1 Name: KRISTINN INGASON Profession: Manager of Geothermal Plant Division Mechanical Engineer Date of birth: September 24, 1958 Nationality: Education: Icelandic Technical University of Denmark (DTH). Master of Science in Mechanical Engineering, The University of Iceland. Final Examination in Mechanical Engineering Fields of specialization: Languages: Mr. Kristinn Ingason is a Senior Mechanical Engineer with Mannvit, who possesses a wide experience in mechanical engineering including experience in geothermal utilization, geothermal drilling, and environmental engineering. He has undertaken the responsibility of managing numerous projects in geothermal development both within and outside Iceland. Among projects Mr Ingason has participated in are projects in the North-East Iceland, Krafla, Hellisheidarvirkjun, Nesjavellir, as well as projects in Hungary, USA and the Philippines. Icelandic, English, Danish, (Swedish, Norwegian, German) kristinn@mannvit.is PROFESSIONAL EXPERIENCE: Mannvit hf. (formerly VGK-Hönnun hf.) VGK-Hönnun hf., Consulting Engineers VGK, Consulting Engineers Engineer at Verkfræðistofa Guðmundar & Kristjáns hf., (VGK Consulting Engineers). Partner since Member of the board Since 2004 manager of the geothermal power plant division. GEOTHERMAL UTILIZATION: 2017 GeoMagma Geothermal Comparison Study Statoil, Norway Project management for comparing utilization of high temperature and high pressure geothermal resource, GeoMagma, with conventional high enthalpy resource Tura Geothermal Power Plant KS Orka, Hungary Engineering manager for the design of a 3 MW binary power plant in Tura, Hungary Tura Geothermal Power Plant KS Orka, Hungary Engineering manager for the design of a 3 MW binary power plant in Tura, Hungary Wells in Ölfusdalur OS, Iceland Evaluation and assessment of wells drilled in Ölfusdalur, Iceland Kristinn Ingason 1
2 2016 Yukon, Geothermal Review and Site Inventory Yukon Energy Corporation, Canada Review of possible power generation from geothermal resources in Yukon, Canada 2015 St. Vincent Geothermal Project Emera Inc. Manager for the well design, drilling program, tender documents and supervision of the drilling of four high enthalpy geothermal wells in St. Vincent Deep Geothermal Utilization Gunnlaugur Jónsson Concept study for utilizing heat from deep wells drilled into the volcanic zone in Iceland but outside known high temperature areas Mosonmagyarovar EU-FIRE, Hungary Well design, scope of drilling work and negotiations with contractors for drilling of low enthalpy wells in Mosonmagyarovar, Hungary Biliran Geothermal Power Project Orka Energy Project Manager for the construction of a 50 MW geothermal power plant in Biliran, Philippines present South Hungarian EGS Demonstration Project EU-FIRE EGS Hungary Engineering Procurement and Construction Management of an Enhanced Geothermal System in Hungary. Senior Mechanical Engineer, Engineering Manager of EPCM team IDDP-2 HS-Orka, Iceland Well design and drilling program for IDDP-2 drilled in Reykjanes, Iceland Longonot, Kenya AGIL, Africa Geothermal International Limited Well design an drilling program for exploration phase Entiv Geothermal Power Plant Entiv Organic Energy, LLC, USA Project Manager. Management of work carried out by Mannvit including geoscience, well logging, flow testing and supporting EPC contractor Technip in geothermal engineering expertise Tolhuaca Geothermal Power Plant, Chile GeoGlobal Energy, LLC. Project manager for an analysis of a steam pipeline for the Tolhuaca Geothermal Power Plant in Chile Promotion of RES and EE, Serbia Eptisa Non-key geothermal utilisation expert, Senior Mechanical Engineer. Participation in estimate of the geothermal potential by review of reports and calculations of existing wells potential and volumetric method. Review of report on feed in tariff. Participation in development of model cases for geothermal utilization in Serbia. Report review. Review of ranking of geothermal project possibilities. Pre-feasibility studies in three towns in Serbia. Kristinn Ingason 2
3 Drilling design, Geothermal power plant Refurbishment Various Magma Energy, Oski Energy, Landsvirkjun, Theistareykir Senior Mechanical Engineer/Discipline Leader for Process Design/Project Manager on various projects implemented by Mannvit, in the field of geothermal exploration and utilisation. The expert participated in a number of projects in Iceland and abroad Geothermal Drilling / Þeistareykir Ltd. Project manager for design and tender documents for drilling of high temperature geothermal wells in North-East Iceland, to be drilled Bjarnarflag, Geothermal Station Project manager for the finalisation of project design of an up to 90MW geothermal powerplant at Bjarnarflag, North-East Iceland Geothermal Power plant in Akutan, Alaska Trident Managing a feasibility study for a geothermal power plant in Akutan, Alaska Geothermal utilization in Serbia European Union Review of engineering aspects of a report on the utilization of geothermal energy in Serbia IDDP-1 Project manager for the development of a process to clean HCI from IDDP-1 fluid Geothermal station at Bottle Rock Bottle Rock Power, LLC Participation in the development of an independent engineering report regarding the Owner s application for a project loan from US Department of Energy Bald Mountain Geothermal Project in USA Oski Energy Design of a Kalex process in cooperation with Technip, USA. Mannvit design PFD and P&ID and reviews other design Krafla Geothermal Station Project manager for various improvements carried out in the Krafla Geothermal Station in North-Eastern Iceland Bjarnarflag Geothermal Station Project manager for various improvements carried out in the Bjarnarflag Geothermal Station by Lake Myvatn in North-Eastern Iceland Geothermal Power Plant in Slovakia Korlea Invest Discipline Leader for drilling and for power plant design for a geothermal power plant in in Kosice, Slovaki, where hot water is planned to be used for electrical generation IDDP-1 Leader of the Fluid Handling and Evaluation group for the Icelandic Deep Drilling Project (IDDP). The group designs and supervises the testing of the IDDP-1 well drilled in Krafla, Iceland. Kristinn Ingason 3
4 2009 IDDP-1 Member of the Drilling Team specifying and supervising the drilling of the first Icelandic Deep Drilling Project (IDDP) well drilled in Krafla, Iceland NE Iceland Geothermal Project Risk assessment of Energy production and transmission Member of the expert team for carrying out a risk assessment for the geothermal power plants planned to be built in North-Eastern Iceland Theistareykir Þeistareykir Ltd. Project manager for a feasibility study for up to 275 MWe geothermal power plant in Þeistareykir, Iceland for Þeistareykir ltd Geothermal Drilling PannErgy, Hungary Design of well, scope of drilling work and negotiations with contractors for drilling of geothermal wells in Hungary for PannErgy Geothermal development S&B, Greece Project manager of a feasibility study for geothermal development in Milos, Greece, for S&B 2008 Geothermal Drilling Tender documents for drilling up to forty five (45) high temperature geothermal wells in the Hengill area in Iceland, for Orkuveita Reykjavikur Technical Due Diligence Geysir Green Energy Participation in technical due diligence of EDC, Philippines Hengill area Assistance project manager for the designing of new geothermal power plants in the Hengil area, Iceland for Orkuveita Reykjavikur Geothermal Drilling Coordination of the site supervision of drilling of exploration geothermal wells in North Eastern Iceland, for the Geothermal Power Plants study Studies for geothermal power plants in North Eastern Iceland for the National Power Company Deep drilling The Icelandic Deep Drilling Project Design, tender documents and preparation for drilling of a 5 km deep exploration well, the Icelandic Deep Drilling Project Geothermal Drilling Tender documents and negotiations for drilling of thirty (30) high temperature geothermal wells for Kristinn Ingason 4
5 2005 Mechanical Design Management of the mechanical design of the construction of a 9 MWe binary power plant in Berlin, El Salvador 2005 On site Management Site manager for the installation of turbine unit number four in Nesjavellir geothermal power plant Hellisheiði GPP Feasibility study of utilizing separation water for electrical production in Hellisheiði geothermal power plant Moderator University of Iceland Moderator in M.Sc. projects for the University of Iceland, Faculty of Engineering 2004 Preliminary Design Various Managing the preliminary designing of several binary power generation projects, ORC processes as well as Kalina processes 2003 Bjarnarflag GPP Project manager for a feasibility study for an up to 90 MWe geothermal power plant in Bjarnarflag, Iceland for the Hellisheiði geothermal wells Oversight of site supervision of drilling of two exploration geothermal wells at Hellisheiði, Iceland, for Orkuveitu Reykjavíkur 2003 Bjarnarflag Project manager for improving of the efficiency of the steam supply system in Bjarnarflag, Iceland, for the Hágöngur, geothermal drilling Project manager for geothermal drilling at Hagöngur, including contract documents, consulting regarding selection of contractor and site supervision, for the National Power Company Geothermal Power Plants Master Plan The National Energy Authority Typical layout and cost estimates of geothermal power plants for the National Energy Authority, Iceland, as a part of a Master Plan for Hydro and Geothermal Energy Resources in Iceland Hellisheiði GPP Assistance project manager for the designing of a 120 MWe and 200 MWt geothermal power plant at Hellisheiði, Iceland for Orkuveita Reykjavikur. Included is the coordination of the supervision of the construction of the power plant. Kristinn Ingason 5
6 Deep drilling feasibility study IDDP A consultant in drilling technology and pilot plant in the IDDP (Icelandic Deep Drilling Project) feasibility study. The goal of IDDP is to drill a 5 km deep well producing supercritical steam Bjarnarflag GPP Project manager for further feasibility study for a 40 MWe geothermal power plant in Bjarnarflag, Iceland for the 2001 Optimization of GPP The University of Iceland Consultant for optimisation of geothermal power plants, a project run by the Engineering Department of the University of Iceland Bjarnarflag Refurbishment of a 3,7 MWe power plant in Bjarnarflag, Iceland 2000 Bouillante 2, Guadaloupe CFG Project manager for the design of a steam supply system for Bouillante 2, Guadeloupe for CFG (Compagnie Francaise de Geothermi) Krafla GPP Environmental impact study for increasing the power generation from 60 MWe to 100 MWe at Krafla Geothermal Power Plant, Iceland for the Krafla GPP Feasibility study for increasing the power generation from 60 MWe to 100 MWe at Krafla Geothermal Power Plant, Iceland for the Bjarnarflag Feasibility study for a 40 MWe geothermal power plant in Bjarnarflag, Iceland for the Residen Engineer Orkuveita Húsavíkur Resident Engineer at Husavik for the Construction of a 2 MWe binary plant for Orkuveita Husavikur Feasibility study for utilizing heat from geothermal effluent for electrical generation in Krafla geothermal power plant, Iceland Design of geothermal power plant utilizing 125 C hot water for electrical power generation in Husavik, Iceland Resident engineer for modification of the Krafla geothermal power plant, including drilling of wells, modification of the steam gathering system, installation of vacuum pumps and renewal of governors Resident engineer for the completion of the 2 x 30 MWe Krafla Geothermal Power Plant, Iceland. Unit 2 was commissioned in November Kristinn Ingason 6
7 1996 Consultant for modifications of a Crematorium for Kirkjugarðar Reykjavíkurprófastsdæmis (Reykjavik s Cemetery) Resident engineer in charge of the drilling at the Krafla Geothermal Power Plant for the Feasibility study for installation of a second 30 MWel turbo generator in the Krafla geothermal power plant, Iceland for the Re-evaluation of a 12 year old Project planning study for Vatnsfell hydro power plant, Iceland for the 1996 Design of 5000 tonnes atmospheric ammonia storage tank for Akzo - Nobel in Stenungsund, Sweden Responsible for the technical part for the environmental impact study of a 2 x 20 MW power plant in Bjarnarflag, Iceland, for the Lectures on utilisation of plastic pipelines in fish farming and industry, a part of seminars on utilisation of plastic pipelines held by Trésmiðafélag Reykjavíkur (Association of carpenters in Reykjavík) Pre-feasibility study for electrical production in combination with a 200 MWth geothermal power plant in Nesjavellir, Iceland for The Reykjavík District Heating Service Pre-feasibility study for a geothermal development for combined electricity and heat production in two geothermal fields in Croatia for INA-Naftaplin, Croatia Design of modification of several systems of a 30 MWel geothermal plant at Krafla, Iceland for the Participation in the design of several fish farms utilizing geothermal energy Participation in a feasibility study for Eldvörp geothermal plant, 15 MWel, for Sudurnes Region Heating. BUILDINGS: 1994 Design of theatre stage equipment in a restored theatre, Idno, Reykjavik, Iceland for the City of Reykjavik Design of moveable sound mirrors in Haskolabio cinema, Reykjavik, Iceland for The Icelandic Symphonic Orchestra Project Manager for the restoration of the stage equipment (mechanical part) for the National Theatre in Iceland. Design, shop drawings and supervision of stage equipment Assistant Project Manager of the design, shop drawings and supervision of stage equipment for the City Theatre in Reykjavík for the City of Reykjavík. The work was carried out in cooperation with Theatre Projects Ltd. in London Design of stage equipment for the night club Hótel Ísland in Reykjavík Co-author of a finite element computer program for structural analysis. The program has been VGK's main computer programme in structural analysis since Kristinn Ingason 7
8 POWER: Feasibility study and Project panning study for a multiple 20 MWel power generating plant in Bjarnarflag, Iceland for the. MECHANICAL & PROCESS ENGINEERING: 1994 Design of equipment for weighing of freight containers while those are lifted by the main harbour crane of the Icelandic Steam Company in Reykjavík. Kristinn Ingason 8
9 ENVIRONMENTAL - QUALITY CONTROL - SAFETY CONSULTING: A study of reducing the environmental impacts of an incineration plant owned by the municipality of Húsavík in Northern Iceland A study of solid waste disposal from The National University Hospitals in Reykjavík Assistant Project Manager for all mechanical equipment of a tons per year domestic and industrial waste sorting and treatment for the Municipal Waste Disposal Company, Iceland Feasibility study of solid waste disposal from several communities in Northern Iceland Participation in a feasibility study of tons per year solid waste incineration and utilization of energy for Reykjavík and surrounding communities. Carried out in cooperation with VBB in Stockholm. OTHER SERVICES: 1990 Design of facilities for exhibiting fish species in the Reykjavík's Farm Zoo Assistant Project Manager and Project Manager in the planning, design and erection of a fish farm for smolts per year and tons per year salmon ranching for Árlax Ltd. COMMISSION: VFI Association of Chartered Engineers in Iceland FRV Association of Consulting Engineers in Iceland, a member of FIDIC IGA International Geothermal Association Kristinn Ingason 9
Geothermal Country Update for Iceland
Geothermal Country Update for Iceland Árni Ragnarsson Iceland GeoSurvey ÍSOR, Reykjavík, Iceland ARGe-C6 conference, Addis Ababa, Ethiopia, 2 nd 4 th November 2016 Outline Energy resources and consumption
More informationGEOTHERMAL PROJECT TIMELINES
Proceedings, 6 th African Rift Geothermal Conference Addis Ababa, Ethiopia, 2 nd 4 th November 2016 GEOTHERMAL PROJECT TIMELINES Yngvi Gudmundsson Verkis Ofanleiti 2, 103 Reykjavik ICELAND yg@verkis.is
More informationKS ORKA Renewables Pte Ltd
KS ORKA Renewables Pte Ltd FINANCING THE INCREMENTAL DEVELOPMENT MODEL M.R. Reading 1 Introduction of KS ORKA Incremental vs Traditional Development Model Advantages of Well Head Units Financing Program
More informationLONG DISTANCE TRANSMISSION PIPELINES FOR GEOTHERMAL WATER IN ICELAND (20-60 KM)
LONG DISTANCE TRANSMISSION PIPELINES FOR GEOTHERMAL WATER IN ICELAND (20-60 KM) By Thorkell Erlingsson Sverrir Þórhallsson Workshop for Decision Makers on Direct heating Use of Geothermal Resources in
More informationBinary Cycle Geothermal Power Systems
Summary Binary Cycle Geothermal Power Systems 09.11.2016, Skuli Johannsson, Annad veldi ehf, Iceland skuli@veldi.is www.veldi.is Energy consumption of the world is predicted to increase considerably in
More informationGEOFAR : Innovative geothermal technologies Last modifications: BINARY PLANTS
BINARY PLANTS GENERAL PRESENTATION Context Geothermal resources vary in temperature from app. 50 C to 350 C. With dry steam or flash steam plants an economical exploitation of the geothermal resource for
More informationDesign of a H2S Absorption Column at the Hellisheiði Powerplant
Proceedings World Geothermal Congress 2015 Melbourne, Australia, 19-25 April 2015 Design of a H2S Absorption Column at the Hellisheiði Powerplant Ari Ingimundarson, Magnús Þór Arnarson, Húni Sighvatsson,
More informationGerman-African Energy Forum 2012
German-African Energy Forum 2012 Kirsten Offermanns Senior Project Manager Subdevision Energy and Environment KfW Entwicklungsbank Dr. Fritjof Börstler Senior Project Manager Bundesanstalt für Geowissenschaften
More informationRES - Status Quo, Potential and Prospects Vasileios Tsolakidis, CRES
RES - Status Quo, Potential and Prospects Vasileios Tsolakidis, CRES 20 June 2017, Thessaloniki Greek energy sector 2 Source: Eurostat (2017) RES targets Directive 2009/28/EC Gross final energy consumption
More informationCONTRACTING OF GEOTHERMAL PROJECTS
Presented at Short Course on Geothermal Project Management and Development, organized by UNU-GTP, KenGen and MEMD-DGSM, at the Imperial Botanical Beach Hotel, Entebbe, Uganda, November 20-22, 2008. GEOTHERMAL
More informationOPPORTUNITIES FOR DIRECT UTILIZATION OF GEOTHERMAL ENERGY IN EBURRU AREA, KENYA
OPPORTUNITIES FOR DIRECT UTILIZATION OF GEOTHERMAL ENERGY IN EBURRU AREA, KENYA Cornelius Ndetei Environmental Scientist Kenya Electricity Generating Co. Ltd 6 th African Rift Geothermal Conference (ARGEO-C6)
More informationCOST AND REVENUES OF DIRECT USE APPLICATIONS
Presented at Short Course VI on Utilization of Low- and Medium-Enthalpy Geothermal Resources and Financial Aspects of Utilization, organized by UNU-GTP and LaGeo, in Santa Tecla, El Salvador, March 23-29,
More informationWe deliver gas infrastructure
We deliver gas infrastructure We are Uniper We are a leading international energy company with operations in more than 40 countries and around 13,000 employees. We combine a balanced portfolio of modern
More informationGeothermal Energy in El Salvador
Geothermal Energy in El Salvador Luis Roberto Reyes Executive Secretary Tokyo, Japan November 2012 General Information of El Salvador Compared to El Salvador: Mexico Land: 94 times larger Population: 19
More informationCONTENT, OBJECTIVES, MILESTONES, RESULTS. National Roadshow Event Berlin, Germany, - 15 September 2016
CAPACITY BUILDING ON ENERGY PERFORMANCE CONTRACTING IN EUROPEAN MARKETS IN TRANSITION (ENPC-INTRANS) CONTENT, OBJECTIVES, MILESTONES, RESULTS National Roadshow Event Berlin, Germany, - 15 September 2016
More informationWELLHEAD POWER PLANTS
Installed power [GWe] Proceedings, 6 th African Rift Geothermal Conference Addis Ababa, Ethiopia, 2 nd 4 th November 2016 WELLHEAD POWER PLANTS Yngvi Gudmundsson, Elin Hallgrimsdottir Verkís, Mannvit,
More informationDALKIA ENERGY EFFICIENT SERVICES
DALKIA ENERGY EFFICIENT SERVICES ENERGY & ENVIRONMENT: Global warming: Drastically reduce CO 2 emissions Energy: Volatile energy prices showing an upward trend Energy optimization Preserve the environment
More informationGEOTHERMAL POWER PROFILE
PROFILE World-class skills. World-class team. Geothermal Steamfield and Power Plant Engineers HYDRO GEOTHERMAL THERMAL WATER INDUSTRIAL World-class skills Detailed Design Steamfield, Power Station and
More informationCOMPLETION OF KRAFLA GEOTHERMAL POWER PLANT
COMPLETION OF KRAFLA GEOTHERMAL POWER PLANT Gunnlaugur Nielsen 1, Runólfur Maack 2, Ásgrímur Gudmundsson 3 and Gunnar Ingi Gunnarsson 4 1 Landsvirkjun, Háaleitisbraut 68, 108 Reykjavík, Iceland 2 VGK Consulting
More informationFrom surface to the reservoir, solving your geothermal challenges for over 50 years
GEOTHERMAL From surface to the reservoir, solving your geothermal challenges for over 50 years Solving challenges. 1 Geothermal Clean, renewable and plentiful, geothermal energy holds huge promise worldwide
More informationGEOTHERMAL DEVELOPMENT IN KENYA COUNTRY UPDATE. Cornel Ofwona Geothermal Development Company
GEOTHERMAL DEVELOPMENT IN KENYA COUNTRY UPDATE Cornel Ofwona Geothermal Development Company Electricity situation in Kenya Source Installed MW Hydro 761 Thermal 419.6 Geothermal 209 Co-gen 26 Wind 5.45
More informationThe experience in Bosnia and Herzegovina
Promotion of RE in BiH The experience in Bosnia and Herzegovina Form of Government: Governmental System: Republic Parliamentary democracy Area: 51,209 km 2 ; a total of 1,538 km of shared borders with
More informationSTRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR ENERGY SECTOR: CASE STUDY OF OLKARIA GEOTHERMAL EXPANSION PROGRAMME IN NAKURU COUNTY, KENYA.
STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR ENERGY SECTOR: CASE STUDY OF OLKARIA GEOTHERMAL EXPANSION PROGRAMME IN NAKURU COUNTY, KENYA. Philip.J. Barasa Environmental Scientist Kenya Electricity Generating
More informationEnhanced Geothermal Systems (EGS) Using CO 2 as Working Fluid
CCS School, 19 th -21 th April, 2012 Enhanced Geothermal Systems (EGS) Using CO 2 as Working Fluid Ruina Xu Department of Thermal Engineering, Tsinghua Univ. Beijing 1 What is Geothermal Energy? Geo: (Greek)
More informationRequest for proposals International Team Leader, Phase 1 of EU-financed project on Administrative Service Centres
Request for proposals International Team Leader, Phase 1 of EU-financed project on Administrative Service Centres SKL International is looking for an international Team Leader for implementation of Ukraine
More informationOverview of the heat market in the Baltic countries and future prospects
Overview of the heat market in the Baltic countries and future prospects Baltic District Heating and Gas Market Mini Forum Vilnius May 2 nd 2016 Kristian Rehnström Fortum in brief Forerunner in clean energy
More informationData, tables, statistics and maps ENERGY IN DENMARK
Data, tables, statistics and maps ENERGY IN DENMARK 215 1 1 GENERAL INFORMATION ON DENMARK Energy in Denmark, 215 Contents General information on Denmark 3 Energy production 4 Imports and exports of energy
More informationDeveloping Geothermal Energy in the Pacific Northwest. The Energy Under Our Feet
Developing Geothermal Energy in the Pacific Northwest The Energy Under Our Feet Geothermal Energy The deeper you go the hotter it gets. AltaRock Confidential 2 Using the Earth s Heat Today Hydrothermal
More informationFIRST CROATIAN GEOTHERMAL POWER PLANT MARIJA 1, 4.71 MW
FIRST CROATIAN GEOTHERMAL POWER PLANT MARIJA 1, 4.71 MW Example of cascade use of geothermal energy Suncica Lalic GeoPower -Paris 8-9.12.2010 CROATIA S POSITION ON GEOTHERMAL ATLAS OF EUROPE North Eastern
More informationHúsavík Energy - Multiple use of geothermal energy Thermie project nr. GE 321 / 98 / IS / DK
Húsavík Energy - Multiple use of geothermal energy Thermie project nr. GE 321 / 98 / IS / DK Hreinn Hjartarson, Húsavík Energy Runólfur Maack, VGK Sigþór Jóhannesson, Fjarhitun Email: hreinn@husavik.is,
More informationSenior engineer in designing of cooling- and drain water systems in hydro power plants.
CURRICULUM VITAE Name: UNDRUM, Bjørn Profession/ Senior Project Engineer, Job Title: Department of Electro-Mechanical Engineering Year of Birth: 1938 Nationality: Norwegian Languages: Norwegian (fluent),
More informationMaking Cities Work Sustainable Urban Infrastructure
Making Cities Work Sustainable Urban Infrastructure Stuart Clarkson Chief Executive Officer - Siemens Southern Africa 20 Nairobi Megatrends pose urgent challenges to cities Urbanisation Climate Change
More informationWP Future opportunities for geothermal and energy system integrated
WP 2018-2020 Future opportunities for geothermal and energy system integrated Horizon 2020 WP 2018-2020 Horizon 2020 WP 2018-2020 Many opportunities for geothermal h&c projects Horizon 2020 WP 2018-2020
More informationHow is the situation in Iceland... seen from an external expert? Peter Sundt, Mepex Consult AS, Norway
Seminar in Reykjavik 14th November 2005 How is the situation in Iceland... seen from an external expert? Peter Sundt, Mepex Consult AS, Norway Reykjavik 14.11.05 1 Main Activities National plans and strategies
More informationMichael D. Brown, P.E. Principal Engineering Consultant
EDUCATION Master of Business Administration Degree, Golden Gate University Bachelor of Science Degree in Environmental Engineering, California Polytechnic State University, San Luis Obispo PROFESSIONAL
More informationCOGENERATION OF HEAT & POWER (CHP) FROM MEDIUM ENTHALPY GEOTHERMAL FLUIDS
4TH INTERNATIONAL CONFERENCE ENERTECH 2009 ATHENS,, 23 242 OCTOBER 2009 COGENERATION OF HEAT & POWER (CHP) FROM MEDIUM ENTHALPY GEOTHERMAL FLUIDS M. FYTIKAS & M. PAPACHRISTOU Medium Enthalpy Geothermal
More information108+ MW Wind Energy Farm in NE Colorado In Logan County, Colorado
108+ MW Wind Energy Farm in NE Colorado In Logan County, Colorado Phase 1: $200,000,000 wind farm venture to produce 40 to 46 MW per year of clean renewable energy at roughly 6 cents per KW. Projection
More informationGeothermal Steam Turbines for Various Purposes
Geothermal Steam Turbines for Various Purposes Shigeto Yamada 1. Introduction Geothermal power generation was first experimentally developed in Italy in 1904, and commercial power generation also commenced
More informationServices. We operate with a truly global perspective and have completed projects across 4 continents
Services Clearwater Consulting Partners offer full service design, engineering, management, and implementation for all aspects of forest industry projects - with particular emphasis on pulp & paper mill
More informationEnergy Services. Your one-stop-shop solutions provider
Energy Services Your one-stop-shop solutions provider We are Uniper We are a leading international energy company with operations in more than 40 countries and 12,600 employees. We combine a balanced portfolio
More informationIEEE POWER ENGINEERING SOCIETY ENERGY DEVELOPMENT AND POWER GENERATING COMMITTEE HARNESSING UNTAPPED GEOTHERMAL POWER
IEEE POWER ENGINEERING SOCIETY ENERGY DEVELOPMENT AND POWER GENERATING COMMITTEE HARNESSING UNTAPPED GEOTHERMAL POWER IEEE 2002 Summer Power Meeting, Chicago, Monday, July 22, 2002 Sponsored by: - International
More informationGEOLEC Final Conference
GEOLEC Final Conference ORC technology for geothermal electricity: where we are? Joseph Bonafin Turboden Geothermal Sales Marco Baresi Turboden Institutional Relations Pisa, 05 th June 2013 About us Turboden
More information2017 Geothermal Energy International Forum. 7 March 2017, Washington DC
2017 Geothermal Energy International Forum 7 March 2017, Washington DC Today, only 6% of geothermal technical potential deployed! Geothermal Power: ~25 countries with a total installed capacity of 12,6
More informationArctic Renewable Energy Networks Academy (ARENA) - Community Capacity Building
Arctic Renewable Energy Networks Academy (ARENA) - Community Capacity Building Arctic Energy Summit Helsinki, Finland 19 September 2017 Moderators: Rob Cooke (Polar Knowledge Canada) George Roe (Alaska
More informationEEA/Norway Grants. Energy efficiency and renewable energy
EEA/Norway Grants Energy efficiency and renewable energy Conference in Oslo November 7 2012 Bjørn Aulie, International Section, NVE Norwegian Water Resources and Energy Directorate (NVE) Reports to the
More informationEPRI-EPA-DOE-A&WMA Power Plant Air Pollutant Control MEGA Symposium
Paper # 72 CCS Project with Alstom s Chilled Ammonia Process at AEP s Mountaineer Plant EPRI-EPA-DOE-A&WMA Power Plant Air Pollutant Control MEGA Symposium R Bollinger D Muraskin August 31, 2010 Baltimore,
More informationSimulator for operator training in the Sudurnes Regional Heating Corporation 30 MW el combined heat and power (CHP) plant
Simulator for operator training in the Sudurnes Regional Heating Corporation 30 MW el combined heat and power (CHP) plant Geir Þórólfsson Sudurnes Regional Heating Corporation, Iceland Email: geir@hs.is
More information2016 BioCleantech Forum TURBODEN ORC TECHNOLOGY: STATE-OF-THE-ART. Ilaria Peretti. Manager, Sales and Business Development North America
2016 BioCleantech Forum TURBODEN ORC TECHNOLOGY: STATE-OF-THE-ART Ilaria Peretti Manager, Sales and Business Development North America Ottawa, November 3rd, 2016 Table of Contents Who is Turboden and What
More informationGEOTHERMAL DEVELOPMENT IN THE PHILIPPINES
GEOTHERMAL DEVELOPMENT IN THE PHILIPPINES Atty. MARISSA P. CEREZO Assistant Director, Renewable Energy Management Bureau Philippines Department of Energy Outline Historical Geothermal Development in the
More information2 nd Annual Meeting Global Geothermal Alliance. 18 January 2017, Abu Dhabi
2 nd Annual Meeting Global Geothermal Alliance 18 January 2017, Abu Dhabi Strong Commitment to GGA GGA MEMBER COUNTRIES - 41 COUNTRIES ACCROS THE GLOBE AMERICAS / CARIBBEAN Bolivia Chile Colombia Costa
More informationCONTENTS 2. PROJECT DESCRIPTION NEED FOR THE PROJECT ABOUT THE PROPONENT SITE SELECTION OVERVIEW OF THE PROJECT 2 5
CONTENTS 2. PROJECT DESCRIPTION 2-2 2.1 NEED FOR THE PROJECT 2 2 2.2 ABOUT THE PROPONENT 2 4 2.3 SITE SELECTION 2 4 2.4 OVERVIEW OF THE PROJECT 2 5 Figure 2.1: Provisional wind profile for the Jeffrey
More informationMASTERING REINJECTION IN THE HELLISHEIDI FIELD, SW-ICELAND: A STORY OF SUCCESSES AND FAILURES
PROCEEDINGS, Thirty-Sixth Workshop on Geothermal Reservoir Engineering Stanford University, Stanford, California, January 31 - February 2, 2011 SGP-TR-191 MASTERING REINJECTION IN THE HELLISHEIDI FIELD,
More informationCUBE ENGINEERING. Wind energy with the focus on suppliers and provision of services, questions regarding the grid integration in Tunisia
Wind energy with the focus on suppliers and provision of services, questions regarding the grid integration in Tunisia CUBE ENGINEERING Engineering services for renewable energies Dipl. Landscape ecologist
More informationEnergy Efficiency in Public Buildings through Energy Services The example of Germany
through Energy Services The example of Germany Michael Geissler CEO Berlin Energy Agency Odessa, 1 June 2016 Contents Berliner Energieagentur (BEA) Energy Efficiency in Public Buildings Energy Services
More informationWind Potential in Hungary
www.tuv-sud.cz Wind Potential in Hungary Martin Shanel, Central Eastern Europe Thomas Arnold, Industry Service GmbH. December 2010 Hungary Country Specific Information Hungary Germany Area 93 030 km 2
More informationForecasts of geothermal development in the EU 27 by
Forecasts of geothermal development 2008-2020 2020 in the EU 27 by R. Cataldi (1) - P. Fulignati (1,2) - A. Sbrana (1,2) (1) UGI/Italian Geothermal Union; (2) University of Pisa/Dep.t of Earth Sciences
More informationPre-Feasibility Study for the Establishment of a Pre-Commercial Concentrated Solar Power Plant in Namibia
Pre-Feasibility Study for the Establishment of a Pre-Commercial Concentrated Solar Power Plant in Namibia Project developed for Renewable Energy and Energy Efficiency Institute of Namibia PROJECT BACKGROUND
More informationGlobal Geothermal Development Plan Roundtable
Global Geothermal Development Plan Roundtable Dominica Geothermal Resource Development Programme Presented by: Lucien Blackmoore Permanent Secretary Ministry of Public Works, Energy and Ports Commonwealth
More informationDesign and Optimization of Kalina Cycle for Geothermal Energy in Kenya
GRC Transactions, Vol. 38, 2014 Design and Optimization of Kalina Cycle for Geothermal Energy in Kenya Wencheng Fu School of Electrical Engineering, Tianjin University of Technology, Tianjin, China fuwch@tju.edu.cn
More informationProduction Test of Kalina System Using Hot Spring Fluid at Geopressure Field in Japan
GRC Transactions, Vol. 36, 2012 Production Test of Kalina System Using Hot Spring Fluid at Geopressure Field in Japan Norio Yanagisawa 1, Hirofumi Muraoka 2, Munetake Sasaki 1, Hajime Sugita 1, Sei-ichiro
More informationJ O S E P H R. B E V E R I D G E
J O S E P H R. B E V E R I D G E B E n g P h D WestGlen Consult Ltd. 55 Paisley Road, Renfrew, UK +44 (0) 141 406 9772 joseph.beveridge@westglenconsult.com C U R R E N T P O S I T I O N Director and Head
More informationPellet Fueled Central Heating in New England:
Pellet Fueled Central Heating in New England: Convenient and Automatic Central Heating with Sustainable Fuel from our Forests Presented by Dr. William Strauss President, FutureMetrics Co-Founder and Director,
More informationMSc (Eng) Environmental & Energy Engineering.
Chemical & Biological Engineering. MSc (Eng) Environmental & Energy Engineering. Going Green Is More Than Just A Fashionable Phrase. MSc (Eng) Environmental & Energy Engineering. Public concern about processes
More informationDISTRICT HEATING SYSTEMS FROM LIGNITE FIRED POWER PLANTS TEN YEARS EXPERIENCE IN GREECE
DISTRICT HEATING SYSTEMS FROM LIGNITE FIRED POWER PLANTS TEN YEARS EXPERIENCE IN GREECE E. Karlopoulos 1, D. Pekopoulos 2, E. Kakaras 1 1. Centre for Research and Technology Hellas/Institute for Solid
More informationPromoting Renewable Energy Development: An Introductory Workshop for Energy Regulators. Kenyan Country Report
Promoting Renewable Energy Development: An Introductory Workshop for Energy Regulators Kenyan Country Report Bernard Osawa, Director Renewable Energy Energy Regulatory Commission, Kenya March 16 18, 2011
More informationCase 2 Croatia - project microgrid Positioning. Ivona Štritof EU and Regulatory Affairs Department
Session 4: Best practices from pilot projects in smart grid development Case 2 Croatia - project microgrid Positioning Ivona Štritof EU and Regulatory Affairs Department HEP Corporate Structure HEP GROUP
More informationGeothermal Power Plant
Geothermal Power Plant Star Energy Geothermal (Wayang Windu) Ltd., Indonesia Wayang Windu Geothermal Power Plant 1 110MW and 1 117MW 01A3-E-0020 14 Outline Wayang Windu Geothermal Power Plant is located
More informationENGINEERING MANAGEMENT
ENGINEERING MANAGEMENT Identification Selection Definition Execution Develop engineering to sufficient detail to enable a Class 4 or 5 capital estimate to be prepared for the alternative. Use benchmarking,
More informationTHE GEOTHERMAL LEXICON
Alternative Energy Dossin THE GEOTHERMAL LEXICON Geothermal Basics 1.1. What is geothermal energy? (2) 1.2. How does a geothermal reservoir work? (2) 1.3. What are the different ways in which geothermal
More informationThe ILF Group General Presentation. Best practice in public tendering, a view from the private sector. Thomas Fritz, 05 th November 2009
Conference Best practice in public tendering, a view from the private sector Thomas Fritz, 05 th November 2009 About the speaker Name: Thomas FRITZ Education: Master of Arts in Business Administration
More informationDEVELOPMENT OF GEOTHERMAL ENERGY IN EUROPE UNTIL 2008 AND SHORT-TERM PROSPECTS
DEVELOPMENT OF GEOTHERMAL ENERGY IN EUROPE UNTIL 2008 AND SHORT-TERM PROSPECTS Dr. Miklos ANTICS European Geothermal Energy Council (EGEC), Brussels c/o GPC IP, Paris Nord 2, Business Park, 165, rue de
More informationNUCLEAR CONSULTING SERVICES
NUCLEAR CONSULTING SERVICES AN EXPERIENCED DEVELOPER OF NEW NUCLEAR POWER PLANTS ABOUT US Brief history Lithuania has more than 30 years of experience operating and decommissioning the Ignalina NPP and
More informationCOSTA RICA COUNTRY UPDATE
COSTA RICA COUNTRY UPDATE Dr. Alfredo Mainieri Dept. Estudios Geotérmicos, Instituto Costarricense de Electricidad, Sabana Norte, Piso 7, San Jose, Costa Rica Key Words: Costa Rica, Miravalles, Tenorio,
More informationFramework conditions and public regulation for wind turbines in the Øresund Region Hansen, Kenneth; Mathiesen, Brian Vad; Connolly, David
Aalborg Universitet Framework conditions and public regulation for wind turbines in the Øresund Region Hansen, Kenneth; Mathiesen, Brian Vad; Connolly, David Publication date: 2011 Document Version Early
More informationGEO-HEAT CENTER EXECUTIVE SUMMARY
GEO-HEAT CENTER Oregon Institute of Technology, Klamath Falls, Oregon 97601 541/885-1750 FAX 541/885-1754 John W. Lund, Director Andrew Chiasson Tonya Toni Boyd Debi Carr EXECUTIVE SUMMARY The Geo-Heat
More informationWater Dependency of Geothermal Power Generation Systems
Proceedings 5 th African Rift geothermal Conference Arusha, Tanzania, 29-31 October 2014 Water Dependency of Geothermal Power Generation Systems (Esther Sironka. ) Kenya Electricity Generating Company
More informationKozienice Power Plant - ENEA Group
Kozienice Power Plant - ENEA Group - Basic engineering, Construction Permit Designs (substitutes), detailed design (cooling water system, raw water system, coal supply and power output system) and as-built
More informationPower & Energy. Solutions for a better world
Power & Energy Solutions for a better world P WERING Solutions for a Better World Louis Berger provides a wide range of services to plan, engineer and deliver power infrastructure to meet the world s growing
More informationPOWER SYSTEMS RENEWABLE ENERGY SUSTAINABLE ENERGY
20 POWER SYSTEMS RENEWABLE ENERGY SUSTAINABLE ENERGY The energy professionals The company intec in the world Power systems Power transmission & distribution Power network key competencies Thermal power
More informationWind in power 2014 European statistics. February 2015 THE EUROPEAN WIND ENERGY ASSOCIATION
Wind in power 2014 European statistics February 2015 1 WIND IN POWER: 2014 EUROPEAN STATISTICS Contents Executive summary... 3 2014 annual installations... 5 Wind power capacity installations... 5 Power
More informationNorwegian Center for Geothermal Energy Research - CGER. Ranveig Bjørk General manager CGER
Norwegian Center for Geothermal Energy Research - CGER Ranveig Bjørk General manager CGER 15.11.2017 CGER organization CGER is a non-legal partnership consisting of research and industrial Partners from
More informationELE2212 Lecture 2: Introduction to Renewable Energy. Dwight Reid
ELE2212 Lecture 2: Introduction to Renewable Energy Resources Dwight Reid doreid@utech.edu.jm Introduction What is Renewable Energy Renewable energy can be defined as energy sources that are constantly
More informationContracting Fund for Industrial and Commercial Applications. German-African Energy Forum Hamburg , Tobias Schwind
Contracting Fund for Industrial and Commercial Applications German-African Energy Forum Hamburg 26.4.2017, Tobias Schwind Topics 1. Introduction Industrial Solar 2. Industrial Energy Market & Challenges
More informationPROSPECTS FOR GEOTHERMAL ENERGY WORLDWIDE IN THE NEW CENTURY
PROSPECTS FOR GEOTHERMAL ENERGY WORLDWIDE IN THE NEW CENTURY Ingvar B. Fridleifsson, United Nations University Geothermal Training Programme, Orkustofnun - National Energy Authority Grensasvegur 9, 18
More informationHYBRID POWER PLANT USING THREE ENERGY RESOURCES AT THE SAN VICENTE GEOTHERMAL FIELD, EL SALVADOR
Presented at Short Course VI on Utilization of Low- and Medium-Enthalpy Geothermal Resources and Financial Aspects of Utilization, organized by UNU-GTP and LaGeo, in Santa Tecla, El Salvador, March 23-29,
More informationIntroduction to Project Management
Introduction to Project Management 600-101 INTRODUCTION Enterprise Consultants International, Ltd. Enterprise Consultants International, Ltd. INTRODUCTION Large projects in the oil and gas industry create
More informationRENEWABLE ENERGY INSURANCE WE RE BIG ON A CLEANER FUTURE
RENEWABLE ENERGY INSURANCE WE RE BIG ON A CLEANER FUTURE We re BIG on a cleaner FUTURE Renewable Energy is an important source of power for the growing energy demands of the 21st century. By harnessing
More informationSmall Scale Nuclear Power: an Option for Alaska? Gwen Holdmann, Director
Small Scale Nuclear Power: an Option for Alaska? Gwen Holdmann, Director Alaska Center for Energy and Power University of Alaska History Overview of of Nuclear Presentation Energy What is nuclear energy?
More informationRECENT GEOTHERMAL ACTIVITY. Industry Update for Thorndon Cook NZGW 2015
RECENT GEOTHERMAL ACTIVITY Industry Update for Thorndon Cook NZGW 2015 Thorndon Cook Power NZ based Power Consultancy significant geothermal Formed in January 2015 from the Thermal Power team of document
More information20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile
Contents Power Plants Steam Power plants Binary Power plants Geothermal Power Plants Single flash systems Binary systems 1 Equipment Well head Gathering piping system Steam separators and moisture separators
More informationMODELLING AND OPTIMIZATION OF POSSIBLE BOTTOMING UNITS FOR GENERAL SINGLE FLASH GEOTHERMAL POWER PLANTS
GEOTHERMAL TRAINING PROGRAMME Reports 2009 Orkustofnun, Grensásvegur 9, Number 2 IS-108 Reykjavík, Iceland MODELLING AND OPTIMIZATION OF POSSIBLE BOTTOMING UNITS FOR GENERAL SINGLE FLASH GEOTHERMAL POWER
More informationThe First Solar Thermal Power Plant. In Egypt. Engineer. R & D Sector Director New & Renewable Energy Authority NREA, Egypt
The First Solar Thermal Power Plant In Egypt Engineer Amina M. El-Zalabany R & D Sector Director New & Renewable Energy Authority NREA, Egypt CSP Technologies Power Tower : A field of heliostats track
More informationIII.4. INDUSTRIAL USES OF GEOTHERMAL ENERGY IN EUROPE
Session III POSSIBILITIES OF WIDER INTRODUCTION OF AGRICULTURAL AND INDUSTRIAL USES OF GEOTHERMAL ENERGY IN CENTRAL EUROPEAN REGION Sanja Popovska Vasilevska: INDUSTRIAL USES OF GEOTHERMAL ENERGY IN CENTRAL
More informationconsulting engineers hydropower
consulting engineers hydropower Glendoe, Scottish Highlands Front cover The turbine hall in the Dolgarrog Power Station, North Wales consulting engineers Sloy, Loch Lommond, Scotland KGAL acted as Principal
More informationWater Environment Association New England Water Environment Association Project Experience Boston Expansion Project - Boston, Massachusetts Responsibl
James J. Colantonio, P.E. CEO/President President and Principal Civil Engineer Education Villanova University, B.S. Civil Engineering Northeastern University, M.B.A. Oklahoma University, M.S. level courses
More informationWASTE TO ENERGY (W2E) AS THE MODERN CONCEPT OF WASTE MANAGEMENT
WASTE TO ENERGY (W2E) AS THE MODERN CONCEPT OF WASTE MANAGEMENT Marta Starostka-Patyk Czestochowa University of Technology, Faculty of Management, Armii Krajowej 19B, 42-200 Czestochowa, Poland Abstract
More informationOverview of CO2 Capture Technologies, System Integration, and Costs
Overview of CO2 Capture Technologies, System Integration, and Costs Presented to the World Bank CCS Training Session Robert Hilton, Vice President, August 25, 2011 Alstom: Three Activities Leading global
More informationGeothermal District Heating
Geothermal District Heating Dr. Oddur B. Björnsson Fjarhitun hf, Reykjavík, Iceland SUMMARY In geothermal heating maximum effective temperature drop should be strived at across the house heating systems.
More informationMaking Renewable Fuel by Carbon Recycling
Making Renewable Fuel by Carbon Recycling By: K-C Tran CEO and Co-founder, Carbon Recycling International Fulbright US Iceland Partnership Award Recipient Emission Reduction, Energy Storage and Sustainability
More informationOrganic Rankine Cycle Configurations
Proceedings European Geothermal Congress 2007 Unterhaching, Germany, 30 May-1 June 2007 Organic Rankine Cycle Configurations Uri Kaplan Ormat Technologies, Inc., 6225 Neil Road, Suite 300 - Reno, NV 89511-1136,
More information