Michigan's. Water Quality Event. 92 nd Annual Conference Boyne Mountain Steve Aiken Regional Sales Manager
|
|
- Myrtle Nelson
- 6 years ago
- Views:
Transcription
1 Michigan's Water Quality Event 92 nd Annual Conference Boyne Mountain Steve Aiken Regional Sales Manager
2 Presentation Represents: 41 Projects $ 96,655,900 Invested All to improve Clean Water for the citizens of Michigan
3 Funding Sources: $ 96,655,900 $ 47,021,400 SRF % $ 32,647,500 Local Funding 33.8% $ 16,655,000 Various Grant 17.6
4 News From the Field MWEA 2017 Annual Conference
5
6
7
8 Benton Harbor St Joseph Wastewater Plant MWEA 2017 Annual Conference
9 BHSJ Blower Project
10
11
12 BHSJ Headworks/Grit
13
14
15 MWEA 2017 Annual Conference
16 Continued Sewer Separation in Grand Rapids Although the last sewage overflow point, under permit requirements, was eliminated in Grand Rapids in July of 2015, the City is continued to separate additional areas. Client: City of Grand Rapids Consultants: Moore & Bruggink: CSO #27 Design and Construction Inspection Black & Veatch: CSO #28A Design and Construction Management Contractor(s): Georgetown Construction (CSO #27), Nagel Construction (CSO #28A) CSO Contract #27 and #28A included: Sanitary sewer replacement (9,700 ft) New storm sewers (5,500 ft) Water main replacement (13,200 ft) 2 urban rain garden Porous pavement (9,200 sq yds) 31 Infiltration Basins Elimination of an additional 184 acres of combined sewers
17 Commemorative Plaque Dedication City dedicated a plaque at a ceremony held in April to commemorate the CSO Program and all those that worked on it over the past 30 years.
18 Great Lakes Water Authority (GLWA) Incinerator Improvements Project: Sewage Sludge Incinerator Air Quality Control Improvements at the Detroit WRRF Client: Great Lakes Water Authority (GLWA) Design and Construction Inspection: Black & Veatch, Wade Trim, Metco, PCI Contractor: Walsh Construction This Design-Build project included air quality upgrades to eight (8) sewage sludge incinerators. Improvements include installation of new venturi scrubbers, replacement of induced draft (ID) fans and motors and addition of VFDs for the ID fans. The project was needed to meet 2016 Federal air quality MACT standards.
19
20 SEWAGE SLUDGE INCINERATOR AIR QUALITY CONTROL IMPROVEMENTS DESIGN/BUILD CONTRACT PC-791 To enable eight multiple heath incinerators at Incineration Complex II of GLWA WRRF to comply with MACT (Maximum Achievable Control Technology) air quality regulations for Sewage Sludge Incineration units as addressed in U.S. EPA Final Rule incorporated into 40 CFR Part 60 20
21 PC-791 Process Improvements Project Schematic and Process Flow Piping Elements 21
22 Complex II Incineration Firm Capacity 260 dtpd (6 units in operation) Design/Build Contractor Walsh Construction Company Funding Source MDEQ State Revolving Fund Cost Estimate $37,989,471 22
23 GLWA Rouge River Outfall Disinfection Project PC-797 Update: Project Players: Owner: Great Lake Water Authority (GLWA) Engineer: CDM Smith Contractor: CDM Constructors Inc. Project Background: Upgrade to GLWA Water Resource Recovery Facility (WRRF) disinfection facility Provide ability to disinfect flows up to 1,700 MGD Includes disinfection for two outfalls Project Delivery: Design/Build 60% design completed Guaranteed Maximum Price Developed for 60% design Complex hydraulics required physical model
24 GLWA Rouge River Outfall Disinfection Project System Components: New Chemical Facility includes: Sodium Hypochlorite System: 110,000 gallon tanks 9 chemical pumps 4 chemical diffusers 2 flow meters (ea 18 x 14.5 ) Gaseous Chlorine System 8 chemical diffusers 4 flow meters (ea 15.5 x 15 ) Sodium Bisulfite System 35,000 gallon tanks 6 chemical pumps 4 chemical diffusers 2 flow meters (ea 19.3 x 10.7 ) Required Removal of 11,000 cu yds of solids From existing underground conduits
25 GLWA Rouge River Outfall Disinfection Project Project Status Current activities: Completed deep foundation design for building permit application Finalizing remaining 100% design Completing soft dig utility location Performing utility relocation Site demo completed Schedule: Completed sediment removal in early 2016 Started construction April 1, 2017 Chemical building completed Fall 2018 Substantial completion April 1, 2019 Demonstration testing Spring/Summer 2019 Final completion, December 31, 2019 New facility located on constrained site
26 HUBBELL, ROTH & CLARK NEWS FROM THE FIELD MWEA 2017 Annual Conference JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 26
27 Downriver Wastewater Treatment Facility (DWTF) Headworks System Renovations JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 27
28 Downriver Wastewater Treatment Facility (DWTF) Secondary System Renovations JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 28
29 Downriver Wastewater Treatment Facility (DWTF) Laboratory Renovations JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 29
30 Downriver Wastewater Treatment Facility (DWTF) Solids Complex Renovation Project (DR-6) JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 30
31 City of South Haven WWTP Pump Station Addition JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 31
32 City of Wixom Solids Handling Improvements JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 32
33 City of Bay City RTB #3 - Screw Pumps Replacement JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 33
34 Calhoun County Drain Inspection & Maintenance Guidance JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 34
35 Calhoun County Drain Inspection & Maintenance Guidance JUNE 2017 HUBBELL, ROTH & CLARK, INC. MWEA NEWS FROM THE FIELD 35
36 News From the Field for MWEA Annual Conference 2017
37 Fife Lake Area Utility Authority Fife Lake, Michigan
38 Fife Lake Area Utility Authority Fife Lake, Michigan
39 Fife Lake Area Utility Authority Fife Lake, Michigan
40 Nashville Wastewater System Improvements Nashville, Michigan
41 Nashville Wastewater System Improvements Nashville, Michigan
42 Nashville Wastewater System Improvements Nashville, Michigan
43 City of Albion 2017 WWTP Improvements Albion, Michigan
44 City of Albion 2017 WWTP Improvements Albion, Michigan
45 Sturgis Market St. Lift Station: Construction Phase Sturgis, Michigan
46 Sturgis Market St. Lift Station: Construction Phase Sturgis, Michigan
47 Sturgis Market St. Lift Station: Construction Phase Sturgis, Michigan
48 Kinross WWTP Improvements Segment 1 Kinross, Michigan
49 Kinross WWTP Improvements Segment 1 Kinross, Michigan
50 Kinross WWTP Improvements Segment 1 Kinross, Michigan
51 Hillsdale BPU Wastewater System Improvements Hillsdale, Michigan
52 Hillsdale BPU Wastewater System Improvements Hillsdale, Michigan
53 Hillsdale BPU Wastewater System Improvements Hillsdale, Michigan
54 Dexter Dexter, Michigan
55 Dowagiac WWTP Dowagiac, Michigan
56 Dowagiac WWTP Dowagiac, Michigan
57 Croswell Imhoff tanks
58 Croswell Sludge Press Croswell, Michigan
59 Croswell Sludge Press Croswell, Michigan
60 West Bay County WWTP West Bay County, Michigan
61 West Bay County WWTP West Bay County, Michigan
62 Pinconning Pinconning, Michigan
63 News From the Field Prein & Newhof MWEA 2017 Annual Conference
64 City of Mason 2017 Wastewater Treatment Plant Improvements Headworks
65 City of Mason Wastewater Treatment Plant Improvements Headworks
66 City of Mason Wastewater Treatment Plant Improvements Headworks
67 Plainfield Charter Township Northerly Trunk Siphons
68 Plainfield Charter Township Northerly Trunk Siphons
69
70 Plainfield Charter Township Northerly Trunk Siphons
71 City of Roosevelt Park Roosevelt Road Drainage Improvements and Groundwater Collection System BEFORE DURING AFTER
72 City of Roosevelt Park Roosevelt Road Drainage Improvements and Groundwater Collection System Gravity Groundwater Discharge Pipe
73 City of Roosevelt Park Roosevelt Road Drainage Improvements and Groundwater Collection System
74 Ottawa County Road Commission Wastewater Collection System Replacement Chicago Drive M-121 and Rush Creek Trunk Sewer
75 Ottawa County Road Commission Wastewater Collection System Replacement Chicago Drive M-121 and Rush Creek Trunk Sewer
76 Ottawa County Road Commission Wastewater Collection System Replacement Chicago Drive M-121 and Rush Creek Trunk Sewer
77 NEWS FROM THE FIELD M W E A A N N U A L C O N F E R E N C E FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors
78 Coldwater Phase 1 Improvements Engineer: FTCH Construction Manager: FTCH Investment By CBPU: $3.3 million
79 Coldwater Phase 1
80 Coldwater Phase 1
81 Walled Lake-Novi WWTP EQ Basin
82 Walled Lake-Novi WWTP EQ Basin
83 Lakewood Wastewater Authority/Village of Lake Odessa Replacement submersible pump station Watermain Replacement 4160 feet of 12 WM 3,390 feet of 8 WM Sanitary Sewer Replacement 7,925 feet of 8 gravity
84 Lakewood Wastewater Authority/Village of Replacement submersible pump station Watermain Replacement 4160 feet of 12 WM 3,390 feet of 8 WM Sanitary Sewer Replacement 7,925 feet of 8 gravity Lake Odessa
85 N.E. Road & Utility Improvements Fiske Road Pump Station
86 Fiske Road Pump Station
87 Fiske Road Pump Station
88 Large Construction Jobs Moore & Bruggink Zeeland CWP Expansion Delta Charter Township WWTP Upgrades
89 Zeeland CWP Expansion January 2016 June 2016 June 2017
90 Zeeland CWP Expansion
91
92 Delta Charter Township WWTP Upgrades Before After
93 Delta Charter Township WWTP Upgrades Before After
94 Delta Charter Township WWTP Upgrades Before After
95 Projects Wyoming: Diffuser Replacement Niles: RAS Improvements Coldwater: SCADA Upgrade 95
96 96 Wyoming: Diffuser Replacement
97 97 Wyoming: Diffuser Replacement
98 98 Wyoming: Diffuser Replacement
99 99 Wyoming: Diffuser Replacement
100 100 Niles: RAS Improvements
101 101 Niles: RAS Improvements
102 102 Niles: RAS Improvements
103 103 Coldwater: SCADA Upgrade
104 104 Coldwater: SCADA Upgrade
105 105 Coldwater: SCADA Upgrade
106 Milford Wastewater Treatment Plant Improvements Headworks, Equalization Basin, and Sludge Storage Tank
107 Construction of a new below-ground pump station that will operate with both the existing plant and the new Equalization Basin Headworks Facility Construction of new screen grit building to increase grit removal efficiency and reduce grit settling in other areas of the plant
108 Equalization Basin 300,000 gallon Equalization Basin Provide consistent flow rate to plant improving treatment efficiency Provides means for diverting flows during low flow periods for inspection & maintenance
109 Sludge Handling Upgrades 400,000 gallon Sludge Storage Tank Decreases frequency of sludge hauling and improves operational flexibility
110 TETRA TECH NEWS FROM THE FIELD 2017 MWEA 2017 Annual Conference
111 Tertiary Filter, UV Disinfection, and Effluent Discharge East Lansing Water Resource Recovery Facility Engineer: Contractor: Tetra Tech Grand River Construction New UV Building Addition New Tertiary Filter Equipment
112 Tertiary Filter, UV Disinfection, and Effluent Discharge East Lansing Water Resource Recovery Facility New UV Equipment Room New Outfall Structure
113 North Secondary Flow Distribution Improvements Grand Rapids Water Resource Recovery Facility Engineer: Contractor: Tetra Tech L.D. Dosca Company
114 North Secondary Flow Distribution Improvements Grand Rapids Water Resource Recovery Facility New Flow Split Structure Green Wall Feature
115 City of Kinross City of Hillsdale Village of Dexter City of Dowagiac THANK YOU City of Jackson Benton Harbor St Joseph Authority Bay County City of Grand Rapids Prein & Newhof Black & Veatch City of Roosevelt Park Great Lakes Water Authority Plainfield Township Hubble Roth & Clark Ottawa County Wayne County Downriver WWTP Fishbeck Thompson Carr & Huber City of South Haven City of Coldwater City of Wixom Walled Lake Novi WWTP City of Bay City Lakewood Wastewater Authority Calhoun County Moore & Bruggink Fleis & Vandenbrink City of Zeeland Fife Lake Delta Township City of Nashville Donahue City of Sturgis City of Wyoming Village of Milford OHM City of Niles Tetra Tech
Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project
Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project Presented August 29 th, 2016 Function of IMKWWTP Treatment Facility History Reasons for Proposed Project Why Now? Modest
More informationAnn Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017
Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater
More informationStreamlining I/I Repairs in Berlin Charter Township
Case Study: Streamlining I/I Repairs in Berlin Charter Township Presented by: Rich Grant, PE Agenda Discussion of the problems & the SAW I/I Evaluation & SSES = Asset Management Groundtruthing of Results
More informationIntegrated Fixed Film Activated Sludge (IFAS) System for Additional Nitrification at the Coldwater WWTP
Fishbeck, Thompson, Carr & Huber, Inc. Integrated Fixed Film Activated Sludge (IFAS) System for Additional Nitrification at the Coldwater WWTP Jim Flamming, P.E., Senior Process Engineer, FTC&H Dave Woodman,
More informationFacilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station
City of St. Joseph, Missouri Hydraulic Analysis and Effluent Pump Station By Work Order No. 09-001 B&V Project 163509 May 20, 2010 Table of Contents 1.0 Executive Summary...1 2.0 Purpose of Study...2 3.0
More informationNorthfield Township WWTP Capacity Evaluation Report
Northfield Township WWTP Capacity Evaluation Report March 18, 2015 PRESENTED TO PRESENTED BY Northfield Township 8350 Main Street Suite A Whitmore Lake, Michigan 48189 Tetra Tech 710 Avis Drive Suite 100
More informationTABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION
TABLE OF CONTENTS 2. Description of Water and Wastewater Systems... 2 2.1 General... 2 2.2 Existing Facilities Reference and Record Documents... 2 2.3 Existing Infrastructure Location and Legal Description...
More informationProject Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14
Project Name: Central WWTP Capacity Improvements and CSO Reduction Project MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 BACKGROUND / PURPOSE Metro Water Services (MWS), in order to comply with
More informationWastewater Treatment. Knowledge. Commitment. Excellence.
Wastewater Treatment Knowledge. Commitment. Excellence. www.kcepc.com Wastewater Treatment KC s wastewater treatment group has designed, constructed, and helped to operate over 70 facilities. We work with
More informationMilwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by
Milwaukee Metropolitan Sewerage District Conveyance and Treatment System MACRO made available by Eric Loucks,, CDM MMSD Collection System Operations MMSD operates an extensive system of sanitary sewers
More informationCHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA
CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA A. EXISTING FACILITIES 1. Westtown-Chester Creek Plant Westtown Township acquired the Westtown-Chester Creek Treatment Plant (WCC Plant)
More informationAUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE
PLAN SUMMARY AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE The Pennsylvania Sewage Facilities Act (Act 537) was enacted by the Pennsylvania
More informationWastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013
Wastewater Treatment Plant Facility Plan Update City Project #11-013 City of Liberty, Missouri May 6, 2013 Background 2 HDR Begins Feasibility Study to Evaluate Construction of a New Wastewater Treatment
More informationNew York State Department of Environmental Conservation
May 2012 New York State Department of Environmental Conservation Award Submission for Environmental Excellence Awards Port Washington Water Pollution Control District (PWWPCD) Submitted by D&B Engineers
More informationTaylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati
Taylor Creek Treatment Plant Metropolitan Sewer District of Greater Cincinnati Who is this guy and what is he talking about? Brad Blankenship Taylor Creek Operator 3.5 years MSD Operator 5.5 years (total)
More informationFAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY
FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY Ahmed El-Zayat, Environmental Engineering Group, Egypt Emaill: ahmed_el_zayat@yahoo.com Introduction This case study focuses on three
More informationMinnesota Pollution Control Agency
Minnesota Pollution Control Agency STATE OF MINNESOTA Minnesota Pollution Control Agency MUNICIPAL DIVISION PUBLIC NOTICE OF INTENT TO REISSUE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/ STATE
More informationCity of Grand Rapids Environmental Services Grand River Monitoring
City of Grand Rapids Environmental Services Grand River Monitoring by Mike Lunn Environmental Services Department Manager A Glimpse into the Future: 2005 A.D. Sewer Once a River New Year s Day prophecy
More informationHillsdale Wastewater Treatment Plant
Hillsdale Wastewater Treatment Plant SRF Project Plan Public Hearing sdgfdgdf June 10, 2014 Presented by: Jeff Pugh, PE and Elaine Venema, PE Synopsis/Agenda Purpose of Presentation Project Background
More informationYour Guide to the. Budd Inlet Treatment Plant
Your Guide to the Budd Inlet Treatment Plant How does LOTT know the plant is working correctly? All activity within the treatment plant is monitored 24 hours a day, 7 days a week. A highly trained team
More informationStorm Water and Sanitary Sewer
Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements
More informationTABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...
TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed
More informationAgenda. Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques
Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques MWEA Collections System Seminar September 2012 Presented by: Elaine Venema, PE Rich Grant, PE Agenda Discussion of the problems
More informationAdvanced Wastewater Treatment Plant Plant Profile
Advanced Wastewater Treatment Plant Plant Profile 2008 Brief History Wastewater treatment started in Penticton in 1948 with a Package Primary / Secondary plant at what is now the Alberni Lift Station.
More informationROUGE RIVER MONITORING FOR E. COLI TMDL IMPLEMENTATION FINAL REPORT GRANT#
1 ROUGE RIVER MONITORING FOR E. COLI TMDL IMPLEMENTATION FINAL REPORT GRANT# 2011-0504 FUNDED BY: MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY CLEAN MICHIGAN INITIATIVE CLEAN WATER FUND LANSING, MI PREPARED
More informationBEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary
BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred
More informationCity of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:
FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:
More informationWastewater Master Plan. Evaluation of the GDRSS System Model for Wastewater Master Planning
Wastewater Master Plan DWSD Project No. CS-1314 Evaluation of the GDRSS System Model for Wastewater Master Planning Technical Memorandum Original Date: June 13, 2001 Revision Date: September 2003 Author:
More informationTunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions
City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles
More informationFillmore, CA. Fillmore Wastewater Treatment Plant LOCATION: MBR MANUFACTURER:
FACILITY: Fillmore Wastewater Treatment Plant LOCATION: Fillmore, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: W.M. Lyles ENGINEERING: Kennedy / Jenks MBR MANUFACTURER: Unknown
More informationConceptual Design for a Future Wastewater Treatment Plant
Wastewater Master Plan DWSD Project No. CS-1314 Conceptual Design for a Future Wastewater Treatment Plant Technical Memorandum Original Date: April 1, 2003 Revision Date: September 2003 Author: CDM Table
More informationWASTEWATER DEPARTMENT CITY OF MANNHEIM
WASTEWATER DEPARTMENT CITY OF MANNHEIM TABLE OF CONTENTS Key dates Locations und employees Organisation Distribution of staff Wastewater charges and expenses Expense distribution Sewage disposal Sewerage
More informationBuffalo Sewer Authority. David P. Comerford General Manager
Buffalo Sewer Authority David P. Comerford General Manager Introduction Like it has since its inception in 1938, the Buffalo Sewer Authority has successfully safeguarded the public health and protected
More informationASSET MANAGEMENT PROGRAM
ASSET MANAGEMENT PROGRAM MAKING IT PRACTICAL & USEFUL NORTHERN MICHIGAN OPERATORS SEMINAR Sam Bender Fleis & VandenBrink September 29, 2016 What is asset management and why should I care about it? Asset
More informationSanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview
Sanitary Sewer Systems General Overview Sewage Collection System Pipes Pumping stations Maintenance entry points manholes Types of Sewage Sanitary Domestic sewage: human wastes and washwater from public
More informationFigure 6.3 STORAGE BASIN AREA OF INFLUENCE INTEGRATED WASTEWATER MASTER PLAN CITY OF SAN MATEO. sm0914f ai
sm0914f10-8562.ai Figure 6.3 STORAGE BASIN AREA OF INFLUENCE INTEGRATED WASTEWATER MASTER PLAN CITY OF SAN MATEO 6.6 PRELIMINARY MODELING RESULTS FOR THE STORAGE ALTERNATIVES Following the preliminary
More informationmembrane bioreactor performance compared to conventional wastewater treatment
Water Technologies & Solutions technical paper membrane bioreactor performance compared to conventional wastewater treatment Authors: Thomas C. Schwartz and Brent R. Herring, Woodard and Curran Incorporated
More informationFacilities Plan. Technical Memorandum Nos. TM-CSO-11 and TM-WW-5 Disinfection Facilities
City of St. Joseph, Missouri Technical Memorandum Nos. TM-CSO-11 and TM-WW-5 Disinfection Facilities By Work Order No. 09-001 B&V Project 163509 July 31, 2009 Technical Memorandum Nos. TM-CSO-11/TM-WW-5
More informationBest practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest
Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest Steve Russell WRc PLC Swindon UK Steve.russell@wrcplc.co.uk WRc plc 2011 Plan
More informationDealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017
Dealing with Unexpected Wastewater Treatment Plant Disruptions February 16, 2017 Location Map WPCP History Original WPCP constructed on this site in 1928 consisting of primary treatment and chlorination;
More informationTHE CARIBBEAN S MOST BEAUTIFUL WASTEWATER TREATMENT SYSTEM: CONSTRUCTED WETLAND AT ANTIGUA, W. I.
THE CARIBBEAN S MOST BEAUTIFUL WASTEWATER TREATMENT SYSTEM: CONSTRUCTED WETLAND AT ANTIGUA, W. I. Gregory L. Morris * Laura Carbó Gregory L. Morris Engineering P.O. Box 9024157, San Juan, PR 00902 Tel.
More informationCustomer Conference Speedway, IN 46224
Customer Conference Speedway, IN 46224 DigIndy and Citizens Capital Investment Plan Updates Mark C. Jacob Vice President Capital Programs & Engineering September 18, 2014 A Matter of Trust Challenges Annually
More informationProvider: Water District #1 of Johnson County (www.waterone.org) Quasi-municipal agency operating independently of city and county governments
Utilities (2007) Purpose A key factor in determining the development potential an area is the capacity and accessibility utilities to service that area. The City Overland Park is not a full-service city
More informationNorwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment
A Technical Memorandum Date: Project: Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation Subject: Task 3 Existing Grit Removal System Assessment This memorandum presents
More informationCEDAR CREEK Wastewater Treatment Facility
CEDAR CREEK Wastewater Treatment Facility Where does the waste originate Private homes Businesses from? Condominium complexes Nursing homes Apartments ANY DWELING THAT USES WATER AND IS CONNECTED TO THE
More informationI am writing in response to your request for a Revenue Legal Opinion addressing the Sales Tax on the Wastewater Treatment equipment.
STATE OF ARKANSAS REVENUE LEGAL COUNSEL Department of Finance Post Office Box 1272, Room 2380 Little Rock, Arkansas 72203-1272 and Administration Phone: (501) 682-7030 Fax: (501) 682-7599 http://dfa.arkansas.gov
More informationCHAPTER 10 PRELIMINARY TREATMENT
CHAPTER 10 PRELIMINARY TREATMENT TM 5-814-3/AFM 88-11, Volume III 10-1. General considerations. Preliminary treatment of wastewater includes screening, grinding, grit removal, flotation, equilization,
More informationCITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY
CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY RAW SEWAGE Raw sewage is the water that flows into a wastewater treatment facility. It is made up of waste from toilets, sinks, garbage
More information6.1 Introduction to Wastewater Issues
Section 6: Water Pollution This Section will help you: Understand if you generate industrial wastewater; Understand where your wastewater goes; Make sure you meet requirements for floor drains; Properly
More informationPittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager
Pittsburgh Water Treatment Plant Projects by Jay R. Lucas, P.E. Senior Project Manager Who Is American Water We are the largest publicly traded water and wastewater utility in the United States Broad national
More informationWatershed: an area or ridge of land that separates waters flowing to different rivers, basins, or seas. It is the interdependent web of living
Watershed: an area or ridge of land that separates waters flowing to different rivers, basins, or seas. It is the interdependent web of living organisms that inhabit a geographic area and depend on it
More informationBEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION : : : : : : : : : : : : : : : DIRECT TESTIMONY MICHAEL J. GUNTRUM, P.E.
BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION Application of Pennsylvania-American Water Company for (1) approval of the transfer, by sale, of substantially all of the Borough of New Cumberland s assets,
More informationTHE WASTEWATER MANAGEMENT IMPROVEMENT PROJECT OF DARKHAN CITY
THE WASTEWATER MANAGEMENT IMPROVEMENT PROJECT OF DARKHAN CITY Asian Development Bank Ministry of Construction and Urban Development Governor s Office of the Darkhan Uul aimag Project Goals, Outcomes and
More informationFrom Brown to Green- Reducing Carbon Footprint via Biogas Cogeneration in a Phased Digestion Process Producing Class A Biosolids
From Brown to Green- Reducing Carbon Footprint via Biogas Cogeneration in a Phased Digestion Process Producing Class A Biosolids Sudhakar Viswanathan * Ky Dangtran - Degremont Technologies Sandra Diorka
More informationEllis Creek Water Recycling Facility, City of Petaluma
Ellis Creek Water Recycling Facility, City of Petaluma Historical Timeline Facility Treatment Processes / Flow Schematics Challenges of Wetlands Dechlorination Mode of Operation Benefits of Natural Dechlorination
More informationLong Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE
Long Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE Christopher Walker, PE Christopher Curran, PE Mark Prouty, PE May 12, 2016 Long Point Water
More informationCITY OF POWELL RIVER LIQUID WASTE MANAGEMENT PLAN - STAGE 3
CITY OF POWELL RIVER LIQUID WASTE MANAGEMENT PLAN - STAGE 3 DRAFT 8 APRIL 2015 D-21300.84 LIMITATIONS AND DISCLOSURE This document has been prepared by Opus DaytonKnight Consultants Ltd. ( Opus DK ) for
More informationOVERVIEW CAPACITY & CONDITION
OVERVIEW The nation s 14,748 wastewater treatment plants protect public health and the environment. Years of treatment plant upgrades and more stringent federal and state regulations have significantly
More informationPHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017
PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017 MSD is delivering Phase 1 is under the original cost estimate Improving Trends in Water Quality MSDGC has completed
More informationWhat is a stormwater utility fee?
What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville
More informationAir Lift Pumps (Grit Pump) ST-027
Air Lift Pumps (Grit Pump) ST-027 I. Grit removal facilities at Gilroy/Morgan Hill Plant. a. Aerated grit chambers and appurtenant equipment. 1. 2 grit tanks 2. Effective volume 47,713 Gal each. 3. Aeration
More informationBackground Where did CSO systems begin? Combined Sewer Overflow (CSO) Control. Background. Background. Background
Background Where did CSO systems begin? Combined Overflow (CSO) Control Eric Bergstrom HDR Engineering Background System Development Before About 196 House Background System Development After 196 Building
More informationCHAPTER 9: SANITARY SEWER INTRODUCTION FORECASTS CHAPTER 9: SANITARY SEWER 9-1
CHAPTER 9: SANITARY SEWER INTRODUCTION The Metropolitan Land Planning Act (amended 1995) requires local governments to prepare comprehensive plans and submit them to the Metropolitan Council to determine
More informationGrand River Monitoring
City of Grand Rapids Environmental Services Grand River Monitoring by Mike Lunn Environmental Services Department Manager Grand River Monitoring History 1968 Grand River Monitoring Network Since 1988 Data
More informationIrvine Ranch Water District Michelson Water Recycling Plant. Irvine, CA LOCATION: MBR MANUFACTURER: COMMENTS:
FACILITY: Irvine Ranch Water District Michelson Water Recycling Plant LOCATION: Irvine, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: FILANC ENGINEERING: HDR Engineering MBR
More informationLow Impact Development (LID) in a Combined Sewer Overflow (CSO) District:
Low Impact Development (LID) in a Combined Sewer Overflow (CSO) District: Evaluating the Effectiveness of LID in Reducing CSOs Prepared for: DOW-PIRGM Saginaw Bay Watershed Initiative Network City of Saginaw
More informationOMBI 2012 Data Dictionary Wastewater Services
C CAO ( ) WASTEWATER SERVICES WWTR001 Population This result feeds from the Municipal data input area. Population is as per FIR Schedule 90, line 0020 column 2 WWTR002 WWTR005 WWTR006 Override Population
More informationCopies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100
MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033
More informationEFFLUENT DOMINATED WATER BODIES, THEIR RECLAMATION AND REUSE TO ACHIEVE SUSTAINABILITY
EFFLUENT DOMINATED WATER BODIES, THEIR RECLAMATION AND REUSE TO ACHIEVE SUSTAINABILITY Chapter 9 Vladimir Novotny DEFINITION Effluent dominated water body Predominantly contains waste water effluents during
More informationSurge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel
5 Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel M. P. Cherian, Ari Pandian, Karen Ridgway and Gregory Barden The City of Columbus, Ohio, submitted a wet weather management plan
More informationAlternative Rouge River CSO Control Program Executive Summary
Alternative Rouge River CSO Control Program Executive Summary Updated as of February 2011 A revised approach to pollution control that controls stormwater runoff before it gets into the sewer system and
More informationCity of Grenora, ND Municipal Infrastructure Needs Assessment August 2012
City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and Impact
More informationSpecial Report MUB WWTP Expansion and Upgrade Evaluation of Alternatives
Special Report MUB WWTP Expansion and Upgrade Evaluation of Alternatives Introduction The expansion and upgrade of the MUB Wastewater Treatment Plant (WWTP) is a critical component of MUB s response to
More informationDynamic Hydraulic Modeling of a Wastewater Treatment Plant. City of Fort Worth Case Study
Dynamic Hydraulic Modeling of a Wastewater Treatment Plant City of Fort Worth Case Study AGENDA Drivers for a Dynamic Integrated Large WWTP Hydraulic Model Model Development Modeling Conduits and Bends
More informationPRESENTED BY: IR. TAI LEE YOON JURUTERA JASA (SARAWAK) SDN BHD
PRESENTED BY: IR. TAI LEE YOON JURUTERA JASA (SARAWAK) SDN BHD PRE-PROJECT SITUATION Black water is partially treated by septic tanks. Grey water is directly discharged into the drains and river system
More informationOperations Report. September 10, 2015
Operations Report September 1, 215 Plant Loading and Operations Summary August 215 Biochemical Oxygen Demand, 5-Day (Avg. 2,151 lb./day) Total Suspended Solids (Avg. 33,197 lb./day) Average Daily Flow
More informationCHAPTER 12 TRICKLING FILTER PLANTS
CHAPTER 12 TRICKLING FILTER PLANTS TM 5-814-3/AFM 88-11, Volume III 12-1. General considerations. Trickling filter plants have been justified by their low initial cost, low operating and maintenance costs,
More informationFY 2018 Proposed Capital Improvement Program
FY 2018 Proposed Capital Improvement Program Metropolitan St. Louis Sewer District FY 2018 Capital Improvement Program Proposed Engineering Services Rich Unverferth, P.E. Director of Engineering January
More informationDecentralized WW Management: Issues for Small-Scale WWTPs. Mike Stephens MWEA Local Sections Committee Frankenmuth, MI
Decentralized WW Management: Issues for Small-Scale WWTPs Mike Stephens MWEA Local Sections Committee Frankenmuth, MI Topics What is Decentralized Wastewater Treatment? What are small-scale facilities?
More informationGRIT HAPPENS: KNOW HOW TO DEAL WITH IT
GRIT HAPPENS: KNOW HOW TO DEAL WITH IT A CASE STUDY ON SELECTION OF GRIT REMOVAL SYSTEMS FOR WWTPs Murali Erat, P.E. November 18, 2014 Outline What is Grit? Characteristics of Grit Grit Removal Technologies
More informationStreamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators
Page 1 of 5 STREAMLINES A Newsletter for North Carolina Water Supply Watershed Administrators Volume 2, Number 2 May 1997 Non-Point Source (NPS) Pollution This issue of Streamlines provides basic information
More informationResidential Sewer Backup Prevention Program
City of Wheaton Residential Sewer Backup Prevention Program Please Note: The City reserves the right to modify the policies, procedures and rules of this program or discontinue the program in its entirety
More informationTampa Bay Water (TBW) is a regional
FWRJ Enhanced Residuals Treatment Helps Tampa Bay Water Regional Surface Water Treatment Plant Achieve Total Recycling Tony Pevec and Richard D. Moore Tampa Bay Water (TBW) is a regional water supply authority
More informationCity of Clinton: Wastewater Systems Annual Performance Report
City of Clinton: Wastewater Systems Annual Performance Report January 2016 through December 2016 I. General Information Facility/System Name: City of Clinton Collection System and Norman H. Larkins Wastewater
More informationREQUEST FOR QUALIFICATIONS -ENGINEERING DESIGN SERVICES-
BUCKSKIN SANITARY DISTRICT Parker, Arizona PUBLIC NOTICE FOR PROFESSIONAL ENGINEERING SERVICES REQUEST FOR QUALIFICATIONS -ENGINEERING DESIGN SERVICES- PHASE 5&6 WASTEWATER TREATMENT PLANT DESIGN Chairman
More informationMUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT
MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT SUBMITTED BY: TREATMENT FACILITY: NPDES #: MUNICIPALITY: COUNTY: CONTACT PERSON: Responsible Official Title Telephone #: Fax #: Email Address:
More informationReducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto
Reducing Flood Risk in Toronto David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Institute for Catastrophic Loss Reduction February 19, 2016 1 Agenda Reducing Flood Risk in Toronto 1) Overview
More informationDECENTRALIZED TREATMENT: Moving toward Sustainability. Jim Kreissl USEPA ORD, retired
DECENTRALIZED TREATMENT: Moving toward Sustainability Jim Kreissl USEPA ORD, retired WHAT IS SUSTAINABILITY? Most accept the Brundtland Commission s definition: development that meets the needs of the
More informationDesign of Sewerage System for Jaffarpur area in Southwest New Delhi
International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 1 (2014), pp. 29-34 Research India Publications http://www.ripublication.com/ijcer.htm Design of Sewerage System for
More informationBOARD OF PUBLIC UTILITIES SCHEDULE OF WASTEWATER RATES PROVISIONS APPLICABLE TO ALL CONSUMERS
NATURE OF SERVICE PROVIDED: VOTE: November 21, 2016 Effective Date: All billing after January 1, 2017 Service Area: All Wastewater service shall be provided for the purposes provided to users in accordance
More informationby Geraud Ramond MAPM RPP & Peter Ratcliffe Bsc CEng MICE
Oldham and Royton Integrated Strategy (ORIS) UUs 80m project in the Oldham area of Manchester to improve the environment, future-proof wastewater treatment assets and optimise operation and maintenance
More information2013 WASTEWATER PROJECTS
WASTEWATER PROJECTS 1 PROJECT NAME TABLE 1b - Wastewater Projects PROJECT STATUS SUMMARY UP PROJECT NUMBER PROJECT PHASE April 2013 PERCENT COMPLETION Ocean Outfall Rule Change (Pilot) 10-9086 Design 50%
More informationSite Utility Study. Prepared By: Rodolfo Ibarra, PE, PA SW 117 th Avenue Unit #3 Miami, Florida 33177
WEST BRICKELL CENTRE Major Use Special Permit 290 SW 10 th Street, 245 SW 11 th Street,240-270 SW 10 th Street, 251-253 SW 11 th Street, 255 SW 11 th Street, and 267 SW 11 th Street Site Utility Study
More information- 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants. by Glenn Thesing
- 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants by Glenn Thesing Through retrofitting IFAS systems, communities can upgrade and expand wastewater treatment without the expense and complication
More informationClark County Water Reclamation District January 1, 2017
Clark County Water Reclamation District January 1, 2017 DEFINITIONS Unless specifically indicated otherwise, the meaning of terms in these Service Rules shall be as follows. 1. Accidental Discharge Accidental
More informationOperations Division Budget
Operations Division Budget OPERATIONS DIVISION In MWRA established the Operations Division to integrate wastewater and water system operations and maintenance, treatment, planning, laboratory services,
More informationCity of Needles Waste Water
City of Needles Waste Water Sewer System Management Plan (SSMP) 817 Third Street Needles, CA 92363 March 2011 Table of Contents LIST OF ABBREVIATIONS... 3 Section I GOALS... 5 Section II ORGANIZATION...
More informationTable 5-1: Availability of Public Sanitary Sewer. Are plans underway to provide Public Sewer?
CHAPTER 5: PUBLIC SANITARY SEWER AND PRIVATE WASTEWATER DISPOSAL; PUBLIC WATER SERVICE AND PRIVATE WELLS Public Sanitary Sewer The presence or absence of public sanitary sewer service is a major factor
More informationCHAPTER 5 WASTEWATER FLOWS
CHAPTER 5 WASTEWATER FLOWS 5.1 REGIONAL FACILITIES Regional Water Recycling Plants Figure 5-1 illustrates the service area boundaries for IEUA s four water recycling plants. The four Regional facilities
More information719 Griswold, Suite 820 Detroit, MI DANVERS POND DAM REMOVAL AND STREAM RESTORATION PROJECT
Great Lakes Restoration Initiative Grant Final Report US EPA Grant GL 00E006 43 October, 2013 Valley Woods Wetland Southfield Lola Valley Grow Zone Wayne County Parks Venoy Park Grow Zone Wayne County
More information