DOCUMENT VERIFICATION IMP411

Size: px
Start display at page:

Download "DOCUMENT VERIFICATION IMP411"

Transcription

1 DOCUMENT VERIFICATION IMP411 Project Code: 10IEB006 Project Name: Seweragee and Wastewater Strategic Master Plan for the West Morava River Basin Document Name VERIFIED ELEMENTS NAME DATE VISA (Signature) Author in charge Lionel HUET Revised by : (Substance Control) Content Validation Lionel HUET Text Review Eventual Corrections Revised by : (Form Control) Nadja Hordez According to template Editing (figures, tables, annexes, header, footer) Copies Control Completee Report (n page / figures and drawings in B&W colors / annexes) Nadja Hordez Quality of copies Binding Number of Issued Copies Date of issuing Document filing and archiving: This table fully completed is classified: - Original paper with the exemplar to be copied - Format pdf in the project directory

2 DOCUMENT VERIFICATION IMP411 Project Code: 10IEB006 Project Name: Seweragee and Wastewater Strategic Master Plan for the West Morava River Basin Document Name Final report - VERIFIED ELEMENTS NAME DATE VISA (Signature) Author in charge Lionel HUET Draft submitted on Revised by the Beneficiary EN AL EN AL Revised by Manager the Project Final version submitted on Approved by the Beneficiary Approved by the Project Manager - This report, and information or advice which it contains, is provided by SAFEGE solely for internal use and reliance by its Client in performance of SAFEGE's duties and liabilities under its contract with the Client. Any advice, opinions, or recommendations within this report should be read and relied upon only in the context of the report as a whole. The advice and opinions in this report are based upon the information made available to SAFEGE at the date of this report and on current EU standards, codes, technology and construction practices as at the date of this report. Following final delivery of this report to the Client, SAFEGE will have no further obligations or duty to advise the Client on any matters, including development affecting the information or advice provided in this report. This report has been prepared by SAFEGE in their professional capacity as Consulting Engineers. The contents of the report do not, in any way, purport to include any manner of legal advice or opinion. This report is prepared in accordance with the terms and conditions of SAFEGE's contract with the Client. Regard should be had to those terms and conditions when considering and/or placing any reliance on this report. Should the Client wish to release this report to a Third Party for that party's reliance, SAFEGE may, at its discretion, agree to such release provided that: - (a) SAFEGE's written agreement is obtained prior to such release, and - (b) By release of the report to the Third Party, that Third Party does not acquire any rights, contractual or otherwise, whatsoever against SAFEGE and SAFEGE, accordingly, assume no duties, liabilities or obligations to that Third Party, and - (c)safege accepts no responsibility for any loss or damage incurred by the Client or for any conflict of SAFEGE's interests arising out of the Client's release of this report to the Third Party.

3 July 2012 An EU funded project managed by the European Union Office in Kosovo SEWERAGE & WASTEWATER STRATEGIC MASTER PLAN FOR THE WEST MORAVA RIVER BASIN (07SER01/34/11) FINAL REPORT HEAD OFFICE PARC DE L' ILE - 15/27 RUE DU PORT NANTERRE CEDEX France

4 Beneficiary Country: Republic of Serbia Kosovo 1 under UNSCR1244 Contracting Authority: Project Area: Project Beneficiaries: Beneficiary institution: Coordinator of Project implementation: Project funded by: Project Title: The Delegation of the European Union to the Republic of Serbia and the European Union Office in Kosovo West Morava River Basin Population that lives within the Project Area, downstream population of Serbia and neighboring countries Ministry of Environment and Spatial Planning of Kosovo and its Water Department and Municipalities Directorate for Water of MESP European Union Sewerage & Wastewater Strategic Master Plan for the West Morava River Basin, Serbia Contract Number: 2009/ and 2010/ This designation is without prejudice to positions on status, and is in line with UNSCR 1244 and the ICJ Opinion on the Kosovo Declaration of Independence. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO i

5 This project is implemented by a consortium led by SAFEGE International consisting of SAFEGE EPTISA SEURECA BEOINŽENJERING 2000 SAFEGE DOO This publication has been produced with the assistance of the European Union. The contents of this publication are the sole responsibility of SAFEGE and can in no way be taken to reflect the views of the European Union. This report has been prepared as a team effort of the project experts. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO ii

6 Name Contact Address Project Beneficiary represented by Ministry of Environment and Spatial Planning Mr. Naser Bajraktari Director Ish Pallati i Mediave Pristina 10000, Kosovo Contracting Authority The European Union Office in Kosovo Mr. Gazmend Selimi Project Manager Kosova street nr.1 PO BOX 331 Pristina 10000, Kosovo Telephone Fax naser.bajraktari@ks.gov.net gazmend.selimi@eeas.europa.eu Signatures Date FINAL REPORT Date of Report: 31 st July 2012 SIGNATURES FOR THE CONTRACTOR Team Leader: Lionel HUET Project Director: Nicolas Jais-Nielsen SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO iii

7 TABLE OF ACRONYMS AND ABBREVIATIONS Acronym BOD5 CAPEX CCI CES COD DSHSK ECD EIRR EIS EU FIDIC GIS IMS IPA IRR KEPA KFOR LRMC MGRI MESP NCF OECD O&M Full name Biological Oxygen Demand Capital Expenditures Cross Cutting Issues Cumulated Environmental Scores Chemical Oxygen Demand Demographic, Social, Health Survey in Kosovo Delegation of the European Commission Economical Internal Rate of Return Environmental Impact Study European Union International Federation of Consulting Engineers Geographical Information System Information Management System Instrument for Pre-Accession Assistance Internal Rate of Return Kosovo Environmental Protection Agency Kosovo Force Long-Run Marginal Cost Municipal Groundwater Risk Index Ministry of Environment and Spatial Planning Net Cash Flow Organisation for Economic Co-operation and Development Operation and Maintenance SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO iv

8 Acronym PE PM REC RWC SMP SOK ToR TSS UNDP WB WFD WHO WMRB WPZ WWRO WWTP Full name Population Equivalent Project Manager Index of presence of recreational water Regional Water Company Strategic Master Plan Statistical Office of Kosovo Terms of Reference Total Suspended Solids United Nations Development Programme World Bank Water Framework Directive World Health Organization West Morava River Basin Water Protection Zones Water and Waste Regulatory Office Wastewater Treatment Plant SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO v

9 TABLE OF CONTENTS 1 Executive Summary Background Government/Sector Policy Features of the Sector Beneficiaries and Parties involved in the Project Problems to be addressed Cross-Cutting Issues to be mainstreamed Other Interventions Intervention Overall Objectives Project Purpose Expected Results Activities Activity No.1: Review of Legislation Activity No.2: Preparation of Assets Inventory Activity No.3: Environmental Impact Assessment Review Activity No.4: Conduct of Household Survey Activity No.5: Land Use, Population and Water Demand Activity No.6: Tariff Considerations Report Activity No.7: Planning Design Manual Activity No. 8: Master Plan Activity No.9 &No.10 Institutional Arrangement Activity No.11: Model of Tender Documents Mainstreaming of CCI Gender Equality Minorities Inclusion and Participation Environmental Dimension SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO vi

10 4 Assumptions Assumptions at Different Level Risks and Flexibility Implementation Physical and Non-physical Means Organization and implementation procedures Timetable Costs and Financing Plan Factors ensuring Sustainability Policy Support Appropriate Technology Effective mainstreaming of Cross-Cutting Issues Institutional and Management Capacity (public and private) Economic and Financial Analysis Monitoring and Evaluation Definition of Indicators (incl. indicators for CCI) Conclusion and Proposals SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO vii

11 ANNEXES Annex A-1 Logical Framework Annex A-7 Result Performance Report SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO viii

12 LIST OF TABLES Table 1: Timetable of delivery of the reports SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO ix

13 LIST OF FIGURES Figure 1: Diagramme of execution of the Project SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO x

14 1 Executive Summary The European Union Delegation to the Republic of Serbia has appointed our Consortium of Consulting Firms formed by SAFEGE, EPTISA, SEURECA, BEOINZENJERING 2000 and SAFEGE DOO, for the preparation of the Sewerage and Wastewater Strategic Master Plan for the West Morava River Basin. The main contract was signed on December 15 th, Notice of award was issued on December 3 rd, 2009 and the operations started on February 1 st, 2010 following Administrative order No. 1. The Contracting Authority was modified by Addendum No. 2 dated November 12 th, 2011 which amends art. (3) and Annex II of the Contract. The activities related to the Project area located in Kosovo started on December 1 st. In December 2011, the EUO in Kosovo extended the term of this contract until July 31 st, The Overall Objective of The Project is to strengthen the protection of water resources, water quality and public health improvement. The purpose of this assignment is to prepare a master plan in order to speed up investment in wastewater treatment and sewerage, and protection of ground and surface water. Expected Results of the assignment consist of (1) the Strategic Master Plan approved by the relevant authorities involved in the implementation of investment programmes in the sector, and (2) Typical Tender Documents as may be required to implement wastewater treatment plant project with EU funding under applicable IPA grant application procedure. Main direct beneficiaries are the 2 Regional Water Companies and the municipalities which shall be provided a clear road map for implementing effective investment programmes for improving sewerage and wastewater treatment with IPA funding instruments. About 2 Millions populations living in the Watershed of West Morava River shall benefit from the Project, of which 800,000 people are living in Kosovo within the Ibër River Basin.More population living along Morava River, downstream the confluence with South Morava shall benefit of the better quality of water in the receiving water bodies. Kosovo's Law on Environmental Protection (UNMIK Regulation No 2003/9) lays down two fundamental objectives concerning wastewater management policy: i) to promote an increasingly healthy environment for the people of Kosovo through the SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 1

15 gradual introduction of EU Environmental Standards, and ii) to ensure that the creation of such an environment is accomplished in a manner that is affordable and consistent with sustainable economic development. Morava River s river basin constitutes a part of Danube River Basin. Increasing capacity of wastewater treatment in the Project Area shall have a positive effect on the water quality in Danube River. Wastewater management in Kosovo currently consists of collection and discharge into rivers. With the exception of a single wastewater treatment plant that has been constructed in the Municipality of Skenderaj but is not yet on line, municipal wastewater treatment is non-existent apart from individual domestic septic tanks and some ponds that have formed naturally, accounting for the many highly polluted streams near municipal areas in Kosovo. Raw sewerage and industrial waste is discharged straight to surface waters untreated. Previous assistance includes the EC funded capacity building of MESP institutional support of publicly owned water and wastewater utilities and waste regulatory office and projects supporting infrastructure improvements in both, water and wastewater sector. The activities of the Sewerage and Wastewater Strategic Master Plan for West Morava River Basin were organized in two Parts: 1. Diagnostic of Current Status, Identification of main problems and typical improvement measures 2. Strategic Master Plan of sewerage and wastewater The quality of existing data was found variable and, in a large extent, questionable, requiring comprehensive site investigations which ended in June The data from the asset inventory are organized in a database attached to a GIS (MapInfo tables). The three municipalities with Serbian majority located in the northern part of the Ibër river basin did not collaborate with this process of data collection. For security reasons, the team of experts was unable to conduct required field investigations. The asset inventory is consequently not reporting the existing facilities in these municipalities. The total consumption of water for drinking water supply within the Basin is roughly estimated to 65 million m 3 /year. Within the Basin, the annual water consumption of industrial sector has been roughly estimated to 36 million m 3 and the consumption of agricultural (irrigation) sector to 26 million m 3. There are in total 17 municipalities totally or partially included in the Ibër River Basin including the Graçanicë/Gračanica Municipality created in Based on the census performed in 2011 in Kosovo, and older data as concerns towns inhabited by Serbian population, the population dwelling within the Ibër River Basin amounts SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 2

16 currently to nearly 705,000 inhabitants, with a density of 175 inhab./km 2. The most populated municipalities (within the basin) are Prishtinë/Priština (193,684 inhab. i.e. 27% of total.), Podujevë/Podujevo (Besianë) (87,933 inhab. i.e. 12% of total) and Mitrovicë/Mitrovica (71,601 inhab, i.e. 10% of total). The rate of connection to a sewage network for the population living in the Ibër Basin varies from 4% (Skënderaj/Srbica) to 100% (Fushë Kosovë/Kosovo Polje and Novobërdë/Novo Brdo); it reaches 85% in Prishtinë/Priština, 66% in Mitrovicë/Mitrovica and 49% in Podujevë/Podujevo. In total, 422,904 people, i.e. 60% of the total population living in the Ibër River Basin is connected to a sewage network, the remaining 40% of population use formal (septic tank) or informal onsite sanitation system. Actually 39 % of the connected populations of the Basin live in Prishtinë/Priština, 10% in Mitrovicë/Mitrovica and 9% in Podujevë/Podujevo. With a total lack of wastewater treatment plant, the pollution loads annually discharged by sewage networks into water bodies of the Basin have been estimated to 9,262 tons of BOD5, 18,523 tons of COD, 10,805 tons of TSS, 2,315 tons of N and 617 tons of P. The sewage network of Prishtinë/Priština is logically the most polluting, furthermore, it discharges into a small stream (Prishtevkë River) which is hence an actual open sewerage joining the Sitnica River few km downstream. Septic tanks and other on-site sanitation system have been estimated to release annually 1544 tons of nitrogen and 412 tons of phosphorus into the soil. Spatial Planning system is regulated by the Law on Spatial Planning no. 2003/14 and the amendment of Law no. 03/L-106 on Amending the Law on Spatial Planning no Since 2004, municipal authorities in Kosovo have been working on their development strategies. An important effort has been made after 2008, and now almost all municipalities included in the project region have published finalized or draft municipal development plans. The planning documentation has been collected from the municipalities of Prishtinë/Priština, Mitrovicë/Mitrovica, Podujevë/Podujevo, Fushë Kosovë/Kosovo Polje, Graçanicë/Grašanica, Kastriot/Obilić, Lipjan/Lipljan, Gllogoc/Glogovac, Shtime/Štimlje and Vushtrri/Vučitrn, and was used in the preparation of land use zoning. The water demand was divided into three main types of users: domestic users, small non-domestic users and large non-domestic users. The large customers in the WMRB have been identified through the industrial survey and the customer databases of RWCs.The wastewater generation was evaluated for each agglomeration and rural area within the project area during planning period Basic assumption was that all dwellings will be connected to public sewerage system by The tariff policy and methodology has been reviewed by the project Further Supports to WWRO and ECLO considered that there was no need for additional consideration. Clarifications were obtained from the consultants assigned for this project regarding the issues related to wastewater tariff policy. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 3

17 The preparation studies allowed defining five sewerage agglomerations and identifying 14 locations for the construction of centralized wastewater treatment plants. Each programme of investment was valued according to prioritization criteria: 1. Environmental impact, 2. Readyness of the project, 3. Economical efficiency. 279 projects were identified; these projects were organised in 142 proposed measures including several alternative options. The impacts of each project on public health and on relevant environmental aspects have been evaluated through usual set of parameters. The results were consolidated in a Consolidated Environmental Score (CES) attributed to the investment programs. The cost-effectiveness of investment projects is evaluated on the basis of the Long- Run Marginal Cost of improved wastewater operation compared to the CES. The social and economic benefits expected from the proposed investment programme are measured by the Economical Internal Rate of Return (EIRR). The total investment requirement is estimated by 230 Million Euro at prices of The prioritization model allowed to phase out the 7 identified investment programs in 3 phases as required by the ToR. The program recommended to be undertaken during Phase 1 ( ) consists in the construction of the mutual WWTP for Prishtinë/Priština, the Capital city and two neighboring agglomerations: Fushë Kosovo/Kosovo Polje and Kastriot/Obilić, and the rehabilitation and construction of new sewage networks in Prishtinë/Priština and Kastriot/Obilić. The current institutional framework operates on a regional basis whereby the RWCs provide services for a number of municipalities: RWC Prishtina: 8 municipalities: ~500,000 people RWC Mitrovica: 3 municipalities: ~200,000 people Under the Water Law the Ministry of Environment and Spatial Planning has key responsibilities for water policy including preparation of strategic policy documents and overseeing the preparation of River Basin Management Plans by the River Basin District Authorities. Whilst considerable progress has been made with River Basin Planning as a result of recent EU-funded technical assistance, further work is needed to complete the policy framework and finalise the establishment of the River Basin District Authorities. However, these issues are due to be addressed in the course of a forthcoming EU funded TA project supporting the MESP. It is of note that this TA project includes provision for the preparation of the Kosovo Water Strategy and an associated Water Action and Investment Plan. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 4

18 2 Background 2.1 Government/Sector Policy 2 Kosovo's Law on Environmental Protection (UNMIK Regulation No 2003/9) lays down two fundamental objectives concerning wastewater management policy: i) to promote an increasingly healthy environment for the people of Kosovo through the gradual introduction of EU Environmental Standards, and ii) to ensure that the creation of such an environment is accomplished in a manner that is affordable and consistent with sustainable economic development. The vision of the water sector was agreed by the MESP and the main stakeholders in the course of the Study of Wastewater Treatment Strategy (2004): All wastewater in Kosovo are treated to meet all wastewater collection and treatment related EU and local standards.the present wastewater management in Kosovo covers the collection of the wastewater and storm water out of the settlement area and the discharge of these flows untreated into the nearest river. Only approximately 30% of Kosovo s population has access to a sanitation system, including less than 10% of the rural population. The 2004 Study suggests the solution for centralized wastewater treatment is to have one wastewater treatment plant in each of the 7 regional water utilities, which, in the course of time, may also treat wastewaters from surrounding rural villages and urban centers. Centralized wastewater treatment is recommended as more feasible than a separate system for each city in the future, because: Investment, operation and maintenance costs are lower in all future scenarios; The most likely socio-economic development (migration to bigger towns) supports the centralized wastewater treatment option; Regional collection and treatment systems facilitate the connection of smaller villages and rural areas to public water and sewerage systems; Environmental impacts (effluent and recipient quality, reuse potential for treated wastewater, sludge disposal) are less harmful; Ease of operation and better treatment results; Higher capacity to tolerate shock loads; and 2 UNDP - A Human Rights-Based Approach (HRBA) to Improve Water Governance in Europe & CIS. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 5

19 Higher institutional capacity to respond to changes in the operational environment. 2.2 Features of the Sector Of the total population of Kosovo, about 50% or 1,100,000 are served by public water utilities. The remainder of the population relies on village water supply systems, wells, or other sources. Roughly 9,800 local or village water supply systems are used in addition to the public supply system. These are at high risk to pollution and evidence is emerging that many deliver contaminated water or water of poor quality. The supply of water for drinking is more-or-less evenly split between surface water, which accounts for about 55% of the water supplied, and underground water sources, which account for the remaining 45%. Half the water supplied in Kosovo is taken from the five large impounding reservoirs and a further, significant 31% from the Karst natural springs, the latter providing a major source of high quality raw water. Several rivers are no longer suitable for water supply for even agricultural use. Wastewater management in Kosovo currently consists of collection and discharge into rivers. With the exception of a single wastewater treatment plant that has been constructed in the Municipality of Skenderaj, municipal wastewater treatment is nonexistent apart from individual domestic septic tanks and some ponds that have formed naturally, accounting for the many highly polluted streams near municipal areas in Kosovo. Raw sewerage and industrial waste is discharged straight to surface waters untreated. There are seven licensed RWCs in Kosovo whose collective service areas cover around 96% of the population and who supply water to 60% of the population that live in those areas. Of the 40% who do not receive water from a RWC, an estimated 7% live in a community with a piped running water system some of which (3%) are not managed by anyone and the remaining 33% do not have a piped water supply system, relying instead on water from household wells or springs. It is reasonable to assume that most of the 40% of the population that do not receive water from a RWC are not supplied with disinfected water. Continuing development in Kosovo, particularly unplanned development, is almost certainly placing a greater stress on the water eco-system with consequent risks to the quality of raw water used for the public supply. RWCs report that of the 71 water sources in Kosovo used for drinking water supply 33 are at significant risk of some form of contamination. These at-risk sources provide around 65% of the drinking water that is put into supply. In particular many of the aquifer water sources were noted as at-risk from contamination. This situation is made worse by the lack of defined and established water protection zones (WPZs), a situation that leaves the drinking water sources vulnerable to continued adverse development and potential pollution. The present wastewater management in Kosovo covers the collection of the wastewater and storm water out of the settlement area and the discharge of these flows untreated into the nearest river. Only approximately 30% of Kosovo spopulation has access to a sanitation system, including less than 10% of the SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 6

20 rural population; the rest have, at best, septic holes. In the absence of a sewage network, the population tends to be self-providers, limited to simple cesspools, latrines or septic tanks. Access to sewerage disposal appears unrelated to ethnicity; 71% of Kosovo Albanians, 69% of Kosovo Serbs and 80% of other minorities reportedly have access (UNDP and USAID, 2009). There is no system for monitoring sewage discharge and treatment of municipal wastewater is virtually non-existent, with the exception of some septic tanks for restricted housing areas or natural ponds, which have been formed at the discharge points of wastewater collection systems. A few Kosovo Force (KFOR) camps and the hospital complex of Pristina have biological treatment plants. Due to water contamination and unsafe hygiene (hand washing at critical times, unsafe handling, transportation and storing of drinking water), waterborne diseases are widespread among rural populations. Improvements have been made in urban areas; water contamination has reduced to 10% on average, but remains a big issue in Shtërpcë and Klina. Klina had 28 cases of typhoid in 2008 and 42 of Hepatitis A. No reliable scientific data portrays the level of infection of children and adults by waterborne diseases. 2.3 Beneficiaries and Parties involved in the Project About 2 Millions populations living in the Watershed of West Morava River shall benefit from the Project. More population living along Morava River, downstream the confluence with South Morava shall benefit of the better quality of water in the receiving water bodies. Morava River s river basin constitutes a part of Danube River Basin. Increasing capacity of wastewater treatment in the Project Area shall have a positive effect on the water quality in Danube River. 2.4 Problems to be addressed Untreated sewage discharge represents a major source of pollution of natural waters, affecting dissolved oxygen, phosphorous and nitrogen content, and pathogenic bacteria and viruses. The main surface water polluters are municipalities and industries. Municipalities and communities discharge wastewater without any treatment, reducing water quality. Appropriate measures need to be made in order to protect waters from pollution and other damaging effects; and to protect and improve the ecosystems. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 7

21 2.5 Cross-Cutting Issues to be mainstreamed Understanding gender roles and relations and how these affect and are affected by water and sanitation interventions can ensure greater sustainability and resource efficiency, potentially increasing the number of beneficiaries. WM-SMP aims at the protection of the sources of drinking water, bio-diversity and of public health. 2.6 Other Interventions Previous assistance includes the EC funded capacity building of MESP institutional support of publicly owned water and wastewater utilities and waste regulatory office and projects supporting infrastructure improvements in both, water and wastewater sector. The most relevant projects to this project financed by EC are: Institutional support for environmental management to the Ministry of Environment and Spatial Planning, Kosovo (Oct March 2005); Institutional strengthening and capacity building of all departments of MESP ended in Sept. 2007: One of the main outputs of this project is provision of practical tools (GIS and hydraulic models) which will be compatible with the existing Information Management Systems (IMS) already installed in MESP and KEPA; Institutional support to the Ministry of Ministry of Environment and Spatial Planning, Kosovo ended Sept. 2007; Further support to the Association of Kosovo Municipalities, May 2006 July 2008; EAR funded project to rehabilitate the hydrometric network in Kosovo (EUR 200,000) ; 'Support Kosovo municipalities and MESP for the implementation of environmental Laws at municipal level' (Jan 2008 April 2009) Support MESP for the water resources management in Drini river basin Jan 2008 Feb 2010; Feasibility study on drinking water quality March 2009 September 2009; Further Institutional Strengthening Support to Water and Waste Regulatory Office (WWRO) June 2010 ongoing. In addition, a number of international donors provide assistance in the water sector. KfW supports the operation, consolidation and incorporation of water utilities in the Prizren and Peje regions and has carried out studies regarding to sewage disposal at Prizren. Much of this work has been carried out with the support of GTZ. Austria funds the improving of water supply at villages. The most important projects related to this programme are: SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 8

22 Water management preparatory project in Kosovo financed by the Ministry of Foreign Affairs of Finland (2004), Under the financing of the Italian government a central laboratory for testing water, air and soil, has been established at the KEPA. Development of south-eastern water resources financed by the Swiss Development Agency (ends 2007). There are strong links between the engagement of KfW in the project Water Supply and Sewage Programme in the City of Pristina (Phase I) and the EU (EAR), the second phase Water Supply and Sewerage Programme in the City of Pristina (Phase II) amounting to approx. EUR 17 million started in The Water Task Force financed by the Swiss Development Agency (on-going) aims to develop and establish long term water sector management structures and the relationships between corporate entities, municipalities and the central government, including the sustainable takeover of water utilities by local institutions to provide cost-effective, high quality services to all sectors of the population. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 9

23 3 Intervention 3.1 Overall Objectives To strengthen the protection of water resources, water quality and public health. Meeting such Objective is deemed to require implementing considerable and sustained investment efforts. 3.2 Project Purpose Provide improved conditions for increased investment in wastewater treatment and sewerage, and protection of ground and surface water. Increasing investment should be affordable for the population Beneficiary. In this respect improving conditions for increased investment involve securing access to soft funding resources. Project s results aim at providing to meet appropriate conditions for successful fasttrack application of IPA grant funding. Project measures shall be designed with a view to provide for achieving that water quality complies with WFD in accordance with agreed water quality objectives in Serbia under IPA scheduled arrangements when such arrangements exist. At the same time, fast implementation of EU funded wastewater treatment projects under IPA policies may require using specific procurement methods which needs to be fully compatible with both local regulations and EU directives set forth by European Commission of competition. 3.3 Expected Results Sewerage and Wastewater Strategic Master Plan for the region of the West Morava River Basin prepared. Tender Documents prepared for the construction of a model wastewater treatment plant with a capacity of 20,000 PE. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 10

24 3.4 Activities The activities of the Sewerage and Wastewater Strategic Master Plan for West Morava River Basin were organized in two Parts: 1. Diagnostic of Current Status, Identification of main problems and typical improvement measures 2. Strategic Master Plan of sewerage and wastewater The organization of the Deliverables is visualized in the figure below: R1: Review of Legislation R2: Assets Inventory Report R3: Environmental Impact Review R4: Household Survey Report R5: Land Use, Population, WaterDemand and Wastewater Forecast Diagnostic of current situation R6: Tariff Consideration Review R7: Planning Design Manual R8.1: Required Measures Identification R8.2: Strategic Planning Criteria R8.3: Implementation Program & Financial Planning R9: Institutional Arrangements Result 1 R10: Proposals for Public Consultation SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 11

25 3.4.1 Activity No.1: Review of Legislation The legal framework of water supply and wastewater operation in Kosovo is still in a process of development. The team leader of the consultant s team has participated to the periodic meetings of the Water Task Force in charge of driving the process which will lead to establish strong institutional framework and legislation compatible with the EU directives for water and wastewater. On 17 August ECLO provided the Review of Legislation relating to Water Sector in Kosovo 3 and a review for each directive of a) implementation status in Kosovo legislation and b) compliance in practice with the Directive s requirements. The main outcomes of these documents are incorporated in the Deliverable R3 Environmental Impact Review. Kosovo is in transition under UNMIK administration, and as a result the passing and implementation of national legislation related to water and sanitation is ongoing. All legal authority is derived from resolution 1244 (1999) which established UNMIK. A complex and rapidly evolving mix of human rights, environmental law and water law is applicable in Kosovo Activity No.2: Preparation of Assets Inventory Baseline data concerning existing facilities is the result of an extensive review of number of data and information collected from municipalities and from Regional Water Companies, and from previous or on-going studies conducted by several donors. The quality of collected data was variable and, in a large extent, questionable, requiring comprehensive site investigations which ended in June The three municipalities with Serbian majority located in the northern part of the Ibër river basin did not collaborate with this process of data collection. For security reasons, the team of experts was unable to conduct required field investigations. The asset inventory is consequently not reporting the existing facilities in these municipalities. The Asset Inventory report (Deliverable R2) compiles information concerning all existing public sewerage facilities and treatment facilities (sewer mains, boundary of the service areas, outlets, pumping stations, WWTPs) for the main settlements of the 13 Municipalities which have resulted concerned by wastewater collection within the River Basin. The data from the asset inventory are organized in a database attached to a GIS (MapInfo tables). 3 Gail Warrander, SDC. June SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 12

26 3.4.3 Activity No.3: Environmental Impact Assessment Review This activity consists in the assessment of the impact on public health and the environment of the current wastewater discharges and sanitation practices in the Region. The Environmental Impact Assessment Review report contains recommendations regarding remedial measures. A large part of this activity consisted in the evaluation and localization of industrial effluents and of discharges of domestic sewage as well as in assessing the impact of on-site sanitation facilities in the 9 municipalities with urban centers located in the River Basin (the information regarding the industrial pollution in the 3 northern municipalities with Serbian majority was not made available). The report was submitted to ECLO in English on November 24 th and then to the MESP in Albanian on December 20 th, The drinking water supply within Kosovo municipalities rests with the Regional Water Companies and with small-scale local companies scattered in rural areas. Moreover the municipalities with Serbian population have their own autonomous Water Companies. The total consumption of water for drinking water supply within the Basin is roughly estimated to 65 million m 3 /year. Within the Basin, the annual water consumption of industrial sector has been roughly estimated to 36 million m 3 and the consumption of agricultural (irrigation) sector to 26 million m 3. There are in total 17 municipalities totally or partially included in the Ibër River Basin including the Graçanicë/Grašanica Municipality created in Based on the census performed in 2011 in Kosovo, and older data as concerns towns inhabited by Serbian population, the population dwelling within the Ibër River Basin amounts currently to nearly 705,000 inhabitants, with a density of 175 inhab. /km 2. The most populated municipalities (within the basin) are Prishtinë/Priština (193,684 inhab. i.e. 27% of total.), Podujevë/Podujevo (Besianë) (87,933 inhab. i.e. 12% of total) and Mitrovicë/Mitrovica (71,601 inhab, i.e. 10% of total). The rate of connection to a sewage network for the population living in the Ibër Basin varies from 4% (Skënderaj/Srbica) to 100% (Fushë Kosovë/Kosovo Polje and Novobërdë/Novo Brdo); it reaches 85% in Prishtinë/Priština, 66% in Mitrovicë/Mitrovica and 49% in Podujevë/Podujevo. In total, 422,904 people, i.e. 60% of the total population living in the Ibër River Basin is connected to a sewage network, the remaining 40% of population use formal (septic tank) or informal onsite sanitation system. Actually 39 % of the connected populations of the Basin live in Prishtinë/Priština, 10% in Mitrovicë/Mitrovica and 9% in Podujevë/Podujevo. With a total lack of wastewater treatment plant, the pollution loads annually discharged by sewage networks into water bodies of the Basin have been estimated to 9,262 tons of BOD 5, 18,523 tons of COD, 10,805 tons of TSS, 2,315 tons of N and 617 tons of P. The sewage network of Prishtinë/Priština is logically the most polluting, furthermore, it discharges into a small stream (Prishtevkë River) which is hence an actual open sewerage joining the Sitnica River few km downstream. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 13

27 Septic tanks and other on-site sanitation system have been estimated to release annually 1,544 tons of nitrogen and 412 tons of phosphorus into the soil. The ecosystem quality assessment results in three categories of water bodies: Water bodies with good ecological status which encompass upstream-most river stretches and reservoirs. Water bodies with moderately bad ecological status, which are the river stretches moderately polluted by urban wastewater, for instance: the Ibër between Zubin Potok and Mitrovicë/Mitrovica, and few km downstream of Mitrovicë/Mitrovica, the Sitnica from the junction with Llap River to the junction with Trepca River (upstream of Mitrovicë/Mitrovica), Llap River downstream of Podujevë/Podujevo, as well as Drenica and Shtime/Štimlje rivers. Water bodies with bad to very bad ecological status, which mainly are the Prishtevkë River (from Prishtinë/Priština to the junction with Sitnica), the Sitnica River from the junction with Prishtevkë to the junction with Llap River and the Sitnica just upstream o its junction with Ibër River in Mitrovicë/Mitrovica Activity No.4: Conduct of Household Survey SAFEGE proposed to carry out a household survey. Building representative sample of 500 households requires using reliable statistical data. Following the recommendations of the Steering Committee, we addressed a request to the MESP in a view to use the mapping and the statistical attributes of the enumeration districts used in the census 2011 in the design of the sampling strategy. The realization of a household survey has been abandoned due to the lack of reliable statistical baseline data. The census data will not be available for public access before September 2012 and the SOK had not resources available to provide effective support for defining the representative sample of households required by the Project. After several failed intents supported by the Permanent Secretary and by the EUO in Kosovo, an alternative methodology was developed with using existing studies Activity No.5: Land Use, Population and Water Demand Since SOK did not authorize SAFEGE to use the statistical data of census 2011, the identification of settlement, population forecast, water demand and consequently the estimate of domestic wastewater effluents will be based on consultants assumptions. Particular attention was paid to assessing the population data. In Kosovo, Spatial Planning system is regulated by the Law on Spatial Planning no. 2003/14 and the amendment of Law no. 03/L-106 on Amending the Law on Spatial Planning no Since 2004, municipal authorities in Kosovo have been working on their development strategies. An important effort has been made after 2008, and now almost all municipalities included in the project region have SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 14

28 published finalized or draft municipal development plans. The planning documentation has been collected from the municipalities of Prishtinë/Priština, Mitrovicë/Mitrovica, Podujevë/Podujevo, Fushë Kosovë/Kosovo Polje, Gračanica/Graçanicë, Kastriot/Obilić, Lipljan/Lipjan, Gllogovc/Glogovac, Shtime/Štimlje and Vushtrri/Vučitrn, and was used in the preparation of land use zoning. In order to compensate for the lack of accurate land use zoning in some municipalities, it is possible to use the mapping of built-up areas from the SOK The projection is made by application of the "components method", given the population distribution according to the sex and age group bands of fiveyear. Existing demographic data were produced by four main sources: The Census 2011 (preliminary results); The data from the registry office; The Demographic, Social, Health Survey in Kosovo (DSHSK) from 2003 and 2009; The estimations published by the Population Reference Bureau 4. The future migration scenario used for the baseline scenario was based more on plausible assumptions than observations. It was assumed that measures from the government promoting the return of emigrants would be successful and that the situation would return to a «normal»state by The water demand can be divided into three main types of users: domestic users, small non-domestic users and large non-domestic users. The demand of each type of users has its own rationale and drivers and needs to be studied independently: The large customers in the WMRB have been identified through the industrial survey (Activity 3) and the customer databases of RWCs. The wastewater generation was evaluated for each agglomeration and rural area within the project area during planning period Basic assumption was that all dwellings will be connected to public sewerage system by Activity No.6: Tariff Considerations Report The tariff policy and methodology has been reviewed by the project 'Further Supports to WWRO and ECLO considered that there was no need for additional consideration. Clarifications were obtained from the consultants assigned for this project regarding the issues related to wastewater tariff policy. Based on the extensive information provided by the Regulatory Office, the report on Tariff Consideration Review was submitted on March 1 st ; The outcome of this review was used in the economic and financial analysis of the proposed investment programs. 4 Population Reference Bureau Connecticut Avenue, NW Suite 520 Washington, DC USA SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 15

29 3.4.7 Activity No.7: Planning Design Manual The Planning Design Manual was prepared in order to be applicable in the entire extent of the project area (West Morava River Basin). The harmonization of the design criteria in the context of Kosovo was carried out and the document was submitted in Albanian language to the consideration of the MESP on February 1 st, Activity No. 8: Master Plan This activity comprises the main tasks of preparation of the master plan. It comprises 1) the identification of needed works required to meet targeted service performance levels, 2) organizing these projects in programs and ranking these programs according to a set of priority criteria which were defined in respect to environmental, economic and financial ranking criteria, and 3) phasing the implementation of identified programs over the 25-year planning period on consideration to implementation management requirement and to affordability criteria. The preparation studies allowed defining five sewerage agglomerations and identifying 14 locations for the construction of centralized wastewater treatment plants. It started with the asset inventory which allowed collecting outstanding information concerning the immediate rehabilitation and repairs requirement. The environmental impact review (Activity 3) identified issues to be addressed in order to approximate the objectives of the EU directives concerning wastewater management. 279 projects were identified; these projects were organized in 142 proposed measures including several alternative options. The impacts of each project on public health and on relevant environmental aspects have been evaluated through usual set of parameters. The results were consolidated in a Consolidated Environmental Score (CES) attributed to the investment programs. The prioritization takes into account the settlement policies and planning proposals prepared by the municipalities with the assistance of IRD in coordination with SHUKOS 5. 5 Investment Plan in the Infrastructure of Water Supply and Sewage System, SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 16

30 The main program which consists in the construction of the mutual WWTP for Prishtinë/Priština, the Capital city and two neighboring agglomerations: Fushë Kosovo/Kosovo Polje and Kastriot/Obilić, and the rehabilitation and construction of new sewage networks in Prishtinë/Priština and Kastriot/Obilić. Considering the size of the project (nearly 630,000 P.E.) and the vulnerability of the receiving milieu (middle stretch of the Sitnica River), this program can be considered of uppermost environmental priority. Four sets of programs with a CES above 100 can be considered of very high environmental priority. The financial feasibility was assessed in respect to the cost to be borne by connected users by the Long-Run Marginal Cost (LMTC) which relates the present value of the capital and to operating expenditure resulting from the implementation of the proposed measures, with considering a social discount rate of 5.5%, to the population equivalent effectively served by improved sanitation. The economic rate of return of each program was evaluated in order to measure the social benefit of the measure. The total investment requirement is estimated by 230 Million Euro at prices of The prioritization model allowed to phase out the 7 identified investment programs in 3 phases as required by the ToR Activity No.9 &No.10 Institutional Arrangement In compliance with section of the Terms of Reference, a review has been undertaken of the institutional and management arrangements for implementation and monitoring of the Strategic Master Plan. The current institutional framework for water management in Kosovo involves, as is common in the sector, a large number of Government institutions and other stakeholders including numerous Ministries and associated institutions. The current institutional framework operates on a regional basis whereby the RWCs provide services for a number of municipalities: RWC Prishtina: 8 municipalities : ~500,000 people RWC Mitrovica: 3 municipalities : ~200,000 people The performance of the Regional Water Companies is assessed regularly (annually) by the WWRO and the PMUPE. Whilst performance of both companies has improved, there remain a number of performance shortfalls. Both RWCs have made losses in recent years, RWC Prishtina has lost about 2 million Euros per annum in 2009 and 2010, whilst RWC Mitrovica has lost about 0.3 million Euros per annum in the same period. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 17

31 Whilst considerable progress has been made with River Basin Planning as a result of recent EU-funded technical assistance, further work is needed to complete the policy framework and finalise the establishment of the River Basin District Authorities. The current framework for water supply and sanitation services (water utilities) provides for an appropriate division of competences and achieves reasonable levels of aggregation in service provision Activity No.11: Model of Tender Documents This activity was carried out as part of the main contract under the supervision of the EU Delegation in Belgrade. A model of procurement documentation has to be prepared in order to meet the Result 2. The model was developed for the Municipality of Raska in Serbia. Include lessons learnt. Recommendations that may go beyond the scope of the project (e.g. as regards similar project sectors and for follow-up measures required) may be included as well. 3.5 Mainstreaming of CCI Gender Equality According to the Kosovo Gender Profile 2009, Kosovo scores 0.76 on the Gender Development Index, the lowest in the Balkan region. No exact data are available on gender disparity in access to water and sanitation in the rural areas, yet women are likely to bear the major burden of taking care of the sick suffering from waterborne diseases; a consequence of contaminated wells and poor hygiene. Global improvement of protection of water resources shall have a positive impact on improving the quality of surface and ground water, on preventing risks of degradation of water supply and on improving quality of waters in recreation areas. It will consequently improve Public Health in particular as concerns children. Regarding the execution of the activities under this project, it is worth underlining that in accordance with the policy adopted by the consortium of consulting firms, all experts were selected on the basis of their knowledge and experience. Overall, the Consultant firms involved in the Project adhere to EC policies on equal rights and non-discrimination Minorities Inclusion and Participation Global environmental approach based on environmental impact assessment shall allow identifying measures which better concern general public interest. Special attention was paid to recommending effective Public Consultation (Activity 10) SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 18

32 methods which should ensure participation and support of minorities living in the watershed. However, Serbs represent an ethnic minority, but are majority in 4 municipalities concerned by the project. Serbian majority municipalities have refused to register as Kosovo municipalities. In refusing to acknowledge the new political situation, the Serbian (and partly Roma) community are strengthening their support and consolidating their ties and dependence towards the parallel institutions administrated by the Republic of Serbia in Kosovo, especially in the northern part of Kosovo. Under this project the lack of cooperation, with Serbian administration and with the authorities in charge in Kosovo, of 3 Serbian majority municipalities located in the northern part of the project area conduced to neglect the needs of this population. Nevertheless, in municipalities (as in Graçanicë/Gračanica) already connected to a water supply system under the jurisdiction of a regional water company of Pristinë/Prishtina, Serb non-cooperation still represents a major issue. The company provides water but does not receive payments to reinvest in the network Environmental Dimension Assessment of environmental aspects related to water and wastewater management in the whole watershed is providing the key driver of planning process. The prioritization of the investment projects needed to meet the master plan objectives and goals is based on an environmental score which reflects the impacts of each project component on the environment. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 19

33 4 Assumptions 4.1 Assumptions at Different Level The main assumptions upon which the project intervention is based (Specific Objectives to Overall Objectives) is that increased investment is made in the provision of wastewater treatment and sewerage facilities to protect public health and the environment and (Results to specific objectives) that there is political stability, that the process of economic transition continues and that national income grows (thereby providing the conditions for increased investment). The assumptions upon which the project activities will lead to the envisaged results were: That sufficient information is made available by the Water Directorate of the Ministry of Agriculture, Forestry and Water Management, Municipalities and by the water utility companies. That the Water Directorate of the Ministry of Agriculture, Forestry and Water Management undertakes a credible public consultation process. The Water Department of the Ministry of Environment and Spatial Planning of Kosovo will make available necessary information and permissions. That the municipalities and regional water companies in Kosovo will provide the permissions and the necessary information. Sufficient support, will and commitment from the recipient institutions; Continuous support and active involvement of the MESP and MEF; Absorption capacity and technical capability of the various institutions to fulfill their commitments; Unrestricted access to all available relevant data including maps, water quality and quantity records, population data, municipal development plans, etc. Timely approval of the submitted reports by the authority and timely approval of necessary actions, licenses etc. from the appropriate authorities. 4.2 Risks and Flexibility In consequence the main risks to project implementation were: SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 20

34 That political instability results in administrative paralysis, hindering the process of economic transition and reducing national income growth. That insufficient information is made available by the Water Directorate of the Ministry of Agriculture, Forestry and Water Management, Municipalities and wastewater treatment bodies. That the Water Directorate of the Ministry of Agriculture, Forestry and Water Management fails to undertake a credible public consultation process. Non co-cooperativeness of relevant stakeholders in Kosovo. Insufficient availability and/or capacity of key stakeholders to actively and effectively participate in the project; Incompletely defined and developed structure, framework, for management of needs identification, prioritization, and investments in WSS infrastructure, and lack of clearly defined responsibilities of relevant government entities which likely will not be resolved prior to the timeframe of the project. Difficulties in coordinating key stakeholders: poor and/or slow co-ordination could be time consuming for the project and reduce time available for the effective implementation of project tasks. Delays in obtaininginformation Delays in obtaining comprehensive and accurate information on existing facilities have led to reconsider the terms of the project. Six months extension had to be agreed by the EUO and by the EU Delegation in Belgrade until the 31 st of July Such delays have resulted from major difficulties encountered in accessing recent population data; the publication of data from the census realized by the Statistical Office of Kosovo in 2011 was not possible before September 2012 and such data processing disabled this institution to support the identification of future needs as it would have been expected to develop this Master Plan. Other source of delays was the poor institutional environment in which the wastewater facilities have been developed over the last 10-year period. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 21

35 5 Implementation 5.1 Physical and Non-physical Means Nine international experts who have contributed to the preparation of this project over the 20 months of execution: Lionel HUET: Key Expert 1 and Team Leader who was the team leader for the overall river basin project; Romain Denoix: Assistant team leader, coordinator of local experts; Georges Petitzon: Senior expert for sewers networks; Pascal de Giudicci: Key Expert for environmental impact studies; Jacques Bonneric: Key expert for economical and financial studies; Ursula Lewis-Peutot: Senior espert in wastewater Treatment; Manuel Eguido: Senior expert for on-site sanitation and treatement facilities for small communities; Grégoire Landel: Senior expert in financial modeling; Dominique Waltisperger: Senior expert in population studies. In order to support the team of international expert in collecting data and in establishing appropriate communication with the municipal authorities and with the Regional Water Companies, SAFEGE has counted with the collaboration of ENBIKO Consulting group acting as an authorized sub-contractor of SAFEGE. Safege established a permanent office in Prishtina for the duration of the project and appointed Mr Adnan Ahmeti for assistance in translation. 5.2 Organization and Implementation Procedures The Contracting Authorities are the Delegation of the European Commission to the Republic of Serbia and the European Union Office in Kosovo represented by Mrs. Iva Stamenova and Mr. Gazmend Selimi as Task Managers. In Kosovo, the Consultant s primary counterpart has been Mr. Naser Bajraktari, Director of the Water Department of the MESP. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 22

36 The Drector of the Water Department of the MESP established a Steering Committee involving the following persons: Naser Bajraktari MESP WD Director Iva Stamenova and Gazmend Selimi ECLO Task managers Sami Hasani WWRO Head of department for Tariff and financial regulation Kero Bardhaj WWRO Hazir Çadraku MESP WD Miradije Asllanaj MESP EI Officer Hikmete Morina MESP EI Officer 5.3 Timetable The time table of deliveries is summarised in the table hereafter. Table 1: Timetable of delivery of the reports No. Name Draft submitted to the Beneficiray on Draft submitted to the PM on 2 Assets Inventory Report 20/12/ /12/2011 3&1 Environmental Impact Review 20/12/ /11/ Land Use, Population, Water Demand and Wastewater Generation 10/07/ /07/ Tariff Consideration Review 29/02/ /02/ Planning Design Manual 01/02/ /02/2012 8,1 Required Measures Identificaton 27/07/ /07/2012 8,2 Prioritization and Phasing of Investment Programmes 27/07/ /07/2012 8,3 Financial Planning 27/07/ /07/2012 9&10 Institutional Arrangements and Proposals for Public Consultation 27/07/ /07/2012 Progress Report 1 22/08/ /08/2011 Progress Report 2 06/10/ /10/2011 Progress Report 3 01/02/ /02/2012 Progress Report 4 17/05/ /05/2012 SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 23

37 Actual Progress Initial Planning Poly. (Actual Progress) Poly. (Initial Planning) 0 Aug 10 Nov 10 Feb 11 Jun 11 Sep 11 Dec 11 Apr 12 Jul 12 Oct 12 Figure 1: Diagramme of execution of the Project 5.4 Costs and Financing Plan The project has been financed by a lump sum budget of 725,000. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 24

38 Factors ensuring Sustainability Policy Support WWRO tariff policies should ensure appropriate conditions to ensure the sustainability of the project. However, a proper tariff policy for wastewater is still missing. The investment programs of the Master Plan has been scheduled at the level of the 2 licensed Regional Water Companies in accordance with the general policies and criteria issued by the WWRO (internal rate of return, tariff increase do not exceed 10% per annum ). 6.2 Appropriate Technology Use of GIS integrated database covering the entire river basin. 6.3 Effective mainstreaming of Cross-Cutting Issues According to the OECD Gender Policy Marker, the project is classified as "0" - not targeted. The objectives to be reached by the project are equally important for both genders. The project has not been planned with a gender-based approach, but such a method would not lead to improving its impact significantly. The application of good environmental practices and the mitigation of the damage caused by inappropriate ones are the core objectives of this intervention. The correct implementation of the project should contribute to the improvement of water quality and to the compliance with the EU environmental acquis, i.e. the EU Water Framework Directive. 6.4 Institutional and Management Capacity (public and private) The new institutional framework establishing Regional Water Companies operating under the regulation of a water and wastewater regularoy office is deemed to strengthen the capacity of the sector to implement the proposed master plan. However these institutions still need to improve considerably their operational efficiency before embarking in massive investment programs for wastewater. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 25

39 6.5 Economic and Financial Analysis In general tariffs are affordable and meet international standards that state less than 5% of domestic income should be spent on water and sewerage services. RWCs low performance regarding non revenue water (water losses, illegal connections), bill collection and metered consumption remain major hindrances to the overall economic performance of RWCs. Both RWCs face continued problems of revenue collection from customers, particularly RWC of Mitrovica which may not be in condition to afford undertaking the huge amount of investment required for the construction of centralized WWTP in the Phase 1. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 26

40 Monitoring and Evaluation Definition of Indicators (incl. indicators for CCI) The submitted deliverables listed in the ToRs are deemed to be the indicators Reviews/evaluation. An interim evaluation of the project was carried out in April SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 27

41 Conclusion and Proposals 8 RWC Pristina is in condition to undertake the implementation of one major programme of investment during the first 5-year period: Constuction of a Construction of WWTP in Kastriot/Obilić, rehabilitation of Prishtina, Fushë Kosovo/Kosovo Polje, Kastriot/Obilić. The feasibility study of this project was developed; it may have to be revised in order to include provisions for further integration of the sewerage systems of Lipljan/Lipjan and Graçanicë/Gračanica. The timetable of implementation of the other programmes of investment will be adjusted in accordance with the actual operational and financial performance of the RWCs. Wastewater charges need to be increased progressively in accordance with WWRO policies. Technological solutions are proposed for smaller villages under 2,000 PE which would not be connected to a centralized sewerage system. The implementation of such smaller projects may be envisaged in Phase 2 after completing the legislation concerning the ownership of these facilities, and of the institutional and legal framework governing the O&M obligations of the RWCs with a view to ensure the sustainability of such investment programmes. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 28

42 ANNEX A-1 LOGICAL FRAMEWORK SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 29

43 Intervention Logic Objectively verifiable Indicators Sources of Verification Risks &Assumptions Overall Objectives Specific Objectives Results Activities To strengthen the protection of water resources, water quality and public health. Provision of improved conditions for increased investment in wastewater treatment and sewerage, and protection of ground and surface water. Sewerage and Wastewater Strategic Master Plan for the region of the West Morava River Basin prepared. Tender Documents prepared for the construction of a model wastewater treatment plant with a capacity of 20,000 PE. Inception Report Component 1: Preparation of the Wastewater and Sewerage Master Plan Review of Legislation Preparation of Asset Inventory Review of Environmental Impact Conduct of Household Survey Preparation of Land use, Population and Water Demand Estimates Review of Tariff Considerations Preparation of Planning Design Manual Preparation of Master Plan Preparation of proposals for public consultation Ground and surface water quality. Health of population Municipal plans for construction of sewerage and wastewater treatment plants Sewerage and wastewater master plan Tender documents. To be completed by Consultant Official environmental and health data Budgets of Municipalities Project Reports To be completed by Consultant Increased investment in the provision of wastewater treatment and sewerage facilities. Political stability Economic transition continues, National income growth Water Directorate undertakes a credible public consultation process. Sufficient information made available by the Water Directorate, Municipalities and wastewater treatment bodies. Component 2: Preparation of tender documents for construction of Wastewater Treatment Plant of capacity 20,000 PE. SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 30

44 ANNEX A-7 RESULT PERFORMANCE REPORT SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 31

45 SAFEGE-EPTISA-SEURECA-BEOINZENJERING 2000-SAFEGE DOO 32

Construction of first wastewater treatment plant in Kosovo: an EU pilot project

Construction of first wastewater treatment plant in Kosovo: an EU pilot project Water Utility Journal 14: 41-46, 2016. 2016 E.W. Publications Construction of first wastewater treatment plant in Kosovo: an EU pilot project B.Sh. Kajtazi European Union Office in Kosovo, Kosovo Street

More information

Council Directive 91/271/EEC The National Programme for Municipal Waste Water Treatment

Council Directive 91/271/EEC The National Programme for Municipal Waste Water Treatment Council Directive 91/271/EEC The National Programme for Municipal Waste Water Treatment Regional Water Management Board Council Directive 91/271/EEC of 21 May 1991 concerning urban waste-water treatment

More information

Case Study on the Right to Water and Sanitation in Kosovo

Case Study on the Right to Water and Sanitation in Kosovo Case Study on the Right to Water and Sanitation in Kosovo By Bardha Korca, University of Prishtina, Kosovo I. Abstract Access to safe drinkable water for personal and domestic uses and proper sanitation

More information

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION)

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) 1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) The national water legislative framework in the Republic of Macedonia is comprehensive and regulates, from different perspectives,

More information

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities Dhaka Environmentally Sustainable Water Supply Project (RRP BAN 42173) SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES Sector Road Map 1. Sector Performance, Problems, and

More information

ON THERMAL ENERGY. Based on Article 65 (1) of the Constitution of the Republic of Kosovo, LAW ON THERMAL ENERGY CHAPTER I GENERAL PROVISIONS

ON THERMAL ENERGY. Based on Article 65 (1) of the Constitution of the Republic of Kosovo, LAW ON THERMAL ENERGY CHAPTER I GENERAL PROVISIONS LAW No. No. 05/L 05/L -058-052 ON ON INDUSTRIAL THERMAL ENERGY DESIGN LAW No. 05/L -052 ON THERMAL ENERGY Assembly of the Republic of Kosovo, Based on Article 65 (1) of the Constitution of the Republic

More information

ASSESSMENT AND DEVELOPMENT OF MUNICIPAL WATER AND WASTEWATER TARIFFS AND EFFLUENT CHARGES IN THE DANUBE RIVER BASIN.

ASSESSMENT AND DEVELOPMENT OF MUNICIPAL WATER AND WASTEWATER TARIFFS AND EFFLUENT CHARGES IN THE DANUBE RIVER BASIN. September 2004 ASSESSMENT AND DEVELOPMENT OF MUNICIPAL WATER AND WASTEWATER TARIFFS AND EFFLUENT CHARGES IN THE DANUBE RIVER BASIN. Volume 2: Country-Specific Issues and Proposed Tariff and Charge Reforms:

More information

4.05. Groundwater Program. Chapter 4 Section. Background. Follow-up to VFM Section 3.05, 2004 Annual Report. Ministry of the Environment

4.05. Groundwater Program. Chapter 4 Section. Background. Follow-up to VFM Section 3.05, 2004 Annual Report. Ministry of the Environment Chapter 4 Section 4.05 Ministry of the Environment Groundwater Program Follow-up to VFM Section 3.05, 2004 Annual Report Chapter 4 Follow-up Section 4.05 Background Groundwater is defined as water located

More information

Emission accounts. Julian Chow United Nations Statistics Division September 2016 Putrajaya, Malaysia

Emission accounts. Julian Chow United Nations Statistics Division September 2016 Putrajaya, Malaysia Emission accounts Julian Chow United Nations Statistics Division 26-30 September 2016 Putrajaya, Malaysia SEEA Conceptual Framework Types of physical flows accounts in SEEA-CF Physical flow accounts Topics

More information

LAO PEOPLE'S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY

LAO PEOPLE'S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY LAO PEOPLE'S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY President s Office No. 60/PO DECREE of the PRESIDENT of the LAO PEOPLE S DEMOCRATIC REPUBLIC on the Promulgation of the Law

More information

Water Security for Central Kosovo

Water Security for Central Kosovo WEAP Model Activities Ministry of Environment and Spatial Planning World Bank Water Security for Central Kosovo March 2011 TABLE OF CONTENTS I. General Presentation of WEAP model...10 II. Introduction

More information

Report on the Global Assessment of Water Statistics and Water Accounts. Prepared by the United Nations Statistics Division

Report on the Global Assessment of Water Statistics and Water Accounts. Prepared by the United Nations Statistics Division Statistical Commission Fortieth session 24-27 February 2009 Item 3 (d) of the provisional agenda Environmental-Economic Accounting Background document Available in English only Report on the Global Assessment

More information

PROJECT INFORMATION FORM Part A - General information

PROJECT INFORMATION FORM Part A - General information PROJECT INFORMATION FORM Part A - General information Country Project submission Date Serbia and Montenegro, Republic of Montenegro February 2003 1 (updated June 2005) Sector Project Code (filled by the

More information

Implementation of the Water Framework Directive in the Czech Republic

Implementation of the Water Framework Directive in the Czech Republic Towards Integrated River Basin Management Bratislava 29 May 2006 2 June 2006 Implementation of the Water Framework Directive in the Czech Republic Lubomír Petružela T.G. Masaryk Water Research Institute,

More information

Requires Member States to take actions to mitigate the effects of floods and droughts.

Requires Member States to take actions to mitigate the effects of floods and droughts. 2.5 THE WATER FRAMEWORK DIRECTIVE Official Title: Council Directive 2000/60/EC of 23 October 2000 establishing a framework for Community action in the field of water policy 2.5.1 INTRODUCTION The Water

More information

REQUEST FOR PROPOSAL (RFP) RFP

REQUEST FOR PROPOSAL (RFP) RFP REQUEST FOR PROPOSAL (RFP) ENGINEERING CONSULTANT REGIONAL WASTEWATER PIPELINE FEASIBILITY STUDY FEBRUARY 9, 2015 TABLE OF CONTENTS SECTION 1 SUMMARY AND BACKGROUND 2 SECTION 2 PROJECT SCOPE 3 SECTION

More information

Palestinian Water Sector Capacity Building

Palestinian Water Sector Capacity Building Palestinian Water Sector Capacity Building By Khairy Al-Jamal Senior Infrastructure Specialist World Bank, MNSSD International Conference -Sustainable Development and Management of Water in Palestine-

More information

ACCESS TO IMPROVED SANITATION AND WASTEWATER TREATMENT

ACCESS TO IMPROVED SANITATION AND WASTEWATER TREATMENT ACCESS TO IMPROVED SANITATION AND WASTEWATER TREATMENT FACT SHEET 1.3 December 2009 CODE: RPG1_WatSan_P1 Percentage of the population in the community or area under consideration served by a sewerage system

More information

WORKS PROCUREMENT NOTICE

WORKS PROCUREMENT NOTICE Document for completion and publication by the Contracting Authority. 1. Publication reference EuropeAid/131550/C/WKS/RS 2. Procedure Open 3. Programme IPA 4. Financing IPA 2010 5. Contracting authority

More information

ANNEX 11 WATER SUPPLY, SANITATION AND SOLID WASTE MANAGEMENT

ANNEX 11 WATER SUPPLY, SANITATION AND SOLID WASTE MANAGEMENT ANNEX 11 WATER SUPPLY, SANITATION AND SOLID WASTE MANAGEMENT A. Introduction 1. The South Asia earthquake disaster significantly affected the water and sanitation sector in five districts of North West

More information

Detailed technical design for acid mine water treatment in Novo Brdo Mine, Artana / KOSOVO

Detailed technical design for acid mine water treatment in Novo Brdo Mine, Artana / KOSOVO Detailed technical design for acid mine water treatment in Novo Brdo Mine, Artana / KOSOVO Nikolaus Linder 1, Michael Mackenbach 2, Jaromír Novák 3 1 Fichtner Water & Transportation GmbH, Department Mining

More information

Template for ToR for Transaction Advisory Services

Template for ToR for Transaction Advisory Services Template for ToR for Transaction Advisory Services Addendum 1 Prepared by Genesis Analytics 4 December 2013 PPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services

More information

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017 REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES Issuance Date November 27, 2017 Submittal Deadline January 8, 2018 Page Is Blank For Photocopying MARIN LAFCO 2 TABLE OF CONTENTS Section Page Number I.

More information

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning) Page: 1 Date: May 27, 2014 Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full Title of the Project 2. Type of the study (e.g. Master

More information

Information on the focal point for the Convention. Information on the point of contact for the Convention

Information on the focal point for the Convention. Information on the point of contact for the Convention Questionnaire for the REPORT OF MONTENEGRO ON THE IMPLEMENTATION OF THE CONVENTION ON ENVIRONMENTAL IMPACT ASSESSMENT IN A TRANSBOUNDARY CONTEXT in the period 2006 2009 Information on the focal point for

More information

Water and Waste Water Management in Yangon, Myanmar

Water and Waste Water Management in Yangon, Myanmar Union of Myanmar Ministry of Agriculture and Irrigation Irrigation Department Water and Waste Water Management in Yangon, Myanmar Mu Mu Than Staff Officer, Irrigation Department Myanmar March,2010 Socio-economical

More information

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY UNITED NATIONS United Nations Interim Administration Mission in Kosovo UNMIK NATIONS UNIES Mission d Administration Intérimaire des Nations Unies au Kosovo UNMIK/REG/2004/22 30 June 2004 REGULATION NO.

More information

CYPRUS EXPERIENCE WITH URBAN WASTEWATER TREATMENT DIRECTIVE (91/271/EEC)

CYPRUS EXPERIENCE WITH URBAN WASTEWATER TREATMENT DIRECTIVE (91/271/EEC) WATER DEVELOPMENT DEPARTMENT 1047 NICOSIA REPUBLIC OF CYPRUS MINISTRY OF AGRICULTURE, RURAL DEVELOPMENT AND ENVIRONMENT Water Security in Bulgaria 18 19 September 2017 Sofia Bulgaria CYPRUS EXPERIENCE

More information

Terms of Reference for a Gender Analysis

Terms of Reference for a Gender Analysis Terms of Reference for a Gender Analysis 1. BACKGROUND The European Commission defines a gender analysis as the study of differences in the conditions, needs, participation rates, access to resources and

More information

Indonesia Towards SDGs 2030

Indonesia Towards SDGs 2030 Indonesia Towards SDGs 2030 Aldy Mardikanto Directorate Urban, Housing, and Settlements Ministry of National Development Planning/ National Development Planning Agency Indonesia s progress on SDGs planning

More information

Improvement District Conversion Guide

Improvement District Conversion Guide Improvement District Conversion Guide Ministry of Community, Aboriginal and Women s Services 2004 Table of Contents Introduction 2 Reasons for Conversion 2 Participants in the Conversion Process 3 Regional

More information

Ex-ante Evaluation - 1 -

Ex-ante Evaluation - 1 - Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: Hue City Water Environment Improvement Project (Loan Agreement: March 31, 2008; Loan Amount: 20,883 million

More information

CERTIFICATION AND FINANCING PROPOSAL

CERTIFICATION AND FINANCING PROPOSAL EXPANSION OF WATER AND WASTEWATER SERVICES TO UNSERVED AREAS OF THE PIEDRA ANGULAR COLONIA TECATE, BAJA CALIFORNIA Published: November 7, 2014 EXPANSION OF WATER AND WASTEWATER SERVICES TO UNSERVED AREAS

More information

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)

More information

SUPPLY CONTRACT NOTICE

SUPPLY CONTRACT NOTICE Public document to be completed by the Contracting Authority SUPPLY CONTRACT NOTICE Procurement of Mobile drinking water treatment plants Location Republic of Serbia 1. Publication reference Europeaid:

More information

WATER QUALITY PROTECTION IN RURAL AREAS OF EGYPT

WATER QUALITY PROTECTION IN RURAL AREAS OF EGYPT WATER QUALITY PROTECTION IN RURAL AREAS OF EGYPT HUSSEIN A.A. EL GAMMAL RESEARCHER, WATER QUALITY MANAGEMENT UNIT, MINISTRY OF WATER RESOURCES AND IRRIGATION, EGYPT h_elgammal101@hotmail.com ABSTRACT Egypt

More information

URBAN WATER QUALITY MANAGEMENT. Pharmafilter: an innovative waste and wastewater management system for hospitals, The Netherlands

URBAN WATER QUALITY MANAGEMENT. Pharmafilter: an innovative waste and wastewater management system for hospitals, The Netherlands URBAN WATER QUALITY MANAGEMENT Pharmafilter: an innovative waste and wastewater management system for hospitals, The Netherlands Ms. Ellen Van Lindert, Directorate General for Water Affairs, Ministry of

More information

2010 Annual Programme Twinning Fiche KS 10 IB AG 02 Veterinary and Food Safety

2010 Annual Programme Twinning Fiche KS 10 IB AG 02 Veterinary and Food Safety 1. Basic information 2010 Annual Programme Twinning Fiche KS 10 IB AG 02 Veterinary and Food Safety 1.1 CRIS Number: 2010/022-452 1.2 Title: Veterinary and food safety 1.3 ELARG Statistical code: 03.12

More information

CALL FOR PROPOSALS ACCESS TO AND USE OF ICT FOR WOMEN AND GIRLS

CALL FOR PROPOSALS ACCESS TO AND USE OF ICT FOR WOMEN AND GIRLS CALL FOR PROPOSALS ACCESS TO AND USE OF ICT FOR WOMEN AND GIRLS Guidelines for grant applicants Information and Communication Technology (ICT) for Development NOTICE This is an Open Call for Proposals.

More information

ON THE EXECUTIVE BRANCH OF THE PROVISIONAL INSTITUTIONS OF SELF-GOVERNMENT IN KOSOVO

ON THE EXECUTIVE BRANCH OF THE PROVISIONAL INSTITUTIONS OF SELF-GOVERNMENT IN KOSOVO REGULATION NO. 2001/19 UNMIK/REG/2001/19 13 September 2001 ON THE EXECUTIVE BRANCH OF THE PROVISIONAL INSTITUTIONS OF SELF-GOVERNMENT IN KOSOVO The Special Representative of the Secretary-General, Pursuant

More information

POLLUTION POTENTIAL OF GROUND- WATER RESOURCES IN ANTALYA CITY

POLLUTION POTENTIAL OF GROUND- WATER RESOURCES IN ANTALYA CITY POLLUTION POTENTIAL OF GROUND- WATER RESOURCES IN ANTALYA CITY Mustafa Yildirim and Bulent Topkaya Akdeniz University, Department of Environmental Engineering, Topcular, 07200 Antalya, Turkey Presented

More information

Danube Facts and Figures. The Czech Republic (July 2007)

Danube Facts and Figures. The Czech Republic (July 2007) Danube Facts and Figures The (July 2007) General Overview The is situated at the roof of Europe, and its waters are drained through rivers into three different seas. The major part of the territory is

More information

SWOT ANALYSIS FOR THE PILOT RIVER BASIN: Irminio River Basin

SWOT ANALYSIS FOR THE PILOT RIVER BASIN: Irminio River Basin Project cofinanced by European Regional Development Fund Project cofinancé par le Fonds européen de développement régional 1G-MED08-515 Sustainable Water Management through Common Responsibility enhancement

More information

Morava River Basin - Slovakia

Morava River Basin - Slovakia Morava River Basin - Slovakia Pavel Hucko 1 General description of the basin Slovak territory Morava river basin is bounded River basin districts of the Slovak Republic and their sub-basins White Carpathians

More information

Casework Technical Support (Social Welfare - Project Management)

Casework Technical Support (Social Welfare - Project Management) Casework Technical Support (Social Welfare - Project Management) Request for Tenders for Services to MABS NATIONAL DEVELOPMENT The latest date for receipt of tenders is 09 June 2017 Commercial House Westend

More information

Susan P. Abano Engineer IV Policy and Program Division

Susan P. Abano Engineer IV Policy and Program Division National Water Resources Board Integrated Water Resources Management Susan P. Abano Engineer IV Policy and Program Division National Water Resources Board Outline Philippines Water Resources Situationer

More information

Environmental Hot Spot Remediation

Environmental Hot Spot Remediation Environmental Hot Spot Remediation Dragana Vidojevic Ministry of Environment, Mining & Spatial Planning Environmental Protection Agency Republic of Serbia Republic of Serbia The Republic of Serbia is located

More information

Benefits of investing in water and sanitation

Benefits of investing in water and sanitation Benefits of investing in water and sanitation OECD Expert Meeting on Water Economics and Financing Paris, 17 th March 2010 Sophie Trémolet sophie@tremolet.com 1 Introduction Report objectives Synthesise

More information

Table 5-1: Availability of Public Sanitary Sewer. Are plans underway to provide Public Sewer?

Table 5-1: Availability of Public Sanitary Sewer. Are plans underway to provide Public Sewer? CHAPTER 5: PUBLIC SANITARY SEWER AND PRIVATE WASTEWATER DISPOSAL; PUBLIC WATER SERVICE AND PRIVATE WELLS Public Sanitary Sewer The presence or absence of public sanitary sewer service is a major factor

More information

Clackamas County Septic Systems 101. Brannon Lamp, REHS

Clackamas County Septic Systems 101. Brannon Lamp, REHS Clackamas County Septic Systems 101 Brannon Lamp, REHS What is a Septic System? Definition of Septic : Infected with Bacteria. Hmmm What does a Septic System Do? Treatment Disposal Dispersal Recycling

More information

WASTEWATER AND STORM DRAINAGE REGULATION

WASTEWATER AND STORM DRAINAGE REGULATION Province of Alberta ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT WASTEWATER AND STORM DRAINAGE REGULATION Alberta Regulation 119/1993 With amendments up to and including Alberta Regulation 170/2012 Office

More information

Economic and Social Council

Economic and Social Council UNITED NATIONS E Economic and Social Council Distr. GENERAL E/CN.4/Sub.2/2005/25 11 July 2005 ENGLISH Original: FRENCH COMMISSION ON HUMAN RIGHTS Sub-Commission on the Promotion and Protection of Human

More information

DRAFT. DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Standards and Facility Regulation

DRAFT. DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Standards and Facility Regulation DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Standards and Facility Regulation DOCUMENT ID: 362-2206-002 TITLE: EFFECTIVE DATE: AUTHORITY: POLICY: PURPOSE: APPLICABILITY: DISCLAIMER: PAGE LENGTH:

More information

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination WATER ELEMENT INTRODUCTION Water is one of the most critical resources for the Merced County economy and for the quality of life of its residents. Both surface water and groundwater supplies are an important

More information

Ex Post-Evaluation Brief Macedonia: Environmental Protection - Lake Ohrid

Ex Post-Evaluation Brief Macedonia: Environmental Protection - Lake Ohrid Ex Post-Evaluation Brief Macedonia: Environmental Protection - Lake Ohrid Programme/Client Environmental Protection - Lake Ohrid BMZ No: 1999 65 195 (main investment) Programme executing agency PROAQUA

More information

HISTORY

HISTORY HISTORY Protecting the environment and meeting all requirements of the national and the EU legislation in this area are a major priority and inseparable part of the business strategy of Sofiyska Voda JSC.

More information

CIRCULAR GENERAL PROVISIONS

CIRCULAR GENERAL PROVISIONS MINISTRY OF CONSTRUCTION -------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No. 10/2013/TT-BXD Hanoi, July 25, 2013 CIRCULAR ON CONSTRUCTION QUALITY MANAGEMENT Pursuant

More information

Proposed New 18 CFR Part Hydraulic Fracturing in Shale and Other Formations:

Proposed New 18 CFR Part Hydraulic Fracturing in Shale and Other Formations: Proposed New 18 CFR Part 440 - Hydraulic Fracturing in Shale and Other Formations: SUBCHAPTER B SPECIAL REGULATIONS * * * * PART 440 HYDRAULIC FRACTURING IN SHALE AND OTHER FORMATIONS Sec. 440.1 Purpose,

More information

Tackling Non-point Source Water Pollution in British Columbia

Tackling Non-point Source Water Pollution in British Columbia Water Quality Clean Water Tackling Non-point Source Water Pollution in British Columbia Our well-being depends on sustainable supplies of clean water for our physical health and for a healthy environment

More information

Water Account, Mauritius 2013

Water Account, Mauritius 2013 Republic of Mauritius Water Account, Mauritius 2013 Statistics Mauritius, Ministry of Finance and Economic Development June 15 Contents Foreword... III List of Symbols and Abbreviations... IV 1. Introduction...

More information

EU Membership and Water Quality in Malta. Q&A Fact File

EU Membership and Water Quality in Malta. Q&A Fact File EU Membership and Water Quality in Malta. Q&A Fact File Why Does the EU Have a Policy on Water? Because water resources are very limited and are often much polluted. Recent statistics show that industry

More information

SPP TENDER MODEL. Green Electricity. Joint procurement of 700 GWh green electricity in Catalonia

SPP TENDER MODEL. Green Electricity. Joint procurement of 700 GWh green electricity in Catalonia SPP TENDER MODEL Green Electricity Joint procurement of 700 GWh green electricity in Catalonia Contracting authority: Contract: Catalan Association of Towns and Counties Framework agreement for the supply

More information

Integrated Watershed Management Plan

Integrated Watershed Management Plan mighty peace watershed alliance Integrated Plan SUMMARY What is the Plan? The Mighty Peace Alliance (MPWA) supports the three goals of Alberta s Water for Life Strategy: safe secure drinking water, healthy

More information

OAKLAND COUNTY HEALTH DIVISION SANITARY CODE ARTICLE II - GROUNDWATER PROTECTION

OAKLAND COUNTY HEALTH DIVISION SANITARY CODE ARTICLE II - GROUNDWATER PROTECTION OAKLAND COUNTY HEALTH DIVISION SANITARY CODE ARTICLE II - GROUNDWATER PROTECTION INDEX OF CODE SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 DEFINITIONS RESIDENTIAL BUILDING SITES COMMERCIAL

More information

REGULATIONS FOR EXTENSION, EVALUATION AND USE OF MUNICIPAL SANITARY SEWERAGE SYSTEMS IN THE TOWN OF BURLINGTON

REGULATIONS FOR EXTENSION, EVALUATION AND USE OF MUNICIPAL SANITARY SEWERAGE SYSTEMS IN THE TOWN OF BURLINGTON REGULATIONS FOR EXTENSION, EVALUATION AND USE OF MUNICIPAL SANITARY SEWERAGE SYSTEMS IN THE TOWN OF BURLINGTON Adopted By The Burlington Water Pollution Control Authority ARTICLE I AUTHORITY These regulations

More information

National Water Demand Management Policy

National Water Demand Management Policy National Water Demand Management Policy Introduction In 1997, the Ministry of Water and Irrigation developed Jordan s Water Strategy and the following four policies, which include: Water Utility Policy;

More information

CERTIFICATION AND FINANCING PROPOSAL

CERTIFICATION AND FINANCING PROPOSAL CONSTRUCTION OF A WASTEWATER COLLECTOR NUEVO CASAS GRANDES, CHIHUAHUA Submitted: May 31, 2013 CERTIFICATION PROPOSAL CAP GRANT, NUEVO CASAS GRANDES, CHIH. CONSTRUCTION OF A WASTEWATER COLLECTOR NUEVO CASAS

More information

WASTEWATER DEPARTMENT CITY OF MANNHEIM

WASTEWATER DEPARTMENT CITY OF MANNHEIM WASTEWATER DEPARTMENT CITY OF MANNHEIM TABLE OF CONTENTS Key dates Locations und employees Organisation Distribution of staff Wastewater charges and expenses Expense distribution Sewage disposal Sewerage

More information

GUIDELINES FOR THE REALIZATION OF THE RIGHT TO DRINKING WATER AND SANITATION

GUIDELINES FOR THE REALIZATION OF THE RIGHT TO DRINKING WATER AND SANITATION GUIDELINES FOR THE REALIZATION OF THE RIGHT TO DRINKING WATER AND SANITATION in Realization of the Right to Drinking Water and Sanitation, Report of the Special Rapporteur, El Hadji Guissé, United Nations

More information

This project will support the development of a sewerage service targeting districts not

This project will support the development of a sewerage service targeting districts not Ex-Ante Evaluation 1. Name of Project Country: The Republic of Indonesia Project: Denpasar Sewerage Development Project (II) Loan Agreement: March 28, 2008 Loan Amount: 6,004 million yen Borrower: The

More information

final report Water quality improvement strategy for a processing site

final report Water quality improvement strategy for a processing site final report Project title: Water Quality Improvement Strategy Project code: P.PSH.0449 Prepared by: GHD Date published: July 2010 PUBLISHED BY Meat & Livestock Australia Limited Locked Bag 991 NORTH SYDNEY

More information

DURATION : 30 working days over the period 20 September November 2016

DURATION : 30 working days over the period 20 September November 2016 Terms of Reference for the recruitment of a national consultant for the formulation of a Project Document on Inclusive Development and Public Sector Efficiency under the Pillar 1 of the UNDP Country Programme

More information

. ARUSHA URBAN WATER SUPPLY AND SANITATION AUTHORITY (AUWSA)

. ARUSHA URBAN WATER SUPPLY AND SANITATION AUTHORITY (AUWSA) . ARUSHA URBAN WATER SUPPLY AND SANITATION AUTHORITY (AUWSA) ENVIRONMENT STATISTICS IN SUPPORT OF THE IMPLEMENTATION OF THE FRAMEWORK FOR THE DEVELOPMENT OF ENVIRONMMENT (FDES 2013) PRESENTED BY MKAMA

More information

TITLE OF CONSULTANT: Individual Consultant (IC) to Develop a Strategic Plan and Implementation Program for Business Botswana

TITLE OF CONSULTANT: Individual Consultant (IC) to Develop a Strategic Plan and Implementation Program for Business Botswana INDIVIDUAL CONSULTANT PROCUREMENT NOTICE 19 th December 2017 TITLE OF CONSULTANT: Individual Consultant (IC) to Develop a Strategic Plan and Implementation Program for Business Botswana COUNTRY: BOTSWANA

More information

OVERVIEW CAPACITY & CONDITION

OVERVIEW CAPACITY & CONDITION OVERVIEW The nation s 14,748 wastewater treatment plants protect public health and the environment. Years of treatment plant upgrades and more stringent federal and state regulations have significantly

More information

Subsequent to these early efforts, the complexities associated with potable water provision have increased significantly.

Subsequent to these early efforts, the complexities associated with potable water provision have increased significantly. 10.1 INTRODUCTION The reliable supply, treatment and distribution of potable water is vital to the health, safety and welfare of urban areas. The citizens and officials of the have long been involved with

More information

2: 2008/ SPECIFIC TERMS OF REFERENCE

2: 2008/ SPECIFIC TERMS OF REFERENCE EUROPEAID/119860/C/SV/multi LOT N o 2: Transport and Infrastructure REQUEST N o : 2008/161763 SPECIFIC TERMS OF REFERENCE For The Preparation of a Twinning Project Fiche /Technical Assistance Tender Dossier

More information

WATER AND SEWER SYSTEMS ASSISTANCE ACT - ENACTMENT Act of Jul. 9, 2008, P.L. 915, No. 64 Cl. 71 AN ACT

WATER AND SEWER SYSTEMS ASSISTANCE ACT - ENACTMENT Act of Jul. 9, 2008, P.L. 915, No. 64 Cl. 71 AN ACT WATER AND SEWER SYSTEMS ASSISTANCE ACT - ENACTMENT Act of Jul. 9, 2008, P.L. 915, No. 64 Cl. 71 AN ACT Authorizing the incurring of indebtedness, with the approval of the electors, of $400,000,000 for

More information

TERMS OF REFERENCE KAZAKHSTAN: ASTANA WATER - FEASIBILITY STUDY

TERMS OF REFERENCE KAZAKHSTAN: ASTANA WATER - FEASIBILITY STUDY TERMS OF REFERENCE KAZAKHSTAN: ASTANA WATER - FEASIBILITY STUDY 1. BACKGROUND The State Communal Enterprise Astana Su Arnasy (the Company ) supported by the Akimat of Astana (the Akimat ) approached the

More information

4 Desired Levels of Service (LOS)

4 Desired Levels of Service (LOS) 4 Desired Levels of Service (LOS) LOS are a key business driver and influence all asset management decisions. LOS statements describe the outputs Halton intends to deliver to its residents and commonly

More information

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS Sec. 26.001. DEFINITIONS. As used in this chapter: (1)

More information

Applicants Manual PART 4: APPLICATION AND ASSESSMENT. for the period A stream of cooperation. Version 1.1

Applicants Manual PART 4: APPLICATION AND ASSESSMENT. for the period A stream of cooperation. Version 1.1 Applicants Manual for the period 2014-2020 Version 1.1 PART 4: APPLICATION AND ASSESSMENT edited by the Managing Authority/Joint Secretariat Budapest, Hungary, 2016 A stream of cooperation Programme co-funded

More information

Potable Water Supply, Wastewater & Reuse Element

Potable Water Supply, Wastewater & Reuse Element Potable Water Supply, Wastewater & Reuse Element GOAL ONE: HIGH QUALITY AND AFFORDABLE POTABLE WATER WILL BE AVAILABLE TO MEET THE EXISTING AND PROJECTED DEMANDS OF PINELLAS COUNTY UTILITY CUSTOMERS. 1.1.

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Kingdom of Morocco Project: Sewerage System Development Project (III) Loan Agreement: March 26, 2013 Loan

More information

Provincial Policy Statement 2014 Training Aid

Provincial Policy Statement 2014 Training Aid This job aid has been developed for education and training purposes as a high-level summary of the policy changes in the PPS 2014. It should not be relied upon as a substitute for specialized legal or

More information

Service Delivery Indicators for Strengthening Local Monitoring of Rural Water Service Delivery in Uganda

Service Delivery Indicators for Strengthening Local Monitoring of Rural Water Service Delivery in Uganda BRIEFING PAPER November 2014 Service Delivery Indicators for Strengthening Local Monitoring of Rural Water Service Delivery in Uganda Points for action Ministry of Water and Environment (MWE) to adopt

More information

Water Security Agency. Plan for saskatchewan.ca

Water Security Agency. Plan for saskatchewan.ca Water Security Agency Plan for 2016-17 saskatchewan.ca Table of Contents Statement from the Minister... 1 Response to Government Direction... 2 Operational Plan... 3 Highlights... 8 Financial Summary...

More information

BOARD CHARTER TOURISM HOLDINGS LIMITED

BOARD CHARTER TOURISM HOLDINGS LIMITED BOARD CHARTER TOURISM HOLDINGS LIMITED INDEX Tourism Holdings Limited ( thl ) - Board Charter 2 1. Governance at thl 2 2. Role of the Board 3 3. Structure of the Board 4 4. Matters Relating to Directors

More information

PROJECT INFORMATION FORM Part A - General information

PROJECT INFORMATION FORM Part A - General information Part A - General information Country Serbia and Montenegro, Republic of Montenegro Sector WATER Project submission Date Project title 3 March 2003 Project Code (filled by the REC) MN-8 CONSTRUCTION OF

More information

Nutrients and Water Quality in the East Souris River Watershed

Nutrients and Water Quality in the East Souris River Watershed Nutrients and Water Quality in the East Souris River Watershed Phosphorus and nitrogen occur naturally and are important plant nutrient sources in water bodies. However, several human factors have created

More information

Northern Region Small Towns Water and Sanitation Project (NORST)

Northern Region Small Towns Water and Sanitation Project (NORST) Northern Region Small Towns Water and Sanitation Project (NORST) Canadian Consulting Engineering Awards 2017 PROJECT INFORMATION Project Name: Location: Year Completed: Entering Firms: Role of Firm: Northern

More information

R R K RETURN AND REINTEGRATION IN KOSOVO. Contract number: CRIS 2008/ FINAL REPORT (March 2011)

R R K RETURN AND REINTEGRATION IN KOSOVO. Contract number: CRIS 2008/ FINAL REPORT (March 2011) R R K RETURN AND REINTEGRATION IN KOSOVO Contract number: CRIS 2008/ 162 519 FINAL REPORT (March 2011) Return and Reintegration in Kosovo An EU funded project managed by the European Commission Liaison

More information

Wastewater Treatment & Water Supply Alternatives Analysis

Wastewater Treatment & Water Supply Alternatives Analysis Wastewater Treatment & Water Supply Alternatives Analysis Lake Sallie & Lake Melissa Chain of Lakes Prepared for Pelican River Watershed District February 2008 Table of Contents 1.0 EXECUTIVE SUMMARY...

More information

Office of Climate Change Guyana September TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE

Office of Climate Change Guyana September TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE Office of Climate Change Guyana September 2017 TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE TRANSPORTATION SECTOR ENERGYAUDIT IN BARTICA 1. INTRODUCTION AND

More information

Water Recycling and Reuse

Water Recycling and Reuse Water Recycling and Reuse WATER RECYCLING Water recycling is reusing treated wastewater for beneficial purposes such as agricultural and landscape irrigation, industrial processes, toilet flushing, and

More information

Black Sea / Danube Basin

Black Sea / Danube Basin Animal Waste Management on Farms and Slaughterhouses in the Black Sea and Danube Basin Tijen Arin, ECSSD Black Sea / Danube Basin Animal waste from livestock farms and slaughterhouses reaches water courses

More information

Syracuse General Redevelopment Plan Study Areas #1-3

Syracuse General Redevelopment Plan Study Areas #1-3 2010 Syracuse General Redevelopment Plan Study Areas #1-3 JEO Consulting Group, Inc. SYRACUSE GENERAL REDEVELOPMENT PLAN STUDY AREAS 1-3 Introduction/Background INTRODUCTION The Syracuse General Redevelopment

More information

Memorandum of Understanding for an Adaptive Management Pilot Project in the Yahara Watershed

Memorandum of Understanding for an Adaptive Management Pilot Project in the Yahara Watershed Memorandum of Understanding for an Adaptive Management Pilot Project in the Yahara Watershed 1. Background The Wisconsin Department of Natural Resources (WDNR or the department) has developed numeric water

More information

The National Statistical System in Italy. Coordinating function of Istat and the quality of statistics operations in the system

The National Statistical System in Italy. Coordinating function of Istat and the quality of statistics operations in the system The National Statistical System in Italy. Coordinating function of Istat and the quality of statistics operations in the system Presentation outline The Italian national statistical system: institutional

More information

INTERGOVERNMENTAL COORDINATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

INTERGOVERNMENTAL COORDINATION ELEMENT GOALS, OBJECTIVES, AND POLICIES INTERGOVERNMENTAL COORDINATION ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 8 To provide accessible, effective and frequent intergovernmental opportunities to achieve consistency among all government agencies

More information