1 Project Number: E.12.1 Project Title: Ruzizi III Hydropower Project Status: S3 programme/project structuring and promotion to obtain financing Countries Region Rwanda, Burundi, Democratic Republic of Congo (DRC) East Africa Project Location Near Lake Kivu and the Ruzizi River at the border of Rwanda and the DRC Sector Sub-Sector Energy Generation Project description A 145 megawatt run-of-the-river hydro-electric plant with three power units will be constructed. Objectives Supply of sustainable electricity to the three countries Control of the water level in the river basin Promotion of peace and stability in the Great Lakes Region Economic Sustainability and expected benefits The project is expected to contribute to the stabilization of the region by enhancing economic cooperation, and to address economically the issue of the growing lack of generation capacity in the sub-region, which hampers access to electricity. There is potential to flourish thanks to the mounting need for power and for replacing high-cost gas-oil based generation with lower cost sources; precedent set by the hydro-electric generation plants Ruzizi I and II, which have never stopped during the past decade of war; cross-border coordination; and tariffs tailored specifically for the needs of the parties involved. Project structure A public-private partnership (PPP) structure will be followed as a 20-year build, own, operate and transfer (BOOT) concession, and the project company will operate the plant as an independent power producer. REC COMESA, EAC Project Sponsors Governments of Rwanda, Burundi, DRC Implementing Authority Lead Agency: Energie des Grands Lacs (EGL) Regional organization comprising of Burundi, DRC and Rwanda, responsible for the elaboration and implementation of the strategy of energy development in the Great Lakes region, operating under the auspices of the Economic Community of the Great Lakes Countries (CEPGL). A new supra-national authority is planned in order to replace EGL and temporary structure, ABAKIR, as the implementing agency. Private Sector Developer Consortium of SITHE Global Power Ventures LLC (USA) and Industrial Promotion Services Ltd (IPS) (Kenya) Project Status Feasibility study for the project completed by Sofreco and Fichtner between Preferred bidder selected after tendering process in 2012 Negotiations on exemptions to the preferred bidder on-going Total estimated Project Value USD 600,000,000 Way Forward Signature of the PPP contract between EGL and Sithe Global/IPS Mid 2014 Financial Closing End 2015 Mid 2016 Beginning of the construction 2016 End of the construction 2020 Political Support This project enjoys strong political support in all countries involved. It is the first regional PPP power project in Africa and is a model for successful implementation as per the African Development Bank. There is a single agency, EGL, to co-ordinate between the three countries, thus presenting a unified policy to development finance institutions and private sector financiers. 1
2 2
3 Background The Ruzizi River forms the border between the DRC and Rwanda. The south-flowing river connects Lake Kivu with Lake Tanganyika. Lake Kivu, which is surrounded by Rwanda to the east and the DRC to the west, drains at the south into the Ruzizi River, also known as the Ruzizi Cascades, which flows into Lake Tanganyika. In 1959, a small hydropower project was developed near Buakavu (DRC), located 3 kilometers downstream of the outlet from Lake Kivu, with a capacity of 29.8MW. This plant was owned and operated by the SNEL, national utility in DRC. However, due to technical problems only 21.2MW are currently available. This power plant is known as Ruzizi I. Later a second plant, Ruzizi II, was commissioned further downstream with a capacity of 43.8MW in The second plant was initiated by «Organisation de la CEPGL Pour L Energie des pays des Grands Lacs (EGL)» and managed by Société Internationale d'electricité des Pays des Grands Lacs (SINELAC). SINELAC is a multi-national organization established by a treaty among Burundi, the DRC, and Rwanda. It has the mandate to (i) operate the Ruzizi II hydropower plant and its dependencies like the regional substation of Mururu II, and (ii) sell the energy production of Ruzizi II to the three national utilities, namely REGIDESO in Burundi, SNEL in DR Congo and RECO in Rwanda. As the hydrology of the Ruzizi river was such that there was potential for more power to be generated downstream of the existing operations, the three bordering countries DRC, Rwanda and Burundi mandated EGL to study and prepare the development of Ruzizi III. Economic Sustainability and Strategic Importance While other parts of sub-saharan Africa are experiencing high growth rates, countries of the Great Lakes region have had extremely high levels of poverty and very low levels of key services such as access to electricity. This project will enable an increase in power generation and interconnectivity by taking advantage of low-cost and renewable sources of hydropower and geothermal energy that can be easily harnessed in the region. Developing the hydropower potential in DRC, in particular, will provide Burundi and Rwanda access to low-cost power and a stake in regional stability. This landmark scheme has the potential to transform electricity supply for an estimated 107 million people living in the Great Lakes region, where energy use is currently dominated by use of charcoal for cooking. It is noted that the dam and the hydro-electric generation plants Ruzizi I and II have never stopped during the past decade of war, and cooperation between the three countries has always existed to generate power from the Great Lakes. In fact, this project has been selected by EU to support the peace process in the Great Lakes region. It is expected to contribute to the stabilization of the region by enhancing economic cooperation between the three countries involved, and to address economically the issue of the growing lack of capacity in the sub- 3
4 region, which hampers the development of access to electricity and has been identified as a major obstacle to economic growth. The primary objectives of the project are to: Bridge the medium term energy deficit; Provide the energy necessary for economic recovery in the sub-region; Contribute to reconstruction and rehabilitation of socio-economic infrastructure and to rural electrification. This post-conflict project has potential to flourish thanks to the mounting need for power and for replacing high-cost gas-oil based generation with lower cost sources; precedents set by previous initiatives; crossborder coordination, (primarily performed through EGL); and tariff tailored specifically for the needs of the parties involved. We explore each of these is some detail below. THE NEED FOR LOW-COST CAPACITY: The power systems of Burundi, the eastern DRC, and Rwanda are mainly based on gas-oil fired units. The cost of gas-oil based generation is especially high in the Great Lakes region due to huge transport costs from Kenyan and Tanzanian ports. Most of the alternative economical hydro sites are small and Ruzizi III is the largest and lowest cost option in the region, along with methane gas extracted from Lake Kivu for the generation of base load electricity. Increasing demand for electricity has been fuelled by economic growth and ambitious electricity access programs financed by donors. As a result, the region is facing a rapidly increasing shortage of capacity and energy. PRECEDENTS PAVE THE WAY: The Ruzizi III dam will be the third in a series of four projects on the Ruzizi River. The experiences of the first two initiatives provide the clues to the success of Ruzizi III. Donors and governments wanted a fully commercial and independent structure protected from interference by any of the three governments, assuring that they are all equal, and the project has been designed to ensure this. CROSS-BORDER COORDINATION: The need for cross-border coordination has derailed many projects that are economically attractive. Typically, the political issue of distributing power among three nations is trickier than the technical solutions proposed. In this case, the cross-border coordination facilitated by EGL has been key. EGL has been successful at bringing the three countries together by developing practical solutions, and sidestepping the more sensitive political issues by emphasizing values such as transparency, competence, and socio-economic benefits. Most importantly, EGL has arranged for a balanced project structure, which ensures benefits and cost are distributed evenly between the three countries. COMMON CAUSE, COMMON POWER: The countries will enter into a Common Power Purchase Terms Agreement before firm pricing is known because the tariff will be set using a so-called regulation by contract method. To allow for a system of regulation that entails many of the benefits of return on rate base regulation, the regulation by contract method defines the methodology that will be used to establish the final tariff in an agreement that is subject to international arbitration. This agreement is entered into before the investment is made. This approach leads to a balanced sharing of risks on construction cost between the investor and the future off-takers. 4
5 Technical Specifications The proposed Ruzizi III Hydro Power Plan (HPP) comprises of a dam and a power plant, totaling 145MW of installed capacity. It will be a run-of-the-river hydro-electric plant with three power units. The reservoir will cover approximately m² with million cubic meters of water with a useful volume of cubic meters. The Proposed Technical Solution has a total installed capacity of 147 MW, with each turbine designed for a maximum flow rate of 50m3/s, giving a total plant discharge of 150 m3/s (not including the small unit at the dam site). Given the hydrology of the river, it is anticipated that the nominal mean annual energy production will equal approximately 710 gigawatts per hour, which equates to a capacity factor of approximately 56 percent. It will be a medium-head power plant which will have the following technical characteristics: A diversion dam; the dam will be either a gravity dam made of concrete, or an embankment dam with watertight core. A 7 kilometer headrace tunnel. The three plants will operate as a cascade: the same water will flow successively through the turbines of Ruzizi I, II and III. The reservoir will cover approximately 140,000 m² with a storage capacity of 1,34 million cubic meters of water. A surface powerhouse; the powerhouse itself, located 3.9km from the dam, will be built above ground, and comprise of 3 Francis type turbine generator units. A penstock and surge chamber; while the derivation channel will be dug on the Congolese side of the river, the penstock (3.9km long) will be on the Rwandan side. 92% of the river flow will pass through the penstock and turbines, leaving an ecological residual flow in the river bed. Downstream of the powerhouse, all the water will be returned to the riverbed. A 220 kilovolts switchyard. A 10 kilometre transmission line to a substation located at Kamanyola in the DRC. The design also includes a small generating unit at the dam site to produce energy from the ecological flow that will be released to the bypassed reach of the river between the dam and power station. The electricity will be evacuated by 220kV lines that connect the powerhouse's elevating substation to the transmission substation. A smaller 30kV line is used to carry power to the dam site. Associated facilities include: Access roads on both sides of the river (DR Congo and Rwanda); Temporary and permanent colonies accommodation for workers; Storage areas. The Ruzizi I and II plants are already in operation with a combined capacity of 74 megawatt, while the 287 megawatt Ruzizi IV is still in the planning stage. 5
6 Project Structure Development Finance Institutions: EU, EIB, KFW, AfDB and AFD-DBSA PPFS Project Sponsors: Govt.s of DRC /Rwanda /Burundi Ruzizi III Co-ordinating agency on behalf of the 3 countries: Organisation de la CEPGL Pour L Energie des pays des Grands Lacs (EGL) Off-takers: Govt.s/utilities (the stakeholders): SNEL for DRC, EWASA for Rwanda, REGIDESCO for Burundi. Private Sector Developer: SITHE Global Power Ventures LLC (USA) and Industrial Promotion Services Ltd (IPS) (Kenya) The proposed Ruzizi III project will involve the cooperation of three countries as co-owners of the site or water basin, or as off-takers. The energy will be equally sold between the 3 countries utilities (the stakeholders): SNEL for DRC, EWASA for Rwanda, REGIDESCO for Burundi. For Ruzizi III, EGL has arranged for the project s capacity to be purchased by the parastatal utilities of Burundi, the DRC, and Rwanda. Each off-taker will purchase on commercial terms, with a full payment security package, one-third of the capacity of the project under a Common Power Purchase Terms Agreement, and separate Power Purchase Agreements. Tariffs are being structured with cooperation in mind as well. Off-takers will pay for the capacity made available by the project company. Capacity will be adjusted hourly from actual to nominal hydraulic conditions to determine an hourly availability payment, which will later be converted to a monthly availability payment. This structure achieves two objectives: it incentivizes the project company to ensure that the plant is available, and it allocates day-to-day hydrological risk to the offtakers. This all for one and one for all concept allows the nations to share equally in the benefits as well as the risks. 6
7 The EGL Authority des pays des Grands Lacs (EGL) is responsible for the preparation and development of the project. A key feature of the project is that the stakeholders agreed to develop it as a fully commercial PPP under parallel long term concession agreements awarded by the riparian countries. A PPP structure will be followed as a 20-year build, own, operate and transfer (BOOT) concession, and the project company will operate the plant as an independent power producer. Multi-lateral development finance institutions (DFIs) have expressed an interest in providing or have already provided significant funding for the Ruzizi III project. Interested private lenders will be encouraged to participate by the protection offered by a possible (under discussion) partial credit guarantee from the World Bank. The sponsors are expected to request political risk insurance on equity from MIGA. Risk Analysis Potential Risk Description Impact on Project Mitigation Arrangement Political Project located in Ruzizi I & II have Instability politically sensitive continued operating area at the border of despite rebel DRC, Rwanda & movements, but Burundi Inflation project costs of Financial situation of national utilities Inflation of project cost may lead to tariff structures that less viable Arrears from national govt. to utility and bad financial situation of national utilities in Burundi and the DRC possibility of targeting facility cannot be eliminated. May impact project feasibility, if tariffs become too high for off-takers Capacity from the national utilities to the pay the Energy to the SPV Project will lead to peace and stabilisation in the region; Continued peace discussions between the three countries and addressing of rebel movements complexities. Sponsor and lenders to tie down the developer to fixed price, turn key solution with heavy cost control during construction; Project team currently engaging advisors to EGL to ensure a cap on the project cost is placed on the developer. Guarantees from the 3 states to pay the energy in case of default from the 3 utilities; Authorisation to the Rwandan energy utility to buy all the energy from the SPV in case of surplus. 7
8 Project Status The feasibility study for the project was completed by Sofreco and Fichtner between Hunton & Williams (H&W) is the advisor to assist EGL in phase I - the preparation of the Request for Proposal (RFP) document & the selection of the preferred bidder The RFP was sent out in April 2012 and the Sithe Global /IPS consortium was selected as the preferred bidder. The composition of the consortium was: - SITHE Global Power Ventures LLC (USA) - ( - Industrial Promotion Services Ltd IPS (Kenya) ( consortium The Sithe Global / IPS consortium is the developer of The Bujagali Hydropower project, a 250-megawatt power plant on River Nile in Uganda. Negotiation of the exemptions is the main issue at this stage of the development of the project. Signature of PPP contract between EGL and Sithe Global/IPS to be done 8
9 Financial Status Total estimated Project Value USD 600,000,000 Distribution of estimated project costs (December 2011): USD (million) Preparation 13 Ruzizi III Construction 449 Ruzizi III Supervision 23 Ruzizi III Environment 13 Financial expenses and reserve accounts 71 Total Ruzizi III 569 Rehabilitation Ruzizi I 10 Rehabilitation Ruzizi II 19 Total Rehabilitation R I & R II 29 Total Ruzizi Cascades 600 Financing Obtained: EU & EIB KFW, AfDB and AFD-DBSA PPFS Financed the feasibility study and bankability study Financed the advisor to EGL, Hunton & Williams, for the first phase of advisory services Euro 2 million USD 2.2 million Funding Gap USD 200 million 9
RUZIZI HYDROPOWER CASCADE COORDINATION OPTIMIZATION: A CASE STUDY
RUZIZI HYDROPOWER CASCADE COORDINATION OPTIMIZATION: A CASE STUDY Stefano Galantino 1 Fabio Vulpiani 1 Antonio Brasca 1 Claude Kayitenkore 2 1 Studio Ing. G. Pietrangeli, Rome, 2 ECGLC Economic Community
More informationPowering the Nile Basin
BRIEFING NOTE 2 Powering the Nile Basin The Nile countries are endowed with substantial energy resources. Yet, these have not been fully tapped and several Nile countries have low levels of access to electricity.
More informationRegional Rusumo Falls Hydroelectric Project. Terms of Reference for the Project Manager
1 Nile Equatorial Lakes Subsidiary Action Program Coordination Unit Regional Rusumo Falls Hydroelectric Project Terms of Reference for the Project Manager May 2017 Page 1 of 8 2 1 Background and Description
More informationDeveloping an Integrated Energy Model for the Eastern African Power Pool (EAPP)
Developing an Integrated Energy Model for the Eastern African Power Pool (EAPP) Jarrad Wright PrEng MSc Energy Exemplar (Africa) (Pty) Ltd jarrad.wright@energyexemplar.com Outline Introduction The Energy
More informationDocument of The World Bank FOR OFFICIAL USE ONLY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY STAFF APPRAISAL REPORT BURUNDI - RWANDA
More informationThe Story of the Nile River
The Story of the Nile River The History, Organisation Structure, Meetings, Projects and Process of the Nile River Bain and NBI By Dr. John Rao Nyaoro, HSC Introduction; The Basin Geographical location
More informationFifth Complaint (Bujagali Energy-05) Regarding the Bujagali Energy Ltd. Project (IFC #24408 & MIGA #6732) Jinja, Uganda
OMBUDSMAN ASSESSMENT REPORT Fifth Complaint (Bujagali Energy-05) Regarding the Bujagali Energy Ltd. Project (IFC #24408 & MIGA #6732) Jinja, Uganda December 2011 Office of the Compliance Advisor/Ombudsman
More informationTitle of Study- A Short Paper Research on energy sources in Rwanda and alternative solution regarding the lack of fossil fuels in the country.
Title of Study- A Short Paper Research on energy sources in Rwanda and alternative solution regarding the lack of fossil fuels in the country. Author 1: Gaurav Gupta Affiliation: Lecturer, Sharda University
More informationSMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016
SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri September 21, 2016 CONTENT Introduction Potential in Southeast Asia Challenges in Small Hydro Main Design Steps (Bad) Examples
More informationEIB Contribution in Renewable Energy Projects Financing in West Africa
EIB Contribution in Renewable Energy Projects Financing in West Africa ECOWAS Forum for Investments in Renewable Energy EIB West Africa Regional Office Accra, October 9th 2013 European Investment Bank
More informationWestern Power Company Ltd. Ngonye Falls Hydroelectric Project October 2014
Western Power Company Ltd. Ngonye Falls Hydroelectric Project October 2014 Western Power Company Western Power Company (WPC) is a Zambian Independent Power Producer which is working for the development
More informationNBI Role in Facing Energy Security Challenges in the Nile Basin
NBI Role in Facing Energy Security Challenges in the Nile Basin Wael Khairy, Ph.D. Wael Khairy, Ph.D. Executive Director Nile Basin Initiative Secretariat Entebbe, Uganda Mekong 2 Rio+20 Int l l Conference
More informationPROJECT BRIEF for the John Hart Generating Station Replacement Project
PROJECT BRIEF for the John Hart Generating Station Replacement Project Issue Date: March 13, 2012 TABLE OF CONTENTS John Hart Generating Station Replacement Project Page ii of 17 1. INTRODUCTION... 3 1.1
More informationESP ENERGY SYSTEM PLANNING (PTY) LTD COMPANY EXPERIENCE (PROJECTS) Cons ulting Group
ENERGY SYSTEM PLANNING (PTY) LTD COMPANY EXPERIENCE (PROJECTS) Suite 2B, 08 Arnold Road, Rosebank, 2196, Johannesburg, South Africa Tel: +27 11 447 9852; Website: http://www.espcg.com Transaction advisory
More informationPower Africa Geothermal Road Show. Presented by David Kagiri
Power Africa Geothermal Road Show Presented by David Kagiri September 2014 Outline of Presentation JOH-KGN001-20070825-JvW-P1 1.Summary of power sector and country investment environment 2. Detailed summary
More informationPublic Private Partnership PPP & The Egyptian Experience
Public Private Partnership PPP & The Egyptian Experience Bassel Shoirah Project Manager / Utilities Sector - Egypt Good Governance for Development In Arab Countries initiatives of the OECD July 8, 2009
More informationHydropower and Water Resources
Hydropower and Water Resources Hydropower and Water Resources The development, planning, design, and construction of hydropower as well as large-scale irrigation schemes and special hydraulic structures
More informationCase Study: Lokoho Project, Madagascar
Session 2.1 RE Identification Case Study: Lokoho Project, Madagascar Pascale Bonzom (UNDP) / Sascha Thielmann (GTZ) Rural Electrification Workshop March 1-3, 2006 Nairobi Case Study: Lokoho Project, Madagascar
More informationThe Nigerian Power Sector A case study of Power sector reform and the role of PPP
The Nigerian Power Sector A case study of Power sector reform and the role of PPP Erik Fernstrom World Bank November 14, 2011 1 Background: Nigeria Nigeria: Population is the seventh largest in the World,
More informationDEMOCRACTIC REPUBLIC OF CONGO Implementing Agency Democratic Republic of Congo Congo, Democratic Republic of
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2795 Regional
More information2. General description of the Consulting Services
Reconstruction of Mingachevir Hydroelectric Power Plant Cascade 1. Introduction The main objectives of the Reconstruction of Mingachevir Hydroelectric Power Plant Cascade are to (a) rehabilitation of the
More informationRenewable Energy and Climate Change: The CIF Experience TITLE SLIDE
Renewable Energy and Climate Change: The CIF Experience TITLE SLIDE Regional Expert Meeting on Climate Change and Enhanced Renewable Energy Deployment in Central Africa Libreville, Gabon June 1, 2016 CIF
More informationFast Tracking Hydro Infrastructure Build in Developing Economies. BJ Rochecouste Collet Technical Director Aurecon South Africa
Fast Tracking Hydro Infrastructure Build in Developing Economies BJ Rochecouste Collet Technical Director Aurecon South Africa Fast Tracking? Hydro is the cheapest power source in the Nordic market (Source:
More informationNELSAP AT A GLANCE. Overview of NELSAP
NELSAP AT A GLANCE Overview of NELSAP The Nile Basin Initiative (NBI) is a partnership of the riparian states effective 1999; it seeks to develop the river in a cooperative manner, share substantial socioeconomic
More informationPrivate Sector Participation in the Off-grid Market
Private Sector Participation in the Off-grid Market Is the Mozambican Renewable Energy Sector Bankable? Emmett Costel Epsilon Energia Solar Director of Operations Epsilon Energia Solar (EES), is a company
More informationINDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati
INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati Introduction Indonesian power sector is one of the business sectors in Indonesia which is strictly regulated. For the
More informationCTF PRIVATE SECTOR PROPOSAL SUSTAINABLE ENERGY GENERATION COMPONENT A JOINT SUBMISSION FROM IFC & AfDB
CTF PRIVATE SECTOR PROPOSAL SUSTAINABLE ENERGY GENERATION COMPONENT A JOINT SUBMISSION FROM IFC & AfDB Name of Project or Program CTF amount requested (US$): Country targeted Indicate if proposal is a
More informationWorking With Cost Reflective Tariffs-The Kenyan Experience
Working With Cost Reflective Tariffs-The Kenyan Experience Dr. Frederick Nyang Director, Economic Regulation Energy Regulatory Commission Kenya INTRODUCTION Energy Regulatory Commission is a single sector
More information10th German-African-Energy Forum, Hamburg, April 25 & 26, 2016
INGA? What is Inga A brief history Recent development The current tender WHAT IS INGA? What is INGA? The best hydroelectric site in the World Total potential 44 GW (roughly equivalent 44 nuclear power
More informationBringing electricity to the rural areas: Designing Laws and Policies that work
Bringing electricity to the rural areas: Designing Laws and Policies that work By Hon.Umaru Lule Member of Parliament / Chairman Committee on Natural Resources Parliament of Uganda Contents Introduction
More informationPolicy and Regulatory Issues of Solar Power in Sub-Saharan Africa
Policy and Regulatory Issues of Solar Power in Sub-Saharan Africa International Solar Alliance Monthly Get Together 20 th December 2017 Presentation by: Abhishek Kumar and Samir Bhattacharya CUTS International
More informationInfrastructure and Capital Projects
Infrastructure and Capital Projects Contents Deloitte s Capabilities in Infrastructure and Capital Projects 1 Strategy and Planning 3 Financing and Procurement 4 Project Organisation, Execution and Construction
More informationDarial Energy LLC. Dariali Hydro Power Plant Construction and Operation Project. Environmental and Social Action Plan, Dariali HPP
Darial Energy LLC Dariali Hydro Power Plant Construction and Operation Project Environmental and Social Plan, Dariali HPP Tbilisi 2014 Dariali Energy JSC, the Sponsor, is planning construction and operation
More informationHydropower & Dams Services
Hydropower & Dams Services We represent a world-class concentration of hydropower and dam expertise. Since 1920, we have designed hundreds of new hydropower and dams globally, producing clean reliable
More informationPOWER SYSTEMS RENEWABLE ENERGY SUSTAINABLE ENERGY
20 POWER SYSTEMS RENEWABLE ENERGY SUSTAINABLE ENERGY The energy professionals The company intec in the world Power systems Power transmission & distribution Power network key competencies Thermal power
More informationRenewable energy: Investing in Africa
1. Who is responsible for energy policy? 2. To what extent have generation, transmission and distribution activities been unbundled? 3. Who owns and operates the (grid-connected) generation, transmission
More informationWORLD BANK GROUP INFRASTRUCTURE ACTION PLAN AFRICA REGION FY
WORLD BANK GROUP INFRASTRUCTURE ACTION PLAN AFRICA REGION FY2012-2015 Access Indicators Energy Electrification rate (% of population with access) 1 30.5 Delay in obtaining electrical connection (days)
More informationJohn Hart Generating Station Replacement Project. January 2018 Community Construction Update Report #55
John Hart Generating Station Replacement Project January 2018 Community Construction Update Report #55 Prepared by: Stephen Watson, BC Hydro (O) 250-755-4795 or (C) 250-616-9888 Twitter: @Puntledge Email:
More informationEnergoFichtner. General Information. your reliable partner in power industry
OOO EnergoFichtner Ul. Marksistskaya 3, str.2, Moscow, 109147, Russia Tеl./Fax: +7 (495) 661-5957 www.energofichtner.ru EnergoFichtner your reliable partner in power industry General Information The Group
More informationNigeria, Niger, Algeria West Africa 4,400 km pipeline from Warri (Nigeria), through Niger to Hassi R Mel in Algeria
Project Number: E.15.1.1/E.15.1.2/E.15.1.3 Project Title: Nigeria Algeria Pipeline Status: S2 Feasibility/needs assessment Countries Region Project Location (current line routing) Sector Sub - sector Project
More informationChapter 4. Introduction to the Toolkit
Chapter 1 Introduction to the Toolkit This table explains which sections of the Plan are completed in each chapter of the toolkit: Toolkit Chapters: Chapter 1 Chapter 2 Chapter 3 Chapter 4 Plan Section
More informationKERIO VALLEY DEVELOPMENT AUTHORITY INVITATION TO TENDER
KERIO VALLEY DEVELOPMENT AUTHORITY KVDA REPUBLIC OF KENYA MINISTRY OF ENVIRONMENT, WATER AND NATURAL RESOURCES INVITATION TO TENDER Introduction Kerio Valley Development Authority (KVDA) is a Parastatal
More informationAfrica EU Action Programme to support improved transboundary basins management
Africa EU Action Programme to support improved transboundary basins management Animated by: French Ministry for Foreign Affairs. Dakar, November 2004 Alain BERNARD a.bernard@oieau.fr AMCOW has selected
More informationCOTTON DEVELOPMENT AUTHORITY
REPUBLIC OF KENYA COTTON DEVELOPMENT AUTHORITY THE STATUS REPORT ON THE COTTON INDUSTRY IN KENYA FOR ICAC PLENARY MEETING IN CAPETOWN SOUTH AFRICA, SEPTEMBER 7 TH -11 TH -2009 COMPILED BY COTTON DEVELOPMENT
More informationIndependent Accountability Mechanism for IFC & MIGA, World Bank Group
Independent Accountability Mechanism for IFC & MIGA, World Bank Group Meeting with Civil Society Organizations in Accra, Ghana December 14, 2017 What is CAO? Independent accountability mechanism ( grievance
More informationDEMOCRATIC REPUBLIC OF CONGO PROGRAMME PLAN 2014
1. Introduction DEMOCRATIC REPUBLIC OF CONGO PROGRAMME PLAN 2014 is co-ranked the poorest country in the world, (along with Niger), at 186th of the UN Human Development Index (2013). Following Joseph Kabila
More informationProject Helios The Greek Solar Energy Project
Ministry of Environment, Energy and Climate Change of the Hellenic Republic Project Helios The Greek Solar Energy Project Hamburg, 5 th September 2011 1 Why Helios The context The market The opportunity
More informationProactive Ismaili Imam: His Highness the Aga Khan
Aga Khan IV Source: AKDN.org Proactive Ismaili Imam: His Highness the Aga Khan Culture, faith, religious tranquility, and social and economic development are the silver threads that are knitted together
More informationDEVELOPED COUNTRIES SUPPORT TO THE AGRICULTURAL SECTOR IN LEAST DEVELOPED COUNTRIES OF EAST AFRICA: THE CASE OF AGRICULTURAL PRODUCTIVITY
Development Challenges of the Least Developed Countries Tracking the International Commitments DEVELOPED COUNTRIES SUPPORT TO THE AGRICULTURAL SECTOR IN LEAST DEVELOPED COUNTRIES OF EAST AFRICA: THE CASE
More informationAFRICA CLEAN ENERGY CORRIDOR Infrastructure for Renewable Power. Kudakwashe Ndhlukula Programme Officer, IRENA
AFRICA CLEAN ENERGY CORRIDOR Infrastructure for Renewable Power Kudakwashe Ndhlukula Programme Officer, IRENA Luanda, 24 a 27 de Setembro de 2013 CONFERÊNCIA INTERNACIONAL SOBRE ENERGIA E ÁGUAS INTERNATIONAL
More informationeni: Providing access to electricity and reducing gas flaring in the Republic of the Congo
case study eni: Providing access to electricity and reducing gas flaring in the Republic of the Congo Summary eni is a leading global energy company with operations in 79 countries and activities in oil
More informationCountry Action Plan-Proposed Outline
e8-gef-undesa Financing Sustainable Electrification Africa Dialogues Nairobi, Kenya, April 13-15, 2010 Country Action Plan-Proposed Outline [Kenya] OVERVIEW Liberalization of the energy sector in 1996
More informationThe WWF Water Neutral Scheme Review. Reduce. Replenish.
The WWF Water Neutral Scheme Review. Reduce. Replenish. The Global Water Situation Globally, the availability of clean freshwater is a growing social, economic and environmental issue. It is estimated
More informationWe deliver gas infrastructure
We deliver gas infrastructure We are Uniper We are a leading international energy company with operations in more than 40 countries and around 13,000 employees. We combine a balanced portfolio of modern
More informationAddress at the opening ceremony of Workshop
Address at the opening ceremony of Workshop IEC AFRC Safe and sustainable power to everyone du 2 November 2015 Nairobi, Kenya. KOUTOUA Claude : Président AFSEC 02/11/2015 Objectives of AFSEC To harmonize
More informationEMPLOYMENT RESEARCH BRIEF EMPLOYMENT IMPACT OF INFRASTRUCTURE INVESTMENTS IN MOROCCO
EMPLOYMENT RESEARCH BRIEF EMPLOYMENT IMPACT OF INFRASTRUCTURE INVESTMENTS IN MOROCCO This country brief provides insights into the various employment outcomes of European Investment Bank (EIB)- financed
More informationAFRICA ENERGY FORUM. Barcelona, 19 June com energia construimos futuro ELECTRICIDADE DE MOÇAMBIQUE, E.P.
AFRICA ENERGY FORUM Barcelona, 19 June 2013 1 Energy Outlook for Mozambique Content 1. General information on the ESI in Mozambique 2. Domestic and regional power demand 3. Mozambique power Generation
More informationHYDROPOWER GENERATION, THE GOOD, THE BAD AND THE UGLY
HYDROPOWER GENERATION, THE GOOD, THE BAD AND THE UGLY By Elenestina M. Mwelwa (Mrs), Senior Manager, Environmental Unit, ZESCO LIMITED Paper presented at the IUCN Energy, Ecosystems and Livelihoods in
More informationINTEGRATED SAFEGUARDS DATA SHEET
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:
More informationSustainable Energy for All. Gearing up for the road ahead
Sustainable Energy for All Gearing up for the road ahead Gearing up for the road ahead Sustainable Energy for All World Bank Photo Collection Three Goals Recognizing urgent energy challenges, the World
More informationAFRICA ENERGY MINISTERS CONFERENCE JOHANNESBURG DECLARATION
AFRICA ENERGY MINISTERS CONFERENCE JOHANNESBURG DECLARATION Preamble We, African Ministers responsible for Energy, convened in Johannesburg, South Africa on September 15 and 16, 2011 at the Africa Energy
More informationAgricultural price volatility and its impact on government and farmers: a few observations
Agricultural price volatility and its impact on government and farmers: a few observations Junior Davis UNCTAD, Special Unit on Commodities OECD Agricultural Price Volatilities Conference: G20 Outreach
More informationLong Lake Small Hydro Project
Long Lake Small Hydro Project Minerals North 2005 29 April 2005 Presented by David Carter Regional Power Inc. Stuart Croft - Summit Power Group Project Location 25 km north of Stewart, in northwest B.C.
More informationNBI strategic water resources analysis Phase I findings
NBI strategic water resources analysis Phase I findings Abdulkarim H Seid NBI Secretariat The NBI Strategic Water Resources Analysis Key question: how to meet demands for water, food and energy upstream
More informationMeeting Vietnam s Energy Demands in a Sustainable Way
TRUNG SON HYDROPOWER PROJECT Meeting Vietnam s Energy Demands in a Sustainable Way Photo by: World Bank 1 Photo by: Mai Ky/World Bank, 2012 OVERVIEW Trung Son Hydropower Project (TSHPP) is a US$411.57
More informationCONTENTS 2. PROJECT DESCRIPTION NEED FOR THE PROJECT ABOUT THE PROPONENT SITE SELECTION OVERVIEW OF THE PROJECT 2 5
CONTENTS 2. PROJECT DESCRIPTION 2-2 2.1 NEED FOR THE PROJECT 2 2 2.2 ABOUT THE PROPONENT 2 4 2.3 SITE SELECTION 2 4 2.4 OVERVIEW OF THE PROJECT 2 5 Figure 2.1: Provisional wind profile for the Jeffrey
More informationLi Junfeng Zhu Li Center For Renewable Energy Development, Energy Research Institute (China)
Authors: Li Junfeng Zhu Li Center For Renewable Energy Development, Energy Research Institute (China) Liu Zhan zhang Yuan State Power Company (China) Byron Washom (Spencer Management Associates, USA) Gregory
More informationUNECE Activities in Energy Efficiency in Buildings and Housing Sector
UNECE Activities in Energy Efficiency in Buildings and Housing Sector Oleg Dzioubinski Energy Efficiency 21 Programme Manager UNECE Sustainable Energy Division ESCWA Expert Group Meeting on Best Practices
More informationLower Mattagami River Project
Lower Mattagami River Project 2016 Canadian Consulting Engineering Awards Project summary Ontario Power Generation s (OPG) Lower Mattagami River (LMR) project, its largest hydro project in 40 years, added
More informationRegulator s Role in the Promotion of Renewable Energy Resources
Regulator s Role in the Promotion of Renewable Energy Resources 16 September 2008 Marie Römpötti Econ Pöyry AB The views expressed in this presentation are the views of the author and do not necessarily
More informationBANK MANAGEMENT RESPONSE TO REQUEST FOR INSPECTION PANEL REVIEW OF THE UGANDA: PRIVATE POWER GENERATION PROJECT (PROPOSED)
BANK MANAGEMENT RESPONSE TO REQUEST FOR INSPECTION PANEL REVIEW OF THE UGANDA: PRIVATE POWER GENERATION PROJECT (PROPOSED) Management has reviewed the Request for Inspection of the proposed Uganda: Private
More informationTapping untapped. renewable energy
Tapping untapped renewable energy IN WATER DISTRIBUTION networks in South Africa, water is often fed under gravity from a higher reservoir to another reservoir at a lower level. The high pressure head
More informationINTERNATIONAL WATERS IN AFRICA COOPERATION AND GROWTH
INTERNATIONAL WATERS IN AFRICA COOPERATION AND GROWTH April 11, 2013 Gustavo Saltiel Program Manager, CIWA A Multi-Donor Program Supporting Cooperation in International Waters in Africa DEVELOPMENT CHALLENGES:
More informationUkraine Action Plan. Translation
Ukraine Action Plan Translation The German Government is supporting Ukraine s political and economic stabilisation via an action plan involving ministries, implementing and partner organisations, the business
More informationESCAP/APEF/2018/INF/1
Distr.: General 8 January 2018 Original: English Economic and Social Commission for Asia and the Pacific Second Asian and Pacific Energy Forum Bangkok, 3 5 April 2018 Item 2 of the provisional agenda *
More informationReporting System for Lake Kivu Gas Resources Operations
REPUBLIC OF RWANDA RWANDA UTILITIES REGULATORY AGENCY Reporting System for Lake Kivu Gas Resources Operations 1 1. INTRODUCTION Pursuant to the Law n o 39/2011 of 13/09/2001 establishing the Rwanda Utilities
More informationStatus, Challenges and Forecast of the Philippines Wind Industry
Status, Challenges and Forecast of the Philippines Wind Industry MARIO C. MARASIGAN OIC Assistant Secretary Asian Clean Energy Forum 2016 June 6, 2016 ADB Headquarter, Mandaluyong City Department of Energy
More informationThe UNDP 3x6 Approach:
United Nations Development Programme The UNDP 3x6 Approach: Enhancing resilience through livelihoods recovery programmes in post-crisis and transition settings Empowered lives Resilient Nations Enhancing
More informationVIETNAM GUIDE ON RENEWABLE ENERGY
VIETNAM GUIDE ON RENEWABLE ENERGY 2017 FOREWORD Vietnam s power sector has been developing rapidly over the years with opportunities opening for renewable energy (i.e. Solar Energy and Wind Energy, although
More informationThe Republic of Guinea. Sustainable Economic Growth & Prosperous Future
Sustainable Economic Growth & Prosperous Future Proposal for the Funding, Construction, & Implementation of: Combined Cycle Gas Turbine Power Plant Hydro-Electric Power Plant Joint Venture Introduction
More informationCountry Summary Sheet Guatemala
Country Summary Sheet Guatemala Executive Summary Guatemala provides equal treatment for foreign investors, and incentives for the development of renewable energy projects. Because of the steady energy
More informationSMALL HYDRO FEED IN TARIFF ISSUES KEK COMMENTS AND RECOMMENDATIONS
SMALL HYDRO FEED IN TARIFF ISSUES KEK COMMENTS AND RECOMMENDATIONS 1. SUMMARY The Government of Kosovo has a renewable policy 1 to encourage the development of small hydro power projects (SHPP) as well
More informationGerman-African Energy Forum 2012
German-African Energy Forum 2012 Kirsten Offermanns Senior Project Manager Subdevision Energy and Environment KfW Entwicklungsbank Dr. Fritjof Börstler Senior Project Manager Bundesanstalt für Geowissenschaften
More informationDeveloping Albania s Hydroelectric Potential
Developing Albania s Hydroelectric Potential One-day Workshop Tirana, Albania 3 June 2016 A Concise Presentation by Costis Stambolis, Executive Director Institute of Energy for S.E. Europe (IENE), Athens
More informationOverview of BPC, its hydropower projects and Opportunities for further Development
Overview of BPC, its hydropower projects and Opportunities for further Development Pratik Pradhan, Vice President BPC Nepal Power Investment Summit 2016 Kathmandu 1 June 2016 Content Overview of BPC Generation
More informationSediment management of hydropower cascade: example of CNR run-of-river developments, French Rhone River, France
Sediment management of hydropower cascade: example of CNR run-of-river developments, French Rhone River, France Christophe PETEUIL Compagnie Nationale du Rhone Engineering Department, River Systems and
More informationBloemwater Conduit Hydropower Plant launched
Bloemwater Conduit Hydropower Plant launched Marco van Dijk Department of Civil Engineering University of Pretoria marco.vandijk@up.ac.za On 31 March 2015 the Minister of Water and Sanitation, Nomvula
More informationGEOTHERMAL EXPLORATION IN RWANDA: A COUNTRY UPDATE
Presented at Short Course IX on Exploration for Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Nov. 2-24, 2014. Kenya Electricity Generating Co.,
More informationIndonesia update: Tariff framework for renewable energy
September 2017 Indonesia update: Tariff framework for renewable energy In brief On 7 August 2017, the Ministry of Energy and Mineral Resources of the Republic of Indonesia ( MEMR ) enacted Regulation No.
More informationRenovAr PROJECT ON ARGENTINA Ministry of Energy and Mining Argentina Republic
RenovAr PROJECT ON RENEWABLE ENERGIES ARGENTINA 2016-2025 Ministry of Energy and Mining Argentina Republic THE ACT ON RENEWABLE ENERGIES SETS A NEW STAGE IN THE ARGENTINE REPUBLIC It is a historic event
More informationCommissioners Mital, Simpson, Helgeson, Manning, and Brown Mel Damewood, Engineering Manager; Mike McCann, Generation Manager
M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: FROM: DATE: October 23, 2015 SUBJECT: OBJECTIVE: Commissioners Mital, Simpson, Helgeson, Manning, and Brown Mel Damewood, Engineering Manager; Mike
More informationWorld Bank Group Renewable Energy & Energy Efficiency Performance July June2005 Q&A
World Bank Group Renewable Energy & Energy Efficiency Performance July 2004 - June2005 Q&A Q. Did the World Bank Group meet the June 2004 Bonn International Conference on Renewable Energies commitment
More informationLesotho Highlands Water Project. Refiloe Tlali Chief Executive LHDA 22 May 2015
Lesotho Highlands Water Project Refiloe Tlali Chief Executive LHDA 22 May 2015 Today s roadmap Why the LHWP? What is the mandate? How is LHDA governed? What has been achieved? Where to from here? Why the
More informationHydro & Small Hydro Outlook in India 2017
Hydro & Small Hydro Outlook in India 217 Evaluating Business Case & Future Scenario of Large & Small Hydro Power Plants in India Report Summary enincon consulting llp, 217, New Delhi, India Enincon s Key
More informationHYDRO AND ELECTRIC ENERGY REGULATION
Province of Alberta HYDRO AND ELECTRIC ENERGY ACT HYDRO AND ELECTRIC ENERGY REGULATION Alberta Regulation 409/1983 With amendments up to and including Alberta Regulation 136/2015 Office Consolidation Published
More informationCost of Service and Public Policy. Ted Kury Director of Energy Studies, PURC
Cost of Service and Public Policy Ted Kury Director of Energy Studies, PURC ted.kury@warrington.ufl.edu Session Overview Improving Utility Sector Performance Costs to Provide Service Uniform System of
More informationWorld Small Hydropower Development Report 2013
World Small Hydropower Development Report 2013 www.smallhydroworld.org SPAIN Disclaimer Published in 2013 by United Nations Industrial Development Organization (UNIDO) and International Center on Small
More informationInformation on a joint Agricultural and Renewable Energies Program at Sandfontein Farm, Bonnievale Bonnievale Solar Farm
Information on a joint Agricultural and Renewable Energies Program at Sandfontein Farm, Bonnievale Bonnievale Solar Farm Overview This proposal describes the concept of a joint agricultural and renewable
More informationSome aspects of the sediment transit on the Mekong river in relation with hydropower development
Some aspects of the sediment transit on the Mekong river in relation with hydropower development Daniel Loudière Société Hydrotechnique de France A presentation in three parts - the situation when starting
More informationRwanda Electricity Sector Access Programme. March Volume I: Investment Prospectus
Rwanda Electricity Sector Access Programme March 2009 Volume I: Investment Prospectus Rwanda Electricity Sector Access Programme Volume I: Investment Prospectus March 2009 Copyright Castalia Limited.
More information