Michigan's. Water Quality Event. 92 nd Annual Conference Boyne Mountain Steve Aiken Regional Sales Manager

Size: px
Start display at page:

Download "Michigan's. Water Quality Event. 92 nd Annual Conference Boyne Mountain Steve Aiken Regional Sales Manager"

Transcription

1 Michigan's Water Quality Event 92 nd Annual Conference Boyne Mountain Steve Aiken Regional Sales Manager

2 Presentation Represents: 41 Projects $ 96,655,900 Invested All to improve Clean Water for the citizens of Michigan

3 Funding Sources: $ 96,655,900 $ 47,021,400 SRF % $ 32,647,500 Local Funding 33.8% $ 16,655,000 Various Grant 17.6

4 News From the Field MWEA 2017 Annual Conference

5

6

7

8 Benton Harbor St Joseph Wastewater Plant MWEA 2017 Annual Conference

9 BHSJ Blower Project

10

11

12 BHSJ Headworks/Grit

13

14

15 MWEA 2017 Annual Conference

16 Continued Sewer Separation in Grand Rapids Although the last sewage overflow point, under permit requirements, was eliminated in Grand Rapids in July of 2015, the City is continued to separate additional areas. Client: City of Grand Rapids Consultants: Moore & Bruggink: CSO #27 Design and Construction Inspection Black & Veatch: CSO #28A Design and Construction Management Contractor(s): Georgetown Construction (CSO #27), Nagel Construction (CSO #28A) CSO Contract #27 and #28A included: Sanitary sewer replacement (9,700 ft) New storm sewers (5,500 ft) Water main replacement (13,200 ft) 2 urban rain garden Porous pavement (9,200 sq yds) 31 Infiltration Basins Elimination of an additional 184 acres of combined sewers

17 Commemorative Plaque Dedication City dedicated a plaque at a ceremony held in April to commemorate the CSO Program and all those that worked on it over the past 30 years.

18 Great Lakes Water Authority (GLWA) Incinerator Improvements Project: Sewage Sludge Incinerator Air Quality Control Improvements at the Detroit WRRF Client: Great Lakes Water Authority (GLWA) Design and Construction Inspection: Black & Veatch, Wade Trim, Metco, PCI Contractor: Walsh Construction This Design-Build project included air quality upgrades to eight (8) sewage sludge incinerators. Improvements include installation of new venturi scrubbers, replacement of induced draft (ID) fans and motors and addition of VFDs for the ID fans. The project was needed to meet 2016 Federal air quality MACT standards.

19

20 SEWAGE SLUDGE INCINERATOR AIR QUALITY CONTROL IMPROVEMENTS DESIGN/BUILD CONTRACT PC-791 To enable eight multiple heath incinerators at Incineration Complex II of GLWA WRRF to comply with MACT (Maximum Achievable Control Technology) air quality regulations for Sewage Sludge Incineration units as addressed in U.S. EPA Final Rule incorporated into 40 CFR Part 60 20

21 PC-791 Process Improvements Project Schematic and Process Flow Piping Elements 21

22 Complex II Incineration Firm Capacity 260 dtpd (6 units in operation) Design/Build Contractor Walsh Construction Company Funding Source MDEQ State Revolving Fund Cost Estimate $37,989,471 22

23 GLWA Rouge River Outfall Disinfection Project PC-797 Update: Project Players: Owner: Great Lake Water Authority (GLWA) Engineer: CDM Smith Contractor: CDM Constructors Inc. Project Background: Upgrade to GLWA Water Resource Recovery Facility (WRRF) disinfection facility Provide ability to disinfect flows up to 1,700 MGD Includes disinfection for two outfalls Project Delivery: Design/Build 60% design completed Guaranteed Maximum Price Developed for 60% design Complex hydraulics required physical model

24 GLWA Rouge River Outfall Disinfection Project System Components: New Chemical Facility includes: Sodium Hypochlorite System: 110,000 gallon tanks 9 chemical pumps 4 chemical diffusers 2 flow meters (ea 18 x 14.5 ) Gaseous Chlorine System 8 chemical diffusers 4 flow meters (ea 15.5 x 15 ) Sodium Bisulfite System 35,000 gallon tanks 6 chemical pumps 4 chemical diffusers 2 flow meters (ea 19.3 x 10.7 ) Required Removal of 11,000 cu yds of solids From existing underground conduits

25 GLWA Rouge River Outfall Disinfection Project Project Status Current activities: Completed deep foundation design for building permit application Finalizing remaining 100% design Completing soft dig utility location Performing utility relocation Site demo completed Schedule: Completed sediment removal in early 2016 Started construction April 1, 2017 Chemical building completed Fall 2018 Substantial completion April 1, 2019 Demonstration testing Spring/Summer 2019 Final completion, December 31, 2019 New facility located on constrained site

26 HUBBELL, ROTH & CLARK NEWS FROM THE FIELD MWEA 2017 Annual Conference JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 26

27 Downriver Wastewater Treatment Facility (DWTF) Headworks System Renovations JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 27

28 Downriver Wastewater Treatment Facility (DWTF) Secondary System Renovations JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 28

29 Downriver Wastewater Treatment Facility (DWTF) Laboratory Renovations JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 29

30 Downriver Wastewater Treatment Facility (DWTF) Solids Complex Renovation Project (DR-6) JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 30

31 City of South Haven WWTP Pump Station Addition JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 31

32 City of Wixom Solids Handling Improvements JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 32

33 City of Bay City RTB #3 - Screw Pumps Replacement JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 33

34 Calhoun County Drain Inspection & Maintenance Guidance JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 34

35 Calhoun County Drain Inspection & Maintenance Guidance JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 35

36 News From the Field for MWEA Annual Conference 2017

37 Fife Lake Area Utility Authority Fife Lake, Michigan

38 Fife Lake Area Utility Authority Fife Lake, Michigan

39 Fife Lake Area Utility Authority Fife Lake, Michigan

40 Nashville Wastewater System Improvements Nashville, Michigan

41 Nashville Wastewater System Improvements Nashville, Michigan

42 Nashville Wastewater System Improvements Nashville, Michigan

43 City of Albion 2017 WWTP Improvements Albion, Michigan

44 City of Albion 2017 WWTP Improvements Albion, Michigan

45 Sturgis Market St. Lift Station: Construction Phase Sturgis, Michigan

46 Sturgis Market St. Lift Station: Construction Phase Sturgis, Michigan

47 Sturgis Market St. Lift Station: Construction Phase Sturgis, Michigan

48 Kinross WWTP Improvements Segment 1 Kinross, Michigan

49 Kinross WWTP Improvements Segment 1 Kinross, Michigan

50 Kinross WWTP Improvements Segment 1 Kinross, Michigan

51 Hillsdale BPU Wastewater System Improvements Hillsdale, Michigan

52 Hillsdale BPU Wastewater System Improvements Hillsdale, Michigan

53 Hillsdale BPU Wastewater System Improvements Hillsdale, Michigan

54 Dexter Dexter, Michigan

55 Dowagiac WWTP Dowagiac, Michigan

56 Dowagiac WWTP Dowagiac, Michigan

57 Croswell Imhoff tanks

58 Croswell Sludge Press Croswell, Michigan

59 Croswell Sludge Press Croswell, Michigan

60 West Bay County WWTP West Bay County, Michigan

61 West Bay County WWTP West Bay County, Michigan

62 Pinconning Pinconning, Michigan

63 News From the Field Prein & Newhof MWEA 2017 Annual Conference

64 City of Mason 2017 Wastewater Treatment Plant Improvements Headworks

65 City of Mason Wastewater Treatment Plant Improvements Headworks

66 City of Mason Wastewater Treatment Plant Improvements Headworks

67 Plainfield Charter Township Northerly Trunk Siphons

68 Plainfield Charter Township Northerly Trunk Siphons

69

70 Plainfield Charter Township Northerly Trunk Siphons

71 City of Roosevelt Park Roosevelt Road Drainage Improvements and Groundwater Collection System BEFORE DURING AFTER

72 City of Roosevelt Park Roosevelt Road Drainage Improvements and Groundwater Collection System Gravity Groundwater Discharge Pipe

73 City of Roosevelt Park Roosevelt Road Drainage Improvements and Groundwater Collection System

74 Ottawa County Road Commission Wastewater Collection System Replacement Chicago Drive M-121 and Rush Creek Trunk Sewer

75 Ottawa County Road Commission Wastewater Collection System Replacement Chicago Drive M-121 and Rush Creek Trunk Sewer

76 Ottawa County Road Commission Wastewater Collection System Replacement Chicago Drive M-121 and Rush Creek Trunk Sewer

77 NEWS FROM THE FIELD M W E A A N N U A L C O N F E R E N C E FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors

78 Coldwater Phase 1 Improvements Engineer: FTCH Construction Manager: FTCH Investment By CBPU: $3.3 million

79 Coldwater Phase 1

80 Coldwater Phase 1

81 Walled Lake-Novi WWTP EQ Basin

82 Walled Lake-Novi WWTP EQ Basin

83 Lakewood Wastewater Authority/Village of Lake Odessa Replacement submersible pump station Watermain Replacement 4160 feet of 12 WM 3,390 feet of 8 WM Sanitary Sewer Replacement 7,925 feet of 8 gravity

84 Lakewood Wastewater Authority/Village of Replacement submersible pump station Watermain Replacement 4160 feet of 12 WM 3,390 feet of 8 WM Sanitary Sewer Replacement 7,925 feet of 8 gravity Lake Odessa

85 N.E. Road & Utility Improvements Fiske Road Pump Station

86 Fiske Road Pump Station

87 Fiske Road Pump Station

88 Large Construction Jobs Moore & Bruggink Zeeland CWP Expansion Delta Charter Township WWTP Upgrades

89 Zeeland CWP Expansion January 2016 June 2016 June 2017

90 Zeeland CWP Expansion

91

92 Delta Charter Township WWTP Upgrades Before After

93 Delta Charter Township WWTP Upgrades Before After

94 Delta Charter Township WWTP Upgrades Before After

95 Projects Wyoming: Diffuser Replacement Niles: RAS Improvements Coldwater: SCADA Upgrade 95

96 96 Wyoming: Diffuser Replacement

97 97 Wyoming: Diffuser Replacement

98 98 Wyoming: Diffuser Replacement

99 99 Wyoming: Diffuser Replacement

100 100 Niles: RAS Improvements

101 101 Niles: RAS Improvements

102 102 Niles: RAS Improvements

103 103 Coldwater: SCADA Upgrade

104 104 Coldwater: SCADA Upgrade

105 105 Coldwater: SCADA Upgrade

106 Milford Wastewater Treatment Plant Improvements Headworks, Equalization Basin, and Sludge Storage Tank

107 Construction of a new below-ground pump station that will operate with both the existing plant and the new Equalization Basin Headworks Facility Construction of new screen grit building to increase grit removal efficiency and reduce grit settling in other areas of the plant

108 Equalization Basin 300,000 gallon Equalization Basin Provide consistent flow rate to plant improving treatment efficiency Provides means for diverting flows during low flow periods for inspection & maintenance

109 Sludge Handling Upgrades 400,000 gallon Sludge Storage Tank Decreases frequency of sludge hauling and improves operational flexibility

110 TETRA TECH NEWS FROM THE FIELD 2017 MWEA 2017 Annual Conference

111 Tertiary Filter, UV Disinfection, and Effluent Discharge East Lansing Water Resource Recovery Facility Engineer: Contractor: Tetra Tech Grand River Construction New UV Building Addition New Tertiary Filter Equipment

112 Tertiary Filter, UV Disinfection, and Effluent Discharge East Lansing Water Resource Recovery Facility New UV Equipment Room New Outfall Structure

113 North Secondary Flow Distribution Improvements Grand Rapids Water Resource Recovery Facility Engineer: Contractor: Tetra Tech L.D. Dosca Company

114 North Secondary Flow Distribution Improvements Grand Rapids Water Resource Recovery Facility New Flow Split Structure Green Wall Feature

115 City of Kinross City of Hillsdale Village of Dexter City of Dowagiac THANK YOU City of Jackson Benton Harbor St Joseph Authority Bay County City of Grand Rapids Prein & Newhof Black & Veatch City of Roosevelt Park Great Lakes Water Authority Plainfield Township Hubble Roth & Clark Ottawa County Wayne County Downriver WWTP Fishbeck Thompson Carr & Huber City of South Haven City of Coldwater City of Wixom Walled Lake Novi WWTP City of Bay City Lakewood Wastewater Authority Calhoun County Moore & Bruggink Fleis & Vandenbrink City of Zeeland Fife Lake Delta Township City of Nashville Donahue City of Sturgis City of Wyoming Village of Milford OHM City of Niles Tetra Tech

Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project

Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project Presented August 29 th, 2016 Function of IMKWWTP Treatment Facility History Reasons for Proposed Project Why Now? Modest

More information

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater

More information

Streamlining I/I Repairs in Berlin Charter Township

Streamlining I/I Repairs in Berlin Charter Township Case Study: Streamlining I/I Repairs in Berlin Charter Township Presented by: Rich Grant, PE Agenda Discussion of the problems & the SAW I/I Evaluation & SSES = Asset Management Groundtruthing of Results

More information

Integrated Fixed Film Activated Sludge (IFAS) System for Additional Nitrification at the Coldwater WWTP

Integrated Fixed Film Activated Sludge (IFAS) System for Additional Nitrification at the Coldwater WWTP Fishbeck, Thompson, Carr & Huber, Inc. Integrated Fixed Film Activated Sludge (IFAS) System for Additional Nitrification at the Coldwater WWTP Jim Flamming, P.E., Senior Process Engineer, FTC&H Dave Woodman,

More information

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station City of St. Joseph, Missouri Hydraulic Analysis and Effluent Pump Station By Work Order No. 09-001 B&V Project 163509 May 20, 2010 Table of Contents 1.0 Executive Summary...1 2.0 Purpose of Study...2 3.0

More information

Northfield Township WWTP Capacity Evaluation Report

Northfield Township WWTP Capacity Evaluation Report Northfield Township WWTP Capacity Evaluation Report March 18, 2015 PRESENTED TO PRESENTED BY Northfield Township 8350 Main Street Suite A Whitmore Lake, Michigan 48189 Tetra Tech 710 Avis Drive Suite 100

More information

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION TABLE OF CONTENTS 2. Description of Water and Wastewater Systems... 2 2.1 General... 2 2.2 Existing Facilities Reference and Record Documents... 2 2.3 Existing Infrastructure Location and Legal Description...

More information

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 Project Name: Central WWTP Capacity Improvements and CSO Reduction Project MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 BACKGROUND / PURPOSE Metro Water Services (MWS), in order to comply with

More information

Wastewater Treatment. Knowledge. Commitment. Excellence.

Wastewater Treatment. Knowledge. Commitment. Excellence. Wastewater Treatment Knowledge. Commitment. Excellence. www.kcepc.com Wastewater Treatment KC s wastewater treatment group has designed, constructed, and helped to operate over 70 facilities. We work with

More information

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by Milwaukee Metropolitan Sewerage District Conveyance and Treatment System MACRO made available by Eric Loucks,, CDM MMSD Collection System Operations MMSD operates an extensive system of sanitary sewers

More information

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA A. EXISTING FACILITIES 1. Westtown-Chester Creek Plant Westtown Township acquired the Westtown-Chester Creek Treatment Plant (WCC Plant)

More information

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE PLAN SUMMARY AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE The Pennsylvania Sewage Facilities Act (Act 537) was enacted by the Pennsylvania

More information

Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013

Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013 Wastewater Treatment Plant Facility Plan Update City Project #11-013 City of Liberty, Missouri May 6, 2013 Background 2 HDR Begins Feasibility Study to Evaluate Construction of a New Wastewater Treatment

More information

New York State Department of Environmental Conservation

New York State Department of Environmental Conservation May 2012 New York State Department of Environmental Conservation Award Submission for Environmental Excellence Awards Port Washington Water Pollution Control District (PWWPCD) Submitted by D&B Engineers

More information

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati Taylor Creek Treatment Plant Metropolitan Sewer District of Greater Cincinnati Who is this guy and what is he talking about? Brad Blankenship Taylor Creek Operator 3.5 years MSD Operator 5.5 years (total)

More information

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY Ahmed El-Zayat, Environmental Engineering Group, Egypt Emaill: ahmed_el_zayat@yahoo.com Introduction This case study focuses on three

More information

Minnesota Pollution Control Agency

Minnesota Pollution Control Agency Minnesota Pollution Control Agency STATE OF MINNESOTA Minnesota Pollution Control Agency MUNICIPAL DIVISION PUBLIC NOTICE OF INTENT TO REISSUE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/ STATE

More information

City of Grand Rapids Environmental Services Grand River Monitoring

City of Grand Rapids Environmental Services Grand River Monitoring City of Grand Rapids Environmental Services Grand River Monitoring by Mike Lunn Environmental Services Department Manager A Glimpse into the Future: 2005 A.D. Sewer Once a River New Year s Day prophecy

More information

Hillsdale Wastewater Treatment Plant

Hillsdale Wastewater Treatment Plant Hillsdale Wastewater Treatment Plant SRF Project Plan Public Hearing sdgfdgdf June 10, 2014 Presented by: Jeff Pugh, PE and Elaine Venema, PE Synopsis/Agenda Purpose of Presentation Project Background

More information

Your Guide to the. Budd Inlet Treatment Plant

Your Guide to the. Budd Inlet Treatment Plant Your Guide to the Budd Inlet Treatment Plant How does LOTT know the plant is working correctly? All activity within the treatment plant is monitored 24 hours a day, 7 days a week. A highly trained team

More information

Storm Water and Sanitary Sewer

Storm Water and Sanitary Sewer Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements

More information

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed

More information

Agenda. Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques

Agenda. Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques MWEA Collections System Seminar September 2012 Presented by: Elaine Venema, PE Rich Grant, PE Agenda Discussion of the problems

More information

Advanced Wastewater Treatment Plant Plant Profile

Advanced Wastewater Treatment Plant Plant Profile Advanced Wastewater Treatment Plant Plant Profile 2008 Brief History Wastewater treatment started in Penticton in 1948 with a Package Primary / Secondary plant at what is now the Alberni Lift Station.

More information

ROUGE RIVER MONITORING FOR E. COLI TMDL IMPLEMENTATION FINAL REPORT GRANT#

ROUGE RIVER MONITORING FOR E. COLI TMDL IMPLEMENTATION FINAL REPORT GRANT# 1 ROUGE RIVER MONITORING FOR E. COLI TMDL IMPLEMENTATION FINAL REPORT GRANT# 2011-0504 FUNDED BY: MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY CLEAN MICHIGAN INITIATIVE CLEAN WATER FUND LANSING, MI PREPARED

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS: FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:

More information

Wastewater Master Plan. Evaluation of the GDRSS System Model for Wastewater Master Planning

Wastewater Master Plan. Evaluation of the GDRSS System Model for Wastewater Master Planning Wastewater Master Plan DWSD Project No. CS-1314 Evaluation of the GDRSS System Model for Wastewater Master Planning Technical Memorandum Original Date: June 13, 2001 Revision Date: September 2003 Author:

More information

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles

More information

Fillmore, CA. Fillmore Wastewater Treatment Plant LOCATION: MBR MANUFACTURER:

Fillmore, CA. Fillmore Wastewater Treatment Plant LOCATION: MBR MANUFACTURER: FACILITY: Fillmore Wastewater Treatment Plant LOCATION: Fillmore, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: W.M. Lyles ENGINEERING: Kennedy / Jenks MBR MANUFACTURER: Unknown

More information

Conceptual Design for a Future Wastewater Treatment Plant

Conceptual Design for a Future Wastewater Treatment Plant Wastewater Master Plan DWSD Project No. CS-1314 Conceptual Design for a Future Wastewater Treatment Plant Technical Memorandum Original Date: April 1, 2003 Revision Date: September 2003 Author: CDM Table

More information

WASTEWATER DEPARTMENT CITY OF MANNHEIM

WASTEWATER DEPARTMENT CITY OF MANNHEIM WASTEWATER DEPARTMENT CITY OF MANNHEIM TABLE OF CONTENTS Key dates Locations und employees Organisation Distribution of staff Wastewater charges and expenses Expense distribution Sewage disposal Sewerage

More information

Buffalo Sewer Authority. David P. Comerford General Manager

Buffalo Sewer Authority. David P. Comerford General Manager Buffalo Sewer Authority David P. Comerford General Manager Introduction Like it has since its inception in 1938, the Buffalo Sewer Authority has successfully safeguarded the public health and protected

More information

ASSET MANAGEMENT PROGRAM

ASSET MANAGEMENT PROGRAM ASSET MANAGEMENT PROGRAM MAKING IT PRACTICAL & USEFUL NORTHERN MICHIGAN OPERATORS SEMINAR Sam Bender Fleis & VandenBrink September 29, 2016 What is asset management and why should I care about it? Asset

More information

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview Sanitary Sewer Systems General Overview Sewage Collection System Pipes Pumping stations Maintenance entry points manholes Types of Sewage Sanitary Domestic sewage: human wastes and washwater from public

More information

Figure 6.3 STORAGE BASIN AREA OF INFLUENCE INTEGRATED WASTEWATER MASTER PLAN CITY OF SAN MATEO. sm0914f ai

Figure 6.3 STORAGE BASIN AREA OF INFLUENCE INTEGRATED WASTEWATER MASTER PLAN CITY OF SAN MATEO. sm0914f ai sm0914f10-8562.ai Figure 6.3 STORAGE BASIN AREA OF INFLUENCE INTEGRATED WASTEWATER MASTER PLAN CITY OF SAN MATEO 6.6 PRELIMINARY MODELING RESULTS FOR THE STORAGE ALTERNATIVES Following the preliminary

More information

membrane bioreactor performance compared to conventional wastewater treatment

membrane bioreactor performance compared to conventional wastewater treatment Water Technologies & Solutions technical paper membrane bioreactor performance compared to conventional wastewater treatment Authors: Thomas C. Schwartz and Brent R. Herring, Woodard and Curran Incorporated

More information

Facilities Plan. Technical Memorandum Nos. TM-CSO-11 and TM-WW-5 Disinfection Facilities

Facilities Plan. Technical Memorandum Nos. TM-CSO-11 and TM-WW-5 Disinfection Facilities City of St. Joseph, Missouri Technical Memorandum Nos. TM-CSO-11 and TM-WW-5 Disinfection Facilities By Work Order No. 09-001 B&V Project 163509 July 31, 2009 Technical Memorandum Nos. TM-CSO-11/TM-WW-5

More information

Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest

Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest Steve Russell WRc PLC Swindon UK Steve.russell@wrcplc.co.uk WRc plc 2011 Plan

More information

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017 Dealing with Unexpected Wastewater Treatment Plant Disruptions February 16, 2017 Location Map WPCP History Original WPCP constructed on this site in 1928 consisting of primary treatment and chlorination;

More information

THE CARIBBEAN S MOST BEAUTIFUL WASTEWATER TREATMENT SYSTEM: CONSTRUCTED WETLAND AT ANTIGUA, W. I.

THE CARIBBEAN S MOST BEAUTIFUL WASTEWATER TREATMENT SYSTEM: CONSTRUCTED WETLAND AT ANTIGUA, W. I. THE CARIBBEAN S MOST BEAUTIFUL WASTEWATER TREATMENT SYSTEM: CONSTRUCTED WETLAND AT ANTIGUA, W. I. Gregory L. Morris * Laura Carbó Gregory L. Morris Engineering P.O. Box 9024157, San Juan, PR 00902 Tel.

More information

Customer Conference Speedway, IN 46224

Customer Conference Speedway, IN 46224 Customer Conference Speedway, IN 46224 DigIndy and Citizens Capital Investment Plan Updates Mark C. Jacob Vice President Capital Programs & Engineering September 18, 2014 A Matter of Trust Challenges Annually

More information

Provider: Water District #1 of Johnson County (www.waterone.org) Quasi-municipal agency operating independently of city and county governments

Provider: Water District #1 of Johnson County (www.waterone.org) Quasi-municipal agency operating independently of city and county governments Utilities (2007) Purpose A key factor in determining the development potential an area is the capacity and accessibility utilities to service that area. The City Overland Park is not a full-service city

More information

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment A Technical Memorandum Date: Project: Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation Subject: Task 3 Existing Grit Removal System Assessment This memorandum presents

More information

CEDAR CREEK Wastewater Treatment Facility

CEDAR CREEK Wastewater Treatment Facility CEDAR CREEK Wastewater Treatment Facility Where does the waste originate Private homes Businesses from? Condominium complexes Nursing homes Apartments ANY DWELING THAT USES WATER AND IS CONNECTED TO THE

More information

I am writing in response to your request for a Revenue Legal Opinion addressing the Sales Tax on the Wastewater Treatment equipment.

I am writing in response to your request for a Revenue Legal Opinion addressing the Sales Tax on the Wastewater Treatment equipment. STATE OF ARKANSAS REVENUE LEGAL COUNSEL Department of Finance Post Office Box 1272, Room 2380 Little Rock, Arkansas 72203-1272 and Administration Phone: (501) 682-7030 Fax: (501) 682-7599 http://dfa.arkansas.gov

More information

CHAPTER 10 PRELIMINARY TREATMENT

CHAPTER 10 PRELIMINARY TREATMENT CHAPTER 10 PRELIMINARY TREATMENT TM 5-814-3/AFM 88-11, Volume III 10-1. General considerations. Preliminary treatment of wastewater includes screening, grinding, grit removal, flotation, equilization,

More information

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY RAW SEWAGE Raw sewage is the water that flows into a wastewater treatment facility. It is made up of waste from toilets, sinks, garbage

More information

6.1 Introduction to Wastewater Issues

6.1 Introduction to Wastewater Issues Section 6: Water Pollution This Section will help you: Understand if you generate industrial wastewater; Understand where your wastewater goes; Make sure you meet requirements for floor drains; Properly

More information

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager Pittsburgh Water Treatment Plant Projects by Jay R. Lucas, P.E. Senior Project Manager Who Is American Water We are the largest publicly traded water and wastewater utility in the United States Broad national

More information

Watershed: an area or ridge of land that separates waters flowing to different rivers, basins, or seas. It is the interdependent web of living

Watershed: an area or ridge of land that separates waters flowing to different rivers, basins, or seas. It is the interdependent web of living Watershed: an area or ridge of land that separates waters flowing to different rivers, basins, or seas. It is the interdependent web of living organisms that inhabit a geographic area and depend on it

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION : : : : : : : : : : : : : : : DIRECT TESTIMONY MICHAEL J. GUNTRUM, P.E.

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION : : : : : : : : : : : : : : : DIRECT TESTIMONY MICHAEL J. GUNTRUM, P.E. BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION Application of Pennsylvania-American Water Company for (1) approval of the transfer, by sale, of substantially all of the Borough of New Cumberland s assets,

More information

THE WASTEWATER MANAGEMENT IMPROVEMENT PROJECT OF DARKHAN CITY

THE WASTEWATER MANAGEMENT IMPROVEMENT PROJECT OF DARKHAN CITY THE WASTEWATER MANAGEMENT IMPROVEMENT PROJECT OF DARKHAN CITY Asian Development Bank Ministry of Construction and Urban Development Governor s Office of the Darkhan Uul aimag Project Goals, Outcomes and

More information

From Brown to Green- Reducing Carbon Footprint via Biogas Cogeneration in a Phased Digestion Process Producing Class A Biosolids

From Brown to Green- Reducing Carbon Footprint via Biogas Cogeneration in a Phased Digestion Process Producing Class A Biosolids From Brown to Green- Reducing Carbon Footprint via Biogas Cogeneration in a Phased Digestion Process Producing Class A Biosolids Sudhakar Viswanathan * Ky Dangtran - Degremont Technologies Sandra Diorka

More information

Ellis Creek Water Recycling Facility, City of Petaluma

Ellis Creek Water Recycling Facility, City of Petaluma Ellis Creek Water Recycling Facility, City of Petaluma Historical Timeline Facility Treatment Processes / Flow Schematics Challenges of Wetlands Dechlorination Mode of Operation Benefits of Natural Dechlorination

More information

Long Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE

Long Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE Long Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE Christopher Walker, PE Christopher Curran, PE Mark Prouty, PE May 12, 2016 Long Point Water

More information

CITY OF POWELL RIVER LIQUID WASTE MANAGEMENT PLAN - STAGE 3

CITY OF POWELL RIVER LIQUID WASTE MANAGEMENT PLAN - STAGE 3 CITY OF POWELL RIVER LIQUID WASTE MANAGEMENT PLAN - STAGE 3 DRAFT 8 APRIL 2015 D-21300.84 LIMITATIONS AND DISCLOSURE This document has been prepared by Opus DaytonKnight Consultants Ltd. ( Opus DK ) for

More information

OVERVIEW CAPACITY & CONDITION

OVERVIEW CAPACITY & CONDITION OVERVIEW The nation s 14,748 wastewater treatment plants protect public health and the environment. Years of treatment plant upgrades and more stringent federal and state regulations have significantly

More information

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017 PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017 MSD is delivering Phase 1 is under the original cost estimate Improving Trends in Water Quality MSDGC has completed

More information

What is a stormwater utility fee?

What is a stormwater utility fee? What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville

More information

Air Lift Pumps (Grit Pump) ST-027

Air Lift Pumps (Grit Pump) ST-027 Air Lift Pumps (Grit Pump) ST-027 I. Grit removal facilities at Gilroy/Morgan Hill Plant. a. Aerated grit chambers and appurtenant equipment. 1. 2 grit tanks 2. Effective volume 47,713 Gal each. 3. Aeration

More information

Background Where did CSO systems begin? Combined Sewer Overflow (CSO) Control. Background. Background. Background

Background Where did CSO systems begin? Combined Sewer Overflow (CSO) Control. Background. Background. Background Background Where did CSO systems begin? Combined Overflow (CSO) Control Eric Bergstrom HDR Engineering Background System Development Before About 196 House Background System Development After 196 Building

More information

CHAPTER 9: SANITARY SEWER INTRODUCTION FORECASTS CHAPTER 9: SANITARY SEWER 9-1

CHAPTER 9: SANITARY SEWER INTRODUCTION FORECASTS CHAPTER 9: SANITARY SEWER 9-1 CHAPTER 9: SANITARY SEWER INTRODUCTION The Metropolitan Land Planning Act (amended 1995) requires local governments to prepare comprehensive plans and submit them to the Metropolitan Council to determine

More information

Grand River Monitoring

Grand River Monitoring City of Grand Rapids Environmental Services Grand River Monitoring by Mike Lunn Environmental Services Department Manager Grand River Monitoring History 1968 Grand River Monitoring Network Since 1988 Data

More information

Irvine Ranch Water District Michelson Water Recycling Plant. Irvine, CA LOCATION: MBR MANUFACTURER: COMMENTS:

Irvine Ranch Water District Michelson Water Recycling Plant. Irvine, CA LOCATION: MBR MANUFACTURER: COMMENTS: FACILITY: Irvine Ranch Water District Michelson Water Recycling Plant LOCATION: Irvine, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: FILANC ENGINEERING: HDR Engineering MBR

More information

Low Impact Development (LID) in a Combined Sewer Overflow (CSO) District:

Low Impact Development (LID) in a Combined Sewer Overflow (CSO) District: Low Impact Development (LID) in a Combined Sewer Overflow (CSO) District: Evaluating the Effectiveness of LID in Reducing CSOs Prepared for: DOW-PIRGM Saginaw Bay Watershed Initiative Network City of Saginaw

More information

OMBI 2012 Data Dictionary Wastewater Services

OMBI 2012 Data Dictionary Wastewater Services C CAO ( ) WASTEWATER SERVICES WWTR001 Population This result feeds from the Municipal data input area. Population is as per FIR Schedule 90, line 0020 column 2 WWTR002 WWTR005 WWTR006 Override Population

More information

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100 MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033

More information

EFFLUENT DOMINATED WATER BODIES, THEIR RECLAMATION AND REUSE TO ACHIEVE SUSTAINABILITY

EFFLUENT DOMINATED WATER BODIES, THEIR RECLAMATION AND REUSE TO ACHIEVE SUSTAINABILITY EFFLUENT DOMINATED WATER BODIES, THEIR RECLAMATION AND REUSE TO ACHIEVE SUSTAINABILITY Chapter 9 Vladimir Novotny DEFINITION Effluent dominated water body Predominantly contains waste water effluents during

More information

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel 5 Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel M. P. Cherian, Ari Pandian, Karen Ridgway and Gregory Barden The City of Columbus, Ohio, submitted a wet weather management plan

More information

Alternative Rouge River CSO Control Program Executive Summary

Alternative Rouge River CSO Control Program Executive Summary Alternative Rouge River CSO Control Program Executive Summary Updated as of February 2011 A revised approach to pollution control that controls stormwater runoff before it gets into the sewer system and

More information

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and Impact

More information

Special Report MUB WWTP Expansion and Upgrade Evaluation of Alternatives

Special Report MUB WWTP Expansion and Upgrade Evaluation of Alternatives Special Report MUB WWTP Expansion and Upgrade Evaluation of Alternatives Introduction The expansion and upgrade of the MUB Wastewater Treatment Plant (WWTP) is a critical component of MUB s response to

More information

Dynamic Hydraulic Modeling of a Wastewater Treatment Plant. City of Fort Worth Case Study

Dynamic Hydraulic Modeling of a Wastewater Treatment Plant. City of Fort Worth Case Study Dynamic Hydraulic Modeling of a Wastewater Treatment Plant City of Fort Worth Case Study AGENDA Drivers for a Dynamic Integrated Large WWTP Hydraulic Model Model Development Modeling Conduits and Bends

More information

PRESENTED BY: IR. TAI LEE YOON JURUTERA JASA (SARAWAK) SDN BHD

PRESENTED BY: IR. TAI LEE YOON JURUTERA JASA (SARAWAK) SDN BHD PRESENTED BY: IR. TAI LEE YOON JURUTERA JASA (SARAWAK) SDN BHD PRE-PROJECT SITUATION Black water is partially treated by septic tanks. Grey water is directly discharged into the drains and river system

More information

Operations Report. September 10, 2015

Operations Report. September 10, 2015 Operations Report September 1, 215 Plant Loading and Operations Summary August 215 Biochemical Oxygen Demand, 5-Day (Avg. 2,151 lb./day) Total Suspended Solids (Avg. 33,197 lb./day) Average Daily Flow

More information

CHAPTER 12 TRICKLING FILTER PLANTS

CHAPTER 12 TRICKLING FILTER PLANTS CHAPTER 12 TRICKLING FILTER PLANTS TM 5-814-3/AFM 88-11, Volume III 12-1. General considerations. Trickling filter plants have been justified by their low initial cost, low operating and maintenance costs,

More information

FY 2018 Proposed Capital Improvement Program

FY 2018 Proposed Capital Improvement Program FY 2018 Proposed Capital Improvement Program Metropolitan St. Louis Sewer District FY 2018 Capital Improvement Program Proposed Engineering Services Rich Unverferth, P.E. Director of Engineering January

More information

Decentralized WW Management: Issues for Small-Scale WWTPs. Mike Stephens MWEA Local Sections Committee Frankenmuth, MI

Decentralized WW Management: Issues for Small-Scale WWTPs. Mike Stephens MWEA Local Sections Committee Frankenmuth, MI Decentralized WW Management: Issues for Small-Scale WWTPs Mike Stephens MWEA Local Sections Committee Frankenmuth, MI Topics What is Decentralized Wastewater Treatment? What are small-scale facilities?

More information

GRIT HAPPENS: KNOW HOW TO DEAL WITH IT

GRIT HAPPENS: KNOW HOW TO DEAL WITH IT GRIT HAPPENS: KNOW HOW TO DEAL WITH IT A CASE STUDY ON SELECTION OF GRIT REMOVAL SYSTEMS FOR WWTPs Murali Erat, P.E. November 18, 2014 Outline What is Grit? Characteristics of Grit Grit Removal Technologies

More information

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators Page 1 of 5 STREAMLINES A Newsletter for North Carolina Water Supply Watershed Administrators Volume 2, Number 2 May 1997 Non-Point Source (NPS) Pollution This issue of Streamlines provides basic information

More information

Residential Sewer Backup Prevention Program

Residential Sewer Backup Prevention Program City of Wheaton Residential Sewer Backup Prevention Program Please Note: The City reserves the right to modify the policies, procedures and rules of this program or discontinue the program in its entirety

More information

Tampa Bay Water (TBW) is a regional

Tampa Bay Water (TBW) is a regional FWRJ Enhanced Residuals Treatment Helps Tampa Bay Water Regional Surface Water Treatment Plant Achieve Total Recycling Tony Pevec and Richard D. Moore Tampa Bay Water (TBW) is a regional water supply authority

More information

City of Clinton: Wastewater Systems Annual Performance Report

City of Clinton: Wastewater Systems Annual Performance Report City of Clinton: Wastewater Systems Annual Performance Report January 2016 through December 2016 I. General Information Facility/System Name: City of Clinton Collection System and Norman H. Larkins Wastewater

More information

REQUEST FOR QUALIFICATIONS -ENGINEERING DESIGN SERVICES-

REQUEST FOR QUALIFICATIONS -ENGINEERING DESIGN SERVICES- BUCKSKIN SANITARY DISTRICT Parker, Arizona PUBLIC NOTICE FOR PROFESSIONAL ENGINEERING SERVICES REQUEST FOR QUALIFICATIONS -ENGINEERING DESIGN SERVICES- PHASE 5&6 WASTEWATER TREATMENT PLANT DESIGN Chairman

More information

MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT

MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT SUBMITTED BY: TREATMENT FACILITY: NPDES #: MUNICIPALITY: COUNTY: CONTACT PERSON: Responsible Official Title Telephone #: Fax #: Email Address:

More information

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Reducing Flood Risk in Toronto David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Institute for Catastrophic Loss Reduction February 19, 2016 1 Agenda Reducing Flood Risk in Toronto 1) Overview

More information

DECENTRALIZED TREATMENT: Moving toward Sustainability. Jim Kreissl USEPA ORD, retired

DECENTRALIZED TREATMENT: Moving toward Sustainability. Jim Kreissl USEPA ORD, retired DECENTRALIZED TREATMENT: Moving toward Sustainability Jim Kreissl USEPA ORD, retired WHAT IS SUSTAINABILITY? Most accept the Brundtland Commission s definition: development that meets the needs of the

More information

Design of Sewerage System for Jaffarpur area in Southwest New Delhi

Design of Sewerage System for Jaffarpur area in Southwest New Delhi International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 1 (2014), pp. 29-34 Research India Publications http://www.ripublication.com/ijcer.htm Design of Sewerage System for

More information

BOARD OF PUBLIC UTILITIES SCHEDULE OF WASTEWATER RATES PROVISIONS APPLICABLE TO ALL CONSUMERS

BOARD OF PUBLIC UTILITIES SCHEDULE OF WASTEWATER RATES PROVISIONS APPLICABLE TO ALL CONSUMERS NATURE OF SERVICE PROVIDED: VOTE: November 21, 2016 Effective Date: All billing after January 1, 2017 Service Area: All Wastewater service shall be provided for the purposes provided to users in accordance

More information

by Geraud Ramond MAPM RPP & Peter Ratcliffe Bsc CEng MICE

by Geraud Ramond MAPM RPP & Peter Ratcliffe Bsc CEng MICE Oldham and Royton Integrated Strategy (ORIS) UUs 80m project in the Oldham area of Manchester to improve the environment, future-proof wastewater treatment assets and optimise operation and maintenance

More information

2013 WASTEWATER PROJECTS

2013 WASTEWATER PROJECTS WASTEWATER PROJECTS 1 PROJECT NAME TABLE 1b - Wastewater Projects PROJECT STATUS SUMMARY UP PROJECT NUMBER PROJECT PHASE April 2013 PERCENT COMPLETION Ocean Outfall Rule Change (Pilot) 10-9086 Design 50%

More information

Site Utility Study. Prepared By: Rodolfo Ibarra, PE, PA SW 117 th Avenue Unit #3 Miami, Florida 33177

Site Utility Study. Prepared By: Rodolfo Ibarra, PE, PA SW 117 th Avenue Unit #3 Miami, Florida 33177 WEST BRICKELL CENTRE Major Use Special Permit 290 SW 10 th Street, 245 SW 11 th Street,240-270 SW 10 th Street, 251-253 SW 11 th Street, 255 SW 11 th Street, and 267 SW 11 th Street Site Utility Study

More information

- 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants. by Glenn Thesing

- 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants. by Glenn Thesing - 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants by Glenn Thesing Through retrofitting IFAS systems, communities can upgrade and expand wastewater treatment without the expense and complication

More information

Clark County Water Reclamation District January 1, 2017

Clark County Water Reclamation District January 1, 2017 Clark County Water Reclamation District January 1, 2017 DEFINITIONS Unless specifically indicated otherwise, the meaning of terms in these Service Rules shall be as follows. 1. Accidental Discharge Accidental

More information

Operations Division Budget

Operations Division Budget Operations Division Budget OPERATIONS DIVISION In MWRA established the Operations Division to integrate wastewater and water system operations and maintenance, treatment, planning, laboratory services,

More information

City of Needles Waste Water

City of Needles Waste Water City of Needles Waste Water Sewer System Management Plan (SSMP) 817 Third Street Needles, CA 92363 March 2011 Table of Contents LIST OF ABBREVIATIONS... 3 Section I GOALS... 5 Section II ORGANIZATION...

More information

Table 5-1: Availability of Public Sanitary Sewer. Are plans underway to provide Public Sewer?

Table 5-1: Availability of Public Sanitary Sewer. Are plans underway to provide Public Sewer? CHAPTER 5: PUBLIC SANITARY SEWER AND PRIVATE WASTEWATER DISPOSAL; PUBLIC WATER SERVICE AND PRIVATE WELLS Public Sanitary Sewer The presence or absence of public sanitary sewer service is a major factor

More information

CHAPTER 5 WASTEWATER FLOWS

CHAPTER 5 WASTEWATER FLOWS CHAPTER 5 WASTEWATER FLOWS 5.1 REGIONAL FACILITIES Regional Water Recycling Plants Figure 5-1 illustrates the service area boundaries for IEUA s four water recycling plants. The four Regional facilities

More information

719 Griswold, Suite 820 Detroit, MI DANVERS POND DAM REMOVAL AND STREAM RESTORATION PROJECT

719 Griswold, Suite 820 Detroit, MI DANVERS POND DAM REMOVAL AND STREAM RESTORATION PROJECT Great Lakes Restoration Initiative Grant Final Report US EPA Grant GL 00E006 43 October, 2013 Valley Woods Wetland Southfield Lola Valley Grow Zone Wayne County Parks Venoy Park Grow Zone Wayne County

More information