$0.005 per actual kwh saved Maximum Incentive:...$0.11 per actual kwh saved Incentive Cap:... 25% of total project cost Gas Incentives Base Incentive based on 15% savings:...$0.90 per actual Therm saved For each % over 15% add:...$0.05 per actual Therm saved Maximum Incentive:...$1.25 per actual Therm saved This incentive will be released upon submittal of a Post-Construction Benchmarking Report that verifies that the level of savings actually achieved by the installed measures meets or exceeds the minimum performance threshold. To validate the savings and achievement of the Energy Target, the EPA Portfolio Manager shall be used. Savings should be rounded to the nearest percent. Total value of Incentive #2 and Incentive #3 may not exceed 50% of the total project cost. Incentives will be limited to $1 million per gas and electric account per building; maximum of $2 million per project. See Participation Agreement for details /12

55 Englewood Cliff - NJBPU CHA Project #24385 North Cliffs Elementary Schoo New Jersey Pay For Performance Incentive Program Note: The following calculation is based on the New Jersey Pay For Performance Incentive Program per April, 2012 Building must have a minimum average electric demand of 100 kw. This minimum is waived for buildings owned by local governements or non-profit organizations. Values used in this calculation are for measures with a positive return on investment (ROI) only. Incentive #1 Total Building Area (Square Feet) 24,971 Audit is funded by NJ BPU $0.05 $/sqft Is this audit funded by NJ BPU (Y/N) Yes Board of Public Utilites (BPU) Annual Utilities kwh Therms Existing Cost (from utility) $24,567 $16,272 Existing Usage (from utility) 150,540 16,280 Proposed Savings 66,883 7,045 Existing Total MMBtus Proposed Savings MMBtus % Energy Reduction Proposed Annual Savings 2, % $17,100 Min (Savings = 15%) Increase (Savings > 15%) Max Incentive Achieved Incentive $/kwh $/therm $/kwh $/therm $/kwh $/therm $/kwh $/therm Incentive #2 $0.09 $0.90 $0.005 $0.05 $0.11 $1.25 $0.11 $1.25 Incentive #3 $0.09 $0.90 $0.005 $0.05 $0.11 $1.25 $0.11 $1.25 Incentives $ Elec Gas Total Incentive #1 $0 $0 $5,000 Incentive #2 $7,357 $8,806 $16,163 Incentive #3 $7,357 $8,806 $16,163 Total All Incentives $14,714 $17,612 $37,326 Total Project Cost $103,100 Allowable Incentive % Incentives #1 of Utility Cost* 12.2% $5,000 % Incentives #2 of Project Cost** 15.7% $16,163 % Incentives #3 of Project Cost** 15.7% $16,163 Project Payback (years) Total Eligible Incentives*** $37,326 w/o Incentives w/ Incentives Project Cost w/ Incentives $65, * Maximum allowable incentive is 50% of annual utility cost if not funded by NJ BPU, and %25 if it is. ** Maximum allowable amount of Incentive #2 is 25% of total project cost. Maximum allowable amount of Incentive #3 is 25% of total project cost. *** Maximum allowable amount of Incentive #1 is $50,000 if not funded by NJ BPU, and $25,000 if it is. Maximum allowable amount of Incentive #2 & #3 is $1 million per gas account and $1 million per electric account; maximum 2 million per project

56 APPENDIX E ESIP Information New Jersey BPU - Energy Audits Page 30 of 33

57 LFN June 16, 2011 Contact Information Director's Office V F Local Government Research V F Financial Regulation and Assistance V F Local Finance Board V F Local Management Services V F Authority Regulation V F Mail and Delivery 101 South Broad St. PO Box 803 Trenton, New Jersey Web: Distribution Municipal and Freeholder Clerks Municipal and County Chief Financial Officers Local Authority and Fire District Officials School Business Administrators Local Procurement Officials Update on Implementing Energy Savings Improvement Programs This Local Finance Notice provides guidance concerning Energy Savings Improvement Program (ESIP) matters that affect local units covered under the Local Public Contracts Law (LPCL, N.J.S.A. 40A:11) and the Public School Contracts Law (PSCL, N.J.S.A. 18A:18A). The Notice covers a model ESCO (Energy Services Company) Request for Proposal document and provides information on using the Do-It-Yourself process for implementing an ESIP. This Notice supplements Local Finance Notice concerning ESIPs. Model ESCO Request for Proposal Document General Issues The Division of Local Government Services and the Board of Public Utilities have completed development of a model ESCO Request for Proposal Document. It is designed to assist all organizations (contracting units) covered by the LPCL and PSCL hire an energy services company (ESCO) to develop and implement an Energy Savings Plan (ESP) as part of an Energy Savings Improvement Program as authorized under N.J.S.A. 40A: and 18A:18A-4.6. Specifically, the document serves as the starting point for these government agencies to select an ESCO through the competitive contracting procedure (N.J.S.A. 40A: et seq. and 18A:18A-4.1 et seq.). Notwithstanding the efforts of the State agencies to ensure that the RFP is consistent with all relevant procurement procedures, laws, and regulations, there are several issues contracting unit personnel should keep in mind: 1) Local legal advisors should review the document to ensure it is consistent with any allowable local practices and legal considerations. 2) The individual responsible for managing the project should review the entire RFP in order to be able to answer questions and ensure the document meets local needs. 3) Forms have been carefully designed to meet the need of this specific process. Care should be taken if proposed forms are removed and replaced with ones normally used by the contracting unit.

58 Local Finance Notice June 16, 2011 Page 2 Feedback from users about the model is encouraged and the Division plans to update it as experience warrants. To start this feedback process two immediate options are available to users. 1. An ESIP webpage has been established for ESIP issues (the model document will be posted there as well) and it has the ability for users to comments directly to the Division. 2. The Division will hold a meeting to accept comments from interested parties on the RFP. The meeting is scheduled for Thursday, July 28, 2011 at 9:30, to take place at DCA offices at 101 South Broad Street in Trenton. Attendees are asked to register (via ) if they plan to attend or speak; if too many people sign up, we may move the location and will need to contact attendees. This is not an educational session there will be no staff presentations on the RFP and is expressly to take comments that are not submitted in writing. It is expected that professional organizations will sponsor training sessions this fall. As changes are made, they will be noted in text or in a tracked document and posted to the website. Users are urged to check the site to be sure they are using the latest version. The GovConnect Local Procurement role will be used to notify procurement officials when a new version has been posted. Using the Model ESCO RFP The Model ESCO RFP is broken into several self-explanatory sections: Part A. Instructions to Proposers Part B. Terms and Conditions Part C. Scope of Work Part D. Proposal Evaluation Part E. Form of Proposal and Content Part F. Appendix Part G. Proposal Forms It is designed to be used by contracting units under the LPCL and PSCL, but it requires the user to edit the document to reflect the specific type of contracting unit. These edits are substantive and reference-related edits, and are listed below. The RFP is designed to minimize the amount of drafting of technical issues related to an ESIP effort. Since development of an Energy Savings Plan (ESP) is based on an audit that meets the statutory requirements previously conducted by the contracting unit, it is the responsibility of the contracting unit to provide proposers with a copy of the audit as part of the ESCO RFP package (or linked to an online posting of the audit). The audit should guide contracting units to make preliminary decisions concerning energy conservation measures to include in their ESIP. To inform proposers of these decisions, Appendix A of the RFP must be completed by the contracting unit to inform proposers of the projects to be undertaken and any special considerations that proposers are to incorporate into their proposal.

59 Local Finance Notice June 16, 2011 Page 3 The RFP also uses a formal process for potential proposers to submit questions and requests for clarifications. Appendix B is a form for the submission of these requests and is referred to throughout the text. Contracting units are also reminded the Competitive Contracting process does not allow for negotiating proposals. While legal elements of the contract (project development agreement) may require legal determinations and modifications, the process does not allow for negotiation of price or related substantive elements and any element that would have provided less than a level playing field for proposers. Contracting units are also cautioned that setting qualification standards that arbitrarily limit competition is inconsistent with public bidding requirements. Office of State Comptroller Filing: Contracting units are also reminded of their obligations to meet State Comptroller requirements for public contracts. In accordance with N.J.S.A 52:15C- 10, contracting units must notify OSC as early as practicable, but no later than 30 days before advertisement, of any negotiation or solicitation of a contract that may exceed $10 million. Contracting units must also provide post-award notification for any contract for an amount exceeding $2 million. Notification must be given within 20 days of the award. Substantive Edits: Several sections are highlighted in green. These sections should be carefully edited to meet contracting unit needs. This has important application to evaluation criteria in Section D. Once finalized, the green highlight should be removed. Section B-16; Insurance should be reviewed by the contracting unit s Risk Management professionals to be sure the standards are appropriate to the contracting unit and the work to be done. The following Sections also require local decisions and editing: A-3: # of copies of proposal and # of CDs to be submitted A-4: Web posting address, if desired A-5: If extra credit is to be provided on evaluation scoring for attending site walk through B-11: Delete LPCL or PSCL section as appropriate B-34: Use only if PSCL C-1: Explanation of type of audit information C-3(k): Include if ESCO is to provide financing option Use of Appendix F and Proposal Requirements #8: These forms are related to submission of Political Contribution Disclosure forms. Only PSCL agencies are required to use these forms as pursuant to Public School Fiscal Accountability Procedures (N.J.A.C. 6A23A- 6.3). The forms and references to it should be removed for all LPCL users.

60 Local Finance Notice June 16, 2011 Page 4 Reference Editing: <Brackets> are used to highlight text that requires user editing. Users need to review each set and edit as necessary to properly reflect the contracting unit s circumstances. For example, brackets are used to reflect statutory references (i.e., LPCL or PSCL listings), the name of owner, or refer to a website. It is urged that preparers use the search function to locate brackets to be sure all references are corrected. Header: the header section should be edited to reflect the name of the contracting unit Footer: The footer includes a reference to the version of the RFP document. It is recommended that the reference be removed when the RFP is circulated. The model includes a draft Cover letter to send to potential proposers. Located immediately following the cover page, it should be removed and used as a separate document, not part of the RFP. Consider how to refer to the owner s full name or where owner is used. The ESIP Alternative to ESCO: the Do-it-Yourself Process The ESIP law (see Local Finance Notice ) allows two approaches to taking advantage of the financing options the law provides. It allows development and implementation using an ESCO and permits a Do-It-Yourself (DIY) option. The DIY approach involves the contracting unit properly procuring services from different organizations to perform the various elements of an ESIP (i.e., audit, ESP preparation, developing construction plans and specification, etc.). It is an alternative to the ESCO approach, where a single organization provides a wide range of services. Under both contracting models, it is important that contractors performing a range of services do not have conflicts (e.g., the firm developing plans and specifications cannot conduct the final system verification, or the firm that conducts the audit cannot serve as an ESCO). The DIY approach allows the contracting unit to contract for an energy audit from a NJ Division of Property Management and Construction (DPMC) approved energy auditor. At the conclusion of the audit, the contracting unit can choose to specify energy conservation measures (ECM s) in its ESP than can be implemented through a DYI process. The process (ESCO or DIY) also requires that an independent organization verify the ESP. Once the governing body approves the ESP, the contracting unit can then hire (subject to procurement law) a DPMC approved professional architect or engineering firm to design the improvements and prepare the plans and specifications for implementing the Energy Savings Plan. In these cases, subject to the contracting unit procurement requirements, the firm conducting the audit and preparing the ESP, if DPMC qualified, may also provide the services necessary to develop plans and specifications for the contracting unit to use for bidding purposes, as long as they provide the contracting unit Errors and Omissions insurance coverage.

61 Local Finance Notice June 16, 2011 Page 5 Under the ESIP DIY approach, there would be no conflict in a properly procured single organization conducting the audit, developing the ESP, then preparing plans and specifications. This does not apply when using the ESCO approach, where the auditor and ESCO must be independent. Once construction plans and specifications are complete, the contracting unit would then conduct the bidding process as it would any public works construction project: manage the project as it sees fit (the firm that did the plans could also serve as construction manager), and then contract as necessary for commissioning and final third party verification. The two verification steps (the ESP and verifying implementation) must be performed by an organization independent of the ones preparing the ESP, overseeing construction and commissioning. By following this process, the contracting unit can then apply to the Local Finance Board for the issuance of ESIP-based energy saving obligations or enter into appropriate lease financing. The ESIP approach to energy improvement provides a range of options for contracting units to accrue energy savings while improving the environment, taking advantage of low-cost financing and state and federal incentives. DLGS and the BPU encourage comments and questions (through the ESIP web page) on this new opportunity so we can improve it as time goes on. Approved: Thomas H. Neff, Director, Division of Local Government Services Table of Web Links Page Shortcut text Internet Address 1, 4 Local Finance Notice ESIP webpage 2 comments mailto:lpcl@dca.state.nj.us 2 to register (via mailto:lpcl@dca.state.nj.us 2 GovConnect Local Procurement 3 State Comptroller requirements.

62 APPENDIX F Photovoltaic (PV) Rooftop Solar Power, Solar Hot Water Generation New Jersey BPU - Energy Audits Page 31 of 33

63 Photovoltaic (PV) Solar Power Generation - Screening Assessment Englewood Cliffs Public Schools North Cliff Elementary School Cost of Electricity $0.163 /kwh Electricity Usage 150,540 kwh/yr System Unit Cost $4,000 /kw Photovoltaic (PV) Solar Power Generation - Screening Assessment Budgetary Annual Utility Savings Estimated Total Federal Tax Credit New Jersey Renewable Payback Payback (without incentive) (with incentive) Cost Maintenance Savings ** SREC Savings $ kw kwh therms $ $ $ $ $ Years Years $400, ,897 0 $20,382 0 $20,382 $0 $9, ** Estimated Solar Renewable Energy Certificate Program (SREC) SREC for 15 Years= $80 /1000kwh Area Output* 2,085 m2 22,443 ft2 Perimeter Output* 201 m 660 ft Available Roof Space for PV: (Area Output - 10 ft x Perimeter) x 85% 13,469 ft2 Approximate System Size: Is the roof flat? (Yes/No) Yes 8 watt/ft2 107,750 DC watts 100 kw Enter into PV Watts PV Watts Inputs* Array Tilt Angle 20 Array Azimuth 180 Zip Code DC/AC Derate Factor 0.83 Enter into PV Watts (always 20 if flat, if pitched - enter estimated roof angle) Enter into PV Watts (default) Enter into PV Watts Enter info PV Watts PV Watts Output 124,897 annual kwh calculated in PV Watts program % Offset Calc Usage 150,540 (from utilities) PV Generation 124,897 (generated using PV Watts ) % offset 83% * ** 9/17/2012 Page 1, North Cliff

64 PVWATTS: AC Energy and Cost Savings Page 1 of 1 9/6/2012 * * * AC Energy & Cost Savings (Type comments here to appear on printout; maximum 1 row of 80 characters.) Station Identification City: Newark State: New_Jersey Latitude: N Longitude: W Elevation: 9 m PV System Specifications DC Rating: kw DC to AC Derate Factor: AC Rating: 77.0 kw Array Type: Fixed Tilt Array Tilt: 40.7 Array Azimuth: Energy Specifications Cost of Electricity: 16.3 /kwh Month Solar Radiation (kwh/m 2 /day) Results AC Energy (kwh) Energy Value ($) Year Output Hourly Performance Data About the Hourly Performance Data * Output Results as Text Saving Text from a Browser Run PVWATTS v.1 for another US location or an International location Run PVWATTS v.2 (US only) Please send questions and comments regarding PVWATTS to Webmaster Disclaimer and copyright notice Return to RReDC home page ( )

65 Englewood Cliff - NJBPU Multipliers CHA Project #24385 Material: North Cliffs Elementary School Labor: Equipment: Description QTY UNIT Synergy Solar Thermal System UNIT COSTS SUBTOTAL COSTS TOTAL MAT. LABOR EQUIP. MAT. LABOR EQUIP. COST 1 EA $ 2,400 $ 1,200 $ 2,386 $ 1,494 $ - $ 3,880 Piping modifications 1 LS $ 1,500 $ 2,000 $ 1,491 $ 2,490 $ - $ 3,981 Electrical modifications 1 LS $ 400 $ 500 $ 398 $ 623 $ - $ 1,020 REMARKS 65 Gallon Storage Tank 10 Gallon Drip Tank 1 EA $ 300 $ 200 $ 300 $ 200 $ - $ EA $ 100 $ 80 $ 100 $ 80 $ - $ 180 $ - $ - $ - $ - $ 9,561 Subtotal $ % Contingency $ % Contractor O&P $ % Engineering $ 12,429 Total

66 APPENDIX G EPA Portfolio Manager New Jersey BPU - Energy Audits Page 32 of 33

67 OMB No STATEMENT OF ENERGY PERFORMANCE North Cliff Elementary School Building ID: For 12-month Period Ending: October 31, Date SEP becomes ineligible: N/A Date SEP Generated: June 25, 2012 Facility North Cliff Elementary School 642 Floyd St. Englewood Cliffs, NJ Year Built: 1963 Gross Floor Area (ft 2 ): 24,971 Facility Owner N/A Primary Contact for this Facility N/A Energy Performance Rating 2 (1-100) 74 Site Energy Use Summary 3 Electricity - Grid Purchase(kBtu) 513,642 Natural Gas (kbtu) 4 1,627,968 Total Energy (kbtu) 2,141,610 Energy Intensity 4 Site (kbtu/ft 2 /yr) 86 Source (kbtu/ft 2 /yr) 137 Emissions (based on site energy use) Greenhouse Gas Emissions (MtCO 2 e/year) 159 Electric Distribution Utility Public Service Electric & Gas Co National Median Comparison National Median Site EUI 109 National Median Source EUI 173 % Difference from National Median Source EUI -21% Building Type K-12 School Stamp of Certifying Professional Based on the conditions observed at the time of my visit to this building, I certify that the information contained within this statement is accurate. Meets Industry Standards 5 for Indoor Environmental Conditions: Ventilation for Acceptable Indoor Air Quality N/A Acceptable Thermal Environmental Conditions N/A Adequate Illumination N/A Certifying Professional N/A Notes: 1. Application for the ENERGY STAR must be submitted to EPA within 4 months of the Period Ending date. Award of the ENERGY STAR is not final until approval is received from EPA. 2. The EPA Energy Performance Rating is based on total source energy. A rating of 75 is the minimum to be eligible for the ENERGY STAR. 3. Values represent energy consumption, annualized to a 12-month period. 4. Values represent energy intensity, annualized to a 12-month period. 5. Based on Meeting ASHRAE Standard 62 for ventilation for acceptable indoor air quality, ASHRAE Standard 55 for thermal comfort, and IESNA Lighting Handbook for lighting quality. The government estimates the average time needed to fill out this form is 6 hours (includes the time for entering energy data, Licensed Professional facility inspection, and notarizing the SEP) and welcomes suggestions for reducing this level of effort. Send comments (referencing OMB control number) to the Director, Collection Strategies Division, U.S., EPA (2822T), 1200 Pennsylvania Ave., NW, Washington, D.C EPA Form

ENGLEWOOD CLIFFS PUBLIC SCHOOLS UPPER SCHOOL ELEMENTARY SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO.

ENGLEWOOD CLIFFS PUBLIC SCHOOLS UPPER SCHOOL ELEMENTARY SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. ENGLEWOOD CLIFFS PUBLIC SCHOOLS UPPER SCHOOL ELEMENTARY SCHOOL ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 24385 November 2012 Prepared by: 6 Campus Drive Parsippany, NJ

More information

MAYWOOD BOARD OF EDUCATION MEMORIAL ELEMENTARY SCHOOL ENERGY ASSESSMENT. For NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO.

MAYWOOD BOARD OF EDUCATION MEMORIAL ELEMENTARY SCHOOL ENERGY ASSESSMENT. For NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. MAYWOOD BOARD OF EDUCATION MEMORIAL ELEMENTARY SCHOOL ENERGY ASSESSMENT For NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 24473 September 2012 Prepared by: 6 Campus Drive Parsippany, NJ 07054 (973)

More information

ROXBURY TOWNSHIP TOWN HALL / POLICE DEPARTMENT ENERGY ASSESSMENT. for NEW JERSEY BUREAU OF PUBLIC UTILITIES CHA PROJECT NO

ROXBURY TOWNSHIP TOWN HALL / POLICE DEPARTMENT ENERGY ASSESSMENT. for NEW JERSEY BUREAU OF PUBLIC UTILITIES CHA PROJECT NO ROXBURY TOWNSHIP TOWN HALL / POLICE DEPARTMENT ENERGY ASSESSMENT for NEW JERSEY BUREAU OF PUBLIC UTILITIES CHA PROJECT NO. 20556 May 2010 Prepared by: CLOUGH HARBOUR & ASSOCIATES LLP 6 Campus Drive Parsippany,

More information

ROXBURY TOWNSHIP PUBLIC LIBRARY ENERGY ASSESSMENT. for NEW JERSEY BUREAU OF PUBLIC UTILITIES

ROXBURY TOWNSHIP PUBLIC LIBRARY ENERGY ASSESSMENT. for NEW JERSEY BUREAU OF PUBLIC UTILITIES ROXBURY TOWNSHIP PUBLIC LIBRARY ENERGY ASSESSMENT for NEW JERSEY BUREAU OF PUBLIC UTILITIES ROXBURY TOWNSHIP PUBLIC LIBRARY ENERGY ASSESSMENT for NEW JERSEY BUREAU OF PUBLIC UTILITIES CHA PROJECT NO. 20556

More information

MILFORD BOARD OF EDUCATION MILFORD PUBLIC SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO

MILFORD BOARD OF EDUCATION MILFORD PUBLIC SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO MILFORD BOARD OF EDUCATION MILFORD PUBLIC SCHOOL ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 25130 March 2013 Prepared by: 6 Campus Drive Parsippany, NJ 07054 (973) 538-2120

More information

CAMDEN COUNTY COLLEGE PAPIANO GYM ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO November 2012.

CAMDEN COUNTY COLLEGE PAPIANO GYM ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO November 2012. CAMDEN COUNTY COLLEGE PAPIANO GYM ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 24364 November 2012 Prepared by: 6 Campus Drive Parsippany, NJ 07054 (973) 538-2120 New Jersey

More information

MERCHANTVILLE-PENNSAUKEN WATER COMMISSION WOODBINE AVENUE TREATMENT PLANT ENERGY ASSESSMENT

MERCHANTVILLE-PENNSAUKEN WATER COMMISSION WOODBINE AVENUE TREATMENT PLANT ENERGY ASSESSMENT MERCHANTVILLE-PENNSAUKEN WATER COMMISSION WOODBINE AVENUE TREATMENT PLANT ENERGY ASSESSMENT FOR NEW JERSEY BOARD OF PUBLIC UTILITIES JANUARY 2013 Prepared by: 6 Campus Drive Parsippany, NJ 07054 (973)

More information

UPPER TOWNSHIP SCHOOL DISTRICT UPPER TOWNSHIP ELEMENTARY SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO.

UPPER TOWNSHIP SCHOOL DISTRICT UPPER TOWNSHIP ELEMENTARY SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. UPPER TOWNSHIP SCHOOL DISTRICT UPPER TOWNSHIP ELEMENTARY SCHOOL ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 24145 June 2012 Prepared by: 6 Campus Drive Parsippany, NJ 07054

More information

BISHOP FARMSTEAD OFFICES OF PINELANDS PRESERVATION ALLIANCE ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO.

BISHOP FARMSTEAD OFFICES OF PINELANDS PRESERVATION ALLIANCE ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. BISHOP FARMSTEAD OFFICES OF PINELANDS PRESERVATION ALLIANCE ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 23261 NOVEMBER 2011 Prepared by: 6 Campus Drive Parsippany, NJ 07054

More information

CITY OF LINWOOD CITY HALL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO February 2011.

CITY OF LINWOOD CITY HALL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO February 2011. CITY OF LINWOOD CITY HALL ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 22215 February 2011 Prepared by: CLOUGH HARBOUR & ASSOCIATES LLP 6 Campus Drive Parsippany, NJ 07054

More information

ORADELL BOARD OF EDUCATION ORADELL PUBLIC SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO

ORADELL BOARD OF EDUCATION ORADELL PUBLIC SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO ORADELL BOARD OF EDUCATION ORADELL PUBLIC SCHOOL ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 24384 November 2012 Prepared by: 6 Campus Drive Parsippany, NJ 07054 (973) 538-2120

More information

CITY OF LINWOOD PUBLIC WORKS GARAGE ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO February 2011.

CITY OF LINWOOD PUBLIC WORKS GARAGE ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO February 2011. CITY OF LINWOOD PUBLIC WORKS GARAGE ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 22215 February 2011 Prepared by: CLOUGH HARBOUR & ASSOCIATES LLP 6 Campus Drive Parsippany,

More information

CAMDEN COUNTY COLLEGE HELENE FULD BUILDING ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO

CAMDEN COUNTY COLLEGE HELENE FULD BUILDING ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO CAMDEN COUNTY COLLEGE HELENE FULD BUILDING ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 24364 November 2012 Prepared by: 6 Campus Drive Parsippany, NJ 07054 (973) 538-2120

More information

CITY OF LINWOOD EMERGENCY MEDICAL SERVICE BUILDING ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO

CITY OF LINWOOD EMERGENCY MEDICAL SERVICE BUILDING ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO CITY OF LINWOOD EMERGENCY MEDICAL SERVICE BUILDING ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 22215 February 2011 Prepared by: CLOUGH HARBOUR & ASSOCIATES LLP 6 Campus Drive

More information

ELMER ELEMENTARY SCHOOL 207 Front Street, Elmer NJ 08318

ELMER ELEMENTARY SCHOOL 207 Front Street, Elmer NJ 08318 PITTSGROVE TOWNSHIP SCHOOL DISTRICT ELMER ELEMENTARY SCHOOL 207 Front Street, Elmer NJ 08318 LOCAL GOVERNMENT ENERGY AUDIT PROGRAM FOR NEW JERSEY BOARD OF PUBLIC UTILITIES June 2014 Prepared by: 6 Campus

More information

SPRINGFIELD BOARD OF EDUCATION JAMES CALDWELL ELEMENTARY SCHOOL ENERGY ASSESSMENT

SPRINGFIELD BOARD OF EDUCATION JAMES CALDWELL ELEMENTARY SCHOOL ENERGY ASSESSMENT SPRINGFIELD BOARD OF EDUCATION JAMES CALDWELL ELEMENTARY SCHOOL ENERGY ASSESSMENT FOR NEW JERSEY BOARD OF PUBLIC UTILITIES MAY 2013 Prepared by: 6 Campus Drive Parsippany, NJ 07054 (973) 538-2120 CHA PROJECT

More information

FOR BOARD OF PUBLIC. February (973)

FOR BOARD OF PUBLIC. February (973) PARSIPPANY-TROY HILLS BOARD OF EDUCATION LAKE PARSIPPANY ELEMENTARY SCHOOL E N ERG Y AS SESSMEN T BOARD OF FOR NEW JERSEY PUBLIC UTILITIES February 2013 Prepared by: 6 Campus Drive Parsippany, NJ 07054

More information

BOROUGH OF OCEANPORT BOROUGH HALL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES

BOROUGH OF OCEANPORT BOROUGH HALL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES BOROUGH OF OCEANPORT BOROUGH HALL ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES BOROUGH OF OCEANPORT BOROUGH HALL ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO.

More information

ROXBURY TOWNSHIP CHEMICAL ENGINE COMPANY NO. 3 ENERGY ASSESSMENT. for NEW JERSEY BUREAU OF PUBLIC UTILITIES

ROXBURY TOWNSHIP CHEMICAL ENGINE COMPANY NO. 3 ENERGY ASSESSMENT. for NEW JERSEY BUREAU OF PUBLIC UTILITIES ROXBURY TOWNSHIP CHEMICAL ENGINE COMPANY NO. 3 ENERGY ASSESSMENT for NEW JERSEY BUREAU OF PUBLIC UTILITIES ROXBURY TOWNSHIP CHEMICAL ENGINE COMPANY NO. 3 ENERGY ASSESSMENT for NEW JERSEY BUREAU OF PUBLIC

More information

CITY OF NEWARK CITY HALL COMPLEX City Hall Building Police Building Courthouse ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES

CITY OF NEWARK CITY HALL COMPLEX City Hall Building Police Building Courthouse ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CITY OF NEWARK CITY HALL COMPLEX City Hall Building Police Building Courthouse ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 21823 February 2011 Prepared by: 6 Campus Drive

More information

T ROY HILLS T FOR BOARD OF PUBLIC. February (973)

T ROY HILLS T FOR BOARD OF PUBLIC. February (973) PARSIPPANY-TROY HILLS BOARD OF EDUCATION T ROY HILLS ELEM ENTARY S CHOOO L E N ERG Y AS SESSMEN T BOARD OF FOR NEW JERSEY PUBLIC UTILITIES February 2013 Prepared by: 6 Campus Drive Parsippany, NJ 07054

More information

LOCAL GOVERNMENT ENERGY AUDIT PROGRAM FOR NEW JERSEY BOARD OF PUBLIC UTILITIES

LOCAL GOVERNMENT ENERGY AUDIT PROGRAM FOR NEW JERSEY BOARD OF PUBLIC UTILITIES CITY OF LINDEN J T GREGORIO CENTER 330 Helen Street Linden, NJ, 07036 LOCAL GOVERNMENT ENERGY AUDIT PROGRAM FOR NEW JERSEY BOARD OF PUBLIC UTILITIES March 2015 Prepared by: 6 Campus Drive Parsippany, NJ

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report West Cape May Elementary School West Cape May Board of Education Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution

More information

HACKENSACK MIDDLE SCHOOL 360 Union St Hackensack NJ 07601

HACKENSACK MIDDLE SCHOOL 360 Union St Hackensack NJ 07601 HACKENSACK BOARD OF EDUCATION HACKENSACK MIDDLE SCHOOL 360 Union St Hackensack NJ 07601 LOCAL GOVERNMENT ENERGY AUDIT PROGRAM FOR NEW JERSEY BOARD OF PUBLIC UTILITIES December 2015 Revised January 27,

More information

SECAUCUS RECREATION CENTER LOCAL GOVERNMENT ENERGY AUDIT FOR NEW JERSEY BOARD OF PUBLIC UTILITIES. January Prepared by:

SECAUCUS RECREATION CENTER LOCAL GOVERNMENT ENERGY AUDIT FOR NEW JERSEY BOARD OF PUBLIC UTILITIES. January Prepared by: SECAUCUS RECREATION CENTER LOCAL GOVERNMENT ENERGY AUDIT FOR NEW JERSEY BOARD OF PUBLIC UTILITIES January 2014 Prepared by: 6 Campus Drive Parsippany, NJ 07054 (973) 538-2120 CHA PROJECT NO. 27601 New

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: i Energy Audit Report Lift Station #1, 3, 5, 6, 7, 8, and 9 Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part

More information

ELIAS BOUDINOT ELEMENTARY SCHOOL Pearl and Ellis Street, Burlington NJ 08016

ELIAS BOUDINOT ELEMENTARY SCHOOL Pearl and Ellis Street, Burlington NJ 08016 BURLINGTON CITY PUBLIC SCHOOLS ELIAS BOUDINOT ELEMENTARY SCHOOL Pearl and Ellis Street, Burlington NJ 08016 LOCAL GOVERNMENT ENERGY AUDIT PROGRAM FOR NEW JERSEY BOARD OF PUBLIC UTILITIES September 2014

More information

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit: Energy Audit Report Local Government Energy Audit: Energy Audit Report Montclair High School Montclair Board of Education 100 Chestnut Street Montclair, New Jersey 07402 Copyright 2019 TRC Energy Services. All rights reserved.

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report BOE Warehouse Brick Township Board of Education Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or

More information

Energy Assessment Report Clayville Elementary School DRAFT October George Washington Highway, Clayville, RI DRAFT

Energy Assessment Report Clayville Elementary School DRAFT October George Washington Highway, Clayville, RI DRAFT Report Clayville Elementary School October 2016 3 George Washington Highway, Clayville, RI 02815 Clayville Elementary School Summary of Findings On behalf of the School Building Authority at Rhode Island

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of this document without

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Lake Riviera Middle School Brick Township Board of Education Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of

More information

LAWRENCE BROOK ELEMENTARY SCHOOL 48 Sullivan Way, East Brunswick, NJ 08816

LAWRENCE BROOK ELEMENTARY SCHOOL 48 Sullivan Way, East Brunswick, NJ 08816 EAST BRUNSWICK BOARD OF EDUCATION LAWRENCE BROOK ELEMENTARY SCHOOL 48 Sullivan Way, East Brunswick, NJ 08816 LOCAL GOVERNMENT ENERGY AUDIT PROGRAM FOR NEW JERSEY BOARD OF PUBLIC UTILITIES February 2016

More information

Energy Auditing for Schools. Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007

Energy Auditing for Schools. Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007 Energy Auditing for Schools Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007 Schools Consumption breakdown 19% 6% 9% Space Heating 46% Water Heating Lighting Cooling 20%

More information

WARNSDORFER ELEMENTARY SCHOOL 9 Hardenburg Lane, East Brunswick, NJ 08816

WARNSDORFER ELEMENTARY SCHOOL 9 Hardenburg Lane, East Brunswick, NJ 08816 EAST BRUNSWICK BOARD OF EDUCATION WARNSDORFER ELEMENTARY SCHOOL 9 Hardenburg Lane, East Brunswick, NJ 08816 LOCAL GOVERNMENT ENERGY AUDIT PROGRAM FOR NEW JERSEY BOARD OF PUBLIC UTILITIES February 2016

More information

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit: Energy Audit Report Local Government Energy Audit: Energy Audit Report Abraham Clark High School Roselle Borough Board of Education Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Mystic Island Volunteer Fire Company Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of

More information

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit: Energy Audit Report Local Government Energy Audit: Energy Audit Report Renaissance at Rand Montclair Board of Education 176 North Fullerton Avenue Montclair, New Jersey 07402 Copyright 2019 TRC Energy Services. All rights

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Abbott and Costello Center Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents

More information

HOLMDEL TOWNSHIP BOARD OF EDUCATION HOLMDEL HIGH SCHOOL ENERGY ASSESSMENT FOR NEW JERSEY BOARD OF PUBLIC UTILITIES FEBRUARY 2013.

HOLMDEL TOWNSHIP BOARD OF EDUCATION HOLMDEL HIGH SCHOOL ENERGY ASSESSMENT FOR NEW JERSEY BOARD OF PUBLIC UTILITIES FEBRUARY 2013. HOLMDEL TOWNSHIP BOARD OF EDUCATION HOLMDEL HIGH SCHOOL ENERGY ASSESSMENT FOR NEW JERSEY BOARD OF PUBLIC UTILITIES FEBRUARY 2013 Prepared by: 6 Campus Drive Parsippany, NJ 07054 (973) 5382120 CHA PROJECT

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Hamilton Bus Garage Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of

More information

ENERGY AUDIT REPORTS SUMMARY

ENERGY AUDIT REPORTS SUMMARY Steven Winter Associates, Inc. 293 Route 18, Suite 330 Telephone (866) 676-1972 Building Systems Consultants East Brunswick, NJ 08816 Facsimile (203) 852-0741 www.swinter.com February 16, 2011 Sussex Community

More information

MEADOWLANDS MAINTENANCE GARAGE 2600 Pennhorn Avenue, North Bergen, NJ 07047

MEADOWLANDS MAINTENANCE GARAGE 2600 Pennhorn Avenue, North Bergen, NJ 07047 NEW JERSEY TRANSIT MEADOWLANDS MAINTENANCE GARAGE 2600 Pennhorn Avenue, North Bergen, NJ 07047 LOCAL GOVERNMENT ENERGY AUDIT PROGRAM FOR NEW JERSEY BOARD OF PUBLIC UTILITIES Original: March 2016 Revised:

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Municipal Building Township of Woodbridge Copyright 2016 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part

More information

WAYNE MAINTENANCE GARAGE 75 West Belt Parkway, Wayne, NJ 07470

WAYNE MAINTENANCE GARAGE 75 West Belt Parkway, Wayne, NJ 07470 NEW JERSEY TRANSIT WAYNE MAINTENANCE GARAGE 75 West Belt Parkway, Wayne, NJ 07470 LOCAL GOVERNMENT ENERGY AUDIT PROGRAM FOR NEW JERSEY BOARD OF PUBLIC UTILITIES Original: March 2016 Revised: June 10, 2016

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Deptford Township High School Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents

More information

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit: Energy Audit Report Local Government Energy Audit: Energy Audit Report Panzer Athletic Center Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Bohn Hall Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of this document

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Veterans Memorial Middle School Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the

More information

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit: Energy Audit Report Local Government Energy Audit: Energy Audit Report Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of this document without

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Pavonia Pool City of Jersey City 914 Pavonia Ave. Jersey City, NJ 07306 Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution

More information

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit: Energy Audit Report Local Government Energy Audit: Energy Audit Report Health Science Building (#4) Ocean County College Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole,

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Firehouse Copyright 2016 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of this document

More information

Multifamily Net Zero Retrofit Market: Technical and Cost Benchmarks for San Francisco

Multifamily Net Zero Retrofit Market: Technical and Cost Benchmarks for San Francisco Multifamily Net Zero Retrofit Market: Technical and Cost Benchmarks for San Francisco 1 Table of Contents Acronym Key Analysis Process Retrofit Economics Technical Analysis Details 6 Unit Building Analysis

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Alexander Kasser Theater Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents

More information

New Jersey Board of Public Utilities Clean Energy Program Incentives and Proposed Hurricane Sandy Storm Response

New Jersey Board of Public Utilities Clean Energy Program Incentives and Proposed Hurricane Sandy Storm Response New Jersey Board of Public Utilities Clean Energy Program Incentives and Proposed Hurricane Sandy Storm Response Energy Efficient Equipment and Building Upgrades February 2013 Program Goals Save energy

More information

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit: Energy Audit Report Local Government Energy Audit: Energy Audit Report Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of this document without

More information

SUMMARY OF SERVICES & INCENTIVES

SUMMARY OF SERVICES & INCENTIVES SMALL BUSINESS PROGRAM 2017 SUMMARY OF SERVICES & INCENTIVES Effective through December 31, 2017 Last updated February 1, 2017 EFFICIENCY INCENTIVES SUMMARY The Focus on Energy Small Business Program offers

More information

Somerset Hills School District JUNE Final Energy Audit Report

Somerset Hills School District JUNE Final Energy Audit Report A Somerset Hills School District JUNE 2009 Final Energy Audit Report Contents Executive Summary Section 1 Introduction 1.1 General... 1-1 1.2 Background... 1-1 1.3 Purpose and Scope... 1-2 Section 2 Facility

More information

2/17/2017. Energy Accounting & Education. Topics (Electricity) Creating Electricity

2/17/2017. Energy Accounting & Education. Topics (Electricity) Creating Electricity Energy Accounting & Education Energy Managers Kermit King School District of La Crosse John Daily School District of Holmen 1 Topics (Electricity) Creating electricity Defining degree days Customer charges

More information

LOGO. Trivium Level II Energy Audit

LOGO. Trivium Level II Energy Audit LOGO Trivium Level II Energy Audit Submission Date: 9/16/2016 Table of Contents 1.0 EXECUTIVE SUMMARY 3 2.0 SITE ENERGY CONSUMPTION 5 3.0 BACKGROUND INFORMATION 6 3.1 Description of the Client 6 3.2 Description

More information

Deep Energy Retrofit Modeling and Cost Effectiveness Study: A Technical Policy Brief. January 2013

Deep Energy Retrofit Modeling and Cost Effectiveness Study: A Technical Policy Brief. January 2013 Deep Energy Retrofit Modeling and Effectiveness Study: A Technical Policy Brief January 2013 Table of Contents EXECUTIVE SUMMARY... 3 INTRODUCTION... 4 BUILDING 1... 7 BUILDING 2... 9 BUILDING 3... 11

More information

Monmouth County. June Final Energy Audit Report

Monmouth County. June Final Energy Audit Report A Monmouth County June 2010 Final Energy Audit Report Contents Executive Summary Section 1 Introduction 1.1 General... 1-1 1.2 Background... 1-1 1.3 Purpose and Scope... 1-2 Section 2 Facility Description

More information

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit: Energy Audit Report Local Government Energy Audit: Energy Audit Report Senior Center Secaucus, Town of 101 Center Avenue Secaucus, New Jersey 07094 Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or

More information

New Jersey Board of Public Utilities Clean Energy Program Opportunities for Commercial, Industrial and Institutional Buildings

New Jersey Board of Public Utilities Clean Energy Program Opportunities for Commercial, Industrial and Institutional Buildings New Jersey Board of Public Utilities Clean Energy Program Opportunities for Commercial, Industrial and Institutional Buildings Gary E Finger Ombudsman June 2013 NJ Clean Energy Program Background Introduced

More information

Consumer Energy Tax Credit

Consumer Energy Tax Credit Consumer Energy Tax Credit FLAMMABLE AND COMBUSTIBLE LIQUIDS 2009 IFC Overview of Tax Credit Energy efficiency incentives for upgrades to existing homes are now available for 2009 and 2010. These tax incentives

More information

Implementing Low-Cost Energy Savings Projects & Conducting Energy Audits

Implementing Low-Cost Energy Savings Projects & Conducting Energy Audits AEP Ohio Customer Seminar Implementing Low-Cost Energy Savings Projects & Conducting Energy Audits Presented by: Julie Birchfield Customer Manager Energy Optimizers, USA May, 2018 Test your Energy IQ 11

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Main Academic Central Brookdale Community College Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole,

More information

Energy Expenditure Plan Prepared January 4, 2017

Energy Expenditure Plan Prepared January 4, 2017 Proposition 39 Energy Expenditure Plan Prepared January 4, 2017 Redwood Coast Montessori School District 1611 Peninsula Drive Arcata, CA 95521 Table of Contents I. Executive Summary 1 Energy Star s Portfolio

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Transportation Depot Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of

More information

PATERSON CHARTER SCHOOL K-6 CAMPUS FACILITY ENERGY REPORT 276 WABASH AVENUE PATERSON, NEW JERSEY 07502

PATERSON CHARTER SCHOOL K-6 CAMPUS FACILITY ENERGY REPORT 276 WABASH AVENUE PATERSON, NEW JERSEY 07502 PATERSON CHARTER SCHOOL K-6 CAMPUS 276 WABASH AVENUE PATERSON, NEW JERSEY 07502 FACILITY ENERGY REPORT Paterson Charter School Grades K-6 Campus Energy Audit TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST...

More information

EAST ORANGE SCHOOL DISTRICT GORDON PARKS ACADEMY FACILITY ENERGY REPORT 99 GREENWOOD AVENUE EAST ORANGE, NEW JERSEY 07017

EAST ORANGE SCHOOL DISTRICT GORDON PARKS ACADEMY FACILITY ENERGY REPORT 99 GREENWOOD AVENUE EAST ORANGE, NEW JERSEY 07017 EAST ORANGE SCHOOL DISTRICT GORDON PARKS ACADEMY 99 GREENWOOD AVENUE EAST ORANGE, NEW JERSEY 07017 FACILITY ENERGY REPORT East Orange School District Gordon Parks Academy TABLE OF CONTENTS I. HISTORIC

More information

Energy Audit. Town of Charlemont. Town Hall. 157 Main Street Charlemont, MA August 31, 2018

Energy Audit. Town of Charlemont. Town Hall. 157 Main Street Charlemont, MA August 31, 2018 Energy Audit Town of Charlemont Town Hall 157 Main Street Charlemont, MA 01339 August 31, 2018 Prepared by: Bowman Engineering, Inc. PO Box 410 Greenfield, MA 01302 (413) 303-0238 Preparer: Thomas Bowman,

More information

The baseline building system for compliance with Senate Bill 668 is defined by Appendix G,

The baseline building system for compliance with Senate Bill 668 is defined by Appendix G, Project: North Carolina A&T State University New Student Health Center SCO #: 08-08109-01A 1.0 Heating, Ventilating and Air Conditioning (HVAC) Baseline Building Systems Senate Bill 668 Compliance The

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Machuga Heights and Dinallo Heights Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of

More information

Hamilton Board of Education Robinson Elementary School Hamilton, NJ 08610

Hamilton Board of Education Robinson Elementary School Hamilton, NJ 08610 Steven Winter Associates, Inc. 50 Washington Street Telephone (203) 857-0200 Architects and Engineers Norwalk, CT 06854 Facsimile (203) 852-0741 www.swinter.com E-mail: swinter@swinter.com July 17, 2009

More information

Local Government Energy Audit:

Local Government Energy Audit: areappendix Local Government Energy Audit: Energy Audit Report Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of this document

More information

City of New Brunswick Engine 5 Fire House 75 Bartlett St New Brunswick, NJ 08901

City of New Brunswick Engine 5 Fire House 75 Bartlett St New Brunswick, NJ 08901 Steven Winter Associates, Inc. 293 Route 18 South, Suite 330 Telephone: (866) 676-1972 Architects and Engineers East Brunswick, NJ 08816 E-mail:swinter@swinter.com www.swinter.com August 25, 2010 Local

More information

Energy Audit. Town of Charlemont. Highway Garage. 12 Factory Rd. Charlemont, MA August 31, 2018

Energy Audit. Town of Charlemont. Highway Garage. 12 Factory Rd. Charlemont, MA August 31, 2018 Energy Audit Town of Charlemont Highway Garage 12 Factory Rd. Charlemont, MA 01339 August 31, 2018 Prepared by: Bowman Engineering, Inc. PO Box 410 Greenfield, MA 01302 (413) 303-0238 Preparer: Thomas

More information

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal The following documentation provides an example submittal for the LEED-NC v2.1 Energy & Atmosphere Credit 1 (EAc1). This sample EAc1 submittal

More information

VOORHEES TOWNSHIP BOARD OF EDUCATION OSAGE ELEMENTARY SCHOOL 128 E CHEWS LANDING RD, VOORHEES, NJ, FACILITY ENERGY REPORT

VOORHEES TOWNSHIP BOARD OF EDUCATION OSAGE ELEMENTARY SCHOOL 128 E CHEWS LANDING RD, VOORHEES, NJ, FACILITY ENERGY REPORT VOORHEES TOWNSHIP BOARD OF EDUCATION OSAGE ELEMENTARY SCHOOL 128 E CHEWS LANDING RD, VOORHEES, NJ, 08043 FACILITY ENERGY REPORT Voorhees Township Public Schools Osage Elementary School TABLE OF CONTENTS

More information

Mercer County Technical Schools MAY Draft Energy Audit Report Final Energy Audit Report

Mercer County Technical Schools MAY Draft Energy Audit Report Final Energy Audit Report Mercer County Technical Schools MY 2010 Draft Energy udit Report Final Energy udit Report Contents Executive Summary Section 1 Introduction 1.1 General... 1-1 1.2 Background... 1-1 1.3 Purpose and Scope...

More information

Results and Recommendations from Energy Audit of Kipnuk. For VEEP Grants. City of Kipnuk, Alaska

Results and Recommendations from Energy Audit of Kipnuk. For VEEP Grants. City of Kipnuk, Alaska ENERGY AUDIT POST INSTALLATION REPORT Results and Recommendations from Energy Audit of Kipnuk For VEEP Grants City of Kipnuk, Alaska June 20, 2012 Prepared By:, Inc. 6643 Brayton Drive Anchorage, AK 99507

More information

Holistic Design Approach For Energy Efficiency ASHRAE TECHNOLOGY AWARD CASE STUDIES

Holistic Design Approach For Energy Efficiency ASHRAE TECHNOLOGY AWARD CASE STUDIES ASHRAE TECHNOLOGY AWARD CASE STUDIES This article was published in ASHRAE Journal, June 2018. Copyright 2018 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically

More information

BRICK TOWNSHIP BOARD OF EDUCATION EMMA HAVENS YOUNG ELEMENTARY SCHOOL 43 DRUM POINT ROAD BRICK, NJ FACILITY ENERGY REPORT

BRICK TOWNSHIP BOARD OF EDUCATION EMMA HAVENS YOUNG ELEMENTARY SCHOOL 43 DRUM POINT ROAD BRICK, NJ FACILITY ENERGY REPORT BRICK TOWNSHIP BOARD OF EDUCATION EMMA HAVENS YOUNG ELEMENTARY SCHOOL 43 DRUM POINT ROAD BRICK, NJ 08723 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION...

More information

CREDIT COMPLIANCE (Please complete the color coded criteria(s) based on the option path selected)

CREDIT COMPLIANCE (Please complete the color coded criteria(s) based on the option path selected) (Responsible Individual) (Company Name) I,, from verify that the information provided below is accurate, to the best of my knowledge. CREDIT COMPLIANCE (Please complete the color coded criteria(s) based

More information

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit: Energy Audit Report Local Government Energy Audit: Energy Audit Report Combined Heat & Power Plant (Includes: Campus Exterior Lighting) Ocean County College Copyright 2018 TRC Energy Services. All rights reserved. Reproduction

More information

EAST ORANGE SCHOOL DISTRICT DIONNE WARWICK INSTITUTE FACILITY ENERGY REPORT 120 CENTRAL AVENUE EAST ORANGE, NEW JERSEY 07017

EAST ORANGE SCHOOL DISTRICT DIONNE WARWICK INSTITUTE FACILITY ENERGY REPORT 120 CENTRAL AVENUE EAST ORANGE, NEW JERSEY 07017 EAST ORANGE SCHOOL DISTRICT DIONNE WARWICK INSTITUTE 120 CENTRAL AVENUE EAST ORANGE, NEW JERSEY 07017 FACILITY ENERGY REPORT East Orange School District Dionne Warwick Institute TABLE OF CONTENTS I. HISTORIC

More information

FACILITY ENERGY REPORT

FACILITY ENERGY REPORT LOWER TOWNSHIP BOARD OF EDUCATION CHARLES W. SANDMAN CONSOLIDATED ELEMENTARY SCHOOL 838 Seashore Road Cape May, New Jersey 08204 FACILITY ENERGY REPORT Lower Township B.O.E. Charles W. Sandman Consolidated

More information

Energy Benchmarking Report for Mt. Pleasant Elementary School. Millville, NJ

Energy Benchmarking Report for Mt. Pleasant Elementary School. Millville, NJ Energy Benchmarking Report for Mt. Pleasant Elementary School Millville, NJ (for the period: June 1, 2008 through May 31, 2009) Prepared by: Background & Findings: The New Jersey Clean Energy Program (NJCEP)

More information

Hamilton Board of Education Greenwood Elementary School Hamilton, NJ 08610

Hamilton Board of Education Greenwood Elementary School Hamilton, NJ 08610 Steven Winter Associates, Inc. 50 Washington Street Telephone (203) 857-0200 Architects and Engineers Norwalk, CT 06854 Facsimile (203) 852-0741 www.swinter.com E-mail: swinter@swinter.com July 17, 2009

More information

Energy Efficiency Solutions for Multifamily Housing. Clark Energy Group LLC

Energy Efficiency Solutions for Multifamily Housing. Clark Energy Group LLC Energy Efficiency Solutions for Multifamily Housing Clark Energy Group LLC 1 Agenda About Clark Energy Group Energy Service Company (ESCO) Overview ESCO Services Utility Rate Forecasts Making the Decision

More information

Instant discount of 33% off improvement cost, up to $1,250 Plus, potential savings bonus of up to $250 (**)

Instant discount of 33% off improvement cost, up to $1,250 Plus, potential savings bonus of up to $250 (**) RESIDENTIAL PROGRAM HOME PERFORMANCE with ENERGY STAR IMPROVE YOUR HOME'S COMFORT. SAVE MONEY. REDUCE ENERGY. EARN S. Home Performance with ENERGY STAR offers homeowners instant discounts for making recommended

More information

use Solar thermal for hot water production

use Solar thermal for hot water production use Solar thermal for hot water production DESIGN STRATEGIES sustainable HOT WATER SOLUTIONS SOLAR HOT WATER Production of domestic hot water by converting direct sunlight into thermal energy through use

More information

use Solar thermal for hot water production DESIGN APPROACHES

use Solar thermal for hot water production DESIGN APPROACHES use Solar thermal for hot water production DESIGN APPROACHES GLUMAC DESIGN APPROACHES sustainable HOT WATER SOLUTIONS S SOLAR HOT WATER Production of domestic hot water by converting direct sunlight into

More information

Energy Audit. Prepared For: Ewing Township School District. Contact Brian S. Falkowski Business Administrator

Energy Audit. Prepared For: Ewing Township School District. Contact Brian S. Falkowski Business Administrator Prepared For: Ewing Township School District Energy Audit Contact Brian S. Falkowski Business Administrator Prepared By: Dome Tech, Inc. Prepared Under the Guidelines of the State of NJ Local Government

More information

Hamilton Board of Education Morgan Elementary School Hamilton, NJ 08619

Hamilton Board of Education Morgan Elementary School Hamilton, NJ 08619 Steven Winter Associates, Inc. 50 Washington Street Telephone (203) 857-0200 Architects and Engineers Norwalk, CT 06854 Facsimile (203) 852-0741 www.swinter.com E-mail: swinter@swinter.com July 17, 2009

More information

Energy Benchmarking Report for Bacon Elementary School. Millville, NJ

Energy Benchmarking Report for Bacon Elementary School. Millville, NJ Energy Benchmarking Report for Bacon Elementary School Millville, NJ (for the period: June 1, 2008 through May 31, 2009) Prepared by: Background & Findings: The New Jersey Clean Energy Program (NJCEP)

More information

June 11, Local Government Energy Program Energy Audit Report Final

June 11, Local Government Energy Program Energy Audit Report Final Steven Winter Associates, Inc. 293 Route 18 South, Suite #330 Telephone: (866) 676-1972 Architects and Engineers East Brunswick, NJ 08816 Web: www.swinter.com E-mail: swinter@swinter.com June 11, 2010

More information

Arts Building Raritan Valley Community College North Branch, NJ 08876

Arts Building Raritan Valley Community College North Branch, NJ 08876 Steven Winter Associates, Inc. 50 Washington Street Telephone (203) 857-0200 Architects and Engineers Norwalk, CT 06854 Facsimile (203) 852-0741 www.swinter.com E-mail: swinter@swinter.com July 15, 2009

More information